Montevideo: historical development of sewer and drainage systems
|
|
|
- Valerie Booker
- 9 years ago
- Views:
Transcription
1 Montevideo: historical development of sewer and drainage systems J. Alsina and M. Mena* Servicio de Estudios y Proyectos de Saneamiento, Intendencia de Montevideo, Avda. 18 de Julio1360, tel , Montevideo, Uruguay [email protected] ABSTRACT The present paper describes the historical development of the urban sewer and drainage system in the city of Montevideo. The department of Montevideo has inhabitants (INE, 2004), 96% of which dwells in the urban area. This population represents 41% of the total population of the country. The City Council of Montevideo (IM) provides sewerage and drainage services to the community. In the begging of the sanitation worldwide, the city of Montevideo undertakes the task in a pioneer form, but it then had ups and downs in terms of development. In this paper we present an overview of the historical development of the sewerage works of the city and the design criteria applied at every stage as well as changes in the management of the system over time. Montevideo today is in a privileged position from the standpoint of environmental quality like coverage of the Department and the sanitation sector is prepared to face future challenges Finally the conclusions resume what did work, what didn t work as well as lessons learned and plans forward. KEYWORDS sewerage, drainage, historical, development. HISTORICAL DEVELOPEMENT Early years: Arteaga s sewerage network Montevideo was the first city in South America with a sewerage network. The construction of this network was granted to Mr. Juan José de Arteaga s private company, under a concession contract. The record of this contract goes back to 1852, just four years after the studies for London s drainage were began, and five years before Brooklyn s network design started.(fair, Geyer, Okun, 1968) This first network had main pipes that formed a combined sewage gravity system, constructed without defined dimensional criteria and with an outline of an egg-shaped looped network. The network construction is done without any planning, according to customer demand and the shortest topographic path. The design criteria are quite empirical. Hygienist approach prevails, where the conveying system consists of large conduits in every street in order to ensure the rapid removal of the source of contamination at source far away to the bay J. Alsina and M. Mena 1
2 Transition period: Maggiolo s Plan This period had as an outstanding characteristic the rapid and planned expansion of the new systems. It began with the formulation of a General Plan of Building Works of the City of Montevideo (Maggiolo, 1922), that established the first effort in the planning of the sewerage system of the city and was not updated until 70 years after its approval. Even though the combined sewer system is still used efforts are made in order to minimize the discharge points and minimize the outfalls so as to optimize the performance of the network. No application of mechanized elements such as pumping stations, mechanized grades or other are incorporated to the system. Efforts were made in order to use the formulations available to calculate sewerage dimensions. The application of formulas for the calculation of storm flows depending on the basins surface, slope, and its urban characteristics became a standard. The intensity of rainfall was updated with over the years. While the forecast horizon of the Maggiolo Plan was 30 years ( ) population growth projections were exceeded broad mind ahead of schedule, both in quantity and spatial distribution. Provided some of the interceptors were not built for economic reasons this result in a multiplication of the sewage outfalls and contamination of urban waterways and beaches to a greater extent than expected. The fact that land use forecasts were outdated and that the formulation applied to the calculation of the flow depended heavily on this factor implies that works built in this stage is nowadays far exceeded in its transport capacity. Although the network in the Maggiolo area have already been depreciated and far exceeded its service life, these are the only structures available for collection and conveyance of storm water. Thus, in these areas are now serious flooding problems. In these dense and consolidated urban areas the solution to drainage problems becomes now very difficult and expensive. A pause: the crisis period It can be identified by the changes in the design criteria (separate sewers instead of combined systems) and the decline of the country s economical situation, which is reflected in several characteristics of the network. The following graph shows the slowdown in the works in these years Montevideo: historical development of sewer and drainage systems
