Asset Management Performance Report (Asset Management Plan Phase 1)
|
|
|
- Jade Adams
- 9 years ago
- Views:
Transcription
1 2016 Asset Management Performance Report (Asset Management Plan Phase 1) Prepared by the California Department of Transportation In Accordance with Government Code Section
2 Table of Contents Executive Summary... 3 Introduction... 5 Background... 6 Asset Management Implementation... 7 Implementation Status of Major Asset Management Milestones... 7 Inventory... 7 Condition Assessment... 8 Performance Measurement... 9 Performance Gap Analysis Project Prioritization Planning Business Process Review Activities External Stakeholder Awareness and Involvement Deterioration Modelling Risk Management Life Cycle Cost Analysis Enterprise Asset Management Software Asset Performance Report Pavement Assets Inventory Condition Trends SHOPP Investment Bridge Assets Inventory Condition Trends SHOPP Investment Intelligent Transportation System Assets Inventory Condition Trends SHOPP Investment Asset Management Performance Report Page 1
3 Culvert Assets Inventory Condition Trends SHOPP Investment Looking Forward Asset Management Performance Report Page 2
4 Executive Summary 2015 was a year marked with many activities related to the implementation of asset management in California. These activities include: Completion of an updated automated pavement condition survey of state highway pavement. Rollout of new condition assessment methods for pavement and bridges Refinement of State Highway Operation and Protection Program(SHOPP) project prioritization methodology through an asset management pilot program CTC adoption of the four core asset classes: pavement, bridges, culverts and Intelligent Transportation System (ITS) Elements Adoption of performance measures for all four asset classes (Pavement and bridges pending final federal rulemaking). Collection of risk management information required by the Moving Ahead for Progress in the 21 st Century (MAP-21) and continued in the Fix America s Surface Transportation (FAST) Act. Implementation of the SHOPP Management Tool Evaluation of several commercially available asset management software programs External outreach to our transportation partners through workshops and the formation of the Transportation Asset Management Advisory Committee (TAMAC) Initiation of contracts to provide consultant assistance with our Transportation Asset Management Plan (TAMP) development and project prioritization efforts The 2016 Asset Management Report provides performance information for the four core asset classes; pavement, bridges, intelligent transportation systems, and culverts. Performance charts and discussion of each of the four asset classes are presented reflective of the proposed 2016 SHOPP project portfolio. At current investment levels in the SHOPP, the condition of the pavements are expected to remain fairly flat for the coming five year period at approximately 8,300 distressed lane miles of pavement. Distressed bridge counts are expected to increase near term and then level out at to an estimated 555 distressed bridges by The culvert inventory is expected to continue to expand as the program continues their initial inspection efforts. Culverts conditions are expected to continue to grow as the inventory expands with approximately 13% of the known inventory in poor condition. The condition of ITS elements (changeable message signs, ramp meters and traffic loop detectors) are expected to lag desired performance levels due to a lack of projects to specifically address the lagging loop detector health. In recognition of the growing culvert inventory needs and lagging ITS element condition, 2016 SHOPP reservations of $100 and $150 million respectively are proposed to reserve 2016 Asset Management Performance Report Page 3
5 funding until planning documents can be completed in these two areas. Once planning studies are completed, these projects would be proposed for amendment into the 2016 SHOPP against these reservations. With the noted strategic changes in our investments within the 2016 SHOPP, Caltrans expects to be able to hold the major assets at current conditions or better while simultaneously increasing the culvert and ITS investment to improve future conditions in these two asset classes. Many significant activities are planned for 2016 related to the implementation of asset management as the program marches toward full implementation in Planned activities include: Completion of locally owned NHS pavement condition survey Scheduled final rule making of performance measures for pavement and bridges Development of the asset management system requirements Beginning a shift to performance management in the 2017 SHOPP Ten Year Plan The asset management implementation will require the development of an asset management software system. The development of this application is dependent on Information Technology approval and funding package. This is a substantial critical path activity in the overall implementation effort. In 2016, Caltrans will begin the process of defining business requirements and gaining necessary approvals to move forward with this aspect of the asset management implementation Asset Management Performance Report Page 4
6 Introduction This California Department of Transportation (Caltrans) Asset Management Performance Report provides an overview of activities accomplished in 2015 related to the implementation of asset management and key activities planned for The Asset Management Performance Report also provides the first State Highway Operation and Protection Program (SHOPP) Performance Report addressing the expected performance of the four core asset classes; pavement, bridges, culverts and ITS elements resulting from the 2016 SHOPP project portfolio. The California Government Code section (14526) modified by Senate Bill 486 requires Caltrans to submit Phase 1 of the asset management plan in conjunction with the 2016 SHOPP. This report is provided to meet the Phase 1 requirement of the TAMP Asset Management Performance Report Page 5
7 Background Federal regulations (MAP-21) and California Government Code (14526) both require the implementation of a TAMP to guide transportation infrastructure investments. Asset Management is defined by the American Association of State Highway and Transportation Officials (AASHTO) as a strategic and systematic process of operating, maintaining, upgrading, and expanding physical assets effectively throughout their lifecycle. It focuses on business and engineering practices for resource allocation and utilization, with the objective of better decision making based upon quality information and well defined objectives. California Government Code (CGC) requirements call for a robust asset management plan to guide the investments in the SHOPP. The CGC requires full implementation by 2020 with Phase 1 to be delivered in The scope of the TAMP under the CGC is not specifically defined, however subsequent action by the California Transportation Commission (CTC) has focused the initial implementation on pavement, bridges, culverts and intelligent transportation system elements. The CGC requirement is directed to the State Highway System assets and the SHOPP investment program. The federal regulation governing asset management was introduced in the Moving Ahead for Progress in the 21 st Century (MAP-21) regulations and carried forward in the Fixing Americas Surface Transportation (FAST) Act. Compulsory items under federal regulations include the following: Summary listing of the pavement and bridge assets Description of the condition of those assets Asset management objectives and measures Performance gap identification Lifecycle cost and risk management analysis Financial plan Investment strategies Federal regulations require that the California TAMP address both state and local agency owned pavements and bridges on the National Highway System (NHS). Federal regulations also standardize the condition assessment methods and performance measures for pavement and bridges. The federal implementation timeline is contingent on the date of the finalization of rule making efforts. Caltrans timeline for implementation could be accelerated through the federal rule making process. The implementation of asset management in California must thread the needle and satisfy both sets of regulations with a single strategic plan Asset Management Performance Report Page 6
