Optimal outpatient appointment scheduling
|
|
|
- Ashlee Allen
- 9 years ago
- Views:
Transcription
1 Health Care Manage Sc (27) 1: DOI 1.17/s Optmal outpatent appontment schedulng Gudo C. Kaandorp Ger Koole Receved: 15 March 26 / Accepted: 28 February 27 / Publshed onlne: 23 May 27 Sprnger Scence + Busness Meda, LLC 27 Abstract In ths paper optmal outpatent appontment schedulng s studed. A local search procedure s derved that converges to the optmal schedule wth a weghted average of epected watng tmes of patents, dle tme of the doctor and tardness (lateness) as obectve. No-shows are allowed to happen. For certan combnatons of parameters the well-nown Baley- Welch rule s found to be the optmal appontment schedule. Keywords Patent schedulng Health care Local search Multmodularty 1 Introducton Outpatent appontment schedulng has been the subect of scentfc nvestgaton snce the begnnng of the fftes of the prevous century when Baley and Welch wrote [1]. he obectve of appontment schedulng s tradng off the nterests of physcans and patents: the patents prefer to have a short watng tme, the G. C. Kaandorp Department of Epdemology & Bostatstcs, Erasmus Medcal Center, Rotterdam, he Netherlands G. Koole Department of Mathematcs, VU Unversty Amsterdam, Amsterdam, he Netherlands URL: oole G. Koole (B) Department of Mathematcs, Vre Unverstet, De Boelelaan 181a, 181 HV Amsterdam, Holland e-mal: [email protected] physcan les to have as lttle dle tme as possble, and to fnsh on tme. Baley and Welch [1] ntroduced the frst advanced schedulng rule and tested t through smulaton. Snce then many papers have appeared that analyzed appontment schedulng n varous settngs (see Cayrl and Veral [2] for an overvew). Most of them use smulaton to analyze the performance of dfferent appontment schedulng rules. A new method s ntroduced to determne optmal schedulng rules for arbtrary numbers of patents. Servce tme duratons are eponentally dstrbuted and patents arrve on tme. No-shows are allowed to happen. he settng s dscrete tme,.e., there s a fnte number of (equally spaced) potental arrval moments. A local search method s descrbed that, startng from an arbtrary appontment schedule, tres to fnd neghborng appontment schedules that are better. From Koole and Van der Slus [7] t follows that when the obectve has a certan property related to convety (called multmodularty) then a locally optmal schedule s globally optmal. he man techncal result of ths paper s the proof that our obectve s ndeed multmodular. hs obectve s a weghted sum of the average epected patent watng tme, the dleness of the doctor durng the sesson length, and the tardness. he tardness s the probablty that the sesson eceeds the planned fnshng tme multpled by the average ecess. he local search method s also mplemented and avalable for publc use on the world wde web at For bg nstances (many ntervals) the computaton tmes can be qute long. A faster local search method wth a smaller neghborhood s also mplemented. It s not guaranteed that t termnates wth a global optmum
2 218 Health Care Manage Sc (27) 1: soluton, but t gves very good results, also for bg nstances, wthn a reasonable amount of tme. We gve a short lterature overvew. he semnal paper on outpatent schedulng s Baley and Welch [1]. For an overvew of the results obtaned snce then, see Cayrl and Veral [2]. Roughly speang we can classfy the papers as follows: there are those that evaluate schedules (often usng smulaton) and those that desgn algorthms to fnd good schedules. A recent eample of the former, not ncluded n [2], s Hutzschenreuter [6]. In addton to no-shows she consders patents not arrvng on tme, and noneponental servce tmes. hose papers that present algorthms to desgn schedules can also be dvded n two: those that focus on contnuous tme, whch deal wth fndng the optmal nterarrval ntervals, and those that focus on dscrete tme, where the queston s how many arrvals should be scheduled at each potental arrval moment. Pegden and Rosenshne [1] consder a contnuous-tme model. her algorthm fnds the optmal arrval moments, assumng convety of the obectve n the nterarrval tmes. Also Lau and Lau [8]gve a procedure for fndng optmal arrval nstants, agan assumng convety. Hassn and Mendel [5] etend ths wor to no-shows. Wang [16, 17] proves optmalty, for phase-type servce-tme dstrbutons, but for a lmted number of patents. Denton and Gupta [3] formulate the problem as a two-stage stochastc lnear program. her algorthm s a good approach for qucly appromatng large-scale systems. Also Robnson and Chen [12] consder a stochastc lnear program. hey derve a fast heurstc for fndng good and robust nterarrval tmes, usng the fact that nterarrval tmes are dome-shaped, meanng that they are shorter at the begnnng and near the end of the sesson, and longer n the mddle. Let us now consder papers that are most relevant to the current wor as they are dealng wth dscrete tme,.e., a fnte number of potental arrval moments. In Lao et al. [9] a branch-and-bound method s used to fnd the optmal schedule. hs wors only for small nstances. Vanden Bosche, Detz and Smeon [15] use a method that resembles the method of ths paper n a number of ways. hey derve upper and lower bounds for the optmal appontment schedule. o show these bounds they use what they call submodularty (Lemma 1 of [15]), whch s n fact multmodularty on a subset of the equatons that we use (see the append). Usng the results of [15] upper and lower bound schedules (whch often concde) can be made startng from specfc schedules. Our results gve convergence to the optmal schedule startng from any schedule. he results of [15] are etended to dfferent types of patents n Vanden Bosche and Detz [13], and also to no-shows n Vanden Bosche and Detz [14]. he ncluson of dfferent types of patents s relatvely straghtforward, the sequence s optmzed usng local search, and for each sequence the optmal schedule s determned usng the method of [15]. Also our proofs nowhere use the fact that servce tmes are equally dstrbuted. Summarzng, compared to the wor of Vanden Bosche and coauthors, our stronger sub/multmodularty results allow us to formulate an algorthm that converges from any ntal schedule to the optmal one. he paper s structured as follows. In Secton 2 a model s defned, n whch we can compute for an arbtrary appontment schedule the obectve. In Secton 3 the local search algorthm s descrbed. Secton 4 s devoted to numercal results. he proof that our obectve s multmodular s gven s Append A. 2 Model For the schedulng problem we have to ntroduce some varables. A treatment/operaton room s operatonal durng ntervals wth length d (for eample a day from 8: am tll 4: pm splt n ntervals wth length 1 mn gves = 48 and d = 1). Wthn these ntervals a total of N patents should be scheduled. Patent servce tmes are assumed to be eponentally dstrbuted wth rate (and epectaton 1 ). Let t {,...,N} be the number of patents scheduled at the start of nterval t. A schedule s a vector ( 1,..., ) wth t=1 t = N. So we have: β = 1 : average servce tme : number of ntervals d: length of nterval N: total number of patents t : number of patents scheduled at the start of nterval t, t = 1,..., In the model we mae the followng assumptons: he servce tmes of patents are ndependent and eponentally dstrbuted. Patents always come on tme (no-shows are modeled later on). In the followng sectons we wll gve the formulas for calculatng for a gven schedule the mean watng tme, dle tme and tardness (lateness), whch we call W(), I() and L(), respectvely. o compare schedules we gve weghts α W, α I,andα L to the three man factors to obtan the overall obectve functon C() = α W W() +
