EXHIBIT H QUALITY ASSURANCE REQUIREMENTS
|
|
|
- Lisa Wilkerson
- 9 years ago
- Views:
Transcription
1 Dated v :24AM EXHIBIT H QUALITY ASSURANCE REQUIREMENTS QC-01B QUALITY ASSURANCE PROGRAM REQUIREMENTS FOR ONSITE SUBCONTRACTS (May 2012) All work activities, including the purchase and inspection of any provided items intended for permanent installation (or spares), items ultimately intended for off-site shipment such as waste containers etc., or calibrated portable Measuring & Test Equipment (M&TE) being used in testing/calibration of permanently installed equipment, will be governed by the following sub-clauses that are marked with an X : For LANL designated ML-4 work only: All work activities associated with this Subcontract have been planned, reviewed, approved, and designated herein by CONTRACTOR under the controls of the LANL Quality Assurance (QA) Program defined in SD330, which is compliant with DOE Order 414.1D and 10 CFR 830 Subpart A. As such, applicable LANL QA Program requirements have been tailored to the scope of work of this Subcontract within the various Subcontract Exhibits for implementation by SUBCONTRACTOR. Thus, SUBCONTRACTOR is performing work under this Subcontract in accordance with the graded approach requirements of the LANL QA Program. Consistent with a graded approach to the LANL QA Program, it is acceptable for SUBCONTRACTOR to directly procure/supply items as necessary in support of the scope of this Subcontract. SUBCONTRACTOR provided Measuring and Testing Equipment (M&TE), which requires calibration and is used on-site at LANL for the purpose of determining LANL item/process acceptability, must be coordinated with the LANL Standards & Calibration Laboratory (S&CL). As defined in LANL procurement quality procedures, any SUBCONTRACTOR supplied stand-alone circuit breakers and fasteners, and/or hoisting, lifting, and rigging equipment intended to be installed at LANL or otherwise remain at LANL for future use (i.e. spares), must have an Inspection Plan (Form 1952) completed by LANL project personnel and receive documented LANL QA Division receipt inspection approval prior to installation. Unless otherwise provided for in this subcontract, no other exceptions to the LANL QA Program are allowable unless specifically defined in an approved LANL Compensatory Action Plan. Unless otherwise provided for in this subcontract, SUBCONTRACTOR is responsible for including (i.e. flowing down) the quality assurance requirements of this subcontract in its lower-tier subcontracts to the extent necessary to ensure SUBCONTRACTOR S compliance with these requirements. TSME Approved Phillip Sena Date 11/20/2014 Requisition# CTS-1 LLNL Solicitation/PO # Page 1 of 1
2 Dated v :24AM NOTE 1: For n-catalog iprocurement orders, the information on these pages concerning the questions/answers of the Exhibit H Workflow (that resulted in the Exhibit H) should be left in place when forwarded to ASM Procurement. These questions/answers are intended for ASM s information but are not intended to be included with the Exhibit H sent to the Vendor. ASM should separate this information from the Exhibit H prior to including the Exhibit H as part of the purchase document. NOTE 2: For Catalog (BOA) orders, the information on these pages concerning the questions/answers of the Exhibit H Workflow (that resulted in the Exhibit H) should be separated by the Originator/Requester/Designated Procurement Representative (DPR) from the Exhibit H clauses prior to attaching in iprocurement. NOTE 3: When the WPA workflow question, Is item and/or service to be provided from another DOE M&O contractor site (i.e. is this an ICO)? is answered as Yes, then only a subset of the total amount of workflow process questions needs to be answered (Originator name, TSME name, requisition #, generic item/service description, attached file [optional], ML, and ICO = Yes). The Exhibit H will be generated with a single quality clause intended for ICO s (i.e. QC-01C). 1. Does the Item or Service to be furnished under this subcontract potentially affect nuclear or radiological safety? 2. Originator / Requester: Lujan, James 3. Requisition.: CTS-1 LLNL 4. Would you like a QSME to review and approve the information submitted? 5. Would you like to add any other supporting documentation? 0 files uploaded 6. Technical SME: Sena, Phillip Page 1 of 6
3 Dated v :24AM 7. Would you like to add any other supporting documentation? 0 files uploaded 8. Type-in a generic item/service description: installation of CTS and possible on-going maintenance 9. Is work described under this subcontract being performed on- and/or off-site? Select all that apply. On-Site 10. Does the scope of this subcontract provide items and/or services? Select all that apply. Services 11. Attach description documents from files (Exhibit D, Vendor catalog, Vendor Quote, etc.): 0 files uploaded 12. Quality SME: Answer 13. What is the Management Level (ML) of the service or item(s) provided under this subcontract? ML Do the items provided under this subcontract include any of the following? N/A 14.a. Is hoisting, lifting and/or rigging (HLR) one of the following types, such that a Certificate of Proof Test [CPT] shall be provided? Answer 15. Is item and/or service to be provided from another DOE M&O contractor site (ie. is this an ICO)? Page 2 of 6
