Installation and Maintenance
|
|
|
- Arlene Welch
- 9 years ago
- Views:
Transcription
1 MRXBOX95B-LP1 (Standard Unit) MRXBOX95B-LP1-OH (Opposite Hand Unit) Mechanical Ventilation Unit with Heat Recovery & Summer Bypass for Ceiling Void Mounting Installation and Maintenance The EMC Directive 2014/30/EU The Low Voltage Directive 2014/35/EU 1.0 Introduction The LP1 ceiling void mounted unit is designed to provide mechanical supply and extract ventilation with heat recovery and incorporates summer bypass. The unit is fitted with two independent fans. Each fan has full speed control for background and boost ventilation rates. To recover heat from the extract air the heat exchanger block is utilised. The heat exchanger can recover up to 80% of the normally wasted heat. The bypass damper shall open automatically via a wax actuator allowing the air to bypass the heat exchanger to deliver fresh filtered air during the warmer months. The unit is fitted with a frost protection mode, in the event of the fresh air temperature dropping below -5 Deg C the supply fan will switch off. The unit will then automatically switch back on when the temperature raises back above -5 Deg C. Figure 1a. Airflow through unit (Standard unit). Spigots 1 to 4 1. Intake air (Fresh Air from outside). 2. Supply Air (Supply in to house). 3. Extract Air (Warm air from house). 4. Exhaust Air (Waste air to outside). Spigot 2. Spigot 3. Spigot 4. Figure 1b. Airflow through OH unit (Opposite hand unit). Spigots 1 to 4 1. Extract Air (Warm air from house). 2. Exhaust Air (Waste air to outside). 3. Intake air (Fresh Air from outside). 4. Supply Air (Supply in to house). Spigot 2. Spigot 3. Spigot 1. The unit must remain switched on at all times to maintain ventilation within the dwelling. Turning the unit off will cause long term damage to the unit and building fabric. This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning the use of the appliance by a person for their safety. Children should be supervised so that they do not play with the appliance. 2.0 Installation Installation must be carried out by competent personnel in accordance with the appropriate authority and conforming to all statutory governing regulations. All mains wiring must be in accordance with the current I.E.E. Regulations, or the appropriate standards. Ensure that the mains supply (Voltage, Frequency and Phase) complies with the rating label. Please note a clear working space is required around the installed unit to allow the cover to be removed and provide sufficient access for maintenance such as filter change. The fan must be installed indoors, in a suitable ceiling void away from direct sources of frost, heat, water spray or moisture generation. For a vibration-free result the unit must be mounted to a solid surface in the void. The unit is designed for ceiling mounting only (Horizontal surface). 1. The unit is supplied with a steel mounting bracket. 2. Position & secure the steel bracket to the ceiling using appropriate fixings (supplied by others), ensuring that the two outer fixing holes on the unit are accessible (see fig 2). Note: The mounting bracket should be on the same side as the condensate take off. 3. The unit can now be offered into position & located into the mounting bracket. 4. Using appropriate fixings (supplied by others), fix the unit to the ceiling. It is recommended that the unit is fixed through three holes on the non-bracket side and the two outer holes on the bracket side. Note: The unit must be installed in an upright position as shown for the condensate drain and for compliance with safety regulations relating to IP protection for water drip ingress. Spigot 1. Spigot 4. Nuaire Limited Western Industrial Estate Caerphilly United Kingdom CF83 1NA T: F: E: [email protected] W: Leaflet Number
2 Installation and Maintenance MRXBOX95B-LP1 Mechanical Ventilation with Heat Recovery & Summer Bypass Figure 2. Installing the unit using appropriate fixing bolts. (shown on a standard unit). Air valve in ceiling. 2.1 Condensate Drain installation 1. Unit comes complete with external drain pipe (21.5mm waste pipe). Use conventional plumbing connections to link up with U-trap or alternative drain method (Solvent cement connections or compression fit connections are recommended). The condensate must be discharged under a water level in a U-trap drainpipe or an alternative drain method which acts as an airlock. 2. This condensate discharge connection is suitable for 21.5mm dia. overflow pipe. Solvent cement should be used to make the joint. 3. If using a U-trap please ensure the U-trap has been filled to a suitable level of water to avoid any air locks. 4. If the condensation pipe is fitted in an unheated space the pipe should be in insulated to prevent freezing. Nuaire recommend MVHR-DRAIN be used as the primary condensate take-off. (see figures 4a and 4b). RIGHT Flow 204 x 60mm ducting in ceiling void. Steel mounting bracket Figure 3. Typical side view example of a (Standard unit) mounted in a ceiling void using 204 x 60mm rectangular ducting and air valves. Side view of unit mounted in the ceiling void. Figure 4a. MVHR-DRAIN condensate drain, running to SVP. (shown on a standard unit). Figure 4b. MVHR-DRAIN correct installation. WRONG Fixing Offer up the MVHR-DRAIN inlet to the threaded tail of the appliance waste outlet or MVHR-DRAIN knuckle or running adaptor, and tighten the threaded cap sufficiently hand-tight to provide a water-tight seal (check that the cap screws on square and does not cross-thread ). When the screwed cap is tight, the MVHR-DRAIN body is secure. 1. Cut the pipe to length, allowing for the full compression socket depth (using an appropriate pipe cutter, such as a Hepworth rachet pipe cutter). 2. Remove any swarf from the end of the plastic pipe. Ream the copper pipe end to remove any burr, and file if necessary to remove any external sharp edges. Mark the socket depth on the pipe, and check that the pipe section to be jointed is free of any surface damage which may affect the joint seal. 3. Unscrew the cap from the MVHR-DRAIN outlet, and slide the cap and rubber seal onto the pipe. 4. Insert the pipe end fully into the socket. 