8 Asset Management Implementation The implementation of Transportation Asset Management (TAM) in California will involve a number of significant changes to Caltrans business processes, software systems and culture of transportation managers at both state and local levels. In 2015 with the enactment of Senate Bill 486, Caltrans began the steps necessary to meet the 2020 implementation date set forth in statutes. Key implementation areas defined in CGC and Federal Regulation (MAP-21) are defined below with accomplishments in 2015 summarized in the following pages. Implementation Status of Major Asset Management Milestones Activity Status Target Date Establishment of the Asset Classes Adopted by CTC Complete March 2015 Establishment of the performance measures for the four Adopted by CTC Complete asset classes March 2015 Internal/External Stakeholder Engagement Ongoing NA Define inventory for the four asset classes 80% Complete 2016* Performance Goal Setting (Targets for four asset classes) Not Started 2017 Performance Gap Analysis Not Started 2017 Assess the condition of the asset classes 60% Complete 2018* Risk Management 80% Complete 2018 Performance Management 20% Complete 2019 SHOPP Project Prioritization (MODA) 60% Complete 2020 Deterioration Modelling 25% Complete 2020 Life Cycle Cost Analysis Not Started 2020 Publish Transportation Asset Management Plan Not Started 2020 Enterprise Asset Management Software Development Not Started 2022 * - Culvert inventory will not be fully defined or assessed until 2024, Bolded items require CTC approval In 2015 we devoted a large part of our effort to the foundational building blocks of asset management. The foundation of asset management involves having an accurate inventory and condition assessment of assets in their current state. The bolded headings indicate the combined compulsory requirements of these two regulations governing the implementation of asset management. Some reporting requirements for the SHOPP required under CGC requirements have been omitted from this document if they do not directly apply to the asset management implementation. Inventory In 2015, Caltrans continued and expanded efforts already underway to strengthen the inventory definition of the four core asset classes; pavement, bridges, culvert, and ITS elements Asset Management Performance Report Page 7
9 Significant accomplishments include initiating a contract for the collection of pavement condition on the locally owned portions of the National Highway System (NHS) in California. The definition of the NHS was expanded by the Moving Ahead for Progress in the 21 st Century (MAP-21) regulations to include pavement and bridges owned by cities and counties in California on designated routes. This contract will result in a comprehensive pavement inventory for the entire NHS in California in California s inventory of bridges on both the state and local systems is complete under provisions of federal requirements that have been in place for many years. Efforts continued to build the initial inventory of culvert and drainage structures in California. Caltrans has been building this inventory over time and currently has over 105,000 culverts documented. While substantial progress has been made, we estimate that there are another 100,000 culverts not in our asset inventory at this time. Locating and inventorying of these culverts is a challenge due to heavy overgrowth, difficult access, and limited staffing and equipment allocated for this work. In 2016, Caltrans will continue to expand the culvert inventory. The full culvert inventory is expected to be completed by The ITS inventory was established prior to the enactment of Senate Bill 486, however in some cases this inventory lacked complete data that is necessary for asset management. In 2015, efforts were undertaken to bolster the ITS inventory to facilitate asset management of these system operation elements. In addition to looking at the current state of the inventory for each of the four core asset classes, Caltrans began conceptual planning for how to integrate this information into a single asset management system database. A preliminary format for this combined information was developed and will be used for development of the asset management system requirements. Condition Assessment Asset management relies on having a good baseline of existing asset conditions. The enactment of MAP-21 resulted in changes in the way that pavement and bridge conditions are assessed. Federal requirements for pavement condition assessment were expanded to include new attributes not previously captured by pavement condition surveys. The condition assessment of the State Highway pavement will be improved with the completion of the 2015 automated pavement condition survey. The new pavement condition information will provide the most comprehensive and objective status of pavement conditions. The improved condition assessment and new local NHS inventory represent fundamental steps in our progress toward a fully implemented asset management plan Asset Management Performance Report Page 8
10 MAP-21 also required all states to implement a new bridge condition assessment method. Caltrans began conducting inspections using the new assessment protocol in July 2014 and continues to increase the number of bridges inspected utilizing the newest standard. By July 2016, approximately 65 percent of bridges will have been inspected using the new assessment method. Culvert condition assessment utilizes specialized robotic crawlers that enter smaller pipe culverts to capture video information of the culvert condition. This video information is converted to numerical scores used to determine the overall condition of the culvert. This inspection method produces good results but is time consuming and limits the number of culverts that can be assessed with the available robotic equipment inventory. ITS element condition reporting in the past has focused on whether the equipment was operational or not. In order to make the performance connection to the SHOPP it was necessary to refine the condition assessment to include the cause of the non-operation. In some cases, ITS elements were reported accurately as non-operational when being relocated during an active construction project. This non-operational status would not require any additional SHOPP action and therefore needed to be excluded from the reporting. Data collection changes put into place in 2015 allow SHOPP ITS needs to be isolated from maintenance needs and construction activities. Performance Measurement Under provisions of MAP-21, all states are required to utilize nationally defined performance measures for pavement and bridges. These measures were called out in regulation as good, fair and poor condition based on the surface area of the asset. The specific details of what constitutes good, fair and poor was left to the federal rule making process. In 2015, a Notice of Proposed Rule Making (NPRM) was issued to begin the process of defining the specifics of these performance measures. Caltrans provided comments and suggested changes to these proposed rules based upon internal and external discussions. The final performance measure rule is currently scheduled to be released in the summer of In March of 2015, the CTC adopted the proposed performance measures for pavement and bridges. The CTC further granted Caltrans the authority to continue to use existing performance measures until the federal measures become regulation. Therefore, the 2016 Asset Management Performance Report will utilize distressed lane miles and distressed bridges as measures. Caltrans developed state specific measures for culverts and ITS elements because they do not have a national performance measure requirement. For culvert assets, Caltrans opted to model the measure after the good, fair and poor condition assessment measures used for pavement and bridge. Similarly, the ITS performance measure was able to be finalized 2016 Asset Management Performance Report Page 9
