1 Systems Architecture and Data Model We are seeking stakeholders views on the questions set out in this consultation document. If you have any comments on the paper please contact: Publication Date: 2 January 2014 Response deadline: 14 February 2014

2 Contents 1. Executive summary Required market operator IT systems Industry data exchange hub interface approach Market data model 4 2. Introduction Programme background Document purpose and context 5 3. Market participants and market facilitation 8 4. Required IT systems Approach to data exchange and required interfaces Services offered by the market operator Types of IDEX interface Transmission Storage Validation Indicative event and data volumes High-level market conceptual data models Conceptual model for registration data Conceptual model for service request data Conceptual model for consumption and financial settlement data 22 Appendix A: Consultation questions and approach 25 Appendix B: Glossary of terms 27 Appendix C: Customer expectations assessment 28 2

3 Appendix D: Working group comments 29 3

4 1. Executive summary This document sets out our high-level design proposals for the systems architecture and data model and the scope of message services that the market operator (MO) offers within the new retail market. 1.1 Required market operator IT systems To enable the MO to deliver services in the areas of registration and switching, financial settlement, market governance, and industry data exchange, IT systems will be required, most notably: a registration system and database; a meter reading preparation system, charge calculation system, and associated databases; a management information/business intelligence system; and an industry data exchange hub, including a message validation system and message database. 1.2 Industry data exchange hub interface approach The MO should be responsible for co-ordinating data exchange within the industry. To enable this, an industry data exchange (IDEX) hub will be created, through which market participants will send and receive data. Reflecting the different frequencies with which different market processes will be employed, and the different scale of market participants, the following three types of interface will be implemented. An automated interface, expected to be for machine-to-machine communication and used for transferring large volumes of data at low cost. A semi-manual interface for participants to upload data files to and download data files from manually, to be used as a contingency or as a low-cost alternative for new or small market entrants with lower volumes of data to be transferred. A manual interface such as set of secure web forms to enter data into manually, to be used as a contingency or as a very low-cost alternative for new or small market entrants with lower volumes of data to be transferred. The transmission of all standard messages between market participants should be through the IDEX hub and mandatory for all participants, with the MO validating and storing the data contained in such messages. The MO should also enable the transmission of all non-standard messages through the IDEX hub. Use of this will be optional for participants, but where it is used, the MO will store, but not validate, message data. The IDEX is only intended to support the electronic transfer of information between participants and/or the MO. It does not cover verbal communications. 1.3 Market data model The data model for the market, and for the MO in particular, includes: for registration and switching, a centrally held record of premises, service points, and associated meters and market participants. The central data model will not hold customer-level data; for operational services, a centrally held record of service requests and notifications; and for metering and financial settlement, a centrally held record of meter readings, wholesale charging schemes, and derived wholesale charges. 4

5 2. Introduction 2.1 Programme background The UK Government s Water Bill 1 was introduced into Parliament and published on 27 th June The Water Bill is designed to address the current and future challenges faced by the water and sewerage sector, which were described in the Water White Paper 2. Among other things, the Water Bill is designed to: increase customer choice; improve service provision; stimulate innovation; and drive more sustainable approaches to managing our scarce resources. The Government s key reforms are: the introduction of retail competition for water and sewerage services to non-household customers in England, which will be in place from April 2017; and the introduction of competition in the upstream sector, which will take place at a later date (after 2019). The Open Water programme has been created to facilitate the implementation of the proposed reforms. 2.2 Document purpose and context This document is part of a suite of materials being published throughout They set out the Open Water programme s recommendations for the high-level design for the new competitive water and sewerage retail market for non-household customers in England. These materials are: a market blueprint, which describes the present and future market arrangements and the different roles in the new market arrangements, and summarises the programme s recommendations for the high-level market design; a series of documents on strategy and high-level design (of which this is one), which present in more detail the programme s recommendations in areas such as registration and switching, financial settlement, and industry governance and performance management; and supporting discussion papers and option analyses, which have informed the documents listed above. The intended audiences for the high-level design documents are: the strategy, regulation and change teams within incumbent and new entrant water companies in England; Ofwat; potential providers of services and systems to a new central MO and/or to water companies; and anyone with an interest in the reform of the water and sewerage sector. 1 Water Bill Water for Life Market reform proposals. 5

6 This document sets out the Open Water programme s recommendations for how the systems architecture and data Model should be configured in the new retail market in particular, by explaining: market participants and market facilitation activities (chapter 2); the MO and market participants required IT systems and how data exchange is to be managed (chapter 3); services that the MO offers in relation to data exchange, message transmission, validation and storage; including indicative event and data flow volumes (chapter 4); and the conceptual data models for registration, financial settlement and operational services (chapter 5). The design recommendations set out in this document have been developed with consideration of their impact on and response to wider issues, including how they would: ensure a level playing field for market participants; support market consistency both within England and between the English market and the markets in Wales and Scotland; reflect customers expectations of how they hope to see the retail market operate; align with the later introduction of upstream markets; and strike an appropriate balance between scale and complexity, deliverability and the benefits they will generate. In creating this document, the Open Water team has reviewed and considered the market designs and associated codes for, and met market participants from the: Irish and British electricity markets; British gas market; and Scottish water market. We have also met with market operators and experts in these markets such as Ofgem, the Central Market Authority (CMA), the Water Industry Commission for Scotland (WICS), Elexon and Electralink. The recommendations set out in this document have been discussed by: an industry working group; Ofwat s Choice and Trading Arrangements Programme Board members; Open Water s Programme Delivery Board; and Open Water s High Level Group. Feedback from these groups has been considered and reflected in the proposals made. Throughout this document we ask a number of questions and seek stakeholders views on these. We list all of the questions in appendix A. Please provide your responses to the consultation questions and any other comments or queries you may have regarding this paper by 14 th February 2014, to feedback@open-water.org.uk. We provide an accompanying template for responses on the Open Water website to help this process, which we strongly encourage respondents to use. We will, however, accept responses in other formats if necessary. We will be running a workshop on 29th January for representatives from water companies to discuss the content presented in all of the high-level design papers. Details of this session have been shared with water companies, and for more information please contact feedback@open-water.org.uk. A second iteration of this document will be issued in early summer This will include any changes necessary to align with additional strategy and high-level design papers which will be produced in early summer 2014, and will also reflect any changes made in response to consultation responses received. 6

7 The recommendations set out in this document are intended to facilitate wider discussion about the changes. Following the consultation, the updated recommendations will act as a recommendation to Ofwat, for the relevant regulatory decisions in due course. 7

8 3. Market participants and market facilitation From 1 st April 2017, a new retail market for water and sewerage services will be introduced in England. Market participants that will operate in the new retail market will comprise the following. Wholesalers: o Incumbent water and sewerage companies (WaSCs), water only companies (WOCs) and new appointments and variations (NAVs) will evolve to provide wholesale services to their own and new entrant retailers on a non-discriminatory basis. Retailers: o Incumbent retailers, including the existing WaSCs, WOCs and NAVs, acting as the default retailer for customers within their area of appointment. o New entrant retailers, including the competitive retail arms of any existing water companies operating anywhere in the country, and any other new market entrants. Market operator: o A new MO providing services in the areas of registration and switching, financial settlement, market governance, and industry data exchange. Further details about types and roles of future market participants can be found in section 4.3 of the market blueprint. To enable the new retail market to function effectively, new market facilitation activities are required to enable: registration and switching maintaining a record of service points and the registered parties for providing different services to each service point, and enabling the registered parties to be switched; financial settlement determining and processing the financial payments between companies to pay for services provided; and industry data exchange passing relevant data between market participants to enable market processes to be executed. For the full list of services provided, more detail on those stated above, and information supporting the decisions can be found in the market blueprint. We are seeking your views on the recommended scope of services provided by the MO related to registration and switching through consultation questions in the registration and switching strategy. We are seeking your views on the recommended scope of services provided by the MO related to financial settlement through consultation questions in the financial settlement strategy. 8

