1 Incurred Cost Submissions - It's Not Too Early! March 28, 2013 David Eck and Todd W. Bishop Dixon Hughes Goodman LLP
2 Agenda Treat Incurred Cost Submissions like a Project Why an Incurred Cost Submission? Current requirements for the Incurred Cost Submission DCAA s current checklist for ICS adequacy Some common mistakes causing ICS to be returned as inadequate Allowability Issues of the Day GAO s recent audit report outlining DCAA s significant backlog and DCAA s proposed action plan The Statute of Limitations and the potential impact of recent court decisions on older, unaudited submissions Penalties 2
3 Treat ICS Like a Project Establish a Project Plan for the preparation of your ICS Identification of Milestone projects (i.e., each ICS Schedule) Identification of key parts of each ICS Schedule and responsible parties Milestone dates (beginning and end) for reviewing and completing each project/schedule, and for final review and submission of the ICS Purpose of this webinar is to help you get started in preparing your ICS, or help in the review process Please contact us on detailed questions you may have on Schedules or any other aspects of the ICS 3
4 Why an Incurred Cost Submission? Federal Acquisition Regulation (FAR) (d), allowable cost and payment Annual rates and bases shall be established based on FAR 42.7 Shall submit an adequate Rate Proposal within 6 months of FYE Clause ((d)(2)(iii)) includes list of schedules to meet adequacy FAR 42.7, Indirect Cost Rates Provides CO with procedures to settle final indirect rates Prescribes final vouchering process (within 120 days of final rates) Includes Quick Close-out (FAR ) FAR , Payments under Time-and-Materials and Labor-Hour Contracts Labor is excluded from ICS requirement (Hours and Labor Rates) Defines material costs (travel, ODCs, materials, subcontracts, indirect) Pass through costs defined by costs accounting practices 4
5 Current Requirements Must be adequate based on DCAA checklist or civilian agency requirements!! Subcontractors where you are the Prime (Schedule J) Review each of your subcontract documents to ensure subcontract type Determine if your subs are required to submit ICS (Type and Materiality) Utilize Quick Close-out procedures (FAR ) Cost Type subcontracts ensure your SubK Admin P&Ps are adequate Subcontractors where you are the Sub Be prepared for Prime to request an ICS (T&M, Cost Type SubK) If immaterial, request Quick close-out process Ensure that supporting financial data and documentation is readily available Indirect Rate True-ups/Adjusting Vouchers See DCAA Adequacy Checklist for specific details 5
6 The Adequacy Checklist
7 Examples Proposal Adequacy Checklist Questions Ensure all claimed pools, bases, and rates are shown, including COM (Schedule A) Verify the contractor has included explanatory notes for any adjustments from G&A Expenses booked per G/L to claimed costs (Schedule B) Ensure a cost schedule is provided for each overhead pool (Schedule C) Ensure a cost schedule is provided for each intermediary cost pool (Schedule D) Ensure that an explanation of each allocation base is included (Schedule E)
8 Examples Proposal Adequacy Checklist Questions Ensure the contractor calculated a separate COM rate (if applicable) for each final indirect pool (Schedule F) Verify the contractor included explanatory notes for any adjustments from direct costs and indirect costs booked per G/L to claimed costs (Schedule G) Ensure all flexibly priced contracts and subcontracts, including commercial T&M, are listed by contract and subtotaled by contract type. FFP and other commercial contracts may be shown on one summary line each (Schedule H)
9 Examples Proposal Adequacy Checklist Questions Verify cost detail is in the same level used for billing costs, comparisons of billed and claimed costs have been made and that any overpayments have been identified and include explanations on notifications to the government (Schedule I) Ensure the auditable subcontract schedule includes all types of subcontracts (e.g., cost-type, T&M/LH, IDIQ, with a variable element and FPI) and intercompany costs claimed by the contractor on flexibly prices contracts and/or upper-tier subcontracts (Schedule J)
10 Examples Proposal Adequacy Checklist Questions Ensure T&M contract cost information is presented by cost element, with labor presented by labor category, showing contract labor rates, not actual labor rates (Schedule K) Verify reconciliation of total payroll per IRS Form 941 to labor costs distribution (Schedule L) Ensure completion of the list of decisions, agreements, approvals, and accounting/organization changes that may impact claimed costs negative responses are required (Schedule M)
11 Examples Proposal Adequacy Checklist Questions Verify that the Certificate of Final Indirect Costs is signed by an individual of the contractor s organization at a level no lower that a vice president or chief financial officer of the business segment of the contractor that submits the proposal (Schedule N) Verify the contractors has accurately identified physically complete contracts that are already closed or ready to close (Schedule O)
12 Common Mistakes Driving Inadequacies Reconciliation of Disclosure Statement, Accounting Description and Forward Pricing Rate Submission to ICS to verify all rates have been included (especially intermediate pools) and direct costs are at the right level Appropriate T&M/LH/LOE contracts have been included on Schedule H of costs by contract and subcontract Overpayments/underpayments identified on Schedule I on billed and claimed costs have not been identified, of explanations have not been provided for payment identified payment variances
