1 Overview and Scrutiny Committee nd 2 September 2010 th Agenda Item 7 Ward: Purchase of Corporate Electronic Document and Records Management System (EDRMS) Report by the Executive Head of Planning, Regeneration and Wellbeing 1.0 Summary 1.1 The purpose of this report is to update on recent discussions regarding the provision of a Corporate Electronic Document and Records Management System and recommends that Worthing contributes to a new EDRM system to be purchased by Adur District Council for the joint services of Planning (Development Management and Building Control), Technical Services and Legal & Democratic Services Background 2.1. At its meeting on the 18 th November 2009, the Joint Strategic Committee agreed a corporate strategy for the adoption of common EDRMS systems across Adur and Worthing Councils. The report highlighted that there was arguably no such thing as a comprehensively corporate EDRMS solution at the present time but nevertheless there was significant advantage to be gained from a centralised approach to the deployment of EDRM systems. As Adur was already using the Opentext R/KYV EDRM system, developed by the Census Partnership, it was agreed at that stage that Worthing Planning Services should deploy the Census solution pending the expiry of the current contract in As Worthing Revenue and Benefits service has, for many years, used the Anite/Northgate Information at Work (info@work) EDRM system, it was agreed that, ultimately, both Councils should converge upon a common EDRM solution to minimise the likely diseconomies and loss of interconnectivity that would be associated with the proliferation of alternative systems. The Joint Strategic Committee agreed that individual services should only be authorised to introduce entirely new EDRM infrastructures if they could produce a compelling Business Case for doing so Since the Joint Strategic Committee, Officers have been involved in a number of discussions with Census Partners and have continued to look at the various systems on the market, in particular Officers have been comparing the two EDRM systems currently in use across the Census partnership namely info@work (Anite) and R/KYV (Opentext).

2 3.0 Current position 3.1 Whilst, the Joint Strategic Committee originally agreed that it would make sense to extend the Opentext EDRM solution to Worthing s Planning and Building Control service until the end of the current maintenance contract (October 2011), it subsequently became clear that this was not a straightforward interim solution. The original contract was between Horsham and Opentext and only referred to the other Census partners of Mid Sussex and Adur being able to make use of the software product. The alternative would have been to procure a new EDRM system for Worthing Planning and Building Control. This was not an option that would have been appropriate given the desire to reduce the number of EDRM systems and it was clearly appropriate for the provision of the joint Planning and Building Control services to utilise the same system. 3.2 In addition your Officers have been increasingly concerned about the R/KYV system and therefore have been loath to extend the system to Worthing even if it could have been undertaken in accordance with current procurement and legal regulations. 3.3 Census partners are currently reviewing the use of Opentext R/KYV and which EDRM system, currently in use, would be most suitable to extend to other service areas. Although, Census partners will not want to prejudice the outcome of its Board meeting it is apparent that there have been reservations about the extending the Opentext R/KYV solution to other service areas. Whilst, the product was purchased as a corporate system some years ago it has only been introduced for Planning and Building Control and Census has already purchased a different EDRM solution for its Revenues and Benefits service. 3.4 One of the main drawbacks with the R/KYV solution is its lack of functionality. In this respect it is not possible to adapt the system and make refinements without involving Opentext IT staff and this is both costly and time consuming. In contrast the Anite product, info@work has been a far more flexible product to be developed for the Census Revenues and Benefits service and can be refined and altered by the staff within the service. Increasingly a number of technical problems have occurred with R/KYV and Adur Planning staff have started to lose confidence in the system. On occasions this has also affected customer service with access to plans being not possible for certain cases. 3.5 In addition to the concerns regarding the technical aspects of R/KYV EDRMS the product is very expensive compared to info@work not only in terms of initial set up costs but also subsequent maintenance. Having reviewed current EDRM systems being used by Census your Officers are satisfied that info@work would be a better technical and cost efficient option and would meet current and future needs of the service. 3.6 The operational benefits of EDRM to Worthing s Development Management service are significant and the implementation of an EDRM system is an essential requirement for the provision of a joint service. The benefits to Worthing customers are also significant allowing all planning applications to be viewed on

3 line, reducing the need for the public to visit the offices and improving the efficiency of the service. 3.7 Your Officers have been investigating whether there is scope to utilise the existing contract entered into by Mid-Sussex for the Census Revenues and Benefits service to purchase additional licenses for the joint Planning and Building control services. 3.8 At the present time the imperative is to implement a common system across Planning and Building Control and negotiations have centred around this requirement. However, more recently it is clear that Technical Services has an urgent need to replace its existing electronic document storage for a all of its plans (Council own buildings and projects) and Legal & Democratic Services have identified the need for an EDRMS system. As a result Anite/Northgate has recently provided quotes for Planning, Building Control and Technical Services and it is clear that by purchasing both service requirements at the same time, there is scope for significant savings. Discussions have not yet taken place with regard to the inclusion of Legal & Democratic Services. Option 1 - Worthing & Adur DC & BC Only Cost ( ) 3 rd Party & Conversio Annual Support n Costs Charge ( ) ( ) Information@Work Software, including Modules 52, Implementation Services rd Party Software OpenText Conversion 7650 Total capital & recurring annual revenue cost 97,150 11,674 11,304 Notes to Option 1 All costs and assumptions are as identified in our proposal dated 7/6/10 Above based on Option 1 of Northgate's proposal dated 7/6/10 Option 2 - Technical Services as a separate procurement Cost 3 rd Party & Annual ( ) Conversio n costs (3) Support Charge ( ) Information@Work Software Implementation Services Conversion Total capital & recurring annual revenue cost Notes to Option 2 Based on assumptions in Northgate's proposals dated Based on the option (2) of Worthing assisting with the Conversion

4 Option 3 - Combined Procurement & implementations of Cost 3 rd Party & Annual Option 1 & 2 ( ) Conversio n costs ( ) Support Charge ( ) I@W Software for DC, BC & Technical Services (including modules) BC & CD Implementation Services rd Party Software (DC & BC) BC & DC Conversion (OpenText) 7240 Technical Services Implementation Services Technical Services Conversion 4000 Total capital & recurring annual revenue cost Notes to Option 3 Based on assumptions in Northgate's proposals dated & Based on 'loan' of batch import module for conversion purposes Implementation days & conversion based on a reduced day rate Savings to be enjoyed by a joint procurement (year 1-17,070-5,310-3,440 breakdown) Total savings to be enjoyed by a joint procurement over years 3.9 As Adur is currently tied into a maintenance contract with Opentext until the end of next year ideally any change to the EDRM supplier should be after this date to avoid paying for the maintenance of two systems. However, in view of the operational benefits of implementing a new EDRM system at the same time for the new joint service and the savings in costs by addressing Technical Services requirements it is considered that there is a strong business case for Adur purchasing info@work at this time. The above figures also demonstrate the strong invest to save case in relation to maintenance. Currently Adur is paying 24,000 per annum just for the Planning and Building Control services towards the annual maintenance costs for R/KYV system whilst info@work would have an annual maintenance charge of 11,304 for Planning, Building Control and Technical Services. It is anticipated that the additional costs for Legal & Democratic Services would not be substantial Research by your officers into the current Legal Agreement between Mid Sussex District Council, on behalf of Census Revenues and Benefits, and Northgate/Anite has shown that the contract cannot be extended to services other than Revenues and Benefits, nor can it be extended to Authorities other than Mid Sussex. The current Agreement provides for EDRMS on three sites but not for three Authorities Whilst the Framework Agreement arranged by Buying Solutions from which the current Agreement with Mid Sussex was called-off has ceased, enquiries have shown that there is a current Framework Agreement between Buying Solutions and a number of suppliers, including Northgate/Anite for the provision of EDRMS.

