Uganda Program for Human and Holistic Development. GRANTS MANAGEMENT MANUAL: Civil Society Organisation
|
|
|
- Griffin Casey
- 9 years ago
- Views:
Transcription
1 Uganda Program for Human and Holistic Development GRANTS MANAGEMENT MANUAL: Civil Society Organisation April 2005
2 This Civil Society Organisation (CSO) Grants Management Manual is intended to clarify the process of UPHOLD CSO Grants and outline the responsibilities and roles of people in four key areas: Civil society organizations (CSOs) which have received a grant from UPHOLD, District officials in the regions where UPHOLD works and is funding CSO activities to contribute to the overall development goals of districts, Staff at UPHOLD Regional Offices (ROs) who are working directly with the CSOs, Staff at UPHOLD Headquarters in Kampala who are providing support and technical assistance to the CSOs and ROs. This report was made possible by the generous support of the American people through the United States Agency for International Development (USAID). The contents are the responsibility of UPHOLD and do not necessarily reflect the views of USAID or the United States Government. UPHOLD is implemented by JSI Research and Training Institute Inc., with funding from USAID under Cooperative Agreement number 617- A in collaboration with the Education Development Centre (EDC), Constella Futures, Malaria Consortium, the Manoff Group Inc. and World Education.
3 Table of Contents 1.0 UPHOLD Program Overview Themes Strategies Core Areas of Technical intervention Civil Society Organizations (CSOs) Contractual Responsibilities Interaction with Regional Offices Reporting and Monitoring CSO Relationship with Partner Groups CSO Interaction with District Government Public Relations Key Outputs and Timeline Uganda District Local Governments Regional Offices Regional Director (RD) Community Participation Coordinator (CPC) Financial and Administrative Assistant Headquarters Staff Grants Manager Grants Finance Officer (GFO) Grants Assistant Kampala-based Technical Staff Training and Performance Improvement Specialist (TPIS) Private Sector Specialist (PSS) Monitoring and Evaluation (M&E) Administration/Finance-Kampala based Senior Management Team. 13
4 1.0 The Ugandan Programme for Human and Holistic Development The Uganda Program for Human and Holistic Development (UPHOLD) works to assist Ugandans to achieve improved health, and longer and more productive lives, through interventions in three integrated social sectors: Education, Health and HIV/AIDS Themes UPHOLD s holistic approach to development entails six cross-cutting themes: 1) integrated approach that builds human capacity and creates synergy between the sectors; 2) strengthening effective partnerships and dialogue between the public sector, the private sector, civil society, communities and families; 3) building on the existing strengths and opportunities of Uganda s wealth of human and socio-cultural resources; 4) behaviour-centred orientation that focuses on understanding and strategically addressing human motivations and constraints in taking specific actions; 5) improving quality assurance systems; and 6) systems thinking using creative processes for strategic analysis and planning Strategies UPHOLD S main strategies include: Working within districts plans and priorities Increasing involvement of families and communities Awarding grants to foster social change Using responsible speed in implementation Fostering organizational effectiveness Measuring results Going National by helping to scale up good practices Core Areas of Technical Intervention Primary School Education: UPHOLD will labour to improve teacher effectiveness; facilitate dialogue and consensus-building between families, communities, teachers and other stakeholders; build capacity in planning, management and supervision at decentralized levels; increase parental involvement; and facilitate the use of innovative tools and approaches to improve children s learning both in school and at home. HIV/AIDS: UPHOLD will strengthen services for Voluntary Counseling and Testing; Preventing Mother-To-Child Transmission of HIV; managing Sexually- Transmitted-Infections; supporting People Living with HIV/AIDS; and applying innovative approaches to empower and involve young people as well as addressing gender and culture. Integrated Reproductive Health: UPHOLD will promote improved antenatal and postnatal care; safe and clean deliveries; essential obstetric care; post abortion care; gender-sensitive approaches; effective dialogue and decision-making in UPHOLD CSO Grants Management Manual Page 1
5 families and communities; increased access and utilization of quality family planning methods and services; youth-friendly services; and efficient synergies aiming at the control of HIV/AIDS, sexually transmitted infections, and malaria. Child and Adolescent Health: UPHOLD s key interventions include the Integrated Management of Childhood Illnesses (IMCI) and Community IMCI; Community-Based Growth Promotion; improved strategies and indicators for nutrition; Vitamin A and micro-nutrient supplementation; promoting exclusive breastfeeding; childhood immunizations; youth-friendly services; and innovative strategies promoting peer support groups, child-to-child activities, and parentchild communication. Communicable Disease Control: Malaria control activities will include the effective Home Based Management of Fever, Intermittent Presumptive Treatment of malaria during pregnancy, and promoting use of Insecticide-Treated Nets. UPHOLD will also work to control tuberculosis, schistosomiasis, and other communicable diseases in a multi-sectoral approach. 2.0 Civil Society Organizations (CSOs) Civil society organizations are recognized for their innovativeness, interventions at grassroots serve families and communities in hard-to-reach areas, and their ability to be flexible, pragmatic, relatively quick and effective in their implementation. The UPHOLD grants seek to leverage these comparative advantages of civil society organizations to promote positive social transformation. Positive social transformation is a process where social norms, structures, and systems change in such a way as to improve the choices and opportunities available to communities, especially those vulnerable, marginalized or disadvantaged groups. 2.1 Contractual Responsibilities CSOs are expected to abide by all the terms and conditions outlined in the Grant Agreement, including: a) Implement activities as per the approved workplan and budget b) Use and manage funds appropriately c) Submit financial and technical reports as required d) Ensure availability of audits e) Notify UPHOLD focal point persons at least 15 days prior to any public meetings or training activities being implemented as part of the grant agreement f) Obtain prior written approval from UPHOLD before funding communications materials and ensure materials are in compliance with the Communication Guidelines CSOs will use grant funds provided by UPHOLD only for those activities not funded by other donors CSOs are expected to grasp the UPHOLD project indicators and contribute to meeting the indicators specified in their grant proposals. UPHOLD CSO Grants Management Manual Page 2
6 2.1.4 CSOs are expected to maintain all equipment purchased under the grant, including all routine maintenance, repair, and their entire security. If any equipment is stolen or not functional, CSOs should inform the Regional Office. 2.2 Interaction with UPHOLD Regional Office The CSO and the Regional Offices should Maintain Regular Communication with the Regional Office a) The CSO is responsible for communicating all problems, or issues of concern to Regional Office staff as soon as they come up so that UPHOLD can provide assistance or advice. b) Should any CSOs wish to change use of grant budget by more than 10% for any line item, they must submit a letter of request to the Regional Office, stating which budget activity item will increase, and which item(s) will decrease respectively. If approved, the Regional Office will forward the request to the UPHOLD Chief of Party for formal approval and grant amendment. c) Should there exist a need to amend the work plan, CSOs must submit a letter to the Regional Office explaining the desired changes. If approved, the Regional Office will forward the request to the UPHOLD Chief of Party for approval and record of changes; d) Any changes involving key positions in personnel designated in the Grant Agreement must be reported to the Regional Office within 15 working days, together with contact information for replacement staff e) CSO are requested to document and share any success stories or innovative programming with UPHOLD for improvement and further distribution of lessons learned The Regional Office Community Participation Coordinator (CPC) should have regular (least monthly) communication with CSOs, by telephone, or in person to discuss the proposed activities, confirm the completed ones, identify the challenges they are facing, provide feedback on reports, request for assistance and/or discuss other issues prevailing The Regional Office Finance and Administrative Assistant (FAA) should have regular (least monthly) communication via telephone, or in person to discuss any budget/financial issues. 2.3 Reporting and Monitoring Quarterly Meetings to be held to provide technical assistance to CSOs and enable monitoring and reporting. CSO attendance at the quarterly meeting is mandatory and CSOs are responsible for sending the appropriate staff. UPHOLD will notify CSOs of meetings with at least 10 days notice. UPHOLD will sponsor these meetings. Activities to take place at the quarterly meeting may include: A meeting between the CSO and CPC to review the quarterly report, work plan, and 90-day activity calendar, to evaluate support and requested technical assistance; UPHOLD CSO Grants Management Manual Page 3