13 Common Mistakes Driving Inadequacies All auditable subcontracts (e.g., T&M/LH and FPI) have not been identified on Schedule J and reconciled to purchasing department information Contract/subcontract briefs are not adequate (especially identification of contract billing instructions) On T&M/LH contracts, employees appear to be billed in labor categories where they do not have the appropriate qualifications per the contract, and explanations have not been provided (e.g., resumes have not been updated, CO provided a waiver, etc)
14 Common Mistakes Driving Inadequacies Appropriate reconciliations of claimed direct and indirect costs to the G/L have not been performed, or if performed, differences have not been adequately explained Adequate reconciliations of total payroll per IRS submissions to labor cost distributions have not been included in ICS DCAM only requires a reconciliation to payroll totals if labor system is adequate ICS does not include a Schedule of Cumulative Allowable Costs by Contract
15 Common Mistakes Driving Inadequacies For identified unallowable costs, ICS does not include any directly associated costs Certificate of Final Indirect Rates has not been signed by a business segment VP or higher
16 Allowability Issues of the Day Executive Compensation (FAR ) Compensation reasonable reviews conducted by DCAA, especially Mid-Atlantic Region (FAR ); DHG has issued 2 articles: DCAA Compensation Reviews Court Finds They are based on Fatal Statistical Flaws 2/7/12 DCAA Compensation Reviews Court Finds Again They are Flawed 9/25/12 Incomplete supporting data for purchases and subcontracts, especially cost/price analyses (FAR )
17 Allowability Issues of the Day Professional and Consultant Costs (FAR ) Travel Costs (FAR ) Unreasonable Health Benefits, with emphasis on ineligible dependents Unexplained reconciliation issues
18 Executive Compensation 2012 Authorization Act ( 803) extended reimbursement cap to all employees rather than top 5, starting January 1, 2012 Exemption to scientists/engineers when necessary to ensure DOD access to needed skills Executive caps 2011: $763,029 (applies to all future years until revised) 2010: $693, : $684, : $612,196 Applies to DOD, Coast Guard and NASA contracts
19 ICS Audit Backlog and Plan Forward December 2012 GAO Report (GAO ) Assessed DCAA plan for 25,000 audit Backlog (Dates back to 1996) Timely contract closeout dependent upon audits Plan Forward Developed sampling plan in Coordination with DCMA Will use , Contracting officer determination procedure, for ICS not audited
20 Contract Closeout Process Figure 1: DOD Contract Closeout Process Interactive Graphic To highlight firm-fixed-price closeout process, roll mouse over legend. Click on blue box to go to figure 2, DCAA s incurred cost audit process. Contract is physically complete/ goods and services received Contracting officer performs pre-closeout administrative tasks a Payment differences reconciled and excess funds deobligated Final payment made Contract closed when contracting officer signs contract completion statement Indirect cost rates settled with DCAA recommendations Indirect cost rates for all relevant years applied to contract Final invoice submitted and reviewed Firm-fixed-price Flexibly priced Source: GAO analysis of federal and DOD regulations and guidance. a Certain low-dollar, fixed-price contracts are closed using a more simplified process.
21 DCAA s Risk based Initiative Creating DCAA s Sampling Pool (Data from March 14, 2013 DCAA Presentation American Bar Associations-Section of Public Contract Law Conference)
22 How Does DCAA Develop Sampling Pool? Most Importantly, an Adequate ICS DCAA Determines Adequacy Using its Checklist (available on DCAA website) Total Value of Incurred Cost Proposal Four Different Ranges Over $250M Then Expect an Audit Most recent audited ICS questioned costs Classified as Significant Meet the Above Criteria, Then Join the Sampling Pool as Low Risk
23 How Many Proposals Will DCAA Sample? (Data from March 14, 2013 DCAA Presentation American Bar Associations-Section of Public Contract Law Conference)
24 DCAA Backlog Sampling Criteria Exceptions If $1M or less and submitted Prior to then Excluded from Sampling Pool 100% Greater Than $250M will be audited All Proposals Greater than $100M will be audited once every three years Four Different Ranges Low Risk Not Sampled, Contracting Officer Negotiation/Determination DCMA Class Deviation Memorandum through Sept. 2013
25 Contractor Actions Regarding Backlog Evaluate your most recent negotiated Audited Rates and Amounts Questioned Do you fit the Sampling Criteria? Communicate with cognizant CO s/aco s regarding this process Are CO/ACO s are even aware of the process? Recommend Quick Closeout Procedures (FAR ) as they might be applicable regardless of Sampling Criteria
26 Statute of Limitations on ICS DHG issued article on 3/19/2013 entitled When Does the Clock Start Ticking? In 1994, Federal Acquisition Streamlining Act (FASA) established a six-year Statute of Limitations for claims Recent Court Cases demonstrate the Statute of Limitations is being tested at phases throughout the contract life cycle Each of these cases deal with cost claims and some directly relate to ICS One testing ground still to be proven either way is the applicability of the Statute of Limitations to the eventual audits of the ICS
27 Statute of Limitations on ICS Some companies have taken bold steps on unaudited ICS over 6 years old, such as: Notify DCAA they have 30 days to take what ever action on the old ICS, and then records will be destroyed Refused DCAA access to records on ICS, saying the ICS are no longer subject to audit Consult with your legal and other advisors before taking bold steps
28 Penalties Expressly Unallowable Costs ACO Assessment (FAR ) Unallowable Costs Under $10K, Mandatory Waiver (Far , FAR ) Thomas Assoc., Inc., ASBCA No , May 17, 2011, 11-1 BCA 34,764