5. Slide the rubber seal and screwed cap up against the face of the socket, and tighten the cap sufficiently hand-tight (check that the cap is square to the body and does not crossthread ). Hand tight should be adequate to form a proper seal. 2.2 Extract/input areas The unit is designed to extract air from all wet rooms e.g. bathroom, kitchen, en-suite, utility room (with sink). WC s do not need to be ventilated if openable windows are fitted. Supply air should be to all habitable rooms e.g. bedrooms and lounge. Extract / input grilles should be adjustable valve types (not supplied). External grilles to have a minimum free area of 12,250 sq mm. 2.3 Ducting Before commencing ducting installation reference should be made to building regulations document Domestic ventilation compliance guide. This document supports ADF2010 and details installation, testing and commissioning of all ventilation systems. It is recommended that rigid ducting must be used it all times. Flexible ducting has a very high resistance and it is impossible to calculate how much resistance will be on a system if used. If used the flexible ducting must be kept to a minimum and should always be pulled taut. A maximum of 300mm should be used on each leg. To prevent condensation on the outside of the outside air inlet duct and the air outlet duct from the MRXBOX95B-LP1, these ducts should be insulated. Ducting must be installed in such a way that resistance to airflow is minimised. Bends should be kept to a minimum. A minimum distance of 300mm between the appliance and any bends in ductwork is recommended. 204 x 60mm rectangular ducting should be used. (Refer to dwelling ducting design drawing, figure 6 on page 4 for further information). Ducting joints must be sealed with silicone type sealant and needs to be taped. Ducting shall be adequately and reliably fixed to the appliance. Side elevation When installed horizontally the ribs must be at the bottom to ensure correct operation Leaflet Number
3 Installation and Maintenance MRXBOX95B-LP1 Mechanical Ventilation with Heat Recovery & Summer Bypass 2.4 Ventilation flow rates Table 1. ADF 2010 Extract ventilation rates Room Min high rate Min low rate Kitchen Utility room Bathroom Sanitary accommodation 13 l/s 8 l/s 8 l/s 6 l/s Total extract rate should be at least the whole dwelling ventilation rate given in table 2. Any air intake terminal MUST be installed in accordance with the appropriate regulation. As a guide, the BS5440 series of British Standards deals with this issue and currently states that an air intake must be at a minimum distance of 300mm from a gas boiler balanced flue. Installers are advised to be aware of the requirements of this standard when installing through the wall supply air ducting. Table 2. Whole dwelling ventilation rates Number of bedrooms in dwelling Whole dwelling ventilation rate l/s 1, 2 Notes: 1, In addition, the minimum ventilation rate should be not less than 0.3 l/s per m 2 of internal floor area. (This includes all floors, e.g. for a two-story building add the ground and first floor areas). 2, This is based on two occupants in the main bedroom and a single occupant in all other bedrooms. This should be used as the default value. If a greater level of occupancy is expected add 4 l/s per occupant. 2.5 ADF 2010 Ventilation calculations Design of MVHR systems The MVHR system has been sized for the winter period. Additional ventilation may be required during the warmer months and it has been assumed that the provisions for purge ventilation (e.g. openable windows) could be used. Step 1: For any design air permeability, determine the whole dwelling ventilation supply rate from Table 2. As an alternative where the design air permeability is intended to be leakier than (>) 5m 3 /(h.m 2 ) 50 Pa, allow for infiltration for all dwelling types by subtracting from the whole dwelling ventilation supply rate from Table 2; 0.04 x gross internal volume of the dwelling heated space (m 3 ). Step 2: Calculate the whole dwelling extract ventilation rate by summing the individual room rates for minimum high rate from Table 1. (For sanitary accommmodation only, as an alternative, the purge ventilation provisions given in ADF 2010 can be used where security is not an issue. In this case minimum high extract rate for the sanitary accommodation should be omitted from the step 2 calculation). Step 3: The required airflow rates are as follows: n the maximum whole dwelling extract ventilation rate (e.g. boost) should be at least the greater of step 1 and step 2. Note that the maximum individual room extract rate should be at least those given in table 1. for minimum high rate. n the minimum air supply rate should be at least the whole building ventilation rate found in step 1. For Scotland refer to BRE Digest 398. Pre Commissioning MRXBOX95 MVHR Units MRXBOX95 units are designed to ventilate the whole dwelling and must not be used during site construction or the clean-up period. Cement and plaster dust can be abrasive and can affect fan performance and reliability. Please ensure that the filters are checked prior to commissioning to ensure there is no build-up of dust or debris. While the property is drying out, very high moisture levels are likely to occur. Therefore it is advisable that if the installation and building works are complete the unit is left running. If the building works are not complete please close the air valves or cover up the air valves to prevent condensation forming in the ductwork and the MRXBOX95 unit due to natural migration of warm air. For further information refer to Domestic Ventilation Compliance Guide documents/partl/compliance Leaflet Number
4 Installation and Maintenance MRXBOX95B-LP1 Mechanical Ventilation with Heat Recovery & Summer Bypass 3.0 Dimensions (mm) Standard configuration Figure 5. Also shows the working space required. View from top with lid (A) View from underside with lid removed (B) hole centres Supply fan 21.5mm condensate pipe Extract fan Spigot 3. Extract Air Spigot 2. Supply Air Spigot 1. Intake Air Spigot 4. Exhaust Air 668 hole centres Wire frame filter 2. 3 Removable filter access 4. Wire frame filter 1. Removable filter access 250 Work space 600 Bypass chamber Heat exchanger Drip tray Bypass damper View from control side (A) End view (Filter access distance) (B) Ducting arrangements, standard configuration Figure 6. Typical ducted arrangement for a void mounted unit using using rectangular 204 x 60mm ducting and ceiling air valves. Top of ceiling void. Supply air to bedrooms via Air Valve in ceilings. Exhaust air from kitchen/bathroom to outside via air brick. Supply air to lounge via Air Valve in ceilings. Minimum distance as specified in Building Regulations. Extract air from kitchen via Air Valve in ceilings. Extract air from bathroom via Air Valve in ceilings. Nuaire ceiling void mounted unit. MVHR-DRAIN condensate drain, running to SVP. Intake air from outside via air brick. Supply and extract ducts from external air bricks to the unit needs to be insulated Leaflet Number