9 4. Required IT systems Key recommendations made in this chapter To enable the MO to deliver services in the areas of registration and switching, financial settlement, market governance, and industry data exchange, IT systems will be required, most notably: a registration system and database; a meter reading preparation system, charge calculation system, and associated databases; a management information/business intelligence system; and an industry data exchange hub, including a message validation system and message database. To deliver the activities described in chapter 3. wholesalers, retailers and the MO will require IT systems. The types of system/the high-level system functionality required are shown as the green items in Figure 1and described below. Figure 1: IT systems and interfaces Wholesalers and retailers will both require systems to support their business activities. For example, a retailer will require billing and collection systems. It is the responsibility of such companies to define their own IT plans, but it might be reasonably expected that: most of the required systems will already exist in the IT estate of an incumbent water company, but that some separation or modification may be required, for example to support processes for customers changing Retailer. 9

10 some new IT systems may be required where Wholesalers and Retailers have to provide input to or take action based on new market processes, for example to validate financial settlement charge calculations made by the Market Operator. retailers may at their discretion choose to make additional IT investments as part of a competitive market strategy, for example investing in enhanced marketing systems to support proactive customer retention. To deliver registration and switching services to the market, the MO will require systems that provide the following functionality. A registration database containing the relevant information regarding sites and the registered parties for providing different services to each site. A registration system for managing registration processes for example, updating data in the registration database and performing reviews and audits of registration data. A business/market intelligence (BI/MI) system for capturing market process performance data to provide visibility of performance to enable market monitoring activities. To deliver financial settlement services to the market, the MO will require systems that provide the following functionality. A meter read database containing all required meter readings for performing financial settlement calculations. A meter data preparation system to perform any validation, editing, estimating and/or aggregation of meter reads that may be required to determine the appropriate consumption values to be used in financial settlement. A charge calculation system to apply charging rules to processed meter read data to determine the financial charges due between wholesalers and retailers. A financial transaction database to provide a record of all financial charges calculated in the market and to store all other relevant data. It is expected that as and when systems are procured or built to provide the MO functionality outlined above, it may be the case that particular systems can perform a number of functions. 4.1 Approach to data exchange and required interfaces For the market to function successfully, the IT systems of wholesalers, retailers and the MO will need to exchange data. The approach for data exchange in the market is that data which supports market processes will be in a standard format and communicated between parties through a single IDEX hub. This, together with the key flows of data, are shown as the pink items in Figure 1and described below. The MO will be responsible for co-ordinating data exchange within the industry. To enable this, the following systems and functions are envisaged. Data exchange interfaces with which wholesalers and retailers send and receive data. These interfaces would then push that data on to the intended recipient(s). It is expected that there will be up to three types of interface: o an automated interface, expected to be for machine-to-machine communication and used for transferring large volumes of data at low cost; o a semi-manual interface for participants to upload data files to and download data files from manually, to be used as a contingency or as a low-cost alternative for new or small market entrants with lower volumes of data to be transferred; and o a manual interface such as set of secure web forms to enter data into manually, to be used as a contingency or as a very low-cost alternative for new or small market entrants with lower volumes of data to be transferred. A message verification and validation system to confirm and accept or reject transmitted messages based on predefined rules. 10

11 A message database to maintain a central record of some or all of the data exchanged between market participants. The MO s functional IT systems for registration and financial settlement would be integrated with the industry data exchange hub. It would be through the hub that data associated with these activities is exchanged with wholesalers and retailers. Performance of processes captured within the BI/MI statistics system will be integrated with the industry data exchange hub, and made available to market participants through the use of a web form interface To exchange data with the IDEX hub, wholesalers and retailers will need to implement changes that facilitate the passing of data to/from their functional IT systems. While it is for these companies to develop and deliver their own plans, it may be reasonably expected that these changes could include: data preparation systems, which produce market message files, transforming the data from the format used in functional IT systems into the format required by market processes (and vice versa); and an industry data exchange interface, which manages the transmission of data from the functional systems to the industry data hub (and vice versa). If a wholesaler or retailer confirmed they required it, the capability outlined above might be: delivered in stand-alone systems; embedded in functional IT systems; or carried out in an alternative manner. Consultation questions: SD 4a: Do you think that the proposed systems architecture is appropriate for enabling the services that are being recommended for delivery by the MO and market participants? SD 4b: Do you agree that the services within the IDEX (automated, semi-manual and manual) sufficiently covers the data transmission requirements of market participants? 11

12 5. Services offered by the market operator Key recommendations made in this chapter The MO will be responsible for co-ordinating data exchange within the industry. To enable this, an industry data exchange (IDEX) hub will be created, through which market participants will send and receive data. Reflecting the differing frequencies with which different market processes will be employed, and the different scale of market participants, three types of interface will be implemented. An automated interface, expected to be for machine-to-machine communication and used for transferring large volumes of data at low cost. A semi-manual interface for participants to upload data files to and download data files from manually, to be used as a contingency or as a low-cost alternative for new or small market entrants with lower volumes of data to be transferred; and A manual interface such as set of secure web forms to enter data into manually, to be used as a contingency or as a very low-cost alternative for new or small market entrants with lower volumes of data to be transferred. The MO should be responsible for transmitting, validating and storing standard market messages between participants. It should be mandatory to use this MO service. The MO should provide the capability for transmitting and storing (but not validating) non-standard messages, and use of this service should be optional. 5.1 Types of IDEX interface As we explained in section 4.1, it is intended there may be up to three interfaces through which a wholesaler or retailer may be required to, or may choose to, send or receive market data. We explain the current thinking behind such an approach below, and give examples of when the different interfaces may be most appropriate. 12

13 Figure 2: IDEX hub interface choices The automated IDEX Interface For many common events, such as managing a customer changing their retailer, it is important for the data transfer approach to be fast and cost effective. In this scenario, it is envisaged that most wholesalers and retailers would make use of automated data exchange, and that the process to produce and pass data to the market could be as marked in Figure 2 as route (A-A-A) and described below. The underlying functional system (for example, the retailer s Customer Relationship Management (CRM) system, manages the workflow associated with the activity and produces data that needs to be passed to another market participant. A data preparation system (which may be part of the functional system) translates the data into agreed market data formats and produces a market data file. An IDEX Interface automatically passes the market data file through to the MO s automated IDEX Interface The semi-manual IDEX Interface For events that are less frequent, or for all events for smaller wholesalers and retailers, it may not be cost effective to develop or purchase an IDEX Interface. In these scenarios, it is envisaged that wholesalers and retailers may use the semi-manual data exchange. In addition, wholesalers and retailers that use the automated IDEX Interface may choose to be able to use the semi-manual IDEX Interface as a contingency. The process to produce and pass data to the market could be as marked in Figure 2 as route (B-B) and described below. The underlying functional system (for example, the retailer s CRM system) manages the workflow associated with the activity and produces data that needs to be passed to another market participant. A data preparation system (which may be part of the functional system) translates the data into agreed market data formats and produce a market data file. A user uploads the produced market data file to the MO s semi-manual IDEX interface (for example, through a secure market website). 13

14 5.1.3 The manual IDEX interface For events that are even less frequent, or for all events for smaller wholesalers and retailers, it may not be cost effective to develop or purchase both an IDEX Interface and a data preparation system. In these scenarios, it is envisaged that wholesalers and retailers may use the manual data exchange. In addition, wholesalers and retailers that use the automated and/or semi-manual IDEX interfaces may choose to be able to use the manual IDEX interface as a contingency. The process to produce and pass data to the market could be as marked in Figure 2 as route (C) and described below. The underlying functional system (for example, the retailer s CRM system) manages the workflow associated with the activity and produces data that needs to be passed to another market participant. A user manually enters the required data into a secure web form (or similar product) that is part of the MO s manual IDEX interface. 5.2 Transmission Transmission decision The table below sets out the recommendation for message types requiring transmission through a standardised IDEX mechanism that the MO offers. The justification for each message type will be described within subsequent sections. Data service Market operator messages Standard participant to participant Non-standard participant to participant Transmission Mandatory Mandatory Optional Market operator messages By definition, MO messages have the MO involved in the communication either as the sender or the recipient, of a message. Therefore, the MO must transmit all messages of this type Market consequence of not implementing It would not be possible to implement centralised registration, switching and financial settlement processes without providing transmission services of MO messages Standard participant to participant messages Standard participant to participant messages represent standard interactions between market participants. Therefore, it is through this type of message that performance within the market can be monitored. As the MO will already perform message transmission services in support of MO messages, implementation costs for further exploitation of these services for this message type will be significantly reduced Market consequence of not implementing Failure to implement standardised MO transmission of standard participant to participant messages would result in the creation of participant-specific and non-standardised interfaces. Establishing such interfaces requires all participants within the market to develop integration systems specifically for 14

