Army Corps of Engineers Enhanced Use Leasing and the Data Center Value Proposition
|
|
|
- Dorothy Garrett
- 9 years ago
- Views:
Transcription
1 Army Corps of Engineers Enhanced Use Leasing and the Data Center Value Proposition April 21 st 2009 Patrick Giardina United States Army Corps of Engineers Project Manager Enhanced Use Lease Program
2 U.S. Army Corps of Engineers Enhanced Use Leasing Program Proudly serving the Armed Forces and the Nation now and in the future
3 Enhanced Use Lease What is EUL? Title 10 Section 2667 of the United Stated Code Allows Department of Defense Installations to lease non excess real estate assets Energy, Office Parks, Industrial Centers, Hot Weather Test Track
4 What is EUL? Property in all fifty states Create Value for the Army through rent through In Kind Consideration Helps offset declining maintenance and service budgets on military installations Addresses UFRs (Un Funded Requests) Principle target
5 Where are we?
6 Where Are We? Fort Detrick (Existing Chevron CUP) Aberdeen Proving Ground (Existing EUL with OPUS) Fort Belvoir Fort Meade Trammel Crow Selected Developer
7 EUL Highlights 10 Leases signed Revenue over lease term $1.1 Billion 9 Leases in negotiation project revenue $1.3 Billion Average Present Value of Leases vs. Appraisal Value 5.45 times
8 EUL Highlights 2008 National Council for Public Private Partnerships Award for Distinguished Public Private Partnership Infrastructure Award Fort Detrick Co Generation Facility Maryland EUL Program one of 3 finalists for 2007 GSA Achievement Award for Real Property Innovation, Asset Management Category
9 Who Do We Work With? Hewlett Packard EYP Mission Critical Siemens Energy Solutions Chevron Energy Solutions General Motors Trammel Crow Opus Weston/LCOR Jim Wilson Associates Beztak Weston/Orion Keenan Development
10 Value Proposition Inherent Security on Army Installations Behind the Fence 24 Hour access granted Attractive locations for DoD End Users BRAC effect DoD research tenants (R&D, BSL 3&4 Laboratories) Inherent Security NSA and contractors to occupy the Fort Meade EUL Low Power Rates For Federal Tenants and EUL partners Some installations achieve 6 cents/kwh Developments of Scale EUL has over 10 Million Sq feet of office and commercial space currently under development Main tenants are military research and design firms
11 Value Proposition Currently the two robust growth models for real estate: Data Centers Energy related projects Traditional Co Gen, Natural Gas, Coal Non Traditional Solar, wind, geothermal, biomass We believe there is a convergence!!!
12 Value Proposition Greening of Datacenters EUL is Army has been chosen as a contract vehicle for renewable and traditional energy projects Watervliet Arsenal Biomass Component Potential Tax Credits Fort Irwin California Advertised 500 MW solar facility Potential Data Center Co Location
13 Value Proposition Army initiative to increase and secure energy Green initiative to increase renewable generation on post Islanding and security measures to include on base generation and micro grids Will remain powered up through commercial black outs To achieve economies of scale energy developers are looking to high energy users datacenters, manufacturing and industrial applications LEED Data Centers Entitlement process with LEED designs expedited DoD to green existing and upcoming Data Centers
14 RECENT SUCCESS WATERVLIET ARSENAL Source Selection Award Issued to Developer on December 2 nd 2008 EYP Mission Critical High density Research Center 100, 000 square foot Data Center Siemens Business Technologies Co Gen Replace existing boiler Bio Mass Meet Green Requirements
15 Watervliet Arsenal
16 Long Term 100,000 SF Data Center New Co Gen Power Plant Affordable Bio Mass Energy Redundant Off Grid Power Single or Multi Tenant 24+ Month Development Cycle Watervliet Arsenal Short Term 15,000 SF Raised Floor Available Tier 3 Capable w/ Existing Infrastructure 9 12 Month Availability Current Nanotech & Cleanroom Neighbors
17 Why Now? Current Federal Buying Atmosphere Federal Acquisition not conducive to Speed to Market IT space requirements have a Just in Time development expectation Stimulus and recovery dollars intended for down payment, not total cost Federal shift from traditional real estate ownership, to varied forms of off sheet financing Build to Suit and Design/Build Lease Back Hosting & Collocation Outsourcing & MSAs Dynamic of Current Data Center Marketplace 85% of data center stock pre 2000 is obsolete Enterprise Expansions Upgrades & Refreshes Consolidations/Transformations