5 TH1 TH2 SWL2 L SWL1 L N Installation and Maintenance MRXBOX95B-LP1 Mechanical Ventilation with Heat Recovery & Summer Bypass 5.0 Electrical Connection Please note: the electrical connection of the unit must be be carried out by a qualified electrician. For good EMC engineering practice, any sensor cables or switched live cables should not be placed within 50mm of other cables or on the same metal cable tray as other cables. The unit is supplied with a flexible cord for connection to the mains supply. Electrical details:- Voltage: 240V 1ph 50Hz Consumption: LP1-1.3 Amp Fuse rating: 3 Amp NOTE This unit must be earthed. The three core cable from the mains power supply should be connected to a fixed wiring installation, via a fused isolator, in accordance with current IEE wiring regulations. Figure 7. CN11 and CN12 NET Connections for Ecosmart devices. 3 2 BYPASS BLU WHI YELI RED BLU WHI YEL RED FAIL CN8 CN7 EXTRACT CN6 SUPPLY CN5 B L U SUPPLY FAN EXTRACT EXTRACT FAN FAN B B B R R L N N U B R N B L U L N SUPPLY EXTERNAL PUMP If more than one Ecosmart sensor is required please use MRXBOX95-JB and refer to leaflet No for installation instructions. Note: Wiring is for reference purposes only as the connections above are factory fitted. The unit is pre-wired with a 2 metre fly lead. Connection to Remote Fail Indicator Ref: MRXBOX95LH-RFI (Optional). Supply Supply Extract Extract Trickle Boost Trickle Boost Unit serving kitchen and bathroom Figure 8. Disconnection from the supply mains must be incorporated within the fixed wiring in accordance with the wiring regulations and shall have a minimum contact separation of 3mm. MAINS 230V 50Hz N L Fuse 2A Light switch (Double Pole) Room light 3 Pole isolator Green/yellow Blue Brown Black Grey Supply cord from unit Optional summer boost switch Kitchen switch Unit serving kitchen and two bathrooms Figure 9. Disconnection from the supply mains must be incorporated within the fixed wiring in accordance with the wiring regulations and shall have a minimum contact separation of 3mm. MAINS 230V 50Hz N L Fuse 2A Light switches (Double Pole) Room lights 3 Pole isolator Green/yellow Blue Brown Black Grey Supply cord from unit Optional summer boost switch Kitchen switch 5.1 Optional Controls For further information contact Nuaire on Leaflet Number
6 Installation and Maintenance MRXBOX95B-LP1 Mechanical Ventilation with Heat Recovery & Summer Bypass 6.0 Commissioning The filters fitted inside the unit are protected with a plastic film. Prior to commissioning remove the covers (fig 11), take off the film and replace. 1. For the required air flow rates please refer to the design specification for the property, follow 2.4, or refer to building regulations ADF The unit is supplied with independent control for both normal and boost airflows. (see fig. 10). 3. Correct commissioning is essential to ensure the ventilation air flowrates are met. It also ensures the unit is not over ventilating and causing excessive power consumption. 4. Commissioning should be carried out in accordance with building regulations document Domestic ventilation compliance guide. regulations/approved documents/partf/associated A calibrated moving vane anemometer and hood will be required to carry out commissioning. 5. Adjustment valves should be locked in place to prevent further adjustment. 6. Once commissioned the home owner / tenant should be informed that the unit should not be adjusted as it will have a detrimental effect on the indoor air quality and could result in condensation and mould growth. The label covering the control has an adhesive panel which should be removed post commissioning to prevent tampering. Figure 10. PCB inside enclosure. Control module 7.0 Status Indication The status of the unit is indicated by a series of LED s on the control box cover. The varients are listed below. Normal Mode Supply Fan Fault Extract Fan Fault Boost Summer Boost Frost Protection Filter Change Summer Bypass 8.0 Maintenance/Cleaning Isolation - Before commencing work make sure that the unit, switched live and Nuaire control are electrically isolated from the mains supply and switched live supply. We recommend that the two G3 fiters are inspected after 6 months, and replaced every 12 to 18 months. The filters can be removed from the unit by removing the two filter covers on the bottom panel of the unit. Take hold of the two circular tabs either end of the filter covers and pull to remove. (see fig. 11). The filter can now be extracted by pulling the removal loop on the edge of the filter. Once the filters have been inspected return or replace them as necessary. Inspect the heat exchanger every 5 years. Generally check for damage and security of components. Refit cover. Figure 11. Remove the two filter covers on the underside panel of the unit, and the filters can be pulled out of the unit using the tab on the lower edge of the filter. Access to second filter Filter cover and filter being removed Control module Leaflet Number
7 Installation and Maintenance MRXBOX95B-LP1 Mechanical Ventilation with Heat Recovery & Summer Bypass 9.0 Replacement of Parts Should any component need replacing Nuaire keep extensive stocks for quick delivery. Ensure that the unit is electrically isolated, before carrying out any work. Note: The supply cable must be replaced by an electrically competent person. When ordering spare parts, please quote the serial number of the unit and the ARC number of the purchase if possible. (This information will be available on the fan label) Warranty The 5 year warranty starts from the day of delivery and includes parts and labour for the first year and parts only for the remaining 4 years. This warranty is conditional on planned maintenance being undertaken Service Enquiries Nuaire can assist you in all aspects of service. Our service department will be happy to provide any assistance required, initially by telephone and If necessary arrange for an engineer to call. Technical Support Technical or commercial considerations may, from time to time, make it necessary to alter the design, performance and dimensions of equipment and the right is reserved to make such changes without prior notice Leaflet Number
8 Standard Assessment Procedure 2005 Appendix Q MVHR Installation Guide Installation Guide and Checklist Mechanical Ventilation with Heat Recovery (Version 11 February 2011) The Electric Heating and Ventilation Association have developed this guidance and checklist document in partnership with the Residential Ventilation Association (a HEVAC association), BRE and EST. NOTE: This guide and checklist has been superseded for dwellings assessed under The Building Regulations 2010, specifically SAP 2009 and Approved Documents L and F. Completion of this document is therefore only required for dwellings assessed by SAP Customer Details Customer Name: Address: Telephone Number: Date of Installation: Name of Lead Contractor: Design Project Number: It should be noted that this guidance is not intended to replace product manufacturer installation instructions; it is a generic addition which defines good practice. Installers are advised to complete this form for each installation and keep a copy to provide to Building Control Officers in case requested.