3 Health Care Manage Sc (27) 1: α I I() + α L L(). Our problem can now be stated as follows: { mn α W W() + α I I() + α L L() t t = N t N } (1) For a gven schedule ( = ( 1,..., )) the probabltes of havng patents n the queue ust before new arrval(s) and ust after arrval(s) can be calculated. hs can be used to calculate the mean watng tme, dle tme and tardness. We ntroduce the followng notaton: p t ()=P ( patents n queue ust before the arrval(s) at nterval t ) and p t +()=P( patents n queue ust after the arrval(s) at nterval t ). We start empty, thus p 1 () = 1. Iteratvely the other probabltes can be calculated as follows: p 1 () 1, p t +( ) =, < t, p t +( ) = p t ( t ), t, p (t+1) () = N = p t +()b, p (t+1) ( ) = N = p t +()a,. where a = P(# potental departures = ) = (d) e d! and 1 b = P(# potental departures ) = 1 a. Because of the eponental servce tme dstrbutons the potental number of departures n any nterval has a Posson dstrbuton. 2.1 Mean watng tme of a patent If a patent arrves and fnds patents n the queue (ncludng the patent who s currently beng treated), then the mean watng tme of that patent wll be /. In our model patents arrve ust before a new nterval alone or n groups. he th one of that group has a mean watng tme of N = p t ( ) ( + 1) 1.hss ust the mean watng tme of one patent, so we must sum them all over the groups and ntervals an dvde = that through all N patents. hus we fnd the followng formula for the mean watng tme: W() = 1 N t N p t ( ) ( + 1) 1 t=1 =1 = 2.2 Mean dle tme of a doctor (2) For calculatng the mean dle tme of a doctor, we calculate frst the mean maespan M(), whch s the tme the last patent fnshes. hen t s easy to fnd the mean dle tme I(), because I() = M() N/. Set t {ma t t > }. Now we now for sure that the maespan s greater than ( t 1)d. he dstrbuton of the number of patents n the queue at tme t s nown. So the average maespan s M() = ( t 1)d + N p t +( ). =1 So now we obtan the followng formula for the mean dle tme: I() = ( ( t 1)d Mean tardness N ) p t +( ) N =1 (3) For the mean tardness of the day we loo at the end of the last nterval. Now f there are patents n queue, then the etenson s on average 1. We now the patent dstrbuton ust after the last nterval, sothe tardness functon s as follows: L() = N p (+1) ( ) =1 2.4 Includng no-shows (4) We can add no-shows to our model. hs s an mportant generalzaton as no-shows occur frequently n practce. Every patent now has a probablty ρ of not showng up. We assume that ρ s the same for all patents and that the patents are ndependent. hus the number of arrvals at tme t has a Bnomal( t,ρ) dstrbuton. hs changes the formulas used n the model as follows. p t () remans the same. p t +() s somewhat dfferent, because t s not nown how many patents are eactly comng. We must sum over the dstrbuton
4 22 Health Care Manage Sc (27) 1: Fg. 1 Base-case scenaro wth dfferent weghts αw=.5 2 αw=1 αw=2 αw=1 8: 8:1 8:2 8:3 8:4 8:5 9: 9:1 9:2 9:3 9:4 9:5 1: 1:1 1:2 1:3 1:4 1:5 11: 11:1 11:2 11:3 11:4 11:5 of how many patents wll be arrve. hs gves for p t () and p t +(): p 1 () 1, p t +( ) = t = ( t ) ρ t (1 ρ) p t ( ),, p (t+1) () = N p t +()b, = p (t+1) ( ) = N p t +()a,. = Mean watng tme of a patent For the mean watng tme, for all ntervals we must addtonally sum the watng tme over the dstrbuton of the number of arrvng patents. hs gves the followng equaton: W() = 1 N(1 ρ) ( =1 t t=1 =1 N = ( t p t ( ) Mean dle tme of a doctor ) ρ t (1 ρ) ) (5) Agan we frst calculate the maespan. Now we do not now when the last patent s comng. But we can calculate the probablty that the last patent s comng at nterval t. hs probablty s P(last patent s comng at nterval t) = P(all patents after nterval t are no-shows) P(# arrvals at tme t 1) = ρ N t =1 (1 ρ t ). If the last patent s comng at nterval t, we now for sure the maespan s greater than (t 1)d.ocalculate the ecess after nterval t, we sum over the dstrbuton of the number of patents that come (havng n mnd that at least one patent comes) tmes the mean ecess. What we fnd s then: M()= P(last patent s comng at tme t) t: t > E(mean maespan last patent s comng at tme t) = ρ N t =1 (1 ρ t ) t: t > ( t (t 1)d + N = =1 p t () + ( t ) ρ t (1 ρ) 1 ρ t he mean dle tme s then gven by: I() = M() N(1 ρ) 1 (6) he queston can be ased how mportant ths mean dle tme s, because now the tme between the real last patent and the last planned patent s not added as dle tme. So n the case of no-shows the dle tme s less relevant as obectve and should have a relatvely low weght Mean tardness he formula of the mean tardness s the same (of course wth the new probabltes p t () and p t +()). ) able 1 Outcome values for dfferent schedules α W =.5 α W = 1 α W = 2 α W = 1 Indvdual Baley Welch Mean watng tme Mean dle tme Mean tardness Obect value (α W =.5) Obect value (α W = 1) Obect value (α W = 2) Obect value (α W = 1)
5 Health Care Manage Sc (27) 1: Fg. 2 a Optmal schedules (ρ aganst β) b Optmal schedules (N aganst β) c Optmal schedules (N aganst ρ) a ρ=, β=18 ρ=.1, β=2 ρ=.25, β=24 ρ=.5, β=36 2 b N=8, β=25 N=1, β=2 N=16, β=12.5 N=2, β=1 8: 8:1 8:2 8:3 8:4 8:5 9: 9:1 9:2 9:3 9:4 9:5 1: 1:1 1:2 1:3 1:4 1:5 11: 11:1 11:2 11:3 11:4 11:5 c N=9, ρ= N=1, ρ=.1 N=12, ρ=.25 N=18, ρ=.5 2 8: 8:1 8:2 8:3 8: 8:4 8:1 8:2 8:3 8:4 8:5 9: 9:1 9:2 9:3 9:4 9:5 1: 1:1 1:2 1:3 1:4 1:5 11: 11:1 11:2 11:3 11:4 11:5 8:5 9: 9:1 9:2 9:3 9:4 9:5 1: 1:1 1:2 1:3 1:4 1:5 11: 11:1 11:2 11:3 11:4 11:5 3 Local search o compute the schedule wth the lowest obectve value we could try all possble schedules (the soluton space) and loo whch one has the lowest obectve value. But the number of all possble schedules s huge (t s ( ) N+ 1 N ), so we need a search algorthm to reduce the computaton tme. A local search algorthm starts wth a feasble soluton and tres teratvely to mprove the current soluton by searchng a better soluton n ts neghborhood untl a local mnmum s found. In general the local mnmum s not a global mnmum, but for the current problem and a well-chosen neghborhood t s possble to show that the local search algorthm fnshes n the global mnmum. We ntroduce our neghborhood. Defne the vectors u 1, ( 1,,...,, 1), u 2, (1, 1,,...,), u 3, (, 1, 1,,...,), =,.. u 1, (,...,1, 1, ), u (,...,, 1, 1) and tae V ={u 1,...,u }. As the neghborhood of schedule we tae all vectors of the form + v v wth v 1,...,v V such that + v 1 + +v. hen the algorthm s as follows. Algorthm for computng an optmal schedule 1. Start wth some schedule 2. For all U V : for y = + v U v such that y compute C(y); f C(y) <C() then := y and start agan wth step 2 3. s the optmal schedule A vector u t can be nterpreted as movng a patent from tme slot t to tme slot t 1. hus the neghborhood of conssts of all combnaton of sngle-nterval shfts startng from. In Append A we prove that wth ths neghborhood the local search algorthm converges to the global optmal soluton. In the onlne tool we also mplemented a smaller neghborhood that gves much faster results. Under ths opton we smply tae y = + u for all u U n step 2 of the algorthm, thus we only consder U wth U =1. able 2 Outcome values(ρ aganst β) ρ =, β = 18 ρ =.1, β = 2 ρ =.25, β = 24 ρ =.5, β = 36 Mean watng tme Mean dle tme Mean tardness Obect value
6 222 Health Care Manage Sc (27) 1: able 3 Outcome values(n aganst β) N = 8,β = 25 N = 1,β = 2 N = 16,β = 12.5 N = 2,β = 1 Mean watng tme Mean dle tme Mean tardness Obect value Numercal eamples In ths secton we gve some numercal eamples. All these computatons were done wth our webtool whch s avalable for epermentaton at math.vu.nl/healthcare/software/ges. Let the followng be the base-case scenaro. A medcal practce s operatonal between 8: am and 12: am. We splt ths nterval up n 48 ntervals of 5 mn. hus = 48 and d = 5. A treatment duraton s on average 2 mn (1/ = 2) and the percentage of noshows s 1% (ρ =.1). We want to plan ten patents (N = 1). o analyze ths model wth the small neghborhood (whch s not guaranteed to gve the optmal soluton) too a few seconds, analyzng the full neghborhood (what we dd for all cases consdered n ths secton) too around 12 h for each nstance. Frst we compute for base-case scenaro the the optmal schedule, for dfferent weghts n our obectve functon. he weght for the tardness s taen 1 (α L = 1), for the dle tme t s taen.2 (α I =.2). he dle tme has a relatvely low weght because of the noshows. We too four dfferent weghts for α W (.5, 1, 2, and 1), and determned the optmal schedules for each of these cases. he schedules are gven n Fg. 1. It s seen that f the watng tme has gven a bgger weght then the patents are more spread out to the end of the schedule, as one would epect. In the optmal schedule wth α W =.5 there are two patents scheduled at the begnnng of the day. Note that the optmal schedule for α W =.5 s close to the Baley Welch rule. In all cases the tmes between consecutve arrvals frst ncreases and then decreases agan. hs s the dome-shaped form that we dscussed n the lterature overvew. o have a better loo on the results we compare the optmal schedules wth two estng schedules: the ndvdual bloc schedule and the Baley Welch rule. Wth the ndvdual bloc schedule the worng day s dvded n the same number of ntervals as there are patents. In each bloc eactly one patent s scheduled. he Baley Welch rule s smlar as the ndvdual bloc schedule, but wth the last patent moved to the begnnng of the day. So n our base-case scenaro the ndvdual bloc schedule and the Baley Welch rule plan every 24 mn a patent, wth the ecepton that the Baley Welch rule schedules two patents at 8: am and none at 11:36 am. he results of the schedules are gven n able 1. he optmal schedules are of course better than the two estng schedules, but t can been seen for α W = 2 that the Baley Welch schedule s almost as good as the optmal one. Now we wll loo what happens wth the optmal schedules f we change some parameters. he changes are chosen such that the total worload does not change. he worload for the base-case scenaro s Nβ(1 ρ)=1 2.9=18 mnutes. We change the parameters two at a tme, ρ and β, N and β,andn and ρ, respectvely. Let α W = 2 and the other parameters fed as n the base-case scenaro. he optmal schedules are gven n Fg. 2. he correspondng outcome values are shown n ables 2, 3, 4. From able 2 we see that f ρ becomes larger (thus β decreases) the mean watng tme, dle tme and tardness all becomes larger, because of the hgher uncertanty. From the results of able 3 t s seen that f β becomes smaller (thus N ncreases) then the mean watng tme, dle tme and tardness all becomes smaller because of reduced uncertanty. he results of able 4 show us that f ρ becomes larger (thus N decreases) the able 4 Outcome values(n aganst ρ) N = 9, ρ = N = 1, ρ =.1 N = 12, ρ =.25 N = 18, ρ =.5 Mean watng tme Mean dle tme Mean tardness Obect value
