1 5151 San Felipe, Suite 2400 Houston, Texas Phone: Fax: Jim Downs Vice President of & Regulatory Affairs April 1, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Re: Columbia Gas Transmission, LLC, Docket No. RP Operational Transactions Adjustment Filing Pursuant to Section 4 of the Natural Gas Act ( NGA ), and Part 154 of the Federal Energy Regulatory Commission s ( Commission ) regulations, 1 Columbia Gas Transmission, LLC ( Columbia ) hereby submits for filing the following revised tariff sections of its FERC Gas Tariff, Fourth Revised Volume No. 1 ( Tariff ), with a proposed effective date of May 1, 2015: Part Version Title V FTS V FTS-APX V NTS and NTS-S V ITS V GTS V OPT V TPS V SST V FTS-GC Statement of Nature, Basis and Reasons On June 1, 2012, Columbia implemented the Operational Transaction Adjustment ( OTRA ) surcharge to recover the costs of certain operational purchases and sales required to ensure a sufficient amount of flowing supply into Columbia s system in northern Ohio. 2 Columbia implemented the OTRA because it would result in lower costs for its customers than rerouting gas supplies from the southwest part of its system to northern Ohio on other pipelines or requiring customers to deliver gas to northern Ohio receipt points through the use of Operational Flow Orders (OFOs). 3 On December 16, 2013, in Docket RP14-287, Columbia proposed to extend the OTRA mechanism through March 31, 2016, while it continues to follow the market and work collaboratively with its shippers in identifying a long-term solution to 1 18 C.F.R. Part 154 (2014). 2 Columbia Gas Transmission, LLC, 139 FERC 61,141 (2012). 3 Id. at P 16. Columbia Gas Transmission Columbia Gulf Transmission Central Kentucky Transmission Crossroads Pipeline Hardy Storage Company Millennium Pipeline Columbia Midstream
2 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission April 1, 2015 Page 2 of 3 address the supply shortage in Northern Ohio. The OTRA mechanism is set forth in Section 49.4 of Columbia s Tariff and provides for Columbia to make filings to adjust its OTRA rates twice annually for a summer season (April 1 to October 31) and a winter season (November 1 to March 1). These semiannual filings address both prospective changes in the OTRA rate and prior over or under recoveries. Columbia proposes, in the instant filing, to collect costs associated with the summer OTRA period (April 2015 October 2015) in the amount of $11,114,4504. Consistent with GTC Section 49.4(c), Columbia is utilizing demand billing determinants projected to be in effect on May 1, The calculation of the OTRA rate associated with the April October time period, along with the derivation of costs, is set forth on Appendix A. The derivation of the billing determinants included in the OTRA mechanism is set forth on Appendix C. As noted in its initial filing, the OTRA mechanism was created to provide a lower cost solution to third-party transport. Generally, Columbia includes an Appendix D in its biannual OTRA filings, which compares OTRA costs to hypothetical TCRA costs. Columbia evaluated the historical transport paths utilized to get gas into Northern Ohio but these were sold out and not available on a firm basis. Therefore, due to the lack of practical and available TCRA capacity, Appendix D is not included in the instant filing. A summary of the OTRA Costs and the OTRA Revenues, along with the calculation of the OTRA True-Up Surcharge is set forth on Appendix B. Columbia over-recovered approximately $1.4 million of OTRA costs from the previous OTRA period. Motion Pursuant to Section 154.7(a)(9) of the Commission s regulations, Columbia moves to place the proposed tariff sections into effect at the requested effective date. Material Submitted Herewith In accordance with Section 154.7(a)(1) of the Commission s regulations, the following material is submitted herewith: (1) The proposed revised tariff sections being filed; (2) Marked version of the revised tariff sections in accordance with Section (a) of the Commission s regulations; and (3) Workpapers and other documents supporting Columbia s filing. Posting and Certification of Service Pursuant to Sections 154.7(b) and (b) of the Commission s regulations, a copy of this tariff filing is served to all of Columbia s existing customers, and affected state commissions. 4 Columbia s proposed summer 2015 OTRA costs are significantly less than the $17 million in OTRA costs that Columbia proposed in its last summer OTRA in Docket No. RP Columbia Gas Transmission Columbia Gulf Transmission Central Kentucky Transmission Crossroads Pipeline Hardy Storage Company Millennium Pipeline Columbia Midstream
3 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission April 1, 2015 Page 3 of 3 A copy of this filing is also available for public inspection during regular business hours at Columbia s offices at 5151 San Felipe, Suite 2400, Houston, Texas, Service on Columbia It is requested that a copy of all communications, correspondence and pleadings with respect to this filing be sent to: Subscription Georgia B. Carter, Senior Vice President, Compliance & Regulatory Affairs *James R. Downs, Vice President, & Regulatory Affairs Sorana Linder, Manager, & Regulatory Affairs Columbia Gas Transmission, LLC 5151 San Felipe, Suite 2400 Houston, Texas Phone: (713) gcarter@nisource.com jdowns@nisource.com slinder@nisource.com *S. Diane Neal Assistant General Counsel Columbia Gas Transmission, LLC 5151 San Felipe, Suite 2400 Houston, Texas Phone: (713) dneal@nisource.com *Persons designated for official service pursuant to Rule Pursuant to Section 154.4(b) of the Commission s regulations, the undersigned certifies that: (1) he knows the contents of the filing; (2) the contents are true to the best of his knowledge and belief; and (3) that he possesses full power and authority to sign the filing. Respectfully submitted, Enclosures James R. Downs Vice President, and Regulatory Affairs Columbia Gas Transmission Columbia Gulf Transmission Central Kentucky Transmission Crossroads Pipeline Hardy Storage Company Millennium Pipeline Columbia Midstream
4 APPENDIX A
5 Appendix A Page 1 of 4 COLUMBIA GAS TRANSMISSION, LLC COMPARISON OF THE CURRENT OTRA RATE TO THE PROPOSED OTRA RATE EFFECTIVE MAY 1, 2015 LINE BASE RATE NO. DESCRIPTION CURRENT PROPOSED ADJUSTMENT (1) (2) (3) $ $ $ (2) - (1) 1 TRANSPORTATION 2 RATE SCHEDULE GTS 3 COMMODITY RATE SCHEDULE FTS / NTS 5 DEMAND $ COMMODITY RATE SCHEDULE TPS 8 DEMAND $ COMMODITY RATE SCHEDULE SST 11 DEMAND $ COMMODITY RATE SCHEDULE OPT DAY INTERRUPTION 15 DEMAND $ COMMODITY DAY INTERRUPTION 18 DEMAND $ COMMODITY RATE SCHEDULE ITS 21 WINTER SUMMER
