1 CELTIQUE ENERGIE BROADFORD BRIDGE 1 PERMITTING DOCUMENTATION WASTE MANAGEMENT PLAN FOR DRILLING REVISION DATE PREPARED CHECKED APPROVED 01 19/11/2013 J Dobson P Bird 02 26/11/2011 J Dobson P Bird 03 12/12/2013 J Dobson P Bird 04 15/01/2014 J Dobson P Bird 05 30/03/2014 J Dobson P Bird Document Number HSEC-BB-PD-04 Review Date March 2015 Rev 05 This is an uncontrolled copy when printed

2 Table of Contents Table of Contents Introduction Background Referenced Documentation Document Structure Overview Waste Generating Activities Drilling fluids Drill Cuttings Cement Natural gas (methane) Fluids & Chemicals Site Operation & Waste Treatment General Drilling Fluids Drill cuttings Cement Environmental Risk Management Environmental Risk Assessment Environmental Risk Mitigation Control & Monitoring Fugitive Air Emissions Mud Odour Noise/Vibration Accidents Drilling Muds & Drill Cuttings Cement Complaints Proposed Plan for Closure Measures to Prevent Pollution Rev 05 This is an uncontrolled copy when printed 2

3 1.1 Background 1 Introduction Celtique Energie Limited (subsequently referred to as Celtique) intends to construct a boring for the purpose of searching for oil and gas resources at Broadford Bridge. This well is classified as a Non-Inert Mining Waste Operation without a Mining Waste facility. This Waste Management Plan supports Celtique s permit application for this borehole under Schedule 20 of the Environmental Permitting (England and Wales) Regulations The purpose of the Plan is to demonstrate that Celtique will manage the wastes which result from its occupation and activities at the site in an environmentally sound manner and that, wherever possible, it uses the waste hierarchy to minimise the potential impact of the operation on its surroundings. The process to drill the well and extract the trapped hydrocarbons will generate extractive waste which falls under the scope of Directive 2006/21/EC (the Mining Waste Directive) and, as a result, an environmental permit is required under Schedule 20 of the Environmental Permitting (England and Wales) Regulations 2010 (as amended). Extractive waste is defined in accordance with Environment Agency Position Statement MWRP PS 015 version 1.0 August The exploratory drilling site at Broadford Bridge received planning permission from West Sussex County Council (WSCC) in 2012 permit WSCC/052/12/WC. This Waste Management Plan reflects the agreed conditions from the planning permission and the statutory consultee responses (which included both the Environment Agency and Natural England). Celtique Energie is currently only applying for a Waste Management Permit to cover the drilling of the Broadford Bridge-1 borehole. In the event that potentially economic hydrocarbon reserves are identified, a separate permit application or a variation to this permit will be made to address the testing of this well. Consequently, this Waste Management Plan only covers the drilling of the borehole. The Broadford Bridge-1 borehole is a conventional well and will not, at any stage, involve hydraulic fracturing. The borehole site is situated at: Broadford Bridge -1 Exploration Site Wood Barn Farm Adversane Lane Broadford Bridge Billingshurst West Sussex 1.2 Referenced Documentation This Waste Management Plan is part of a suite of documentation submitted by Celtique Energie as part of their permit applications. The full list of documents is as follows: Summary of Celtique Energie s HSE Management System (HSEC Management Standards, document number HSEC-MS-001); Environmental Method Statement (document number HSEC-BB-PD-01); Environmental Non-Technical Summary (document number HSEC-BB-PD-02); Site Condition Report and Management & Monitoring Plan (document number HSEC-BB- PD-03); Green lined Site Plan (document number HSEC-BB-PD-05); This document has been written to be as self-contained as possible resulting in some repetition of the information contained in these referenced documents, particularly with regard to the Environmental Method Statement (HSEC-BB-PD-01). Rev 05 This is an uncontrolled copy when printed 3

4 1.3 Document Structure The document is structured as recommended by EPR 6.14 How to comply with your environmental permit. Additional Guidance for mining waste operations as follows: Section 2 defines the Facility Classification; Section 3 describes the arrangements in place for Waste Prevention & Reduction and the prevention of Environmental Pollution; Section 4 addresses Fluids & Chemical Additive Information; Section 5 addresses Site Operation & Waste Treatment; Section 6 summarises the arrangements in place for Risk Management, addressing both risk assessment and risk mitigation; Section 7 summarises the arrangements in place for the Control & Monitoring of emissions; Section 8 summarises the Plan for Closure, addressing the requirements for closure and restoration of the site; Section 9 summarises the measures in place for the Prevention of Environmental Pollution. In addition, the following appendices support the Waste Management Plan: Appendix 1 - Environmental Risk Assessment (ERA): Detailed risk assessment demonstrate that with the application of the controls described in this Waste Management Plan, potential hazards arising from the activities are unlikely to be significant; Appendix 2 - Hydrogeological Risk Assessment (HRA): Detailed risk assessment which demonstrates that the Broadford Bridge-1 borehole poses no significant risk to controlled waters and that the works do not constitute a groundwater activity. Rev 05 This is an uncontrolled copy when printed 4

5 2 Description & Classification 2.1 Overview The drilling process incorporates a closed loop system whereby drilling fluids ( muds ) are circulated down through the drill pipe and back up the well bore to create hydrostatic pressure (primary well control), return the cuttings created in drilling the well-bore back to the surface and control the temperature of the drill bit. This process is common in other industries including drilling for geo-thermal exploration, water well drilling and drilling within the civil engineering sector. A waste is defined in Annex 1 of Article 3(1) of the Mining Waste Directive as any substance or object (in the three categories set out below) which the holder discards or intends to discard or is required to discard. The three categories are: Inert waste: Waste that does not undergo any significant physical, chemical or biological transformations. Inert waste will not dissolve, burn or otherwise physically or chemically react biodegrade or adversely affect other matter with which it comes into contact in a way likely to give rise to environmental pollution or harm human health. The total leachability and pollutant content of the waste and the ecotoxicity of the leachate must be insignificant, and in particular not endanger the quality of surface water and/or groundwater; Hazardous Waste: Article 3(2) of the Hazardous Waste Directive lists properties of wastes that render them hazardous. These properties are: explosive, oxidising, highly flammable, flammable, irritant, harmful, toxic, carcinogenic, corrosive, infectious, toxic for reproduction, mutagenic, waste which releases toxic or very toxic gases in contact with water / air / acid, sensitising, ecotoxic, waste capable by any means after disposal of yielding another substance which possesses any of the above characteristics; Non-Hazardous waste: waste which is neither classified as inert or hazardous waste. The extractive and non-extractive wastes generated in the drilling of the borehole are summarised in Table 2.1 below and described in detail in section 4. Table 2.1: Summary of Extractive Wastes Waste Type Non-Hazardous Hazardous Non-Hazardous Hazardous Non-Hazardous Hazardous Classification Water based drilling fluids referred to as Water based muds (WBM) Oil based drilling fluids referred to as Oil based muds (OBM). Note that only those OBM which cannot be re-used are deemed waste a small minority of the OBM in use. Formation cuttings from sections drilled with WBM (cuttings are the broken bits of rock naturally occurring underground and removed from a borehole while drilling into underground formations) Formation cuttings from sections drilled with OBM Surplus cement Natural gas and fluids from the reservoir (if hydrocarbons exist) although these fugitive emissions will be minimal and insufficient to flow, flare or meter. For greater detail regarding drilling operations the reader is referenced to document HSEC-BB- PD-01 (Environmental Method Statement). However, information relevant to waste management is presented below. 2.2 Waste Generating Activities Summary The drilling process is a relatively short duration operation that inherently minimises waste through only using those volumes of raw materials and components that are required to Rev 05 This is an uncontrolled copy when printed 5

