1 Essex County Fire & Rescue Service Our Values: Respect, Accountability, Openness and Involvement Vehicle and Equipment Asset Management Strategy Report by Head of Fleet & Equipment Services? June Revison 7 1
2 The rationale and principles of the Vehicle & Equipment Asset Management This Vehicle and Equipment Asset Management Strategy (VEAMS) has been established to provide focus for the activities of the Fleet Services Department in support of the wider organisational goals. Key objectives arise from these strategic goals which will require corporate and departmental policies under which the Fleet Services Department can operate to meet these objectives. An action plan in line with these objectives, for activities which are considered outside of business as usual (BAU), has been developed to monitor the performance of the application of this strategy over the period covered by this document. Other key performance indicators (KPI s) developed from BAU activities and Service Level Agreements (SLA) will also form part of the performance measurement of the Fleet Services department activities. For the purpose of this Strategy and Action Plan assets are defined as all vehicles and operational equipment in use by Essex Fire & Rescue Service and will be referred to as Fleet Assets within this document. Where it is necessary to distinguish between Vehicles and Equipment then the terms vehicles or equipment will be used. Likewise for clarity the Fleet and Equipment Services department will be referred to as Fleet Services This strategy has been developed in accordance with the values and principles of the Essex Fire and Rescue Service (ECFRS) and is supportive of the promotion of the following ideals: Fleet Services will seek continuous improvement to the services it provides to end users and stake holders by adopting and applying current industry best practice to the provision, management, maintenance and disposal of all fleet assets. Fleet Services will continue to promote collaboration with both regional and national fire service colleagues and other agencies, to reduce costs and to develop and exchange best practice, reliable bench marking and improvements in fleet asset management. Fleet Asset acquisition will be controlled through mechanisms in place to evaluate and approve Vehicles and Equipment, in accordance with the ECFRS, financial regulations, and its policies of equality, diversity and sustainability. Fleet Services continue to commit to maintaining the ISO9001:2008 Quality management systems and Investors in People (IiP) accreditation for the Fleet Workshops site and will encourage wider accreditation throughout the Fleet, Equipment and Transport sections. The VEAMS and Action Plan promotes the generation of income from external sources including Partners and Agencies, in order to obtain the highest efficiency from the available resources. The VEAMS and emerging policies will take into consideration the ECFRS: Strategic Assessment of Risk (SAOR) in terms of fleet asset provision, ensuring that assets are fit for purpose. 2
3 Vehicle & Equipment Asset Management Strategy and Action Plan Health Safety and Welfare strategy and policies. Property Asset Management Plan including the relocation of stores and equipment onto the Lexden site. ICT strategy including the review or replacement of the fleet management system to include equipment asset management. The VEAMS has the Environment as an inclusion to reflect international awareness, which places vehicle usage under the spotlight and is addressed further by the attendance of the Fleet Services representation at the Service s Carbon Management Programme Board. The VEAMS and action plan will be measured through Key Performance Indicators (KPI s) set out within the relevant Service Level Agreement for the Fleet Services and its end users. 3
4 Contents 1. INTRODUCTION ORGANISATIONAL AIMS, OBJECTIVES AND OPERATIONAL CONTEXT Operational Context Factors Which Effect Fleet Asset Provision Financial Factors Driving Change Environmental Factors Driving Change Organisational Aims and Objectives ECFRS POLICY ENVIRONMENTAL POLICY FLEET SERVICES GOALS AND STRUCTURE Departmental Goals Linked To Corporate Aspirations Departmental Goals ORGANISATIONAL STRUCTURE General Fleet Management and Engineering Teams Technical Services Team Transport Team Procurement Department EFA (Trading) Ltd Training Department Operations (Drivers and Local Managers) THE STRATEGY MEETING OPERATIONAL DEMAND Strategy Objectives Governance Framework Ensuring Efficient And Effective Processes Developing A Centre Of Technical Excellence Fleet Asset Replacement EFA (Trading) Ltd Environmental Considerations Service Level Agreements Collaboration And Working With Partners Maximising Output From Available Resources Fuel And Fuel Budgets
5 Vehicle & Equipment Asset Management Strategy and Action Plan 8. IMPLEMENTATION OF THE STRATEGY General Financial Planning Procurement Standards Warranties Fleet Asset Evaluation And Approval Fleet Asset Life Policy Decommissioning And Disposal Planned Servicing And Maintenance Of Fleet Assets Unscheduled Repairs And Defects Vehicle Log Books Alternative Forms Of Service Provision Benchmarking And Analysis Management Information Systems And Quality Records Staff Development And Succession Planning Performance Monitoring Legislative Requirements ORGANISATIONAL AIMS, OBJECTIVES AND OPERATIONAL CONTEXT ASSET PROVISION AND ALLOCATION Continued Suitability of Existing Assets Asset Allocation Asset Register - Provision of information Spare Appliances Temporary Hire Or Short-term Loan EQUALITY AND DIVERSITY COLLABORATION AND PARTNERSHIPS MANAGEMENT OF THE VEHICLE AND EQUIPMENT ASSET STRATEGY AUDIT AND REVIEW PROGRESS AGAINST PREVIOUS ACTION PLANS CONCLUSION SUMMARY OF VEAMS OBJECTIVES AND ACTION PLAN...32 APPENDIX 1 - PERFORMANCE AGAINST THE PREVIOUS ACTION PLAN
6 1 Introduction The purpose of this Vehicle and Equipment Asset Management Strategy is to outline how we intend to ensure our Vehicle and Equipment Assets are procured, renewed and replaced to meet current and future operational needs, user requirements and the needs of the communities we serve. It also ensures that our capability and effectiveness is aligned to our risk reduction activities, which is encompassed within our Integrated Risk Management Plan. Essex Fire Authority continues to be committed to improving the safety and quality of life for residents and visitors to Essex. The Fire and Rescue Service plays a major part in supporting these aims. A major part of delivering a safe, effective and responsive service is through the provision of a compliant and fit for purpose vehicle fleet with suitable equipment that supports our operational response, prevention and protection activities. The performance of Essex County Fire & Rescue Service (ECFRS) is overseen by Essex Fire Authority with 25 elected Members from Essex County Council and the Unitary Authorities of Southend and Thurrock. The Strategic Management Board of ECFRS includes Chief Fire Officer/Chief Executive, Deputy Chief Fire Officer/Deputy Chief Executive, Finance Director & Treasurer, Director of Operations, Human Resources and Organisational Development and Assistant Chief Fire Officer Safer and Resilient Communities. The ECFRS structures it s operational and community safety resources around two Commands (East and West). In addition to the Commands the Authority currently has an Administrative Headquarters in Kelvedon Park, where central departments are located. There are a number of other centres around the county that contribute to the running of the organisation such as training centres at Wethersfield, Witham and Orsett. The management of the Service s fleet and equipment assets are controlled from a single workshop at Lexden which also maintains the majority of operational equipment and fleet of fire appliances, specials and other vehicles. Fleet, Transport and Technical departments are currently managed from ECFRS workshops in Lexden and delivered from the Lexden site, Hutton or KP administration centre. (The Hutton site is scheduled to be closed and its technical staff relocated to the Lexden site as part of the phase 2 KP development) 2. Organisational aims, objectives and operational context 2.1 Operational Context Essex County Fire & Rescue Service (ECFRS) serves the population of Essex, Thurrock and Southend. ECFRS is one of the largest county fire services in the UK. 6
7 Vehicle & Equipment Asset Management Strategy and Action Plan The county of Essex contains every conceivable risk - oil and gas storage, a power station, two airports, docks including Harwich and Tilbury, 7,500km of roads, several motorways, and a section of the country's busiest motorway, the M25 which runs through the heart of the county. Essex borders with rural and metropolitan neighbours and covers an area of approximately 3,670 sq km, or 1,417 sq miles, with a population of over 1.7 million, with large areas of flat, low-lying land; about half of which are in agricultural use. Essex also has some 515km, or 350 miles of coastline, with ecologically important mudflats and salt marshes. Essex has 215 designated Conservation Areas and nearly 14,000 Listed Buildings. There are 50 fire stations across Essex, Southend and Thurrock of which 12 are wholetime, 34 are retained, 4 are day crewed and one other which is a USAR station (Urban Search and Rescue). There is a workforce establishment of 890 wholetime and 466 retained fire-fighters, 46 control staff and 253 support staff. More information on the operational context in which the ECFRS works can be found at www. essex-fire.gov.uk Risk and Business continuity section. Within the ECFRS, fleet and equipment is one of the most important physical assets that exist in the Service. It is the workplace of staff, the front line of the organisation and it delivers all operational service resources to the incident location or activity venue. The diverse nature of operational requirements is the key driver to change and development of fleet assets. 2.2 Factors Which Effect Fleet Asset Provision Some of the external factors that are driving change in vehicle and equipment type and provision can be listed as: Community growth Housing, industry and transport infrastructure. Population movement Existing housing, industry and transport moving towards prosperous areas, for more space or for work. Community fire safety Legislation requiring Fire and Rescue Services to provide fire safety education and attend different (more types of) incidents. Health and Safety legislation and our responsibilities to all our stake holders. Equality and diversity legislation, which will undoubtedly mean that the Service will, in the future, employ a more diverse range of staff that may have different needs. Environmental legislation including more stringent emissions standards and our own gaols of reducing our carbon foot print. Ever increasing customer expectations choice of ways of accessing services and the provision of access to sites. Changes in service delivery methods changes in appliance design, equipment design and service delivery techniques. 7
8 2.3 Financial Factors Driving Change The financial factors that are driving change can be listed as: Central Government funding support declining in real terms. Ability to generate income may not continue or increase. Affordable borrowing becoming more difficult. 2.4 Environmental Factors Driving Change The environment in which the Service operates is ever changing, requiring more diverse resource provision to meet the effects of spate weather conditions, increased populations and busier infrastructures. More stringent vehicle emission standards, clear air zones, whole life carbon foot print and secure and safe disposal of assets all affect type of vehicles and equipment procured. The Service will take advantage of new technologies, materials and fuels if they are found to be beneficial to the core undertaking of the Service. 2.5 Organisational Aims and Objectives It is the statutory duty of ECFRS to provide the people of Essex with an effective fire and rescue service that is mobilised efficiently to emergencies, keeping people safe from fires and other dangers. Linked to this duty and aim is the vision of Essex County Fire and Rescue Service which is to be able to direct our resources and services more flexibly to where they are most needed, reducing risks as well as costs, and supporting wider civil resilience in communities. The principal mission statement of the organisation is to Save and protect lives, property and the environment. Our Corporate strategy has been communicated as part of our business planning program. The strategy map identifies four key stake holder groups affected by our undertaking:- For the public For communities For taxpayers For our people Resources where we need them most Tailored services, shared responsibilities Lower costs and improved outcomes Innovative, forward looking, trusted leaders at all levels Vehicles and equipment play a vital role in delivery of public safety services both now and for the foreseeable future, and this strategy aims to ensure ECFRS policies on Fleet Assets and associated environmental considerations are implemented to ensure that the right vehicles and equipment are available in the right places at the right time. 8
9 Vehicle & Equipment Asset Management Strategy and Action Plan 3. ECFRS Policy The Service will ensure a structured approach is in place for the provision, control, maintenance and renewal of a vehicle fleet and related equipment which supports the needs of the Service. The following processes or procedures have been identified which are key to ensuring the Service policy is delivered and are central to the safe and effective procurement, operation, replacement and eventual disposal of the fleet assets: A governance framework to oversee the management and control of fleet assets A structured fleet asset renewal and replacement programme covering at least ten years. Procedures for procuring fleet assets linked to our Strategic Assessment of Risk (SAOR) where vehicle and equipment requirements are concerned. Procedures for operating the vehicle fleet linked to national, legal and best practice standards so that the fleet may be operated and maintained safely and effectively. Procedures linked to our Carbon management plans and environmental statement which lays out information about how we intend to protect the environment, monitor and manage vehicle use. Procedures for managing vehicle fleet performance to ensure: Increased customer and stakeholder involvement. Improved use of resources. Ensuring the effective use of capital and that value for money is achieved. Compliance with statutory regulations. Improved corporate management. Use of appropriate monitoring technologies. Quality records in respect of vehicle and equipment assets. Procedures for ensuring the cost effective and secure disposal of fleet assets This document will ensure that the Service s fleet assets are suitable and sufficient to meet our statutory obligations, (SAOR) requirements and operational and corporate business requirements. 4. Environmental Policy The delivery and contribution of ECFRS VEAMS will reflect corporate environmental policy. In particular emphasis will be focussed upon: Compliance with legal obligations under the current Health, Safety and Welfare Act and the Environmental Protection Act, together with all other applicable statutory provisions and relevant codes of practice. Promotion of health, safety and environmental awareness throughout the organisation of the vehicle fleet management plans. Minimising the impact on the environment from vehicle emissions, with adequate facilities appropriate to the nature of the business activities. 9