3 The first designs of separative sewage systems were based on bibliographic data to estimate domestic flows and then speed criteria for pipes. With respect to the calculation criteria for stormwater networks the Rational Methods is applied indiscriminately but without unanimity in the intensity formulation. This implies that the works planned at this time have very different behavior with regard to extreme events. Studies conducted by Ing. Capandeguy indicates that for return period of 10 years, the intensity may vary between 20 and 60% according to the methods used in this years. The figure below shows the areas with sanitation coverage for the three periods mentioned above. Programs: the Plans of Urban Sewerage. Despite the fact that Montevideo was founded as a port city, its beaches turned out to be a major attraction, with 77 km of coastline over the La Plata River, 20 of which are sandy beaches. The coast with its beaches is one of the most precious asset of the city. So much so that according to the Gallup surveys, "The summer tourism in the summer of , 79% of tourists entering the country did it first attracted by the beaches. But the increasing deterioration of the environmental quality of the coast waters, bays and beaches, accentuated by the lack of development of the sanitation system, produces a severe affectation of the coasts uses because of its unacceptable condition, with a noticeable diminution of the concurrence to the beaches and the arrival of tourists. In the mid 80's the population was convinced that the beaches were unhealthy and therefore attendance dropped dramatically. Even family doctors recommend not taking children to the beaches. The results of the analysis carried out then for thermotolerant coliforms showed values of over cfu/ml and cfu/ml for dry and wet days respectively For these reasons the problem is considered of national importance and of maximal priority to the Government. Therefore, in 1972, technical studies were conducted in order to look for solutions and the Plan of Urban Sewerage of the City of Montevideo (PSU) was defined. Its execution was divided in stages that are carried out with the partial financing of the IDB since 1981 Today 3 Plans named PSUI, PSUII and PSUIII have been completed. Works include extension of sewer and drainage network, rehabilitation of existing networks and management improvement programs. The figure below shows schematically the works associated with these plans. J. Alsina and M. Mena 3
4 PSU I PSU II PSU III As these pictures show the three plans achieved to extend sanitation coverage significantly and particularly final disposal is provided to the east of Montevideo in PSUI by a marine outfall that serves almost half of the system. The main objectives of the Plans are the improvement of the environmental quality and the increment of the efficiency and quality of the service In this period new technologies were incorporated and special attention was paid to water quality aspects as well as new design criteria Strategic plans: the Sewerage Master Plan of Montevideo: PDSDM (Sogreah-Seureca- GKW -CSI, ) PDSM is a strategic plan, based in a tendency and scenarios analysis, allowed to define the main activities, with a time horizon of 2035, as well as the means to obtain the necessary resources to carry them out. There was made an important effort by the Plan to adopt new tools and methods in order to optimize the use of the existing network as well as the future one. Uniform criteria are established for the development of projects according to the state of the art techniques at that time. The Plan applies for the first time in Montevideo software for the analysis of phenomena such as quality of water courses, modeling of the sewerage and drainage hydraulics and coastal water quality. An important contribution is made in regard to the processing of available information and its application to the design area. With respect to the expansion of the sewer and drainage systems the PDSM scheduled the extensions of the separative system. Electromechanical elements such as pumping stations, mechanized grades, controlled weirs, remote control systems and other are incorporated to the system resulting in a very complex network. Land Use Master Plan and the Solid Waste Master Plan are indicated as a great priority for the City Council to address. The Plan also proposes institutional strengthening plans that result in separate accounting for the sanitation sector. Current situation: PDSDUM and CCLIP. Once the PSUIII was still under construction the IM noticed that the PDSM (1994) needed an update. There were several reasons for this: 4 Montevideo: historical development of sewer and drainage systems
5 Deviations in the population scenario. Economic difficulties to carry out works. New plans that affect the occupation and development of the city. Once the environmental quality of the Department had been improved by increasing sanitation coverage, people began to demand the resolution of other long-neglected problems: urban flooding in both consolidated areas with poor drainage as well as new drainage systems in areas of recent occupation. That is why the IM is advancing in the elaboration of the Master Plan of Sewerage and Urban Drainage of Montevideo: PDSDUM (IM, 2006) incorporating with more emphasis the urban drainage component. Today the IM continues with the implementation of plans for urban sanitation in the context of joint financing between the IDB and the IM. The PSUIV is being executed and its main objectives are to increase coverage of sewer and drainage systems, construction of the western submarine outfall, family re settlements in the areas provided for construction and improvement of commercial and institutional management. As presented in the figure below the PSUIV will construct a submarine outfall that will serve the western side of the city. With this infrastructure the complete sewerage system will have proper final disposal in the La Plata River. A Conditional Credit Line for Investment Projects (CCLIP) has been approved until