5 The details of the lot are provides document and records management solutions which may include solution identification, design, development, implementation, data take-on, migration, integration and security; user training, maintenance and support as part of a wider solution. It may also cover the prototyping, configuring or tailoring of existing products and also include some goods and services as part of a wider solution and it, therefore, appears that the Council can, subject to the provision of a valid business case to show that Northgate/Anite is the appropriate supplier to approach, call-off a contract from this Framework Agreement with Northgate/Anite. 4.0 Legal Implications 4.1. EU Procurement Regulations which have been adopted in the Public Contract Regulations 2006 provide that where one or more Local Authority seeks to procure goods or services to a value exceeding 156,442 over the life of a contract, they must comply with the Regulations. If the Councils were required to comply fully with the Regulations, this would add several months on to the procurement process The Office of Government Commerce (OGC) has sought to assist the Local Authorities and other public bodies by advertising and entering into Framework Agreements in accordance with EU Regulations which allow Local Authorities to either carry out mini competitions with three or four suppliers within the Framework Agreement or, if a suitable business case is made by the Local Authority, allow the Local Authority to call-off from the frameworker contract with a single supplier Buying Solutions has set up software application solutions which is a Framework Agreement aimed at providing UK public sector customers with a means of acquiring information and communications technology solutions from best of breed suppliers, to enable them to address specific ICT business objectives and targets. The services under the framework have been broken down and include: Lot 3 Document and Management Solutions Provides document and records management solutions which may include solution identification, design, development, implementation, data take-on, migration, integration and security; user training, maintenance and support as part of a wider solution. It may also cover the prototyping, configuring or tailoring of existing products and also include some goods and services as part of a wider solution. The framework is legally compliant with the new EU Procurement Directives as well as UK Procurement Regulations. 4.4 Under the Framework Agreement, the Councils may order directly from the online catalogue, without having to invite tenders, if they can satisfy the following criteria: (a) They are selecting suppliers solely on the basis of the information provided in the online catalogue, and that information enables them (and anyone

6 else reviewing your decision) to clearly identify the supplier that offers you best value for money; and (b) The Councils do not need to either supplement or refine the existing terms and conditions. Therefore, provided the Councils can produce a strong business case for Anite/Northgate, they can go directly to that company. A robust business case has been now prepared which would justify an approach to this supplier. 4.5 The Councils may, under Section 111 of the Local Government Act 1972, do anything (whether or not involving the expenditure, borrowing or lending of money or the acquisition or disposal of any new property or rights) which is calculated to facilitate or is conductive, or incidental to, the discharge of any of their functions. 4.6 The Local Government (Contracts) Act 1997 confers power on Local Authorities to enter into contract with other persons with the provision or making available of assets or services, or both, (whether or not together with goods) for the purposes of, or in connection with, the discharge of the functions of the Local Authorities. 5.0 Finance Implications 5.1. In view of the importance of EDRM deployment to Planning Services, 190,000 of Planning Delivery Grant was allocated by Worthing Borough Council for the provision of EDRM systems in Worthing and the overall capital budget currently available in Worthing, is 340,000. The capital provision is therefore sufficient to make the appropriate contribution to Adur District Council to purchase info@work for Planning Building Control and Technical Services. In line with the division of other costs between the partnership, the capital costs would need to be split 60/40 (Worthing/Adur) The revenue costs of EDRM deployment would have to be met from existing resources but it should be noted that there are already significant revenue costs associated with the Opentext R/KYV solution for Planning Services in Adur. As mentioned previously Adur is already tied into a maintenance contract for the Opentext R/KYV solution and this does not expire until October It is likely therefore that this cost ( 24,000 per annum) would have to be met until the expiry of the contract. However, the benefits of providing EDRMS outweigh this concern particularly given the significant reduction in maintenance costs for the future and the operational benefits for the joint services of Planning and Technical Services. 6.0 Recommendation 6.1. That Worthing agrees to purchase an EDRM system for Planning, Building Control and Technical Services from Anite/Northgate out of the existing EDRMS Capital Programme.

7 Local Government Act 1972 Background Papers: Buying Solutions Framework Agreement Contact Officer: James Appleton, Head of Planning, Regeneration and Wellbeing Ext 1333

8 Schedule of other matters (To be completed on all reports. If no issues are identified under a heading then it should read "Matter considered and no issues identified." ) 1.0 Council Priority 1.1 To protect and improve priority services 2.0 Specific Action Plans 2.1. Adur and Worthing Partnership Blueprint 3.0 Sustainability Issues 3.1 Reduction in use of paper based materials 4.0 Equality Issues 4.1 Matter considered and no issues identified. 5.0 Community Safety issues (Section 17) 5.1 Matter considered and no issues identified. 6.0 Human Rights Issues 6.1 Matter considered and no issues identified. 7.0 Reputation 7.1 Improved services will enhance the reputation of the Councils. 8.0 Consultations 8.1 Matter considered and no issues identified 9.0 Risk assessment 9.1 Not implementing a new EDRMS for Technical Services would lead to a diminution in service when current system fails Use of incorrect procurement method. Likelihood Medium Consequences serious Amelioration follow advice and use new procurement Health & Safety Issues 10.1 Matter considered and no issues identified Procurement Strategy

9 11.1 The report deals with procurement issues Partnership working The report relates to partnership working across Adur DC and Worthing BC as well as wider issues relating to the CenSus Partnership. The proposals will enhance joint working in Planning Services.

