2 CHAPTER OUTLINE 13.1 Planning for and Justifying IT Applications 13.2 Strategies for Acquiring IT Applications 13.3 The Traditional Systems Development Life Cycle 13.4 Alternative Methods and Tools for Systems Development 13.5 Vendor and Software Selection
3 LEARNING OBJECTIVES 1. Define an IT strategic plan, identify three objectives it must meet, and describe the four common approaches to cost-benefit analysis. 2. Discuss the four business decisions that companies must make when they acquire new applications. 3. Identify the six processes involved in the systems development life cycle, and explain the primary tasks and importance of each process.
4 LEARNING OBJECTIVES (continued) 4. Describe four alternative development methods and four tools that augment development methods, and identify at least one advantage and one disadvantage of each method and tool. 5. Analyze the process of vendor and software selection.
5 13.1 Planning for and Justifying IT Applications Organizations must analyze the need for the IT application. Each IT application must be justified in terms of costs and benefits. The application portfolio Just like a stock portfolio, an application portfolio should balance risk and reward know your organization s priorities for each
6 Information Systems Planning
7 Information Systems Planning (continued) Organizational strategic plan states the firm s overall mission, the goals that follow from that mission, and the broad steps necessary to reach these goals. IT architecture delineates the way an organization s information resources should be used to accomplish its mission. IT strategic plan is a set of long-range goals that describe the IT infrastructure and major IT initiatives needed to achieve the goals of the organization.
8 IT Steering Committee The IT steering committee is comprised of managers and staff representing various organizational units. This committee establishes IT priorities and ensures that the MIS function meets the needs of the enterprise. Image Source/Age Fotostock America, Inc. Needs members high enough in the organization to have (1) an organization-wide perspective and (2) ability to control resources
9 IS Operational Plan Contains the following elements: Mission derived from the IT strategic plan IS environment needs for information Objectives of the IS function how to achieve goals Constraints of the IS function technology, financial, personnel, other Application portfolio must be prioritized Resource allocation and project management members must have enough authority to accomplish objectives
10 Evaluating & Justifying IT Investment: Benefits, Costs & Issues Assessing the costs Fixed costs Total cost of ownership (TCO) acquire, operate, dispose Assessing the benefits (Values) Intangible benefits: Benefits from IT that may be very desirable but difficult to place an accurate monetary value on. Comparing the two
11 Conducting the Cost-Benefit Analysis Using Net Present Value (NPV) Return on investment Breakeven analysis The business case approach A business case is one or more specific applications or projects. Its major emphasis is the justification for a specific required investment, but it also provides the bridge between the initial plan and its execution.
12 13.2 Strategies for Acquiring IT Applications Four fundamental business decisions to make before choosing a strategy: (1) How much computer code does the company want to write? (2) How will the company pay for the application? (3) Where will the application run? (4) Where will the application originate?
13 Strategies for Acquiring IT Applications Purchase a Prewritten Application Customize a Prewritten Application Lease the applications Application Service Providers and Softwareas-a-Service Vendors Use Open-Source Software Outsourcing Custom Development
14 Purchase a Prewritten Application Software can be tried out Can save time and money A known product is purchased even though it may not exactly match organization needs May not be easily modified (possibly by contract) Product could be discontinued by a vendor Product controlled by another company that may not have goals in sync with your organization
15 Marin County, California (page 352) Deloitte consulting put in an SAP enterprise resource planning system From 2005 to 2009 the implementation went on but was fraught with problems Marin county sued The consulting bills were $29 million Marin county spent $5 million in legal fees Deloitte settled paying $4 million
16 Operation of an Application Service Provider (ASP) Customer A Customer B Customer C Application Application Application Database Database Database ASP Data Center
17 Operation of a Software-as-a-Service (SaaS) Vendor Customer A Customer B Customer C Application Customer A Customer B Customer C SaaS Vendor Data Center
18 13.3 Traditional Systems Development Life Cycle Software Development Life Cycle (SDLC) Systems Investigation Systems Analysis Systems Design Programming and Testing Implementation Operation and Maintenance
19 Six-Stage Systems Development Life Cycle (SDLC) with Supporting Tools Business Need Prototyping Systems Investigation Deliverable: Go/No Go Decision Systems Analysis Deliverable: User Requirement Systems Design Deliverable: Technical Specification Programming and Testing Implement The System Operation and Maintenance Upper CASE Tools Joint Application Design (JAD) Lower CASE Tools
20 The SDLC Major advantages Control Accountability Error detection Major drawbacks Relatively inflexible Time-consuming and expensive Discourages changes once user requirements are gathered
21 SDLC Systems Investigation Begins with the business problem (or opportunity) followed by the feasibility analysis. Feasibility study Deliverable: Go/No-Go Decision
22 Feasibility Study Technical feasibility Economic feasibility Organizational feasibility Behavioral feasibility Many consider these as one feasibility
23 SDLC System Analysis The examination of the business problem that the organization plans to solve with an information system. Main purpose is to gather information about existing system to determine requirements for the new or improved system. Deliverable is a set of system requirements, also called user requirements.