the year 2022, which will allow the execution of the necessary works to achieve a 100 % of urban area with sanitation and the adequate final disposal. The IM is moving in the application of tools to help design new projects. It aims to generate the know-how for the technical personnel necessary to implement the models and perform alternative studies both at planning and budgeting and project management. The IM has also incorporated into the solutions, the concept of sustainable urban water cycle and complement the classical solutions for the disposal and transport of urban water with detention and retention facilities. In present the city council has begun to incorporate nonstructural management measures depending on the land use and zoning ordinances in order to provide lower impact development. J. Alsina and M. Mena 5
6 CONCLUSIONS In the begging of the development of sanitation worldwide, the city of Montevideo undertakes the task in a pioneer form. It can be noticed that in the first decades of the past century the city s growth was accompanied by the sewerage system expansion, until the crisis of the middle of the century. This has implied that in the implementation of the three stages defined by Desbordes of the historical development of sewer systems (sanitary, rational designs and finally integrated and sustainable sanitation solutions and management) the city was left behind by the first world in the last two stages. Once undertaken the path of strategic planning and the plans of sewerage a vast effort has been made in order to incorporate the new concepts to the phases of planning, execution and operation of the systems. During over more than 100 years of experience, and despite of the ups and downs in the development of the sewerage and drainage system, there has been an important effort made by the city council in order to update the design criteria, use more modern and up to date tools as well as to incorporate the new technology and modernize institutional aspects of the organization as far as possible considering the distinctive features of a developing country. What did work As a conclusion of the recent years sewerage and drainage management, it can be emphasized that: The department's environmental quality is good, the beaches are recovered and the process of recovery of the Bay has begun. Montevideo is the first city to be certified ISO for environmental management in its 5 most popular beaches. Coverage of sewerage reaches 91% of households including the informal city. Major investments have been accompanied by management changes and institutional updates. The city of Montevideo has been able to prioritize a global and integrated country strategy against purely sectorial interests. This sustained long-term effort has become a state policy. As a result of this, the FEMSA Foundation and the IDB granted the 2009 award for innovation in water and sewer services to the city of Montevideo. What didn't work Management systems still needs to be improved. 6 Montevideo: historical development of sewer and drainage systems
7 Interdisciplinary coordination between plans and their integration has begun but needs more efforts to be made. The area of sanitation of the IM is very vulnerable to corporate environment which hampers the implementation of sector-specific policies. Network extensions has often not been accompanied by a similar increase in house connections. Health education and communication with the population has started but is still insufficient. Lessons learned. Planning, dynamism, flexibility. Strategic planning is an indispensable tool. An irreversible process has begun and the sanitation sector has its own Master Plan as guide. However the plans must have sufficient dynamism and flexibility in order to accompany unexpected changes and adjust to new realities. There for it is particularly important that the knowledge is in the hands of the technicians of the IM. Management commitments. Its very important to define indicators to assess progress of activities aligned with the achievement of goals. Institutional strengthening and human resources. The management changes were necessarily accompanied by institutional strengthening and technical training. It is essential to continue in this path to accompany the development of the sanitation sector. International financing. The good relationship with the IDB has assured the international funding in order to assure the IM the founds to achive 100% coverage of sanitation and drainage in urban areas and proper disposal of 100% of domestic effluent. Plans forward Complete the update of the Plan. Accompany the paradigm shift in urban drainage, incorporating the concept of zero hydrological change, sustainable water cycle and incorporate non-structural measures. Seeking to be an engine and inter-sectorial and inter-institutional relationships. REFERENCES Instituto Nacional de Estadística, Censo Nacional de Población y Vivienda. Fair, Geyer, Okun, Abastecimiento de agua y remoción de aguas residuales. Maggiolo, General Plan of Building Works of the City of Montevideo SOGREAH-SEURECA-GKW-CSI, Plan Director de Saneamiento de Montevideo, PDSM. IMM, Plan Director de Saneamiento y Drenaje Urbano de Montevideo. DESBORDES, Contribution à l'analyse et à la modélisation des mecanismes hydrologiques en milieu urbain, Montpellier: Académie de Montpellier, Thèse. J. Alsina and M. Mena 7
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.
