Guidelines for designing a wood pellet storage facility
|
|
|
- Loren Spencer
- 9 years ago
- Views:
Transcription
1 Processing / Products No. 12 COFORD 2008 Guidelines for designing a wood pellet storage facility Translated by Pieter D. Kofman 1 These guidelines outline German industry recommendations for the location and construction of storage facilities for wood pellets. They are reproduced with permission of the German Energy Pellet Association. 2 General Danger: The quality of the fuel used will determine how well the pellet boiler functions. Only quality pellets produced according to CEN TS14961:2005 Table 5 are recommended for use as fuel. It is recommended that wood pellets are purchased only from suppliers that have certified quality fuel. Before filling the pellet storage room, the boiler must be switched off. The location of the pellet storage room Wood pellets are generally delivered by a silo truck, from which they are blown into the storage room. The silo truck should be able to come as close as possible to the filling connection, to minimise damage to the pellets during offloading. Silo trucks usually have pumping hoses that are a maximum of 30 m in length. Therefore, the pellet storage room (or the outside connectors or bag silo) should be situated a maximum of 30 m from the place where the truck can park. If the pumping hose has to be longer, the supplier should be consulted to clarify whether this can be accommodated. COFORD Arena House, Arena Road, Sandyford, Dublin 18, Ireland Telephone: [email protected] Access For transport and off-loading (through a pressure hose) of the pellets, the recommendation is to use hoses that have been coated with Teflon on the inside to reduce damage to the pellets. The entrance road should be at least 3 m wide with an unobstructed height of at least 4 m. If possible, the storage room should adjoin an outer wall, to allow access to the filling connectors from the outside. In any case, there should be enough room to manoeuvre while attaching the filling hose to the connectors. Care should be taken to ensure that the filling hose does not kink at the filling connector. The storage room must be easily accessible for necessary maintenance and cleaning work (see Figure 1). Construction of the storage room The size of the storage room An oblong/rectangular storage room has proven to be the best shape. The filling and exhaust connectors should be placed in the narrow side of the room. Good access to the connections is vital. The required size of the storage room depends on the heat load of the building, but should be large enough to store the total annual fuel requirement. If waste volume is taken into consideration, follow the rule of thumb given in Figures 2 and 3. 1 Danish Forestry Extension, Senior Consultant Wood for Energy. [email protected]. 2 This document was translated and adapted, with permission, from the publication Empfehlungen zur Lagerung von Holzpellets, produced by the Deutscher Energie-Pellet-Verband e.v. (DEPV), Germany (
2 A Extra equipment: 230 Volt electrical outlet for the exhaust ventilator of the pellet delivery and/or the cutoff switch of the boiler. B An alternative route for the filling pipes inside the building can shorten the required hose length. RULE OF THUMB: Per kw heating load = 0.9 m 3 storage space (including empty space) Useable storage space= 2 / 3 of the storage space 1 m 3 pellets 650 kg Energy content 5 kwh/kg or 18 MJ/kg Example: A single family house with a heating load of 15 kw = kg wood pellets/year 15 kw heating load x 0.9 m³/kw = 13.5 m³ storage space (incl. empty space) Useable storage space volume = 13.5 m³ x 2 / 3 = 9 m³ Amount of pellets = 9 m³ x 650 kg/m³ = kg ~ 6 t Size of pellet store = 13.5 m³ : 2.4 m (height of room) = 5.6 m² storage room surface (2 x 3 m minimum) Stored energy amount = kg x 5 kwh/kg = kwh (equals about 3,000 litre fuel oil) Figure 2