24 SDLC Systems Design Describes how the system will accomplish this task. Deliverable is the technical design that specifies: System outputs, inputs, user interfaces. Hardware, software, databases, telecommunications, personnel & procedures. Blueprint of how these components are integrated.
25 SDLC System Design (continued) Scope creep is caused by adding functions after the project has been initiated. Kajano/Shutterstock
26 SDLC Programming & Testing Programming involves the translation of a system s design specification into computer code. Testing checks to see if the computer code will produce the expected and desired results under certain conditions. Testing is designed to delete errors (bugs) in the computer code.
27 SDLC Systems Implementation Implementation involves three major conversion strategies: Direct Conversion Pilot Conversion Phased Conversion Parallel Conversion (not used much today)
28 SLDC Operation & Maintenance Audits are performed to assess the system s capabilities and to determine if it is being used correctly. Systems need several types of maintenance. Debugging Updating Maintenance
29 13.4 Alternative Methods and Tools for Systems Development Joint application design (JAD) - A group based tool for collecting user requirements and creating system designs Rapid application development (RAD) - a development method that uses special tools and an iterative approach to rapidly produce a high-quality system Agile development - delivers functionality in rapid iterations requiring frequent communication, development, testing, and delivery End-user development - development method that has the actually user develop their own application(s) for use
30 RAD versus SDLC
31 Tools for Systems Development Prototyping Integrated computer-assisted software engineering (ICASE) Component-based development Object-oriented development
32 13.5 Vendor & Software Selection Step 1: Identify potential vendors. Step 2: Determine the evaluation criteria. Request for proposal (RFP) Step 3: Evaluate vendors and packages. Step 4: Choose the vendor and package Step 5: Negotiate a contract. Step 6: Establish a service level agreement. Request for proposal (RFP) is a document sent to potential vendors to submit a proposal describing their software package and explain how it would meet the company s needs. Service Level Agreements (SLAs) are formal agreements that specify how work is to be divided between the company and its vendors.
33 Chapter Closing Case The Problem The Solution The Results
CHAPTER 13. Acquiring Information Systems and Applications
CHAPTER 13 Acquiring Information Systems and Applications CHAPTER OUTLINE 13.1 Planning for and Justifying IT Applications 13.2 Strategies for Acquiring IT Applications 13.3 The Traditional Systems Development
More informationFundamentals of Information Systems, Fifth Edition. Chapter 8 Systems Development
Fundamentals of Information Systems, Fifth Edition Chapter 8 Systems Development Principles and Learning Objectives Effective systems development requires a team effort of stakeholders, users, managers,
More informationCHAPTER 9. DEVELOPING IT SY STEM S Bringing IT System s to Life
CHAPTER 9 DEVELOPING IT SY STEM S Bringing IT System s to Life 9-2 Introduction Every Organization Is Using Information Technology But IT systems don t magically appear. Organizations spend billions of
More informationLECTURE 1. SYSTEMS DEVELOPMENT
LECTURE 1. SYSTEMS DEVELOPMENT 1.1 INFORMATION SYSTEMS System A system is an interrelated set of business procedures used within one business unit working together for a purpose A system has nine characteristics
More informationMULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.
