Off white sheetrock May 07 no asbestos found. Bralley Annex sheetrock office/room 106 May 07 removed pipe insulation mechanical room Mar 05 removed
|
|
- Laura Charlene Turner
- 8 years ago
- Views:
Transcription
1 Buildings and Building Materials Locations of Building Materials Report Date Status ACT/Admisions Building sheet rock hallways and stairwells Oct 02 removed ceiling texture 2nd and 6th floor men's restrooms, women's restroom in lobby Nov 02 not removed joint compound 2nd floor outside restroom, 3rd and 6th floors outside men's restroom, 5th floor men's restroom, 2nd floor lobby Nov 02 not removed 12x12 floor tile w/ black mastic hallway to Hubbard Hall, break rooms on 7th, 8th, 9th, 10th, 12th, and 14th floors Nov 02 not removed ceiling texture floors 1,2,3,5,6,7,8 and floors Dec 02 removed ceiling texture 14th through 16th floors Sep 03 removed boiler several floors throughout building Sep 03 removed floor tile kitchen Aug 08 removed sheet rock 7th floor electrical room Dec 09 removed Alumni Building Blue green carpet and mastic May 07 no asbestos found Off white joint compound May 07 no asbestos found Grey floor tile May 07 no asbestos found Arts & Science Building Green beige carpet and mastic May 07 no asbestos found Off white joint compound May 07 no asbestos found Off white sheetrock May 07 no asbestos found Bralley Annex sheetrock office/room 106 May 07 removed pipe insulation mechanical room Mar 05 removed CFO pipe insulation with white wrap 1st and 15th floor, mechanical room Jul 03 not removed wallboard throughout the building, restrooms on floors 2 thru 13 and rooms 1003 & 1007,room 103 &2 05 Jul 03 not removed joint compound throughout the building Jul 03 not removed floor tile w/ black and gray spots throughout the building office rooms Jul 03 not removed black mastic throughout the building office rooms, 1st floor, 2nd floor men's bathroom, room 201, 202, 203 Jul 03 not removed floor tile dark blackish brown throughtout the building office rooms Jul 03 not removed floor tile light brownish yellow 2nd floor men's bathroom Jul 03 not removed floor tile white 2nd floor room 201 Jul 03 not removed floor tile white w/ gray spots 1st floor Jul 03 not removed floor tile white w/ brown spots 1st floor Jul 03 not removed pipe joints/elbows insulation w/ blue wrap 1st floor mechanical room Jul 03 not removed pipe faculty offices and workroom 605,606,607,607A,1008,1009,1010 Jan 04 removed sheetrock faculty offices and workroom 605,606,607,607A,1004, 1008,1009,1010 Jan 04 removed Dance & Gymnastics Lab black mastic throughout lobby, office, hallways, vending areas 2nd and 3rd floor, patch in rm 120 Jul 03 not removed floor tile white w/tan mottle throughout lobby, office, hallways, vending areas 2nd and 3rd floor Jul 03 not removed floor tile brown w/ red and tan streaks border tile and stairwells from 2nd to 3rd floor Jul 03 not removed carpet mastic under orange carpet room 119 Jul 03 not removed floor tile peach patcin in room 120 Jul 03 not removed floor tile tan mottle patcin in room 120 Jul 03 not removed pipe insulation mastic machine room 1st floor Jul 03 not removed Fine Arts Building joint compound hallway outside and room adjacent to room 302 Oct 02 no asbestos found wall texture entry way, hallway outside room, room adjacent to room 302 Oct 02 no asbestos found plaster 1st floor vending room, west wall Oct 02 no asbestos found ceiling tile 3rd floor west hallway outside room 302 Oct 02 no asbestos found floor tile 1stfloor vending room, 3rd floor, main stairwell Oct 02 no asbestos found thermal pipe insulation steamline elbow in basement Oct 02 no asbestos found 12"x12" black floor tile throughout building Oct 02 not removed floor tile/mastic bathrooms on all three floors Feb 04 removed Golf Clubhouse
2 no asbestos containing material found in the samples no asbestos found GRB lab bench tops lab vent hoods Jun 08 removed transite siding lab vent hoods Jun 08 removed white floor tile w/brown specks stairwells and 3rd floor reception area Jul 03 not removed black mastic stairwells and 3rd floor reception area, throughout the building Jul 03 not removed joint compound on walls w/ rough pink texure walls in common areas and classrooms Jul 03 not removed joint compound on walls w/ smooth pink texure walls in common areas and classrooms Jul 03 not removed pink floor tile throughout the building Jul 03 not removed white wall texture and joint compound offices, break rooms, labs Jul 03 not removed pipe insulation above ceilings, storage rooms, janitor's closets Jul 03 removed hard fittings on piping above ceilings, storage rooms, janitor's closets Jul 03 removed light gray thermal pipe insulation north of mechanical room above the ceiling tile in hallway Oct 02 not removed black HVAC pipe insulation mastic observed througout the west wing of 1st floor Oct 02 not removed black