3 Figure 3. Useable volume of a pellet storage room (side view). Footprint of a pellet storage room.
4 Figure 5. Cross-section through a pellet storage room. Protection against moisture and water Concrete 10 cm; Pellets are hygroscopic. In contact with water or moist walls and floors, the pellets will swell and fall apart and become useless. Wet pellets can also block the infeed mechanism. Brick 17.5 cm thickness, plastered on both sides; Timber frame to standard, with skimmed plaster board to the inside. The pellet storage room must be dry throughout the year. In newly built houses the storage room must be allowed to fully dry out before it is filled. Normal air moisture, such as indoors, should not damage pellets. If there is a risk of moist walls (even temporarily) a special silo should be used. Structural requirements for the pellet store Warning: The walls around the store room should be designed for a weight load corresponding to a pellet bulk density of ~650 kg/m³). The ceiling and the walls should be constructed and finished so that contamination of the pellets does not occur by abrasion or crumbling. Thickness of walls In practice the following wall thicknesses 3 have proven to be sufficient: Equipment in the storage room Doors and hatches Doors and hatches should be sealed to prevent dust from entering other rooms. Doors and hatches should open to the outside and should have a dust-proof seal all the way round. Wooden planks must be used on the inside of doors or hatches to the pellet store so that the pellets do not touch the door or hatch. The door lock should be dust-proof sealed from the inside (Figure 6). Visual inspection facilities to check the degree of filling (e.g. dust-proof inspection holes in the wooden boards) are recommended. If possible, the door should be in the vicinity of the filling connector. This ensures that entry to the pellet store is available for a period during delivery, as the pellets will build up against the far wall when blown in. 3 Wall lengths of max. 5 m, height 2.5 m and well bonded to the floor and ceiling.
5 Impact protection mat It is essential to install an impact protection mat made of wear- and rip-proof material. The mat should be installed at right angles to the direction that pellets are blown in, close to the far wall opposite the filling connector. The mat should be inspected the first time the storage room is filled to see if it performs according to requirements. Inclined bottom The storage room should have an inclined base, constructed so that the silo will be emptied completely (Figure 7). The angle of the inclined base should be between 40 and 45 degrees, so that the pellets can slide down (Figure 7). The inclined base should be made of wooden sheet materials with a smooth surface (such as coated fibreboard or particle board. OSB sheets have a fairly rough surface and should be sanded smooth if used). The sides of the pellet removal conveyor should have no edges or grates that prevent the pellets from falling into it. The inclined base should be connected to the surrounding walls in such a way that no pellets can fall into the empty space (from which they usually cannot be retrieved). The inclined base should be able to cope with the static load of the weight of the pellets (bulk density ~650 kg/m³). A stable foundation is essential. Suitable angle irons can be used for the construction of the inclined base. There should be a maximum distance of cm between supports (Figure 7). The connection of the inclined base to the outfeed system should be made according to the instructions of the firm that has delivered the outfeed system. Noise protection The construction of the inclined base, the outfeed system, as well as the passages through walls, should be constructed in such a way that transfer of noise is prevented. The impact protection mat (e.g x 1500 mm) protects the pellets from being damaged on impact with the rear wall. The mat also protects the rear wall from damage. Examples of suitable impact protection: high density polyethyleen foil at least 1 mm thick, or wear-proof rubber with a thickness of 1-3 mm. Objects in the pellet storage room Any existing objects that cannot reasonably be removed from the storage room, such as sewage pipes, central heating system pipes, that may hinder the trajectory of the pellets during filling, should be shielded by sheet metal. Rectangular shielding should be avoided as this can damage the pellets. Electrical installations in the storage room Danger: Filling system There should be no electrical installations such as switches, lights, connectors in the pellet storage room. Filling and exhaust pipes A filling connector and an exhaust connector are needed in any pellet store. The function of the connectors should be clearly and permanently marked (e.g. wood pellets). Storz Type A have proven their worth as standard connectors for the delivery vehicle (see photo).
