1 Rob Barton EPRI CEM User Group Conference May 8, 2013
2 Unique Reporting Challenges Compilation of various reporting requirements Electronic submittal of most data/records Adapting existing tools to new types of data Reporting Elements Emissions Data Initial/Ongoing QA Test Results Compliance Reports Other (Notifications/Monitoring Plan) Still Significant Uncertainty in Reporting Requirements
3 Emissions Collection and Monitoring Plan System Client Tool (ECMPS) Acid Rain Program/Clean Air Interstate Rule Electronic Reporting Tool (ERT) MATS Information Collection Request (ICR) Compliance and Emissions Data Reporting Interface (CEDRI) Legacy system accessed through EPA Central Data Exchange (CDX) website (cdx.epa.gov) None of these Tools Fully Support MATS at this Time
4 Compliance Based on 30-Boiler Operating Day (BOD) Rolling Averages BOD = any fuel combusted in any 24-hour period Calculated at the end of each BOD Based on all available quality assured hourly data No Missing Data Substitution No Bias Adjustment Factors Exclude Startup/Shutdown Periods Quarterly Data Reporting
5 PM CEMS/CPMS 30-BOD averages only Submit all PM data through CEDRI Electronic form/template for data submittal Deadline - 60 days after the end of the quarter All other CEMS/Hg Sorbent Trap Systems Hourly data only Submit data using ECMPS Deadline - 30 days after the end of the quarter Submittal Process/Deadlines for Initial Compliance Data is Unclear
6 Initial Certification/Ongoing QA Activities All Data Submitted Using CEDRI Deadline - 60 days after completion of each test Daily Calibration Records Standardized form? All Other QA Data Emissions Reporting Tool (ERT)/CEDRI ERT does not currently support PS-11 or Procedure 2 Likely a Time Consuming Process PM CPMS Quality Assurance Data/Records are Retained Onsite
7 Initial Certification/Ongoing QA Activities All Data Submitted Using ECMPS Deadline Prior to/concurrent with quarterly report SO 2 /CO 2 /O 2 /Flow Data Already Submitted* HCl/HF/Hg CEMS/Sorbent Trap Systems New/modified ECMPS records RATA Data Submitted Using ERT/CEDRI Deadline 60 days after completion of testing Method 30B not supported by ERT
8 ECMPS/CEDRI/ERT Do Not Fully Support MATS Work in progress ECMPS Draft (4/2013) DAHS vendors need time to implement changes PM CEMS Issues Conditionally valid data procedures Diluent cap Startup Data Exclusion SUSD definition not tied to control device operation
9 Quarterly Stack Testing for HCl/HF/PM/TSM Submit using ERT/CEDRI Reference Methods 5, 26, 26A and 29 are supported ERT-compatible templates for raw data Unit/control device operating data Deadline - 60 days after completion of testing
10 HCl/HF/PM/TSM Same procedures as quarterly testing Notification of Compliance Status Dates of last 3 tests, results, no changes in operation Hg (annual) Reporting requirements are unclear Summary included in ECMPS monitoring plan records Detailed test results submitted through CEDRI ERT does not support Method 30B
11 Semi-Annual Compliance Report CEMS Summary Report Tune Up Report
12 Contents CEMS Summary Report Total fuel use per calendar month Description of fuels/justification as non-waste Dates of most recent tune-up/burner inspection Description of excess emissions Breakdown of malfunction periods Statements of compliance with work practice standards or emissions limitations Report Submitted through CEDRI
13 Initial Reporting Period Begins on compliance date and ends June 30 or December 31 (whichever first occurs after 180 days) Existing units: April 16, 2015* December 31, 2015 (due January 31, 2016) Ongoing Reporting Period January 1 June 30 (due July 31) July 1 December 31 (due January 31) Title V Report Could Satisfy Requirements
14 Contents General unit/cems information Date of latest CEMS certification or audit Total operating time Breakdown of excess emissions Breakdown of monitor downtime Changes in CEMS, process, or controls Much of the Content is Redundant Submit with Semi-Annual Compliance Report
15 Contents CO/NO x concentrations before and after tune-up Correction action taken as part of tune-up Types and amounts of fuel used over the 12 calendar months prior to tune-up (multi-fuel units only) Information necessary to demonstrate that all tuneup activities were conducted Submittal Requirements Date of initial/next scheduled tune-up Notification of Compliance Status/Semi-Annual Report Submittal of tune-up report is unclear
16 Site-Specific Monitoring Plan Differences in Part 63/Part 75 terminology Part 60/75 CEMS Exempt Submit 60 days prior to certification (if requested) Submit within 21 days of compliance date for Hg CEMS/sorbent trap and HCl/HF CEMS using ECMPS Existing units - March 26, 2015 Notifications Compliance status, performance tests, QA tests Deadlines may conflict with Title V requirements
17 MATS Reporting is a Work in Progress Reporting tool updates PM data requirements Inconsistencies on other requirements Timely Guidance Needed to Implement Solutions for Vendors/Utilities Other Issues Likely to Be Identified Further Rule Revisions? MATS Policy Manual?
