Automated identification of hazardous scenarios due to human errors in batch plant operation

Size: px
Start display at page:

Download "Automated identification of hazardous scenarios due to human errors in batch plant operation"

Transcription

1 Automated identification of hazardous scenarios due to human errors in batch plant operation Abstract C.Palmer, P.W.H. Chung and D.F. Zhou Department of Computer Science, Loughborough University, Leicestershire, LE11 3TU, UK. S.A. McCoy Hazid Technologies LTD, Beeston, Nottingham, NG9 2ND, UK HAZOP studies are widely used for identifying hazard and operability problems during plant design. However, the application of the technique is very repetitive and time consuming. Research into the automation of HAZOP has been motivated by the opportunity for reducing the considerable time spent by engineers. Much of the research on automated hazard identification so far has concentrated on continuous plants by considering the causes and consequences of deviations from steady state. This paper focuses primarily on batch processes where a batch plant moves through a number of different stages during operation. It investigates the use of qualitative simulation and knowledge-based techniques to analyse the effect of following a sequence of operating instructions on a plant. To create an automated system for batch HAZOP, a number of research issues had to be addressed. These include the formal representation of operating instructions, the generation of deviation from normal operation, the propagation of effects of the results of a sequence of operations and the identification of potential hazardous consequences. CHECKOP is a prototype batch HAZOP system that is being developed at Loughborough University. It takes a plant description and a set of operating instructions as input and produces a HAZOP report automatically. In this paper the novel features of CHECKOP for addressing these issues will be described. The overall system architecture and the details of the major components of the systems will also be discussed. The capabilities and limitations of CHECKOP will be illustrated through a number of examples. 1 Introduction HAZOP studies are widely used for identifying hazard and operability problems during plant design. However, the application of the technique is very repetitive and time consuming. One way to overcome this bottleneck is to develop automated hazard identification systems that emulate the HAZOP technique. Much of the research on automated hazard identification so far has concentrated on continuous plants by considering the causes and consequences of deviations from steady state. The computing technique used is generally based on the idea of fault propagation using signed-directed graph (Chung, 1993; Vaidhyanathan and Venkatasubramanian, 1995). While a lot of progress has been made in this area (McCoy et al, 2000a and 2000b; Chung et al, 2003), very little work has been done in automated hazard identification of batch plants. In batch processes the plant operation moves through a number of stages, rather than each equipment item remaining in a steady state indefinitely, as is normal for continuously operating plants. The changes in equipment state over time mean that batch processes are more difficult to model accurately than continuous processes. Batch processes require the state of the plant to be expressed. A method of representing a sequence of actions (operating instructions) to achieve a state is also needed. These are not captured by the signeddirected graph technique (McCoy et al, 2003). A new approach is being sought (Chung and McCoy, 2004; McCoy et al, 2004). This paper describes a research project that considers the use of qualitative simulation and knowledge-based techniques to analyse the effect following a sequence of operating instructions has on a plant. It commences by describing a simple batch plant case study. A number of research issues which had to be addressed in order to create an automated system for batch HAZOP are considered. A prototype batch HAZOP system, CHECKOP, is described. The novel features contained within it for addressing the research issues are detailed. Examples from the case study are used to illustrate the capabilities and limitations of CHECKOP.

2 Figure 1 A Simple Batch Processing Plant Example 2 Batch Reactor Case Study In order to demonstrate how the prototype batch HAZOP system, CHECKOP, is used to aid batch HAZOP of a process, the simple batch processing plant illustrated in Figure 1 is considered. The reactor shown produces a product P from two reactants A and B, using the simple chemical reaction A + B P. An excess of reactant B is used so that reactant A is completely consumed in the reactor. To safely produce the product, a sequence of operating instructions is followed by the human operators of the plant. A simplified example of such a sequence might be: 1. Charge the reactor with reactant A. 2. Turn on the agitator and the cooling water flow through the cooling jacket. 3. Gradually add a sufficient excess of reactant B to the vessel. 4. Continue mixing reactor contents for a while, to allow reaction to complete. 5. Pump the product mixture away for separation. 6. When reactor is empty, switch off mixer, product transfer pump and cooling water. 7. Wash reactor internals thoroughly with water. 3 Research Issues In order for an operating procedure to be analysed by a computerized system it must be formally represented. Instructions written in natural language style are difficult for the computer to understand and their meaning may also be ambiguous. Some means of representing the (typically) implicit assumptions associated with each step is needed. For instance, the procedure shown in section 2 assumes that the reactor is clean and empty at the start of the batch. If, however, an operator had not adequately washed the reactor, or (worse still) had not pumped away the product mixture after the last batch had finished, adding reactant A to the reactor in such a state could have potentially hazardous consequences (such as a premature reaction with reactant B present from the last batch). Predicting such consequences is possible if some way of representing the sequence of actions in the procedure is available, as well as a way of expressing the assumed state of the plant items before and after each of the steps.

3 A combination of human error analysis and process modelling can be used to detect these situations and to suggest redesign of the plant to eliminate such dangers. HAZOP studies are performed by a multi-disciplinary team of experts. A study considers all possible deviations of a plant from its intended operation, by using deviation guidewords (None, More of, Less of, Part of, Other) applied to each of the process variables (flow, pressure, temperature, etc.) in the plant in turn (Lawley, 1974). The causes and consequences of each of these deviations are then examined, and a report of all the important hazards and operability problems is prepared. For a continuous plant the expected operation of the plant is a single steady state, and deviations from that are disturbances in the pressures, temperatures, flows, etc. in the plant. For Batch HAZOP this method is extended to consider deviations from the intended state of the plant during each of the stages of its operations. The technique also looks at variations in the operating instructions of the plant, to consider what would happen if operations were missed out, performed in the wrong order, for too long a time, etc. 4 CHECKOP System Overview A research prototype, CHECKOP, has been created to address the research issues detailed. The CHECKOP system consists of three main components, takes a number of files as input and generates a report file as output as shown in Figure 2. Plant Description File Plant specific Operating Procedure File Internal Plant Model Parser Internal Procedure Model Action Model Library Simulation Engine Modified Procedure Deviation Generator Batch HAZOP Report CHECKOP Figure 2 The components of CHECKOP 5 CHECKOP Features The three main components of the system are the Parser, the Deviation Generator and the Simulation Engine. The Parser reads the input files prepared by the user and converts the information into an internal form for