exhaust/condition air duct mastic observed througout the west wing of 1st floor Oct 02 not removed Guinn Hall texture on wallboard 1st floor hallways and office area, lobby, janitor's closet Jul 03 not removed black mastic 1st floor office, hallways, and tv room, remodeled dorm rooms Jul 03 not removed floor tile dark brown with tan flecks 1st floor office, hallways, and tv room Jul 03 not removed ceiling tile, multi size hole stipple tv rooms Jul 03 not removed joint compound on non ACM drywall first floor office area, throughout dorm rooms Jul 03 not removed floor tile light gray first floor office area, remodeled dorm rooms Jul 03 not removed floor tile white w/ brown or green mottle throughout dorm rooms and 2nd floor apartment Jul 03 not removed floor tile peach/white checkboard over another floor tile laundry room in basement Jul 03 not removed Hubbard Hall pipe insulation restrooms May 06 removed tank insulation laundry room Apr 06 removed plaster ceiling all banquet halls and dining rooms Mar 04 removed acoustical material, brown, under white popcorn ceiling texture four dining rooms, pioneer room, redbud room, and 3rd level circular foyer Jul 03 not removed acoustical material, brown, under white smooth ceiling texture north and south foyer, banquet room and room adjacent to the west Jul 03 not removed floor tile dark maroon with tan streaks storage room, upstairs in kitchen Jul 03 not removed black mastic storage room, upstairs in kitchen, texas 1st ladies gown collection wing Jul 03 not removed pipe elbow insulation with white wrap transverse (N/S) portion of kitchen ceiling,enters upstairs storage room & elbows SE corner Jul 03 not removed joint compound texas 1st ladies gown collection wing Jul 03 not removed floor tile tan and white texas 1st ladies gown collection wing Jul 03 not removed Human Resource no asbestos containing material found in the samples taken Jul 03 no asbestos found Jones Hall (dorm) pipe insulation with silver wrap all mechanical rooms Jul 03 not removed pipe elbow insulation with silver wrap all mechanical rooms Jul 03 not removed tar mastic associated with HVAC duct insulation with black mastic throughout the project building Jul 03 not removed floortile light brown with black and white spots 1st floor lobby Jul 03 not removed top tar associated with HVAC duct insulation mechanical rooms Jul 03 not removed floortile brown east wing kitchen Jul 03 not removed floortile white with black spots 2nd floor lobby Jul 03 not removed black mastic east wing kitchen, 1st, 2nd, and 3rd floor lobby Jul 03 not removed floortile red with black spots 3rd floor lobby Jul 03 not removed Little Chapel no asbestos containing material found in the samples taken Jul 03 no asbestos found Library roof tiles roof Oct 09 removed dormers front side of building Oct 09 removed scaffolding sides of building Oct 09 repaired/removed wall texture 1st floor, 3rd floor, 2nd floor men's restroom Oct 02 no asbestos found
3 sheetrock 1st floor, 3rd floor, 2nd floor men's restroom Oct 02 no asbestos found joint compound 1st floor, 3rd floor, 2nd floor men's restroom Oct 02 no asbestos found floor tile basement at elevator, entry to mechanical room, entry to men's room Oct 02 no asbestos found Ceiling tile 1st floor, 2nd floor, 3rd floor Oct 02 no asbestos found thermal pipe insulation at elbow, at valve, steam line, and return line Oct 02 no asbestos found Marketing & Communications off white floor tile underneath carpeting and resilient sheet flooring throughout the building Jul 03 not removed black mastic underneath carpeting and resilient sheet flooring throughout the building Jul 03 not removed MCL steam pipe removed TSI offof a steam pipe that had a leak Jan 05 removed insulation a valve in the mechanical room had a leak and the insulation was removed, 6th, 7th floor Dec 07 removed floor tile 2nd floor rooms , 3rd, 4th, 6th, 7th, 8th floor Dec 08 removed mastic 2nd floor rooms , 3rd, 4th, 6th, 7th, 8th floor Dec 08 removed pipe insulation 9th floor rooms , dental hygiene clinic, air handler room Dec 08 removed sheetrock 6th, 7th, 8th floor Sep 09 removed joint compound 8th floor Feb 10 removed ceiling grid 9th floor rooms , dental hygiene clinic, air handler room tan floor tile with black mastic on all nine floor's thermal insulation associated with all steam lines throughout the building white HVAC duct mastic on all fiberglass duct branches white mastic thermal insulation Music walls auditorium all 3 floors Apr 88 removed ceilings auditorium all 3 floors Apr 88 removed pipes auditorium all 3 floors Apr 88 removed insulation auditorium all 3 floors Apr 88 removed linoleum located in all restrooms Oct 02 not removed off white floor tile with black mastic all 3 floors Oct 02 not removed floor tile and mastic removed in rm 304 Jul 08 removed Old Main sheetrock 1st floor print shop, room across