10 : 20 th September 2010 Agenda Item 7 Ward: N/A Purchase of Corporate Electronic Document Records and Management System (EDRMS) Report by the Executive Head of Planning, Regeneration and Wellbeing 1.0 Update ADDENDUM 1.1 Since the Overview and Scrutiny Committee, further negotiations with Anite/Northgate have continued around the scope for entering into an Enterprise Licence Agreement which would enable all services across Adur and Worthing and other Census partners to make use of the info@work software As Anite/Northgate can see significant benefits with its product being rolled out across a number of different service areas it has offered a very competitive price for an enterprise licence on the basis that the Council purchases the Planning/Technical Service modules and software to assist Environmental Health deal with address matching requirements necessary to form a joint service. The table below sets out the current costs and conditions (one of which is that contracts are signed by the 31 st October 2010). Description Capital Annual Service & Maintenance Enterprise licence for Adur, Worthing, Horsham & Mid Sussex 105,000 21,000 Less DC & BC agreement -26,250 Less address matching & DFT Software -7,500 Offer Price 71,250 14,250 Notes Enterprise licence is based on up to 1200 users Includes the corporate upgrade usage of modules already purchased This is based on the assumption that the DC & BC contract is signed This offer is also based on the assumption that the DFT & address matching software is contracted for Based on signed contracts by the 31st October 2010 All Existing CenSus and Worthing Revs/Bens annual charges remain 20 Septembe 2010 Agenda item: 7 Addendum to Report

11 1.3 As the above table demonstrates by entering into an Enterprise Licence Agreement with Anite/Northgate, the company is offering a reduction in the cost of the Planning and Building Control modules of 26,000 and 7,500 for the Environmental Health Software. In addition, Anite/Northgate is offering free upgrades to the Planning modules and the ability for Mid-Sussex and Horsham to utilise the Planning and Building Control modules if it decides to move away from Opentext in the future. If this happens there would be scope to recover some of these initial costs from our Census partners Your Officers have also received a draft contract for the provision of info@work for Planning, Building Control and Technical Services and the updated costs vary slightly from the agenda report with the total capital costs being 133,574 (previously 127,164) and the annual maintenance charge slightly less 10,500 (previously 11,304). 2.0 Revised Recommendation 2.1. That Worthing agrees to purchase info@work EDRM system from Anite/Northgate for the Planning, Building Control and Technical Services groups as well as an Enterprise Licence out of the existing EDRMS capital programme. Local Government Act 1972 Background Papers: Buying Solutions Framework Agreement Contact Officer: James Appleton, Head of Planning, Regeneration and Wellbeing Ext 1333 James.appleton@worthing 20 Septembe 2010 Agenda item: 7 Addendum to Report

The ESCC Framework Agreement - A Guide for Local Authorities

The ESCC Framework Agreement - A Guide for Local Authorities POLICY & RESOURCES COMMITTEE Agenda Item 166 Brighton & Hove City Council Subject: Date of Meeting: 19 March 2015 Report of: Procurement of Schools Management Information Systems (MIS) Interim Executive

More information

Delegated Decisions of the Board Member, Finance and Efficiency

Delegated Decisions of the Board Member, Finance and Efficiency To: Delegated Decisions of the Board Member, Finance and Efficiency Date: 4 th November 2011 Item No: Report of: Title of Report: Head of Business Improvement Supply of an Integrated Land and Property

More information

Councillor David Chambers Date of Decision/Referral to O & S REPORT OF: STRATEGIC DIRECTOR (CORPORATE) SDC/08/37

Councillor David Chambers Date of Decision/Referral to O & S REPORT OF: STRATEGIC DIRECTOR (CORPORATE) SDC/08/37 REPORT TO INDIVIDUAL CABINET MEMBER FOR FINANCE, LEGAL AND ICT 20 MAY 2008 Key Decision YES Forward Plan Ref No Corporate Priority ALL Cabinet Portfolio Holder : Councillor David Chambers Date of Decision/Referral

More information

Agreement for the provision of IT Management Services and IT Services

Agreement for the provision of IT Management Services and IT Services Board Date: 26 March 2015 Item 16: Agreement for the provision of IT Management Services and IT Services This paper will be considered in public 1 Summary 1.1 This paper asks the Board to approve extended

More information

REQUEST FOR MAYORAL DECISION MD405. Title: Disaster Recovery Services

REQUEST FOR MAYORAL DECISION MD405. Title: Disaster Recovery Services REQUEST FOR MAYORAL DECISION MD405 Title: Disaster Recovery Services Executive Summary: In May 2006, the GLA entered into an agreement with a recovery partner to offer immediate replacement IT equipment

More information

Project Athena Phase 1 Human Resources and Payroll

Project Athena Phase 1 Human Resources and Payroll Executive 14 November 2011 Report from the Director of Finance and Corporate Services Project Athena Phase 1 Human Resources and Payroll Wards Affected: [ALL] 1.0 Summary 1.1 This report concerns the transfer

More information

Officer Delegated Decision Report - Procurement. For All Procurement Awards, Waivers, Contract Extensions & Variations

Officer Delegated Decision Report - Procurement. For All Procurement Awards, Waivers, Contract Extensions & Variations G atew a y T h r ee For All Procurement Awards, Waivers, Contract Extensions & Variations Fuel Cards Payment Solutions Contract Requisition Number R000760 Wards All Report authorised by: (Enter name and

More information

Cabinet Member for Adult Social Care and Health ASCH04 (14/15)

Cabinet Member for Adult Social Care and Health ASCH04 (14/15) Cabinet Member for Adult Social Care and Health ASCH04 (14/15) Commissioning of Telecare as part of wider Assistive Technology Services for West Sussex July 2014 Report by Director of Public Health and

More information

CABINET. 24 March 2015

CABINET. 24 March 2015 CABINET 24 March 2015 Title: Procurement of Electricity and Gas Supplies Report of the Cabinet Member for Finance Open Report with Exempt Appendix 4 Wards Affected: All Report Author: Andrew Sivess Group

More information

CABINET. 19 January 2016. Accountable Divisional Director: Martin Rayson, Divisional Director for Human Resources and Organisational Development

CABINET. 19 January 2016. Accountable Divisional Director: Martin Rayson, Divisional Director for Human Resources and Organisational Development CABINET 19 January 2016 Title: Oracle R12 - Proposal to Extend Contract for Hosting and Support Report of the Cabinet Member for Finance and Central Services Open Report Wards Affected: None Report Author:

More information

FUNDING APPROVAL FOR IMPLEMENTATION OF CLOUD-BASED PRODUCTIVITY AND COLLABORATION TOOLS (OFFICE 365)

FUNDING APPROVAL FOR IMPLEMENTATION OF CLOUD-BASED PRODUCTIVITY AND COLLABORATION TOOLS (OFFICE 365) London Borough of Hammersmith & Fulham CABINET 2 NOVEMBER 2015 FUNDING APPROVAL FOR IMPLEMENTATION OF CLOUD-BASED PRODUCTIVITY AND COLLABORATION TOOLS (OFFICE 365) Report of the Leader - Councillor Stephen

More information

Portfolio: Transformation, Modernisation and Regulation

Portfolio: Transformation, Modernisation and Regulation Portfolio: Transformation, Modernisation and Regulation Procurement Committee 19 October 2006 Procurement of E-mail, Calendar and Archiving System Report by: Ward Implications: Head of City Service and

More information

Badger BC. Investments Ltd. Business Plan 2014 2017. A wholly owned subsidiary of Broxbourne Borough Council