11 using a good and poor assessment related to operational status. These measures were adopted by the CTC in March of Caltrans has been awaiting the final rule making for the pavement and bridge performance measures. The Federal Highway Administration has a scheduled final rule date of July The date for the final rule is beyond the control of the department. If the schedule for the final rule is further delayed beyond July 2016, Caltrans plans to develop our own technical criteria for the missing technical parameters in these proposed performance measures. This would allow Caltrans to develop the 2017 SHOPP Ten Year Plan utilizing Good, Fair and Poor measures for pavement and bridges, however it would carry the risk of potential future changes once the federal rule becomes final. Performance Gap Analysis Caltrans has performed performance gap analysis in our SHOPP Ten Year Plans for over a decade. These plans establish an unconstrained fiscal need necessary to achieve a desired condition or performance goal and a fiscally constrained performance level. The difference between these two plans represent the gap analysis required under provisions of MAP-21. Historically, SHOPP Ten Year Plans have focused on fiscal need first and performance second. For the 2017 SHOPP Ten Year Plan, Caltrans intention is to move to a performance based plan as the primary measure, with funding required to achieve the plan as an outcome of desired performance. This will mark a fundamental shift in thinking within Caltrans. This new approach is consistent with the multi-objective approach of project planning and delivery. Project Prioritization Improvement and documentation of the SHOPP project prioritization methodology continued in Caltrans began implementing a Multi-Objective Decision Analysis (MODA) approach for project prioritization. The MODA framework for project prioritization was first piloted in parallel with the 2014 SHOPP. In the initial pilot effort, the focus was on evaluating if the MODA framework could be effectively applied to SHOPP project evaluation. The MODA approach is the state of the art practice for multi-criteria decision analysis applied to transportation asset management. The MODA approach allows agencies to evaluate project benefits across multiple assets and competing investment decisions. As applied to the SHOPP, MODA will allow project benefits ranging from condition improvement to safety improvement and sustainability efforts to be evaluated in a common framework. When fully implemented, the MODA project evaluation will provide the following benefits: 2016 Asset Management Performance Report Page 10
12 The benefits in each of the five Department Strategic Goal areas will be determined at a project level. This will effectively tie SHOPP project prioritization to the broader goals of the Department. Allow the department to prioritize projects from highest to lowest benefit cost ratio across the entire SHOPP regardless of asset composition and will incorporate condition improvement, safety, operations, and sustainability objectives among others. Ability to measure the benefits of projects that involve multiple objectives and shift our project development culture from one of a largely silo based funding centered on a single objective to more comprehensive transportation solutions. This change in approach will provide the opportunity for greater economies of scale, better local partner coordination and less disruption to traffic. A byproduct of the MODA implementation is a comprehensive documentation of how projects are prioritized and selected in the SHOPP. This documentation will provide a level of transparency that has been desired by external partners and oversight agencies. Provide Caltrans with the ability to maximize the impact of investment of each transportation dollar. Provide the CTC with information necessary to implement the Commission s responsibilities for the SHOPP. Planning Business Process Review Activities The implementation of asset management will inevitably require business process changes in Caltrans system and project planning to support the new requirements. In 2015, a number of efforts were initiated to begin the process of defining necessary changes and to develop plans for the implementation of these changes. The Caltrans Division of Planning initiated Planning Forward and Planning to Programming reviews. These consultant assisted reviews take a fresh look at the products of system planning and how these products meet the current needs of Caltrans and external partners. The Planning to Programming effort is looking at how system planning efforts can better support asset management and project level programming of projects. Asset management implementation requires information for project prioritization and performance management that is not currently available in project initiation documents. In 2015, an asset management pilot program was developed to engage our districts in the process of developing multiple objectives project nominations prior to the initiation of formal project planning. The asset management pilot required our districts to produce projects that achieved at least three Departmental objectives in a single project. The specific objectives were left to the districts to define. The criteria for the pilot projects required the districts to develop multi-disciplinary teams that brought together various 2016 Asset Management Performance Report Page 11
13 project perspectives at the concept phase of project development. Feedback from Caltrans districts indicated that in many cases, this requirement demanded a more global approach to project scoping that was seen as beneficial. The multi-objective requirement also led to several districts consolidating highway system needs and deficiencies in a spatial format to better see needed comprehensive system improvements. These asset management pilot projects were nominated using an abbreviated process that provided the information necessary for project prioritization prior to formal planning efforts. The asset management pilot program will inform the development of a standardized project nomination process that will allow projects to be prioritized prior to being resourced for formal project planning. This project nomination process is proposed to be moved into a web based software wizard format that will allow projects to dynamically compete statewide for project planning resources. The asset management pilot program engaged five internal teams of subject matter experts to develop criteria for evaluation of 37 pilot program nominations. These teams worked for over six months developing objective data driven prioritization criteria necessary to rank the pilot program nominations. Selected projects in this pilot program will begin formal planning efforts and will become 2018 SHOPP candidates. This process facilitated the selection of the winners of the pilot program and also resulted in identification of evaluation information needs that will inform future project initiation document changes. The evaluation criteria also resulted in the first comprehensive documentation of a project selection criterion that covers all SHOPP objectives. External Stakeholder Awareness and Involvement Caltrans took a number of steps to increase external stakeholder awareness of the requirements of asset management and engage partners in key decisions. Caltrans held two workshops with external partners during One workshop focused on the performance management requirements included in MAP- 21. This workshop included city, county, Metropolitan Planning Organizations (MPO), Regional Transportation Planning Agencies (RTPA), the Federal Government and Caltrans staff. Keynote speakers included an invited guest from the Office of Performance Management in Washington D.C. During this session, Caltrans presented information on the current inventory, condition and performance of the four defined asset classes. The Department also received significant feedback on the collection of locally owned NHS pavement inventory and condition information. Caltrans also co-sponsored an Asset Management and SHOPP workshop with the CTC. This workshop was held in conjunction with the California Council of Governments (CalCOG) Executive Board meeting and featured presentations by Caltrans and CTC staff on asset management and the SHOPP development process. A discussion session followed the 2016 Asset Management Performance Report Page 12