Type of Sewer Systems. Solomon Seyoum
Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of
CHAPTER 2 HYDRAULICS OF SEWERS
CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination
Water resources. The main problems of pollution that need to be addressed in the country are the following:
Translated from Spanish Water resources 1. The issue of water resources At the present time, sustainable standards for the development and use of water resources are not maintained in many parts of the
Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans
Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans OVERVIEW The objective of a Combined Sewer Overflow (CSO) Facility Plan is to abate CSO discharges
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
Financing sustainable and resilient water and sanitation infrastructure in African cities
Financing sustainable and resilient water and sanitation infrastructure in African cities The issue The 2015 Addis Ababa Action Agenda recognises the critical need to provide sustainable and resilient
Water Management in Cuba: Problems, Perspectives, Challenges and the Role of the Cuban Academy of Sciences
Water Management in Cuba: Problems, Perspectives, Challenges and the Role of the Cuban Academy of Sciences Daniela M. Arellano Acosta Environment Agency/ Water Commission, Academy of Science, CUBA Water
Climate Change and Infrastructure Planning Ahead
Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports
CHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
DRAFT Public Outreach Document for What s an SSMP?
DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials
Guidance on applying for approval of installation of a commercial onsite wastewater system
Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the
Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000
Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short
5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
Stormwater Control Measures for Tokyo
Stormwater Control Measures for Tokyo M. Sugai* *Planning Section, Planning and Coordination Division, Bureau of Sewerage, Tokyo Metropolitan Government, 2-8-1 Nishi-Shinjuku, Shinjuku-ku, Tokyo 163-8001
Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06
Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 1. Goals The goal of this SSMP is to provide a plan and schedule to properly manage, operate,
The IPCC Special Report on Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation
The IPCC Special Report on Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation A changing climate leads to changes in extreme weather and climate events 2 How do changes
4 Water supply description
4 Water supply description A description of the drinking-water system is equally applicable to large utilities with piped distribution systems, piped and non-piped community supplies, including handpumps
Student Seminar Building climate resilient cities: Exploring theories, practices and prospects 16-17 Feb 2015
Student Seminar Building climate resilient cities: Exploring theories, practices and prospects 16-17 Feb 2015 Database Management System for coastal cities Rozita Singh, Research Associate, Sustainable
Training Program on Urban Climate Change Resilience 20-22 April, 2015 Database Management System for coastal cities
Training Program on Urban Climate Change Resilience 20-22 April, 2015 Database Management System for coastal cities Rozita Singh, Research Associate, Sustainable Habitat Division, TERI Why Data? Infrastructure
ORDINANCE NO. 2013 -
ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION
Standard Operating Procedures Storm Drain System Maintenance
s Storm Drain System Maintenance SECTIONS 1. Storm Drain System Inspections 2. Storm Drain System Cleaning 3. Storm Drain System Repairs 4. Proper Disposal of Material Storm Sewer System Cleaning Directive
Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water
1 P age Module 6 : Quantity Estimation of Storm Water Lecture 6 : Quantity Estimation of Storm Water 2 P age 6.1 Factors Affecting the Quantity of Stormwater The surface run-off resulting after precipitation
Practical Measures for the Prevention of Basement Flooding Due to Municipal Sewer Surcharge. Plumbing stack. Figure 1
research highlight January 2004 Technical Series 04-104 Practical Measures for the Prevention of Basement Flooding Due to Municipal Sewer Surcharge introduction This highlight is based on a project funded
Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy
Melbourne Water s Submission Draft Victorian Floodplain Management Strategy Waterways, drainage and floodplains are essential to life and liveability. The rivers, creeks, estuaries, wetlands and floodplains
DeSoto County is not a water service provider and does not operate any
Water and Sewer DeSoto County is not a water service provider and does not operate any water delivery systems. There are 14 certificated, non-municipal water associations operating in the county that are
Managing sewer flood risk
Managing sewer flood risk J. Ryu 1 *, D. Butler 2 1 Environmental and Water Resource Engineering, Department of Civil and Environmental Engineering, Imperial College, London, SW7 2AZ, UK 2 Centre for Water
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for
1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance
Ex-ante Evaluation 1. Name of the Project Country: India Project: Goa Water Supply and Sewerage Project (Loan Agreement: 09/14/2007; Loan Amount: 22,806 million yen; Borrower: The President of India )
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,
Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.
Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage
Drainage. Information for those with problem drains
Drainage Information for those with problem drains Contents 1 Purpose 2 Introduction 2 Explanations: what is a drain and what is a sewer 3 Explanation of the responsibilities for public and private sewers
East Riding of Yorkshire Council
East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee
Designed and produced by geo-graphicsdesign.com DP 300 3/02
Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended
EPA Trends for wastewater Treatment in California - 2011
EPA S TECHNOLOGY NEEDS FOR THE WATER AND WASTEWATER INDUSTRY Nancy Stoner Acting Assistant Administrator U.S. EPA Office of Water International Emerging Technology Symposium Arlington, VA April 23rd, 2014
Mega Manila: Partnership in Action
Domestic WastewaterManagement in Mega Manila: Partnership in Action Leonor C. Cleofas Deputy Administrator Metropolitan Waterworks and Sewerage System Securing the Future Today The MWSS Privatization On
Basement Flood Risk Reduction City of Winnipeg. Charles Boulet
Basement Flood Risk Reduction City of Winnipeg Charles Boulet Outline Background Winnipeg Floodway Rain Events Winnipeg Sewer System Basement Flooding Flood Reduction Measures ICLR - BFRR Strategy 2 Where
Public Works Engineering Technician: Speciality Civil Constructions
Public Works Engineering Technician: Speciality Civil Constructions FIRST YEAR PHYSICAL BASES OF ENGINEERING 3207001 Core 1st 1st semester 6 7.2 Rational mechanics. Wave phenomena. Electricity. Thermodynamics.
Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains
1 P age Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 2 P age 7.1 General Consideration Generally, sewers are laid at steeper
Risk and vulnerability assessment of the build environment in a dynamic changing society
Risk and vulnerability assessment of the build environment in a dynamic changing society Limnei Nie SINTEF Building and infrastructure, P.O.Box 124 Blindern, NO-0314 Oslo, Norway. [email protected]
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
Applying MIKE SHE to define the influence of rewetting on floods in Flanders
Applying MIKE SHE to define the influence of rewetting on floods in Flanders MARK HENRY RUBARENZYA 1, PATRICK WILLEMS 2, JEAN BERLAMONT 3, & JAN FEYEN 4 1,2,3 Hydraulics Laboratory, Department of Civil
PRSENTATION ON DRAINAGE SYSTEM DELHI 25.07.2014 EAST DELHI MUNICIPAL CORPORATION
PRSENTATION ON DRAINAGE SYSTEM OF DELHI EAST DELHI MUNICIPAL CORPORATION 25.07.2014 MAP OF DELHI SHOWING MCD s, NDMC & DCB ABOUT DELHI DELHI MANIFESTS UNCONTROLLED URBANISATION POPULATION INDUSTRIALISATION
Viet Nam Da Nang Waste water management
Case Study Country: City: Key Sectors: Viet Nam Da Nang Waste water management Local Partner Organization Geography and Population Da Nang People s Committee Department of Natural Resources and Environment
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply
Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
Integrated Local Flood Management and Drainage Strategy OVERVIEW
Integrated Local Flood Management and Drainage Strategy OVERVIEW Flooding is a natural phenomenon. In urban areas where drainage relies on pipe networks, open channels and creeks, flooding can cause infrastructure
Havnepromenade 9, DK-9000 Aalborg, Denmark. Denmark. Sohngaardsholmsvej 57, DK-9000 Aalborg, Denmark
Urban run-off volumes dependency on rainfall measurement method - Scaling properties of precipitation within a 2x2 km radar pixel L. Pedersen 1 *, N. E. Jensen 2, M. R. Rasmussen 3 and M. G. Nicolajsen
Terms of Reference For First Joint Mission for the Pilot Programme on Climate Resilience (PPCR) In St. Vincent and the Grenadines
Terms of Reference For First Joint Mission for the Pilot Programme on Climate Resilience (PPCR) In St. Vincent and the Grenadines 1 Glossary of Terms and Abbreviations CIF IDB MTESP NEMO NESDC NESDP NGO