7 Meeting with appropriate UPHOLD staff as need arises, including technical and financial staff, monitoring and evaluation specialists and/or consultants. Meeting with district officials who have been invited to the meeting to network with CSOs. Accessing agreed upon technical assistance. Sharing accomplishments and challenges with UPHOLD and other CSOs Quarterly Reporting - CSOs will submit Quarterly Reports within 15 days of the end of the quarter. (The calendar for each CSO is exclusive based on the dates the Grant Agreement was signed.) When available, the CSO should submit soft copies of the reports. Quarterly Reporting includes both financial and activity reports. The Quarterly Report should contain the following: completed technical and financial forms provided for reporting. completed activity reports for all activities/trainings held during the quarter. reports on other relevant activities such as meetings with district officials, technical training, etc Monthly Reporting CSOs are responsible for providing timely and accurate reports to UPHOLD using the reporting formats provided. a. During the first quarter, the Regional Office Finance and Administrative Assistant (FAA) will meet with the CSOs to review the established accounting systems and review the UPHOLD financial reporting requirements. b. Based on this review, UPHOLD reserves the right to request specific CSOs to submit monthly financial reports within 15 days of the end of the month. These reports should include the monthly bankbook register, the monthly cashbook register, the monthly bank statement reconciliation, and the bank statement Additional Reporting CSOs should submit the Quarterly Funding Request Form and Quarterly Funding Requirements Form (see UPHOLD Grants Financial Management Guidance) to the Regional Office at least fifteen days before the end of the previous quarter in order to ensure the transfer of next quarter funding. A Final Grant Report must be submitted to the Regional Office no later than 30 days after the end of the grant period. As outlined in the Grant Agreement, CSOs shall provide UPHOLD with a list of any items purchased with grant funds and valued over $500 at least 90 days before the end of the grant. These items will be considered UPHOLD property unless CSOs are otherwise notified by UPHOLD in writing. UPHOLD CSO Grants Management Manual Page 4
8 2.3.5 General Monitoring and Evaluation The M&E team will meet with each CSO in the first quarter to carry out an initial assessment of monitoring capacity and tools, and then provide CSOs with additional tools or trainings in M&E. CSOs can request additional assistance as need arises; CSOs will complete an activity report for each UPHOLD-funded activity or training within 5 days of completion. The reports should be kept and submitted to the RO with the quarterly report. Activity reports should be available for review by RO staff during their visits. CSOs can expect feedback on reports from Regional Office staff at least 10 days prior to the next report due, and regular additional feedback from the technical staff; CSOs are asked to share any photographs, video, or published materials with UPHOLD as specified in the Grant Agreement. All records and documents related to the grant and activities must be retained by the CSO for three years after the end of the Grant Agreement.. UPHOLD is developing a computer-based indicator tracking system. Once completed, CSOs will be responsible for submitting evaluation data on-line, when possible. 2.4 CSO Relationship with Partner Organizations A fundamental goal of UPHOLD s Family and Community Action Grants is building partnerships between CSOs as reflected in the selection of CSOs actively pursuing collaboration with other groups. UPHOLD will be monitoring partnerships between CSOs and providing support to enhance the effective collaboration between partner organizations. In this context, CSOs are obliged to work with the partners they identified in the grant application. If this is no longer feasible, CSOs should submit a letter to the Regional Office outlining the circumstances and get approval for dissolving the partnership. CSOs are expected to ensure partner groups comply with UPHOLD requirements, and submit data that is important for grant reporting. 2.5 CSO Interaction with District Government UPHOLD strives to deepen public-private partnership by encouraging a productive relationship between CSOs and local government as development partners. UPHOLD will support CSOs in maintaining their current positive relationship with their district government. Examples of maintaining this relationship include meeting with district officials, sending a copy of Quarterly Reports to the district focal person, attending relevant district meetings or events, and taking advantage of technical assistance provided by the district. UPHOLD CSO Grants Management Manual Page 5
9 2.6 Public Relations It is common that the press will be present at CSO/UPHOLD funded activities. The following guidelines are offered to best facilitate the process of effectively working with the press: UPHOLD will provide guidance (talking points) for CSOs to use with members of the press. CSOs are encouraged to contact the Regional Director with any questions they have about speaking to the press CSOs are asked to contact the Regional Office about any contact with press, or advance press requests in a timely manner CSOs must prominently acknowledge USAID and UPHOLD in any project press coverage or published materials as specified in the Grant Agreement. 2.7 At a Glance: Key Outputs and Timeline (yearly) CSO Activities and Timeline 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter Required Activity Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Attend quarterly meeting, 1 submit quarterly report, meet UPHOLD staff x x x x 2 Monthly Financial Report x x x x x x x x x x x x Advance Request form 3 for disbursal of next funds (approximately quarterly). x x x x Activity Reports for each 4 activity completed. x x x x x x x x x x x x 5 Final Report x UPHOLD CSO Grants Management Manual Page 6
10 3.0 Uganda District Local Government Uganda district local government is a critical element of UPHOLD s Family and Community Action Grants. District staff played key roles in the identification of UPHOLD funded CSOs and were part of the grants award process at each step. District officials are expected to continue to play an active role through the life of the grant in support of UPHOLD s strategy to increase public-private partnerships, specifically those between district governments and private CSOs operating in those districts. District government input has been, and will continue to be actively sought. As per local government requirements, all CSO grants must be reflected in district planning documents. 3.1 District officials shall receive a letter from UPHOLD confirming activities, start date and total budgets for CSOs in their district. 3.2 CSOs in each district will attend a quarterly meeting and district officials are requested to attend in order to meet with each UPHOLD funded CSO in their district and be updated on current activities. UPHOLD will provide advance notice of meetings. 3.3 Copies of the CSO quarterly technical reports will be forwarded to district officials by the UPHOLD Regional Offices for review and comment. 3.4 District officials are requested to ensure that CSOs are included in local government planning, technical meetings, or other opportunities, as appropriate. 3.5 District officials are requested to provide general oversight and feedback to CSOs and UPHOLD Regional or Kampala office on grant implementation as warranted. 4.0 UPHOLD Regional Offices The UPHOLD Regional Offices support and assist CSOs in achieving their results through monitoring and mentoring. UPHOLD is committed to increasing the efficacy of public-private partnerships and a key goal of the Regional Offices is to support and strengthen the relationships between local government and CSOs. Integral to the smooth operation of the CSO grant process are the Regional Director (RD), the Community Participation Coordinator (CPC) and the Finance and Administration Assistant (FAA). The following outlines the responsibilities of each member of the UPHOLD Regional Office. 4.1 Regional Director - The RD is responsible for the overall implementation and oversight of the CSO grant programme in the region. UPHOLD CSO Grants Management Manual Page 7
