1 CIO Dashboards Fletcher Hearns PMP PMP SP MSTC Fletcher Hearns, PMP, PMP SP, MSTC Director, Technology Solutions
2 CIO Dashboards Overview Problem Cause Answer Benefits April 9, 2014 Edwards Project Solutions Proprietary 2
3 Problem What keeps the CIO awake a night? What to monitor? Are Strategic goals being met worked towards? April 9, 2014 Edwards Project Solutions Proprietary 3
4 Problem CIO function crosses organizational boundaries Finance Operations IT Sales/Service Large amount of data to choose from Disparate sources Multiple tools April 9, 2014 Edwards Project Solutions Proprietary 4
5 Cause What is the problem? What changed? What is the impact? Pro Active vs. Re active indicators? April 9, 2014 Edwards Project Solutions Proprietary 5
6 Cause What created the problem? Rapidly changing markets, technologies Increased project demands Portfolio Management Reduced budgets Limited Resource April 9, 2014 Edwards Project Solutions Proprietary 6
7 Cause Pro active vs. Re active Leading vs. Lagging Indicators Leading indicators predictive in nature measures current events highly hl correlated to the future results drive future results through cause and effect and effect relationships April 9, 2014 Edwards Project Solutions Proprietary 7
8 Cause Pro active vs. Re active Leading vs. Lagging Indicators Lagging indicators results from past events results based and measured after the fact Output oriented April 9, 2014 Edwards Project Solutions Proprietary 8
9 Indicators Leading vs. Lagging Example Weight Loss Leading Lagging Calorie Intake Scale Display Calorie Expended April 9, 2014 Edwards Project Solutions Proprietary 9
10 Indicators Leading vs. Lagging Example Delivery Truck Efficiency Leading Lagging Vehicle Mi Maintenance Fuel Expense Miles Per Gallon April 9, 2014 Edwards Project Solutions Proprietary 10
11 Indicators Leading vs. Lagging Example Project Execution Leading Lagging Number of Change Request Cost Overruns Missed Milestones April 9, 2014 Edwards Project Solutions Proprietary 11
12 Answers Simple yet informative Dashboards Simple KPI with drill down capabilities Familiar tools for users Keep your Car Dashboard in mind April 9, 2014 Edwards Project Solutions Proprietary 12
13 Answer KISS Keep it simple st***d Auto dashboard Speed, RPM, Gas, Hot/Cold More is not always better Information overload One Page/Screen per Dashboard Yes each dashboard should be printable April 9, 2014 Edwards Project Solutions Proprietary 13
14 Dashboard Examples Good Example Important Metrics Only More detail via drill downs April 9, 2014 Edwards Project Solutions Proprietary 14
15 Dashboard Examples April 9, 2014 Edwards Project Solutions Proprietary 15
16 Dashboard Examples Good Presentation but More than 1 screen Allow drill downs from more data April 9, 2014 Edwards Project Solutions Proprietary 16
17 Dashboard Examples Information Overload Does not point to problem areas Would this work for a car? April 9, 2014 Edwards Project Solutions Proprietary 17
18 Drill Downs Click on Project it to find more information April 9, 2014 Edwards Project Solutions Proprietary 18
19 Drill down more details More information about Projects. April 9, 2014 Edwards Project Solutions Proprietary 19
20 We now see project level information April 9, 2014 Edwards Project Solutions Proprietary 20
21 Answer Key Performance Indicators (KPI) 4 Basic types Quantitative Directional Actionable Category April 9, 2014 Edwards Project Solutions Proprietary 21
22 Answers KPIs should be SMART Specific Measurable Achievable Relevant Timelyl April 9, 2014 Edwards Project Solutions Proprietary 22
23 What should be measured Metrics worth measuring just some not all. Number of bug fixes/enhancement requests for top systems. Average hours/days to close critical/high support issues. Percentage of projects using enterprise HW/SW standards Number of projects in each phase of the SDLC and average times in each stage. April 9, 2014 Edwards Project Solutions Proprietary 23