hall of print shop Sep 09 removed white and rust floor tile/floor tile with brown specks rooms Sep 98 not removed brown floor tile rooms 200A through F 202 Sep 98 not removed green floor tile entrance to second floor Sep 98 not removed transite cooling tower Dec 03 removed black mastic stairwells and storage under stairs on bottom floor, rm 206, 208, 211, 213, 217, 218, 221 Jul 03 not removed texture on plaster wall interior plaster walls and walls in stairwells Jul 03 not removed resilient sheet flooring, pebble pattern 4th floor men's restroom Jul 03 not removed Patio Building 9" x 9" floor tile olive green with black/tan lineaments and black mastic throughout most of building July 03 not removed 9" x 9" floor tile grey green with black/tan lineaments and black mastic replacement tiles throughout building July 03 not removed 9" x 9" floor tile solid black and black mastic patch in room 106 July 03 not removed 9" x 9" floor tile bright green patch in room 102 July 03 not removed 9" x 9" floor tile pink patch in room 103 July 03 not removed 9" x 9" floor tile brown patch in room 103 July 03 not removed 9" x 9" floor tile gray with white streaks and black mastic large patch in room 103 July 03 not removed piping insulation 1 pipe in 1st floor mechanical room July 03 not removed 12" x 12" floor tile solid black and black mastic large patch in room 201 only Pioneer Day Care Facility Jul 03 not removed ceiling tile throughout the building Jul 03 not removed black mastic/linoleum throughout the building Jul 03 not removed ceiling texture throughout the building Jul 03 not removed black mastic/floortile throughout the building hallways Jul 03 not removed Pipe insulation South mechanical room Jul 03 removed Jul 03 not removed
4 Physical Plant/Service Center pipe insulation throughout building Jan 03 removed boilers throughout building Jan 03 removed boilers throughout building Mar 03 removed pipe elbows over restroom Jul 03 not removed boiler insulation boiler at NW corner Jul 03 not removed pipe elbows insulation pipes associated with boiler at NW corner Jul 03 not removed valve joint insulation near south entrance Jul 03 not removed transite siding outside wall Jul 03 not removed pipe insulation pipe run at SE corner of building Jul 03 not removed pipe insulation pipe along east wall of building Jul 03 not removed transite paneling roof of building Jul 07 removed transite paneling ground level of building Jul 03 removed transite paneling all sides of building Jan 03 removed Power House pipe insulation throughout building Jul 09 removed floor tile renovation/ entire building May 02 removed pipe insulation throughout building Feb 08 removed boiler insulation boiler area Mar 91 removed pipe insulation boiler area Mar 91 removed boiler insulation steam generating plant Nov 91 removed pipes steam generating plant May 91 removed Dallas Presbyterian Campus off white floor tile with tan streaks underneath off white floor tile with tan streaks Jul 03 not removed black mastic underneath carpeting throughout the building Jul 03 not removed Redbud Auditorium black mastic on 12" x 12" floor tile stairs and hallway leading to costume room, SW portion of building Jul 03 not removed 9" x 9" floor tile associated with black mastic video production support rooms & adjacent hall, north end of Green Room Jul 03 not removed 9" x 9" floor tile associated with black mastic 2nd floor hall, stairs, base of stairway Jul 03 removed spray applied ceiling texture main foyer to auditorium, east end of building Jul 03 removed black mastic on concrete under carpet, with non ACM yellow mastic Rooms 205, 206 Jul 03 not removed 9" x 9" floor tile with yellow mastic Video Production Room Jul 03 removed floor tile mastic office area and hallway Jul 08 removed wall insulation 1st and 2nd Jul 08 removed ceiling auditorium Jul 08 removed ceiling throughout building Jul 08 removed Central Plant/Steam Plant flue insulation boiler #1 and #2 Sep 97 removed pipe elbows insulation with metal jacket pipes over restroom Jul 03 not removed boiler insulation boiler at NW corner Jul 03 not removed pipe elbows insulation pipes associated with the boiler at NW corner Jul 03 not removed valve joint insulation near south entrance Jul 03 not removed transite siding outside wall Jul 03 not removed pipe insulation pipe run along east wall and southeast corner of building Jul 03 not removed Student Union sheetrock/joint compound throughout the building Jul 03 not removed ceiling texture bookstore, store room Jul 03 not removed white w/green spots floor tile throughout the building not removed black mastic throughout the building Jul 03 not removed floor tile whitew/ brown spots throughout the building Jul 03 not removed floor tile dark brown 2nd floor Jul 03 not removed transite siding roof Jul 03 not removed pipe elbows insulation w/ white wrap room 122M, Mechanical room in dock area Jul 03 not removed Science (ASSC) floor tile gray throughout hallways and chemical storage area's, rooms on the 1st, 2nd, & 3rd floor Oct 02 not removed