11 4.1.1 The RD shall monitor all CSO grants, working with the CPCs and FAA to track and compile data for each CSO in their region. a) Each monthly regional report submitted by the RD to UPHOLD/Kampala should include a section on CSOs activities. This update should specify which CSO activities have been verified by RO staff, as outlined below. b) The RD shall assign one CPC as the point person for each CSO grant with the understanding that the CPC will represent UPHOLD in all of their contacts with the CSO. c) The RD shall approve the quarterly work plans for the CPC and FAA which include the work they plan to undertake on the CSO grants. d) The RD is responsible for communicating any challenges or questions about CSO programs to both the UPHOLD Grants Manager and the CSO itself. e) The RD, or his/her designate, will provide feedback to CSOs on any reports a minimum of 10 days prior to the next report being due, copying the Grants Manager who will distribute to appropriate staff The RD is expected to review all CSO reports, ensure they comply with UPHOLD standards, sign off on them and forward to the appropriate Kampala staff member. For quarterly technical reports the RD or their designate shall: Receive one original and three copies of the technical reports from the CSO Once approved, the original should be forwarded to the Grants Manager at UPHOLD/Kampala. Copies of the report should be sent to the Chief Administrative Officer and the district section head for that technical area (as stated in the Grant Agreement). One copy should be kept on file at the Regional Office The RD shall review communication materials submitted for funding, ensure compliance with the UPHOLD guidelines, and provide prior approval for the items in conjunction with the UPHOLD BCC Specialist The RD shall ensure he/she, or a delegate, maintain contact as needed with key people associated with CSO grants (local government officials, technical staff, or others as needed) The RD and UPHOLD Private Sector Specialist shall work together to plan and host the quarterly CSO meetings The RD shall monitor community relations and press coverage of UPHOLD or any UPHOLD funded CSOs and communicate information to the DCOP- Operations. UPHOLD CSO Grants Management Manual Page 8
12 4.1.7 The RD shall assist with, and participate in, public relation activities related to the CSO grants. 4.2 Community Participation Coordinator - CPCs are the most direct and frequent link between UPHOLD and CSOs. They play the integral role in maintaining the effectiveness of CSO grants by ensuring that grantees receive adequate support CPCs shall monitor the activity and implementation of CSO grants through direct and regular contact, review of all reporting, and other tasks necessary to maintain a solid understanding of the status of each CSO for which they are the point person. a) CPCs must have a thorough understanding of the Grant Agreements signed with each CSO. b) CPCs shall be in touch with each CSO at least twice a month for the first quarter, and at least monthly after that. c) CPCs are expected to be at all of the meetings attended by the CSOs for which they are the point person. Such meeting may include the quarterly meetings, meetings with partner organizations, district meetings, technical assistance workshops, etc. d) CPCs are responsible for developing their personal quarterly work plans that outline activities required to meet their objectives for CSO grants. e) CPCs are the first to review all CSO technical reports and provide written feedback on the reports. Once completed, CPCs shall sign before forwarding to the RD for final approval. f) CPCs should also review CSO financial reports in conjunction with the FAA and be comfortable with the UPHOLD Grants Financial Guidance in order to answer any budget/finance related questions. g) CPCs should contact CSOs about reports that are late, have missing information, or do not use the required UPHOLD formats. a. CPCs will provide CSOs with any monitoring and evaluation analysis received from Kampala to help CSOs with future planning and/or implementation CPCs shall help identify and provide technical assistance to CSOs. a. CPCs shall act as a liaison between CSOs, local government, and UPHOLD Kampala staff as appropriate to communicate technical needs and/or secure technical assistance for CSOs. b. CPCs will participate, with other technical staff and consultants, in evaluation of the training needs of CSOs through workshops, visits, surveys, etc. c. As technical support needs are identified, CPCs will incorporate any expertise they can provide, as appropriate by the skill base each CPC has, into their quarterly work plans for review with the RD. UPHOLD CSO Grants Management Manual Page 9
13 4.3 Finance and Administrative Assistant - The Finance and Administrative Assistant (FAA) is the key financial liaison between UPHOLD and the CSO and is responsible for routine financial communication with the CSOs Within the first month of grant award, the FAA shall meet with all new grantees and conduct a review of their financial recordkeeping systems. In conjunction with the GFO, a decision should be made if the grantee may use their current recordkeeping systems or be required to use the UPHOLD templates The FAA shall provide financial technical assistance on requirements, reporting formats, etc. to the CSOs as required in order to ensure timely and effective financial reporting The FAA shall review CSO financial reports discuss activities projected/completed with the assigned CPC, make comments/revisions to the reports as necessary, and provide final authorization before submission to the RD for approval. a) The FAA shall provide appropriate feedback to the CSO a maximum of five days after receipt of the report. b) If there are concerns regarding the integrity of the financial reports, the FAA shall contact the RD and Grants Manager immediately The FAA shall conduct audit checks of the CSO on a regular basis to ensure that the financial records are being kept according to the UPHOLD requirements The FAA shall work with the RD to review any requests for budget amendments (modifications to a line item plus/minus 10%). Requests must include the budget item that the funds will be deducted from to accommodate the change. The FAA should review the request and submit to the RD for review and approval before forwarding to the Grants Finance Officer The FAA shall maintain a grantee file including; the grant proposal(s), the Grant Agreement, copies of all reports, and all communications between UPHOLD and the grantee. 5.0 UPHOLD Kampala Headquarters Staff The role of staff in Kampala is to provide support and guidance to people in the field. They are also responsible for reviewing reports, analyzing M&E data, and ensuring that programmes are as effective as possible. 5.1 Grants Manager The Grants Manager is responsible for maintaining the strategy for CSO grants. UPHOLD CSO Grants Management Manual Page 10
14 5.1.2 As part of a team, the Grants Manager shall assist M&E with the development of reporting tools and implementation of tracking systems for the CSO grants The Grants Manager shall monitor and ensure timely financial and technical reporting by the CSOs and Regional Offices The Grants Manager shall provide oversight on CSO compliance with the Grant Agreement The Grants Manager shall provide reports on the status and progress of the CSO grants The Grants Manager, or his/her designate, shall receive all CSO reports from the Regional Offices, log them as having been received, and distribute them to the appropriate Kampala-based staff The Grants Manager shall coordinate and provide feedback on CSOs and reports to RDs and CSOs. 5.2 Grants Finance Officer (GFO) - The Grants Finance Officer will act as the financial focal point person in Kampala for all CSO grants The GFO is responsible for monitoring the overall financial reporting of all CSO grants and providing financial technical assistance as required. a) Before the Grant Agreement is issued, the GFO shall send the Regional Offices the final revised CSO grant proposals and draft Grant Agreement for final review and comment. b) In conjunction with the Regional Office FAA, the GFO is responsible to ensure that the financial recordkeeping systems of each CSO meet the UPHOLD minimum requirements. c) The GFO shall also ensure that the financial technical assistance needs are identified and assistance provided to the CSOs as required. d) The GFO is responsible for reviewing/approving the Quarterly Funding Request Form and the Quarterly Funding Requirement Worksheet received from the RO. Upon approval, the GFO should forward the forms to the Finance Department for processing. e) The GFO shall review financial reports on a regular basis to ensure that CSOs are accounting for expenditures according to UPHOLD guidelines. The review can be quarterly if FAA feels the reports are adequate, or monthly if there are concerns. The GFO should review, provide feedback to the ROs/CSOs as necessary, and approve the final report. Once approved, the GFO should then forward the required reports to the Finance Department for processing. f) The GFO shall conduct spot checks of CSOs on a quarterly basis, assisted by accounting staff. The GFO shall spend at least five days each quarter visiting CSOs. Each quarter, at least 15-20% of grantees in each district should have a financial check. g) The GFO shall work with the Finance Department to reconcile QuickBooks accounts with CSO expenditures as required. UPHOLD CSO Grants Management Manual Page 11