Exam Name MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) Which of the following requires a systems development method that uses a data orientation
More informationManaging the development and purchase of information systems (Part 2)
Managing the development and purchase of information systems (Part 2) (November 26, 2012) BUS3500 - Abdou Illia, Fall 2012 1 LEARNING GOALS Describe alternative systems development methodologies Prototyping
More informationINFORMATION SYSTEMS DEVELOPMENT
INFORMATION SYSTEMS DEVELOPMENT 14 CHAPTER PREVIEW Planning and developing large information systems is akin to a multilevel chess game it is a very demanding task for even the most experienced professionals.
More informationThis unit introduces the Systems Development Life Cycle and the roles involved in ICT system development.
Unit Title: OCR unit number 34 Level: 2 Credit value: 6 Guided learning hours: 50 Unit reference number: Introduction to IT Systems Development J/601/3247 Candidates undertaking this unit must complete
More informationDomain 1 The Process of Auditing Information Systems
Certified Information Systems Auditor (CISA ) Certification Course Description Our 5-day ISACA Certified Information Systems Auditor (CISA) training course equips information professionals with the knowledge
More informationPhase 2 Systems Analysis. Dr. Feng-Jen Yang
Phase 2 Systems Analysis Dr. Feng-Jen Yang Phase Description Systems analysis is the 2nd phase in the systems development life cycle (SDLC) Use requirements modeling, data and process modeling, and object
More informationHow To Model Software Development Life Cycle Models
Various Software Development Life Cycle Models Sahil Jindal, Puneet Gulati, Praveen Rohilla Dronacharya College of Engineering, India Abstract:An SDLC model is a conceptual framework describing different
More informationSystem Design Approaches. System Design. Model-Driven Approaches Modern Structured Design. Model-Driven Approaches
System Design Systems design the specification of a detailed computer-based solution. Also called physical design. systems analysis emphasizes the business problem systems design emphasizes the technical
More informationDevelopment and Acquisition D&A
Federal Financial Institutions Examination Council FFIEC Development and Acquisition D&A APRIL 2004 IT EXAMINATION H ANDBOOK Development and Acquisition Booklet April 2004 TABLE OF CONTENTS INTRODUCTION...
More information5/19/2014. 1 Professor Lili Saghafi
5/19/2014 1 Professor Lili Saghafi MANAGING INFORMATION TECHNOLOGY Lecture 9 METHODOLOGIES FOR CUSTOM SOFTWARE DEVELOPMENT By : Prof. Lili Saghafi 1-2 METHODOLOGIES FOR CUSTOM SOFTWARE DEVELOPMENT Large
More informationObjectives. Chapter 12. System Design. Model-Driven Approaches. System Design Approaches 2016-02-17. Systems Design
McGraw-Hill/Irwin Chapter 12 Systems Design Copyright 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12-2 Objectives Describe the design phase in terms of your information building blocks.
More informationChapter 13 BUILDING INFORMATION SYSTEMS. How does building new systems produce organizational change?
MANAGING THE DIGITAL FIRM, 12 TH EDITION Learning Objectives Chapter 13 BUILDING INFORMATION SYSTEMS VIDEO CASES Case 1: IBM: Business Process Management in a Service Oriented Architecture and Managing
More informationInformation Systems Development Process (Software Development Life Cycle)
Information Systems Development Process (Software Development Life Cycle) Phase 1 Feasibility Study Concerned with analyzing the benefits and solutions for the identified problem area Includes development
More informationInformation Technology (IT) Introduction to System Analysis and Design. Information System. Information System Components
Information Technology (IT) Introduction to System Analysis and Design Peter Lo A combination of Hardware Software Telecommunications systems Support business operations Improve productivity Help managers
More informationAssuming the Role of Systems Analyst & Analysis Alternatives
Assuming the Role of Systems Analyst & Analysis Alternatives Nature of Analysis Systems analysis and design is a systematic approach to identifying problems, opportunities, and objectives; analyzing the
More informationSAULTCOLLEGE OF APPLIED ARTS AND TECHNOLOGY SAULT STE. MARIE, ONTARIO COURSE OUTLINE
SAULTCOLLEGE OF APPLIED ARTS AND TECHNOLOGY SAULT STE. MARIE, ONTARIO COURSE OUTLINE COURSE TITLE: Systems Analysis & Design CODE NO. : SEMESTER: 3 PROGRAM: AUTHOR: Computer Programmer Dennis Ochoski DATE:
More informationIntroduction to Systems Analysis and Design
Introduction to Systems Analysis and Design What is a System? A system is a set of interrelated components that function together to achieve a common goal. The components of a system are called subsystems.