Badger BC. Investments Ltd. Business Plan 2014 2017. A wholly owned subsidiary of Broxbourne Borough Council Badger BC Investments Ltd Business Plan 2014 2017 A wholly owned subsidiary of Broxbourne Borough Council Contents Summary 3 Governance and management structure 4 Rights, obligations and decision making

More information

Report to: Executive Date: 1 December 2014 Report for: Decision Report of: The Executive Member for Finance and the Director of Finance

Report to: Executive Date: 1 December 2014 Report for: Decision Report of: The Executive Member for Finance and the Director of Finance TRAFFORD COUNCIL Report to: Executive Date: 1 December 2014 Report for: Decision Report of: The Executive Member for Finance and the Director of Finance Report Title CAPITAL INVESTMENT PROGRAMME MONITORING

More information

SUBJECT: REPLACEMENT OF CORPORATE ELECTRONIC DATA STORAGE, BACKUP AND DISASTER RECOVERY SOLUTIONS

SUBJECT: REPLACEMENT OF CORPORATE ELECTRONIC DATA STORAGE, BACKUP AND DISASTER RECOVERY SOLUTIONS REPORT TO CABINET TO BE HELD ON 15 SEPTEMBER 2015 Key Decision No Forward Plan Ref No 23K Corporate Priority The proposals in this report contribute to the delivery of all the Council s priorities Cabinet

More information

DRAFT V5. PFSC 16/05/2014 Appendix 1. Outline Plan to deliver the County Council s investment property Strategy

DRAFT V5. PFSC 16/05/2014 Appendix 1. Outline Plan to deliver the County Council s investment property Strategy PFSC 16/05/2014 Appendix 1 Outline Plan to deliver the County Council s investment property Strategy 1. Strategic Drivers 1.1 The County Council s property investment strategy sets out how its property

More information

ELECTRONIC DOCUMENT AND RECORDS MANAGEMENT SYSTEM REPORT OF THE HEAD OF INFORMATION MANAGEMENT AND TECHNOLOGY

ELECTRONIC DOCUMENT AND RECORDS MANAGEMENT SYSTEM REPORT OF THE HEAD OF INFORMATION MANAGEMENT AND TECHNOLOGY CAB2304 FOR DECISION WARD(S): GENERAL CABINET 13 June 2012 ELECTRONIC DOCUMENT AND RECORDS MANAGEMENT SYSTEM REPORT OF THE HEAD OF INFORMATION MANAGEMENT AND TECHNOLOGY Contact Officer: Tony Fawcett Tel

More information

LIST OF BACKGROUND PAPERS AS REQUIRED BY LAW (papers relied on to write the report but which are not published and do not contain exempt information)

LIST OF BACKGROUND PAPERS AS REQUIRED BY LAW (papers relied on to write the report but which are not published and do not contain exempt information) 9 COMMITTEE: EXECUTIVE REF NO: E/14/43 DATE: 7 OCTOBER 2014 SUBJECT: CUSTOMER ACCESS STRATEGY 2013-16: CUSTOMER RELATIONSHIP MANAGEMENT SYSTEM (CRM) REPLACEMENT PORTFOLIO HOLDER: COUNCILLOR NEIL MACDONALD

More information

NORTH LANARKSHIRE COUNCIL

NORTH LANARKSHIRE COUNCIL NORTH LANARKSHIRE COUNCIL To: POLICY AND RESOURCES (FINANCE & CUSTOMER SERVICES) SUB- COMMITTEE From: HEAD OF E-GOVERNMENT & SERVICE DEVELOPMENT Subject: PROCUREMENT OF MICROSOFT SOFTWARE LICENSES FOR

More information

Commissioning Strategy

Commissioning Strategy Commissioning Strategy This Commissioning Strategy sets out the mechanics of how Orkney Alcohol and Drugs Partnership (ADP) will implement its strategic aims as outlined in the ADP Strategy. Ensuring that

More information

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective

More information

State-wide Public Library Management System Technology Capabilities. Business Case. Version 2.0

State-wide Public Library Management System Technology Capabilities. Business Case. Version 2.0 State-wide Public Library Management System Technology Capabilities Business Case Version 2.0 Public Library Services File Number: PLS 046/2009 1 EXECUTIVE OVERVIEW 1.1 Introduction Currently two major

More information

1.1 Approve the proposals for the roll-out of the new telephone system as set out in this report.

1.1 Approve the proposals for the roll-out of the new telephone system as set out in this report. APPENDIX L Agenda Item No. 13 REPLACEMENT OF TELEPHONE SYSTEM Councillor Cartwright Leader of the Council 1.0 Purpose The purpose of this paper is to recommend the progressive roll-out of new telephone

More information

Cambridge City Council

Cambridge City Council Cambridge City Council Item To: Report by: Relevant scrutiny committee: Wards affected: Executive Councillor for Customer Services and Resources James Nightingale, Head of ICT Client Services Strategy

More information

WELFARE REFORM COMMITTEE WELFARE FUNDS (SCOTLAND) BILL SUBMISSION FROM COMMUNITY RESOURCES NETWORK SCOTLAND

WELFARE REFORM COMMITTEE WELFARE FUNDS (SCOTLAND) BILL SUBMISSION FROM COMMUNITY RESOURCES NETWORK SCOTLAND WELFARE REFORM COMMITTEE WELFARE FUNDS (SCOTLAND) BILL SUBMISSION FROM COMMUNITY RESOURCES NETWORK SCOTLAND A. Background to CRNS 1. Community Resources Network Scotland (CRNS) represents re-use, recycling

More information

Page 97. Executive Head of Asset Planning, Management and Capital Delivery

Page 97. Executive Head of Asset Planning, Management and Capital Delivery Page 97 Agenda Item 7 Report to: Strategy and Resources Committee Date: 16 December 2013 Report of: Executive Head of Asset Planning, Management and Capital Delivery Ward Location: Not applicable Author

More information

HERTSMERE BOROUGH COUNCIL EXECUTIVE. Urgency: The proposals are not exempt from call-in on PLANNING IMPROVEMENT PROGRAMME REPLACEMENT SOFTWARE

HERTSMERE BOROUGH COUNCIL EXECUTIVE. Urgency: The proposals are not exempt from call-in on PLANNING IMPROVEMENT PROGRAMME REPLACEMENT SOFTWARE HERTSMERE BOROUGH COUNCIL EXECUTIVE PART 1 Agenda Item No 8.1 Document Reference No EX/12/45 Date of Meeting / Decision: 7 November 2012 This is a key decision. the grounds of urgency. Urgency: The proposals

More information

Agenda Item No: 2 Page Numbers: 1-6 EAST RIDING OF YORKSHIRE COUNCIL THE CABINET 1 FEBRUARY 2011

Agenda Item No: 2 Page Numbers: 1-6 EAST RIDING OF YORKSHIRE COUNCIL THE CABINET 1 FEBRUARY 2011 Report to: The Ca binet To appr ove as a correct record the Minutes of t he meeting of The Cabinet held on 1 Febr uary 2011 Contact Officer: 01 March 2011 Iain Edmiston Senior Committee Manager Telephone

More information

Aberdeen City Council

Aberdeen City Council Aberdeen City Council Internal Audit Report Final Contract management arrangements within Social Care & Wellbeing 2013/2014 for Aberdeen City Council January 2014 Internal Audit KPI Targets Target Dates

More information

CenSus ICT Strategy (2012 2015)

CenSus ICT Strategy (2012 2015) CenSus ICT Strategy (2012 2015) Date: September 2012 Version: 5.0 Version Control Amendment History including Author: Version Date Author / Amendment History 1.0 Draft 30 th August 2012 Graham Crossingham

More information

To be used in conjunction with the Invitation to Tender for Consultancy template.