4 processing by the other two components. The information provided by the user is specific to the plant that is required to be HAZOPed. One of the files gives details about the items of equipment in the plant, their connectivities and their current states. The other file contains a set of operating instructions to be applied to the plant to bring the plant from its initial state to its goal state, whilst also achieving the production of a batch of product! The Deviation Generator systematically applies the deviation guidewords to the operating procedure so that the Simulation Engine can infer what will be the consequence if a certain instruction in the procedure is not executed, or if the instruction is carried out too early or too late, etc. Having gone through all the deviations, the Simulation Engine will produce a report file providing warnings against any undesirable situations that may result from the deviations. To carry out the simulation the Simulation Engine requires the Action Model Library which provides information about actions that can be performed on different pieces of equipment and the effects of those actions. 5.1 Plant Description An object-oriented approach is used to describe the plant. Consider the batch plant shown in figure 1; each item in the plant is declared in the plant description file. For each item at least the following basic information is given: The type of unit it belongs to; Which other plant items it is connected to. Other appropriate information related to a plant item will also be stored with that plant item. Table 1 provides some example descriptions of the plant items found in figure 1. Formal plant item declaration instance(tank101 isa tank, [ content info [reactanta], outports info [out is [pump101,in]] ]). instance(pump101 isa pump, [ status is offline, outports info [out is [valve101,in]] ]). instance(valve101 isa valve, [ status is closed, outports info [out is [reactor101, in2]] ]). instance(reactor101 isa stirred_tank_reactor, [ outports info [out1 is [valve103,in], out2 is [valve106,in]], heatsink info [hout is [jacket101,hin]], Explanation Tank101 is a tank The content of the tank is reactanta The outlet of the tank is connected to the inlet of pump101 Pump101 is a pump The status of the pump is off-line The outlet of the pump is connected to the inlet of valve101 Valve101 is a valve The status of the valve is closed The outlet of the valve is connected to inlet 2 of reactor101 Reactor101 is a stirred-tank-reactor The outlet 1 of the reactor is connected to the inlet of valve 101 and outlet 2 is connected to valve 106 The heat of the reactor is transferred to jacket 101 The intended reaction is called reaction_ab_p reaction info [reaction_ab_p] ]). Table 1 Explanation of Plant Description

5 By convention the batch plant is given in its idle state, with all valves closed and all pumps off-line. During operation the states of these equipment items are changed by the action of plant operations. 5.2 Operating Procedure Description In order to avoid the difficulties and ambiguities caused by natural language, the operating procedures supplied as input to CHECKOP are composed using a formal template representation. The following templates are utilised: Template 1: Item Action Example: valve101 open Template 2: Item Action until Condition Example: mixer on until elapsed-time 20 minutes Template 3: Item1 Action Item2 Filler-word Fluid until Condition Example: reactor101 fill-from tank101 with reactanta until volume 30 percent Given the plant shown in figure 1, the instructions for charging reactor101 with reactanta can be expressed as: valve101 open pump101 start reactor101 fill-from tank101 with reactanta until volume 30 percent pump101 stop valve101 close An input file of operating instructions for CHECKOP is shown in figure 3 below. Compare this with the operating instruction sequence for human operators given in the Batch Reactor Case Study section (section 2). (1) valve101 open (2) pump101 start (3) reactor101 fill_from tank101 with reactanta until volume 30 percent (6) agitator turn_on (7) valve104 open (8) jacket1 cool_content until temperature 25 degree (9) valve102 open (10) pump102 start (11) reactor101 fill_from tank102 with reactantb until volume 60 percent (12) pump102 stop (13) valve102 close (14) agitator stir_content of reactor101 until elapsed_time 20 minutes (15) valve103 open (16) pump103 start (17) reactor101 empty_to tank103 with [reactantb, productp] until volume 0 percent (18) pump103 stop (19) valve103 close (20) agitator turn_off (21) valve104 close (22) valve106 open (23) valve105 open (24) reactor101 wash with water (25) valve105 close (26) valve106 close Figure 3 Example Operating Procedure for Batch Plant Some of the arguments given in this operating procedure may seem to be redundant, but they do play a part as a way of checking the plant state during operation against the stated intention of the action in the instructions. For

6 example in the action reactor101 fill-from tank101 with reactanta until volume 30 percent the with reactanta part may be considered as a check that tank101 is a source of reactanta just in case the tank contents have been contaminated, or the action wrongly executed, for instance. Some of the actions shown in figure 3 necessitate more operator involvement, and may therefore not seem to be not primitive when compared to others (e.g. compare pump101 start to reactor101 wash with water ). This is inevitable, but does not prevent simulating the state of the plant during operation. The file containing the operating instructions for operating the plant is read in by CHECKOP and translated into its internal form. 5.3 The Deviation Generator The Deviation Generator component of CHECKOP applies the batch HAZOP guidewords. The guidewords are utilized by introducing a particular error into an operating procedure. The Deviation Generator applies the guide words no, early and late systematically to generate different versions of the operating procedure. This allows CHECKOP to explore the consequences of different scenarios that could result from human errors made by the operators. By applying the guideword no to the following example procedure: Charge Reactor101 with reactanta (1) valve101 open (2) pump101 start (3) reactor101 fill-from tank101 with reactanta until volume 30 percent the Deviation Generator will remove systematically one instruction at a time from the procedure, which will result in five different operations. Each represents an error of omission, i.e. an operator failed, or forgot, to carry out a specified instruction. For example, procedure with instruction 1 omitted: (2) pump101 start (3) reactor101 fill-from tank101 with reactanta until volume 30 percent Procedure with instruction 2 omitted: (1) valve101 open (3) reactor101 fill-from tank101 with reactanta until volume 30 percent When the guide word early is applied to the operation, actions are moved earlier in the procedure. For example, moving the instruction reactor101 fill-from tank101 with reactanta until volume 30 percent two steps forward will result in the procedure: (3) reactor101 fill-from tank101 with reactanta until volume 30 percent (1) valve101 open (2) pump101 start All the different procedures generated by the Deviation Generator are passed to the Simulation Engine for analysis to identify operability problems and potential hazardous situations.

7 5.4 Simulation Engine The heart of the CHECKOP system is the simulation engine. Given an operating procedure, it applies each of the instructions one at a time and simulates its effect by changing the state of the plant. Therefore, the plant moves from one state to another until all the instructions are completed. However, the execution of a procedure may not always reach its end. This is because when the simulation engine detects an operability problem or hazardous situation it will report this to the user. For example, an analysis of the example procedure with instruction one missing will result in the following warning: There is no flow path between tank101 and reactor101 for filling. The simulation engine will work systematically through all the procedures generated by the deviation generator. 5.5 The Action Model Library Associated with each plant item type there is an action model in the Action Model Library. An object-oriented approach is used, so that each model inherits the properties from its class definition. The model specifies the operations that can be carried out on that type of plant item. For each action the pre-conditions that must be true before the action and the post-conditions after the action are stated. For example, the actions for a valve can be open or close. In its general form, there is no pre-condition for opening or closing a valve. However, the post-condition for opening a valve is that a flow path exists between the upstream unit and the downstream unit. The post-condition for closing a valve is that the flow path between the upstream unit and the downstream unit no longer exists. The actions for a pump can be start or stop. To start a pump, the pre-conditions are that there must be a flow path between the source of a fluid and the pump and there must be a flow path between the pump and the sink. If the pre-conditions are not met then the start operation will generate a warning message. The post-condition of starting a pump is that there is a flow between the source and the sink. On the other hand, there is no precondition for stopping a pump and the post-condition of stopping a pump is that there is no flow between the source and the sink. 6 Sample Runs A sample of the type of output produced by CHECKOP is given in Table 2, which shows the results for the examples given in the Deviator Generator section (section 5.3). Guideword Action Consequences No action (1) valve101 open (2) pump101 deadheading, equipment damage. (2) pump101 overheating. (3) reactor101 cannot be filled from tank101 because there is no flow path. (6) agitator running while vessel empty. No action (2) pump101 start (3) reactor101 cannot be filled from tank101 because there is no driving force for flow. Early action (3) reactor101 fill from tank101 with reactanta until volume 30 percent (-2) reactor101 cannot be filled from tank101 because there is no flow path. Table 2 Sample Batch HAZOP results from CHECKOP