More informationSystem/Data Requirements Definition Analysis and Design
EXECUTIVE SUMMARY This document provides an overview of the Systems Development Life-Cycle (SDLC) process of the U.S. House of Representatives. The SDLC process consists of seven tailored phases that help
More informationIntroduction to the ITS Project Management Methodology
Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer
More information2.1 The RAD life cycle composes of four stages:
2.1 The RAD life cycle composes of four stages: A typical RAD life cycle is composed of the following Stages 2.1.1. Requirements Planning; 2.1.2 User Design; 2.1.3 Rapid Construction; 2.1.4 Transition.
More informationInformation Technology Project Management (ITPM)
FUNCTIONAL AREA 10 Project Management (ITPM) Incumbents in this functional area direct information technology system solution and/or improvement projects for cost, time, scope, risk, and quality. They
More informationExam Results. IT 4823 Information Security Administration. Project Management for Information Security. Introduction. Project Planning Considerations
Exam Results 90+ 7 IT 4823 Information Security Administration November 14 Implementing Security Copyright 2005 by Bob Brown 80-89 70-79 < 70 Questions 1, 5, 9, and 16 came from exam 1. Questions 6 and
More informationINFORMATION TECHNOLOGY GUIDELINE
COMMONWEALTH OF PENNSLVANIA DEPARTMENT OF HUMAN SERVICES INFORMATION TECHNOLOG GUIDELINE Name Of Guideline: System Development Methodology (SDM) Domain: Business Date Issued: 03/01/1999 Date Revised: 03/29/2016
More informationEvaluating Software Alternatives. Chapter 4 Methods of Software Acquisition. Advantages of Custom Developed Software. Custom Developed Software
Evaluating Software Alternatives Chapter 4 Methods of Software Acquisition Examine software alternatives and select an overall strategy for the proposed system to prepare for the transition to the systems
More informationImplementing ERP Systems
ERP Implementation Implementing ERP Systems Implementation was a major challenge in the late 1990s as firms rushed to implement ERP systems to avoid the Y2K problem Implementations were hampered by a lack
More informationTotal Quality Management (TQM) Quality, Success and Failure. Total Quality Management (TQM) vs. Process Reengineering (BPR)
Total Quality Management (TQM) Quality, Success and Failure Total Quality Management (TQM) is a concept that makes quality control a responsibility to be shared by all people in an organization. M7011
More informationA. Waterfall Model - Requirement Analysis. System & Software Design. Implementation & Unit Testing. Integration & System Testing.
Processing Models Of SDLC Mrs. Nalkar Sanjivani Baban Asst. Professor, IT/CS Dept, JVM s Mehta College,Sector 19, Airoli, Navi Mumbai-400708 Nalkar_sanjivani@yahoo.co.in Abstract This paper presents an
More informationSystems Analysis and Design
Systems Analysis and Design Slides adapted from Jeffrey A. Hoffer, University of Dayton Joey F. George, Florida State University Joseph S. Valacich, Washington State University Modern Systems Analysis
More informationExhibit F. VA-130620-CAI - Staff Aug Job Titles and Descriptions Effective 2015
Applications... 3 1. Programmer Analyst... 3 2. Programmer... 5 3. Software Test Analyst... 6 4. Technical Writer... 9 5. Business Analyst... 10 6. System Analyst... 12 7. Software Solutions Architect...
More informationSystem Development Life Cycle Methodology
2 System Development Life Cycle Methodology Learning Objectives : To introduce the general concepts of various approaches of systems development, their framework, advantages and disadvantages; To explain
More informationProcess Methodology. Wegmans Deli Kiosk. for. Version 1.0. Prepared by DELI-cious Developers. Rochester Institute of Technology
Process Methodology for Wegmans Deli Kiosk Version 1.0 Prepared by DELI-cious Developers Rochester Institute of Technology September 15, 2013 1 Table of Contents 1. Process... 3 1.1 Choice... 3 1.2 Description...