6 Figure 7. Danger: The filling connector should be connected to earth with a 1.5 mm² earth wire. The earth connection is needed to prevent the build up of an electrostatic charge during filling. Type of filling system Warning: Only metal pipes should be used for the filling system. The filling system should be earthed to prevent electrostatic charges. The connectors should be installed cm from the ceiling of the storage room (measured from the ceiling to the top of the connector). The filling pipe should protrude about 2% of the length of the pellet storage room. After a maximum of 50 cm, a connector for the filling pipe should follow (Figures 4 and 8). If the filling connector is situated in an air shaft, it should point in a straight line out of the shaft (Figure 8). The filling connector should be solidly fixed in place so that it cannot twist when the filling hose is connected. Pipes and bends should have a smooth inner surface to prevent damage to the pellets during filling. Items such as screws may not protrude into the pipe, as these may damage the pellets. The filling pipes should be as short as possible (not longer than 10 m) and should have as few changes of direction as possible. If the direction is changed by more than 45 degrees, only bends with a radius of more than 200 mm should be used. The filling pipe should not end in a bend, but in a straight pipe of at least 50 cm to let the pellets settle. The connector and the diameter of the exhaust air pipe should have the same dimensions as the filling pipe. After filling, the connectors should be closed with a proper lid.
7 Power outlet A power outlet with 230 V and a fuse of 16 A should be available outside the storage room for the pellet supplier. Customised filling system If a standard solution cannot be used, a customised solution can be found in consultation with a competent firm (Figure 9). Special equipment It is recommended that a house connection box be installed close to the filling connector. The house connection box should contain the 230 V power outlet for the exhaust ventilator of the pellet supplier. The box should be equipped with a door switch that can disconnect the boiler. This prevents smoke from being drawn from the boiler by the exhaust ventilator (Figure 1). Fire protection Fire protection requirements for the storage room Ensure that the local fire authority is consulted and that the building regulations are adhered to. Figure 9.
8 Checklist for the pellet storage room Floor and walls Are the floor and walls of the storage room dry?... yes no Presence of installations Are there lamps, switches, outlets or connection boxes etc. in the storage room?... yes no Are installations that cannot be removed from the storage room (electrical cords, sewage lines etc), sufficiently protected with a deflection shield?... yes no Filling pipe connector Are end covers present?... yes no Is there a safety sticker on the filling connection Warning: switch off installation before filling?... yes no Is the filling connector pipe connected to earth?... yes no House connection box Is a house connection box present?... yes no Has the door contact switch been tested?... yes no Impact protection mat Has the impact protection mat been installed and if so correctly?... yes no Door to storage room Is there a seal all the way around the door?... yes no Is the key hole sealed from the inside?... yes no Are protective boards applied on the inside of the door?... yes no Is the storage room dust proof?... yes no For information and a free on-line advisory service on the wood energy supply chain, the quality of wood fuels and internal handling visit Note: The use of trade, firm or corporation names in this publication is for the information of the reader. Such use does not constitute an official endorsement, or approval by COFORD of any product or service to the exclusion of others that may be suitable. Every effort is made to provide accurate and useful information. However, COFORD assumes no legal liability for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed herein or for any loss or damage howsoever arising as a result of use, or reliance, on this information.
Recommendations for storage of wood pellets
Recommendations for storage of wood pellets i Deutscher Energieholz- und Pellet-Verband e.v. (DEPV) (German Wood Fuel and Pellet Association) Reinhardtstr.18 10117 Berlin Germany Tel.: 0049 (0)30 688159966
INSTRUCTION FOR ASSEMBLY. 150x180 v Traditional sauna cabin
INSTRUCTION FOR ASSEMBLY 150x180 v Traditional sauna cabin 1. SAUNA PLAN 1800 LIGHT UNDER THE BENCH VENTILATION OUTLET UPPER BENCH 600 1500 LOWER BENCH 400 700 1656 956 HEATER 366 381 690 815 Light switch
Recommendations for storage of wood pellets
Recommendations for storage of wood pellets i Recommendations for storage of wood pellets i Deutscher Energieholz- und Pellet-Verband e.v. (DEPV) (German Wood Fuel and Pellet Association) Reinhardtstr.18
Chapter 6: Logistics and storage room for wood pellets
Chapter 6: Logistics and storage room This chapter deals with the demands of the transport and the storage of wood pellets. Content 6. Logistics and storage room 2 6.1 Introduction 2 6.2 Requirements for
USER INSTRUCTIONS FOR 10 LITRE PORTABLE DEHUMIDIFIER MODEL NO. DHMD102
USER INSTRUCTIONS FOR 10 LITRE PORTABLE DEHUMIDIFIER MODEL NO. DHMD102 THANK YOU FOR CHOOSING YOUR NEW DEHUMIDIFIER. BEFORE USING THE UNIT READ THESE INSTRUCTIONS FULLY AND RETAIN THEM FOR FUTURE REFERENCE
Planning Information. Passenger and Freight Elevators.