18
Guidance and Reporting Instructions on Temporary E-reporting for the MATS Rule
Guidance and Reporting Instructions on Temporary E-reporting for the MATS Rule As explained in the interim MATS e-reporting rule, which was signed by the Administrator on March 9, 2015, the EPA plans to
Quality Assurance Program Quality Assurance Plan Periodic Audits Standard Operating Procedures Preventive Maintenance Outline Quality Assurance Plan (QAP) What is a QAP Why is a QAP required? What does
INDUSTRIAL BOILER MACT FACTSHEET
INDUSTRIAL BOILER MACT FACTSHEET The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Industrial/Commercial/Institutional Boilers and Process Heaters (40 CFR Part 63, Subpart DDDDD),
Continuous Emission Monitoring Guide
Continuous Emission Monitoring Guide Course No: C08-015 Credit: 8 PDH Harlan H. Bengtson, PhD, P.E. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800
By Robert Bivens. RMB Consulting & Research, Inc. Raleigh, NC www.rmb-consulting.com (919) 791-3133 @RMBConsulting
CEMS Certification and Compliance Testing Lessons Learned on Turbines By Robert Bivens RMB Consulting & Research, Inc. Raleigh, NC www.rmb-consulting.com (919) 791-3133 @RMBConsulting Background While
Texas Commission on Environmental Quality Page 1 Chapter 117 - Control of Air Pollution from Nitrogen Compounds
Texas Commission on Environmental Quality Page 1 SUBCHAPTER G: GENERAL MONITORING AND TESTING REQUIREMENTS DIVISION 1: COMPLIANCE STACK TESTING AND REPORT REQUIREMENTS 117.8000, 117.8010 Effective June
Continuous Monitoring Manual
January, 1992 Revisions: April, 2015 Operations Division 811 SW 6 th Avenue Portland, OR 97204 Phone: 503-229-5696 800-452-4011 Fax: 503-229-5850 Contact: Jill Inahara www.oregon.gov/deq DEQ is a leader
PROCEDURE 1. QUALITY ASSURANCE REQUIREMENTS FOR GAS CONTINUOUS EMISSION MONITORING SYSTEMS USED FOR COMPLIANCE DETERMINATION
While we have taken steps to ensure the accuracy of this Internet version of the document, it is not the official version. Please refer to the official version in the FR publication, which appears on the
Keywords: PEMS, CEMS, turbine
SYMPOSIUM OF THE INDUSTRIAL APPLICATION OF GAS TURBINES COMMITTEE BANFF, ALBERTA, CANADA OCTOBER 2015 CERTIFICATION OF A STATISTICAL HYBRID PREDICTIVE EMISSION MONITORING SYSTEM IN THE U.S.A. AND DEVELOPMENT
Part 75 Emissions Monitoring Policy Manual. U.S. Environmental Protection Agency Clean Air Markets Division Washington, D.C.
Part 75 Emissions Monitoring Policy Manual U.S. Environmental Protection Agency Clean Air Markets Division Washington, D.C. 2013 TABLE OF CONTENTS Page Introduction... iii Section 1 -- General... 1-i Section
Chapter 2 Compliance Branch CEMS Guidance Manual Table of Contents. Applicability... 1.0
Chapter 2 Compliance Branch CEMS Guidance Manual Table of Contents Page No. Applicability... 1.0 1.0 Continuous Emissions Monitor Operating Principles... 3.0 1.1 Introduction... 3.0 1.2 Definitions...
