Live-front (MES) and Dead-front (MDS) Padmount Switchgear Instruction Bulletin: 15 kv and 25 kv
|
|
|
- Gwenda Hawkins
- 9 years ago
- Views:
Transcription
1 1VAM2205-MB Rev. A Live-front (MES) and Dead-front (MDS) Padmount Switchgear Instruction Bulletin: 15 kv and 25 kv
2 TABLE OF CONTENTS Description Page 1.0 Safety Notices Introduction Receiving, Handling and Storage General Description Installation Pre-Operational Inspection and Testing Operation Maintenance Re-Fusing Coating Maintenance of 20
3 1.0 SAFETY NOTICES Install the ABB Padmount Switchgear within the design limitations as described in these instructions. These padmount load interrupter switches are designed to operate within the current and voltage limitations on the switch nameplate. Do not apply these switches to systems with current and/or voltages that exceed these limits. Follow your company s safety procedures. Do not remove covers, open doors or work on equipment unless power has been turned off and all circuits de-energized. For the safety of personnel performing maintenance operations on the switchgear or connecting equipment, all components should be electrically disconnected by means of a visible break, securely grounded and locked out, and tagged in accordance with personnel precautions spelled out in ANSI Standard Z244.1 Control of Hazardous Energy Lockout/Tagout and Alternative Methods. After opening the switch, use the viewing window to ensure that all three switch blades are open. If necessary, use a flashlight to verify all three contacts are open. Personnel doing the work should follow applicable OSHA guidelines and specifically adhere to NFPA 70E for PPE and working distance. Every precaution should be taken to prevent electrical grounding on an energized circuit. Suitable grounding clamp leads should be used and safety grounding techniques employed. All such grounds must be removed after testing, inspection, or maintenance prior to energizing the equipment. The equipment covered by this instruction book must be selected for a specific application and it must be installed, operated and maintained by qualified persons, 2 of 20
4 thoroughly trained and knowledgeable of the hazards involved. This publication is written only for such qualified persons and is not intended to be a substitute for adequate training and experience in the safety procedures for this device. WARNING Detailed descriptions of standard repair procedures, safety principles and service operations are not included. It is important to note this document contains some warnings and cautions against some specific service methods that could cause personal injury to service personnel, damage equipment, or render it unsafe. These warnings do not cover all conceivable ways in which service, whether or not recommended by ABB, might be performed, or the possible hazardous consequences of each conceivable way, nor could ABB investigate all such ways. Anyone using service procedures or tools, whether or not recommended by ABB, must satisfy himself thoroughly that neither personal safety, nor equipment safety, will be jeopardized by the service method or tools selected. Should further information be required or specific problems arise that are not sufficiently covered, refer the matter to an ABB service representative. It is the responsibility of the purchaser, installer or ultimate user to ensure that warning signs are attached and all access doors and operating handles are securely locked when the gear is left unattended, even momentarily. All information contained in this manual is based on the latest product information available at the time of printing. The right is reserved to make changes at any time without notice. 2.0 INTRODUCTION These instructions do not purport to cover all details or variations of equipment, nor provide for every possible contingency to be met in conjunction with installation, operation or maintenance. Also, as improvements in part and assemblies are made, some parts may differ in appearance as depicted in the illustrations, however, functionality will be equivalent. Should particular problems arise which are not covered sufficiently for the purchaser s purposes, the matter should be referred to ABB using the contact information provided on the last page of this booklet. The ABB MES Series live-front and MDS Series dead-front padmount switchgear are high-voltage, three-phase equipment incorporating manually operated load interrupter switches. Together with fuse protection, the switchgear can be used to isolate, sectionalize and protect a variety of underground distribution circuits. Satisfactory performance of the switchgear is contingent upon the correct installation and adequate maintenance and service of the product. Careful study of these instructions will permit the user to obtain maximum benefit from this equipment. 3 of 20
5 The warranty associated with this equipment is fully described in the terms and conditions provided at the time of purchase. It should be emphasized that unless approved by ABB, no modification, alteration, change or correction should be undertaken without such express authority provided in writing. The following instructions contain information required to correctly install, operate and test the ABB Padmount Switchgear. ABB contact information is listed on the back cover of this booklet. 3.0 RECEIVING, HANDLING AND STORAGE 3.1 Receiving Inspection Each padmount switch is assembled, tested, packed and shipped in new condition from the factory. Upon receipt, inspect units immediately for damage and or missing parts. If damage is noticed, call the carrier at once for inspection and request an inspection report. File a formal claim with the carrier supported with the paid freight bill, inspection report and invoice, and notify the local ABB sales office. This must be done within 15 days of receipt or the receiver assumes all responsibility for damage. Check all parts against the shipping list as they are unpacked. Wherever practical, all components such as fuses, fuse holders, end fittings, & etc. are shipped within the enclosure. Instructions and literature packed with the switchgear should be kept with the unit. If the switchgear is not to be placed in service immediately, it is essential that proper care be exercised in the handling and storage to ensure good operating conditions in the future. (See 3.3 Storage) 3.2 Handling The padmount switchgear comes with two or four removable lifting brackets that attach to the sides of the cabinet and offer provisions for lifting the switchgear. Ensure the lifting brackets are securely bolted to the enclosure before lifting. Use lifting slings that are equal to or greater than the width of the enclosure. Arrange the slings to distribute the load equally as shown in Figure 1. The switchgear is shipped securely bolted to a pallet. When handling with a forklift, make sure the forks extend the full width of the pallet to prevent damage. Prior to installation, make sure your concrete pad or foundation is level and the conduit or cable entrance locations are correct. 4 of 20
6 Figure Storage For prolonged storage, indoor storage is recommended. If stored outdoors, make sure all external plastic wrap and other moisture absorbing packing materials are removed and there is adequate air space between enclosures to prevent damage to the coating. 4.0 GENERAL DESCRIPTION ABB Padmount Switches are applied in the control and switching of power distribution systems having nominal A.C. voltage ratings from 2.4 kv to 25 kv. They are capable of switching 200 and 600 amperes. When used in conjunction with fuses, they will afford overload, short circuit and disconnect services. These switches are used: on the primary of transformers for their protection and isolation; for the protection and isolation of single circuit systems; for the protection, isolation and sectionalizing of multi-circuit systems. 5 of 20