More informationFoundations for Systems Development
Foundations for Systems Development ASSIGNMENT 1 Read this assignment introduction. Then, read Chapter 1, The Systems Development Environment, on pages 2 25 in your textbook. What Is Systems Analysis and
More informationChapter 1 The Systems Development Environment
Your Objects of SA&D Study Chapter 1 The Systems Development Environment 2011 by Prentice Hall: J.A.Hoffer et.al., Modern Systems Analysis & Design, 6 th Edition 1/55 2/55 Course Content Fundamental of
More informationDetermining requirements
Systems Analysis Determining requirements ผ สอน ดร.สล ล บ ญพราหมณ ITM-631 Information System Development ... การจะพ ฒนาท กส งท กอย างให เจร ญน น จะต องสร างและเสร ม ข นจากพ นฐานเด มท ม อย ก อนท งส น ถ
More informationAuditing Systems Development
Auditing Systems Development This paper is an exposure draft of a new major output of the INTOSAI Working Group on IT Audit, produced by a research team from the SAIs of China, Kuwait, Pakistan and Bhutan.
More informationCertified Information Systems Auditor (CISA)
Certified Information Systems Auditor (CISA) Course Introduction Course Introduction Module 01 - The Process of Auditing Information Systems Lesson 1: Management of the Audit Function Organization of the
More informationBrief Contents. Part Three: Decisions and Strategies. Part One: Information Technology Infrastructure. Part Four: Organizing Businesses and Systems
Brief Contents 1 Introduction Part One: Information Technology Infrastructure 2 Information Technology Foundations 3 Networks and Telecommunications 4 Database Management Part Two: Business Integration
More informationSystems Analysis and Design in a Changing World, Fifth Edition
Systems Analysis and Design in a Changing World, Fifth Edition Learning Objectives Explain the elements of project management and the responsibilities of a project manager Explain project initiation and
More informationThe following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material,
More informationChapter 11 Project Management
Chapter 11 Project Management Managing and Using Information Systems: A Strategic Approach by Keri Pearlson & Carol Saunders Introduction What are the elements of a good project? Why do so many IT projects
More informationProject Management. Systems Analysis and Design, 8e Kendall & Kendall
Project Management Systems Analysis and Design, 8e Kendall & Kendall Learning Objectives Understand how projects are initiated and selected, define a business problem, and determine the feasibility of
More informationMANAGING THE SYSTEMS DEVELOPMENT LIFE CYCLE
CHAPTER MANAGING THE SYSTEMS DEVELOPMENT LIFE CYCLE The development of a new information system is a complicated effort. But it must be done. Manual systems are eventually automated and old systems become
More informationID Task Name Time Pred
0 UC Modernization Project Plan 1115 d 1 1 Phase I - Business Case Development and Competitive Procurement 205 d 2 1.1 Complete Initial Feasibility Study 55 d 3 1.2 Prepare and Issue LBR 30 d 2 4 1.3 Competitive
More informationDevelopment, Acquisition, Implementation, and Maintenance of Application Systems
Development, Acquisition, Implementation, and Maintenance of Application Systems Part of a series of notes to help Centers review their own Center internal management processes from the point of view of
More informationCIS 270. Systems Analysis and Design
CIS 270 Systems Analysis and Design Approved: May 6, 2011 EFFECTIVE DATE: Fall 2011 COURSE PACKAGE FORM Team Leader and Members Andra Goldberg, Matt Butcher, Steve Sorden, Dave White Date of proposal to
More informationINFORMATION TECHNOLOGY
INFORMATION TECHNOLOGY MISSION The mission of Information Technology is to deliver innovative, high quality, cost effective computing, networking, information management and business apps management services
More informationMINNESOTA STATE POLICY
Version: 2.00 Approved Date: 02/24/2012 Approval: Signature on file MINNESOTA STATE POLICY From the Office of Carolyn Parnell Chief Information Officer, State of Minnesota IT Project Portfolio Data Management
More informationProgram Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
More informationIntroduction to Change
Introduction to Management and SDLC Steve Owyoung Sr. Manager KPMG LLP, IT Advisory Doug Mohrland Audit Manager Oracle Corporation Discussiontopics o significance o o s o o o o Software (SDLC) s Organization
More informationASSESSMENT OF SOFTWARE PROCESS MODELS
ASSESSMENT OF SOFTWARE PROCESS MODELS Akhilesh Research Scholar, Department of Computer Science, Manav Bharti University, Solan (H.P.) ABSTRACT The field of software engineering is related to the development
More informationProgram Management Professional (PgMP) Examination Content Outline
Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management
More informationWhat is a life cycle model?
