1 Quality plan of IRIS SPES-3 Project Massimo Orsi, Stefano Botti Report RSE/2009/72
2 Ente per le Nuove tecnologie, l Energia e l Ambiente RICERCA SISTEMA ELETTRICO Quality plan of IRIS SPES-3 Project Massimo Orsi, Stefano Botti Report RSE/2009/72
3 Massimo Orsi, Stefano Botti (SIET) Maggio 2008 Report Ricerca Sistema Elettrico Accordo di Programma Ministero dello Sviluppo Economico ENEA Area: Produzione e fonti energetiche Tema: Nuovo Nucleare da Fissione Responsabile Tema: Stefano Monti, ENEA
4 Page 2 of 30 SUMMARY 1. INTRODUCTION 1.1 The SIET Company 1.2 The SIET Quality System 1.3 The IRIS Project 1.4 Job description 2. THE QUALITY PLAN 2.1 Scope and applicability 2.2 Contractual documents ENEA documents QA reference documents SIET documents Other documents 2.3 SIET Organization Director of Operation Production Responsible Project Leader Quality Manager Project Controller Task Responsible Instrumentation, Data Acquisition & Control, Electrical power components Thermal-hydraulic and mechanical structures build-up competences Instrumentation calibration Test facility operation Technical personnel experience and training 2.4 Project time schedule 2.5 Document Plan 2.6 Design Record File 2.7 Quality Assurance Activity
5 Page 3 of INTRODUCTION 1.1 The SIET Company SIET (Società Informazioni Esperienze Termoidrauliche) is a Research/Testing Company whose main programs concern the thermal-hydraulic experimentation on Nuclear Power Plants components and systems. SIET, whose facilities are located in Piacenza (60 km south of Milan), employs twenty people including seven engineers with university degree and has a net turnover of about three million US dollars per year. Most of the SIET experiences are performed at real thermodynamic conditions on large-scale test sections with respect to the reference plants. They cover a quite large extent of applications as for instance: - experimental studies on integral systems (PWR simulators) for code assessment; - experimental studies on critical heat flux, void fraction and pressure drops in tubes, annuli and fuel bundles of LWRs; - heat transfer in PWR Steam Generators; - efficiency measurements of full scale steam-water separators of both PWR Steam Generators and Boiling Water Reactors; - experimental qualification of Innovative Passive Safety System for ALWR; - performance test on Steam Injector for ALWR applications; - high heat flux test (up to 50 MW/m 2 ) related to the thermal-hydraulic design of the Fusion Reactor Tokamak. The main SIET programs performed in the past concerned: - the Certification Program of the Westinghouse AP-600 Reactor carried out on the SPES-2 plant, an integral facility simulating all the reference reactor primary and safety system (20 MPa 365 C design condition, 1:400 volume and power scaling factor, full elevations); - the experimental qualification of full-scale prototypes of the Isolation Condenser (IC) and the Passive Containment Condenser (PCC) for the GE Simplified Boiling Water Reactor (SBWR).
6 Page 4 of 30 Furthermore the SIET Company is usually involved also in non-nuclear activities as for instance experimental qualification/certification of conventional power plant or process plant components (heat exchanger, pumps, valves, etc.). Moreover SIET is able to perform the calibration of different instrumentation typologies in its instrument calibration laboratory. 1.2 The SIET Quality System All above described SIET testing and calibration activities are performed in compliance with the requirements of an internal Quality System with the primary goal to satisfy the needs and expectations of its clients, the accreditation bodies and the regulatory boards. This Quality System fulfils the requirements of UNI EN ISO 9001:2000, ASME NQA-1 and UNI EN CEI ISO/IEC international standards and it is certified by the Certification Body DNV (Det Norske Veritas Italia srl). This certification covers the main SIET activities, in particular, all the service provision of thermo-fluid dynamic and mechanical testing on components/systems of power plants, process plants and fluid distribution plants. The design and construction of the testing facilities used for the conduction of all the testing are also included in the same certification. A copy of the DNV certificate is reported in Attachment 1. The SIET Laboratory is also accredited by SIT, the Italian Calibration Service, for the calibration of instruments for temperature measurements. A copy of the SIT certificate of accreditation is reported in Attachment 2. The provision of the calibration service, both in house and on site, of instruments for measurements of pressure, temperature, fluid flow rate and velocity, heat, humidity, mass, fluid density and viscosity, time, force and torque, electrical parameters, length, acoustic parameters is covered by the above mentioned DNV certification.
7 Page 5 of 30 The general features of this Quality System is described in the SIET Quality Manual (document 00001QQ90, III a Edition, Revision 0) which represents the First Level document. This Quality Manual deal with the policy, principles, organization, responsibilities and relationships among the different internal units, the processes, resources, programmes, procedures and actions which are applied within the company in order to achieve the quality objectives set by the Top Management Team in accordance with the reference standards. This Quality Manual is compiled and updated by the Quality Manager and approved by the Director of Operation. The QA Manager is responsible for ensuring that the managerial and technical procedures are consistent with all the major rules outlined in this Quality Manual and should guarantee conformity between the contents of all QA documents issued by the Company. The Quality Manual is distributed by the Quality Department through Distribution Lists. A table of contents of SIET Quality Manual, including a cross reference among the different type of reference standards (UNI EN ISO 9001:2000, ASME NQA-1 and UNI EN CEI ISO/IEC 17025), is reported in Attachment 3. The Second Level documents of the SIET Quality System include both the QA procedures describing in details the main processes and activities, as: - organization (00005QQ94) - document control (00002QQ92, 00012QQ95) - measurement equipments (00003QQ92) - internal audits (00007QQ92) - plant control (00008QQ94, 00009QQ94, 00011QQ95) - customer complaints (00017QQ99) - non conformity (00018QQ02) - corrective and preventive actions (00019QQ02) - job management (00023QQ06)
8 Page 6 of 30 - business process management (00025QQ06) - design process management (00026QQ06) - procurement process management (00027QQ06) - communication and correspondence processes management (00028QQ06) and the Quality Plans which are usually issued for specific testing activities in order to describe how the SIET structure and Quality System conform with specific contractual requests. Examples are the followings: - Quality Plans for product certification testing (00004QQ92, 00016QQ99) - Quality Plan for calibration activity (00010QQ95) - Quality Plans for steam water separator testing (00013QQ95, 00015QQ98, 00020QQ03, 00021QQ04) - Quality Plan for steam generator testing (00014QQ96) The Third Level documents of the SIET Quality System include operating procedures and quality records. Examples are the followings: - Test Plan & Procedures - calibration procedures and working instructions (reference list of documents 00367ED94) - check lists - audit reports, management reviews, etc. In the framework of the IRIS Project described in detail in the following Section 1.3, the activities performed by SIET, summarized in Section 1.4, takes upon characteristics of great complexity, both technical and managerial. For this reason the SIET Management decided to issue a specific Quality Plan, which characteristics are fully described in Section 2, with the main objective to support and complete the SIET QA System and to guarantee the compliance of the requirements of the applicable contractual documents.