29 ICS Audit Process - Before and After BEFORE AFTER 29
30 Questions? 30
31 Contacts David Eck, CPA Director, Government Contracting 1410 Spring Hill Rd., Suite 500 Tysons, VA Todd Bishop Director, Government Contracting 1410 Spring Hill Rd., Suite 500 Tysons, VA
DEFENSE CONTRACT AUDIT AGENCY GUIDE FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL
Instructions: This form should be completed for each proposal submission and maintained in the permanent file. Adequacy reviews of contractor incurred cost proposals include verification for completeness
More informationDEFENSE CONTRACT AUDIT AGENCY CHECKLIST FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL
Instructions: This form should be completed for each proposal submission and maintained in the permanent file. Adequacy reviews of contractor incurred cost proposals include an assessment for completeness
More informationFAR UPDATE 52.216-7, Allowable Cost and Payment (Jun 2013)
FAR UPDATE 52.216-7, Allowable Cost and Payment (Jun 2013) "It's never too early to prepare for your incurred cost submission (A webinar sponsored by Pleasant Valley Business Solutions) 1 Objective Know
More informationCracking the ICE: Ensuring a Compliant Incurred Cost Submission. Carlos Alvarado, VP, FP&A
Cracking the ICE: Ensuring a Compliant Incurred Cost Submission Carlos Alvarado, VP, FP&A Agenda Introduction Incurred Cost Proposal ICE Model Leveraging Reporting Applications Inadequacy Letters Q&A 2
More informationIncurred Cost Submissions
Incurred Cost Submissions Further information is available in the Information for Contractors Manual under Enclosure 2 The views expressed in this presentation are DCAA's views and not necessarily the
More informationMonitoring Subcontracts. The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations
Monitoring Subcontracts The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations Subcontracts What should a contractor know about subcontracting:
More informationIncurred Cost Submissions. John S. Sroka, CPA Acquisition Cost/Price Analyst
Incurred Cost Submissions John S. Sroka, CPA Acquisition Cost/Price Analyst Incurred Cost Proposals Allowable cost and payment clause requires the submission (FAR 52.216-7) Requires a signed certification
More informationDCAA Perspective: Key Subcontracting Practices for Maintaining Approved Business Systems Accounting System and Estimating System
DCAA Perspective: Key Subcontracting Practices for Maintaining Approved Business Systems Accounting System and Estimating System Breakout Session A Alfred J. Massey, Western Region, Special Programs Manager,
More informationTime s Up: DCAA s Renewed Focus on Incurred Cost Submissions
Time s Up: DCAA s Renewed Focus on Incurred Cost Submissions Nicole Mitchell, CPA Donna Dominguez Aronson LLC May 1, 2013 2013 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland
More informationSubmitting a Quality Report. Presented by Laura Davis, Strategic Consulting Solutions, Inc.
Submitting a Quality Report Presented by Laura Davis, Strategic Consulting Solutions, Inc. Started in 2004 Based in Oak Ridge, TN Offices in Charleston, SC & Fayetteville, NC Focus on Government Contracting
More informationJuly 6, 2015 11(1) CHAPTER 11
July 6, 2015 11(1) CHAPTER 11 Table of Contents Paragraph Page 11-000 Audit of Contractor Compliance with Contract Financial Management Requirements 11-001 Scope of Chapter... 1101 11-100 Section 1 ---
More informationIf you require a copy of this presentation, please provide your contact information to either Christopher Weir or Bob Eyer and we will be sure to
How do I survive an audit of an incurred cost submission? If you require a copy of this presentation, please provide your contact information to either Christopher Weir or Bob Eyer and we will be sure
More informationAs the Defense Contract Audit Agency slowly
Reprinted from Government Contract Costs, Pricing & Accounting Report, with permission of Thomson Reuters. Further use without the permission of West is prohibited. For further information about this publication
More informationAccounting System Requirements
Accounting System Requirements Further information is available in the Information for Contractors Manual under Enclosure 2 The views expressed in this presentation are DCAA's views and not necessarily
More informationDCAA Audit R 4 Rights to Records, Requirements & Remedies
San Diego Chapters Present DCAA Audit R 4 Rights to Records, Requirements & Remedies A Seminar with Panel Discussion and Audience Participation February 18, 2009 This Morning s Agenda 8:30 Introduction
More informationDOECAA Spring Conference Presentation. Cost Reimbursement Contracting Issues - DOE Proposed Business System Rule
DOECAA Spring Conference Presentation Cost Reimbursement Contracting Issues - DOE Proposed Business System Rule Mary Karen Wills, CPA Director/Leader, BRG Government Contracts 2014 Berkeley Research Group
More informationPre-Award Accounting Systems
Pre-Award Accounting Systems 2013 National SBIR Conference Christopher Andrezze, CPA Special Assistant to the Deputy Director May 16, 2013 The views expressed in this presentation are DCAA's views and
More informationThe Cost Accounting Standards and Consequences of Noncompliance
The Cost Accounting Standards and Consequences of Noncompliance Breakout Session E05 Greg Bingham, Vice President, The Kenrich Group LLC Mike LaCorte, Principal, The Kenrich Group LLC Tuesday, December
More informationThe Changing Government Contractor Environment
The Changing Government Contractor Environment 1 Federal Government Contracting DCAA FY 2014 Report to Congress DCAA Audit Guidance Business systems Federal regulatory rule changes State Contracting (Dept.
More informationDEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219
DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 IN REPLY REFER TO PSP 730.8.B.1/2010-003 February 18, 2011 11-PSP-003(R) MEMORANDUM
More informationDCAA Our Role. Laura Cloyd-Hall, CPA, MBA John D. Mollohan II, CPA, CFE. Page 1. DCAA 1965-2015: Celebrating 50 Years of Excellence
DCAA Our Role Laura Cloyd-Hall, CPA, MBA John D. Mollohan II, CPA, CFE DCAA 1965-2015: Celebrating 50 Years of Excellence Page 1 Topics About DCAA Typical DCAA Audits for Small Businesses Basic Roles of
More informationGovernment Contract Accounting Are You DCAA Compliant? Procurement Technical Assistance Program (PTAP)
Government Contract Accounting Are You DCAA Compliant? Procurement Technical Assistance Program (PTAP) NH Presentation October 20, 2010 Presented by: Fred Kline, MBA, CPA Tom Martin MBA, CPA Malcolm Young,
More informationCurrent Initiatives May 2015
DHG 20 th Annual Government Contracting Update Current Initiatives May 2015 Mr. Ken Saccoccia Deputy Director Page 1 One Agency One Mission DCAA Overview Priorities and Better Buying Power Small Business
More informationINCURRED COST ELECTRONICALLY (ICE) MANUAL
INCURRED COST ELECTRONICALLY (ICE) MANUAL TABLE OF CONTENTS VERSION 2.0.1c A. INTRODUCTION 1. Purpose 2. Benefits of Using ICE 3. Hardware/Software Requirements B. ICE SOFTWARE APPLICATIONS PACKAGE 1.
More informationStrategic Implications of the New DFARS Business System Rule Co-presented by Venable LLP and Argy, Wiltse & Robinson June 12, 2012
Strategic Implications of the New DFARS Business System Rule Co-presented by Venable LLP and Argy, Wiltse & Robinson June 12, 2012 1 Panelists Robert A. ( Rob ) Burton, Partner, Venable LLP A 30-year veteran
More informationCHAPTER 8. Table of Contents
July 29, 2015 8(1) Paragraph CHAPTER 8 Table of Contents 8-000 Cost Accounting Standards Page 8-001 Scope of Chapter... 801 8-100 Section 1 --- Overview - Cost Accounting Standards Board (CASB) Rules and
More informationINSTRUCTION NUMBER 7640.02 August 22, 2008
Department of Defense INSTRUCTION NUMBER 7640.02 August 22, 2008 IG DoD SUBJECT: Policy for Follow-up on Contract Audit Reports References: See Enclosure 1 1. PURPOSE. This Instruction: a. Reissues DoD
More informationJanuary 2004 6(1) CHAPTER 6. Table of Contents
January 2004 6(1) Paragraph CHAPTER 6 Table of Contents 6-000 Incurred Costs Audit Procedures Page 6-001 Scope of Chapter... 601 6-100 Section 1 --- Introduction to Incurred Cost Audit Objectives 6-101
More informationWhat Exactly is an Acceptable Accounting System?