What is a life cycle model? Framework under which a software product is going to be developed. Defines the phases that the product under development will go through. Identifies activities involved in each
More informationHealth Information Management Systems Technology and Analysis (HIMSTA) Domains, Competencies and Modules. The Curriculum.
Health Information Management Systems Technology and Analysis (HIMSTA) Domains, Competencies and Modules Introduction: The Curriculum The outline below frames the 14 modules of this curriculum within their
More informationHow To Design An Information System
Chapter 2 System Development Life Cycle Methodology 2.1. Definition :- System Development Process is a process of examining a business problem - - with the intentions of improving it, - through better
More informationQ1 What is systems development?
Q1 What is systems development? The process of creating and maintaining information systems is called systems development or systems analysis and design. This diagram shows that it involves all five components
More informationA REPORT BY THE NEW YORK STATE OFFICE OF THE STATE COMPTROLLER
A REPORT BY THE NEW YORK STATE OFFICE OF THE STATE COMPTROLLER Alan G. Hevesi COMPTROLLER NEW YORK CITY SCHOOL CONSTRUCTION AUTHORITY IMPLEMENTATION OF THE ENTERPRISE RESOURCE PLANNING SYSTEM 2002-N-6
More informationDeveloping and Implementing a Strategy for Technology Deployment
TechTrends Developing and Implementing a Strategy for Technology Deployment Successfully deploying information technology requires executive-level support, a structured decision-making process, and a strategy
More informationSkatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt. Programme, Project & Service Management Analysis
Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt Programme, Project & Service Management Analysis Table of Content 1 Executive Summary... 3 1.1 Scope of Work... 3 1.2 Methodology for
More informationManaging the IT Procurement Process
61-04-68 Managing the IT Procurement Process Robert Heckman An IT procurement process, formal or informal, exists in every organization that acquires information technology. As users of information systems
More informationBFB-IS-10: Systems Development Standards
Responsible Officer: VP - Chief Information Officer Responsible Office: IT - Information Technology Services Issuance Date: 5/18/2001 Effective Date: 5/18/2001 Scope: [Scope] Contact: Stephen Lau Email:
More informationA system is a set of integrated components interacting with each other to serve a common purpose.
SYSTEM DEVELOPMENT AND THE WATERFALL MODEL What is a System? (Ch. 18) A system is a set of integrated components interacting with each other to serve a common purpose. A computer-based system is a system
More informationIT2404 Systems Analysis and Design (Compulsory)
Systems Analysis and Design (Compulsory) BIT 1 st YEAR SEMESTER 2 INTRODUCTION This is one of the 4 courses designed for Semester 1 of Bachelor of Information Technology Degree program. CREDITS: 04 LEARNING
More informationSoftware Development Processes. Software Life-Cycle Models
1 Software Development Processes Sequential, Prototype-based RAD, Phased, Risk-based Spiral (c) 1998 M Young CIS 422/522 4/3/98 1 Software Life-Cycle Models Breaking projects down into pieces for... Planning
More informationBlueprint for Selecting Improvement Approach
Kenan-Flagler Business School State of North Carolina Business Systems Infrastructure Study Phase II Blueprint for Selecting Improvement Approach Executive Summary January 5, 2004 Business Case www.osc.state.nc.us
More informationChapter 1 System Development Environment
Chapter 1 System Development Environment Definition Information systems analysis and design: The organizational process to develop computer-based information systems. History In the early years of computing,
More informationOctober 16, 2009 Florida Chapter Presented by Raphael Klebanov, WhereScape USA Best Practices Building a Data Warehouse Quickly
October 16, 2009 Florida Chapter Presented by Raphael Klebanov, WhereScape USA Best Practices Building a Data Warehouse Quickly Copyright 2009 by WhereScape Software Abstract Key factors that influence
More informationCOURSE TITLE: (OLS 207) INFORMATION SYSTEMS ANALYSIS, DESIGN AND EVALUATION