14 presentations that provided the Department with a number of partner suggestions for improvement. Caltrans also established a Transportation Asset Management Advisory Committee (TAMAC) comprised of MPO, RTPA and advocacy groups. The TAMAC is a standing committee that will be providing input on numerous aspects of the asset management implementation effort. This committee was asked to develop an independent project prioritization methodology as part of the asset management pilot program. The TAMAC was further asked to rank the 37 pilot project nominations independently of Caltrans. The goal was to provide external partners an opportunity to propose a project prioritization methodology that could be evaluated along with the internally developed criteria to arrive at the best possible approach. Deterioration Modelling An assessment of the viability of existing deterioration models for the four asset classes was completed in Deterioration models are necessary for the Department to evaluate expected future performance and perform programmatic life cycle cost analysis. The pavement and bridge management systems used by the Department both have existing deterioration models. The culvert and ITS assets do not have defined deterioration models. The ITS element deterioration is largely a service life based model that the Caltrans Division of Traffic Operations began developing in This deterioration model relies on acquiring the extended data set discussed in the condition assessment section of this report. Preliminary discussion of methods to develop a culvert deterioration model took place in The culvert program continues to perform the initial inventorying of culverts statewide. With the focus on identifying where all the culverts are located and establishing current condition, repeated inspections of the same culverts have not been possible on a programmatic scale. Without a history of performance of the culverts, alternative methods were explored to establish a reasonable deterioration model. Work on the ITS and culvert deterioration models will continue in Risk Management MAP-21 required and the FAST Act confirms the requirement that the asset management plan be risk based. This requirement is interpreted to mean two distinct activities: the identification of risks that could impact the delivery of agreed upon performance targets and the incorporation of transportation risks in the project prioritization methodology. The MODA approach satisfies the latter requirement. The risks that could impact or prevent state and local agencies from delivering agreed upon performance include such things as changes in transportation funding levels, general 2016 Asset Management Performance Report Page 13
15 economic pressures, construction cost increases, political changes in transportation focus, local agency priorities, climatic deterioration and more. In 2015, the Caltrans Enterprise Risk Management Office conducted workshops with all twelve Caltrans Districts and local agencies in order to develop a risk register of items that may influence the ability of California transportation agencies to deliver agreed upon performance. It is worth noting that the agreed upon performance will include agreements with both the Federal Highway Administration (FHWA) and the CTC. In early January 2016, it is not yet possible to establish TAM performance targets that satisfy the requirements of MAP-21 due to the incomplete inventory data, condition assessments, and the absence of final performance measures coming out of the federal rule making process. The risk information from the workshops conducted in 2015 is being analyzed and documented and will form the basis for the risk management portion of the TAMP. Life Cycle Cost Analysis MAP-21 requires that all states implement life cycle cost analysis in their TAMP s. This life cycle cost analysis occurs at the network level and should not be confused with project level alternative evaluations. Network level life cycle cost analysis is independent of project limits or location with the exception of environmental and operational deterioration influence. None of the individual asset systems are capable of performing this level of analysis currently. The State Asset Management Engineer is evaluating options for how to satisfy this requirement. It is likely that a custom software application will be necessary to perform this level of analysis for all four core asset classes. It is worth noting that the Department does utilize a project level life cycle cost analysis tool called RealCost when warranted. The RealCost tool is a sophisticated Excel spreadsheet that was developed by the FHWA and distributed for free. Enterprise Asset Management Software Asset management implementation in California will require the development of an enterprise asset management software system. This software will integrate a number of existing Departmental systems that house inventory and condition information, manage projects, fiscal system, and geographical information systems. During 2015, the Department met with a number of commercial asset management software vendors to assess what capabilities these tools have relative to our business requirements. The development of the transportation asset management system will represent a significant investment in the management of infrastructure and the projects selected for funding in the SHOPP. In 2016, Caltrans will begin formalizing the business and data requirements of this software system in order to develop a funding plan and feasibility study for the 2016 Asset Management Performance Report Page 14
16 development. The development of the asset management software solution is currently a critical path item for the overall implementation. It is expected that the development of the underlying linear referencing system backbone to support the spatial requirements of asset management and the asset management software itself will likely take 2-3 years to implement once contracts are executed. The development of the feasibility study report is expected to take approximately 12 months to develop and secure necessary approvals internally, from the Department of Technology Services, and from the Department of General Services. Caltrans is evaluating options to utilize consultant or retired annuitant resources in order to expedite the completion of the feasibility study and requirements document Asset Management Performance Report Page 15
17 2016 Asset Performance Report The ultimate goal of TAM is to develop a strategic approach to managing investments in order to achieve a desired condition or performance level for the transportation network. California Government Code requires that TAM apply to the SHOPP. The SHOPP is the primary program available to the Department to execute the asset management plan. The Maintenance Program also provides critical maintenance and preservation efforts during the early stages of asset deterioration that collectively reduce the demand for SHOPP funding. The SHOPP and Maintenance Program efforts are related through the SHOPP Ten year Plan and Five Year Maintenance Plans. Ultimately these two plans, required under separate state laws, could be combined into a single asset management document if this would satisfy the separate requirements. In 2015, the provisions of Senate Bill 486 were signed into law by Governor Brown, requiring the department to implement a robust asset management plan by the end of the The CGC requires that Phase 1 of the asset management plan be produced in conjunction with the 2016 SHOPP. The following performance information for the 2016 SHOPP reflects the asset management accomplishments achieved in This is the first ever performance reporting of this nature for the SHOPP covering the four core asset classes adopted by the CTC in This reporting shows the progress made by the department in implementing a formal transportation asset management program. Though meaningful progress was made in 2015, it is important to remember that this is only 20 percent into the implementation time period provided in law. Recognizing the current asset management implementation stage, this report relies on information available at the time of writing and asset management tools already in place. The expectation is that this performance report will be a building block that can be improved through implementation efforts and feedback as we move closer to full implementation in Asset Management Performance Report Page 16
