1 APPENDIX TO ITEM 3 Thurston Road Industrial Estate Planning Application Local Meeting Notes Due to the level of local interest, a local meeting was held on the evening of Monday 27 th June 2011 to discuss the redevelopment of the Thurston Road Industrial Estate. Attendance registers were circulated during the meeting which were signed by 24 people. In addition, seven people attended on behalf of the applicant: Paul Woods planning consultant, esa planning (PW) Andrew Gale planning consultant (AG) Steve Gibbons applicant, Empire Property Group (SG) John Fish applicant, L&Q (JF) Andy Bell EIA specialist (AB) Lucy Rosser EIA specialist (LR) Marcus Dellacroce transport specialist (MD) Representatives from the Council s Planning Service in attendance were: Emma Talbot (ET) Graham Harrington (GH) Lewisham Central ward Councillors in attendance were Cllr Stella Jeffrey and Cllr Michael Harris, who chaired the meeting. Following a short introduction by Cllr Harris, ET explained the planning context of the application and the fact that the scheme for an extension of time limit for implementation of an already approved scheme rather than an application for a new scheme. The Council are therefore limited in their consideration of the scheme to those matters which have changed since the scheme was considered by Members in November 2007 and approved in February ET explained that this meant that matters such as the design of the scheme and density had already been considered and deemed acceptable in 2007 and that as policies had not changed significantly since that time, these matters could not be reconsidered. The applicant is also unable to amend or revise the scheme and can only reapply for the scheme that was previously approved in They are able to provide further information to support the application to update environmental and transport data. The Council can impose new conditions and agree new obligations if necessary. The relationship of the scheme with Loampit Vale South does need to be considered as that scheme had not been submitted when Thurston was considered. There were also matters such as energy targets, targets for affordable housing and air quality policies that have changed significantly. ET agreed to provide a note explaining the context that could be appended to the local meeting note and could also be circulated to objectors. PW explained the main elements of the scheme which would remain unchanged from the 2007 application apart from altering a proposed biomass boiler originally secured by condition to a Combined Heat and Power (CHP) unit plus Photovoltaic (PV) cells. He also explained that the current application was accompanied by an updated Environmental Statement and Transport Assessment and that L&Q were joint applicant and would be responsible for delivering 90 affordable units in a mix of social rented and intermediate. Q. What does mezzanine actually mean
2 A. PW explained that this was effectively a first floor within the units Q. Are there only 118 car parking spaces for the residential units? If that is the case that is too few to meet the needs of a possible 800+ residents. A. PW confirmed that 118 car parking spaces would serve residents. Q. What is the split of social rented to intermediate units? A. 70/30 split between social rented and intermediate (also known as shared ownership) Comment. The thinking for the scheme and the area is not joined up. There are too many children and not enough infrastructure. There are concerns that residents of schemes surrounding the school site could look into the playground and give rise to safety issues. Q. Who are Empire Property Developments and how and who is financing the scheme? A. SG explained the background to Empire Property and how the scheme would be financed. ET also explained that given the position with school places and Primary School need, should planning permission be granted, the Council could seek a contribution towards schools which would be put towards expanding other schools and providing additional places. Q. Has the applicant considered the option cost for the site? A. SG and PW explained that they did not know of that term and were unable to answer that query. Q. Why isn t the infrastructure in place to deal with Primary School capacity which is overstretched with many local schools having bulge classes. A. GH explained that Lewisham Council was looking at options to expand existing schools and new sites within the two Pupil Place Planning Localities which cover Lewisham Town Centre. Recent reports to Mayor and Cabinet have been seeking ways to address this issue. Comment. The council are allowing too much housing for the infrastructure to cope with. Cllr Harris explained that there is a problem with capacity generally and this has been across London so there is significant pressure on existing schools which the Council are seeking to resolve. Comment. The site is too cramped and too dense. ET explained that in density terms, the policy position on guideline density has not changed since the scheme was considered in This means that this matter was
3 considered as part of the last application and would not be reconsidered as part of the current extension of time limit application. Q. Who is the developer? Who owns the land? A. SG explained there is a joint applicant; Empire Property and L&Q but L&Q own the land. Q. How long have the industrial units been vacant? A. SG explained that they ve been vacant for approximately 3 years and that those tenants were on short term leases. L&Q acquired the site in Q. Why has the scheme been delayed? A. Current market conditions delayed the scheme. SG explained that it is their intention to commence works in Autumn 2011, should permission be granted. Q. Will the units compete with Lewisham Town Centre? Concerns that existing tenants were being lost and that that would affect the vibrancy and economy of the town centre. A. SG did not feel this would be the case because of the type of large format retail units that would be restricted to non-food uses. He explained that previous tenants had been offered relocation packages and declined those offers. Q. The figures within the Transport Assessment are based on the Lewisham Town Centre Transport Capacity Study however, there are concerns that this report is flawed. Statements about over 5,000 spare spaces on rush hour trains were disputed as were the predicted drop in numbers using Lewisham trains services because of DLR, East London Line (now known as Overground) services and Thameslink. If people divert to these services, it is likely that they will make linked trips, first travelling by train to pick up those services. The report relies on transport capacity improvements through additional train carriages serving Lewisham, which are no longer committed. The effects of high density development is therefore overoptimistic and the travel impacts will be worse. A. MD stated that in undertaking the transport assessment they had used the available data in the study. ET explained that the points that had been raised were relevant to the reconsideration of the scheme and needed to be investigated and resolved. Officers would be reviewing these points with Transport colleagues in light of the issues raised. Comment. There were issues raised about the Council s corporate approach to deciding to reduce school capacity at a time when so many new developments were planned for the area. Q. If renewable energy is being updated, why aren t PV panels proposed to reclad the building by positioning them on the south facing side of the building?