To be used in conjunction with the Invitation to Tender for Consultancy template. GUIDANCE NOTE Tendering for, choosing and managing a consultant Using this guidance This information is not intended to be prescriptive, but for guidance only. Appointing consultants for relatively small

More information

Authority to Award Contract for the Supply of ACD Call Centre Software for Customer Services

Authority to Award Contract for the Supply of ACD Call Centre Software for Customer Services Cabinet 29 June 2015 Report from the Chief Operating Officer Wards Affected: ALL Authority to Award Contract for the Supply of ACD Call Centre Software for Customer Services 1.0 Summary 1.1 This report

More information

Digital Inclusion Programme Started. BL2a

Digital Inclusion Programme Started. BL2a PROJECT BRIEF Project Name Digital Inclusion Programme Status: Started Release 18.05.2011 Reference Number: BL2a Purpose This document provides a firm foundation for a project and defines all major aspects

More information

Cork City Council CORPORATE PROCUREMENT PLAN

Cork City Council CORPORATE PROCUREMENT PLAN Cork City Council CORPORATE PROCUREMENT PLAN 2008 2010 Foreword Cork City Council is committed to delivering excellent quality services. The role a strategic approach to procurement has in achieving such

More information

Project acronym: Open Source software usage by European Public Administrations

Project acronym: Open Source software usage by European Public Administrations Project acronym: OSEPA Project name: Open Source software usage by European Public Administrations Project code: INTERREG IVC, 0918R2 Document Information: Document title: Interim synthesis assessment

More information

SUBJECT: FRAMEWORK AGREEMENT FOR THE PROVISION OF VIDEO CONFERENCING EQUIPMENT

SUBJECT: FRAMEWORK AGREEMENT FOR THE PROVISION OF VIDEO CONFERENCING EQUIPMENT REPORT TO INDIVIDUAL CABINET MEMBER FOR FINANCE, LEGAL AND ICT 29 FEBRUARY Key Decision YES Forward Plan Ref No Corporate Priority ALL Cabinet Portfolio Holder: Date of Decision/ Referral to O&S Cllr David

More information

Questionnaire. Financial Safeguarding, Assessment and Advice Services for Adults

Questionnaire. Financial Safeguarding, Assessment and Advice Services for Adults Page Appendix 1 of 5 B Questionnaire Financial Safeguarding, Assessment and Advice Services for Adults Along with other local authorities across the country, West Sussex County Council is facing severe

More information

Project Initiation Document

Project Initiation Document Project Sponsor: Richard Ellis Version: 1.0 Date: 2 nd July 2009 Document Control Project Sponsor Richard Ellis Project Initiation Document Project Call Recording and Workforce Management Document PID

More information

HIGHLANDS AND ISLANDS PATHFINDER BROADBAND PROCUREMENT: APPOINTMENT OF PREFERRED SUPPLIER

HIGHLANDS AND ISLANDS PATHFINDER BROADBAND PROCUREMENT: APPOINTMENT OF PREFERRED SUPPLIER ARGYLL AND BUTE COUNCIL STRATEGIC POLICY COMMITTEE CHIEF EXECUTIVE 20 JULY 2006 HIGHLANDS AND ISLANDS PATHFINDER BROADBAND PROCUREMENT: APPOINTMENT OF PREFERRED SUPPLIER 1 SUMMARY This report updates the

More information

Replacement of ICT Systems (Software) Used Exclusively within the Environmental Services Department (Highways and Transport, Technology and Recycling)

Replacement of ICT Systems (Software) Used Exclusively within the Environmental Services Department (Highways and Transport, Technology and Recycling) Agenda Item No Derbyshire County Council Cabinet Meeting 7 March 2011 Joint Report of the Strategic Director Environmental Services and the Director of Transformation Replacement of ICT Systems (Software)

More information

Page 131. London Borough of Sutton The Executive - 6 July 2010 Report of the Chief Executive and the Strategic Director - Resources

Page 131. London Borough of Sutton The Executive - 6 July 2010 Report of the Chief Executive and the Strategic Director - Resources Page 131 Agenda Item 14 London Borough of Sutton The Executive - 6 July 2010 Report of the Chief Executive and the Strategic Director - Resources Re-commissioning and amalgamation of Sutton and Merton

More information

REQUEST FOR MAYORAL DECISION MD670. Title: Storage Area Network Maintenance Contract

REQUEST FOR MAYORAL DECISION MD670. Title: Storage Area Network Maintenance Contract REQUEST FOR MAYORAL DECISION MD670 Title: Storage Area Network Maintenance Contract Executive Summary: Approval is sought for the award of a two-year contract (with provision for the extension of the contract

More information

Cabinet Portfolio Holder

Cabinet Portfolio Holder REPORT TO CABINET TO BE HELD ON 18 JANUARY 2011 Key Decision Forward Plan Ref No YES N/A Corporate Priority: To improve the performance of our Services and ensuring they provide Value for Money Cabinet

More information

AWARD OF CONTRACT MAINTENANCE AND UPGRADE OF THE HIGHWAYS ASSET MANAGEMENT SYSTEM (REF: CU2373)

AWARD OF CONTRACT MAINTENANCE AND UPGRADE OF THE HIGHWAYS ASSET MANAGEMENT SYSTEM (REF: CU2373) Wards Affected: All Wards ITEM 9 CABINET PROCUREMENT COMMITTEE 5 AUGUST 2014 AWARD OF CONTRACT MAINTENANCE AND UPGRADE OF THE HIGHWAYS ASSET MANAGEMENT SYSTEM (REF: CU2373) Author: Rachael Kingsley, Head

More information

Financial and Commercial Services HIRE OF MANAGEMENT IT/IS CONSULTANTS

Financial and Commercial Services HIRE OF MANAGEMENT IT/IS CONSULTANTS Financial and Commercial Services HIRE OF MANAGEMENT IT/IS CONSULTANTS Table of Contents Contents INTRODUCTION... 2 1. DEFINING MANAGEMENT CONSULTANCY... 2 2. KEY SUCCESS FACTORS... 3 3. THE PROJECT APPROACH