6 Appendix A Page 2 of 4 COLUMBIA GAS TRANSMISSION, LLC DERIVATION OF CURRENT OTRA RATE APPLICABLE TO RATE SCHEDULES FTS / NTS, TPS, SST, ITS AND GTS EFFECTIVE MAY 1, 2015 TOTAL LINE COMMODITY / DEMAND AND NO. DESCRIPTION DEMAND / FIXED VARIABLE COMMODITY (1) (2) (3) $ $ $ 1 TOTAL OTRA COSTS 11,114, ,114,450 2 LESS: 3 OPT TRANSPORTATION REVENUE 398, ,978 4 NET OTRA COSTS 10,715, ,715,472 5 RATE DETERMINANTS - Dth 6 TRANSPORTATION 7 RATE SCHEDULE FTS / NTS 40,325, RATE SCHEDULE TPS 1,201, RATE SCHEDULE ITS - WINTER 92,664 8,455, RATE SCHEDULE ITS - SUMMER 42,145 2,307, RATE SCHEDULE GTS 113,867 3,896, RATE SCHEDULE SST 19,780, TOTAL 61,555,871 14,659, NON-GAS COST BASE RATES 15 RATE SCHEDULES FTS / NTS, TPS, AND SST $ RATE SCHEDULE 50% LOAD FACTOR RATE SCHEDULE ITS % LOAD FACTOR - WINTER ITS % LOAD FACTOR - SUMMER ITS 0.38
7 Appendix A Page 3 of 4 COLUMBIA GAS TRANSMISSION, LLC CALCULATION OF CURRENT OTRA REVENUES UNDER RATE SCHEDULES OPT EFFECTIVE MAY 1, 2015 LINE NO. DESCRIPTION DEMAND / FIXED (1) $ 1 Schedule OPT-30 Day Interruption 2 Determinants Dth 556,500 3 Non-Gas Cost Base $ Revenue $ 88,484 5 Schedule OPT-60 Day Interruption 6 Determinants Dth 2,141,335 7 Non-Gas Cost Base $ Revenue $ 310,494 9 Total Schedule OPT Revenue $ 398,978
8 Appendix A Page 4 of 4 COLUMBIA GAS TRANSMISSION, LLC DERIVATION OF CURRENT OTRA RATE APPLICABLE TO RATE SCHEDULES OPT EFFECTIVE MAY 1, 2015 TOTAL LINE COMMODITY / DEMAND AND NO. DESCRIPTION DEMAND / FIXED VARIABLE COMMODITY (1) (2) (3) $ $ $ 1 TOTAL OTRA COSTS 11,114, ,114,450 2 NET OTRA COSTS FOR CURRENT PERIOD 11,114, ,114,450 3 RATE DETERMINANTS - Dth 4 TRANSPORTATION 5 RATE SCHEDULE FTS / NTS 40,325, RATE SCHEDULE TPS 1,201, RATE SCHEDULE ITS - WINTER 92,664 8,455,619 8 RATE SCHEDULE ITS - SUMMER 42,145 2,307,455 9 RATE SCHEDULE GTS 113,867 3,896, RATE SCHEDULE OPT , RATE SCHEDULE OPT ,141, RATE SCHEDULE SST 19,780, TOTAL 64,253,706 14,659, NON-GAS COST BASE RATES $ RATE SCHEDULE OPT DAY INTERRUPTION $ DAY INTERRUPTION $
9 APPENDIX B
10 COLUMBIA GAS TRANSMISSION, LLC COMPARISON OF THE CURRENT OTRA SURCHARGE RATE TO THE PROPOSED OTRA SURCHARGE RATE EFFECTIVE MAY 1, 2015 LINE BASE RATE NO. DESCRIPTION CURRENT PROPOSED ADJUSTMENT (1) (2) (3) $ $ $ (2) - (1) 1 TRANSPORTATION 2 RATE SCHEDULE GTS 3 COMMODITY RATE SCHEDULE FTS / NTS 5 DEMAND $ COMMODITY RATE SCHEDULE TPS 8 DEMAND $ COMMODITY RATE SCHEDULE SST 11 DEMAND $ COMMODITY RATE SCHEDULE OPT DAY INTERRUPTION 15 DEMAND $ COMMODITY DAY INTERRUPTION 18 DEMAND $ COMMODITY RATE SCHEDULE ITS 21 WINTER SUMMER
11 COLUMBIA GAS TRANSMISSION, LLC DERIVATION OF CURRENT OTRA SURCHARGE RATE APPLICABLE TO RATE SCHEDULES FTS / NTS, TPS, SST, ITS AND GTS EFFECTIVE MAY 1, 2015 TOTAL LINE COMMODITY / DEMAND AND NO. DESCRIPTION DEMAND / FIXED VARIABLE COMMODITY (1) (2) (3) $ $ $ 1 TOTAL OTRA COSTS (1,441,544) 0 (1,441,544) 2 LESS: 3 OPT TRANSPORTATION REVENUE (49,674) 0 (49,674) 4 NET OTRA COSTS (1,391,870) 0 (1,391,870) 5 RATE DETERMINANTS - Dth 6 TRANSPORTATION 7 RATE SCHEDULE FTS / NTS 40,325, RATE SCHEDULE TPS 1,201, RATE SCHEDULE ITS - WINTER 92,664 8,455, RATE SCHEDULE ITS - SUMMER 42,145 2,307, RATE SCHEDULE GTS 113,867 3,896, RATE SCHEDULE SST 19,780, TOTAL 61,555,871 14,659, NON-GAS COST BASE RATES 15 RATE SCHEDULES FTS / NTS, TPS, AND SST ($0.023) RATE SCHEDULE 50% LOAD FACTOR RATE SCHEDULE ITS % LOAD FACTOR - WINTER ITS % LOAD FACTOR - SUMMER ITS -0.05
12 COLUMBIA GAS TRANSMISSION, LLC CALCULATION OF CURRENT OTRA SURCHARGE REVENUES UNDER RATE SCHEDULES OPT EFFECTIVE MAY 1, 2015 LINE NO. DESCRIPTION DEMAND / FIXED (1) $ 1 Schedule OPT-30 Day Interruption 2 Determinants Dth 556,500 3 Non-Gas Cost Base $ (0.020) 4 Revenue $ (11,130) 5 Schedule OPT-60 Day Interruption 6 Determinants Dth 2,141,335 7 Non-Gas Cost Base $ (0.018) 8 Revenue $ (38,544) 9 Total Schedule OPT Revenue $ (49,674)
13 COLUMBIA GAS TRANSMISSION, LLC DERIVATION OF CURRENT OTRA SURCHARGE RATE APPLICABLE TO RATE SCHEDULES OPT EFFECTIVE MAY 1, 2015 TOTAL LINE COMMODITY / DEMAND AND NO. DESCRIPTION DEMAND / FIXED VARIABLE COMMODITY (1) (2) (3) $ $ $ 1 TOTAL OTRA COSTS (1,441,544) (1,441,544) 2 RATE DETERMINANTS - Dth 3 TRANSPORTATION 4 RATE SCHEDULE FTS / NTS 40,325, RATE SCHEDULE TPS 1,201, RATE SCHEDULE ITS - WINTER 92,664 8,455,619 7 RATE SCHEDULE ITS - SUMMER 42,145 2,307,455 8 RATE SCHEDULE GTS 113,867 3,896,433 9 RATE SCHEDULE OPT , RATE SCHEDULE OPT-60 2,141, RATE SCHEDULE SST 19,780, TOTAL 64,253,706 14,659, NON-GAS COST BASE RATES $ (0.022) 0 14 RATE SCHEDULE OPT DAY INTERRUPTION $ (0.020) DAY INTERRUPTION $ (0.018) 0
14 COLUMBIA GAS TRANSMISSION, LLC SUMMARY OF TOTAL UNRECOVERED OTRA COSTS DURING THE PERIOD OCOTOBER 1, MAY 31, 2015 DEMAND LINE CURRENT CURRENT CURRENT CARRYING NO. PURCHASES SALES RECOVERIES CHARGES SURPLUS BALANCE (1) (2) (3) (4) (5) (6) ($) ($) ($) ($) ($) ($) 1/ 1/ 1 OCTOBER (354.79) , , / 2 NOVEMBER (768,000.00) 768, (111,199.69) (37,966.33) 1/ 3 DECEMBER 14,545, (13,015,102.05) (1,741,176.75) (2,927.19) 0.00 (251,972.32) 4 JANUARY 11,156, (9,626,802.05) (1,773,144.07) (2,677.94) 0.00 (497,699.98) 5 FEBRUARY 9,172, (7,790,776.05) (1,812,689.42) (2,224.48) 0.00 (930,586.65) 2/ 6 MARCH 10,242, (8,712,302.00) (1,812,689.42) (2,553.09) 0.00 (1,215,731.16) 2/ 7 APRIL 11,602, (10,552,500.00) (1,359,517.07) (2,326.66) 86, (1,441,543.80) 2/ 8 TOTAL 55,951, (48,928,588.52) (8,537,854.14) (12,577.12) 86, / Includes updates of estimated purchases, sales and recoveries amounts from November 2014 filing. 2/ Purchases, sales and recoveries amounts are estimated and will be updated to reflect actuals in the November 2015 filing.
15 LESS: LINE BEGINNING CARRYING DEFERRED ADJUSTED INTEREST CARRYING NO. DESCRIPTION BALANCE CHARGE INCOME TAXES BALANCE FACTOR CHARGE (1) (2) (3) (4) (5) (6) $ $ $ $ $ DEMAND COLUMBIA GAS TRANSMISSION, LLC CALCULATION OF CARRYING CHARGES FOR THE PERIOD OCTOBER MAY OCTOBER (1,754,052.64) , (1,081,438.35) % (2,984.77) 2 NOVEMBER 376, (2,984.77) (145,586.53) 234, % DECEMBER (1,722,571.99) (2,359.55) 659, (1,060,574.62) % (2,927.19) 4 JANUARY (1,573,737.13) , (970,267.17) % (2,677.94) 5 FEBRUARY (1,449,937.14) (2,677.94) 554, (892,288.85) % (2,224.48) 6 MARCH (1,505,271.72) (4,902.42) 575, (925,033.19) % (2,553.09) 7 APRIL (1,412,864.14) , (871,083.02) % (2,326.66) 8 TOTAL (12,742.25)
16 COLUMBIA GAS TRANSMISSION, LLC AMORTIZATION OF UNRECOVERED OTRA COSTS FOR THE PERIOD OCTOBER 1, MAY 31, 2015 LINE NO. RECOVERIES SURPLUS BALANCE (1) (2) (3) $ $ (1,680,838.40) 1 OCTOBER 8, / 0.00 (1,672,744.59) 2 NOVEMBER (11,861.07) 1/ 0.00 (1,684,605.66) 3 DECEMBER 362, (1,321,764.81) 4 JANUARY 369, (952,237.16) 5 FEBRUARY 377, (574,685.07) 6 MARCH 377, (197,132.98) 7 APRIL 283, / (86,031.09) 2/ TOTAL 1,766, (86,031.09) 1/ Includes updates of estimated purchases, sales and recoveries amounts from November 2014 filing. 2/ Recoveries and Surplus amounts are estimated and will be updated to reflect actuals in the April 2016 filing.