4 Dated v :24AM 16. Is this procurement for weapon or weapon-related services, materials, supplies, or components (i.e., subject to QC-1 quality requirements)? 17. Is this a Staff Augmentation Contract? 18. Does the service to be conducted under this subcontract involve providing calibration certification for new or existing M&TE? 19. Is a Certificate of Conformance (C of C) required for the item(s) provided under this subcontract? 20. The Certificate of Conformance (CoC) will be traceable to the subcontract and describe the item, including applicable requirement documents. Do you require the CoC include any additional information? Answer 20.a. You have indicated the need for specific content on the CoC. Please complete the following statement which will appear in the subcontract clauses. The C of C shall specifically certify that: Answer 21. Are Certified Material Test Reports (CMTRs) required to be provided? 22. Is traceability to raw materials required to be provided? 23. Is Measurement and Test Equipment provided by the Subcontractor for testing/certification of an on-site structure, system or component? 24. Do you require any of the following requirements/submittals? Select all that apply. N/A Page 3 of 6
5 Dated v :24AM 24.a. You have selected Inspection and/or Test Reports. Do you require specific reports or specific report information to be included? Answer 24.a.1. You have indicated the need for additional reports to be provided. Please complete the following statement which will appear in the subcontract clauses. In addition, the following specific reports shall be provided: Answer 25. Does the work involve environmental remediation for which an administrative record is required? 26. Do the item(s) being supplied under this subcontract have any special handling, storage, shipping or packaging requirements? 27. Do the item(s) being supplied under this subcontract have any special serialization and/or marking of lot numbers required? 28. Is item a DOT/UN container? 29. Is the subcontractor providing design services? 30. Is the Subcontractor implementing a LANL-controlled design? 31. Does statement of work include on-site welding? 32. Is item a chemical for which a Certificate of Analysis (CoA) is required? Page 4 of 6
6 Dated v :24AM 33. Is a LANL review of the subcontractor's design required prior to implementation of the design? 34. Does the statement/scope of work include special processes? 35. Does work require LANL review/approval of manufacturing, inspection, and/or test procedures? 36. Do you require First Article Inspection review? 37. Does work require witness and/or hold points (ie. source inspection) at the subcontractors facility prior to shipment? 38. Do you potentially require a LANL representative to be resident at the Subcontractor facility? 39. Does the item have shelf life concerns or special storage requirements? 40. Is 10 CFR 21 defects and non-compliance reporting required? 41. Does work scope require compliance with IBC (International Building Code)? 42. Does procurement potentially require the subcontractor to provide nuclear grade HEPA filters for on-site use? Page 5 of 6
7 Dated v :24AM 43. Does the item or service involve Safety Software or Risk Level 1 or 2 Software per P1040, Software Quality Management? 43.a. You have indicated that the procurement involves software in scope of P1040. Please select the documentation you require the vendor to provide: Answer 44. Do you require supplier to maintain records of the scope of work covered by this subcontract beyond the duration of the subcontract? 44.a. You have indicated you desire the subcontractor to maintain records on behalf of the Laboratory for a period beyond the completion of work. Please specify for how many years the records are to be maintained by the Subcontractor: Answer 45. Is it required to have a vendor QAP for this procurement? 45.a. Please provide the approval date for vendor QAP approved by LANL as documented on the IESL or if not an IESL company, enter the date from the correspondence sent to the Vendor indicating QAP approval. If this will be a competitive bid process or the Vendor QAP is not yet approved, enter TBD instead of a date: Answer 46. If a LANL approved Vendor's QAP is not being implemented for On-site work, select whether work will be conducted On-Site under the LANL QAP (SD330) or a Compensatory Plan Action Plan (if no On-Site work is involved or if Vendor is working to their approved QAP, select N/A). N/A Page 6 of 6
QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G 414.1-2A, Appendix A, 6-17-05)
QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G 414.1-2A, Appendix A, 6-17-05) This review template is intended for use by the DOE for evaluating a DOE Site Office or Contractor Quality Assurance
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).