18 DISTRESSED LANE MILES Pavement Assets Inventory The State Highway System consists of 49,645 lane miles of pavement. To provide a visual, the area of pavement being managed by Caltrans could cover every inch of San Francisco County almost twice over. The reported pavement area does not reflect shoulders and on and off ramp pavement that would add additional area that the Department is responsible for maintaining. Condition Trends The most recent five years of performance and projected condition performance for the coming five years is presented in Chart 1 below. The existing distressed lane mile performance measure is used for reporting. A distressed lane mile is defined as a pavement section that has more than one defined threshold of cracking or has measured pavement roughness beyond established levels or combinations thereof. The historic goal for pavement is 5,000 distressed lane miles or 10% of the total inventory. The projections of future performance assumes that the funding level available to rehabilitate pavement remains at current funding levels, deterioration rates follow historical patterns and construction buying power remains flat over the five year period. It also assumes the adoption of the 2016 SHOPP projects as proposed and a stable funding picture for pavement maintenance through the Caltrans Maintenance Program. 14,000 12, Year Distressed Pavement Performance Trend 10,000 8,000 6,000 4,000 Goal 2, Historic Performance Projected Performance Chart 1 - Pavement Performance Trend and Forecast Performance Pavement condition beyond 2016 is projected to remain fairly flat as current funding levels are just sufficient to treat the natural deterioration of pavements across the network Asset Management Performance Report Page 17
19 Additional funding would be required to further reduce the number of distressed lane miles. Chart 1 shows significant drops of distressed lane miles in 2011 and These two significant drops reflect the one time change in the sampling selection method used for pavement condition assessment and additional funds from ARRA (American Recovery and Reinvestment Act) funding of SHOPP Investment The 2016 SHOPP project portfolio includes 143 pavement preservation or rehabilitation projects that will work on a combined 4,876 lanes miles of pavement throughout California. Collectively these projects will provide thin overlays on 3,198 lane miles (750 distressed lane miles) of pavement and rehabilitate or replace 1,678 lane miles (312 distressed lane miles). The total 2016 SHOPP investment in the pavement condition statewide is $2.8 billion over the four year period from July 2016 June Notable pavement projects include the following: District 3 Interstate 5 in Sacramento $175 M 53 Project Lane Miles District 4 Interstate 680 in Alameda $142 M 63 Project Lane Miles District 7 Interstate 210 in Los Angeles $125 M 52 Project Lane Miles District 8 - Interstate 15 in San Bernardino $173 M 95 Project Lane Miles Note: The projects noted above include pavement work in addition to other improvements Asset Management Performance Report Page 18
20 DISTRESSED BRIDGES Bridge Assets Inventory The State Highway System relies on almost 13,000 bridges to carry the highway over waterways, canyons and intersecting roadways. The total bridge deck surface area is more than 251 million square feet. If one were to place all the bridges end to end, bridges would span from Mexico to the Oregon border. Condition Trends The most recent five years of bridge condition performance and projected performance for the coming five years is presented in Chart 2 below. The performance chart is based on the existing performance measure of distressed bridges. A distressed bridge is defined as any bridge that has a rehabilitation, replacement, scour or seismic retrofit need that has been identified by an engineer either through inspection or analysis. The historic goal is three percent of the inventory or 400 distressed bridges. The projections of future performance assume that the funding level available to rehabilitate bridges remains at current funding levels, deterioration rates follow historical patterns and construction buying power remains flat over the five year period. Chart 2 also assumes the adoption of the 2016 SHOPP projects as proposed and a stable funding picture for the Bridge Maintenance Program Year Distressed Bridge Performance Trend Goal Historic Performance Projected Performance Chart 2 Bridge Performance Trend and Forecast Performance 2016 Asset Management Performance Report Page 19
21 2016 SHOPP Investment The 2016 SHOPP project portfolio includes 163 bridge preservation, rehabilitation or vulnerability mitigation projects that will work on 178 distressed bridges throughout California. The total 2016 SHOPP investment in the bridges statewide is $1.4 billion over the four year period from July 2016 June Collectively these projects will replace 40 bridges, rehabilitate 138 bridges, upgrade 83,000 feet of deficient bridge rail, increase vertical clearance on 12 bridges, strengthen 7 bridges and apply preservation treatments on 209 bridges. Notable bridge projects include the following: Albion River bridge replacement The project is located in Mendocino County on State Route 1 approximately 7 miles south of the community of Mendocino. This 969 foot long bridge was built in 1944 and features 34 spans constructed of timber and steel. Upon completion of this project will replace a functionally obsolete bridge, improve seismic safety and provide pedestrian and bicycle access across the river. I-80 Mobility Project The project is located in Solano County on Interstate 80 in the city of Vallejo. This project will increase the vertical clearance of 6 structures on Interstate 80 to a minimum standard height of This project is the final phase to improve vertical clearance restrictions along the I-80 corridor from San Francisco to the Nevada State line. This project is part of the Interstate 80 freight improvement corridor work. Sacramento River Bridge and Overhead Sacramento River BOH (Bryte Bend) are a pair of parallel 4,050 foot long bridges which carry Interstate 80 over the Sacramento River in West Sacramento. These 4,050 foot long steel box girder bridges were built in 1971 have a long history of fatigue related cracking. The load carrying capacity of these structures has been reduced to a level that restricts heavy permit vehicles. This project will restore capacity and improve freight use. This project is also being done to facilitate clearing freight restrictions along the I-80 corridor. Santa Monica Viaduct This project is located in the City of Los Angeles on Interstate 10. The structure is over 4 miles long and was built in 1959 with a total of 271 mainline spans constructed of reinforced concrete and steel. This project will provide preventive maintenance measures to the structure to extend the service life of the bridge. Stanislaus River Bridge The bridge carries southbound State Route 99 near Ripon and spans the Stanislaus River which separates San Joaquin and Stanislaus counties. The 1,220 foot long structure was originally built in 1903 and consisted of two reinforced concrete 2016 Asset Management Performance Report Page 20