More information

Procurement and Contract Management Strategy 2013-2017

Procurement and Contract Management Strategy 2013-2017 Procurement and Contract Management Strategy 2013-2017 Title Owner Version 1 Distribution Procurement and Contract Management Strategy 2013 2017 Procurement and Performance Manager Corporate Issue date

More information

IMPLEMENTATION DETAILS

IMPLEMENTATION DETAILS Policy: Title: Status: 1. Introduction ISP-I11 Software License Regulations Approved Information Security Policy Documentation IMPLEMENTATION DETAILS 1.1. The Software Management Policy (ISP-S13) makes

More information

Cabinet Member for Business, Skills and Housing. Title: Purchase of Communal Electricity and Gas 2014/15

Cabinet Member for Business, Skills and Housing. Title: Purchase of Communal Electricity and Gas 2014/15 Decision Maker: Cabinet Member for Business, Skills and Housing Date: 13 January 2014 Classification: General Release Title: Purchase of Communal Electricity and Gas 2014/15 Wards Affected: Better City,

More information

Report To: Policy & Resources Committee Date: 12 August 2014. Contact Officer: Robert Stoakes Contact No: 2765

Report To: Policy & Resources Committee Date: 12 August 2014. Contact Officer: Robert Stoakes Contact No: 2765 AGENDA ITEM NO: 13 Report To: Policy & Resources Committee Date: 12 August 2014 Report By: Acting Corporate Director Environment, Regeneration and Resources Report No: ICT 12-8-14 Web CMS Renewal Contact

More information

All reports. 1. Governance Service receive draft report Name of GSO Andrew Charlwood

All reports. 1. Governance Service receive draft report Name of GSO Andrew Charlwood DELEGATED POWERS REPORT NO. SUBJECT: Children s Centre Management Information System - Retender Control sheet All of the following actions MUST be completed at each stage of the process and the signed

More information

You will assist the executive directors as required in their dealings with shareholders.

You will assist the executive directors as required in their dealings with shareholders. [Date] [Name/address] Dear [Name], Appointment as a Non-Executive Chairman of Johnston Press plc ( the Company ) Following the recommendation of the Nomination Committee, I write to confirm your re-appointment

More information

Supplier & Contract Management System (SCMS)

Supplier & Contract Management System (SCMS) Meeting of the Executive Member for Corporate Services and Advisory Panel 30 October 2007 Report of the Assistant Director Audit and Risk Management Supplier & Contract Management System (SCMS) Summary

More information

8. DIGITAL BY DESIGN - CUSTOMER RELATIONSHIP MANAGEMENT SYSTEM

8. DIGITAL BY DESIGN - CUSTOMER RELATIONSHIP MANAGEMENT SYSTEM 8. DIGITAL BY DESIGN - CUSTOMER RELATIONSHIP MANAGEMENT SYSTEM REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF DIGITAL AND CUSTOMER SERVICES Simon Hughes, Head of Digital and

More information

LONDON BOROUGH OF WALTHAM FOREST

LONDON BOROUGH OF WALTHAM FOREST LONDON BOROUGH OF WALTHAM FOREST Meeting / Date Cabinet 13 th November 2012 Agenda Item 10 Report Title Cabinet Portfolio Report Author/ Contact details Wards affected Public Access Appendices OneSAP ERP

More information

EXECUTIVE CENTRAL BUSINESS DISTRICT - FOUR STAR HOTEL DEVELOPMENT

EXECUTIVE CENTRAL BUSINESS DISTRICT - FOUR STAR HOTEL DEVELOPMENT Report to: EXECUTIVE Relevant Officer: Steve Thompson, Director for Resources Relevant Cabinet Member Councillor S. Blackburn, Leader of the Council Date of Meeting 6 th October 2014 CENTRAL BUSINESS DISTRICT

More information

Officer Delegated Decision Report - Procurement

Officer Delegated Decision Report - Procurement G a t e w a y T h r e e For all procurement awards, waivers, contract extensions and variations Upgrade to NICE call recording system in the Lambeth Service Centre to deliver NICE Perform Analytics Release

More information

The Provision of a new Innovation and Business Support Centre at Northbrook College

The Provision of a new Innovation and Business Support Centre at Northbrook College 7 th July 2015 Agenda Item 13 Ward: [Insert details] The Provision of a new Innovation and Business Support Centre at Northbrook College Report by the Director for the Economy 1.0 Summary 1.1 This report

More information

KIRKLEES COUNCIL CONTRACT PROCEDURE RULES

KIRKLEES COUNCIL CONTRACT PROCEDURE RULES KIRKLEES COUNCIL CONTRACT PROCEDURE RULES JUNE 2012 CONTRACT PROCEDURE RULES DEFINITIONS Assets CPRs Director Disposal EU Procurement Rules EU Threshold/ (*) FPRs Framework Agreement All property of whatever

More information

Request for Quotation (RfQ028) Customer Relationship Management System (CRM)

Request for Quotation (RfQ028) Customer Relationship Management System (CRM) Request for Quotation (RfQ028) Customer Relationship Management System (CRM) Kings Road, Plymouth, PL1 5QG Issued: Request for Quotation P a g e 2 Confidentiality Statement This document, and any attachments

More information

Duty Solicitor Call Centre and CDS Direct Expansion

Duty Solicitor Call Centre and CDS Direct Expansion Duty Solicitor Call Centre and CDS Direct Expansion March 2007 Contents Section: Page Number: Introduction and Background 3 The Carter Review 5 The Current System 6 The Need For Change 7 The Proposal 8

More information

The annual total cost to Lambeth is approximately 100k. Introduction of this surcharge provides a cost saving of 100K per annum.

The annual total cost to Lambeth is approximately 100k. Introduction of this surcharge provides a cost saving of 100K per annum. b Officer delegated decisions August 2012 Implementation of credit card surcharges All Wards Report authorised by: Mike Suarez - Executive Director of Finance & Resources. Executive summary As part of

More information

MPA/MPS PROCUREMENT STRATEGY 2009-12 TO BE THE UK LEADER IN PUBLIC SECTOR PROCUREMENT

MPA/MPS PROCUREMENT STRATEGY 2009-12 TO BE THE UK LEADER IN PUBLIC SECTOR PROCUREMENT MPA/MPS PROCUREMENT STRATEGY 2009-12 TO BE THE UK LEADER IN PUBLIC SECTOR PROCUREMENT CONTENTS Foreword ------------------------------------------------------------------------ 3 Executive Summary ---------------------------------------------------------

More information

Rate Regulation Mechanisms for Cable and MMDS Television Operators

Rate Regulation Mechanisms for Cable and MMDS Television Operators Rate Regulation Mechanisms for Cable and MMDS Television Operators Report on consultation process Document No. ODTR 00/56 August 2000 Oifig an Stiúrthóra Rialála Teileachumarsáide Office of the Director