8 The format shown here is similar to that produced in a traditional HAZOP study, except for the absence of a column for Causes and for Suggested Actions. The deviations generated by CHECKOP are deemed to be sufficient cause for the scenarios reported. CHECKOP does not advise on how to solve the problems it detects. The instructions in the operating procedure are referred to by line number in the Action and Consequences column. If no such number is given in the consequences column, then the operation referred to by that consequence is the deviated one. For Early/Late action, a number is given in parentheses after the entry in the Action column this gives the number of sequence steps early or late that the action takes place, for the deviation considered. 7 Discussion and Future Work When both input files have been processed, CHECKOP proceeds to examine deviations from the intended operating instructions and to simulate the plant operation for each deviation as explained above. For each simulation, it detects when hazardous situations or operability problems arise and reports them. It also continues the simulation after such problems, to see if there are further consequences later on if the procedure is followed blindly. This policy is most likely to over-report hazards because problems are usually (but not always) noticed when they occur. Nevertheless, over-reporting is preferable to missing something important. Further work is required on the deviation generator part of CHECKOP, in order to allow it to generate the most credible deviations of a given operating instruction. No action is straightforward there are only a limited number of ways of applying this guideword. Early action and Late action present more difficult decisions how far is it permissible to move the action? Without a sensible limit on this, exhaustive examination could bury the user in unwanted detail. A wider range of deviation guidewords needs to be considered, as automatically applied to actions in the operating instructions. So far, No Action and Early/Late Action have been considered and modelled. The next step is to fully consider Shorter/Longer Action, where the action is performed for a longer or shorter time than intended. This is particularly applicable for those actions which have an until clause (e.g. what happens if reactor101 is only filled to 10% instead of 30%?). Variants of the Other Action guide word should also be considered. This would include considering what happens if the action is performed on the wrong piece of equipment (e.g. what if the wrong pump is switched off?). Care needs to be taken to ensure that the most sensible and likely deviations are created for a given guide word, as the potential number of variations for even a single action step is huge. The Action Model Library is limited and requires further development work, to cover a wider range of actions; additionally, some of the existing action models need enhancing, to ensure that their pre-conditions and postconditions are as accurate as possible. CHECKOP s operating procedure templates describe primitive actions. A method is needed of organising the actions into either unordered groups or ordered sequences. Thus the example operating procedure shown in figure 3 could be organised as follows: charge reactor101 with reactanta: (1) valve101 open (2) pump101 start (3) reactor101 fill_from tank101 with reactanta until volume 30 percent start_up reactor101 cooling and agitator: (6) agitator turn_on (7) valve104 open (8) jacket1 cool_content until temperature 25 degree charge reactor101 from tank102 with excess of reactantb: (9) valve102 open (10) pump102 start (11) reactor101 fill_from tank102 with reactantb until volume 60 percent (12) pump102 stop (13) valve102 close wait until reaction complete:

9 (14) agitator stir_content of reactor101 until elapsed_time 20 minutes discharge product mixture for separation: (15) valve103 open (16) pump103 start (17) reactor101 empty_to tank103 with [reactantb, productp] until volume 0 percent (18) pump103 stop (19) valve103 close shut_down reactor101 cooling and agitator: (20) agitator turn_off (21) valve104 close wash reactor101 thoroughly with water: (22) valve106 open (23) valve105 open (24) reactor101 wash with water (25) valve105 close (26) valve106 close Figure 4 Example Operating Procedure for Batch Plant with grouped actions. The primitive actions are grouped together to form an operation. The plant operating procedure consists of a succession of operations. The process operations correspond most closely to the level of operating instructions an operator will usually follow, whereas the primitive actions correspond to the detailed activities performed in order to achieve the goals of the stated operation. This grouping of actions will allow standard operations models to be defined and reused in the same way that individual actions are defined from a model. Within CHECKOP, further development will also be needed to model phenomena which are not so far covered very well, such as process fluids and their interactions and reactions (whether intended or unwanted). This work will feed into more accurate modelling of the consequences of mal-operation in the batch plant, in terms of chains of events and/or hazards a form of consequence modelling. The objective in doing this type of modelling is to provide an even richer form of output as a result of the batch Hazop emulation performed by CHECKOP. 8 Conclusion By formalising the actions that take place in the batch plant we can start to look at the most likely human failure modes which could lead to hazards in the plant (in contrast to the process initiated ones). CHECKOP, the prototype batch HAZOP system, has demonstrated proof of concept for modelling operating procedures and their effect on a simple batch process. CHECKOP allows the state of plant units to be defined. A sequence of operator actions may be represented whereby each action is associated with a set of assumptions about the state of the plant and an expectation of the results of the action. Using the CHECKOP simulation engine batch HAZOP can be demonstrated by considering deviations from the intended sequence of operations and their resulting hazards. 9 References Chung, P.W.H. (1993) Qualitative Analysis of Process Plant Behaviour. In: Chung, P.W.H., Lovegrove, G. and Ali, M. (eds.), Proceedings of the Sixth International Conference on Industrial and Engineering Applications of Artificial Intelligence and Expert Systems, June 1993, Edinburgh, Gordon and Breach Science Publishers, pp Chung, P.W.H., McCoy, S.A. and Zhou, D.F. (2003) Computer-aided Hazard Identification. In: Mannan, M.S (ed.), Proceedings of Mary Kay O Connor Process Safety Center Annual Symposium, October 2003, Texas A&M University, Omnipress, pp Lawley, H.G. (1974) Operability Studies and Hazard Analysis, Chem. Engng Prog. 70, pp McCoy, S.A., Wakeman, S.J., Larkin, F.D., Chung, P.W., Rushton, A.G. and Lees, F.P. (2000a) HAZID, A