6 complete the drilling process. Waste prevention and minimisation is further reinforced through the following processes: Drilling fluids: The volumes required to drill to the target depth are calculated in advance of the drilling operation. The drilling process is monitored by the Drilling Fluids Engineer, and along with the mud logging process this enables monitoring of volumes of fluids pumped downhole and returned to be assessed. The primary considerations when selecting drilling mud is to manage the safety of the well. This aim is impacted by the particular well design, formations and geology to be drilled and achieving the well objectives safely without environmental impact. The general principle followed is that WBM (Water based mud) is used unless its use is not reasonably practicable due to the need to ensure the safety of the well. Geological conditions are also a key factor in preventing reactive clays swelling during the drilling phase causing the drill string to become stuck. Environmentally compatible Oil based mud (OBM) is proposed when reactive claystone sections are expected. Consequently, for Broadford Bridge 1, WBM is used in the drilling of upper part of the well to minimise impact on near surface aquifers. However, once the borehole has been drilled below these aquifers and the interval cased off, it is necessary to use OBM to drill the remainder of the borehole to improve well control in these sections and prevent safety problems arising in the well (the use of WBM in these long sections of water reactive clays and shales can result in drilling problems such as stuck pipe or casing pack-off and potentially increase safety risks). There are also secondary environmental benefits from using OBM in that total drilling time is reduced compared to Water Based Muds thus resulting in reduced indirect emissions at surface (e.g. reduced use of fuel for the drilling rig or on site generators). In addition, OBM is reusable on subsequent wells whereas WBM is not. The intent is to recycle used WBM during the drilling. Drilling muds with added loss circulation materials are used to prevent loss of drilling fluids into permeable formations. OBM are re-used during the drilling and, once drilling is completed, returned to the supplier for further reconditioning and re- use; Drill cuttings: Only cuttings from the drilled borehole to the target depth are generated. Reducing-size drill bits are used to reduce hole size and therefore reduce the volumes of returned cutting. Where possible, cuttings solids are recycled into compost/soil improver and eventually for land reclamation/improver; Cement: Volumes pumped into the well are controlled to minimise returns at surface Detailed Description The drilling muds, to be used for this well are both oil and water based as summarised in Table 2.2 below. They are contained in closed loop systems as described below. Detailed information on the chemical make-up of the various muds is given in Section 4 Table 2.2: Drilling Fluids Summary End Depth MD Hole Size Drilling Fluid (ft) (inches) Fresh water based / 2 Water Based Mud system with clay inhibition / 4 Environmentally Compatible Oil Base Mud System / 2 Environmentally Compatible Oil Base Mud System Water based muds (WBM) are used for drilling through fresh water aquifer sections. Any additives used when drilling these sections have all been assessed as non-hazardous substances at the concentrations used (see Hydrogeological Risk Assessment HSEC-BB-PD- 06). WBM are treated for re-use during the drilling process site by removal of solids (through the use of shale shakers and centrifuges) and the making up fluid losses. A WBM will produce a volume of cuttings and liquid wastes of around 4 times the volume of the hole to be drilled. As WBM is used up in the drilling process, it is sent for waste disposal at the completion of the well Rev 05 This is an uncontrolled copy when printed 6

7 Environmentally compatible Oil based muds (OBM) are used to drill the lower sections of the borehole. These muds have been assessed as presenting a hazard so small as to obviate any present or future damage (see Hydrogeological Risk Assessment HSEC-BB-PD-06).The OBM is treated for re-use during the drilling process by removal of solids (through the use of shale shakers and centrifuges) and the replenishment of the oil phase. An OBM will produce a waste volume of cuttings and liquid waste of around two to three times the volume of the hole to be drilled. In addition, OBM can always be reused in other wells, they will be returned to the supplier base for cleaning, restocking and reuse. The drilling mud is used to remove drill cuttings from the well and bring them to the surface. These drill cuttings (which are the broken bits of solid rock removed from the borehole) are transported back to surface within the drilling fluids are separated at surface using a two stage process. The first separation stage (shale shakers) vibrates the returned drilling fluid over a screen basket separating large drill cuttings from the drilling muds. The cuttings flow from the shakers via a screen mesh for waste storage in steel rectangular open tanks with a capacity of up to 40m³. If required, further treatment utilising mud cleaners and centrifuges is used to remove finer drill cuttings from the muds. these fine cuttings are also directed to these rectangular open tanks. Drill cuttings are then taken off site for disposal via an authorised waste contractor to an authorised waste facility. Records are maintained on a daily basis of the quantities of drill cuttings from the well bore placed into cuttings skips pending off site removal. Once the cuttings separation is completed, the drilling fluids are then temporarily deposited in dedicated steel mud tanks with a total system volume (active / reserve) of 200m 3. Where possible, WBM are reused at site for the next hole section (thus reducing the amount of drilling muds required and reducing waste quantities) until the solids entrained become too great for effective treatment. At this point they are replaced by fresh WBM and the spent WBM is removed by vacuum loading road tankers to an authorised waste facility. OBM continue to be reused throughout the well and, at completion, are returned to the mud owner (Celtique is simply renting use of the fluid) for clean-up and re-use. Double valve isolation is provided on all tanks holding OBM. The returning drilling muds are either reused or sent off site for disposal via an authorised waste carrier to an authorised waste disposal facility. The company looks to minimise waste from these mud systems at all times and this is achieved through good mud management and best drilling practices as well as choosing the appropriate mud systems for the hole to be drilled. Potential loss of drilling fluids into the formation is continuously monitored during drilling by the Mud Logging Unit using a Pit Volume Totaliser (PVT). In the event of a formation loss being identified in the PVT, maintaining borehole stability and controlling fluid leak-off to permeable formations is achieved with the inclusion of fluid loss control additives (lost circulation material LCM) into the drilling muds. Both the WBM and OBM fluids have a range of additives to adjust their properties and make them suitable for specific hole conditions these are discussed in detail in Section 4. Once each hole section has been drilled, steel casing is cemented in the wellbore in a series of stages to protect groundwater and maintain wellbore integrity. The cement is pumped in slurry form down the inside of the casing and rises up through the annular space between the drilled hole and the casing, and once in place sets hard. The cemented slurry displaces the mud both from the casing and the borehole to assure continuing well integrity, returning the drilling muds to the surface. The process of replacing the drilling muds with cement slurry is to maintain primary well control, create a complete cement sheath for well integrity and thus provide life of well barriers. After circulating the cement slurry down the well bore and back up the casing annuli a FIT (Formation Integrity Test) is conducted to confirm the integrity of the cement at the casing shoe. The volume of cement used is carefully calculated and pumped volumes are controlled to minimise returns at surface. Rev 05 This is an uncontrolled copy when printed 7

8 For the Broadford Bridge -1 well, the 13 3 / 8 and 9 5 / 8 casing will be cemented in place. A 8 1 / 2 hole is then drilled through the prospective reservoir. If hydrocarbons are found to be present this is cemented in place and a 7 liner installed and perforated for well testing. Figure 2.1 shows a schematic of the borehole. Rev 05 This is an uncontrolled copy when printed 8

9 Figure 2.1: Borehole Schematic. Rev 05 This is an uncontrolled copy when printed 9

10 3 Waste Prevention & Reduction The drilling process differs from a manufacturing process in that it is a relatively short duration operation that, in principle, uses only volumes of raw materials and components as needed to complete the drilling. The activities will be conducted so as to prevent waste production wherever possible, and to reduce the quantities generated in all other cases applying the Waste Hierarchy. However, the nature of the operations giving rise to the extractive waste that are the subject of this Plan means that it is practically impossible to de-couple waste creation from the originating process. It is also subject to a degree of variation, and whilst every effort will be made to conserve natural resources and therefore generate as little waste as possible, the precise characteristics encountered in the target reservoir will mean this is subject to change. Prevention and minimisation will be applied as follows: 3.1 Drilling fluids: Volumes are calculated in advance of the drilling operation - planned drill to target depth. The drilling process is monitored by the Drilling Fluids Engineer, and along with the Pit Volume Totaliser (PVT) and mud logging process this enables monitoring of volumes of fluids pumped and returned. Drilling muds deposit a thin layer of low permeability solids called a filter cake around the sides of the borehole. Loss circulation materials are added to the drilling muds in permeable formations to form a non-permeable layer that prevents any loss of drilling fluids into these formations. The WBM is recirculated and reused until spent. Treatment for re-use consists of removal of solids (through the use of shale shakers and centrifuges) and fluid loss control (replacing lost water). WBM treatment generally becomes uneconomical after a certain amount of use of the mud, at which point the mud become waste. The OBM is treated for re-use during the drilling process by removal of solids (through the use of shale shakers and centrifuges) and the replenishment of the oil phase. Once drilling is completed, this repeat process enables the remaining oil based muds to be returned to the supplier for further conditioning and reuse. Estimated waste quantities, classification and management controls are summarised in Table 3.1 (EWC Classification refers to the European Waste Catalogue) using the following logic: The drilling fluid used determines the total amount of waste. It is assumed that this results in a total waste volume of 390 m 3 (factor 4 x volume of hole) when using WBM and 364 m 3 (factor 2.5x volume of hole) when using OBM; The total anticipated volume of drill cuttings is very conservatively estimated to around 373m 3 (based on around 70% greater than the hole volume), comprising approximately 140m 3 inert (from WBM drilling) and 233m 3 hazardous (from OBM drilling); This results in fluid waste volumes of WBM of 250 m 3 ( ) and for OBM of 131 m 3 ( ). Table 3.1: Drilling fluids: Estimated waste quantities, classification and controls Activity Waste Type EWC 2002 Code Classification Waste Estimate Management Route (m 3 ) Drill to 2050 ft MD WBM Non Hazardous 250 Collected and transported offsite for reclamation / treatment Drill from 2050 ft to target at 9784 ft MD OBM Hazardous 131 Transferred offsite for treatment and disposal Rev 05 This is an uncontrolled copy when printed 10