7 4.1 Applicable Industry Standards IEEE C37.74 IEEE C IEEE C Standard Requirements for Subsurface, Vault and Pad- Mounted Load-Interrupter Switchgear and Fused Load- Interrupter Switchgear for Alternating Current Systems up to 38 kv (including referenced standards) Standard for Pad-Mounted Equipment Enclosure Integrity Standard for Pad-Mounted Equipment Enclosure Integrity for Coastal Environments 5.0 INSTALLATION Installation of Padmount Switchgear must only be done with de-energized switchgear. When installing the switchgear: (a) Protect workers adequately from live parts with barriers, screens, etc., (b) Observe National Electrical Safety Code ANSI C2, Rule 124 for guarding live parts and OSHA regulations. 5.1 Access to Interior A penta-head socket or wrench is required to gain access to the interior of the enclosure. The padlock (if installed) must be removed first and the handle pivoted out to the operating position. The penta-head (or optional hex-head) security bolt can then be retracted until it spins freely, releasing the door latching mechanism. Turn the handle counter-clockwise to operate the latch mechanism and open the door. To close the doors, make sure the left hand door is closed before closing and latching the right hand door. The security bolt must be re-engaged and fully seated before the folding handle can be closed and padlock re-installed. An automatic door stay (wind lock) secures the door in the open position when servicing the switchgear. Lift up on the arm to release and close the door. To remove the doors completely, remove the nut from the door end of the arm and lift the door off the hinge pins. 5.2 Removal of Shipping Materials Before any installation of Padmount Switchgear, a careful check should be made to ensure that all materials included for shipping purposes have been removed. Switches are shipped closed to avoid shipping damage. Open switches in accordance with outlined instructions. Before any installation work is done, consult and study all drawings furnished by ABB. Mats, screens, railings, etc., which are external to the switchgear and may be required to meet local codes, must be furnished by the purchaser or enduser. 6 of 20
8 5.3 Barrier Removal (MES Live-front only) The standard barrier system used in the MES Series live-front switchgear is designed to be easily removed to provide improved access during installation, terminating cables, or when servicing the gear. Use the following procedure to remove the inter-phase barriers: 1. Cut the ty-wraps used to secure the dual purpose front hanging barriers during shipment. 2. Remove and store the dual purpose barriers on the hanger brackets on the exterior doors or another clean location. 3. Remove the clear viewing windows at the top of each switch compartment by pressing up on the spring retainer above each window. 4. Cut the shipping ty-wraps and remove the retainer strips and interlocking barrier spreaders across the top and bottom of each barrier assembly. 5. Align the phase barrier with the notch in the metal bracket above the barriers. 6. Lift up and pull out to remove the phase barriers as shown in figure 2. Figure 2 7. Reverse the above procedure to re-install the barriers. Make sure to keep the barriers clean and dry to prevent tracking and arcing. 5.4 Preparation of Foundation (Anchoring) The foundation must be strong enough to prevent sagging due to the weight of the switchgear structure. The impact loading is approximately 1.1 times the static load. 7 of 20
9 Suitable means must be provided by the purchaser for anchoring the equipment to the pad or foundation. It is essential that the pad or foundation be level to avoid distortion of the switchgear structure and the equipment be properly aligned prior to final anchoring. The recommended pad size should be 4-6 minimum larger than the switchgear footprint shown in the assembly drawing and/or product brochure. Steel shims should be used for final leveling of the switchgear, if necessary. Care should be taken to provide a smooth, hard and level pad under and in front of the units to facilitate installation. If the pad is not level and flush with the base channels, it will be difficult to align the equipment and open the doors. Once the switchgear is level, anchor the enclosure to the pad using the anchor holes in the mounting brackets located inside each corner of the switchgear. After the switchgear is leveled and anchored to the pad, caulk around the bottom of the enclosure with a permanent weatherproof caulking compound to prevent entry of moisture, contamination or varmints. Before replacing doors, carefully inspect bus work and phase barriers to ensure that no tools or other objects are accidentally left inside the unit. Always be sure that all switch hardware is in place and tightened properly. Never energize the switch without the barriers installed and in place and compartments closed. 5.5 Cable Connections ABB Padmount Switchgear is provided either with bolted cable terminations, referred to as live-front, or elbow terminations, referred to a dead-front. Both types of equipment provide safe and reliable performance based on the utility s or user s experience with the specific type of equipment. CAUTION External sources of power supplied to this switchgear may cause back-feed to the high voltage bus. Care must be taken by disconnecting the back-feed source and safety grounding the terminations before working on the switchgear. Before making up the cable connections, the phasing of each cable should be determined in accordance with the connection diagram, and the cables tagged accordingly. The cable manufacturer's instructions should be followed when performing cable terminations and during the installation of the cable. The terminating devices (where required) should be installed pursuant to the terminator manufacturer's instructions Live-front Terminations (MES) Cable terminations in live-front switchgear are made with bolted lug connections and stress cone style cable terminators. Termination space is provided in the cubicle for bottom entry. It is essential that the connections be clean and securely 8 of 20
10 bolted with hardware torqued to hardware specifications, since the conductivity of the joints is proportional to the applied pressure. Belleville spring washers are recommended to ensure positive contact pressure. Adequate electrical clearance must be maintained between cables, energized parts and grounded metal parts. according to the following electrical clearance guide in Table 1. Minimum electrical clearances VOLTAGE CLASS (kv) BIL (kv) PHASE-TO- GROUND (INCHES) PHASE-TO- PHASE (INCHES) LIVE PART TO BARRIER TERM SKIRT TO BARRIER Table 1 When positioning the cable terminations, make sure the lugs are flat against the termination pad and bolt holes are in alignment before installing the bolts. It is the installer's responsibility to correctly position and adequately support cables such that insulators or bus connections do not carry excessive strain from the cables. Optional cable supports are available from ABB Dead-front Terminations (MDS) On dead-front switchgear, the switch terminals are supplied with 600 ampere bushings and fuse terminals are supplied with 200 ampere bushing wells with interfaces conforming to IEEE Standard 386. The appropriate bushing inserts and separable connectors (elbows) must be furnished and installed by the user. (Note: As an option, bushing inserts can be installed at the factory). Remove all shipping covers from the bushings and bushing wells prior to installation of the inserts and elbows. Bushing inserts should be grounded to the grounding tab adjacent to the bushing well with a short ground wire Before installing the 200 ampere elbows in the fuse compartment, make sure the cables are correctly positioned in the cable guide to prevent the cable from interfering with the operation of the fuse access door. WARNING Before energizing the switchgear, make sure that shipping caps on all bushings and bushing wells have been replaced with elbows or voltage rated insulating caps or plugs. Failure to do so can cause a flashover and serious injury. 5.6 Lightning Protection 9 of 20
