1 DEPARTMENT OF TRANSPORTATION AUDITS & INVESTIGATIONS Overview of A&E Related Audit Issues 1
2 INTRODUCTION Overview of Audit Related Issues At the conclusion of this session, you will understand: - Basic A&E related financial information, - Key A&E requirements, - Important A&E resources available, and - Future changes from Lean Six Sigma effort 2
3 AGENDA The following subjects will be hi-lighted today: Direct & Indirect Costs Indirect Cost Rates Interpretive Guidance Documents Common Audit Issues Safe Harbor Rate Lean Six Sigma 3
4 DIRECT & INDIRECT COST DEFINITIONS (FAR & FAR ) Direct Cost: Any cost that is identified specifically with a particular final cost objective (i.e.. Project or Contract) Examples: Labor, Travel, Vehicles, Equipment, Printing/Copying, etc. Indirect Cost: Any cost that is not identified specifically with a particular final cost objective Examples: Indirect Labor, Fringe Benefits, Depreciation, Rent, etc. For more information, refer to the AASHTO Uniform Audit & Accounting Guide, 2012 Edition (AASHTO Audit Guide) & 48 CFR Chapter 1 Part 31 4
5 DIRECT & INDIRECT COST PRINCIPLES (FAR & FAR ) Imperative that costs treated as direct costs in cost proposals are recorded as such in the accounting records Direct costs may be allocable to a project, but not billable. Must be recorded as direct project costs in the accounting records Costs identified as direct or indirect must be allocable, allowable and reasonable (FAR ; ; , respectively) Success in Government Contracting: Establish adequate Accounting & Labor Charging Systems Perform Self Evaluation using Table 6-1: Labor Charging Checklist in AASHTO Audit Guide Develop and follow written Policies & Procedures and Internal Controls 5
6 DIRECT & INDIRECT COST PRINCIPLES (FAR & FAR ) Success in Government Contracting - Continued: Understand the Federal and State Laws, Rules & Regulations applicable to contracts Submit completed paperwork & documents to your Prime, or if you are the Prime, ensure your Subs paperwork is complete Establish procedures to identify unallowable indirect costs prior to posting costs to the accounting system 6
7 DIRECT & INDIRECT COST PRINCIPLES (FAR & FAR ) Success in Government Contracting - Continued: Account for unallowable indirect costs in Unallowable Accounts and do not include these costs in the ICR Schedule Reduce the indirect cost pool for items charged directly to contracts Maintain adequate documentation for your costs Consistency is key 7
8 INDIRECT COSTS (FAR ) Key High Risk Cost Areas: Employee Morale Travel Meals Selling costs (marketing) Vehicle costs Related party rent Executive Compensation For more information, refer to the AASHTO Audit Guide, Chapters 7 and 8 8
9 INDIRECT COST RATE (ICR) Accrual Basis Direct Labor is preferred allocation base FAR (c) 12 months base period FAR (g)(2) Tables 5-5 & 5-6, AASHTO Audit Guide - In-House ICR Schedule COMING SOON: Link to Indirect Cost Rate and Timekeeping webinars on A&I s website: 9
10 INTERPRETIVE GUIDANCE DOCUMENTS Why & Benefits Labor Costs Uncompensated Overtime A&I s website: Draft Meals Interpretive Guidance is under review Future - Prevailing Wages and Vehicles 10
11 COMMON AUDIT ISSUES Inadequate Accounting Systems. Required, but not limited to: Segregate direct, indirect, and unallowable costs Identify & accumulate direct costs by cost objective Accumulate costs under General Ledger control Periodically reconcile costs charged to contracts (every 30-days is best practice) Exclude unallowable costs to contracts Important to Note: Firms must track and disallow labor costs incurred in connection with unallowable activities. This is a major deficiency in most firms (lack of tracking), and CPA s generally do not test for this. Table 8-1, Common Unallowable Costs, p84, 2012 AASHTO Guide 11
12 Example COMMON AUDIT ISSUES Inadequate (project) job cost system No separate G/L Account for direct, indirect, and unallowable costs Cannot identify direct costs by cost objective Inability to identify unallowable costs Table 6-1, Labor Charging Checklist, p52, 2012 AASHTO Guide 12