18 Why Private Sector Data Centers on DoD Sites? Location, Location, Location Defense Contractors and DoD End Users Prefer Military Installations Security / ATFP measures Low to No Profile Limited Staff / Limited Access Infrastructure Inherent Redundancy via Dedicated Base Energy Source Robust Utility Distribution and Backup Power Secure telecom distribution Underwriting of cogeneration expansion enhanced by data center off use Roads, access, parking, sometimes even building shells already in place Other Advantages Collocation with other related DoD tenants & missions Workforce Skilled O&M Staff Transitional Opportunities for Retiring Military Tax incentives and availability of federal matching grants
19 HP s Own Data Center Transformation Consolidating 85 data centers into 6 global ones: ~60% reduction in annual energy use through thermal mapping, virtualization, technology refresh and densification, enough electricity to power all homes in Palo Alto for more than a year 80% more processing power with 30% fewer servers Reduced the data storage costs while doubling the capacity 3 Geographical zones in U.S. chosen for: Proximity to fiber optic backbones/multiple power grids 200K SF white space used, a 10% reduction Within each zone: 2 sites within mile radius of each other Each site Tier III Each site designed for 3 levels of availability and continuity service
20 HP data center transformation: business outcomes by end of 2008 Less = 30% fewer servers, ~60% reduction in annual energy use Decreased storage cost 50% lower networking cost 60% retirement of legacy apps Fewer sites, 10% less floor space Less HP IT cost More 80% more processing power Double the storage (replicated) Triple the bandwidth Global applications Faster application rollout with availability and continuity integrated with data center More capability
21 HP s CFS Value Proposition Define facilities needs & identify options Determine appropriate, competitive, and potentially game changing approach Package facilities team to deliver approach, based on: Delivery model purchase, lease, collocate, etc. Components necessary contractors, designers, subs, etc. Appropriateness to task size, scale, locale, experience, etc. Be the Trusted Advisor to users in the marketplace
22 Our Unique Position in the Marketplace Work with every major player in data center development: Collocation and Hosting Companies (Terremark, DRT, Savvis) Data Center RE Developers (DuPont Fabros, JLL, PowerLoft) Contractors and CMs (Clark, Holder, Gilbane) Systems Integrators (Lockheed Martin, SAIC, GD) MSA providers (CSC, EDS, Unisys) Architects/Engineers (P+W, Gensler, HOK) Program Managers/Reps (Parsons, BAH, Mark Anderson) IT Service Providers (Lee Technologies, Fortress) Manufacturers / Energy Providers (APC, Eaton, Siemens)
23 EUL PROCESS Project Identification Army Installation Identified A Float Test is performed Market conditions tested Assets assessed Checklist for uses now included data center potential
24 Industry Forum EUL Process Industry Forum We invite members of the private business community A tour of the site and overview of the process is given Master Developers and Interested Parties are encouraged to network and form teams Technology specific companies encouraged to attend
25 Source Selection EUL PROCESS Source Selection Team submit proposals according to NOL (RFQ) direction Independent consultant review Proposals are presented in front of Source Selection board Selection is made
26 EUL Process Lease and Management Plan Kick off meeting Lease and Management Plan Overview of proposed development and time lines established Negotiations of Master Agreement to Lease (MAL) Guideline for site specific leases Negotiation of Site Specific Lease (SSL)
27 Settlement EUL Process Finalizing Army Corps is Responsible for lease management Escrow account established for in kind services
28 EUL Process Map Identify Assets Execution and Development Market Analysis Notice of Lease (RFQ) Negotiation of Enhanced Use Lease Industry Forum Lease and Management Plan Proposals Received Source Selection
29 HOW LONG???? 18 months to 3 years to Execute Master Lease Agreements Environmental Lease negotiations Special Circumstances TIFs PILOT Federal and State Interaction