15 integrating with each participant. Spiralling participant development costs and increasingly complex integration within the market would become a significant barrier for new entrants into the market Non-standard participant to participant messages It is not necessary for the MO to provide transmission services for non-standard participant to participant messages to facilitate market communication, standard communication mechanisms, such as , could be used. However, there is a real opportunity for the MO to provide ease of communication to multiple participants for example, where a wholesaler must communicate the details of an operational incident to the retailers of customers within an affected area. Although this is not demanded by the market, transmitting non-standard participant to participant messages would provide a consistent communication mechanism that participants could exploit. This would reduce barriers to market entry for new entrants and provide participants a mechanism for communicating with a number of other participants in a single action. As the MO will already perform message transmission services in support of market operator messages, implementation costs for further exploitation of these services for this message type will be significantly reduced Consequence of not implementing Failure to implement transmission of these messages through the market operator would not be detrimental to the market, but opportunities to improve communication within the market would be lost. 5.3 Storage Storage decision The table below sets out the decision for message types requiring storage within a standardised IDEX mechanism that the MO offers. The justification for each message type will be described within subsequent sections. Data service Market operator messages Standard participant to participant Non-standard participant to participant Storage Mandatory Mandatory Mandatory where transmitted Market operator messages MO messages effectively provide two functions within the market. Inbound messages (to the MO from market participants) provide the ability to maintain a current and correct representation of the market within the centralised registration system through registration, switching and financial settlement processes. Outbound messages (to market participants from the MO) provide visibility to the market participants of progress through the registration, switching and financial settlement processes. Therefore, it is a fundamental requirement that messages and their content are stored within the MO. 15

16 Market consequence of not implementing Failure for the MO to store such message content would result in the data loaded in preparation for market opening becoming stale and untrustworthy. The processes of registration, switching and financial settlement all provide updates to data held centrally within the MO. Therefore failure to store the content of these messages would result in a centralised registration system that no longer represents the market Standard participant to participant messages To facilitate market monitoring and management of default service levels, all standard participant to participant messages must be stored within the MO. This also gives the added benefit of providing resilience to the whole market. Should any market participant experience system failure that results in data loss, standard participant to participant messages may be re-sent following system recovery. As message storage will be delivered for MO messages, the implementation costs for further storage of messages will be significantly reduced Market consequence of not implementing Failure to store standard participant to participant messages within the MO would leave the MO blind to the performance of participants within the market. This would result in the MO being unable to perform market monitoring and service level agreement (SLA) management of standard industry processes such as operational services to ensure a level playing field Non-standard participant to participant messages It is not necessary for the MO to store non-standard participant to participant messages, but retaining an accurate record of market communication of this type would provide insight into activity within the market. This also provides the added benefit of providing resilience to the whole market. Should any market participant experience system failure that results in data loss, non-standard participant to participant messages may be re-sent following system recovery. As message storage will be delivered for MO messages, the implementation costs for further storage of messages will be significantly reduced Market consequence of not implementing Failure to store non-standard participant to participant messages within the MO would remove the ability to replay those messages should a participant experience system outage. 5.4 Validation Validation The table below sets out the decision for message types requiring validation within a standardised IDEX mechanism that the MO offers. The justification for each message type will be described within subsequent sections. Data Service Market operator messages Standard participant to participant Non-standard participant to participant Validation Mandatory Mandatory N/A 16

17 5.4.2 Market operator messages Because of the critical nature of the MO messages and their support of data held within the centralised registration system, messages presented to the MO must be validated to ensure suitability of market data update into the data representation of the market. Messages that the MO generates expose registration data and therefore the validation can be assumed. Recipients of MO messages may also choose to validate the message content before processing, Market consequence of not implementing If validation against the centralised registration is not performed before updates take place, then inaccurate or incomplete data updates could be performed, causing downstream process problems for participants. Below, we set out two examples of such problems. A wholesaler installs a new meter at customer premises, but registers it with the MO without including location details. This causes problems for the retailer when they attempt to read a meter for which they have no location details. It also causes problems for the wholesaler in the future when replacing the meter as part of site works is required. A retailer uploads an invalid meter reading that is of a lower value than previous readings ( ), thus causing data-related issues within the financial settlement process between the retailer and wholesaler Standard participant to participant messages Message content is validated against the centralised registration data. Therefore, all standard messages passed through the market will be proven as valid before being forwarded to the recipient, thus reducing the validation development work that market participants require Market consequence of not implementing Failure to implement validation of standard participant to participant messages within the MO would allow for processes to be invoked incorrectly. Examples of these would include the following. A retailer requests a meter exchange at premises where the meter has previously been removed. A retailer requests any operational services at customer premises for which they do not provide retail services Non-standard participant to participant messages Non-standard messages between participants are freeform in nature. Therefore, it is not possible to implement any validation mechanisms. 5.5 Indicative event and data volumes To specify the required IT systems it is necessary to understand non-functional requirements, including the volume of data being exchanged. In this section, we set out very rough estimates of the volume of data messages which that would be produced in a given year in steady state market operations. We have provided estimates are provided for the following areas. Managing registration updates. Managing service requests. Managing consumption data. Managing financial settlement. For each case the estimate is derived by considering the: 17

18 (a) volume of applicable service points or participants; (b) number of events per year or participant per site (for example, the number of service requests per site); and (c) number of data messages exchanged to complete an event in each area (for example, the number of messages exchanged to complete a service request). These values are then multiplied to give an indicative data volume for: (i) a small water retailer with 2,000 customers; (ii) a large water retailer with 250,000 customers; (iii) a large water wholesaler with 250,000 customers; and (iv) the total market/the MO with an assumed 1.5 customers. These estimates are provided to give an order-of-magnitude to aid design. Managing registration updates Managing registration updates Value Min Max Events per supply point per year 0.23 e.g. Change of Retailer, New supply added, supply removed, demolition, disconnections/reconnections, Newly Eligible premises and Loss of eligibility premises, increase/decrease 0.65 size of supply, Messages per event between retailers & MO 2 2 From the Retailer to the MO, MO confirms Messages per event between wholesalers & MO 2 2 From the Wholesaler to the MO, MO confirms Assumption Potable Water, Surface Water and Foul Supply points per customer 3 3 Sewerage/Trade Effluent Messages per customer per year Annual Totals Annual Totals No. of customes Small Retailer; 2k customers Larger Retailer 250k customers Large Wholesaler 250k customers Market Operator 1.5mill customers Managing service requests Managing Operational Service requests (site works) Value Min Max Events per supply point per year 0.05 Based on a companies data for total non-hh Operational Service Request contacts in 2012 into total non-hh premises for all supply points. This is divided by the expecetd no. of 0.11 supply points Messages per event between retailers & MO 6 Request to/from MO, MO confirms received, MO notifies Retailer of update, Retailer confirms received, MO notifies 6 completion, Retailer confirms received Messages per event between wholesalers & MO 6 Request to/from MO, MO confirms received, MO notifies of update, Wholesaler confirms received, MO notifies 6 completion, Wholesaler confirms received Supply points per customer 3 Assumption Potable Water, Surface Water and Foul 3 Sewerage/Trade Effluent Messages per customer per year Annual Totals Annual Totals No. of customes Small Retailer; 2k customers Larger Retailer 250k customers Large Wholesaler 250k customers Market Operator 1.5mill customers

