1 VALUE STREAM ANALYSIS ON A PRINTED CIRCUIT BOARD (PCB) PRODUCTION LINE Arvind S, Syari S Nair, Department of Industrial Engineering & Management, M.G University, Kerala aravinds@gmail.com, syarinair@gmail.com ABSTRACT- The possibility of lean implementation in a high mix low volume industry is studied at an electronic manufacturing firm. The aim is to analyze the production process of one of the Printed Circuit Board (PCB) production line and find out possibility of productivity and lead time improvement. Value Stream Mapping is used to check the current production flow of one product family of PCB. VSM is a lean manufacturing tool that helps to identify and remove seven deadly wastes. evsm software is used to draw the Current State Value Stream of the production flow. This current state VSM is been analyzed to identify all value added and non-value added activities. Implementing flow using supermarket concept, TakT time and pacemaker analysis are also carried out. It is found that, by removing all non-value added activities and by including flow and supermarket and pacemaker process at each subassembly, considerable reduction in lead time is possible. Based on these finding, a future state Value Stream Mapping is been devised showing modified work flow with improved matrices like lead time, less waste etc. The changes needed to achieve the desired future state are summarized. Keywords evsm, High mix Low volume, Lean, Printed Circuit Board, VSM I. INTRODUCTION As part of the growth plan of this electronic manufacturing company, it is looking at implementing lean in their facility so that they can accommodate more orders without increasing resources or investing in more machines. This study takes up production flow of one of the PCB product family and analyzes value added and non- value added activities using Value stream management tool. It then suggests improvement areas, especially better cycle time and inventory lead time. The assembly section is usually the highest concentration of labor in an electronics assembly plant, and therefore holds much potential for undetected waste. This project looks at the assembly portion of a manufacturing facility and shows how Lean Manufacturing can be applied to improve these processes. The VSM tool is considered as a functional method aimed at reorganizing production system with the lean vision. Reducing the lead time of value streams through the implementation of lean methodologies would help the firm to increase current customer delivery challenges as well to plan for increased demand in the future. Through this thesis, an attempt is made to implement traditional lean methods to a high mix low volume production environment to prove that lean base concepts are applicable and does produce improvement in this kind of industry too. II. METHOOLOGY The research started by taking a tour of the plant and observations were made on the shop floor and the entire plant. Then discussions involving people from different departments of the company were conducted, so that further details of the current production process could be obtained and discussed. Information regarding cycle time, lead time, number of involved in each process, amount of inventory and work-in progress between processes were determined. Based on the information gathered, a current state map was drawn which depicts process flow, product flow, information flow and communication flow. Takt time and cycle time are also calculated. The data is then analyzed to see what areas need improvement by identifying non-value added activities that can be reduced and eliminated. Thereafter, the current state map is expanded into future state map followed by further discussions and analysis. Lean ISSN (Online): 4-8, Volume -, Issue-, 6

2 techniques are suggested for improvising the product flow, communication flow and information flow. Data collection In the study, data is collected through different means. The prominent method is to visit the production plant, walk through the length and breadth and observe activities. Recording of original data related to flow is done. An attempt is made to talk with the, QA of each section as well as the production engineers. Formal interview with engineers,, different department members, line manager and production manager are conducted. Studying the internal documentation and previous quality data helps to get a detailed picture as well like field observation. In particular, quantitative data on lead and cycle times as well as product specifications were collected, whereas field observations resulted in both qualitative and quantitative data (cycle time measurement). Product Family Selection All the products are analyzed for its different process stages for the purpose of identifying the ones going through similar process stages. Not only the process stages matters, but lead times across stages need to be comparable. After careful and time taking study and observation of about to production lines, DSM series of products are found to be suitable for lean implementation.the reason being, all product variations goes through a set of sub processes with hardly any variations. The difference between lead times taken at each stage between each product variety is within a comparable limit as well. So combining them and brining then under one umbrella is possible, Create a Current State VSM using evsm Current State Map depicts the AS-IS material and information flow of DSM production. It also depicts major matrices of importance across each sub process level and a cross sub assembly levels. Supplier details and customer details are captured. evsm software is used to draw current state VSM. evsm is built on top of Microsoft Visio. This software has templates specific with Value Stream mapping symbols. The current state material and information flow can be mapped by dragging and dropping appropriate symbols into the drawing pane and by including values for key performance parameters. After inserting the appropriate symbols, collected data as well as the correct names for each operation is included. After inserting the correct cycle times, the total cycle time for the specific VSM is calculated by adding up the individual cycle times together. Fig : One Process with matrices in VSM Supplier loop, internal loop and Customer loop has to be separately drawn Recommendations for a future state map Based on the analysis above, different recommendations are provided to improve from the current stage. Possible results post lean implementation is highlighted. Improvements in key matrices across states are highlighted. Ways to remove different wastes are discussed in detail. How each non value added activity can be eliminated is looked into in details. Post elimination of waste and non-value added activates, the improved lead time, machine efficiency etc are shown. After implementing the changes like continuous flow and pacemaker process, improvements in key matrices are noted. A future value stream map including all the changes devised above is been drawn III. ANALYSIS Different products being manufactured at the pant are studied and their process stages re-recorded It is seen that, DSM Part Number to 6 follow similar process stages from row material receiving till packing and shipping. It is also observed that, the difference in lead time across DSM products family products are negligible compared to other products analyzed here. Current State Processes and Statistics Production of DSM consists of a chain of processes to convert the row material to finished good product. The production steps of DSM product family is shown below. The process starts when row materials in cartons in packed state, are been delivered to the shop floor for SMD and delivered to the kitting area for Through Hole. Any pre- processing to be done on the components like cutting the edges etc for through hole components is to done at kitting area. Once order to make is been given to shop floor, loading/unloading team comes to the shop floor, unpacks the cartons of components and starts loading the components to the pick and place machine. Operators do setup for Screen Printing, Pick & Place ISSN (Online): 4-8, Volume -, Issue-, 64

3 and Reflow oven machines. Appropriate programs have to be loaded to all these machines. ICT, FCT and Packing is located in a different building, approximately 4 meters away from the production floor. Work in progress Printed Circuit Boards need to be transported to the building where testing and packing team is located. Packed PCBs in cartons, ready to be shipped would be moved to nd floor of the same building, from where it will be picked by shipping team by PM every day. Current state value stream Current state of DSM product family is drawn after considering both material and information flow between and through the production line. The value stream includes the value adding and non-value adding activities that are required to bring a product from raw material through delivery to the customer. Customer Loop of VSM Customer has projected a monthly demand of pieces. There are slight variations across months. Monthly average delivery of finished goods to customers is 8 to pieces. The finished goods are delivered as pallets. One pallet contains units of finished good. This many printed circuit boards are usually packed in boxes, where each box contains 6 pieces of finished goods. In one week customer expects pallet to be delivered. The finished goods are stored in warehouses. The cartons of 6 pieces would be delivered to customer on a daily basis. Daily Target is to send boxes full or cartons, so that by 6 days cartons can be sent. Takt = Effective work time per / Customer requirements per TT = Available production time / Total daily Quantity required. Takt is calculated as minutes. In order to achieve standard output in each, production crew has to produce piece of PCB in minutes. Customer is buying this product at a rate of one every minutes. Customer loop of VSM is shown in fig. Supplier Loop of VSM Fig : Customer Loop Entire components per order is been delivered to the warehouse by the supplier directly. The warehouse is located at KM distance from the plant plot. Only when kit pulling is initiated by the planning department, the boxes of row materials for that order would be retrieved from the warehouse to the kitting area. The customer sends separate boxes for SMD and Through Hole area. Supplier loop is shown in Fig. Fig : Supplier Loop ISSN (Online): 4-8, Volume -, Issue-, 6 Internal Loop of VSM Internal loop is given in Fig 4. Material Requirement Planning (MRP) and Master Production Schedule (MPS) runs twice monthly. Monthly sales plan will be provided by Program Management Team.6 months forecast also would be given.inventory availability report is generated based on the sales forecast and procurement order would be generated and would be send to SCM team. SCM team creates purchase orders and sends through to suppliers. For confirmed orders, product build option is run which will generate Dynamic shortage list. Based on this Work Order would be generated. Work order status can be Released against a customer order, or Firm planned is where plan is confirmed or planned. Planned is system generated and deleted orders. Once an order is the status changes to Production Plan release, a Kit loading Plan would be generated. A daily production plan gets generated which would be communicated to the production team. There is a separate plan called Machine loading to finished good plan. Management information system for reporting is also gets generated. The analysis is based on the three lean principles: specify value, identify value stream and make value flow. The analysis starts with an understanding of how customers perceive value. Next, visualize the value stream of DSM flows including the analysis of time frame and ownership in the order fulfillment process. The main focus will be on the waste identification in the flow and the solutions to reduce the influence of identified wastes. Furthermore, possible lead time reduction due to waste and bottleneck elimination will be calculated. Analysis on making the process more lean and continuous will be done. In addition, lot size analysis would also be conducted