10 Responsibility for delivering the aims of this Strategy and for effective overall arrangements rests with the Deputy CFO/Director Service Support who is responsible for agreeing strategy with the Strategic Management Board and reviewing performance against it. 5. Fleet Services Goals And Structure 5.1 Departmental Goals Linked To Corporate Aspirations Fleet Services provide a key support function to the ECFRS to assist it meeting its objectives. The raison d être for the Fleet Services function is therefore to provide a cradle to grave management and administration of fleet assets used by the Service. The joint aim of Fleet Services, and the Procurement and Purchasing department, with whom it works closely, is to provide fit for purpose, safe, reliable and cost effective vehicles/equipment. The Fleet Services team therefore make a valuable contribution to the objectives of the organisation, by ensuring all of the vehicles and equipment are managed and maintained to appropriate standards and are kept in an efficient and effective operational condition. The function also acts as custodians of vehicle and equipment histories and other related data ensuring it is up to date and fit for purpose. In order to meet the requirements of the ECFRS in terms of fleet asset provision departmental goals and a structure of resources have been established. These resources including Staffing, Premises and logistics are continually reviewed and monitored to ensure they remain fit for purpose. 5.2 Departmental Goals This Strategy seeks to provide an overarching reference which entwines key vehicle and equipmentrelated policy strands into a coherent structure and resultant objectives for the Fleet Services team. Activities and actions which arise in pursuance of these objectives are monitored through performance in line with the SLA KPI s and through continuing review of this strategy. To achieve this Strategy, key goals for Fleet Services have been set, as follows:- To establish a governance framework with strategic, managerial and end user input, through which the fleet asset needs of ECFRS and its stake holders can be identified and met for both operational and support functions. The framework will provide a mechanism through which performance against this strategy can be reviewed. To maintain cost-effective and timely processes for the procurement, repair, maintenance, commissioning, decommissioning and disposal of fleet assets. To review work already undertaken and continue to develop a centre of technical excellence for the Service based on a single site. To maintain efficient and effective vehicle fleet assets, ensuring vehicles and equipment are replaced by following optimum replacement cycles, in line with the Vehicle and Equipment Asset Management Strategy. 10
11 Vehicle & Equipment Asset Management Strategy and Action Plan To review developments and opportunities in fuel and other technologies and if beneficial to the Service s undertaking carry them through to the fleet asset replacement policy and procurement strategy in conjunction with the Vehicle User and Fleet Management Groups To protect and enhance the environment, supporting the concept through the Service s Environmental Policy To continue to develop and communicate Service Level Agreements in association with the Vehicle Fleet Management and Vehicle User Groups To extend opportunities for collaboration between Services in the region and nationally To maximise output from the resources available in the most cost effective and appropriate way These goals have been focused into nine key objectives and which have been broken down into key activities forming the action plan at the end of this strategy document. 6. Organisational Structure 6.1 General The Fleet and Equipment Services department is led by the Head of Fleet Services (Engineering Manager), who is responsible to the DCFO. Fleet services is organised into five distinct sections; Fleet Management, Fleet Transport, Fleet Workshops, Technical and External Trading arm EFA (T) The Fleet Management, Fleet Transport and Workshop Engineering functions are presently located at Lexden along with the EFA (T) trading arm. See Appendix 1 which shows the current organisational structure. Technical Services are based in Kelvedon Park, with the Breathing Apparatus workshops currently based at the Hutton site. (It is an aspiration of the Service to relocate technical staff from Hutton to the Lexden site) The Fleet Services work in close liaison with other key departments of the Service to deliver this strategy this include procurement, Training and Operations 6.2 Fleet Management and Engineering Teams The fleet management team are the delegated custodians of the fleet assets on behalf of the Service they are responsible for agreeing policies which deliver the strategy and developing activity plans and targets for its implementation. This includes responsibility for the safe and effective provision, operation, maintenance and renewal of the fleet assets along with meeting associated legal requirements. 11
12 The fleet management team monitor and manage the performance of the assets and the functional teams of Fleet Services and seek continuous improvements in fleet asset operation, maintenance, procurement and management. Key to this continuous improvement is ensuring the Vehicle and Equipment Asset Strategy and Action Plan is up to date to reflect developments and targets associated with its implementation. Workshop Engineering will provide full maintenance, servicing and 24/7 defect response to end users and operational crews. Jointly the Teams will: Maintain vehicles and equipment to support continued efficient operation by managing road worthiness, the asset register, vehicle histories, vehicle specifications, vehicle procurement and disposal. Ensure that vehicles are procured to the highest practical environmental standard available including noise level reduction. Provide technical support to stake holders, either in groups or as individuals, who undertake activities concerned with the use of fleet assets. Canvass ideas from all stake holders on improvements to its service provision including reducing emissions, conserving energy and other resources regarding fleet asset provision and use. 6.3 Technical Services Team The Technical Services Department is the organisational focus for advice and best practice for all equipment research and development activity. They manage the evaluation and implementation of new equipment acquired for the Service. 6.4 Transport Team The Transport team are responsible for maintaining the statutory elements of road vehicle use. This includes Insurance, Vehicle excise duty etc and maintaining sufficient fuel supplies and monitoring and recording fuel related stats. They also undertake the management and control of the officer s lease car scheme vehicles, pool vehicles and crew buses. 6.5 Procurement Department The Procurement and Purchasing Department are responsible for co-ordinating all procurement activities in assistance of Fleet Services for the vehicles and equipment assets. 6.6 EFA (Trading) Ltd EFA (Trading) Ltd are responsible for the generation of income through sale, trade in, reuse and disposal of assets and meeting the requirements of all current legislation and guidance in relation to asset disposal and transfer. 12
13 Vehicle & Equipment Asset Management Strategy and Action Plan 6.7 Training Department Instruct vehicle drivers on driving behaviour, through adequate training and retraining, to ensure safety and consideration for other road users and environmental issues. Provide training and information to enable end users to competently operate and choose appropriate equipment assets to undertake their activities within the designed limitations of its use. 6.8 Operations (Drivers and Local Managers) Carry out local daily, weekly and scheduled inspections and testing as determined by the Engineering Manager in terms of vehicles and the SDO Operations in terms of equipment Operate vehicles to optimise vehicle mileage and use of fuel. Support local efforts to reduce emissions through local action. Record vehicle mileage to support the collation of fuel use for central analysis. Comply with the requirements of license checking and management of road risk (MORR) policies of the Service including timely reporting of defects. The cleanliness of all vehicles, appliances and equipment under their control. Ensuring that vehicle or equipment hand over routines and appliance operator maintenance is carried out correctly and on time. Checking vehicles and equipment in line with the requirements of service orders. Reporting of defects and breakdowns including nil defect reporting. Checking to ensure the completion of log sheets and other relevant documents. Log books, Vehicle operator manuals and servicing handbooks are issued with each car or van and must always be kept with the vehicle. It is the driver s responsibility to examine the servicing handbook on a regular basis to ensure no vehicle exceeds its service interval. Each driver is to maintain a journey record and defect record within the vehicle log book. Individual drivers, on the Officers Lease Scheme are responsible for arranging the servicing of these vehicles with the local franchised dealership. Contact details of all approved dealerships and repair centres are available from the Workshop Manager or Engineering Manager. 7. The Strategy Meeting Operational Demand 7.1 Strategy Objectives The purpose of the Fleet Services and HQ Stores function is the supply and maintenance all vehicle and equipment assets to meet end user and stakeholder needs, through a cohesive strategy which interlinks with the ECFRS corporate strategy. 13
14 The goals of Fleet Services have been established into key objectives which give rise to BAU activities which are already embedded in the daily undertaking. Where project or one off activity arise from these objectives or this Strategy an action plan has been developed and is appended to this report. 7.2 Governance Framework Objective 1 will establish a governance framework with three levels of stakeholder interaction; a strategic Fleet Asset Management Board (FAM) to provide governance and strategic direction, a Fleet Tactical Group (FTG) which will act as a forum for information exchange between Fleet Services and key department heads and thirdly day to day policies and procedures by which asset use and performance can be monitored through end user interactions. The Fleet Asset Management Board will be established and consist of the DCFO, the Treasurer- Director of Finance, ACFO Operations the Engineering Manager - Head of fleets Services. Other members will be invited to attend as necessary. The FAM will meet on a Quarterly basis and provide strategic direction for fleet strategy, asset renewal against the replacement schedule and disposals, to ensure that Fleet Assets are appropriate and fit for purpose. The FAM board will provide assurance to the CFO and SMB that fleet assets are legally compliant and fit for purpose by monitoring the performance of the Fleet Services against Strategic KPIs, for example the asset replacement programme. The Fleet Tactical Group (FTG) will be established to feed information and business cases into the FAM Board, it will consist of senior functional managers and Fleet Services representatives. As well as a forum for information provision to the FAM Board it will also act as a senior user group to enhance communications between Fleet Services and its stake holders. This group will review draft policies as appropriate before presentation to the FAM Board for approval. The Fleet Services teams will continue to review and amend its policies and user guidance to ensure they remain fit for purpose. 7.3 Ensuring Efficient And Effective Processes Objective 2 Fleet Services will continue to liaise with its peers both nationally and regionally to develop and identify notable practice which can be adopted within ECFRS. The Fleet Services team at all levels engage with manufacturers, suppliers and end users to ensure it maintains cost-effective and timely processes in the provision, repair, maintenance, commissioning, decommissioning and disposal of the Service s fleet assets. This objective will be achieved through the monitoring and reporting of KPIs linked to user needs and SLAs. Performance against KPIs will be a key driver for change and continuous improvement. 14
15 Vehicle & Equipment Asset Management Strategy and Action Plan 7.4 Developing A Centre Of Technical Excellence Objective 3 will continue the integration of the Fleet, Transport, SHQ Stores and Technical Services into one Engineering Service centre of excellence. The benefits already achieved through closer integration of the sections will be built upon further to develop more efficient and effect service provision while reducing costs to the lowest practical level. The aspirations of this objective include the further development or provision of three key elements to the management and maintenance of modern fleet assets within an emergency service; these are our people, our facilities (both buildings and plant) and our quality management system QMS. 7.5 Fleet Asset Replacement Objective 4 Through comprehensive fleet asset records, benchmarking data and performance monitoring Fleet Services will continue to maintain efficient and effective fleet assets, ensuring vehicles and equipment are replaced by following optimum replacement cycles, in line with this Vehicle and Equipment Asset Management Strategy. Planning is key to the achievement of this objective and therefore asset registers are maintained to provide data which can be used to forecast replacements dates and assist with the requirements of financial scheduling. A rolling annual Fleet Asset Replacement Programme is maintained as a controlled document for vehicles and Plant (see section 9), other equipment is replaced according to condition or upgrading to meet operational need. Vehicles and plant which reaches the replacement criteria based on mileage, age or condition are listed for replacement and the results checked and collated to form a Capital Bid projection for the rolling four year period. Heads of end user departments are informed in order that specifications based on user needs can be prepared, and costed for business case preparation and capital program approval. Changes to specification are built in to the updated specifications within the replacement programme to ensure that the latest technical and safety features are included where necessary, for example in the case of Large Goods vehicles such considerations as developments in ABS, EBD, ESP, parking sensors, telematics and CCTV cameras have all featured in previous years. 7.6 New Products And Technologies Objective 5 Fleets Services will continue to review the developments and opportunities in fuel and other technologies through interaction with industry, suppliers and manufacturers. Where a new technology has perceived benefits to the Service s undertaking, Fleet Services will carry them through to the fleet asset replacement policy and procurement strategy in conjunction with the Vehicle User and Fleet Management Groups seeking approval at the appropriate level through project, business case or BAU processes. 15
16 7.7 Environmental Considerations Objective 6 Essex County Fire & Rescue Service will control and manage its fleet assets to ensure risks to the health, safety and welfare of its employees, customers and the general public are identified and action is taken to minimise or eliminate their effects. Key to this is to protect and enhance the environment, by supporting the concept through the Service s Environmental Policy. Asset evaluations for environmentally beneficial alternatives, measurement of CO2 and other vehicle exhaust emissions, plus the logging of fuel used by the Service will be monitored. New technologies or ways of working inline with these findings will be adopted where operationally compatible. This will enable Fleet Management to recommend more environmentally friendly vehicles and equipment for each role. The environmental debate, climate change and carbon footprint are important issues for transport organisations operating large fleets irrespective of the miles covered each year. The carbon footprint of Essex County Fire & Rescue Service is now being put clearly into focus, and will increasingly become more and more of a driving force in vehicle selection and the life of the vehicle. Vehicle emission legislation has been established to provide a staged approach to the reduction in vehicle emissions over a number of years. ECFRS have two vehicles which are non-operational and are at the Euro II standard these will be disposed of by 2014, meaning that most frontline appliances are Euro III and above. Euro III was introduced for new vehicles from October 2001 up to October Euro IV emissions then applied up until October 2009 and Euro 5 requirements run from October 2009 to December Further emission restrictions are planned to be implemented at Euro 6 from December ECFRS recognises that in the provision of its service it will have an impact on the environment both locally and globally. Therefore a strategy for reducing this impact based around the calculation of our carbon footprint has been developed in an Environmental Strategy & Action Plan 2012/13. The Service has chosen the carbon footprint as its Key Performance Indicator as it is easy to understand, easy to compare, easily calculated and can be informed by a variety of work areas. The VEAMS is cognisant of the objectives of that strategy and therefore environmental issues are considered within procurement, use and disposal of all fleet Assets. 7.8 Service Level Agreements Objective 7 is the review and continued development of the Interdepartmental Memorandum of Understanding for Servicing, Repair and Maintenance of Vehicles and Operational Equipment (SLA) in line with the new governance framework discussed in Objective 1. This Service Level Agreement will be reviewed in association with the Fleet Tactical Group (FTG) to ensure it remains fit for purpose and provides for the full scope of services required by fleet asset stake holders. A comprehensive service level agreement was developed during 2008/9 to formalise processes, and provides a framework for the service to manage both vehicles and levels of services regarding asset performance. 16