5 black mastic throughout hallways and chemical storage area's, rooms on the 1st, 2nd, & 3rd floor Oct 02 not removed floor tile ACM university classrooms May 10 removed fume hoods and associate duct work university classrooms 20 hoods and 1700 linear feet of duct work May 10 removed transite vent piping university classrooms May 10 removed transite table tops university classrooms May 10 removed chalk boards university classrooms May 10 removed black streaked floor tile/mastic entrance area northeast Jan 08 not removed 4'6"x14' lab tops 41 tops in science labs Jan 08 not removed 3'6"x16' lab tops 63 tops in science labs Jan 08 not removed thermal insulation and fittings absorption units Jan 08 not removed brown and black floor tile/mastic north end of building lobby on 1st floor Jan 08 not removed Stark Hall floor tile white with dark gray streaks first floor kitchen/break room, first floor office area Jul 03 not removed black mastic first floor kitchen/break room, first floor office area,throughout common areas and rooms on floors 2 19 Jul 03 not removed joint compound first floor office area Jul 03 not removed floor tile white/gray mottled throughout common areas and rooms on floors 2 19 Jul 03 not removed yellow mastic laundry room in basement Jul 03 not removed floor tile blue/white checkerboard laundry room in basement Jul 03 not removed texture on wallboard first floor office area Jul 03 not removed white mastic (old) on cardboard type piping insulation hot water pipe in mechanical room Jul 03 not removed Jul 03 not removed Stoddard Hall black mastic on non ACM hallways, elevators, library, and various rooms throughout building not removed floor tile hallways, elevators, library, and various rooms throughout building Jul 03 not removed light gray and gray mottled hallways, elevators, library, and various rooms throughout building Jul 03 not removed exterior window caulking college dormitory Jan 11 removed Student Health Service Bldg. floor tile health clinic crawl space/offices/attic Jan 00 removed mastic health clinic crawl space/offices/attic Jan 00 removed pipe insulation health clinic crawl space/offices/attic Jan 00 removed TWU Housing 627 Grove Street sheetrock texture wall Jul 07 not removed floor tile apartments A,B,C, & D Jul 07 not removed joint compound walls and ceilings Jul 07 not removed ceiling texture ceilings Jul 07 not removed carpet floors Jul 07 not removed mastic floors Jul 07 not removed ULB floor tile tan throughout entire facility Oct 02 not removed black mastic throughout entire facility Oct 02 not removed floor tile gray and white throughout entire facility Oct 02 not removed yellow and black mastic throughout entire facility Oct 02 not removed water main mechanical room clean up rupture of water main in adjacent tunnel Feb 04 removed floor tile hallways and classrooms Aug 04 removed mastic hallways and classrooms Aug 04 removed
SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS
ASBESTOS SURVEY SUMMARY PACIFIC UNION COLLEGE ANGWIN, CALIFORNIA SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS Definition of terms: Friable: Material that can be crumbled
More informationPhoto 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1.
APPENDIX B PHOTOLOG Photo 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1. Photo 2: This photograph shows layered floor tile and
More informationAsbestos Survey Former Kraft General Foods Facility 500 Dalton Avenue and 1222 Statesville Avenue Charlotte, North Carolina. H&H Job No.
Asbestos Survey Former Kraft General Foods Facility 500 Dalton Avenue and 1222 Statesville Avenue Charlotte, North Carolina H&H Job No. CLT-204 August 13, 2009 2923 South Tryon Street Suite 100 Charlotte,
More informationRoom ID------- Material ID ASBESTOS Components Positive? Yes, No, Trace, Assumed PISTM-1 White pipe insulation on hot water supply and return throughout building Yes 5-10% CH, 5-15%AM NA NA LF 1400 FLVCT-7
More informationChicago Public Schools 6 Month Asbestos Surveillance 2015- Spring
Chicago Public Schools 6 Month Surveillance 2015- Spring School: John W Garvy School Oracle Unit: 23301 Building ID: 3510 Address: 5225 N Oak Park Avenue Region: 01 Mail Room: 30 Surveyor: Zacarias, Mr.
More informationNew Jersey Army National Guard. Environmental Compliance Database
New Jersey Army National Guard Environmental Compliance Database All Presumend and Confirmed Asbestos Containing Materials Facility Facility Homogenious / Atlantic City Armory 1st Armorer's Supply Insulation,
More informationAsbestos Procedures. Asbestos Products
Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia
More informationNARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.