What Exactly is an Acceptable Accounting System? Kristen Soles, CPA Member Stephanie Widzinski, CPA Senior Manager September 27, 2012 Agenda Review DFARS Business System Rule What Agency is Responsible
More informationBasic Financial Requirements for Government Contracting
Basic Financial Requirements for Government Contracting 2014 National SBIR/STTR Conference The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations
More informationBusiness Systems: Update on Proposed Rules
Business Systems: Update on Proposed Rules Presented By: Mark Burroughs, Partner Topics Review of Business System requirements Observations on areas of focus by the government Enforcement of significant
More informationNCMA MEETING PREPARING FOR A DCAA PRICE PROPOSAL AUDIT JUNE 8, 2011
NCMA MEETING 1 PREPARING FOR A DCAA PRICE PROPOSAL AUDIT JUNE 8, 2011 Denise M. Hunt DCAA LM Mt. Laurel Resident Office Forward Pricing Technical Specialist DCAA OVERVIEW AND PRICE PROPOSAL AUDIT PROCESS
More informationDepartment of Defense INSTRUCTION
Department of Defense INSTRUCTION NUMBER 7640.02 April 15, 2015 IG DoD SUBJECT: Policy for Follow-Up on Contract Audit Reports References: See Enclosure 1 1. PURPOSE. This instruction reissues DoD Instruction
More informationDOD's Business Systems Rule: The Challenge Measuring Government Contractor Compliance Against Subjective Criteria and Perceived Risks
DOD's Business Systems Rule: The Challenge Measuring Government Contractor Compliance Against Subjective Criteria and Perceived Risks Breakout Session #: B04 Presented by: Michael E. Steen, CPA Date: July
More informationReview of Consultant/Professional Services Cost Accounts
Review of Consultant/Professional Services Cost Accounts 1 Table of Contents Risk Assessment Research and Planning Entrance Conference Preliminary Analytical Procedures Results from Preliminary Analytical
More informationDCAA Guidelines. How the SBIR firm can work effectively with the Defense Contract Audit Agency
DCAA Guidelines How the SBIR firm can work effectively with the Defense Contract Audit Agency Today s Presenters OUTLINE Presenter Introduction DCAA & DCMA DCAA Overview Types of DCAA Audits What it takes
More informationPresenting the Numbers: Accounting Systems for Government Contractors
Presenting the Numbers: Accounting Systems for Government Contractors William D. Craven, CPA Senior Cost/Price Analyst CH2M HILL Plateau Remediation Company William D. Craven, CPA, CMA, CIA Cost/Price
More informationAudit Expectations for Small Businesses
Audit Expectations for Small Businesses DEFENSE CONTRACT CONSULTING Joseph A. Dalton, CGFM/CFE/CAP Over 31 Years -Supervisory/Auditor Service- DCAA Retired Captain, U. S. Naval Reserve 1996 BUSINESS NO.
More informationCertificate of Accounting, Billing and Property System Adequacy
Certificate of Accounting, Billing and Property System Adequacy This certifies that, to the best of my knowledge and belief, Contractor s Accounting, Billing and/or Property System and related internal
More informationSeptember 16, 2015 6(1) CHAPTER 6
September 16, 2015 6(1) CHAPTER 6 Paragraph Table of Contents 6-000 Incurred Costs Audit Procedures Page 6-001 Scope of Chapter... 601 6-100 Section 1 --- Introduction to Incurred Cost Audit Objectives
More informationManaging Cost Type Contracts
Managing Cost Type Contracts October 9, 2013 By: Tom Marcinko Donna Dominguez 2013 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland 20850 301.231.6200 P 301.231.7630 F www.aronsonllc.com
More informationCHAPTER 6. 6-000 Incurred Cost Proposals
January 2005 6-1 6-101 CHAPTER 6 6-000 Incurred Cost Proposals 6-101 Introduction a. This chapter covers submission of incurred cost proposals. These would include the various indirect overhead and General
More informationDCAA New Tactics in Obtaining Contractor Internal audit reports
DCAA New Tactics in Obtaining Contractor Internal audit reports By Todd Bishop and David Eck, CPA In August 2012, the Defense Contract Audit Agency (DCAA) issued updates to its policy guidance and the
More informationAccounting System Requirements
Basic Financial Requirements for Government Contracting The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations Accounting System Requirements
More information31402 Federal Register / Vol. 76, No. 104 / Tuesday, May 31, 2011 / Rules and Regulations
31402 Federal Register / Vol. 76, No. 104 / Tuesday, May 31, 2011 / Rules and Regulations (iv) Best management practices for energy-efficient management of servers and Federal data centers. PART 52 SOLICITATION
More informationPreaward and Post Award Accounting System Audits. November 17, 2011 Pikes Peak NCMA Roland Wick
Preaward and Post Award Accounting System Audits November 17, 2011 Pikes Peak NCMA Roland Wick OVERVIEW This presentation will provide: 1. The basic criteria for the Preaward and Post Award accounting
More informationPost Award Accounting System Audit at Nonmajor Contractors
Activity Code 17741 Version 3.1, dated November 2015 B-01 Planning Considerations Post Award Accounting System Audit at Nonmajor Contractors Audit Specific Independence Determination Members of the audit
More informationUnderstanding the Rate Cycle. Presented By: Rich Wilkinson, VP Client Services
Understanding the Rate Cycle Presented By: Rich Wilkinson, VP Client Services The Rate Cycle and Related Trivia Basics of Indirect Rates The Traditional Structures Developing Rates Prospective Rate Submissions