19 Managing consumption data Managing consumption data Proportion of premises metered 89% 2010/11 figures from OFWAT (WaSCs and WoCs combined water forecast figures) Events per supply point per year (Reads per meter per year) 2 No. of meter readings taken for non-hh for billing purposes No. of meters per premises 1 Messages per event between Retailers & MO 2 Messages per event between Wholesaler & MO 2 Messages per water service point per year Annual Totals No. of customes Small Retailer; 2k customers Larger Retailer 250k customers Large Wholesaler 250k customers Market Operator 1.5mill customers Managing financial settlement Managing financial settlement Settlement periods per year 365 Setlement runs per settlement period 4 As per Scotland Standard No. of retailers Incumbent Retailer WaScs, 12 Incumbent Retailer WoCs, 21 Incumbent WSL Retailers, plus expectation of 7 more new retailers coming in to the market, 5 Incumbent NAVs, 5 Incumbent WSL NAVS No. of wholesalers WaSc/WoC and 5 NAVs Messages per settlement run between MO & Retailer 2 Messages per settlement run between MO & Wholesaler 2 Annual Totals Small Retailer; 2k customers Larger Retailer 250k customers Large Wholesaler 250k customers Market Operator 1.5mill customers Consultation questions: SD 5a: Do you agree with the recommendation that the transmission of standard participant to participant messages should be via the IDEX, and mandatory? SD 5b: Do you agree with the recommendation that the transmission of non-standard participant to participant messages should be via the IDEX, and optional? SD 5c: Do you agree with the recommendation that the MO should store all standard participant to participant messages? SD 5d: Do you agree with the recommendation that the MO should store all non-standard participant to participant messages, where the IDEX is used? SD 5e: Do you agree with the recommendation that the MO should validate all MO messages received e.g. meter readings? SD 5f: Do you agree with the recommendation that the MO should validate all standard participant to participant messages? SD 5g: Do you agree with the recommendation that the MO should not validate any non-standard participant to participant messages, where the IDEX is used? 19

20 6. High-level market conceptual data models Key recommendations made in this chapter The data model for the market, and particularly for the MO, includes: for registration and switching, a centrally held record of premises, service points, and associated meters and market participants. The central data model will not hold customer-level data; for operational services, a centrally held record of service requests and notifications; and for metering and financial settlement, a centrally held record of meter readings, wholesale charging schemes, and derived wholesale charges. To enable the market to function successfully, a common data model is required. This chapter sets out early thinking regarding: a conceptual model for registration data; a conceptual model for service request data; a conceptual data model for consumption and financial settlement data; and indicative event and data volumes. The conceptual data models show the data entities and examples of data items within those entities. It is not intended that the models shown represent all data items. The data models shown, especially the consumption and settlement model, are highly dependent on decisions still to be made about how the market shall operate. As such, they should be considered as giving indication of the possible data models, and are highly likely to change. 20

21 6.1 Conceptual model for registration data The conceptual data model for registration data is shown in Figure 3 and is described below. Figure 3: Registration conceptual data model At the heart of the registration data model are service points these are uniquely identified points where a service is provided. Data items related with these may be a unique service point ID and information such as a service point effective date. Each service point would be associated with a premises, with data items such as the: unique property reference number; house number; street name; city name; and post code. One premises may have multiple service points associated with it, but one service point would only be associated with one premises. Each service point may be associated with none, one or more present meter, as well as with historical meters. Meter data items may include the: meter type; meter serial number; and meter install date. A Meter would only be associated with one service point. Each service point would be associated with responsible parties (both present and past). Responsible parties data items may include a: retailer ID; retailer effective date; and wholesaler ID. 21

22 All responsible parties would associate with a market participant, with related data items such as the participant name and participant type. 6.2 Conceptual model for service request data The conceptual data model for service requests is shown in Figure 4 and is described below. In the diagram, registration data entities that also apply here are shown in blue and are not explained further. New data entities related to service requests are shown in green. Figure 4: Service request conceptual data model Service requests would be created with data items related to where the work is required (such as the premises ID, service point ID and/or meter serial number), what work is required (indicated through a job type ID), who is required to perform the work (such as wholesaler ID), and other relevant data items such as a job urgency flag. Service requests would be categorised by and therefore associated with service request types. 6.3 Conceptual model for consumption and financial settlement data The conceptual data model for consumption and settlement data is shown in Figure 5 and is described below. Registration data entities that also apply here are shown in blue (or grey if repeated) and are not explained further. New data entities for consumption and financial settlement are shown in orange. Note that this data model relates to financial settlement for water and sewerage, and not execution of service requests or other event-based activities. 22

23 Indicates data sets that are assumed but would need to be re-evaluated once more detail on the structure of wholesale charging becomes known Figure 5: Consumption and settlement conceptual data model Meter readings are associated with meters and may have data items such as meter reading date and meter reading value. One meter would have multiple meter readings, and one meter reading would be associated with only one meter. A series of settlement adjustment factors may need to be defined that describe how meter readings are adjusted or, in absence, estimated for use in settlement. The relevant data items may be settlement uplift percentage, factor effective date and such like. Settlement adjustment factors would likely be associated with one market participant and service points would be associated with one set of settlement adjustment factors. Depending on the agreed settlement approach, settlement readings would be determined from adjusting or estimating meter readings using settlement adjustment factors to produce aggregate consumption values for market participants in a given settlement period. Data items would be those to link to these other entities for example, the participant ID and trading period, and the settlement reading. 23

24 Wholesale charging frameworks would define the financial settlement variables, with data items such as the charge rate for a given consumption level. Service points would likely be associated to a relevant Wholesale charging scheme. Wholesale charges would be determined through combination of settlement readings and wholesale charging schemes to produce financial charge due values for market participants in a given settlement period. Data items would be those to link to these other entities for example, the participant ID and trading period, and the financial value. Consultation questions: SD 6a: Do you agree with the recommended data model for registration? SD 6b: Do you agree with the recommended data model for operational services? SD 6c: Do you agree with the recommended data model for financial settlement? 24

25 Appendix A: Consultation questions and approach Consultation questions We are seeking views in relation to the following questions posed throughout this document. SD 4a: Do you think that the proposed systems architecture is appropriate for enabling the services that are being recommended for delivery by the MO and market participants? SD 4b: Do you agree that the services within the IDEX (automated, semi-manual and manual) sufficiently covers the data transmission requirements of market participants? SD 5a: Do you agree with the recommendation that the transmission of standard participant to participant messages should be via the IDEX, and mandatory? SD 5b: Do you agree with the recommendation that the transmission of non-standard participant to participant messages should be via the IDEX, and optional? SD 5c: Do you agree with the recommendation that the MO should store all standard participant to participant messages? SD 5d: Do you agree with the recommendation that the MO should store all non-standard participant to participant messages, where the IDEX is used? SD 5e: Do you agree with the recommendation that the MO should validate all MO messages received e.g. meter readings? SD 5f: Do you agree with the recommendation that the MO should validate all standard participant to participant messages? SD 5g: Do you agree with the recommendation that the MO should not validate any non-standard participant to participant messages, where the IDEX is used? SD 6a: Do you agree with the recommended data model for registration? SD 6b: Do you agree with the recommended data model for operational services? SD 6c: Do you agree with the recommended data model for financial settlement? And in particular what complexities do you see in this area of design? Consultation approach Please provide your responses to the above consultation questions and any other comments you may have regarding this paper by 14 th February 2014, to We provide an accompanying template for responses on the Open Water website to help this process, which we strongly encourage respondents to use. We will, however, accept responses in other formats if necessary. 25

26 In addition, we will be running a workshop on 29 th January for representatives from water companies to discuss the content presented in all of the high-level design papers. Details of this session have been shared with water companies, and for more information please contact feedback@open-water.org.uk. 26

27 Appendix B: Glossary of terms For a full glossary of terms used in this document please refer to the Open Water programme Glossary of Terms, available at 27

28 Appendix C: Customer expectations assessment Open Water has previously identified that to achieve the objectives of water market reform it is critical to ensure that customers expectations of a competitive water retail market are understood and considered in the market design. To achieve this, work has been carried out 3 with the objectives of: Understanding what customers expectations are of a competitive water market; Identifying whether customer expectations will be met through market design, or left to market competition and innovation; and Where the need for market design has been identified, agreeing what the Open Water programme will deliver, what will be delivered elsewhere, and what expectations will not be met. The customer expectations defined through this work have been considered in the relevant strategy and high-level design documents. As no customer expectations have been mapped to the market operator target operating model, accordingly no assessment has been carried out. Customer expectation Assessment Commentary None N/A N/A 3 Document available at: 28