4 A. PW explained that the necessary energy targets could be met using PVs on the roof only. ET added that the repositioning of PVs as a cladding would be likely to go beyond the limits for this type of application and be considered a design change rather than something that could be secured by condition or obligation alone. Q. In the ES addendum the wind impact assessment relies on the Loampit Vale assessment. Why hasn t this scheme carried out its own assessment? PPG13 encourages the use of public transport, walking and cycling so why has the scheme got 118 car parking spaces? Higher than Loampit Vale south. How has the impact of car parking for the retail been assessed for right turns into Jerrard Street? A. LR explained that the approach to wind assessment had been agreed with Council advisors as the Loampit Vale scheme had considered the cumulative impact with Thurston Road and remains valid for this application. It can be therefore be relied upon to understand the cumulative impact. MD explained that the scheme relies on the signalisation of Jerrard Street which would control right turns into Jerrard Street. Q. The Council can hear that people are extremely worried about the impacts of density, the effect on local services, the canyonisation of Loampit Vale, lack of green space and difficult access to the station. How liveable will this area be? What are the grounds for reconsidering this scheme? A. ET committed to circulate a note following the meeting explaining the context of the application and policy changes. Q. Where is Empire Property based and what is their share capital and who is their director? Why should the community be confidents that they can deliver this scheme? Is the scheme speculative? A. SG answered the specific questions about Empire Property Group and explained that as with any development, the scheme is speculative but that they had every intention of building the scheme if permission was granted. Q. Is financial viability a consideration? A. Cllr Harris explained that the financial position of a company and their intention or ability to carry out a development were not planning considerations. ET went on to explain that if planning permission is granted, a developer is under no obligation to implement a development and could not be forced to do so. The Council s involvement in financial viability was limited to understanding the finances of the scheme itself to determine whether it was proposing the maximum reasonable amount of affordable housing if it was not meeting policy targets. Q. how can people be confident that the retail units would be occupied rather than be left without tenants like Silkworks?
5 A. SG explained that in his view, Thurston Road was in a better location than Silkworks being within but at the edge of the town centre and although no occupier was identified yet, he was confident they would be let. Comment. There are a number of schemes that have been submitted over the years for Lewisham Town Centre, each involving large documents. In this case the scheme is very large and involved lots of documents and changes to the scheme as well as tracked changes to documents. This makes the application inaccessible for local people. Reading the Environmental Statement, the documents are all drafted to demonstrate that the meet necessary targets but many of the chapter conclude that the impacts would not be too bad and there are very few chapters that show a good impact and most f this is speculative. There is only a tiny amount of social housing overall. Lewisham has the highest level of youth unemployment in the Borough and this needs to be addressed. The issue of options needs to be considered and alternatives for the site that could be much better than the scheme that is proposed should be included in the ES. The retail units proposed are too big Lewisham is losing small traders which bring money into the community. This scheme is an attack on small businesses. Q. When is the scheme likely to go to Planning Committee A. ET explained that the earliest would be July 21 st otherwise it would be after the August holiday period. Concerns were expressed that given the issues that people had raised at the local meeting, July was too early and people needed more time. ET explained that normally following a local meeting, changes may be expected to a scheme but in this case given the nature of the application the scheme was either going to be acceptable as it is or not. Therefore a potential July committee was an option. While there are concerns that not all issues can be considered and the attendees wished for clarification to make sure they were raising relevant issues, ET explained that the majority of letters were based on the standard letter format, raised relevant issues and were not just being dismissed. Comment. The design of the building is too blocky Q. Who would be the retailers? A. SG answered that that no end user was identified currently. SG also stated that he considered design to be subjective and felt that the scheme would not be a brutalist type design which some attendees had likened it to. Comment. A statement was read out on behalf of Lewisham People Before Profit. It was felt that the planning system is a dictatorship with rule based on force and unmediated by any law. Developers and big businesses are also a dictatorship and they get what they want. Councillors have to be careful about what they say, planning has to be careful how they consider things. Everyone is in a vice apart from a developer who can keep coming back because the market has fallen and planning law allows them to. People in Lewisham have needs for jobs with 25 people for every job. Lewisham is losing small businesses and big retailers coming in squeeze out those jobs. Lewisham needs housing instead what is being built is sold abroad. There are needs for school places the capacity at Lewisham Bridge