30 Accessibility? Security? Ownership? The ownership of the buildings and all contained remains with the developer Security is the same that is provided to our military installations inside the gate Locations outside the gate availible as well 24 hour access Most installations during 9/11 were closed for 48 hours or less
31 Fort Detrick Cogeneration Facility Power reliability up to five nines reliability 70 Mega watt capacity Chilled water and steam outputs Off take electric rate less than private market Generation of chilled water and steam Online and operational Start of EUL to Online under three years
32 Fort Detrick
33 Redstone Arsenal Huntsville Alabama 4.5 Million square feet of office and lab space Servicing Redstone Weapons research NASA Huntsville operations 470+ Acres Hi Tech and research campus and training facility Projected clients General Dynamics, Northup Grumman, Raytheon, Projected demand for Data Centers Payment in Lieu of Taxes Tax Increment Financing of 45 Million to assist Infrastructure Utilities Fiber Over Haul Electrical Substation improvement
34 Upcoming Industry Forums West Point, Highland Falls, NY Industry Forum, April 23rd Sierra Army Depot, Herlong, CA Projected Industry Forum, May 2009 Fort Stewart, Savannah, GA Projected Industry Forum, May 15th Los Alamitos, Long Beach CA Projected Industry Forum, June 2009
35 Future EUL Fort Irwin, Barstow, CA Proposals DUE!!!! Fort Knox, Radcliff, KY Industry Forum, April 29 th Fort Lee, Virginia Projected Industry Forum, late Spring Fort Benning, Georgia Projected Industry Forum, late Spring
36 How to Get Involved Visit Attend our Industry Forums Join a master developer Propose your own Remember the NOL = s RFQ Ask us about an installation Interested in your local installation? Review current projects Leverage current developments Connect with developments in process
A Sustainable, Master-Planned Data Center Park.
Vineyard Data Center Park A Sustainable, Master-Planned Data Center Park. THE RUNDOWN Square feet : Up to 800,000 Critical Power: Up to 100 MW Power Cost: 4.4 cents/kwh (all in) PUE: 1.21 Availability:
Engineering and Support Center, Huntsville Energy Capabilities Overview
Engineering and Support Center, Huntsville Energy Capabilities Overview Energy Huntsville Meeting Paul Robinson Chief, Energy Division Engineering and Support Center, Huntsville U.S. Army Corps of Engineers
Information Technology White Paper
Information Technology White Paper Virtualization Building an Adaptive, Cost Effective Infrastructure at SSCT October 5, 2009 As the College grows the College needs to be poised to respond faster to market
Enabling an agile Data Centre in a (Fr)agile market
Enabling an agile Data Centre in a (Fr)agile market Phil Dodsworth Director, Data Centre Solutions 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without
DESC Renewables & ESPCs
WARFIGHTER FOCUSED, GLOBALLY RESPONSIVE SUPPLY CHAIN LEADERSHIP DEFENSE LOGISTICS AGENCY AMERICA S COMBAT SUPPORT LOGISTICS AGENCY DESC Renewables & ESPCs John Nelson, Energy Analyst April 2010 WARFIGHTER
Subject: County of Los Angeles Data Center Space Requirement
Subject: County of Los Angeles Data Center Space Requirement The County of Los Angeles, Chief Executive Office, Real Estate Division (CEO-RED) is issuing this Property Search for the purchase of a vacant,
TEXAS A&M UNIVERSITY Utilities & Energy Services
TEXAS A&M UNIVERSITY Utilities & Energy Services (A Full Service Campus Utility in College Station, Texas, United States) Submission for the 3rd International District Energy Climate Award June 13, 2013
3 rd Party Solar Sales April 2012
3 rd Party Solar Sales April 2012 About SolarCity The Leading Solar Service Provider in the U.S. More than 30,000 projects completed or underway Serving thousands of markets nationwide AZ, CA, CO, DC,
Energy Systems Integration
Energy Systems Integration Dr. Martha Symko-Davies Director of Partnerships, ESI March 2015 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy,
Department of Defense and Siemens. January, 2012
Department of Defense and Siemens January, 2012 Agenda Siemens USA Building Technologies - What We Do in Buildings Contracting Solutions Case Studies Touching the lives of Americans everywhere Every business
Midwest s Premier Carrier Neutral Colocation Data Center Greater Minneapolis St. Paul, Minnesota
Midwest s Premier Carrier Neutral Colocation Data Center Greater Minneapolis St. Paul, Minnesota A Premier Mission Critical Development and Leasing Opportunity The Connexion A carrier-neutral data center
Special Report Data Centers: Why the Great Demand for Data Centers?