11 It will be the responsibility of the purchaser to provide suitable lightning arrestors to protect the switchgear from damage due to lightning. A variety of optional arrester mounting provisions and arresters are available from ABB for inclusion on live-front (MES) switchgear products. Consult the product guide for selection of available options. Most can be ordered for field installation. Distribution class arresters for installation in padmount switchgear should be ordered without isolators or insulated support brackets. Note: Dead-front switchgear is not available with factory installed arresters or arrester mounting provisions. Elbow style arresters are available from a variety of manufacturers for installation on 200 ampere load break Reducing Tap Plugs interfaced with the incoming 600 ampere elbow connectors. 5.7 Fault Indicator Provisions (Optional) Optional fault indicator mounting provisions are available factory installed from ABB. The standard option includes viewing windows installed in each switch compartment door with a universal fault indicator mounting plate on the inside of the door. As an alternate, ABB can provide plugged holes for installing LED style fault indicators. 5.8 Fuse Installation CAUTION Fuses supplied by ABB are not installed when shipped. They must be installed in the final installation. The installer must verify that all fuses, holders, etc. are securely placed in their stationary live parts, and that fuses are latched and/or locked in place where latching or locking accommodations are provided. Since there are a wide variety of fuses available, refer to a proper fuse instruction book from the fuse manufacturer for detailed assembly, installation and operation instructions. It is the responsibility of the installer to properly install fuses, holders, end fittings, etc. according the fuse manufacturers instructions. See "Maintenance" section for re-fusing instructions. 5.9 Grounding The ground connection pads are welded to the frame near the bottom. They are arranged so that connections to the ground can be made in any compartment. Ground connections are made in the lower position of the cable entrance compartment. The switchgear must be grounded by a conductor with a current carrying capacity equal to that of the maximum momentary rating of the switchgear. It is very important that the equipment be adequately grounded to protect the operator from injury when short circuits or other abnormal 10 of 20
12 occurrences take place and to ensure that all parts of the equipment, other than live parts, are at ground potential. Grounding rods or bars are provided in all compartments for connecting safety grounding devices during installation or service as well as cable shield drain wires Interlocks Key interlocks if provided must be operated in accordance with customer pratices and shall not be disabled. Typical interlocks that may be supplied are: (1) that access to the power fuses cannot be obtained unless the interrupter switches are open, and (2) that the interrupter switches cannot be closed while the power fuses are accessible. Interlocks should be checked for proper operation before power is applied to the switchgear. In order to maintain the integrity of key interlock systems, duplicate keys should be destroyed or retained in a place accessible only to authorized personnel. Interlocks shall be operated and verified for correct operation prior to energizing the equipment. These shall be inspected on a yearly basis or per customer required period. WARNING Duplicate keys must be destroyed or retained in a place accessible to authorized personnel only, before any part of the equipment is energized. Failure to do so or defeating any part of the key interlock scheme can provide access to the equipment or permit operating errors, which can result in property damage, injury or death. 6.0 PRE-OPERATIONAL INSPECTION AND TESTING 6.1 Production Tests The following standard production tests are conducted on all padmount switchgear prior to shipment to check the quality and uniformity of the workmanship and materials used in the manufacture: 1. Circuit resistance tests to verify that all contact points have been properly aligned and current transfer points properly assembled. 2. Power-frequency withstand voltage (Hi-Pot) tests to make sure the insulators, bushings and other components will withstand system operating voltages per the following table for one minute: 11 of 20
13 VOLTAGE CLASS (kv) IMPULSE BIL (kv) 60 HZ WITHSTAND (kv) Table 2 DC WITHSTAND (kv) Mechanical operation of all switches to ensure the switch position indicators and main contacts are in the correct position for both the open and closed positions. 6.2 Pre-operational Check Field Power-frequency withstand voltage (Hi-Pot) should be performed at 75% of value listed above. This is to confirm insulators, bushings and other components did not fail during shipment and installation. Care must be exercised to make sure the padmount switchgear is disconnected from the power system while preliminary tests are being conducted. If disconnecting means are not available, line leads should be disconnected. All internal connections should be examined to ensure they have not been loosened or damaged during shipment or installation, and all bolted connections and joints should be tightened to ensure good contact. If spring washers are used under bolt head and nuts, they should be tightened in accordance with manufacturer's instructions. CAUTION Instructions and safety precautions under section entitled Maintenance must be strictly observed. After equipment has been installed and all connections made, it should be tested and inspected before being put in service. Check area for foreign materials, tools, etc. that may have been placed on or near the high voltage parts. Wipe down and clean all barriers, bus insulators, bushings, switches, etc. with a clean dry cloth. Although the equipment and devices have been completely tested at the factory, a final test should be made to be sure that the equipment has been properly installed and that all connections are correct and have not loosened in transportation. 7.0 OPERATION 7.1 Description 12 of 20
14 The powerful opening and closing spring of the stored energy mechanism on ABB s VersaRupter switch provides for quick make (rated fault closing) and quick break (rated load interruption). The switch mechanism shaft is driven by a removable side mounted handle. As the handle is rotated, the opening spring is "charged". As the operator continues to rotate the handle, the charged spring is driven over-center and releases its energy into rotating the operating shaft to open the switch. The switch blades will not move, in either a closing or opening direction, until the closing spring causes rotation in the operating shaft. It should be noted that once the spring is moved over-center, the operator has no further control of the opening and closing operation. The rated fault closing and load interrupting performance of the switch are independent of the operating procedure. Access to the operating handle for the switches is via a small door on the side of each switch compartment that is secured with a padlock, as well as a penta-head (or optional hex-head) security bolt. The padlock must be removed to gain access to the bolt. When the bolt is fully retracted, the door can be opened to gain access to the folding switch operator handle which is tethered to the pocket with a chain. Large Open and Closed stickers indicate the position of the switch. Rotate handle in the direction indicated to open or close the switch. Provisions are included to lock the switch in either the open or closed position. Make sure the access door is closed, re-secured and padlocked before leaving the switchgear unattended. 8.0 MAINTENANCE CAUTION Before any checking or maintenance of switchgear after it has been installed, the following must be observed: Only qualified persons may operate, inspect or maintain power switchgear. It is the responsibility of the purchaser, installer, or ultimate user to insure that the warning voltage signs are provided. Make sure all access doors and operating handles are securely locked by qualified people when the gear is left unattended. DANGER HAZARDOUS VOLTAGE Do not open or work on equipment unless power has been turned off and all circuits de-energized and disconnected. Disconnect, de-energize, lock-out and properly ground circuit(s) before working on equipment. 13 of 20