24 What should be measured Metrics worth measuring just some not all. Projects performance EVM (SPI, CPI, CV, SV), # Late, # Over Budge Harder to measure Did it deliver business goal. Customer/user measure if company has any customers using an online channel avg. time on the site, top content viewed, conversions, etc. Core application availability Uptime is not the same. Financial Spend vs. Budget (Operational) April 9, 2014 Edwards Project Solutions Proprietary 24
25 Net Benefits Senior Executives with real time information Minimal delay from data to action Track performance against business goals Are we heading in the right direction Cost Saving Quicker action = Quicker Results April 9, 2014 Edwards Project Solutions Proprietary 25
26 Why use Dashboards If you don t measure it, you can t manage it If you don t measure it, you can t improve it If you don t measure it, you probably don t care And remember. If you can t influence it, then don t measure it April 9, 2014 Edwards Project Solutions Proprietary 26
27 Dilbert does Dashboards April 9, 2014 Edwards Project Solutions Proprietary 27
28 Contact Information Thank you for your time and allowing me the opportunity to speak with you. Fletcher Hearns, PMP, PMP SP, MCTS Director, EMP Solutions Edwards Project Solution 6085 Marhalee Drive Elkridge MD, Phone: Mobile: Also visit our website at: April 9, 2014 Edwards Project Solutions Proprietary 28
QUALITY AND PERFORMANCE IN PROJECTS. Project Management and Leadership 2015D, PhD, PMP
QUALITY AND PERFORMANCE IN PROJECTS Project Management and Leadership 2015D, PhD, PMP Our PROGRAMME: 1. INTRODUCTION TO PROJECT MANAGEMENT 2. STARTING A PROJECT 3. WORK MOTIVATION 4. COMMUNICATION 5: TEAMS
Expert Reference Series of White Papers. Importance of Schedule and Cost Control
Expert Reference Series of White Papers Importance of Schedule and Cost Control 1-800-COURSES www.globalknowledge.com Importance of Schedule and Cost Control Bill Scott, PE, PMP, PgMP Outline I. Project
Fleet Management. Fleet Management is responsible for supporting the transportation and equipment needs of Pinellas County.
Fleet Management Fleet Management is responsible for supporting the transportation and equipment needs of Pinellas County. The preventive maintenance and repair of the County s automobile, light truck,
Using Earned Value Management for Improving Processes. By Cynthia K. West
Using Earned Value Management for Improving Processes By Cynthia K. West Summary: This article explains earned value management and explores how the metric can be used to improve project and business processes.
Project Cost Management
Project Cost Management Martin Pazderka [email protected] INSO - Industrial Software Institut für Rechnergestützte Automation Fakultät für Informatik Technische Universität Wien Agenda
Tracking Budgets and Schedules
Tracking Budgets and Schedules David V. Tennant, PE, PMP One of the simplest questions you are likely to encounter as an engineering or project manager is: Are we on budget and schedule? While this is
Applied Project Management ( APM )
Applied Project Management Applied Project Management ( APM ) TRAINING PROGRAM Page 1 Of 7 APPLIED PROJECT MANAGEMENT PRO PROGRAM OVERVIEW This course provides in-depth Project Management Training and
TEST METRICS AND KPI S
WHITE PAPER TEST METRICS AND KPI S Abstract This document serves as a guideline for understanding metrics and the Key performance indicators for a testing project. Metrics are parameters or measures of
Data Center UPS Systems Why 1% Efficiency Matters
Data Center UPS Systems Why 1% Efficiency Matters Christina Campbell Great Lakes Regional Sales Manager Mario Belluomini Chicago Sales Manager May 14 th, 2014 Critical Power Key Questions / Problems Addressed:
PERFORMANCE AND QUALITY IN PROJECTS Project Management and Leadership 2016D, PhD, PMP
PERFORMANCE AND QUALITY IN PROJECTS Project Management and Leadership 2016D, PhD, PMP PROJECTS PROGRESS WELL UNTIL 70% Quick progress until 60-70% complete. Then we discover the project is in distress.