9 Page 7 of The IRIS Project Among the many new designs that have been proposed in these recent years at the sight of a possible nuclear power renaissance, IRIS (International Reactor Innovative and Secure) is the one that has moved most rapidly from an idea to the preliminary design. IRIS is a small-scale advanced grid appropriate pressurized water reactor with an integral configuration: all primary system component (i.e.: pumps, steam generators, pressurizer and control rod drive mechanism) are inside the reactor vessel. It is offered in configurations of single or multiple modules, each having a power rating of 1000 MWt (about 335 MWe). The IRIS program began in October 1999 as one of the winning proposal in the first Nuclear Energy Research Initiative (NERI) by the US Department of Energy (DOE) and it has since progressed through the conceptual design and moved to a stage in the preliminary design, which has allowed initiation of the licensing process, with the first meeting with the Nuclear Regulatory Commission (NRC) on pre-application licensing held in October IRIS is a very advanced reactor design with many new features, especially in the safety area, but at the same time its technology is grounded on well-proven and universally familiar water reactor experience. The IRIS design was conceived to satisfy the four objectives stated by the DOE for the new generation reactors: improved proliferation resistance, enhanced safety, improved economics and reduced waste. Distinguishing and defining characteristics of IRIS are: - integral configuration, which, to a greater or lesser degree, addresses all the four a.m. objectives; - the capability of employing high burnup, long-life cores, wich, together with the capability of operating four years without shutdown for maintenance, addresses the proliferation-resistance requirement and increases the capacity factor and decreases the operation and maintenance costs; - integral configuration design, which practically eliminates small-to-medium loss of coolant accidents as a safety concern;
10 Page 8 of 30 - the safety by design approach, where, rather than coping with their consequences, accidents are eliminated from occurring. IRIS is an international Project with partnership of industry, research organizations, academia, and power producers from the countries as follows: USA, Italy, UK, Spain, Mexico, Brazil, Japan, and Croatia. 1.4 Job description The IRIS licensing process required by the US Nuclear Regulatory Commission (NRC) foresees a series of experimental tests on properly built facilities suitable to verify the capabilities of the new plant and its safety systems to cope with postulated accidents. One of the most important experiments to be performed in the framework of the reactor licensing process is the so called Integral Test. It consists of an experimental campaign to be performed on a large scale test facility properly simulating all the safety related systems of the reference reactor. Such facility, named SPES-3, will be built at SIET laboratories with 1:100 volume scaling factor and with a full scale in elevation with respect to the IRIS reactor. It will be suitable to perform both integral and separate effect tests and will allow to investigate the thermal hydraulic interaction among the various systems (primary and secondary systems, containment, safety systems, etc.). The primary goal of testing on the SPES3-IRIS facility is to demonstrate the vessel to containment coupling as the main safety issue of IRIS plant in mitigating small break LOCAs. The SPES-3 facility will be built by using both the existing auxiliary system and infrastructures of the SIET SPES-2 facility (already used in the past for the Westinghouse AP- 600 reactor certification programs) as much as possible. The SIET role in the SPES-3 Project concerns the design, procurement, manufacturing, installation of all the facility components with exception of the reactor simulator (including the relevant auxiliary components) and the special instrumentation. Furthermore SIET will
11 Page 9 of 30 conduct the facility commissioning, the facility operation for matrix tests, data validation and reporting. Moreover SIET will be involved in both the pre-test and post-test calculations by using the RELAP-5 code. All the above mentioned activities will be funded by ENEA in the framework of the agreement between ENEA and the Italian Ministry of the Economic Development. More in detail the SIET scope of supply concerns the works as follows: a) Quality Plan issue b) conceptual design of the SPES-3 facility; c) pre-test analysis by using the Relap-5 code in support of both the SPES-3 conceptual design and test procedures; d) design of the SPES-3 facility; e) removal of SPES-2 facility components; f) modification and set up of the facility auxiliary systems; g) issue of the SPES-3 facility components technical specification; h) procurement of the facility components (except the reactor simulator and special instrumentation); i) installation of the components (except the reactor simulator and special instrumentation), setting up the facility; j) conduction of the facility commissioning; k) conduction of the matrix tests; l) post test calculations.
12 Page 10 of THE QUALITY PLAN Within the IRIS SPES-3 Project all the activities pertaining to SIET shall be strictly carried out following the requirements of its Quality System whose representative structure and documentation are summarized in Section 1.2. The present Quality Plan has to be considered a part of the SIET QA System having as main objectives to implement the specific requests included in the applicable parts of the contractual documents, to take into consideration the characteristics of this job and to manage the of Project items able to assure the quality of the final results. The following sections represent a detailed description of the peculiarities of this Quality Plan. 2.1 Scope and applicability Within the SIET job this Quality Plan applies to all the IRIS SPES-3 Project phases and establishes as major objectives to: - specify the applicable contractual documents both for Technical and Quality Assurance requirements to be fully comply with; - arrange a detailed internal organization fixing duties and responsibilities of SIET involved personnel; - define the criteria for the issue, the periodical revision and the proper application of a Project Time Schedule; - plan a set of documents (Document Plan) to be issued according to the contractual documents and the time schedule;
13 Page 11 of 30 - guarantee the recording of all information affecting the quality of results through all the Project phases and its quick traceability by the arrangement of an efficient Design Record File (document archive); - set up an independent quality asurance control able to assure the compliance to the requirements of the applicable contractual documents; - include a detailed cross reference among the QA contractual documents and the sections of the SIET Quality Manual to put in evidence the fulfilment of all QA requirements and supply a tool able to define where each QA argument is described. A copy of this Quality Plan shall be distributed to the SIET Management and to all SIET personnel involved in the IRIS SPES-3 Project. 2.2 Contractual documents ENEA documents In the framework of a R&D multi-annual program between ENEA and MSE (Italian Ministry of Economical Development) having many subjects, including the study of the new generation Nuclear Power Plants based on fission technology, ENEA and SIET drew up a research contract for the activities on the IRIS (International Reactor Innovative & Secure) integral test (First Annual Plan). At the time of writing of the present Quality Plan, the only available contractual documents issued by ENEA are the following: a) Research contract between ENEA and SIET (ENEA Letter prot. No ENEA/2008/16706/FPN) b) Technical specification ENEA (attached to the above mentioned research contract)
14 Page 12 of 30 These two documents refer to the execution of the first annual plan of the above mentioned ENEA-MSE agreement. In particular, this plan includes the design of the IRIS experimental simulator, the preliminary works to prepare the installation area of this new facility at the SIET laboratory in Piacenza (Italy) and the first phase of the facility auxiliary systems setup. A third reference document (to be issued) for the IRIS-SPES3 design and manufacturing is: c) IRIS Integral System Test Specification The list of ENEA contractual documents described in this clause of the Quality Plan shall be updated every time a new documents will be issued. A copy of the contractual documents shall be distributed to the SIET Personnel as follows: - Managing Director and President; - Director of Operation; - Production Responsible; - IRIS-SPES3 Project Leader. The contractual documents will be recorded in the Design Record File QA reference documents The applicable requirements of the following QA reference documents shall be fulfill. d) UNI EN ISO 9001: Quality Management System. Requirements; e) UNI EN CEI ISO/IEC 17025: General requirements for the competence of testing and calibration laboratories; f) ASME NQA-1 - Quality assurance program requirements for nuclear facilities; g) 10CFR50 Appendix B - Quality assurance criteria for nuclear power plants and fuel reprocessing plants.
15 Page 13 of 30 A copy of the QA documents f) and g) shall be distributed to the SIET Personnel as follows: - Director of Operation; - Production Responsible; - IRIS-SPES3 Project Leader; - QA Responsible. These documents will be recorded in the Design Record File. A copy of the QA documents d) and e) are already available to the SIET Personnel according to the criteria defined in the SIET QA System. They will not be recorded in the Design Record File SIET documents The applicable requirements of the following SIET documents shall be fulfill. h) 00001QQ90 Third Edition, Rev. 0 - Quality Manual; i) 00367ED94 - List of internal documents and procedures. A copy of the documents h) and i) are already available to the SIET Personnel according to the criteria defined in the SIET QA System. They will not be recorded in the Design Record File Other documents Some technical or management documents might be assumed as contractual documents during the IRIS SPES-3 Project as conseguence of the importance of their content provided that ENEA and SIET should agree. These documents will be stored in the Design Record File with the stamp AS C and the signature of ENEA and SIET Contract Responsibles.