7 Health Care Manage Sc (27) 1: mean watng tme, dle tme and tardness all becomes larger because of the hgher uncertanty. A fnal change n parameters would be changng and d. hs would evdently lead to more smultaneous arrvals. 5 Conclusons In ths paper a method s presented to obtan optmal outpatent schedules n case of a fnte number of possble arrval epochs. he proof of the optmalty reles on showng that the obectve s multmodular, whch s a generalzaton of convety to lattces. Numercal results are presented. he nterarrval tmes have a dome shape, as observed earler n the lterature: the frst nterarrval tmes are short, then they get longer, and become agan short. Note that n certan cases the optmal rule s close to the Baley-Welch rule. For certan parameter values the Baley-Welch rule s ndeed optmal. Acnowledgements he authors would le to than the three anonymous referees for ther valuable suggestons. Append A: Local search method o prove that the local search algorthm converges to the global optmum, we frst show that our obectve functon s multmodular. We start by defnng multmodularty. A.1 Multmodularty Multmodularty (Hae [4]) s a property of functons on Z m. Defne the vectors v,...,v m Z m as follows: v = ( 1,,...,) v 1 = (1, 1,,...,) v 2 = (, 1, 1,,...,). v m 1 = (,..., 1, 1) v m = (,...,, 1) Let V ={v,...,v m }.Now: Defnton A.1 A functon f : Z m R s called multmodular f for all Z m,v,w V,v = w, f ( + v) + f ( + w) f () + f ( + v + w) (7) Central n the theory of multmodular functons s the concept of an atom. Defnton A.2 For some Z m and σ a permutaton of {,...,m}, we defne the atom S(,σ) as the conve set wth etreme ponts + v σ(), + v σ() + v σ(1),..., + v σ() + +v σ(m). It s shown n Hae [4] that each atom s a smple, and each unt cube s parttoned nto m! atoms; all atoms together span R m. In Koole and Van der Slus [7] the followng theorem s shown. It forms the bass of our neghborhood choce. heorem A.3 For f multmodular, a pont Z m s a global mnmum f and only f f () f (y) for all y = such that y Z m s an etreme pont of S(,σ) for some σ. Our problem (1) sa 1 dmensonal problem: gven 1,..., 1 we derve by = N 1 t=1 t. We wll show that t has a multmodular obectve functon. he set of allowable solutons s gven by { Z 1, 1 t=1 t N}. hs doman s not equal to Z 1, so the queston arses f the local search algorthm stll converges to the global mnmum. Accordng Lemma 2 n Koole and Van der Slus [7] heorem A.3 remans vald for ths subset of Z 1. Provng that our obectve functon s multmodular for the 1- dmensonal problem (1) s equvalent to showng that the obectve functon n dmensons satsfes Eq. 7 for v, w V,where V = u 1, u 2, u 3,. u 1, u ( 1,,...,, 1), (1, 1,,...,), (, 1, 1,,...,), =.. (,...,1, 1, ), (,...,, 1, 1) Note that u t s nothng else then movng a patent from tme slot t to tme slot t 1. Now we show that our obectve functon s multmodular and that t can be mnmzed by a local search algorthm that s guaranteed to termnate n the global mnmum. Our neghborhood s the set of all possble combnatons of the vectors u t added to the current schedule. heorem A.4 he watng tme functon W(), the dle tme functon I() and the tardness functon L(), as defned n Eqs. 2, 3, and4, are multmodular for all u, u V for whch =.
8 224 Health Care Manage Sc (27) 1: Proof of heorem A.4 It s easy to see that f the maespan s multmodular then also the dle tme s multmodular. hus t s suffcent to show that the maespan, the watng tme and the tardness are multmodular. hus t has to be shown that W( + u ) + W( + u ) W() + W( + u + u ), M( + u ) + M( + u ) M() + M( + u + u ) and ( + u ) + ( + u ) L() + ( + u + u ) for every possble and wth 1 <. Weuse couplng (see Rghter [11]) for ths proof, to compare the dfferent schedules, + u, + u and + u + u. For every possble combnaton of and, all dfferent possbltes of patent flows are dstngushed to detect the dfference between the number of patents n queue for each schedule for each tme nterval. Frst the proof s gven for 2 <. In Fg. 3, dfferent paths are shown for the dfferent schedules. (A) Let us start wth Case A. Schedule (A1) and schedule (A3) are followng the same path untl tme 1. Also Schedule (A2) and schedule (A4) are followng the same path untl that tme. In Case A the queue emptes between tme and tme 1, sofromthattmeonall the paths are the same. hus ust before tme 1, there are say patents n queue. Let = + 1. hen ust after tme 1 there are patents n queue for schedules (A1) and (A2) and + 1 for schedules (A3) and (A4). hus after tme 1 schedule (A1) and schedule (A2) are followng the same path and also Case A he queue emptes somewhere (A1) -1 (A2) -1 +u +1 (A3) -1 +u +1 (A4) -1 Case B he queue emptes not # departures < # departures = # departures > l (B a 1) (B b 1) (B c 1) l-1-1 (B a 2) -1 (B b 2) -1 (B c 2) -1 +u +1 l+1 (B a 3) +1 1 (B b 3) +1-1 (B c 3) -1 +u -1 l -1 (B a 4) -1 (B b 4) -1 (B c 4) -1 Fg. 3 Case A & B (2 < )
9 Health Care Manage Sc (27) 1: (B) schedule (A3) and schedule (A4) are followng the same path. Now say that untl tme 1 schedule (A1) has a total watng tme α 1, then schedule (A3) also has that total watng tme α 1. Say that untl tme 1 schedule (A2) has a total watng tme α 2, then schedule (A4) has the same total watng tme. Just after tme 1 schedules (A1) and (A2) follow the same path, so they have the same total watng tme, say β 1. Schedule (A3) and (A4) also follow the same path, thus they also have the same total watng tme, say β 2. Now t s easy to see that the watng tme satsfes α 2 + β 1 (A2)+α 1 + β 2 (A3)=α 1 + β 1 (A1)+α 2 + β 2 (A4). For the maespan and tardness only the end of a day s mportant, so we want to now what happens at the end of the path of each schedule. Schedules (A1) and (A2) follow after tme 1 the same path, and therefore they have the same maespan and tardness. Schedules (A3) and (A4) follow after tme 1 the same path, therefore they also have the same maespan and tardness. So (A2)+(A3)=(A1)+(A4) for the maespan and the tardness. Now loo at Case B. he queue does not empty between tme and 1, so now ust before tme 1 t can be that for schedules (B2) and (B4) there s one patent less n queue, because one patent more could be treated (because the movement of one patent from tme to tme 1). Otherwse all dfferent schedules wll have the same number n queue and then Case A apples. So for schedule (B2) and (B4) there are then 1 patents n queue and for schedules (B1) and (B3) there are patents n queue. Concernng the watng tme, let us say agan that schedules (B1) and (B3) have a total watng tme of α 1 and that schedules (B2) and (B4) have a total watng tme of α 2. Defne agan = + 1. hen ust after tme 1 there are patents n queue for schedule (B1), 1 for schedule (B2), + 1 for path (B3), one more because of the movement of one patent from tme to tme 1 and for schedule (B4). Now we dstngush between the followng three possbltes for the number of departures between tme 1 an.letl = l +. (a) he number of departures s less than. For schedule (Ba1) there wll be say l( 1) patents left ust before tme and ust after tme t wll be then l. Let the total watng tme between tme 1 and be β and after tme γ 1. For schedule (Ba2) the number of patent s l 1 ust before tme. Soust after tme there are l 1 patents n queue and the total watng tme between tme 1 and s then β d and after tme γ 2. For schedule (Ba3) the number of patent s l + 1, ust before tme. Justafter tme there are l patents n queue (one patent less arrves) and the total watng tme between tme 1 and s then β + d and after tme agan γ 1. For schedule (Ba4) the number of patent s l, ust before tme. Just after tme there are l 1 patents n queue (one patent comes less) and the total watng tme between tme 1 and s agan β and after tme agan γ 2. Now we see that the watng tme satsfes α 2 + β d + γ 2 (Ba2)+α 1 + β + d + γ 1 (Ba3) = α 1 + β + γ 1 (Ba1)+α 2 + β + γ 2 (Ba4) he end of the path (after tme ) ofschedules (Ba1) and (Ba3) s the same. he same holds for (Ba2) and (Ba4). So n ths case (Ba2)+(Ba3)=(Ba1)+(Ba4), for the maespan and tardness. (b) he second possblty s that there are eactly departures between tme 1 and. For schedule (B b 1) there wll be = patents left ust before tme and ust after tme t wll be l. Let the total watng tme between tme 1 and β and after tme γ 1. For schedule (B b 2) the number of patents s also, ust before tme. So ust after tme there are l patents n queue and the total watng tme between tme 1 and s then β d and after tme agan γ 1. For schedule (B b 3) the number of patents s + 1 = 1, ust before tme. So ust after tme there are l patents n queue and the total watng tme between tme 1 and s then β + d and after tme agan γ 1. For schedule (B b 4) the number of patents s =, ust before tme