11 3.2 Drill Cuttings Cuttings only arise from the drilling of the borehole to its target depth. The drill bit size is reduced with depth to reduce hole size and therefore reduce cuttings volume. The volume of cuttings is conservatively estimated based on simple geometric considerations (70% greater than well volume) as discussed in section 3.1 above. Where possible, these surface waste solids are recycled into compost/soil improver and eventually for land reclamation/improver. Estimated waste quantities, classification and management controls are summarised in Table 3.2 (EWC Classification refers to the European Waste Catalogue) Table 3.2: Drill Cuttings: Estimated surface waste quantities, classification and controls Activity Waste Type EWC 2002 Code Classification Waste Estimate Management Route Cuttings from WBM Cuttings from OBM 3.3 Cement Waste gravel and crushed rocks other than those mentioned in Waste gravel and crushed rocks but containing dangerous substances from physical / chemical processing on n on metalliferous minerals & (mirror hazardous entry) (m 3 ) Non Hazardous 140 Collected and transported offsite for reclamation / treatment Hazardous 233 Transferred offsite for treatment and disposal Pumped volumes are controlled to minimise returns at surface. Returning cement cannot be reused on site but, due to the small quantities involved, the solidified cement can be sent for recycling to an offsite authorised waste facility. Estimated waste quantities, classification and management controls are summarised in Table 3.3 (EWC Classification refers to the European Waste Catalogue) Table 3.3: Cement: Estimated waste quantities, classification and controls Activity Waste Type EWC 2002 Code Classification Waste Estimate Solidified Grouting Cement (m 3 ) Concrete Non Hazardous 25 (to be confirmed) Management Route Likely to be mixed in with drilling fluids 3.4 Natural gas (methane) Fugitive emissions will not occur in the normal operation of the borehole. They are only possible when in a gas bearing reservoir. The drilling fluids are designed to provide a hydrostatic overpressure above the expected formation pressure and thus prevent any such fugitive emissions. In addition, continuous monitoring instrumentation indicates any gas content/pressures during drilling and, on detection, the hydrostatic pressure of the drilling fluids will be increased (by use of heavier fluids) to prevent such gas releases. Additional control is provided by well shut-in procedure at surface (including the use of the Blow Out Preventer - BOP). Rev 05 This is an uncontrolled copy when printed 11

12 However, in the unlikely event of an unplanned accident scenario when the above controls fail, the drilling rig will shut the well in by closing the annular or BOPs and will vent any such gas arriving at surface into the atmosphere via a diverter line or choke. Rev 05 This is an uncontrolled copy when printed 12

13 4 Fluids & Chemicals The drilling process involves the use of drilling fluids (muds) that are circulated down the drill string and through the drill bit in order to remove the drilled formation cuttings, maintain hydraulic pressure and control the temperature of the drill bit. Drilling fluids used in Broadford Bridge-1 will fall into two categories: a) Water based inhibitive drilling fluids (WBM) containing salts such as potassium chloride (generally at a level of 3 to 7%) and / or sodium chloride (up to saturation) or other nonhazardous salts. They are typically used for drilling water sensitive formations. The additives reduce clay swelling or dispersion and the consequent borehole sloughing and colloidal solids retention in the mud; b) Low toxicity oil based emulsion drilling fluids (OBM) containing around 75% oil phase and the remainder a water phase of calcium chloride solution. These are typically used for drilling through formations, particularly in deviated wellbores, in which the use of WBM would result in clay dispersion and reactive clay swelling leading to a potential for loss of operational control. Their applicability for the Broadford Bridge -1 well is shown in Table 4-1. Table 4.1: Drilling Fluids Used Drilled section hole size Drilling fluid 26 Augured in no drilling mud required 17 1 / 2 WBM (Freshwater/polymer plus salt type a above) 12 1 / 4 OBM (Oil Based Mud - type b above) 8 1 / 2 OBM (Oil Based Mud - type b above) Both types of drilling fluid (WBM & OBM) contain additives to improve drilling performance or to address contingent impacts. Table 4.2 lists the base chemicals and potential additives that may be used in the Broadford Bridge-1 well. Finally, Table 4.3 summarises planned chemical usage in the well. Note that the Hydrogeological Risk Assessment (Appendix 2) expands on the information in these tables and provides more detailed information and should be used as the reference source if more information is required. Rev 05 This is an uncontrolled copy when printed 13

14 Table 4.2: Drilling Fluids / Base Chemicals & Potential Additives Products to be used in drilling mud Product s Function How is the product used? If the product is only to be used in certain eventualities, explain. ADAPTA Filtration Control Agent The product is added in a BARACARB Weighting / Bridging known quantity by the Drilling Agent Fluid Engineer into the fluid at the rig site; the concentration is calculated at the rig site at the General use: Provides filtration control and secondary viscosity in oil-based muds. Contingent use: Increases fluid density and it is also used as a bridging agent across porous formations thereby building a filter cake to prevent loss of whole mud or excessive filtrate. BARACOR 100 Corrosion Inhibitor Contingent use: Helps prevent general corrosion attack on casing, tubing and down-hole tools that could react with dissolved oxygen (O2) to corrode. BARAKLEAN DUAL Solvent Cleaning Solution time of the addition based on Contingent use: Detergent-based casing cleaner typically used to clean the well-bore before running completion equipment into the well. BARAZAN Suspension Agent/ the planned fluid program and Contingent use: Viscosifier for fresh water and brine-based fluids. Suspends solids and weighting materials in fresh water and brine systems. Viscosifier monitored properties. BARITE Weighting Agent General use: Increases density of drilling muds to control formation pressure and stabilises the well-bore. BAROFIBRE Lost Circulation Material Contingent use: Helps reduce wall-cake permeability and seepage loss. Wall- cake (mud-cake or filter-cake) is the layer of solid particles formed against the porous formation because of the pressure differential between the hydrostatic pressure in the fluid and the formation pressure. Wall-cake is necessary to isolate the drilling fluid from the formation. Helps seal and bridge depleted sands and micro-fractures. BAROFIBRE Coarse Lost Circulation Material Contingent use: Helps reduce wall-cake permeability and seepage loss. Wall- cake (mud-cake or filter-cake) is the layer of solid particles formed against the porous formation because of the pressure differential between the hydrostatic pressure in the fluid and the formation pressure. Wall-cake is necessary to isolate the drilling fluid from the formation. Helps seal and bridge depleted sands and micro-fractures. BAROMUL 303 Oil-Wetting Agent/ Invert Emulsifier CALCIUM CHLORIDE brine CALCIUM CHLORIDE powder Shale Stabilizer Shale Stabilizer General use: Stabilises oil-wetting emulsion in oil-based muds. Oil-wetting is a primary property of oil-based muds and indicates the tendency for the well- bore rock to be in contact with an oil-phase rather than a water-phase. General use: Brine phase to minimize shale swelling and improve borehole stability. General use: Brine phase to minimize shale swelling and improve borehole stability. CAUSTIC SODA ph Adjuster Contingent use: Used to adjust ph in water-based fluid systems. CFS-476 Filming Agent Contingent use: Helps prevent general corrosion attack on casing, tubing and down-hole tools that could react with dissolved oxygen (O2) to corrode. Described as a filming agent because it coats the surface of metals and acts as a barrier between the metal surface and the oxygen. CMO 568 Lubricant Contingent use: Helps reduce torque, drag, and incidence of stuck pipe. DEXTRID E Filtration Control Agent General use: Used to lower filtration rates in water-based drilling fluids. Helps improve borehole stability and flocculate dispersed drill cuttings to improve cuttings separation from the drilling mud. EZ MUL NT Oil-Wetting Agent/ Invert Emulsifier General use: Stabilises the oil-wetting emulsion in oil-based muds. Oil- wetting is a primary property of oil-based muds and indicates the tendency for the well-bore rock to be in contact with an oil-phase rather than a water- phase. GELTONE II Viscosifier General use: Viscosifier for oil-based drilling fluids. Required for hole cleaning during drilling and work-over operations. It is used to gel oil drilling fluids for suspension of weighting agents in drilling fluids. Lime ph Adjuster/ Water Hardness Reducer General use: Used to adjust alkalinity in oil-based muds. LIQUITONE Filtration Control Agent General use: Provides filtration control and secondary viscosity in oil-based muds. Rev 05 This is an uncontrolled copy when printed 14