9 Standard Assessment Procedure 2005 Appendix Q MVHR Installation Guide Page 2 of 6 Introduction This document is to be used in support of the SAP Appendix Q scheme which provides tested performance values for MVHR products. Note that all checklist items must be answered YES in order for the SAP Appendix Q test figures to be used in As built SAP calculations. If any checklist items are answered NO then SAP default figures must be used. Systems must be designed by a manufacturer designer and sized correctly to qualify for SAP Appendix Q figures. SECTION 1: INSTALLATION GUIDANCE 1. Ductwork Installation Decision Yes, No or N/A Have the ducts been installed with as little air resistance and leakages as possible (flexible ducts should be avoided)? Note: Refer to HVCA DW/143 document A Practical Guide to Ductwork Leakage Testing for detailed guidance on air tightness. Rigid plastic ducting is recommended and flexible duct should only be used in very short lengths and mainly just to connect the ductwork to the units/diffusers or to overcome particular obstructions. If flexible ducting has been used, has it been pulled taut to minimise system resistance? Has the number of duct bends been minimised to ensure adequate air flow and least resistance? Bends should have a minimum radius at least the same as the diameter of the ducting used? Refer to Figure 1 if using flexible ducting Have the fans and ducting placed in unheated voids been insulated to reduce the possibility of condensation forming (see notes below)? Note: Ducts should be insulated with the equivalent of at least 25mm of insulating material with a thermal conductivity of 0.04W/mK. Where a duct rises vertically it may be necessary to fit a condensation trap in order to prevent backflow of any moisture in the product. Insulation should be applied to both warm and cold air ducts. Cold air ducts should be wrapped additionally with a vapour barrier outside the insulation. Ducts with cold air running in warm environments will condense on the outside of the duct. Have recommended duct jointing collars and components been used to ensure appropriate duct performance (duct runs should be as air tight as possible)? Note: All the joints should be sealed correctly either using duct tape or silicon.
10 Standard Assessment Procedure 2005 Appendix Q MVHR Installation Guide Page 3 of 6 Figure 1 Ductwork Visual Guide Source: Approved Document F (England & Wales) Unit Fixing Decision Yes, No or N/A Has the heat recovery unit been effectively insulated? Note: If the unit is not pre-insulated then ensure additional insulation is installed around the unit to minimise heat loss Has the heat recovery unit been fixed to a stable element of the building fabric (e.g. wall or floor) using manufacturer recommended/supplied fixing brackets? Has the condensation drain been fitted and the pipe insulated? Have approved acoustic/anti-vibration mountings been used? Note: Special attention is needed to avoid transmission and stress to duct joints Has the unit been installed in a position that will permit access for maintenance purposes? Have all grilles or ductwork that penetrate the building s air barrier, as identified in the construction drawings, been sealed to ensure continuity of the air barrier?
11 Standard Assessment Procedure 2005 Appendix Q MVHR Installation Guide Page 4 of 6 Figure 2 Sample Mounting Positions 3. Electrical Connection Decision Yes, No or N/A Has the rating label been verified to establish suitability for the installation strategy and whether an earth is required (e.g. voltage, class I or II product status)? Has a local isolator been provided to enable the unit to be isolated for maintenance purposes? Has the unit been fused in accordance with its power rating? SECTION 2: COMMISSIONING GUIDANCE
12 Standard Assessment Procedure 2005 Appendix Q MVHR Installation Guide Page 5 of 6 1. System Balancing & Calibration Decision Yes, No or N/A Has the air flow been checked using a proprietary device such as an anemometer (recommended)? Have the controls been set following a defined process? Refer to figure 3 flow diagram Have all distribution grilles been locked where possible to minimise unapproved occupant adjustment? Figure 3 Step 1 Ensure all external and internal windows and doors are closed Step 2 Set fan speed using manufacturer data table Step 3 Set normal daytime air flow on extract points starting at location furthest from unit Step 4 Set normal daytime air flow on input points starting at location furthest from unit Step 5 Set fan speed to boost and measure extract rates at each location, adjust fan speed setting as required to achieve required flow
13 Standard Assessment Procedure 2005 Appendix Q MVHR Installation Guide Page 6 of 6 2. Handover and Control/Maintenance Advice Decision Yes, No or N/A Has the customer been supplied with suitable documentation detailing maintenance and operational requirements? Has the customer been advised that opening windows is not recommended during normal use in order to ensure the energy efficient operation and performance of the balanced system? Has the customer been advised not to seal natural air flows from room to room (e.g. avoid door seals and thick pile carpets) Has the customer been advised not to alter settings postcommissioning? Has the customer been advised to clean the filters as explained in the manufacturer s instructions?
MODEL: DV72. Mechanical Ventilation with Heat Recovery Installation Instructions and User Manual. Configuration Left Hand Right Hand
9041381- Issue 6 4/11 MODEL: DV72 Mechanical Ventilation with Heat Recovery Installation Instructions and User Manual Commissioning Data: to be completed by the installer Date of installation: Configuration
Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery
Part 3 Ancillary technologies Chapter CONTENTS SCOPE Clause Page DESIGN Design standards D1 1 Statutory requirements D2 1 System design D3 1 Building integration D4 2 Noise D5 2 Access and controls D6
HRU ECO 4. System 4 Continuous Mechanical Supply and Extract Ventilation with Heat Recovery Appendix Q Eligible
HRU ECO 4 System 4 Continuous Mechanical Supply and Extract Ventilation with Heat Recovery Appendix Q Eligible Weight As a result of the unique clamping construction in combination with the plastic/synthetic
Duplexvent DV72 EC So light, so slim it fits inside a 600mm cupboard
Duplexvent DV72 EC So light, so slim it fits inside a 600mm cupboard Duplexvent DV72 EC MVHR is designed to provide constant volume ventilation levels to exceed the latest Building Regulations 2010. The
1. Description. 2. List of Accessories included A B C F G H
1. Description This unit is a pump that will clear the waste from a domestic shower and washbasin. The unit will start automatically. Please pay particular attention to the following: Possible danger to
Rapide Inline Ceiling Extractor Fan, White Fascia 41800040590. Rapide Inline Ceiling Extractor Fan, Chrome Fascia 41800040580
Any Queries Call : 08000 23 23 23 Rapide Inline Ceiling Extractor Fan, White Fascia 41800040590 Rapide Inline Ceiling Extractor Fan, White Fascia Illuminated 41800040670 Rapide Inline Ceiling Extractor
Green Line HRX Ceiling Mounted
Green Line HRX Ceiling Mounted Mechanical Ventilation with Heat Recovery appliance Installation and Operating Instructions Models: HRX-S-C, HRX-B-C, HRX-FP-C, HRX-BFP-C These instructions must be given
BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS
BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS PLEASE READ COMPLETE INSTRUCTIONS BEFORE YOU BEGIN LEAVE INSTALLATION INSTRUCTIONS AND USER'S GUIDE WITH OWNER ALL ELECTRIC WIRING AND PLUMBING MUST BE DONE
Installation and User Instructions Unvented Electric Storage Water Heater Models: S10UNV, S15UNV.