Guided Process across Project Management; Preliminary phase: Contract Preparation
Electronics Technology Department FINAL PROJECT Guided Process across Project Management; Preliminary phase: Contract Preparation Author: Mª Pilar Albertos Mesonero Director: Bernardo Delicado Trapero
CVR/IT Consulting LLC
2011 CVR/IT Consulting LLC All Rights Reserved 1 www.cvr-it.com [email protected] Overview Easy Earned Value CVR/IT Consulting LLC 2011 CVR/IT Consulting LLC All Rights Reserved 2 Introduction Earned Value
GPMCEP GLOBAL PROJECT MANAGEMENT, LLC C O U R S E
C O U R S E C E GPMCEP GLOBAL PROJECT MANAGEMENT, LLC Project Management Professional (PMP) Certification Exam Prep Global Project Management, LLC is a Global Registered Education Provider (R.E.P.) of
2012 National BDPA Technology Conference. Defining Project and PMO Metrics
2012 National BDPA Technology Conference Defining Project and PMO Metrics Betty Hutchins, MBA, PMP August 1 4, 2012 Baltimore, MD Presentation Objectives Project Performance Determine the Process Defining
Presented By: Leah R. Smith, PMP. Ju ly, 2 011
Presented By: Leah R. Smith, PMP Ju ly, 2 011 Business Intelligence is commonly defined as "the process of analyzing large amounts of corporate data, usually stored in large scale databases (such as a
PPM Project Portfolio- Management. PROCOS AG, Vaduz
PPM Project Portfolio- Management PROCOS AG, Vaduz STRATandGO - Project portfolio management STRATandGO Project Portfolio Management (PPM) is an already pre-configured solution which is integrated in the
Estimating Cost at Completion - Judgment & EV Information
Page 1 of 10 Estimating Cost at Completion - Judgment & EV Information Cost estimating is often called a "black art" and, too often, estimates are structured to fit some predetermined idea of a number
PERFORMANCE MANAGEMENT
PERFORMANCE MANAGEMENT integrated software solutions 01 EXECUTIVE SUMMARY SOLUTION OVERVIEW Concerto provides a secure, web-based solution incorporating complete project and programme performance management
Principles of Execution. Tips and Techniques for Effective Project Portfolio Management
Principles of Execution Tips and Techniques for Effective Project Management Roadmap Develop A Shared Vision for Management Understanding the Difference between Project Management Reviews and Management
Project Management: Tracking Progress and Earned Value with MS Project 2003
Project Management: Tracking Progress and Earned Value with MS Project 2003 Project Planning Suppose you have been assigned a project to construct a website in a certain time frame and given a certain
Improve Project Team Collaboration Using Microsoft Project Online
Improve Project Team Collaboration Using Microsoft Project Online Presented by Steven Vowles, PMP, CISA, MCTS Senior Program Director, Infor Consulting Services Global PMO April 29, 2016 1 Discipline!
Use of Measurements and Metrics for the Project Management Office (PMO)
Use of Measurements and Metrics for the Project Management Office (PMO) Presented by: Joseph Raynus Founder & Principal Consultant ShareDynamics, Inc. The Paradigm Paradigm: A set of assumptions, concepts,
The new Project. Large Scale ERP Deployments using Microsoft Project Portfolio Management Solution. Alexander Rodov, Microsoft MVP, PMP
The new Project Large Scale ERP Deployments using Microsoft Project Portfolio Management Solution Alexander Rodov, Microsoft MVP, PMP 1 Trusted IT Group Managing Partner Agenda Project Server Overview
performance management system that is based on Earned Schedule Management.