COURSE TITLE: (OLS 207) INFORMATION SYSTEMS ANALYSIS, DESIGN AND EVALUATION Course Instructor Nelson Msagati (Assistant Lecturer) Said Ally (Assistant Lecturer) Course Description The course introduces
More informationAGILE vs. WATERFALL METHODOLOGIES
AGILE vs. WATERFALL METHODOLOGIES Introduction Agile and waterfall are two major methodologies that software developers and project managers have the option of using. Some of the goals of developers and
More informationSaaS-Based Budget Planning
SaaS-Based Budget Planning Advantages over Traditional Models Author: Tom Olson Tom Olson is President and CEO of MyBudgetFile Inc. and former Associate Superintendent of Business and Finance for the Parkland
More informationIT1104- Information Systems & Technology (Compulsory)
INTRODUCTION - Information Systems & Technology (Compulsory) This is one of the 4 courses designed for Semester 1 of Bachelor of Information Technology (BIT) Degree program. Information Systems and Technology
More informationCS435: Introduction to Software Engineering! " Software Engineering: A Practitioner s Approach, 7/e " by Roger S. Pressman
CS435: Introduction to Software Engineering! " " " " " " " "Dr. M. Zhu! Chapter 3! Agile Development! Slide Set to accompany Software Engineering: A Practitioner s Approach, 7/e " by Roger S. Pressman
More informationApplication of software product quality international standards through software development life cycle
Central Page 284 of 296 Application of software product quality international standards through software development life cycle Mladen Hosni, Valentina Kirinić Faculty of Organization and Informatics University
More informationBuilding Software in an Agile Manner
Building Software in an Agile Manner Abstract The technology industry continues to evolve with new products and category innovations defining and then redefining this sector's shifting landscape. Over
More informationA Comparison between Five Models of Software Engineering
International Journal of Research in Information Technology (IJRIT) www.ijrit.com ISSN 2001-5569 A Comparison between Five Models of Software Engineering Surbhi Gupta, Vikrant Dewan CSE, Dronacharya College
More informationTHE APPLICATION OF THE PARETO PRINCIPLE IN SOFTWARE ENGINEERING.
THE APPLICATION OF THE PARETO PRINCIPLE IN SOFTWARE ENGINEERING. Ankunda R. Kiremire 19th October, 2011 1 Introduction The Pareto Principle, or more commonly the 80/20 rule is a relation that describes
More informationChapter 6 Determining System Requirements
Chapter 6 Determining System Requirements Multiple Choice Questions 1. The impertinence characteristic of a good systems analyst is represented by which of the following statements? a. You must challenge
More informationSoftware Development Processes. Software Life-Cycle Models. Process Models in Other Fields. CIS 422/522 Spring 1998 1
1 Software Development Processes Sequential, Prototype-based RAD, Phased, Risk-based Spiral (c) 1998 M Young CIS 422/522 1/10/99 1 Software Life-Cycle Models Breaking projects down into pieces for... Planning
More informationInformation Technology Services firms
CHAPTER 2 SIX SOURCES OF SOFTWARE 1. Information Technology Services Firms, 2. packaged software producers, 3. enterprise-wide solutions, 4. application and managed service providers, 5. open-source and
More informationGlobal Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.872.8200 F.508.935.4015 www.idc.com
WHITE PAPER Integrated Application Life-Cycle Management: Accelerating Innovation, Reducing Costs, and Improving Quality Sponsored by: SAP Melinda-Carol Ballou April 2010 Global Headquarters: 5 Speen Street
More informationCOST-BENEFIT ANALYSIS TEMPLATE
*************** REMOVE THIS PAGE FROM FINAL DOCUMENT. *************** TEMPLATE INTRODUCTION A cost-benefit analysis (CBA) is a systematic process for calculating and comparing benefits and costs of a project
More informationBusiness Logistics Specialist Position Description
Specialist Position Description March 23, 2015 MIT Specialist Position Description March 23, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level
More information44-76 mix 2. Exam Code:MB5-705. Exam Name: Managing Microsoft Dynamics Implementations Exam