More informationHow to Survive a DCAA Audit
How to Survive a DCAA Audit www.paulgunn.com 1 How to Survive a DCAA Audit - Overview Areas of interest and expectations of a typical audit: 1. Introduction o 2. The DCAA and Types of audits 3. Preparing
More informationObjectives of the Incurred Cost Audit
36 Contract Management March 2011 Government contractors who incur costs on behalf of the government via contracts, grants, loans, or other contract vehicles are subject to incurred cost audits by the
More informationFederal Regulatory Compliance Best Practices Washington Technology Webcast. September 27, 2012
Federal Regulatory Compliance Best Practices Washington Technology Webcast September 27, 2012 Agenda Topic Minutes Regulatory compliance overview 5 Major areas of financial compliance risk 15 Best practices
More informationIs Your Accounting System Making the Grade? Attributes of an Acceptable Accounting System April 26, 2012
Is Your Accounting System Making the Grade? Attributes of an Acceptable Accounting System April 26, 2012 2012 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland 20850 301.231.6200
More informationUncompensated Overtime
Uncompensated Overtime 1 Table of Contents Risk Assessment Research and Planning Risk Assessment Labor System Entrance Conference Preliminary Analytical Procedures Audit Team Brainstorming for Fraud Risk
More informationReview of Audits Issued by the Defense Contract Audit Agency in FY 2012 and FY 2013
Report No. DODIG-2014-109 Inspector General U.S. Department of Defense SEPTEMBER 8, 2014 Review of Audits Issued by the Defense Contract Audit Agency in FY 2012 and FY 2013 INTEGRITY EFFICIENCY ACCOUNTABILITY
More informationSurviving a DCAA. Audit. Nicole Mitchell, CPA Director Aronson LLC. March 29, 2011
Surviving a DCAA Incurred Cost Submission Audit Nicole Mitchell, CPA Director Aronson LLC March 29, 2011 2011 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland 20850 301.231.6200
More informationAudit Issues In Government Subcontracting
Audit Issues In Government Subcontracting Breakout Session E Brent A. Calhoon, CPA, Partner, Baker Tilly Virchow Krause, LLP Janie L. Maddox, CPCM, Fellow, Thursday, March 27 1:30pm 2:45pm Agenda 1. Introductions
More informationGovernment Contractor Business Systems and Overview of System Assessments
Government Contractor Business Systems and Overview of System Assessments Agenda Overview of business systems rules and environment today 3 rd party assessments Practical solutions Contractor perspective
More informationCAS. Combined Air Support Cost Accounting Standards. Cost Impact Statements
CAS Combined Air Support Cost Accounting Standards Cost Impact Statements Cost Impact Statements Presenter: Anthony J. Nicolella References 48 CFR 9903 CON 252 Fundamentals of CAS FAR Parts 30, 31 and
More informationWHAT MAKES AN ACCOUNTING SYSTEM COMPLIANT
WHAT MAKES AN ACCOUNTING SYSTEM COMPLIANT Presented by: Laura Davis OVERVIEW Why Do I Need a Compliant Accounting System Auditor s Judgment Definitions Key Components Audits How to be prepared for an audit
More informationINTERNAL CONTROL MATRIX FOR AUDIT OF BILLING SYSTEM CONTROLS Version No. 4.2 August 2006
INTERNAL CONTROL MATRIX FOR AUDIT OF BILLING SYSTEM CONTROLS Version No. 4.2 August 2006 1. MANAGEMENT REVIEWS The contractor should have policies and procedures for periodic monitoring of the billing
More informationGOVERNMENT CONTRACTING MICROSOFT DYNAMICS AX AND
GOVERNMENT CONTRACTING AND MICROSOFT DYNAMICS AX White paper on Government Contracting requirements and considerations in planning for a Dynamics AX implementation. 1 Government Contracting and Microsoft
More informationCHAPTER 2. 2-000 Preaward Surveys of Prospective Contractor Accounting Systems
CHAPTER 2 2-000 Preaward Surveys of Prospective Contractor Accounting Systems 2-101 Preaward Survey Overview A preaward survey is an evaluation, usually made by the cognizant contract administration office,
More informationU.S.Government. Contracts. Understanding and. Managing Receivables on U$A U$A U$A U$A U$A U$A U$A U$A U$A U$A U$A U$A U$A U$A U$A U$A
Understanding and Managing Receivables on U.S.Government Contracts B Y R OGER C. GRAHAM, JR., CPA, PH.D., AND G ERALD R. CHROBUCK, CPA MANAGEMENT accounting quarterly 3 IT IS COMMON FOR GOVERNMENT CONTRACTORS
More informationEnsure Compliance For Government Contractors
Ensure Compliance For Government Contractors Topics Overview NeoSystems Corp 2009-2012 ENSURE COMPLIANCE FOR GOVERNMENT CONTRACTORS TABLE OF CONTENTS V15C Learning Objectives... 4 Introduction... 5 Government
More informationAre You Looking to Sell Your Products & Services to the US Government? Overview
Are You Looking to Sell Your Products & Services to the US Government? What You Need to Know About Accounting, Compliance, and Reporting! 1 FICPA Overview The US Government is the largest consumer of goods
More informationDCAA and the Small Business Innovative Research (SBIR) Program
Defense Contract Audit Agency (DCAA) DCAA and the Small Business Innovative Research (SBIR) Program Judice Smith and Chang Ford DCAA/Financial Liaison Advisors NAVAIR 2010 Small Business Aviation Technology
More informationDEFENSE CONTRACT AUDIT AGENCY
DEFENSE CONTRACT AUDIT AGENCY Fundamental Building Blocks for an Acceptable Accounting System Presented by Sue Reynaga DCAA Branch Manager San Diego Branch Office August 24, 2011 Report Documentation Page
More informationTime-and-Materials and Labor-Hour Contracts The New Policies