17 Vehicle & Equipment Asset Management Strategy and Action Plan The Service Level Agreement enables the Vehicle and Equipment Asset Strategy and Action Plan to be implemented and monitored, ensuring a consistent and compliant delivery of equipment and vehicle maintenance and procurement. The Service level agreement is a controlled document within the ISO document control system of Fleet Workshops and is available on request. The Service Level Agreement provides key performance indicators to enable statutory and industry standards to be measured in particular productivity versus cost. 7.9 Collaboration And Working With Partners Objective 8 The Fleets Services teams recognise the benefits that working with others in similar organisations can bring, not only to ECFRS but to our regional and national partners by us sharing our best practice and knowledge. The EFCRS Fleet services department will seek extend opportunities for collaboration between Services in the region and nationally Maximising Output From Available Resources Objective 9 recognises the extreme pressure on financial resources in the current economic climate and the need to support the ever changing and increased capabilities to which the ECFRS is required operate. Therefore Fleets services will continue to look for new ways of working and review existing processes to maximise output from the resources available in the most cost effective and appropriate way Fuel And Fuel Budgets Vehicles contribute significantly to the destruction of the environment. Gaseous emissions from vehicle engines have been linked to global warming, destruction of the ozone layer and respiratory and other health problems. Waste lubricants from vehicles and engine noise both pollute the environment. Additionally, the rising cost of fuels places a significant strain on limited resources. It is evident that fuel costs will continue to rise as successive governments use fuel taxation as one of the means to reduce the amount of road traffic. Service bulk diesel fuel supplies shall be used in preference to commercial forecourts whenever practicable. Where fuel must necessarily be purchased elsewhere, such purchases should be made using the fleet fuel card issued to each vehicle. Fuel should not be obtained from highcost outlets such as motorway service stations unless there is no alternative. Use of the fuel card ensures that fuel is procured within a contract. This ensures that environmental issues, value for money and quality will have been considered Receipts for the reimbursement of fuel used in connection with authorised private use of service vehicles shall be credited to the appropriate fuel budget. 17
18 The costs of fuel used by the fleet in connection with income generation will be recovered from that income and credited to the service fuel budgets. 8. Implementation Of The Strategy 8.1 General Having established the strategic link between the aims of the EFA, the needs and objectives of the ECFRS through to the key objectives of the Fleet Services department, the following section will provide details of processes, procedures and policies which enable the implementation of this strategy. All of the Business as usual (BAU) activities and processes undertaken by Fleet Services are cognisant of the objectives of this strategy and will therefore all contribute to the achievement of them. Where specific actions outside of BAU are identified they will be detailed in the action plan at the end of this document. 8.2 Financial Planning Capital expenditure is the term used to describe the acquisition of assets that have a long-term value to the service. The Fleet Services function s capital expenditure forms part of an investment strategy drawn from the replacement cycle of vehicles and equipment assets. Fleet Services has established an agreed replacement programme for Fleet Assets which sets out the capital finance recommendations relating to the delivery of corporate objectives and projects. Revenue expenditure is provided through a balanced-budget mechanism whereby the revenue cost of the Fleet Services is matched by income. A level of external revenue is generated and Fleet Services teams seek to increase this income through its external trading arm. The Engineering manager is responsible for preparing annual budget bids for both Capital and Revenue and the monitoring of budget expenditure. 8.3 Procurement Procurement of fleet assets is undertaken in line with the financial regulations of the Authority, UK and European regulations and statutory instruments appertaining to public contracts. Procurement exercises in each case will be in accordance with the EFCRS procurement strategy (current version Nov 2010). Where possible and to ensure best value, procurements will be made through national, regional or collaborative frameworks, where frameworks are not available tendering will mirror best practice as detail in the procurement strategy. 18
19 Vehicle & Equipment Asset Management Strategy and Action Plan 8.4 Standards All fleet assets are purchased to User Requirement Specifications (URS) and conform to an appropriate EN or BS standard applicable to the type vehicle or equipment to be procured; For example Pumping appliances are designed and built to BS EN & 3: 2001 and also conform to The Road Vehicles (Construction and Use) Regulations 1986 and all other applicable Road Traffic legislation. An assessment of compliance to the applicable standards will form part of the tender evaluation and any user demonstration trails prior to the procurement exercise. 8.5 Warranties Recovery of costs through warranted defects is key to reducing whole life costs of assets and therefore each procurement will look at obtaining the most advantageous warranty terms in consideration of standard warranties and optional extended warranties offered. Where asset use is such that buying additional warranty would not prove cost effective then a minimum of 12 months manufacturer s warranty will be required. All vehicular assets are purchased with a minimum of 12 months warranty from the vehicle manufacturer; the majority of light vehicles have a whole vehicle warranty of 36 months duration. In respect to vehicles above 3500 Kg gross vehicle weight the body is generally not produced by the chassis manufacturer and is built and warranted by a specialist bodybuilder. Warranty claims will be monitored for cost recovery and evidence of asset performance against intended use. Where operational activities demand it may be necessary for repairs to be undertaken prior to warranty claims being entered to reduce operational down time. 8.6 Fleet Asset Evaluation And Approval In conjunction with the end Users in the effected department/section a User Requirement Specification (URS) for replacement or new type of asset will be prepared. Where a product is readily available as loan units of a similar design or specification Fleet Services will seek to arrange demonstrations or loan units for evaluation. In the case of more specialist roles and where appropriate visits to similar operational assets in other FRS which meet the URS will be arranged. Evaluation notes will be completed and scored by those attending evaluations or visits and this data will inform the final specification and tendering process. This allows users to test the relative strengths and weaknesses of assets for the designated roles prior to the procurement process commencing. Fleets Services will in conjunction with the Procurement team follow a tendering or procurement process in line with financial regulations and the procurement strategy. Shortlisted suppliers will be evaluated against given objective criteria appropriate to the requirements for the asset detailed within the URS. A business case will be prepared for approval at director level to ensure that Essex Fire & Rescue Service maintain best value and fit-for-purpose assets for its needs within the constraints of budget funding. 19
20 Additions or changes to the fleet will follow the above method and require a business case which includes the rationale for the additional resources. This ensures that a formal justification is evidenced and placed in context of this Strategy and considerations of alternative methods of provision are considered prior to expenditure being incurred. 8.7 Fleet Asset Life Policy Establishing an effective asset life is important to ensure that the wholelife costing of asset provision is considered against the effective use of that asset. Clearly a lower price asset at initial purchase may result in a lower quality product which in turn is more costly and less reliable is service, meaning it would need to be replaced sooner. This may in some cases meet the operational needs for less operationally critical assets for example a shovel or broom often used at road traffic accidents (RTC) for highway clearance will be replaced as and when it is deemed no longer suitable or is defective. At the other end of the scale a critical asset such as a vehicle or breathing apparatus set requires a high quality product that ensures the safety of end users and reliable service to the public. Defining the optimum lifing policy of all assets therefore requires consideration of the following criteria: Legislation Procurement practices Disposal methods User requirements and Level of specification Good practice methodology Maintenance and upkeep requirements Requirements of user departments Cost of purchase and in life maintenance Environmental factors Availability suitable replacement or upgraded products Viability of technology Consideration of these factors allows the planned life cycle to be set prior to the commencement of the procurement process for the Asset. It is the Service policy to maximise the use of each asset whilst at the same time reducing to a minimum its whole life cost and maintaining its residual value at the optimum level achievable. The Service currently replaces vehicles and equipment in accordance with an agreed and planned life cycle and to a predetermined renewals programme as detailed in the asset file within the MIS. Some examples of key asset lives are given below:- Pumping Appliances 13 years (with up to a further year in YFF Schemes) consideration to extend this to 15 years once older Dennis appliances are removed. Special Appliances such as Aerial ladder platforms and prime movers 15 years 20
21 Vehicle & Equipment Asset Management Strategy and Action Plan Support vehicles Pool cars, Vans and 4x4 s up to 8 years Officer s lease and provided cars Ladders linked to appliance life. 3 to 4 years Note: Vehicle condition and maintenance costs, risk profile changes, mileage and technical ability will also influence vehicle life and therefore vehicles may be replaced outside of these parameters if operationally efficient and effective to do so. 8.8 Decommissioning And Disposal All decommissioning and disposal of Fleet Assets is in line with the Services financial regulations and carried out in the most advantageous method in terms of return on residual value of the assets. This may result in expenditure for environmental or statutory reasons. The disposal policy is cognisant of the threat of Trojan use of assets for terrorist or illegal purposes and will therefore follow a secure sale methodology by selecting appropriate disposal routes which have been vetted through our trading arm. Where possible subsequent transfer of the assets to third party users will be monitored. Decommissioning fleet assets at the end of their useful lives, will be appropriate to the disposal route for sale, to outlets where the asset will be used for the purpose it was designed Fire Service livery will be removed, other disposals will require, in the case of vehicles, the additional removal of conspicuity and emergency blue lights. Assets will be disposed of in consideration of the above yet still providing the maximum residual value possible within the appropriate market. Asset sale will be recorded within the MIS system and notification will be given to the Finance team for amendment of the asset registered in terms of capital assets. 8.9 Planned Servicing And Maintenance Of Fleet Assets Commissioning, servicing, repair and maintenance of fleet asset as applicable is carried out in accordance with the guidelines of the CFOA Best Practice manual for fire service fleet maintenance, manufacturer s guidance, and national standards and also in accordance with the Fleet Workshop s scope of accreditation within its ISO9001:2008 Quality System. In the case of vehicles over 3.5 tonnes inspections are carried out in accordance with the CFOA Transport Officers Group (TOG) inspection manual which is based on the VOSA inspection manual for heavy goods vehicles. The former containing specific addendums relating to fire service vehicles. As a minimum requirement equipment will be maintained in accordance with manufacturer s guidance and where additional works are deemed necessary they will be undertaken to enhance reliability for operational use. Statutory inspections or examinations appropriate to the equipment will be undertaken on a scheduled basis, for example MOTs, LOLER thorough examinations and pressure vessel inspections. 21
22 Critical fleet Assets are categorised by type code in terms of vehicles and by supply code in terms of equipment. Sub categories will be established as necessary and appropriate to the type and use of the fleet assets. This will provide a means to allocate a service, inspection, statutory examination and maintenance schedule to each asset code type. This coding also provides analysis of asset history records for provision of performance figures in line with the KPIs of this strategy and the SLA s. Each asset type is allocated an appropriate service plan and inspection schedule dependent on the nature of the asset and how it is used. This schedule is set up within the Fleet Management or the Equipment management MIS systems and is such that the closure of one job card of a specific job type will automatically schedule the next due inspection or service according to pre-set plans. Detailed records of each critical fleet asset history will be retained and managed in line with legal requirements and the quality records procedures of the fleet services Quality management System (QMS). Although electronic data is sufficient for quality records, hard copies will be retained in some instances. Critical fleet assets will be determined through the operational SLA Unscheduled Repairs And Defects Fleet Services will seek to reduce down time of critical assets due to defects by continued delivery of 24/7 response service to end users. This response time is a KPI for the delivery of service. Defect records will be retained to show clearance rates and trends so that preventative action can be identified and taken to further improve overall reliability. Accidents and other damaged caused to assets will be attended under defect procedures in the first instance for response, safety reasons and the determination of the cause, work will be progressed through the accident repair process or routine job process with the HS&W section informed as necessary. In the case of vehicles timely collision repairs are arranged in liaison with insurance and repairers with the claim being processed through the Transport team. The repairs will be provided either in house or at approved repairs and job progress will be monitored through our normal job card processes. Accident reporting that highlights trends by station and operator will be monitored and effect actions to reduce vehicle accidents will be implemented where appropriate, Service wide performance figures on vehicle accidents will be considered at the Fleet Asset Management Board and Fleet Tactical Group Vehicle Log Books Each vehicle is issued with a vehicle log book. This is required to ensure that vehicle use is controlled and can be properly accounted for and managed. The driver must complete the log book in full with all the relevant information correctly entered at the conclusion of each journey or use. Pre-use checks should also be carried out in line with Service policy. At the end of each month the log book must be totalled and the total fuel used, oil used, pumping time and miles travelled etc. entered. 22