15 h) At the end of the grant agreement, the GFO is responsible for reviewing/approving the final grants report for each CSO and working with the Finance Department to close out each grant. 5.3 Grants Assistant The Grants Assistant is responsible for managing all files of the CSO grantees, including the original Grant Agreements, communications, amendments and feedback provided to CSOs The Grants Assistant shall work with the Administrative Manager on procurement of items specified in the CSO grant. The Finance Department should be copied on all procurement requests The Grants Assistant shall work with the Administrative Manager and the GFO in obtaining USAID approval for final disposition of nonexpendable equipment procured for or by the CSOs The Grants Assistant shall work with the Grants Manager to support Regional Offices, the Technical Team and partners (local government, NGOs, FBOs, private sector) to maintain a smoothly functioning grants strategy The Grants Assistant will be responsible for managing all unsolicited proposals and responding as directed by the Grants Manager. 5.4 Kampala-based Technical Staff Technical staff shall review monthly, quarterly, and activity reports as appropriate, and will provide comments, recommendations, and sign off on them. a) Technical staff shall review, and revise as necessary, all reporting forms, to ensure they include adequate technical information. b) Technical staff shall review the quarterly CSO programme reports as requested by the Grants Manager and identify any technical problems or support needed by CSOs. c) As requested, technical staff shall review any programme changes CSOs request and sign off if acceptable, for final approval by COP Technical staff shall work with Regional Offices and provide technical assistance to the CSOs. a. Technical staff shall provide CSOs with technical assistance as defined in the technical plan. b. Technical staff shall attend and monitor CSO activities and provide feedback to both the CSO and RO. c. It is expected that Kampala technical staff will provide backstopping to CPCs in whatever ways are feasible and as appropriate. d. Kampala-based Technical staff and CPCs should assess the best ways to meet the technical assistance needs of CSOs given UPHOLD s existing capacity. Where appropriate, technical staff will provide information to CPCs to provide technical assistance. UPHOLD CSO Grants Management Manual Page 12
16 e. Technical assistance focal point persons or their designee shall conduct, at a minimum, one visit per month to each region or sectoral area. f. Technical staff shall communicate with Regional Office at least once a month about each CSO. g. Technical staff are responsible for having a general understanding of the status and programme of each CSO in their region Under the leadership of M&E, the technical team shall assist M&E to develop reporting tools and implement tracking systems for the CSO grants. Technical staff shall provide M&E with give advance notice for all field visits to see if there is any need for data collection, and share trip reports and additional data gained from the field. 5.5 Training and Performance Improvement Specialist (TPIS) The TPIS shall work with the ROs to conduct performance reviews at the district level twice each year The TPIS shall provide support to the CSOs through the Regional Offices. a) The TPIS shall help CSOs understand how to present results of their work at conferences or through written materials The TPIS shall provide support to CPCs or ROs in areas of performance improvement as called upon The TPIS shall revise Training Evaluation forms for use by CSOs, compile and analyze data on training, and make recommendations on training improvement The TPIS shall gather information on best practices and success stories among CSOs for a national conference. 5.6 Private Sector Specialist (PSS) The PSS shall provide oversight for organization of the quarterly CSO meetings The PSS shall meet with CSOs at the quarterly meetings as appropriate to discuss expectations, assist with work plan development, and evaluate technical needs The PSS shall manage the capacity strengthening strategy for the CSO grantees. a) The PSS shall develop a template that CSOs can use to request technical assistance from their districts. 5.7 Monitoring and Evaluation (M&E) Monitoring and Evaluation is responsible for the overarching strategy of data collection, analysis and dissemination of CSO grant data. UPHOLD CSO Grants Management Manual Page 13
17 5.7.2 M&E, with input from a range of other staff, will develop tools and templates for CSOs to use when tracking their programmes. Forms will include quarterly programme reports, activity reports, training evaluations, facility profile forms, and sector specific tracking forms M&E will collect data from CSOs. M&E is responsible for all aspects of managing M&E, including: o Develop monitoring tools, as requested and as needed. o Meet with each CSO at beginning of grant to conduct initial assessment. o Receive and analyze activity reports, quarterly reports, and other monitoring data from CSOs on a regular basis. o Document all technical assistance provided to CSOs and report to technical staff, CSOs (through the regional offices) and other partners periodically. o Provide CSOs with feedback based on the data during quarterly meetings M&E will gather and compile data and complete analyses to help UPHOLD and CSOs effectively implement programmes. a) M&E will manage the annual household survey and solicit input from CSOs on the data that would be most useful. b) M&E, with the TPIS, will analyze data on CSO and UPHOLD trainings and report on how to improve effectiveness. c) M&E will share any CSO grants data analysis with the Regional Offices, all technical staff and the Grants Manager M&E staff will provide support to the ROs and CSOs. a) Each staff member of M&E will spend at least five days each month in the districts or Regional Offices. 5.8 Administration/Finance- Kampala based The Administration/Finance Team, based in Kampala, will provide support and assistance to all stakeholders, as needed. The Administration Team will assist in all central procurement activities. The Finance Team will work closely with the FAA and GFO to ensure proper reporting and accountability. 5.9 Senior Management Team (COP and DCOPs) The Management Team is responsible for oversight of the entire CSO grants process to ensure it is on track and in line with UPHOLD results, targets, and guidelines. a) Management will ensure that programme planning includes input from applicable departments. b) Management will monitor overall progress on targets. UPHOLD CSO Grants Management Manual Page 14
18 c) The COP has final sign-off on all grant agreements and modification requests. He or his delegate will make a decision within 5 working days and communicate the decision to the RO and CSO Management will represent UPHOLD at the national and international level. a) Management will oversee public relations related to CSO grants, and manage any national public relations activities. b) Management will maintain relationships with the national line ministries to educate and advocate for CSOs and UPHOLD. c) Management will provide USAID with all appropriate information regarding CSOs. d) Management will coordinate visits of UPHOLD partners and other officials Management will provide support to Regional Offices. a) At least one Deputy Chief of Party or the Chief of Party will periodically visit Regional Offices and/or attend quarterly meetings and ensure the smooth functioning of the CSO system. b) The management team is responsible for monitoring the political situation and environment in each region, and keeping Regional Directors informed about opportunities or challenges. c) Management will support Regional Office staff in their work with CSOs, including giving specific feedback to CSOs in certain cases. UPHOLD CSO Grants Management Manual Page 15
Quality Assurance Coordinator - South Sudan
Quality Assurance Coordinator - South Sudan Location: [Africa] [South Sudan] [Juba] Category: Strategy, Collaboration, & Innovation Job Type: Fixed term, Full-time PURPOSE OF POSITION: Provide leadership
JHU CCP Zambia Chief of Party
JHU CCP Zambia Chief of Party General Job Description The Johns Hopkins Bloomberg School of Public Health Center for Communication Programs (JHU CCP) seeks a Chief of Party to provide strategic leadership
HEAD OF POLICY AND ADVOCACY
JOB DESCRIPTION JOB TITLE: DEPARTEMENT: LOCATION: REPORTING TO: COUNTRY REPRESENTATIVE - SENEGAL PAN- AFRICAN PROGRAMME DAKAR, SENEGAL HEAD OF POLICY AND ADVOCACY BACKGROUND & ORGANISATIONAL CONTEXT ACORD
JOB DESCRIPTION. Job Purpose To provide overall leadership and strategic direction to the ACORD country programme.