15 Products to be used in drilling mud Product s Function How is the product used? If the product is only to be used in certain eventualities, explain. MICA Lost Circulation Material Contingent use: Helps reduce wall-cake permeability and seepage loss. OXYGON Oxygen Scavenger/Corrosion Inhibitor Contingent use: Oxygen scavenger suitable for mono and divalent brines. Used to inhibit corrosion and maintain the alkaline ph in water-based muds PAC L Filtration Control Agent General use: Helps control filtration rates without significantly increasing fluid viscosity in water-based muds. In brines, it can be used as a thinner at low concentrations and also as a shale stabilizer by encapsulating the shale to prevent swelling and disintegrations. SODA ASH Water Hardness Reducer General use: Utilised to reduce drilling mud water hardness, especially where bentonite clay is used as a viscosifier. With excess hardness, the bentonite is inhibited from yielding to perform its function to a sufficient level of effectiveness. Fluid viscosity is essential for the drilling operation. SODIUM BICARBONATE ph Adjuster Contingent use: Used to adjust ph in water-based fluid systems when contaminated with cement. STARCIDE Biocide Contingent use: Helps control bacterial contamination in drilling fluids (eg sulphate reducing bacteria) and prevents breakdown of organic colloids. STEELSEAL 100 Lost Circulation Material Contingent use: Utilized to stop losses in porous and fractured formations in all types of drilling fluids. In water-based fluids, it performs as a solid lubricant for torque and drag reduction. It provides lost circulation treatments for pore plugging as background material and small sized induced and natural fractures. May be used in combination with other lost circulation materials. STEELSEAL 400 Lost Circulation Material Contingent use: Utilized to stop losses in porous and fractured formations in all types of drilling fluids. In water-based fluids, it performs as a solid lubricant for torque and drag reduction. It provides lost circulation treatments for pore plugging as background material and small sized induced and natural fractures. May be used in combination with other lost circulation materials. SUSPENTONE Suspension Agent Contingent use: Improves suspension qualities of oil-based muds. Reduces sagging or settling tendencies in deviated or high-angle wellbores. TOTAL DF1 Base Fluid General use: Low aromatics base oil for oil-based fluids: C11-C14, n-alkanes, isoalkanes, cyclics, <2% aromatics. Rev 05 This is an uncontrolled copy when printed 15

16 Table 4.1: Planned Chemical Usage Chemical substance in the products as per the SDSs CAS number of the component constituent (1) WATER-BASED MUD (WBM) 17 ½ inch drill section Percentage of the substance in drilling mud (w/w) PRIMARY CONSTITUENTS 12 ¼ inch drill section Percentage of the substance in drilling mud (w/w) OIL BASED MUD (OBM) 8 ½ inch drill section Percentage of the substance in drilling mud (w/w) Barium sulfate ~28.0 ~28.0 ~28.0 n/a Calcium chloride n/a ~20.0 ~20.0 n/a Calcium hydroxide n/a ~2.0 ~2.0 n/a Carbohydrate 2 - <1.5 n/a n/a n/a Cellulose derivative: polyanionic cellulose 3 - <1.0 n/a n/a n/a Crystalline silica, quartz <1.0 <1.0 <1.0 n/a Diethylene glycol monobutyl ether n/a <0.1 <0.1 n/a Ethylene glycol monobutyl ether n/a <0.1 <0.1 n/a Fatty acid, tall-oil, reaction product with diethylenetriamine, maleic, anhydride, tetraethylenepentamine, and triethylenetriamine n/a <1.5 <1.5 n/a Hydrocarbons, C11-C14, n- alkanes, isoalkanes, cyclics, <2% aromatics * *EC number CAS number n/a ~48.0 ~48.0 n/a Hydrotreated light petroleum distillate n/a ~1.0 ~1.0 n/a Polymer in an aqueous emulsion 4 - n/a <1.0 <1.0 n/a Sodium carbonate <0.1 n/a n/a <0.1 Sodium hydroxide <0.1 n/a n/a <0.1 Xanthan gum <1.0 n/a n/a <1.0 CONTINGENT CONSTITUENTS Calcined petroleum coke n/a ~6.0 ~6.0 n/a Calcium carbonate ~6.0 ~14.0 ~14.0 n/a Crystalline silica, cristoballite n/a ~0.01 ~0.01 n/a Crystalline silica, quartz <0.1 <0.1 <0.1 n/a Crystalline silica, tridymite n/a ~0.01 ~0.01 n/a Methanol n/a n/a n/a <0.5 Mica <0.5 n/a n/a n/a Completion Percentage of the substance in completion fluid (w/w) Rev 05 This is an uncontrolled copy when printed 16

17 Chemical substance in the products as per the SDSs CAS number of the component constituent (1) WATER-BASED MUD (WBM) 17 ½ inch drill section Percentage of the substance in drilling mud (w/w) 12 ¼ inch drill section Percentage of the substance in drilling mud (w/w) OIL BASED MUD (OBM) 8 ½ inch drill section Percentage of the substance in drilling mud (w/w) Morpholine process residues n/a n/a n/a <0.5 N, N' -Methylene bis (5-methyl oxazolidine) n/a n/a n/a <1.0 Nitrilotriacetic acid, trisodium salt monohydrate (5) n/a n/a n/a <0.01 Silica gel n/a <0.1 <0.1 n/a Sodium bicarbonate <1.0 n/a n/a n/a Completion Percentage of the substance in completion fluid (w/w) 1. Listed as in SDS and according to the requirements of Regulation (EC) No 1272/2008) Rev 05 This is an uncontrolled copy when printed 17

18 5.1 General 5 Site Operation & Waste Treatment The activities will be conducted so as to prevent waste production wherever practicable, reducing the quantities generated wherever practicable / appropriate. In all cases the Waste Hierarchy will be applied, in order to reduce the amount of material sent to landfill for final disposal, applying recovery / recycling best practice where applicable / appropriate. However, the nature of the operations giving rise to the extractive wastes which are the subject of this Plan means that it is in essence impossible to de-couple waste creation from the originating process. The drilling process is also subject to a degree of variation, and whilst every effort will be made to conserve natural resources, and therefore generate as little waste as possible, the precise rock / material characteristics encountered in the target reservoir will mean this is subject to change 5.2 Drilling Fluids Drilling muds are stored on site in high volume storage tanks, circulated down through the drill bit and returned to surface via enclosed lines. The returned drilling muds are passed through mechanical separation devices (known as shakers ) which are used to extract solid drill cuttings. Further centrifugal treatment is used to remove finer drill cuttings from the muds. Continual sampling and analysis of the drilling muds monitors solids content within the circulated fluids. Once the drilled solids content of the WBM mud reaches 6 to 10% by volume, it is considered degraded in terms of drilling performance and is pumped to open topped skips for off-site transfer via vacuum loading road tanker. The waste drilling muds will be removed by vacuum loading road tanker to an authorised waste facility. The ultimate end waste management route for drilling muds will be dependent on the material composition and it is anticipated that: Water based muds will be transferred for disposal; Oil based muds will be transferred for conditioning, resale and reuse. The mud storage tanks will subject to annual thickness inspections and weekly visual integrity inspections. 5.3 Drill cuttings Drill cuttings that are separated at the surface from the drilling muds, as described above, are stored in steel rectangular open skips with a capacity of up to 40m³. Skips are covered during storage and for any transportation off site. The rectangular containers are subject to annual thickness inspections and daily visual integrity inspections. The waste is transferred onto trailers and subsequently removed to one of several facilities that are appropriately permitted to receive, keep, store and treat industrial wastes of this nature (or exempt from the requirement to hold a permit) and are typically graded into recycled aggregate. Vacuum loading road tankers will be used for drill cuttings waste with a high liquid content. The rectangular containers will be subject to annual thickness inspections and daily visual integrity inspections. 5.4 Cement Returning cement to the surface is temporarily stored into skips before being sent off site to an authorised waste facility. Cement returns are minimised by controlling the volumes put into the well. Rev 05 This is an uncontrolled copy when printed