15 8.1 Periodic Checking The load interrupter switches should be examined and checked after one year in service. Thereafter, switches should be inspected every five years or sooner when conditions require inspection (such as numerous operations, polluted atmosphere or overloading of the switch). All switches should occasionally be opened and closed several times in succession, not exceeding their rated duty. 8.2 Cleaning All switches, including insulators and operating arms should be thoroughly cleaned periodically by wiping with a clean cloth to prevent accumulations of dust. A mild detergent can be used to remove excessive contamination from insulators, barriers and painted surfaces. Dry thoroughly after washing. After cleaning, a light coat of lubricant (non-corrosive, high-temperature grease such as Isoflex Topaz NB52) should be applied to the contact surfaces. Do not use "cup" or other grease which may harden upon exposure to air. Do not use any solvents or Alcohol based cleaners when cleaning switches. 8.3 Contacts Check to determine that the blades make good contact. Important - this is a sliding joint. Over tightening can cause the switch not to open and also cause severe damage to the mechanism. A contact resistance reading between the upper and lower switch terminal pads should be taken and should be between 50 to 70 micro ohms. If values are less than 50 micro ohms, loosen the bolt at the pivot point of the blades approximately 1/6 of a turn. Check resistance again and continue to loosen bolt until resistance is between micro ohms and the switch freely opens and closes. Switches are provided with silver to silver contacts. These contacts do not tarnish like copper, but they should be "wiped" clean occasionally, especially if the switch has not been operated for some time. This can be done by opening and closing the switch several times in succession. Do not attempt to grind the blades with powered emery or other abrasives. Such practice inevitably results in poor contact and overheating. 8.4 Insulator and Barriers It is necessary that insulator surfaces be kept clean. This is absolutely essential, particularly when the switches are located where cement dust, metallic dust, salt spray, acid fumes and other unfavorable environmental conditions exist. A light detergent is recommended for cleaning the insulators. Do not use any solvents or Alcohol based cleaners when cleaning switches. Make absolutely sure that proper ventilation and other precautions are 14 of 20
16 provided when using any chemical cleaner. Discard and replace any insulators showing signs of treeing or tracking. 8.5 Insulation Check When making an annual check, all insulation should be carefully examined for tracking. Special attention must be given to areas where the conductor lays near a barrier. Examine the surface for cracks or streaked discoloration. When tracking is found the insulation involved must be replaced. 8.6 Bus and Conductor Check Inspect the bus and connections carefully every year for evidence of overheating. It is desirable to measure the resistance to ground with a meter (or use a megger of proper voltage) and between phases of the insulation of bus and connections. A record should be kept of this reading. Weakening of the insulation from one maintenance period to the next period can be recognized from the recorded readings. At recording time, the record should include the temperature, the humidity and the date. 8.7 Operating Shaft The operating shaft connects the stored energy mechanism to the switch operating arms. The shaft is integral with the switch assembly and is bearing mounted. No adjustments are necessary. 8.8 Drawbars Each main blade of the switch is connected to the throw arms of the main operating shaft by an insulating drawbar. These drawbars should be examined during each normal maintenance procedure for signs of contamination buildup, cracking or damage to either end of the drawbar. Blow or wipe off contamination. 8.9 High Potential Tests Field Power-frequency withstand voltage (Hi-Pot) should be performed at 75% of value listed above in table 2. This is recommended whenever periodic field inspection is made Bus Section Check that all bus connection bolts and cable connection bolts are tight and torqued per hardware specification. After cleaning, megger and record the resistance to ground and between phases of the insulation of buses and connections. Since definite limits cannot be given for satisfactory insulation resistance values, a record should be kept of the reading. Weakening of the insulation from one maintenance period to 15 of 20
17 the next can be recognized from the recorded readings. The readings should be taken under similar conditions each time and the record should include temperature and humidity Overall Switchgear a. Remove or reverse lifting brackets after installation. b. Check to see that all anchor bolts and bolts in the structure are tight. c. Check the ground bus connection and mounting bolts for tightness. d. Clean and inspect all painted surfaces. Retouch where necessary. (See section 10.0) e. Check for foreign items such as tools, loose nuts and bolts that are not normally part of the equipment. f. Look for indications of moisture: (1) Staining (2) Tracking over insulators (3) Rust (4) Paint crazing or bubbles g. Inspect for indications of partial discharge (corona): (1) Ozone odors (2) Tracking on bus supports and insulators (3) Cracking or sparking noises (4) Components glowing in the dark h. Check for indications of overheating: (1) Cracked or crazed insulation (2) Discolored bus insulation, paint, etc. j. Check for cleanliness 16 of 20
18 9.0 RE-FUSING CAUTIONS Re-fusing of high-voltage switchgear should be performed only by qualified persons, observing the following precautions. These recommendations may differ from standard operating procedures and safety practices of certain electric utility companies. Where such discrepancy exists, the electric utilities should follow their operating procedures. 1. Adhere to prescribed safety rules at all times. 2. Wear approved and periodically tested rubber gloves, hard hat, safety glasses and flash clothing. 3. Perform operations only in the presence of other qualified persons. 4. Always assume terminals are energized unless proved otherwise by both visual evidence of open circuit and by grounding. 9.1 Live-Front Switchgear (MES) Fuses in live-front switchgear are single phase loadbreak switching devices and should always be operated using a grappler tool attached to a universal hot stick at least 6 long. Refer to separate fuse manufacturer s instruction bulletin for proper operation and re-fusing procedure in addition to proper OSHA regulations NPFA 70E and other applicable standards. 9.2 Dead-Front Switchgear (MDS) Follow the following procedure for replacing or inspecting fuses in dead-front switchgear. Always use an appropriate shotgun style hot stick when opening and closing the fuse door: Disengage Fuse 1. Disconnect loadbreak elbow connector and insert in stand-off bushing in adjacent parking stand. 2. Raise mechanical interlock arm (Item 1) to unlock fuse access door (Figure 3). 3. Pull out on fuse door release eye (Item 2) to de-energize fuse assembly (Figure 4) 4. Slowly pivot fuse door out and down into full open position. (Figure 5) 5. Inspect and replace fuses per fuse manufacturer s instructions. 17 of 20
19 Re-Engage Fuse 1. Attach the hot stick to the release eye (Item 2) and pivot the fuse door back to the position shown in Figure Push fuse door in firmly to ensure contact is fully engaged. 3. Lower mechanical interlock (Item 1) down into locked position. (Figure 3) 4. Re-connect loadbreak elbow to bushing COATING MAINTENANCE Damage to the coating during transportation or installation should be repaired immediately to ensure long term performance from the switchgear enclosure. A small bottle of touch up paint is furnished with each switch product. Small scratches or abrasions should be touched up as soon as possible. Follow the following procedure for more extensive repairs: A. Sand marred or scraped areas with medium sandpaper ( grit). B. Make certain area is clean and free of grease or oil. C. Apply two coats of all purpose primer with a flat brush or small spray gun. D. Feather paint into unmarred portion with light strokes of the brush or light passes with the spray gun. E. When primer has dried, apply two coats of finish paint in the same manner. F. Small narrow scratches may be best covered, using an artist's brush to fill in the scratched area. G. If time allows, give the primer additional drying time and sand between coats. 18 of 20
20 1VAM2205-MB Rev. A June 2009 Copyright 2009 ABB. All rights reserved. ABB Inc. 655 Century Point Lake Mary, FL U.S.A For sales & marketing contact your local Representative or: Tele: Fax:
Replacement of 600-Ampere Bushing and 200-Ampere Bushing-Well Adapters
S&C Vista SD Underground Distribution Switchgear Pad-Mounted and Vault-Mounted Style Outdoor Distribution (17.5 kv and 29 kv) With Visi-Gap Load Interrupter Switches and Visi-Gap Fault Inetrrupters Replacement
Instructions For SF 6 Refill Kit
S&C Vista Underground Distribution Switchgear UnderCover, Vault-Mounted, and Pad-Mounted Styles Instructions For SF 6 Refill Kit TABLE OF CONTENTS Section Page Section Page INTRODUCTION..................................
ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013
ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013 READ CAREFULLY These instructions are intended to cover good practices in
Submit shop drawings for equipment provided under this section Shop drawings shall indicate:
Section 16435 - SWITCHBOARDS Introduction Part 1 - General Reference The work under this section is subject to requirements of the Contract Documents including the General Conditions, Supplementary Conditions,
Operating Manual. Los Angeles Abrasion Machine HM-70A & HM-70AF
Operating Manual Los Angeles Abrasion Machine HM-70A & HM-70AF Rev: 07/19/2012 PHONE: 800-444-1508 P.O. Box 200, Lewis Center, Ohio 43035-0200 FAX: 800-255-5314 740-548-7298 E-mail: [email protected]
Uninterruptible Power Supply. 500 kva - 750 kva
9 315 Uninterruptible Power Supply 500 kva - 750 kva T1 and T3 Installation Addendum 164201244-001 Rev. A ------------------------------------------------------------------------ ------------------------------------------------------------------------
Instructions for Secondary Unit Substation Transformers 150-3000 KVA, Three Phase
ABB Inc. Instruction Booklet Distribution Transformers Jefferson City, MO ISO 9001 Certified I.B. 46-060-1, Section E ILUJ000004-BLE Effective: January, 2008 Instructions for Secondary Unit Substation
INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast
Installation Instructions for Alarm Module Kit A043F059
Instruction Sheet 07-2013 Installation Instructions for Alarm Module Kit A043F059 1 Introduction The information contained within is based on information available at the time of going to print. In line
2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.
2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to
758 Heavy-duty Ratchet Guy Wire Cutter
INSTRUCTION MANUAL 758 Heavy-duty Ratchet Guy Wire Cutter Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Register this product
OWNER S MANUAL Table Tennis Table Patent Pending
OWNER S MANUAL Table Tennis Table Patent Pending Be sure to write your model number and serial number here for future reference. You can find these numbers printed on the bottom of the table. MODEL # T8179
HYDRAULIC LIFT TABLE CART 2200-LB.
HYDRAULIC LIFT TABLE CART 2200-LB. OWNER S MANUAL WARNING: Read carefully and understand all MACHINE ADJUSTMENT AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other
149mm. Walk-Thru Assembly Gate. MODEL NO: 1161, 1167 Owner s Manual. www.regalo-baby.com
149mm 210mm Walk-Thru Assembly Gate MODEL NO: 1161, 1167 Owner s Manual READ ALL INSTRUCTIONS BEFORE ASSEMBLY AND USE OF GATE. KEEP INSTRUCTIONS FOR FUTURE USE. www.regalo-baby.com... Regalo International,
Owners & Installation Manual for the Sheridan, Mountainair, Pine Valley and Old Forge Ceiling Fan Family
Owners & Installation Manual for the Sheridan, Mountainair, Pine Valley and Old Forge Ceiling Fan Family Part of the Kiva Lighting Family Custom Lighting and Fans Since 1992 1312 12th St NW Albuquerque,
AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller
January 2013 AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller Milliken Valve Company 190 Brodhead Avenue, Suite 100 Bethlehem, PA 18017 Phone: (610) 861-8803 Fax:
5800 Temperature Sensor Cable Assembly
5800 Temperature Sensor Cable Assembly Removal and Replacement Instruction Sheet #60-4702-070 Revision D, January 14, 2013 Overview The 5800 has two refrigeration temperature sensors, one attached to the
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
25-kV Apparatus Bushings B Series (bolt-in) for Elbow to Air-Insulated Service 200 Amp, 600 Amp and 1250 Amp
Page 1 2015 Grounded Metal Equipment Plate Equipment Connection Bus Bar or Other Component 15 kv or 25 kv Separable Insulated Connector (elbow) Equipment Connection Power Cable Power Cable Grounded Metal
Maintenance Report MEDIUM VOLTAGE POWER STATION 500SC / 630SC / 800SC / 900SC / 1000 1SC / 1000 2SC / 1250SC / 1600SC / 1800SC / 2000SC
Maintenance Report MEDIUM VOLTAGE POWER STATION 500SC / 630SC / 800SC / 900SC / 1000 1SC / 1000 2SC / 1250SC / 1600SC / 1800SC / 2000SC Project name: Customer: Address, location of the system: Serial number
SEWER CHEWER Wastewater / Sludge Grinder Submersible Gearmotor
INSTALLATION, OPERATION AND MAINTENANCE MANUAL For SEWER CHEWER Wastewater / Sludge Grinder Submersible Gearmotor Yeomans Chicago Corporation 3905 Enterprise Court P.O. Box 6620 Aurora, IL 60598-0620 Phone:
ATS Overhead Table Shelf System INSTRUCTION MANUAL
ATS Overhead Table Shelf System INSTRUCTION MANUAL ATS Overhead Table Shelf System Instruction Manual Warranty Newport Corporation warrants this product to be free of defects in material and workmanship
Active and Passive Sash Replacement
for Andersen Gliding Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete the procedure, call Andersen at 1-888-888-7020 for
Table of Contents. www.hunterfan.com. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.
www.hunterfan.com Table of Contents What to Expect with Your Installation 30 inches Hanging the Fan Wiring 8 Maintenance, Operation & Cleaning Light Kit 13??? 14 1 9 Troubleshooting 11 5 Blades Motor Housing
HYDRAULIC TABLE CART 500-LB.