23 Vehicle & Equipment Asset Management Strategy and Action Plan A current log book should always be kept on the vehicle, and must accompany it at all times on transfer to Workshops/Engineering Alternative Forms Of Service Provision External garages may be used for light vehicle and chassis warranty work in addition to contingency repairs. Vehicle body shop repair facilities at approved outlets are used for collision repair and the work checked by Fleet Services for compliance with standards. Warranty repairs are undertaken internally wherever possible to take advantage of the cover provided by manufacturers. Where specialist repairs or certification is required Fleet Services will aim to have this undertaken by the vehicle or equipment manufacturers or organisations which are compliant with national standards. Essex Fire has, through the National CFOA Transport Officers Group (TOG), arranged a MOU with other fire and rescue services (FRS) for road side breakdown assistance, which is a cost effective way of supporting Essex vehicles which need to travel out of county on business. This collaboration provides 24/7 assistance should it be required and each party to the MOU reciprocates Benchmarking And Analysis Fleet Services are responsible for ensuring best value of the vehicle maintenance and repair activities. To this end, benchmarking data continues to be developed to maintain cost efficiency and effective overall service. This includes comparison with other Fire & Rescue Services, external agencies and suppliers. The Engineering Manager (head of fleet services) chaired a national pilot among 15 other FRS in 2012 and will look at expanding this work to a fully national scheme by developing an annual benchmarking exercise through CFOA and the national TOG group Management Information Systems and Quality Records The implementation of this strategy is heavily depended on having accurate and easily accessible records of asset histories including running costs and other benchmarking data. Although the current Management Information System (MIS) provides excellent history and planning data it is not considered future proof in terms of development and support to meet the expansion identified in this strategy. Therefore Fleet Services will look to market research an alternative system and work with the ITC section to redevelop or implement a new software in line with the IT strategy. It is essential that the current provision is seen as a minimum requirement for any new specification, as there are elements within it that are not common to a number of off the shelf packages. In particular the ability to code vehicle type, Job type and run bespoke reports for bench marking data are essential. These reports allow the same data set to be queried in two different ways thus verifying the result and cleansing the data within the system. This means that fleet services can be confident that any data sets, trend analysis or figures with which decisions and made are correct. 23
24 Initial discussions with regional colleagues have identified a willingness for regional collaboration on a common software package to reduce costs and assist in benchmarking of subsequent KPIs this will be considered in the resultant action plan from this strategy Staff Development And Succession Planning Fleet Services workshops have had a long history of compliance with quality systems and continue to comply with the requirements of ISO 9001:2008. This ensures that ECFRS has the right training, equipment, reference material, calibrated tools plus the documentary evidence to provide assurance. It is essential that a competent and qualified staff establishment is available to meet the changing demands of technology, Operations and legislation. Therefore consideration and annual planning of staff training needs is undertaken to maintain competences. The succession planning for the section has been considered and an apprentice training scheme has been implemented within the Fleet Workshops. As evidence of National and regional collaboration ECFRS has through its Engineering Manager lead on setting up a national blue light apprenticeship scheme for vehicle technicians which other FRS can choose to part take in. The Engineering Manager has also been instrumental in organising the CFOA national apprentice of the year award since its inception. The importance of having well trained, competent and well-motivated staff is recognised by the management and supervisors of the department. Therefore, the Fleet Services teams at the Lexden site are accredited to the Investors in People standard (IiP) Performance Monitoring Essex County Fire & Rescue Service will participate in the National Benchmarking processes in conjunction with the Transport Officers Group, TOG. This will enable Services to compare and contrast data on a range of activities relating to all aspects of Fleet Asset management, including asset reliability, turnaround, availability and whole life costs. ECFRS Fleet and Equipment Service department are leading and participating in Best Value / Benchmarking Group to improve national indicators and to ensure that ECFRS stay in the forefront of developments. Customer feedback is monitored to ensure that fleet services are reviewed and improved to support operational performance. Performance indicators are also communicated to senior representatives of all main users through a Quarterly Report. The fleet asset management systems allow for the development of performance indicators and Service Level Agreements between Fleet Services and our internal customers. This also provides a basis for feedback and review within the continuous improvement cycle of the ISO 9001:2008 Quality Systems under which Fleet Services operate. Quality data records and measurements have been developed to provide comparators for benchmarking and subsequent investigation for any beneficial possibilities. The list below identifies key indicators for Fleet Services which are available from the Fleet MIS system. Procurement costs per Asset. Maintenance costs per Asset. Whole life costs (in terms of Vehicles fuel, insurance, repairs etc.). Technical support/fleet management costs. 24
25 Vehicle & Equipment Asset Management Strategy and Action Plan Warranty management. Maintenance cost per mile. Other local performance indicators are used to outline current performance and to target areas for improvement. The indicators used below may be changed or added to pending the review of the Service Level agreement with the Service delivery department (operations) Number of Asset breakdowns/defects. (in terms of Vehicles) Defect response times Sickness Absence of departmental staff Planned v unplanned maintenance. Maintenance of Asset service schedules. Vehicle downtime 8.17 Legislative Requirements When planning for fleet asset provision, the following legislative requirements will be met: The Road Assets (Construction and Use) Regulations The Road Assets Lighting Regulations The Motor Assets (Driving Licences) Regulations The Road Traffic Act The Road Assets (Registration & Licensing) Regulations The Health and Safety at Work Act. Provision and Use of Work Equipment Regulations The Management of Health and Safety at Work Regulations The Control of Pollution (oil storage) (England) Regulations The Fire and Rescue Services Act The European Procurement Regulations. The CFOA Guidelines for Fleet Maintenance. LOLER, PUWER Compliance. The list of Acts and Regulations is not exhaustive, and by the very nature of the fleet and equipment environment has various legislative requirements that cut across other sections of the Authority. To adhere to vehicle operating legislation the Fleet services employs a variety of procedures to ensure that the vehicle fleet complies with regulations. The following are some of the current procedures adopted to satisfy the legal requirements and also provide a good practice methodology: Safety Inspection programme. Defect Reporting System. Preventative Maintenance Schedule. Vehicle Inventory. Vehicles repair / maintenance history quality records. 25
26 9. Current Fleet Asset Makeup Current Fleets Assets are those determined as in service and are coded within the MIS system as status 010 in terms of Vehicles and larger items operational plant for example Ladders, Light portable pumps. Other critical equipment for example lifting harnesses are recorded and controlled within the Equipment Management system (EMS). Fleet Structure - Operational This covers pumping appliances, specials appliances i.e. aerial appliances, water tankers, New Dimension vehicles, incident response units, operational cars and training vehicles. Vehicles in this area are broken down further into the following Vehicle type codes for maintenance and recording purposes: The table below shows the current in-service items for vehicles: Type Type Description Number in Service 001 RESCUE PUMP WHOLETIME RESCUE PUMP RETAINED WATER TENDER WHOLETIME WATER TENDER RETAINED TURNTABLE LADDER (Not in Service) CONTROL UNIT HOSE LAYING LORRY BEAVERTAIL RECOVERY LORRY RESCUE TENDER MULTI-PURPOSE CURTAIN SIDER FOAM VEHICLE HOOKLIFT ANIMAL RESCUE UNIT WATER BOWSER CRAFTER VAN CAR MONTHLY CAR DERIVED VAN MONTHLY CAR TRANSIT VAN PCV MAN L PROVIDED CARS URBAN SEARCH AND RESCUE COMMUNITY WHEELS RANGERS INCIDENT RESPONSE UNIT BRONTO F32 ALPS LEASE CAR 2006 ONWARDS 61 26
27 Vehicle & Equipment Asset Management Strategy and Action Plan Equipment Structure Operational Plant This covers plant items such as Ladders, Generators, Light portable pumps, Positive pressure fans, boats and trailers. Plant items in this area are broken down further into the following Vehicle type codes for maintenance and recording purposes: The table below shows the current in-service items for plant: Type Type Description Number in Service 013 TRAILER INFLATABLE FIRE BOAT BOAT TRAILER POSITIVE PRESSURE VENTILATION FAN FIRE FOGGING SYSTEMS STINGER GROUND MONITORS TRIPLE EXTENSION ROOF LADDER CFS LADDER LADDER LADDER LADDER LIGHT PORTABLE PUMP GENERATOR FORK LIFT TRUCK HYDRAULIC EQUIP BOBCAT TOOLCAT 1 Equipment Structure Critical Operational items This area covers assets such as Working at height gear, hoses and items subject to LOLER testing. These items are recorded within the EMS system under supply categories and currently amount to some 3500 assets. Equipment Structure Non Critical Operational items This category of equipment relates to equipment that undergoes visual examination only and would include such items as shovels, beaters, brooms, salvage sheets, hearth kits and torches. There are many items which fall into this category and due to the nature of the item replacement is normally triggered by condition as there is no specified life. Equipment Structure PPE This area covers Fire fighting clothing and Breathing apparatus. Fire fighting clothing is currently provided to national standards through a regional collaboration of FRS providing a fully managed service. Breathing apparatus is maintained and tested to national standards through the BA section of Fleet Services and records of tests and maintenance are held on a bespoke system as quality records. There is currently a review of BA provision and replacement underway and a project group has been established to monitor and action any renewal of equipment. This work hopes to conclude by
28 10. Asset Provision and Allocation 10.1 Continued Suitability of Existing Assets Maintaining a dynamic and proactive approach to asset provision is essential if the ever changing needs of the Service are to be met now and into the future. In order that optimum value for money is achieved from the investment in assets longevity of use is required. However, the requirements of the asset may well change faster and through a shorter span than the effective life of the asset, meaning that it is likely to provide a less than satisfactory function as time passes. There is therefore a balance between current needs and technology and changing needs and innovation. It follows that vehicle and equipment refresh may be necessary before the scheduled replacement determined at the point of purchase, a rational approach to Research and Development (R&D) is therefore required, which will provide a level of future proofing and exploitation of new technologies while maintaining cost effective procurement which meets the needs of the Service. Continued consultation through the proposed governance structure (see 7.2) will ensure that fleet assets remain fit for purpose and provide a forum for the objective evaluation and approval of R&D suggestions which meet the business needs Asset Allocation In the case of vehicle assets these will be allocated to meet the needs of the various Service departments both operational and support by the Engineering Manager after consulting and liaising with the Director Service Support, SDO Operations and departmental managers. Vehicles will be managed throughout their service life so as to minimise whole life fuel use and to maximise on resale value. This may mean that vehicles will be swapped between posts during their operational life in order to average out cumulative mileage. Replacement operational appliances will be issued based on operational need. Vehicles will normally be issued to stations where activity levels are higher, before being transferred to less active stations. This ensures vehicle use will be maximised in the early years after issue and during the warranty periods to maximise operational effectiveness and reduce whole life running costs. Upon notification of the delivery of vehicles, their allocation will be made by the Engineering Manager, in liaison with the SDO Operations taking into account the following factors: Operational needs of the service and risk profile. New engineering developments for appliances. Variant maintenance requirements. Training needs include specific driver training. Attempt to keep like appliances on the same stations. Consequential cascade impact (to other stations/departments). Ability of the station to house the appliance, or modifications required. 28
29 Vehicle & Equipment Asset Management Strategy and Action Plan Training and familiarisation needs of stations. Projected fuel usage of all appliances concerned (aim to place heavy users in quieter locations). Appliances into reserve fleet. Reserve fleet to disposal. Operational resilience maintaining fire cover arrangements. For Pool cars and car derived Vans the Engineering Manager will: with regard to the renewal programme (and if applicable the end user department and or individual), replace end of life cars and car derived vans on a like for like basis, taking into account fit for purpose, environmental and whole life running cost issues. Light vehicles allocated to flexible duty officer posts will be assessed annually. Vehicles may be reallocated as necessary in order to average out operational life so as to achieve the optimum resale value. In the case of equipment assets allocation is on a direct replacement basis as cascading is not required. If however, a new technology or activity is adopted by the Service then allocation of the new asset will be determined in liaison with the SDO Operations Asset Register - Provision of information In addition to the quality records held by Fleet Services within the MIS system for statutory obligations, provision of an equipment asset list for each appliance type is to be developed in liaison with the Service Delivery. These lists will be made available to station personal through the intranet and are to be controlled documents, showing the stowage and quantity held for all critical equipment assets on the appliance. Lists will be review and authorised at the FTG Spare Appliances It is essential that Fire cover is not disrupted by the maintenance and servicing programme of assets and this is achieved by incorporating within the Fleet asset profile a number of operational spares. It is not cost effective to hold spare assets for every asset type due to their initial purchase cost, for example Aerial Ladder Platforms (type code 071), therefore although these are critical assets, alternative mobilising or temporary movement of assets is consider when servicing is undertaken. The number of pumping appliances (code 001,002,003 and 004) within the Service does however require the provision of spare appliances to replace vehicles that are Out of Service for maintenance. Current Fleet Assets incorporates 14 vehicles of this type which represents 13% of the total of pumping appliances in the Service. Although this figure is compatible with national FRS fleets activity levels suggest that a further reduction in the spares fleet is achievable and will be progress. 29