19 6 Environmental Risk Management 6.1 Environmental Risk Assessment An Environmental Risk Assessment has been carried out and is documented in Appendix 1. It is in compliance with the requirements of the Environment Agency horizontal guidance H1 Environmental Risk Assessment for Permits, Version 2.1, December 2011 and EPR6.14 How to comply with your environmental permit - Additional guidance for: mining waste operations, Version 2, February This qualitative assessment has considered noise, traffic movement, fugitive emissions, air emissions, releases to water environment, waste and potential for accidents and incidents as these relate directly to the activities. The assessment concluded that with the implementation of appropriate risk management measures, potential hazards from the activities are unlikely to be significant. 6.2 Environmental Risk Mitigation The Environmental Risk Assessment of Appendix 1 details the risk control and mitigation measures that Celtique Energie will put in place. Rev 05 This is an uncontrolled copy when printed 19

20 7 Control & Monitoring The Environment Risk Assessment demonstrate that due to the nature of the waste to be generated and the proposed risk control and mitigation measures, there will be no significant environmental risk and hence only limited monitoring of selected parameters is proposed as listed below. The quantity of waste arising each day will be monitored and recorded, along with the quantities despatched off-site for disposal. This data will be used to inform waste prevention and reduction strategies The results of all such monitoring will be used: to inform changes to the Waste Management Plan, be shared with the Environment Agency and used to inform site closure plans. 7.1 Fugitive Air Emissions The Environmental Risk Assessment has concluded any quantities are expected to be very minor and deemed to pose a low environmental risk. 7.2 Mud The site is located on a stone pad overlying an impermeable geotextile membrane, with an established unmade access and egress track to the drilling location. A once daily inspection of the road immediately at the juncture of the site entrance will be performed (and the details recorded) to ensure that any potential mud deposits from road tankers visiting to collect extractive waste does not become a problem. In the unlikely event of any build-up of mud and debris, the area will be cleaned using a sub-contracted road sweeper service. 7.3 Odour Based on prior experience, the extractive waste that will be generated is not malodorous and nor are any of the associated processes that will be performed. 7.4 Noise/Vibration Road contractors are required to manage HGV deliveries to avoid weekday peak hours and school finishing times. Road tankers visiting the site to collect extractive waste may be fitted with audible reversing alarms. Noise will be maintained within planning condition levels. The site is not in close proximity to residential properties and the anticipated noise levels during site construction and drilling (as calculated in the Environmental Statement) are not predicted to be problem. In addition, the exploration site is screened by natural features (established woodland) providing an additional sound attenuation. As defined in the Site Monitoring Plan (HSEC-BB-PD-03), noise monitoring will be undertaken at pre-determined locations around the boundary of the site and close to sensitive receptors throughout construction and drilling activities. If any complaint is received an investigation will be conducted into the causes of the complaint. The findings will as appropriate inform further monitoring and risk control arrangements and may lead to additional mitigation measures. Details of any such complaints and any remedial action taken or planned will be discussed with the Environment Agency. 7.5 Accidents The environmental risk of an accident is predominantly associated with the potential for spillage of extractive wastes. Given that the site is constructed with a large impermeable geotextile membrane providing spillage containment; that pipework and the associated storage tanks will be inspected daily for leaks and damage; that the waste is non-hazardous; and that the site is not situated in a Source Protection Zone (with no potable water abstraction activities in the site boundary or immediately nearby) the environmental risk assessment has concluded the risk to be low. Nonetheless, it is proposed that nearby surface water features will be sampled and tested to identify the presence of extractive waste contaminants prior to construction starting Rev 05 This is an uncontrolled copy when printed 20

21 and at regular intervals during construction and drilling as defined in the Site Monitoring Plan (HSEC-BB-PD-03).. The results of this monitoring will be recorded and will inform the future monitoring for the site closure plan. Details of all accidents, and our response, will be shared with the Environment Agency and other regulators as appropriate. 7.6 Drilling Muds & Drill Cuttings Appropriate storage capacities will be provided for each mud type once it is to be discarded, i.e. water- and oil-based, and, subject to analysis to confirm otherwise, the former will be handled as a non-hazardous material / waste, the latter as a hazardous material / waste The quantity of waste arising each day will be monitored and recorded, along with the quantities dispatched off site for disposal. This data will be used to inform waste prevention and reduction strategies. Fluid and solid drilling waste are sampled at the first available opportunity when drilling commences for chemical analysis and any other additional waste acceptance criteria that is requested by the offsite authorised waste facility. 7.7 Cement The quantity of waste arising each day will be monitored and recorded, along with the quantities dispatched off site to an authorised waste facility. 7.8 Complaints If any complaints are received from stakeholders, including neighbours, they will be recorded, investigated and responded to without delay in accordance with the Company s existing complaints handling procedures. Complaints will additionally be reported to the Environment Agency, with whom actions to avoid a recurrence will be discussed and agreed Rev 05 This is an uncontrolled copy when printed 21

22 8 Proposed Plan for Closure In the event that no hydrocarbons are found in the borehole, the well will be abandoned without any testing. This process will involve the following: Condition 17 of the planning consent for the site sets out the requirements for closure and restoration of the site (ref WSCC/052/12/WC of 11 th February 2013), namely A scheme of aftercare specifying the steps to be taken to manage restored land shall be submitted for the written approval of the County Planning Authority prior to the commencement of restoration. Thereafter the approved strategy shall be implemented in full. This will be complied with; The well will be plugged and abandoned following industry best practice and regulatory requirements as set out in guidance by: o o Borehole Sites & Operations Regulations 1995 (BSOR); Land based requirements of the Offshore Installations and Wells (Design & Construction, etc.) Regulations 1996 (DCR); o Oil & Gas UK Guidelines for the Suspension & Abandonment of Wells, July 2012 o UK Onshore Operators Group Guidelines. These approaches will be reviewed and endorsed by both an independent well examiner and the regulator (HSE - Health and Safety Executive); The process to plug and abandon the well will involve: pumping cement into the well to create a series of plugs and the removal of the wellhead, cutting the casings and sealing them below ground level. No active pollution control requirements will be deployed. When the well is plugged and abandoned, a closure plan will be developed, agreed with the WSCC, EA and the site owner and implemented as discussed above and the Waste Management Permit will be surrendered. During the period prior to surrender of the permit, as required by the Environment Agency s guidance How to comply with your environmental permit. Additional guidance for: mining waste operations, the following actions will be implemented: o o o Any environmental management and monitoring systems (as defined in the Site Monitoring Plan (HSEC-BB-PD-03)) will be maintained and operated until the point of surrender; Any aftercare requirements necessary to satisfy other regulatory regimes will be implemented and followed; The Environmental Agency will inspect the facility to confirm that all required actions under the permit have been completed. In the event that the borehole encounters hydrocarbons, the well will be temporarily suspended and the drilling rig released. This temporary suspension will be carried out in compliance with regulatory and industry guidelines to leave the well in a safe state and allow a subsequent test of the reservoir to be made (this test will be the subject of a separate permit application and is not covered by this drilling permit documentation). This temporary suspension involves the following actions: The last well construction operations with the drilling rig will leave the well with a 7 liner cemented in position extending from some 500 ft above the shoe of the 9⅝ " casing to TD; The well will be filled with inhibited kill weight fluid of sufficient weight (density) to assure that the hydrostatic pressure in the well at the reservoir depth will be in excess of the known reservoir pressure. This combination of cement and fluid provides two independent pressure / isolation barriers between the reservoir and the environment; In addition, the following actions will be implemented: Rev 05 This is an uncontrolled copy when printed 22

23 A kill string comprising of 2 7 / 8 tubing) will be run into the well to a depth of around 1000 ft; A tubing hanger will be landed and a back pressure valve installed into the hanger profile and pressure tested; All surface valves will be chained closed to prevent any tampering; The integrity of surface equipment is assured by inspections and maintenance as required; The security of the surface equipment is provided by security barriers at the well site and security guarding. Rev 05 This is an uncontrolled copy when printed 23

24 9 Measures to Prevent Pollution The Environmental Statement for Broadford Bridge-1 and the supporting planning approval and the Risk Assessments to this Waste Management Permit submission (see Appendices) have identified all the potential hazards and pollutant linkages at the site relating to the management of the extractive waste, the risks they pose, and the risk control measures that Celtique will implement in order to mitigate those risks. These risk control measures are considered to meet the requirements of the Mining Waste Directive, including the need to prevent water status deterioration and soil pollution and are listed below: Direct discharges of extractive waste: There will be no leachate generated at the site. There will be no deliberate discharges of extractive liquid waste directly to the environment from the site. Measures to prevent the pollution of soil and accidental releases of waste that could cause pollution of surface water and groundwater have been considered and mitigation measures within the environmental risk assessment implemented on site; Indirect discharges of extractive waste: Mitigation measures are in place to prevent indirect discharges of extractive waste arising from accidents, leaks or percolation into the environment. The mitigation measures are documented with the environmental risk assessment. Rev 05 This is an uncontrolled copy when printed 24