HYDRAULIC TABLE CART 500-LB. OWNER S MANUAL WARNING: Read carefully and understand all MACHINE ADJUSTMENT AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic
JANUS INTERNATIONAL CORPORATION INSTALLATION INSTRUCTIONS Pantheon Mini Operator
JANUS INTERNATIONAL CORPORATION INSTALLATION INSTRUCTIONS Pantheon Mini Operator The Janus Pantheon mini operator does not typically require the provision of any additional site requirements other than
Owner s Guide and Installation Manual. Vancouver Model Name. 21321, 21328 Model No. English Español
For Your Records and Warranty Assistance For reference, also attach your receipt or a copy of your receipt to the manual. Vancouver Model Name 21321, 21328 Model No. Type A Models Owner s Guide and Installation
Step 1. Item 6. Item 1
Voltage Regulators QD3/T350 Motor Replacement Kit Kit Number 57A63675100B Service Information S225-50-35 Contents General..................................... 1 Parts Supplied...............................
Assembly and Usage Instructions
Assembly and Usage Instructions A Product 5885 West Van Horn Tavern Road Columbia, MO 65203 www.caldwellshooting.com Instruction #1001667 Limited Warranty Every Caldwell product is warrantied to be free
Multi-Pitch Pitching Machine USER MANUAL
Multi-Pitch Pitching Machine USER MANUAL TABLE OF CONTENTS Thank you for purchasing the Cimarron Multi-Pitch Pitching Machine. The Cimarron Multi-Pitch Pitching Machine is a high performance pitching machine
15GAL STEEL OIL DRAIN WITH 110V PUMP
15GAL STEEL OIL DRAIN WITH 110V PUMP OWNER S MANUAL WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety
Table of Contents WARNING SYMBOLS AND DEFINITIONS
Table of Contents SAFETY INSTALLATION OPERATION MAINTENANCE Safety... 2 Specifications... 4 Installation... 5 Operation... 8 WARNING SYMBOLS AND DEFINITIONS Maintenance... 9 Parts List and Assembly Diagram...
Owner s Manual Gantry Cranes
Owner s Manual Gantry Cranes Fixed Height Gantry Crane MODEL NUMBER: SERIAL NUMBER: CAPACITY IN TONS: Telescoping Gantry Crane Bushman AvonTec 262-790-4200, 800338-7810, Fax 262-790-4200 www.bushmanavontec.com
Rebuild Instructions for 70001 and 70010 Transmission
Rebuild Instructions for 70001 and 70010 Transmission Brinn, Incorporated 1615 Tech Drive Bay City, MI 48706 Telephone 989.686.8920 Fax 989.686.6520 www.brinninc.com Notice Read all instructions before
Mechanical Installation
Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s
TABLE OF CONTENTS. I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2
BAL Accu-Slide System I. Table of Contents TABLE OF CONTENTS I. TROUBLESHOOTING... 2 - Section 1.01: Common Problems/Solutions... 2 II. GETTING STARTED... 5 - Section 2.01: Tools You Will Need... 5 - Section
Instructions and precautions. Fork Height. Visit our website at: http://www.harborfreight.com
Pallet Jack Item 68760 / 68761 Instructions and precautions Specifications Capacity Control Lever Fork Height Fork Length Fork Width Maximum Minimum Width over Forks Steering Wheel Dia. 2-1/2 Ton (5,000
INSTALLATION AND MAINTENANCE INSTRUCTIONS FOR THREE PHASE INDUCTION MOTORS
INSTALLATION AND MAINTENANCE INSTRUCTIONS FOR THREE PHASE INDUCTION MOTORS Frames 143T - 449TZ 5100 North IH 35 Round Rock, Texas 78681 Phone: 800-451-8798 512-255-4141 Fax: 512-244-5512 RECEIVING 1. Check
2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure
2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure Derek Guenther 1/28/2015 Rev. Purpose The purpose of this document is to describe the procedure necessary to replace one of the ball nuts
Specification Guide. for RVAC. Direct Replacement. AC Medium Voltage. Circuit Breakers
Specification Guide for RVAC Direct Replacement AC Medium Voltage Circuit Breakers Table of Contents 1.0 General Work Scope...3 2.0 Standards...3 3.0 Supplier Qualifications...4 4.0 Circuit Breaker Element
RAY-MAX Integrated Solar Power Strip
RAY-MAX Integrated Solar Power Strip 600008, 600009, 600010, 600208, 600209, 600210 Owner s Manual NEXTRONEX, INC. Revision Date: 10/27/14 Contents 1. Safety Instructions... 3 2. General Equipment Warnings...
ZAPPY 3 OWNER S MANUAL. Read this manual completely before riding your Electric ZAPPY 3.
ZAPPY 3 OWNER S MANUAL Read this manual completely before riding your Electric ZAPPY 3. TECHNICAL INFORMATION Model No. : ZAPPY 3 Product size Type of motor Motor power Battery type Battery Charger Charging
Series 30000 Hose Reels
Operating Instructions and Parts List for Series 30000 Hose Reels - MANUAL DRIVEN - - POWER DRIVEN - SAFETY PRECAUTIONS Personal injury and/or equipment damage may result if proper safety precautions are
PEDAL CAR - GO CART ASSEMBLY & OPERATING INSTRUCTIONS
PEDAL CAR - GO CART 42822 ASSEMBLY & OPERATING INSTRUCTIONS 3491 Mission Oaks Blvd., Camarillo, CA 93011 Visit our Web site at: http://www.harborfreight.com Copyright 2000 by Harbor Freight Tools. All
Unit: mm(in) Item Standard value Service limit Axle shaft run out - 0.2(0.008)
Rear Wheel/Brake/Suspension 13. Rear Wheel/Brake/Suspension Service Information 13-1 Troubleshooting 13-2 Rear Wheel 13-3 Rear Cushion 13-4 Rear Swing Arm 13-7 Service Information General Safety If the
1000-LB. TRAILER JACK OWNER S MANUAL
1000-LB. TRAILER JACK OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious
Installer s Guide WARNING: 18-GJ11D1-2. Ultraviolet (UV-C) Lamp Kit for 2-5 Ton Air Handlers HAZARDOUS VOLTAGE - DISCONNECT POWER BEFORE SERVICING
Installer s Guide 18-GJ11D1-2 : Models: BAYUVCLK001-40 Watt, 2 Lamp NOTE: A BAYCC24VK01 can be installed for Series 8 Air Handlers to extend the life of the lamp. This accessory kit will disable the lamp
MBSAW. Meat Cutting Band Saw With Meat Grinder Assembly & Operating Instructions
06/2011 MBSAW Meat Cutting Band Saw With Meat Grinder Assembly & Operating Instructions READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. This manual provides important information on proper
FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions
FJ2 2 Ton Trolley Floor Jack Assembly & Operating Instructions READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. This manual provides important information on proper operation & maintenance.