A company of ThyssenKrupp Elevator Thyssen Aufzüge tk This planning information will give you an overview of the most important planning criteria of passenger and freight elevators. However you should
plumbing products guide
plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly
ZAPPY 3 OWNER S MANUAL. Read this manual completely before riding your Electric ZAPPY 3.
ZAPPY 3 OWNER S MANUAL Read this manual completely before riding your Electric ZAPPY 3. TECHNICAL INFORMATION Model No. : ZAPPY 3 Product size Type of motor Motor power Battery type Battery Charger Charging
MERO Floor Systems - CleanRoom
MERO Floor Systems - CleanRoom Innovative solutions out of one hand Development Access floor Consulting Hollow floor Planning Floor covering and Manufacturing Installation Installation Services Floor systems
CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS
CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS D E F Y I N G C O N V E N T I O N Congratulations on your new Corner Fridge Your new corner fridge may have different functions
Installation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version
Installation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version with operating bar with crank electrical version 1. Prerequisite for a correct installation of
TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING
6.CW.1A TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS wood or gas standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING The Fireplace Ltd is able to design and fabricate custom brick open masonry
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
VOLUME AND SURFACE AREAS OF SOLIDS
VOLUME AND SURFACE AREAS OF SOLIDS Q.1. Find the total surface area and volume of a rectangular solid (cuboid) measuring 1 m by 50 cm by 0.5 m. 50 1 Ans. Length of cuboid l = 1 m, Breadth of cuboid, b
Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 [email protected]
CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can
Refuse and Recycling Advice note For Developers. September 2015
Refuse and Recycling Advice note For Developers Contents: September 2015 1.0 Refuse and recycling Background Information 1.1 Introduction 2.0 Planning and design 2.1 Good Practice 2.2 Internal storage
Static Electricity. A Health and Safety Guideline for Your Workplace. What Are Some Sources of Static Electricity? What is Static Electricity?
A Health and Safety Guideline for Your Workplace What is static electricity? What causes it? How is it hazardous? And, most importantly, how can it be controlled? All of these questions will be answered
Manual piston sampler...m 11
SAMPLING Manual piston sampler...m 11 Screw sampler...prec 22...PREC 100 Slide sampler...pr 55 Rotative screw sampler...prv Piston sampler...p 11 Sampler on belt conveyor...pba Rotating cup sampler...pgr
INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT 2003-2014 CHEVROLET/GMC VANS FOR
INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT 2003-2014 CHEVROLET/GMC VANS FOR (For NEW 2007 ALL WHITE KWIK-KITS ONLY) Warning do not attempt to install A/C units unless you are experienced with servicing
Saferand easierinstallation
EN 85-07 Saferand easierinstallation IföSigninstallationsystem andifösignbuilt-incistern www.ifosanitar.com/sign Aneffectivesolution withmanyadvantages. Ifö Sign installation system makes life a little
Renovation instructions
1(13) Renovation instructions The purpose of these instructions is to inform you of the things to consider when renovating an apartment. You can avoid many possible problems and additional costs following
Portable Air Conditioner
Portable Air Conditioner Owner's Manual Model:3 in 1 12,000 Btu/h Series 3 Please read this owner s manual carefully before operation and retain it for future reference. CONTENTS 1. SUMMARY...1 2. PORTABLE
IMPORTANT INSTRUCTIONS & OPERATING MANUAL. Houston 50 Inch Electric Wall Mounted Fireplace Black / White
IMPORTANT INSTRUCTIONS & OPERATING MANUAL Houston 50 Inch Electric Wall Mounted Fireplace Black / White Model Number:MFE5050BK Model Number:MFE5050WH Read these instructions carefully before attempting
Storage and Handling Requirements for Biomass. Richard Farnish, CEng MIMechE