16 Page 14 of SIET Organization The SIET general organization is described in Section of the Quality Manual and reported in the Organization Chart of Attachment 4 of this QA Plan. Responsibilities and duties of each Unit and Function are described in Section of the Quality Manual as well as in the operating quality procedure 00005QQ94 (Organization). A nominative SIET organization for the IRIS SPES-3 Project activity has been proposed by the Director of Operation (DO) and authorized by the Top Management (i.e: SIET Managing Director) through the issue of the present Quality Plan, according to our Quality System requirements. This operating Organization Chart is shown in Figure 1; its main functions are the following: - SIET Manager (DO) - Production Responsible (RP) - Project Leader (PL) - Responsible of Task (RT) - Responsible of Competence Unit (IEC, MEC, CAL, OPR) - QA Responsible (UGQ) - Project Controller (PC) At the time of this QA Plan issue, the ENEA-SIET contract scope of supply is limited to the following defined tasks: #1 Conceptual design of the SPES-3 experimental facility #2 Quality Plan issue #3 Pre-test calculation #4 Design of the SPES-3 test facility #5 SPES-2 removal #6 Auxiliary systems set-up (first phase) #7 Procurement of SPES-3 components (first phase).
17 Page 15 of 30 The Responsible of each task has been defined by RP in co-operation with DO and it is reported in the IRIS SPES-3 Project organization chart. Every time that a new task will be defined, RP, based on the characteristics of the activity, shall identify the relevant Responsible according to its qualification and experience; after the approval of DO, RP will inform all the personell involved in the IRIS SPES-3 Project organization without revising the organization chart. Additional technical competences have been identified for supporting the activities linked up with RP and PL. In particular, they refer to: - Instrumentation, Data Acquisition & Control System, Electrical Power Components - IEC - Thermal-Hydraulics, Mechanical Structures, Plant Build-up - MEC - Instrument Calibration - CAL - Test Facility Operation - OPR The specific responsibilities of each involved function have been defined to satisfy all the contractual requirements and the specific needs of IRIS SPES-3 Project specification and they are described in the following paragraphs Director of Operation The SIET Director of Operation (DO) has the authority and responsibility to spot, promote, plan, co-ordinate and supervise all IRIS SPES-3 Project activities. DO has the responsibility to arrange the programs, processes and resources necessary to carry out the quality policy and to achieve the defined aims referred to both technical and economical aspects, involvement of personnel and compliance with the requirements of the contractual documents and applicable standards, ensuring the quality of the provided services. DO relates directly to the Top Management Team.
18 Page 16 of Production Responsible The Production Responsible (RP) has the global responsibility of monitoring and controlling all the IRIS SPES-3 project acivities with the aim of satisfy the contractual requirements and to ensure that the customer needs, expectations and satisfaction are completely fulfilled. Operating in close joint effort with PL, the responsabilities of RP include: - the design of the integral test facility and pre-test analysis; - the supervision of the procurement of components, instrumentation, services, etc. both for the integral test facility and for the auxiliary systems; - the supervision of the assembly phases of the new integral test facility; - the design and updating of the operating test procedures; - the supervision of all the testing phase; - the definition of the Responsible of each Task; - the supervision and coordination of the SIET operating personnel involved in the different Tasks and Competence Units; - the approval of the contractual document issue; - the respect of time schedule; RP relates directly to DO Project Leader The Project Leader (PL), operating in co-operation with RP, has the responsibility for: - keeping up the relationships with ENEA (reference Contractor) and all the other involved subjects, as SIET representative; - attending, as SIET representative, to the conference calls involving the Contractor and the other participants to the IRIS SPES-3 project; - define those technical items arising during the conference calls that can have a basic impact on the activities performed by SIET or represent requirements equivalent to contractual documents;
19 Page 17 of 30 - opening and keep updating the Design Record File, as described in the following paragraph 1.6; - inform all the SIET personnel involved in the IRIS SPES-3 project about the technical decisions agreed during conference calls, IRIS meeting, communications, etc.; - supporting the acivities performed by each Task operating in cooperation with the relevant Responsibles; - supporting the activities of the Competence Units (IEC, MEC, CAL, OPR) for suppling with any technical requirements defined among SIET and all the other partners involved in the IRIS SPES-3 project. PL relates directly to RP Quality Manager The Quality Manager (UGQ) has the responsibility of the arrangement and the correct application of the present Quality Plan in compliance with the policy and aims established in the Quality Manual, with the requirements of internal operating procedures and applicable standards and with the needs of ENEA (Contractor). UGQ supervises all the phases of IRIS SPES-3 Project activity through controls, audits, interviews, document checks, etc. and guarantees his continuous presence during all the activities in order to identify all that could affect the quality of the final results. UGQ has the duty to inform DO of any aspect that could have a negative impact on the correctness of all the activities, on the quality of the provided service and of the efficiency of the quality system management and to suggest the most suitable corrective and preventive actions. UGQ leads internal audits as described in Section of Quality Manual and in the operating procedure 00007QQ92, in order to verify the application of the Quality System.
20 Page 18 of 30 Internal Audit reports are sent to all the SIET personnel involved in the IRIS SPES-3 Project activity and directly to DO. UGQ relates directly to DO Project Controller The Project Controller (PC), operating in close co-operation with RP and PL, has the responsibility of supervise the IRIS SPES-3 Project activities in terms of: - arrange periodical meetings involving all the functions of the IRIS SPES-3 Project organigram with the main scope of respecting the timing of the internal scheduled activities; - put in evidence those activities having a strong impact on the reference project time schedule which can affect the quality of the final results of the SIET activities: - prepare and distribute the relevant meeting minutes. PC relates directly to DO Task Responsible The Task Responsible has the main responsibility to perform the contractual activity operating under the supervision of RP and on the basis of the imput supplied by PL. The Task Responsible shall assure: - the quality of the activity in terms of respect of the requirements defined in the contractual documents; - the fulfilment of the time planning scheduled during the periodical meetings; - the issue of the final documents (when expected); - the submittion of the document to the verifiers and to the final approval responsible according to the Document Plan, as described in the following paragraph 2.5; - the final issue of the approved documents and their distribution;
21 Page 19 of 30 - the delivering of the document to PL for the final storage in the DRF and to all the others Companies/Person according to the agreed Distribution List; - the review of the documents after the comments of the Contractor or any other involved subjects. The Task Responsibles relate directly to RP and co-operate with PL Instrumentation, Data Acquisition & Control, Electrical power components The Responsible of the IEC Competence Unit, operating under the supervision of RP and on the basis of the imputs supplied by PL, has the main responsibility of: - define the technical specification for the instrumentation procurements to be used on the SPES-3 facility based on the requirements of the applicable technical documents and after the review of PL; - issue the orders for the instrumentation and follow their procurement in compliance with the time planning scheduled during the periodical meetings; - guarantee that the instrumentation procurement has no impact on the time schedule define by the Contractor; - installation of the instruments on the test facility and connection of the line/cable to the DAS; - define the technical specification for the DAS (Data Acquisition System) procurement, issue the relevant orders and follow their procurement; - define the technical specification for the procurement of the componnts of the Electrical Power System, issue the relevant orders and follow their procurement and installation. The Responsible of the IEC Competence Unit relates directly to RP.