4 A A DATE FILENAME REVISED A4 TITLE DESCRIPTION A6 A A8 o A9 A A A A A4 6 A 8 9 A6 6 A A 6 A A9 International Journal of Electrical, Electronics and Computer Systems, (IJEECS) Supplier Row Materials Row Materials Machine Manual Loading Utilization % Supply Chain Management N/A Warehouse to to Lot Size Screen Printing Machine Manual 4 Sec Sec Sec Utilization % + to to 4/4/ CURRENT VALUE STREAM.VSDX 4/4/ Ite at a time m Production SMD Pick and Place Machine Manual.8.8. Utilization % to to Current State Value Stream Current state VSM of Printed Circuit Board Production Flow at a time Machine Manual Reflow Oven Utilization % to to Reflow Inspection Machine Manual Utilization % to to Planning and Control Department Manual Stuffing Machine Manual Utilization o % to to Wave Soldering Machine Manual Weekly Production Schedule Production Through hole Utilization % to to Post Wave Soldering Inspection Machine Manual Utilization % No lot size at a time at a time at a time at a time to to Final Inspection Machine Manual Utilization % to to Program Management In process Circult Testing ( ICT) Machine Manual ICT Utilization % to to Machine Manual Download Utilization % to to Customer Demand xx Machine Manual Item Analog Utilization % Fig 4: Internal, Loop Sub Assembly Surface Mounting Process (SMD) ing time across Top and Bottom processing for a single PCB does vary from 4 to % of the total order processing time per order. Statistics are given in s table. Setup (Per order) Bot.4 tom Top. Tot al to to Functional Testing ( FCT) Machine Manual RF Utilization % Table : Statistics of SMD Lead (per board).49 min 4. min.9 s.99 in g (across a day) to to Machine Manual Burning Utilization % to to Customer Machine Manual all Sourcing Utilization % to to # Oper ators Opera tors + QA Final Inspection Final Inspection Machine Manual Utilization % to to Packing Machine Manual Packing.. Utilization % to to # Shifts Following are the wastes which has significant impact on the performance of the SMD process High ing : Every stage has considerable waiting time which can be reduced. Pick & Place stage has the maximum waiting time, the main reason being component error outing and component reels getting over. Component reels get over frequently. Entire process waits for reel re-loading. Searching and loading a reel takes a lot of time. Unnecessary Motion: Operators walk across the length of the entire SMD process (~ meters) multiple times. During reel changes, has to walk across to the loading table at the beginning of BAY 4, find the reel, walk back to the reel to feeder loading reels would be located at the central loading table, Over processing: Reflow inspection usually takes minutes for top and minutes for bottom. So a total of minutes per board is taken. The defects identified at this stage are very les. Since the entire chain is handled by machine (SMD), the possibilities of frequent errors are not there. So inspection based on a sampling need to be considered. So % inspection is not needed. Ways to remove waste: Reduce set up time: To avoid searching time and to reduce waiting time to load reels to machines, reels need to be colored or use colored label to differentiate between s of components. Component value checking is performed twice for all components, by loading team & by QA. QA team can check for sampling rather than % validation. All QA check needs to be done in parallel to loading to the machine time. Make trays of PCBs already before screen printing gets finished for one batch. Reduce ing : Reels of the same components need to be grouped and hanged on the stand by loading team. Piling up reels in cartons and making operator searching for it need to be stopped. Reel size need to be in proportion to number of components per board and order size. This helps in minimizing reel changes and thus reduces waiting time. TakT time analysis for SMD Fig : Takt analysis for SMD Bottleneck Process : Clearly Reflow inspeciton which takes minutes per top and bottom is the bottleneck, whose cycle time is way above the cycle time of rest of the processes and also way abo ve th takt time. Ways need ot be identified to reduce or normalize reflow inspeciton stage to correspond to the Takt time to manage the current delivery promises to custoemr. Pacemaker Process : A loop is any set of operations through which there is continuous flow. In this case, loops would indicate the manufacturing lines comprised of all of the different processes. The Pacemaker at each loop is the process which sets the pace for the entire manufacturing line. The term may be used interchangeably with the term of a bottleneck; however, they are not equal. The pacemaker is usually the most upstream process in a continuous flow loop. The concept of Takt time should be implemented to control the process. The pacemaker is mostly useful in production lines, and manufacturing cells which show fairly consistent product families. ISSN (Online): 4-8, Volume -, Issue-, 66

5 The first process in the chain of processes in SMD, screen printing takes only 4 seconds ot finish a panel. The pick & place machie also take only less than a minute to procss a panel, bu the man time required there to place components manually delay the etnire process. Because of the man itme, the total cycle time for Pick & Place process is high near to the Takt time. If this process can perform with lesser lead time,then even reflow oven can funtion with better utilization as it can take nearly 8 to 9 boards at a time. If reflow oven taken 8 boards with a processing time of minutes, then the cycle time for each board within reflow oven comes down to below second. So total cycle time up to reflow inspeciton can be made less than second for each of the processes, which is a huge increase from current status. Bottleneck Process Analysis Reflow Inspection: As evident from figure above, lead time for reflow inspection is way too above the allowed or desired Takt. So clearly this stage is a bottleneck and the first place in the value chain where work in progress inventory is piled up. Since the entire processes before reflow inspection is done by machines (as per the modified VSM), the possibility of errors would be continuous which can be easily identified though sampling than % inspection. This is also proved by the following observation. Rework post reflow is too less ~. % and hardly any rejections. So inspection needs to be made on sampling basis. Inspect all of first batch () of boards and then boards per batch. Inspection has to be made online Analysis of Value added Vs Non value added activities: For an order size of PCBs, boards are processed. Each Panel that is processed has PCBS in it. Bottom Lead time Total is 9.4min. Top Lead time Total is.4. Pick & Place machine waiting time is 4 to %. Final matrices of the current state are shown in table. Table Final matrices of current state Bottom Top Total Cycle 9.4 m.4 6 h m ing time.4 m. m. Set up.4 h. h.9 Maintenance hour Table shows as is statistics for current state value stream. The statistics are per order processing time, final matrices, value added and non-value added activities Table Final matrices of current state Cycle 6 VA + NVA ing time. NVA Set up.9 VA + NVA Maintenance VA + NVA Sub Assembly Through-Hole Process Since the board has already soldered with components by the SMD process, those components need to be protected from the soldering process. for this purpose, machine inserted components need to be shielded with the use of a frame in such a way that only those newly inserted components would be exposed through the soldering process. Thus wave soldering is a combination of manual and machine process. Post soldering and cooling, the boards need ot be inspected for the newly inserted components to make sure they are placed at the correct location, and the soldering is proper etc. Post this inspection, boards need to be moved to the testing section. So a final inspection of all the boards, a through checking based on a checklist is performed to ensure quality.any defect found are re-worked and the details are entered into the computer for logging purpose. Boards are then temporarily stored for transportation to another building. This stage comprises of following sequential steps Stuffing-- > Wave Soldering -- > Post Wave soldering Inspection Final Inspection are the sequence of operations. ing in stuffing area: Currently push the board to the next person through a slider. Productivity of each operator cannot be validated through this set up. So conveyor belt can be introduced for stuffing which happens in sequential order between. This helps to reduce the productivity issues per operator. ing time in Wave soldering area: This is already described above. The only way to remove this waiting time is to utilize the machine in full capacity by introducing more frames. Operators need to be make sure that to 8 frames are loaded in the machine sequentially. Increase number of frames of the fixture for boards for wave soldering so that machine can be used for its maximum capacity. Currently the number of frames varies in the range of to for different versions of DSM. The machine has the capacity to take frames at a time. As shown above, machine utilization is way less than norm. ation: By introducing supermarkets between wave soldering and Inspection stages, transportation between stages can be reduced a lot. Unnecessary motion: A method need to be devised remove unnecessary motion of between beginning and ending of Wave soldering process to collect the fixtures. This is identified as a waste. ISSN (Online): 4-8, Volume -, Issue-, 6

6 Table 4 Final matrices of current state Bottom Top Total for boards Cycle 8 min min 6.6h ing 6. min 6. min 4.6 time Set up Maintenance /down time Over Processing: % inspection i.e. inspection of every single board in every order, takes a lot of time. But the amounts of defects identified are considerable and rework is done immediately on the boards. Considering these facts, it is recommended. Fig 6: Takt analysis Bottleneck Process: As clearly seen in the graph above, lead time of each sub process across top and bottom is way too above the recommended Takt. The main drawback of this stage is that, it is a totally non continuous flow with each stage functions independent of other, though sequential in stages.. Wave soldering process has the highest lead time and clearly main bottleneck. Stuffing process is another candidate for improvement. Since stuffing is completely manual, there is more room for mishandling and errors as well. Pace maker Process: Because of the non continuous flow of nature, no pacemaker process can be identified as though-hole sub assembly. Both the inspection stages are currently carried out %, i.e. for each and every panel is inspected. Manual logging of details like errors identified and fixes given etc also need to be carried out. Since there are few reworks happening at each of the inspection stages, it is advisable to continue with the inspection stages. A method study needs to be done on the process to see what all sub activities can be automated Further analysis of the Current State Map Continuous flow through production line analysis: In SMD process, between pick & Place and re-flow oven, the flow becomes non continuous due to the intervention of operator s. Manual time to place ½ components takes to min additional whereas same can be done by machine in no time if sufficient feeder sticks available. The entire SMD process gets paced based on this manual intervention and lead time increases. If this manual intervention can be included in the machine pick & place process, entire SMD process can be automated and pacing becomes better. Ways to make SMD process continuous: Components that are not coming is reels are currently being placed manually. It adds to the lead time. Those components need to be bought in reels itself.getting more stick feeders is another option. Between batches of, the board loading is manual where boards are loaded one by one. This need to be changed to pre-loading of boards and loading of the tray to the machine after each batch. Super Market pull system analysis : An inventory supermarket (kanban stock point) like a supermarket is a place where small inventory is available and one or more downstream customers come to the supermarket to pick out what they need. The upstream work center then replenishes stocks as required. When continuous flow is impractical, and the upstream process must operate in batch mode, a supermarket reduces overproduction and limits total inventory. Supermarket Pull Systems have proven to be very efficient at eliminating wastes caused by overproduction. By linking the bulk of the operations to the customer s demand, companies have seen a lot of success. However, pull systems are very difficult to establish in a high-mix, low-volume environment. The reason for this is that a very high amount of WIP needs to be kept in order to have a stock of all of the different types of product. However, the production mix as the product goes downstream should be analyzed to see where it is not very necessary to maintain a lot of WIP. IV. RESULTS Future State VSM Statistics for Sub Assembly SMD Process After the implementation of changes to SMD to remove the manual intervention, the modified statistics would be as follows. Man time would be completely removed. The additional component, with the help of stick feeder would be inserted by the machine itself. So the total lead time is reduced from 9.6 to 8.8.Since reflow oven has the capacity to take up to PCB panels at a time, as the pick & place machine releases PCBS in a faster pace, reflow oven would be able to process them in the same pace. Hence the utilization of reflow oven also increases. Though it takes minutes ti process one board, if 4 cards flows through the machine at any given point of time, its averaged lead time per board would be less than or equal to min. ISSN (Online): 4-8, Volume -, Issue-, 68

7 Major Future State statistics of SMD Lead time changes would be as given in Table and improvement matrices for SMD is given in Table. Table Future statistics for SMD Lead time(curren t State) Setup (Futur e State) Improvemen t Botto 9.4 min 4. min 4% m Top.4 min 4. min 46% Total % process, once that process is levelled out, reflow oven starts getting frequent boards and its utilization has increased proportionately. Reflow inspection, which was considered as a real bottleneck is handled with the help of sampling methodology. The latest statistics is given in figure. Ways to reduce set up would be the following. Introduction of color to the differentiate between reel of different components, Grouping all the reels of same components to one tag,for getting bigger sized reels for most frequently used components in any given order. I.e. Instead of giving standard sized reels, Supplier has to be given bigger sized reels based on the order size to avoid frequent reel changes and to reduce searching required form the high number of components with repetition. Since the components are supplied by AM technologies itself, and increased demand is their own requirement, they would be more than ready to help SFO with these changes. Discussion with SCM team confirmed that, reel size can be adjusted if already mentioned to the suppliers or if guidelines can be given to them. Post these changes are implemented, the improvement matrices for SMD would be as given in Table 6. Bottom Top Total Table 6 Improvement in matrices for SMD Setup ( Per order) Current State.4..9 Setup ( Per order) Future State 4 min to hour to..6 to. Changes 4 min 4.64% hour.9 hour.8.4 hour.96 Improvement % to % 4 % To % % To % Final result of Pacemaker and Flow changes of SMD Pick & Place process was identified as the pacemaker process. By removing manual intervention, lead time is reduced as well continuous flow is ensured. This resulted in considerable lead time reduction in that process stage alone. Since pick & place is a pacemaker Figure : Pacemaker analysis ISSN (Online): 4-8, Volume -, Issue-, 69 Future State - Sub Assembly Through Hole Process Following are the recommendations to improve future state statistics for through-hole process. Stuffing: Introduction of a conveyor belt for stuffing process: Conveyor belt would increase the efficiency of working of the who are working in sequence to fix the components to the PCB. It would enable the workers to keep a constant pace ot the work and would not be depend on the pace of individual resources. Wave Soldering: It is a stage where 8 to fixtures are introduced to the product. Operator takes minutes to load a PCB into the fixture and put the frames in the conveyor of the wave soldering machine. That means every minutes boards are entering wave soldering machine. Considering wave soldering machine takes 4 to minutes to process a board. It would be able to process minimum cards constantly in that interval. Introduce an automatic trolley system or pushing trolley system that works between the ending porting and beginning portion of Wave Soldering machine. : This would help eliminate unnecessary motion of between the ends of the machine and the waiting time of the machine until the frames are reached at the beginning and processing has started. Better scheduling of stuffing and wave soldering so as to avoid the delay caused by different timings between the operations : Currently stuffing team only works on day i.e. 8 am to 4 pm, where as both the previous process ie SMD and wave soldering is / can be run on all the s. Unless cards are made available for wave soldering post stuffing, it cannot start the processing. Consider a scenario where SMD has started on second i.e. 4 pm pm. By the time day starts, cards would be ready for stuffing team. During this entire processing wave soldering machine is waiting. Once manual stuffing starts processing, cards gets piled up as wave soldering machine is slow

8 compared to the manual stuffing. Better sequencing between the operations is necessary. Future State Lead Lead time changes are shown in Table. Set up time is minutes per board, which cannot be reduced more than this. Stuffing needs maximum minutes to load all components. Table Lead time improvements for Through-hole Lead time (Current State) Lead (Future State) Improvement process, once that process is levelled out, reflow oven starts getting frequent boards and its utilization has increased proportionately. Reflow inspection, which was considered as a real bottleneck is handled with the help of sampling methodology described in last chapter. The latest statistics would be as given in figure 8. Bottom 8 min 4 min % Top min 6 min % Total 8 % Machine Utilization & ing Results The proposals to decrease waiting time as well increase the utilization of Wave soldering machine considerably are.. Increase in number of frames per product versions of DSM: Number of frames increased to per product version from current number of / 4 would considerably reduce waiting time for the machine. Once the machine starts processing more frames within the stipulated 4 minutes timeframe, the average processing time per frame would reduce to as less than minute.. Enable automatic or mechanical movement of frames back to the beginning of the chain than the current operator lead movement.the time taken to move the frames back to beginning of the machine workstation after cooling and removal of board from the frames adds to the waiting time. It also adds fatigue to the operator to move between the work stations in frequent duration just to pass the empty frames. With increased number of frames, lot size is also increased from or 4 to 8 or. So the processing time has reduced to the new processing time + cooling time. ing time improvement is found to be 66 % as given in table 8. Table 8: ing time improvements for Through-hole Current State Future State ing time reduced to % Final result of Pacemaker and Flow changes Pick & Place process was identified as the pacemaker process. By removing manual intervention, lead time is reduced as well continuous flow is ensured. This resulted in considerable lead time reduction in that process stage alone. Since pick & place is a pacemaker Figure 8: Future state Takt analysis & Result V. CONCLUSION If lead time can be reduced with the introduction of lean tools and methodologies more PCBs can be produced with the available machine and resources. Value Stream mapping tool of Lean is used in this plant to analyze current production processes in detail for a selected product family DSM. DSM has 6 versions of products being produced almost throughout the month, with a current requirement of 8 to pieces per month. By identifying waste at SMD, through- hole, testing, final inspection & packing sub-assemblies, lead time reduction is made possible. Also by introducing flow and pacemaker processing through TakT time analysis, lead times have been levelled across stations. Considerable improvement in lead time is made possible across all the three sub-assemblies of DMS production. Machine utilization has increased. Producing to Takt time is been made possible across the value chain. This modified statistics shows that, it is possible to meet the increased demand of the customer with the available resources; facilities provided all the suggested changes are implemented. Thus Value Stream Mapping is proved to a very valuable tool for analysis of Current value stream of a high mix low volume production scenario. Identifying waste and removing it, implementing flow concept and Takt time levelling are powerful concepts which are able to bring phenomenal improvements to current state of production flow. Owing to lack of time, all changes proposed could no be implemented to observe results and hence possible output only could be included in this thesis. As an ISSN (Online): 4-8, Volume -, Issue-,

9 extension of this work, the results can be verified through simulation. REFERENCES [] Peter Hines, Nick Rich, The seven value stream mapping tools, Lean Enterprise Research Centre, Cardiff Business School, Cardiff, UK. [] The basics of Value Stream Mapping,, CMTC - California Manufacturing Technology Consulting, San Fernando Valley Secti, [] Seth, D. & Gupta, Application of value stream mapping for lean operations and cycle time reduction: an Indian case study. Production Planning & Control, [4] Hines, P., Rich, N., Bicheno, J., Brunt, D., Taylor, D., Butterworth, C. & Sullivan, J.. Value stream management. International Journal of Logistics Management, 998 [] Tapping, D.,Luyster, T., & Shuker,. T. Value stream management: Eight steps to planning, mapping and sustaining lean improvements. NewYork, NY : Productivity Press,. ISSN (Online): 4-8, Volume -, Issue-,

VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the

VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS by Ganesh S Thummala A Research Paper Submitted in Partial Fulfillment of the Requirements for the Master of Science Degree In Management Technology

More information

Lean Kitting: A Case Study

Lean Kitting: A Case Study Lean Kitting: A Case Study Ranko Vujosevic, Ph.D. Optimal Electronics Corporation Jose A. Ramirez, Larry Hausman-Cohen, and Srinivasan Venkataraman The University of Texas at Austin Department of Mechanical

More information

REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL

REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL REDUCTION OF WORK IN PROCESS INVENTORY AND PRODUCTION LEAD TIME IN A BEARING INDUSTRY USING VALUE STREAM MAPPING TOOL Praveen Saraswat 1, Deepak Kumar 2 and Manoj Kumar Sain 3 1 Senior Lecturer, 2,3 Associate

More information

Value Stream Mapping

Value Stream Mapping Value Stream Mapping 1 Value Stream Mapping Definition Value Stream Mapping (VSM): Special type of flow chart that uses symbols known as "the language of Lean" to depict and improve the flow of inventory

More information

Traceability Data Integrity: Challenges and Solutions By Mitch DeCaire, Cogiscan, Inc.

Traceability Data Integrity: Challenges and Solutions By Mitch DeCaire, Cogiscan, Inc. Traceability Data Integrity: Challenges and Solutions By Mitch DeCaire, Cogiscan, Inc. The electronics manufacturing industry is experiencing increased demands for material traceability. Competitive pressures

More information

Going Lean the ERP Way

Going Lean the ERP Way Going Lean the ERP Way Somnath Majumdar Abstract: Lean concepts and techniques are widely used all over the world today to eliminate waste in all processes. These are applicable for all organizations,

More information

Does enterprise resource planning software support lean? ERP goes 44 TARGET AME.ORG/TARGET

Does enterprise resource planning software support lean? ERP goes 44 TARGET AME.ORG/TARGET Does enterprise resource planning software support lean? ERP goes 44 TARGET AME.ORG/TARGET BY HARRY F. LANDSBURG AND SHELDON NEEDLE lean WINTER 2014 TARGET 45 Many articles have been written about how

More information

Appendix Lean Glossary Page 1

Appendix Lean Glossary Page 1 Appendix Lean Glossary Page 1 Andon Board A visual control device in a work area giving the current status on performance to expectations and alerting team members to emerging issues. Batch-and- Queue

More information

Rules to Consider. All work shall be highly specified as to content, timing, sequence, and outcome.

Rules to Consider. All work shall be highly specified as to content, timing, sequence, and outcome. Lean Manufacturing An operational system that maximizes Value Added, reduces Essential Support and eliminates Waste in all processes throughout the Value Stream. What is Value-added? What is Essential

More information

Chapter 11. Lean synchronization

Chapter 11. Lean synchronization Chapter 11 Lean synchronization Slack et al s model of operations management Direct Design Operations Management Deliver Develop Supply network management Capacity management Inventory management Planning

More information

Business Challenges. Customer retention and new customer acquisition (customer relationship management)

Business Challenges. Customer retention and new customer acquisition (customer relationship management) Align and Optimize Workflows with Lean Dan Marino Marino Associates, LLC Strategic and tactical planning Information systems integration Customer retention and new customer acquisition (customer relationship

More information

Map the Value Stream

Map the Value Stream 1 Map the Value Stream Objectives Create and format a value stream map Add data to a value stream map Compare a current-state value stream map and future-state value stream map 1-1 Contents Contents Examples

More information

Hessel Visser NCOI Les 6 A P 373. Operations Management, 7E: Chapter 14 en15

Hessel Visser NCOI Les 6 A P 373. Operations Management, 7E: Chapter 14 en15 1 Lecture Planning and Control 14 Enterprise Resource Planning (ERP) 15 Lean synchronization 16 Project Management (zie andere sheets) 17 Quality Management (zie andere sheets) Hessel Visser NCOI Les 6

More information

Ten Steps to Lean Electrical Controls. a White Paper by J.E. Boyer Company, Inc.

Ten Steps to Lean Electrical Controls. a White Paper by J.E. Boyer Company, Inc. a White Paper by J.E. Boyer Company, Inc. Executive Summary Globalization is forcing companies to constantly become more efficient. To drive efficiencies, many companies are implementing Lean Manufacturing

More information

ARTICLE IN PRESS. LeanThinking. journalhomepage:www.thinkinglean.com/ijlt. Redesinging an Automotive Assembly Line Through Lean Strategy

ARTICLE IN PRESS. LeanThinking. journalhomepage:www.thinkinglean.com/ijlt. Redesinging an Automotive Assembly Line Through Lean Strategy InternationalJournalofLeanThinkingVolume2,Isue2(December2011) LeanThinking journalhomepage:www.thinkinglean.com/ijlt Redesinging an Automotive Assembly Line Through Lean Strategy K. P. Paranitharan * Department

More information

LEAN 101 CRASH COURSE. Presented by Jacob McKenna and Seaver Woolfok

LEAN 101 CRASH COURSE. Presented by Jacob McKenna and Seaver Woolfok LEAN 101 CRASH COURSE Presented by Jacob McKenna and Seaver Woolfok Introductions Name Company Position Expectations Favorite Movie Instructors Background: Jacob McKenna has been involved with Lean manufacturing

More information

Work Cells and Cellular Manufacturing

Work Cells and Cellular Manufacturing Work Cells and Cellular Manufacturing Improving the fitness of the factory 1 Cellular Manufacturing Concept of performing all of the necessary operations to make a component, subassembly, or finished product

More information

Getting Started with Lean Process Management

Getting Started with Lean Process Management Getting Started with Lean Process Management Hi-Tec Exchange Conference San Francisco July 25, 2011 Missions To team with Organizational Leaders, Managers, & Employees to focus on customers & improve competitiveness,

More information

Connecting Assembly with Batch Processes Via Basic Pull Systems

Connecting Assembly with Batch Processes Via Basic Pull Systems Connecting Assembly with Batch Processes Via Basic Pull Systems By Art Smalley Pull systems are an integral part of lean manufacturing yet they are frequently misunderstood and considered hard to implement.

More information

Implementing Automation after Making Lean Improvements

Implementing Automation after Making Lean Improvements Implementing Automation after Making Lean Improvements Frank C. Garcia, P.E., Director Business Solutions & Engineering Services Tom Lawton, President Advent Design Corporation Bristol, PA, USA December

More information

Manufacturing Flow Management

Manufacturing Flow Management Manufacturing Flow Management Distribution D Distribution Authorized to Department of Defense and U.S. DoD Contractors Only Aim High Fly - Fight - Win Supply Chain Management Processes Information Flow

More information

times, lower costs, improved quality, and increased customer satisfaction. ABSTRACT

times, lower costs, improved quality, and increased customer satisfaction. ABSTRACT Simulation of Lean Assembly Line for High Volume Manufacturing Hank Czarnecki and Nicholas Loyd Center for Automation and Robotics University of Alabama in Huntsville Huntsville, Alabama 35899 (256) 520-5326;

More information

Operational Business Intelligence in Manufacturing

Operational Business Intelligence in Manufacturing Operational Business Intelligence in Manufacturing Copyright 2007 KeyTone Technologies Inc. Page 1 SmartWIP - Intelligent Manufacturing with RFID Manufacturers are under competitive pressure to fulfill

More information

The Tools of Lean - Value Stream Mapping

The Tools of Lean - Value Stream Mapping ASQ Section 1302 Summer 2004 Series Mahoney State Park The Tools of Lean - Value Stream Mapping Stan Gidley Managing Director Institute of Business Excellence July 15, 2004 Outline Two Stories 1 English,

More information

Lean Manufacturing and Six Sigma

Lean Manufacturing and Six Sigma Lean Manufacturing and Six Sigma Research Questions What have we done in the past? What must we do in the future? How do we know these are the correct actions? 1 Lean Definitions Key concepts of lean:

More information

LEAN TOOLS FOR CQI. Value Stream Mapping. Lorelei Kurimski, MS Performance Excellence Consultant State Hygienic Laboratory at The University of Iowa

LEAN TOOLS FOR CQI. Value Stream Mapping. Lorelei Kurimski, MS Performance Excellence Consultant State Hygienic Laboratory at The University of Iowa Value Stream Mapping LEAN TOOLS FOR CQI State Hygienic Laboratory at The University of Iowa (09/2011) Lorelei Kurimski, MS Performance Excellence Consultant State Hygienic Laboratory at The University

More information

NETWORK BUSINESS SYSTEMS SOFTWARE SYSTEM DOCUMENTATION MANUFACTURING SYSTEM FEATURES

NETWORK BUSINESS SYSTEMS SOFTWARE SYSTEM DOCUMENTATION MANUFACTURING SYSTEM FEATURES NETWORK BUSINESS SYSTEMS SOFTWARE SYSTEM DOCUMENTATION MANUFACTURING SYSTEM FEATURES WORK ORDERS Standard Mfg. vs. Full Mfg./MRP Manufacturing Target date, open date, closed date You can make and buy the

More information

Sage 200 Manufacturing Datasheet

Sage 200 Manufacturing Datasheet Sage 200 Manufacturing Datasheet Sage 200 Manufacturing is a powerful manufacturing solution that enables you to manage your entire supply chain in detail, end to end, giving you the information needed

More information

Seradex White Paper. Using Project Management Software for Production Scheduling. Software Selection Spectrum

Seradex White Paper. Using Project Management Software for Production Scheduling. Software Selection Spectrum Seradex White Paper A Discussion of Issues in the Manufacturing OrderStream Using Project Management Software for Production Scheduling Frequently, we encounter organizations considering the use of project

More information

MANUFACTURING EXECUTION SYSTEMS INTEGRATED WITH ERP & SIX SIGMA FOR PROCESS IMPROVEMENTS

MANUFACTURING EXECUTION SYSTEMS INTEGRATED WITH ERP & SIX SIGMA FOR PROCESS IMPROVEMENTS MANUFACTURING EXECUTION SYSTEMS INTEGRATED WITH ERP & SIX SIGMA FOR PROCESS IMPROVEMENTS Name: Sumanth Pandith Surendra Institution: Wichita State University Status: Current Full time graduate in Industrial

More information

Seradex White Paper A newsletter for manufacturing organizations April, 2004

Seradex White Paper A newsletter for manufacturing organizations April, 2004 Seradex White Paper A newsletter for manufacturing organizations April, 2004 Using Project Management Software for Production Scheduling Frequently, we encounter organizations considering the use of project

More information

VISUAL management techniques for optimum INVENTORY form, fit and function

VISUAL management techniques for optimum INVENTORY form, fit and function You won t GET LEAN... until you GET VISUAL! VISUAL management techniques for optimum INVENTORY form, fit and function Raw materials, work-in-process, finished goods, location and product flow Kanban Min/max

More information

Lead time Reduction Using Lean Manufacturing Principles For Delivery Valve Production

Lead time Reduction Using Lean Manufacturing Principles For Delivery Valve Production Global Journal of Finance and Management. ISSN 0975-6477 Volume 6, Number 1 (2014), pp. 35-40 Research India Publications http://www.ripublication.com Lead time Reduction Using Lean Manufacturing Principles

More information

A Review of Assembly Line Changes for Lean Manufacturing

A Review of Assembly Line Changes for Lean Manufacturing IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684, PP: 01-05 www.iosrjournals.org A Review of Assembly Line Changes for Lean Manufacturing Awasare Anant Dattatray 1, M.V.Kavade

More information

USE OF THE VALUE STREAM MAPPING TOOL FOR WASTE REDUCTION IN MANUFACTURING. CASE STUDY FOR BREAD MANUFACTURING IN ZIMBABWE.

USE OF THE VALUE STREAM MAPPING TOOL FOR WASTE REDUCTION IN MANUFACTURING. CASE STUDY FOR BREAD MANUFACTURING IN ZIMBABWE. Proceedings of the 2011 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, January 22 24, 2011 USE OF THE VALUE STREAM MAPPING TOOL FOR WASTE REDUCTION

More information

Lean manufacturing and ERP: How to leverage ERP to get lean

Lean manufacturing and ERP: How to leverage ERP to get lean E-Book Lean manufacturing and ERP: How to leverage ERP to get lean A manufacturing firm adopting the principles of lean manufacturing can effectively leverage the company s ERP system during its transition

More information

VALUE STREAM MAPPING ICONS

VALUE STREAM MAPPING ICONS Material Material ASSEMBLY Process I 300 Pieces 1 Day Inventory MRP Control Center "Go-See" Scheduling XYZ Corporation Outside Source Takt = 50 sec. C/T = 45 sec. C/O = 30 min. Uptime = 95% Scrap = 2%

More information

Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8)

Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8) Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8) Pathway: (Unit 8) PAGE 1 OF 17 Unit 8: Pathway 1. Assist to purchase materials

More information

ADVANCES IN AUTOMATIC OPTICAL INSPECTION: GRAY SCALE CORRELATION vs. VECTORAL IMAGING

ADVANCES IN AUTOMATIC OPTICAL INSPECTION: GRAY SCALE CORRELATION vs. VECTORAL IMAGING ADVANCES IN AUTOMATIC OPTICAL INSPECTION: GRAY SCALE CORRELATION vs. VECTORAL IMAGING Vectoral Imaging, SPC & Closed Loop Communication: The Zero Defect SMD Assembly Line Mark J. Norris Vision Inspection

More information

Auditing Contract Manufacturing Processes

Auditing Contract Manufacturing Processes Auditing Contract Manufacturing Processes Greg Caswell and Cheryl Tulkoff Introduction DfR has investigated multiple situations where an OEM is experiencing quality issues. In some cases, the problem occurs

More information

INVENTORY CONTROL BY TOYOTA PRODUCTION SYSTEM KANBAN METHODOLOGY A CASE STUDY

INVENTORY CONTROL BY TOYOTA PRODUCTION SYSTEM KANBAN METHODOLOGY A CASE STUDY Int. J. Mech. Eng. & Rob. Res. 2013 V M Nistane and Srinivas Viswanath V, 2013 Research Paper ISSN 2278 0149 www.ijmerr.com Vol. 2, No. 1, January 2013 2013 IJMERR. All Rights Reserved INVENTORY CONTROL

More information

Manufacturing. Manufacturing challenges of today and how. Navision Axapta solves them- In the current explosive economy, many

Manufacturing. Manufacturing challenges of today and how. Navision Axapta solves them- In the current explosive economy, many Manufacturing challenges of today and how Navision Axapta solves them- the solution for change; controlled by you. Manufacturing In the current explosive economy, many manufacturers are struggling to keep

More information

Glossary of Inventory Management Terms

Glossary of Inventory Management Terms Glossary of Inventory Management Terms ABC analysis also called Pareto analysis or the rule of 80/20, is a way of categorizing inventory items into different types depending on value and use Aggregate

More information

PERFORMANCE ANALYSIS OF A CONTRACT MANUFACTURING SYSTEM

PERFORMANCE ANALYSIS OF A CONTRACT MANUFACTURING SYSTEM PERFORMANCE ANALYSIS OF A CONTRACT MANUFACTURING SYSTEM Viswanadham.N 1, Vaidyanathan.G 2 The Logistics Institute- Asia Pacific National University of Singapore Singapore 11926 mpenv@nus.edu.sg 1 engp9778@nus.edu.sg

More information

Chapter 4 SUPPLY CHAIN PERFORMANCE MEASUREMENT USING ANALYTIC HIERARCHY PROCESS METHODOLOGY

Chapter 4 SUPPLY CHAIN PERFORMANCE MEASUREMENT USING ANALYTIC HIERARCHY PROCESS METHODOLOGY Chapter 4 SUPPLY CHAIN PERFORMANCE MEASUREMENT USING ANALYTIC HIERARCHY PROCESS METHODOLOGY This chapter highlights on supply chain performance measurement using one of the renowned modelling technique

More information

How to Improve Process Performance Using Lean Automation

How to Improve Process Performance Using Lean Automation How to Improve Process Performance Using Lean Automation Frank Garcia ADVENT DESIGN CORPORATION What We ll Cover Determine how much automation is appropriate and whether this automation should be done

More information

Five Tips to Achieve a Lean Manufacturing Business

Five Tips to Achieve a Lean Manufacturing Business Five Tips to Achieve a Lean Manufacturing Business Executive Overview Introduction The more successful manufacturers today are those with the ability to meet customer delivery schedules while maintaining

More information

Small Lot Production. Chapter 5

Small Lot Production. Chapter 5 Small Lot Production Chapter 5 1 Lot Size Basics Intuition leads many to believe we should manufacture products in large lots. - Save on setup time - Save on production costs Costs associated with Lots

More information

Understanding Automotive EDI Automating and Integrating EDI for Increased Efficiency and Improved Delivery Performance

Understanding Automotive EDI Automating and Integrating EDI for Increased Efficiency and Improved Delivery Performance WHITE PAPER Understanding Automotive EDI Automating and Integrating EDI for Increased Efficiency and Improved Delivery Performance September 1, 2010 Written by Donna M. Ward PMP and former co-chair of

More information

Developing a Formidable Business / Continuous Improvement Methodology in Africa. By: Frederick O Popoola

Developing a Formidable Business / Continuous Improvement Methodology in Africa. By: Frederick O Popoola Developing a Formidable Business / Continuous Improvement Methodology in Africa By: Frederick O Popoola INTRODUCTION The Challenge: How do Organizations survive in a competitive environment? Need to change

More information

SC21 Manufacturing Excellence. Process Overview

SC21 Manufacturing Excellence. Process Overview SC21 Manufacturing Excellence Process Overview Prepared by:- The SC21 Performance, Development and Quality (PDQ) Special Interest Group (SIG) Acknowledgement The scoring methodology used in the Management

More information

ERP Meets Lean Management

ERP Meets Lean Management Meets Lean Management James M. Noblitt, CPIM, CIRM Sr. Management Consultant High-Tech meets No-Tech! Digital Lean Visual Work Orders Push Data Entry Reports Security/Access Data Accuracy Complicated Spread

More information

APPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY

APPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY Bulletin of the Transilvania University of Braşov Vol. 3 (52) - 2010 Series I: Engineering Sciences APPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY M. APREUTESEI 1 I.R. ARVINTE 1 E. SUCIU 2 D. MUNTEANU

More information

Lean Manufacturing. Professor Deborah Nightingale September 26, 2005

Lean Manufacturing. Professor Deborah Nightingale September 26, 2005 ean Manufacturing Professor eborah Nightingale September 26, 2005 Content eneral lean concepts in factory design Manufacturing Video Manufacturing System esign Framework Conclusions Source: Tom Shields,

More information

Louisiana Tech University Lean Manufacturing Courses

Louisiana Tech University Lean Manufacturing Courses Lean Course Objectives: Your Employees will be able to: Louisiana Tech University Lean Manufacturing Courses Understand the tools, terms, terminology, and most importantly the benefits of Lean Manufacturing.

More information

How large and small manufacturers are benefiting from Lean Manufacturing and Robotic Automation

How large and small manufacturers are benefiting from Lean Manufacturing and Robotic Automation Robotics White Paper Ten Ways Robots Enhance Lean Manufacturing Environments How large and small manufacturers are benefiting from Lean Manufacturing and Robotic Automation Ten Ways Robots Enhance Lean

More information

Increased Productivity of Tyre Manufacturing Process using Lean Methodology

Increased Productivity of Tyre Manufacturing Process using Lean Methodology INSTITUTE OF TECHNOLOGY, NIRMA UNIVERSITY, AHMEDABAD 382 481, 08-10 DECEMBER, 2011 1 Increased Productivity of Tyre Manufacturing Process using Lean Methodology Ajit Chavda, Prof. M.Y.Patil Abstract--The

More information

CREATING A LEAN BUSINESS SYSTEM

CREATING A LEAN BUSINESS SYSTEM CREATING A LEAN BUSINESS SYSTEM This white paper provides an overview of The Lean Business Model how it was developed and how it can be used by enterprises that have decided to embark on a journey to create

More information

Lean Manufacturing for the Wood Products Industry. Brian Brashaw University of Minnesota Duluth Natural Resources Research Institute

Lean Manufacturing for the Wood Products Industry. Brian Brashaw University of Minnesota Duluth Natural Resources Research Institute Lean Manufacturing for the Wood Products Industry Brian Brashaw University of Minnesota Duluth Natural Resources Research Institute Natural Resources Research Institute University of Minnesota Duluth NRRI

More information

THE BEGINNER S GUIDE TO LEAN

THE BEGINNER S GUIDE TO LEAN THE BEGINNER S GUIDE TO LEAN Professor Daniel T Jones Lean Enterprise Academy Who am I? Writer Machine and Lean Thinking books Researcher on how to do lean everywhere! Founder of the non-profit Lean Enterprise

More information

ROBOTIC PRINTED CIRCUIT BOARD ASSEMBLY LINE

ROBOTIC PRINTED CIRCUIT BOARD ASSEMBLY LINE ROBOTIC PRINTED CIRCUIT BOARD ASSEMBLY LINE MET 415 By Martin Houlroyd 03/29/14 DEPARTMENT MAP 1. BARE PCBS 2. SOLDER PASTE 3. IC ASSEMBLY 4. REFLOW SOLDERING 5. AQUEOUS CLEANING 6. VISUAL INSPECTION 7.

More information

Operations Management and the Integrated Manufacturing Facility

Operations Management and the Integrated Manufacturing Facility March 2010 Page 1 and the Integrated Manufacturing Facility This white paper provides a summary of the business value for investing in software systems to automate manufacturing operations within the scope

More information

What is Lean Manufacturing?

What is Lean Manufacturing? What is Lean Manufacturing? Levantar March 2012 www.levantar.co.uk info@levantar.co.uk Lean Guides for other sectors are available on our website www.levantar.co.uk e.g. Lean Office, Lean Legal, Lean Engineering

More information

Datasheet Electronic Kanban Ultriva vs. ERP ekanban Modules By Narayan Laksham

Datasheet Electronic Kanban Ultriva vs. ERP ekanban Modules By Narayan Laksham Datasheet Electronic Kanban Ultriva vs. ERP ekanban Modules By Narayan Laksham Summary: Several ERP vendors offer rudimentary Kanban modules to compliment their MRP systems. However, these Kanban modules

More information

Lean Implementation in a Low Volume Manufacturing Environment: a Case Study

Lean Implementation in a Low Volume Manufacturing Environment: a Case Study Proceedings of the 2010 Industrial Engineering Research Conference A. Johnson and J. Miller, eds. Lean Implementation in a Low Volume Manufacturing Environment: a Case Study Lucas Simmons, Robbie Holt,

More information

Teaching lean thinking through game: some challenges

Teaching lean thinking through game: some challenges Teaching lean thinking through game: some challenges I. Dukovska-Popovska 1, V. Hove-Madsen 2, K.B. Nielsen 3 1 Aalborg University, Department of Production, DK-9220 Aalborg, Denmark (iskra@production.aau.dk)

More information

Experiences with The Trimrian factory game - a production game within the education of Bachelor Production Engineers

Experiences with The Trimrian factory game - a production game within the education of Bachelor Production Engineers Experiences with The Trimrian factory game - a production game within the education of Bachelor Production Engineers Jens Peter Jensen Department of Production Engineering, Engineering College of Copenhagen

More information

Business Process Optimization w/ Innovative Results

Business Process Optimization w/ Innovative Results Business Process Optimization w/ Innovative Results Sam DiSalvatore Introduction The principle of continuous process improvement is based on the belief that even excellent products and services can be

More information

LIGHTING UP the LEAN SUPPLY CHAIN: Pick-to-Light in Manufacturing Applications PREPARED IN CONJUNCTION WITH

LIGHTING UP the LEAN SUPPLY CHAIN: Pick-to-Light in Manufacturing Applications PREPARED IN CONJUNCTION WITH LIGHTING UP the LEAN SUPPLY CHAIN: Pick-to-Light in Manufacturing Applications PREPARED IN CONJUNCTION WITH Introduction In February, 2009, Modern Materials Handling magazine conducted a survey on behalf

More information

A better way to calculate equipment ROI

A better way to calculate equipment ROI page 1 A better way to calculate equipment ROI a West Monroe Partners white paper by Aaron Lininger Copyright 2012 by CSCMP s Supply Chain Quarterly (www.supplychainquarterly.com), a division of Supply

More information

Factory Physics: The Key to Green Industries

Factory Physics: The Key to Green Industries Factory Physics: The Key to Green Industries College of Engineering and Architecture - College Days 2012 EXHIBIT: Greening Industries Student Chapter Philippine Institute of Industrial Engineers (PIIE)

More information

BSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 -

BSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 - BSCM Sample TEST. 1. Which of the following demand fulfillment approaches typically provides the longest delivery time? A) Engineer-to-order. B) Make-to-order. C) Assemble-to-order. D) Make-to-stock. 2.

More information

MANUFACTURING EXECUTION SYSTEMS VS. ERP/MRP

MANUFACTURING EXECUTION SYSTEMS VS. ERP/MRP www.globalsmt.net %*(*5 "- &% *5*0/ The Global Assembly Journal for SMT and Advanced Packaging Professionals Volume 11 Number 9 September 2011 ISSN 1474-0893 MANUFACTURING EXECUTION SYSTEMS VS. ERP/MRP

More information

AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS

AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Integrity, Reliability and Failure of Mechanical Systems Paper Ref: 3927 AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Eric Costa 1(*), Rui Sousa 1, Sara Bragança 1,

More information

QUEST The Systems Integration, Process Flow Design and Visualization Solution

QUEST The Systems Integration, Process Flow Design and Visualization Solution Resource Modeling & Simulation DELMIA QUEST The Systems Integration, Process Flow Design and Visualization Solution DELMIA QUEST The Systems Integration, Process Flow Design and Visualization Solution

More information

Warehouse Management in

Warehouse Management in Warehouse Management in Microsoft Dynamics NAV 2013 Technical White Paper Warehouse Management... 1 Warehouse Overview... 2 Basic or Advanced Warehousing... 3 Warehouse Setup... 4 Bin and Bin Content...

More information

LEAN Office & Business Processes Participant Handout Value Stream Mapping

LEAN Office & Business Processes Participant Handout Value Stream Mapping LEAN Office & Business Processes Participant Handout Value Stream Mapping Manary Harcus Consulting Corp, 200 Value Stream Mapping Symbols xcel IN Process Box Inventory/Inbox Delay Time Customer or Supplier

More information

Steel supply chain transformation challenges Key learnings

Steel supply chain transformation challenges Key learnings IBM Global Business Services White Paper Industrial Products Steel supply chain transformation challenges Key learnings 2 Steel supply chain transformation challenges Key learnings Introduction With rising

More information

Microsoft Dynamics GP. Manufacturing Management Functions

Microsoft Dynamics GP. Manufacturing Management Functions Microsoft Dynamics GP Manufacturing Management Functions Copyright Copyright 2010 Microsoft. All rights reserved. Limitation of liability This document is provided as-is. Information and views expressed

More information

Typically 95% of Total Lead Time is Non-Value Added!!!

Typically 95% of Total Lead Time is Non-Value Added!!! Logistics, nventory, Material Flow Optimisation, Monika Uhrová, Ján Košturiak LOGSTC SYSTEM OPTMSATON Abstract n a typical factory, logistics accounts for 25% of all employees, 55% of all factory space,

More information

Lean Six Sigma Lean 201 Introduction. TECH 50800 QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY

Lean Six Sigma Lean 201 Introduction. TECH 50800 QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY TECH 50800 QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY Before we begin: Turn on the sound on your computer. There is audio to accompany this presentation. Audio will accompany most of the online

More information

white paper Inventory Control: Control it before it controls you

white paper Inventory Control: Control it before it controls you white paper Inventory Control: Control it before it controls you Introduction The purpose of this paper is to offer up ideas and discussion points on the importance of inventory control for businesses.

More information

UTILIZAÇÃO DA LEAN METODOLOGIA. Desmistificando Aplicações Reais Para CME. Apresentado por John Kimsey

UTILIZAÇÃO DA LEAN METODOLOGIA. Desmistificando Aplicações Reais Para CME. Apresentado por John Kimsey UTILIZAÇÃO DA METODOLOGIA LEAN Desmistificando Aplicações Reais Para CME Apresentado por John Kimsey STERIS LEAN CME SIMULATION SAO PAULO, RIO, PORTO ALEGRE 2 STERIS LEAN CME SIMULATION SAO PAULO, RIO,

More information

Understanding Manufacturing Execution Systems (MES)

Understanding Manufacturing Execution Systems (MES) Understanding Manufacturing Execution Systems (MES) Presented by: Shirley Schmidt Freedom Technologies 10370 Citation Dr., Suite 200 Brighton, MI 48116 Phone: 810-227-3737 www.freedomcorp.com What is a

More information

Lean Healthcare Simulation Segment I: Baseline Performance

Lean Healthcare Simulation Segment I: Baseline Performance Lean Healthcare Simulation Segment I: Baseline Performance Learning Objectives At the end of this module, you should be able to: Explain the mechanics and rules of the simulation Execute the process in

More information

Product Documentation SAP Business ByDesign 1302. Supply Chain Setup Management

Product Documentation SAP Business ByDesign 1302. Supply Chain Setup Management Product Documentation PUBLIC Supply Chain Setup Management Table Of Contents 1 Supply Chain Setup Management.... 6 2 Supply Chain Design Master Data... 7 2.1 Business Background... 7 Locations and Location

More information

Lean Principles by Jerry Kilpatrick

Lean Principles by Jerry Kilpatrick Lean Principles by Jerry Kilpatrick Introduction Lean operating principles began in manufacturing environments and are known by a variety of synonyms; Lean Manufacturing, Lean Production, Toyota Production

More information

COORDINATION IN THE SUPPLY CHAIN: VENDOR MANAGED INVENTORY IS THE WAY TO GO

COORDINATION IN THE SUPPLY CHAIN: VENDOR MANAGED INVENTORY IS THE WAY TO GO www.sjm.tf.bor.ac.yu Serbian Journal of Management 1 (1) (2006) 41-47 Serbian Journal of Management COORDINATION IN THE SUPPLY CHAIN: VENDOR MANAGED INVENTORY IS THE WAY TO GO R. Piplani * Center for Supply

More information

ERP Software for: The Print Industry

ERP Software for: The Print Industry ERP Software for: The Print Industry One Vision, One Mission, One Solution BREAKTHROUGH FLEXIBILITY Change is relentless. Resources are scarce. You have to do more with less. Your competition used to be

More information

Management Information System Prof. Biswajit Mahanty Department of Industrial Engineering & Management Indian Institute of Technology, Kharagpur

Management Information System Prof. Biswajit Mahanty Department of Industrial Engineering & Management Indian Institute of Technology, Kharagpur Management Information System Prof. Biswajit Mahanty Department of Industrial Engineering & Management Indian Institute of Technology, Kharagpur Lecture - 02 Introduction Part II Welcome to all of you

More information

Distribution Training Guide. D100 Inventory Management: Basic

Distribution Training Guide. D100 Inventory Management: Basic Distribution Training Guide D100 Inventory Management: Basic Certification Course Prerequisites The course consists of a hands- on guide that will walk you through the specifics of Acumatica s Inventory

More information

Agile support with Kanban some tips and tricks By Tomas Björkholm

Agile support with Kanban some tips and tricks By Tomas Björkholm Agile support with Kanban some tips and tricks By Tomas Björkholm Foreword A year ago I held an Open Space at Scrum Gathering in Stockholm about Agile Support. I have since received several requests to

More information

Lean Healthcare Online

Lean Healthcare Online Lean Healthcare Online Online Healthcare Workshops Can Lean Process Principles Be Applied To Healthcare? We sometimes hear We are not manufacturers, and we re not Toyota! That s quite right; Healthcare

More information

Lawrence S. Farey. 193 S.W. Seminole Drive Aloha, OR 97006

Lawrence S. Farey. 193 S.W. Seminole Drive Aloha, OR 97006 Proceedings of the 1996 Winter Simulation Conference. ed. J. 1\1. Charnes, D. J. l\iorrice, D. T. Brunner, and J. J. S,valfl TRWITED ACCELEROMETER WAFER PROCESS PRODUCTION FACILITY: MANUFACTURING SIM:ULATION

More information

Supply Chain Management

Supply Chain Management Supply Chain Management Contents A. Definition and Terminologies B. Evolution of SCM C. Supply Chain Management D. Integrated Logistics E. Fulfillment Process F. Specialized Supply Chains G. Supply Chain

More information

Global Packaging Solutions Driving world class supply chain solutions

Global Packaging Solutions Driving world class supply chain solutions Global Packaging Solutions Driving world class supply chain solutions What determines world class logistics? 2 World class logistics means: the lowest Total Cost of Ownership for all supply chains, both

More information

Lean Manufacturing: Part 1. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1

Lean Manufacturing: Part 1. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1 Lean Manufacturing Part 1 2013 ProcessPro, the ProcessPro logos, and the ProcessPro product and service names mentioned herein are registered trademarks or trademarks of Blaschko Computers, Inc. d.b.a.

More information

"Kanban Do It Now but Do It Right" Workshop Illustrates the Importance of Kanban as a Tool in Lean Production

Kanban Do It Now but Do It Right Workshop Illustrates the Importance of Kanban as a Tool in Lean Production "Kanban Do It Now but Do It Right" Workshop Illustrates the Importance of Kanban as a Tool in Lean Production Helping to empower and motivate employees. Jeff Schaller, Ph.D. Just-In-Time (JIT) production

More information

Chapter 11. MRP and JIT

Chapter 11. MRP and JIT Chapter 11 MRP and JIT (Material Resources Planning and Just In Time) 11.1. MRP Even if MRP can be applied among several production environments, it has been chosen here as a preferential tool for the

More information

Production Planning Process in a Flexible Manufacturing Cell

Production Planning Process in a Flexible Manufacturing Cell ISBN 978-1-84626-xxx-x Proceedings of 2011 International Conference on Optimization of the Robots and Manipulators (OPTIROB 2011) Sinaia, Romania, 26-28 Mai, 2011, pp. xxx-xxx Production Planning Process

More information