10 Computer Aid for Hazard Identification 4. Learning Set, Main Study System, Output Quality and Validation Trials, Transactions of the Institution of Chemical Engineers, Part B, 78, pp McCoy, S.A., Wakeman, S.J., Larkin, F.D., Chung, P.W., Rushton, A.G. and Lees, F.P. (2000b) HAZID, A Computer Aid for Hazard Identification 5. Future Development Topics and Conclusions, Transactions of the Institution of Chemical Engineers, Part B, 78, pp McCoy, S.A., Zhou, D. and Chung, P.W.H. (2003) State-Based Modelling in Hazard Identification. In: Chung, P.W.H., Hinde, C.J. and Ali, M. (eds), Proceedings of 16th International Conference on Industrial and Engineering Applications of Artificial Intelligence and Expert Systems, June 2003, Springer-Verlag, pp McCoy, S.A. and Chung, P.W.H (2004) Computer-aided HAZOP of Batch Processes. In: Proceedings of HAZARDS XVIII Symposium, November 2004, Manchester. McCoy, S.A., Chung, P.W.H. and Zhou, D.F. (2004) Computer-Aided HAZOP of Batch Processes. In: A. and Matos, H. (eds.), Proceedings of European Symposium on Computer-Aided Process Engineering (ESCAPE-14), May 2004, Lisbon, Elsevier (Amsterdam). Vaidhyanathan, R. and Venkatasubramanian, V. (1995) Digraph-based models for automated HAZOP analysis, Reliab Eng System Safety, 50, 1,

DISCRETE EVENT SIMULATION IN THE DESIGN, LAYOUT AND SCHEDULING OF PIPELESS BATCH PLANTS

DISCRETE EVENT SIMULATION IN THE DESIGN, LAYOUT AND SCHEDULING OF PIPELESS BATCH PLANTS DISCRETE EVENT SIMULATION IN THE DESIGN, LAYOUT AND SCHEDULING OF PIPELESS BATCH PLANTS F. Mushtaq and P.W.H. Chung Department of Chemical Engineering, Loughborough University, Loughborough, Leicestershire,

More information

Hydraulic Pipeline Application Modules PSI s Tools to Support Pipeline Operation

Hydraulic Pipeline Application Modules PSI s Tools to Support Pipeline Operation Hydraulic Pipeline Application Modules PSI s Tools to Support Pipeline Operation Inhalt 1 Leak Detection and Location Modules... 3 1.1 Dynamic Balance Leak Detection... 3 1.2 Transient Model Leak Detection...

More information

INCIDENT INVESTIGATION BASED ON CAUSALITY NETWORKS

INCIDENT INVESTIGATION BASED ON CAUSALITY NETWORKS IChemE SYMPOSIUM SERIES NO. 153 INCIDENT INVESTIGATION BASED ON CAUSALITY NETWORKS Yukiyasu Shimada 1, Rafael Batres 2, Tetsuo Fuchino 3 and Toshinori Kawabata 1 1 Chemical Safety Research Group, National

More information

The Challenge of Integrating Non-Continuous Processes Milk Powder Plant Case Study

The Challenge of Integrating Non-Continuous Processes Milk Powder Plant Case Study The Challenge of Integrating Non-Continuous Processes Milk Powder Plant Case Study Martin Atkins, Michael Walmsley, James Neale Energy Research Group, University of Waikato Private Bag 315, Hamilton, New

More information

by Paul Baybutt and Remigio Agraz-Boeneker Primatech Inc. 50 Northwoods Blvd. Columbus, Ohio, 43235 USA

by Paul Baybutt and Remigio Agraz-Boeneker Primatech Inc. 50 Northwoods Blvd. Columbus, Ohio, 43235 USA A COMPARISON OF THE HAZARD AND OPERABILITY (HAZOP) STUDY WITH MAJOR HAZARD ANALYSIS (MHA): A MORE EFFICIENT AND EFFECTIVE PROCESS HAZARD ANALYSIS (PHA) METHOD by Paul Baybutt and Remigio Agraz-Boeneker

More information

Risk Matrix as a Tool for Risk Assessment in the Chemical Process Industry

Risk Matrix as a Tool for Risk Assessment in the Chemical Process Industry Risk Matrix as a Tool for Risk Assessment in the Chemical Process Industry Content 1. BASF Process Safety 2. Qualitative risk assessment 3. Semi-quantitative risk assessment Description of the BASF Risk

More information

Reusable Knowledge-based Components for Building Software. Applications: A Knowledge Modelling Approach

Reusable Knowledge-based Components for Building Software. Applications: A Knowledge Modelling Approach Reusable Knowledge-based Components for Building Software Applications: A Knowledge Modelling Approach Martin Molina, Jose L. Sierra, Jose Cuena Department of Artificial Intelligence, Technical University

More information

PROGRAMMABLE LOGIC CONTROL

PROGRAMMABLE LOGIC CONTROL PROGRAMMABLE LOGIC CONTROL James Vernon: control systems principles.co.uk ABSTRACT: This is one of a series of white papers on systems modelling, analysis and control, prepared by Control Systems Principles.co.uk

More information

PETRI NET BASED SUPERVISORY CONTROL OF FLEXIBLE BATCH PLANTS. G. Mušič and D. Matko

PETRI NET BASED SUPERVISORY CONTROL OF FLEXIBLE BATCH PLANTS. G. Mušič and D. Matko PETRI NET BASED SUPERVISORY CONTROL OF FLEXIBLE BATCH PLANTS G. Mušič and D. Matko Faculty of Electrical Engineering, University of Ljubljana, Slovenia. E-mail: [email protected] Abstract: The

More information

Fuzzy Knowledge Base System for Fault Tracing of Marine Diesel Engine

Fuzzy Knowledge Base System for Fault Tracing of Marine Diesel Engine Fuzzy Knowledge Base System for Fault Tracing of Marine Diesel Engine 99 Fuzzy Knowledge Base System for Fault Tracing of Marine Diesel Engine Faculty of Computers and Information Menufiya University-Shabin

More information

Overview of IEC 61508 - Design of electrical / electronic / programmable electronic safety-related systems

Overview of IEC 61508 - Design of electrical / electronic / programmable electronic safety-related systems Overview of IEC 61508 - Design of electrical / electronic / programmable electronic safety-related systems Simon Brown The author is with the Health & Safety Executive, Magdalen House, Bootle, Merseyside,

More information

ALARM PERFORMANCE IMPROVEMENT DURING ABNORMAL SITUATIONS

ALARM PERFORMANCE IMPROVEMENT DURING ABNORMAL SITUATIONS ALARM PERFORMANCE IMPROVEMENT DURING ABNORMAL SITUATIONS Peter Andow Honeywell Hi-Spec Solutions, Southampton, UK The process industries are continually facing new challenges to increase throughput, improve

More information

Safety Requirements Specification Guideline

Safety Requirements Specification Guideline Safety Requirements Specification Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:[email protected] -1- Summary Safety Requirement

More information

Reliability Modeling Software Defined

Reliability Modeling Software Defined Reliability Modeling Software Defined Using Titan Reliability Modeling Software May 30, 2014 Prepared by: The Fidelis Group 122 West Way, Suite 300 Lake Jackson, TX 77566 Fidelis Group, LLC All Rights

More information

Understanding Human Behaviour and Error

Understanding Human Behaviour and Error Understanding Human Behaviour and Error David Embrey Human Reliability Associates 1, School House, Higher Lane, Dalton, Wigan, Lancashire. WN8 7RP 1. The Skill, Rule and Knowledge Based Classification