44-76 mix 2 Number: MB5-705 Passing Score: 800 Time Limit: 120 min File Version: 22.5 http://www.gratisexam.com/ Exam Code:MB5-705 Exam Name: Managing Microsoft Dynamics Implementations Exam Exam A QUESTION
More informationMIS 5203. Systems & Infrastructure Lifecycle Management 1. Week 13 April 14, 2016
MIS 5203 Lifecycle Management 1 Week 13 April 14, 2016 Study Objectives Systems Implementation contd Configuration Management Monitoring and Incident Management Post implementation Reviews Project Success
More informationProject management. Objectives. Topics covered. Organizing, planning and scheduling software projects DISCUSSION
Project management 1 Objectives 2 Organizing, planning and scheduling software projects DISCUSSION Project Managers? To introduce software project management and to describe its distinctive characteristics
More informationAn Assessment between Software Development Life Cycle Models of Software Engineering
International Journal of Electronics and Computer Science Engineering 700 Available Online at www.ijecse.org ISSN- 2277-1956 An Assessment between Software Development Life Cycle Models of Software Engineering
More informationWhy a feasibility study? Content of a feasibility study. When to do Feasibility Study? Lecture 3, Part 2: Feasibility Study
Why a feasibility study? Lecture 3, Part 2: Study Jennifer Campbell CSC340 - Winter 2007 Objectives of a feasibility study: To find out if an system development project can be done:...is it possible?...is
More informationOakland County Department of Information Technology Project Scope and Approach
Oakland County Department of Information Technology Project Scope and Approach Project Name: Reverse Proxy Standardization Project ID: T62186RP Leadership Group: Information Technology Steering Committee
More informationHow To Manage Technology
Chapter 4 IT Infrastructure: Hardware and Software 4.1 2007 by Prentice Hall STUDENT OBJECTIVES Identify and describe the components of IT infrastructure. Identify and describe the major types of computer
More informationRole and Skill Descriptions. For An ITIL Implementation Project
Role and Skill Descriptions For An ITIL Implementation Project The following skill traits were identified as fairly typical of those needed to execute many of the key activities identified: Customer Relationship
More informationCAREER TRACKS PHASE 1 UCSD Information Technology Family Function and Job Function Summary
UCSD Applications Programming Involved in the development of server / OS / desktop / mobile applications and services including researching, designing, developing specifications for designing, writing,
More informationJoint UNECE/Eurostat/OECD Seminar on the Management of Statistical Information Systems (MSIS) Sofia, Bulgaria, 21-23 June 2006
Distr. GENERAL ECE/CES/SEM.54/31 9 June 2006 ENGLISH ONLY UNITED NATIONS STATISTICAL COMMISSION and ECONOMIC COMMISSION FOR EUROPE CONFERENCE OF EUROPEAN STATISTICIANS EUROPEAN COMMISSION STATISTICAL OFFICE
More informationPage 1 of 5. IS 335: Information Technology in Business Lecture Outline Computer Technology: Your Need to Know
Lecture Outline Computer Technology: Your Need to Know Objectives In this discussion, you will learn to: Describe the activities of information systems professionals Describe the technical knowledge of
More informationInformation Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
More informationSolution: The Company chose Fujitsu s Network Operations Center (NOC) management service to manage its missioncritical
Highlights Goal: Leading fiber network services provider wanted to grow strategically while offering the highest level of service and reliability to customers of its managed services network, with a minimum
More informationlclinical Informatics: Evaluation,
1 Clinical Informatics: Evaluation, Selection, Implementation, and Management of Electronic Health Records lclinical Informatics: Evaluation, Marisa L Wilson DNSc MHSc RN-BC Selection, Implementation,
More informationCompetency Requirements for Executive Director Candidates
Competency Requirements for Executive Director Candidates There are nine (9) domains of competency for association executives, based on research conducted by the American Society for Association Executives
More information