Section 100 Contractor Quality Control Program
7/21/2014 AC 150/5370-10G Section 100 Contractor Quality Control Program 100-01 General. When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and
ESH 007 Lesson Plan ESQ Training
ESH 007 Lesson Plan ESQ Training Course Number and Title Revision to LMS-PROC-125, Applying the Graded Approach to Quality Date 01/27/2015 Terminal Objective (Describes the expected outcomes of this training)
Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division
Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...
How DCMA Helps To Ensure Good Measurements
How DCMA Helps To Ensure Good Measurements Speaker/Author: Robert Field Defense Contract Management Agency 605 Stewart Avenue Garden City, New York 11530 Email: [email protected] Phone: (516) 228-5886;
Linac Coherent Light Source (LCLS)
Linac Coherent Light Source (LCLS) An X Ray Free Electron Laser LLNL Quality Implementation Plan PMD 003 r0 May 2004 Prepared for the US Department of Energy under contract numbers: SLAC DE AC03 76SF00515
Supplier Quality Assurance
Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on
Purchase Order Clauses and Conditions
Purchase Order Clauses and Conditions All purchase orders for materials, special processes, machining and fabrication services and end items are subject to the following requirements: General Requirements:
Supplier Quality Assurance Requirements Manual
12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D
VENDOR QUALIFICATION APPROVAL FORM
COMPANY INFORMATION: Company Name: Jet Aviation St. Louis, Inc. Address (Street, City, State) Other Property Locations: Website: Repair Station Certificate No. With Class Rating: Date of Last FAA Audit:
Supplier Quality Requirements F16 Program
ISRAEL AEROSPACE INDUSTRIES LTD. MILITARY AIRCRAFT GROUP, LAHAV DIVISION DOCUMENT IDENTIFIER : WF16Z/150901 Supplier Quality Requirements F16 Program RESTRICTION ON USE, DUPLICATION, OR DISCLOSURE OF PROPRIETARY
GLOBAL AEROSPACE PROCEDURE
1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to
Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility
WM 07 Conference, February 25 March 1 2007, Tucson, AZ Quality Assurance Manual for Low Level Radioactive Waste Disposal Facility Yasser T. Mohamed Hot Laboratories and Waste Management Center, Egyptian
IEC Electronics Terms and Conditions
IEC Electronics Terms and Conditions 1. General: This Purchase Order is placed subject to these terms and conditions including those within the Purchase Order. The terms of any proposal referred to in
F4E-QA-010 - QUALITY CLASSIFICATION
idm@f4e UID / VERSION 22MD99 / 2.0 VERSION CREATED ON / STATUS 20 Jul 2012 / APPROVED EXTERNAL REFERENCE (F4EDocs: N22010) Quality Procedures F4E-QA-010 - QUALITY CLASSIFICATION This document describes
Helical Products Co., Inc.
Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance
This document was prepared in conjunction with work accomplished under Contract No. DE-AC09-96SR18500 with the U. S. Department of Energy.