22 arch spans over the channel and 24 steel approach spans. This project proposes to replace the original two reinforced concrete arch spans. Intelligent Transportation System Assets Inventory ITS elements increase the efficiency of the existing highway system by maximizing throughput of the system and through the facilitation of rapid response to clear nonrecurrent delays caused primarily by accidents or disabled vehicles impeding efficient traffic flows. ITS assets are represented by the three most significant elements; ramp meters, changeable message signs and highway loop detectors. Other lesser cost or lesser count items such as closed circuit television cameras, weigh in motion systems, highway advisory radio systems are excluded from this reporting. The State Highway System relies on 2,802 ramp meters, 834 changeable message signs, and over 43,200 highway traffic loop detectors to improve system operation. In total there are over 46,800 individual ITS elements represented by these three major types. Condition Trends The most recent five years of ITS element performance and projected performance for the coming five years is presented in Chart 3. The performance chart is based on the adopted performance measure of Good (operational) or Poor (non-operational or obsolete). The performance measure is a count of elements in these two categories. The lagging condition is dominated by non-functioning highway loop detectors. These loop detectors are cut into the pavement and wired to controllers on the side of the highway. The controllers work with ramp meters to control the signal timing of traffic entering the highway. Loop detectors can become non-operational for a number of reason including damage from traffic loads, construction and copper wire theft or because of controller failure. The projections of future performance assumes that the funding level available to replace poor condition ITS elements remains at current funding levels, service lives follow historical patterns and our construction buying power remains flat over the five year projection period. Chart 3 also assumes the adoption of the 2016 SHOPP projects as proposed, the execution of the proposed SHOPP reservation and a stable funding picture for the Maintenance Program Asset Management Performance Report Page 21
23 ITS ELEMENT HEALTH Better 100% 90% 80% 70% Worse Goal 10 Year ITS Element Health Performance Trend 60% 50% 40% 30% 20% 10% 0% Historic Performance Projected Performance Chart 3 Intelligent Transportation System Performance Trend and Forecast Performance* * Chart is inclusive of expected performance from the proposed SHOPP reservation 2016 SHOPP Investment The 2016 SHOPP project portfolio includes thirty ITS projects. These projects include a mix of element replacement and system build out projects. In total the 2016 SHOPP includes 1,600 rehabilitation or replacement of existing ITS elements and 1,100 ITS element additions to continue the system build out. The total 2016 SHOPP investment in the ITS elements statewide is $260 million over the four year period from July 2016 June 2020 including proposed reservation. In recognition of the lagging projected performance of the ITS elements shown in Chart 3, the Department is proposing a SHOPP reservation of $150 million to allow additional ITS projects to be planned and included in the later years of the 2016 SHOPP(fiscal years 2018/19 and 2019/20). This reaction to lagging performance reflects an adjustment of our investment strategy to achieve a desired performance goal. This is asset management. The department will also be evaluating improved technology and alternative means to capture the necessary information in addition to conventional loop detection approaches Asset Management Performance Report Page 22
24 Culvert Assets Inventory Culverts are unique among the four core asset classes as they are the only asset where we are rapidly building the known inventory. At the time of the writing of this report, more than 105,000 individual culverts had been added to the inventory. The inventory is comprised of small box culverts not meeting the requirements to be defined as bridges and pipe culverts. Caltrans estimates that the total number of highway culverts is approximately 205,000. Ongoing culvert inspections are adding approximately 12,000 culverts to the inventory each year. Failure to address deteriorating culvert conditions increases the risk of potential mobility disruptions associated with highway fill collapse or severing of the highway during period of high flows. The total length of currently inventoried culverts is 10.2 million feet. If one were to line these culverts end to end on Interstate 80 the length would reach from San Francisco to the state of Illinois. Condition Trends The most recent five years of culvert performance and projected performance for the coming five years is presented in Chart 4. The performance chart is based on the adopted performance measures of Good, Fair and Poor. The presented performance measure is a count of culverts that have varying degrees of deterioration when inspected. The projections of future performance assumes that the funding level available to replace poor culverts remains at current levels with proposed reservation, deterioration follows historical patterns, newly inventoried culverts have a similar statistical condition distribution to those already in the inventory and construction buying power remains flat over the five year projection period. Chart 4 also assumes the adoption of the 2016 SHOPP projects as proposed and a stable funding picture for the maintenance program Asset Management Performance Report Page 23
25 POOR CULVERTS (1,000'S OF FEET) Year Culvert Performance Trend LF (x1000) Goal 10% Poor Historic Performance Projected Performance Chart 4 Culvert Performance Trend and Forecast Performance (Includes proposed reservation in projection) 2016 SHOPP Investment The 2016 SHOPP project portfolio includes 37 culvert rehabilitation or replacement projects valued at $150 million which will address approximately 64,000 feet of poor condition culverts. The total 2016 SHOPP investment in the culverts statewide is approximately $250 million (including proposed reservation) over the four year period from July 2016 June In recognition of the lagging projected performance of the culverts shown in Chart 4 being driven by the increasing inventory, the Department is proposing a SHOPP reservation of $100 million to allow additional culvert projects to be planned and included in the 2016 SHOPP over the next two years. This reaction to the growing inventory and lack of planning studies in this asset area reflects adjustment of our investment strategy to achieve a desired performance goal Asset Management Performance Report Page 24
26 Looking Forward Substantial work is still needed to fully implement the asset management requirements contained in federal and state regulation. This initial Asset Management Performance Report serves to document our progress to date in implementing asset management in California and the performance relationship to the SHOPP. The Department invites feedback on this report and suggestions for improvement in future reports will mark another year of considerable activities associated with our asset management implementation efforts. Looking ahead in 2016, the Department is anticipating the scheduled release of the final rulemaking on the federal performance measures, completion of the local NHS pavement condition survey, the development of our asset management system requirements and beginning a fundamental shift to performance management in our approach to the 2017 Ten Year SHOPP Plan Asset Management Performance Report Page 25
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY
Caltrans - Asset Management Implementation. March 2015
Caltrans - Asset Management Implementation March 2015 Asset Management Plan Definition An asset management plan is a strategic plan for managing an organization's infrastructure and other assets to deliver
How To Manage Transportation Asset Management
1 TRANSPORTATION ASSET MANAGEMENT THE NEW BUSINESS MODEL FOR TRANSPORTATION AGENCIES Presented at the AASHTO Subcommittee on Transportation Finance Policy Business Meeting Irvine, California June 26, 2012
Asset Management Highway Division Plan
Asset Management Highway Division Plan 3/17/15 Leading the Nation in Transportation Excellence 1 U.S. Transportation Agencies Challenges Rising Costs Higher customer demand for better and safer roads Highly
New Mexico DOT Transportation Asset Management Implementation Plan. final plan
New Mexico DOT Transportation Asset Management Implementation Plan final plan February 23, 2015 report New Mexico DOT Transportation Asset Management Implementation Plan date February 23, 2015 Table