JOB DESCRIPTION Position: Location: Responsible to: COUNTRY DIRECTOR (CD) ADDIS ABABA, ETHIOPIA with regular visits to all project locations in Ethiopia Head of Programmes Operations & Development Background
UNICEF in South Africa
UNICEF in South Africa A message from the Representative 47,900,000 people live in South Africa 20,200,000 are children 294,000 children are HIV-positive 1 in 17 children die before their fifth birthday
DATA ANALYSIS AND USE
CapacityDevelopment RESOURCE GUIDE DATA ANALYSIS AND USE July 2014 The s highlight the key technical areas of expertise needed to effectively influence health policy design, implementation, and monitoring
NCBS DATA ANALYST EXPERT COACH TERMS OF REFERENCE. National Capacity Building Secretariat
NCBS DATA ANALYST EXPERT COACH TERMS OF REFERENCE Position Type Organization Partner organization Duration Type of contract Data Analyst Expert Coach Consultancy contract National Capacity Building Secretariat
Scaling Up Nutrition (SUN) Movement Strategy [2012-2015]
Scaling Up Nutrition (SUN) Movement Strategy [2012-2015] September 2012 Table of Contents Synopsis... 3 A: SUN Movement Vision and Goals... 4 B: Strategic Approaches and Objectives... 4 C: Principles of
7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION NEEDS: INFORMATION GAP ANALYSIS
7. ASSESSING EXISTING INFORMATION 6. COMMUNITY SYSTEMS AND LEVEL INFORMATION MONITORING NEEDS: OF THE INFORMATION RIGHT TO ADEQUATE GAP ANALYSIS FOOD 7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION
Job Profile. Component Manager, Deepening Democracy Democratic Governance Facility (Senior Adviser (N1)) Uganda
Job Profile Component Manager, Deepening Democracy Democratic Governance Facility (Senior Adviser (N1)) Uganda Reference number: DK-00237-2016/UGA.01-W 1. Preliminary 1.1. Short background: In 2011, eight
CSO CAPACITY ANALYSIS: A tool for assessing capacities for quality OVC response
CSO CAPACITY ANALYSIS: A tool for assessing capacities for quality OVC response 1. Capacity areas for strengthening among OVC CSOs These capacity areas were generated from OVC grantee profiles and feedback
HIV/AIDS AND LIFE SKILLS MONITORING TOOL ASSESSMENT REPORT
MINISTRY OF EDUCATION, SCIENCE, VOCATIONAL TRAINING AND EARLY EDUCATION HIV/AIDS AND LIFE SKILLS MONITORING TOOL ASSESSMENT REPORT Prepared by Monitoring and Learning Unit September 2013 Table of Contents
Position Title: Management Info Chief. Working Title: Technical Project Management Section Chief
Position Title: Management Info Chief Working Title: Technical Project Management Section Chief This management position directs the operational activities of the Project Management Office whose mission
Monitoring and Evaluation Framework and Strategy. GAVI Alliance 2011-2015
Monitoring and Evaluation Framework and Strategy GAVI Alliance 2011-2015 NOTE TO READERS The 2011-2015 Monitoring and Evaluation Framework and Strategy will continue to be used through the end of 2016.
Performance Monitoring Tools
Performance Monitoring Tools M&E training for MoHSW & Business Coalition on HIV/AIDS Material adapted from USDOL/ILO HIV/AIDS Workplace Education programme Session Objectives Participants will be able
10 Steps for Managing Sub-Grants
New Partners Initiative 10 Steps for Managing Sub-Grants DRAFT Table of Contents ACRONYMS AED PEPFAR NPI USG Introduction T he Academy for Educational Development (AED) provides technical support for grantees
Timor- Leste. United Nations Development Programme. Vacancy Announcement
United Nations Development Programme Timor- Leste Vacancy Announcement Project Title: Strengthening Capacities for Disaster Risk Management in Timor Leste Post Title: National Administration and Finance
Vacancy Notice No. 2015/011
Vacancy Notice No. 2015/011 Everyone Counts: Join the UNFPA team in Myanmar Are you interested in being part of a multi-cultural team delivering a world where every pregnancy is wanted, every birth is
Terms of reference - INDIVIDUAL CONSULTANT PROCUREMENT NOTICE
Terms of reference - INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Position: Senior Specialist for the Survey of Public Satisfaction on Court Service in Judiciary Support to the Justice Sector Reform in Indonesia
Public Health Analyst, Myanmar
Public Health Analyst, Myanmar Vacancy code VA/2015/B5506/8444 Position title Public Health Analyst Department/office AEMO, MMOH, Myanmar Duty station Yangon, Myanmar Contract type Local ICA Specialist
Job Profile. Component Manager, Voice and Accountability Democratic Governance Facility (DGF) (Senior Adviser (N1)) Uganda
Job Profile Component Manager, Voice and Accountability Democratic Governance Facility (DGF) (Senior Adviser (N1)) Uganda Reference number: DK-00247-2016/UGA.02 1. Preliminary 1.1. Short background: In
Technical guidance note for Global Fund HIV proposals in Round 11
Technical guidance note for Global Fund HIV proposals in Round 11 UNAIDS I World Health Organization I August 2011 Rationale for including the development of a system in the proposal With the global momentum
Rapid Assessment of Sexual and Reproductive Health
BURKINA FASO Rapid Assessment of Sexual and Reproductive Health and HIV Linkages This summary highlights the experiences, results and actions from the implementation of the Rapid Assessment Tool for Sexual
SCOPE OF WORK. Social Work Organizational Development Specialist OVERVIEW OF VOLUNTEER ASSIGNMENT
SCOPE OF WORK Country: Host Site: Partner Organization: Assignment title: Length of assignment: Lusaka, Zambia Social Workers Association of Zambia Zambia Rising Project Social Work Organizational Development
Section 7. Terms of Reference
APPENDIX-A TERMS OF REFERENCE UNION-LEVEL TECHNICAL ASSISTANCE TO PROVIDE INSTITUTIONAL SUPPORT TO THE MYANMAR NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT I. INTRODUCTION IDA GRANT H814MM FY 2013-16
Draft conclusions proposed by the Chair. Recommendation of the Subsidiary Body for Implementation
United Nations FCCC/SBI/2012/L.47 Distr.: Limited 1 December 2012 Original: English Subsidiary Body for Implementation Thirty-seventh session Doha, 26 November to 1 December 2012 Agenda item 14 Article
Country Representative. Dar Es Salaam, Tanzania
44 Eccles Street Suite 200, Ottawa, Ontario, Canada K1R 6S4 - Tel.: (613) 829-7445 Fax/Télécopieur : (613) 829-1303 [email protected] SUMMARY Country Representative Location: Dar Es Salaam, Tanzania
NEEDHAM PUBLIC SCHOOLS Needham, Massachusetts 02492-2692 EVALUATION PROCESS: NURSES
NEEDHAM PUBLIC SCHOOLS Needham, Massachusetts 02492-2692 EVALUATION PROCESS: NURSES INTRODUCTION The evaluation process focuses on ten standards that are consistent with the the guidelines set forth by
Terms of Reference for a Short Term Consultancy to Develop Training Materials and Conduct Training on HIV M&E in Zanzibar
Zanzibar AIDS Commission Terms of Reference for a Short Term Consultancy to Develop Training Materials and Conduct Training on HIV M&E in Zanzibar Revision: 9 March 2006 1. BACKGROUND: HOW THE ZAC S ROLE
International Service Program 2010-2012
International Service Program 2010-2012 Prevention of Mother-to-Child Transmission of HIV and Gender-Based Violence in Rwanda UNICEF USA$500,000 Project Description THE GOAL To prevent mother-to-child
USAID/India is accepting applications for the following Foreign Service National (FSN) Personal Services Contract position:
USAID/India is accepting applications for the following Foreign Service National (FSN) Personal Services Contract position: Advertisement No. : USAID/14-07 Position Title : Project Management Specialist
Procurement Performance Measurement System
Public Procurement and Disposal of Public Assets Authority Procurement Performance Measurement System User's Guide August 2008 Public Procurement and Disposal of Public Assets Authority Procurement Performance
A flexible structure and global reach means that we can quickly respond to our partners' needs, while offering the benefits of economies of scale.
DISCLAIMER: The screening of your application will be conducted based on the information in your profile. Before applying, we strongly suggest that you review your profile to ensure completeness, especially
1. Background and Overview 1 1.1 Why the addendum? 1 1.2 How should this addendum be used? 1 1.3 Organization of the addendum 2
ADDENDUM june 2011 evaluation Updated guidance on EvalUAtion in the Handbook on Planning, Monitoring and EvalUAting for Development Results(2009) Table of Contents 1. Background and Overview 1 1.1 Why
CBF Youth Ministry Network By-Laws February 25, 2013
CBF Youth Ministry Network By-Laws February 25, 2013 Article I. Name The name of the organization will be the Cooperative Baptist Fellowship Youth Ministry Network. Article II. Purpose We exist to encourage,
The Healthy Asia Pacific 2020 Roadmap INTRODUCTION: THE HEALTHY ASIA PACIFIC 2020 INITIATIVE
The Healthy Asia Pacific 2020 Roadmap INTRODUCTION: THE HEALTHY ASIA PACIFIC 2020 INITIATIVE In the 2014 APEC Leader s Declaration and Joint Ministerial Statement, it is recognized that the prospect of
Zambia Early Childhood Care and Education (ECCE) programmes
IBE/2006/EFA/GMR/CP/94 Country profile prepared for the Education for All Global Monitoring Report 2007 Strong Foundations: Early Childhood Care and Education Zambia Early Childhood Care and Education
NORWIN SCHOOL DISTRICT JOB DESCRIPTION. 7-12 Guidance Counselor
NORWIN SCHOOL DISTRICT JOB DESCRIPTION JOB ANALYSIS Under the supervision of the Building Principal, the s provide a comprehensive counseling program for students in their buildings. They consult with
Grant Monitoring. Curriculum developed by the Office of Grants Management and Nonprofits Assistance Fund
Grant Monitoring Curriculum developed by the Office of Grants Management and Nonprofits Assistance Fund Who We Are The mission of Admin's Office of Grants Management is to standardize, streamline and improve
Health Systems Strengthening and Integration of FP/MNCH in Uganda The experience of MSH STRIDES project
Health Systems Strengthening and Integration of FP/MNCH in Uganda The experience of MSH STRIDES project Stronger health systems. Greater health impact. Celia Kakande, Project Director STRIDES Uganda Fabio
PROJECT MANAGEMENT AND COORDINATION
PROJECT MANAGEMENT AND COORDINATION a) MANAGEMENT Owing to the sheer magnitude of surveys/censuses and administrative data operations involved in this project, various committees have been constituted
Self-Assessment Duval County School System. Level 3. Level 3. Level 3. Level 4
Standard 1: Purpose and Direction 1.1 The system engages in a systematic, inclusive, and comprehensive process to review, revise, and communicate a system-wide propose for the student success. The system
CARIBBEAN DEVELOPMENT BANK STATUS REPORT ON THE IMPLEMENTATION OF THE GENDER POLICY AND OPERATIONAL STRATEGY
SDF 8/2-NM-4 CARIBBEAN DEVELOPMENT BANK SPECIAL DEVELOPMENT FUND (UNIFIED) STATUS REPORT ON THE IMPLEMENTATION OF THE GENDER POLICY AND OPERATIONAL STRATEGY Revised APRIL 2012 ABBREVIATIONS AMT - Advisory
TOOL. Project Progress Report
TOOL SUMMARY: PROJECT PROGRESS REPORT The purpose of the is to compile information from the analysis done by project participants, partners and LWR country staff about the progress or advances the project
NORWIN SCHOOL DISTRICT JOB DESCRIPTION. K-6 Guidance Counselor
NORWIN SCHOOL DISTRICT JOB DESCRIPTION JOB ANALYSIS Under the supervision of the Building Principal, the s provide a comprehensive counseling program for students in their buildings. They consult with
READINESS ASSESSMENT MOVING TOWARDS A COUNTRY-LED AND -FINANCED HIV RESPONSE FOR KEY POPULATIONS HEALTH POLICY P R O J E C T
READINESS ASSESSMENT MOVING TOWARDS A COUNTRY-LED AND -FINANCED HIV RESPONSE FOR KEY POPULATIONS HEALTH POLICY P R O J E C T This guide was developed by the USAID- and PEPFAR-funded Health Policy Project
Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee on Grant Management in Wales Final Report
Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee on Grant Management in Wales Final Report The Welsh Government appreciates both the time and effort
Governing Body 313th Session, Geneva, 15 30 March 2012
INTERNATIONAL LABOUR OFFICE Governing Body 313th Session, Geneva, 15 30 March 2012 Policy Development Section Employment and Social Protection Segment GB.313/POL/2 POL Date: 15 February 2012 Original:
Risk Management & Business Continuity Manual 2011-2014
ANNEX C Risk Management & Business Continuity Manual 2011-2014 Produced by the Risk Produced and by the Business Risk and Business Continuity Continuity Team Team February 2011 April 2011 Draft V.10 Page
Frequently asked questions
Frequently asked questions 1. What is the Integrated School Health Programme (ISHP)? Government is strengthening school health services in the country in support of children s health throughout their school
National Standards for Disability Services. DSS 1504.02.15 Version 0.1. December 2013