13 COMMON AUDIT ISSUES Inadequate procedures over labor charging system: ALL employees must record ALL hours worked Accounting for uncompensated OT Ensure proper distribution of labor costs Reconcile Job Cost System to the GL (every 30- days is best practice) 13
14 Example COMMON AUDIT ISSUES No/Inadequate procedures over the labor charging system Salaried employees do not record all hours worked in excess of 8hrs/day or 40hrs/wk. unless they work directly on a project Even if OT is not paid, all time worked over 8hrs/day or 40hrs/wk. (indirect & direct) must be recorded on time sheets 14
15 COMMON AUDIT ISSUES No/Inadequate documented Executive Compensation Analysis Salary Surveys with Benchmarks Or National Compensation Matrix Allowability of compensation must be performed for all employees FAR (a) is criteria for allowability FAR identifies unallowable compensation and activities 15
16 COMMON AUDIT ISSUES Documentation for Other Direct Costs (ODCs) should include: Identification and accumulation by cost objective Actual cost without mark-up or profit Support ODCs are treated consistently Support ODCs are excluded from indirect expense pool Like-cost categories consistently allocated in accounting system 16
17 COMMON AUDIT ISSUES Classifying Employee Morale when costs are actually Entertainment in nature Examples of Employee Morale Painting, new carpet to improve workplace In-house health and wellness publications Employee counseling services Examples of Entertainment Gifts or prizes not tied to performance based on formal policies Gifts to the public Parties/Social Events, Shows/Sports Events, etc. Example: Costs associated with mandatory Off-Site Staff Meetings. 17
18 COMMON AUDIT ISSUES FAR allowability Business purpose Documentation Requirements Who, what, when, where, why Detailed/itemized receipts in English Expense reports, company credit cards, and vendor invoices 18
19 SAFE HARBOR RATE (SHR) Background & Policy June 2013, FHWA approved the Safe Harbor Indirect Cost Rate (SHR) Test and Evaluation Project Work Plan. Test period - July 1, 2013 to June 30, SHR is 110% for new A&E contracts using federal aidhighway funds. Use of SHR is voluntary for eligible firms. Use of SHR after June 30, 2016 not permitted unless FHWA makes the SHR rate permanent. 19
20 SAFE HARBOR RATE (SHR) Eligibility & Requirements Firms must not have a previously accepted or audited ICR. Firms must not have relevant contract cost history to use as a base for developing its own indirect cost rate. SHR is not adjustable for the term of the contract. Retroactive adjustment to indirect costs not allowed for contracts utilizing the SHR 20
21 SAFE HARBOR RATE (SHR) Eligibility & Requirements All firms must have a project/cost accounting system capable of accumulating and tracking direct labor and other direct costs by contract, segregating indirect costs, and removing unallowable costs. Refer to Table 6-1: Labor-Charging Checklist and Evaluation of Accounting System. Fixed hourly labor rates may need to be established for calculation of the direct labor portion of contracts. 21
22 SAFE HARBOR RATE (SHR) What Eligible Firms Need To Do Consultant Certification of Eligibility and Contract Costs & Financial Management System. Questionnaire for Evaluating Consultant s Financial Management System. Upon satisfactory review, Caltrans A&I issues an acceptance/approval letter. A rejection letter will be issued by Caltrans A&I if the consultant cannot use the SHR. 22
23 LEAN SIX SIGMA Proposal to reduce contract procurement timeline A&I s role during the contract negotiation phase Expectations for Primes & Subconsultants Non-Responsive Bids 23
24 STANDARDS THAT APPLY 23 Code of Federal Regulation (CFR) Part 172 Procurement, Management, and Administration of Engineering and Design Related Services 48 CFR, Federal Acquisitions Regulation (FAR) Systems, Chapter 1 FAR Part 31- Contract Cost Principles and Procedures 48 CFR Chapter 99 Cost Accounting Standards, Subpart CFR Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards 24