Special Report Data Centers: Why the Great Demand for Data Centers? OCTOBER 2010 WHY THE GREAT DEMAND FOR DATA CENTERS? There has been much written over the past two years about the lack of liquidity in
Combined Heat & Power. Discussion with Connecticut Energy Advisory Board. February 23, 2010
Combined Heat & Power Discussion with Connecticut Energy Advisory Board February 23, 2010 Discussion Topics Introduce NRG Thermal Representative NRG Thermal projects District Energy Combined Heat and Power
Gilbane Building Company. White Paper THE DRIVERS OF GREEN: BEYOND THE CHECKLIST
Gilbane Building Company White Paper THE DRIVERS OF GREEN: BEYOND THE CHECKLIST November 2013 1 THE DRIVERS OF GREEN: BEYOND THE CHECKLIST November 2013 THE DRIVERS OF GREEN The concept and practice of
The Current and Future State of Solar. Walter Cuculic SolarCity - National Sales Manager Builder Program
The Current and Future State of Solar Walter Cuculic SolarCity - National Sales Manager Builder Program Agenda Solar Trends and Market Overview and Trends Residential Markets 3 rd Party Ownership Which
Renewable Choice Energy
Catawba College Table of Contents About Renewable Choice The Problem: Electricity Production Today The Solutions: Renewable Energy Sources Renewable Energy Credits (RECs) Who can participate in Renewable
Forward-Looking Statement Disclosure
Forward-Looking Statement Disclosure Certain information contained in this article is forward looking information based on current expectations and plans that involve risks and uncertainties. Forward looking
PRINCIPLES OF DATA CENTER SITING AND ECONOMIC DEVELOPMENT INCENTIVES
PRINCIPLES OF DATA CENTER SITING AND ECONOMIC DEVELOPMENT INCENTIVES Tim Comerford SVP, Strategic Consulting Biggins Lacy Shapiro & Company www.blsstrategies.com UEDA Winter Forum February 23, 2011 # THE
Successful Partnerships. Sid Saunders. June 3, 2015
Successful Partnerships Sid Saunders June 3, 2015 www.pendulumservices.com Situation Given restrictions and limitations of funding the DOD and installations are having to find new ways to meet energy requirements
A community of organizations working together to accomplish their respective missions with a common goal of improving human performance through
1 A community of organizations working together to accomplish their respective missions with a common goal of improving human performance through simulation 2 Team Orlando Mission The mission of Team Orlando
Data Center Optimization: California s Blueprint for Success
2011 NASCIO RECOGNITION AWARD NOMINATION Nomination Category: Enterprise IT Management Initiatives Data Center Optimization: California s Blueprint for Success California Technology Agency Office of Technology
Data Center & IT Infrastructure Optimization. Trends & Best Practices. Mickey Iqbal - IBM Distinguished Engineer. IBM Global Technology Services
Data Center & IT Infrastructure Optimization Trends & Best Practices Mickey Iqbal - IBM Distinguished Engineer IBM Global Technology Services IT Organizations are Challenged by a Set of Operational Issues
Federal Data Center Consolidation Initiative (FDCCI)
Federal Data Center Consolidation Initiative (FDCCI) Final Data Center Consolidation Plan U. S. Office of Personnel Management Office of the Chief Information Officer Update 9/30/2011 1 Introduction...