10 226 Health Care Manage Sc (27) 1: So ust after tme there are l 1 patents n queue and the total watng tme between tme 1 and s then β (same as (B b 1))andaftertme γ 2 whch s of course smaller then γ 1. Now we see that the watng tme satsfes α 2 + β d + γ 1 (Ba2)+α 1 + β + d + γ 1 (Ba3) α 1 + β + γ 1 (Ba1)+α 2 + β + γ 2 (Ba4). he end of the path (after tme ) ofschedules (B b 1), (B b 2) and (B b 3) are the same so the maespan and tardness are the same for these schedules. At the end of the path of schedule (B b 4) there s one patent less (or n the worst case the same), so the maespan and tardness s also less or equal than the other schedules. So we can conclude that (B b 2)+(B b 3) (B b 1)+(B b 4), for the maespan and tardness. (c) he last possblty s that there are more than departures between tme 1 and.soforallpaths((bc1), (Bc2), (Bc3) and (Bc4)) there wll be no patents left ust before tme. Just after tme there wll be for schedule (Bc1) and (Bc2) l patents n queue and have a total watng tme of γ 1.(Bc3) and (Bc4) have then l 1 patents n queue and a total watng tme of γ 2. Now the total watng tme between tme 1 and tme, f there are s > departures s m (n 1)d n=1 s = m(m 1)d 2s (the frst patent has a watng tme of, the second d s, the thrd 2d s, etc...), wth m the number of patents ust after tme 1. Because ths s a conve functon t s clear that the watng tme functon satsfes α 2 + ( 1)( 2)d + 2s γ 1 (Bc2) + α 1 + (+1)d + γ 2s 2 (Bc3) α 1 + ( 1)d + γ 2s 1 (Bc1)+α 2 + ( 1)d +γ 2s 2 (Bc4). he ends of the paths of schedule (Bc1) and (Bc2) are the same and the ends of paths of schedule (Bc3) and (Bc4) are the same. herefore s (Bc2)+(Bc3)=(Bc1)+(Bc4), for the maespan and tardness. All cases for 2 < are done. Now for 1 = <. For Case C untl Case E (Fg. 4) counts that before tme 1 the queue somewhere emptes, so after that tme all schedules wll followng the same path and ust before tme 1 there are patents n queue for all schedules. untl tme 1 schedule (1) and (3) have a total watng tme α 1 and schedule (2) and (4) a total watng tme α 2. Just after tme 1 there wll be patents for schedule (1) and (2) and + 1 patents for schedule (3) and (4). Now after tme 1 we can dstngush the followng four possbltes. (C) Now for Case C there are equal or less than departures so ust before tme there are for schedule (C1) and (C2) l patents left and for schedule (C3) and (C4) l + 1 patents left. Between tme 1 and schedule (C1) and (C2) have the same total watng tme, say β 1 and schedule (C3) and (C4) have the same total watng tme, say β 2. Just after tme there are for all schedules l patents. So after tme follows schedule (C1) and (C3) the same path and have a total watng tme of γ 1 and follows schedule (C2) and (C4) the same path and have a total watng tme of γ 2. Now s easy to see that the watng tme satsfes α 2 + β 1 + γ 2 (C2)+α 1 + β 2 + γ 1 (C3)=α 1 + β 1 + γ 1 (C1)+α 2 + β 2 + γ 2 (C4). he ends of paths of schedule (C1) and (C3) are the same and the ends of paths of schedule (C2) and (C4) are the same. herefore s (C2)+(C3)=(C1)+(C4), for the maespan and tardness. (D,E) Now for Case D and Case E there are more than departures between tme 1 and tme. So ust before tme there are no patents left for all schedules. Between tme 1 and schedule (1) and (2) have the same total watng tme, say β 1 and schedule (3) and (4) have the same total watng tme, say β 2. Just after tme there are for schedule (1) and (2) l patents n queue and for schedule (3) and (4) l 1. Between tme and tme schedule (1) and (2) have a total watng tme of say γ 1 and schedule (3) and (4) have a total watng tme of say γ 2. Between tme and can happen the followng two cases: (D) he queue emptes. So for all schedules there are say m patents left ust before tme ( Case D ). Let m =m+.just after tme there wll be then m patents for schedule (D1) and (D3), wth a total watng tme of δ 1 and m +1 patents for schedule (D2) and (D4), wth a total watng tme of δ 2.Sothewat-
11 Health Care Manage Sc (27) 1: Case C he queue emptes somewhere # Departures l (C1) l (C2) +u +u +1 l+1 +1 l+1 (C3) (C4) Case D he queue emptes somewhere # Departures > he queue emptes somewhere m m (D1) Case E he queue emptes somewhere # Departures > he queue emptes not m m (E1) m m +1 (D2) m m +1 (E2) +u +1-1 m m (D3) +u +1-1 m-1 m -1 (E3) +u +1-1 m m +1 (D4) +u +1-1 m-1 m (E4) Fg. 4 Case C, D & E (1 = < ) (E) ng tme functon satsfes α 2 +β 1 +γ 2 +δ 2 (D2) + α 1 + β 2 + γ 1 + δ 1 (D3) = α 1 + β 1 +γ 1 +δ 1 (D1)+α 2 + β 2 + γ 2 + δ 2 (D4). he ends of paths of schedule (D1) and (D3) are the same and the ends of paths of schedule (D2) and (D4) are the same. herefore s (D2)+(D3)=(D1)+(D4), for the maespan and tardness. Now emptes the queue not between tme and tme, so now ust before tme there s one patent less (m 1) n queue for schedule (E3) and (E4). Just after tme there wll be for schedule (E1) and (E4) m patents, for schedule (E2) m + 1 and for schedule (E3) m 1 n queue. Now the total watng tme f there s m patents left s gven by m(m 1) 1. Because ths 2 s a conve functon t s clear that the watng tme functon satsfes α 2 + β 1 + γ 2 + (m +1)m 1 2 (D2)+α 1 + β 2 + γ 1 + (m 1)(m 2) 1 2 (D3) α 1 + β 1 + γ 1 + m (m 1) 1 (D1) + α β 2 + γ 2 + m (m 1) 1 2 (D4). Let s=d( 1). he man fnshng tme of the day wll be at s+m 1 for schedule (E1) and (E4), s + (m +1) 1 for schedule (E2) and s+(m 1) 1 for schedule (E3). So s+(m +1) 1 (E2)+s+(m 1) 1 (E3)=s+m 1 (E1)+s + m 1 (E4) for the maespan and tardness. For Case F untl Case I (Fg. 5) counts that before tme 1 the queue does not empty, so ust before tme 1 there are patents n queue for schedule (1) and (3) and for schedule (2) and (4) one less, so 1.Untltme 1 schedule (1) and (3) have
12 228 Health Care Manage Sc (27) 1: Case F # Departures < Case G # Departures = he queue emptes not l (F1) he queue emptes not (G1) -1-1 l-1-1 (F2) -1-1 (G2) +u +1 l+1 (F3) +u +1 1 (G3) +u -1 l -1 (F4) +u -1-1 (G4) Case H he queue emptes not # Departures > he queue emptes somewhere m m (H1) Case I he queue emptes not # Departures > he queue emptes not m m (I1) -1-1 m m +1 (H2) -1-1 m m +1 (I2) +u +1-1 m m (H3) +u +1-1 m-1 m -1 (I3) +u -1-1 m m +1 (H4) +u -1-1 m-1 m (I4) Fg. 5 Case F, G, H & I (1 = < ) a total watng tme α 1 and schedule (2) and (4) a total watng tme α 2. Just after tme 1 there wll be patents fore schedule (1) and (4), 1 patents for schedule (2) and + 1 patents for schedule (3). (F) For Case F, after tme 1 we can dstngush the followng four possbltes. For schedule (F1) there are say l patents left ust before tme and ust after tme t s l. Say that the total watng tme between tme 1 and s β and after tme γ 1. For schedule (F2) the number of patent s l 1 ust before tme. So ust after tme there are l 1 patents n queue and the total watng tme between tme 1 and s then β d and after tme γ 2. For schedule (F3) the number of patent s l + 1 ust before tme. Just after tme there are l patents n queue (one patent comes less) and the total watng tme between tme 1 and s then β + d and after tme agan γ 1 (same path as schedule (F1)). For schedule (F4) the number of patent s l ust before tme. Just after tme there are l 1 patents n queue (one patent comes less) and the total watng tme between tme 1 and s agan β and after tme agan γ 2 (same path as schedule (F2)). Now we see that the watng tme satsfes α 2 + β d + γ 2 (F2)+α 1 + β + d + γ 1 (F3)=α 1 + β + γ 1 (F4)+α 2 + β + γ 2 (F4) he end of the path (after tme ) ofschedules (F1) and (F3) are the same, and also (F2) and (F4) are the same. So n ths case (F2)+(F3)=(F1)+(F4), for the maespan and tardness.