Emission monitoring, reporting, and verification (MRV) for U.S. cap and trade programs. Jeremy Schreifels US EPA
Emission monitoring, reporting, and verification (MRV) for U.S. cap and trade programs Jeremy Schreifels US EPA Principles of MRV for cap and trade programs Cap & trade requires a complete record of total
Continuous Emissions Monitoring - Program 77
Program Description Program Overview Coal-fired power plants are in increased need of robust, accurate, and certifiable continuous emissions monitors (CEMs) for mercury, particulate matter (PM), acid gases,
SMALL ENTITY COMPLIANCE GUIDE FOR MAJOR SOURCE BOILERS AND PROCESS HEATERS
SMALL ENTITY COMPLIANCE GUIDE F MAJ SOURCE BOILERS AND PROCESS HEATERS National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and
SLMA Meeting. Boiler MACT and Related Rules. Atlanta, GA March 2, 2011. Martin Rollins, P. E. H. M. Rollins Company, Inc. Gulfport, Mississippi
SLMA Meeting Atlanta, GA March 2, 2011 Boiler MACT and Related Rules Martin Rollins, P. E. H. M. Rollins Company, Inc. Gulfport, Mississippi Boiler MACT and Related Rules EPA Had Requested 15 Month Delay
U.S. EPA Part 75 Emissions Monitoring Policy Manual and Updates Copy can be downloaded at: http://www.epa.gov/airmarkets/emissions/monitoring.
ECMPS Emissions Collection and Monitoring Plan System CEMTEK Environmental 2012 ECMPS is the electronic reporting system through which Part 75 affected facilities report monitoring plan records, QA/Certification
Comparative Cap and Trade Programs: U.S. SO 2 and NO x, EU CO 2
Comparative Cap and Trade Programs: U.S. SO 2 and NO x, EU CO 2 Joe Kruger Resources for the Future RGGI Stakeholder Meeting April 2, 2004 Overview of Presentation Introduction to Cap and Trade Overview
Site Identification No.: 197809AAO Application No.: 15030051
Project Summary for a Construction Permit Application from Midwest Generation for a Natural Gas Conversion Project for the Joliet Electric Generating Station Joliet, Illinois Site Identification No.: 197809AAO
Technical Support Document for the Soda Ash Manufacturing Sector: Proposed Rule for Mandatory Reporting of Greenhouse Gases
Technical Support Document for the Soda Ash Manufacturing Sector: Proposed Rule for Mandatory Reporting of Greenhouse Gases Office of Air and Radiation U.S. Environmental Protection Agency January 22,
Electronic Reporting to BTS
Electronic Reporting to BTS EPA s Electronic Reporting Tool (ERT) Software to Standardize Source Test Planning, Reporting and Assessment. http://www.epa.gov/ttnchie1/ert/ Enhancements made to improve and
Environmental Compliance using CEMS
Environmental Compliance using CEMS ERM s Exton Office March 13, 2012 Joel Millard Environmental Regulatory Specialist.1 Overview CEMS Why install a CEMS Common Analyzer Types MATS Compliance using CEMS
IVISIONS STEAM PLANT DIVISIONS TOTAL TURNKEY SOLUTIONS. INDUSTRIAL BOILER & MECHANICAL
IVISIONS INDUSTRIAL BOILER & MECHANICAL STEAM PLANT DIVISIONS TOTAL TURNKEY SOLUTIONS. FIELD SERVICE & REPAIR DIVISION Rely on IB&M's field service experts for your steam plant. Our Field Service & Repair
GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF
GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF REGULATION O.Reg. 127/01 Ontario Ministry of the Environment
GUIDELINES FOR SOURCE TESTING
GUIDELINES FOR SOURCE TESTING Created August 12, 2011 Revised October 03, 2013 Source Testing Guidelines Rev. 2 TABLE OF CONTENTS 1.0 INTRODUCTION...6 1.1 Purpose...6 1.2 Application...6 1.3 Revisions...6