Module No. # 02. Impact of oil and gas industry on marine environment

Module No. # 02. Impact of oil and gas industry on marine environment Health, Safety and Environmental Management in Petroleum and offshore Engineering Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module No. # 02 Lecture

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

GUIDELINES FOR LEACHATE CONTROL

GUIDELINES FOR LEACHATE CONTROL GUIDELINES FOR LEACHATE CONTROL The term leachate refers to liquids that migrate from the waste carrying dissolved or suspended contaminants. Leachate results from precipitation entering the landfill and

More information

Drilling Problems. pull

Drilling Problems. pull Drilling Problems Pipe Sticking Lost Circulation Hole Deviation Pipe Failures Borehole Instability Mud Contamination Formation Damage Hole Cleaning H S General Equipment & Personnel Pipe Sticking Can not

More information

Introduction to Waste Treatment Technologies. Contents. Household waste

Introduction to Waste Treatment Technologies. Contents. Household waste Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting

More information

Characterization of Greenhouse Gas Emissions Involved in Oil and Gas Exploration and Production Operations

Characterization of Greenhouse Gas Emissions Involved in Oil and Gas Exploration and Production Operations Characterization of Greenhouse Gas Emissions Involved in Oil and Gas Exploration and Production Operations Review for the California Air Resources Board by Angela Zahniser What greenhouse gas (GHG) emissions

More information

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012 DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY August 2012 SECTION 2 The storage requirements in Directive 055 apply to upstream petroleum facilities, well sites, and pipelines

More information

ANNEX 2 Emergency / Pollution Incident Response Plan

ANNEX 2 Emergency / Pollution Incident Response Plan ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...

More information

CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction

CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction California Groundwater Association An NGWA Affiliate State PO Box 14369 Santa Rosa CA 95402 707-578-4408 fax: 707-546-4906 email: [email protected] website: www.groundh2o.org CGA Standard Practices Series

More information

Understanding Hydraulic Fracturing

Understanding Hydraulic Fracturing Understanding Hydraulic Fracturing Natural gas is a safe, abundant and economical source of energy for the planet. North America has relied on natural gas for heating homes and buildings, as a fuel source

More information

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2 Introduction Canadian Oilwell Systems Company and it s subsidiaries are suppliers of oil well Electric Submersible Pumping systems (ESPs). Such pumps are used to lift oil from oil wells so that the oil

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Section 1421 of SDWA tasks EPA with protecting USDWs for all current and future drinking water supplies across the country (see section 1.3 for the complete definition of a USDW). EPA s UIC Program

More information

Cabot Oil & Gas Corporation

Cabot Oil & Gas Corporation Information you need to know regarding Cabot Oil & Gas Corporation s natural gas production activities and hydraulic fracturing About Cabot Cabot Oil & Gas Corporation (Cabot) is a leading independent

More information

Guidance on applying the waste hierarchy to hazardous waste November 2011

Guidance on applying the waste hierarchy to hazardous waste November 2011 www.defra.gov.uk Guidance on applying the waste hierarchy to hazardous waste vember 2011 This guidance is produced under regulation 15(1) of the Waste (England and Wales) Regulations 2011 and any person

More information

SANTA FE COUNTY'S OIL DEVELOPMENT ZONING ORDINANCE

SANTA FE COUNTY'S OIL DEVELOPMENT ZONING ORDINANCE SANTA FE COUNTY'S OIL DEVELOPMENT ZONING ORDINANCE Stephen C. Ross Santa Fe County Attorney 102 Grant Avenue P.O. Box 287 Santa Fe, New Mexico 87504-0287 (505) 989-6279 December 5, 2013 Existing oil field

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.

More information

Remediation of Water-Based Drilling Fluids and Cleaning of Cuttings

Remediation of Water-Based Drilling Fluids and Cleaning of Cuttings OVERVIEW Water-Based Drilling Fluids are environmentally friendly compared with oil-based drilling fluids; however their safe disposal can still be a challenge. There are normally no hydrocarbons present,

More information

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the

More information

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION GAS WELL/WATER WELL SUBSURFACE CONTAMINATION Rick Railsback Professional Geoscientist CURA Environmental & Emergency Services [email protected] And ye shall know the truth and the truth shall make you free.

More information

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN SCOPE: This guidance sets out best practice for producing a Pollution Incident Response Plan to deal with an environmental incident

More information

CHAPTER 4 WELL COMPLETION AND MAINTENANCE

CHAPTER 4 WELL COMPLETION AND MAINTENANCE CHAPTER 4 WELL COMPLETION AND MAINTENANCE Section 1: Disinfection. (a) Each person who repairs, modifies, works on, or otherwise affects the physical components of a well shall clean and disinfect the

More information

Remediation Services & Technology

Remediation Services & Technology Remediation Services & Technology Miranda Cruttenden- Well Remediation Engineer Todd Studer- Business Development Manager September 2011 Agenda Near wellbore remediation Causes of formations damage Field

More information

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment

More information

Tuesday, March 17, 2015 Houston, TX. Energy Exchange 9:20 9:50 a.m. and 9:55 10:25 a.m. OIL AND GAS: ENVIRONMENTAL INSURANCE IS IT NECESSARY?

Tuesday, March 17, 2015 Houston, TX. Energy Exchange 9:20 9:50 a.m. and 9:55 10:25 a.m. OIL AND GAS: ENVIRONMENTAL INSURANCE IS IT NECESSARY? Tuesday, March 17, 2015 Houston, TX Energy Exchange 9:20 9:50 a.m. and 9:55 10:25 a.m. OIL AND GAS: ENVIRONMENTAL INSURANCE IS IT NECESSARY? Copyright 2015 International Risk Management Institute, Inc.

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,

More information

Secondary Containment: Regulations & BMPs. Beth Powell Vice-President and General Manager New Pig Energy [email protected]

Secondary Containment: Regulations & BMPs. Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com Secondary Containment: Regulations & BMPs Beth Powell Vice-President and General Manager New Pig Energy [email protected] Federal Secondary Containment Safeguarding method in addition to the primary

More information

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O APPENDIX O Spill Prevention and Emergency Response Plan APPENDIX O G3 Terminal Vancouver Port Metro Vancouver Project Permit Application G3 TERMINAL VANCOUVER: PORT METRO VANCOUVER SPILL PREVENTION AND

More information

Objectives. Describing Waterflooding. Infill Drilling. Reservoir Life Cycle

Objectives. Describing Waterflooding. Infill Drilling. Reservoir Life Cycle Objectives Describing Waterflooding Definition Objectives Candidates Patterns Oil, water, and gas saturations Fractional flow Performance measures Practices and problems Reservoir monitoring 1 2 Reservoir

More information

Guide on the Segregation, Packaging, Labelling and Storage of Laboratory Chemical Wastes for Schools

Guide on the Segregation, Packaging, Labelling and Storage of Laboratory Chemical Wastes for Schools APPENDIX II Guide on the Segregation, Packaging, Labelling and Storage of Laboratory Chemical Wastes for Schools (Prepared by Environmental Protection Department) 1. Introduction The Waste Disposal (Chemical

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

Drilling Fluids, Inc. Brine Fluids

Drilling Fluids, Inc. Brine Fluids Drilling Fluids, Inc. Brine Fluids 1 2 Why Brine Fluids... 3 Introduction... 3 Completion Methods... 3 Maximum Density... 4 Brine Fluids... 4 Crystallization... 5 Maintenance... 5 Thermal Expansion...