More information

BUSINESS COST SAVINGS SCHEME

BUSINESS COST SAVINGS SCHEME BUSINESS COST SAVINGS SCHEME START SAVING WITH SHREWSBURY BID Shrewsbury BID is working to make doing business in Shrewsbury easier with the introduction of a new scheme which uses the collective buying

More information

Contract Standing Orders and Procedure - A Guide For Council Employees

Contract Standing Orders and Procedure - A Guide For Council Employees Hampshire County Council Constitution Part 3:F Contract Standing Orders 1. Interpretation 2. Status of, and Compliance with, Contract Standing Orders 3. Approval to Commence Procurement 4. Contract Value

More information

CENSUS JOINT COMMITTEE (CENTRAL SUSSEX PARTNERSHIP) 21 st June 2013

CENSUS JOINT COMMITTEE (CENTRAL SUSSEX PARTNERSHIP) 21 st June 2013 CENSUS JOINT COMMITTEE (CENTRAL SUSSEX PARTNERSHIP) 21 st June 2013 Present: Councillor Helena Croft, Horsham District Council Tom Crowley, Chief Executive, Horsham District Council Tim Delany, Head of

More information

Cllr Ray Theodoulou. Yes Lead Member report dated 18 th March 2013 Tender documents Draft Contracts from the framework

Cllr Ray Theodoulou. Yes Lead Member report dated 18 th March 2013 Tender documents Draft Contracts from the framework IT Managed Services/SAP Support Services Contract Cabinet Date 10th July 2013 Finance and Change Cllr Ray Theodoulou Key Decision Background Document Location/Contact for inspection of Background Documents

More information

Manchester City Council Report for Information. Resources and Governance Overview and Scrutiny Committee- 15 December 2011

Manchester City Council Report for Information. Resources and Governance Overview and Scrutiny Committee- 15 December 2011 Manchester City Council Report for Information Report To: Subject: Report of: Resources and Governance Overview and Scrutiny Committee- 15 December 2011 Contract Management City Treasurer Summary This

More information

ACTION TAKEN BY CABINET MEMBER (EXECUTIVE FUNCTION) 3 July 2013

ACTION TAKEN BY CABINET MEMBER (EXECUTIVE FUNCTION) 3 July 2013 ACTION TAKEN BY CABINET MEMBER (EXECUTIVE FUNCTION) Subject Cabinet Member StreetScene Parking Service Credit and Debit Card Machine Roll Out Cabinet Member for the Environment Date of Decision 3 July

More information

Councillor K Chambers Personnel & Business Support

Councillor K Chambers Personnel & Business Support Agenda item 18 Cabinet 4 February 2015 Tendering for replacement mobile phone contract Portfolio: Councillor K Chambers Personnel & Business Support Related portfolios: All Service: Wards: Key decision:

More information

Consultancy Project. Procurement Review. Leonard Cheshire Disability. March 2010

Consultancy Project. Procurement Review. Leonard Cheshire Disability. March 2010 Consultancy Project Procurement Review Leonard Cheshire Disability March 2010, Registration No. 06819590 1 Procurement Review - Objective Broadband Service Executive Summary Review current arrangements

More information

Agency Board Meeting 28 July 2015

Agency Board Meeting 28 July 2015 SEPA 22/15 Agency Board Meeting 28 July 2015 Report Number: SEPA 22/15 Audit Committee Annual Performance Report 2014-2015 Summary: Risks: Resource and Staffing Implications Equalities: Environmental and

More information

Gary Cooke, Cabinet Member for Corporate and Democratic Services

Gary Cooke, Cabinet Member for Corporate and Democratic Services From: Gary Cooke, Cabinet Member for Corporate and Democratic Services David Cockburn, Corporate Director of Business Strategy & Support To: Subject: Classification: Past Pathway of Paper: Future Pathway

More information

PROCUREMENT MANAGER Support Services. Salary range 30,843 to 33,315 (Subject to Job Evaluation)

PROCUREMENT MANAGER Support Services. Salary range 30,843 to 33,315 (Subject to Job Evaluation) PROCUREMENT MANAGER Support Services Salary range 30,843 to 33,315 (Subject to Job Evaluation) We are looking to appoint an innovative Procurement Manager to advise and support client departments and identify

More information

HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE

HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE Item no: 7.4 Document Reference no: EX/13/73 Date of Meeting / Decision: 15 January 2014 This is not a key decision call-in on the grounds of urgency Urgency:

More information

1. Executive Summary. 2. Definitions

1. Executive Summary. 2. Definitions 1. Executive Summary The aim of this strategy is to explain the different facets of e-procurement and clearly set out how Procurement Lincolnshire will approach e-procurement. This document links with

More information

Implementation of the EU payment accounts directive: Consultation response

Implementation of the EU payment accounts directive: Consultation response Implementation of the EU payment accounts directive: Consultation response November 2015 Implementation of the EU payment accounts directive: Consultation response November 2015 Crown copyright 2015 This

More information

Rent to Buy 2015 to 2017

Rent to Buy 2015 to 2017 Rent to Buy 2015 to 2017 BIDDING PROSPECTUS September 2014 Rent to Buy Contents Page Number Ministerial Foreword 2 Chapter 1 Overview of the fund 3 Chapter 2 The funding model 4 Chapter 3 Bidding requirements

More information

QE Girls School - Site Upgrades

QE Girls School - Site Upgrades DELEGATED POWERS REPORT NO. 1486 SUBJECT: Acceptance of Quotation from UK Power Networks to upgrade the electrical supply to QE Girls School Control sheet All of the following actions MUST be completed

More information

London Borough of Bromley COMMISSIONING - PROPOSED TOTAL FACILITY MANAGEMENT CONTRACT

London Borough of Bromley COMMISSIONING - PROPOSED TOTAL FACILITY MANAGEMENT CONTRACT Report No. DRR14/089 London Borough of Bromley PART 1 - PUBLIC Decision Maker: Executive Date: 15 th October 2014 Decision Type: Non-Urgent Executive Key Title: COMMISSIONING - PROPOSED TOTAL FACILITY

More information

Proposal to commission The Language Shop to provide translation and interpretation services

Proposal to commission The Language Shop to provide translation and interpretation services Proposal to commission The Language Shop to provide translation and interpretation services What is The Language Shop? The Language Shop is the name of the London Borough of Newham s award winning translation

More information

Cabinet Member for Public Protection PP03 (11/12) Key Decision: Approval to Commence Procurement of Drug and

Cabinet Member for Public Protection PP03 (11/12) Key Decision: Approval to Commence Procurement of Drug and Cabinet Member for Public Protection PP03 (11/12) Key Decision: Approval to Commence Procurement of Drug and Yes Alcohol Treatment Services. Part I July 2011 Report by the Interim Director Joint Commissioning