More information

How To Clean Up A Reactor Water Cleanup

How To Clean Up A Reactor Water Cleanup General Electric Systems Technology Manual Chapter 2.8 Reactor Water Cleanup System TABLE OF CONTENTS 2.8 REACTOR CLEANUP SYSTEM... 1 2.8.1 Introduction... 2 2.8.2 System Description... 2 2.8.3 Component

More information

DIRECT STEAM INJECTION HOT WATER SYSTEMS FOR JACKETED HEATING

DIRECT STEAM INJECTION HOT WATER SYSTEMS FOR JACKETED HEATING By Philip Sutter Pick Heaters, Inc. DIRECT STEAM INJECTION HOT WATER SYSTEMS FOR JACKETED HEATING INTRODUCTION Many process plants currently use steam or hot water to heat jacketed devices such as tanks,

More information

Human Error Probability Estimation for Process Risk Assessment with emphasis on Control Room Operations

Human Error Probability Estimation for Process Risk Assessment with emphasis on Control Room Operations Human Error Probability Estimation for Process Risk Assessment with emphasis on Control Room Operations Claudio Nespoli, Sabatino Ditali Loss Prevention and Environment Department, Snamprogetti Centre

More information

A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER

A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER ABSTRACT Leonard P. Seed, M.Sc., P.Eng., Enpar Technologies Inc. * Daren D. Yetman, A.Sc.T., Enpar Technologies

More information

A Real -Time Knowledge-Based System for Automated Monitoring and Fault Diagnosis of Batch Processes

A Real -Time Knowledge-Based System for Automated Monitoring and Fault Diagnosis of Batch Processes A Real -Time Knowledge-Based System for Automated Monitoring and Fault Diagnosis of Batch Processes Eric Tatara, Cenk Ündey, Bruce Williams, Gülnur Birol and Ali Çinar Department of Chemical and Environmental

More information

Jump Start: Aspen HYSYS Dynamics V7.3

Jump Start: Aspen HYSYS Dynamics V7.3 A Brief Tutorial (and supplement to training and online documentation) Glenn Dissinger, Product Director, Aspen Technology, Inc. Julie Levine, Associate Product Marketing Professional, Aspen Technology,

More information

The Piping System Model a New Life Cycle Document. Elements of the Piping System Model

The Piping System Model a New Life Cycle Document. Elements of the Piping System Model Piping System Model as a Life Cycle Document White Paper Introduction When designing piping systems, a variety of documents are created providing the details necessary to design, purchase, build, and test

More information

Version: 1.0 Last Edited: 2005-10-27. Guideline

Version: 1.0 Last Edited: 2005-10-27. Guideline Process hazard and risk Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:[email protected] -1- Summary This report will try

More information

Introduction. Chapter 1

Introduction. Chapter 1 Chapter 1 Introduction The area of fault detection and diagnosis is one of the most important aspects in process engineering. This area has received considerable attention from industry and academia because

More information

Performance Evaluation of a Heat Pump System for Simultaneous Heating and Cooling

Performance Evaluation of a Heat Pump System for Simultaneous Heating and Cooling for Simultaneous Heating and Cooling F. Sustainable Energy Centre, University of South Australia Mawson Lakes Boulevard, Mawson Lakes 5095 AUSTRALIA E-mail: [email protected] Abstract The high efficiency

More information

Heating Water by Direct Steam Injection

Heating Water by Direct Steam Injection Heating Water by Direct Steam Injection Producing hot water by direct steam injection provides a solution where large volumes of hot water at precise temperatures are required, and where energy and space

More information

Failure Analysis Methods What, Why and How. MEEG 466 Special Topics in Design Jim Glancey Spring, 2006

Failure Analysis Methods What, Why and How. MEEG 466 Special Topics in Design Jim Glancey Spring, 2006 Failure Analysis Methods What, Why and How MEEG 466 Special Topics in Design Jim Glancey Spring, 2006 Failure Analysis Methods Every product or process has modes of failure. An analysis of potential failures

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 24 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia S TABLE OF CONTENT SCOPE 2 DEFINITIONS

More information

A methodology For the achievement of Target SIL

A methodology For the achievement of Target SIL A methodology For the achievement of Target SIL Contents 1.0 Methodology... 3 1.1 SIL Achievement - A Definition... 4 1.2 Responsibilities... 6 1.3 Identification of Hazards and SIL Determination... 8

More information

Boiler Preparation, Start-Up and Shutdown

Boiler Preparation, Start-Up and Shutdown Boiler Preparation, Start-Up and Shutdown Learning Outcome When you complete this module you will be able to: Describe the basic preparation of a boiler for start-up, and the start-up and shutdown procedures.

More information

Optimization of Preventive Maintenance Scheduling in Processing Plants

Optimization of Preventive Maintenance Scheduling in Processing Plants 18 th European Symposium on Computer Aided Process Engineering ESCAPE 18 Bertrand Braunschweig and Xavier Joulia (Editors) 2008 Elsevier B.V./Ltd. All rights reserved. Optimization of Preventive Maintenance

More information

Fault codes DM1. Industrial engines DC09, DC13, DC16. Marine engines DI09, DI13, DI16 INSTALLATION MANUAL. 03:10 Issue 5.0 en-gb 1

Fault codes DM1. Industrial engines DC09, DC13, DC16. Marine engines DI09, DI13, DI16 INSTALLATION MANUAL. 03:10 Issue 5.0 en-gb 1 Fault codes DM1 Industrial engines DC09, DC13, DC16 Marine engines DI09, DI13, DI16 03:10 Issue 5.0 en-gb 1 DM1...3 Abbreviations...3 Fault type identifier...3...4 03:10 Issue 5.0 en-gb 2 DM1 DM1 Fault

More information

IAI : Expert Systems

IAI : Expert Systems IAI : Expert Systems John A. Bullinaria, 2005 1. What is an Expert System? 2. The Architecture of Expert Systems 3. Knowledge Acquisition 4. Representing the Knowledge 5. The Inference Engine 6. The Rete-Algorithm

More information

Optimization of Natural Gas Processing Plants Including Business Aspects

Optimization of Natural Gas Processing Plants Including Business Aspects Page 1 of 12 Optimization of Natural Gas Processing Plants Including Business Aspects KEITH A. BULLIN, Bryan Research & Engineering, Inc., Bryan, Texas KENNETH R. HALL, Texas A&M University, College Station,

More information

3.4.4 Description of risk management plan Unofficial Translation Only the Thai version of the text is legally binding.

3.4.4 Description of risk management plan Unofficial Translation Only the Thai version of the text is legally binding. - 1 - Regulation of Department of Industrial Works Re: Criteria for hazard identification, risk assessment, and establishment of risk management plan B.E. 2543 (2000) ---------------------------- Pursuant

More information

HSE information sheet. Fire and explosion hazards in offshore gas turbines. Offshore Information Sheet No. 10/2008