17 APPENDIX C
18 COLUMBIA GAS TRANSMISSION, LLC OTRA TRACKER FILING SUMMARY OF BILLING DETERMINANTS EFFECTIVE MAY 1, 2015 LINE BILLING DETERMINANTS NO. DESCRIPTION DEMAND 1/ THROUGHPUT (1) (2) Dth Dth 1 RATE SCHEDULE FTS / NTS 40,325,504 2 RATE SCHEDULE TPS 1,201,158 3 RATE SCHEDULE SST 19,780,533 2/ 4 RATE SCHEDULE OPT - 30 DAY INTERRUPTION 556,500 5 RATE SCHEDULE OPT - 60 DAY INTERRUPTION 2,141,335 6 RATE SCHEDULE ITS 7 WINTER 92,664 3/ 8,455,619 8 SUMMER 42,145 4/ 2,307,455 9 RATE SCHEDULE GTS - SST 64,055 2,597, RATE SCHEDULE GTS - FTS 49,812 1,298, TOTAL TRANSPORTATION 64,253,706 14,659,507 1/ Demand rates based on 7 month effective period (May - November). 2/ Reflects SST contract demand levels at 100% in the winter and at 50% in the summer. 3/ Imputed demand for October - November. 4/ Imputed demand for May - September.
19 COLUMBIA GAS TRANSMISSION, LLC OTRA TRACKER FILING RATE SCHEDULES FTS/NTS Line Demands at No. Customer 05/1/2015 Dth/d 1 AEP Generation Resource 12,000 2 Allegheny Technologies, Inc. 1,500 3 Anadarko Energy Services Company 22,194 4 Antero Resources Corporation 581,892 5 Appalachian Gas and Oil Trust 30 6 ARP Mountaineer Production, LLC 15,500 7 Atmos Energy Marketing, LLC 3,425 8 Aurora Services 20 9 Baltimore Gas & Electric Company 209, Berry Energy Blue Creek Gas Company Bluefield Gas Company 2, BP Energy Company 4, Bunge North America 3, C I Mckown And Son Inc Cabot Oil & Gas Corporation 25, Cabot Oil & Gas Corporation 1/ 50, Cabot Oil & Gas Marketing Corporation 29, Calpine Energy Services, L.P. 181, Campbell Oil & Gas, Inc. 4, Celanese Acetate LLC 46, Celina Aluminum Precision Technology Inc Central Hudson Gas & Electric Corporation 10, Chesapeake Energy Marketing, Inc. 114, Chesapeake Utilities Corp Delaware Division 10, Chesapeake Utilities Corp Maryland Division 4, City of Charlottesville 7, City of Lancaster 5, City of Richmond 50, Clay County Gas Company Clean Gas Inc CNE Gas Supply, LLC 34, CNX Gas Company, LLC 214, Cobra Petroleum Production Corporation Columbia Gas of Kentucky, Inc. 20, Columbia Gas of Maryland, Inc. 15, Columbia Gas of Ohio, Inc. 351, Columbia Gas of Pennsylvania, Inc. 137, Columbia Gas of Virginia, Inc. 162, Corning Natural Gas Corporation 1, Cumberland Valley Resources, LLC 2, Cut Through Hydrocarbon 2, Delmarva Power & Light Company 26,919
20 COLUMBIA GAS TRANSMISSION, LLC OTRA TRACKER FILING RATE SCHEDULES FTS/NTS Line Demands at No. Customer 05/1/2015 Dth/d 44 Direct Energy Business Marketing, LLC 59, Dominion Field Services, Inc. 22, Dominion Retail, Inc. 8, East Ohio Gas Company 24, Energy Corporation of America 120, EnerVest Energy Institutional Fund XII LP 8, EP Rock Springs LLC 135, EQT Energy, LLC 1, EQT Production Company 76, eservices, LLC 1, EXCO Resources (PA), LLC 7, Exelon Generation Company, LLC 10, Ford Motor Company 2, Gas Natural Resources LLC Hard Rock Exploration, Inc. 9, Hayden Harper Energy KA LLC HG Energy, LLC 10, Honda of America MFG, Inc. 18, Honeywell International, Inc. 50, Hope Gas, Inc. dba Dominion Hope Hugh Dale Jr, dba Drilco Oil & Gas Corporation Husky Marketing and Supply Company 7, Integrys Energy Services Natural Gas, LLC 1, International Paper Company 7, Interstate Gas Supply, Inc. 12, Interstate Natural Gas Company IPR-GDF SUEZ Energy Marketing North America, Inc. 33, ISG Acquisition, Inc. 18, J. W. Kinzer Drilling Company Jay-Bee Production Company 18, Jefferson Gas Transmission Company, Inc. 3, Joseph E. Pauley JP Morgan Ventures Energy Corporation 24, Key Oil Company KIDN Marketing, Ltd. 6, Kinzer Business Realty Ltd. 30, KNG Energy, Inc Lindsey Gas Transporation, LLC Marathon Petroleum Company LP 15, MBM Production LLC MeadWestvaco Corporation 14, Minnesota Mining & Manufacturing 1, MMGS Inc. 4,306
21 COLUMBIA GAS TRANSMISSION, LLC OTRA TRACKER FILING RATE SCHEDULES FTS/NTS Line Demands at No. Customer 05/1/2015 Dth/d 87 Mountain State Production, Inc Mountaineer Gas Company 99, Nami Resources Company, LLC 5, National Fuel Gas Distribution Corporation 1, NCL Natural Resources, LLC New Jersey Natural Gas Company 20, New Jersey Natural Gas Company 1/ 40, New York State Electric & Gas Corporation 36, NewPage Corporation 3, Noble Americas Gas & Power Corp. 39, Noble Energy, Inc. 99, Northeast Natural Energy, LLC 18, Northeast Ohio Natural Gas 3, NOVEC Energy Solutions, Inc Nytis Exploration Company, LLC 2, Old Dominion Electric Cooperative 135, Orange & Rockland Utilities, Inc. 63, Osram Sylvania, Inc. 3, P.H. Glatfelter Company 2, Pacific Summit Energy, LLC 21, Peoples TWP, LLC 3, Petro Services, LLC 2, Piedmont Natural Gas Company, Inc. 42, Pivotal Utility Holdings, Inc dba Elkton Gas Pivotal Utility Holdings, Inc. dba Elizabethtown Gas 22, PPL EnergyPlus, LLC 25, Prime Operating Company PSEG Energy Resources & Trade L.L.C. 25, PTC Group Holdings Corp R B Robertson & Son Gas & Oil Range Resources-Appalachia, LLC 284, Reed Brothers LP 2, Reynolds Consumer Products Rice Drilling B LLC 177, Rice Energy Marketing LLC 142, Roanoke Gas Company 30, Roberts S Roberts dba Oliver M. Roberts Company Rouzer Oil Company Sequent Energy Management, L.P. 31, Shipley Choice LLC Snyder Armclar Gas Co. 3, South Jersey Gas Company 54, South Jersey Gas Company 1/ 50,000
22 COLUMBIA GAS TRANSMISSION, LLC OTRA TRACKER FILING RATE SCHEDULES FTS/NTS Line Demands at No. Customer 05/1/2015 Dth/d 130 South Jersey Resources Group, LLC 41, South Jersey Resources Group, LLC 1/ 40, Southern Tier Transmission Corporation 3, SouthStar Energy Services, LLC 1, Sprague Operating Resources, LLC 1, Stalnaker Energy Corporation Stand Energy Corporation 10, Statoil Natural Gas LLC 41, Suburban Natural Gas Company 14, SWN Energy Services Company, LLC 121, Tate Gas Co., Inc Tenaska Marketing Ventures The Easton Utilities Commission The Narragansett Electric Company 47, Toyota Motor Engineering & Manufacturing 9, UGI Central Penn Gas, Inc. 14, UGI Energy Services Incorporated 62, UGI Penn Natural Gas, Inc. 18, UGI Utilities Inc. 150, Union Rural Electric Cooperative, Inc United States Gypsum Company 13, UTZ Quality Foods, Inc Viking Energy Corporation 1, Village of Williamsport, Ohio Virginia Natural Gas, Inc. 59, Virginia Power services Energy Corp., Inc. 267, Volunteer Energy Services, Inc. 19, Wald LLC Washington Gas Light Company 268, WGL Energy Services, Inc. 27, WGL Midstream, Inc. 40, WPX Energy Marketing LLC 7, TOTAL 5,915,072 1/ New Contracts Represented in Billing Determinants for 1 month.