More information

TRI-BOROUGH MANAGED SERVICES FINANCE AND HUMAN RESOURCES (TRANSACTIONAL SERVICES) Report of the Cabinet Member for Finance Councillor Max Schmid

TRI-BOROUGH MANAGED SERVICES FINANCE AND HUMAN RESOURCES (TRANSACTIONAL SERVICES) Report of the Cabinet Member for Finance Councillor Max Schmid London Borough of Hammersmith & Fulham CABINET 3 NOVEMBER 2014 TRI-BOROUGH MANAGED SERVICES FINANCE AND HUMAN RESOURCES (TRANSACTIONAL SERVICES) Report of the Cabinet Member for Finance Councillor Max

More information

CABINET June 2nd 2015 EXECUTIVE SUMMARY OF AGENDA ITEM 6

CABINET June 2nd 2015 EXECUTIVE SUMMARY OF AGENDA ITEM 6 CABINET June 2nd 2015 EXECUTIVE SUMMARY OF AGENDA ITEM 6 Report title: CUSTOMER AND STOCK DATABASE SYSTEM RENEWAL (LIBRARY MANAGEMENT SYSTEM) Wards affected: All Strategic Director: Alison Comley Report

More information

CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1

CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 PART 3G Contracts Standing Orders 2015/16 Definitions Aggregation is the combining together of the total contract value from separate contracts

More information

NWSCCG HQ, 58 Church Street, Weybridge, Surrey KT13 8DP Date: 14th September 2015. Procurement Services (ICES)

NWSCCG HQ, 58 Church Street, Weybridge, Surrey KT13 8DP Date: 14th September 2015. Procurement Services (ICES) Agenda Item: 14. Report Number: GB242-15 Venue: NWSCCG HQ, 58 Church Street, Weybridge, Surrey KT13 8DP Date: 14th September 2015 Meeting: Governing Body North West Surrey CCG Governing Body Title of Report

More information

Cloud (educational apps) software services and the Data Protection Act

Cloud (educational apps) software services and the Data Protection Act Cloud (educational apps) software services and the Data Protection Act Departmental advice for local authorities, school leaders, school staff and governing bodies October 2014 Contents 1. Summary 3 About

More information

SCRUTINY COMMITTEE ITEM 04 28 MARCH 2012

SCRUTINY COMMITTEE ITEM 04 28 MARCH 2012 SCRUTINY COMMITTEE ITEM 04 28 MARCH 2012 INTERNAL AUDIT PLAN Report of the: Director of Finance Contact: John Turnbull or Gillian McTaggart Urgent Decision?(yes/no) No If yes, reason urgent decision required:

More information

BLABY DISTRICT COUNCIL

BLABY DISTRICT COUNCIL BLABY DISTRICT COUNCIL Meeting: Cabinet Executive Date: 30 June 2008 Subject: Report of: Status: Telephone Replacement System Head of ICT Services Public 1. Purpose of Report 1.1 To seek authority to allocate

More information

Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14

Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Procedures for Tenders and Contracts October 2014 Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Huon Valley Council Procedures for Tenders and Contracts October 2014

More information

Nottingham City Council Delegated Decision

Nottingham City Council Delegated Decision Nottingham City Council Delegated Decision Reference Number: 1269 Author: Richard Allen Department: Resources Contact: Richard Allen (Job Title: Programme Manager, Email: richard.allen@nottinghamcity.gov.uk,

More information

0.00 2000 2001 2002 2003 2004 2005 Year

0.00 2000 2001 2002 2003 2004 2005 Year 1 Background 1.1 Healthcare organisations are increasingly generating and thus storing information in electronic format. This is an eclectic mix of Email, Microsoft Office Documents, Images as well as

More information

MAIDSTONE BOROUGH COUNCIL LEADER OF THE COUNCIL REPORT OF THE HEAD OF BUSINESS IMPROVEMENT

MAIDSTONE BOROUGH COUNCIL LEADER OF THE COUNCIL REPORT OF THE HEAD OF BUSINESS IMPROVEMENT MAIDSTONE BOROUGH COUNCIL LEADER OF THE COUNCIL REPORT OF THE HEAD OF BUSINESS IMPROVEMENT Report prepared by Steve Trigg Date Issued: 16 April 2008 1. MULTIFUNCTION DEVICES AND PRINT MANAGEMENT SOFTWARE

More information

Cabinet Member Finance and Resources. Procurement of Electricity and Gas Supplies

Cabinet Member Finance and Resources. Procurement of Electricity and Gas Supplies Cabinet Member Finance and Resources Procurement of Electricity and Gas Supplies Report by Executive Director Customers and Change Ref No. FR07(11/12) Key Decision Yes Part I Electoral Division N/A Executive

More information

Date: 26/01/2004. MEETING NAME Executive Delegation of award of energy supply contracts

Date: 26/01/2004. MEETING NAME Executive Delegation of award of energy supply contracts Item No. Classification: Open Report title: Ward(s) or groups affected: From: Date: 26/01/2004 MEETING NAME Executive Delegation of award of energy supply contracts ALL Assistant Chief Executive Strategy

More information

Manchester City Council Report for Resolution. Greater Manchester Housing Investment Fund. The Chief Executive, City Treasurer and City Solicitor

Manchester City Council Report for Resolution. Greater Manchester Housing Investment Fund. The Chief Executive, City Treasurer and City Solicitor Manchester City Council Report for Resolution Report to: Council 1 April 2015 Subject: Report of: Greater Manchester Housing Investment Fund The Chief Executive, City Treasurer and City Solicitor Purpose

More information

BT EDUCATION & LOCAL GOVERNMENT. Strategic Sourcing. Transforming Procurement in Local Government

BT EDUCATION & LOCAL GOVERNMENT. Strategic Sourcing. Transforming Procurement in Local Government BT EDUCATION & LOCAL GOVERNMENT Strategic Sourcing Transforming Procurement in Local Government Transforming the way things get done Strategic Sourcing: Value through joined-up purchasing BT is working

More information

Business Improvement Programme Framework

Business Improvement Programme Framework Finance and Policy Committee Date: 11 March 2015 Item 19: Business Improvement Programme Framework This paper will be considered in public 1 Summary 1.1 The Transport for London Business Improvement Programme

More information

Decisions 1. Permission to tender for a recruitment partner to supply 15 permanent social work practitioners with a contract value of 159,000.

Decisions 1. Permission to tender for a recruitment partner to supply 15 permanent social work practitioners with a contract value of 159,000. ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 28 th October 2015 Title Report of Wards Status Recruitment of Children s Social Work Practitioners Nicola Francis, Family Services Director All Public Enclosures

More information

Tri-Borough Cabinet Member Decision Report

Tri-Borough Cabinet Member Decision Report Tri-Borough Cabinet Member Decision Report Decision maker(s) at each authority and date of Cabinet meeting, Cabinet Member meeting or (in the case of individual Cabinet Member decisions) the earliest date

More information