Asset Management for MAP-21. Gary Lasham, P.E. Jonathan Pollack
Asset Management for MAP-21 Gary Lasham, P.E. Jonathan Pollack Replaced Intermodal Surface Transportation Efficiency Act (ISTEA) MAP-21 is transforming the policy and programmatic framework for investments
SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS
SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS October 2015 Background The Surface Transportation Program (STP) was originally established as Section 133 of
Earth Retaining Structures
Earth Retaining Structures and Asset Management Earth Retaining Structures and Asset Management A Critical Component Tool in Maintaining Public Safety Earth Retaining Structures (ERS) are often an overlooked
Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding
C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM
INDOT 2000-2025 Long Range Plan
Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process
CHAPTER 4 SURFACE TRANSPORTATION PROGRAM (STP)
Local Assistance Program Guidelines Chapter 4 CHAPTER 4 SURFACE TRANSPORTATION PROGRAM (STP) CONTENTS Section Subject Page Number 4.1 INTRODUCTION... 4-1 4.2 ELIGIBILITY CRITERIA... 4-1 General... 4-1
Surface Transportation Program (STP) Projects
Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE
WSDOT s Approach to Seismic Retrofit of Highway Structures
WSDOT s Approach to Seismic Retrofit of Highway Structures Role of the Lifeline Route in Reducing Network Risk Lynn Peterson Secretary of Transportation Patrick Morin, PE Capital Program Development &
Appendix E Transportation System and Demand Management Programs, and Emerging Technologies
Appendix E Transportation System and Demand Management Programs, and Emerging Technologies Appendix Contents Transportation System Management Program Transportation Demand Management Program Regional Parking
SF Bay Area Transportation Management Systems: An Innovative DOT and MPO Partnership
SF Bay Area Transportation Management Systems: An Innovative DOT and MPO Partnership Radiah Victor Principal, Operations Metropolitan Transportation Commission Oakland, California ITS CA Annual Meeting
Chapter 5 RISK MANAGEMENT ANALYSIS CHAPTER 5 RISK MANAGEMENT ANALYSIS PAGE 49
Chapter 5 RISK MANAGEMENT ANALYSIS CHAPTER 5 RISK MANAGEMENT ANALYSIS PAGE 49 This page intentionally left blank. PAGE 50 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN RISK MANAGEMENT ANALYSIS
Final NPS Alternative Transportation Program Strategic Action Plan, 2012 2016
Final NPS Alternative Transportation Program Strategic Action Plan, 2012 2016 FY 2012 Executive summary This plan is an action oriented, performance based update to the 2002 2006 Alternative Transportation
THE USE OF HIGHWAY MAINTENANCE MANAGEMENT SYSTEMS IN STATE HIGHWAY AGENCIES
THE USE OF HIGHWAY MAINTENANCE MANAGEMENT SYSTEMS IN STATE HIGHWAY AGENCIES Introduction The American Association of State Highway and Transportation Officials (AASHTO) published its Guidelines for Maintenance
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM 2.1. INTRODUCTION TO PAVEMENT MANAGEMENT The ability of a pavement system to serve a society is largely a function of planning. Planning is the intersection between
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
Date: 10/10/2014 Initiated by: AAS-100
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Airport Pavement Management Program (PMP) Date: 10/10/2014 Initiated by: AAS-100 AC No: 150/5380-7B Change:
CHAPTER 6 Project Cost, Scope, and Schedule Changes Table of Contents
Chapter 6 Project Cost, Scope, and Schedule Changes Table of Contents CHAPTER 6 Project Cost, Scope, and Schedule Changes Table of Contents CHAPTER 6 Project Cost, Scope, and Schedule Changes... 6-3 ARTICLE
American Public Works Association Asset Management Task Force, 1998
a comprehensive and structured approach to the long term management of assets as tools for the efficient and effective delivery of community benefits. Strategy for Improving Asset Management Practice,
CHAPTER 2 LCCA APPROACHES
2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to
Traffic Incident Management Enhancement (TIME) Blueprint Version 2.0 Executive Summary
Blueprint Version 2.0 Executive Summary Strategic Background The Southeastern Wisconsin region, which encompasses the following eight counties: Fond du Lac, Kenosha, Milwaukee, Ozaukee, Racine, Walworth,
ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A
ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow
AIR QUALITY TECHNICAL MEMORANDUM
AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision
The Development of Practical Asset Management System for an Urban Expressway Network
The Development of Practical Asset Management System for an Urban Expressway Network Motohiko Nishibayashi, Hanshin Expressway Company Limited 1. Introduction Hanshin Expressway is an urban expressway
South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures
South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures Prepared for: Prepared by: June 2013 TABLE OF CONTENTS 1. Introduction... 1 1.1 Baseline Understanding...
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_
2007 STATEWIDE PRESERVATION (SPP) _MAINTAIN IT_ 1 Preventive Maintenance and Rehabilitation MING AUTHORITY allocation by fmula. Projects selected by districts. State % 0% State Districts RANKING INDEX
Maintenance Management and Asset Management
Defining and Understanding the Difference Between Maintenance Management and Asset Management Dr. Simon Lewis AgileAssets, Inc. 12th AASHTO-TRB Maintenance Management Conference Annapolis Maryland, July
WASHINGTON STATE TRANSPORTATION BY THE NUMBERS:
WASHINGTON STATE TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility MARCH 2014 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit
Associated Students of the University of California, Merced 2014-2015. Resolution #14. Resolution in Support of the California High-Speed Rail Project
Introduced By: Isaias Rumayor III, ASUCM Senator At-Large Authored By: Michael Lomio, ASUCM Senator At-Large Isaias Rumayor III, ASUCM Senator At-Large Sponsored By: Background: The California High-Speed
Update on the Development of MAP 21 Performance Measures
Update on the Development of MAP 21 Performance Measures TPB Technical Committee February 6, 2015 Eric Randall Department of Transportation Planning Item 9 MAP 21 Rulemaking National Goals Rulemaking Overview
Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A
Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement
MassDOT s Work Zone Transportation Management Procedures. By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB
MassDOT s Work Zone Transportation Management Procedures By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB What is the Work Zone Safety and Mobility Rule? 23 CFR 630 Subpart J, effective October
Texas Freight Advisory Committee A PRIMER ON PUBLIC SECTOR FREIGHT PERFORMANCE MEASURES
Texas Freight Advisory Committee A PRIMER ON PUBLIC SECTOR FREIGHT PERFORMANCE MEASURES October 1, 2013 A PRIMER ON PUBLIC SECTOR FREIGHT PERFORMANCE MEASURES How Do Performance Measures Assist the Public
Critical Assets and Extreme Weather Process & Lessons
Critical Assets and Extreme Weather Process & Lessons Steven Olmsted Intermodal Transportation Division Arizona Department of Transportation 2014 Transportation Asset Management Conference April 28-30,
City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN
Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,
Chapter VIII: Long-Term Outlook and the Financial Plan
A. Long-Term Outlook Chapter VIII: Long-Term Outlook and the Financial Plan When examining the long-term outlook for transportation planning and programming over the foreseeable future, there are several
Technical Memorandum PERFORMANCE MEASURES. Prepared by:
Technical Memorandum PERFORMANCE MEASURES Prepared by: March 2014 TABLE OF CONTENTS Executive Summary... 1 1. Introduction... 2 1.1 Performance Measures and the Public Sector... 2 1.2 National Focus: MAP
Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT
Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT Comprehensive Asset Management Planning What Is Your Asset Management Organization? What Do You