National Standards for Disability Services DSS 1504.02.15 Version 0.1. December 2013 National Standards for Disability Services Copyright statement All material is provided under a Creative Commons Attribution-NonCommercial-
Child Selection. Overview. Process steps. Objective: A tool for selection of children in World Vision child sponsorship
Sponsorship in Programming tool Child Selection Objective: A tool for selection of children in World Vision child sponsorship We ve learned some things about selecting children. It is not a separate sponsorship
Reporting Service Performance Information
AASB Exposure Draft ED 270 August 2015 Reporting Service Performance Information Comments to the AASB by 12 February 2016 PLEASE NOTE THIS DATE HAS BEEN EXTENDED TO 29 APRIL 2016 How to comment on this
QUALITY MANAGEMENT POLICY & PROCEDURES
QUALITY MANAGEMENT POLICY & PROCEDURES Policy Statement Cotleigh Engineering Co. Limited specialises in the recruitment of engineering & technical personnel in the oil & energy, rail, civil engineering,
Documentation And Record Keeping
Documentation And Record Keeping A Guide for Service Providers Serial No: 037/SDD24/MAR07 0 Contents Page Feedback 2 Foreword 3 Chapters 1 The Importance Of Documentation And Record Keeping 5 2 Guidelines
Skills for Youth Employment
Skills for Youth Employment Published on UNESCO (https://en.unesco.org) Home > Call for Proposals - 8th UNESCO Youth Forum > Webform results > Submission #43245 I. INFORMATION ON THE IMPLEMENTING ORGANIZATION
Candidate Brief. Governance Business Manager
Candidate Brief Governance Business Manager January 2016 Dear Candidate, Thank you for the interest you have shown in our position. The Governance Business Manager is a new position in the governance team
Ninth session. Intergovernmental Council for the Information for All Programme
IFAP-2016/COUNCIL.IX/Inf 7 Paris, 4 April 2016 Original : English Distribution limited Ninth session Intergovernmental Council for the Information for All Programme 30-31 May 2016 UNESCO House, Paris (Fontenoy
Botswana s Integration of Data Quality Assurance Into Standard Operating Procedures
Botswana s Integration of Data Quality Assurance Into Standard Operating Procedures ADAPTATION OF THE ROUTINE DATA QUALITY ASSESSMENT TOOL MEASURE Evaluation SPECIAL REPORT Botswana s Integration of Data
TOOL. Project Progress Report
Purpose TOOL SUMMARY: LOGFRAME CHEAT SHEET The purpose of the is to compile information from the analysis done by project participants, partners and LWR country staff about the progress or advances the
HIV and AIDS in Bangladesh
HIV and AIDS in Bangladesh BACKGROUND The first case of HIV/AIDS in Bangladesh was detected in 1989. Since then 1495 cases of HIV/AIDS have been reported (as of December 2008). However UNAIDS estimates
Position Area Manager Grade D2 Department Programs and Operations (Field Based) Date January 2016
Job Description Position Area Manager Grade D2 Department Programs and Operations (Field Based) Date January 2016 & Location Duration 3 year fixed term contract Reports to Operations Manager (position):
BOARD AND CEO ROLES DIFFERENT JOBS DIFFERENT TASKS
BOARD AND CEO ROLES DIFFERENT JOBS DIFFERENT TASKS Introduction Local boards of trustees and chief executive officers play different roles and have different responsibilities in leading their districts.
Current Employment Opportunities Project Based Consultants
We are always open to hearing from exceptional talent If you are looking for consulting opportunities within the International Development sector, please register your details with us on our website www.maxwellstamp.com/consultants.asp,
C-IMCI Program Guidance. Community-based Integrated Management of Childhood Illness
C-IMCI Program Guidance Community-based Integrated Management of Childhood Illness January 2009 Summary This document provides an overview of the Community-based Integrated Management of Childhood Illnesses
Project Management Specialist (Health) Type of vacancy:
Solicitation is open to: Position Title: Type of vacancy: Afghan Nationals ONLY Project Management Specialist (Health) Single Opening date: June 18, 2014 Closing date: July 09, 2014 Vacancy announcement
Whenever there is a disaster or a humanitarian catastrophe, the UN is on the ground providing relief, support and assistance.
UNITED NATIONS HUMANITARIAN AND DISASTER RELIEF ASSISTANCE (UNHDR) NEWSLETTER Whenever there is a disaster or a humanitarian catastrophe, the UN is on the ground providing relief, support and assistance.
WOMEN S HEALTH VICTORIA POSITION DESCRIPTION
WOMEN S HEALTH VICTORIA POSITION DESCRIPTION Title Classification Team Work location Employment type Policy and Health Promotion Manager WHV Enterprise Agreement 2013 Level 5 Classification Policy and
THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT
THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT ACCOUNTABLE SIGNATURE AUTHORISED for implementation SIGNATURE On behalf of Chief Executive
Current Employment Opportunities Full Time Staff
Current Vacancies: I. Senior Project Manager - Project Management Unit (PMU)... 2 II. Human Development and Social Inclusion Consultant and Senior Consultant... 6 I. Senior Project Manager - Project Management
RECRUITMENT PROFILE. Profile: Community Services
Profile: Community Services RECRUITMENT PROFILE Major Duties and Responsibilities 1. Provide information and social analysis of the cultural, political and economic context of population of persons of
GENDER AND DEVELOPMENT. Uganda Case Study: Increasing Access to Maternal and Child Health Services. Transforming relationships to empower communities
GENDER AND DEVELOPMENT Uganda Case Study: Increasing Access to Maternal and Child Health Services The Context World Vision has been active in working with local communities to increase access to health
KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results
KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results KPI 2: Corporate strategy and mandate KPI 3: Corporate focus on results KPI 4: Focus
A Summary of the National NGO Policy July 2012
A 9 Point Guide to Understanding the National NGO Policy and Supporting its Implementation A Summary of the National NGO Policy July 2012 1 The National Non Governmental Organisations POLICY PREFACE AND
NCBS HUMAN RESOURCES EXPERT COACH TERMS OF REFERENCE. National Capacity Building Secretariat. 2. BTC Change co-manager. Signature.