Storage and Handling Requirements for Biomass Richard Farnish, CEng MIMechE Storage and Handling Requirements for Biomass The storage and handling of biomass materials need not present major problems if
USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR
USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR CONTENTS Introduction Safety Notes Identification of parts Installation instructions Operation instructions Maintenance Troubleshooting
Division 9. SignaFlor Pad and Pour Flooring System
Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions
HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY
HOW-TO HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY Most floor coverings, if laid over uneven wooden floors, will wear unevenly and look unsightly. The answer is to cover the old boards with hardboard
How to build a Pizza Oven in 4 days
How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY
EZ-Steer Assisted Steering System
EZ-Steer Assisted Steering System Installation Instructions Platform Kit P/N 53059-21 Case IH Puma 165 Puma 180 Puma 195 Puma 210 New Holland T7030 T7040 T7050 T7060 Revision A June 2007 Part Number 53345-21-EU2
DRYER VENTING SPECIFICATIONS DRYER SAFETY
DRYER VENTING SPECIFICATIONS Table of Contents DRYER SAFETY...1 INSTALLATION REQUIREMENTS...4 Venting Requirements...5 DRYER INSPECTION AND CLEANING...7 Frequency of Exhaust System Cleaning...7 Inspecting
(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark
Spectrum Laboratories Ltd is accredited by International Accreditation New Zealand (formerly Telarc). The tests reported herein have been performed in accordance with the terms of our accreditation. This
Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko
INSTALLATION MANUAL Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko Ventilated Notified entity Building Technical and Research Institute Prague notification no. 1020 This instruction refers to double-layer
Heating with wood chips and pellets
YOUR RELIABLE PARTNER Heating with wood chips and pellets Present on the market 110 for over years 90-150 Advantages of the HERZ firematic boiler User friendly with: Easy operation Automatic cleaning system
Rapide Inline Ceiling Extractor Fan, White Fascia 41800040590. Rapide Inline Ceiling Extractor Fan, Chrome Fascia 41800040580
Any Queries Call : 08000 23 23 23 Rapide Inline Ceiling Extractor Fan, White Fascia 41800040590 Rapide Inline Ceiling Extractor Fan, White Fascia Illuminated 41800040670 Rapide Inline Ceiling Extractor
15GAL STEEL OIL DRAIN WITH 110V PUMP
15GAL STEEL OIL DRAIN WITH 110V PUMP OWNER S MANUAL WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety
DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP
DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP CONTENTS WHAT IS RISING DAMP STEP 1 SURVEY STEP 2 METER READINGS STEP 3 CONCLUSION STEP 4 PREPARATION FOR TREATMENT STEP 5 TYPE OF TREATMENT STEP 6
50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance
02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW
39HQ Airovision Air Handling Units
39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport
Lesson 2 - Force, Friction
Lesson 2 - Force, Friction Background Students learn about two types of friction static and kinetic and the equation that governs them. They also measure the coefficient of static friction and the coefficient
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table
UNIVERSAL CLEANERS. Seed Conditioning And Processing Global Solution UNIVERSAL 240
UNIVERSAL CLEANERS Seed Conditioning And Processing Global Solution UNIVERSAL 240 UNIVERSAL EXCELLPRE CLEANERS High Effective Pre-cleaning Performance Akyurek Technology develops and manufactures solutions
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
SMD Rework Station TABLE OF CONTENTS
SMD Rework Station Thank you for purchasing the Hakko 50B SMD Rework Station. The Hakko 50B is designed to solder and desolder surface mounted devices with hot air. Please read this manual before operating
KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850
INSTALLATION AND OPERATING INSTRUCTIONS KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850 Product advantages Automatic float switch as water
Dehumidifier D 850E. - Instruction manual version 02