NARRATIVE REPORT 1.0 BUILDING INFORMATION The original date of construction for Construction Management Engineering was not immediately available; the building has had no major renovations. Construction
More informationSafeway 691 Berkeley. 1444 Shattuck Place Date: May 3, 2007 MDA. Store Data: Interior Construction Materials: Exterior Construction Materials:
Safeway 691 Berkeley Preliminary Draft Environmental Survey for Renovation Store Data: Total Area: 26,327 Sq. Ft. at main level ACM 12x12: 17,600 Sq. Ft. Approx. Est. Vinyl Sheet: NA Other: See Table 1444
More informationAppendix 2-A: Asbestos Assessment Summary Table
Final Environmental Impact Statement Cricket Valley Energy Project Dover, NY Appendix 2-A: Assessment Summary Table Earth Resources 1 Main First Floor A33 Heater Unit 1 EA F Poor Y Assumed ACM 1 Main Second
More informationChicago Public Schools 6 Month Asbestos Surveillance 2015 - Fall
Chicago Public Schools 6 Month Surveillance 2015 - Fall School: Carter G Woodson South Oracle Unit: 26541 Building ID: 7820 Address: 4444 S. Evans Region: 04 Mail Room: 41 Surveyor: Johnson, Mr. Michael
More informationDon Hau, Project Development, 100 Shops Building, 319 15th Avenue SE, Minneapolis, MN 55414
July 13, 1993 REPORT: Complete Building Asbestos Survey TO: FROM: Don Hau, Project Development, 100 Shops Building, 319 15th Avenue SE, Minneapolis, MN 55414 Michael Buck, Asbestos Group, Environmental
More information1804 W. Colorado Avenue Colorado Springs CO 80904 719-473-2311 Fax 719-473-2312 AlpineConsultInc.com
Page 1 of 6 1804 W. Colorado Avenue Colorado Springs CO 80904 719-473-2311 Fax 719-473-2312 AlpineConsultInc.com Re: 7 ½ Cragmoor Village Drive, Colorado Springs CO ACI Job: 33043 Date of Inspection: February
More informationUNVERSITY HIGH SCHOOL U0018 65-108-9010-0001 500 W. Gregory St. Normal, IL 61761. School Asbestos Management Plan. Supplemental.
UNVERSITY HIGH SCHOOL U0018 65-108-9010-0001 500 W. Gregory St. Normal, IL 61761 School Asbestos Management Plan Supplemental Prepared By: David Martin Management Planner Environmental Health and Safety
More informationAsbestos Management Program
Asbestos Management Program Facilities and Operations Revision #4: February 17, 2012 Page IMPORTANT Asbestos related incidents must be reported IMMEDIATELY to your supervisor Emergency Contacts During
More informationFIRE EXTINGUISHER DORM #1 SYMPHONY
FIRE EXTINGUISHER DORM #1 SYMPHONY 101 ABC (Dry Chem) Basement (Downbeat Café Pool Tables) 102 ABC (Dry Chem) Hall Men s room (Downbeat Café) 103 ABC (Dry Chem) Hallway across chiller (Downbeat Café) 104
More information6% Chrysotile NA 2 008 White floor tile 2 nd Floor 10,000 sq ft Cat 1 2% Chrysotile Poor
1.0 Asbestos Inspection Barge, Waggoner Summer & Cannon performed an asbestos survey for building 4666 (the Building) at the George C. Marshall Space Flight Center in Huntsville, Alabama on April 5, 2012.
More informationASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823.
ASBESTOS BUILDING INSPECTION REPORT for the City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823 at the City of East Lansing Waste Water Treatment Plant and Woodingham Pump Station
More informationWORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES
California Institute of Technology WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727
More informationASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823
ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 at Bailey Hall Building #315 East Lansing, Michigan 48823
More informationMay 23, 2014. Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240
May 23, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Demolition Asbestos Survey Report 6150 Farrell Street, Marysville, California 95901
More informationProfessional Service Industries, Inc. 6330 Gateway Drive Suite B Cypress, CA 90630 Phone 714/484-8600 Fax 714/484-8601
Professional Service Industries, Inc. Phone 714/484-8600 Fax 714/484-8601 GENERAL INFORMATION SECTION 1 Executive Summary Professional Service Industries, Inc. (PSI) was retained by The Wieland-Davco
More informationMEMORANDUM. DATE: January 6, 2015. Campus Community. Tim Ridley, CSP, ARM-P Director, Safety and Risk Management. SUBJECT: Asbestos Notification 2015
MEMORANDUM DATE: January 6, 2015 TO: FROM: Campus Community Tim Ridley, CSP, ARM-P Director, Safety and Risk Management SUBJECT: Asbestos Notification 2015 California Health and Safety Code, 25915 (Asbestos
More information2013 AHERA 3 Year Re-Inspection Report For. Northeast Elementary School 82 Scofieldtown Road Stamford, CT. Performed by
2013 AHERA 3 Year Re-Inspection Report For 82 Scofieldtown Road Stamford, CT Performed by P.O. Box 423 Stratford, CT 06615 Inspection Date: April 17, 2013 82 Scofieldtown Road Stamford, CT I. EXECUTIVE
More informationAsbestos-Containing Material Re-Inspection Report
Asbestos-Containing Material Re-Inspection Report WA032 PFC JOE E. MANN UNITED STATES ARMY RESERVE CENTER Site Code 53920 4415 North Market Street Spokane, Washington 99207 Prepared for: 88 th Regional
More informationAsbestos Management POLICY
Asbestos Management POLICY All Asbestos Containment Material (ACM) removal activities shall comply with applicable federal, state, and local regulations. Areas of responsibility of Facilities Management
More informationTable of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9
Table of Contents I Introduction 2 II Definitions & Area Calculation 2 III Room Numbering 7 IV Appendix A 9 I. Introduction A. Purposes The purposes of this document are to: B. Benefits 1. Clarify and
More informationDoughty Environmental Hygiene Associates
Top: Photo #1: View of the top of the elevator shaft from the roof. The open ventilation causes condensation to form inside on the sheetrock. It also allows for the access for insects. Note the discoloration
More informationAT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
More informationThe main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.
MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating
More informationPOTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for
POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for Michigan State University Engineering and Architectural Services Physical Plant Building, Room 101 East Lansing, Michigan 48824-1326 at Michigan
More informationAPPLICANT: ORANGE COUNTY, NEW YORK
Figure 1 Div 1 3 rd Flr Leakage in County Executives Office Figure 2 Div 1 3 rd Flr Location 067 approximately 2 SF of visible mold growth above entrance to Room 341 Figure 3 Div 1 3 rd Flr Location 067
More informationAHERA 3-Year Asbestos Re-Inspection
AHERA 3-Year Asbestos Re-Inspection Denver 940 Fillmore Street Denver, Colorado 80206 Report Date: November 20, 2013 OEI Project No. 13.159 Prepared For: John Lewis Denver 940 Fillmore Street Denver, CO
More informationEnvironmental Education Associates. Asbestos in Construction
Environmental Education Associates Asbestos in Construction Asbestos What Is It? 1-2 Asbestos is a naturally occurring mineral, found in rock form and is mined from the earth similar to iron, lead, and
More informationBuilding Description Project Description Estimated Cost Notes Total Deferred
Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field
More informationMURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationASBESTOS BUILDING INSPECTION
ASBESTOS BUILDING INSPECTION LOCATION: LIBRARY EAST 1825 SW BROADWAY PORTLA, OREGON 97201 JUNE 23, 2008 FORENSIC ANALYTICAL PROJECT NO. PJ5592 PREPARED FOR: PORTLA STATE UNIVERSITY PO BOX 13175 PORTLA,
More informationASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT 05403 AIP 84
ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT 05403 AIP 84 December 16, 2011 Revised January 31, 2012 KAS PROJECT # 509110228 PREPARED FOR: Stantec, Inc.
More informationThe Management of Asbestos at the University of Manitoba
The Management of Asbestos at the University of Manitoba WHAT IS ASBESTOS? Asbestos is a name given to a group of minerals which occur naturally as masses of long silky fibres. Asbestos is known for its
More informationBUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationItems in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes.
Office of Safe and Orderly Schools Facility Safety Assessment Dennis Meador, School Facilities Supervisor Mark Hobson, School Facilities Supervisor Division of School Building September 18 19, 2007 Items
More informationBuilding Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
More informationIllinois State University Asbestos Containing Building Material Summaries
Illinois State University Asbestos Containing Building Material Summaries 302 Normal St. (HHN)... 2 Bone Student Center (BON)... 2 Carter Harris Physical Plant Shop (PPO)... 3 Centennial West (CW)... 3
More informationAsbestos Survey Form (See Instructions)
Asbestos Survey Form (See Instructions) 777 12th Street, 3rd Floor Sacramento, CA 95814 Office (916) 874-4800 Fax (916) 874-4899 Email: asbestos@airquality.org 1. Purpose of Survey Renovation Demolition
More informationBid Tabulation for IFB #9708 (Asbestos and Mold Abatement Services)
Bid Tabulation for IFB #9708 (Asbestos and Services) Item IES of Marshall, Inc (SERVPRO) B&R Insulation Inc Major Abatement (Pipe Insulation up to 2-inch) Linear Foot (Pipe Insulation up to 2-inch) Linear
More informationCONDITION OF QUALITY ITEMS
CONDITION OF QUALITY ITEMS FOUNDATION Always look for moisture problems and any bulges or irregularities in the walls. Lines on the walls or floors may indicate water problems. Have these been cured? If
More informationArbor Heights Indoor Air Quality Investigation Interim Report
Arbor Heights Indoor Air Quality Investigation Interim Report Arbor Heights Elementary PTSA 3701 SW 104 Street Seattle, WA 98146 ENVIROTEST RESEARCH INC. 1108 NE 200 th, St. Suite 100 Shoreline, WA 98155-1136
More informationThe picture is from http://www.easywaystogogreen.com/health-and-wellness/howasbestos-can-affect-homeowners/
The picture is from http://www.easywaystogogreen.com/health-and-wellness/howasbestos-can-affect-homeowners/ Brochure for Public Info. - Risks of Asbestos General info from Health Canada Another picture
More informationThe work has continued on final Phase 4 and is nearing completion.