Urban Problems and Environmental Protection. Governo do Estado de São Paulo
Urban Problems and Environmental Protection Brazil and Sao Paulo State South America Sao Paulo State Sao Paulo Metropolitan Region Sao Paulo Metropolitan Area Water Supply in Sao Paulo Metropolitan Region
5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
Monterey Regional Water Pollution Control Agency. Sewer System Management Plan
Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.
How To Study Access To Water Supply And Wastewater Service In Gjirokastra
Study The access in water supply and sewerage in the informal urban settlements and rural areas in five districts of Albania Prepared by October 2012 Executive Summary of the Study 1. Introduction The
UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT
TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN
What is a CSO / SSO? Sewer Overflows. Prevalence of CSOs in the US. Magnitude of Problem (Local)
Sewer Overflows Combined Sewer Overflows (CSOs( CSOs) Older, large cities built combined networks to convey sewage and stormwater Stormwater overwhelmed sewage flow, but only for short periods To reduce
Toronto s Wet Weather Flow Master Plan
Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...
Creating the environment for business
1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,
Recovery of full cost and pricing of water in the Water Framework Directive
Abstract Recovery of full cost and pricing of water in the Water Framework Directive D. Assimacopoulos Professor, Department of Chemical Engineering, NTUA The Water Framework Directive (EC 2000/60) introduces
San Diego Citizen s Forum. USIBWC San Diego Field Office
San Diego Office Update San Diego Citizen s Forum Steve Smullen, Area Operations Manager USIBWC San Diego Field Office August 25, 2011 SAN DIEGO OFFICE ACTIVITIES Flood Control Tijuana River Flood Control
City of Los Angeles Bureau of Sanitation Business Development Services
City of Los Angeles Bureau of Sanitation Business Development Services OUR MISSION IS TO PROTECT PUBLIC HEALTH AND THE ENVIRONMENT TABLE OF CONTENTS BUSINESS DEVELOPMENT SERVICES...2-5 EFFORTS TO FACILITATE
2013-2015. Milwaukee Metropolitan Sewerage District STRATEGIC PLAN
Milwaukee Metropolitan Sewerage District STRATEGIC PLAN 2013-2015 The Strategic Plan identifies the District s strengths, weaknesses, opportunities, and threats, and provides direction and focus to help
4.3 Cisterns and Rain Barrels
4.3 Cisterns and Rain Barrels Rain barrels, cisterns, and tanks are structures designed to intercept and store runoff from rooftops. Rain barrels are used on a small scale while cisterns and tanks may
APPENDIX 1 Floodplain Management Strategies & Guidelines
APPENDIX 1 Floodplain Management Strategies & Guidelines A. Port Phillip Flood Management Plan (2012) B. Draft Flood Management Strategy Port Phillip and Westernport (2015) C. Revised Draft Victorian Floodplain
CRS Report for Congress
Order Code RS22285 Updated March 22, 2006 CRS Report for Congress Received through the CRS Web Hurricane-Damaged Drinking Water and Wastewater Facilities: Impacts, Needs, and Response Summary Claudia Copeland
City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405
City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 REGULATORY CONSIDERATIONS FOR WET WEATHER COLLECTION SYSTEM BACKUPS FINAL DRAFT August 2009 2700 YGNACIO
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-
Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,
Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework
HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto
HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto
City of Charlottetown Wastewater Treatment Expansion & Upgrading