13 Health Care Manage Sc (27) 1: (G) (H,I) Now for Case G there are eactly departures between tme 1 and. For schedule (G1) there wll be = patents left ust before tme and ust after tme t wll be l. Say that the total watng tme between tme 1 and s β and after tme γ 1. For schedule (G2) the number of patent shall also be ust before tme.soustafter tme there are l patents n queue and the total watng tme between tme 1 and s then β d and after tme γ 2. For schedule (G3) the number of patent shall be + 1 = 1 ust before tme. So ust after tme there are l patents n queue and the total watng tme between tme 1 and s then β + d and after tme agan γ 1 (same path as schedule (G1)). For schedule (G4) the number of patent shall be = ust before tme. So ust after tme there are l 1 patents n queue and the total watng tme between tme 1 and s then β (same as (G1)) and after tme γ 3 whch s of course smaller than γ 2, because 1 patent s less to do. Now we see that the watng tme satsfes α 2 + β d + γ 2 (G2) + α 1 + β + d + γ 1 (G3) α 1 + β + γ 1 (G1)+α 2 + β + γ 3 (G4). he end of the path (after tme ) of schedules (G1) and (G3) are the same so the maespan and tardness are the same for these schedules. At the end of the path of schedule (G4) there are one patent less (or n the worst case the same) than at the end of path (G2), so the maespan and tardness shall also be less or equal than schedule (G2). So we can conclude that (G2)+(G3) (G1)+(G4), for the maespan and tardness. Now for Case H and I there are more than departures between tme 1 and tme. So ust before tme there are no patents left for all schedules. Between tme 1 and schedules (1) and (4) have the same total watng tme of ( 1)d 2s (4) ( +1) d 2s, schedule (2) ( 1)( 2)d 2s (same as n Case Bc ). and schedule Just after tme the schedules wll follow the same path as n Case D and Case F, whch we already dscussed, so for the maespan and tardness t s mmedately clear that t satsfes the multmodularty. Now for the watng tme t s also clear because before tme t satsfes the multmodularty, and after tme also. Now we dstngushed all possble cases and we proved that n each case the watng tme, maespan and tardness are multmodular. hus the same holds for the dle tme. he proof can easly be etended to nclude noshows. hs s done by condtonng on the no-shows: we get the same model as wthout no-shows but wth less patents planned. References 1. Baley NJ, Welch JD (1952) Appontment systems n hosptal outpatent departments. Lancet 259: Cayrl, Veral E (23) Outpatent schedulng n health care: a revew of lterature. Prod Oper Manag 12: Denton B, Gupta D (23) A sequental boundng approach for optmal appontment schedulng. IIE rans 35: Hae B (1985) Etremal splttng of pont processes. Math Oper Res 22: Hassn R, Mendel S (26) Schedulng arrvals to queues: a model wth no-shows. Worng paper 6. Hutzschenreuter A (25) Queueng models for outpatent appontment schedulng. M.Sc hess, Unversty of Ulm 7. Koole G, van der Slus E (23) Optmal shft schedulng wth a global servce level constrant. IIE rans 35: Lau H, Lau AH (2) A fast procedure for computng the total system cost of an appontment schedule for medcal and ndred facltes. IIE rans 32: Lao C, Pegden CD, Rosenshne M (1993) Plannng tmely arrvals to a stochastc producton or servce system. IIE rans 25: Pegden CD, Rosenshne M (199) Schedulng arrvals to queues. Comput Oper Res 17: Rghter R (1994) Schedulng. In: Shaed M, Shanthumar, JG (eds) Stochastc orders and ther applcatons. Academc, New Yor 12. Robnson LW, Chen RR (23) Schedulng doctors appontments: optmal and emprcally-based heurstc polces. IIE rans 35: Vanden Bosche PM, Detz DC (2) Mnmzng epected watng n a medcal appontment system. IIE rans 32: Vanden Bosche PM, Detz DC (21) Schedulng and sequencng arrvals to an appontment system. J Serv Res 4: Vanden Bosche PM, Detz DC, Smeon JR (1999) Schedulng customer arrvals to a stochastc servce system. Nav Res Logst 46: Wang PP (1993) Statc and dynamc schedulng of customer arrvals to a sngle-server system. Nav Res Logst 4: Wang PP (1997) Optmally schedulng N customer arrval tmes for a sngle-server system. Comput Oper Res 24:
Optimal outpatient appointment scheduling
Optimal outpatient appointment scheduling Guido C. Kaandorp & Ger Koole Department of Epidemiology & Biostatistics, Erasmus Medical Center Rotterdam, he Netherlands Department of Mathematics, VU University
Recurrence. 1 Definitions and main statements
Recurrence 1 Defntons and man statements Let X n, n = 0, 1, 2,... be a MC wth the state space S = (1, 2,...), transton probabltes p j = P {X n+1 = j X n = }, and the transton matrx P = (p j ),j S def.
1. Fundamentals of probability theory 2. Emergence of communication traffic 3. Stochastic & Markovian Processes (SP & MP)
6.3 / -- Communcaton Networks II (Görg) SS20 -- www.comnets.un-bremen.de Communcaton Networks II Contents. Fundamentals of probablty theory 2. Emergence of communcaton traffc 3. Stochastc & Markovan Processes
benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ).