22 Page 20 of Thermal-hydraulic and mechanical structures build-up competences The Responsible of the MEC Competence Unit (Technical Office), operating under the supervision of RP and on the basis of the imputs supplied by PL, has the main responsibility of: - thermal-hydraulic and mechanical design of the SPES-3 facility including auxiliary systems; - all the operations concerning the mechanical construction and/or modification of the SIET experimental plants to assure the required performances of the SPES-3 facility; - supervision of activity affering the procurement, construction and assembly of the testing equipments and facility, including the auxiliary systems; - issuing, updating and filing of all the drawings related to the experimental facility; - issue the final document (Plant Report), submit it to the verifiers and to the final approval responsible according to the Document Plan, as described in the following paragraph 2.5; - issue of the distribution of the approved document and their review; - supervise the activity of purchasing of products and services; - control the incoming components; - operate in cooperation with RP for any kind of technical items that can occur during the test facility design and assembly. The Responsible of the MEC Competence Unit relates directly to RP Instrumentation calibration The Responsible of the CAL Competence Unit (Technical Office), operating under the supervision of RP and in co-operation with the Responsible of the SIET calibration laboratory, has the main responsibility of: - prepare the list of the used instrumentation complete with its main characteristics; - assure that the used instruments shall be calibrated before their use on the testing facility with traceability to national or international primary instruments;
23 Page 21 of 30 - assure that those instrument not well operating will be replace without any impact on the testing schedule and guaranteeing the same quality of the final results. The Responsible of the CAL Competence Unit relates directly to RP Test facility operation The Responsible of the OPR Competence Unit, operating under the supervision of RP and in co-operation with its staff, has the main responsibility of: - performing all the actions described in the testing procedures; - managing of the plant and the SAD log - guarantee the efficiency of the plant components through a defined program of ordinary and extraordinary maintenance operations; - performing any other activity related to the safety items. The Responsible of the OPR Competence Unit relates directly to RP Technical personnel experience and training DO has identified the minimum qualification requirements for the SIET technical personnel. A detailed description for each function foreseen in the SIET general organization is available in the internal procedure 00005QQ94 (Organization), Section 5. This procedure also specifies the education and experience requirements to perform the main tasks and in Section 6 the personnel training procedure. A personal experience card reporting the professional experiences is available for each SIET personnel.
24 Page 22 of Project time schedule The Production Responsible (RP) in co-operation with the Project Leader (PL) issues a detailed Project Time Schedule (PTS) and defines the criteria of its periodical updating. For every single activity, each identified with a proper code, this Project Time Schedule shall include at least: - a concise description; - the initial and final date; - the responsible personnel or function, both for SIET and other involved subjects; - the necessity of the Customer (ENEA) approval; - the necessity of other approvals. When required, a single activity of the PTS shall be described with more detail using a proper time schedule. 2.5 Document Plan The Document Plan (DP) is the tool used by RP for controlling and managing the design of the IRIS SPES-3 Project. It contains the list of documents (Quality Plan, Test Plan & Procedures, Facility Report, Drawings, Analysis Report, Data Report, etc.) to be issued by SIET during the different phases of the IRIS SPES-3 Project which could affect the quality of the final results. It is updated as the project develops. For each planned document the Document Plan specifies the following information: - title and identification code; - drawing up, verifications and final approval responsibilities; - time schedule issuing; - authorization (when required); - distribution list.
25 Page 23 of 30 Section 4.2 of the SIET Quality Manual and the internal procedure 00002QQ92 (Documents Control) ensure the correct issue of the documents. RP assigns the responsibility of issuing, defines the list of the verifiers (qualified SIET experts) and the function in charge for approval of these documents and reports this information in the IRIS SPES-3 Project Document Plan. Results of the activities performed by each involved personnel (writer, verifiers and approver) are recorded on a Document Approval Sheet - FAD (Mod QQ/b). Some calculations and technical solutions can require additional check by a qualified SIET experts either or not directly involved in the IRIS SPES-3 Project activity. All the phases of this verification are planned and recorded in a Verification Cover Sheet (Mod QQ/c). Preliminary documents (draft version) can be issued and they shall be identified by a letter (A, B, etc.) and do not follow the approval procedure. Document approval and verification cover sheets are filed in the IRIS SPES-3 Project Design Record File (DRF) by PL. After each modification of a technical document SIET shall issue a new revision of the document following the same verification and approval procedure, as specify in the internal procedure 00002QQ92. The SIET documents shall be delivered according to the distribution list. ENEA or any other subject according to the contractual documents notifies its comments and approves the SIET documents by letter, fax or s. PL shall review the documents taking the comments into account and reports the reference detail of the approval letter, fax or on the front page of the documents.
26 Page 24 of Design Record File A Design Record File (DRF) will be opened and managed by PL in order to keep the full traceability of any information and to document the development of the IRIS SPES-3 Project activities (design and testing). The DRF is used to record and file all the documents received and issued by SIET, all the documents and approvals, letters, faxes, s between SIET and the other Companies involved in the IRIS SPES-3 Project, the verification cover sheets, drawings, procedures, deviations, corrective and preventive actions, QA audit, testing results, Reports and more generally any information that can affect the quality of the results of experimental activity. Documentation filed in the DRF is taken as official documents for the IRIS SPES-3 Project activity. Documents in the DRF are subdivided according to their subjects and issuing organization (IRIS SPES-3 Project Partecipants, SIET, others) and recorded in chronological order. The DRF is placed in a dedicated room to make its management easier, to avoid damages or losses and to prevent the access of unauthorized people. All the information in the DRF is kept for a five years period of time after date of the end of job. 2.7 Quality Assurance Activity A quality assurance control system able to assure the compliance to the requirements of the applicable contractual documents has been set up for the IRIS SPES-3 Project through the following activities. a) INSPECTIONS AND AUDITS
27 Page 25 of 30 Inspections and audits are carried out as described in Section (internal audits) of the SIET Quality Manual and following the requirements of the operating procedure 00007QQ92. An inspection program covering all the activities affecting the quality of the of the final results shall be planned by the SIET Quality Manager (UGQ) at the opening of the job. Following this program UGQ, or a deputed qualified person, shall carry out the planned audits and inspections to ensure that the Quality Manual, the Quality Plan and the applicable procedures are being applied as well as to assess their effectiveness. UGQ shall sets up the dates and the units to be inspected in agreement with RP usually considering the following aspects: - importance and extension of each activity; - duration of the single activity; - variations occurring during the contract; - corrective actions applied following previous audits; - intensity of surveillance from outside bodies. b) CONTROLS OF PURCHASED COMPONENTS The components and any other material directly procured by SIET shall be purchased according to the technical specifications and/or drawings attached to the SIET orders. At the receiving and before the installation on the plant, the SIET responsible of the purchase order shall check these components in order to verify the respect of their characteristics and their capability to correctly operate on the testing facility. The verifier shall report their signature on the technical specifications and/or drawings to documents this check. For all the other material and components not directly procured by SIET, RP shall perform an incoming control based on the same procedure.
28 Page 26 of 30 The instruction for incoming material control are reported in Section 7.4 (procurement process) of the Quality Manual and following the requirements of the operating procedure 00027QQ07. c) CONTROL OF MEASURING AND TEST EQUIPMENTS The responsible for the IRIS instrumentation, operating in cooperation with RP, shall have the duty to manage and control the measuring and test equipments according to the instruction reported in Section 7.6 (testing and measurement equipments) of the Quality Manual and following the requirements of the operating procedure 00003QQ92. This procedure specifies the methods for management of the measurement and control equipment used in SIET for the testing activities as well as the first and second line standard instruments used in the instrumentation laboratory for calibration verifications. Calibration of used instruments shall be performed according to appropriate SIET procedure (l00367ed94) and assuring the traceability to the national and/or international reference samples. Each instrument shall be identified by a code number that shall be reported on the instrument itself, on the instrument sheet together with all the other technical data (range, period of calibration validity, etc.). A detailed description of the instruments used for the testing activities shall be reported in the Test Plan & Procedur document. The instrument set used in each test shall be reported in the final Test Report.