25 STANDARDS THAT APPLY 23 U.S.C. Letting of Contracts Caltrans Local Assistance Procedures Manual (LAPM) Project Program Supplemental Agreements Contract terms and conditions Caltrans Contract Requirements and Specifications Federal Highway Administration, Safe Harbor Indirect Cost Rate Test & Evaluation Project Work Plan 25
26 RESOURCES AVAILABLE AASHTO Uniform Audit & Accounting Guide DCAA (Defense Contract Audit Agency) Contract Audit Manual Independent CPA or Consultants FHWA Procurement, Management, and Administration of Engineering and Design Related Services - Questions and Answers - National Compensation Matrix 26
27 RESOURCES AVAILABLE National Highway Institute (NHI) Training Using the AASHTO Audit Guide for the Procurement and Administration of A/E Contracts (FHWA-NHI ) Using the AASHTO Audit Guide for the Development of A/E Consultant Indirect Cost Rates (FHWA-NHI ) Using the AASHTO Audit Guide for the Auditing and Oversight of A/E Consultant Indirect Cost Rates (FHWA-NHI ) Audits & Investigations Interpretive Guidance Documents 27
28 CONCLUSION An Overview of Direct & Indirect Costs, Indirect Cost Rates, Interpretive Guidance Documents, Common Audit Issues, Safe Harbor Rates and Lean Six Sigma changes were discussed You learned basic A&E related financial information, key A&E requirements, important A&E resources available to you, and an idea of future changes in A&E contracting process 28
29 Questions???? 29
30 Contact Information Linda Laubinger, Audit Manager Department A/E Unit Caltrans A&I Laurine Bohamera, Audit Chief Caltrans A&I
A&E CONSULTANT CONTRACT REVIEWS AND INDIRECT COST RATE AUDITS AND REVIEWS
A&E CONSULTANT CONTRACT REVIEWS AND INDIRECT COST RATE AUDITS AND REVIEWS Presented by Caltrans Audits & Investigations TOPICS FAR Compliant Indirect Cost Rate CPA Indirect Cost Rate Audits Safe Harbor
Labor Costs Interpretive Guidance Labor Costs: Timekeeping, Direct Labor Base, Labor Transfers & Direct to Indirect Labor Ratio
Labor Costs Interpretive Guidance Labor Costs: Timekeeping, Direct Labor Base, Labor Transfers & Direct to Indirect Labor Ratio External Audits Architectural and Engineering (A&E) Contracts This Document
Presenting the Numbers: Accounting Systems for Government Contractors
Presenting the Numbers: Accounting Systems for Government Contractors William D. Craven, CPA Senior Cost/Price Analyst CH2M HILL Plateau Remediation Company William D. Craven, CPA, CMA, CIA Cost/Price
CONNECTICUT DEPARTMENT OF TRANSPORTATION
EXTERNAL AUDIT CIRCULAR No. 1 CONNECTICUT DEPARTMENT OF TRANSPORTATION 2800 BERLIN TURNPIKE, PO BOX 317546, NEWINGTON, CT 06131-7546 SUBJECT: Definitions, Audit Authority, and Guidance for Computing Indirect
WHAT MAKES AN ACCOUNTING SYSTEM COMPLIANT
WHAT MAKES AN ACCOUNTING SYSTEM COMPLIANT Presented by: Laura Davis OVERVIEW Why Do I Need a Compliant Accounting System Auditor s Judgment Definitions Key Components Audits How to be prepared for an audit
Accounting System Requirements
Accounting System Requirements Further information is available in the Information for Contractors Manual under Enclosure 2 The views expressed in this presentation are DCAA's views and not necessarily
Guidance for Small Firms (And/or New to WSDOT)
Guidance for Small Firms (And/or New to WSDOT) (WSDOT & Local Agency Agreements) WSDOT Internal Audit Office July 2014 Guidance for Small Firms (this also includes firms that are new to working with WSDOT
How to Survive a DCAA Audit
How to Survive a DCAA Audit www.paulgunn.com 1 How to Survive a DCAA Audit - Overview Areas of interest and expectations of a typical audit: 1. Introduction o 2. The DCAA and Types of audits 3. Preparing
WSDOT Internal Audit Office January 29, 2013
Interpretive Guidance Document Auto Expense Architectural & Engineering Firm Indirect Cost Rate January 29, 2013 Indirect Cost Auto Expense This Interpretive Guidance Document will address auto expenses.