FACT SHEET. General Information about the Defense Contract Management Agency
FACT SHEET General Information about the Defense Contract Management Agency Mission: We are the independent eyes and ears of DoD and its partners, delivering actionable acquisition insight from the factory
9.0 Data Center Facilities Requirements
9.0 Data Center Facilities Requirements Expect the Best Instructions to Vendors: Vendor shall address in its proposal the solution it proposes to address the Commonwealth s requirements for Data Center
Effective Workspaces. Understanding how your space and location decisions can improve your organization s impact, staff morale and your bottom line
Effective Workspaces Understanding how your space and location decisions can improve your organization s impact, staff morale and your bottom line Today s Agenda Objective 1: Objective 2: Objective 3:
Philadelphia Navy Yard Microgrid Modernization. Will Agate LEED AP Senior Vice President Philadelphia Industrial Development Corporation (PIDC)
Philadelphia Navy Yard Microgrid Modernization Will Agate LEED AP Senior Vice President Philadelphia Industrial Development Corporation (PIDC) October 2014 THE NAVY YARD: The Campus. The Energy. The Opportunity.
Renewable Energy Roadmap Overview
Renewable Energy Roadmap Overview Curt Maxey with assistance from many Renewable Energy Roadmap Overview Discussion of renewable resources Electric energy consumption and mandates Utility scale solar Green
The HP IT Transformation Story
The HP IT Transformation Story Continued consolidation and infrastructure transformation impacts to the physical data center Dave Rotheroe, October, 2015 Why do data centers exist? Business Problem Application
SAN DIEGO S DEFENSE INDUSTRY AT A GLANCE
Defense Editor s Note: The San Diego Regional Economic Development Corporation (EDC) would like to credit the San Diego Military Advisory Council (SDMAC) as a principal contributor to the following industry
DOE Data Center Energy Efficiency Program
DOE Data Center Energy Efficiency Program Paul Scheihing U.S. Department of Energy Energy Efficiency and Renewable Energy April 2009 1 DOE Industrial Technologies Program Worki king to improve th e energy
J. Freihaut, Ph.D. Architectural Engineering, Professor Penn State Univesity
Philadelphia NAVY YARD Energy Innovation Campus J. Freihaut, Ph.D. Architectural Engineering, Professor Penn State Univesity Navy Yard Grid Background Navy Yard Grid Background One of the largest non-municipal
Los Angeles Community College District
Los Angeles Community College District BLUE AND GREEN TOGETHER Developing Sustainable Integrated Approaches to Green Technologies and Water Usage Green California Schools and Community Colleges October
Making Energy Storage Work for The Pacific Northwest
Making Energy Storage Work for The Pacific Northwest US DOE Peer Review Program 2015 Portland, OR September 23, 2015 Diane Broad, PE Energy Planning & Innovation Division Oregon Department of Energy Leading
Guideline for Water and Energy Considerations During Federal Data Center Consolidations
Guideline for Water and Energy Considerations During Federal Data Center Consolidations Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory
NEW JERSEY CENTER OF EXCELLENCE
Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves
The Economics of Nuclear Power: Is New Nuclear Competitive?