23 COLUMBIA GAS TRANSMISSION, LLC OTRA TRACKER FILING RATE SCHEDULE TPS Line Demands at No. Customer 05/1/2015 Dth/d 1 Baltimore Gas & Electric Company 23,017 2 Piedmont Natural Gas Company, Inc. 68,835 3 Washington Gas Light Company 79,742 4 TOTAL 171,594
24 COLUMBIA GAS TRANSMISSION, LLC OTRA TRACKER FILING RATE SCHEDULE SST Line Demands at No. Customer 05/1/2015 Dth/d 1 Baltimore Gas & Electric Company 94,625 2 Bluefield Gas Company 8,682 3 Central Hudson Gas & Electric Corporation 8,985 4 Chesapeake Utilities Corp Delaware Division 8,224 5 Chesapeake Utilities Corp Maryland Division 6,276 6 City of Charlottesville 24,755 7 City of Lancaster 15,779 8 City of Richmond 46,913 9 Columbia Gas of Kentucky, Inc 220, Columbia Gas of Maryland, Inc. 33, Columbia Gas of Ohio, Inc. 1,445, Columbia Gas of Pennsylvania, Inc. 456, Columbia Gas of Virginia, Inc. 167, Constellation Energy Gas Choice, Inc. 1, Corning Natural Gas Corporation Delmarva Power & Light Company 10, Duke Energy Kentucky, Inc. 39, Duke Energy Ohio, Inc. 216, East Ohio Gas Company 60, Gas Natural Service Company LLC 2, Mountaineer Gas Company 236, National Fuel Gas Distribution Corporation 18, New York State Electric & Gas Corporation 68, Orange & Rockland Utilities, Inc. 20, Peoples TWP, LLC 10, Piedmont Natural Gas Company, Inc. 96, Pivotal Utility Holdings, Inc dba Elkton Gas Pivotal Utility Holdings, Inc dba Elizabethtown Gas 3, PPL EnergyPlus, LLC 5, Public Service Company of North Carolina Incorporated 35, Roanoke Gas Company 25, South Jersey Gas Company 52, Stand Energy Corporation 7, Suburban Natural Gas Company 6, The Easton Utilities Commission 2, The Narragansett Electric Company 2, UGI Central Penn Gas, Inc. 11, UGI Energy Services Incorporated 3, UGI Penn Natural Gas, Inc UGI Utilities Inc. 114, United States Gypsum Company 6, Vectren Energy Delivery of Ohio, Inc. 200, Virginia Natural Gas, Inc. 63, Washington Gas Light Company 533, TOTAL 4,395,674
25 COLUMBIA GAS TRANSMISSION, LLC OTRA TRACKER FILING RATE SCHEDULE OPT Line Demands at No. Customer 05/1/2015 Dth/d RATE SCHEDULE OPT-30 1 Direct Energy Business Marketing, LLC 6,000 2 NextEra Energy Power Marketing, LLC 5,400 3 Pacific Summit Energy, LLC 25,000 4 Range Resources-Appalachia, LLC 10,000 5 Stand Energy Corporation Virginia Power Services Energy Corp., Inc. 32,500 7 TOTAL OPT-30 79,500 RATE SCHEDULE OPT-60 8 Antero Resources Corporation 26,350 9 Calpine Energy Services, L.P. 10, Dominion Field Services, Inc. 12, NextEra Energy Power Marketing, LLC 5, Pacific Summit Energy, LLC 146, T&F Exploration, L.P Texla Energy Management, Inc 40, Virginia Power Services Energy Corp., Inc. 65, TOTAL OPT , TOTAL OPT 385,405
26 COLUMBIA GAS TRANSMISSION, LLC OTRA TRACKER FILING RATE SCHEDULE ITS Line No. Customer Throughput Dth WINTER 1 AEP Energy, Inc. 101,027 2 AEP Generation Resources Inc. 24,332 3 Atmos Energy Marketing, LLC 181,573 4 BP Energy Company 979,982 5 Calgon Carbon Corporation 425,457 6 CNE Gas Supply, LLC 481,110 7 Cobra Pipeline Company, Ltd. 2,941 8 Colonial Energy Inc. 76,336 9 Consolidated Edison Energy, Inc 55, Direct Energy Business Marketing, LLC 2,821, DPL Energy, Inc. 2, DTE Energy Trading, Inc 339, Eagle Point Power Generation LLC 314, EDF Trading North America, LLC 190, Exelon Generation Company, LLC 8, Gas Natural Resources LLC 56, Honeywell International, Inc. 79, Infinite Energy, Inc 13, Integrys Energy Services Natural Gas, LLC 514, Jefferson Gas Transmission Company, Inc 11, Johnson County Gas Company 14, KNG Energy, Inc. 1, LES Renewable NG, LLC 84, Macquarie Energy LLC 28, Mieco Inc. 2, Mountain State University, Inc. 2, NextEra Energy Power Marketing, LLC 167, Noble Americas Gas & Power Corp. 1, NRG Power Marketing LLC Pacific Summit Energy, LLC 1, Riley Natural Gas Company 15, Sequent Energy Management, LP. 22, Snyder Armclar Gas Co South Jersey Resources Group, LLC 72, Southwest Energy, LP 30, Spark Energy Gas, LLC 1, Stand Energy Corporation 81, Tenaska Marketing Ventures 532, Texican Natural Gas Company Texla Energy Management, Inc. 614, Tiger Natural Gas, Inc Virginia Power Services Energy Corp, Inc. 97, TOTAL WINTER 8,455,619
27 COLUMBIA GAS TRANSMISSION, LLC OTRA TRACKER FILING RATE SCHEDULE ITS Line No. Customer Throughput Dth SUMMER 44 AEP Energy, Inc. 15, AEP Generation Resources, Inc. 15, Calgon Carbon Corporation 474, Chevron Natural Gas 124, Colonial Energy Inc. 4, Consolidated Edison Energy, Inc 97, Constellation ProLiance, LLC 1, Direct Energy Business Marketing, LLC 53, DPL Energy, Inc. 10, DTE Energy Trading, Inc 9, Eagle Point Power Generation LLC 307, EnergyMark, LLC 11, Gas Natural Resources LLC 116, Gatherco Inc. 34, Honeywell International, Inc. 191, Integrys Energy Services Natural Gas, LLC 28, Johnson County Gas Company 4, KNG Energy, Inc LES Renewable NG, LLC 209, Macquarie Energy LLC 6, Mountain State University, Inc. 3, Noble Americas Gas & Power Corp. 39, NRG Power Marketing LLC 7 67 Riley Natural Gas Company 7, Snyder Armclar Gas Co. 2, South Jersey Resources Group, LLC 69, Spark Energy Gas, LLC 2, Stand Energy Corporation 40, Tenaska Marketing Ventures 314, Texla Energy Management Inc 3, Virginia Power Services Energy Corp., Inc. 104, TOTAL SUMMER 2,307, TOTAL ITS 10,763,074
28 COLUMBIA GAS TRANSMISSION, LLC OTRA TRACKER FILING RATE SCHEDULE GTS Line No. Customer Throughput Dth 1 Atmos Energy Marketing, LLC 2,566,646 2 Blacksville Oil And Gas Company, Inc. 12,164 3 Cumberland Gas Marketing Company 313,280 4 KIDN Marketing, Ltd. 307,152 5 National Gas & Oil Cooperative 183,900 6 Natural Energy Utility Corporation 70,317 7 Northeast Ohio Natural Gas 226,946 8 Orwell Natural Gas Company 38,860 9 Southeastern Natural Gas Company 47, Waterville Gas Company 130, TOTAL 3,896,433
29 CLEAN TARIFF SECTIONS
30 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.1. Currently Effective FTS Version Currently Effective Applicable to Schedule FTS Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Schedule FTS Reservation Charge 3/ $ Commodity Maximum Minimum Overrun Maximum Minimum Daily 2/ 1/ Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. 3/ Minimum reservation charge is $0.00. Issued On: April 1, 2015 Effective On: May 1, 2015
31 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.2. Currently Effective FTS-APX Version Currently Effective Applicable to Schedule FTS Incremental APX Service Recourse Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA Total Effective 2/ Daily 2/ Schedule FTS APX Incremental Services Recourse Reservation Charge 3/ $ Commodity Maximum Minimum Overrun Maximum Minimum / Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. 3/ Minimum reservation charge is $0.00. Issued On: April 1, 2015 Effective On: May 1, 2015
32 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.3. Currently Effective NTS and NTS-S Version Currently Effective Applicable to Schedule NTS and NTS-S Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Schedule NTS Reservation Charge 3/ 4/ $ Commodity Maximum Minimum Overrun Maximum Minimum / Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. 3/ Minimum reservation charge is $ / The rates shown above for Service under Schedule NTS shall be applicable to Service under Schedule NTS-S except that the maximum Reservation Fee shall be adjusted to reflect the applicable expedited period of gas flow (EPF) utilizing the following formula, rounded to 3 decimal places: NTS-S = NTS * (24/EPF) where: NTS-S = NTS-S Reservation Fee NTS = Applicable NTS Reservation Fee 24 = Number of Hours in a Gas Day EPF - MDQ/MHQ Daily 2/ Issued On: April 1, 2015 Effective On: May 1, 2015
33 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.4. Currently Effective ITS Version Currently Effective Applicable to Schedule ITS Per Dth Winter Maximum Winter Minimum Summer Maximum Summer Minimum Commodity Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Daily 2/ / Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. Issued On: April 1, 2015 Effective On: May 1, 2015