29 Appendix D: Working group comments Open Water held a working group on 21 October 2013 to provide water industry experts with the chance to provide early feedback on high-level principles, processes and switching scenarios outlined in this strategy document. The group s key comments and questions were captured and we have set them out in the table below. The accompanying commentary identifies where these are referenced in the strategy document and/or where they will inform future detailed design work. In particular, the group endorsed the proposed switching process and the Open Water programme s proposal to take a top-down approach to developing a central register of the contestable market. The group agreed that this strategy document had identified all potential switching scenarios. It was agreed that outstanding debt was an appropriate grounds for the current retailer to object to a customer switch request, but it was noted that there was more work required to establish: a clear definition of what debt is; whether the current retailer may want to have discretion to write off small debts; and the exact requirements of what needs to be settled and when in order for switch to be able to progress. Incumbents in particular noted the need for sight of data specifications for the information they will need to provide to the central register as soon as possible. This has been noted and will inform the Open Water programme s data work stream. Working group comments and questions The aim of a seamless experience was discussed. Would this place a constraint on design re how Scotland currently works? After the OJEU is issued will we need to revisit how services are cut? It was asked how companies had been selected for data pilot? It was pointed out that companies will need to do a lot of work. It was raised that there will be complexities Commentary It was clarified that Open Water is designing for England with a view to Scottish arrangements. Aiming for consistency but not bound by it. It was confirmed the OJEU is just high-level call for interest. The pilot wanted to ensure there was coverage of the borders with Wales and Scotland, regions with lots of multi-premises sites, a water only company wholly enclosed, and a new entrant. Scoping document will be published on website. The pilot is also looking to engage with those who have previous experience. Open Water will provide the required outputs but will not do the work. It was confirmed that the MO is a given and B3 option confirmed. The MO will do all wholesale charging. A standard catalogue of services is needed. This was 29

Financial Settlement Strategy

Financial Settlement Strategy Financial Settlement Strategy We are seeking stakeholders views on the questions set out in this consultation document. If you have any comments on the paper please contact: feedback@open-water.org.uk

More information

1. Executive summary 5

1. Executive summary 5 Market Blueprint We are seeking stakeholders views on the questions set out in this consultation document. If you have any comments on the paper please contact: feedback@open-water.org.uk Publication Date:

More information

Workshop 5: Discussion Paper

Workshop 5: Discussion Paper Workshop 5: Discussion Paper How will my wholesale business interact with retailers? Introduction This workshop offers the industry a further opportunity to consider the practicalities of arm s-length

More information

Market architecture plan. Delivering an effective retail market for non-household customers

Market architecture plan. Delivering an effective retail market for non-household customers Market architecture plan Delivering an effective retail market for non-household customers July 2014 About this document This document builds on the Market Blueprint, an initial consultation that Open

More information

Water and sewerage services in Scotland: An overview of the competitive market

Water and sewerage services in Scotland: An overview of the competitive market Water and sewerage services in Scotland: An overview of the competitive market www.watercommission.co.uk www.watercommission.co.uk Overview of the market The competitive market for water and sewerage

More information

Appendix 10: Improving the customer experience

Appendix 10: Improving the customer experience Appendix 10: Improving the customer experience Scottish Water is committed to delivering leading customer service to all of our customers. This means we deliver the following activities: We will ensure

More information

ElectraLink s New Data Flow Services

ElectraLink s New Data Flow Services ElectraLink s New Data Flow Services ElectraLink s New Data Flow Services The gas and electricity markets are complex, competitive and evolving, especially as we move into the Smart era. ElectraLink connects

More information

Competition. Quick reference guides and checklists for: Retailers Wholesalers Currently Integrated Businesses

Competition. Quick reference guides and checklists for: Retailers Wholesalers Currently Integrated Businesses Quick reference guides and checklists for: Retailers Wholesalers Currently Integrated es About Ascendancy Water At Ascendancy we believe that the best way to develop a competitive advantage is to be totally

More information

Standard conditions of the Electricity Distribution Licence

Standard conditions of the Electricity Distribution Licence Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of the Electricity Distribution Licence Standard conditions of the Electricity Distribution Licence 30 October 2015 SECTION

More information

The Strategic Review of Non-household Spicying and Supply Pipes

The Strategic Review of Non-household Spicying and Supply Pipes Commission information paper CP27/09 This paper provides a further update on the review of wholesale activities. The initial review of processes suggests that transferring responsibility for trade effluent

More information

RHODE ISLAND. Electronic Business Transactions (EBT) Standards. for Electronic Data Interchange (EDI) in a Restructured Electric Industry

RHODE ISLAND. Electronic Business Transactions (EBT) Standards. for Electronic Data Interchange (EDI) in a Restructured Electric Industry RHODE ISLAND Electronic Business Transactions (EBT) Standards for Electronic Data Interchange (EDI) in a Restructured Electric Industry PREPARED BY: THE NARRAGANSETT ELECTRIC COMPANY AUGUST 1999 TABLE

More information

Standard conditions of the Electricity Distribution Licence

Standard conditions of the Electricity Distribution Licence Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of the Electricity Distribution Licence Statutory Consultation: 29 April 2008 SECTION A: STANDARD CONDITIONS FOR ALL ELECTRICITY

More information

Our Services for Partners

Our Services for Partners Our Services for Partners ElectraLink as the central body providing the infrastructure for the British retail electricity industry can provide unique services to support Partner s projects with utility

More information

Staff Paper 6. Allowed for operating costs. 6.1 Introduction

Staff Paper 6. Allowed for operating costs. 6.1 Introduction Staff Paper 6 Allowed for operating costs This staff paper has been produced by our office to assist stakeholders in responding to the Draft Determination. The material reflected in this staff paper has

More information

HP Service Manager. Software Version: 9.40 For the supported Windows and Linux operating systems. Processes and Best Practices Guide (Codeless Mode)

HP Service Manager. Software Version: 9.40 For the supported Windows and Linux operating systems. Processes and Best Practices Guide (Codeless Mode) HP Service Manager Software Version: 9.40 For the supported Windows and Linux operating systems Processes and Best Practices Guide (Codeless Mode) Document Release Date: December, 2014 Software Release

More information

Government response: EMR consultation on BSC subsidiary documents

Government response: EMR consultation on BSC subsidiary documents Government response: EMR consultation on BSC subsidiary documents June 2014 Crown copyright 2014 Copyright in the typographical arrangement and design rests with the Crown. This publication (excluding

More information

a description of the various categories of embedded generators

a description of the various categories of embedded generators Guidance Embedded Generation This document provides: a description of the various categories of embedded generators an outline of the types of bilateral agreements that owners/lead Parties of embedded

More information

Water resources planning guideline

Water resources planning guideline Water resources planning guideline The guiding principles for developing a water resources management plan June 2012 Development by Environment Agency, Ofwat, Defra and the Welsh Government Environment

More information

Proposed debt assignment protocol for prepayment customers. A consultation document

Proposed debt assignment protocol for prepayment customers. A consultation document Proposed debt assignment protocol for prepayment customers A consultation document Summary Ofgem is committed to removing any unnecessary barriers preventing customers from switching suppliers. This document

More information

Data Communications Company (DCC) price control guidance: process and procedures

Data Communications Company (DCC) price control guidance: process and procedures Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: tricia.quinn@ofgem.gov.uk Overview: The Data and Communications Company (DCC) is required

More information

The form of the price control for monopoly water and sewerage services in England and Wales a discussion paper

The form of the price control for monopoly water and sewerage services in England and Wales a discussion paper Water today, water tomorrow The form of the price control for monopoly water and sewerage services in England and Wales a discussion paper www.ofwat.gov.uk _ About this document This document considers

More information

The Drinking Water Inspectorate s response to the Consultation on the Cave Review of competition and innovation in water markets

The Drinking Water Inspectorate s response to the Consultation on the Cave Review of competition and innovation in water markets The Drinking Water Inspectorate s response to the Consultation on the Cave Review of competition and innovation in water markets This is Drinking Water Inspectorate s (DWI) response to the UK and Welsh

More information

Risk & Hazard Management

Risk & Hazard Management Rivo Software Solution Layer provides a rapidly deployable complete set of hazard and risk management functionality from any device, accessible from anywhere through our highly secure cloud platform. Identify,

More information

IT Service Continuity Management PinkVERIFY

IT Service Continuity Management PinkVERIFY -11-G-001 General Criteria Does the tool use ITIL 2011 Edition process terms and align to ITIL 2011 Edition workflows and process integrations? -11-G-002 Does the tool have security controls in place to