Time-and-Materials and Labor-Hour Contracts The New Policies Overview: Time-and-materials and labor-hour (T&M/LH) contracts are the least preferred contract types, but they may play an important role in
More informationDCAA Current Trends and Practices. SCS GovCon Seminar October 24, 2013
DCAA Current Trends and Practices SCS GovCon Seminar October 24, 2013 What s Hot 2 Incurred Cost Submissions Requirements Common Deficiencies Closer Cost Scrutiny Travel Costs Restructuring Costs Consultant
More informationHow to Survive a DCAA Pre-Award Audit
How to Survive a DCAA Pre-Award Audit February 27, 13 Presented by: Paul H. Calabrese Senior Manager 301-214-4137 pcalab@rubino.com Bio http://www.rubino.com/company/staff/11- paul_h_calabrese/view LinkedIn
More informationDEFENSE CONTRACT AUDIT AGENCY AUDIT REPORT NO. 3311-2002K11010001
DEFENSE CONTRACT AUDIT AGENCY AUDIT REPORT NO. 3311-2002K11010001 PREPARED FOR: Corporate Administrative Contracting Officer (CACO) ATTN: DCMDW-GEOSB (Ms. Catharina N. Ignacio) Defense Contract Management
More informationDCAA Compliant Accounting Systems
DCAA Compliant Accounting Systems State Designated as Florida s Principal Provider of Business Assistance [ 288.001, Fla. Stat.] Helping Businesses Grow & Succeed About Your Presenter Jenny W. Clark With
More informationThe Devil is in the Details Compliance with the Business Systems Rule
Metropolitan Area Corporate Counsel Association WMACCA Conference on Ethics and Compliance for Government Contractors The Devil is in the Details Compliance with the Business Systems Rule April 1, 2014
More informationEvaluation of Defense Contract Management Agency Actions on Reported DoD Contractor Business System Deficiencies
Inspector General U.S. Department of Defense Report No. DODIG-2016-001 OCTOBER 1, 2015 Evaluation of Defense Contract Management Agency Actions on Reported DoD Contractor Business System Deficiencies INTEGRITY
More informationThank You for Joining Us, The Webinar Will Begin Shortly. While you are waiting please check out the Upcoming Webinars on www.giveme5.com.
Thank You for Joining Us, The Webinar Will Begin Shortly. While you are waiting please check out the Upcoming Webinars on www.giveme5.com. Before we begin just a few notes: During the presentation lines
More informationUNIT 34: COST ACCOUNTING STANDARDS
UNIT CERTIFICATION Statement of Completion has satisfactorily completed training in the duty of this Unit under the conditions described below and in accordance with the overall standard(s) for this Unit.
More informationDefense Contract Audit Agency: What Do They Do and How Does It Affect ME as a Resource Manager? (Breakout #63)
Defense Contract Audit Agency: What Do They Do and How Does It Affect ME as a Resource Manager? (Breakout #63) Pat Fitzgerald Director Defense Contract Audit Agency The views expressed in this presentation
More informationTestimony. Patrick J. Fitzgerald Director, Defense Contract Audit Agency. before the. Commission on Wartime Contracting In Iraq and Afghanistan
Testimony of Patrick J. Fitzgerald Director, Defense Contract Audit Agency before the Commission on Wartime Contracting In Iraq and Afghanistan July 26, 2010 Chairman Thibault, Chairman Shays, and members
More informationCONTACT: 1. Proposed rule BDO GOVERNMENT CONTRACTING PRACTICE GUIDANCE ON THE PROPOSED DOE BUSINESS SYSTEM RULE
BDO GOVERNMENT CONTRACTING PRACTICE GUIDANCE ON THE PROPOSED DOE BUSINESS SYSTEM RULE By Eric Sobota, Kelley Doran and Barron Avery Contractors that work for the Department of Energy (DOE) under agreements
More informationNASA Office of Inspector General
NASA Office of Inspector General National Aeronautics and Space Administration Office of Audits COSTS INCURRED ON NASA S COST-TYPE CONTRACTS December 17, 2014 Report No. IG-15-010 Office of Inspector General
More informationUnderstanding Unallowable Cost so You Don t Pay the Price
Understanding Unallowable Cost so You Don t Pay the Price Identification and Definition of Unallowable Costs per CAS and FAR An unallowable cost is one that: Under the provisions of any pertinent law,
More informationGovernment Accounting, Estimating, and Billing Systems: Pitfalls and Answers
Curtis Matthews, Managing Partner Government Accounting, Estimating, and Billing Systems: Pitfalls and Answers Findley Gillespie, Senior Manager May 18, 2011 1 The material appearing in this presentation
More informationPost Award Accounting System Audit at Nonmajor Contractors
Activity Code 17740 B-1 Planning Considerations Post Award Accounting System Audit at Nonmajor Contractors To provide general guidance for the audit of the adequacy and suitability of nonmajor contractor
More informationTypes of Contracts. A quick walk through FAR Part 16
Types of Contracts A quick walk through FAR Part 16 Contract Types Contract types vary according to -- (1) The degree and timing of the responsibility assumed by the contractor for the costs of performance;
More informationBusiness Systems Compliance Guide
McKenna Government Contracts, continuing excellence at Dentons Government Contractor Business Systems Compliance Guide 2nd Edition Thomas A. Lemmer Steven M. Masiello Michael J. McGuinn Kelly P. Garehime
More informationDCAA Contract Audits: Current Trends and Issues
DCAA Contract Audits: Current Trends and Issues Presented to: NCMA Huntsille, AL Chapter August 25, 2011 Darryl L. Walker, CPA Technical Director Beason & Nalley, Inc. Copyright 2011 Beason & Nalley, Inc.