REVIEW OF RISK MANAGEMENT CONCEPTS LOSS DISTRIBUTIONS AND INSURANCE Loss and nsurance: When someone s subject to the rsk of ncurrng a fnancal loss, the loss s generally modeled usng a random varable or
THE DISTRIBUTION OF LOAN PORTFOLIO VALUE * Oldrich Alfons Vasicek
HE DISRIBUION OF LOAN PORFOLIO VALUE * Oldrch Alfons Vascek he amount of captal necessary to support a portfolo of debt securtes depends on the probablty dstrbuton of the portfolo loss. Consder a portfolo
An Alternative Way to Measure Private Equity Performance
An Alternatve Way to Measure Prvate Equty Performance Peter Todd Parlux Investment Technology LLC Summary Internal Rate of Return (IRR) s probably the most common way to measure the performance of prvate
AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE
AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE Yu-L Huang Industral Engneerng Department New Mexco State Unversty Las Cruces, New Mexco 88003, U.S.A. Abstract Patent
Project Networks With Mixed-Time Constraints
Project Networs Wth Mxed-Tme Constrants L Caccetta and B Wattananon Western Australan Centre of Excellence n Industral Optmsaton (WACEIO) Curtn Unversty of Technology GPO Box U1987 Perth Western Australa
Luby s Alg. for Maximal Independent Sets using Pairwise Independence
Lecture Notes for Randomzed Algorthms Luby s Alg. for Maxmal Independent Sets usng Parwse Independence Last Updated by Erc Vgoda on February, 006 8. Maxmal Independent Sets For a graph G = (V, E), an ndependent
8.5 UNITARY AND HERMITIAN MATRICES. The conjugate transpose of a complex matrix A, denoted by A*, is given by
6 CHAPTER 8 COMPLEX VECTOR SPACES 5. Fnd the kernel of the lnear transformaton gven n Exercse 5. In Exercses 55 and 56, fnd the mage of v, for the ndcated composton, where and are gven by the followng
Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic
Lagrange Multplers as Quanttatve Indcators n Economcs Ivan Mezník Insttute of Informatcs, Faculty of Busness and Management, Brno Unversty of TechnologCzech Republc Abstract The quanttatve role of Lagrange
BERNSTEIN POLYNOMIALS
On-Lne Geometrc Modelng Notes BERNSTEIN POLYNOMIALS Kenneth I. Joy Vsualzaton and Graphcs Research Group Department of Computer Scence Unversty of Calforna, Davs Overvew Polynomals are ncredbly useful
Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School
Robust Desgn of Publc Storage Warehouses Yemng (Yale) Gong EMLYON Busness School Rene de Koster Rotterdam school of management, Erasmus Unversty Abstract We apply robust optmzaton and revenue management
Chapter 4 ECONOMIC DISPATCH AND UNIT COMMITMENT
Chapter 4 ECOOMIC DISATCH AD UIT COMMITMET ITRODUCTIO A power system has several power plants. Each power plant has several generatng unts. At any pont of tme, the total load n the system s met by the
Module 2 LOSSLESS IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur
Module LOSSLESS IMAGE COMPRESSION SYSTEMS Lesson 3 Lossless Compresson: Huffman Codng Instructonal Objectves At the end of ths lesson, the students should be able to:. Defne and measure source entropy..
Extending Probabilistic Dynamic Epistemic Logic
Extendng Probablstc Dynamc Epstemc Logc Joshua Sack May 29, 2008 Probablty Space Defnton A probablty space s a tuple (S, A, µ), where 1 S s a set called the sample space. 2 A P(S) s a σ-algebra: a set
Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts
Power-of-wo Polces for Sngle- Warehouse Mult-Retaler Inventory Systems wth Order Frequency Dscounts José A. Ventura Pennsylvana State Unversty (USA) Yale. Herer echnon Israel Insttute of echnology (Israel)
Lecture 3: Force of Interest, Real Interest Rate, Annuity
Lecture 3: Force of Interest, Real Interest Rate, Annuty Goals: Study contnuous compoundng and force of nterest Dscuss real nterest rate Learn annuty-mmedate, and ts present value Study annuty-due, and
On the Optimal Control of a Cascade of Hydro-Electric Power Stations
On the Optmal Control of a Cascade of Hydro-Electrc Power Statons M.C.M. Guedes a, A.F. Rbero a, G.V. Smrnov b and S. Vlela c a Department of Mathematcs, School of Scences, Unversty of Porto, Portugal;
Support Vector Machines
Support Vector Machnes Max Wellng Department of Computer Scence Unversty of Toronto 10 Kng s College Road Toronto, M5S 3G5 Canada [email protected] Abstract Ths s a note to explan support vector machnes.
NON-CONSTANT SUM RED-AND-BLACK GAMES WITH BET-DEPENDENT WIN PROBABILITY FUNCTION LAURA PONTIGGIA, University of the Sciences in Philadelphia
To appear n Journal o Appled Probablty June 2007 O-COSTAT SUM RED-AD-BLACK GAMES WITH BET-DEPEDET WI PROBABILITY FUCTIO LAURA POTIGGIA, Unversty o the Scences n Phladelpha Abstract In ths paper we nvestgate
The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis
The Development of Web Log Mnng Based on Improve-K-Means Clusterng Analyss TngZhong Wang * College of Informaton Technology, Luoyang Normal Unversty, Luoyang, 471022, Chna [email protected] Abstract.
Simple Interest Loans (Section 5.1) :
Chapter 5 Fnance The frst part of ths revew wll explan the dfferent nterest and nvestment equatons you learned n secton 5.1 through 5.4 of your textbook and go through several examples. The second part
Rate Monotonic (RM) Disadvantages of cyclic. TDDB47 Real Time Systems. Lecture 2: RM & EDF. Priority-based scheduling. States of a process
Dsadvantages of cyclc TDDB47 Real Tme Systems Manual scheduler constructon Cannot deal wth any runtme changes What happens f we add a task to the set? Real-Tme Systems Laboratory Department of Computer
1 Example 1: Axis-aligned rectangles
COS 511: Theoretcal Machne Learnng Lecturer: Rob Schapre Lecture # 6 Scrbe: Aaron Schld February 21, 2013 Last class, we dscussed an analogue for Occam s Razor for nfnte hypothess spaces that, n conjuncton
Joint Scheduling of Processing and Shuffle Phases in MapReduce Systems
Jont Schedulng of Processng and Shuffle Phases n MapReduce Systems Fangfe Chen, Mural Kodalam, T. V. Lakshman Department of Computer Scence and Engneerng, The Penn State Unversty Bell Laboratores, Alcatel-Lucent
A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm
Avalable onlne www.ocpr.com Journal of Chemcal and Pharmaceutcal Research, 2014, 6(7):1884-1889 Research Artcle ISSN : 0975-7384 CODEN(USA) : JCPRC5 A hybrd global optmzaton algorthm based on parallel
Enabling P2P One-view Multi-party Video Conferencing
Enablng P2P One-vew Mult-party Vdeo Conferencng Yongxang Zhao, Yong Lu, Changja Chen, and JanYn Zhang Abstract Mult-Party Vdeo Conferencng (MPVC) facltates realtme group nteracton between users. Whle P2P
Calculation of Sampling Weights
Perre Foy Statstcs Canada 4 Calculaton of Samplng Weghts 4.1 OVERVIEW The basc sample desgn used n TIMSS Populatons 1 and 2 was a two-stage stratfed cluster desgn. 1 The frst stage conssted of a sample
The OC Curve of Attribute Acceptance Plans
The OC Curve of Attrbute Acceptance Plans The Operatng Characterstc (OC) curve descrbes the probablty of acceptng a lot as a functon of the lot s qualty. Fgure 1 shows a typcal OC Curve. 10 8 6 4 1 3 4
Research Article Enhanced Two-Step Method via Relaxed Order of α-satisfactory Degrees for Fuzzy Multiobjective Optimization
Hndaw Publshng Corporaton Mathematcal Problems n Engneerng Artcle ID 867836 pages http://dxdoorg/055/204/867836 Research Artcle Enhanced Two-Step Method va Relaxed Order of α-satsfactory Degrees for Fuzzy
Retailers must constantly strive for excellence in operations; extremely narrow profit margins
Managng a Retaler s Shelf Space, Inventory, and Transportaton Gerard Cachon 300 SH/DH, The Wharton School, Unversty of Pennsylvana, Phladelpha, Pennsylvana 90 [email protected] http://opm.wharton.upenn.edu/cachon/
PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 12
14 The Ch-squared dstrbuton PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 1 If a normal varable X, havng mean µ and varance σ, s standardsed, the new varable Z has a mean 0 and varance 1. When ths standardsed
What is Candidate Sampling
What s Canddate Samplng Say we have a multclass or mult label problem where each tranng example ( x, T ) conssts of a context x a small (mult)set of target classes T out of a large unverse L of possble
2008/8. An integrated model for warehouse and inventory planning. Géraldine Strack and Yves Pochet
2008/8 An ntegrated model for warehouse and nventory plannng Géraldne Strack and Yves Pochet CORE Voe du Roman Pays 34 B-1348 Louvan-la-Neuve, Belgum. Tel (32 10) 47 43 04 Fax (32 10) 47 43 01 E-mal: [email protected]
A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña
Proceedngs of the 2008 Wnter Smulaton Conference S. J. Mason, R. R. Hll, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds. A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION
The Greedy Method. Introduction. 0/1 Knapsack Problem
The Greedy Method Introducton We have completed data structures. We now are gong to look at algorthm desgn methods. Often we are lookng at optmzaton problems whose performance s exponental. For an optmzaton
Examensarbete. Rotating Workforce Scheduling. Caroline Granfeldt
Examensarbete Rotatng Workforce Schedulng Carolne Granfeldt LTH - MAT - EX - - 2015 / 08 - - SE Rotatng Workforce Schedulng Optmerngslära, Lnköpngs Unverstet Carolne Granfeldt LTH - MAT - EX - - 2015
Scatter search approach for solving a home care nurses routing and scheduling problem
Scatter search approach for solvng a home care nurses routng and schedulng problem Bouazza Elbenan 1, Jacques A. Ferland 2 and Vvane Gascon 3* 1 Département de mathématque et nformatque, Faculté des scences,
An Interest-Oriented Network Evolution Mechanism for Online Communities
An Interest-Orented Network Evoluton Mechansm for Onlne Communtes Cahong Sun and Xaopng Yang School of Informaton, Renmn Unversty of Chna, Bejng 100872, P.R. Chna {chsun,yang}@ruc.edu.cn Abstract. Onlne
Efficient Project Portfolio as a tool for Enterprise Risk Management
Effcent Proect Portfolo as a tool for Enterprse Rsk Management Valentn O. Nkonov Ural State Techncal Unversty Growth Traectory Consultng Company January 5, 27 Effcent Proect Portfolo as a tool for Enterprse
Performance Analysis of Energy Consumption of Smartphone Running Mobile Hotspot Application
Internatonal Journal of mart Grd and lean Energy Performance Analyss of Energy onsumpton of martphone Runnng Moble Hotspot Applcaton Yun on hung a chool of Electronc Engneerng, oongsl Unversty, 511 angdo-dong,
Answer: A). There is a flatter IS curve in the high MPC economy. Original LM LM after increase in M. IS curve for low MPC economy
4.02 Quz Solutons Fall 2004 Multple-Choce Questons (30/00 ponts) Please, crcle the correct answer for each of the followng 0 multple-choce questons. For each queston, only one of the answers s correct.