29 Page 27 of 30 d) CONTROLS OF TEST PLANT CONFIGURATION A detailed test plant description shall be reported in the SIET Test Plan & Procedures (TP&P) document. The dimensions of the facility that can affect the test performances and the results of the tests shall be measured and verified according to the procedure 00011QQ95 (Test Plant Configuration Control). In this case a list of these critical dimensions shall be included in the TP&P. The control results of the plant configuration shall be directly marked out on the construction drawings together with the date of the check and the verifier signatures. The construction drawings and all the other records used to store the control results shall be filed in the DRF and they will be used during the data analysis phase. e) CONTROLS PRIOR TO AND DURING TESTING The tests on the IRIS SPES-3 integral test facility shall be performed according to SIET written procedures. Each test procedure shall include a pre-test check list and a test procedure check list to be used during the test performance. Preliminary controls shall be performed by OPR before the beginning of each test type by means of a specific check list in order to verify the correctness of the plant configuration. The evidence of this control shall be guaranteed by the signature of OPR in the dedicated area of the check list filed in DRF. Each test procedure shall include a detailed check-list with the main object to verify the correct performance of every test phase. The evidence of the performed actions shall
30 Page 28 of 30 be guaranteed by the signature of RC on the check list. At the end of each testing day this list shall be filed in the DRF. During the test performance RP can introduce some modifications in the test procedures in order to achieve the test results. In this case the modifications shall be recorded in the test procedure check list. The Client (ENEA) shall be informed of any deviation from the approved testing procedure. Any instrument replacement shall be recorded in the test DRF and reported in the instruments list. Each test shall be identified by: - date of execution - identification number All the test procedures and the test reports can be traceable through this set of identification number. f) CONTROLS OF TEST RESULTS Test validity shall be determined by the criteria specified in the TP&P document. An independent controls of the testing data shall be performed according to the criteria specified in the TP&P document. Preliminary data can be released to the Test Requestor (ENEA) at the end of each test for an additional control. At the end of these controls the final test results shall be reported in the Test Data Report as specified in TP&P document.
31 Page 29 of 30 Test Data Report shall be sent to Test Requestor (ENEA) for approval. g) NON CONFORMITIES, CORRECTIVE AND PREVENTIVE ACTIONS If during the controls described at clause 2.7, points a) to f), some non conformities should put in evidence on respect to the quality management system procedures, the applicable standards, the technical specifications and contractual requirements, they will be dealt as are described in section 8.3 of the Quality Manual and the procedure 00018QQ02 Specific or general corrective and/or preventive actions shall put into effect by UGQ, as a result of identified non-conformity arising during the controls a) to f). The operating details and the related responsibilities are described in section 8.5 of the Quality Manual and procedure 00019QQ02. Quality records, managed as described in Section 5 of the Quality Manual and procedure 00002QQ92, shall be maintained to furnish evidence of activities affecting quality.
32 Page 30 of 30 DO (SIET Director of Operations) G. Cattadori IEC S. Gandolfi (Responsible) INSTRUMENTATION DATA ACQUISITION & CONTROL ELECTRICAL POWER COMPONENTS UGQ M. Orsi PC Project Control S. Botti MEC A. Achilli (Leader, a.i.) C. Congiu, G. Filella (Staff) THERMAL-HYDRAULICS MECHANICAL STRUCTURES CAL S. Gandolfi (Responsible) SIET Calibration Lab Staff INSTRUMENTATION CALIBRATION OPR S. Gandolfi (Responsible) SPES-3 Operation Staff TEST FACILITY OPERATION RP (SIET Production Responsible) A. Achilli PL IRIS SPES3 Project Leader R. Ferri Figure 1 - IRIS SPES-3 Project Organization 1- CONCEPTUAL DESIGN R. FERRI 2- QUALITY PLAN M. ORSI 3- PRE-TEST CALCULATION R. FERRI 4- TEST FACILITY DESIGN A: ACHILLI 5- SPES-2 REMOVAL M. RIGAMONTI 6- AUX. SYSTEMS A. ACHILLI 7- PROCUREMENT S.BOTTI N- NEXT TASK
33 QUALITY PLAN FOR IRIS PROJECT Attachment 1 Page 1 of 1 ATTACHMENT 1 ISO 9001:2000 DNV CERTIFICATE FOR SIET COMPANY
34 QUALITY PLAN FOR IRIS PROJECT Attachment 2 Page 1 of 1 ATTACHMENT 2 SIT ACCREDITATION CERTIFICATE OF SIET CALIBRATION LABORATORY
35 QUALITY PLAN FOR IRIS PROJECT Attachment 3 Page 1 of 4 ATTACHMENT 3 CROSS REFERENCE AMONG THE SIET QUALITY MANUAL SECTIONS AND THE REFERENCE STANDARD MQ SIET Section Title 10CFR50 App. 'B' Cross reference NQA-1 ISO 9001:2000 ISO IEC 17025: FOREWORD I SIET SpA description Factory processes description Quality system management description I Agreement with other factory management system I Scope and field of application I Scope I Field of application REFERENCE DOCUMENT Standards Documents Internal documents External documents 2.3 Law 2.4 Priority 3 TERMS AND DEFINITION I 4, III QUALITY SYSTEM MANAGEMENT II I General requirements II II Documents requirements II II General V Documents V, XVII II Documents control management VI, XVII II , 4.1.1, 4.1.2, 4.1.3, 4.1.4, 4.1.5, 4.2, 4.2.1, 4.2.2, 4.2.3, , 4.2.3, 4.2.4, , 4.2.3, , 4.2.3, Documents distribution VI, XVII II , 4.12
36 QUALITY PLAN FOR IRIS PROJECT Attachment 3 Page 2 of 4 MQ SIET Section Title 10CFR50 App. 'B' Cross reference NQA-1 ISO 9001:2000 ISO IEC 17025: MANAGEMENET RESPONSABILITY Management commitments I II , a) 4.1.2, b) c) d) e) Customer focus Quality Policy II II Quality system planning II II Organization, responsibility communication I II Organization structure I II a), f), h) Job and responsibility I i) Communication Management review II II Forward II Input II Output II RESOURSE MANAGEMENT I Provision of resources Human resources 2S Personnel requirements and qualification Personnel training, competence and knowledge 2S-1 2, 2S-4 2S S , 5.2.2, Infrastructure Work environment , 5.3.2, 5.3.3, 5.3.4, PRODUCT REALIZATION Planning of product realization and processes management II, XIV II 2,
37 QUALITY PLAN FOR IRIS PROJECT Attachment 3 Page 3 of 4 MQ SIET Section Title 10CFR50 App. 'B' Project activation II Project management II, XIV NQA-1 Cross reference ISO 9001: a) b) 7.1 c); 7.1 d) ISO IEC 17025: , a), 4.2.1, , 5.9; 4.1, 5.4, Customer related processes II Identification of customer requirements , Evaluating and communication of product and service requirements; Review of product and service requirement Communication with the customer , 4.4.2, 4.4.3, 4.4.4, 4.4.5, 5.4, 5.9, , 4.4.2, 4.4.3, 4.4.4, 4.4.5, 5.4, 5.9, , 4.4.4, 4.5, 4.7, Design control III II , 5.4, , Generality, planning and development of design III Design input III Design output III Design review III Design verification III Design validation III Design modify III Purchasing IV II 7, , 4.6.2, Purchasing process IV , Suppliers qualification, Purchase order process IV Purchasing product and material verification VII II Production process IX, XIV Ii , 7.5.2: , , , , , , , , , ISO SECTION 5 - REQUIREMENTS IX, X, XI , 5.2, 5.4, 5.5, 5.6, 5.7, 5.8, 5.9, 5.10
38 QUALITY PLAN FOR IRIS PROJECT Attachment 3 Page 4 of 4 MQ SIET Section 7.5.2, Title 10CFR50 App. 'B' NQA-1 Cross reference ISO 9001:2000 Process control IX II 9, ISO IEC 17025: , 5.4.2, Identification and traceability VIII II Customer product control c), Storage product management VIII, XIII II , 4.12, 5.8, Inspection, measurement and test equipment X, XII II , 5.5 MEASUREMENT ANALISYS AND IMPROVEMENT 8.1 Forward , 5.4, Management system monitoring and measurement X, XVII Customer satisfaction , Internal audit XVIII II 18, 2S Processes monitoring and measurement X, XVII II 10, Product and services monitoring and measurement X, XI, XVII II 10, , Control of non-conforming product or service XV II , 4.14, , 4.6, 4.9, 5.5.2, 5.5.9, 5.8, 5.8.3, 5.8.4, Analysis of quality information XVI II , Improvement XVI II Continual improvement XVI II , Corrective action XVI II , Preventive action II II , 4.11, 4.12
39 QUALITY PLAN FOR IRIS PROJECT Attachment QQ 04 Page 1 of 1 ATTACHMENT 4 SIET ORGANIZATION CHART
QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010
Section i INTRODUCTION QUALITY POLICY STATEMENT: The purpose of our business is to provide continuity of electrical power to keep businesses in business. We do this by helping clients solve their power
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).