Updates-January 22, 2013 29369-Rehab Plaza Deck/Drainage Budget: $18,000,000, constr. Start 8/2009 The work has continued on final Phase 4 and is nearing completion. The main plaza area of phase 4 is now
More informationCENTRAL FACILITIES SERVICES ASBESTOS REPORT. List of buildings containing friable and non-friable asbestos 11/7/2014
CENTRAL FACILITIES SERVICES ASBESTOS REPORT List of buildings containing friable and non-friable asbestos 2014 11/7/2014 ASBESTOS INTRODUCTION Asbestos is a naturally occurring fibrous mineral found in
More informationLITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -
The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior
More informationHolz Choices & Specifications
March 21, 2011 0. SALES AND DESIGN 1. UTILITIES AND PERMITS Holz Choices & Specifications 2. EXCAVATION AND LOT PREPARATION Job Beginning date of Monday May 2 nd, 2011 ALTERNATE: Garage walls as drawn
More informationSUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: 1860. Inspection Date: Saturday, February XX, XXXX
SUMMARY REPORT Report Number: 1860 Inspection Date: Saturday, February XX, XXXX Property Address: XX XXXXX XXX Toronto, ON XXX XZX Client Name: Xxxx Xxxxxxxxxxxxx Prepared by: Andrew Marioselva BSc,CHI
More informationRequest for Proposals ASBESTOS ABATEMENT SERVICES. Coffeyville Community College 400 W. 11 th Street Coffeyville, KS 67337
Request for Proposals ASBESTOS ABATEMENT SERVICES Coffeyville Community College 400 W. 11 th Street Coffeyville, KS 67337 Date Issued: January 14, 2016 Date Due: February 5, 2016 at 2:00 pm, local time
More informationFacility Assessment for. 11801 East Main Street, Huntley, IL
Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested
More informationSupplemental Investigation Summary Report
130 Liberty Street New York, New York Supplemental Investigation Summary Report Visual Mold Inspection Summary Prepared for: Lower Manhattan Development Corporation One Liberty Plaza, 20 th Floor, New
More informationAsbestos 2 hr. Awareness
Asbestos 2 hr. Awareness LEA Designee Definition Any local educational agency as defined in section 198 of the Elementary and Secondary Education Act of 1965 (20U.S.C. 3381) The owner of any nonpublic,
More informationComputing & Telecommunications Services Monthly Report March 2015
March 215 Monthly Report Computing & Telecommunications Services Monthly Report March 215 CaTS Help Desk (937) 775-4827 1-888-775-4827 25 Library Annex helpdesk@wright.edu www.wright.edu/cats/ Last Modified
More informationMONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5
Rendering Provided by McKissick Associates MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Additions and Alterations to Williamsport Area Middle School Williamsport Area School District 17 July 2012 Geo-Thermal
More informationAsbestos Related Data For the Healthcare Facility
Prepared for: Mr. Anthony Gagliano Project Manager Facilities Services Broward Health Headquarters 303 Southeast 17 th Street, Suite No. 205 Fort Lauderdale, Florida 33316 NESHAP PRE-DEMOLITION ASBESTOS
More informationEstimating Database Checklist
Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to
More informationMequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
More informationSECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS
PART 1 GENERAL 1.01 SUMMARY SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS A. This section provides a list of known and assumed hazardous materials that may be impacted during renovation, demolition,
More informationCOST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)
COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.
More informationCase 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
More informationVision Home Inspection
Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the
More informationAnalysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
More informationHome Energy Evaluation Report for Fritz Kreiss and Catherine McQueen
Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen May 2008 Wisconsin Area PO BOX 115 Lake Geneva, WI 53147 CELL (414) 550-4765 Home Performance with ENERGY STAR Evaluation Report Customer
More informationArizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST
It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist
More informationHistoric Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345
Exterior Features 1 site and drainage 2 foundation 3 wood siding and trim 4 exterior doors 5 windows / storm windows 6 porches front and rear 7 chimneys 8 roofing Interior Features 9 frame 10 basement
More informationASBESTOS CONTAINING MATERIALS (ACM) REFERENCE GUIDE
ASBESTOS CONTAINING MATERIALS (ACM) REFERENCE GUIDE by Environmental Health & Safety Office January 2012 Page 1 of 38 ASBESTOS ON CAMPUS... 3 MAG BLOCK... 5 AIRCELL... 6 SWEATWRAP... 7 CAPOSITE... 8 PARGING
More informationASBESTOS BACKGROUND INFORMATION
ASBESTOS BACKGROUND INFORMATION Asbestos Facts What is Asbestos? Asbestos is a mineral. It is a natural rock mined from the ground. Most of the asbestos used in this country comes from Quebec in Canada.
More informationFacilities Operations Customer Service Standards WORK ORDER PRIORITIES
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system
More informationMaryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009
Maryland American Recovery and Reinvestment Act 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Building 316 Electrical, HVAC, Plumbing,
More informationASBESTOS NESHAP DEMOLITION SURVEY
ASBESTOS NESHAP DEMOLITION SURVEY PERFORMED AT REDDING GARDENS APARTMENTS 419 SOUTH LOCUST AVENUE SANFORD, FLORIDA 32771 PREPARED FOR SANFORD HOUSING AUTHORITY 94 CASTLE BREWER COURT SANFORD, FLORIDA 32771
More informationHOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationThe Richard Stockton University ASBESTOS MANAGEMENT PLAN
The Richard Stockton University ASBESTOS MANAGEMENT PLAN January 2015 Asbestos Management Plan Table of Contents I. Introduction II. III. IV. Definitions Identification of Asbestos Notification and Labeling
More informationI. AMFITEATRU HOTEL ** For more details visit : http://www.unita-turism.ro/ro/sale-olimp-estival.html
NEPTUN OLIMP BLACK SEA RESORT SALE PRICE = 24.000.000 euro - Negociable price Amfiteatru** Belvedere**- Panoramic** Complex from Neptun-Olimp Resort has a total area of 44,308 square meters Olimp Resort
More informationSTOCKTON UNIVERSITY ASBESTOS - GENERAL AWARENESS TRAINING. For workers and building occupants
STOCKTON UNIVERSITY ASBESTOS - GENERAL AWARENESS TRAINING For workers and building occupants Asbestos Awareness Asbestos is a serious health hazard commonly found in our environment today. This module
More informationASBESTOS-CONTAINING MATERIAL REPORT
ASBESTOS-CONTAINING MATERIAL REPORT Purchase College State University of NY 735 Anderson Hill Road Town of Purchase Westchester County, New York July 13, 2009 Prepared for: Jacobs Engineering Group, Inc.