30 10.5 Temporary Hire Or Short-term Loan Where operational requirements dictate that short-term contingencies arrangements are required for fleet assets such as provision of a vehicle for non BAU activities the section of Fleet service will arrange for the hire or loan of a suitable asset from other FRS, Equipment manufacturers or commercial organisations. Hire will be arranged through national procurement contracts if available. Fleet Services will undertake a safety inspection and or interrogation of relevant records to ensure that fleet assets loaned or hired conform to the aspirations of the strategy before being released to end users. 11. Equality and Diversity For all Fleet assets procured, an equality impact assessment will be carried out within the specification/development process. Use of national contracts, which embed this ethos, ensures the Service procures its vehicles and equipment with regard for the diverse needs of the workforce and the communities we serve. All fire appliances are now fitted-out and stowed using an ergonomic manual handling programme based on the anthropomorphic capabilities of the female fire fighter, (the application is called Firestore). This reduces the manual handling risk to fire-fighters. As this application model is based on the manual handling capabilities of the female fire-fighters it will ensure all of our new to service builds meet the relevant equality and diversity requirements. 12. Collaboration and Partnerships The opportunity for regional collaboration within with surrounding services is clear and could include but not be limited to: Fleet Management Systems Fleet Management and reporting Engineering support (specifications) Procurement to a standard chassis to generate framework discounts Vehicle maintenance and support Strategic mentoring management support. Collaboration with training, contracts, apprentice schemes and workshop issues are current examples of areas where improvements and savings can be made. Compliance and assistance with contracts enhances collaboration, will reduce costs and improves safety and conformity through nationally and locally agreed specifications. 30
31 Vehicle & Equipment Asset Management Strategy and Action Plan 13. Management of The Vehicle and Equipment Asset Strategy Responsibility for achieving the objectives in this Strategy rests with the Engineering Manager (Head of Fleet and Equipment Services) who reports to the Deputy Chief Fire Officer. Achievement and progress of outcomes from the strategy will be monitored by through the Fleet Asset Management board with functional KPIs reported at the Strategic Delivery board. Fleet Services will continue to ensure the provision of services to match the varying levels of demand in a challenging 24/7 service environment. This strategy will require updating as the service evolves and the possibilities of a regional approach are investigated. 14. Audit and Review Internal processes and management arrangements will be subject to both internal and external audits and reviews. We will challenge our performance by a variety of methods including service reviews, budget reviews, peer reviews and equipment and vehicle reviews. We will also seek to bench mark our provision against our peers and industry. Feedback from review and audit will be taken into account when determining future asset provision and general fleet arrangements. Depending on the nature of the feedback, actions will be either programmed into the IRMP and/or Fleet Services Business Plan for medium to long term implementation, or alternatively into local Action Plans for immediate and short term issues. 15. Progress Against Previous Action Plans Although the strategy is a rolling 3 year plan an annual action plan detailing specific actions over and above BAU activities will be prepared, progress on this action plan will be monitored and reported on at each annual revision of the strategy. The progress against the previous plan is provided at Appendix 2. Where items are on-going or have not been completed in full the action will be carried over to the subsequent plan. 16. Conclusion It is the intention of the overarching strategy to provide a link from the statutory obligations and aspirational goals of the Essex Fire Authority in terms of vehicle and equipment assets through all appropriate stakeholders within the ECFRS to work instructions for technicians providing maintenance and repairs to fleet assets. 31
32 17. Summary Of Vehicle And Equipment Asset Management Strategy Objectives And Action Plan Objective 1 2 Vehicle and Equipment Asset Management Strategy To establish a governance framework with strategic, managerial and end user input, through which the fleet asset needs of ECFRS and its stake holders can be identified and met for both operational and support functions. The framework will provide a mechanism through which performance against this strategy can be reviewed. To maintain cost-effective and timely processes for the procurement, repair, maintenance, commissioning, decommissioning and disposal of fleet assets To review work already undertaken and continue to develop a centre of technical excellence for the Service based on a single site. To maintain efficient and effective fleet assets, ensuring vehicles and equipment are replaced by following optimum replacement cycles, in line with the Vehicle and Equipment Asset Management Strategy. To review developments and opportunities in fuel and other technologies and if beneficial to the Service s undertaking carry them through to the fleet asset replacement policy and procurement strategy in conjunction with the Vehicle User and Fleet Management Groups To protect and enhance the environment, supporting the concept through the Service s Environmental Policy 7 To continue to develop and communicate Service Level Agreements in association with the Vehicle Fleet Management and Vehicle User Groups 8 To extend opportunities for collaboration between Services in the region and nationally 9 To maximise output from the resources available in the most cost effective and appropriate way 32
33 Vehicle & Equipment Asset Management Strategy and Action Plan Objective 1 To establish a governance framework with strategic, managerial and end user input, through which the fleet asset needs of ECFRS and its stake holders can be identified and met for both operational and support functions. The framework will provide a mechanism through which performance against this strategy can be reviewed. Actions Target date Person responsible 1a Establish a Fleet Asset Management Board (FAM) and agree terms of reference for the work of the group. September 2013 Engineering Manager in liaison with the DCFO 1b Establish a Fleet Asset Tactical Forum (FTF) and agree Terms of reference at FAM and implement at FTF September 2013 Engineering Manager 1c Develop or enhance processes through which performance against this strategy can be reviewed. As Appropriate Engineering Manager in liaison with FAM and FTF members 1d Develop or enhance processes through which end user input can be captured and considered As Appropriate Engineering Manager in liaison with FAM and FTF members 1e Review the SLA for service provision with the FTF group for approval at FAM October 2013 Engineering Manager in liaison with FTF members Objective 2 To maintain cost-effective and timely processes for the procurement, repair, maintenance, commissioning, decommissioning and disposal of fleet assets. Actions Target date Person responsible 2a Continue to identify all vehicles on a master / controlled vehicle and equipment asset register within the MIS. Ongoing and annually reviewed Engineering Manager 2b Work through the FTF to identify critical equipment lists for operational use and vehicle stowage. Establish a process for the control and approval of those lists September 2013 onwards Technical services manager Engineering Manager in liaison with FTF members 2c Produce a lifing policy for all critical operational equipment through the Equipment management System EMS. As appropriate Engineering Manager Technical Services Manager in liaison with FTF members 2d Continue develop and report on KPI s within the department to improve service delivery and cost effectiveness As appropriate Engineering Manager and Fleet Services Section Heads 33
34 Objective 2 To maintain cost-effective and timely processes for the procurement, repair, maintenance, commissioning, decommissioning and disposal of fleet assets. Actions Target date Person responsible 2e Once reviewed agree KPI s from the SLA with the SDO Ops and report on performance at FTF and FAM level. As appropriate Engineering Manager, Fleet Services Section Heads and SDO operations 2f Provide details of KPIs and performance to the performance team in order that they can provided updates for SDB meetings Pending 2e and then monthly Engineering Manager, Fleet Services Section Heads and Performance team KP 2g Develop a national benchmarking for Fire Service fleets on behalf of the CFOA TOG. TBC Engineering Manager 2h Continue to take an active role in National committees and working groups which drives or provides access to notable practice which can be adopted locally As appropriate Engineering Manager, Fleet Services Section Heads and SDO operations 2i Consider the outcomes of the Best Value review currently underway in relation to internal processes and resources and if appropriate implement change. Pending Best value review outcomes as appropriate Engineering Manager, Fleet Services Section Heads Objective 3 To review work already undertaken and continue to develop a centre of technical excellence for the Service based on a single site Actions Target date Person responsible 3a Continue the integration of people focuses processes and procedures across all sections within the department ensure that staff competence is sufficient to meet customer requirements As appropriate Engineering Manager, Fleet Services Section Heads and SDO operations 3b Through liaison with peers, customers and national colleagues in relation to objective 2, ensure that equipment and tools meet the needs of staff undertaking our activities As appropriate Engineering Manager, Fleet Services Section Heads and SDO operations 3c Work closely with the Property Team and others in determining the most cost effective and appropriate development plan for the Lexden site. As appropriate Engineering Manager, Fleet Services Section Heads and SDO operations 34
35 Vehicle & Equipment Asset Management Strategy and Action Plan Objective 4 To maintain efficient and effective fleet assets, ensuring vehicles and equipment are replaced by following optimum replacement cycles, in line with the Vehicle and Equipment Asset Management Strategy. Actions Target date Person responsible 4a Produce a 15 year vehicle and equipment replacement programme, and refresh on an annual basis. Ongoing Engineering Manager 4b Procure vehicles and equipment to the agreed replacement program pending provision of funding and suitable User requirements. Annually assets to be delivered before the end of the financial year Engineering Manager/Head of Procurement 4c Monitor performance of fleet Asset and make provision for their replacement in consideration of the identified criteria within this strategy. Preparing business cases for approval at FAM As appropriate Engineering Manager/Head of Procurement Objective 5 To review developments and opportunities in fuel and other technologies and if beneficial to the Service s undertaking carry them through to the fleet asset replacement policy and procurement strategy in conjunction with the Vehicle User and Fleet Management Groups Actions Target date Person responsible 5a Section heads will continue to liaise with and attend appropriate industry seminars and workshops within their specialism to obtain up to date information of technological developments As appropriate Engineering Manager/Head of Sections 5b Where new technologies would enhance the replacement of assets the URS will be updated and when replacement is required a business case will be prepared which includes the perceived benefits As appropriate Engineering Manager/Head of Sections, Procurement Manager 35
36 Objective 6 To protect and enhance the environment, supporting the concept through the Service s Environmental Policy Actions Target date Person responsible 6a Review the contracts for the disposal waste produced from our work activity. September 2013 Fleet Workshops Store Manager 6b Continually assess processes thorough internal audit and review activities to adjust work or products to reduce levels of waste, including bulk storage, less packaging, Coshh assessing etc. On-going As appropriate Engineering Manager/Head of Sections, Procurement Manager. officer. Objective 7 To continue to develop and communicate Service Level Agreements in association with the Vehicle Fleet Management and Vehicle User Groups Actions Target date Person responsible 7a Under take a review of the external customers Service Level agreements, to ensure they remain fit for purpose. Identify KPI s which can be used to monitor performance. On-going completion September 2013 Business development Officer EFA(T) (internal SLA is detailed in obj 1) 7b Once the reviewed SLA is agreed with Service Delivery through the FTF and FAM prepare a briefing document of expectations for end users with regard to the responsibilities of stake holders and expected levels of response. Pending activity 1e Engineering Manager, Fleet Services Section Heads and SDO operations 7c Consider the outcomes of the Best Value review currently underway in relation to service provision and if appropriate implement changes Pending Best value review outcomes as appropriate Engineering Manager, Fleet Services Section Heads 36
37 Vehicle & Equipment Asset Management Strategy and Action Plan Objective 8 To extend opportunities for collaboration between brigades in the Region and nationally for the benefit of Essex County Fire & Rescue Service. Actions Target date Person responsible 8a Review the contracts for the disposal waste produced from our work activity. On-going Director Support Services, Engineering manager, Procurement manager. 8b Through the EFA(T) business development officer continue to seek out business opportunities with other FRS and suitable organisations On-going Director Support Services, Head of Engineering, Head of Procurement, Business development officer 8c Pending the review of Fleet asset MIS systems consider a Regional approach to vehicle and equipment asset Management systems. TBC pending review of ITC projects Engineering Manager, Procurement Manager 8e Continue to engage with regional colleagues on the common specification and progress to procurement of agreed appliance numbers over the next three years Delivery of first vehicle before 31st March 2014 Engineering Manager, Procurement Manager In liaison with the ECFRS treasurer. Objective 9 To maximise output from the resources available in the most cost effective and appropriate way Actions Target date Person responsible 9a Continue to monitor Work activity within Fleets Services Sections to agreed levels. Encourage staff to review and suggest improvements to work processes through regular meetings, internal audits and staff surgeries On-going as Appropriate Engineering Manager and sections heads, all staff 9b Continue to generate income through our trading arm or by shared service arrangements with other authorities On-going as Appropriate Engineering Manager and sections heads 9c Assess the performance against KPIS s and implement corrective or improvement action as appropriate On-going as Appropriate Engineering Manager and sections heads 37
38 38
39 Vehicle & Equipment Asset Management Strategy and Action Plan Appendices 39
40 Appendix 1 Essex Fire & Rescue Fleet Services Department Quality Manual Engineering Manager 1 (Fte) Assistant E Fleet Equipment Fleet Management Technical/ R&D Manager 1 (Fte) Technical Officer 1 (Fte) Vacant R&D Officer 1 (Fte) Equipment Officer 1 (Fte) Engineering Support Officer 1 (Fte) Technical Officer 1 (Fte) Transpor Manager 1 (Fte) Op Equipment Technical Team PPE contract Manager 1 (Fte) Clerical Assistant (admin).8 (Fte) Clerical Assistant Fleet 1 (Fte) Clerical Assistant (admin) 1 (Fte) Cleric Assista (transp 1 (Fte) BA Workshop Manager 1 (Fte) Fleet Technical Team Transport Team BA TEAM Technician BA service and repair (Tech x3) 3 (Fte) EFA (T) Business Development officer 1 (Fte) Admin Support.5 (Fte) Vacant 9.8 x Full time staff 7.18 X Full time staff 40
41 Vehicle & Equipment Asset Management Strategy and Action Plan ngineering Manager 1 (Fte) Fleet Workshops Workshop Manager 1 (Fte) t Admin Office Supervisor 1 (Fte) 5 or 6 Store Supervisor 1 (Fte) Quality Inspector 1 (Fte) Charge Hand (equipment) Sca 1 (Fte) l SO1 Reception Engineer 1 (Fte) al nt ort) Clerical Assistant 1 (Fte) Assistant Storekeeper 1 (Fte) Senior Technician 1 (Fte) Engineering Craftsmen Appliance repair (Tech x17 App x2) 16 (Fte) Engineering Craftsmen Equipment/ accident repair (Tech x7) 4 (Fte) Reception Assistant 1 (Fte) 3 4 General Labourer 1 (Fte) Driver Labourer 1 (Fte) WS Admin WS Stores WS Vehicle Repair WS Equipment Repair WS Reception 35.5 X Full time staff 41
42 Progress against the 2011 to 2014 Vehicle and equipment asset management plan Objective 1 To maintain cost-effective and timely processes in the provision, repair, maintenance, commissioning, decommissioning and disposal of the Service s fleet and equipment assets. Actions Target date Person responsible RAG Comment 1a Continue to identify all vehicles on a master/controlled vehicle and equipment asset register within the MIS. On-going and annually reviewed Engineering Manager Complete This is an on-going function and internal processes ensure that all new vehicles and critical equipment assets are recorded within the MIS system. 1b Set up a working group to Identify all necessary operational equipment on the master/controlled asset register within the Equipment Management system. Feb 2012 Technical services manager Engineering Manager On-going - Work has been undertaken in commands to establish a critical list of equipment currently used operational unfortunately the work was suspended do to the GIAN project. The work has been reinstated and this list will inform the categorisation of equipment within the asset register. This action has been carried over to the 2013 action plan. 1c Refresh vehicle and equipment asset register on a quarterly basis. Quarterly Assistant Engineering Manager Complete This is maintained on an on-going basis 1d Produce a lifing policy for all critical operational equipment through the Equipment management System EMS. June 2012 Engineering Manager and Head of Technical Services On-going Vehicles, Plant and Critical equipment life has been established within the MIS systems. Other equipment (non-critical) will be replace on condition 1e Produce an equipment inventory and stowage directory for each appliance type. June 2012 Revised date June 2013 Engineering Manager and Head of Technical Services On-going - Retirement of a team member within fleet technical office has delayed this project, a revised target date has been identified. Fleet Technical office has initiated a project to review stowage lists and make them more easily available to end users. This action has been carried over to the 2013 action plan. 1f Embed the operational equipment need and selection process agreed with Service delivery into the day to day provision of equipment. Ongoing and Quarterly review Engineering Manager and Head of Technical Services On-going This process is being followed and will be further enhanced by the continued liaison of Fleet Services and Service delivery through the PPG and (when established) the 42
43 Vehicle & Equipment Asset Management Strategy and Action Plan 1g Work with regional colleagues to develop an agreed common specification for pumping appliances and bring forward to tender. March 2012 Engineering Manager Complete A common Draft specification has been established in agreement with regional colleagues. The next stage is to obtain confirm buy in from other FRS to move to tender project. This action has been entered onto the 2013 action plan 1h Participate in national benchmarking for Fire Service fleets through the CFOA TOG TBC Engineering Manager Complete ECFRS Engineering Manager (EM) lead a pilot project for national fleet bench marking on behalf of CFOA Transport Officers group. Following the successful pilot it was agreed to progress to developing a national bench marking group and the Essex EM would again lead. This action has been entered onto the 2013 action plan Progress The Fleet Services team have continued to engage with stake holders and peers both locally and nationally to bring improvements to the cost effectiveness and efficiency of running the Authority s Fleet Assets. In addition to the completed actions of this objective some key BAU activities have been undertaken: - A continued review of service content of vehicles has reduced the time taken for annual services without compromising quality. Annual servicing and safety inspections of all Fleet Vehicle assets are up to schedule despite some staffing resource issue and heavy workloads concerning resilience work for the GIAN project. The Fleet Workshops continues to maintain its accreditation to the ISO Quality Standard and Investors in People. KPI s on total reported defects on vehicles continues to show a year on year reduction despite the growth in fleet numbers (figures taken from Fleet management review report) See Figure 1 below Figure 1 The total numbers of reported defects on vehicles continues to reduce year in year which is an indication of the increased reliability of the fleet specification and maintenance. Although the trend line is levelling out a predicted defects figure for is
44 Objective 2 To review the integration of the Fleet, Transport, SHQ Stores and Technical Services into one Engineering Service centre of excellence. Actions Target date Person responsible RAG Comment 2a Considerable proprietary work has been undertaken in this activity with Transport now well established on the Lexden site. Their full integration with the processes and policy of the workshops will continue with IiP and ISO integration IiP November 2011 Achieved January 2012 for ISO Engineering Manager Assistant Engineering Manager Complete The transport team are now settle in their new location a review of jobs descriptions and grading has been undertaken. Some processes remain outside the scope of ISO accreditation as our scope covers only repair, maintenance and roadside assistance for vehicles and equipment. However, document controlled and other processes are in line with the requirements of the standard 2b Movement of Hutton Store to the Lexden site TBC Engineering Manager, Purchasing Manager, HR assistance On-going - The commencement of the Kelvedon Phase 2 project has meant that the work has begun on moving the Stores function and BA maintenance to the Lexden site. Fleets Services teams and Property services are working closely to ensure that space and facilities are made available to accommodate the movement of staff, stock and equipment. Progress The stores, Transport and BA maintenance will be a physical move to the Lexden site where as the Technical team will remain at the Kelvedon park HQ. Areas within the Lexden site have been identified and modifications of the welding bay area are underway to allow space for a BA repair workshops to be developed. The Complete Hutton move is now a formal project and key mile stones and actions will be monitored through that process. In order to provide better continuity within the section the R&D manager s role has been reviewed and the operational response requirement has been removed from the job description. This has allowed for a change in terms and conditions from grey to green book thus bringing a saving in establishment costs. Objective 3 Following the business case outcome in objective 2b conduct an organisation review of the four departments to ensure appropriate resources and skills are available. Actions Target date Person responsible RAG Comment 3a Identify which resources in Workshops, Technical and Stores may be affected following an impact analysis of property strategy relating to Lexden, Hutton and Kelvedon Park. Pending development of Lexden Director Support Services, Head of Engineering, Head of Procurement, Head of Technical Services Complete The effected departments within the Hutton closure project will be the Store function, and the BA maintenance workshop. As detailed in 2b above 44
45 Vehicle & Equipment Asset Management Strategy and Action Plan 3b Identify which resources in Workshops, Technical and Stores may be affected following an impact analysis of ICT strategy relating to Lexden, Hutton and Kelvedon Park. Refresh on a quarterly basis. Pending development of Lexden Director Support Services, Head of Engineering, Head of Procurement, Head of Technical Services Pending - The BC for the development of a Workshop on the KP site was rejected on change of use grounds. The move of stores and BA from Hutton to Lexden has commenced as the Hutton closure will occur behalf the development of the Lexden site. Therefore temporary accommodation will be made. 3c Consult with all affected personnel in accordance with Green Book / Contractual arrangements. Pending development of Lexden Director Support Services Pending - The move of stores and BA from Hutton to Lexden has commenced as the Hutton closure will occur behalf the development of the Lexden site. Therefore temporary accommodation will be made. 3d Identify potential efficiencies arising from potential rationalisation of systems and property. Pending development of Lexden Director Support Services, Head of Engineering, Head of Procurement, Technical Services Pending - The move of stores and BA from Hutton to Lexden has commenced as the Hutton closure will occur behalf the development of the Lexden site. Therefore temporary accommodation will be made. 3e Conclude HR strategy for revised functions include organisational structure and management. Pending development of Lexden Director Support Services Pending - The move of stores and BA from Hutton to Lexden has commenced as the Hutton closure will occur behalf the development of the Lexden site. Therefore temporary accommodation will be made. Progress Following the deferment of the development of the Lexden site and the commencement of the phase 2 Kelvedon project it has been necessary to relocate the Stores and BA maintenance sections from the Hutton site to the Lexden site on an interim basis. Work has begun on identifying suitable facilities and preparing business cases for associated property works. HR consultation with effected staff is underway and being monitored through a single Hutton relocation project. Actions from this objective will therefore be monitored outside of the Vehicle and Equipment Management Strategy action plan or
46 Objective 4 To continue to develop and communicate performance indicators in association with the Vehicle Fleet Management and Vehicle User Groups. Actions Target date Person responsible RAG Comment 4a Once agreed with Service Delivery implement the Fleet Service s service level agreement (SLA). TBC Engineering manager/head of Technical Services/DO Service support east and west areas Complete User needs have changed little since the implementation of the SLA and Fleet Services continue to work to its requirements. It is however, due for a review in line with the new governance framework planned for 2013 onwards 4b Produce an action plan for measuring the KPIs set out within the SLA presenting the data in a format easily understood by interested parties. Feb 2012 and on-going monthly Engineering Manager/ Head of Technical Services/ Performance team Partly Complete - Although KPI s from the SLA have been recorded and discussed at management review meetings. Work is on-going with the performance team (PT) to present these in the SDB format when resources in the PT become available. As part of the review of the SLA the KPI s will be considered with Service Delivery to ensure they are relevant to the end user. Progress We continue to monitor set KPIs and report quarterly to staff at IiP meetings and to review performance at six monthly management review meetings. Reported defect numbers continue to reduce although the trend line is levelling out see figure one above. Service schedule remain up to date and are continually monitored daily by the workshop manager as part of workshop loading. Objective 5 Procure in accordance with ECFRS procurement policy, in line with the published capital /revenue replacement programmes. Actions Target date Person responsible RAG Comment 5a Produce a 15 year vehicle and equipment replacement programme, and refresh on an annual basis. April 2012 Engineering Manager Complete and on-going Planned vehicular and plant assets replacements are recorded on a rolling spread sheet program form data held within the MIS the currently schedule covers asset replacement up to
47 Vehicle & Equipment Asset Management Strategy and Action Plan 5b Pending the outcome of 1g, that of a standardised regional pumping, work with the procurement team to purchase appliance over a three year contract. March 2012 Director Support Services/ Engineering/ Head of Technical Services/ Head of Procurement regional colleagues Complete - A draft specification has been agreed by the Eastern region Transport Officers group. The procurement manager is currently working on a procurement strategy that will identify confirmed commitment and vehicle numbers from partaking FRS. Once this has been established tendering and contract award will follow. 5c Review through the Regional procurement activity the possibility of standardised equipment to enable a standard approach to border incidents and increase resilience. TBC Director Support Services/ Engineering/ Head of Technical Services/ Head of Procurement regional colleagues Complete and on-going The Service has undertaken a large collaborative procurement exercise on PPE lead by the DCFO Service Support and it will look to develop other such arrangements as and when the opportunity arises. 5d Procure vehicles and equipment to the agreed replacement program pending provision of funding and suitable User requirements. Annually assets to be delivered before the end of the financial year 2012 Engineering Manager/ Head of Procurement Complete and on-going Fleet Services have procure a number of assets for the Service as per the replacement schedule when user requirements have been established to enable full specifications to be drawn up. Through the new governance process Fleet services will seek to assist its end user identify and complete user needs and business cases to improve the budget bidding and procurement timelines for asset refresh. Progress The Service has taken delivery of the following asset replacements in line with the replacement schedule since the 1st January 2012 upto the 1st March 2013: 67 x Ladders consisting of 135 and 105 fire fighting ladders, community fire safety ladders and triple extension access ladders 30 x positive Pressure Ventilation Fans (PPV) for smoke evacuation at incidents 27 X Officers cars in line with replacement schedule 12 X pool car replacements 11X Car derived and larger vans replacements; Vehicles currently in build and scheduled for delivery before 31st March 2013 are 2 x specialist rescue vehicles and 1 x Pickup utility 4x4 vehicle. 47