ATTACHMENT B California Energy Commission Air Quality Self-Certification Checklist for Simple-Cycle Gas Turbine Generation Units
ATTACHMENT B California Energy Commission Air Quality Self-Certification Checklist for Simple-Cycle Gas Turbine Generation Units License Application for: [ X ] New Emissions Unit(s) at a New Stationary
Energy Efficient Operations and Maintenance Strategies for Boilers
Energy Efficient Operations and Maintenance Strategies for Boilers Large, complex and widely used, industrial boilers are major consumers of fuel. Proper operations and maintenance (O&M) procedures must
Fuel Burning Equipment. Maximum Firing Rate (gal/hr)
A-806-71-B-A ) Amendment #1 After review of the air emissions license amendment application, staff investigation reports and other documents in the applicant s file in the Bureau of Air Quality, pursuant
MATHESON STACK EMISSION CALIBRATION PROGRAM. Experience the MATHESON Commitment to Supply Chain Excellence
MATHESON STACK EMISSION CALIBRATION PROGRAM MATHESON STACK EMISSION CALIBRATION PROGRAM MATHESON is a single source for industrial, medical, specialty, and electronics gases as well as gas handling equipment,
Employing a Data Acquisition Handling System (DAHS) for New Source Performance Standards (NSPS) Ja Rule Reporting of Petroleum Refinery Emissions
Technical Paper BR-1923 Employing a Data Acquisition Handling System (DAHS) for New Source Performance Standards (NSPS) Ja Rule Reporting of Petroleum Refinery Emissions Authors: D.C. Pretty Babcock &
Air Quality PERMIT TO CONSTRUCT
Air Quality PERMIT TO CONSTRUCT Permittee Chobani Idaho, Inc. Permit Number P-2012.0003 Project ID 60981 Facility ID 083-00138 Facility Location Permit Authority 3450 Kimberly Road East Twin Falls, ID
NetDAHS Edge Software A proactive and centralized control hub for air compliance reporting
NetDAHS Edge Software A proactive and centralized control hub for air compliance reporting Babcock & Wilcox Power Generation Group, Inc. (B&W PGG), the exclusive provider of KVB-Enertec emissions products
Resolution of Natural Gas and Pipeline Natural Gas Definition Issues
Resolution of Natural Gas and Pipeline Natural Gas Definition Issues Question: Answer: The definition of natural gas in 72.2 of the May 26, 1999 revisions to 40 CFR Parts 72 and 75 states that in order
Title V Compliance Verification Process
em case study by Sara King and Jeffrey Meyers Development and Implementation of a Title V Compliance Verification Process Sara L. King is the environmental director at the ConocoPhillips Ponca City Refinery,
QA Transactions and Reports
QA Transactions and Reports Monitoring Quality Assurance QA Transactions & Reports National Ambient Air Monitoring Conference August 2014 1 Background The QA requirements for ambient air quality monitoring
Roadmap Performance Target Best technology Capability
Sulfur Dioxide Control Technologies In Electric Power Plants CCTR Basic Facts File #5 Brian H. Bowen, Marty W. Irwin The Energy Center at Discovery Park Purdue University CCTR, Potter Center, 500 Central
INDEX 9-7-100 GENERAL
REGULATION 9 INORGANIC GASEOUS POLLUTANTS RULE 7 NITROGEN OXIDES AND CARBON MONOXIDE FROM INDUSTRIAL, INSTITUTIONAL AND COMMERCIAL BOILERS, STEAM GENERATORS AND PROCESS HEATERS INDEX 9-7-100 GENERAL 9-7-101
Common Compliance Violations. The state belongs to all of us - "Kansas Don't Spoil It"
Common Compliance Violations The state belongs to all of us - "Kansas Don't Spoil It" The importance of compliance.. Take care of the environment, avoid additional inspections, and potential fines. Kansas