More informationJune 29, 2015 Project 131.06099.005
June 29, 2015 Project 131.06099.005 Ms. Tracy Kelly Maine Department of Environmental Protection Bureau of Remediation and Waste Management 17 State House Station Augusta, Maine RE: Hazardous Building
More informationAsbestos Frequently Asked Questions
Asbestos Frequently Asked Questions What is asbestos? Asbestos is a mineral which is mined, processed, and used in many building materials. Since 1988, asbestos has been banned in most US building components;
More informationHAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationEnhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
More informationE-mail: m-skaria@tamu.edu. http://primera.tamu.edu/kcchome/faculty/ms.htm. Moisture Challenges & Solutions: Proactive Construction Strategies
E-mail: m-skaria@tamu.edu http://primera.tamu.edu/kcchome/faculty/ms.htm Moisture Challenges & Solutions: Proactive Construction Strategies 62 nd Annual Convention of the International Builders Show Orange
More informationDRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationMoncton High School Staff Concerns Compiled September 2010. Duct work needs to be cleaned and or blocked. Lintels above bus slip doors are cracked
Moncton High School Staff Concerns Compiled September 2010 General Concerns Duct work needs to be cleaned and or blocked Lintels above bus slip doors are cracked No ventilation system Windows difficult
More informationSchematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL
Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity
More informationCONSTRUCTION PROGRESS MONITORING REPORT
CONSTRUCTION PROGRESS MONITORING REPORT Windermere Memory Care 1060 Tomyn Boulevard Ocoee, FL 34787 Partner Project Number: 15-133494.16 Prepared for: ORIX USA Corporation 1717 Main Street, Suite 1100
More informationCity of Jacksonville Main Library Jacksonville, FL
City of Jacksonville Main Library Jacksonville, FL The company s leadership team shares a passionate commitment to integrity, quality and customer service excellence. The Main Library is a five-story building,
More informationWorkSafe BC Guidelines Regarding Demolition and Asbestos Waste Materials
WorkSafe BC Guidelines Regarding Demolition and Asbestos Waste Materials G20.112 Hazardous Materials - Asbestos Issued June 18, 2008; Revised consequential to February 1, 2012 Regulatory Amendment Regulatory
More informationAsbestos Abatement Work Plan for the Carter Carburetor Superfund Site
for the Prepared for: ACF Industries LLC 101 Clark Street St. Charles, Missouri 63301 Prepared by: AMEC Environment & Infrastructure, Inc. 15933 Clayton Road, Suite 215 Ballwin, Missouri 63011 Project
More informationUBC Plant Operations Asbestos Work Procedures April 2004
UBC Plant Operations Asbestos Work Procedures April 2004 These Procedures are for use by UBC Plant Operations, Utilities, Housing & Conferences, and IT Services only and are not intended for use by other
More informationASBESTOS AWARENESS. With details specific to The University of Alabama campus
ASBESTOS AWARENESS With details specific to The University of Alabama campus What is Asbestos It is the name given to 6 naturally occurring minerals mined from the earth. Crystalline structure forms long
More informationPRE-PURCHASE INSPECTION REPORT
PRE-PURCHASE INSPECTION REPORT PREPARED FOR: PROPERTY ADDRESS: Waiheke Island DATE: 21 November 2012 Page 1 of 13 (a) This is a report of a visual only, non-invasive inspection of the areas of the building
More information2015 RACE TO ZERO STUDENT DESIGN COMPETITION
2015 RACE TO ZERO STUDENT DESIGN COMPETITION Team Members / Industrial Partners A. TEAM and INDUSTRY PARTNERSHIPS B C D E F G H I A. TEAM B C D E F G H I J A C D E F G H I J B. DESIGN GOALS Project Site
More informationCherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete
More informationASBESTOS INSPECTION REPORT 31 DUMONT AVENUE SOUTH BURLINGTON, VT 05403 AIP 78. December 16, 2011 Revised January 31, 2012
ASBESTOS INSPECTION REPORT 31 DUMONT AVENUE SOUTH BURLINGTON, VT 05403 AIP 78 December 16, 2011 Revised January 31, 2012 KAS PROJECT # 509110226 PREPARED FOR: Stantec, Inc. 55 Green Mountain Drive South
More information