48 Objective 6 To review developments and opportunities in fuel types and carry them through to the vehicle replacement policy and procurement strategy in conjunction with the Vehicle User and Vehicle Fleet Management Groups. Actions 6a Where it is economically advantageous to do so and in response to user requirements, alternative fuels and technologies will be evaluated or procured. Target date To undergo an annual review Person responsible RAG Comment 6a Complete and on-going Alternative fuels have been considered and indeed a hybrid vehicle has been added to the fleet for an assessment of its suitability. An electric demo vehicle has been tested and found not suitable for the duty cycle of the fleet cars. Initial purchase cost still proves high for hybrid vehicle. After market adaptations for override recovery have been discussed with the supplier but are not currently manufactured for our vehicle types. Driver displays linked to the vehicle data system to encourage more economic driver performance are being considered as a trail but have not progress as yet. Progress The Service will continue to look to improve its carbon foot print in terms of vehicle and fuel technology where it is compatible with the business need. Unfortunately, Hybrid type vehicles remain higher at initial cost compared to conventional diesel of petrol vehicle and their residual value are lower. Electric vehicles are currently not compatible with the required duty cycle of operational vehicles in terms of cars as journey duration is restricted by battery charge. Other energy regeneration aftermarket devices may prove cost effective but are currently not able to fit to existing vehicle models in the Service. Objective 7 To protect and enhance the environment, supporting the concept through Fleet Services Environmental Policy. Actions Target date Person responsible RAG Comment 7a Introduce effective control and contract management monitoring measures to ensure all procurement manages the environmental impact. On-going Head of Procurement. Complete and on-going - Environmental considerations are given to all procurement tenders undertaken by ECFRS. A clausal section requires adherence to certain environmental and sustainability issues as determined by the asset being purchased. 48
49 Vehicle & Equipment Asset Management Strategy and Action Plan 7b Review the disposal policy of all vehicles and equipment. June 2012 Engineering/ Head of Technical Services/Head of Procurement/Fleet Contracts officer. Complete and On-going - The awareness of environmental issues are contained within the VEAMS which this action plan supports. The disposal routes and processes ensure that the environmental impact of asset disposal is considered. 7c Review effective control, monitoring and recording measures to ensure correct disposal of all waste. August 2012 Service Stores and Fleet Stores Managers Complete and On-going - The ECFRS has signed a disposal agreement with the DSA which provides suitable secure and environmental disposal of used assets. The EFA(T) Contracts officers is further developing the contacts to provide secure and auditable disposal of fleet vehicles not just of internal fleet vehicles but for the wider fire services nationally. Progress Fleet Services continued interaction with the procurement team and the Carbon Reduction Board raises the awareness of the environmental impact of our undertaking it is embedded into all we do. The production of waste form our vehicle repair facilities are continually monitored and reduced where possible, for example longer drain periods for oils. A number of contracts for the disposal of waste products from Workshops are in place and will be reviewed in order to consolidate to a single supplier if possible. 49
50 Objective 8 To extend opportunities for collaboration between brigades in the Region and nationally for the benefit of Essex County Fire & Rescue Service. Actions Target date Person responsible RAG Comment 8a Assess any proposals for the shared use of EFA sites and bring forward proposals to EFA for approval. On-going Director Support Services, Engineering manager, Procurement manager. Complete and on-going - Discussions have been had with other council authorities and agencies to explore sharing of facilities and or the provision of service. Essex police LGV vehicles are an existing customer 8b Through the EFA(T) business development officer continue to seek out business opportunities with other FRS and suitable organisations On-going Director Support Services, Head of Engineering, Head of Procurement, Business development officer Complete and on-going The Business development officer continues to work with other authorities and external customers in order to obtain new revenue streams for the Fleet Workshops. 8c Consider a Regional approach (fire) to vehicle and equipment asset Management systems. TBC pending review of ITC projects Director Support Services Engineering/Head of Technical Services Pending Fleets services continue to work with regional colleagues where ever it is beneficial to the ECFRS, in line with this the possibilities of a regional procurement of Fleet management information systems will be explored pending the outcome of 9a Progress Fleet Services teams have undertaken a pilot for shared services by maintaining a small number of vehicles for a neighbouring borough council, although this pilot brought benefits and savings to both parties, the size of the tendered contract exceeded the resources available to undertake the requirements. There is currently some 7 to 8% of external work undertaken within the existing workshop resources and as efficiency savings are implemented it is hoped that this can be increased, however, the operational needs of the Fire Service must remain our paramount focus. 50
51 Vehicle & Equipment Asset Management Strategy and Action Plan Objective 9 To maximise output from the available resources with the most cost-effective solutions. Actions Target date Person responsible RAG Comment 9a Review the provision of the Fleet and equipment MIS system in line with the IT strategy. Feb 2012 Engineering/Head of Technical Services Head of ICT Pending - A review and or replacement of the Fleet asset management system is required over the next two years. This work is pending the review of ITC projects and available resources within ITC. This action will be carried over to the action plan 9b Ensure the procurement activity includes a review of all appropriate vehicle and equipment fleet management systems from within the public and private sectors. TBC pending review of MIS provision Engineering/Head of Technical Services Head of ICT Pending A review and or replacement of the Fleet asset management system is required over the next two years. This work is pending the review of ITC projects and available resources within ITC. This action will be carried over to the action plan 9c Review the fleet management systems of Regional Fire & Rescue Services in addition to those of neighbouring agencies / partners to inform the replacement project of the current MIS system. TBC pending review of MIS provision Engineering/Head of Technical Services ICT Working Party Pending A review and or replacement of the Fleet asset management system is required over the next two years. This work is pending the review of ITC projects and available resources within ITC. This action will be carried over to the action plan 9d Clarify the implementation cost, lead-time for system population, training, transfer of data, ability to upgrade modules and maintenance. TBC pending review of MIS provision Engineering/Head of Technical Services Head of Procurement Pending A review and or replacement of the Fleet asset management system is required over the next two years. This work is pending the review of ITC projects and available resources within ITC. This action will be carried over to the action plan Progress Unfortunately, resource issues have delayed this work although it is still an aspiration of the Service to upgrade its fleet and equipment management software (MIS). The individual actions from this objective concerning the MIS will be consolidated into one action for the MIS replacement within the action plan in support of the revised VEAMS. 51
52 ? 52
Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy. Submitted: 29 September 2013
Vehicle Replacement & Fleet Utilisation Policy To be considered as part of the overarching Fleet Strategy Submitted: 29 September 2013 To be Reviewed: September 2015 VERSION: AUTHOR: OWNER: v2.3 Barry
Fleet Management & Vehicle Maintenance Team Plan 2015/16
Fleet Management & Vehicle Maintenance Team Plan 2015/16 Team Manager: Service Plan: Visible Services Date signed off: 31/07/2015 Signed off by: Miles Punter 1 Contents Team Overview... 3 Our Contribution
Essex Fire Authority. Fleet Management. Internal Audit Report (4.12/13) 28 February 2013 FINAL. Overall Opinion
Essex Fire Authority Fleet Management Internal Audit Report (4.12/13) 28 February 2013 FINAL Overall Opinion Essex Fire Authority Fleet Management 4.12/13 CONTENTS Section Page Executive Summary 1 Action
Attached is the 2015-16 business plan for Transport Services for consideration by OPCC. (Please see attached)
Financial Performance Programme 2014-15 Report to: the Office of the Police and Crime Commissioner for Essex Report from: Essex Police Meeting Date: 21 st May 2015 Topic: Transport Services 15-16 Business
Asset Management Strategy
Greater Manchester Fire and Rescue Service Asset Management Strategy 2013-2015 Appendix 1 Document Version Control Document Version Date Written by 0.1 June 2012 Andrea Heffernan 0.2 December 2012 Andrea
CHEHSIRE CONSTABULARY VEHICLE FLEET SERVICES DEPARTMENT VEHICLE STRATEGY
CHEHSIRE CONSTABULARY VEHICLE FLEET SERVICES DEPARTMENT VEHICLE STRATEGY Cheshire Constabulary Vehicle Fleet Services Vehicle Strategy Contents Foreword 1. Introduction 2. Strategic Objectives 3. Departmental
Sustainable Development Strategy
Sustainable Development Strategy Our vision and strategy: A railway fit for the future 2013 2024 Document Ref: SBPT204 Version 0.71 Executive summary Network Rail exists to generate outstanding value for
Reduce your fleet costs in nine simple steps
Reduce your fleet costs in nine simple steps 75% of fleets expect their costs to rise in 2010. 1 Running a cost efficient fleet is therefore more important than ever in order to keep your expenditure under
Fleet Strategy 2015-2018
Fleet Strategy 2015-2018 Foreword I am pleased to introduce the Fleet Strategy for Cheshire Constabulary, with its focus very firmly upon supporting frontline operations in the most cost efficient way.
LEASE CAR POLICY AND PROCEDURE
LEASE CAR POLICY AND PROCEDURE Lease Car Policy & Procedure Page: Page 1 of 16 Recommended by Approved by Executive Management Team Board of Directors Approval date 4 May 2011 Version number 1.4 Review
FLEET ROAD RISK POLICY
FLEET ROAD RISK POLICY SGPilliner U:\PolicieandProcedures\FleetRoadRiskPolicy\FleetRoadRiskPolicy040903 1 Fleet Road Risk Policy. 1.0 Introduction. Carmarthenshire County Council is committed to manage
JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot
JOB DESCRIPTION JOB TITLE: DIRECTORATE: SECTION: GRADE: Team Leader Fleet Engineering Environment & Sustainable Communities / Highways Transport Operations / Vehicle Fleet & Depot BBCU11 DATE PREPARED:
SMS0045 Construction Health and Safety Policy and Procedures
SMS0045 Construction Health and Safety Policy and Procedures March 2015 Version 8 Please note that for projects utilising a CDM Co-ordinator under the transitional arrangements of CDM 2015 (between 6 April
NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013
APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective
Business Continuity Management Framework 2014 2017
Business Continuity Management Framework 2014 2017 Blackpool Council Business Continuity Framework V3.0 Page 1 of 13 CONTENTS 1.0 Forward 03 2.0 Administration 04 3.0 Policy 05 4.0 Business Continuity
The Asset Management Landscape
The Asset Management Landscape ISBN 978-0-9871799-1-3 Issued November 2011 www.gfmam.org The Asset Management Landscape www.gfmam.org ISBN 978-0-9871799-1-3 Published November 2011 This version replaces
BoPP Policies and Procedures PR12 BOPP Fleet management and use of vehicles
BoPP Policies and Procedures PR12 BOPP Fleet management and use of vehicles Key evaluation question QMS Standard Key Stakeholders involved in consultation Directorate, Management Forum, Facilities team
AMS Asset Management Redkite Asset Management System When only the best will do.
Defects AMS Asset Management Redkite Asset Management System When only the best will do. Redkite Systems Ltd 2014 AMS Overview You ll wonder how you managed without it! What can I record on Redkite AMS?
REPORT 4 FOR DECISION. This report will be considered in public
REPORT 4 Subject: Safety Readiness for the Summer 2013 Events Programme Agenda item: Public Item 7 Report No: 4 Meeting date: 28 May 2013 Report to: Board Report of: Mark Camley, Interim Executive Director
INFORMATION REQUIRED FOR EMPLOYEE HANDBOOK
INFORMATION REQUIRED FOR EMPLOYEE HANDBOOK Registered Company Name Company Trading Name Address Email Address Contact number We have enclosed a standard employee handbook. You should read through the details
Asset Management Policy March 2014
Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and
JOB DESCRIPTION. Manager Mechanical (Fleet, Workshop & Recycling)
JOB DESCRIPTION JOB TITLE: REPORTS TO: Manager Mechanical (Fleet, Workshop & Recycling) Director of Municipal Services PURPOSE OF THE JOB Organise, control, manage and develop staff and services of the
University of Leicester. Vehicle Fleet Management Procedures
University of Leicester Vehicle Fleet Management Procedures Estates & Facilities Management Division September 2011 1 Introduction The University fleet of vehicles includes all vehicles owned by the University
1.0 Policy Statement / Intentions (FOIA - Open)
Force Policy & Procedure Reference Number Business Continuity Management D269 Policy Version Date 23 July 2015 Review Date 23 July 2016 Policy Ownership Portfolio Holder Links or overlaps with other policies
Performance Detailed Report. Date. Last saved: 12/10/2007 13:18:00. Property asset management. Bristol City Council. Audit 2006/07
Performance Detailed Report Date Last saved: 12/10/2007 13:18:00 Property asset management Audit 2006/07 - Audit Commission descriptor to be inserted by Publishing- Document Control Author Filename Bob
ENVIRONMENTAL POLICY STATEMENT
ENVIRONMENTAL POLICY STATEMENT COMPANY NAME ADDRESS COMPANY ACTIVITIES TRACKYOU LTD BLACKWOOD BUSINESS PARK, ASH ROAD SOUTH, WREXHAM, LL13 9UG Telematics Provider of Vehicle Tracking Units to Local Authorities
Principal risks and uncertainties
Principal risks and uncertainties Our risk management approach We have a well-established risk management methodology which we use throughout the business to allow us to identify and manage the principal
AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007
PAGE: 1 REPORT TO: SUBJECT: BY: AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007 ASSET MANAGEMENT CHIEF FINANCIAL OFFICER 1. REASON FOR REPORT 1.1 To provide the Audit and Performance Review
Derbyshire Trading Standards Service Quality Manual
Derbyshire Trading Standards Service Quality Manual This Quality Manual has been developed to give a broad outline of how the Trading Standards Division s range of services comply with the requirements
Bedfordshire Fire and Rescue Authority Corporate Services Policy and Challenge Group 16 September 2015 Item No. 11
For Publication REPORT AUTHOR(S): Bedfordshire Fire and Rescue Authority Corporate Services Policy and Challenge Group 16 September 2015 Item No. 11 ASSISTANT CHIEF OFFICER (HUMAN RESOURCES AND ORGANISATIONAL
ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service
ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service Agenda Item 8 Page 1 of 13 MEETING MEETING DATE SUBJECT REPORT BY Essex Fire Authority 7 September 2011 Relocation of Service Control The Chief Fire
University of Glasgow Strategic Travel Plan 2010 2015
University of Glasgow Strategic Travel Plan 2010 2015 Jess Bailey Travel Plan Specialist Viola Retzlaff University of Glasgow Document Control Date Reviewed: March 2010 Version Number: 1 Author/Revised
CLEAN GREEN & SUSTAINABLE NS1439215
CLEAN GREEN & SUSTAINABLE NS1439215 1 Contents 2 Introduction Strategic Alignment 1 - Energy Efficiency 2 - Water Management 3 - Fleet and Plant Management 4 - Carbon Offsets 5 - Waste Management Everything
B37: Managing Occupational Road Risk: Guidance. This document should be read in conjunction with Section B37: Managing Occupational Road Risk: Policy.