Review Program for CPA Audits of Consulting Engineers Indirect Cost Rates
Appendix A Review Program for CPA Audits of Consulting Engineers Indirect Cost Rates AASHTO Uniform Auditing & Accounting Guide (2010 Edition) Appendix A-1 All rights reserved. Duplication is a violation
Presented by Albert D. Goldwasser, CPA Government Contractor Consultant
Presented by Albert D. Goldwasser, CPA Government Contractor Consultant Agenda DCAA s Objectives Accounting 101 Indirect Cost Allocations SF 1408 Passing the DCAA Audit References What does the DCAA want?
Government Contract Accounting Are You DCAA Compliant? Procurement Technical Assistance Program (PTAP)
Government Contract Accounting Are You DCAA Compliant? Procurement Technical Assistance Program (PTAP) NH Presentation October 20, 2010 Presented by: Fred Kline, MBA, CPA Tom Martin MBA, CPA Malcolm Young,
Direct Selling, Public Relations, Advertising, and Bid & Proposal
Interpretive Guidance Document Direct Selling, Public Relations, Architectural & Engineering Firm Indirect Costs February 21, 2012 Marketing is a general term that is often used to refer to one or more
Pre-Award Accounting Systems
Pre-Award Accounting Systems 2013 National SBIR Conference Christopher Andrezze, CPA Special Assistant to the Deputy Director May 16, 2013 The views expressed in this presentation are DCAA's views and
How to Establish an SBIR Accounting System that Can Withstand a Government Audit
In cooperation with Connecticut Innovations 4/16/14 How to Establish an SBIR Accounting System that Can Withstand a Government Audit Edward G. Jameson, CPA Managing Partner Jameson & Company, CPAs www.jamesoncpa.com
How to Establish an SBIR Accounting System that Can Withstand a Government Audit
In cooperation with Connecticut Innovations 2/27/14 How to Establish an SBIR Accounting System that Can Withstand a Government Audit Edward G. Jameson, CPA Managing Partner Jameson & Company, CPAs www.jamesoncpa.com
AN INTRODUCTION TO FINANCIAL MANAGEMENT FOR GRANT RECIPIENTS
AN INTRODUCTION TO FINANCIAL MANAGEMENT FOR GRANT RECIPIENTS National Historical Publications and Records Commission National Archives www.archives.gov/nhprc June 17, 2015 Table of Contents USE OF THE
DEFENSE CONTRACT AUDIT AGENCY
DEFENSE CONTRACT AUDIT AGENCY Fundamental Building Blocks for an Acceptable Accounting System Presented by Sue Reynaga DCAA Branch Manager San Diego Branch Office August 24, 2011 Report Documentation Page
Preaward and Post Award Accounting System Audits. November 17, 2011 Pikes Peak NCMA Roland Wick
Preaward and Post Award Accounting System Audits November 17, 2011 Pikes Peak NCMA Roland Wick OVERVIEW This presentation will provide: 1. The basic criteria for the Preaward and Post Award accounting
ACCOUNTING AND AUDITING GUIDELINES. Table of Contents 11.1 MDT POLICIES AND PROCEDURES...11-1
Table of Contents Section Page 11.1 MDT POLICIES AND PROCEDURES...11-1 11.1.1 General...11-1 11.1.2 Cognizant Indirect Cost Rate Review...11-1 11.1.3 Contract Compliance Audit...11-3 11.1.3.1 Objective...11-3
Is Your Accounting System Making the Grade? Attributes of an Acceptable Accounting System April 26, 2012
Is Your Accounting System Making the Grade? Attributes of an Acceptable Accounting System April 26, 2012 2012 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland 20850 301.231.6200
DCAA Guidelines. How the SBIR firm can work effectively with the Defense Contract Audit Agency
DCAA Guidelines How the SBIR firm can work effectively with the Defense Contract Audit Agency Today s Presenters OUTLINE Presenter Introduction DCAA & DCMA DCAA Overview Types of DCAA Audits What it takes
Review Program for CPA Audits of Consulting Engineers Indirect Cost Rates
Review Program for CPA Audits of Consulting Engineers Indirect Cost Rates Name of Consultant (A/E Firm): Name of Name of Date(s) of DOT Review: Background and Objectives Independent CPAs perform audits
Chapter 6 Labor-Charging Systems and Other Considerations
6 Chapter 6 Labor-Charging Systems and Other Considerations The purpose of this chapter is to provide interpretive guidance only. This chapter is not intended to be authoritative or to supersede the FAR.