Dehumidifier D 850E - Instruction manual version 02 Content 1. Description of dehumidifier 1.1. General data 1.2. Technical data 2. Operation and usage 2.1. Usage 2.2. Location and installation 2.3. Preparing
INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
RE-3 : SOLID TOP RANGE RANGE TOP ONLY
VULCAN ELECTRIC SOlid top oven range MODEL: RE-3 - SOLID TOP oven Range RE-3T - SOLID range top only ON CABINET BASE RE-3 : SOLID TOP RANGE Model Re-3T : Solid TOP RANGE TOP ONLY Index: General Data 2
Installation Instructions For Slider Casement Air Conditioners
Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT
IMPORTANT SAFETY RULES TO FOLLOW
WARNING FLOOR & CARPET CLEANER Any piece of equipment can be dangerous if not operated properly. YOU are responsible for the safe operation of this equipment. The operator must carefully read and follow
INFRARED QUARTZ WALL HEATER
INFRARED QUARTZ WALL HEATER MODEL NO: IQ2000 PART NO: 6939004 MOUNTING & OPERATION INSTRUCTIONS GC0715 INTRODUCTION Thank you for purchasing this CLARKE Infrared Wall Heater. Before attempting to use this
Lift and Escalator Installations
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-29 Lift and Escalator Installations Building Works Requirements The
PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS
PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS OVENS MANUFACTURED BY: EARTHSTONE OVENS-6717 SAN FERNANDO RD GLENDALE CA 91201 TELEPHONE: 800-840-4915 818-553-1134 FAX: 818-553-1133
Installation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step
STR-600 Plate Dryer. 1. What it s meant for?
STR-600 Plate Dryer 1. What it s meant for? Device is meant for water damage drying on local wetted areas. The device suits best for different stone type structures, such as concrete, brick structures
Accessory Manual Ventilation Section Model Comfort Circle
Accessory Manual Ventilation Section Model Comfort Circle Manual version:. R a Copyright and trademarks All the information and drawings in this manual are the property of Biddle and may not be used (other
Morco House Riverview Road Beverley HU17 0LD. Retrofit or Upgrade a Water Heater in a Caravan Holiday home
Morco House Riverview Road Beverley HU17 0LD Morco Products Ltd Tel: 01482 325456 Fax: 01482 212869 Email [email protected] Web www.morcoproducts.co.uk Retrofit or Upgrade a Water Heater in a Caravan
INSTALLATION & USER INSTRUCTIONS
INSTALLATION & USER INSTRUCTIONS LED ELECTRIC FIRE Focal Point Fires plc. Christchurch, Dorset BH23 2BT Tel: 0202 499330 Fax: 0202 499326 www.focalpointfires.co.uk e : [email protected] MODELS
INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.
INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS Multi-Layer Technology provides increased strength. Specifically designed for interior applications. Compatible with most internal
Installation Instructions
READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:
- Do not immerse cords, pump or any electrical wire or device in water or other liquid.
TRANSFER PUMP INSTRUCTIONS FOR THE SUPER TRANSFER PUMP 1. Pump (water may be present in the pump and lines due to testing at factory) 2. Instructions. 3. Inlet thicker wall hose (1), outlet hose (1) 4.
Asbestos. from the Home. Removing. Read this booklet for:
Removing Asbestos from the Home Read this booklet for: steps and care you should take if your home has asbestos-containing material (ACM) advice about protective gear. How to get ACM removed from your
Flue Installation. High Efficiency Condensing Boilers
Flue Installation High Efficiency Condensing Boilers Table of contents INTRODUCTION 1 Instruction guidance...4 1.1 Product documentation...4 1.2 Explanation of symbols...4 1.3 Important Notes...4 INSTALLATION
TYPICAL FIRE SAFETY INSPECTION VIOLATIONS
TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to
After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
Meaco 30L and Meaco 40L dehumidifier instruction manual
Meaco 30L and Meaco 40L dehumidifier instruction manual Please read this instruction manual before using the dehumidifier and keep safe for future reference SAFETY INSTRUCTIONS PLEASE READ ALL INSTRUCTIONS
Skirt 1 / 4. The Skirt. The skirt patterns were downloaded from Mark's site but they need expanding before they can be used.