More information

SPE Distinguished Lecturer Program

SPE Distinguished Lecturer Program SPE Distinguished Lecturer Program The SPE Distinguished Lecturer Program is funded principally through a grant from the SPE Foundation. The society gratefully acknowledges the companies that support this

More information

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue

More information

TECHNICAL REVIEW OF SECONDARY CONTAINMENT SYSTEM TECHNOLOGY FOR ALASKA

TECHNICAL REVIEW OF SECONDARY CONTAINMENT SYSTEM TECHNOLOGY FOR ALASKA Final Report to STATE OF ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF SPILL PREVENTION AND RESPONSE TECHNICAL REVIEW OF SECONDARY CONTAINMENT SYSTEM TECHNOLOGY FOR ALASKA May 1, 1998 Steven

More information

Oil and Gas Extraction and Source Water Protection

Oil and Gas Extraction and Source Water Protection PUBLISHED BY THE NATIONAL ENVIRONMENTAL SERVICES CENTER Oil and Gas Extraction and Source Water Protection By Zane Satterfield, P. E., NESC Engineering Scientist Summary Although the U.S. petroleum industry

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

Guidelines For Sealing Groundwater Wells

Guidelines For Sealing Groundwater Wells Guidelines For Sealing Groundwater Wells Government of Newfoundland and Labrador Department of Environment and Conservation Water Resources Management Division Government of Newfoundland and Labrador Department

More information

RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE

RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE (Adopted January 6, 1978)(Amended August 3, 1979)(Amended July 11, 1980) (Amended August 3, 1990)(Amended December 7, 1990) (Amended November 17, 2000) RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN

More information

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County FORWARD In 1991, the Broward County Environmental Protection and Growth Management Department, who was then known as the Department of Natural Resource Protection (DNRP), initiated the development of Pollution

More information

Azeri, Chirag & Gunashli Full Field Development Phase 3 Environmental & Socio-economic Impact Assessment. A10.1 Introduction...

Azeri, Chirag & Gunashli Full Field Development Phase 3 Environmental & Socio-economic Impact Assessment. A10.1 Introduction... APPENDIX 10 Normally Occurring Radioactive Material (NORM) Contents A10.1 Introduction... A10/3 A10.2 Occurrence & Concentration of NORM in Oil and Gas Operations... A10/4 A10.2.1 Probability of NORM formation

More information

Treatment of Hazardous Waste On-Site by Generators

Treatment of Hazardous Waste On-Site by Generators IDEM Indiana Department of Environmental Management Office of Land Quality 100 North Senate Indianapolis, IN 46204 OLQ PH: (317) 232-8941 Guidance Treatment of Hazardous Waste On-Site by Generators The

More information

Fracturing Fluid Systems

Fracturing Fluid Systems Fracturing Fluid Systems Broad Variety of Systems Enables Customizing the Treatment Fluid to Reservoir Requirements Since Halliburton performed the first commercial fracturing treatment in 1949, the development

More information

Tax Executives Institute

Tax Executives Institute Tax Executives Institute Texas Oil and Gas Transactions May 6, 2013 Circular 230 disclaimer Any US tax advice contained herein was not intended or written to be used, and cannot be used, for the purpose

More information

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of

More information

The Control of Major Accident Hazards Regulations (Northern Ireland) 2015

The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 STATUTORY RULES OF NORTHERN IRELAND 2015 No. 325 HEALTH AND SAFETY The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 Made - - - - 26th August 2015 Coming into operation - 28th September

More information

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards Note: Operating instructions updated July 2014 WELL COMMANDER: Versatile multicycle ball-activated drilling

More information

Hydraulic control unit series 0086-372-01

Hydraulic control unit series 0086-372-01 Technical Product Information No. 1290 EN Hydraulic control unit series 0086-372-01 Contents Page About this Technical Product Information (TPI) 2 The ORTLINGHAUS numbering system 2 About the product 3

More information

MUDSOLV NG. Integrated filter-cake removal service for optimizing performance of open-hole completions

MUDSOLV NG. Integrated filter-cake removal service for optimizing performance of open-hole completions MUDSOLV NG Integrated filter-cake removal service for optimizing performance of open-hole completions MUDSOLV NG: Comprehensive filter-cake breaker service A properly formulated and carefully maintained

More information

Temporary Batch Plants

Temporary Batch Plants Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin*

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin* WIERTNICTWO NAFTA GAZ TOM 24 ZESZYT 1 2007 Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin* NEW TECHNICAL CONSIDERATIONS OF ROMGAZ COMPANY REGARDING DRILLING, COMPLETION AND

More information

OFFSHORE FIELD DEVELOPMENT

OFFSHORE FIELD DEVELOPMENT OFFSHORE FIELD DEVELOPMENT OPTIONS & STRATEGY By: Nguyen Ngoc Hoan M.Sc of Petroleum Engineering [email protected] PRESENTATION CONTENT Field Development Consideration Field Development Options & Strategy

More information

Guidelines for Selecting and Maintaining Glycol Based Heat Transfer Fluids

Guidelines for Selecting and Maintaining Glycol Based Heat Transfer Fluids Guidelines for Selecting and Maintaining Based Heat Transfer Fluids David Berry Engineering Manager, Chem-Aqua Canada Allan Browning Technical Marketing Manager, Chem-Aqua, Inc. Based Heat Transfer Fluids

More information

1 What is the purpose of this document?

1 What is the purpose of this document? Executive Summary Comparing the Oil and Gas Drilling Regulatory Regimes of the, the, the U.K,, and 1 What is the purpose of this document? The National Energy Board (NEB) regulates offshore oil and gas

More information

Recommended Practices Associated with Hydraulic Fracturing Operations

Recommended Practices Associated with Hydraulic Fracturing Operations Recommended Practices Associated with Hydraulic Fracturing Operations API standards program includes best-practices for hydraulic fracturing which include: Proper well construction and integrity Zonal

More information

The Impact Of Cementing On Proper Well Control

The Impact Of Cementing On Proper Well Control The Impact Of Cementing On Proper Well Control Lee Dillenbeck Senior Advisor, Cementing Chevron ETC Drilling and Completions 2010 Chevron Learning Objectives Explain the main reasons for cementing wells

More information

Contingency Plan. Facility Name

Contingency Plan. Facility Name Contingency Plan Facility Name This plan is reviewed annually and amended whenever changes occur that will significantly affect the ability of this facility to respond to an emergency situation. This includes

More information

APPENDIX 2A. Shah Deniz Production Sharing Agreement Extract

APPENDIX 2A. Shah Deniz Production Sharing Agreement Extract APPENDIX 2A Shah Deniz Production Sharing Agreement Extract Shah Deniz Production Sharing Agreement Extract ARTICLE 26 - Environmental Protection and Safety 26.1 Environmental Standards Contractor shall

More information

7. Chemical Waste Disposal Procedures

7. Chemical Waste Disposal Procedures 7. Chemical Waste Disposal Procedures Substances that Can and Cannot be Disposed of via Sink Drains or in Regular Solid Refuse Containers 1. It is prohibited to pour down a sink or floor drain, or place

More information

SILICON VALLEY CLEAN WATER. May 2015

SILICON VALLEY CLEAN WATER. May 2015 SILICON VALLEY CLEAN WATER May 2015 Slug Discharge Control and Spill Containment Guidelines This document was revised and used with the permission of the Los Angeles County Sanitation District, Industrial

More information

APPENDIX 7-B. Hazardous Materials Management Plan

APPENDIX 7-B. Hazardous Materials Management Plan S TAR-ORION S OUTH D IAMOND P ROJECT E NVIRONMENTAL I MPACT A SSESSMENT APPENDIX 7-B Hazardous Materials Management Plan SX03733 Section 6.0 1.1.1 Hazardous Materials Management Plan 1.1.1.1 Introduction

More information

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009 Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009 Hydraulic Fracturing Operations Well Construction and Integrity Guidelines

More information

The material of which a petroleum reservoir. Effects of the Workover Fluid on Wellbore Permeability. t e c h n o l o g y

The material of which a petroleum reservoir. Effects of the Workover Fluid on Wellbore Permeability. t e c h n o l o g y Effects of the Workover Fluid on Wellbore Permeability Workover fluids used to kill oil wells for many subsurface production operations can cause many damaging problems to the formation near the wellbore.

