HOWARD RAPSON. Bleach plant and screen room modernization
|
|
|
- Lucas Norris
- 10 years ago
- Views:
Transcription
1 bleaching T178 Bleach plant and screen room modernization HOWARD RAPSON Memorial Award By J. Bennett and L. Garant Abstract: Prince George Pulp produces 800 t/d of softwood Kraft paper and market Kraft pulp, as unbleached or semi-bleached product. Customer requirements and effluent treatment restrictions led to a new screen room and bleaching sequence. The screen room employs a primary pressure screen in a four-stage process. The bleach plant operates as two independent processes, which can provide stock to either the pulp machine or paper machine. The project was completed on schedule and on budget. Operator acceptance has been very good. Performance has exceeded expectations. T HIS PROJECT had two main components; the first focused on changes within the bleach plant and the second within the brown stock screen room. The Bleach Split portion of the project consisted primarily of re-routing stock and filtrate flows to permit the operation of the bleach plant in a 3 stage / 2 stage split configuration to optimize the production cost of bleached grades, while maintaining the ability to produce high-quality unbleached stock. The Screen Room portion of the project involved replacing obsolete pulp and paper brownstock screening systems with a single line pressure screening system to improve pulp cleanliness and reduce fibre and BOD losses to the effluent system. The project was fully operational at the end of the September 2004 shutdown. BLEACH PLANT HISTORY Before 1996, the canfor Prince George mill produced full bleached, semi bleached, and unbleached pulps, along with unbleached sack Kraft paper. In , a bleached grade of paper was developed, which could be produced using the final three stages of the bleach plant. The bleach plant used the following configurations for the production of the various pulp and paper grades (refer to Figs. 1, 2): 1. Unbleached pulp (UBK) and Bleached paper (Polar): UBK on stages 1 and 2 to the 45 tonne high density storage (HD) to the pulp machine Polar on stages 3,4,5 to the 300t HD to the paper machine with a bleaching sequence of DEpD 2. Semi Bleached (SB) or Full Bleached (FB) and Unbleached paper (Kodiak) SB or FB on stages 1,2,3,4,5 to the 45t or 300t HD to the pulp machine. The bleaching sequence is based on DEopDEpD. When on SB, bleaching chemicals were applied only to the first two or three stages with the remaining stages being wash only. Kodiak paper bypassed the bleach plant, en route to the paper machine. This set of bleaching sequences was used from 1996 until SCREEN ROOM HISTORY Prior to the 2004 modernization, most of the process equipment in the PG mill screen room was mill original (1965-vintage), based on Cowan screens. A number of changes were made to the process layout over the years, with the overall goal of improving pulp and paper cleanliness. The screen room in the Prince George mill was a two-line design with a primary screen line dedicated to each of the pulp and paper machines, and a common rejects screening system. The prime purpose of the screen room is to remove shives (not fully delignified fibre bundles) from the brownstock pulp before the bleaching and papermaking processes. A secondary purpose is to wash the stock to remove residual chemicals and dissolved organics (lignin) remaining after the pulping process. The screen room had the following configuration (Fig. 3): 1. Paper Line: Primary Stage: Five Centrifugal Cowan Screens. Primary accepts go to the vacuum decker, to the 90t screened-stock HD and then to the paper machine directly when making unbleached paper, or to the third stage in the bleach plant when making bleached paper grades. Primary rejects go to the pulp secondary stage feed for further processing. 2. Pulp Line Primary Stage: Single Hooper Pressure Screen Primary accepts go to the gravity decker and then to the first stage of the bleach plant. Primary rejects go to the secondary stage feed. 3. Rejects Screening Secondary Stage: Two Centrifugal Cowan screens Secondary accepts go to the Cowan primary screen feed. Secondary rejects go to the tertiary stage feed. Tertiary Stage: One Centrifugal Cowan screen (There is a spare swing screen that can act either as a secondary or tertiary screen). Tertiary accepts go to the fibre reclaim system feed. Tertiary rejects are pumped to the Intercon clarifier for further processing and are burned in the power boiler at Intercon (sister mill located adjacent to PG pulp). J. BENNETT Senior Process Engineer Prince George Pulp Prince George, BC L. GARANT Project Engineer Allnorth Consultants Ltd (formerly Duncan Industrial Engineering Inc.) Prince George, BC PULP & PAPER CANADA 107:9 (2006) 27
2 T179 bleaching FIG. 1. OLD - FBK/SBK Pulp & Brown Paper. FIG. 2. OLD - UBK Pulp & Bleached Paper. Fibre Reclaim System: One (1) primary radiclone canister (20 cones) and one (1) secondary radiclone canister (8 cones). Radiclone accepts go to the secondary stage feed. Radiclone rejects are pumped to the Intercon clarifier for further processing and are burned in the power boiler at the adjacent Intercon mill. One significant change in the screen room came in 2003 as a result of pulp customer concerns about shive levels in the market unbleached pulp. The Hooper screen basket was changed from slots to slots. The rotor speed was increased to maintain the production rate with the smaller opening. These changes satisfied the customer that PG Pulp was looking for a solution to the shive problem, but it was recognized as an interim solution, not a final one. PROJECT JUSTIFICATION A combination of factors came together in 2003 that justified the bleach