The Economics of Nuclear Power: Is New Nuclear Competitive? Craig A. Severance CPA Author, Business Risks and Costs of New Nuclear Power (2009) Co-Author, The Economics of Nuclear and Coal Power (1976)
Massachusetts Clean Energy and Climate Plan for 2020. Executive Office of Energy and Environmental Affairs
Massachusetts Clean Energy and Climate Plan for 2020 Massachusetts Clean Energy and Climate Plan for 2020 I. The Rationale: Launching the Clean Energy Revolution Energy Costs & Volatility; Energy Independence
How To Build A Data Center For Ragingwire
TURN-KEY AND BUILD-TO-SUIT WHOLESALE DATA CENTER SOLUTIONS RAGINGWIRE CA3 SACRAMENTO, CA NOW LEASING LARGEST DATA CENTER IN CALIFORNIA WITH LOWEST COST POWER RagingWire s new CA3 data center facility brings
Austin Energy Resource, Generation and Climate Protection Plan to 2025: An Update of the 2020 Plan
Austin Energy Resource, Generation and Climate Protection Plan to 2025: An Update of the 2020 Plan INTRODUCTION The Austin City Council adopted the Austin Climate Protection Plan (ACPP) in 2007 to build
DISTRICT HEATING & COOLING INTEGRATION OF CHP. BURNS & MCDONNELL October 2014
DISTRICT HEATING & COOLING INTEGRATION OF CHP BURNS & MCDONNELL October 2014 INTRODUCTION: SCOTT CLARK TIM BURKHALTER PROJECT DEVELOPMENT REPRESENTATIVE PROJECTS CANADA PROJECTS Chevron Refueler Inspection
BUSINESS BRIEFING SELF STORAGE
BUSINESS BRIEFING VALUATION & ADVISORY A Cushman & Wakefield Valuation & Advisory Publication JANUARY 2015 SOLID YEAR AHEAD IN As we enter 2015, investors always ask about market expectations for the New
Secure I Reliable I Flexible COPT DC-6. 9651 Hornbaker Road, Manassas, Virginia
Secure I Reliable I Flexible COPT DC-6 9651 Hornbaker Road, Manassas, Virginia Specialized Space by a Specialized Team 2 C O P T D A T A C E N T E R S O L U T I O N S Corporate Office Properties Trust
AHEAD OF THE CURRENT
GENERAL COMPANY INFORMATION An Employee-Owned Company Since 2000 Rosendin Electric Formed in 1919 Net Worth over $160,000,000 $1,000,000,000 Bonding Capacity Over 5,000 Employees Worldwide Largest Private
About Southern California Edison
About Southern California Edison One of the nations largest investorowned utilities with 125 years of service. Service Area 50,000 square miles Over 430 cities and communities Population Served Nearly
Data Centers Road Map! Garry Zacheiss & Mark Silis! Operations & Infrastructure, MIT IS&T!
Data Centers Road Map Garry Zacheiss & Mark Silis Operations & Infrastructure, MIT IS&T 1 Data Centers Executive Summary FY12 FY13 FY14 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 W91 Energy Efficient Study W91
Best Practices in Business Recovery: Colocation or DRaaS? By Brien M. Posey
Best Practices in Business Recovery: Colocation or DRaaS? By Brien M. Posey axcient.com 1 Introduction In the not-too-distant past, protecting an organization s data meant shipping backup tapes offsite
A Study of Increased Use of Renewable Energy Resources in Virginia
A Study of Increased Use of Renewable Energy Resources in Virginia Prepared for The Virginia Commission on Electrical Utility Restructuring, January 6, 2006 The Virginia Center for Coal and Energy Research
Enhanced Army Global Logistics Enterprise Basic Ordering Agreements and Task Orders Were Properly Executed and Awarded
Report No. DODIG-2014-095 I nspec tor Ge ne ral U.S. Department of Defense J U LY 2 5, 2 0 1 4 Enhanced Army Global Logistics Enterprise Basic Ordering Agreements and Task Orders Were Properly Executed
Clean State Energy Actions 2011 Update. colorado
Energy Efficiency Building Energy Codes Utility Demand-Side-Management Energy Savings Targets/Energy Efficiency Resource Standards Residential: 2003 IECC, required in jurisdictions with a building code