The aim of this presentation is to share lessons learned from using a project performance management system that is based on Earned Schedule Management. Earned Schedule Management is a new method created
Certification Exam Objectives: PK0-003
Certification Exam Objectives: PK0-003 INTRODUCTION The CompTIA Project + examination is designed for business professionals involved with projects. This exam will certify that the successful candidate
CPM -100: Principles of Project Management
CPM -100: Principles of Project Management Lesson B: Time and Cost Management Presented by Bruce R. Shaw, P.E., PMP [email protected] Ph: 703-922-2772 Presented at the PMI-CPM 2002 Fall Conference
Earned Value Management Tutorial Module 6: Metrics, Performance Measurements and Forecasting. Prepared by:
Earned Value Management Tutorial Module 6: Metrics, Performance Measurements and Forecasting Prepared by: Module 6: Metrics, Performance Measurements and Forecasting Welcome to Module 6. The objective
STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2015, QUARTER 2 (JULY THROUGH DECEMBER 2014)
STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 215, QUARTER 2 (JULY THROUGH DECEMBER ) CONTENTS BALANCED SCORECARD OF KEY PERFORMANCE INDICATORS SAFETY & SECURITY SLIDE VEHICLE, PASSENGER
Project Prioritization
Project Prioritization and Resourcing Once Size Does Not Fit all 2009 Project Management Symposium Breakout Session D Agenda 1. Overview 2. Prioritization 3. Ideas ROI VOI 4. Resourcing 5. Tips Assignment
Earned Value Management Guidelines
Effective Date: April 21, 2009 Status: Revision 1 Supersedes: NA Document Owner: Director, Environmental and Engineering Program Introduction This paper provides guidance and recommendations for the application
Using Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project Performance R. Scott Brunton, PMP, PMI-RMP/SP, EVP Principal Solutions Consultant Lewis Fowler, LLC www.lewisfowler.com Welcome to the
PUSH INTELLIGENCE. Bridging the Last Mile to Business Intelligence & Big Data. 2013 Copyright Metric Insights, Inc.
PUSH INTELLIGENCE Bridging the Last Mile to Business Intelligence & Big Data 2013 Copyright Metric Insights, Inc. INTRODUCTION... 3 CHALLENGES WITH BI... 4 The Dashboard Dilemma... 4 Architectural Limitations
Earned Value Formulae
Earned Value Formulae This White Paper focuses on the basic values and formulae used in Earned Value calculations. Additional EV resources are available from http://www.mosaicprojects.com.au/techniques.html#earnedvalue
IT Baseline Management Policy. Table of Contents
Table of Contents 1. INTRODUCTION... 1 1.1 Purpose... 2 1.2 Scope and Applicability... 2 1.3 Compliance, Enforcement, and Exceptions... 3 1.4 Authority... 3 2. ROLES, RESPONSIBILITIES, AND GOVERNANCE...
Table of Contents. Welcome to CoPilot Truck 4 Driving Screen 4 Driving Menu 5
v9 User Guide Table of Contents Welcome to CoPilot Truck 4 Driving Screen 4 Driving Menu 5 GO TO MENU 6 Address 6 My Places 7 Points of Interest 11 Contact 12 Browse Map 13 PhotoNav 13 Coordinates 14 ROUTE
Earned Value. Valerie Colber, MBA, PMP, SCPM. Not for duplication nor distribution 1
Earned Value Valerie Colber, MBA, PMP, SCPM Not for duplication nor distribution 1 Where did Earned Value Management come from? In 1967 the Department of Defense (DoD) established the Cost/Schedule Control
1.3 What is Project Management? 1.4 Relationship Among Project Management, E-mail:[email protected]
1 Project Management Professional (PMP) is a credential offered by the Project Management Institute (PMI).The PMP Certification Exam assesses the adeptness of a professional in applying the knowledge,
IST 302 : Project Cost Management
IST 302 : Project Cost Management Project Cost Management : Why do we care? 1 Cost and Cost Management Cost: Cost Management: Project Cost Management Processes Cost Estimating Developing an estimate of
Project Management Using Earned Value
Project Management Using Earned Value Third Edition Gary C. Humphreys Earned Value Management Consulting Training 2002, 2011, 2014 Gary C. Humphreys Humphreys & Associates, Inc. All rights reserved. No
interactive product brochure :: Nina: The Virtual Assistant for Mobile Customer Service Apps
interactive product brochure :: Nina: The Virtual Assistant for Mobile Customer Service Apps This PDF contains embedded interactive features. Make sure to download and save the file to your computer to
A Gentle Introduction to Earned Value Management Systems