More information

LOG AND EVENT MANAGEMENT FOR SECURITY AND COMPLIANCE

LOG AND EVENT MANAGEMENT FOR SECURITY AND COMPLIANCE PRODUCT BRIEF LOG AND EVENT MANAGEMENT FOR SECURITY AND COMPLIANCE The Tripwire VIA platform delivers system state intelligence, a continuous approach to security that provides leading indicators of breach

More information

LOG MANAGEMENT AND SIEM FOR SECURITY AND COMPLIANCE

LOG MANAGEMENT AND SIEM FOR SECURITY AND COMPLIANCE PRODUCT BRIEF LOG MANAGEMENT AND SIEM FOR SECURITY AND COMPLIANCE As part of the Tripwire VIA platform, Tripwire Log Center offers out-of-the-box integration with Tripwire Enterprise to offer visibility

More information

Business Operations. Module Db. Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL:

Business Operations. Module Db. Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL: Module Db Technical Solution Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL: Cost is reduced through greater economies of scale, removal of duplication

More information

EMR: Consultation on industry code and licence modifications

EMR: Consultation on industry code and licence modifications EMR: Consultation on industry code and licence modifications January 2014 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW Telephone: 0300 068 4000 Website: https://www.gov.uk/government/organisations/department-of-energy-climate-change

More information

SmartConnect Use Case: C7 Utility Uses SmartConnect Data for Targeted Marketing Campaigns December 29, 2009

SmartConnect Use Case: C7 Utility Uses SmartConnect Data for Targeted Marketing Campaigns December 29, 2009 SmartConnect Use Case: C7 Utility Uses SmartConnect Data for Targeted Marketing Campaigns December 29, 2009 Author: Edison SmartConnect Page 1 of 34 Document History Revision History Edison SmartConnect

More information

Clarity Infrastructure Management helps network operators to plan and document the change to their networks

Clarity Infrastructure Management helps network operators to plan and document the change to their networks Clarity Infrastructure Management helps network operators to plan and document the change to their networks clarity.com 2 Clarity Simplifying Operations Cost effective and timely network rollouts or upgrades

More information

System Center Configuration Manager

System Center Configuration Manager System Center Configuration Manager Software Update Management Guide Friday, 26 February 2010 Version 1.0.0.0 Baseline Prepared by Microsoft Copyright This document and/or software ( this Content ) has

More information

THE BRITISH LIBRARY. Unlocking The Value. The British Library s Collection Metadata Strategy 2015-2018. Page 1 of 8

THE BRITISH LIBRARY. Unlocking The Value. The British Library s Collection Metadata Strategy 2015-2018. Page 1 of 8 THE BRITISH LIBRARY Unlocking The Value The British Library s Collection Metadata Strategy 2015-2018 Page 1 of 8 Summary Our vision is that by 2020 the Library s collection metadata assets will be comprehensive,

More information

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

THE PROJECT MANAGEMENT KNOWLEDGE AREAS THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human

More information

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX]

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX] EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014 2014 No. [XXXX] 1. This explanatory memorandum has been prepared by the Department for Energy

More information

Competition in British household energy supply markets

Competition in British household energy supply markets Date: October 2014 Competition in British household energy supply markets An independent assessment Prepared by: Robert Buckley, Anna Moss Cornwall Energy About Cornwall Energy Cornwall Energy s team of

More information

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1 PUBLIC GOT-1 GLOSSARY Glossary of Terms for Capacity Based Demand Response Issue 3.0 This document provides a glossary of terms with definitions used in the Capacity Based Demand Response program. Public

More information

Post Trade. Business Process Requirements Document Broker Matching Solution

Post Trade. Business Process Requirements Document Broker Matching Solution Business Process Requirements Document Broker Matching Solution Disclaimer This document is intended for discussion purposes only and does not create any legally binding obligations on the part of AFME.

More information

Competition and Markets Authority Energy market investigation: Notice of possible remedies Response of Smart DCC Ltd

Competition and Markets Authority Energy market investigation: Notice of possible remedies Response of Smart DCC Ltd Competition and Markets Authority Energy market investigation: Response of Smart DCC Ltd 05 August 2015 DCC Public Page 1 of 7 1 Executive summary 1. Smart DCC Ltd, known as the Data and Communications

More information

By email to smartermarkets@ofgem.gov.uk. Andrew Wallace Smarter Markets Ofgem 9 Millbank London. 11 August 2014. Dear Andrew,

By email to smartermarkets@ofgem.gov.uk. Andrew Wallace Smarter Markets Ofgem 9 Millbank London. 11 August 2014. Dear Andrew, By email to smartermarkets@ofgem.gov.uk Andrew Wallace Smarter Markets Ofgem 9 Millbank London 11 August 2014 Dear Andrew, We welcome the opportunity to provide ELEXON Limited s views on the above consultation

More information

Messaging Services. An immediate and engaging way to talk to customers and employees

Messaging Services. An immediate and engaging way to talk to customers and employees Messaging Services An immediate and engaging way to talk to customers and employees Messaging Services from O 2 can help you communicate with your customers and employees quickly and efficiently, using

More information

Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt. Programme, Project & Service Management Analysis

Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt. Programme, Project & Service Management Analysis Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt Programme, Project & Service Management Analysis Table of Content 1 Executive Summary... 3 1.1 Scope of Work... 3 1.2 Methodology for

More information

Migrating to the Cloud. Developing the right Cloud strategy and minimising migration risk with Logicalis Cloud Services

Migrating to the Cloud. Developing the right Cloud strategy and minimising migration risk with Logicalis Cloud Services Migrating to the Cloud Developing the right Cloud strategy and minimising migration risk with Logicalis Cloud Services Organisations are looking for new ways to deliver IT services and demanding that ICT

More information

Cisco Network Optimization Service

Cisco Network Optimization Service Service Data Sheet Cisco Network Optimization Service Optimize your network for borderless business evolution and innovation using Cisco expertise and leading practices. New Expanded Smart Analytics Offerings

More information

PAYMENT SERVICE PROVIDER ACCESS

PAYMENT SERVICE PROVIDER ACCESS PAYMENT SERVICE PROVIDER ACCESS Widening access and choice February 2016 A Bacs white paper 1 FOREWORD This is an exciting time for the financial services industry. As the market evolves, Bacs is keen

More information

Applying Business Architecture to the Cloud

Applying Business Architecture to the Cloud Applying Business Architecture to the Cloud Mike Rosen, Chief Scientist Mike.Rosen@ WiltonConsultingGroup.com Michael Rosen Agenda n What do we mean by the cloud? n Sample architecture and cloud support

More information

Government response: EMR consultation on industry code and licence modifications

Government response: EMR consultation on industry code and licence modifications Government response: EMR consultation on industry code and licence modifications June 2014 Crown copyright 2014 Copyright in the typographical arrangement and design rests with the Crown. This publication

More information

ANCILLARY SERVICES. A Paper for PPC. Establishment Organisation and Pilot Operation of the HTSO. 21 September 2000

ANCILLARY SERVICES. A Paper for PPC. Establishment Organisation and Pilot Operation of the HTSO. 21 September 2000 ANCILLARY SERVICES A Paper for PPC Establishment Organisation and Pilot Operation of the HTSO 21 September 2000 TABLE OF CONTENTS 1. INTRODUCTION 1 2. SYSTEM TRADING ARRANGEMENTS 2 3. OPTIONS FOR PROCUREMENT

More information

Quest for a Business Rules Management Environment (BRME) in the Internal Revenue Service

Quest for a Business Rules Management Environment (BRME) in the Internal Revenue Service Business Rules and Requirements Management Internal Revenue Service Business Rules and Requirements Management Office (BRRM) Quest for a Business Rules Management Environment (BRME) in the Internal Revenue

More information

Software Quality Assurance Plan

Software Quality Assurance Plan For Database Applications Document ID: Version: 2.1a Planning Installation & Acceptance Integration & Test Requirements Definition Design Development 1 / 54 Copyright 2000-2006 Digital Publications LLC.