A Lyapunov Optimization Approach to Repeated Stochastic Games
PROC. ALLERTON CONFERENCE ON COMMUNICATION, CONTROL, AND COMPUTING, OCT. 2013 1 A Lyapunov Optmzaton Approach to Repeated Stochastc Games Mchael J. Neely Unversty of Southern Calforna http://www-bcf.usc.edu/
In some supply chains, materials are ordered periodically according to local information. This paper investigates
MANUFACTURING & SRVIC OPRATIONS MANAGMNT Vol. 12, No. 3, Summer 2010, pp. 430 448 ssn 1523-4614 essn 1526-5498 10 1203 0430 nforms do 10.1287/msom.1090.0277 2010 INFORMS Improvng Supply Chan Performance:
7.5. Present Value of an Annuity. Investigate
7.5 Present Value of an Annuty Owen and Anna are approachng retrement and are puttng ther fnances n order. They have worked hard and nvested ther earnngs so that they now have a large amount of money on
An MILP model for planning of batch plants operating in a campaign-mode
An MILP model for plannng of batch plants operatng n a campagn-mode Yanna Fumero Insttuto de Desarrollo y Dseño CONICET UTN [email protected] Gabrela Corsano Insttuto de Desarrollo y Dseño
"Research Note" APPLICATION OF CHARGE SIMULATION METHOD TO ELECTRIC FIELD CALCULATION IN THE POWER CABLES *
Iranan Journal of Scence & Technology, Transacton B, Engneerng, ol. 30, No. B6, 789-794 rnted n The Islamc Republc of Iran, 006 Shraz Unversty "Research Note" ALICATION OF CHARGE SIMULATION METHOD TO ELECTRIC
SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS
SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS Magdalena Rogalska 1, Wocech Bożeko 2,Zdzsław Heduck 3, 1 Lubln Unversty of Technology, 2- Lubln, Nadbystrzycka 4., Poland. E-mal:[email protected]
Logistic Regression. Lecture 4: More classifiers and classes. Logistic regression. Adaboost. Optimization. Multiple class classification
Lecture 4: More classfers and classes C4B Machne Learnng Hlary 20 A. Zsserman Logstc regresson Loss functons revsted Adaboost Loss functons revsted Optmzaton Multple class classfcaton Logstc Regresson
Analysis of Energy-Conserving Access Protocols for Wireless Identification Networks
From the Proceedngs of Internatonal Conference on Telecommuncaton Systems (ITC-97), March 2-23, 1997. 1 Analyss of Energy-Conservng Access Protocols for Wreless Identfcaton etworks Imrch Chlamtac a, Chara
A Novel Methodology of Working Capital Management for Large. Public Constructions by Using Fuzzy S-curve Regression
Novel Methodology of Workng Captal Management for Large Publc Constructons by Usng Fuzzy S-curve Regresson Cheng-Wu Chen, Morrs H. L. Wang and Tng-Ya Hseh Department of Cvl Engneerng, Natonal Central Unversty,
Ants Can Schedule Software Projects
Ants Can Schedule Software Proects Broderck Crawford 1,2, Rcardo Soto 1,3, Frankln Johnson 4, and Erc Monfroy 5 1 Pontfca Unversdad Católca de Valparaíso, Chle [email protected] 2 Unversdad Fns Terrae,
J. Parallel Distrib. Comput.
J. Parallel Dstrb. Comput. 71 (2011) 62 76 Contents lsts avalable at ScenceDrect J. Parallel Dstrb. Comput. journal homepage: www.elsever.com/locate/jpdc Optmzng server placement n dstrbuted systems n
Preventive Maintenance and Replacement Scheduling: Models and Algorithms
Preventve Mantenance and Replacement Schedulng: Models and Algorthms By Kamran S. Moghaddam B.S. Unversty of Tehran 200 M.S. Tehran Polytechnc 2003 A Dssertaton Proposal Submtted to the Faculty of the
Formulating & Solving Integer Problems Chapter 11 289
Formulatng & Solvng Integer Problems Chapter 11 289 The Optonal Stop TSP If we drop the requrement that every stop must be vsted, we then get the optonal stop TSP. Ths mght correspond to a ob sequencng
v a 1 b 1 i, a 2 b 2 i,..., a n b n i.
SECTION 8.4 COMPLEX VECTOR SPACES AND INNER PRODUCTS 455 8.4 COMPLEX VECTOR SPACES AND INNER PRODUCTS All the vector spaces we have studed thus far n the text are real vector spaces snce the scalars are
1.1 The University may award Higher Doctorate degrees as specified from time-to-time in UPR AS11 1.
HIGHER DOCTORATE DEGREES SUMMARY OF PRINCIPAL CHANGES General changes None Secton 3.2 Refer to text (Amendments to verson 03.0, UPR AS02 are shown n talcs.) 1 INTRODUCTION 1.1 The Unversty may award Hgher
DEFINING %COMPLETE IN MICROSOFT PROJECT
CelersSystems DEFINING %COMPLETE IN MICROSOFT PROJECT PREPARED BY James E Aksel, PMP, PMI-SP, MVP For Addtonal Informaton about Earned Value Management Systems and reportng, please contact: CelersSystems,
Lecture 3: Annuity. Study annuities whose payments form a geometric progression or a arithmetic progression.