Implementing Pavement Management Systems, Do's and Don ts at the Local Agency Level
Implementing Pavement Management Systems, Do's and Don ts at the Local Agency Level Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University 1 Do Understand Basic Pavement
CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE ***DRAFT***
CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE ***DRAFT*** CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE... 1 SECTION 7.1 INTRODUCTION... 2 Subsection 7.1.1 Purpose... 2 Subsection 7.1.2 Scope... 2 Subsection
Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000
1 of 8 12/27/2013 8:21 AM U.S. Department of Transportation Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000 MAP-21 - Moving Ahead for Progress in the 21st Century
CONSTRUCTION COST ESTIMATES
Chapter 8 CONSTRUCTION COST ESTIMATES SCDOT BRIDGE DESIGN MANUAL April 2006 Table of Contents Section Page 8.1 PROGRAMMING ESTIMATES...8-1 8.1.1 Bridge Replacement Projects...8-1 8.1.2 Other Projects...8-1
Wilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
Lynn M. Suter and Associates
3 Lynn M. Suter and Associates Government Relations GM Memo No. 05-181 August 5, 2005 TO: Joe Wallace, President, and Members of the AC Transit Board of Directors Jim Gleich, DGM FR: RE: Lynn M. Suter
MOTION NO. M2015-63 WSDOT Task Order for Final Design Services PROPOSED ACTION
MOTION NO. M2015-63 WSDOT Task Order for Final Design Services MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee 07/09/15 Final Action Ahmad Fazel, DECM Executive Director Ron Lewis, East
Appendix 1 Washington State Department of Transportation (WSDOT)
Appendix 1 Washington State Department of Transportation (WSDOT) Challenges Facing Washington State Freight Systems Across all modes and systems, freight shipments are growing, which reflects positive
PRIORITIZATION PROCESSES
PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take
Railway Crossing Information System
Railway Crossing Information System ITS Canada Presentation June 2, 2014 Ian Steele, P.Eng Agenda Click to edit Master title style RBRC Program Project Background Concept of Operations Design Process Design
Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016
Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016 Date of Release: September 14, 2015 Pre application
CALIFORNIA TRANSPORTATION BY THE NUMBERS:
CALIFORNIA TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility SEPTEMBER 2014 202-466-6706 tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
A Legislative Briefing prepared by Volume 7, Number 1 February 2001
fiscal forum A Legislative Briefing prepared by Volume 7, Number 1 February 2001 Mitchell E. Bean, Director P. O. Box 30014, Lansing, MI 48909-7514 517-373-8080! FAX 517-373-5874! www.house.state.mi.us/hfa
2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation
2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation Version 1 Table of Contents Executive Summary... 5 1.1 Background... 5 1.2 State of Local Infrastructure... 5 1.3 Desired Levels
CONCEPTUAL REHABILITATION ALTERNATIVE
Appendix D While federal law requires preservation/rehabilitation of historic bridges be considered, there is no standard procedure to determine when rehabilitation is appropriate and when replacement
Moving Ahead for Progress in the 21 st Century (MAP-21)
Streets and Freeways Subcommittee Meeting Moving Ahead for Progress in the 21 st Century (MAP-21) September 20, 2012 Metro s America Fast Forward Proposal Included in MAP-21 Act Enhances Transportation
Safety Data Collection, Analysis, and Sharing
Safety Data Collection, Analysis, and Sharing About the HSIP Noteworthy Practice Series The Highway Safety Improvement Program (HSIP) is a core Federal-aid highway program with the primary purpose of achieving
Action Plan Template. [Community Name] Climate Change Action Plan. Province of Manitoba Climate Change Planning Resources.
[Community Name] Climate Change Action Plan Prepared By: Acknowledgements: Ex. council/board, staff, committee Date: When submitted to council/board Executive Summary A short summary outlining the main
The Indiana Experience
Transportation Asset Management Case Studies Presented by HIGHWAY ECONOMIC REQUIREMENTS SYSTEM-STATE The Indiana Experience Aerial view of the I-65/I-75 split in Indianapolis. Photo by James Kinder. FRONT
WORK ZONE SAFETY & MOBILITY GUIDANCE DOCUMENT
WORK ZONE SAFETY & MOBILITY GUIDANCE DOCUMENT August 2007 Prepared by: Vermont Agency of Transportation The following document was drafted in response to updates made to the work zone regulations at 23
Capital Improvement Program: Public Input and the Need for a Multi-year Plan
Attachment 1 OFFICE OF THE INDEPENDENT BUDGET ANALYST REPORT Date Issued: September 21, 2012 IBA Report Number: 12-39 Budget and Finance Committee Docket Date: September 26, 2012 Item Number: 8 OVERVIEW
CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers
United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,
14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:
14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation
SYSTEMWIDE REQUIREMENTS
SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a
GENERAL. This manual addresses five local programs that are funded under the current Highway Act:
OVERVIEW The Local Public Agency Manual published by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal
STATEMENT THOMAS P. MICHELLI CHIEF INFORMATION OFFICER U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT DEPARTMENT OF HOMELAND SECURITY REGARDING A HEARING ON
STATEMENT OF THOMAS P. MICHELLI CHIEF INFORMATION OFFICER U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT DEPARTMENT OF HOMELAND SECURITY REGARDING A HEARING ON EXAMINING CHALLENGES AND WASTED TAXPAYER DOLLARS
DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job
MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments
Memorandum. This memorandum requires Board action. Executive Summary
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: July 8, 2014 Re: Decision on the Delaney-Colorado
OM-13: Transportation Management and Operations
: Transportation and Operations 1-15 points Goal: Maximize the utility of the existing roadway network through use of technology and management of operations strategies. Sustainability Linkage Transportation
Butch Wlaschin P.E. Director, Office of Asset Management, Pavements, and Construction FHWA
Butch Wlaschin P.E. Director, Office of Asset Management, Pavements, and Construction FHWA National Goals Focus the Federal-aid program on the following national goals: 1) SAFETY 2) INFRASTRUCTURE CONDITION
7.0 Transportation Management
7.0 Transportation Management I. Introduction The Kansas City region has invested considerable effort and resources in the design and implementation of its regional multimodal transportation system. As
The City of Owen Sound Asset Management Plan
The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to
CHAPTER 8 Integration of Systems
Integration of Systems CHAPTER 8 Integration of Systems 8-1 Advanced Transportation Management Technologies 8-2 Integration of Systems Individual metropolitan intelligent transportation infrastructure
Examples of Transportation Plan Goals, Objectives and Performance Measures
Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.
Louisiana Department of Transportation and Development. Initial Transportation Asset Management Plan (Pilot Version February 2015)
Louisiana Department of Transportation and Development Initial Transportation Asset Management Plan (Pilot Version February 2015) February 2015 Louisiana Department of Transportation and Development Initial
Review of Recent Bridge Asset Management Systems
Review of Recent Bridge Asset Management Systems Takeshi Hanji 1 and Kazuo Tateishi 1 1. EcoTopia Science Institute, Nagoya University, Nagoya, Japan Abstract: A number of transportation agencies throughout
Chapter 5 Financial Plan
The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to
Asset Management Plan
Example Transportation Asset Management Plan Outline This outline was created using the Transportation Asset Management Plan (TAMP) Builder ( www.tamptemplate.org ), a product of NCHRP Project 8-36/116.