This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM
This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM CONTENTS Page No 1 GENERAL REQUIREMENTS 1 1.1 Requirements 1
Flameless Technology for Particulate Emissions Suppression
Flameless Technology for Particulate Emissions Suppression M. Malavasi, C. Allouis, A. D'Anna Report RSE/2009/108 Ente per le Nuove tecnologie, l Energia e l Ambiente RICERCA SISTEMA ELETTRICO Flameless
JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management
JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project
ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)
ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal Forms Part 4:
ISO/IEC 17025 QUALITY MANUAL
1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4
Quality Management System-A Revision 7 (NRC-approved Version)
Westinghouse Non-Proprietary Class 3 2013 Westinghouse Electric Company LLC. All Rights Reserved. Quality Management System-A (NRC-approved Version) Westinghouse Electric Company Quality Management System
Regulatory Guide 1.169 Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power Plants
Regulatory Guide 1.169Configuration Managemen... Page 1 of 10 September 1997 Regulatory Guide 1.169 Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power
Independent Verification and Validation of SAPHIRE 8 Software Project Plan
INL/EXT-09-17022 Rev. 2 Independent Verification and Validation of SAPHIRE 8 Software Project Plan March 2010 The INL is a U.S. Department of Energy National Laboratory operated by Battelle Energy Alliance
IMQ RULES. Contents. IMQ Rules - Product certification
IMQ RULES PRODUCT CERTIFICATION "ELECTRIC ENERGY METERS AND METER UNITS" PRODUCT OF NEW MANUFACTURING Contents IMQ Rules - Product certification Particular Rules for the Electric energy meters and meter
DRAFT REGULATORY GUIDE
U.S. NUCLEAR REGULATORY COMMISSION August 2012 OFFICE OF NUCLEAR REGULATORY RESEARCH Division 1 DRAFT REGULATORY GUIDE Contact: K. Sturzebecher (301) 251-7494 DRAFT REGULATORY GUIDE DG-1206 (Proposed Revision
Project Management Guidelines
Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.
SQ 901 Version D. Railway Application Quality Specification REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN
SQ 901 Version D Railway Application Quality Specification OBTAINING QUALITY OF PRODUCTS PURCHASED BY SNCF REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN Issue date March 2004 This English
LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003
D LT-422-001 Page 1 of 12 QUALITY MANUAL LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003 Based on ISO 9001:2008 D LT-422-001 Page 2 of 12 INTRODUCTION: This Quality Manual establishes the quality system
TOTAL QUALITY MANAGEMENT II QUALITY AUDIT
TOTAL QUALITY MANAGEMENT II Chapter 13: QUALITY AUDIT Dr. Shyamal Gomes Introduction: The term audit was defined in the 16th Century as the official examination of the accounts with verification by reference
Uncontrolled Document
SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT
QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G 414.1-2A, Appendix A, 6-17-05)
QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G 414.1-2A, Appendix A, 6-17-05) This review template is intended for use by the DOE for evaluating a DOE Site Office or Contractor Quality Assurance
AP1000 European 18. Human Factors Engineering Design Control Document
18.2 Human Factors Engineering Program Management The purpose of this section is to describe the goals of the AP1000 human factors engineering program, the technical program to accomplish these goals,
Office for Nuclear Regulation
ONR GUIDE LC17 Management Systems Document Type: ONR Nuclear Safety Technical Inspection Guide Unique Document ID and Revision No: NS-INSP-GD-017 Revision 2 Date Issued: November 2012 Review Date: November
The World Nuclear Supply
The World Nuclear Supply Chain An Overview Greg KASER Staff Director NEA International WPNE Workshop Paris 11 March 2014 Outline of Presentation 1. About WNA 2. Value of: New construction Early dismantlement
Owner-User Pressure Equipment Integrity Management Requirements
the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management
Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants
Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Published in the Official State Gazette (BOE) No 283 of November 24 th 2009 Nuclear Safety Council Instruction
RADIATION MONITORING SYSTEMS
RADIATION MONITORING SYSTEMS Area monitors Process monitors In-line, Adjacent-to-Line monitors Local/remote processors, Data Acquisition Systems NUPIC Certified, NRC Approved Vendor Wide Range Sensitivity
INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards
INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy
Regulatory Guide 1.168 Verification, Validation, Reviews, And Audits For Digital Computer Software Used in Safety Systems of Nuclear Power Plants
Regulatory Guide 1.168 Page 1 of 10 September 1997 Regulatory Guide 1.168 Verification, Validation, Reviews, And Audits For Digital Computer Software Used in Safety Systems of Nuclear Power Plants Publication
1 For more information T: +1.847.664.1499 / E: [email protected] / W: ul.com/dap
DATA ACCEPTANCE PROGRAM UL Client Test Data Program Investigations of products by UL typically involve the testing of product samples. While UL maintains extensive facilities for these purposes, customers
Quality Manual ISO9001:2008
Quality Manual ISO9001:2008 Connor Winfield Corp. Date: 4/26/10 Revision: 3 Quality Manual Quality Manual Connor Winfield GENERAL Section 0.1 Section Rev.: 2 Rev. Date: 4/26/10 Section Page 1 Index and
CORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
Westinghouse AP1000 PWR and the Growing Market for New Nuclear Power Plants
Westinghouse AP1000 PWR and the Growing Market for New Nuclear Power Plants Westinghouse Electric Company & The Nuclear Fuel Cycle Royal Commission - South Australia November 4, 2015 1 AP1000 is a trademark
Quality Management System Manual
Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:
Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]
Nuclear Safety Council Instruction number IS-22, of July 1st 2009, on safety requirements for the management of ageing and long-term operation of nuclear power plants Published in the Official State Gazette
SAPHIRE 8 Software Configuration Management Plan
INL/EXT-09-16696 Rev. 1 SAPHIRE 8 Software Configuration Management Plan January 2010 The INL is a U.S. Department of Energy National Laboratory operated by Battelle Energy Alliance INL/EXT-09-16696 Rev.
Engineering Procurement Construction Quality Plan
Engineering Procurement Construction Quality Plan Index 1 Introduction... 4 1.1 Project Background... 4 1.2 Document Purpose... 4 1.3 Change Control... 4 1.4 Contract... 4 1.5 Quality system... 4 1.6 Distribution...
Rules for the certification of event sustainability management system
Rules for the certification of event sustainability management system In force from 10/09/2014 RINA Services S.p.A. Via Corsica, 12 16128 Genova Tel. +39 010 53851 Fax +39 010 5351000 E-MAIL: [email protected],
Camar Aircraft Products Co. QUALITY MANUAL Revision D
QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)
ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary
Page 1 / 9 ABSTRACT This document is the Section F to NSQ-100 Guidelines. Its objective is to help to the understanding of NSQ-100 requirements through some examples or recommendations and descriptions
ONTIC UK SUPPLIER QUALITY SURVEY
MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return
Quality Management System
LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority
Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April 2012. Authorised by: Managing Director.