Lecture 3: Annuty Goals: Learn contnuous annuty and perpetuty. Study annutes whose payments form a geometrc progresson or a arthmetc progresson. Dscuss yeld rates. Introduce Amortzaton Suggested Textbook
IDENTIFICATION AND CORRECTION OF A COMMON ERROR IN GENERAL ANNUITY CALCULATIONS
IDENTIFICATION AND CORRECTION OF A COMMON ERROR IN GENERAL ANNUITY CALCULATIONS Chrs Deeley* Last revsed: September 22, 200 * Chrs Deeley s a Senor Lecturer n the School of Accountng, Charles Sturt Unversty,
How To Understand The Results Of The German Meris Cloud And Water Vapour Product
Ttel: Project: Doc. No.: MERIS level 3 cloud and water vapour products MAPP MAPP-ATBD-ClWVL3 Issue: 1 Revson: 0 Date: 9.12.1998 Functon Name Organsaton Sgnature Date Author: Bennartz FUB Preusker FUB Schüller
Traffic-light a stress test for life insurance provisions
MEMORANDUM Date 006-09-7 Authors Bengt von Bahr, Göran Ronge Traffc-lght a stress test for lfe nsurance provsons Fnansnspetonen P.O. Box 6750 SE-113 85 Stocholm [Sveavägen 167] Tel +46 8 787 80 00 Fax
A Probabilistic Theory of Coherence
A Probablstc Theory of Coherence BRANDEN FITELSON. The Coherence Measure C Let E be a set of n propostons E,..., E n. We seek a probablstc measure C(E) of the degree of coherence of E. Intutvely, we want
denote the location of a node, and suppose node X . This transmission causes a successful reception by node X for any other node
Fnal Report of EE359 Class Proect Throughput and Delay n Wreless Ad Hoc Networs Changhua He [email protected] Abstract: Networ throughput and pacet delay are the two most mportant parameters to evaluate
How Sets of Coherent Probabilities May Serve as Models for Degrees of Incoherence
1 st Internatonal Symposum on Imprecse Probabltes and Ther Applcatons, Ghent, Belgum, 29 June 2 July 1999 How Sets of Coherent Probabltes May Serve as Models for Degrees of Incoherence Mar J. Schervsh
A Secure Password-Authenticated Key Agreement Using Smart Cards
A Secure Password-Authentcated Key Agreement Usng Smart Cards Ka Chan 1, Wen-Chung Kuo 2 and Jn-Chou Cheng 3 1 Department of Computer and Informaton Scence, R.O.C. Mltary Academy, Kaohsung 83059, Tawan,
CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK. Sample Stability Protocol
CHOLESTEROL REFERENCE METHOD LABORATORY NETWORK Sample Stablty Protocol Background The Cholesterol Reference Method Laboratory Network (CRMLN) developed certfcaton protocols for total cholesterol, HDL
ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING
ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING Matthew J. Lberatore, Department of Management and Operatons, Vllanova Unversty, Vllanova, PA 19085, 610-519-4390,
Ring structure of splines on triangulations
www.oeaw.ac.at Rng structure of splnes on trangulatons N. Vllamzar RICAM-Report 2014-48 www.rcam.oeaw.ac.at RING STRUCTURE OF SPLINES ON TRIANGULATIONS NELLY VILLAMIZAR Introducton For a trangulated regon
21 Vectors: The Cross Product & Torque
21 Vectors: The Cross Product & Torque Do not use our left hand when applng ether the rght-hand rule for the cross product of two vectors dscussed n ths chapter or the rght-hand rule for somethng curl
Real-Time Process Scheduling
Real-Tme Process Schedulng [email protected] (Real-Tme and Embedded Systems Laboratory) Independent Process Schedulng Processes share nothng but CPU Papers for dscussons: C.L. Lu and James. W. Layland,
Realistic Image Synthesis
Realstc Image Synthess - Combned Samplng and Path Tracng - Phlpp Slusallek Karol Myszkowsk Vncent Pegoraro Overvew: Today Combned Samplng (Multple Importance Samplng) Renderng and Measurng Equaton Random
How To Calculate The Accountng Perod Of Nequalty
Inequalty and The Accountng Perod Quentn Wodon and Shlomo Ytzha World Ban and Hebrew Unversty September Abstract Income nequalty typcally declnes wth the length of tme taen nto account for measurement.
This paper concerns the evaluation and analysis of order
ORDER-FULFILLMENT PERFORMANCE MEASURES IN AN ASSEMBLE- TO-ORDER SYSTEM WITH STOCHASTIC LEADTIMES JING-SHENG SONG Unversty of Calforna, Irvne, Calforna SUSAN H. XU Penn State Unversty, Unversty Park, Pennsylvana
Data Broadcast on a Multi-System Heterogeneous Overlayed Wireless Network *
JOURNAL OF INFORMATION SCIENCE AND ENGINEERING 24, 819-840 (2008) Data Broadcast on a Mult-System Heterogeneous Overlayed Wreless Network * Department of Computer Scence Natonal Chao Tung Unversty Hsnchu,
Price Competition in an Oligopoly Market with Multiple IaaS Cloud Providers
Prce Competton n an Olgopoly Market wth Multple IaaS Cloud Provders Yuan Feng, Baochun L, Bo L Department of Computng, Hong Kong Polytechnc Unversty Department of Electrcal and Computer Engneerng, Unversty
Product-Form Stationary Distributions for Deficiency Zero Chemical Reaction Networks
Bulletn of Mathematcal Bology (21 DOI 1.17/s11538-1-9517-4 ORIGINAL ARTICLE Product-Form Statonary Dstrbutons for Defcency Zero Chemcal Reacton Networks Davd F. Anderson, Gheorghe Cracun, Thomas G. Kurtz
8 Algorithm for Binary Searching in Trees
8 Algorthm for Bnary Searchng n Trees In ths secton we present our algorthm for bnary searchng n trees. A crucal observaton employed by the algorthm s that ths problem can be effcently solved when the
Simulation and optimization of supply chains: alternative or complementary approaches?
Smulaton and optmzaton of supply chans: alternatve or complementary approaches? Chrstan Almeder Margaretha Preusser Rchard F. Hartl Orgnally publshed n: OR Spectrum (2009) 31:95 119 DOI 10.1007/s00291-007-0118-z
Little s Law & Bottleneck Law
Lttle s Law & Bottleneck Law Dec 20 I professonals have shunned performance modellng consderng t to be too complex and napplcable to real lfe. A lot has to do wth fear of mathematcs as well. hs tutoral
Loop Parallelization
- - Loop Parallelzaton C-52 Complaton steps: nested loops operatng on arrays, sequentell executon of teraton space DECLARE B[..,..+] FOR I :=.. FOR J :=.. I B[I,J] := B[I-,J]+B[I-,J-] ED FOR ED FOR analyze
General Auction Mechanism for Search Advertising
General Aucton Mechansm for Search Advertsng Gagan Aggarwal S. Muthukrshnan Dávd Pál Martn Pál Keywords game theory, onlne auctons, stable matchngs ABSTRACT Internet search advertsng s often sold by an
Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College
Feature selecton for ntruson detecton Slobodan Petrovć NISlab, Gjøvk Unversty College Contents The feature selecton problem Intruson detecton Traffc features relevant for IDS The CFS measure The mrmr measure
Hollinger Canadian Publishing Holdings Co. ( HCPH ) proceeding under the Companies Creditors Arrangement Act ( CCAA )
February 17, 2011 Andrew J. Hatnay [email protected] Dear Sr/Madam: Re: Re: Hollnger Canadan Publshng Holdngs Co. ( HCPH ) proceedng under the Companes Credtors Arrangement Act ( CCAA ) Update on CCAA Proceedngs
Using Series to Analyze Financial Situations: Present Value
2.8 Usng Seres to Analyze Fnancal Stuatons: Present Value In the prevous secton, you learned how to calculate the amount, or future value, of an ordnary smple annuty. The amount s the sum of the accumulated
VoIP over Multiple IEEE 802.11 Wireless LANs
SUBMITTED TO IEEE TRANSACTIONS ON MOBILE COMPUTING 1 VoIP over Multple IEEE 80.11 Wreless LANs An Chan, Graduate Student Member, IEEE, Soung Chang Lew, Senor Member, IEEE Abstract IEEE 80.11 WLAN has hgh
How To Solve An Onlne Control Polcy On A Vrtualzed Data Center
Dynamc Resource Allocaton and Power Management n Vrtualzed Data Centers Rahul Urgaonkar, Ulas C. Kozat, Ken Igarash, Mchael J. Neely [email protected], {kozat, garash}@docomolabs-usa.com, [email protected]
Basic Queueing Theory M/M/* Queues. Introduction
Basc Queueng Theory M/M/* Queues These sldes are created by Dr. Yh Huang of George Mason Unversty. Students regstered n Dr. Huang's courses at GMU can ake a sngle achne-readable copy and prnt a sngle copy
An Enhanced Super-Resolution System with Improved Image Registration, Automatic Image Selection, and Image Enhancement
An Enhanced Super-Resoluton System wth Improved Image Regstraton, Automatc Image Selecton, and Image Enhancement Yu-Chuan Kuo ( ), Chen-Yu Chen ( ), and Chou-Shann Fuh ( ) Department of Computer Scence
Implementation of Deutsch's Algorithm Using Mathcad
Implementaton of Deutsch's Algorthm Usng Mathcad Frank Roux The followng s a Mathcad mplementaton of Davd Deutsch's quantum computer prototype as presented on pages - n "Machnes, Logc and Quantum Physcs"
Activity Scheduling for Cost-Time Investment Optimization in Project Management
PROJECT MANAGEMENT 4 th Internatonal Conference on Industral Engneerng and Industral Management XIV Congreso de Ingenería de Organzacón Donosta- San Sebastán, September 8 th -10 th 010 Actvty Schedulng
Many e-tailers providing attended home delivery, especially e-grocers, offer narrow delivery time slots to
Vol. 45, No. 3, August 2011, pp. 435 449 ssn 0041-1655 essn 1526-5447 11 4503 0435 do 10.1287/trsc.1100.0346 2011 INFORMS Tme Slot Management n Attended Home Delvery Nels Agatz Department of Decson and