Audit Guide for Consulting Services Cost Rates. March 11, 2015
Audit Guide for Consulting Services Cost Rates March 11, 2015 Columbus Regional Airport Authority Audit Guide for Consulting Services Cost Rates TABLE OF CONTENTS: History... 3 Page Purpose and Objectives...
Interpretive Guidance Document. Uncompensated Overtime. Architectural & Engineering Firm Indirect Costs WSDOT
Interpretive Guidance Document Uncompensated Overtime Architectural & Engineering Firm Indirect Costs WSDOT Internal Audit Office This Interpretive Guidance Document will address Uncompensated Overtime,
Basic Financial Requirements for Government Contracting
Basic Financial Requirements for Government Contracting 2014 National SBIR/STTR Conference The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations
How-To-Tutorial for MoDOT s Consultant Prequalification Process. How-To-Tutorial for MoDOT s Consultant Annual Financial Prequalification Process
How-To-Tutorial for MoDOT s Consultant Prequalification Process Why has MoDOT developed the Annual Financial Prequalification Process MoDOT s has developed an Annual Financial Pre-Qualification process
The Changing Government Contractor Environment
The Changing Government Contractor Environment 1 Federal Government Contracting DCAA FY 2014 Report to Congress DCAA Audit Guidance Business systems Federal regulatory rule changes State Contracting (Dept.
Cracking the ICE: Ensuring a Compliant Incurred Cost Submission. Carlos Alvarado, VP, FP&A
Cracking the ICE: Ensuring a Compliant Incurred Cost Submission Carlos Alvarado, VP, FP&A Agenda Introduction Incurred Cost Proposal ICE Model Leveraging Reporting Applications Inadequacy Letters Q&A 2
INSTRUCTIONS FOR PROVIDING PROFESSIONAL CONSULTING SERVICES
INSTRUCTIONS FOR PROVIDING PROFESSIONAL CONSULTING SERVICES Prepared by: Engineering Services and Internal Review May 2014 CONTENTS INTRODUCTION... 1 I. AUDIT EVALUATION... 2 II. PERFORMANCE AND POST-PERFORMANCE
ACCOUNTING & AUDIT GUIDELINES FOR CONTRACTS WITH CALTRANS
ACCOUNTING & AUDIT GUIDELINES FOR CONTRACTS WITH CALTRANS Mendocino County Page 1 of 5 INTRODUCTION The purpose of this brochure is to outline for you, a potential contractor with the California State
Incurred Cost Submissions. John S. Sroka, CPA Acquisition Cost/Price Analyst
Incurred Cost Submissions John S. Sroka, CPA Acquisition Cost/Price Analyst Incurred Cost Proposals Allowable cost and payment clause requires the submission (FAR 52.216-7) Requires a signed certification
Example Accounting/Financial Policies
Example Accounting/Financial Policies TABLE OF CONTENTS INTERNAL CONTROLS... 2 ACCESS TO RECORDS BY MEMBERS... 3 ACCOUNTING COMPUTER FILE BACK-UP PROCEDURE... 3 ACCOUNTING METHOD... 3 AUDIT COMMITTEE...
WELCOME. Accounting Systems for DOD Contracts
WELCOME Accounting Systems for DOD Contracts Moderator: Layli Pietri, Small Business Manager, Balfour Beatty Construction Speaker: Kay Papin, Government Compliance Manager, McCarthy Group Inc. Accounting
FAR PART 31 & COST ACCOUNTING STANDARDS (CAS) An Overview
FAR PART 31 & COST ACCOUNTING STANDARDS (CAS) An Overview Agenda Why is this important? Scope & Applicability FAR Part 31, CAS Review FAR Part 31 Common Issues Cost Accounting Standards Background CAS
Government Accounting, Estimating, and Billing Systems: Pitfalls and Answers
Curtis Matthews, Managing Partner Government Accounting, Estimating, and Billing Systems: Pitfalls and Answers Findley Gillespie, Senior Manager May 18, 2011 1 The material appearing in this presentation
What Exactly is an Acceptable Accounting System?