This document was prepared in conjunction with work accomplished under Contract No. DE-AC09-96SR18500 with the U. S. Department of Energy. DISCLAIMER This report was prepared as an account of work sponsored
Bogue Machine Company, Inc. Business Instruction
Bogue Machine Company, Inc. Business Instruction Document Title: Supplier Quality Control Requirements Document Number: Revision: Document Owner: Mark Bogue Backup Owner: Craig Bogue Parent Document: PURP-004,
Century Fasteners & Machine Co., INC. /CFMC PURCHASE ORDER
Century Fasteners & Machine Co., INC. /CFMC PURCHASE ORDER CONDITIONS AND INSTRUCTIONS A HARDCOPY OF THIS DOCUMENT MAY NOT BE THE DOCUMENT IN EFFECT. SEE CFMC DOCUMENT LIBRARY FOR CURRENT REVISION. 1.
Supplier Quality Requirements and Clauses
Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion
Information Description: AG-FFRT-S-15-0002 Bid invitation number: 2000002950 Purchasing Group: AMS-Fruit and Veg
United States Department of Agriculture Agricultural Marketing Service Commodity Procurement Staff 1400 Independence Avenue, S.W. Room 3522-S, STOP 0239 Washington, DC 20250-0239 Purchasing Group: AMS-Fruit
ISO/IEC 17025 QUALITY MANUAL
1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4
Quality Assurance QUALITY ASSURANCE PLAN
Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File
ATTACHMENT B PROPOSAL SUBMITTAL FORMS. For WEB FILTER REPORTING TOOL RFP #0413-242
ATTACHMENT B PROPOSAL SUBMITTAL FORMS For WEB FILTER REPORTING TOOL RFP #0413-242 FORM NAME Page General Company Information Form.. 2 Proposal Cost Summary Form.. 3 Signature Page Form... 4 Buy Local Packet
ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary
Page 1 / 9 ABSTRACT This document is the Section F to NSQ-100 Guidelines. Its objective is to help to the understanding of NSQ-100 requirements through some examples or recommendations and descriptions
Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E
9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Wichita KS Effective: 3-11-15 Rev. IR Page 1 of 6 1.0 Introduction This document establishes Cessna Interiors Manufacturing
9. Quality Assurance 9.1 INTRODUCTION 9.2 FIELD SAMPLING QUALITY ASSURANCE 9.3 ANALYTICAL QUALITY ASSURANCE. 9.3.1 Internal Quality Control
9. Quality Assurance Setting The overall goal of a well-designed and well-implemented sampling and analysis program is to measure accurately what is really there. Environmental decisions are made on the
Final Construction Quality Control Plan Non-Public Properties Newhall Street Neighborhood Site Hamden, Connecticut
Final Construction Quality Control Plan Non-Public Properties Newhall Street Neighborhood Site Hamden, Connecticut Revision 0 Prepared for: Olin Corporation Cleveland, Tennessee Prepared by: Sevenson Environmental
Procure to Pay Process Four Requisition Types. Procure to Pay Process Four Payment Types
Four Requisition Types Requisition for low dollar amount, item is not on a catalog Requisition for a low dollar amount, item is on a catalog Requisition is for a high dollar amount, item is not on a catalog.