Masterclad 5 15 kv Arc Resistant Metal-Clad Indoor Switchgear
Masterclad 5 15 kv Arc Resistant Metal-Clad Indoor Switchgear Class 6055 Instruction Bulletin 6055-62 06/2012 Retain for future use. Hazard Categories and Special Symbols Read these instructions carefully
Installation. Smart-UPS VT and MGE Galaxy 3500. Maintenance Bypass Panel with Power Distribution (wall-mount) 10-30 kva 208 V
Installation Smart-UPS VT and MGE Galaxy 3500 Maintenance Bypass Panel with Power Distribution (wall-mount) 10-30 kva 208 V Contents Safety... 1 SAVE THESE INSTRUCTIONS...............................
Union County Public Schools. Facilities Department. Electrical. Safe Work Practices
1 Union County Public Schools Facilities Department Electrical Safe Work Practices 2 Purpose In accordance with OSHA Standards 1910.331-335, safety-related work practices shall be used by Union County
Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin
Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product
Tri-Homo Style Operation and Maintenance Instructions
Tri-Homo Style Operation and Maintenance Instructions One Research Drive Stratford, CT 06615 (203) 375-0063 www.sonicmixing.com 1 Installation and Start-up Do not perform following adjustments without
MG1532 & MG2032 MIXER-GRINDERS
MIXER-GRINDER MG1532 & MG2032 MIXER-GRINDERS MODEL MG1532 ML-134099 7.5 HP Grind Motor + 1 HP Mix Motor MG1532 ML-134103 5 HP Grind Motor + 1 HP Mix Motor MG1532 ML-134100 7.5 HP Grind Motor + 1 HP Mix
Dead Tank Outdoor Vacuum Circuit Breaker, Type VOX
Dead Tank Outdoor Vacuum Circuit Breaker, Type VOX Class 6065 Instruction Bulletin 6065-13 11/2011 Retain for future use. Hazard Categories and Special Symbols Read these instructions carefully and look
8" BENCH GRINDER OWNER'S MANUAL
8" BENCH GRINDER OWNER'S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious personal
Owner s Manual & Safety Instructions
Owner s Manual & Safety Instructions Save This Manual Keep this manual for the safety warnings and precautions, assembly, operating, inspection, maintenance and cleaning procedures. Write the product s
SBC90. Abrasive Blast Cabinet Assembly & Operating Instructions
SBC90 Abrasive Blast Cabinet Assembly & Operating Instructions READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. This manual provides important
Owner s Manual Read and keep this manual. Patents World Wide
Owner s Manual Read and keep this manual. Patents World Wide S & S Industries, Inc., Sarasota, FL, USA www.trail-gator.com Copyright 2008 All Rights Reserved The following manual is provided to assist
GEK-90214B. GE Lift Truck. User s Guide 144D2933G1 144D2912G1 144D2911G5
g GEK-90214B GE Lift Truck User s Guide 144D2933G1 144D2912G1 144D2911G5 GE LIFT TRUCK EACH USER HAS THE RESPONSIBILITY TO INSTRUCT ALL PERSONNEL ASSOCIATED WITH THIS EQUIPMENT ON ALL SAFETY PRECAUTIONS
WIRE AND CABLE ENGINEERING GUIDE
DC Hi Pot Testing Excerpt from PRYSMIAN S WIRE AND CABLE ENGINEERING GUIDE (FOR INFORMATIONAL PURPOSES ONLY) Page 1 of 6 DC HIGH POTENTIAL TESTING DC Hi-Pot testing can be applied as a withstand test (a
SAFETY & OPERATING INSTRUCTIONS
SAFETY & OPERATING INSTRUCTIONS EDLUND TOMATO LASER, Models ETL -316, -140 & -380 READ AND UNDERSTAND THIS MANUAL AND ALL INSTRUCTIONS BEFORE OPERATING THIS SLICER. 159 Industrial Parkway, Burlington,
Vacuum Circuit Breaker Type VAD-3
Instruction Bulletin Bulletin 6055-11 Vacuum Circuit Breaker Type VAD-3 4.76 kv, 29 ka (250 MVA) 4.76 kv, 41 ka (350 MVA) 8.25 kv, 33 ka (500 MVA) 15.0 kv, 18 ka (500 MVA) 15.0 kv, 28 ka (750 MVA) 15,0
Installation. Smart-UPS VT MGE Galaxy 3500. Maintenance Bypass Panel. 10-40 kva 400 V
Installation Smart-UPS VT MGE Galaxy 3500 Maintenance Bypass Panel 10-40 kva 400 V Contents Safety.................................................. 1 Save these instructions...................................
PALLET JACK - 2.5 TON
PALLET JACK - 2.5 TON 39939 SET UP AND OPERATING INSTRUCTIONS Visit our website at: http://www.harborfreight.com Read this material before using this product. Failure to do so can result in serious injury.
Flat Bottom Long Ram Hydraulic Jack
Flat Bottom Long Ram Hydraulic Jack 3 Ton 8 Ton 36468 36469 ASSEMBLY & OPERATING INSTRUCTIONS 349 Mission Oaks Blvd., Camarillo, CA 930 Visit our Web site at http://www.harborfreight.com TO PREVENT SERIOUS
GreenWay Solar LED Path and Trail Lighting System. Installation and Owner s Manual
GreenWay Solar LED Path and Trail Lighting System Installation and Owner s Manual Important Notes and Warnings This installation and instruction manual provides installation, operation, and maintenance
LUCCI AIRFUSION QUEST II CEILING FAN
LUCCI AIRFUSION QUEST II CEILING FAN WITH IR REMOTE INSTALLATION OPERATION MAINTENANCE WARRANTY INFORMATION CAUTION READ INSTRUCTIONS CAREFULLY FOR SAFE INSTALLATION AND FAN OPERATION. V1.0 QUEST II IR
This section applies to the design and installation of transformers.
ELECTRICAL: TRANSFORMERS BASIS OF DESIGN This section applies to the design and installation of transformers. Design Criteria 13.8-kV equipment shall be 15-kV class. Coordinate with short-circuit studies
3/4 PIPE CLAMP WITH STAND
3/4 PIPE CLAMP WITH STAND Model 94053 ASSEMBLY AND OPERATING INSTRUCTIONS (3/4 DIAMETER PIPE NOT INCLUDED.) 3491 Mission Oaks Blvd., Camarillo, CA 93011 Visit our Web site at: http://www.harborfreight.com
CONTROL PANEL INSTALLATION INSTRUCTIONS. Single Phase Simplex Page 2-7. 3-Phase Simplex Page 8-13
CONTROL PANEL INSTALLATION INSTRUCTIONS Single Phase Simplex Page 2-7 3-Phase Simplex Page 8-13 Single Phase Simplex SXL21=3, SXL24=3, SXH21=3, and SXH24=3 Manufactured by SJE-Rhombus Installation Instructions
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
OPERATOR S MANUAL 18 VOLT, 1 HOUR CHARGER
OPERATOR S MANUAL 18 VOLT, 1 HOUR CHARGER P110 Your battery charger has been engineered and manufactured to Ryobi s high standard for dependability, ease of operation, and operator safety. When properly
SELF-STEERING AXLE TABLE OF CONTENTS
SELF-STEERING AXLE TABLE OF CONTENTS Section 1 - Introduction Section 2 - Pre-Installation Check List Section 3 - Ride Height Adjustments Section 4 - Suspension Mount Section 5 - Axle Mount Section 6 -
4RU High Density Shelf Installation Instructions
4RU High Density Shelf Installation Instructions Table of Contents General Product Information... 1.0 Safety Precautions... 2.0 Tools Required... 3.0 Package Contents... 4.0 Installing the Product Unpacking...