City of Charlottetown Wastewater Treatment Expansion & Upgrading Background As Canada s smallest provincial capital, the City of the Charlottetown has a population of approximately 34,000 residents and
Flood Mitigation and Management in Bangkok Metropolitan Area
กร งเทพมหานคร Flood Mitigation and Management in Bangkok Metropolitan Area Present By Mr. Kriangkrai Phamornpol Department of Drainage and Sewerage Bangkok Metropolitan Administration 1 Flood Mitigation
Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects
Description Retention/irrigation refers to the capture of stormwater runoff in a holding pond and subsequent use of the captured volume for irrigation of landscape of natural pervious areas. This technology
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]
FOUR RIVERS RESTORATION PROJECT
MLTM Republic of Korea Making Every Drop Count International Workshop on Integrated Urban Water Management WATER & GREEN GROWTH FOUR RIVERS RESTORATION PROJECT Office of National River Restoration, Korea
J.M. Jordaan Water Utilisation Division, University of Pretoria, Pretoria, South Africa
DISPOSAL OF SEWAGE J.M. Jordaan Water Utilisation Division, University of Pretoria, Pretoria, South Africa Keywords: sewage disposal, sewers, sanitation, storm water drainage, industrial waste, waste water,
Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted
Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike
London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document
LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?
BP Texas City Refinery
BP Texas City Refinery ENVIRONMENTAL STATEMENT FOR YEAR 2010 (Review of Y2009 Performance) Introduction Recognizing the complex nature of petroleum refining operations and to ensure that we meet our stated
ELEMENT 4 - FUTURE LAND USE ELEMENT
ELEMENT 4 - FUTURE LAND USE ELEMENT Goal 1 To create a long-range development pattern which directs growth into developable areas and away from environmentally sensitive areas, in a manner that is compatible
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this
Package Treatment Plant Policy and Procedure
Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are
Title: Guiding Models and Norm Study for Water Storage: A new way of thinking?
Tools Title: Guiding Models and Norm Study for Water Storage: A new way of thinking? Keywords: Regional; communication; inundation; stakeholder engagement; water management; spatial planning Audience:
Water Resource Plan 2015 (Summary Report) Ensuring customers have clear, fresh, safe drinking water to 2040 and beyond
() Ensuring customers have clear, fresh, safe drinking water to 2040 and beyond November 2014 Overview Our Water Resource Plan sets out our strategy to secure the reliable supply of drinking water to
INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs)
UNITED REPUBLIC OF TANZANIA INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs) 1. Introduction The United Republic of Tanzania, which comprises of Tanzania Mainland and Zanzibar, brings forth her Intended
Essential Water. Customer Charter
Essential Water Customer Charter Who is Essential Water? Essential Water is a division of Essential Energy and provides water supply services to over 20,000 people in Broken Hill, Menindee, Sunset Strip
National Disaster Management Institute
National Disaster Management Institute CONTENTS one Cause of Urban Flood Disaster two Urban Flood Damage Case three Disaster Prevention Measures for Future Urban Flood four NDMI s Measures & Strategy for
DISASTER RISK DETECTION AND MANAGEMENT COURSES SETUP SCENARIO AT MAKERERE UNIVERSITY. Makerere University
DISASTER RISK DETECTION AND MANAGEMENT COURSES SETUP SCENARIO AT MAKERERE UNIVERSITY CASE OF THE DEPARTMENT OF GEOGRAPHY Derek Muhwezi 2 MISSION OF THE DEPARTMENT To provide and promote quality education,