1.0 What Are the Purpose and Applicability of Performance Specification 11?
While we have taken steps to ensure the accuracy of this Internet version of the document, it is not the official version. Please refer to the official version in the FR publication, which appears on the
Document Control Program
Document Control 1.0 Purpose The purpose of this procedure is to provide a system and instructions of how the Document Control program is to be conducted at Hopewell Cogeneration Facility. In this way
AIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC
AIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC Multek Flexible Circuits Inc.-Sheldahl Road East and West Buildings 1150 Sheldahl Road and 805 North Highway 3 Northfield,
COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS
COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS 310 CMR 7.00 APPENDIX B U EMISSION BANKING, TRADING AND AVERAGING 310 CMR 7.00: Appendix
Series of CEMS Guidelines
Series of CEMS Guidelines VERSION 6.0 Nov 2009 Volume I: GUIDELINE FOR THE INSTALLATION & MAINTENANCE OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) FOR INDUSTRIAL PREMISES / FACILITIES Department of
PRE-PERMIT CONSTRUCTION APPROVAL GUIDANCE DOCUMENT
PRE-PERMIT CONSTRUCTION APPROVAL GUIDANCE DOCUMENT State of Idaho Department of Environmental Quality Updated May 2012 OVERVIEW Questions regarding the 15-Day Pre-Permit Construction Approval process may
FINAL UPDATES TO REQUIREMENTS FOR STORAGE TANKS USED IN OIL AND NATURAL GAS PRODUCTION AND TRANSMISSION
EPA s Air Rules for the Oil & Natural Gas Industry FINAL UPDATES TO REQUIREMENTS FOR STORAGE TANKS USED IN OIL AND NATURAL GAS PRODUCTION AND TRANSMISSION Storage tanks are used to temporarily hold liquids
REQUEST FOR QUOTATIONS
Metropolitan Washington Airports Authority Materials Management, MA-133 Terminal A, Room 278 Washington, DC 20001-4901 REQUEST FOR QUOTATIONS 1. FOR INFORMATION CONTACT NAME: Regina Leigh 2. REQUEST FOR
Application Note 12: TrendView Recorders Continuous Emissions Monitoring
Application Note 12: TrendView Recorders Continuous Emissions Monitoring Continuous Emissions Monitoring (often abbreviated to CEM) is the term commonly used to describe instantaneous or real-time environmental
CONTINUOUS MONITORING MANUAL. DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION 811 SW SIXTH AVENUE Portland, Oregon 97204
CONTINUOUS MONITORING MANUAL DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION 811 SW SIXTH AVENUE Portland, Oregon 97204 January 23, 1992 Table of Contents 1.0 INTRODUCTION... 1 2.0 DEFINITIONS...
Flue Gas Desulfurization CEMS Design Lessons Learned and Monitoring Technologies to Meet the New Mercury and Air Toxics (MATS) Rule
Flue Gas Desulfurization CEMS Design Lessons Learned and Monitoring Technologies to Meet the New Mercury and Air Toxics (MATS) Rule Cemtek Environmental, Interactive CEMS Workshop a technical solution
CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT. Lone Star Industries, Inc. 3301 South County Road 150 West Greencastle, Indiana 46135
CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT Lone Star Industries, Inc. 3301 South County Road 150 West 46135 (herein known as the Permittee) is hereby authorized to construct the facilities listed in
Notification of RCRA Subtitle C Activity
United States Environmental Protection Agency January 2015 Notification of RCRA Subtitle C Activity Instructions and Form EPA Form 8700-12 (OMB #2050-0024; Expires 01/31/2017) Office of Resource Conservation
NSPS Subpart OOOO: Applicability and Compliance Basics
NSPS Subpart OOOO: Applicability and Compliance Basics Kentucky Oil & Gas Association 2013 Western Kentucky Meeting September 12, 2013 Roy Rakiewicz All4 Inc. Rob Flynn Environmental Standards, Inc. www.all4inc.com
Advance unedited version
Decision -/CP.20 Guidelines for the technical review of information reported under the Convention related to greenhouse gas inventories, biennial reports and national communications by Parties included
Bill Younger, Manager Business Energy Management Puget Sound Energy Bellevue, Washington
Bill Younger, Manager Business Energy Management Puget Sound Energy Bellevue, Washington Multifunction Portals for Commercial and Industrial Customers Customer Needs Energy Information Pipeline Customer
Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance
Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance The Boiler MACT, 40 CFR 63, Subpart DDDDD, was vacated in 2007 by the U.S Court of Appeals and the 2004 rule
A Guide to Calculating Your Boiler Emissions. A step-by-step manual for your convenience
A Guide to Calculating Your Boiler Emissions A step-by-step manual for your convenience Contents The Importance of Emissions Calculations... 3 Why You Need to Calculate Your Boiler Emissions... 4 The Newest
AIR EMISSION PERMIT NO. 13700318-003 Major Amendment IS ISSUED TO. Mesabi Nugget Delaware LLC Steel Dynamics Inc
AIR EMISSION PERMIT NO. 13700318-003 Major Amendment IS ISSUED TO Mesabi Nugget Delaware LLC Steel Dynamics Inc MESABI NUGGET DELAWARE LLC 6500 Hwy 135 Aurora, St. Louis County, MN 55750 The emission units,
2. Do I have to certify? 1. What is the ERP Installation Compliance Certification? 3. How do I submit a Compliance Certification?