6 Primary School has been reduced which has caused problems. More open space is needed. Lewisham is too crowded and there is too much reliance on Cornmill Gardens. Lewisham is denser than Bromley and areas such as Bombay and Mumbai. Lewisham is being forced to accept poor schemes. Q. If planning permission is refused who do the applicant appeal to? A. ET answered that the Planning Inspectorate would consider any appeal. ET went on to explain that each scheme is considered on its own merits and is considered fairly against planning policies. If a scheme has a negative impact or breaches policy, the Council are able to refuse a scheme but each will have to be judged individually. Q. How are local people meant to defend themselves against bid developers who have greater resources? A. ET and GH explained that the planning system works in the public interest and on behalf of local people. Decisions are made by locally elected Councillors. Comment. There were concerns that because policies were not supported by local people and were taken forward despite local objections, in practice a development would be compliant but would still be objectionable to local people. Q. How does an un-prejudicial mindset [for Councillors] work in practice? This approach is skewed in favour of developers as it means that Councillors are unable to support local people. A. Cllr Harris explained that Councillors have to go to Planning Committees with an open mind about a scheme. He considered that he was able to work in the interests of local people and keep an open mind. Q. Schemes continue to propose 1 and 2 bed flats which are very small rather than large family houses. Why are such small units being allowed? A. ET explained that emerging London Plan policy had increased minimum room sizes for developments and that this scheme would be considered against that new policy. Q. Why hasn t the ES considered cumulative impacts with the scheme at Thurston Road? A. ET explained that this scheme did not have planning permission and was therefore not considered to be a committed scheme for the purposes of undertaken an ES review. However, it was explained that the scheme at that site would have to consider cumulative impacts with Thurston Road Industrial Estate as this was a committed scheme. Comment. Recently open space has had a financial value placed on it. Has the value of open space on a price per person basis been taken into account? A. GH explained that research on the value of open space was interesting, but that planning policy did not currently address open space in this way.
7 Q. How long does Lewisham Gateway have planning permission for? Are they intending to implement the scheme? A. ET explained that the Council understood that Lewisham Gateway Developments Ltd were still committed to the scheme and that commencement had been delayed because of the economic downturn. The length of the permission was longer than the Thurston Road Industrial Estate because it was a mostly outline permission (roads and rivers were fully detailed) with reserved matters which were effectively major application in themselves. Overall the permission was estimated to be for 8 years [post meeting note: the planning permission requires the submission of Reserved Matters applications within 10 years of the grant of planning permission]. GH explained that an outline consent approves the principle of a development, mix and amount of floorspace as well as the overall massing within which individual buildings would be designed. The details of the reserved matters would be fully considered against the relevant policies at that time. Q. Does the transport capacity study take into account development around Creekside both in Lewisham and in Greenwich along the corridor of the DLR that would reduce available capacity? A. GH said that the Council would look into this. Q. With the abolition of the PCT, who is making decisions about healthcare needs? A. GH explained that the details of future healthcare decision making bodies was unknown currently. Cllr Jeffrey explained that the context has not changed yet and that the PCT would still be available but just in smaller numbers. Comment. People want housing and jobs in Lewisham but don t want to live in Croydon. Something needs to happen in the town centre but what is proposed is oppressive and needs to be much more positive. The decision was taken to build to high density despite local people opposing that policy position. Comment. The site should be used for a park or school. Alternatively it should be providing housing for the people of Lewisham and much more social housing. Q. No-one has said anything about the aesthetics of the design from the applicant s side. Lewisham Gateway had a master planner that was retained which gave some comfort. For this scheme, nothing has been said to convince people that there is any design quality. A. SG explained that Empire Property and L&Q were seeking to implement a scheme that had already been designed. ET stated that the design could not be altered given that the application was for an extension of time limit application. Q. At committee, there needs to be more Members in order to make a decision on whether or not to grant planning permission and it can t be left to the chair s casting vote. A. ET stated that the Committee process was a formal process and that as part of this application it would not be possible to change the way Planning Committee s are carried out.