HSE information sheet. Fire and explosion hazards in offshore gas turbines. Offshore Information Sheet No. 10/2008 HSE information sheet Fire and explosion hazards in offshore gas turbines Offshore Information Sheet No. 10/2008 Contents Introduction.. 2 Background of gas turbine incidents in the UK offshore sector...2

More information

A Knowledge Based System towards Identifying Problems and Getting Instant Solutions about Our Personal Vehicles

A Knowledge Based System towards Identifying Problems and Getting Instant Solutions about Our Personal Vehicles Volume 2, No.2, March - April 2013 Shah Murtaza Rashid Al Masud, International Journal of Advanced Trends in Computer Science and Engineering, 2(2), March April 2013, 15-20 International Journal of Advanced

More information

Sensor Integration on a W-CVD Cluster Tool for Real-Time Process Monitoring and Control

Sensor Integration on a W-CVD Cluster Tool for Real-Time Process Monitoring and Control Sensor Integration on a W-CVD Cluster Tool for Real-Time Process Monitoring and Control J.N. Kidder, Jr., Yiheng Xu. Nayanee Gupta, Theodosia Gougousi, Laurent Henn-Lecordier, G.W. Rubloff University of

More information

Maximizing Equipment Uptime

Maximizing Equipment Uptime Maximizing Equipment Uptime The benefits of maximizing your equipment s uptime are obvious: if your equipment is not running, then it cannot produce; if it is not producing, then your revenue and profits

More information

Terminology and Symbols in Control Engineering

Terminology and Symbols in Control Engineering Technical Information Terminology and Symbols in Control Engineering 1 Part 1 Fundamentals Technical Information Part 1: Fundamentals Part 2: Self-operated Regulators Part 3: Control Valves Part 4: Communication

More information

Keggomax CM Reflux Still

Keggomax CM Reflux Still Keggomax CM Reflux Still The Kegomax CM Reflux Still is easily one of the best reflux stills available today. It s a professional grade still that produces exceptional purity spirit with a high level of

More information

Industrial Steam System Process Control Schemes

Industrial Steam System Process Control Schemes Industrial Steam System Process Control Schemes This paper was developed to provide a basic understanding of the different process control schemes used in a typical steam system. This is however a fundamental

More information

By Steven C. Severini, P.E., Member ASHRAE

By Steven C. Severini, P.E., Member ASHRAE The following article was published in ASHRAE Journal, July 2004. Copyright 2004 American Society of Heating, Refrigerating and Air- Conditioning Engineers, Inc. It is presented for educational purposes

More information

A joint control framework for supply chain planning

A joint control framework for supply chain planning 17 th European Symposium on Computer Aided Process Engineering ESCAPE17 V. Plesu and P.S. Agachi (Editors) 2007 Elsevier B.V. All rights reserved. 1 A joint control framework for supply chain planning

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 38 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia CAUSTIC AND CHEMICAL TABLE OF CONTENT

More information

Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle

Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle INL/CON-05-00740 PREPRINT Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle Geothermal Resources Council Annual Meeting Greg Mines October 2005 This is a preprint of a paper intended for publication

More information

Integrated support system for planning and scheduling... 2003/4/24 page 75 #101. Chapter 5 Sequencing and assignment Strategies

Integrated support system for planning and scheduling... 2003/4/24 page 75 #101. Chapter 5 Sequencing and assignment Strategies Integrated support system for planning and scheduling... 2003/4/24 page 75 #101 Chapter 5 Sequencing and assignment Strategies 5.1 Overview This chapter is dedicated to the methodologies used in this work

More information

Understanding Root Cause Analysis

Understanding Root Cause Analysis BRC Global Standards 6/1/2012 Contents 1. What is Root Cause Analysis?... 1 2. Where in the Standard is RCA Required?... 3 3. How to Complete Root Cause Analysis?... 3 4. Methods of Root Cause Analysis...

More information

Quantitative and qualitative methods in process improvement and product quality assessment.

Quantitative and qualitative methods in process improvement and product quality assessment. Quantitative and qualitative methods in process improvement and product quality assessment. Anna Bobkowska Abstract Successful improvement of the development process and product quality assurance should

More information

HEALTH & SAFETY EXECUTIVE NUCLEAR DIRECTORATE ASSESSMENT REPORT. New Reactor Build. EDF/AREVA EPR Step 2 PSA Assessment

HEALTH & SAFETY EXECUTIVE NUCLEAR DIRECTORATE ASSESSMENT REPORT. New Reactor Build. EDF/AREVA EPR Step 2 PSA Assessment HEALTH & SAFETY EXECUTIVE NUCLEAR DIRECTORATE ASSESSMENT REPORT New Reactor Build EDF/AREVA EPR Step 2 PSA Assessment HM Nuclear Installations Inspectorate Redgrave Court Merton Road Bootle Merseyside

More information

SIMATIC Route Control Configuration, Control and Diagnostics of Material Transports. Product Brief February 2004

SIMATIC Route Control Configuration, Control and Diagnostics of Material Transports. Product Brief February 2004 SIMATIC Route Control Configuration, Control and Diagnostics of Material Transports Product Brief February 2004 Application Area, Configuration Application Area SIMATIC Route Control adds a tool for the

More information

stable response to load disturbances, e.g., an exothermic reaction.

stable response to load disturbances, e.g., an exothermic reaction. C REACTOR TEMPERATURE control typically is very important to product quality, production rate and operating costs. With continuous reactors, the usual objectives are to: hold temperature within a certain

More information

Lambda Tuning the Universal Method for PID Controllers in Process Control

Lambda Tuning the Universal Method for PID Controllers in Process Control Lambda Tuning the Universal Method for PID Controllers in Process Control Lambda tuning gives non-oscillatory response with the response time (Lambda) required by the plant. Seven industrial examples show

More information

Umbrella: A New Component-Based Software Development Model

Umbrella: A New Component-Based Software Development Model 2009 International Conference on Computer Engineering and Applications IPCSIT vol.2 (2011) (2011) IACSIT Press, Singapore Umbrella: A New Component-Based Software Development Model Anurag Dixit and P.C.