More informationDCAA / DCMA: Progress or Status Quo? Presented By: Christine Williamson, CPA, Member Kristen Soles, CPA, Member
DCAA / DCMA: Progress or Status Quo? Presented By: Christine Williamson, CPA, Member Kristen Soles, CPA, Member Agenda State of the Agencies DCAA/DCMA What does GAO have to say? What does DOD IG have to
More informationIntroduction and DCAA Overview
Introduction and DCAA Overview Industry Engagement Session 10/29/2015 The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations DCAA 1965-2015:
More informationINSPECTOR GENERAL UNITED STATES POSTAL SERVICE
OFFICE OF INSPECTOR GENERAL UNITED STATES POSTAL SERVICE Trends and Systemic Issues in Defense Contract Audit Agency Audit Work for Fiscal Years 2009-2012 Management Advisory Report Report Number March
More informationProvisional Billing Rates. Beth Citeroni Acquisition Cost/Price Analyst
Provisional Billing Rates Beth Citeroni Acquisition Cost/Price Analyst Definition FAR 42.701 Provisional rate or billing rate is an established temporary indirect rate applicable to a specified period
More informationMaster Document Audit Program. Version No. 2.9, updated November 2015 B-1 Planning Considerations
Activity Code B-1 Planning Considerations Cost Realism Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this audit must complete the Audit Specific
More informationMEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security
MEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security 1. PURPOSE This memorandum sets forth an understanding of contract audit coverage and related audit
More informationMaster Document Audit Program. Version 4.14, dated November 2015 B-1 Planning Considerations
Activity Code 17200 B-1 Planning Considerations Claim Audit, Other Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this audit must complete the
More informationSTOC II Draft RFP (W900KK-08-R-0001) Questions & Answers
STOC II Draft RFP (W900KK-08-R-0001) Questions & Answers Answers to questions submitted, but not included in this set of Q&As,will be provided in a subsequent posting of Q&As in the near future. As the
More informationPublic Vouchers. Further information is available in the Information for Contractors Manual under Enclosure 5
Public Vouchers Further information is available in the Information for Contractors Manual under Enclosure 5 The views expressed in this presentation are DCAA's views and not necessarily the views of other
More informationProperty Management System (GPMS)
Property Management System (GPMS) Business System Overview Sep 20, 2013 Marcia D. Whitson, CPPM, CF NPMA National President DFARS 252.242-7005 Contractor Business Systems DoD Business Systems Rule - Clarifies
More informationAGENDA FOR LUNCH SEMINAR WITH FMI AUGUST 28, 2008 12:30 PM INTRODUCTION TO GOVERNMENT CONTRACTING
AGENDA FOR LUNCH SEMINAR WITH FMI AUGUST 28, 2008 12:30 PM INTRODUCTION TO GOVERNMENT CONTRACTING 1. NICRA - What is a NICRA? - Who has a NICRA? - Do I need a NICRA? - How do I get a NICRA? 2. INDIRECT
More informationCONTRACTOR INVOICE REVIEW AND APPROVAL PROCESS
SECTION XVI. CONTRACTOR INVOICE REVIEW AND APPROVAL PROCESS For purposes of this Guidebook, the terms "voucher" and "invoice" are used interchangeably. A. PURPOSE The purpose of this document is to provide
More informationGOVERNMENT CONTRACT COSTS, PRICING & ACCOUNTING REPORT
Reprinted with permission from Government Contract Costs, Pricing & Accounting Report, Volume 10, Issue 2, K2015 Thomson Reuters. Further reproduction without permission of the publisher is prohibited.
More informationGovernment Contracting in 2015: Balancing Risks to Reap Rewards - Compliance Update
Government Contracting in 2015: Balancing Risks to Reap Rewards - Compliance Update Baker Tilly Beers & Cutler, PLLC, is a wholly-owned subsidiary of Baker Tilly Virchow Krause, LLP. 2015 Baker Tilly Beers
More information