8 Thurston Road Industrial Estate Extension of time Limit Planning Application DC/10/ Overview The present application seeks to extend the time limit for implementation of a scheme that, having already been granted planning permission at an earlier date, has by definition been judged to be acceptable in principle. The local planning authority therefore has to make a decision focusing on national or local policies which may have changed significantly since the original grant of planning permission and any other relevant material considerations which may have changed significantly since the original grant of planning permission. Government guidance in the form of Greater flexibility for planning permissions (October 2010) states that authorities should take a positive and constructive approach towards applications which improve the prospect of sustainable development being taken forward more quickly. In this context, the main planning considerations are whether the scheme complies with relevant development plan policies (London Plan and Development Plan Documents (DPDs) included in Lewisham s Local Development Framework (LDF)), national policies and London-wide and Lewisham guidance which have changed since permission was originally grated. It is also important for the Council to take account of other significant changes that have taken place. Section 38 (6) of the Planning and Compulsory Purchase Act (2004) makes it clear that the determination of planning applications must be made in accordance with the development plan unless material considerations indicate otherwise. The statutory development plan at the time of the Council s consideration of the previous application in November 2007 comprised the London Plan (2004) and the saved policies of the Lewisham UDP (2004, saved 2007) although proposed revisions to the London Plan were at an advanced stage of preparation and were taken into account. Since November 2007, the Mayor of London has published the London Plan consolidated with alterations (February 2008) and the Council is very close to adopting its Core Strategy (which replaces some but not all UDP policies). The statutory development plan now comprises the London Plan (2008), Core Strategy (2011) and saved policies of the UDP (2004, saved 2007). In addition, the Mayor of London is at an advanced stage of adopting the Draft Replacement London Plan and the Council has prepared a Further Options Report for the proposed Lewisham Town Centre AAP. This note, whilst not exhaustive, sets out the key changes to the policy position since 2007 that are relevant to this scheme as well as material changes that also need to be considered in order to assess whether it would be appropriate to extend the time limit within which this permitted scheme could be implemented. Key policy changes since 2007: The Community Infrastructure Levy (CIL) Regulations (2010) puts the Government tests on the use of planning obligations set out in Circular 5/05 on a statutory basis. PPS3 Planning for Housing (June 2010) which updates the 2006 version and proposed Technical change to Annex B (February 2011), which proposes changes to the definition of affordable housing
9 PPS4 Planning for Sustainable Economic Growth (December 2009), which subsumed and updated previous guidance in PPG 4 and PPS6 PPS5 Planning for the Historic Environment (March 2010) replaced PPG15 & 16 PPS10 Planning for Sustainable Waste Management (March 2011) PPG13 Transport (updated January 2011) PPS25 Development and Floodrisk (March 2010). London Plan Industrial Capacity SPG (March 2008) London Plan Providing for Children + Young People s Play etc. SPG (March 2008) Mayor of London Interim London Housing Design Guide (August 2010) London Plan Housing SPG EiP Draft (August 2010) Lewisham Planning Obligations SPD (January 2011). In addition to changes in the planning framework, the following key relevant changes in context have taken place since the previous application was determined: * Lewisham Bridge Primary School was listed in April 2009 * Loampit Vale and Prendergast Vale School are under construction and Lewisham Gateway has been approved * the Environment Agency has published updated flood projections for this part of the town centre * The national economy is in recession (or at least has been). As a result of these changes to policy and guidance and other material considerations, the main changes of relevance to this application are: The proposed relationship with Loampit Vale South and Prendergast Vale school and cumulative impact with those schemes and a consented Lewisham Gateway Scheme The percentage policy target for affordable housing has increased from 35% to 50% Policies have been re-structured with greater emphasis on carbon dioxide emissions (as opposed to energy), clearer targets on such emissions, greater emphasis on decentralised energy and less emphasis on renewable energy LBL policy calls for a minimum of Code for Sustainable Home Level 4 (rather than 3) and for non-residential development to meet BREEAM Excellent Draft Replacement London Plan and the Mayor of London s Interim Housing Design Guide include minimum housing size standards (which are in some cases more demanding than those in LBL s Residential Standards SPD) Residential cycle parking standards have increased Draft Replacement London Plan calls for the inclusion of some Electric Vehicle Charging Points (EVCPs) TfL guidance has changed on travel planning, servicing and construction logistics
10 Draft London Plan calls for the smoothing of traffic flows and takes a tougher stance on the introduction of signal controlled junctions Minimum play space size guidance has been adopted Increased need for school places (particularly Primary) has been identified Air quality policies have been strengthened Flood modeling has been updated Guidance on appropriate planning obligations has been adopted to identify potential Section 106 contributions Those matters where policy objectives and guidance have not changed significantly since 2007 are: LBL policies/guidance relating to residential quality LBL policies relating to loss of business uses Indicative density guidelines within the London Plan policy LBL policies relating to the suitability of tall buildings in Lewisham Town Centre and the need for development to be of high quality design The need for mixed used development The suitability of the site for retail development
CABINET. 8 June 2010 REPORT OF THE CORPORATE DIRECTOR OF FINANCE AND COMMERCIAL SERVICES
CABINET APPENDIX A 8 June 2010 REPORT OF THE CORPORATE DIRECTOR OF FINANCE AND COMMERCIAL SERVICES Title: Local Development Framework Adoption of Core Strategy Development Plan Document For Decision Summary
Manchester City Council Planning and Highways Committee 2 June 2011
Application Number 095804/FO/2011/N1 Date of Appln 21st Mar 2011 Committee Date 2nd Jun 2011 Ward Cheetham Ward Proposal Location Applicant Agent Installation of 929 square metre mezzanine floor area to
Alternatives and Design Evolution: Planning Application 1 - RBKC
3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan
Community Infrastructure Levy in Croydon. A guide
Community Infrastructure Levy in Croydon A guide February 2014 1 Contents 1. Introduction to the Community Infrastructure Levy... 2 2. Who will have to pay the CIL... 2 3. How much is the CIL?... 3 4.
Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms
Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable
Sovereign Court, The Highway, Wapping Change of Use Consent. Councillor David Edgar, Cabinet Member for Resources
Cabinet 28 July 2015 Report of: Corporate Director, Development & Renewal Classification: Unrestricted Sovereign Court, The Highway, Wapping Change of Use Consent Lead Member Originating Officer(s) Wards
Charging for Pre-Application Advice. Guidance Note London Borough of Newham. March 2015
Charging for Pre-Application Advice Guidance Note London Borough of Newham March 2015 This guidance note provides information regarding the Council s preapplication advice service and the relevant charges.
FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT
FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT Canterbury City Council January 2008 1 APPLICATION OF THE PPS25 SEQUENTIAL AND EXCEPTION TESTS 1.0
Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009
Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Application No. 09/00389/LP - 51-61 Whytecliffe Road South, Purley, CR8 1. SUMMARY 1.1 This report concerns
Proposed review of service charges in London Appendix 1
The issues Service charges are payable by most people who live in leasehold properties and also by some private rented sector tenants. In London there are more than 500,000 households that pay these charges.
Richmond upon Thames College. Draft Planning Brief. May 2008
Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of
Pre Application Advice Charging Scheme and Post Application Service Introduction (1 st February 2014)
Pre Application Advice Charging Scheme and Post Application Service Introduction (1 st February 2014) The Development Control Service is responsible for providing planning advice, processing planning applications
The subject matter of this report deals with the following Council Objectives
REGULATORY SERVICES COMMITTEE 4 JUNE 2015 Subject Heading: REPORT Revision to committee resolutions to grant planning permissions subject to S106 Planning Obligation requiring infrastructure contribution.
London Borough of Lewisham Pre-application Advice
London Borough of Lewisham Pre-application Advice October 2010 If you have any queries regarding this guidance, please contact us: Planning Department Directorate of Regeneration, Laurence House, 1 Catford
Annex A: Examples of S106 re-negotiation. 1. Ashford Borough Council
Annex A: Examples of S106 re-negotiation. 1. Ashford Borough Council Ashford was approached by the developers of a key site which has permission for a development of 1100 dwellings. The original section
January 2016. Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH
January 2016 Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH Pre-planning application advice service The city council is committed
A Guide to Pre-Application Advice and Fees and Planning Performance Agreements
A Guide to Pre-Application Advice and Fees and Planning Performance Agreements V3 Sept 2014 Contents 1. Introduction 2. The Benefits of Pre-Application Advice 3. How do I obtain pre-application advice?
Subject: Appointment of a Rapporteur to Review Service Charges in London
Subject: Appointment of a Rapporteur to Review Service Charges in London Report to: Business Management and Administration Committee Report of: Executive Director of Secretariat Date: 20 July 2011 This
Property & Asset Maintenance Business Unit Service Plan 2015/16
Business Unit Leader: Emma Grundy Head of Service: Tom Clark 1. Service Objectives for 2015/16 Property & Asset Maintenance Business Unit Service Plan 2015/16 Issue Work to be undertaken Impact / outcome
Page 117. DEVELOPMENT CONTROL COMMITTEE - Date:1 September 2010. Report of the Executive Head of Planning and Transportation.
Page 117 Agenda Item 10 DEVELOPMENT CONTROL COMMITTEE - Date:1 September 2010 Report of the Executive Head of Planning and Transportation. Ref: A2010/63099/ADV WARD: A03 / STONECOT Time Taken: 5 weeks,
Sustainability Appraisal of the Lichfield Local Plan: Strategy
Lichfield District Council Sustainability Appraisal of the Lichfield Local Plan: Strategy Post Adoption Statement February 2015 U R S U S C O N S U L T I N G L T D Quality Management URSUS Consulting Ltd
Pre-Application Planning Advice: Guidance Note
Pre-Application Planning Advice: Guidance Note Introduction Eastleigh Borough welcomes and encourages discussion before a developer or landowner submits a planning application and is committed to providing
Pre-application advice from the Planning and Development Service at Torridge District Council.
Pre-application advice from the Planning and Development Service at Torridge District Council. April 2015 Why seek pre-application advice? Open and constructive discussions are an opportunity for the Local
Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive.