NCBS HUMAN RESOURCES EXPERT COACH TERMS OF REFERENCE Position Type Organization Partner organization Duration Type of contract Human Resources Expert Coach Consultancy contract National Capacity Building
For a detailed background of the Project and a job description, please refer to page 2.
PROJECT MANAGER (P.4) PROJECT COORDINATION UNIT, IMO-EC PROJECT ON CAPACITY BUILDING FOR CLIMATE MITIGATION IN THE MARITIME INDUSTRY, MARINE ENVIRONMENT DIVISION Circular letter No: 3621 Vacancy announcement:
At a glance: Accreditation principles and standards
Accreditation Standards Guidance Cycle II 1 A At a glance: Accreditation principles and standards Governance and sustainability Principle 1 Standard 1 Standard 2 Standard 3 Standard 4 Standard 5 Principle
INTERNSHIP ANNOUNCEMENT
Ref. Internship Date: 9 June 2015 Announcement No. BKK/INTERNSHIP/2015/04 INTERNSHIP ANNOUNCEMENT Post Title: Monitoring, Evaluation and Research Intern Organization Unit: Decent Work Team in Bangkok Duration:
How To Help The Ghanian Hiv Recipe Cards
UN AID S PROGRAM M E COORDIN AT ING BO ARD UNAIDS/PCB (32)/13.CRP 3 Issue date: 07 June 2013 THIRTY-SECOND MEETING Date: 25-27 June 2013 Venue: Executive Board Room, WHO, Geneva Agenda item 4 Joint United
To be used in conjunction with the Invitation to Tender for Consultancy template.
GUIDANCE NOTE Tendering for, choosing and managing a consultant Using this guidance This information is not intended to be prescriptive, but for guidance only. Appointing consultants for relatively small
Guidelines for Civil Society participation in FAO Regional Conferences
Viale delle Terme di Caracalla, 00153 Rome, Italy Fax: +39 0657053152 Tel: +39 0657051 www.fao.org Guidelines for Civil Society participation in FAO Regional Conferences 1. Intro: Civil Society participation
United Nations Committee on the Rights of the Child Day of Discussion: Implementing Child Rights in Early Childhood 17 September 2004 Palais Wilson
United Nations Committee on the Rights of the Child Day of Discussion: Implementing Child Rights in Early Childhood 17 September 2004 Palais Wilson RECOMMENDATIONS 1 Introduction 1. The Committee reaffirms
Organizational Capacity Assessment for Community-Based Organizations. New Partners Initiative Technical Assistance (NuPITA) Project
Organizational Capacity Assessment for Community-Based Organizations New Partners Initiative Technical Assistance (NuPITA) Project June 2012 The New Partners Initiative Technical Assistance (NuPITA) project
Internal Audit Division
Internal Audit Division at the Financial Conduct Authority Information Pack April 2013 Contents of Information Pack A. Introduction B. Internal Audit Terms of Reference C. Organisation D. Skills and Competencies
WHEELOCK COLLEGE FACULTY DEVELOPMENT AND EVALUATION PROGRAM
WHEELOCK COLLEGE FACULTY DEVELOPMENT AND EVALUATION PROGRAM REVISED SPRING 2011 TABLE OF CONTENTS Development And Evaluation Process: Tenure Track Faculty... 4 Overview Of Mentoring And Evaluation Process
M&E Officer. Location: [Africa] [Ghana] [Accra] Category: Field Operations. Job Type: Fixed term, Full-time
M&E Officer Location: [Africa] [Ghana] [Accra] Category: Field Operations Job Type: Fixed term, Full-time M&E Officer To be responsible for high quality design, monitoring and evaluation of Cocoa Life
Hertsmere Borough Council. Data Quality Strategy. December 2009 1
Hertsmere Borough Council Data Quality Strategy December 2009 1 INTRODUCTION Public services need reliable, accurate and timely information with which to manage services, inform users and account for performance.
* * * * * * * * * * * * * * * * * * * * * * * * * UNITED STATES MISSION-BOGOTA VACANCY ANNOUNCEMENT
* * * * * * * * * * * * * * * * * * * * * * * * * UNITED STATES MISSION-BOGOTA VACANCY ANNOUNCEMENT * * * * * * * * * * * * * * * * * * * * * * * * * No. 065-2015 Job Vacancy May 15, 2015 OPEN TO: POSITION:
Capacity Assessment Indicator. Means of Measurement. Instructions. Score As an As a training. As a research institution organisation (0-5) (0-5) (0-5)
Assessing an Organization s in Health Communication: A Six Cs Approach [11/12 Version] Name & location of organization: Date: Scoring: 0 = no capacity, 5 = full capacity Category Assessment Indicator As
REQUEST FOR PROPOSALS # 985523. Human Resources for Health Data Analyst in Tanzania
REQUEST FOR PROPOSALS # 985523 in support of ELIZABETH GLASER PEDIATRIC AIDS FOUNDATION (EGPAF) Dar es Salaam, Tanzania Firm Deadline: July 15, 2016 **DEADLINE EXTENDED** 12:00pm Eastern Daylight Time
PUBLIC SECTOR CAPACITY INJECTION PROJECT CALL FOR JOB APPLICATIONS
Federal Republic of Somalia National Civil Service Commission Capacity Injection Mechanism Unit Jamhuriyadda Federaalka Somaliya Guddiga Qaranka Shaqaalaha Rayidka Xarunta Mashruuca Tayeynta PUBLIC SECTOR
The assessment will collect, analyze and report the following data at three levels:
Request for proposals for conducting baseline assessment for the USAID Regional Health Integration to Enhance Services Project in South Western Uganda (USAID RHITES SW) Background The goal of USAID Regional
Care service inspection report
Care service inspection report Full inspection SSCN Social Care Housing Support Service Suite 3, Floor 2 ELS House 555 Gorgie Road Edinburgh Inspection completed on 03 May 2016 Service provided by: Support
Case Story. The use of the WCO Time Release Study to measure border performance in a landlocked developing country (Uganda)
Case Story The use of the WCO Time Release Study to measure border performance in a landlocked developing country (Uganda) Executive Summary (1) A Time Release study (TRS) is a unique tool 1 and method
Basel Committee on Banking Supervision. Charter
Basel Committee on Banking Supervision Charter January 2013 This publication is available on the BIS website (www.bis.org). Bank for International Settlements 2013. All rights reserved. Brief excerpts
Kenya Health Initiative - Improving Basic Patient Safety Standards in Private and Public Health Sector Facilities
Kenya Health Initiative - Improving Basic Patient Safety Standards in Private and Public Health Sector Facilities 1- Background and Context By Dr Njeri Mwaura, Operations Officer, IFC Presented at the
Module 2: Introduction to M&E frameworks and Describing the program
Module 2: Introduction to M&E frameworks and Describing the program Learning Objectives Understand the 4 basic steps required to develop M & E plans Learn to develop goals and objectives Learn to develop
2015-16 Rubric for Evaluating Colorado s Specialized Service Professionals: Physical Therapists
2015-16 Rubric for Evaluating Colorado s Specialized Service Professionals: Physical Therapists Definition of an Effective Physical Therapist Effective school physical therapists are vital members of the