Installation and User Instructions Unvented Electric Storage Water Heater Models: S10UNV, S15UNV. MULTIPOINT Please read and understand these instructions before starting work. Please leave this leaflet
Installation, operation and maintenance manual TX 35A
Installation, operation and maintenance manual TX 35A Rev.10 may 2012 Page 1 of 18 1.0.0 Table of contents INSTALLATION, OPERATION AND MAINTENANCE MANUAL...1 1.0.0 TABLE OF CONTENTS...2 2.0.0 ILLUSTRATIONS...2
NUAIRE VENTILATION SYSTEMS FLATMASTER AND FLATMASTER 2000 SYSTEMS
NuAire Ltd Western Industrial Estate Caerphilly Mid Glamorgan CF83 1NA Tel: 02920 858 200 Fax: 02920 858 300 e-mail: [email protected] website: www.nuaire.co.uk NUAIRE VENTILATION SYSTEMS APPROVAL INSPECTION
ATTENTION This is a general warning that failure to follow instructions could result in poor functioning of the unit.
1. Description The macerating system of this unit is installed in a case, specifically designed for horizontal outlet spigots. This macerator is manufactured in a factory which is quality certified to
THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS
THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS IMPORTANT: This booklet should be left with the user after installation and demonstration Thank you for choosing a quality Redring product
Portable Air Conditioner
Portable Air Conditioner Owner's Manual Model:3 in 1 12,000 Btu/h Series 3 Please read this owner s manual carefully before operation and retain it for future reference. CONTENTS 1. SUMMARY...1 2. PORTABLE
- 2 - IMPORTANT SAFETY REMINDERS
USER MANUAL IMPORTANT SAFETY REMINDERS This appliance should only be used for domestic cleaning, as described in this user guide. Please ensure that this guide is fully understood before operating the
squrboxbox heat recovery squrboxbox I technical information
heatrecoveryrange heat recovery squrboxbox I technical information squrboxbox Low depth high performance Only 350mm deep & up to 430l/s, providing the most effective low depth solution. Quietest solution
Please also see 10 golden rules for correct Saniflo installation on www.saniflo.co.uk
1. Description Sanicom is a lifting pump for wastewater used in commercial applications (restaurants, hairdressing salons, the catering industry etc.). The unit operates automatically, has a high performance
CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS
CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS D E F Y I N G C O N V E N T I O N Congratulations on your new Corner Fridge Your new corner fridge may have different functions
Meaco 30L and Meaco 40L dehumidifier instruction manual
Meaco 30L and Meaco 40L dehumidifier instruction manual Please read this instruction manual before using the dehumidifier and keep safe for future reference SAFETY INSTRUCTIONS PLEASE READ ALL INSTRUCTIONS
Installation and maintenance instructions. Danfoss Vent
Installation and maintenance instructions Danfoss Vent 1 Unit design... 2 2 Project planning and installation instructions... 3 2.1 Ventilation...3 2.2 Piping installation....3 2.3 Condensation line...4
SF15K SF05KSS, SF10KSS
Product Instruction Manual Speedflow SF05K, SF10K & SF15K SF05KSS, SF10KSS & SF15KSS Undersink unvented water heater V15.6/6 Version 3.2 Jan 2015 Thank you for purchasing a Hyco Speedflow unvented water
plumbing products guide
plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly
This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink.
1. Description This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink. The unit will start automatically. Please pay particular
NewAir AC-10000E, AC-10000H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS
NewAir AC-10000E, AC-10000H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS BEFORE USE GENERAL SAFETY INSTRUCTIONS: ALWAYS OPERATE THE UNIT IN AN UPRIGHT POSITION AND PLACE
For installation guide see reverse of book
USERS GUIDE LOGIC Combi 24, 30, 35 For installation guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table
Visage. Digital. Digital diverter. Installation guide. Visage Digital diverter installation instructions Page 1
Visage Digital Digital diverter TM Installation guide Visage Digital diverter installation instructions Page 1 Visage Digital diverter Visage Digital concealed with adjustable and fixed head Visage Digital
USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR
USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR CONTENTS Introduction Safety Notes Identification of parts Installation instructions Operation instructions Maintenance Troubleshooting
REPLACEMENT AIR CONDITIONING UNITS FOR BRITISH EMBASSY RESIDENCE
REPLACEMENT AIR CONDITIONING UNITS FOR BRITISH EMBASSY RESIDENCE FOREIGN & COMMENWEALTH OFFICE BE BAHRAIN TEL: MAY 2014 EMAIL: TENDER ISSUE: 002/2014 1. GENERAL REQUIREMENTS 1.01 LOCATION OF SITE The British
Drayton Digistat +2RF/+3RF
/+3RF Programmable Room Thermostat Wireless Model: RF700/22090 Model: RF701/22092 Power Supply: Battery - Thermostat Mains - Digistat SCR Invensys Controls Europe Customer Service Tel: 0845 130 5522 Customer
THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS
THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS Applied Energy Products Limited, Morley Way, Peterborough, PE2 9JJ, UK Telephone: +44 (0) 844 372 7761 / Fax: +44 (0) 84 372 7762 Website:
AN500T, AN1000, AN1000T, AN1500, AN1500T AN2000, AN2000T
Product Instruction Manual Accona AN500T, AN1000, AN1000T, AN1500, AN1500T AN2000, AN2000T Panel heater v16.5/5 Version 3.2 Jan 2015 Contents 1. Important safety points 2. Installation 2.1. Wall mounting
Cooktop Low-Profile Ventilation Hoods
INSTALLATION GUIDE Cooktop Low-Profile Ventilation Hoods Contents Wolf Cooktop Low-Profile Ventilation Hoods........ 3 Cooktop Low-Profile Hood Specifications.......... 4 Cooktop Low-Profile Hood Installation............
Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS
Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS Ducted System RECORD THIS UNIT INFORMATION FOR FUTURE REFERENCE: Model Number: Serial Number: Date Purchased: This manual must be read and
Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling
Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations
ES-LCD User Control SD Card Location
SD Card Location Addendum to Leaflet Number 671415 The EMC Directive 2004/108/EC The Low Voltage directive 2006/95/EC Checking SD Card for secure location Due to the possibility of movement during transit,
USERS GUIDE. LOGIC Combi 24, 30, 35. For installation guide see reverse of book
USERS GUIDE LOGIC Combi 24, 30, 35 For installation guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance
3 IN 1 BATHROOM HEATER
3 IN 1 BATHROOM HEATER MODEL NO.: A515 - SH MINI FUNCTION: HEATER, EXHAUST FAN AND LIGHT Dear customers, Thank you for selecting the AUPU 3 in 1 Bathroom Heater. Please read all instructions before commencing
INSTALLATION & USER INSTRUCTIONS
INSTALLATION & USER INSTRUCTIONS LED ELECTRIC FIRE Focal Point Fires plc. Christchurch, Dorset BH23 2BT Tel: 0202 499330 Fax: 0202 499326 www.focalpointfires.co.uk e : [email protected] MODELS
Te c h n i c a l G u i d a n c e D o c u m e n t
F Ventilation Building Regulations 2009 Te c h n i c a l G u i d a n c e D o c u m e n t Contents Page Introduction 2 Transitional Arrangements 2 The Guidance 2 Existing Buildings 2 Technical Specifications
How To Design A Gas Dryer
Non Domestic Laundry Gas Appliance Installation Code of Practice Introduction This code of practice has been produced with the assistance of all Companies within the OPL sector of SLEAT because of the
Installation and User Instructions Aquarius Undersink Vented Water Heaters Models: AU7/3, AU7/1, AU10/3, AU10/1.
Installation and User Instructions Aquarius Undersink Vented Water Heaters Models: AU7/3, AU7/1, AU10/3, AU10/1. Please read and understand these instructions before starting work. Please leave this leaflet
Flue Installation. High Efficiency Condensing Boilers
Flue Installation High Efficiency Condensing Boilers Table of contents INTRODUCTION 1 Instruction guidance...4 1.1 Product documentation...4 1.2 Explanation of symbols...4 1.3 Important Notes...4 INSTALLATION
USER INSTRUCTIONS FOR 10 LITRE PORTABLE DEHUMIDIFIER MODEL NO. DHMD102
USER INSTRUCTIONS FOR 10 LITRE PORTABLE DEHUMIDIFIER MODEL NO. DHMD102 THANK YOU FOR CHOOSING YOUR NEW DEHUMIDIFIER. BEFORE USING THE UNIT READ THESE INSTRUCTIONS FULLY AND RETAIN THEM FOR FUTURE REFERENCE
INFRARED QUARTZ WALL HEATER
INFRARED QUARTZ WALL HEATER MODEL NO: IQ2000 PART NO: 6939004 MOUNTING & OPERATION INSTRUCTIONS GC0715 INTRODUCTION Thank you for purchasing this CLARKE Infrared Wall Heater. Before attempting to use this
Heating and Domestic Hot Water Systems for dwellings Achieving compliance with Part L 2008
Heating and Domestic Hot Water Systems for dwellings Achieving compliance with Part L 2008 Appendix: Guide to the Condensing Boiler Installation Assessment Procedure for Existing Dwellings CONTENTS PAGE
NUAIRE VENTILATION SYSTEMS DRIMASTER, DRIMASTER 3S, DRIMASTER 2000 AND DRIMASTER 2000 3S SYSTEMS
NuAire Ltd Western Industrial Estate Caerphilly Mid Glamorgan CF83 1NA Tel: 029 2085 8200 Fax: 029 2085 8300 e-mail: [email protected] website: www.nuaire.co.uk Agrément Certificate 00/3727 Product Sheet
SWIMMING POOL HEAT PUMP
SWIMMING POOL HEAT PUMP Installation & User Manual Model HP40B HP50B HP65B Hayward Pool Products Canada, Inc. T: 1-888-238-7665 www.haywardpool.ca CONTENT I. Application 4 II. Features 4 III. Technical
User's Instructions. Alpha HE CB25/33 and HE SY25
User's Instructions Alpha HE CB25/33 and HE SY25 Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Boiler Range For Technical help or for Service call... ALPHA HELPLINE Tel:
Shower and Floor Gullies Channel Drain and Tile Drain SECTION
Shower and Floor Gullies Channel Drain and Tile Drain SECTION 2 Shower and Floor Gullies, Channel Drain and Tile Drain 29 General Information Shower and Floor Gullies McAlpine has responded to market conditions
Energy Efficiency HOSPITALITY. www.energia.ie
Energy Efficiency HOSPITALITY www.energia.ie Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could make a real
LUCCI AIRFUSION QUEST II CEILING FAN
LUCCI AIRFUSION QUEST II CEILING FAN WITH IR REMOTE INSTALLATION OPERATION MAINTENANCE WARRANTY INFORMATION CAUTION READ INSTRUCTIONS CAREFULLY FOR SAFE INSTALLATION AND FAN OPERATION. V1.0 QUEST II IR
ferroli Boiler Replacement Optimax HE- Modena HE
ferroli Boiler Replacement Optimax HE- Modena HE Introduction The new Ferroli Modena 32C HE high efficiency condensing combination boiler is an ideal replacement for the Ferroli Optimax HE 31 C and the
Energy Efficient Air Distribution Systems
(57.7) X from Polypipe Ventilation Energy Efficient Air Distribution Systems VSPweb On-line Planner Providing Duct Systems for: Mechanical Ventilation with Heat Recovery Mechanical Extract Ventilation
Decree of the Ministry of the Environment on fire safety of ventilation systems
THE NATIONAL BUILDING CODE OF FINLAND MINISTRY OF THE ENVIRONMENT Housing and Building Department Decree of the Ministry of the Environment on fire safety of ventilation systems Adopted in Helsinki, 18
Installation and Operating Guide LOOVENT eco Centrifugal Fans (SELV versions)
80000156 Issue 1 10/13 Installation and Operating Guide LOOVENT eco Centrifugal Fans (SELV versions) LOOVENT eco T SELV - 72684309 LOOVENT eco HT SELV - 72684310 LOOVENT eco dmev T SELV - 72684312 LOOVENT
REB 1 REB 3 REB 5 REB 6 REB 8 REB 10 REB 12 REB 16
REB 1 REB 3 REB 5 REB 6 REB 8 REB 10 REB 12 REB 16 Manually Operated Electronic Speed Controller Single Phase For all applications using suitably specified single-phase induction motor fans 1 GENERAL The
Elson Coral E. Open Vented Thermal Store providing mains pressure hot water heated by electricity. Installation, Servicing and User's Instructions
Part No. 130009 Iss. 12 August 2004 Elson www.elsonhotwater.co.uk Open Vented Thermal Store providing mains pressure hot water heated by electricity Installation, Servicing and User's Instructions Read
GREENSTAR 60/100 HORIZONTAL FLUE
FLUE KIT INSTALLATION MANUAL 7 76 9 08 ROOM SEALED TELESCOPIC FLUE 7 76 9 7 ROOM SEALED LONGER TELESCOPIC FLUE 7 76 9 086 PLUME MANAGEMENT SYSTEM GREENSTAR 60/00 HORIZONTAL FLUE FOR WORCESTER GREENSTAR
SELECTION, APPLICATION AND MAINTENANCE
DIESEL PROTECTION SYSTEMS Automatic Diesel Engine Shut Down System for Safe Area Applications SELECTION, APPLICATION AND MAINTENANCE Series 300 Series 310 SYSTEM DESCRIPTION Suitable for attended engine
USER S MANUAL HSC-24A
AIRREX AIR CONDITIONER USER S MANUAL HSC-24A Thank you for purchasing an AIRREX AIR CONDITIONER. BEFORE operation please read this user s manual carefully. Keep this manual readily available. It is ESSENTIAL
SHOWER WATER HEATER MODEL BS 35 / 45 / 60 BS 35 E / 45 E / 60 E OPERATION AND INSTALLATION INSTRUCTIONS
SHOWER WATER HEATER MODEL BS 35 / 45 / 60 BS 35 E / 45 E / 60 E OPERATION AND INSTALLATION INSTRUCTIONS 2 This water heater must be installed (water and electrical installation), commissioned and serviced
HEAVY DUTY STORAGE GAS
Multi-Fin flue technology Flue damper saves energy Electronic controls HEAVY DUTY STORAGE GAS Dependability The Rheem heavy duty gas range is the work horse of the industry having proved itself over many
ENGLISH INSTRUCTION & INSTALLATION MANUAL DUCTLESS MINI SPLIT AIR CONDITIONING SYSTEMS
ENGLISH INSTRUCTION & INSTALLATION MANUAL DUCTLESS MINI SPLIT AIR CONDITIONING SYSTEMS Céliera Corporation. All rights reserved. Unauthorized duplication, reproduction prohibited. CONTENTS SAFETY PRECAUTIONS...
Reverse Cycle Inverter Split System Air Conditioner
Reverse Cycle Inverter Split System Air Conditioner Model Number TAC-09CHSA/JAI5 INSTALLATION MANUAL Contents 03 Warranty Details 04 Welcome 05 General Safety Instructions 06 Product Overview 07 Selecting
Chromalox. Installation, Operation. Portable Industrial Unit Blower Air Heater Type DRA RENEWAL PARTS IDENTIFICATION
Chromalox Installation, Operation RENEWAL PARTS IDENTIFICATION Portable Industrial Unit Blower Air Type DRA and DIVISION SALES REFERENCE DATE SECTION (Supersedes P-) PF-) NOVEMBER, 00 DRA PF- -0-00 Specifications
Installation Instructions
VentilAire IV Whole-House Fresh Air Supply System Installation Instructions 914228 Flat Roof Kit 914229 Sloped Roof Kit 5" x 11' Class I Insulated Flexible Duct Plastic Clamps (2) Metal Clamps (2) Ceiling
ELECTRIC CENTRAL HEATING FLOW BOILER
ELECTRIC CENTRAL HEATING FLOW BOILER EKCO.T Used product can t be treated as general communal waste. Disassembled appliance has to be delivered to the collection point of electrical and electronic equipment
FLEXIT S3 X/TT A3 X/TT K3 X/TT S3 R S3 RK
944E-05 006-0 FLEXIT S X/TT A X/TT K X/TT S R S RK Installation Instructions Air Handling Unit/ Kitchen Model S X/TT K X/TT A X/TT S R S RK Air handling unit with cross heat exchangeror TT exchanger Air
NewAir AC-10100E / AC-10100H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS
NewAir AC-10100E / AC-10100H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS ELECTRICAL SAFETY This appliance is for indoor use only. Always turn off the unit and unplug
Electrical Practices for Construction Work
1. Purpose Electrical Practices for Construction Work The purpose of this Code is to provide practical guidance and set minimum safety requirements for electrical practices on all construction sites in
SunMaxx Solar Filling Station Operating Instructions
SunMaxx Solar Filling Operating Instructions Content 1. Declaration of conformity... 2 2. Introduction... 2 3. Transportation and unpacking... 4 4. Mounting and commissioning... 5 5. End of operation...
Domestic AC Fans 230V Installation and Operating Guide. eco 230V AC Base Models: icon eco15 72683501 icon15 72591501 icon30 72591601 icon60 72591701
Domestic AC Fans 230V Installation and Operating Guide eco 230V AC Base Models: ico eco15 72683501 ico15 72591501 ico30 72591601 ico60 72591701 ico Domestic Fan 230V Installation, Maintenance and Use ico
Element D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer
2014 British Columbia Building Code Changes
District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most
Dehumidifier D 850E. - Instruction manual version 02
Dehumidifier D 850E - Instruction manual version 02 Content 1. Description of dehumidifier 1.1. General data 1.2. Technical data 2. Operation and usage 2.1. Usage 2.2. Location and installation 2.3. Preparing
USERS GUIDE. LOGIC Heat 12, 15, 18, 24, 30. For installation guide see reverse of book
USERS GUIDE LOGIC Heat 12, 15, 18, 24, 30 For installation guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance
HVAC Checklist - Long Form
HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,
IMPORTANT INFORMATION
Curved Quadrant Instruction Manual CQ IMPORTANT INFORMATION Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed according to our guidelines.
Use and Care Manual. Model CPA12KH AIR CONDITIONER
Use and Care Manual Model CPA12KH AIR CONDITIONER Introduction Thank you for choosing this air conditioner to provide you and your family with all of the "Home Comfort" requirements for your home, cottage
Ceiling Mount Air Handler Manual
www.surna.com 303.993.5271 Ceiling Mount Air Handler Manual Models: CMAH12, CMAH18, CMAH24, CMAH30, CMAH36, CMAH48, CMAH60 Revised: September 2014 Table of Contents Warranty Information 4 Limited Warranty
BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010
Building Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010 Page 1 of 6 PURPOSE: This Guidance
INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT 2003-2014 CHEVROLET/GMC VANS FOR
INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT 2003-2014 CHEVROLET/GMC VANS FOR (For NEW 2007 ALL WHITE KWIK-KITS ONLY) Warning do not attempt to install A/C units unless you are experienced with servicing
GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY
GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY July 2008 1.0 SCOPE These guidelines describe the way in which air conditioning units shall be installed or replaced
Speedflow Undersink Unvented Water Heater. Models SF10K and SF15K. Instruction Manual
Speedflow Undersink Unvented Water Heater Models SF10K and SF15K Instruction Manual Version 2.0 May 2009 Hyco SpeedFLOW UnVENTED WATER HEATER Models SF10K (10 Litres) and SF15K (15 Litres) 1. Introduction
Artisan Thermostatic basin mixer. Fitting Instructions & Contents List
Artisan Thermostatic basin mixer Fitting Instructions & Contents List Please keep these instructions for future reference and request of replacement parts 1. Introduction Thank you for choosing Bristan,
FLEXIT S4 R S6 R S7 R
94111E-05 2005-10 FLEXIT S4 R S6 R S7 R User Manual Air Handling Unit Cabinet Models with Heat Recovery - Rotor Contents 1 Important Safety Instructions... 3 2 Method of Operation - System... 3 2.1 Heating
Energy Company Obligation (ECO): Technical Monitoring Questions
Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified
HRU ECO 4 Technical Guide
HRU ECO 4 Technical Guide System 4 Continuous Mechanical Supply and Extract Ventilation with Heat Recovery Appendix Q Eligible Climate for life. Technical Guide for a Climate for Life The Itho Group was
INDUSTRY GUIDANCE FOR INSTALLERS ON CONDENSATE DRAINAGE PIPE INSTALLATION. This guidance is endorsed by HHIC members.
1. BACKGROUND INDUSTRY GUIDANCE FOR INSTALLERS ON CONDENSATE DRAINAGE PIPE INSTALLATION This guidance is endorsed by HHIC members. During recent winters the UK has experienced prolonged spells of extremely
CADB and CADT-D / DI / DC Series
HEAT RECOVERY UNITS CADB and CADT-D / DI / DC Series NEW The CADB, CADT heat recovery range consists of: - Self-supporting casing with extruded aluminium profile structure and beige plastic coated galvanised
HVAC Code Requirements
one and two family dwellings? Answer: SECTION 2001: GENERAL 2001.1 Air supply. Fuel-burning equipment shall be provided with a supply of air for fuel combustion, draft hood dilution and ventilation of
STABITHERM INSTALLATION & SERVICE BOOKLET
STABITHERM INSTALLATION & SERVICE BOOKLET TABLE OF CONTENTS Introduction...3 Warranty...3 Product Range and Physical Description...4 Method of Operation...5 Recommended Pressures and Temperatures...6 Flow
AquaNova. Water heater. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER
AquaNova Water heater Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER Vokèra is a licensed member of the Benchmark scheme which aims to improve the standards of installation
Oil and Coolant Circulating Heating System. Model - OCSM
Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine
Solar air collectors for industry and larger halls S Ø. Efficient dehumidification and air heating for free...
Solar air collectors for industry and larger halls N S Ø Efficient dehumidification and air heating for free... This booklet contains information about SolarVenti Industrial air solar system. The system
Invisidor STYLE Air Curtain
Invisidor STYLE Air Curtain Installation, Operation & Maintenance Manual Version 2.0 English Copyright All the information and drawings in this manual are the property of Biddle and may not be used (other
Split-type Air-Conditioner INSTALLATION MANUAL CONTENTS FOR INSTALLER MXZ-3A30NA MXZ-4A36NA ATTENTION. English. Français. Español
Split-type Air-Conditioner MXZ-3A30NA MXZ-4A36NA INSTALLATION MANUAL Refer to the installation manual of each indoor unit for indoor unit installation. English Français Español ATTENTION This manual mentions
Operators manual Basic water heater
Operators manual Basic water heater Isotemp Basic water heater has been designed and produced to ensure that your water heater will give long and trouble free operation for many years. It is important,
Shower Handbook (Also covers 650 chrome variant)
Shower Handbook (Also covers 650 chrome variant) IMPORTANT: Please retain this booklet for future reference CONTENTS Page How to use your shower 2 How your shower works 3 What to do if things go wrong