planning report D&P/2857b/01 30 November 2015 Bollo Lane, Chiswick Business Park and Colonial Drive, Chiswick in the London Borough of Ealing planning application no. PP/2015/5442 Strategic planning application
How To Develop The Kingsgate Business Centre
Kingsgate Business Centre Employment Report Introduction The subject property comprises serviced offices arranged over two floors within a building in the north side of Kingsgate Road. It is served by
Planning Officers Society
Planning Officers Society Spring Conference: Working in Partnership 15 May 2014 Stewart Murray Assistant Director Planning Email: [email protected]; Mayor s 2020 Vision Global Leading City Double
Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants
Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder
Draft London Plan Early Minor Alterations Mayor s response to comments at Assembly & Functional Bodies consultation stage
Summary The consultation ran from 7 th November to 20 th December 2011 and generated 15 responses. 1 Transport for London Welcome alterations, particularly greater provision for cycle parking for office
4 Alternatives and Design Evolution
4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that
approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a
3.0 Planning Policies
3.0 Planning Policies 3.1 National Policy 3.1.1 Government Planning Policy Guidance Notes (PPGs), and Planning Policy Statements (PPSs) provide the background to most aspects of the planning system. The
Welcome & background. www.theperfumefactory.info
Welcome & background Essential Living welcomes you to this community involvement event introducing the proposed redevelopment of The Perfume Factory, North Acton. EXISTING SITE PLAN AERIAL VIEW OF SITE
DEVELOPMENT MANAGEMENT
DEVELOPMENT MANAGEMENT Sub Heading Sub Heading 2 march 2012 PRE APPLICATION ADVICE SERVICE FOR PLANNING APPLICATIONS Introduction CONTACT DETAILS Telephone 0191 433 3416 / 0191 433 3426 Fax 0191 477 8422
The land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340.
SITE DESCRIPTION The site is occupied by a large single dwelling house which was built in 2007. The building is surrounded by large trees and has a substantial rear garden. The land is allocated within
Hertsmere House, Columbus Tower
planning report PDU/2350/01 25 February 2009 Hertsmere House, Columbus Tower in the London Borough of Tower Hamlets planning application no. PA/08/02709 & PA/08/02710 Strategic planning application stage
Elephant & Castle Regeneration TRADERS CHARTER
Elephant & Castle Regeneration TRADERS CHARTER June 2007 Elephant and Castle Shopping Centre Tenants Association 1 Elephant & Castle Regeneration TRADERS CHARTER June 2007 As small business traders at
Camden Development Policies
Camden Local Development Framework Camden Development Policies Adoption version 2010 1 CAMDEN LOCAL DEVELOPMENT FRAMEWORK CAMDEN DEVELOPMENT POLICIES Camden Development Policies 2010 Introduction 1. Location
Guildford borough Local Plan Local Development Scheme 2015
Guildford borough Local Plan Local Development Scheme 2015 Summary The Local Development Scheme (LDS) is the timetable and project plan for the new Guildford borough Local Plan. The LDS explains what documents
Proposal for a Demonstration Exemplar at British Sugar, York
Executive 21 July 2009 Report of the Director of City Strategy URBAN ECO SETTLEMENT Proposal for a Demonstration Exemplar at British Sugar, York Summary 1. This paper outlines a proposal for funding a
TRANSPORT FOR LONDON BOARD CROXLEY RAIL LINK PROPOSED TRANSPORT AND WORKS ACT ORDER
AGENDA ITEM 8 TRANSPORT FOR LONDON BOARD SUBJECT: CROXLEY RAIL LINK PROPOSED TRANSPORT AND WORKS ACT ORDER DATE: 7 DECEMBER 2011 1 PURPOSE AND DECISION REQUIRED 1.1 The purpose of this paper is to update
Corporate Director Environment and Community Services
CABINET Meeting date: 27 November 2014 From: Corporate Director Environment and Community Services RESPONSE TO SOUTH LAKELAND DISTRICT COUNCILS COMMUNITY INFRASTRUCTURE LEVY REGULATION 16 CONSULTATION
Community and Housing - Empty Property Strategy
Community and Housing - Empty Property Strategy Strategic Objective: Epsom and Ewell Borough Council is committed to minimising the number of empty homes in the Borough The Council is committed to a Corporate
EVENT GUIDE. Oxfordshire s biggest affordable homes show. Help to Buy South. The Kassam Stadium, Autumn 2014 SHARED OWNERSHIP HELP TO BUY RENT TO BUY
Oxfordshire s biggest affordable homes show SHARED OWNERSHIP HELP TO BUY RENT TO BUY Help to Buy South The Kassam Stadium, Autumn 2014 EVENT GUIDE Find out about homes and schemes available, including
Empty Dwelling Management Orders Guidance for residential property owners on new powers available to local councils. housing
Empty Dwelling Management Orders Guidance for residential property owners on new powers available to local councils housing Contents Some facts about empty properties 3 New powers for local councils to
BELVEDERE EMPLOYMENT AREA LINK ROAD SCHEME, ERITH COMPULSORY PURCHASE ORDER
PUBLIC CABINET 7 APRIL 2009 BELVEDERE EMPLOYMENT AREA LINK ROAD SCHEME, ERITH COMPULSORY PURCHASE ORDER ISSUES The Belvedere Employment Area Link Road Scheme will require land not owned by the Council.