34 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.5. Currently Effective GTS Version Currently Effective Applicable to Schedule GTS Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Schedule GTS Commodity Maximum Minimum MFCC Daily 2/ 1/ Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. Issued On: April 1, 2015 Effective On: May 1, 2015
35 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.6. Currently Effective OPT Version Currently Effective Applicable to Schedule OPT Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Schedule OPT 30 Days Interruption Reservation Charge 3/ $ Days Interruption Reservation Charge 3/ $ Commodity Maximum Minimum Overrun 30 Days Interruption Maximum Minimum Days Interruption Maximum Minimum / Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference 3/ Minimum reservation charge is $0.00. Daily 2/ Issued On: April 1, 2015 Effective On: May 1, 2015
36 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.7. Currently Effective TPS Version Currently Effective Applicable to Schedule TPS Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Daily 2/ Schedule TPS Reservation Charge 3/ $ Commodity Maximum Minimum Overrun Maximum Minimum / Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. 3/ Minimum reservation charge is $0.00. Issued On: April 1, 2015 Effective On: May 1, 2015
37 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.8. Currently Effective SST Version Currently Effective Applicable to Schedule SST Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Schedule SST Reservation Charge 3/4/ $ Commodity Maximum Minimum Overrun 4/ Maximum Minimum Daily 2/ 1/ Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. 3/ Minimum reservation charge is $ / Shippers utilizing the Eastern Market Expansion (EME) facilities for Schedule SST service will pay a total SST reservation charge of $ If EME customers incur an overrun for SST services that is provided under their EME Project service agreements, they will pay a total overrun rate of cents. The applicable EME demand charge and EME overrun charge can be added to the applicable surcharges above to calculate the EME Total Effective. Issued On: April 1, 2015 Effective On: May 1, 2015
38 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.18. Currently Effective FTS-GC Version Currently Effective Applicable to Schedule FTS-GC Incremental Giles County Service Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Schedule FTS Reservation Charge 3/ $ Commodity Maximum Minimum Overrun Maximum Minimum Daily 2/ 1/ Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. 3/ Minimum reservation charge is $0.00. Issued On: April 1, 2015 Effective On: May 1, 2015
39 MARKED TARIFF SECTIONS
40 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.1. Currently Effective FTS Version Currently Effective Applicable to Schedule FTS Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Schedule FTS Reservation Charge 3/ $ Commodity Maximum Minimum Overrun Maximum Minimum Daily 2/ 1/ Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. 3/ Minimum reservation charge is $0.00. Issued On: April 1, 2015 Effective On: May 1, 2015
41 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.2. Currently Effective FTS-APX Version Currently Effective Applicable to Schedule FTS Incremental APX Service Recourse Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA Total Effective 2/ Daily 2/ Schedule FTS APX Incremental Services Recourse Reservation Charge 3/ $ Commodity Maximum Minimum Overrun Maximum Minimum / Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. 3/ Minimum reservation charge is $0.00. Issued On: April 1, 2015 Effective On: May 1, 2015
42 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.3. Currently Effective NTS and NTS-S Version Currently Effective Applicable to Schedule NTS and NTS-S Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Schedule NTS Reservation Charge 3/ 4/ $ Commodity Maximum Minimum Overrun Maximum Minimum / Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. 3/ Minimum reservation charge is $ / The rates shown above for Service under Schedule NTS shall be applicable to Service under Schedule NTS-S except that the maximum Reservation Fee shall be adjusted to reflect the applicable expedited period of gas flow (EPF) utilizing the following formula, rounded to 3 decimal places: NTS-S = NTS * (24/EPF) where: NTS-S = NTS-S Reservation Fee NTS = Applicable NTS Reservation Fee 24 = Number of Hours in a Gas Day EPF - MDQ/MHQ Daily 2/ Issued On: April 1, 2015 Effective On: May 1, 2015
43 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.4. Currently Effective ITS Version Currently Effective Applicable to Schedule ITS Per Dth Winter Maximum Winter Minimum Summer Maximum Summer Minimum Commodity Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Daily 2/ / Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. Issued On: April 1, 2015 Effective On: May 1, 2015
44 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.5. Currently Effective GTS Version Currently Effective Applicable to Schedule GTS Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Schedule GTS Commodity Maximum Minimum MFCC Daily 2/ 1/ Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. Issued On: April 1, 2015 Effective On: May 1, 2015
45 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.6. Currently Effective OPT Version Currently Effective Applicable to Schedule OPT Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Schedule OPT 30 Days Interruption Reservation Charge 3/ $ Days Interruption Reservation Charge 3/ $ Commodity Maximum Minimum Overrun 30 Days Interruption Maximum Minimum Days Interruption Maximum Minimum / Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference 3/ Minimum reservation charge is $0.00. Daily 2/ Issued On: April 1, 2015 Effective On: May 1, 2015
46 Columbia Gas Transmission, LLC FERC Tariff Fourth Revised Volume No. 1 V.7. Currently Effective TPS Version Currently Effective Applicable to Schedule TPS Per Dth Base Tariff 1/ 2/ TCRA EPCA OTRA CCRM Total Effective 2/ Daily 2/ Schedule TPS Reservation Charge 3/ $ Commodity Maximum Minimum Overrun Maximum Minimum / Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section of the Commission s Regulations and in accordance with Section 34 of the GTC of Transporter s FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website ( is incorporated herein by reference. 3/ Minimum reservation charge is $0.00. Issued On: April 1, 2015 Effective On: May 1, 2015
May 27, 2014. Version 12.0.0
5151 San Felipe, Suite 2400 Houston, Texas 77056 Phone: 713-386-3759 Fax: 713-386-3755 jdowns@nisource.com Jim Downs Vice President of Rates & Regulatory Affairs May 27, 2014 Ms. Kimberly D. Bose Federal
More informationTranscontinental Gas Pipe Line Company, LLC Flow Through of Dominion Transmission, Inc. Penalty Sharing
Gas Pipeline Transco 2800 Post Oak Boulevard (77056) Houston, Texas 77251-1396 713/215-4060 August 7, 2014 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention:
More informationFlow Through of Dominion Transmission, Inc. Penalty Sharing
Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) Houston, Texas 77251-1396 713/215-2000 August 3, 2015 Federal Energy Regulatory Commission 888 First Street, N.E. Washington,
More informationMailing Address: P.O. Box 1642 Houston, TX 77251-1642. July 27, 2015
5400 Westheimer Court Houston, TX 77056-5310 713.627.5400 main Mailing Address: P.O. Box 1642 Houston, TX 77251-1642 July 27, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888
More informationhereby submits for filing a report of its Operational Purchases and Sales for the thirteen-month period ending December 31, 2011.
April 26, 2012 Ms. Kimberly D. Bose Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Bison Pipeline LLC 717 Texas Street, Suite 2400 Houston, TX 77002 tel 832.320.5675
More informationUpdate to List of Non-Conforming Service Agreements Docket No. RP16-
Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 (713) 215-2000 January 12, 2016 Federal Energy Regulatory Commission 888 First Street,
More informationPUBLIC SERVICE COMMISSION
February 11, 29 Mr. Jeff Deroueii Executive Director Kentucky Public S eivice Commission 21 1 Sower Boulevard P.. Box 615 Frankfort, ICY 462 PUBLIC SERVICE COMMISSION A NiSource Company 21 Mercer Road
More informationTranscontinental Gas Pipe Line Company, LLC Flow Through of Dominion Transmission, Inc. Penalty Sharing
Gas Pipeline Transco 2800 Post Oak Boulevard (77056) Houston, Texas 77251-1396 713/215-4060 August 18, 2011 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention:
More informationMs. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426. Compliance Filing Docket No.
October 31, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 North Baja Pipeline, LLC 717 Texas Street, Suite 2400 Houston, TX 77002 John
More informationWashington Storage Service Update to Lists of Buyers Docket No. RP07-
Transcontinental Gas Pipe Line Corporation 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 713-215-2000 March 9, 2007 Federal Energy Regulatory Commission 888 First Street, N.E.
More informationAugust 31, 2015. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426
August 31, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: Southeast Supply Header, LLC, Docket No. RP15- -000 Dear Ms. Bose: Pursuant
More informationColumbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: July 16, 2013 Service Agreement Number 144414 Sequent
Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective : July 16, 2013 Service Agreement Number 144414 Sequent Energy Management, L.P. Option Code A Service Agreement No.
More informationJanuary 14, 2011. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
January 14, 2011 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Northern Border Pipeline Company 717 Texas Street, Suite 2400 Houston,
More informationVersion Part Section Description 0.0.0 II 13.27 Summary of Negotiated Rate Agreement
Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 (713) 215-2000 Federal Energy Regulatory Commission 888 First Street, N.E. Washington,
More informationZONE & SYSTEM SPECIFIC POOLS AS OF: 11/19/2015 POOL # CUSTOMER NAME ZONE SYSTEM
PSNG11120 ALABAMA GAS CORPORATION ZONE 1 NORTH SYSTEM PSNG11168 ALABAMA GAS CORPORATION ZONE 2 PSNG11314 AMP GATHERING I, LP PSNG17 ANADARKO ENERGY SERVICES COMPANY PSNG28 ANADARKO ENERGY SERVICES COMPANY
More information1300 Main Street Houston, Texas 77002 (713) 989-7000
January 31, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room 1A Washington, D.C. 20426 Re: Trunkline Gas Company, LLC Docket No. RP14- -000 Dear Ms.
More informationTrunkline Gas Company, LLC Docket No. RP12- -000
October 7, 2011 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room 1A Washington, D.C. 20426 Re: Trunkline Gas Company, LLC Docket No. RP12- -000 Dear Ms.
More informationSTATEMENT OF NATURE, REASONS AND BASIS
March 27, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Dear Ms. Bose: Re: Docket No. RP15- Compliance with Order No. 801 on Pipeline
More informationFlorida Gas Transmission Company, LLC Docket No. RP14- -000
April 30, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 RE: Florida Gas Transmission Company, LLC Docket No. RP14- -000 Dear Ms.
More informationMarch 25, 2015. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426
March 25, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Tuscarora Gas Transmission Company 700 Louisiana Street, Suite 700 Houston,
More informationTranscontinental Gas Pipe Line Company, LLC Rate Schedule S-2 Tracking Filing
Gas Pipeline Transco 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 713/215-4060 November 20, 2009 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
More informationFlow Through of Texas Eastern Transmission, LP OFO Penalty Sharing
Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) Houston, Texas 77251-1396 713/215-2000 January 8, 2016 Federal Energy Regulatory Commission 888 First Street, N.E. Washington,
More informationUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION NOTICE. March 9, 2006
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION NOTICE March 9, 2006 The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (PUB. L. No.
More informationColumbia Gas Transmission, LLC Section 4.11. Original Volume No. 1.1 Version 0.0.0. Non-Conforming Service Agreement No. 155679.
Columbia Gas Transmission, LLC Section 4.11 FERC NGA Gas Tariff Non-Conf Neg Rate Svc Agmts Original Volume No. 1.1 Version 0.0.0 Non-Conforming Service Agreement No. 155679 City of Richmond Agreement
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Columbia Gas Transmission Corporation ) Docket No.
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Columbia Gas Transmission Corporation Docket No. RP08-401-000 Atmos Energy Marketing, LLC BP Energy Company Delta Energy, LLC Direct
More informationGas Transmission Northwest Corporation FERC Form 567 Volume 1 of2. Public
FERC Form 567 Volume 1 of2 Public PUBLIC VERSION TransCanada In business to deliver June 1,2009 1400 SW Fifth Avenue, Suite 900 Portland, Oregon 97201 John A. Roscher Director, Rates & Regulatory Affairs
More informationTranscontinental Gas Pipe Line Company, LLC Annual Fuel Tracker Filing
Gas Pipeline Transco 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 713/215-4060 February 27, 2009 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
More informationSouthern LNG Company, L.L.C. ( SLNG ) submits for filing the following section to its FERC Gas Tariff, First Revised Volume No.
March 31, 2015 Ms. Kimberly Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D. C. 20426 Re: Docket No. RP15- Order No. 801 Map Compliance Filing Dear Ms. Bose: (
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Rock Island Clean Line LLC ) Docket No. ER12-365-000
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Rock Island Clean Line LLC ) Docket No. ER12-365-000 ROCK ISLAND CLEAN LINE LLC S ANSWER TO COMMENTS OF INTERSTATE POWER AND LIGHT
More information142 FERC 61,062 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING CONTESTED SETTLEMENT. (Issued January 24, 2013)
142 FERC 61,062 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony T. Clark. Columbia
More informationList of Contracting Parties AECO Gas Storage Partnership. AEP Energy Partners, Inc. Ag Energy Co-operative Ltd. Agrium Partnership
List of Contracting Parties AECO Gas Storage Partnership AEP Energy Partners, Inc. Ag Energy Co-operative Ltd. Agrium Partnership Aitken Creek Gas Storage ULC AltaGas Ltd. Anahau Energy, LLC Apache Canada
More informationMillennium Pipeline Company, LLC Response to New York State Energy Highway RFI
Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI www.millenniumpipeline.com One Blue Hill Plaza, 7th Floor Post Office Box 1565 Pearl River, N Y 10965 845.620.1300 Voice 845.620.1320
More informationLEACH XPRESS. Leach XPress Rayne XPress. Non Binding Open Seasons
LEACH XPRESS Leach XPress Rayne XPress Non Binding Open Seasons Columbia Pipeline Group is pleased to announce another innovative solution that will allow the growing Marcellus and Utica shale production
More informationNovember 20, 2014. Re: Southern Star Central Gas Pipeline, Inc. Docket No. RP15- Annual Cash-Out Refund Report
4700 KY Hwy. 56 West P.O. Box 20010 Owensboro, Kentucky 42304-0010 Phone 270/852-5000 Philip A. Rullman Vice President and Chief Commercial Services Officer Phone: (270)852-4440 Email: phil.a.rullman@sscgp.com
More informationI. TRANSMISSION OWNERS
I. TRANSMISSION OWNERS 1. ALLETE, Inc. (for its operating division Minnesota Power, Inc., and its wholly-owned subsidiary, Superior Water, Light and Power Company) 2. Ameren Illinois Company 3. Ameren
More informationGlobal Head of Power, Gas, Carbon and Coal. Director of Gas Trading and Origination. Senior Analyst. Vice President - - - Civil & Utility Division
TransCanada Power Marketing Calpine Corporation Sequent Energy Management PECO Energy Virginia Power Energy Marketing GDF SUEZ Gas NA LLC Thomson Reuters Southwestern Energy Constellation Energy Williams-
More informationFERC Gas Tariff. Original Volume No. 1 RYCKMAN CREEK RESOURCES, LLC. Filed with the FEDERAL ENERGY REGULATORY COMMISSION
FERC Gas Tariff Original Volume No. 1 Of RYCKMAN CREEK RESOURCES, LLC Filed with the FEDERAL ENERGY REGULATORY COMMISSION Communications covering this tariff should be addressed to: Jeff Foutch, Managing
More informationRegulatory Trends and the Status of Deregulation in the Natural Gas Business
Regulatory Trends and the Status of Deregulation in the Natural Gas Business ESC Technology and Market Assessment Forum Chicago, Illinois October 27, 2011 Cynthia J. Marple Director, Rates and Regulatory
More informationFERC NGA GAS TARIFF. Fifth Revised Volume No. 1. (Supersedes Fourth Revised Volume No. 1) TRANSWESTERN PIPELINE COMPANY, LLC.
FERC NGA GAS TARIFF Fifth Revised Volume No. 1 (Supersedes Fourth Revised Volume No. 1) Of TRANSWESTERN PIPELINE COMPANY, LLC Filed with the FEDERAL ENERGY REGULATORY COMMISSION Communications concerning
More informationPlatts 3 rd Annual Midstream Development & Management Conference - Houston, Texas
Platts 3 rd Annual Midstream Development & Management Conference - Houston, Texas Rodney L. Waller Senior Vice President May 21, 2010 Platts 3 rd Annual Midstream Development & Management Conference l
More information141 FERC 61,117 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
141 FERC 61,117 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony T. Clark. Wyoming
More informationMidcontinent Independent System Operator, Inc. FERC Docket No. ER16- -000 Notice of Termination of Generator Interconnection Agreement
J. Matt Harnish Sr. Corporate Counsel Direct Dial: 317-249-5285 Email: mharnish@misoenergy.org February 4, 2016 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory
More information139 FERC 61,138 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ISSUING CERTIFICATES AND APPROVING ABANDONMENT
139 FERC 61,138 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Texas Eastern Transmission,
More informationMONROE GAS STORAGE COMPANY, LLC
FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 (Superseding Original Volume No. 1) of MONROE GAS STORAGE COMPANY, LLC Filed with the FEDERAL ENERGY REGULATORY COMMISSION Communications Concerning this Tariff
More informationMILLENNIUM PIPELINE NEW YORK S ENERGY BACKBONE Existing Benefits and Expansion Opportunities
MILLENNIUM PIPELINE NEW YORK S ENERGY BACKBONE Existing Benefits and Expansion Opportunities New York is the fourth largest natural gas consuming state in the nation... Overview New York State is highly
More informationBrubaker & Associates, Inc. Testimony Filed Since 1999 by Michael Gorman on Cost of Capital Issues
7/24/2009 9134 PACIFICORP, dba PACIFIC POWER Reply OR UE-210 Return on Common Equity Rate of Return The Industrial and The Citizens' Utility Board of Oregon 7/17/2009 9123 INTERSTATE POWER AND LIGHT Direct
More information2006 & 2007 Earnings Guidance Conference Call and Webcast December 14, 2006
2006 & 2007 Earnings Guidance Conference Call and Webcast December 14, 2006 Forward-Looking Statements Statements contained or incorporated by reference in these slides regarding future events and developments
More informationTOA-AC Member Contact Information
TOA-AC Member Contact Information Vincent Kaminski Manager of Planning Allegheny Electric Cooperative, Inc. 212 Locust Street PO Box 1266 Harrisburg, PA 17108 212 Locust Street PO Box 1266 Harrisburg,
More informationThe Williams Capital Group, L.P. Presentation to National Association of Regulatory Utility Commissioners Summer Committee Meetings.
Presentation to National Association of Regulatory Utility Commissioners Summer Committee Meetings July 18, 2010 WCG Co Manager relationships with Power and Gas utilities Fixed Income Underwriting (Lead
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Potomac-Appalachian Transmission Highline, LLC PJM Interconnection, L.L.C. and Potomac-Appalachian Highline Transmission, LLC )
More information151 FERC 61,108 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING PROPOSED TARIFF REVISIONS. (Issued May 11, 2015)
151 FERC 61,108 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller, Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.
More informationOur analysis of data collected and reported by PADEP between 2008 and 2011 found the following:
Risky Business: An Analysis of Marcellus Shale Gas Drilling Violations in Pennsylvania 2008 2011 Erika Staaf, PennEnvironment Research & Policy Center February 2012 Marcellus Shale gas drilling is expanding
More informationPLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of 9-25-14)
PIPELINE SYSTEMS (as of 9-25-14) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Great Lakes Gas Transmission Limited Partnership ) Docket No. RP11-1723-000 GREAT LAKES GAS TRANSMISSION LIMITED PARTNERSHIP S MOTION
More information135 FERC 61,197 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING AUTHORIZATION TO MAKE AFFILIATE SALES
135 FERC 61,197 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Black
More informationMISO Schedule 41 Charge to Recover Costs of Entergy Storm Securitization SCHEDULES 33.0.0 SCHEDULE 41
SCHEDULE 41 Charges from Entergy Operating Companies Pricing Zones I. GENERAL This Schedule 41 provides for the recovery of the storm securitization charges consistent with settlement agreements approved
More information137 FERC 61,203 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Transcontinental Gas Pipe Line Company, LLC ORDER DENYING REHEARING
137 FERC 61,203 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Transcontinental
More informationUniversity of Denver, MBA, Business Administration, 1973 Regis University, BS, Business Administration, 1972
Resume of Michael J. McFadden MICHAEL J. MCFADDEN AREAS OF QUALIFICATION Rates, regulatory affairs, strategic planning, electric and gas utility operations, corporate finance, financial analysis, asset
More informationChase Tower, Eighth Floor. P.O. Box 1588. July 7,2006
STEPTOE & JOHNSON ATTORNEYS AT LAW Chase Tower, Eighth Floor Writer's Contact Information P.O. Box 1588 Charleston, WV 25326-1588 (304) 353-8000 (304) 353-8180 Fax (304) 353-8113 www.steptoe-johnson.com
More informationCertified Retail Electric Service Providers Currently Registered in AEP Ohio Territory (includes both Ohio Power & Columbus Southern Power)
AEP Energy 353 West Erie St., Suite 700 Chicago, IL 60654 Phone: (866) 258-3782 www.aepenergy.com Agera Energy LLC 55 Pleasantville Rd. South Building, Suite S-107 Briarcliff Manor, NY 10510 Phone: (844)
More information133 FERC 61,057 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AMENDING CERTIFICATE. (Issued October 21, 2010)
133 FERC 61,057 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Southern
More informationAccess Northeast Project New England Energy Reliability Solution
Access Northeast Project New England Energy Reliability Solution Open Season Notice for Firm Service February 18, 2015 May 1, 2015 Access Northeast Project New England Energy Reliability Solution Eversource
More informationSeptember 28, 2015. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
September 28, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Sea Robin Pipeline Company, LLC Docket Nos. RP14-247-000, et al.
More informationSabal Trail Transmission, LLC
FGU 2014 ANNUAL MEETING JUNE 25, 2014 Sabal Trail Transmission, LLC Connecting diverse natural gas supplies to southeast markets Josh Browning Changing Natural Gas Flows Value of capacity increases with
More informationTennessee Gas Pipeline Co, LLC
Co, LLC Northeast Gas Association Regional Market Trends Forum April 30, 2013 Preston Troutman Director, Business Development Kinder Morgan: Unparalleled Asset Footprint 3 rd largest energy company North
More informationUtility Capital Expenditures
Utility Capital Expenditures Jean Reaves Rollins UPMG--Atlanta October 2007 Your Boss Is Wrong You Are In Fact Doing Twice the Work 750,000 Total Investor-Owned Utility Employment 1998-2006 (C Three Analysis)
More information154 FERC 61,032 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ISSUING CERTIFICATE. (Issued January 21, 2016)
154 FERC 61,032 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable. Texas Gas Transmission,
More informationDANIEL J. LAWTON LAWTON CONSULTING B.A. ECONOMICS, MERRIMACK COLLEGE M.A. ECONOMICS, TUFTS UNIVERSITY
Page 1 of 9 DANIEL J. LAWTON LAWTON CONSULTING B.A. ECONOMICS, MERRIMACK COLLEGE M.A. ECONOMICS, TUFTS UNIVERSITY Prior to beginning his own consulting practice Diversified Utility Consultants, Inc., in
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. American Midstream, LLC (Midla) ) Docket No.