Chandler-Arrow Division Arrow Supplier Quality Requirements
AQR-1 QUALITY SYSTEM Supplier must maintain a quality system that meets, as a minimum, the requirements of ISO9001-2008, unless otherwise directed by Chandler-Arrow Division QA organization. Immediate
How To Decommission A Nuclear Plant
International Atomic Energy Agency Decommissioning of Nuclear Facilities Management of Decommissioning Projects Lawrence E. Boing Manila, Philippines, October 2006 1 Lesson Objectives Understand the management
VEHICULAR EQUIPMENT PURCHASE EXHIBIT. This Exhibit modifies the Terms and Conditions for Materials and Related Services:
VEHICULAR EQUIPMENT PURCHASE EXHIBIT This Exhibit modifies the Terms and Conditions for Materials and Related Services: The following definitions are added to DEFINITIONS of the Terms and Conditions. Contract:
ONTIC UK SUPPLIER QUALITY SURVEY
MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return
How To Ensure Quality Assurance
1001 Robb Hill Road Oakdale, PA 15071-3200 412/923-2670 PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS Specification Number: ATI-QA-703, Rev 4 Date: 11/12/13 Page: 1 of 7 Written
Quality Assurance Program Plan. July 2006. U.S. Department of Energy Office of Legacy Management
U. S. Department of Energy Office of Legacy Management July 2006 July 2006 Page i DOE-LM Policy Statement The U.S. Department of Energy (DOE) Office of Legacy Management (LM) performs long-term surveillance
ORACLE PROCESS MANUFACTURING QUALITY MANAGEMENT
ORACLE PROCESS MANUFACTURING QUALITY MANAGEMENT KEY FEATURES Automated stability study management Lot expiration handling and retesting Potency or variability management Quality holds during receiving
QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21. Revision: 14
QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21 Revision: 14 SPRINGS FABRICATION, INC. ADVANCED TECHNOLOGY GROUP 2685 Industrial Lane Broomfield, CO 80020 Controlled
JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management
JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project
Lawrence Livermore National Laboratory
Lawrence Livermore National Laboratory Supply Chain Management Department Attention: To All Offerors June 16, 2016 Subject: Request for Proposal (RFP) Number B617524 Lawrence Livermore National Security,
REQUEST FOR QUOTE. RFQ No. 14-68478 NETWORK MAPPING SOFTWARE
REQUEST FOR QUOTE RFQ No. 14-68478 NETWORK MAPPING SOFTWARE ISSUE DATE: January 16, 2015 QUOTE DUE DATE: January 30, 2015 EXECUTIVE SUMMARY RFQ No. 14-68478 Hampton Roads Transit has a need for the service
R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.
2 of 34 Revision Summary Revision Number Date Description of Revisions Initial issue of the document. Table of Contents Item Description Page 1. Introduction and Purpose... 5 2. Project Management Approach...
City of Johannesburg Supply Chain Management Unit
MBD 6.2 DECLARATION CERTIFICATE FOR LOCAL PRODUCTION AND CONTENT FOR DESIGNATED SECTORS This Municipal Bidding Document (MBD) must form part of all bids invited. It contains general information and serves
Generic CMMS Quality Assurance Plan
Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)
Recertification CARD No. 22 Quality Assurance
Recertification CARD No. 22 Quality Assurance BACKGROUND Quality Assurance (QA) provides for preliminary assessments of the quality/reliability of items and activities that are important to the long-term
Supplier Requirements Manual M M 0 3
Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.
52.219-8 -- Utilization of Small Business Concerns.
MINORITY BUSINESS ENTERPRISE (MBE)/ WOMEN BUSINESS ENTERPRISE (WBE) Policy Honeywell has committed, in connection with certain of its contracts with the U.S. Government, to award subcontract work to small
GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059
QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES Part I: Proposal Information A. General Information The Berwick Area School District is soliciting proposals for construction management services
Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1
Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1 In a recent API Q1 audit, my auditor interpreted API Spec Q1, Section 3.1.6 to mean that the distributor supplying plastic shrink wrap material
Flexible Circuits Inc. Purchase Order Standard Terms and Conditions
Flexible Circuits Inc. Purchase Order Standard Terms and Conditions 1. Acceptance- This writing, together with any attachments incorporated herein, constitutes the final, complete, and exclusive contract
Quality Management Plan
September 8, 2015 NYNJ LINK DEVELOPER LLC Revision 0 Developer s Maintenance and Control Facility Elizabeth, NJ Parsons Project No.: 648109 & 449252 This page intentionally left blank. This page intentionally
Q2A First Article Inspection (FAI) AS9102 * Revised ** Added
Page 1 of 5 Q2A First Article Inspection (FAI) AS9102 * Revised ** Added NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on the
Chapter 4: Contractor Quality Control
Chapter 4: Contractor Quality Control Seattle District, NWS Last updated: 05FEB14 Chapter 4 Contractor Quality Control 1. GENERAL. Contractor is responsible for quality control and shall establish and
Quality Assurance Manual. QAM-2013-Rev2
QAM-2013-Rev2 President s Policy and Authorization of Quality Control The management system for the Steel Structural Fabrication of Pinnacle Industrial Services entrusted through furnishing high quality