Kings Lynn B SoS Decision Letter. The Proposed Palm Paper CCGT 3 Order. Proposed Combined Cycle Gas Turbine by Palm Paper Ltd
Proposed Combined Cycle Gas Turbine by Palm Paper Ltd The Proposed Palm Paper CCGT 3 Order Palm Paper Mill, Saddlebow Industrial Estate, King s Lynn PINS Ref: EN010039 Document Ref: 12.11 Kings Lynn B
LONDON BOROUGH OF TOWER HAMLETS MINUTES OF THE DEVELOPMENT COMMITTEE HELD AT 7.30 P.M. ON WEDNESDAY, 22 AUGUST 2007
LONDON BOROUGH OF TOWER HAMLETS MINUTES OF THE DEVELOPMENT COMMITTEE HELD AT 7.30 P.M. ON WEDNESDAY, 22 AUGUST 2007 COUNCIL CHAMBER, 1ST FLOOR, TOWN HALL, MULBERRY PLACE, 5 CLOVE CRESCENT, LONDON, E14
KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156
APPENDIX C KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005 YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 REPORT BY HEAD OF PLANNING AND DEVELOPMENT SUMMARY
Scottish Homeowners Property Factors Toolkit
Scottish Homeowners Property Factors Toolkit Govan Law Centre, Glasgow, 2013. 1 Scottish Homeowners Property Factors Toolkit Are you unhappy with the service you are getting from your factor in Scotland?
PLANNING STATEMENT. Somerset House / 14 Elmtree Road Teddington. on behalf of Ashill Developments Ltd. May 2010
PLANNING STATEMENT Somerset House / 14 Elmtree Road Teddington on behalf of Ashill Developments Ltd May 2010 2827 UK House, 82 Heath Road, Twickenham, Middlesex TW1 4BW T 020 8843 8211 F 020 8843 8219
Empty Dwelling Management Orders Guidance for residential property owners. housing
Empty Dwelling Management Orders Guidance for residential property owners housing Contents Introduction 2 Summary 3 Key facts for property owners 4 Making of Empty Dwelling Management Orders 5 Money Matters
APRIL 2015 CARE AND SUPPORT CHARGING POLICY
APRIL 2015 CARE AND SUPPORT CHARGING POLICY London Borough of Barking and Dagenham Care and Support Fairer Charging Policy 1.0 Introduction 1.1 The Care and Support Charging Policy is designed that the
How To Buy A Building In South East London For \U00A31.5M
Regent House, 291 307 Kirkdale Sydenham SE26 Freehold mixed use investment/development opportunity for sale. Kinleigh Folkard & Hayward kfh.co.uk COMMERCIAL PROPERTY Executive summary 03 Excellent mixed
Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.
P/2010/1404/MPA St Marychurch Ward Former G A Insurance Buildng, Greenway Road/St Marychurch Road, St Marychurch Torquay Demolition of former G A building; formation of up to 7 retail units for purposes
Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government
Planning Act 2008: Guidance on Changes to Development Consent Orders December 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement rests
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site
K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
Housing and Planning Bill
EXPLANATORY NOTES Explanatory notes to the Bill, prepared by the Department for Communities and Local Government, are published separately as Bill 7 EN. EUROPEAN CONVENTION ON HUMAN RIGHTS Secretary Greg
Keeping pets in strata schemes. Your questions answered.
Keeping pets in strata schemes. Your questions answered. A PROJECT OF THE NSW YOUNG LAWYERS ANIMAL RIGHTS COMMITTEE This guide has been prepared for information purposes only. It should not be taken or
Vote on for a: PUTTING PEOPLE FIRST
Vote on for a: PUTTING PEOPLE FIRST Guildford Borough Council Liberal Democrat Manifesto May 2015 A Fair Local Plan Liberal Democrat councillors aim to develop a fair Local Plan to raise the quality of
GUIDANCE ON PRE APPLICATION ADVICE
Issued 21 st May 2014 1. Introduction GUIDANCE ON PRE APPLICATION ADVICE 1.1 In line with national planning policy, the Council welcomes and encourages discussion before a developer submits an application
SELLING YOUR PROPERTY
SELLING YOUR PROPERTY WHAT DO I NEED TO KNOW? Whether you decide to sell your property yourself or use an estate agent, you will find in today s climate it is difficult to sell your property. When you
Pre-Application Planning Advice
Pre-Application Planning Advice Guidance Note and Schedule of Fees Regeneration and Planning (Development Management) December 2014 The Development Management Service is responsible for the determination
Page 69. Sutton Living Business Plan and Loan Agreement. Mary Morrissey, Strategic Director of Environment, Housing and Regeneration
Page 69 Agenda Item 5b Report to: Opportunity Sutton Limited Sub- Committee Date: 4 August 2015 Report title: Report from: Ward/Areas affected: Chair of Committee/Lead Member: Author(s)/Contact Number(s):
Long Ditton Ward: Alex King Expiry Date: 24/03/2010 Location:
Application No: 2009/2315 Application Type: FULL Case Officer: Long Ditton Ward: Alex King Expiry Date: 24/03/2010 Location: Kingston House Portsmouth Road Thames Ditton Surrey Proposal: Variation of Condition
Cabinet Member (Finance and Resources) (Gary Layzell)
Agenda Item No. REPORT TO: Cabinet Member (Finance and Resources) DATE: 25 March 2015 SERVICE AREA: REPORTING OFFICER: SUBJECT: WARD/S AFFECTED: FORWARD PLAN REF: Finance Benefits Services Manager (Gary
Guidance on Non-Material Amendments and Minor Material Amendments
Minerals and Waste Forum Implementation Planning Advisory Group Guidance on Non-Material Amendments and Minor Material Amendments April 2012 1 Non-Material Amendments and Minor Material Amendments 1) Non-material
Application for Outline Planning Permission with All Matters Reserved Town and Country Planning Act 1990
Application for Outline Planning Permission with All Matters Reserved Town and Country Planning Act 1990 1. Applicant Name and Address Please enter the Applicant Details, including full name and title.