A Gentle Introduction to Earned Value Management Systems Good metrics let us see if we are doing the right things and doing them well." Niwot Ridge Consulting 4347 Pebble Beach Niwot, Colorao www.niwotridge.com
Measuring Program Effectiveness an introduction to the Performance Dashboard. Objectives
Measuring Program Effectiveness an introduction to the Performance Dashboard for the Ontario Literacy Coalition January 19 th 2012 Dr. Alan C. Middleton Objectives 1. to introduce the Performance Dashboard
How To Understand Business Intelligence
An Introduction to Advanced PREDICTIVE ANALYTICS BUSINESS INTELLIGENCE DATA MINING ADVANCED ANALYTICS An Introduction to Advanced. Where Business Intelligence Systems End... and Predictive Tools Begin
IBM Business Monitor V8.0 Global monitoring context lab
Copyright IBM Corporation 2012 All rights reserved IBM BUSINESS MONITOR 8.0 LAB EXERCISE IBM Business Monitor V8.0 lab What this exercise is about... 2 Lab requirements... 2 What you should be able to
How to Use EVM to Maintain Quality in an Agile Environment. A National Asset for National Missions 1
How to Use EVM to Maintain Quality in an Agile Environment 1 Agenda Key Terms and Calculations Earned Value Management System Supporting Systems Practical Example Earned Value Management in an Agile Environment
Smart Cities & Integrated Corridors: from Automation to Optimization
Smart Cities & Integrated Corridors: from Automation to Optimization Presentation to the National Rural ITS Conference August 28, 2013 Cary Vick, Director of Business Development; Smart Mobility for Smart
Introduction to earn value management in Civil Engineering
3 rd World Conference on Applied Sciences, Engineering & Technology 27-29 September 2014, Kathmandu, Nepal Introduction to earn value management in Civil Engineering S. K. KAMANE, S. A. MAHADIK, A. C.
Business Intelligence: So Many Tools and So Little Time! Angela M. Hickey, Levenfeld Pearlstein, LLC Andrew M. Baker, Seyfarth Shaw, LLP Anna
Business Intelligence: So Many Tools and So Little Time! Angela M. Hickey, Levenfeld Pearlstein, LLC Andrew M. Baker, Seyfarth Shaw, LLP Anna Tenutta, Seyfarth Shaw, LLP Angela M. Hickey Executive Director,
ElegantJ BI. White Paper. Key Performance Indicators (KPI) A Critical Component of Enterprise Business Intelligence (BI)
ElegantJ BI White Paper Key Performance Indicators (KPI) A Critical Component of Enterprise Business Intelligence (BI) Integrated Business Intelligence and Reporting for Performance Management, Operational
Oracle Daily Business Intelligence (DBI)
Oracle Daily Business Intelligence (DBI) Agenda What is DBI? DBI Components DBI Nomenclature Financial Intelligence Payables Intelligence DBI Setups Dimension Setups Manager Reporting Security Profile
Project Management Improving Performance with KPIs Shelia Darby, MBA, PMP Darby Consulting www.darbyconsulting.com
Project Management Improving Performance with KPIs Shelia Darby, MBA, PMP Darby Consulting www.darbyconsulting.com Welcome to the PMI Houston Conference & Expo and Annual Job Fair 2015 Please put your
Optimizing Contact Center Performance with Operational Reports Document Version: 1.0 October 2015
Optimizing Contact Center Performance with Operational Reports Document Version: 1.0 October 2015 Introduction LiveEngage is designed to help you attain operational excellence. Agent managers can use LiveEngage
23042012_WORKsmart_ECO_bro_UK. WORKsmart -Eco. Protecting the environment and your bottom line. Let s drive business. www.tomtom.
23042012_WORKsmart_ECO_bro_UK WORKsmart -Eco Protecting the environment and your bottom line www.tomtom.com/business Let s drive business Content 2 How green is your business? 3 Optimise vehicle utilisation
Enterprise IT Portfolio Governance and Management Model
STATE OF MICHIGAN Department of Information Technology Enterprise IT Portfolio Governance and Management Model NASCIO 2007 RECOGNITION AWARDS CATEGORY: IT PROJECT AND PORTFOLIO MANAGEMENT Enterprise IT
PROJECTS SCHEDULING AND COST CONTROLS
Professional Development Day September 27th, 2014 PROJECTS SCHEDULING AND COST CONTROLS Why do we need to Control Time and Cost? Plans are nothing; Planning is everything. Dwight D. Eisenhower Back to
Why is the Governance of Business Intelligence so Difficult? Mark Peco, CBIP [email protected]
Why is the Governance of Business Intelligence so Difficult? Mark Peco, CBIP [email protected] Seminar Introduction A Quick Answer Unclear Expectations Trust and Confidence Narrow Thinking Politics
How Do I Choose my KPIs?
Best Practices in Dashboard Design Building a Dashboard System What tasks are involved in building the system? Building a Dashboard System What tasks are involved in building the system? Design Implementation
Certification Preparation Course LATVIKON (R.E.P.)Centre
PMP Certification Preparation Course LATVIKON (R.E.P.)Centre ABOUT THIS COURSE Your ability as a project manager to demonstrate best practices in Project Management both on the job and through professional
Measures and Metrics for PMO Success
Project Management Office Summit Measures and Metrics for PMO Success Jim Kendrick, PMP, CMC President and Practice Leader 2009 P2C2 Group, Inc. [email protected] 301-942-7985 Also See Related Blog
Rules on using templates. MECH 896 Professional Development for MEng Students. Assignment #6A: Questions. Homework Discussion
MECH 896 Professional Development for MEng Students Mohamed Hefny and Brian Surgenor ([email protected] and [email protected]) Rules on using templates 1) Must reference the template used 2) Use
Improving management reporting using non-financial KPIs
CPA Newcastle Convention - 2009 Improving management reporting using non-financial KPIs John Corrigan March 2009 Knowledge Experience Insight Agenda 1. Performance metrics 2. Issues with Metrics 3. Improving
Agenda. Project Management Pain Points. Solution Option Highlights. The Dark Side. Discussion. Identify your business needs / requirements
Agenda Project Management Pain Points Identify your business needs / requirements Solution Option Highlights Review of some SharePoint Solutions (OTB / Third Party / Combo) The Dark Side Are you prepared/disciplined
Chapter 7: Project Cost Management. Munawar [email protected]
Chapter 7: Project Cost Management Munawar [email protected] Learning Objectives Understand the importance of project cost management. Explain basic project cost management principles, concepts, and terms.
How To Measure It For A Business
Metrics That Matter Supporting IT Decision and Strategy at the Senior Executive Level Randy Steinberg Migration Technologies January 23, 2012 Inc. Pittsburgh itsmf Local Interest Group LIG Name goes here
Business Application Services Testing
Business Application Services Testing Curriculum Structure Course name Duration(days) Express 2 Testing Concept and methodologies 3 Introduction to Performance Testing 3 Web Testing 2 QTP 5 SQL 5 Load
Basics of Cost and Schedule Control
Basics of Cost and Schedule Control Topics Monitoring and Scheduling: Two Parts of a Feedback System. Definitions Schedule Updates from Monitoring Components of Effective Monitoring Cost Control As A Management
Project Management Office Best Practices
Project Management Office Best Practices Agenda Maturity Models (Industry & PMO) PMO Areas of Expertise (Scale & Scope) Project Management Office Process Model Project Management Framework PMO Implementation
700 Analysis and Reporting
Jefferson Science Associates, LLC 700 Analysis and Reporting Project Control System Manual Revision 7-50 - 700 Analysis and Reporting This chapter of the JSA Project Control System Manual explains how
Text. Key Performance Measures in a Lean Agile Program. Thomas Blackburn 2/19/2015
Text Key Performance Measures in a Lean Agile Program Thomas Blackburn 2/19/2015 Goal and Objectives Discussion on Current Performance Measurement in Agile Shared understanding of measures that can drive
The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management.