Mechanical Systems Proposal revised
Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option
Ogden Air Logistics Center
Ogden Air Logistics Center Air Logistics Center Support Proposal for USAF Training Systems 309 th Software Maintenance Group Hill A.F.B. Utah Kenny Bennett [email protected] 801.775.2740 Misty
THE GEYSERS Renewable, Geothermal Energy. Mike Rogers, Senior Vice President Calpine Geothermal Operations
THE GEYSERS Renewable, Geothermal Energy Mike Rogers, Senior Vice President Calpine Geothermal Operations Impact Sonoma Energy: Plugging Into Sonoma County s Future 18 October 2012 Geothermal Fields: Resources
GRID Alternatives. Generating Renewable Ideas for Development Alternatives
Why Solar for Low-Income Families Environment Reduction of green house gases Environmental Justice Power plants often sited in low-income communities High rates of asthma Economic High energy costs Significant
How To Understand The Data Center Bubble In India
Emerging Trends in Data Center Industry A Ctrl S Perspective By : Mr. P Sridhar Reddy CMD Ctrl S Data Center Present Situation Emerging Trends The Indian Datacenter Bubble Emerging Technologies About Ctrl
Midwest Investment Conference
June 22 2016 Midwest Investment Conference Lee D. Rudow President and CEO Michael J. Tschiderer Chief Financial Officer 1 Safe Harbor Statement This presentation contains forward looking statements within
datacentersites.com www.datacentersites.com Security, Infrastructure Redundancy Tier 3+/Tier 4 Data Center Sites
datacentersites.com Tier 3+/Tier 4 Data Center Sites Home of Apple s $1 billion, 500,000sf data center and two 20+ MW solar facilities NC Data Center Corridor home to nearby data centers for Facebook,
Renewable Energy Market Conditions and the 1705 Loan Guarantee Program
Renewable Energy Market Conditions and the 1705 Loan Guarantee Program The US Partnership for Renewable Energy Finance (US PREF) has prepared the following brief summary of changes in the marketplace for
CUSTOMER KEYNOTE Hal Buddenbohm
CUSTOMER KEYNOTE Hal Buddenbohm Supply Chain Director ITT Force Protection Systems Hal Buddenbohm is the Supply Chain Director at ITT Force Protection Systems in Thousand Oaks, CA. Prior to joining ITT,
T5 CHARLOTTE REGION WEST DATA CENTER PARK
Additional!Sites Up to 120+ MW available to site from Duke Energy Low cost reliable power - 3.9-4.6 /kilowatt hour Dual Circuit 100 KV Grid Connector Low natural disaster risk Multiple l fiber carriers
R&D in Vattenfall Johan Söderbom
R&D in Vattenfall Johan Söderbom Agenda 1 2 3 Vattenfall in brief R&D portfolio Smart Grids Vattenfall in brief Net sales 2011: 181 billion SEK (20 billion ) Electricity Generation: 166,7 TWh 7.8 million
Addressing the U.S. Department of Defense Mission Assurance Concerns and Renewable Energy Mandates
Addressing the U.S. Department of Defense Mission Assurance Concerns and Renewable Energy Mandates Rick Tempchin Executive Director, Retail Energy Services Edison Electric Institute NARUC International
Leasing a Data Center: U.S. Market Cost Comparison
GLOBAL RESEARCH AND CONSULTING Leasing a Data Center: U.S. Market Cost Comparison NOVEMBER 2014 EXECUTIVE SUMMARY The data center industry is expanding along with the seemingly limitless demand for data
Renewable Energy Research
Renewable Energy Research Georgia Power and Southern Company have been active in renewable energy research for many years. Over the last five years we have invested six million dollars in renewable energy
NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW
VAZATA 9651 Hornbaker Road Manassas, VA 20109 VAZATA.COM VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from the ground up to deliver highly reliable and