What Exactly is an Acceptable Accounting System? Kristen Soles, CPA Member Stephanie Widzinski, CPA Senior Manager September 27, 2012 Agenda Review DFARS Business System Rule What Agency is Responsible
ACCOUNTING SYSTEM REQUIREMENTS for PROFESSIONAL CONSULTANTS. Background and Authority
ACCOUNTING SYSTEM REQUIREMENTS for PROFESSIONAL CONSULTANTS The Office of Inspector General, Florida Department of Transportation, has prepared this Primer to illustrate and explain some required elements
Frequently Asked Questions (FAQ s)
Questions about Cognizance: Frequently Asked Questions (FAQ s) 1. How can I determine who is my cognizant agency responsible to establish my indirect cost rate(s)? For commercial, for-profit companies
Overview of Federal Cost Allocation & Indirect Cost Rates (2 CFR Part 200) for The State of Washington
Overview of Federal Cost Allocation & Indirect Cost Rates (2 CFR Part 200) for The State of Washington Presented by: MGT of America, Inc. Bret Schlyer, Director [email protected] 316-214-3163 Cost Principles
CHAPTER 2. 2-000 Preaward Surveys of Prospective Contractor Accounting Systems
CHAPTER 2 2-000 Preaward Surveys of Prospective Contractor Accounting Systems 2-101 Preaward Survey Overview A preaward survey is an evaluation, usually made by the cognizant contract administration office,
Presented by: Laura Davis, President Strategic Consulting Solutions, Inc. PDS Consulting Solutions, LLC November 12, 2015
Presented by: Laura Davis, President Strategic Consulting Solutions, Inc. PDS Consulting Solutions, LLC November 12, 2015 Agenda Introductions RFP Process Types of Costs Pricing of Direct Costs Pricing
Time s Up: DCAA s Renewed Focus on Incurred Cost Submissions
Time s Up: DCAA s Renewed Focus on Incurred Cost Submissions Nicole Mitchell, CPA Donna Dominguez Aronson LLC May 1, 2013 2013 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland
Post Award Accounting System Audit at Nonmajor Contractors
Activity Code 17740 B-1 Planning Considerations Post Award Accounting System Audit at Nonmajor Contractors To provide general guidance for the audit of the adequacy and suitability of nonmajor contractor
THE DCAA AUDIT BECOMING DCAA COMPLIANT
THE DCAA AUDIT Created to oversee government spending on behalf of the American tax-payer, the Defense Contract Audit Agency (DCAA) is responsible for supervising all Department of Defense (DoD) contracts.
Are You Looking to Sell Your Products & Services to the US Government? Overview
Are You Looking to Sell Your Products & Services to the US Government? What You Need to Know About Accounting, Compliance, and Reporting! 1 FICPA Overview The US Government is the largest consumer of goods
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF ENVIRONMENTAL REMEDIATION
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF ENVIRONMENTAL REMEDIATION TECHNICAL ASSISTANCE GRANTS STATE ASSISTANCE CONTRACT RECORD KEEPING AND PAYMENT GUIDE 1.0 ACCOUNTING SYSTEM
Certificate of Accounting, Billing and Property System Adequacy
Certificate of Accounting, Billing and Property System Adequacy This certifies that, to the best of my knowledge and belief, Contractor s Accounting, Billing and/or Property System and related internal
Implementing a FAR Part 31 Compliant Cost Accounting System
Implementing a FAR Part 31 Compliant Cost Accounting System Breakout Session #: F11 Presented by: Robert E. Jones, CFCM, CCCM Date: July 23, 2013 Time: 4:00 PM 5:15 PM Agenda 1. Choosing a System 2. Designing
FINANCIAL MANAGEMENT GUIDE FOR NON-PROFIT ORGANIZATIONS
FINANCIAL MANAGEMENT GUIDE FOR NON-PROFIT ORGANIZATIONS NATIONAL ENDOWMENT FOR THE ARTS OFFICE OF INSPECTOR GENERAL SEPTEMBER 2008 Questions about this guide may be directed to the National Endowment for
Program Policy Guidance OSHC-2011-06
U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Office of Sustainable Housing and Communities WASHINGTON, DC 20410-0050 Date: April 13, 2011 Program Policy Guidance OSHC-2011-06 Subject: Indirect Cost
WORKING WITH THE U.S. GOVERNMENT YOUR GUIDE TO THE DCAA
WORKING WITH THE U.S. GOVERNMENT YOUR GUIDE TO THE DCAA The DCAA Audit Created to oversee government spending on behalf of the American tax-payer, the Defense Contract Audit Agency (DCAA) is responsible
Indirect Cost Rate Agreement Guide for Non-Profit Organizations
U.S. Department of Veterans Affairs Homeless Providers Grant and Per Diem Program Indirect Cost Rate Agreement Guide for Non-Profit Organizations Based on the Cost Principles and Procedures Required under
Uncompensated Overtime
Uncompensated Overtime 1 Table of Contents Risk Assessment Research and Planning Risk Assessment Labor System Entrance Conference Preliminary Analytical Procedures Audit Team Brainstorming for Fraud Risk
Incurred Cost Submissions - It's Not Too Early!
Incurred Cost Submissions - It's Not Too Early! March 28, 2013 David Eck and Todd W. Bishop Dixon Hughes Goodman LLP Agenda Treat Incurred Cost Submissions like a Project Why an Incurred Cost Submission?
Capital Area Council of Governments FY 2015 Cost Allocation Plan
Capital Area Council of Governments FY 2015 Cost Allocation Plan The Capital Area Council of Governments uses the cost allocation method prescribed in OMB Circular A 87, Department of Health and Human
DCAA Compliant Accounting Systems
DCAA Compliant Accounting Systems State Designated as Florida s Principal Provider of Business Assistance [ 288.001, Fla. Stat.] Helping Businesses Grow & Succeed About Your Presenter Jenny W. Clark With
You've successfully subscribed to this feed! Updated content can be viewed in Internet Explorer and other programs that use the Common Feed List.
Page 1 of 5 You've successfully subscribed to this feed! Updated content can be viewed in Internet Explorer and other programs that use the Common Feed List. View my feeds DCAA News Thursday, May 28, 2009,
What Documents are required at Pre-award Audit of an agreement or sub-agreement. How to Avoid Common Proposal Mistakes
January 29, 2015 What Documents are required at Pre-award Audit of an agreement or sub-agreement How to Avoid Common Proposal Mistakes How to Avoid Common Invoice Mistakes Pre-Award Review New Agreement/Sub-agreement:
Objectives. Single Audit: Recent Changes and Preparation Tips. Overview. Overview 1/20/2016
Objectives Single Audit: Recent Changes and Preparation Tips January 21, 2016 Discuss and review recently issued Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal
Accounting System Requirements
Basic Financial Requirements for Government Contracting The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations Accounting System Requirements
Incurred Cost Submissions
Incurred Cost Submissions Further information is available in the Information for Contractors Manual under Enclosure 2 The views expressed in this presentation are DCAA's views and not necessarily the
CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB
DEFENSE CONTRACT AUDIT AGENCY GUIDE FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL
Instructions: This form should be completed for each proposal submission and maintained in the permanent file. Adequacy reviews of contractor incurred cost proposals include verification for completeness
1 1 1 2 2 2 2 3 3 3 3 3 4 4 4 4 5 back
Introduction Bid Protest Business Systems Design, Evalution and Validation Contractor Accounting & Compliance Risk Assessments Contractor Purchasing System Review (CPSR) Cost Accounting Standards (CAS)
NEGOTIATION HANDBOOK PROFESSIONAL SERVICES CONTRACTS FLORIDA DEPARTMENT OF TRANSPORTATION
NEGOTIATION HANDBOOK PROFESSIONAL SERVICES CONTRACTS FLORIDA DEPARTMENT OF TRANSPORTATION Last Updated: 10/6/2015 Update History: Date of Update Section Changed Page Numbers 9/7/2007 Attachment D Current
Cost Analysis Key Components Guidance and Checklist
Cost Analysis Key Components Guidance and Checklist A Mandatory Reference for ADS Chapter 300 New Edition Date: 04/02/2013 Responsible Office: M File Name: 300mad_040213 COST ANALYSIS KEY COMPONENTS GUIDANCE
Presentation of Simplified Method for Preparing the Facilities and Administrative Cost Rate Proposal. Jason Guilbeault, Senior Consultant
Presentation of Simplified Method for Preparing the Facilities and Administrative Cost Rate Proposal Jason Guilbeault, Senior Consultant MAXIMUS, 2014 Agenda 1. What is the Facilities and Administrative
How to Survive a DCAA Pre-Award Audit
How to Survive a DCAA Pre-Award Audit February 27, 13 Presented by: Paul H. Calabrese Senior Manager 301-214-4137 [email protected] Bio http://www.rubino.com/company/staff/11- paul_h_calabrese/view LinkedIn