More information

7.1 General 5 7.2 Events resulting in pressure increase 5

7.1 General 5 7.2 Events resulting in pressure increase 5 GUIDE YVL 2.4 / 24 Ma r ch 2006 Primary and secondary circuit pressure control at a nuclear power plant 1 Ge n e r a l 3 2 General design requirements 3 3 Pressure regulation 4 4 Overpressure protection

More information

A SET OF COMPUTER BASED TOOLS IDENTIFYING AND PREVENTING HUMAN ERROR IN PLANT OPERATIONS

A SET OF COMPUTER BASED TOOLS IDENTIFYING AND PREVENTING HUMAN ERROR IN PLANT OPERATIONS Abstract A SET OF COMPUTER BASED TOOLS IDENTIFYING AND PREVENTING HUMAN ERROR IN PLANT OPERATIONS Dr David Embrey 1, Sara Zaed 2 This paper describes a set of techniques, supported by computer based tools,

More information

Simulation and Nonlinear Analysis of the Stagnant Polymer Layer in a LDPE Tubular Reactor

Simulation and Nonlinear Analysis of the Stagnant Polymer Layer in a LDPE Tubular Reactor Ian David Lockhart Bogle and Michael Fairweather (Editors), Proceedings of the 22nd European Symposium on Computer Aided Process Engineering, 17-20 June 2012, London. 2012 Elsevier B.V. All rights reserved

More information

ISA108 Intelligent Device Management (IDM)

ISA108 Intelligent Device Management (IDM) ISA108 Intelligent Device Management (IDM) Intelligent Digital Devices - Have Self-Diagnostics and More Eight-channel two-wire temperature transmitter Intelligent two-wire on/off valve 2 Fully integrated

More information

Hazard Operability Studies (HAZOP) Germanischer Lloyd Service/Product Description

Hazard Operability Studies (HAZOP) Germanischer Lloyd Service/Product Description Safety & Risk Management Services Hazard Operability Studies (HAZOP) Germanischer Lloyd Service/Product Description Germanischer Lloyd Service/Product Description Hazard Operability Studies (HAZOP) Contents

More information

C-Bus Application Messages & Behaviour Chapter 25 Air Conditioning

C-Bus Application Messages & Behaviour Chapter 25 Air Conditioning C-Bus Application Messages & Behaviour Chapter 25 Air Conditioning Document Number: CBUS-APP/25 Comments on this document should be addressed to: Engineering Manager Clipsal Integrated Systems PO Box 103

More information

Safety Integrated. SIMATIC Safety Matrix. The Management Tool for all Phases of the Safety Lifecycle. Brochure September 2010. Answers for industry.

Safety Integrated. SIMATIC Safety Matrix. The Management Tool for all Phases of the Safety Lifecycle. Brochure September 2010. Answers for industry. SIMATIC Safety Matrix The Management Tool for all Phases of the Safety Lifecycle Brochure September 2010 Safety Integrated Answers for industry. Functional safety and Safety Lifecycle Management Hazard

More information

IBM Rational Rhapsody

IBM Rational Rhapsody IBM Rational Rhapsody IBM Rational Rhapsody Reference Workflow Guide Version 1.9 License Agreement No part of this publication may be reproduced, transmitted, stored in a retrieval system, nor translated

More information

The Open University s repository of research publications and other research outputs

The Open University s repository of research publications and other research outputs Open Research Online The Open University s repository of research publications and other research outputs Using LibQUAL+ R to Identify Commonalities in Customer Satisfaction: The Secret to Success? Journal

More information

Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA

Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA 198 Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA 300-MW Pump-turbine

More information

INTRUSION PREVENTION AND EXPERT SYSTEMS

INTRUSION PREVENTION AND EXPERT SYSTEMS INTRUSION PREVENTION AND EXPERT SYSTEMS By Avi Chesla [email protected] Introduction Over the past few years, the market has developed new expectations from the security industry, especially from the intrusion

More information

Alfa Laval PureBallast 3.1

Alfa Laval PureBallast 3.1 Alfa Laval PureBallast 3.1 Ballast water treatment system 1000 m 3 /h system Alfa Laval PureBallast 3.1 is an automated inline treatment system for the biological disinfection of ballast water. Operating

More information

COUNTERBALANCE VALVES

COUNTERBALANCE VALVES COUNTERBALANCE VALVES Introduction They are modulating valves which allow free flow into the actuator and then block the reverse flow until they feel a pilot pressure inversely proportional to the load

More information

University of Paderborn Software Engineering Group II-25. Dr. Holger Giese. University of Paderborn Software Engineering Group. External facilities

University of Paderborn Software Engineering Group II-25. Dr. Holger Giese. University of Paderborn Software Engineering Group. External facilities II.2 Life Cycle and Safety Safety Life Cycle: The necessary activities involving safety-related systems, occurring during a period of time that starts at the concept phase of a project and finishes when

More information

REGULATING VALVE APPLICATIONS

REGULATING VALVE APPLICATIONS REGULATING APPLICATIONS GENERAL REGULAR APPLICATION & INSTALLATION NOTES Regulator Application & Installation Notes The following are considerations for all steam regulator installations, as system operation

More information

THERMAL ANALYSIS OF A DATA CENTRE COOLING SYSTEM UNDER FAULT CONDITIONS

THERMAL ANALYSIS OF A DATA CENTRE COOLING SYSTEM UNDER FAULT CONDITIONS Eleventh International IBPSA Conference Glasgow, Scotland July 27-30, 2009 THERMAL ANALYSIS OF A DATA CENTRE COOLING SYSTEM UNDER FAULT CONDITIONS Michaël Kummert 1, William Dempster 1, and Ken McLean

More information

SIMATIC HMI. WinCC flexible 2008 Getting Started - First-Time Users Getting Started. Printout of the Online Help 06/2008 A5E00279548-04

SIMATIC HMI. WinCC flexible 2008 Getting Started - First-Time Users Getting Started. Printout of the Online Help 06/2008 A5E00279548-04 SIMATIC HMI WinCC flexible 2008 Getting Started - First-Time Users Getting Started Printout of the Online Help 06/2008 A5E00279548-04 Safety Guidelines This manual contains notices you have to observe

More information

Link-Up. Solid Fuel Association Guide to Central Heating. www.solidfuel.co.uk

Link-Up. Solid Fuel Association Guide to Central Heating. www.solidfuel.co.uk Solid Fuel Association Guide to Central Heating Link-Up Combining solid fuel with other central heating technologies using various methods ranging from a simple link-up to a fully integrated thermal store

More information

WELLHEAD FLOWLINE PRESSURE PROTECTION USING HIGH INTEGRITY PROTECTIVE SYSTEMS (HIPS)

WELLHEAD FLOWLINE PRESSURE PROTECTION USING HIGH INTEGRITY PROTECTIVE SYSTEMS (HIPS) WELLHEAD FLOWLINE PRESSURE PROTECTION USING HIGH INTEGRITY PROTECTIVE SYSTEMS (HIPS) Angela E. Summers, Ph.D., P.E., President, SIS-Tech Solutions, LP Bryan A. Zachary, Director, Product & Application

More information

Energy Saving Fact Sheet Boilers

Energy Saving Fact Sheet Boilers Energy Saving Fact Sheet Boilers Turn a burning issue into real energy savings You need a boiler to heat your premises and provide hot water or to generate steam for use in industrial processes. Unfortunately,

More information

Boiler efficiency for community heating in SAP

Boiler efficiency for community heating in SAP Technical Papers supporting SAP 2009 Boiler efficiency for community heating in SAP Reference no. STP09/B06 Date last amended 26 March 2009 Date originated 28 May 2008 Author(s) John Hayton and Alan Shiret,