Compliance Certification Instructions Emergency Engines and Emergency Turbines 1. What is the ERP Installation Compliance Certification? Operators of new emergency engines with a rated power output equal
Technical Guidance for Offset Verifiers Verification of Offset Project Data Reports:
Technical Guidance for Offset Verifiers Verification of Offset Project Data Reports: California Air Resources Board Stationary Source Division Climate Change Program Evaluation Branch October 2013 Page
SULFURIC ACID MIST PERFORMANCE TEST PROTOCOL. Duke Energy Florida, Inc. Crystal River Power Plant Units 4&5 Crystal River, Citrus County, Florida
SULFURIC ACID MIST PERFORMANCE TEST PROTOCOL Duke Energy Florida, Inc. Crystal River Power Plant Units 4&5 Crystal River, Citrus County, Florida August 2013 CONTENTS SECTION 1.0 INTRODUCTION...3 SECTION
3. 1 Five things DrChecks can do for you.
3 Introduction 3. 1 Five things DrChecks can do for you. Reduce meetings and cut travel Corps, Alaska District regularly required a 2-day TDY to site for resolution of all review comments. W/DrChecks remaining
Energy Efficiency Operations & Maintenance Plan August 25, 2010
Energy Efficiency Operations & Maintenance Plan August 25, 2010 Table of Contents Introduction... 3 Repair, Maintain and Operate Existing Equipment Efficiently... 3 Citywide Requirements Contract... 4
E2E Project Management Process Governance (Electric Capital)
Attachment AG-1-8-10 Page 1 of 10 E2E Project Management Process Governance (Electric Capital) Report No. 1332 Final Distribution Final Report Audit Team: Report Grading: Number of Findings: Date of issue
Safe Operating Procedure
Safe Operating Procedure (Revised 11/11) OPACITY OF EMISSIONS FROM COMBUSTION SOURCES (For assistance, please contact EHS at (402) 472-4925, or visit our web site at http://ehs.unl.edu/) The University
PM Planning Configuration Management
: a Project Support Function As stated throughout the Project Planning section, there are fundamental components that are started during the pre-performance stage of the project management life cycle in
REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES
REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES Big Rapids Public Schools Building Program 2005 OWNER Big Rapids Public Schools 21034 15-Mile Road Big Rapids, Michigan 49307 PHONE: (231) 796-2627
Air Quality Performance Test Guidelines. Kansas Department of Health and Environment Bureau of Air and Radiation
Air Quality Performance Test Guidelines Kansas Department of Health and Environment Bureau of Air and Radiation December 22, 2004 TABLE OF CONTENTS 1. INTRODUCTION 2. TEST PLANNING 2.1 EPA Test Methods
What is a successful Steam Trap Management Program?
What is a successful Steam Trap Management Program? With today s energy costs, it is extremely important to have a proactive steam trap-testing program included with the overall Steam System Management
(a) Method 1 Sample and Velocity Traverses for Stationary Sources.
While we have taken steps to ensure the accuracy of this Internet version of the document, it is not the official version. Please refer to the official version in the FR publication, which appears on the
Can I Recycle Some of My Industrial or Hazardous Wastes?
TCEQ REGULATORY GUIDANCE Waste Permits Division RG-240 August 2006 Can I Recycle Some of My Industrial or Hazardous Wastes? Purpose. The purpose of this document is to assist those who recycle industrial