Skirt 1 / 4 The Patterns The Skirt The skirt patterns were downloaded from Mark's site but they need expanding before they can be used. I used Corel Draw's real world dimensions to expand the patterns
Squash Court Design general points
Squash Court Design general points Contents: Contents:... 1 1. Squash Court Dimensions... 2 2. CourtTech Walls... 3 3. Dimensional requirements for courts with CourtTech Walls... 3 4. Loading of CT System
CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011
CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS
DIAMOND Retractable Rodding Robot Model SPRAYROD-R
2004-12-21 2 1 (23) DIAMOND Retractable Rodding Robot Model SPRAYROD-R 2004-12-21 2 2 (23) Table of contents 1 TECHNICAL DESCRIPTION...4 1.1 MAIN DETAILS...5 1.2 COMPONENTS DESCRIPTION...5 1.2.1 Pneumatic
Mold Preventing I nterior System
interior insulation and renovation boards A system of components that have been designed to work perfectly together to repair damage caused by mold. The system consists of boards, insulation wedges, reveal
RAUFOSS EXPLOSIVE COMPRESSION FITTINGS
INSTRUCTION MANUAL FOR RAUFOSS EXPLOSIVE COMPRESSION FITTINGS Box 7 2831 Raufoss Norway Tlf.: +47 61 15 17 87 Fax: +47 61 15 25 56 25 January 2013, rev 2 Available on www.vpmetall.no Page 1 CONTENTS GENERAL
EVOKE LCD ELECTRIC WALL HEATER MODEL : L23LCD INSTALLATION AND USER INSTRUCTIONS
EVOKE LCD ELECTRIC WALL HEATER MODEL : L23LCD INSTALLATION AND USER INSTRUCTIONS All instructions must be handed to user for safekeeping Revision A - 07/08 Country(s) of destination - GB/IE Focal Point
REPAIR INSTRUCTIONS UNDER BODY CYLINDER (UM, UL)
Table of contents 1. Introduction... 3 1.1. Scope of use... 3 1.2. General remarks... 3 1.3. Contact Hyva... 3 1.4. Precautions... 4 1.5. Spare parts... 4 1.5.1. Prior to use... 4 1.6. Recycling and Reuse
CONTROL METHODS. There are five ways to control the release of asbestos fibers:
Control Methods CONTROL METHODS When asbestos containing materials are found in a building, the owner must decide which method or methods will be used to deal with the asbestos. The decision will be based
Depending on which elastic support you have you can secure the V2 power unit to the following seat bracket tubes: EXTERNAL DIAMETER 27.
ASSEMBLY 1 - EPS V2 POWER UNIT (SOLUTION 5) 1.1 - POSITIONING INSIDE THE SEAT TUBE WITH ELASTIC SUPPORT IN THE SEAT BRACKET TUBE Depending on which elastic support you have you can secure the V2 power
COMMERCIAL GAS DRYER FUELLED BY TOWN GAS CODE OF PRACTICE GU13 (MODULE ONE)
COMMERCIAL GAS DRYER FUELLED BY TOWN GAS CODE OF PRACTICE GU13 (MODULE ONE) August 2007 Issue 2 Table of Contents 1. Foreword and Scope...1 2. Terminology...3 3. General...5 4. Gas Meter...6 5. Pipe Connection
Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing
Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight
Installation instructions of the HEKI 3plus rooflight
Installation instructions of the HEKI 3plus rooflight before installing the HEKI 3plus rooflight, please read carefully the installation instructions. 1. Prerequisite for a correct installation of the
ASBESTOS IN THE HOME
J:\Public Protection Division\Food and Occupational Safety\Leaflets\A S B E S T O S.docJ:\Public Protection Division\Food and Occupational Safety\Leaflets\A S B E S T O S.doc ASBESTOS IN THE HOME What
Not required for most applications Not required for most applications High pressure (12-803 provided) High pressure (12-803 provided)
ELECTRIC FUEL PUMPS P/N 12-801-1, 712-801-1, 12-802-1, 712-802-1, 12-815-1, & 712-815-1 FUEL PRESSURE REGULATORS P/N 12-803, 12-501, 12-804, 12-500, & 15812NOS Installation Instructions THESE INSTRUCTIONS
How to secure your property after a disaster
How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,
Flexit Central Vacuum Cleaner
Flexit Central Vacuum Cleaner - your choice for a healthier home! Expels harmful fine dust from the house. Norway s best selling! new and improved FOR A HEALTHY INDOOR ENVIRONMENT A healthier home We spend
English. Symbols used to mark instructions...3. Congratulations...5 Getting the best results...5. Warnings...6 Operating Procedure...