More information

Equipment Performance Monitoring

Equipment Performance Monitoring Equipment Performance Monitoring Web-based equipment monitoring cuts costs and increases equipment uptime This document explains the process of how AMS Performance Monitor operates to enable organizations

More information

The problem with waiting time

The problem with waiting time The problem with waiting time Why the only way to real optimization of any process requires discrete event simulation Bill Nordgren, MS CIM, FlexSim Software Products Over the years there have been many

More information

Multiple Products in a Monoclonal Antibody S88.01 Batch Plant

Multiple Products in a Monoclonal Antibody S88.01 Batch Plant Presented at the World Batch Forum North American Conference Chicago, IL May 16-19, 2004 900 Fox Valley Drive, Suite 204 Longwood, FL 32779-2552 +1.407.774.0207 Fax: +1.407.774.6751 E-mail: [email protected]

More information

18 Best Practices When Applying Process Modeling to Overpressure Protection and Relief Networks

18 Best Practices When Applying Process Modeling to Overpressure Protection and Relief Networks WHITE PAPER 18 Best Practices When Applying Process Modeling to Overpressure Protection and Ron Beck, Industry Marketing Director, Aspen Technology, Inc. Wilfried Mofor, Product Management, Aspen Technology,

More information

Understanding Safety Integrity Levels (SIL) and its Effects for Field Instruments

Understanding Safety Integrity Levels (SIL) and its Effects for Field Instruments Understanding Safety Integrity Levels (SIL) and its Effects for Field Instruments Introduction The Industrial process industry is experiencing a dynamic growth in Functional Process Safety applications.

More information

Government Degree on the Safety of Nuclear Power Plants 717/2013

Government Degree on the Safety of Nuclear Power Plants 717/2013 Translation from Finnish. Legally binding only in Finnish and Swedish. Ministry of Employment and the Economy, Finland Government Degree on the Safety of Nuclear Power Plants 717/2013 Chapter 1 Scope and

More information

Technical Analysis of Accident in Chemical Process Industry and Lessons Learnt

Technical Analysis of Accident in Chemical Process Industry and Lessons Learnt Technical Analysis of Accident in Chemical Process Industry and Lessons Learnt Kamarizan Kidam 1,2, Markku Hurme 1, Mimi H. Hassim 1,2 1 Helsinki University of Technology, Plant Design, Department of Biotechnology

More information

Railway Business Strategy and R&D in Europe

Railway Business Strategy and R&D in Europe Railway Business Strategy and R&D in Europe Hitachi Review Vol. 61 (2012), No. 5 190 Keith Jordan Yoichi Sugita, Dr. Eng. Takayoshi Nishino Toshiaki Kono Kiyoshi Morita OVERVIEW: Hitachi s European railway

More information

MOCET A Certification Scaffold for Critical Software

MOCET A Certification Scaffold for Critical Software MOCET A Certification Scaffold for Critical Software Herbert Hecht SoHaR Incorporated Culver City CA 90230 [email protected] 1. Introduction A common problem besetting certification activities, to whatever

More information

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR 1910.147

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR 1910.147 Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR 1910.147 Contents I. Introduction II. Scope and Application III. Definitions IV. Lockout/Tagout Manual V. Energy Control Procedures 1. Applying Energy

More information

Application of Building Energy Simulation to Air-conditioning Design

Application of Building Energy Simulation to Air-conditioning Design Hui, S. C. M. and K. P. Cheung, 1998. Application of building energy simulation to air-conditioning design, In Proc. of the Mainland-Hong Kong HVAC Seminar '98, 23-25 March 1998, Beijing, pp. 12-20. (in

More information

DeltaV SIS for Burner Management Systems

DeltaV SIS for Burner Management Systems January 2011 Page 1 DeltaV SIS for Burner Management Systems RESULTS Inhibit startup when unsafe conditions exist Protect against unsafe operating conditions, including improper fuel quantities Provide

More information

A Framework for Adaptive Process Modeling and Execution (FAME)

A Framework for Adaptive Process Modeling and Execution (FAME) A Framework for Adaptive Process Modeling and Execution (FAME) Perakath Benjamin [email protected] Madhav Erraguntla [email protected] Richard Mayer [email protected] Abstract This paper describes the

More information

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat - Doc. : 08C00031_e Date : 10.02.2009 Page : 1 / 9 ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric - (Preliminary) Doc. : 08C00031_e

More information

WATER/WASTEWATER: ACHIEVING THE THREE LEVELS OF REDUNDANCY

WATER/WASTEWATER: ACHIEVING THE THREE LEVELS OF REDUNDANCY Schneider Electric Three Levels of Redundancy January 2008 WATER/WASTEWATER: ACHIEVING THE THREE LEVELS OF REDUNDANCY by Grant Van Hemert, P.E., application engineer, Water and Wastewater Competency Center,

More information

CLEANING IN PLACE AUTOMATION FOR PROCESS INDUSTRY USING PLC AND SCADA SOFTWARE

CLEANING IN PLACE AUTOMATION FOR PROCESS INDUSTRY USING PLC AND SCADA SOFTWARE CLEANING IN PLACE AUTOMATION FOR PROCESS INDUSTRY USING PLC AND SCADA SOFTWARE Siddhesh Dhonde 1, Bhaskar Nadigatla 2, D.U. Dalavi 3 1,2, 3 ETC, SCSCOE, SPPU, (India), ABSTRACT In Process Industries, proper

More information

Continuous flow direct water heating for potable hot water

Continuous flow direct water heating for potable hot water Continuous flow direct water heating for potable hot water An independently produced White Paper for Rinnai UK 2013 www.rinnaiuk.com In the 35 years since direct hot water systems entered the UK commercial

More information

Michael A. Mitchell, Cameron Flow Control, DYNATORQUE Product Manager

Michael A. Mitchell, Cameron Flow Control, DYNATORQUE Product Manager SIL Made Simple Michael A. Mitchell, Cameron Flow Control, DYNATORQUE Product Manager KEY WORDS: Safety Integrity Level (SIL) Safety Instrumented Systems (SIS) ISA 84.01, IEC 61511 Partial Stroke Test

More information

Chapter 11. MRP and JIT

Chapter 11. MRP and JIT Chapter 11 MRP and JIT (Material Resources Planning and Just In Time) 11.1. MRP Even if MRP can be applied among several production environments, it has been chosen here as a preferential tool for the

More information

Energy Recovery System for Excavators Meng (Rachel) Wang, Chad Larish Eaton Corporation

Energy Recovery System for Excavators Meng (Rachel) Wang, Chad Larish Eaton Corporation Energy Recovery System for Excavators Meng (Rachel) Wang, Chad Larish Eaton Corporation Abstract Increasing fuel costs have become a significant portion of the operating expenses for owners and fleet managers

More information

Routine and Emergency Boiler Operation

Routine and Emergency Boiler Operation Routine and Emergency Boiler Operation Learning Outcome When you complete this module you will be able to: Describe the routine safe and efficient operation of a packaged boiler. Learning Objectives Here

More information