Knowledge Areas The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management. These are: Project Integration Management Project Scope
QAD Enterprise Asset Management BI Metrics Demonstration Guide. May 2015 BI 3.11
QAD Enterprise Asset Management BI Metrics Demonstration Guide May 2015 BI 3.11 Overview This demonstration focuses on one aspect of QAD Enterprise Asset Management Business Intelligence Metrics and shows
BI Strategy: Getting to Where You Want to Go with a Business-Driven Strategy
BI Strategy: Getting to Where You Want to Go with a Business-Driven Strategy ASUG IL Chicago Chapter Meeting, Nov. 1, 2013 Pat Saporito, Global Center of Excellence Agenda Business Challenges Importance
Introducing ConceptDraw PROJECT
Introducing ConceptDraw PROJECT Introducing ConceptDraw PROJECT Contents Introducing ConceptDraw PROJECT... 1 What is ConceptDraw PROJECT?... 6 Visualize Project Data...6 Plan Projects and Manage Change...7
Chapter 7. (PMBOK Guide)
Chapter 7 Project Cost Management (PMBOK Guide) Mohammad A. Rajabi Dept. of Geomatics Eng., University it of Th Tehran Tel: +98 21 8833 4341, Cell: +98 912 132 5823 Email: [email protected] ir Homepage:
Focused Metrics. Tom Vander Weide G-3 Enterprises and Tom Patterson Saddle Creek Corporation
Focused Metrics Tom Vander Weide G-3 Enterprises and Tom Patterson Saddle Creek Corporation Saddle Creek Corporation Saddle Creek is a 3 rd Party Logistics Services Company Service offering includes warehousing,
What is SharePoint? Dux Raymond Sy, PMP
What is SharePoint? Dux Raymond Sy, PMP The Reality of Information Management On a piece of paper, identify three challenges you ve faced in managing information For example: Multiple tools Difficult to
The New Mobility: Using Big Data to Get Around Simply and Sustainably
The New Mobility: Using Big Data to Get Around Simply and Sustainably The New Mobility: Using Big Data to Get Around Simply and Sustainably Without the movement of people and goods from point to point,
Roadnet. Performance Dashboard. Information That Powers Your Business
Roadnet Performance Dashboard Information That Powers Your Business Big Picture Information, Made Easy Let s face it: You re always seeking more transportation intelligence, especially when it comes to
ITIL Introducing continual service improvement
ITIL Introducing continual service improvement The objectives of continual service improvement Service improvement must focus on increasing the efficiency, maximizing the effectiveness and optimising the
Project Management Professional Exam Prep Plus
In this course, you ll gain the essentials preparation needed to pass the PMP exam. Concentrating on exam content form the Guide to the Project Management Body of Knowledge-Fifth Edition (PMBOK Guide)
SCM. Logistics, Service, and Operations Management [email protected]
SCM Logistics, Service, and Operations Management [email protected] Key concerns Demand/supply/lead time variability Inventory & Transportation Information technology Technological advances Level of service
Expert Reference Series of White Papers. Tips and Techniques to Pass the PMP Exam
Expert Reference Series of White Papers Tips and Techniques to Pass the PMP Exam 1-800-COURSES www.globalknowledge.com Tips and Techniques to Pass the PMP Exam Dan Stober, PMP Introduction Passing the
The Impact of Competency Management
The Impact of Competency Management Competency Management Solutions Author: Lauren Havighurst Index Introduction People are Crucial to Business Success...................... Page 2 Competency Management
Big Data Analytics; The value of the right action. April 1 st, 2014 Edwin Steenvoorden VP Business Analytics & Information Strategy
Big Data Analytics; The value of the right action April 1 st, 2014 VP Business Analytics & Information Strategy Better intelligence, smarter decisions Introduction Better intelligence, smarter decisions
Knowledge Required for Certification
Knowledge Required for Certification The Knowledge Required for Certification by the Digital Analytics Association (DAA) provides an overview of the broad domain of knowledge required for Digital Analytics
// Benchmarking Project Schedules
// Benchmarking Project Schedules Dr. Dan Patterson, PMP CEO & President, Acumen March 2011 www.projectacumen.com Table of Contents Introduction... 4 Benchmarking Overview... 4 Uses of Schedule Benchmarking...
KPiSync. By Larry McGhaw, Chief Technology Officer
KPiSync By Larry McGhaw, Chief Technology Officer 1 Overview CONNX KPiSync is a Mobile Application to help users 'Visualize your Key Business Metrics on any device in real time'. The CONNX KPiSync solution