More information

PBX Series Quick Fit Connector Bimetallic Steam Traps

PBX Series Quick Fit Connector Bimetallic Steam Traps 6262100/6 IM-P626-01 ST Issue 6 PBX Series Quick Fit Connector Bimetallic Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

HAZARDOUS WASTE MANAGEMENT PROGRAM

HAZARDOUS WASTE MANAGEMENT PROGRAM HAZARDOUS WASTE MANAGEMENT PROGRAM UNIVERSITY RISK MANAGEMENT Occupational Safety and Health Programs 19 Hagood Avenue, Suite 908 Charleston, SC 29425 843-792-3604 Revised: January 2015 TABLE OF CONTENTS

More information

Self Assessment Exercise

Self Assessment Exercise Self Assessment Exercise Read the following extract of supporting documentation for Permit Application for Galvos plc galvanising facility and the accompanying tables. Decide if the proposed control techniques

More information

Certificate Programs in. Program Requirements

Certificate Programs in. Program Requirements IHRDC Online Certificate Programs in OIL AND GAS MANAGEMENT Program Requirements IHRDC 535 Boylston Street Boston, MA 02116 Tel: 1-617-536-0202 Email: [email protected] Copyright International Human

More information

11.4.2006 EN Official Journal of the European Union L 102/15

11.4.2006 EN Official Journal of the European Union L 102/15 11.4.2006 EN Official Journal of the European Union L 102/15 DIRECTIVE 2006/21/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 15 March 2006 on the management of waste from extractive industries and

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental Protection Sec. 22a-472 page 1 (4-97) TABLE OF CONTENTS Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental

More information

Removing Heavy Metals from Wastewater

Removing Heavy Metals from Wastewater Removing Heavy Metals from Wastewater Engineering Research Center Report David M. Ayres Allen P. Davis Paul M. Gietka August 1994 1 2 Removing Heavy Metals From Wastewater Introduction This manual provides

More information

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills. WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

MATERIAL SAFETY DATA SHEET Description: SAF DRAIN Revision Number: 00

MATERIAL SAFETY DATA SHEET Description: SAF DRAIN Revision Number: 00 GRANULAR, ALKALINE DRAIN CLEANER GENERAL SAF-DRAIN is a powerful alkaline drain cleaner designed so that the product reaches the problem area before the reaction takes place. It effectively cleans organic

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes

More information

Wastewater Reuse. Typical treated wastewater is:

Wastewater Reuse. Typical treated wastewater is: Wastewater Reuse Most metal finishing industries have in-house wastewater treatment to economically dispose of the acids, alkali, oils, and dissolved metals in the rinse water and occasional tank solution

More information

AESTHETIC AND NOISE CONTROL REGULATIONS

AESTHETIC AND NOISE CONTROL REGULATIONS AESTHETIC AND NOISE CONTROL REGULATIONS 801. INTRODUCTION The rules and regulations in this section are promulgated to control aesthetics and noise impacts during the drilling, completion and operation

More information

ENVIRONMENTAL ASPECTS REGISTER (ISO 14001)

ENVIRONMENTAL ASPECTS REGISTER (ISO 14001) ENVIRONMENTAL ASPECTS REGISTER (ISO 14001) 1. Scope The scope of this Environmental Aspects Register covers the following operational areas: Aberdeen Region (A); Cumbernauld Region (C); Warrington Region

More information

RAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT

RAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT RAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT WASTE MINIMIZATION IN THE OIL FIELD - APPENDIX C NOTES RAILROAD COMMISSION OF TEXAS LIST OF E&P WASTES: EXEMPT AND NON EXEMPT

More information

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the

More information

Material Safety Data Sheet

Material Safety Data Sheet Material Safety Data Sheet Conforms to ISO 11014:2009 DRAIN CLEANER 1. IDENTIFICATION OF THE SUBSTANCE/PREPARATION AND OF THE COMPANY Product name : DRAIN CLEANER Product code : KC7 Use/description of

More information

10 Wireline operations

10 Wireline operations 10 WIRELINE OPERATIONS... 1 10.1 GENERAL... 1 10.2 WELL BARRIER SCHEMATICS... 1 10.3 WELL BARRIER ACCEPTANCE CRITERIA... 1 10.3.1 Well control equipment configuration... 1 10.3.2 Deployment of toolstrings...

More information

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG 21. 1. Introduction

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG 21. 1. Introduction PPG21 February 2004 Environmental Alliance working together Pollution Prevention Guidelines pollution incident response planning: PPG 21 These guidance notes have been drawn up to assist those developing

More information

Safety Data Sheet. (REACH Regulation (EC) No. 1907/2006 No. 453/2010)

Safety Data Sheet. (REACH Regulation (EC) No. 1907/2006 No. 453/2010) Safety Data Sheet (REACH Regulation (EC) No. 1907/2006 No. 453/2010) Date of Issue : Nov. 23, 2009 Date of Revision : Apr. 14. 2014 Version : 2 SECTION 1. IDENTIFICATION OF THE SUBSTANCE/MISTURE AND OF

More information

Properly maintaining your septic system will help reduce the. It s Your Septic System. Homeowner s Guide. Here s How to Take Care of It

Properly maintaining your septic system will help reduce the. It s Your Septic System. Homeowner s Guide. Here s How to Take Care of It Homeowner s Guide for Maintenance and Care of On-Site Sewage Systems It s Your Septic System Here s How to Take Care of It Properly maintaining your septic system will help reduce the possibility of health

More information

AMEC 6007: Linear Velocity and Acceleration Learning Outcome. CHEM 6012: Oil and Gas Compositions and Sales Specifications Learning Outcome

AMEC 6007: Linear Velocity and Acceleration Learning Outcome. CHEM 6012: Oil and Gas Compositions and Sales Specifications Learning Outcome s/objectives Level F ADMN 6044: Post Job Management It is important to know the proper procedures for closing out a job so that rigging and equipment is maintained for future use and personnel are adequately

More information

SAFETY DATA SHEET. Section 1: Identification of the substance/mixture and of the company/undertaking. KaVo Everest ZS-Blanks und Ronden

SAFETY DATA SHEET. Section 1: Identification of the substance/mixture and of the company/undertaking. KaVo Everest ZS-Blanks und Ronden SAFETY DATA SHEET Section 1: Identification of the substance/mixture and of the company/undertaking Product identifier Trade name or designation of the mixture REACH Registration Number KaVo Everest ZSBlanks

More information

Reclamation of Marcellus Shale Drilling Sites in West Virginia by Jeff Skousen and Paul Ziemkiewicz West Virginia University

Reclamation of Marcellus Shale Drilling Sites in West Virginia by Jeff Skousen and Paul Ziemkiewicz West Virginia University Reclamation of Marcellus Shale Drilling Sites in West Virginia by Jeff Skousen and Paul Ziemkiewicz West Virginia University Introduction The rapidly developing boom in natural gas drilling into the Marcellus

More information

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap 1263050/6 IM-P126-07 ST Issue 6 BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

Confined spaces can be deadly. What is a confined space?

Confined spaces can be deadly. What is a confined space? Confined spaces A brief guide to working safely This leaflet explains what you, as an employer, may need to do to protect your employees when working in confined spaces. It will also be useful to the self-employed

More information

Best Practice for Stand-alone Screens

Best Practice for Stand-alone Screens Best Practice for Stand-alone Screens Ian Wattie Completion Engineering Consultant Yala Peak Limited Sand Management Forum 26 th 27 th March 2014 Aberdeen 1 Stand-alone Screens Best Practices Completion

More information

Waste and Cost Reduction Techniques for Small Parts Cleaners

Waste and Cost Reduction Techniques for Small Parts Cleaners Waste and Cost Reduction Techniques for Small Parts Cleaners Edited by Ron Still Mechanical components typically need cleaning during repair and maintenance activities, and most maintenance shops use parts

More information

Shale Energy Fluids Management Practices

Shale Energy Fluids Management Practices Shale Energy Fluids Management Practices Forum on Hydraulic Fracturing Bogota, Colombia, December 1, 2014 Presented by Dave Yoxtheimer, PG Hydrogeologist Penn State Marcellus Center for Outreach and Research

More information

NORSOK Standard D-010 Rev. 4, August 2012

NORSOK Standard D-010 Rev. 4, August 2012 Below is a listing of the main changes 1. Definitions of suspension, temporary and permanent abandonment 2. Included more examples of well barrier schematics 3. Included illustrations for permanent abandonment

More information

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY FREQUENTLY ASKED QUESTIONS (FAQ) Question: Do fuel tanks fall under the requirements of Directive 055? No. For storage of fuels (e.g.,

More information

CHAPTER 7 THE DEHYDRATION AND SWEETENING OF NATURAL GAS

CHAPTER 7 THE DEHYDRATION AND SWEETENING OF NATURAL GAS CHAPTER 7 THE DEHYDRATION AND SWEETENING OF NATURAL GAS Natural gases either from natural production or storage reservoirs contain water, which condense and form solid gas hydrates to block pipeline flow

More information

CHAPTER 13 LAND DISPOSAL

CHAPTER 13 LAND DISPOSAL CHAPTER 13 LAND DISPOSAL Supplemental Questions: Which of Shakespeare's plays is the source of the opening quote? The Tempest [1611-1612],Act: I, Scene: i, Line: 70. 13-1. Cite four reasons landfills remain

More information

HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003

HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003 Page: 1 of 6 PROCEDURE SIG-ENV-PR003 Revision Approved Date Description 1 AV 01/04/99 New EP 2 AV 07/06/00 Revision of EP 3 AV 04/04/03 Revision of EP 4 Stuart Roseby DRAFT 5 Stuart Roseby 25/07/2005 Approved

More information