Quality Manual Issue 4 Forth Engineering (Cumbria) Limited QUALITY MANUAL Copy Number: 1 The information contained in this Manual is the property of Forth Engineering (Cumbria) Limited and must not be
Rules for the certification of asset management systems
Rules for the certification of asset management systems In force from 8/09/2014 RINA Services S.p.A. Via Corsica, 12 16128 Genova Tel. +39 010 53851 Fax +39 010 5351000 E-MAIL: [email protected], web: www.rina.org
ABSTRACT. The Guidelines Section A is related to the general requirements of NSQ100 (Chapters 0, 1, 4, 5 and 6). Summary
Page 1 / 12 ABSTRACT This document is the Section A to NSQ-100 Guidelines. Its objective is to help to the understanding of NSQ-100 requirements through some examples or recommendations and descriptions
OPERATIONAL STANDARD
1 of 11 1. Introduction The International Safe Transit Association (ISTA), a non-profit association whose objective is to prevent product damage and excess packaging usage within the distribution environment.
7.1 General 5 7.2 Events resulting in pressure increase 5
GUIDE YVL 2.4 / 24 Ma r ch 2006 Primary and secondary circuit pressure control at a nuclear power plant 1 Ge n e r a l 3 2 General design requirements 3 3 Pressure regulation 4 4 Overpressure protection
Check-list for auditors. Audit visit at candidate registered laboratories
Check-list for auditors Audit visit at candidate registered laboratories 1 Contents Introduction Laboratory documentation required by the standard(s), available for inspection by the auditor Items to be
Rules for the certification of Quality Management Systems
Rules for the certification of Quality Management Systems Effective from September 15 th, 2015 RINA Via Corsica, 12 16128 Genova - Italy Tel.: +39 01053851 Fax: +39 0105351000 Web site: www.rina.org Technical
How To Ensure Quality Assurance
1001 Robb Hill Road Oakdale, PA 15071-3200 412/923-2670 PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS Specification Number: ATI-QA-703, Rev 4 Date: 11/12/13 Page: 1 of 7 Written
This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and
This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and suppliers. It is transmitted to you in confidence and trust,
GUIDANCE DOCUMENT TO IMPLEMENT POLICY FOR SOFTWARE QUALITY ASSURANCE IN THE NUCLEAR POWER INDUSTRY
NUCLEAR ENERGY INSTITUTE NUCLEAR INFORMATION TECHNOLOGY STRATEGIC LEADERSHIP GUIDANCE DOCUMENT TO IMPLEMENT POLICY FOR SOFTWARE QUALITY ASSURANCE IN THE NUCLEAR POWER INDUSTRY NITSL-SQA-2005-02 Revision
August 24, 2009 NRC INSPECTION REPORT 99901364/2009-201 AND NOTICE OF VIOLATION TO JAPAN STEEL WORKS
August 24, 2009 Mr. Masanobu Maruoka, Deputy Manager Quality Assurance Group JSW, LTD. 4, Chatsumachi, Muroran Hokkaido, Japan 051-08505 SUBJECT: NRC INSPECTION REPORT 99901364/2009-201 AND NOTICE OF VIOLATION
Quality Assurance QUALITY ASSURANCE PLAN
Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File
Quality Management System Manual Revision G
Revision G 2800 Louis-Lumière, Suite 100, Québec (QC), G1P 0A4, CANADA Table of Contents Mission... 3 What We Do... 3 Our Values... 3 Passion... 3 Customer Focus... 3 Reliability... 3 Empowerment... 3
When printed the document is for reference only and is considered uncontrolled - refer to the Document Control System for the most current version
QM-1 SUPPLEMENT QUALITY MANAGEMENT SYSTEMS MANUAL Revision 6 Page: 1 of 6 APPROVED BY: TITLE DATE Electronic Signature on file Quality Director 10/3/15 D. Picciotti Page: 2 of 6 DOCUMENT REVISION HISTORY
1 SUBJECT AND FIELD OF APPLICATION... 1 2 SPECIAL RULES CERTIFICATION ACCORDING TO THE STANDARDS EN 9100 EN 9110 EN 9120... 1
1 SUBJECT AND FIELD OF APPLICATION... 1 2 SPECIAL RULES CERTIFICATION ACCORDING TO THE STANDARDS EN 9100 EN 9110 EN 9120... 1 1 SUBJECT AND FIELD OF APPLICATION This document constitutes the special regulations
Rules for the certification of Environmental Management Systems
Rules for the certification of Environmental Management Systems Effective from November 19 th, 2015 RINA Via Corsica, 12 16128 Genova - Italy Tel.: +39 01053851 Fax: +39 0105351000 Web site: www.rina.org
Achim Beisiegel Fouad El-Rharbaoui Michael Wich. AREVA GmbH, Technical Center, 63791 Karlstein, Seligenstädter Strasse 100, Germany
Achim Beisiegel Fouad El-Rharbaoui Michael Wich AREVA GmbH, Technical Center, 63791 Karlstein, Seligenstädter Strasse 100, Germany 1 Introduction AREVA GmbH operates a unique Thermal-hydraulic platform
QUALITY MANUAL GREAT LAKES INSTITUTE FOR ENVIRONMENTAL RESEARCH ANALYTICAL LABORATORIES. October 2008 Revision 08
QUALITY MANUAL GREAT LAKES INSTITUTE FOR ENVIRONMENTAL RESEARCH ANALYTICAL LABORATORIES October 2008 Revision 08 Great Lakes Institute for Environmental Research University of Windsor Windsor, Ontario
ELECTRICAL AND I&C EQUIPMENT OF A NUCLEAR FACILITY
ELECTRICAL AND I&C EQUIPMENT OF A NUCLEAR FACILITY 1 Introduction 5 2 Scope of application 6 3 Requirement specification, selection, and procurement of electrical and I&C equipment and cables 7 3.1 General
Qualification of Auditor and Lead Auditor to perform an assessment according NSQ-100
Page 1 / 11 ABSTRACT Qualification of Auditor and Lead Auditor to CONTENTS 0. GENERAL... 2 0.1. Purpose... 2 0.2. Scope of application... 2 0.3. References... 2 0.4. Terminology... 2 1. SECTIONS... 2 1.1.
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Technical Guideline Audit and Inspection Version 2.0 February 2012 Table of Contents 1. Introduction... 3 2. Definitions... 3 3. Internal Audit... 3 3.1
General Rules for the certification of Management Systems
General Rules for the certification of Management Systems Effective from 19/11/2015 RINA Via Corsica 12 16128 Genova - Italy tel. +39 010 53851 fax +39 010 5351000 website : www.rina.org Technical rules
1 RCNY 101-07 CHAPTER 100
1 RCNY 101-07 CHAPTER 100 Subchapter A Administration 101-07 Approved Agencies. (a) Definitions. For the purposes of this section, all terms used herein shall have the same meanings as set forth in the
unless the manufacturer upgrades the firmware, whereas the effort is repeated.
Software Validation in Accredited Laboratories A Practical Guide Gregory D. Gogates Fasor Inc., 3101 Skippack Pike, Lansdale, Pennsylvania 19446-5864 USA [email protected] www.fasor.com Abstract Software
FSSC 22000-Q. Certification module for food quality in compliance with ISO 9001:2008. Quality module REQUIREMENTS
FSSC 22000-Q Certification module for food quality in compliance with ISO 9001:2008 Quality module REQUIREMENTS Foundation for Food Safety Certification Gorinchem, The Netherlands: 2015 Version Control
May 7, 2008. SUBJECT: NRC INSPECTION REPORT FOR AREVA-NP GmbH 99901371/2008-201, NOTICE OF VIOLATION, AND NOTICE OF NONCONFORMANCE
May 7, 2008 Mr. Hans-Joachim Nisslein QEM Liaison Officer AREVA-NP GmbH Paul-Gossen-Strasse 100 91001 Erlangen, Germany SUBJECT: NRC INSPECTION REPORT FOR AREVA-NP GmbH 99901371/2008-201, NOTICE OF VIOLATION,
Frequently Asked Questions. Unannounced audits for manufacturers of CE-marked medical devices. 720 DM 0701-53a Rev 1 2014/10/02
Frequently Asked Questions Unannounced audits for manufacturers of CE-marked medical devices 720 DM 0701-53a Rev 1 2014/10/02 What is an unannounced audit?... 6 Are unannounced audits part of a new requirement?...
APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM
APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM The supplemental inspection program is designed to support the NRC s goals of maintaining
REGULATORY GUIDE 1.170 (Draft was issued as DG-1207, dated August 2012)
Purpose U.S. NUCLEAR REGULATORY COMMISSION July 2013 Revision 1 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.170 (Draft was issued as DG-1207, dated August 2012) Technical
ASME QRO Certification Program
ASME QRO Certification Program ASME QRO Certification For Operators of Resource Recovery Facilities Applicant Information Table of Contents Table of Contents Page QRO Certification Overview...1 Types of
NEI 06-13A [Revision 0] Template for an Industry Training Program Description
NEI 06-13A [Revision 0] Template for an Industry Training Program Description NEI 06-13A [Revision 0] Nuclear Energy Institute Template for an Industry Training Program Description ACKNOWLEDGEMENTS This
21. TESTING AND COMPUTER CODE EVALUATION
21.1 Introduction 21. TESTING AND COMPUTER CODE EVALUATION The General Electric (GE) economic simplified boiling-water reactor (ESBWR) design is the first natural-circulation-cooled boiling-water reactor
Guideline on good pharmacovigilance practices (GVP)
22 June 2012 EMA/541760/2011 Guideline on good pharmacovigilance practices (GVP) Module I Pharmacovigilance systems and their quality systems Draft finalised by the Agency in collaboration with Member
Quality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.
This complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.0 2011-04 Prepared By: Phyllis Olsen Release Date: 10/28/15 Certificate No: CERT-08776-2006-AQ-HOU-RvA
D. MCLAUGHLIN & SONS LTD QUALITY MANUAL
D. MCLAUGHLIN & SONS LTD QUALITY MANUAL Originated By: Anne Wall (Quality Consultant) Date: Approved By: Date: Issue AMENDMENT DATE Draft 1 Quality Manual QM1 CONTENTS 1 QUALITY ASSURANCE POLICY 1.1 Quality
CITY UNIVERSITY OF HONG KONG. A Study of Electromagnetic Radiation and Specific Absorption Rate of Mobile Phones with Fractional Human Head Models
CITY UNIVERSITY OF HONG KONG A Study of Electromagnetic Radiation and Specific Absorption Rate of Mobile Phones with Fractional Human Head Models Submitted to Department of Electronic Engineering in Partial
NABL NATIONAL ACCREDITATION
NABL 160 NABL NATIONAL ACCREDITATION BOARD FOR TESTING AND CALIBRATION LABORATORIES GUIDE for PREPARING A QUALITY MANUAL ISSUE NO. : 05 AMENDMENT NO : 00 ISSUE DATE: 27.06.2012 AMENDMENT DATE: -- Amendment
Quality Management System Policy Manual
Quality Management System Burns Engineering, Inc. 10201 Bren Road East Minnetonka, MN 55343 4. 4.1 General Requirements The Quality Manual consists of the quality system policy documents and the quality
- FHIC12 Flue gas denitrification (DeNOx)
DIVISIONE INGEGNERIA E INNOVAZIONE AREA DI BUSINESS SVILUPPO E REALIZZAZIONE IMPIANTI / 1 TITOLO Title Basic requirements: - FHIC12 Flue gas denitrification (DeNOx) Ince Sicurezza Security Index Uso Aziendale
EffiValidation 3.0 software basic training module
EffiValidation 3.0 software basic training module Oct 3, 2012 www.effichem.com Agenda EffiChem company EffiValidation 3.0 software : overview International standards and guidelines Software features Structure
Guideline on good pharmacovigilance practices (GVP)
1 2 20 February 2012 EMA/541760/2011 3 4 Guideline on good pharmacovigilance practices (GVP) Module I Pharmacovigilance systems and their quality systems Draft finalised by the Agency in collaboration
CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems
Date(s) of Evaluation: CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Assessor(s) & Observer(s): Organization: Area/Field
Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998)
1 APPLICABILITY VDA 6.1: Section: 3.1; 7 new: In addition to the applicability for supplier sites for production, services and their subcontractors for: products and production materials, or services like
Helical Products Co., Inc.
Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance
Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA
Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA ASME Vice President, Conformity Assessment and Vice Chairman of Committee on Nuclear Certification 2nd NRC Workshop on Vendor
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition xxxx November 2008 ISO 9001 - Periodic Review ISO 9001:2008 Periodic Review ISO 9001, like all standards is subject to periodic
GE Oil & Gas. Quality at. GE Oil & Gas. GE imagination at work QUALITY
GE Oil & Gas Quality at GE Oil & Gas GE imagination at work QUALITY 2 - Quality at GE Oil & Gas TABLE OF CONTENTS GE Oil & Gas and Quality Visions Our Customer Commitments The Quality Organization and
Quality at GE Energy
Quality at GE Energy Table of Contents GE Energy and Quality Visions 2 Our Customer Commitments 3-5 The Quality Organization and Policy 6-8 Quality Management System 9-11 Key Business Processes 12-16
The Encana Service Provider Safety Manual
Practice Service Provider Equipment Specifications & Quality Management Owner: USA Division Safety Revision No: 00 Date last revised: 08/21/2013 1.0 Applicability This practice applies to all Encana Oil
APPLICATION PACKAGE FOR LISTING AS A WATER AND/OR WASTEWATER INFRASTRUCTURE PROVIDER FOR DESIGNERS, CONSTRUCTORS
APPLICATION PACKAGE FOR LISTING AS A WATER AND/OR WASTEWATER INFRASTRUCTURE PROVIDER FOR DESIGNERS, CONSTRUCTORS (Major & minor works) TO THE MANAGING NEW DEVELOPMENTS PROCESS For information regarding
ISO 9001:2008 Quality Systems Manual
ISO 9001:2008 [Company Name] ADDRESS Phone: Phone: Fax: Fax: The holder of this manual is cautioned that the information contained herein must not be loaned or circulated outside of [Company Name] except
Quality Management System Manual
Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive
QMS Operational Procedure QOP-42-02
QMS Operational Procedure QOP-42-02 DEVICE MASTER RECORD Issued by: Quality Assurance Eff. Date: 00/00/00 Rev.: A Pg. 1 of 4 ISO 13485 requires that for each type or model of medical device the organization
Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables
(1987) Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables 1. General 1.1 Introduction 1.1.1 The present guidelines are to serve as a supplement to the IACS
Audit Report AS/NZS ISO 9001:2008. RRW and Co Pty Ltd trading as National On Site Training
Audit Report AS/NZS ISO 9001:2008 RRW and Co Pty Ltd trading as National On Site Training AUDIT D E T A I L S Invoice Reference Number Certificate Number Review Date/s Review Time Hours S12627 158 10 th
Summary of GE Healthcare's Quality Management System (QMS) Covering BioProcess chromatography media, equipment, software, and spare parts
GE Healthcare Summary of GE Healthcare's Quality Management System (QMS) Covering BioProcess chromatography media, equipment, software, and spare parts Table of content General requirements 3 Documentation
CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems
Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB United Kingdom Tel: +44(0)1604-893-811. Fax: +44(0)1604-893-868. E-mail: [email protected] CP14 ISSUE 5 DATED 1 st OCTOBER
Integrated management systems Ship operating companies
Integrated management systems Ship operating companies Safety, Quality, Environment and Occupational Health and Safety DNV Maritime Preamble Organisations of all kinds are increasingly concerned about
THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT
THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT GERARD M. HILL CRC Press Taylor & Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an informa business
City of Raleigh Public Utilities Department. Wastewater EMS Manual
City of Raleigh Public Utilities Department Wastewater EMS Manual TABLE OF CONTENTS PAGE 2 Wastewater EMS Manual Table of Contents Management Direction 1) EMS Manual 2) Management Policy Planning 3) Process