B37: Managing Occupational Road Risk: Guidance This document should be read in conjunction with Section B37: Managing Occupational Road Risk: Policy. 1. Introduction 1.1 This document outlines the mechanisms
LONDON BOROUGH OF HAVERING
LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN 2015-2019 Sections LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN CONTENTS 1 Introduction and Context 2 Corporate Vision 3 Policy
4 Adoption of Asset Management Policy and Strategy
4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are
Key Solutions Thought Leadership
GE Capital Fleet Services Company Car Trends Your essential guide to the latest developments in the fleet industry Key Solutions Thought Leadership Welcome Every quarter since 2004, GE Capital, Fleet Services
LFRS Business Continuity Planning
LFRS Business Continuity Planning 1.1 INTRODUCTION The LFRS Business Continuity Plan provides a framework for the activation, allocation and deployment of Lancashire Fire and Rescue Services resources
Business Continuity Policy and Business Continuity Management System
Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain
University Fleet Procedures
University Fleet Procedures Category: Human Resources Facilities 1. LEGISLATION/ENTERPRISE AGREEMENTS/POLICY SUPPORTED Remuneration and Benefits Policy 2. IMPLEMENTATION PRINCIPLES 2.1. The University
Area Manager - Head of Operational Policy & Assurance
JOB DESCRIPTION Job Title: Fleet Manager Department: Operational Assurance Location: FSHQ Post Number: Grade/Role: PM2 Special Allowances: Essential Car User Responsible to: Area Manager - Head of Operational
Climate Local Hampshire County Council Our progress on November 2013
Climate Local Hampshire County Council Our progress on November 2013 Since signing up to Climate Local on in July 2013 we have made the following progress towards achieving the commitments and actions
A review of service reform in Scottish fire and rescue authorities
A review of service reform in Scottish fire and rescue authorities Key messages/prepared for the Accounts Commission March 2007 1 Key messages Introduction 1. A National Joint Council (NJC) agreement in
Information Governance Strategy and Policy. OFFICIAL Ownership: Information Governance Group Date Issued: 15/01/2015 Version: 2.
Information Governance Strategy and Policy Ownership: Information Governance Group Date Issued: 15/01/2015 Version: 2.0 Status: Final Revision and Signoff Sheet Change Record Date Author Version Comments
HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY
HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY 16 November 2015 Highway Infrastructure Asset Management Strategy Contents Introduction 1.0 The Need for Asset Management 1.1. Background 1.2. Aims and
South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy
South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy Reference No: CG 01 Version: Version 1 Approval date 18 December 2013 Date ratified: 18 December 2013 Name of Author
Construction Logistics Plan Guidance
Construction Logistics Plan Guidance For planners MAYOR OF LONDON Transport for London Section 1 Introduction Contents Section 1 Introduction 3 Section 2 Policy background 6 Section 3 Typical contents
ECO Stars Fleet Recognition Scheme Improving Local Air Quality Through Operator Engagement
ECO Stars Fleet Recognition Scheme Improving Local Air Quality Through Operator Engagement Mark Cavers, Transport & Travel Research Ltd and Ann Beddoes, Barnsley Metropolitan Borough Council [email protected]
Long-Term Asset Management Plan 2011-2021
Long-Term Asset Management Plan 2011-2021 Contents Introduction...3 A shared vision...4 Strategic planning to achieve our goals...4 Towards 2031...5 A long-term vision, communicated by our community...5
REVIEW OF FLEET SERVICES - FINAL REPORT OF THE ENVIRONMENT SCRUTINY PANEL
REVIEW OF FLEET SERVICES - FINAL REPORT OF THE ENVIRONMENT SCRUTINY PANEL PURPOSE OF REPORT 1. To present the Environment Scrutiny Panel s findings following its examination of Middlesbrough Council s
Nottinghamshire and City of Nottingham Fire Authority. Senior Officer Details 2015/16
Nottinghamshire and City of Nottingham Fire Authority Senior Officer Details 2015/16 Publication of senior officer salary information The following information relates to members of the Nottinghamshire
HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM
HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM September 2011 OUR HEALTH, SAFETY AND ENVIRONMENT POLICY OUR PRINCIPLE OF DUE CARE We care about the wellbeing of our people and our impact on the environment.
carbon footprinting a guide for fleet managers
carbon footprinting a guide for fleet managers Introduction For some organisations, carbon footprinting is perceived to be about reducing emissions purely for environmental reasons. But it is primarily
GREENING THE FLEET STAFF TRAVEL OPTIONS
ITEM NO: 5 Report To: ENERGY PANEL Date: 3 September 2009 Reporting Officer: Robin Monk - Assistant Executive Director Technical and Property Services Paul Jennings Engineering Operations Manager Subject:
OAKPARK SECURITY SYSTEMS LIMITED. Health & Safety Policy. Requests or suggestions for amendment to this procedure
OAKPARK SECURITY SYSTEMS LIMITED Requests or suggestions for amendment to this procedure should be submitted to the owner of the process PROCESS OWNER: MANAGEMENT TEAM Current version: PREVIOUS VERSION
Salary: 45,000-50,000
JOB DESCRIPTION: Responsible to: Purpose of the Post: Business Support Manager Principal Business Support Manager Holds a key post of responsibility within the UTC. Reporting directly to the Principal,
Procurement driving better value for money. Guide 7 to Sustainable Procurement. Manage the contract and disposal route
Procurement driving better value for money Guide 7 to Sustainable Procurement Manage the contract and disposal route A guide for agencies July 2010 This guide is part of a series of documents focussed
LHT S ASSET MANAGEMENT STRATEGY 2015-20. It s My Home
LHT S ASSET MANAGEMENT STRATEGY 2015-20 It s My Home 0 ASSET MANAGEMENT STRATEGY 2015-20 It s My Home Contents Page No 1. WHAT DOES OUR ASSET MANAGEMENT STRATEGY AIM TO DO? 2 2. WHY IS ASSET MANAGEMENT
City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1
City and County of Swansea Human Resources & Workforce Strategy 2013-2017 Ambition is Critical 1 Delivering quality services for a safer, greener, smarter, fairer, healthier, richer Swansea Executive Summary
BUSINESS CONTINUITY POLICY
BUSINESS CONTINUITY POLICY Last Review Date Approving Body n/a Audit Committee Date of Approval 9 th January 2014 Date of Implementation 1 st February 2014 Next Review Date February 2017 Review Responsibility
Document Management Policy
Document Management Policy Introduction 1.1. The Snowdonia National Park Authority considers effective record management to be a key administrative function. It maintains records of its own internal functions
Sustainability and Environmental Review. Introduction
Sustainability and Environmental Review Introduction Edmundson Electrical Ltd is a long established privately owned company with an unrivalled reputation in the marketplace and with a unique culture that
RCT HOMES HOUSING ASSOCIATION JOB DESCRIPTION
RCT HOMES HOUSING ASSOCIATION JOB DESCRIPTION TITLE: REPORTING TO: RESPONSIBLE FOR: Financial Accountant Group Accountant Assistant Accountant 1. Overall Objectives 1.1. To provide the Financial Accounting
The anglo american Safety way. Safety Management System Standards
The anglo american Safety way Safety Management System Standards 2 The Anglo American Safety Way CONTENTS Introduction 04 Anglo American Safety Framework 05 Safety in anglo american 06 Monitoring and review
Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.
Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering
Mining & Construction Transforming your fleet performance
Mining & Construction Transforming your fleet performance Giving you greater focus on your business Today s difficult economy challenges organisations within the mining and construction sector to deliver
Salary Sacrifice (Novated Vehicles) Guideline
Salary Sacrifice (Novated Vehicles) Guideline Policy Hierarchy link This guideline is linked to the Fleet Management Policy Responsible Officer Manager, Campus Services, Ext: 53978 Contact Officer Manager,
VEHICLE MANAGEMENT AND USAGE PROCEDURES
VEHICLE MANAGEMENT AND USAGE PROCEDURES Section Contact Campus Facilities Regional Registrar Facilities Management - Manawatu Last Review February 2008 Next Review February 2009 Approval n/a Purpose: To
Operations. Transport Officer OP199. Operations Manager. Administration Officer
Job Description Service Job Title Post No Salary Grade Operations Transport Officer OP199 E Hours 37 Responsible to Responsible for Operations Manager Administration Officer Purpose of Post: To support
Business Continuity Management Framework
Business Continuity Management Framework Date of Issue: November 2013 Review Date: November 2014 Written by: Jackie Orchard Risk & Business Continuity Manager Authorised by: Signed off by: DCC Francis
Policy: Driving Issued By: SHE Team Effective Date: March 2015 Review Date: March 2016 Version: 1. Driving Policy
Policy: Driving Effective Date: March 2015 Review Date: March 2016 Driving Policy 1. POLICY STATEMENT 2. SCOPE 3. RESPONSIBILITY 4. DEFINITIONS 5. PROCEDURE 5.1 Alternatives to Driving 5.2 Authorisation
For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems
BAFE Scheme: SP203-3 Version 1: July 2008 Amendment No: 1 Fire Protection Industry Scheme, Reference SP203 Part 3 For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Audit Standard 29 May 2014 Table of Contents Page 2 1. Getting Started...3 2. Critical element 1: Registered Owner Commitment to Safety
SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document)
SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW (reproduced review document) Highway Network Management Best Value Review Report of the Member Panel Summary of Key Findings Leicestershire County Council
Lease Car Scheme Managers Guide
NHS Fleet Lease Car Scheme Managers Guide The administration of the scheme is outsourced to a specialist management company (Knowles Associates) who provides quotations, scheme management, driver support
Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors
Procurement guidance Engaging and managing consultants Includes definitions for consultants and contractors Procurement guidance: Engaging and managing consultants Page 2 of 17 Table of contents Table
WEST YORKSHIRE FIRE & RESCUE SERVICE. Business Continuity Management Strategy
WEST YORKSHIRE FIRE & RESCUE SERVICE Business Continuity Management Strategy Date Issued: 12 November 2012 Review Date: 12 November 2015 Version Control Version Number Date Author Comment 0.1 June 2011
18 November 2015 At a meeting of the Select Committee held at 10.30 a.m. at County Hall, Chichester.
Environmental & Community Services Select Committee 18 November 2015 At a meeting of the Select Committee held at 10.30 a.m. at County Hall, Chichester. Present: Mr Tyler (Chairman) Mr Barrett-Miles Mr
Arval Consulting. Understanding your fleet and reducing cost
Arval Consulting Understanding your fleet and reducing cost Understanding your fleet and reducing your costs As you know, running a fleet of company vehicles, whether perk cars or workhorse vans, is a
Asset Management Strategy (2013-2017) Doing things Differently A New Approach for a sustainable future
Asset Management Strategy (2013-2017) A New Approach for a sustainable future Contents Introduction... 2 The Asset Management Vision, Policy Statement & Strategic Themes... 5 Part B The Asset Management
Bedford s Network Management Strategy (2011 2021) November 2010
Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national
1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY
1. GENERAL STATEMENT OF COMPANY HEALTH, SAFETY AND ENVIRONMENTAL POLICY Dumfries Timber Co. Ltd. is committed to comply with our legal duties in order to provide a safe and healthy working environment