More information

Advanced metering for SMEs

Advanced metering for SMEs Advanced metering for SMEs Carbon and cost savings Executive Summary The Carbon Trust would like to thank everyone who has contributed to this report, either through direct involvement in the trial, general

More information

Aiimi Energy Solutions. Controlled Document Management System (CDMS)

Aiimi Energy Solutions. Controlled Document Management System (CDMS) Aiimi Energy Solutions Controlled Document Management System (CDMS) CONTENTS Overview... 3 Introduction to Aiimi... 3 Introduction to the CDMS... 5 Automatic Document Numbering... 5 Automatic Correspondence

More information

Information security controls. Briefing for clients on Experian information security controls

Information security controls. Briefing for clients on Experian information security controls Information security controls Briefing for clients on Experian information security controls Introduction Security sits at the core of Experian s operations. The vast majority of modern organisations face

More information

Bristol Water PR14 Business Plan

Bristol Water PR14 Business Plan - Executive Summary... 1 Retail Non-Household Default Levels of Service... 4 Default Levels of Service... 5 Introduction... 5 Non-Household Customer Research... 5 Default Service Levels... 9 Retail Non-Household

More information

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO

More information

Harmonised Model for Supplier Switching. Report 4/2013

Harmonised Model for Supplier Switching. Report 4/2013 Harmonised Model for Supplier Switching Report 4/2013 1 Harmonised Model for Supplier switching Report 4/2013 NordREG c/o Norwegian Water Resources and Energy Directorate Middelthunsgate 29, 0301 Oslo,

More information

KMS Implementation Roadmap

KMS Implementation Roadmap KMS Implementation Roadmap Sample Excerpt Prepared by: The Knowledge Compass, Inc. TABLE OF CONTENTS 1. EXECUTIVE SUMMARY 5 1.1 Overview 5 1.2 Project Goals & Objectives 5 1.3 Implementation Approach 5

More information

Improving information to support decision making: standards for better quality data

Improving information to support decision making: standards for better quality data Public sector November 2007 Improving information to support decision making: standards for better quality data A framework to support improvement in data quality in the public sector Improving information

More information

PUBLIC. Response to consultation on EMR data flows

PUBLIC. Response to consultation on EMR data flows PUBLIC Response to consultation on 28 April 2014 CONTENTS INTRODUCTION... 3 1. Background... 3 2. ELEXON s proposal to the CfD Counterparty... 3 RECOMMENDATION TO DECC ON MECHANISMS FOR PARTIES TO EXCHANGE

More information

ITC 19 th November 2015 Creation of Enterprise Architecture Practice

ITC 19 th November 2015 Creation of Enterprise Architecture Practice ITC 19.11.15 ITC 19 th November 2015 Creation of Enterprise Architecture Practice C Description of paper 1. As part of a wider strategy of Digital Transformation of the University s core services, ISG

More information

20th February 2015 ScottishPower Standard Domestic Tariff. Prices. Your domestic gas and electricity pricing information

20th February 2015 ScottishPower Standard Domestic Tariff. Prices. Your domestic gas and electricity pricing information 20th February 2015 ScottishPower Standard Domestic Tariff Prices Your domestic gas and electricity pricing information How to find your electricity supply area See what supply area you are in by using

More information

Research and information management strategy 2015-18. Using research and managing information to ensure delivery of the Commission s objectives

Research and information management strategy 2015-18. Using research and managing information to ensure delivery of the Commission s objectives Research and information management strategy 2015-18 Using research and managing information to ensure delivery of the Commission s objectives 1 1. Introduction This strategy sets out a range of research

More information

Data Exchange and Protocol Process Flows for Electric Deregulation in The State of New Jersey

Data Exchange and Protocol Process Flows for Electric Deregulation in The State of New Jersey Data Exchange and Protocol Process Flows for Electric Deregulation in The State of New Jersey Prepared by: The Consumer Process Working Groups July 17, 2000 Version 1.2 Table of Contents Table of Contents...

More information

Moving to reliable next-day switching

Moving to reliable next-day switching Moving to reliable next-day switching Consultation - supplementary appendices Contact: Andrew Wallace Publication date: 16 June 2014 Team: Smarter Markets Response deadline: 11 August 2014 Tel: 020 7901

More information

Water today, water tomorrow Involving customers in price setting Ofwat s customer engagement policy statement

Water today, water tomorrow Involving customers in price setting Ofwat s customer engagement policy statement Water today, water tomorrow Involving customers in price setting Ofwat s customer engagement policy statement About this document This document sets out our approach to customer engagement during the price-setting

More information

Service Integration &

Service Integration & This is a DRAFT document, being published for review & comment The content is therefore subject to change & revision This document is part of the XGOV Strategic SIAM reference set Service Integration &

More information

ESKITP7145.01 Manage IT service delivery performance metrics

ESKITP7145.01 Manage IT service delivery performance metrics Overview This sub-discipline covers the competencies required to manage the monitoring, analysis and communication of IT service delivery performance metrics. Monitoring service level performance is a

More information

UoD IT Job Description

UoD IT Job Description UoD IT Job Description Role: Projects Portfolio Manager HERA Grade: 8 Responsible to: Director of IT Accountable for: Day to day leadership of team members and assigned workload Key Relationships: Management

More information

NATIONAL INFORMATION BOARD. WORK STREAM 1.2 ROADMAP Enable me to make the right health and care choices

NATIONAL INFORMATION BOARD. WORK STREAM 1.2 ROADMAP Enable me to make the right health and care choices NATIONAL INFORMATION BOARD Personalised Health and Care 2020 WORK STREAM 1.2 ROADMAP Enable me to make the right health and care choices Providing citizens with access to an assessed set of NHS and social

More information

Establishing and operating HEA accredited provision policy

Establishing and operating HEA accredited provision policy Page 1 of 13 Establishing and operating HEA accredited provision policy 1. Introduction The Higher Education Academy (HEA) accredits initial and continuing professional development provision delivered

More information

MANAGING DIGITAL CONTINUITY

MANAGING DIGITAL CONTINUITY MANAGING DIGITAL CONTINUITY Project Name Digital Continuity Project DRAFT FOR CONSULTATION Date: November 2009 Page 1 of 56 Contents Introduction... 4 What is this Guidance about?... 4 Who is this guidance

More information

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2

More information

Waterwise response to consultation on Smart Metering for Electricity and Gas

Waterwise response to consultation on Smart Metering for Electricity and Gas 1 Waterwise response to consultation on Smart Metering for Electricity and Gas July 2009 Overall response Our response to this consultation is driven by the current policy agenda relating to water metering

More information

Standard conditions of electricity supply licence

Standard conditions of electricity supply licence Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of electricity supply licence SECTION A: STANDARD CONDITIONS FOR ALL SUPPLIERS Standard conditions 1 to 6: General arrangements

More information

Second Clinical Safety Review of the Personally Controlled Electronic Health Record (PCEHR) June 2013

Second Clinical Safety Review of the Personally Controlled Electronic Health Record (PCEHR) June 2013 Second Clinical Safety Review of the Personally Controlled Electronic Health Record (PCEHR) June 2013 Undertaken by KPMG on behalf of Australian Commission on Safety and Quality in Health Care Contents

More information

CANADIAN PAYMENTS ASSOCIATION ASSOCIATION CANADIENNE DES PAIEMENTS RULE F1 RULES APPLICABLE TO AUTOMATED FUNDS TRANSFER (AFT) TRANSACTIONS

CANADIAN PAYMENTS ASSOCIATION ASSOCIATION CANADIENNE DES PAIEMENTS RULE F1 RULES APPLICABLE TO AUTOMATED FUNDS TRANSFER (AFT) TRANSACTIONS CANADIAN PAYMENTS ASSOCIATION ASSOCIATION CANADIENNE DES PAIEMENTS RULE F1 RULES APPLICABLE TO AUTOMATED FUNDS TRANSFER (AFT) TRANSACTIONS 2015 CANADIAN PAYMENTS ASSOCIATION 2015 ASSOCIATION CANADIENNE

More information

White Paper: FSA Data Audit

White Paper: FSA Data Audit Background In most insurers the internal model will consume information from a wide range of technology platforms. The prohibitive cost of formal integration of these platforms means that inevitably a