Chapter 7 Compensation
Important Note: In this 2012 edition of the guide, Chapter 7 has been updated only to reflect the issuance of the National Compensation Matrix (NCM). Other changes to this chapter may be required based
The Essential Role of Adequate Accounting Systems for Government Contractors
The Essential Role of Adequate Accounting Systems for Government Contractors Jerrold Rosenberg, CPA, CFP Judith H. Lasley, CPA John Pace, CPA, CVA February 29, 2012 American Legion Washington Conference
AGENDA FOR LUNCH SEMINAR WITH FMI AUGUST 28, 2008 12:30 PM INTRODUCTION TO GOVERNMENT CONTRACTING
AGENDA FOR LUNCH SEMINAR WITH FMI AUGUST 28, 2008 12:30 PM INTRODUCTION TO GOVERNMENT CONTRACTING 1. NICRA - What is a NICRA? - Who has a NICRA? - Do I need a NICRA? - How do I get a NICRA? 2. INDIRECT
Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards AT 2 CFR 200
Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards AT 2 CFR 200 November 11, 2014 WHAT S CHANGING AND WHEN? Grants Reform Office of Management and Budget Circulars
2 CFR Part 200: 300-309
Standards for Financial and Program Management Page 1 Standards for Financial and Program Management 2 CFR Part 200: 300-309 Kris Rhodes, Director 1 2 CFR Part 200, Subpart D: 200.300 200.309 What We Will
under Federal Grants/Cooperative Agreements and Cost Reimbursement Contracts (Rev. 7/15/14)
CHARGING OF DIRECT and INDIRECT COSTS under Federal Grants/Cooperative Agreements and Cost Reimbursement Contracts (Rev. 7/15/14) Direct Costs are those costs which are allowed to be reimbursed under federal
CHAPTER 7 COST PRINCIPLES
CHAPTER 7 COST PRINCIPLES 7101. Cost Principles. (a) Definitions. (1) Actual Costs are all direct and indirect costs which have been incurred for services rendered, supplies delivered, or construction
Preaward Survey of Prospective Contractor Accounting System
Activity Code 17740 B-1 Planning Considerations Preaward Survey of Prospective Contractor Accounting System Purpose and Scope The major objectives of this audit are to obtain an understanding of the accounting
As the Defense Contract Audit Agency slowly
Reprinted from Government Contract Costs, Pricing & Accounting Report, with permission of Thomson Reuters. Further use without the permission of West is prohibited. For further information about this publication
Staff Timesheets: Requirements and Issues
Staff Timesheets: Requirements and Issues 1 You need to know... The information in this session is based on CNCS and Federal laws, rules, and regulations; CNCS grant terms and provisions; and generally
How To Audit A Government Contractor
Activity Code 17740 Version 6.11, dated November 2015 B-1 Planning Considerations Preaward Survey of Prospective Contractor Accounting System Audit Specific Independence Determination Members of the audit
SECTION III. Examples of Exhibits to Support Indirect Cost Rate Proposals
SECTION III Examples of Exhibits to Support Indirect Cost Rate Proposals SECTION III Examples of Exhibits to Support Indirect Cost Rate Proposals Index Exhibits Description Page Numbers Exhibit A Personnel
Surviving a DCAA. Audit. Nicole Mitchell, CPA Director Aronson LLC. March 29, 2011
Surviving a DCAA Incurred Cost Submission Audit Nicole Mitchell, CPA Director Aronson LLC March 29, 2011 2011 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland 20850 301.231.6200
Government Contractor Business Systems and Overview of System Assessments
Government Contractor Business Systems and Overview of System Assessments Agenda Overview of business systems rules and environment today 3 rd party assessments Practical solutions Contractor perspective