Student accommodation and affordable housing contributions
Section 106 Planning obligations speeding up negotiations Student accommodation and affordable housing contributions Government Response to consultation March 2015 Department for Communities and Local
PLANNING SUPPORT STATEMENT. 29 Fernshaw Road, London SW10 0TG MRS. GAIL TAYLOR & MRS. KAREN HOWES. Prepared For TR/6570
PLANNING SUPPORT STATEMENT 29 Fernshaw Road, London SW10 0TG Prepared For MRS. GAIL TAYLOR & MRS. KAREN HOWES November 2012 Contents 1 INTRODUCTION 1 THE APPLICATION PROPERTY AND SURROUNDING AREA 1 RELEVANT
CHANGE MANAGEMENT POLICY AND PROCEDURE
CHANGE MANAGEMENT POLICY AND PROCEDURE This Change Management Policy and Procedure contains guidance to managers and staff who are involved in the development and implementation of changes in working arrangements
GOVERNANCE COMMITTEE 16 JULY 2014
23 GOVERNANCE COMMITTEE 16 JULY 2014 3 STATE GOVERNMENT LEGISLATIVE REVIEW - WORK HEALTH & SAFETY ACT 2011; WORK HEALTH AND SAFETY REGULATION 2011; WORKERS COMPENSATION AND REHABILITATION ACT AND WORKERS
Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road.
WELCOME Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road. The site covers approximately 0.37 hectares and
Development Management Report
Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: [email protected] Tel: 01743 252665 Fax:
Date: 9 July 2013. Development Management planning application: Application 13/AP/0277 for: Full Planning Permission
Item. 7.3 Classification: OPEN Date: 9 July 2013 Meeting Name: Planning Sub-Committee B Report title: Development Management planning application: Application 13/AP/0277 for: Full Planning Permission Ward(s)
Policy & Resources Committee 9 July 2015. Delegating a proportion of Community Infrastructure Levy (CIL) income to the Council s Area Committees
Policy & Resources Committee 9 July 2015 Title Delegating a proportion of Community Infrastructure Levy (CIL) income to the Council s Area Committees Report of Director of Strategy Wards All Status Public
ADVICE NOTE BUYING AND SELLING YOUR FLAT. A summary of the typical events when buying and selling a leasehold flat
ADVICE NOTE BUYING AND SELLING YOUR FLAT A summary of the typical events when buying and selling a leasehold flat 2 CONTENTS Note: As the leading trade body for residential leasehold management, ARMA is
21 Plumbers Row, London, E1 1EQ
Committee: Development Date: 19 th October 2011 Classification: Unrestricted Agenda Item No: Report of: Corporate Director of Development and Renewal Case Officer: Shahara Ali-Hempstead Title: Planning
291 Harrow Road / 1-2 Elmfield Way and adjoining land, London W9
291 Harrow Road / 1-2 Elmfield Way and adjoining land, London W9 planning brief Supplementary Planning Document Adopted November 2011 Document title: 291 Harrow Road, 1-2 Elmfield Way and adjoining land
London: the Plan for growth
A presentation for London: the Plan for growth Key development issues for London First Faraz Baber MRTPI MRICS FRSA What I plan to cover London Plan Crossrail: Mayoral CIL Charging Schedule Localism Bill
LONDON ROAD SEVENOAKS
WELCOME TO THE BERKELEY HOMES EXHIBITION Train Station Gr anv i ll e Dar tford Road Lo ad Ro nd on ad Ro Eard SITE Th ed riv e ley R oad on R oad A 224 Gord Pem b rok e Roa d Site Location Since the submission
Cycle storage provision in new dwellings Advice Note: London Borough of Waltham Forest
Cycle storage provision in new dwellings Advice Note: London Borough of Waltham Forest Contents 1.0 Introduction and Policy Background Page 3 2.0 Objectives Page 7 3.0 Cycle storage solutions Page 11 4.0
Site No 17 Former Weston Vinyls Site, Frome Location
Location Former Weston Vinyls site is situated on the A362 Vallis Road in the Western Part of Frome. The surrounding uses are primarily residential with residential to the North East and West. The Vallis
HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE
HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE Item no: 7.1 Document Reference No: EX/12/91 Date of Meeting / Decision: 12 December 2012 This is not a key decision call-in on the grounds of urgency Urgency: