Adding MRP/DRP Functionality to Microsoft Navision

Size: px
Start display at page:

Download "Adding MRP/DRP Functionality to Microsoft Navision"

Transcription

1 Adding MRP/DRP Functionality to Microsoft Navision A Manuscript Submitted to the Department of Computer Science and the Faculty of the University of Wisconsin-La Crosse La Crosse, Wisconsin by Tou Lo in Partial Fulfillment of the Requirements for the Degree of Master of Software Engineering May, 2008

2 Adding MRP/DRP Functionality to Microsoft Navision By Tou Lo We recommend acceptance of this manuscript in partial fulfillment of this candidate s requirements for the degree of Master of Software Engineering in Computer Science. The candidate has completed the oral examination requirement of the capstone project for the degree. Dr. Kasi Periyasamy Examination Committee Chairperson Date Dr. Mao Zheng Examination Committee Member Date Dr. Kenny Hunt Examination Committee Member Date ii

3 ABSTRACT LO, TOU, Adding MRP/DRP Functionality to Microsoft Navision, Master of Software Engineering, May 2008, (Dr. Kasi Periyasamy, Dr. Mao Zheng). Estimating the correct materials to order for the production of finished goods has been a daunting task for many manufacturing industries. Questions such as what materials are needed, how much of each material is needed, and when it is needed have been a challenge that each industry has to deal with. This is where Materials Requirements Planning (MRP) can come in handy. MRP is a system developed to handle the ordering and scheduling of inventories, such as raw materials and subcomponents, which will be used in the production of finished goods [1]. A MRP system is intended to simultaneously meet three objectives: (1) to ensure that materials and products are available for production and delivery to customers (what is needed), (2) to maintain the lowest possible level of inventory (how much is needed), and (3) to plan manufacturing activities, delivery schedules and purchasing activities (when is it needed) [1]. For industries that have multiple locations, Distribution Requirements Planning (DRP) is another handy tool. DRP is an extension of MRP. In the calculation of MRP, it takes into consideration unused raw materials and subcomponents from different locations within the industry. Raw materials and/or subcomponents are recommended to be transferred from one location to another to fill a need instead of ordering raw materials from suppliers. ORC Industries uses an Enterprise Resource Planning (ERP) system called Microsoft Navision. An ERP system is an integrated software solution used to manage an industry s resources (accounting, purchasing, inventory, etc.). Navision comes with stock MRP functionality but needs to be custom-tailored in order to meet the requirements of ORC Industries. It is therefore decided to develop a customized MRP/DRP system for ORC industries. This manuscript describes the development of the iii

4 customized MRP/DRP system. It includes a forecasting module that attempts to predict the sales for a specified period, which will be used in the MRP/DRP calculation. iv

5 ACKNOWLEDGEMENTS I would like to express my sincere thanks to my project advisors Dr. Kasi Periyasamy and Dr. Mao Zheng for their valuable guidance. I would like to thank the project sponsor, ORC Industries who initiated this project and provided the support for this project. I would also like to express my thanks to the Computer Science Department and the University of Wisconsin-La Crosse for providing the computing environment for my project. Finally, I wish to thank my parents and my family for their patience and support throughout this project. v

6 TABLE OF CONTENTS Abstract...iii Acknowledgements..v Table of Contents....vi List of Tables.vii List of Figures...viii Glossary...x 1. Introduction Development of MRP/DRP Functionality MRP/DRP Functionality Requirements Design Implementation Sales Forecasting Functionality Requirements Research Design Implementation Limitations Continuing Work Conclusion 43 Bibliography.45 APPENDIX A: Screen Shots vi

7 LIST OF TABLES 1. MRP Setup Functionality MRP Functionality MRP Equations MRP/DRP Equations Forecast Setup Functionality Forecast Functionality Smoothing Constant Algorithm First Year Equations Smoothing Constant Algorithm Second and Third Year Equations vii

8 LIST OF FIGURES 1. Microsoft Navision Data Flow Bill of Materials Exploded BOM Raw Materials Exploded BOM Subcomponents MRP/DRP Data Flow Class Diagram Use Case Diagram for MRP Setup Use Case Diagram for MRP Use Case Diagram for DRP Database Diagram for MRP/DRP MRP Equations MRP/DRP Equations Linear Regression Algorithm Exponential Function Algorithm Logarithmic Function Algorithm Percent Difference Algorithm Moving Average Algorithm Exponential Smoothing Algorithm Linear Regression Sample Data Exponential Function Sample Data Logarithmic Function Sample Data Percent Difference Sample Data Moving Average Sample Data Exponential Smoothing Sample Data Algorithm Analysis Results Exponential Smoothing Algorithm with Seasonality Smoothing Algorithm with Seasonality Spreadsheet...31 viii

9 28. True Value Vs. Actual Forecast Forecast Error Use Case for Forecast Setup User Case for Forecast Database Diagram for Forecast Seasonal Factor Algorithm for Two Year Period Seasonal Factor Algorithm for Three Year Period Smoothing Constant Algorithm First Year Equations Smoothing Constant Algorithm Second and Third Year Equations 38 ix

10 GLOSSARY Bell Canoe A division of ORC Industries that uses the software. Bell Canoe specializes in making canoes, kayaks, and accessories. Bill of Material The term used to describe the "parts list" of components (raw materials and subcomponents) needed to complete a finished good [2]. Bin Code A physical location within a plant. Distribution Requirements Planning (DRP) Is an extension of MRP. In the calculation of MRP, it takes into consideration raw material and subcomponents from different locations within an industry. Subcomponents and raw materials are recommended to be transferred from other locations due to overstock or due dates of orders instead of being purchased. Division A field used to distinguish between different companies (ORC, RF, and BC). Enterprise Resource Planning (ERP) System An ERP system attempts to integrate all data and processes of an organization into a unified system. A typical ERP system will use multiple components of computer software and hardware to achieve the integration. A key ingredient of most ERP systems is the use of a unified database to store data for various system modules [2]. x

11 Finished Good The item that is produced at the end of production. Location The plant where production is taking place. Loc/Bin A combination of location and bin code Master Planner The person who manages the MRP/DRP functionality. This person runs MRP/DRP, makes adjustments to Purchase Orders and Transfer Orders, and then processes the Purchase Orders and the Transfer Orders. Master Production Schedule (MPS) A realistic, detailed, manufacturing plan for which all possible demands upon the manufacturing facilities (such as available personnel, working hours, management policy, and goals) have been considered and are visualized. The MPS is a statement of what the industry expects to produce and to purchase; MPS is expressed in selected items, specific quantities and dates [2]. Material Requirements Planning (MRP) A software based production planning and inventory control system used to manage manufacturing processes. An MRP system is intended to simultaneously meet three objectives: ensure that materials and products are available for production and delivery to customers (what is needed), maintain the lowest possible level of inventory (how much is needed), and plan manufacturing activities, delivery schedules and purchasing activities [2]. Microsoft Navision The ERP software package that ORC Industries uses. xi

12 ORC Industries The main company that uses the software. ORC Industries specializes in military outerwear. Production Order An order that holds the information on how many units of a finished good item to produce. Purchase Order An order that is used to order raw materials. Raw Material Items that are purchased from a vendor to use in the production of finished good and subcomponent items. Redfeather Snowshoes A division of ORC Industries that uses the software. Redfeather specializes in snowshoes. Sales Forecast A prediction of future sales, based mainly on past sales performance. Sales forecasting takes into account the economic climate, current sales trends, company capacity for production, company policy, and market research. A sales forecast can be a good indicator of future sales in stable market conditions, but may be less reliable in terms of rapid market change [3]. Subcomponent An item that is made and is to be used in the production of another item. For example, a bicycle wheel may be considered as a subcomponent if the frame and the rubber wheel are bought separately and then the bicycle wheel is made. xii

13 Transfer Order An order that is used to transfer raw materials and subcomponents from one location to another. Unit of Measure (UOM) The unit of measure is assigned to each item. For example, the most common UOM are inch, yards, and pounds. xiii

14 1. Introduction MRP is a system developed to handle the ordering and scheduling of inventories, such as raw materials and subcomponents, which will be used in the production of finished goods [1]. A MRP system is intended to simultaneously meet three objectives: (1) to ensure that materials and products are available for production and delivery to customers, (2) to maintain the lowest possible level of inventory, and (3) to plan manufacturing activities, delivery schedules and purchasing activities [1]. Typically, MRP describes what raw materials need to be ordered and subcomponents to be made in order to produce the finished goods. At the same time, MRP also takes into account that there is no overstock of raw materials and subcomponents. For industries that have multiple locations, Distribution Requirements Planning (DRP) is another handy tool. DRP is an extension of MRP. In the calculation of MRP, it takes into consideration unused raw materials and subcomponents from different locations within the industry. Raw materials and/or subcomponents are recommended to be transferred from one location to another to fill a need instead of ordering raw materials from suppliers. An ERP system is an integrated software solution used to manage a company s resources. It integrates all business management functions, including planning, inventory/materials management, order processing, manufacturing, purchasing, accounting and finance, human resources, and payroll. ORC Industries uses an Enterprise Resource Planning (ERP) system called Microsoft Navision. Figure 1 shows a data flow architecture of Microsoft Navision. 1

15 Figure 1. Microsoft Navision Data Flow Navision comes with stock MRP functionality but needs to be custom-tailored in order to meet with the requirements of ORC Industries. ORC Industries is the parent company and it has two divisions, Redfeather Snowshoes and Bell Canoe. ORC Industries specializes in military outerwear such as parkas, trousers, rain suits, ponchos, sailor hats, and other types of clothing. ORC Industries bids for contracts from the Department of Defense. Once it wins a bid, the total amount of finished goods to produce is known and the shipments dates are predetermined. These contracts are usually good for 1-4 years. So planning for these sales is fairly straightforward. There is no need for a forecast because the total amount needed to be produced is already known. The only complexity involves is the DRP because these contracts may be produced in several plants. Redfeather and Bell Canoe produce commercial products. Therefore, their requirements are based on sales forecast as well as customer pre-orders. Planning for these sales require more thinking and efforts because ORC Industries does not want a lot 2

16 of inventory left over. At the same time, the company does not want to forecast less because there will not be sufficient quantities of stock when they are ordered by the customers. Redfeather makes snow shoes which is a seasonal product. The majority of its products are purchased during the winter months. Bell Canoe makes canoes, kayaks, and accessories which are also seasonal products. The majority of its products are purchased during the summer months. This section will describe why stock MRP functionality in Navision does not meet the requirements of ORC Industries. When Navision runs MRP, it runs for the whole company which includes all the three divisions - ORC Industries, Redfeather, and Bell Canoe. ORC Industries requires that MRP be run for each division separately. When Navision runs MRP it takes into account every item in a bin; however, some of these bins contain defective items which are not supposed to be considered as quantity on hand because they are defective. In addition, the resulting Purchase Orders are created for each location. ORC Industries only receives purchased ordered items to two locations and MRP would have to account for this. The locations that don t receive purchased items will be directed to be delivered to one of the two locations that except delivery. From these two locations, the items are then transferred to the appropriate locations. The DRP functionality within Navision also does not meet the requirements of ORC Industries. There are primarily two reasons for this: (1) Stock Navision does not come with DRP. (2) ORC Industries may produce the same item at multiple locations. Instead of always buying items to restock at each location, it may be easier and cheaper to just transfer items that are unused from one location to another. ORC Industries spends a lot of money on shipping items overnight to locations that are running out of items. If ORC Industries can plan for these shortages ahead of time it would save a lot of money on the shipping costs. The need to develop MRP and DRP functionality to meet the requirements of ORC Industries is the basis of this project. The MRP functionality has been developed from scratch instead of reengineering the previous MRP functionality. DRP will then be developed to work with the MRP functionality. A simple sales forecasting requirement of allowing the user to specify a percentage increase based on the previous year s sales 3

17 was given by ORC Industries. However, it was decided that it would enhance this project by including its own forecasting algorithm. Sales forecasting will have the additional functionality of using this algorithm to determine a forecast to use with MRP functionality. 4

18 2. Development of MRP/DRP Functionality Microsoft Navision is an ERP software that can be extendible and customizable. Navision would probably have been able to be modified to add the needed MRP/DRP functionality that ORC Industries required. However, it would have been very costly to have Navision modified by a Navision development company. ORC Industries would also have been able to purchase the fully functional Navision source code and be allowed to these make modifications but this choice would have also been very costly. Therefore, the decision was made to create an external software for MRP/DRP functionality that would interact with the Navision database. This software was built from scratch instead of modifying Navision. The major benefit is that ORC Industries would have control over any modifications and add any new functionality in the future without additional cost from outside sources. Database Setup was an additional functionality added to aid in testing and future development of the software. The Database Setup functionality was added to allow the user to specify the SQL Server, Navision Database, Navision Company, and MRP Database. This functionality would allow the user to create a copy of the Navision database and run testing on it without affecting live data on the original Navision database. If the software were to be sold or given to another company, that company would have the capability to use the software by changing the information in the Database Setup to match their database information. The final software was developed using C# in Microsoft Visual Studio.Net and having a Microsoft SQL Server database. Navision uses a Microsoft SQL Server database as well. The Navision database includes information such as bill of materials, item information, vendor information, and customer orders. Navision also had to be modified to work with the MRP/DRP functionality that ORC Industries developed. ORC Industries has the capability to add fields to some tables in Navision. A field called Division was added to some of the tables in Navision to account for the different divisions of ORC Industries. A field called Purchase Location was added to the Location 5

19 table to specify which location would be the purchase location for that division. A field called Smoothing Constant was added to the Item table to hold the Smoothing Constant used by the forecasting algorithm. 2.1 MRP/DRP The calculations a typical MRP system performs dates back to 1915 when Ford Harris published a formula to calculate an economic order quantity to minimize the total of ordering-related and inventory carrying cost. In 1934, R.H. Wilson showed how statistics could be used to plan inventory cushions to reduce the impact of forecast errors, reduce material shortages, and improve customer deliveries with minimum inventories [4]. Current MRP systems are very complex and are used for production schedule. A Master Production Schedule (MPS) is a realistic, detailed, manufacturing plan for which all possible demands upon the manufacturing facilities (such as available personnel, working hours, management policy, and goals) have been considered and are visualized. The MPS is a statement of what the company expects to produce and to purchase; it is expressed in selected items, specific quantities, and dates [2]. Materials Requirements Planning (MRP) driven by MPS was first applied in 1961 by J.A. Orlicky on J.I Case Company farm machinery. The rigorous logic and masses of data to be handled made this task an ideal computer application. The enormous potential benefits over existing ordering techniques generated great interest worldwide [4]. Subsequent paragraphs details the development of the MRP system for ORC industries. In this software, requirements for MPS include customer orders and/or a sales forecast. MPS will be handled differently for the different divisions. For ORC Industries, MPS will be manually entered into a table. For Bell Canoe and Redfeather, MPS will use Production Orders based on customer orders and sales forecast. Bill of material (BOM) is the term used to describe the "parts list" of components (raw materials and subcomponents) needed to complete a finished good [2]. An Exploded BOM is a list of all the raw materials from all the BOM levels of the finished good as well as a list of all the subcomponents from all the BOM levels of the finished good. For example, Figure 2 shows a list of BOMs for a mountain bike, training bike, and junior s bike. The raw materials are not bolded and the subcomponents are bolded. 6

20 Figure 2 also list the second level BOMs for the subcomponents wheel, seat, and training wheel. Figure 2. Bill of Materials Figure 3 lists the exploded BOM for the mountain bike, training bike, and junior s bike. As seen from this figure, the subcomponents have been replaced by the quantity of the subcomponents used to make the finished good multiplied by the amount of the raw material used to make the subcomponent. Figure 4 shows the exploded list of subcomponents that are needed to produce the finished good. The Exploded BOMs for finished goods used by ORC Industries may have up to five levels or more and may comprise of many raw materials and subcomponents. 7

21 Figure 3. Exploded BOM Raw Materials Figure 4. Exploded BOM Subcomponents The prerequisites to MRP functionality are MPS, BOMs, and on-hand inventory. Onhand inventory includes inventory that is located at each location that is not defective. It also includes raw materials that have already been ordered and are due to arrive within the start and end time that MPR/DRP was calculated. These are the factors that drive MRP. After analyzing the situation with MPR/DRP, the software will generate a list of Purchase Orders, Transfer Orders, and Production Orders. Purchase orders contain raw materials that are needed to be ordered for the production of finished goods. Transfer 8

22 Orders contain raw materials and/or subcomponents are needed to be transferred from one location to another for the production of finished goods. Production Orders contain subcomponents that are needed to be made for the production of finished goods. Distribution Resource Planning, or DRP, was created by Andre Martin while he worked for Abbott Laboratories in the 1970s. DRP has become the accepted planning process for manufacturing industries with make-to-stock products [12]. DRP is the process for determining inventory requirements in a multiple plant/warehouse environment. DRP is an extension of MRP that recognizes the needs of the distribution system in the planning of production and inventory levels [13]. DRP will create Transfer Orders to move items from locations that have a surplus to locations that need the items. DRP lowers the amount of inventory that is over purchased as well as increases the availability of items. MRP/DRP data flow is represented in Figure 5. Figure 5. MRP/DRP Data Flow Functionality Requirements The following tables will describe the functional requirements of the MRP/DRP module. Table 1 describes the functionalities that are needed to be setup in order to run the Run MRP functionality. Table 2 describes the functionalities used to run MRP/DRP as well as functionalities used after running MRP/DRP. 9

23 Functionality Date Range Division Invalid Bins MRP Mode MPS Mode Purchase Locations Scrap Items Description Date Range functionality allows the user to specify a date range to run MRP/DRP. MPR/DRP can be run for any specified date range such as a month, a quarter, a year. Division functionality allows the user to select the division for which to run MRP/DRP. Invalid Bins functionality allows the user to specify which locations/bins should not be included in MRP/DRP. These locations/bins contain defective items and should not be counted while taking inventory. MRP Mode functionality allows the user to specify the software to run MRP or MRP/DRP. ORC Industries will most likely not run MRP by itself too often, but there may be a need for it in the future. This software could to be sold or given to another company. In this case, the company might not need to run DRP. Therefore, the user will have the capability to choose which mode to use. MPS Mode functionality allows the user to specify if MPS is based on Production Orders or manual entries. ORC Industries uses manual entries as the MPS. Redfeather and Bell Canoe use Production Orders as the MPS. Purchase Locations functionality allows the user to specify which locations are able to receive purchased items. For ORC Industries, only a couple of the locations are able to receive purchased items. For a location that doesn t receive purchased items, when MRP/DRP is run, a Purchase Order will be created for the purchase location that is assigned to that location. A Transfer Order will also be created, so when the items are received at the purchase location, they are then transferred to the specified location. Scrap Item functionality allows to the user to assign a scrap percentage to an item. This is used mostly for fabric. For instance, when fabric is used to cut out shapes, not all the fabric is used. The fabric that is not used is most likely thrown away. So it becomes necessary to buy more fabric than what is on the BOM because of scrap. 10

24 Transfer Locations Transfer Mode Transfer Locations functionality allows the user to specify which locations are able to transfer items between them. This functionality is needed because ORC only transfers items between certain locations. Transfer Mode functionality allows the user to specify which transfer mode (Production Order Date, Greatest Amount to Order, or Production History) to use when running DRP. If set to Production Order Date, then transfers will be based on the production order dates. If set to Greatest Amount to Order, then transfers will be based on the greatest amount that is ordered. If set to Production History, then transfers are based on which location has used the item the most. Table 1. MRP/DRP Setup Functionality Functionality Process Orders Run MRP Update BOM Tables Update Production View/Edit Purchase Orders Description Process Orders functionality allows the user to finalize and create the Purchase Orders, Transfer Orders, and Production Orders in Navision. These orders are first created by MRP/DRP in the software and then edited if needed. Run MRP functionality allows the user to run either MRP or MRP/DRP functionality depending on the MRP Mode specified by the user. Update BOM Tables functionality allows the user to update the exploded BOM information of finished goods. This information is stored in the MRP Database and then used when running MPR/DRP. Update Production functionality allows the user to update manual entries used in MPS. The user is able to add, delete, or modify these entries. View/Edit Purchase Orders functionality allows the user to view and edit purchase orders created by MRP/DRP. This functionality allows the user to make any needed changes that they feel is needed. For instance, the user knows that if a certain amount of items was purchased, the vendor would give a discount. In this case, the user can increase the amount to be ordered to save some cost. 11

25 View/Edit Transfer Orders View/Edit Production Orders View/Edit Transfer Orders functionality allows the user to view and edit Transfer Orders created by MRP/DRP. This functionality for instance, would allow the user to add additional items to the Transfer Order if needed. View/Edit Production Orders functionality allows the user to view and edit Production Orders created by MRP/DRP. This functionality for instance, would allow the user to add/decrease quantity to the Production Order if needed. Table 2. MRP/DRP Functionality Design The incremental prototyping lifecycle model was used in the development of the MRP/DRP. A prototype typically implements only a small subset of the features of the eventual program; this implementation may be completely different from that of the eventual product. The purpose of a prototype is to allow users of the software to evaluate proposals for the design of the eventual product by actually trying them out, rather than having to interpret and evaluate the design based on descriptions. Prototyping has several benefits: The software designer and implementer can obtain feedback from the users early in the project [2]. Incremental prototyping includes several iterations of prototypes before the final product is completed. A prototype was developed after the requirements document was written and put into production. Before the prototype was developed, users were using Excel spreadsheets to determine MRP/DRP needs. Once the prototype was developed, the users compared the results to the spreadsheets to determine the accuracy. The prototype was changed to account for any discrepancies that were found. With the use of the prototype, additional requirements were also found that were not thought of before. The addition of requirements included bins with defective items, purchased items, conversion of purchased items, in-transit items, and scrap items. Bins with defective items were excluded when running MRP/DRP. Purchased items that were expected to be delivered within the time period specified by MRP/DRP were included with the on hand inventory when running MRP/DRP. The purchased items were converted from unit of measure 12

26 used in purchasing to the unit of measure used in inventory. This conversion is needed because, for example, ORC Industries will buy a box of tape, and there are ten tapes in a box. On the Purchase Order, it will show one box ordered, but this truly represents ten tapes. In-transit items were included with the on-hand inventory when running MRP/DRP. In Navision, when an item is on a Transfer Order and it is shipped but not received, it is considered in-transit. The item is taken out of inventory and it is not put back in until it is received. This item should be considered as on-hand inventory for the location that is receiving it because it will be put back into inventory once it is received in. Scrap items are needed to be accounted for. This is needed mostly for fabric because of the fabric that is thrown away once a design has been cut from it. A percentage will be assigned to each scrap item. Users provided useful input to make the software easier to use. A generic user interface was first developed at first, but ultimately the user interface was modeled to look and function like Navision. The idea was to make it seem like MRP/DRP was part of Navision so users would feel more comfortable using the software. The following UML diagrams were used to help develop the software. 13

27 `Figure 6. Class Diagram 14

28 Figure 7. Use Case Diagram for MRP Setup 15

29 Figure 8. Use Case Diagram for MRP 16

30 Figure 9. Use Case Diagram for DRP The first MRP database that was created with the first prototype was generic. The tables were created just to hold the prototype information. Using best practices in designing databases in SQL server, the database name, tables, and columns were renamed to make them easy to understand for the developer. The final MRP database was also normalized to improve accuracy and integrity of the database. Because the software also interacts with the Navision database, it was also designed to exclude any information that was already in the Navision database. Figure 10 represent s the MRP/DRP database. 17

31 Figure 10. Database Diagram for MRP/DRP 18

32 2.1.3 Implementation MPS for ORC Industries comes from manual entries that are stored in the MRP database. A table was created in the MRP database to hold these manual entries. MPS for Redfeather and Bellcanoe come from Production Orders in Navision based on customer pre-orders and a sales forecast. When running MRP/DRP, Production Order information is retrieved from the Navision database. The sales forecast information used to create the Production Orders is stored in a table in the MRP database. The sales forecast information comes from running the Forecast module of the software. Exploded BOM information is stored in a table in the MRP database. This information comes from the Update BOM Tables functionality that retrieves BOM information from the Navision database and iterates through all the levels of the BOM of a finish good item. It calculates and records which raw materials and subcomponents that are needed to make the finished good item and it stores the information in the MRP database. When running MRP/DRP, on-hand inventory is retrieved from the Navision database. This inventory includes items that are currently at each location, items that are on a Purchase Order due to arrive during the time period specified by MRP/DRP, and in-transit items. When MRP/DRP is run, it takes the finished good items from MPS that are needed to be produced and it retrieves the Exploded BOM for each item. It then multiplies the quantity needed to be produced for each finished good item by the quantity of each item of the Exploded BOM. The results of all the calculations are then summed up to create a final list of total raw materials and subcomponents needed by location. This will be called Items Needed. On-hand inventory will then be calculated. Items on Purchase Orders due to arrive during the time period specified by MRP/DRP are found and in some cases converted from the unit of measure used in purchasing to the unit of measure used in inventory. Non-defective items are then found from each location and summed with the items on the Purchase Orders. In-transit items are also found and included. This will be called Qty on Hand. We will first look at the equations of the MRP functionality. As an illustration, Figure 11 will show the equations and Table 3 will give the descriptions. 19

33 Raw Material R = Items Needed R Qty on Hand R Subcomponent S = Items Needed S Qty on Hand S Sub on Hand S = Items Needed S Subcomponent S SubRaw R = Sub on Hand S * Exploded BOM Raw Material Final R = Raw Material R SubRaw R where R = raw materials and S = subcomponents Figure 11. MRP Equations Equation Name Raw Material Subcomponent Sub on Hand SubRaw Raw Material Final Description The raw materials on Items Needed are subtracted by the raw materials on Qty on Hand for each location. The subcomponents on Items Needed are subtracted by the subcomponents on Qty on Hand for each location. The final subcomponents that are needed to be produced are also represented by Subcomponent. The Subcomponents on Items Needed are subtracted by the subcomponents on Subcomponent, meaning they are already in stock and not needed to be produced. The Exploded BOM for each subcomponent on Sub on Hand for each location is found and then each subcomponent is multiplied by the quantity of each raw material of its Exploded BOM. SubRaw is needed because we don t want to purchase raw materials for subcomponents that have already been made and are in inventory. Raw Material is then subtracted by SubRaw in order to find the final raw materials needed to be purchased. Table 3. MRP Equations We will now look at the equations of the MRP/DRP functionality. As an illustration Figure 12 will show the equations and Table 4 will give the descriptions. 20

34 Raw Material R = Items Needed R Qty on Hand R Subcomponent S = Items Needed S Qty on Hand S Sub on Hand S = Items Needed S Subcomponent S SubRaw R = Sub on Hand S * Exploded BOM Raw Material SubRaw R = Raw Material R - SubRaw R Qty on Hand Leftover RS = Qty on Hand RS Items Needed RS Raw Material Transfer R = Raw Material SubRaw R Qty on Hand Leftover R Subcomponent Final S = Subcomponent S Qty on Hand Leftover S SubTransfer S = Subcomponent S Subcomponent Final S SubTransferRaw R = SubTransfer S * Exploded BOM Raw Material Final R = Raw Material Transfer R SubTransferRaw R where R = raw materials and S = subcomponents Figure 12. MRP/DRP Equations Equation Name Raw Material Subcomponent Sub on Hand SubRaw Raw Material SubRaw Qty on Hand Leftover Description The raw materials on Items Needed are subtracted by the raw materials on Qty on Hand for each location. The subcomponents on Items Needed are subtracted by the subcomponents on Qty on Hand for each location. The Subcomponents on Items Needed are subtracted by the subcomponents on Subcomponent, meaning they are already in stock and not needed to be produced. The exploded BOM for each subcomponent on Sub on Hand for each location is found and then each subcomponent is multiplied by the quantity of each raw material of its Exploded BOM. Raw Material is then subtracted by SubRaw. Raw materials and subcomponents on Qty on Hand will also subtracted by raw materials and subcomponents on Items Needed for each location. This is done to determine if there is leftover inventory that is not needed at each location. This inventory can then be transferred to be used at a different location. 21

35 Raw Material Transfer Subcomponent Final SubTransfer SubTransferRaw Raw Material Final Depending on which transfer mode you have set (Production Order Date, Greatest Amount to Order, or Production History), the raw materials on Raw Material SubRaw is subtracted by the raw materials on Qty on Hand Leftover for each location. Raw Material Transfer will contain both raw materials that are needed to be purchased as well as raw materials that are needed to be transferred for each location. Then the subcomponents on Subcomponent are subtracted by the subcomponents on Qty on Hand Leftover for each location. The final subcomponents that are needed to be produced and transferred are represented by Subcomponent Final. The subcomponents that are going to be transferred are calculated by taking the Subcomponent and subtracting by the Subcomponent Final. The exploded BOM for each subcomponent on Sub Transfer for each location is found and then each subcomponent is multiplied by the quantity of each raw material of its Exploded BOM. Raw Material Transfer is then subtracted by SubTransferRaw in order to find the final raw materials needed to be purchased and transferred. Table 4. MRP/DRP Equations 2.2 Sales Forecasting A sales forecast is a prediction of future sales, based mainly on past sales performance. It is a good indicator of future sales in stable market conditions, but may be less reliable in times of rapid market change [3]. Forecasting sales can be considered a projection as well as a prediction. A projection is a calculated figure based on simple examination of past data, and the assumption of all other things being equal in the future. A prediction is a calculated figure based on more complex analyses of relationships between causes and effects in the past, and the use of quantitative measures of these relationships to predict the outcome of future combinations of these causal factors [7]. The most important thing to realize is that sales forecasting is about managing resources and managing risk [10]. Therefore, it is important that sales forecast are accurate so that 22

36 all resources are aligned to provide more timely and efficient customer service and to meet the maximum amount of customer demand [9]. Inaccurate sales forecasts may lead to inappropriate inventory levels and increased supply problems. Very often this results in increased costs, and money being spent unnecessarily [11]. Sales forecasting is relatively new for ORC Industries because Redfeather and Bell Canoe have been acquired by ORC for only a few years back. Most of ORC Industries s business is with government contracts which already have a predefined ordered amount. A standard way to run a sales forecast has not been set. ORC Industries previously used a simple forecasting algorithm that would just multiply the previous year s sales by a percentage specified by the user. However, as stated in the Introduction, it was decided that it would enhance this project by developing a forecasting algorithm to try to predict future sales as accurately as possible. For this software, the sales forecast will be used to create Production Orders. Production Orders represent MPS which will be a component that drives MRP/DRP Functionality Requirements The following tables will describe the functional requirements of the Forecast module. Table 5 describes the functionalities that are needed to be setup in order to run the Run Forecast functionality. Table 6 describes the functionalities used to run the Forecast as well as functionalities used after running the Forecast. Functionality Division Forecast Date Range Forecast Mode Description Division functionality allows the user to select which division to run the Forecast. For ORC Industries, the Forecast will only be run for Redfeather and Bell Canoe. Forecast date range functionality allows the user to specify a date range to run the Forecast. The Forecast can be run for a month, a quarter, a year, or another specified date range. Forecast Mode functionality allows the user to specify which Forecast Mode (Percent Difference or Exponential Smoothing) to use when running Forecast. Percent Difference Mode calculates the Forecast based on a percentage specified by the user. 23

37 The percentage is multiplied by the previous year s sales. If set to Exponential Smoothing, then Forecast is based on Exponential Smoothing algorithm. Percent Difference Sales Date Range Update Smoothing Constant Percent Difference functionality allows the user to specify the percent difference used in the Percent Difference Forecast Mode. This value is stored in the MRP database and use to run the Forecast. Sales Date Range functionality allows the user to set the sales date range of the Forecast. Update Smoothing Constant functionality allows the user to update the Smoothing Constant that is used in the Exponential Smoothing algorithm. Table 5. Forecast Setup Functionality Functionality Process Forecast Run Forecast Update Forecast Description Process Forecast functionality allows the user to finalize and create a sales forecast. The user will be able to create multiple sales forecasts for the same time period if needed. These sales forecasts can be used for comparison. Run Forecast functionality allows the user to calculate the Forecast using the specified forecast setup information. Update forecast functionality allows the user to modify the Forecast. The user will be able to add, delete, and edit the Forecast. This functionality allows the user to make the necessary changes that they feel are needed. Table 6. Forecast Functionality 24

38 2.2.2 Research In order to develop a good forecast algorithm, the developer first chose the following algorithms published in literature: Linear Regression, Exponential Function, Logarithmic Function, Percent Difference, Moving Average, and Exponential Smoothing. Linear Regression is a simple forecasting method that calculates a straight line. By its nature, the straight line it produces suggests that it is best suited to data that is expected to change by the same absolute amount in each time period. The mathematical equation in Figure 13 shows that the variable y varies by a constant and increasing (or decreasing) over time (denoted by t) by factor of b. y t = a + bt Figure 13. Linear Regression Algorithm Exponential Function is a method that uses an increasing or decreasing curve rather than the straight line of the Linear Regression method. An exponential method is useful when it is known that there is, or has been, increasing growth or decline in past periods. y t = ab t Figure 14. Exponential Function Algorithm Logarithmic Function is a method similar to Exponential Function, but uses an alternate logarithmic model. y t = a + b log(t) Figure 15. Logarithmic Function Algorithm Percent Difference smoothes out past data by calculating the difference between one period ago versus a varying number of periods ago. y t = y t-1 * y t-1 / y t-1-n where n is a variable number of periods 25

39 Figure 16. Percent Difference Algorithm The Moving Average technique forecasts demand by calculating an average of previous sales from a specified number of previous periods. Each new forecast drops the sales from the oldest period and replaces it with the sales in the most recent period; thus, the data in the calculation moves over time. M t = (Y t-l+1 + Y t-l Y t-1 + Y t ) / L L = number of months used in moving average M = month t = the period Y = sales for month Figure 17. Moving Average Algorithm Exponential Smoothing is a type of modified moving average. The idea is to correct a prior forecast and use it to make the next forecast. Exponential Smoothing uses a Smoothing Constant and a damping factor to help determine the amount of error in an earlier forecast to use in making the next one. The sum of the Smoothing Constant and damping factor is one. For example, if your last forecast was too low, Exponential Smoothing increases your next forecast and if your last forecast was too high, Exponential Smoothing decreases your next forecast. Exponential smoothing corrects the next forecast in a way that would have made your previous forecast a better one. M t = uy t + (1 u) M t-1 M = month t = the period u = Smoothing Constant Y = sales for month Figure 18. Exponential Smoothing Algorithm 26

40 These algorithms were used on a group of selected items from Redfeather. Redfeather was chosen because between Redfeather and Bell Canoe (the two divisions that do forecasting), Redfeather had the most historical information that could be used. Bell Canoe was a more recent acquisition and only had a years worth of historical information. These items included items that had a large number of sales to items that have very little sales. Figures represent some of the data that was collected. The algorithms were tested against a wide range of variables and also tested for a three year period from 2004 to The results of each algorithm included the year, month, forecast quantity, actual quantity, and difference. The forecast quantity is calculated for each year and month combination for the item. The actual quantity represents what was actually sold for the year and month combination for the item. The difference field shows the absolute value of the difference of the forecast quantity subtracted from the actual quantity. The result of the differences for each year and month was put into another spreadsheet and graph. Figure 25 represents a sample graph of this combined data. Figure 19. Linear Regression Sample Data Figure 20. Exponential Function data 27

41 Figure 21. Logarithmic Function Sample Data Figure 22. Percent Difference Sample Data Figure 23. Moving Average Sample Data Figure 24. Exponential Smoothing Sample Data 28

42 Figure 25. Algorithm Analysis Results The results were analyzed but a best fit algorithm was not determined. Therefore, the Statistical Consulting Center of the University of Wisconsin La Crosse was contacted for some guidance. Dr. Abdulaziz Elfessi, who is the head of the Statistical Consulting Center, was asked to look at the data to help determine the best algorithm to use. Dr. Elfessi had experience with forecasting and was able to determine that the Exponential Smoothing Algorithm was the best fit. However, he recommended using an Exponential Smoothing Algorithm that included seasonality. Figure 26 represents the Exponential Smoothing Algorithm that was modified to include seasonality. M t = (u (Y t /S) + (1 u) M t-1 ) S M = month t = the period u = Smoothing Constant Y = sales for month S = seasonality Figure 26. Exponential Smoothing Algorithm with Seasonality 29

43 The next step was finding the best Smoothing Constant to use. Dr. Elfessi provided a spreadsheet that contained an Exponential Smoothing algorithm. This spreadsheet would help determine the best Smoothing Constant. The spreadsheet was modified to include seasonality for multiple years. A set of Seasonal Factors were calculated for each year. The first year wouldn t have a set of Seasonal Factors because the only data to compare it against was itself, so the Seasonal Factor would only be 1 for each month. The following years will have a set of Seasonal Factors based on information from the previous year(s) and its own year s information. For example, Figure 27 is an example of the spreadsheet that was used. The date range for Figure 27 is January 2005 to December The first year will have not have a set of Seasonal Factors, the second year will have a set of Seasonal Factors based on information from January 2005 to December 2006, and the third year will have a set of Seasonal Factors based on information from January 2005 to December By changing the Smoothing Constant and looking at the Overall % Error, the best Smoothing Constant would be the one with the lowest Overall % Error. The True Value is the actual sales. The Seasonally Adjusted Value is the True Value divided by the Seasonal Factor. The Seasonally Adjusted Forecast is the forecast calculated from the Exponential Smoothing algorithm. The Actual Forecast is the Seasonally Adjusted Forecast multiplied by the Seasonal Factor. The Forecasting Error is the absolute value of the difference of the True Value subtracted from the Actual Forecast. The Forecasting Error % was the percent error. Figure 28 shows the True Value vs. the Actual Forecast of the example. Figure 29 shows the Forecasting Error of the example. 30

44 Figure 27. Smoothing Algorithm with Seasonality Spreadsheet 31

45 Figure 28. True Value Vs. Actual Forecast Figure 29. Forecast Error 32

46 The spreadsheet was used on the same group of items from the previous algorithms. The results were mixed. Some of the data provided good results while other data didn t. Most of the data was within a 20% error. Therefore, an outside company was asked to supply data to test against to validate the algorithm. The data used was for the period of January 2005 to December The data for the items of the outside company had more sales than that of the Redfeather items. The spreadsheet was used on this data and the results were the same. Some of the data provided good results while other data didn t. Again most of the data was within a 20% error. The decision was made to use the algorithm but allow the user to make any needed changes to the forecast. This would allow the user to increase or decrease any forecast that wasn t in the expected range Design The developer used incremental prototyping approach to develop the forecasting module. Like the MRP module, the Forecast module s user interface was modeled to look and function like Navision. For the database design, the forecast tables were designed in the MRP database and were also normalized as well. Because the Forecast module also interacts with the Navision database, the forecast tables were also designed not to include any information that was already in the Navision database. The Class Diagram that was used for the Forecast is represented in Figure 6. The Use Case Diagrams are represented by Figures The Database Diagram is represented by Figure

47 Figure 30. Use Case for Forecast Setup Figure 31. Use Case for Forecast 34

48 Figure 32. Database Diagram for Forecast Implementation When running the Forecast, sales information is retrieved from the Navision database. Depending on the Forecast Mode chosen, the Forecast will be calculated differently. If the Forecast Mode is set to Percent Difference, then the forecast generated will be based on a percent that the user has specified in the Forecast Setup. The previous year s sales will be retrieved from the Navision database and will be multiplied by the percent specified by the user. The result will be the forecast. The user will then have the capability to modify this forecast as needed. If the Forecast Mode is set to Exponential Smoothing, the forecast will be calculated using the Exponential Smoothing Algorithm. In order to use Exponential Smoothing, each item will have to have a Smoothing Constant assigned to it. Each item will have its own Smoothing Constant instead of using an overall Smoothing Constant because it 35

49 would make the forecast more accurate. Therefore, functionality was created to calculate the Smoothing Constant for each item. The Smoothing Constant functionality was based on the Exponential Smoothing Algorithm spreadsheet that was provided by the Statistical Consulting Center. For each item, the True Value for each year and month combination within the Sales Forecast Date Range specified by the user was retrieved from the Navision Database. The set(s) of Seasonal Factors were then found for each year. For instance, in the following example we will use the data from Figure 27 with the Sales Date Range set for a three year period, January 2005 to December Two sets of Seasonal Factors will be calculated. The first will be for the first two years and the second will be for the three years. Originally the algorithm that the Statistical Consulting Center provided only had one set of Seasonal Factors for all the calculations. The sets of Seasonal Factors were then re-calculated and used in the algorithm. The results were compared with the results of the algorithm that only had one set of Seasonal Factors. The forecast was more accurate for the algorithm that has the sets of Seasonal Factors. Therefore, it was decided to use the algorithm with the sets of Seasonal Factors in the software. To find the set Seasonal Factors for each year, the average of the total True Value for all sales was calculated for the period. This will be called Avg True Value. Then for the first set of Seasonal Factors, there will be Seasonal Factors for each month, January to December. The Seasonal Factor will be found by taking the January 2005 s True Value and adding it with January 2006 s True Value. This value is then divided by the number of months and then divided by the Avg True Value. As an illustration Figure 33 will show this equation. This algorithm will be calculated for each month. The result is the 2nd Year Seasonal Factor table found in Figure 27. Seasonal Factor = Month 1 +Month 2 / Number of Months / Avg True Value Figure 33. Seasonal Factor Algorithm for Two Year Period For the second set of Seasonal Factors, there will be Seasonal Factors for each month as well, January to December. The Seasonal Factor will be found by taking the January 2005 s True Value, adding it with January 2006 s True Value, and adding it with January 36

50 2007 s True Value. This value is then divided by the number of months and then divided by the Avg True Value. As an illustration Figure 34 will show this equation. This algorithm will be calculated for each month. The result is the 3rd Year Seasonal Factor table found in Figure 27. Seasonal Factor = Month 1 +Month 2 +Month 3 / Number of Months / Avg True Value Figure 34. Seasonal Factor Algorithm for Three Year Period Now that we have the True Values and the sets of Seasonal Factors we can start the calculation of the Overall % Error. As an illustration, Figure 35 will show the equations for all the values needed to find the Forecasting Error of the first year and Table 7 will give the descriptions. Seasonally Adjusted Value C = True Value C SCSAV = Smoothing Constant * Seasonally Adjusted Value P SCSAF = (1 Smoothing Constant) Seasonally Adjusted Forecast P Seasonally Adjusted Forecast C = SCSAV + SCSAF Actual Forecast C = Seasonally Adjusted Forecast C Forecasting Error C = AbsoluteValue(True Value C Actual Forecast C ) where C = current month and P = previous month Figure 35. Smoothing Constant Algorithm First Year Equations Equation Seasonally Adjusted Value SCSAV SCSAF Description For 2005, January through December, the Seasonally Adjusted Value for each month will be the same as its True Value. The Smoothing Constant will be multiplied by the previous month s Seasonally Adjusted Value. The Smoothing Constant will be subtracted from one and then multiplied by the previous month s Seasonally Adjusted Forecast. Seasonally Adjusted Forecast For 2005, the very first entry for January will have its True Value also serve as its Seasonally Adjusted Forecast. For February through December, the 37

51 Actual Forecast Forecasting Error Seasonally Adjusted Forecast will use the Exponential Smoothing algorithm. The Seasonally Adjusted Forecast for the current month will be SCSAV + SCSAF. For 2005, the very first entry for January will have its True Value also serve as its Actual Forecast. For February through December, the Actual Forecast will be the same as the Seasonally Adjusted Forecast. For 2005, the very first entry for January, the Forecasting Error will be zero. For February through December, the Forecasting Error will be the absolute value of the True Value subtracted by the Actual Forecast. Table 7. Smoothing Constant Algorithm First Year Equations For 2006, the set of Seasonal Factors will be represented by the 2nd Seasonal Factor table in Figure 27. For 2007, the set of Seasonal Factors will be represented by the 3rd Seasonal Factor table in Figure 27. As an illustration, Figure 36 will show the equations for all the values needed to find the Forecasting Error of the second year and third year and Table 8 will give the descriptions. Seasonally Adjusted Value C = True Value C / Seasonal Factor C SCSAV = Smoothing Constant * Seasonally Adjusted Value P SCSAF = (1 Smoothing Constant) Seasonally Adjusted Forecast P Seasonally Adjusted Forecast C = SCSAV + SCSAF Actual Forecast C = Seasonally Adjusted Forecast C * Seasonal Factor C Forecasting Error C = AbsoluteValue(True Value C Actual Forecast C ) where C = current month and P = previous month Figure 36. Smoothing Constant Algorithm Second and Third Year Equations Equation Seasonally Adjusted Value Description For January through December, the Seasonally Adjusted Value will be the True Value divided by 38

52 the Seasonal Factor of the corresponding month. SCSAV SCSAF Seasonally Adjusted Forecast Actual Forecast Forecasting Error The Smoothing Constant will be multiplied by the previous month s Seasonally Adjusted Value. The Smoothing Constant will be subtracted from one and then multiplied by the previous month s Seasonally Adjusted Forecast. The Seasonally Adjusted Forecast will use the Exponential Smoothing algorithm. The Seasonally Adjusted Forecast for the current month will be SCSAV + SCSAF. The Actual Forecast will be the Seasonally Adjusted Forecast multiplied by the Seasonal Factor of the corresponding month. Forecasting Error will be the absolute value of the True Value subtracted by the Actual Forecast. Table 8. Smoothing Constant Algorithm Second and Third Year Equations The Overall % Error will be calculated by taking the sum of the Forecasting Errors and dividing by the sum of the True Values. In order to find the best Overall % Error, the functionality will calculate a couple of Smoothing Constant Algorithms using a different Smoothing Constant each time. The first Smoothing Constant will be 0.1 and the Smoothing Constant will be incremented by 0.1 each time another algorithm is ran. The Smoothing Constant will be increased up to a value of 0.9. The Overall % Error will be stored for each algorithm. At the end, the Smoothing Constant with the lowest Overall % Error will be used as the Smoothing Constant for the item. This value will be assigned to the item in the Navision database and used during the Exponential Smoothing functionality. Once the Smoothing Constant has been updated for the items, the Forecast can be calculated using the Forecast Mode of Exponential Smoothing. First the True Values for the specified Sales Forecast Date Range will be retrieved from the Navision database. The Seasonal Factors will be calculated using the True Values. The Seasonal Factors will depend on the specified Sales Forecast Date Range. If the date range is for a two year period, Figure 33 will illustrate the Seasonal Factor Algorithm. If the date range is 39

53 for a three year period, Figure 34 will illustrate the algorithm. If it is more then three years, you will need to add the additional month(s) to the beginning of the algorithm. After the True Values and Seasonal Factors are found, the Exponential Smoothing Algorithm with Seasonality in Figure 26 will be used to calculate the Forecast. 40

54 3. Limitations The software was designed as a starting point for a larger project that ORC Industries has planned. The section Continuing Work will detail the enhancements that ORC Industries would like to make to improve this software. The MRP/DRP functionality of the software was designed for the requirements of ORC Industries and may or may not work with other companies. The software will work in ORC Industries environment but will have to be modified if used in another company s environment. The Database Setup functionality allows the user to specify which databases to use. Although these databases with have to be Microsoft SQL Server databases, companies with Navision will be able to be modified to run this software. Companies with another ERP software package will have to conform to the database tables that are used in this software. In this case, a formal analysis of the company s ERP software will have to be done to determine how best to retrieve information from the ERP software and how to setup the MRP database. 41

55 4. Continuing Work MRP/DRP is just the beginning of ORC Industries MRP initiative. ORC Industries plans to add time-phased Master Production Scheduling (MPS) as an add-on to MRP/DRP. MPS sets the schedule for production. This will allow ORC Industries to see what exact date an item will be produced and what exact date the raw materials and subcomponents will be needed to produce this item. Once MPS is in place, DRP can also be modified to account for the scheduling of finished goods. For example, item A is produced at plant B and plant C. Plant C doesn t start production on item A until two months down the line. Therefore, if plant C needs any items that are in another plant and production hasn t started, it can be transferred to plant C to save time and then a Purchase Order will be created to restock the other plant. There are two alternative ways of keeping MRP up-to-date: Schedule Regeneration and Net Change. This means that there has been a change to amount of finished good items needed during the specified time period MRP/DRP is ran for. Therefore, changes to the Purchase Orders, Transfer Orders, and Production Orders will have to be made to account for this change. ORC Industries plans to add both functionalities. The differences between regeneration and net change are the frequency of re-planning and what initiates it. Regeneration is run periodically when all MPS, revised or not, is fed to MRP. Net change is run at more frequent, random intervals when inventory transactions are processed [4]. Another plan is to refine the forecasting algorithm. Either changing the current algorithm or finding a better fit one as more historical information is gathered and ORC Industries gets a better feel for forecasting. These are some of the modifications that ORC Industries has in store, but more may come in the future. With the software developed and maintained at ORC Industries, these future changes will be possible and less costly. 42

56 5. Conclusion This software was designed as a starting point for a larger project that ORC Industries has planned. It was designed to assist a user in the production, purchasing, and transferring of items used in the production of finished good items. It allowed the user to generate Purchase Orders, Transfer Orders, and Production Orders. These generated orders are then able to be edited by the user. It has become a useful tool for the user as it has cut the cost for items being over purchased as well as items being transferred. It has also provided inventory at the time of production. There were many challenges during the development of the software. The following will describe some of these challenges. The very first challenge was deciding how to develop the software. The software could either be modified to include the needed functionality or it would have to be developed as an external software that would interact with the Navision database. After careful consideration, it was decided to go with the external software. The deciding factors were the cost and the ability by ORC Industries to make adjustments to the software as well as the ability by ORC Industries to add future functionality. The development of the MRP/DRP algorithm was another challenge. Since ORC did not have the source code to the MRP functionality in Navision, the MRP functionality had to be developed from scratch. Information was gathered from various employees within the organization as well as research from outside sources. After a couple of prototype runs and evaluating the results, the MRP/DRP functionality was finally agreed upon. Another challenge was deciding what information from the Navision database could be used and what information had to be captured in the MRP database. Information already captured in the Navision database would not need to be captured in the MRP database because it would be redundant. After analyzing the Navision database and consulting with various employees within the organization, the tables that would be 43

57 required were found and the tables that were needed to be created to capture the additional information that would be needed were created in the MRP database. The Forecast functionality was another challenge. ORC did not have a forecasting algorithm that it would be able to use to predict future sales. Therefore, a forecasting algorithm was developed with the help of the Statistical Consulting Center to solve the challenge. The accuracy of the Forecast functionality is up for debate. For ORC Industries, the Forecast will work because ORC Industries has the capability to adjust the Forecast and will adjust the Forecast as needed. If another company uses the software and is satisfied with the forecast, then the functionality will work. If not, then the company will have the alternative to use a percent difference of the previous year s sales or perhaps design their own algorithm. The algorithm used, Exponential Smoothing with Seasonality, is a simple algorithm. It doesn t factor in trends or other factors that may affect the forecast. Each company is different and in order to find the right algorithm to use, each company will have to do its own research to find the best fit algorithm for them. The development of this software has helped me gain a better understanding of the process that ORC Industries uses to order, transfer, and make products. This knowledge will help me in the future development of the software. 44

58 BIBLIOGRAPHY 1. Content Library, Answers Corporation, Wikipedia, Wikimedia Foundation, Inc., January BNET Business Dictionary, CNET Networks, Inc, George W. Plossl, Material Requirements Planning, McGraw-Hill, Inc, Terry Lunn and Susan A. Neff, Integrating Material Requirements Planning and Modern Business, Richard D. Irwin, Inc, Hans Van Vliet, Software Engineering: Principles and Practice, John Wiley & Sons Ltd, E. J. Davis, Practical Sales Forecasting, McGraw-Hill Book Company Ltd, John T. Mentzer & Carol C. Bienstock, Sales Forecasting Management, Sage Publications, Inc, Mark Moon, Forecasting: The Supply Chain's Critical Enabler, Penton Media, Inc., Angelo Guadagno, Mastering the Magic of Sales Forecasting, National Research Bureau, Albert Genna, What's Wrong With Sales Forecasts, Reed Business Information, Frederick Hiller, Gerald Leiberman, Introduction to Operations Research, 7 th Edition, McGraw-Hill, Walter E. Goddard, Controlling the pipeline with DRP, Reed Business Information, Ira P. Krepchin, Using computers for planning and control, Reed Business Information, Andre J. Martin, Distribution Resource Planning: The Gateway to True Quick Response and Continual Replenishment, John Wiley & Sons, Inc

59 APPENDIX A: Screen Shots Database Setup Screen 46

60 MRP/DRP Main Screen MRP/DRP Screen: Purchase Order Tab 47

61 MRP/DRP Screen: Transfer Order Tab MRP/DRP Screen: Manual Entry Tab 48

62 MRP/DRP Setup Screen: Invalid Bin Locations Tab MRP/DRP Setup Screen: Transfer Locations Tab 49

63 MRP/DRP Setup Screen: Purchase Locations Tab MRP/DRP Setup Screen: Modes Tab 50

64 MRP/DRP Setup Screen: Date Range Tab MRP/DRP Setup Screen: Division Tab 51

65 MRP/DRP Setup Screen: Scrap Items Tab Forecast Main Screen 52

66 Forecast Screen Forecast Setup Screen: Forecast Date Range Tab 53

67 Forecast Setup Screen: Sales Date Range Tab Forecast Setup Screen: Percent Difference Tab 54

68 Forecast Setup Screen: Division Tab Forecast Setup Screen: Forecast Mode Tab 55

Industry Environment and Concepts for Forecasting 1

Industry Environment and Concepts for Forecasting 1 Table of Contents Industry Environment and Concepts for Forecasting 1 Forecasting Methods Overview...2 Multilevel Forecasting...3 Demand Forecasting...4 Integrating Information...5 Simplifying the Forecast...6

More information

Business Proposal: Recommendation for Implementation of the SAGE Enterprise Suite. Debbie Miksiewicz. Elaine Kithcart BSA 375. Mr.

Business Proposal: Recommendation for Implementation of the SAGE Enterprise Suite. Debbie Miksiewicz. Elaine Kithcart BSA 375. Mr. Business Proposal: Recommendation for Implementation of the SAGE Enterprise Suite Debbie Miksiewicz Elaine Kithcart BSA 375 Mr. Andrew Mahaney April 17, 2011 Business Proposal 2 Table of Contents Introduction

More information

Job Manager for Metal Fabrication

Job Manager for Metal Fabrication Job Manager for Metal Fabrication What makes Metal Fabrication unique? First, most metal shops are building to unique specifications. The Jobs are service type jobs, not production type jobs. Mass Production

More information

Dependent vs Independent Demand. The Evolution of MRP II. MRP II:Manufacturing Resource Planning Systems. The Modules In MRP II System

Dependent vs Independent Demand. The Evolution of MRP II. MRP II:Manufacturing Resource Planning Systems. The Modules In MRP II System MRP II:Manufacturing Resource Planning Systems IE 505: Production Planning Control Lecture Notes* Rakesh Nagi University at Buffalo * Adapted in part from Lecture Notes of Dr. George Harhalakis, University

More information

Effective Replenishment Parameters By Jon Schreibfeder

Effective Replenishment Parameters By Jon Schreibfeder WINNING STRATEGIES FOR THE DISTRIBUTION INDUSTRY Effective Replenishment Parameters By Jon Schreibfeder >> Compliments of Microsoft Business Solutions Effective Replenishment Parameters By Jon Schreibfeder

More information

Job Manager for Tool and Die Shops

Job Manager for Tool and Die Shops Job Manager for Tool and Die Shops What makes Tool and Die Shops unique? First, most orders are for a unique Tool or Die. No two Jobs are alike. The Job is a one of a kind job, not a mass production type

More information

CHAPTER 6 AGGREGATE PLANNING AND INVENTORY MANAGEMENT 명지대학교 산업시스템공학부

CHAPTER 6 AGGREGATE PLANNING AND INVENTORY MANAGEMENT 명지대학교 산업시스템공학부 CHAPTER 6 AGGREGATE PLANNING AND INVENTORY MANAGEMENT 명지대학교 산업시스템공학부 Learning Objectives You should be able to: Describe the hierarchical operations planning process in terms of materials planning & capacity

More information

2 Day In House Demand Planning & Forecasting Training Outline

2 Day In House Demand Planning & Forecasting Training Outline 2 Day In House Demand Planning & Forecasting Training Outline On-site Corporate Training at Your Company's Convenience! For further information or to schedule IBF s corporate training at your company,

More information

MANAGE. Warehouse Management Systems. Microsoft Dynamics NAV 5.0. Technical Whitepaper

MANAGE. Warehouse Management Systems. Microsoft Dynamics NAV 5.0. Technical Whitepaper MANAGE Microsoft Dynamics NAV 5.0 Warehouse Management Systems Technical Whitepaper This Paper will give you an overview of the Warehouse Management Systems granule in Microsoft Dynamics NAV. It is written

More information

Operations Management Part 12 Purchasing and supplier management PROF. NAKO STEFANOV, DR. HABIL.

Operations Management Part 12 Purchasing and supplier management PROF. NAKO STEFANOV, DR. HABIL. Operations Management Part 12 Purchasing and supplier management PROF. NAKO STEFANOV, DR. HABIL. Introduction basic terms Supply management describes the methods and processes of modern corporate or institutional

More information

Glossary of Inventory Management Terms

Glossary of Inventory Management Terms Glossary of Inventory Management Terms ABC analysis also called Pareto analysis or the rule of 80/20, is a way of categorizing inventory items into different types depending on value and use Aggregate

More information

PARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling

PARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling PARADIGMS THAT DRIVE COSTS IN MANUFACTURING The whole purpose of a business enterprise is pretty simple to make a profit by selling products or services to persons who desire those particular goods or

More information

PRINCIPLES OF INVENTORY AND MATERIALS MANAGEMENT

PRINCIPLES OF INVENTORY AND MATERIALS MANAGEMENT PRINCIPLES OF INVENTORY AND MATERIALS MANAGEMENT Fourth Edition Richard J. Tersine The University of Oklahoma TEGHNISCHE HOCHSCHULE DARMSTADT Fochbereich 1 Gesonr> 11-. ib I iothek Betiier >wi rtschottsiehre

More information

CHAPTER 3: PRODUCTION BILL OF MATERIALS

CHAPTER 3: PRODUCTION BILL OF MATERIALS Chapter 3: Production Bill of Materials CHAPTER 3: PRODUCTION BILL OF MATERIALS Objectives Introduction The objectives are: Production Bill of Materials (BOM) Production BOM Advanced Features Production

More information

Oracle Network Logistics

Oracle Network Logistics Oracle Network Logistics Concepts and Procedures Release 11i November, 2000 Part No. A86681_01 Oracle Network Logistics Concepts and Procedures, Release 11i Part No. A86681_01 Copyright 1996, 2000, Oracle

More information

Effective Replenishment Parameters. By Jon Schreibfeder EIM. Effective Inventory Management, Inc.

Effective Replenishment Parameters. By Jon Schreibfeder EIM. Effective Inventory Management, Inc. Effective Replenishment Parameters By Jon Schreibfeder EIM Effective Inventory Management, Inc. This report is the fourth in a series of white papers designed to help forward-thinking distributors increase

More information

Supply Chain Management with SAP APO

Supply Chain Management with SAP APO Jörg Thomas Dickersbach Supply Chain Management with SAP APO Structures, Modelling Approaches and Implementation of SAP SCM 2008 3rd edition Springer Contents PART I - OVERVIEW 1 SCM Projects with SAP

More information

A Cross-Functional View of Inventory Management, Why Collaboration among Marketing, Finance/Accounting and Operations Management is Necessary

A Cross-Functional View of Inventory Management, Why Collaboration among Marketing, Finance/Accounting and Operations Management is Necessary A Cross-Functional View of Inventory Management, Why Collaboration among Marketing, Finance/Accounting and Operations Management is Necessary Richard E. Crandall, Appalachian State University, John A.

More information

Collaborative Forecasting

Collaborative Forecasting Collaborative Forecasting By Harpal Singh What is Collaborative Forecasting? Collaborative forecasting is the process for collecting and reconciling the information from diverse sources inside and outside

More information

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning Aggregate, Material Requirement, and Capacity Topic: Aggregate, Material Requirement, and Capacity Slide 1 Welcome to Workshop Eight presentation: Aggregate planning, material requirement planning, and

More information

CHAPTER 3: PRODUCTION BILL OF MATERIALS

CHAPTER 3: PRODUCTION BILL OF MATERIALS Chapter 3: Production Bill of Materials CHAPTER 3: PRODUCTION BILL OF MATERIALS Training Objectives In this chapter, you should learn about: Production Bill of Materials (BOM) Production BOM Advanced Features

More information

PREVIEW DISCRETE MANUFACTURING SCOTT HAMILTON

PREVIEW DISCRETE MANUFACTURING SCOTT HAMILTON PREVIEW Chapter 9: Serial and Batch Tracking Chapter 18: Quality Management DISCRETE MANUFACTURING USING MICROSOFT DYNAMICS AX 2012 SCOTT HAMILTON Contents Preface xi Chapter 1 Introduction 1 1.1 Suggestions

More information

INVENTORY MANAGEMENT: ANALYZING INVENTORY TO MAXIMIZE PROFITABILITY

INVENTORY MANAGEMENT: ANALYZING INVENTORY TO MAXIMIZE PROFITABILITY INVENTORY MANAGEMENT: ANALYZING INVENTORY TO MAXIMIZE PROFITABILITY Jon Schreibfeder Effective Inventory Management, Inc. Sponsored by Every company strives to improve profitability. Countless hours are

More information

Engineering Change Order

Engineering Change Order Engineering Change Order Copyright Chapter 1 - Copyright 2002-2003 Horizons International, Inc. All rights reserved. Information in this document is subject to change without notice. The software described

More information

How to Use the Cash Flow Template

How to Use the Cash Flow Template How to Use the Cash Flow Template When you fill in your cash flow you are trying to predict the timing of cash in and out of your bank account to show the affect and timing for each transaction when it

More information

Business Challenges. Customer retention and new customer acquisition (customer relationship management)

Business Challenges. Customer retention and new customer acquisition (customer relationship management) Align and Optimize Workflows with Lean Dan Marino Marino Associates, LLC Strategic and tactical planning Information systems integration Customer retention and new customer acquisition (customer relationship

More information

MANAGEMENT ISSUES-MRP

MANAGEMENT ISSUES-MRP MANAGEMENT ISSUES-MRP MRP is a confusing term because it has two definitions, materials requirements planning and manufacturing resource planning. The first of these is the original meaning, used in the

More information

Functional Area Systems Production / Operation Systems

Functional Area Systems Production / Operation Systems ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 2 ACS-1803 Introduction to Information Systems Examples:

More information

26/10/2015. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems

26/10/2015. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 2 ACS-1803 Introduction to Information Systems Examples:

More information

CHAPTER 3: PRODUCTION BILL OF MATERIALS

CHAPTER 3: PRODUCTION BILL OF MATERIALS Chapter 3: Production Bill of Materials CHAPTER 3: PRODUCTION BILL OF MATERIALS Objectives The objectives are: Production Bill of Materials (BOM) Production BOM Advanced Features Production BOM Reports

More information

INDEPENDENT STUDY PAILIN UDOMSANTI

INDEPENDENT STUDY PAILIN UDOMSANTI 1 INDEPENDENT STUDY ERP Comparison : Production Planning and Control Module PAILIN UDOMSANTI An Independent Study submitted in Partial Fulfillment of the requirements For the Degree of Master of Engineering

More information

Three Steps to Improving Your Bottom Line with Better Inventory Management and Control

Three Steps to Improving Your Bottom Line with Better Inventory Management and Control Three Steps to Improving Your Bottom Line with Better Inventory Management and Control By Mario Nowogrodzki, CPA.CITP Principal, Mendelson Consulting, Inc. Sponsored by: Are you carrying more inventory

More information

Demand forecasting & Aggregate planning in a Supply chain. Session Speaker Prof.P.S.Satish

Demand forecasting & Aggregate planning in a Supply chain. Session Speaker Prof.P.S.Satish Demand forecasting & Aggregate planning in a Supply chain Session Speaker Prof.P.S.Satish 1 Introduction PEMP-EMM2506 Forecasting provides an estimate of future demand Factors that influence demand and

More information

Manufacturing Planning and Control for Supp Chain Management

Manufacturing Planning and Control for Supp Chain Management Manufacturing Planning and Control for Supp Chain Management Sixth Edition F. Robert Jacobs Indiana University William L. Berry The Ohio State University (Emeritus) D. Clay Whybark University of North

More information

MASTER PRODUCTION SCHEDULE

MASTER PRODUCTION SCHEDULE 6 MASTER PRODUCTION SCHEDULE MGT2405, University of Toronto, Denny Hong-Mo Yeh So far, in discussing material requirement planning (MRP), we have assumed that master production schedule (MPS) is ready

More information

Aspen Collaborative Demand Manager

Aspen Collaborative Demand Manager A world-class enterprise solution for forecasting market demand Aspen Collaborative Demand Manager combines historical and real-time data to generate the most accurate forecasts and manage these forecasts

More information

Best Practices in Inventory Management Systems. Best Practices in Inventory Management Systems

Best Practices in Inventory Management Systems. Best Practices in Inventory Management Systems Best Practices in Inventory Management Systems 1 Disclaimer The information contained within this whitepaper is the opinion of the author and in no way represents the opinion of The Rand Group, LLC. The

More information

Course 2: Financial Planning and Forecasting

Course 2: Financial Planning and Forecasting Excellence in Financial Management Course 2: Financial Planning and Forecasting Prepared by: Matt H. Evans, CPA, CMA, CFM This course provides a basic understanding of how to prepare a financial plan (budgeted

More information

Demand Forecasting When a product is produced for a market, the demand occurs in the future. The production planning cannot be accomplished unless

Demand Forecasting When a product is produced for a market, the demand occurs in the future. The production planning cannot be accomplished unless Demand Forecasting When a product is produced for a market, the demand occurs in the future. The production planning cannot be accomplished unless the volume of the demand known. The success of the business

More information

forecast modeling Statistical Calculations, Replacement Items, and Forecast Templates for Demand Planning Industries Required Modules:

forecast modeling Statistical Calculations, Replacement Items, and Forecast Templates for Demand Planning Industries Required Modules: Industries Manufacturing Wholesale Distribution Required Modules: Inventory Management (Sage) Material Requirements Planning or Inventory Replenishment (Sage) Sales Forecasting & MPS (E2B) Integrated Modules:

More information

Microsoft Axapta Inventory Closing White Paper

Microsoft Axapta Inventory Closing White Paper Microsoft Axapta Inventory Closing White Paper Microsoft Axapta 3.0 and Service Packs Version: Second edition Published: May, 2005 CONFIDENTIAL DRAFT INTERNAL USE ONLY Contents Introduction...1 Inventory

More information

TABLE OF CONTENTS ABSTRACT ACKNOWLEDGEMENT LIST OF FIGURES LIST OF TABLES

TABLE OF CONTENTS ABSTRACT ACKNOWLEDGEMENT LIST OF FIGURES LIST OF TABLES TABLE OF CONTENTS ABSTRACT ACKNOWLEDGEMENT LIST OF FIGURES LIST OF TABLES ii iii x xiv CHAPTER 1: INTRODUCTION 1 1.0 Background 1 1.1 Research Motivation 4 1.2 Research Objectives 5 1.3 Project Scope 6

More information

Features: NEW!! EIM Version 3 Spreadsheets!

Features: NEW!! EIM Version 3 Spreadsheets! NEW!! EIM Version 3 Spreadsheets! An exciting new tool has just been released by EIM, Inc. that implements the principles of effective inventory management! The Version 3 Spreadsheets feature our newly

More information

Warehouse Management in

Warehouse Management in Warehouse Management in Microsoft Dynamics NAV 2013 Technical White Paper Warehouse Management... 1 Warehouse Overview... 2 Basic or Advanced Warehousing... 3 Warehouse Setup... 4 Bin and Bin Content...

More information

Item Master and Bill of Material

Item Master and Bill of Material 4 Item Master and Bill of Material MGT2405, University of Toronto, Denny Hong Mo Yeh The enterprise resource planning (ERP) system plans and controls all resources in an enterprise. Material requirement

More information

DEVELOPMENT OF LOW COST MRP SOFTWARE FOR A MANUFACTURING,

DEVELOPMENT OF LOW COST MRP SOFTWARE FOR A MANUFACTURING, KOLEJ UNIVERSITI TEKNIKAL KEBANGSAAN MALAYSIA DEVELOPMENT OF LOW COST MRP SOFTWARE FOR A MANUFACTURING, PROCESS Thesis submitted in accordance with the partial requirements of the Kolej Universiti Teknikal

More information

SAP Business One Integration with Radley icaras EDI. Mascidon, LLC March, 2011 Dr. Don Maes 248-568-0418

SAP Business One Integration with Radley icaras EDI. Mascidon, LLC March, 2011 Dr. Don Maes 248-568-0418 SAP Business One Integration with Radley icaras EDI Mascidon, LLC March, 2011 Dr. Don Maes 248-568-0418 Table of Contents SAP B1 Integration to icaras... 4 Figure 1.1 SAP Integration Points... 4 Figure

More information

Inventory Decision-Making

Inventory Decision-Making Management Accounting 195 Inventory Decision-Making To be successful, most businesses other than service businesses are required to carry inventory. In these businesses, good management of inventory is

More information

idelpi Software Quick Install and Basic Configuration Guide

idelpi Software Quick Install and Basic Configuration Guide idelpi Software Quick Install and Basic Configuration Guide (Trial version) This documentation helps you in installing the trial version of idelpi construction software on your computer. Prerequisites

More information

Utilizing KolibriMFG Software System to Schedule and Control Shop Floor

Utilizing KolibriMFG Software System to Schedule and Control Shop Floor Utilizing KolibriMFG Software System to Schedule and Control Shop Floor Lajos Kiss Patternium AC., www.patternium.hu, [email protected] Abstract: Manufacturing software modules are essential part of any large

More information

Manufacturing & Production Control Software

Manufacturing & Production Control Software Manufacturing & Production Control Software Cadlay MRP is an application developed through years of experience in the manufacturing and production industry. The extensive functionality has been designed

More information

Spreadsheet simulation for industrial application: a case study

Spreadsheet simulation for industrial application: a case study Spreadsheet simulation for industrial application: a case study Wan Hasrulnizzam Wan Mahmood a,b,1 a Faculty of Manufacturing Engineering, Universiti Teknikal Malaysia Melaka, Locked Bag 1752, Durian Tunggal

More information

Table of Contents. Bibliografische Informationen http://d-nb.info/98771483x. digitalisiert durch

Table of Contents. Bibliografische Informationen http://d-nb.info/98771483x. digitalisiert durch 1 What is Microsoft Dynamics AX? 1 1.1 Axapta and the History of Dynamics AX 1 1.2 Dynamics AX 2009 Product Overview 2 1.3 Technology and System Architecture 4 1.4 Application Components 8 2 Getting Started:

More information

Areté Inc. Avail Fact Sheet. Production Scheduling. Syrup Scheduling. Raw Material Scheduling

Areté Inc. Avail Fact Sheet. Production Scheduling. Syrup Scheduling. Raw Material Scheduling Areté Inc. Avail Fact Sheet Avail is an integrated suite of Supply Chain planning tools created to work within the beverage industry. Avail is the latest in a long line of proven Areté products that have

More information

FORECASTING. Operations Management

FORECASTING. Operations Management 2013 FORECASTING Brad Fink CIT 492 Operations Management Executive Summary Woodlawn hospital needs to forecast type A blood so there is no shortage for the week of 12 October, to correctly forecast, a

More information

Chapter 6. Inventory Control Models

Chapter 6. Inventory Control Models Chapter 6 Inventory Control Models Learning Objectives After completing this chapter, students will be able to: 1. Understand the importance of inventory control and ABC analysis. 2. Use the economic order

More information

INVENTORY MANAGEMENT. 1. Raw Materials (including component parts) 2. Work-In-Process 3. Maintenance/Repair/Operating Supply (MRO) 4.

INVENTORY MANAGEMENT. 1. Raw Materials (including component parts) 2. Work-In-Process 3. Maintenance/Repair/Operating Supply (MRO) 4. INVENTORY MANAGEMENT Inventory is a stock of materials and products used to facilitate production or to satisfy customer demand. Types of inventory include: 1. Raw Materials (including component parts)

More information

Linear Programming Supplement E

Linear Programming Supplement E Linear Programming Supplement E Linear Programming Linear programming: A technique that is useful for allocating scarce resources among competing demands. Objective function: An expression in linear programming

More information

Functional Area Systems Lecture 5

Functional Area Systems Lecture 5 ACS-1803 Introduction to Information Systems Instructor: David Tenjo Functional Area Systems Lecture 5 1 1. ACCOUNTING TRANSACTION SYSTEMS 2 1 Business Transaction Cycles 3 Business Transaction Cycles

More information

Accounting for inventory. www.brightpearl.com

Accounting for inventory. www.brightpearl.com Accounting for inventory Whats inside Accounting for your inventory is as important as accounting for your sales. Every product you have on the shelf has a cost value, and the total cost of goods is likely

More information

IT-375 using the 6 th Edition PRODUCTION AND INVENTORY CONTROL CHAPTER 1: INTRODUCTION TO MATERIALS MANAGEMENT

IT-375 using the 6 th Edition PRODUCTION AND INVENTORY CONTROL CHAPTER 1: INTRODUCTION TO MATERIALS MANAGEMENT IT-375 using the 6 th Edition PRODUCTION AND INVENTORY CONTROL CHAPTER 1: INTRODUCTION TO MATERIALS MANAGEMENT What is wealth? GDP = production = profits What is the source of wealth? The conversion process

More information

The Basics of ERP Selection

The Basics of ERP Selection The Basics of ERP Selection Introduction This document is intended for people with limited or no ERP experience and for small to medium sized businesses. If you are starting out on your first ERP journey

More information

Sage 200 Manufacturing Datasheet

Sage 200 Manufacturing Datasheet Sage 200 Manufacturing Datasheet Sage 200 Manufacturing is a powerful manufacturing solution that enables you to manage your entire supply chain in detail, end to end, giving you the information needed

More information

Manufacturing. Manufacturing challenges of today and how. Navision Axapta solves them- In the current explosive economy, many

Manufacturing. Manufacturing challenges of today and how. Navision Axapta solves them- In the current explosive economy, many Manufacturing challenges of today and how Navision Axapta solves them- the solution for change; controlled by you. Manufacturing In the current explosive economy, many manufacturers are struggling to keep

More information

Module 2: Preparing for Capital Venture Financing Financial Forecasting Methods TABLE OF CONTENTS

Module 2: Preparing for Capital Venture Financing Financial Forecasting Methods TABLE OF CONTENTS Module 2: Preparing for Capital Venture Financing Financial Forecasting Methods Module 2: Preparing for Capital Venture Financing Financial Forecasting Methods 1.0 FINANCIAL FORECASTING METHODS 1.01 Introduction

More information

Inventory Control Models

Inventory Control Models Chapter 12 Inventory Control Models Learning Objectives After completing this chapter, students will be able to: 1. Understand the importance of inventory control. 2. Use inventory control models to determine

More information

UNIT AUTHOR: Elizabeth Hume, Colonial Heights High School, Colonial Heights City Schools

UNIT AUTHOR: Elizabeth Hume, Colonial Heights High School, Colonial Heights City Schools Money & Finance I. UNIT OVERVIEW & PURPOSE: The purpose of this unit is for students to learn how savings accounts, annuities, loans, and credit cards work. All students need a basic understanding of how

More information

WINNING STRATEGIES FOR THE DISTRIBUTION INDUSTRY. Effective Inventory Analysis By Jon Schreibfeder. >> Compliments of Microsoft Business Solutions

WINNING STRATEGIES FOR THE DISTRIBUTION INDUSTRY. Effective Inventory Analysis By Jon Schreibfeder. >> Compliments of Microsoft Business Solutions WINNING STRATEGIES FOR THE DISTRIBUTION INDUSTRY Effective Inventory Analysis By Jon Schreibfeder >> Compliments of Microsoft Business Solutions Contents 2 Effective Inventory Analysis 2 Customer Service

More information

AN OVERVIEW OF SYSTEMS ANALYSIS: SYSTEMS ANALYSIS AND THE ROLE OF THE SYSTEMS ANALYST. Lecture 1. 21.10.2014, Tuesday

AN OVERVIEW OF SYSTEMS ANALYSIS: SYSTEMS ANALYSIS AND THE ROLE OF THE SYSTEMS ANALYST. Lecture 1. 21.10.2014, Tuesday AN OVERVIEW OF SYSTEMS ANALYSIS: SYSTEMS ANALYSIS AND THE ROLE OF THE SYSTEMS ANALYST Lecture 1 21.10.2014, Tuesday 2 A Series of Lectures 1.The Role of the Systems 2.Project Planning and Project Management

More information

NETWORK BUSINESS SYSTEMS SOFTWARE SYSTEM DOCUMENTATION MANUFACTURING SYSTEM FEATURES

NETWORK BUSINESS SYSTEMS SOFTWARE SYSTEM DOCUMENTATION MANUFACTURING SYSTEM FEATURES NETWORK BUSINESS SYSTEMS SOFTWARE SYSTEM DOCUMENTATION MANUFACTURING SYSTEM FEATURES WORK ORDERS Standard Mfg. vs. Full Mfg./MRP Manufacturing Target date, open date, closed date You can make and buy the

More information

Distribution Training Guide. D100 Inventory Management: Basic

Distribution Training Guide. D100 Inventory Management: Basic Distribution Training Guide D100 Inventory Management: Basic Certification Course Prerequisites The course consists of a hands- on guide that will walk you through the specifics of Acumatica s Inventory

More information

A Decision-Support System for New Product Sales Forecasting

A Decision-Support System for New Product Sales Forecasting A Decision-Support System for New Product Sales Forecasting Ching-Chin Chern, Ka Ieng Ao Ieong, Ling-Ling Wu, and Ling-Chieh Kung Department of Information Management, NTU, Taipei, Taiwan [email protected],

More information

Sales. PowerERP e Business Solutions. RMA and Customer Returns. Order Entry. Contact Management. Estimating and Quoting. Sales Commissions.

Sales. PowerERP e Business Solutions. RMA and Customer Returns. Order Entry. Contact Management. Estimating and Quoting. Sales Commissions. Overview Off the shelf accounting programs like QuickBooks & Peachtree dominate very small businesses, but as those businesses get larger, these accounting programsʹ capacities and features can be stretched

More information

Microsoft Dynamics NAV. Prepayments. White Paper. Date: May 2011

Microsoft Dynamics NAV. Prepayments. White Paper. Date: May 2011 Microsoft Dynamics NAV Prepayments White Paper Date: May 2011 2 Contents SUMMARY... 4 PREPAYMENTS BASIC FUNCTIONALITY... 5 PREPAYMENTS WORKFLOW...5 SETUP FOR PREPAYMENTS...6 SETUP OF G/L ACCOUNTS FOR PREPAYMENTS...6

More information

A DECISION SUPPORT SYSTEM FOR CAPACITY MANAGEMENT. A Senior Project. presented to

A DECISION SUPPORT SYSTEM FOR CAPACITY MANAGEMENT. A Senior Project. presented to A DECISION SUPPORT SYSTEM FOR CAPACITY MANAGEMENT A Senior Project presented to the Faculty of the Industrial and Manufacturing Engineering Department California Polytechnic State University, San Luis

More information

Manufacturing Planning and Control for Supply Chain Management

Manufacturing Planning and Control for Supply Chain Management Manufacturing Planning and Control for Supply Chain Management APICS/CPIM Certification Edition F. Robert Jacobs Indiana University William L. Berry The Ohio State University (Emeritus) D.ClayWhybark University

More information

{The High Cost} of Legacy ERP Systems. plantemoran.com

{The High Cost} of Legacy ERP Systems. plantemoran.com {The High Cost} of Legacy ERP Systems plantemoran.com Many organizations have come to realize that while ERP software doesn t appear to generate direct revenue, it can significantly impact financial performance.

More information

Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8)

Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8) Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8) Pathway: (Unit 8) PAGE 1 OF 17 Unit 8: Pathway 1. Assist to purchase materials

More information

26/10/2015. Enterprise Information Systems. Learning Objectives. System Category Enterprise Systems. ACS-1803 Introduction to Information Systems

26/10/2015. Enterprise Information Systems. Learning Objectives. System Category Enterprise Systems. ACS-1803 Introduction to Information Systems ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Enterprise Information Systems Lecture Outline 6 ACS-1803 Introduction to Information Systems Learning Objectives 1. Explain how

More information

Operations Management

Operations Management 13-1 MRP and ERP Operations Management William J. Stevenson 8 th edition 13-2 MRP and ERP CHAPTER 13 MRP and ERP McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright

More information

Streamlining Your Manufacturing Supply Chain Using 5 Key Principles & Lean Tools

Streamlining Your Manufacturing Supply Chain Using 5 Key Principles & Lean Tools Streamlining Your Manufacturing Supply Chain Using 5 Key Principles & Lean Tools Mitch Millstein, CFPIM, C.P.M., CQM, CQE Supply Velocity, Inc. [email protected] (314) 406-4962 October 2011 [email protected]

More information

CHOICES The magazine of food, farm, and resource issues

CHOICES The magazine of food, farm, and resource issues CHOICES The magazine of food, farm, and resource issues 4th Quarter 2005 20(4) A publication of the American Agricultural Economics Association Logistics, Inventory Control, and Supply Chain Management

More information

ACS-1803 Introduction to Information Systems. Enterprise Information Systems. Lecture Outline 6

ACS-1803 Introduction to Information Systems. Enterprise Information Systems. Lecture Outline 6 ACS-1803 Introduction to Information Systems Instructor: David Tenjo Enterprise Information Systems Lecture Outline 6 1 Learning Objectives 1. Explain how organizations support business activities by using

More information

The Total Cost of ERP Ownership

The Total Cost of ERP Ownership Manufacturing October 2, 2006 Key Facts Total Cost of Ownership (TCO) has long been recognized as a significant factor in ERP strategies and decisions. Yet while both end users and ERP solution providers

More information

How to Configure and Use MRP

How to Configure and Use MRP SAP Business One How-To Guide PUBLIC How to Configure and Use MRP Applicable Release: SAP Business One 8.8 All Countries English October 2009 Table of Contents Purpose... 3 The MRP Process in SAP Business

More information

Microsoft Dynamics AX 2012 Licensing Guide. August 2011 Customer Edition

Microsoft Dynamics AX 2012 Licensing Guide. August 2011 Customer Edition Microsoft Dynamics AX 2012 Licensing Guide August 2011 Customer Edition Using This Guide Use this guide to improve your understanding of how to license Microsoft Dynamics AX 2012. It is not intended to

More information

Defining the Scope of a Project

Defining the Scope of a Project The PROJECT PERFECT White Paper Collection Defining the Scope of a Project Neville Turbit Scope v Time & Cost When people talk about scope, they immediately think time and cost. Time and cost are outputs

More information

BI4Dynamics provides rich business intelligence capabilities to companies of all sizes and industries. From the first day on you can analyse your

BI4Dynamics provides rich business intelligence capabilities to companies of all sizes and industries. From the first day on you can analyse your BI4Dynamics provides rich business intelligence capabilities to companies of all sizes and industries. From the first day on you can analyse your data quickly, accurately and make informed decisions. Spending

More information

The Dynamic Small Business Manager Copyright, 2006, Frank Vickers, All rights reserved. ISBN 978-1-4116-5284-2

The Dynamic Small Business Manager Copyright, 2006, Frank Vickers, All rights reserved. ISBN 978-1-4116-5284-2 The Copyright, 2006, Frank Vickers, All rights reserved. ISBN 978-1-4116-5284-2 Page i Table of Contents Table of Contents... ii About this book... ix Why this book?... x Benefits of this book... xi IMPORTANT

More information

Using simulation to calculate the NPV of a project

Using simulation to calculate the NPV of a project Using simulation to calculate the NPV of a project Marius Holtan Onward Inc. 5/31/2002 Monte Carlo simulation is fast becoming the technology of choice for evaluating and analyzing assets, be it pure financial

More information

Demand Forecast. Actual Orders. Order Forecast Collaboration: Benefits for the Entire Demand Chain. Integrating people, process and IT.

Demand Forecast. Actual Orders. Order Forecast Collaboration: Benefits for the Entire Demand Chain. Integrating people, process and IT. Forecast Collaboration: Benefits for the Entire Demand Chain In the recent past, suppliers and retailers often viewed themselves as adversaries. Retailers would order what they wanted a lead time prior

More information

Implementing a Purchase Order System

Implementing a Purchase Order System 10 Maintaining the Inventory System Implementing a Purchase Order System Introduction The following section explains why and how to use purchase orders in your business. This topic assumes that you are

More information

Selecting an ERP Software Package For Small and Midsize Manufacturers

Selecting an ERP Software Package For Small and Midsize Manufacturers Selecting an ERP Software Package For Small and Midsize Manufacturers Choosing the right ERP software package for your company can be a daunting task. The ERP software as well as its vendor can make the

More information

Inventory Management IV: Inventory Management Systems

Inventory Management IV: Inventory Management Systems Inventory Management IV: Inventory Management Systems This module discusses periodic vs. perpetual systems, inventory position, quantity to order, time between orders, target inventory, lead times, reorder

More information

Anytime 500 Forecast Modeling

Anytime 500 Forecast Modeling Page Industries Manufacturing Wholesale Distribution Required Modules Inventory Management (Sage) Material Requirements Planning or Inventory Replenishment (Sage) Sales Forecasting & MPS (e2b) Integrated

More information