More information

Product Complaints Management. Infosys Handbook for Life Sciences

Product Complaints Management. Infosys Handbook for Life Sciences Product Complaints Management Infosys Handbook for Life Sciences Table of Contents Introduction 3 Infosys Point of View 4 Success Story - Complaint management for one of the world s top 5 bio-pharmaceutical

More information

How To Read The Unitholders Of The Kukon Island Power Station

How To Read The Unitholders Of The Kukon Island Power Station E.ON s UK Consolidated Segmental Report for the year ended 31 December 2012 Introduction In accordance with the Electricity Generation Licence Condition 16 - Financial Information Reporting, and the Electricity

More information

Protecting Business Information With A SharePoint Data Governance Model. TITUS White Paper

Protecting Business Information With A SharePoint Data Governance Model. TITUS White Paper Protecting Business Information With A SharePoint Data Governance Model TITUS White Paper Information in this document is subject to change without notice. Complying with all applicable copyright laws

More information

Request for Information Integrated Portfolio, Project & Management Information System Technical Assistance Unit RFI: TAU/01

Request for Information Integrated Portfolio, Project & Management Information System Technical Assistance Unit RFI: TAU/01 Integrated Portfolio, Project & Management Information System Technical Assistance Unit RFI: TAU/01 TABLE OF CONTENT 1 Disclaimer... 4 2 Purpose... 4 3 Background... 4 4 Specific Objectives of this Document...

More information

Final. North Carolina Procurement Transformation. Governance Model March 11, 2011

Final. North Carolina Procurement Transformation. Governance Model March 11, 2011 North Carolina Procurement Transformation Governance Model March 11, 2011 Executive Summary Design Approach Process Governance Model Overview Recommended Governance Structure Recommended Governance Processes

More information

DOCUMATION S SELF-SERVICE PORTAL

DOCUMATION S SELF-SERVICE PORTAL Documation is a leading provider of document-centric workflow and content management software, delivering services and solutions to businesses and organisations in the UK, Europe and around the world.

More information

White Paper. Contract Document Management with SharePoint. Conceive. Build. Succeed.

White Paper. Contract Document Management with SharePoint. Conceive. Build. Succeed. White Paper Contract Document Management with SharePoint Nobody wants to be kept awake at night by a contract management nightmare. Contracts can be complex with multiple draft versions, signed copies,

More information

KPMG Advisory. Microsoft Dynamics CRM. Advisory, Design & Delivery Services. A KPMG Service for G-Cloud V. April 2014

KPMG Advisory. Microsoft Dynamics CRM. Advisory, Design & Delivery Services. A KPMG Service for G-Cloud V. April 2014 KPMG Advisory Microsoft Dynamics CRM Advisory, Design & Delivery Services A KPMG Service for G-Cloud V April 2014 Table of Contents Service Definition Summary (What s the challenge?)... 3 Service Definition

More information

GUIDELINE ON THE APPLICATION OF THE OUTSOURCING REQUIREMENTS UNDER THE FSA RULES IMPLEMENTING MIFID AND THE CRD IN THE UK

GUIDELINE ON THE APPLICATION OF THE OUTSOURCING REQUIREMENTS UNDER THE FSA RULES IMPLEMENTING MIFID AND THE CRD IN THE UK GUIDELINE ON THE APPLICATION OF THE OUTSOURCING REQUIREMENTS UNDER THE FSA RULES IMPLEMENTING MIFID AND THE CRD IN THE UK This Guideline does not purport to be a definitive guide, but is instead a non-exhaustive

More information

Code of Conduct for Indirect Access Providers

Code of Conduct for Indirect Access Providers Code of Conduct for Indirect Access Providers Version 1.0 (interim) August 2015 Contents 1 Introduction. 3 1.1 Background to the Code... 3 1.2 About the Code... 3 1.3 In-Scope Payment Systems... 4 1.4

More information

Queensland recordkeeping metadata standard and guideline

Queensland recordkeeping metadata standard and guideline Queensland recordkeeping metadata standard and guideline June 2012 Version 1.1 Queensland State Archives Department of Science, Information Technology, Innovation and the Arts Document details Security

More information

EMR Capacity Market Implementation Coordination Workshop

EMR Capacity Market Implementation Coordination Workshop EMR Capacity Market Implementation Coordination Workshop Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight

More information

Software Test Plan (STP) Template

Software Test Plan (STP) Template (STP) Template Items that are intended to stay in as part of your document are in bold; explanatory comments are in italic text. Plain text is used where you might insert wording about your project. This

More information

Inland Revenue Department: Managing tax debt

Inland Revenue Department: Managing tax debt Inland Revenue Department: Managing tax debt This is an independent assurance report about a performance audit carried out under section 16 of the Public Audit Act 2001. June 2009 ISBN 978-0-478-32627-7

More information

Integrated Stress Testing

Integrated Stress Testing Risk & Compliance the way we see it Integrated Stress Testing A Practical Approach Contents 1 Introduction 3 2 Stress Testing Framework 4 3 Data Management 6 3.1 Data Quality 6 4 Governance 7 4.1 Scenarios,

More information

Enterprise Broadband Customer Service Description

Enterprise Broadband Customer Service Description BT 2012 Issue 2_8 Table of Contents INTRODUCTION... 3 SERVICE OVERVIEW... 4 BENEFITS OF CHOOSING ENTERPRISE BROADBAND... 5 SERVICE DETAILS... 5 THE WORKPLACE... 5 COVERAGE... 5 ENTERPRISE BROADBAND...

More information

Building on success: the future for Scottish water

Building on success: the future for Scottish water Building on success: the future for Scottish water Introductory remarks Good morning, Ladies and Gentlemen, it is a great pleasure to be here for what I am sure will be a very interesting and informative

More information

LOCAL GOVERNMENT FINANCE (UNOCCUPIED PROPERTIES ETC.) (SCOTLAND) BILL

LOCAL GOVERNMENT FINANCE (UNOCCUPIED PROPERTIES ETC.) (SCOTLAND) BILL LOCAL GOVERNMENT FINANCE (UNOCCUPIED PROPERTIES ETC.) (SCOTLAND) BILL EXPLANATORY NOTES (AND OTHER ACCOMPANYING DOCUMENTS) CONTENTS 1. As required under Rule 9.3 of the Parliament s Standing Orders, the

More information

Diagram. Microsoft Dynamics Sure Step Methodology

Diagram. Microsoft Dynamics Sure Step Methodology Diagram Microsoft Dynamics Sure Step Methodology Designed to enable you to better serve your customers by helping reduce their Microsoft Dynamics total cost of ownership, the Sure Step Methodology can

More information

Asset Factory is a software service that allows you to manage the value, costs, risks and performance of your property, people and supply chain

Asset Factory is a software service that allows you to manage the value, costs, risks and performance of your property, people and supply chain Asset Factory is a software service that allows you to manage the value, costs, risks and performance of your property, people and supply chain assets. It is simple to use and provides instant reporting

More information

Mitel Professional Services Catalog for Contact Center JULY 2015 SWEDEN, DENMARK, FINLAND AND BALTICS RELEASE 1.0

Mitel Professional Services Catalog for Contact Center JULY 2015 SWEDEN, DENMARK, FINLAND AND BALTICS RELEASE 1.0 Mitel Professional Services Catalog for Contact Center JULY 2015 SWEDEN, DENMARK, FINLAND AND BALTICS RELEASE 1.0 Contents MITEL PROFESSIONAL SERVICES DELIVERY METHODOLOGY... 2 CUSTOMER NEEDS... 2 ENGAGING

More information

January 13, 2014. Maribel Bondoc Manager, Network Rules NACHA, The Electronic Payments Association 13450 Sunrise Value Drive Herndon, VA 20171

January 13, 2014. Maribel Bondoc Manager, Network Rules NACHA, The Electronic Payments Association 13450 Sunrise Value Drive Herndon, VA 20171 Stephen Kenneally Vice President Center for Regulatory Compliance Phone: 202-663-5147 E-mail: skenneal@aba.com January 13, 2014 Maribel Bondoc Manager, Network Rules NACHA, The Electronic Payments Association

More information

EDISPHERE. Application Integration

EDISPHERE. Application Integration EDISPHERE Application Integration Integrates Internal Applications in the Format Desired By the Applications EDISPHERE can seamlessly integrate with your internal business applications in many different

More information