2 Contents Components Attachments Guidance Installation Operation Maintenance Service Technical Troubleshooting Symbols used to mark instructions...3 Included Attachments...4 Congratulations...5 Getting
Installation Guide. DEVIreg 530. Electronic Thermostat. www.devi.com
Installation Guide DEVIreg 530 Electronic Thermostat www.devi.com The English language is used for the original instructions. Other languages are a translation of the original instructions. (Directive
5800 Temperature Sensor Cable Assembly
5800 Temperature Sensor Cable Assembly Removal and Replacement Instruction Sheet #60-4702-070 Revision D, January 14, 2013 Overview The 5800 has two refrigeration temperature sensors, one attached to the
Flexit Central Vacuum Cleaner
Flexit Central Vacuum Cleaner - your choice for a healthier home! Expels harmful fine dust from the house. Norway s best selling! new and improved FOR A HEALTHY INDOOR ENVIRONMENT A healthier home We spend
V - JET. Counteflow System. V-JET Counterflow System Installation and Operation Manual
V - JET Counteflow System V-JET Counterflow System Installation and Operation Manual 1. System Installation By purchasing the V - JET counterflow system you have obtained high-quality product, which will
OWNER S MANUAL DRAINVAC ATOMIK PRINTED APRIL 4-2011
OWNER S MANUAL th DRAINVAC ATOMIK PRINTED APRIL 4-2011 INTRODUCTION We take this opportunity to express our gratitude and extend our congratulations for your decision to purchase a Drainvac product. A
1 DESCRIPTION OF THE APPLIANCE
1 DESCRIPTION OF THE APPLIANCE 1.1 INTRODUCTION The cast iron SF boilers are a valid solution for the present energetic problems, since they can run with solid fuels: wood and coal. These series of boilers
Ultrasonic support removal tank
Ultrasonic support removal tank User guide and safety manual See inside for use and safety information. The Ultrasonic support removal tank automatically removes PLA support material from a printed ABS
Solid Wood Worktops Installation and Aftercare Instructions
Solid Wood Worktops Installation and Aftercare Instructions IMPORTANT NOTE: Please note our worktops have an A and a B side; it is important to identify these prior to making any cuts or other amendments.
Spray Booth Guideline
Department of Development Service 135 North D Street, Perris CA. 92570 Phone: (951) 443-1029 Fax: (951) 943-3293 PURPOSE The intent of this guideline is to provide the information necessary to ensure that
9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.
Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and
SWIMMING POOL, SPA, & HOT TUB GUIDELINES
SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015
One-third of all fatalities in the U.S. construction
Guardrail systems: Fall prevention for floor and wall openings and open-sided floors One-third of all fatalities in the U.S. construction industry result from falls from elevations. Falls from elevations
Exhaust Calculation Booklet
Exhaust Calculation Booklet American Dryer Corporation 88 Currant Road Fall River MA 02720-4781 Telephone: (508) 678-9000 / Fax: (508) 678-9447 e-mail: [email protected] ADC Part No. 450450 Exhaust
Rockwool Flexi Insulation Application Guide
Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed
Circular saw benches Safe working practices
Circular saw benches Safe working practices HSE information sheet Introduction This information sheet is one of a series produced by HSE s manufacturing sector. It gives practical guidance on safe working
Installation Instructions Avalanche XUV Cap IMPORTANT! IMPORTANT!
Installation Instructions Avalanche XUV Cap IMPORTANT! Read all instructions carefully before commencing any work. Always wear safety equipment. Some installation steps will require two or more installers.