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION American Midstream, LLC (Midla) ) Docket No. CP14-125-000 American Midstream, LLC (Midla) ) Docket No. CP14-126-000 (unconsolidated)
More informationOffice of Energy Projects Energy Infrastructure Update For December 2013
For December 213 Natural Gas Highlights DCP Midstream received authorization to construct and operate its Lucerne Residue Line Project which will provide 23 MMcf/d of capacity from a proposed gas processing
More information135 FERC 61,012 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
135 FERC 61,012 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Public
More informationSASABE PIPELINE OPEN SEASON BID SHEET. The In-Service Date for the Sasabe Pipeline. MDQ (Quantity in Dth) MDQ (Quantity in Dth)
SASABE PIPELINE OPEN SEASON BID SHEET A. Shipper Name: B. Shipper Address: C. Term of service; Telephone Fax Commencing On: The In-Service Date for the Sasabe Pipeline Terminating On: D. imum Acceptable
More informationUTI ENERGY CORP. (Exact name of registrant as specified in its charter)
SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 Form 10-K/A Amendment to Application or Report Amendment No. 1 (Mark One) Annual report pursuant to section 13 or 15(d) of the Securities Exchange
More informationPLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of 7-24-15)
PIPELINE SYSTEMS (as of 7-24-15) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and
More information152 FERC 61,028 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
152 FERC 61,028 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller, Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.
More information151 FERC 61,274 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
151 FERC 61,274 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller, Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.
More informationORAL ARGUMENT SCHEDULED FOR JUNE 2, 2016 IN THE UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT
USCA Case #15-1363 Document #1606771 Filed: 04/01/2016 Page 1 of 13 ORAL ARGUMENT SCHEDULED FOR JUNE 2, 2016 IN THE UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT ) State of West Virginia,
More informationGDS Associates, Inc. Senior Project Manager Page 2 of 7
Ellen Blumenihal GDS Associates, Inc. Senior Project Manager Page 2 of 7 taxes, Affiliate transactions, Oil and gas exploration and development. Reviewed the books and business records of public utilities
More informationRegional Gas Market Update
April 22, 2015 Milford, MA Regional Gas Market Update Presentation to: ISO-NE Planning Advisory Committee Tom Kiley Northeast Gas Association Objective NGA S ANTITRUST COMPLIANCE PROCEDURES Adopted by
More informationCHICAGO MARKET EXPANSION PROJECT PHASE 2 NOTICE OF NON-BINDING SOLICITATION OF INTEREST CMEP PHASE 1 UPDATE
CMEP PHASE 1 UPDATE Natural Gas Pipeline Company of America LLC (NGPL) is pleased to announce its acceptance of the FERC Certificate Order issued March 17, 2016 in Docket No. CP15-505-000, as filed June
More informationVERIFIED STATEMENT PURSUANT TO RULE 2019(a) OF THE FEDERAL RULES OF BANKRUPTCY PROCEDURE
Thomas R. Slome, Esq. Jil Mazer-Marino, Esq. MEYER, SUOZZI, ENGLISH & KLEIN, P.c. 990 Stewart Avenue, Suite 300 P.O. Box 9194 Garden City, New York 11530-9194 Telephone: (516) 741-6565 Facsimile: (516)
More informationInvestor-Owned Utility Ratio Comparisons
Investor-Owned Utility Ratio Comparisons 2002 Data Published March 2004 2301 M Street NW Washington, D.C. 20037-1484 202/467-2900 Investor-Owned Utility Ratio Comparisons, 2002 Data APPA provides several
More information/s/ Sidney Mannheim Davies Sidney Mannheim Davies Assistant General Counsel Counsel for the California Independent System Operator Corporation
California Independent System February 14, 2007 Via Electronic Filing The Honorable Magalie R. Salas Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: LSP
More informationDecember 30, 2014. Deseret Generation & Transmission Co-operative, Inc.
VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 RE: OATT Order No. 1000 Fourth Regional Compliance Filing
More informationJ.D. Power Reports: Communicating with Customers and Higher Price Satisfaction Increase Overall Satisfaction for Residential Electric Utilities
w J.D. Power Reports: Communicating with Customers and Higher Price Satisfaction Increase Overall Satisfaction for Residential Electric Utilities Proactive Communication during Power Outages Remains a
More informationNOTICE OF ELECTION ON TAX LEVY IN EXCESS OF THE TEN MILL LIMITATION
Notice is hereby given that in pursuance of a Resolution of the Board of Trustees of the Gnadenhutten Public Library District, Tuscarawas County, Ohio passed on the 19 th day of May, 2015, there will be
More informationOFFICE OF PEOPLE S COUNSEL UTILITY SUPPLIER 1 OFFERS. This form is multiple pages divided by Utility Distribution Areas
OFFICE OF PEOPLE S COUNSEL UTILITY SUPPLIER 1 OFFERS This form is multiple pages divided by Utility Distribution Areas Electric Suppliers BGE SERVICE AREA Fee to Cancel* BGE/Standard Offer Service N/A
More informationCatholic High School College Acceptance List
Catholic High School College Acceptance List A B C D American Musical and Dramatic Academy American University Arizona State University Auburn University Ave Maria University Baton Rouge Community College
More informationExxonMobil Pipeline Company
F. E. R. C. No. 315 (Cancels F.E.R.C. No. 292) ExxonMobil Pipeline Company LOCAL AND PROPORTIONAL TARIFF, CONTAINING BASE AND VOLUME INCENTIVE RATES APPLYING ON THE TRANSPORTATION OF CRUDE PETROLEUM FROM
More informationLIMITED PARTNERSHIP FORMATION
LIMITED PARTNERSHIP FORMATION The following Chart has been designed to allow you in a summary format, determine the minimum requirements to form a limited partnership in all 50 states and the District
More informationType of Customer Served Residential Commercial Mercantile* Industrial. CRES Provider
AEP Energy 353 West Erie St., Suite 700 Chicago, IL 60654 Phone: (866) 258-3782 www.aepenergy.com Agera Energy LLC 55 Pleasantville Rd. South Building, Suite S-107 Briarcliff Manor, NY 10510 Phone: (844)
More informationCase 15-31160-5-mcr Doc 149 Filed 08/27/15 Entered 08/27/15 10:11:33 Desc Main Document Page 1 of 8 EXHIBIT B REVISED LIST OF UTILITY PROVIDERS
sc Main Document Page 1 of 8 EXHIBIT B REVISED LIST OF UTILITY PROVIDERS HF 10287966v.1 Main Document Page 2 of 8 TELEPHONES VERIZON 3154750340599255 PO Box 15124 Albany NY VERIZON 6076993555499252 PO
More informationTEAM 2014 Project Texas Eastern Transmission, LP
TEAM 2014 Project Texas Eastern Transmission, LP FERC Section 7(b) and 7(c) Application and Public Exhibits, Except F-1 FERC Docket No. CP13- -000 Volume I PUBLIC February 2013 5400 Westheimer Court Houston,
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Operator ) Corporation ) Docket No. ER10-500-000 MOTION OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR
More informationEffingham County Compressor Station and Meter Stations
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 OFFICE OF ENERGY PROJECTS In Reply Refer To: OEP/DG2E/Gas 2 Elba Liquefaction Company, L.L.C., Southern LNG Company, L.L.C., and Elba Express
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO IN THE MATTER OF THE APPLICATION OF ) PUBLIC SERVICE COMPANY OF COLORADO ) DOCKET NO. 11A- FOR APPROVAL OF REVISIONS TO ITS ) WINDSOURCE
More information104 FERC 61,128 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
104 FERC 61,128 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Pat Wood, III, Chairman; William L. Massey, and Nora Mead Brownell. California Independent System Operator
More informationSeptember 29, 2014. Docket No. ER14- -000 Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review
California Independent System Operator Corporation September 29, 2014 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California
More informationJ.D. Power Reports: Electric Utilities Achieve Highest Level of Business Customer Satisfaction since 2009
w J.D. Power Reports: Electric Utilities Achieve Highest Level of Business Customer Satisfaction since 2009 Satisfaction Improves for More than 80 Percent of Utilities for Second Consecutive Year WESTLAKE
More informationCOLONIAL PIPELINE COMPANY LOCAL, PROPORTIONAL, AND VOLUME INCENTIVE PIPELINE TARIFF
FERC ICA Oil Tariff FERC 99.16.0 Cancels FERC 99.15.0 COLONIAL PIPELINE COMPANY LOCAL, PROPORTIONAL, AND VOLUME INCENTIVE PIPELINE TARIFF APPLYING ON PETROLEUM PRODUCTS FROM POINTS IN: Alabama, Louisiana,