Plan QAQ-82-001 Supplier Quality Requirements (Rev 10)
1.0 Purpose To outline Insitu s quality management system requirements for suppliers. 2.0 Scope This document applies to suppliers and subcontractors that provide products and/or services that affect the
This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM
This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM CONTENTS Page No 1 GENERAL REQUIREMENTS 1 1.1 Requirements 1
PPI/TZ Standard Quality Requirements for Suppliers -SQRS-
PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: November 16, 2015 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact
074-8432-552 Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements
Page 1 of 7 Software Supplier Process Requirements 1.0 QUALITY SYSTEM FRAMEWORK 1.1 QUALITY POLICY The Seller shall document and implement a quality program in the form of Quality manual or detailed Quality
SUPPLIER QUALITY PROGRAM, V (U)
FEDERAL MANUFACTURING & TECHNOLOGIES PQR 1060 PAGE 1 OF 17 SUPPLIER QUALITY PROGRAM, V (U) CHANGE HISTORY ISSUE DESCRIPTION OF CHANGE AUTHOR DATE E CORRECTED CHANGE HISTORY S. L. HALTER 10/18/2000 F UPDATED
Items 1-7 above shall not be subject to any of the following limiting or exclusionary endorsements:
Page 1 of 5 Supplier's Insurance. Before commencing the Work, and as a condition of any payment due under this Subcontract, Supplier shall, at its own expense, procure and maintain insurance on all of
Enhanced calibration High quality services from your global instrumentation partner
Products Solutions Services Enhanced calibration High quality services from your global instrumentation partner Services 2 Calibration One trusted advisor Get the best to meet all your critical application
Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA
Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA ASME Vice President, Conformity Assessment and Vice Chairman of Committee on Nuclear Certification 2nd NRC Workshop on Vendor
Uncontrolled Document
SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT
Procedure for Procurement and Receipt
Procedure for Procurement and Receipt 1.0 Purpose - To ensure that all supplies, equipment and services purchased by the State Crime Laboratory (Laboratory) are properly procured and received. 2.0 Scope
General Terms and Conditions of Purchase
General Terms and Conditions of Purchase Supplement 1 Federal Acquisition Regulation (FAR) Government Contract Provisions 1. When the materials or products furnished are for use in connection with a U.S.
KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts
Approved By: Elliott Major Date: 11-19-09 Page 1 of 9 Rev ECO Date Approve Rev ECO Date Approve A R01_13541 07-23-10 DWL B R01_14787 12-15-11 DWL C R01_14910 03-07-12 DWL D R01_14964 04-16-12 DWL 1.0 Purpose
The Role of Construction Managers. FIDIC offers two contributions on the question of the role of a construction manager in a construction contract:
The Role of Construction Managers FIDIC offers two contributions on the question of the role of a construction manager in a construction contract: A. Notes on the use of FIDIC in the Middle East B. A Communication
Quality Assurance Procedures for Construction and Materials Sampling and Testing 14
Page 1 Quality Assurance Procedures for Construction and Materials Sampling and Testing 14 1. PURPOSE 1.1 To prescribe policies, procedures, and guidelines to assure the quality of materials on all Colorado
SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE
1.0 BACKGROUND INFORMATION Company Name: Company Address: Phone Number: Fax Number: Number of years in business: Number of employees: Annual Sales in Dollars: Size of Facility in Square Feet: Name of Senior
4 PROJECT PLAN DOCUMENTS
1 4 PROJECT PLAN DOCUMENTS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 4.1 Introduction The project plan documents are a blueprint for how a particular project
CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN-OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY
EXHIBIT 1 TO ATTACHMENT CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN-OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY The undersigned certifies on behalf of the Contractor
Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201
PURCHASE ORDER ATTACHMENT Q-201A Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201 1. A qualified employee shall be selected by the Software Quality Manager
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT
STATE OF GEORGIA DEPARTMENT OF TRANSPORTATION OPEN AGENCY SERVICE CONTRACT
STATE OF GEORGIA DEPARTMENT OF TRANSPORTATION OPEN AGENCY SERVICE CONTRACT Contract #: Total Obligation: AGREEMENT BETWEEN: The Georgia Department of Transportation s location identified in Paragraph 101A
QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010
Section i INTRODUCTION QUALITY POLICY STATEMENT: The purpose of our business is to provide continuity of electrical power to keep businesses in business. We do this by helping clients solve their power
State Meat and Poultry Inspection (MPI) Program Laboratory Quality Management System Checklist
This checklist is intended to help laboratories improve the quality of their testing programs with regard to meat and poultry testing samples, in order to ensure those laboratories are at least equal to
Quality Supplier Requirements for Beckwith Electric Co., Inc.