IEC Three Phase AC Motors (Aluminum Frame) Installation & Operating Manual
IEC Three Phase AC Motors (Aluminum Frame) Installation & Operating Manual 7/09 MN301 Table of Contents Section 1 General Information.................................................. 1-1 Overview........................................................
Basement Window Installation Guide Hopper and Sliding
Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant
City Of Ottawa High Voltage Substation Inspection, Maintenance Rev 00 2015 July 17 and Testing, ROPEC Page 1
2015 July 17 and Testing, ROPEC Page 1 PART 1 GENERAL 1.1. Scope.1 Equipment replacement and testing for a 44 kv 4.16kV/600V substation: a. Replacement of Insulators as indicated on the drawings in Appendix
Operating Instructions
Operating Instructions Series L 000 Cord Reels Model Numbers: L 000 L 0 0 L 0 B L 0 X L 00 L A X L 0 L 0 0 L 00 L 0 L 0 B L 0 0 X L 00 L 0 A L 0 X IMPORTANT Read this manual carefully before installing,
Front brakes (FN- 3), servicing
j a t Front brakes (FN- 3), servicing 46-1 Front brakes, servicing Note: Install complete repair kit. After replacing brake pads and before moving vehicle, depress brake pedal several times firmly to properly
Express5800/120Ed. Rack Mount Kit Installation Procedures PN: 455-01607-001
Express5800/120Ed Rack Mount Kit Installation Procedures PN: 455-01607-001 Proprietary Notice and Liability Disclaimer The information disclosed in this document, including all designs and related materials,
QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS
QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine TM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
CHROME FRONT BRAKE MASTER CYLINDER KIT
-J075 REV. 009-0-0 CHROME FRONT BRAKE MASTER CYLINDER KIT GENERAL Kit Number 5-99D, 5-99D Models These Chrome Master Cylinder Kits are designed to replace the original equipment front brake master cylinder
Operating Instructions
Operating Instructions Series L 4000 Spring Driven Cord Reels 63 3 3 3 7A 63 0 63 3 3-RP 3 7B 63 X 6 3 3A 63 8 3 X 6 3 3A-RP 63 8 L 4000 63 3 3 3B 63 9 L 400 63 3-RP A 63 5 3 9 L 4500 63 3 A 63 5 3 9G
CEILING CASSETTE FAN COIL UNIT
CEILING CASSETTE FAN COIL UNIT Operation and Installation Manual MHCFC4W-04, 08, 12, 16 Four way ceiling cassette fan coil unit Please read this manual before using the fan coil unit. Installation and
Extra Tall Wide Span Gate
Extra Tall Wide Span Gate MODEL NO: 1154 Owner s Manual 11/19/2013_BL READ ALL INSTRUCTIONS BEFORE ASSEMBLY AND USE OF GATE. KEEP INSTRUCTIONS FOR FUTURE USE. www.regalo-baby.com... Regalo International,
-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX
-1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.
Lightning Arresters P30027 18 KVA P30038 10 KVA. Description & Installation
Lightning Arresters P30027 18 KVA P30038 10 KVA Description & Installation Printed in USA 09/11 TO330 Rev. B Table of Contents Page 1.0 SCOPE 2 2.0 PRODUCT OVERVIEW 2 2.1 Intended Uses 2 2.2 Lightning
IMPORTANT SAFETY INSTRUCTIONS WARNING READ AND SAVE THESE OPERATING AND SAFETY INSTRUCTIONS BEFORE USING THIS HEATER.
THERMAWAVE CERAMIC HEATER Model HZ-850 Series Model HZ-860 Series IMPORTANT SAFETY INSTRUCTIONS WARNING READ AND SAVE THESE OPERATING AND SAFETY INSTRUCTIONS BEFORE USING THIS HEATER. Warning Failure to
Digital Fingerprint safe
Digital Fingerprint safe Model 96846 Operation Instructions Diagrams within this manual may not be drawn proportionally. Due to continuing improvements, actual product may differ slightly from the product
INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks
Securitron Magnalock Corp. www.securitron.com ASSA ABLOY, the global leader Tel 800.624.5625 [email protected] in door opening solutions INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
The following components are common to most cubicles; this example is an ABB HK cubicle.
4.0 CIRCUIT BREAKER CUBICLE Learning Objectives The circuit breaker cubicle is the component of the switchgear that holds the circuit breaker, and the controls and cabling for the distribution system.
ELECTRIC UTILITY SERVICE EQUIPMENT REQUIREMENTS COMMITTEE, EUSERC
ELECTRICAL SERVICE REQUIREMENTS ELECTRIC UTILITY SERVICE EQUIPMENT REQUIREMENTS COMMITTEE, EUSERC TABLE OF CONTENTS TITLE SECTION NO. List of Approved Electric Utility Service Equipment Requirements Committee
BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS
BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS PLEASE READ COMPLETE INSTRUCTIONS BEFORE YOU BEGIN LEAVE INSTALLATION INSTRUCTIONS AND USER'S GUIDE WITH OWNER ALL ELECTRIC WIRING AND PLUMBING MUST BE DONE
MODEL T200-F18 MODEL T125-F18 Finish Nailers
P MODEL T200-F18 MODEL T125-F18 Finish Nailers IMPORTANT! DO NOT DESTROY It is the customer s responsibility to have all operators and service personnel read and understand this manual. OPERATING MANUAL
INSTALLATION and OPERATION RANGE BALL CONVEYOR MODEL NO: BC-001AN
Easy Picker Golf Products, Inc. 415 Leonard Blvd. N., Lehigh Acres, FL 33971 PH: 239-368-6600 FAX: 239-369-1579 Service: 800-982-4653 SALES: 800-641-4653 www.easypicker.com [email protected] INSTALLATION
INTRODUCTION KINGPIN REPLACEMENT
KINGPIN REPLACEMENT Author: Randy Baumann All information, illustrations and specifications are based on the best information available at the time of publication. The author cannot guarantee the accuracy