Quality Supplier Requirements for Beckwith Electric Co., Inc. This Page Left Intentionally Blank To Our Valued Suppliers: One of the primary goals of Beckwith Electric is to provide the highest Quality
MSC Group Chain of Custody (CoC) Guidance for Non-Reduced Risk Groups
MSC Group Chain of Custody (CoC) Guidance for Non-Reduced Risk Groups 1. About this document This document is a non-normative guidance document intended to help companies understand CoC requirements. The
AGREEMENT FOR SERVICES BETWEEN THE CITY OF YREKA AND [CONTRACTOR] WHEREAS, Contractor has the necessary experience in providing the services; and
AGREEMENT FOR SERVICES BETWEEN THE CITY OF YREKA AND [CONTRACTOR] THIS AGREEMENT is made and entered into this day of, 2014, by and between the City of Yreka, a municipal corporation, hereinafter referred
GE Power Electronics Business Total Quality Management for Suppliers
GE Power Electronics Business Total Quality Author: Reviewers: Contributors: Alessandro A. Cervone Technical Manager Component & Reliability Engineering Alicia Scott Title Erika Nannis Title Robert Roessler
How To Manage A Plant
MALAT 9100 QUALITY REQUIREMENTS For Suppliers of Category 12, 13 This Document is located in the Internet site http://www.iai.co.il/sip_storage/files/2/35782.pdf Date: March 2012 Prepared by : S. Migdal
RELOCATION ASSISTANCE SERVICES SPECIFICATIONS (LUMP SUM)
RELOCATION ASSISTANCE SERVICES SPECIFICATIONS (LUMP SUM) A. PROJECT DESCRIPTION The Local Public Agency (LPA) will receive proposals for Relocation Assistance Services for: Project: CN: Location: The work
VDOT GOVERNANCE DOCUMENT
VDOT GOVERNANCE DOCUMENT Minimum Requirements for Quality Assurance and Quality Control on Design Build and Public-Private Transportation Act Projects Location and Design Division Alternate Project Delivery
EM-QA-001 Rev. 1 Issue Date 06/11/12
Project lifecycles including design, engineering, construction, commissioning, operation, and post-operation, e.g., surveillance and maintenance, deactivation, decommissioning, and environmental restoration.
INTRODUCTION: PURPOSE:
UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found
L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance
Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and
Subject: Lot, Batch & Serial # System - 1 - Created QC/ Edited by Paul DiMarco Approval/Effective Date: 01/01/2002
- 1-1.) Scope: This procedure covers the issuance and use of Lot, batch and serial numbers for Certificate of Analysis, Batch Records and Product Labels. 2.) Normative References: SOP 4-2-2 Quality Manual
Quality management systems
L E C T U R E 9 Quality management systems LECTURE 9 - OVERVIEW Quality management system based on ISO 9000 WHAT IS QMS (QUALITY MANAGEMENT SYSTEM) Goal: Meet customer needs Quality management system includes