plant and screen room modernization. The key issues the project addressed were: High bleaching costs for bleached paper High shive count in unbleached pulp Increased variability of the BOD5 loading in the effluent treatment system Unsteady bleach plant operation due to frequent shutdowns and startups when making grade changes Production rate limitation through the screen room DESIGN CONSIDERATIONS It was realized going into this project that major changes were required in the bleach plant and the screen room layout if all the objectives were to be achieved. The design for the new bleach plant and screen room had to address the cost and quality concerns as well as fit into the plans for the future direction of the Prince George pulp and paper products. Bleach Plant The increased demand for bleached paper made it apparent early in the design that the full-bleached (FB) grade of pulp could not be made in the new PG bleach plant. The production requirements for bleached paper and semibleached pulp used all the available days in the year, with no time left over for producing full bleached pulp. Canfor s Intercon and Northwood Pulp Mills, also in Prince George, took over supplying pulp to the FB pulp customers from the PG mill. Also, it would be very expensive, if not impossible, to satisfy the brightness and quality specifications of the full bleach pulp using a 3-stage bleach plant on non-oxygen delignified pulp. A significant amount of the unbleached pulp from the Prince George Mill is used in electrical applications, due to the low conductivity and ash content of the pulp. In the existing process, this was achieved by washing the stock through two stages of the bleach plant. This ability was retained in the new bleach plant. The bleaching cost for bleach paper was significantly higher than for the semi bleach or full bleach pulp grades. This was attributed mainly to the lack of an Eop stage in the bleach paper sequence. A further consideration was that a significant energy reduction project was commissioned in early The changes with the new bleach plant had to retain the benefits gained from the energy projects. Once the initial design was determined, with brownstock washing in the last two stages, the issue of filtrate contamination was addressed by separating the bleach and unbleached filtrate overflows. A detailed Operability Study (the Op in HazOp) identified a number of scope changes early enough in the project to be included into the design at little or no extra cost. The new bleach plant configuration addressed the major design considerations by becoming two bleach plants. There is a three-stage process for producing the semi-bleach pulp and bleach paper grades and a two-stage process to provide additional washing for the unbleached grades of pulp and paper. The three-stage bleach plant uses the sequence DEopD to produce stock with a final brightness between 68% ISO and 84% ISO, depending on the customer requirements. The two-stage sequence provides two washers to remove as much of the residual lignin and soda as possible from the unbleached stock. The chemistry of the new bleach plant is the same as the old one, albeit with fewer stages. However, the water (filtrate and white water) management is significantly more complex. The brownstock stages (old 4-5) are downstream of the bleached stages (old 1-2-3). The filtrate contamination issue has been addressed with both stages 4 and 5. Filtrate from sealbox #4 is sent to the screen room for white water chest make-up, with any excess being pumped directly to the caustic effluent line. Stage 5 acts as an open washer, with all excess filtrate overflowing directly to the effluent treatment system. The downstream process water is also managed according to the destination of the bleaching stages. Paper machine pressate (from the twin-roll press) is used as shower water and high-density dilution for the stages providing stock to the paper machine. Pulp machine white water is used for the same purposes on the stages feeding the pulp machine. The switching is done with automatic valves at the bleach plant warm water system pumps. Refer to Fig. 4 for the new bleaching sequence, and Fig. 5 for the shower and filtrate management system. Screen Room The first design consideration was choosing to retrofit the existing screen room rather than installing a completely new screening system. The preliminary cost estimates showed that a new installation would cost at least 25% more than the retrofit option. Once the retrofit decision had been made, the existing screening equipment, tanks, and pumps were examined to determine the optimum layout. The decision to use a single large primary screen rather than two or three smaller units in parallel was closely tied to this assessment. As BOD5 reduction was a cornerstone of the justification, the screen room water system had to be closed as much as possible. This aspect tied the bleach plant changes (unbleached stages) into the brown white water system and then to the brownstock washer showers. The balance between final product quality and production capacity determined the slot size for the pressure screens. The decision was made to use slots, assess the quality and production, and change to :9 (2006) PULP & PAPER CANADA
3 bleaching T180 FIG. 3. Old Screen Room. FIG. 4. NEW - All Grades Pulp & Paper. FIG. 5. Shower & Filtrate Management. FIG. 6. Metso Primary Screen slots if necessary. An operability study was also completed for the new screen room, which identified areas that would benefit from re-engineering to allow easier, safer, or more efficient operation of the new screen room. The new screen room uses a singleline, four-stage screening process. The Metso primary screen is capable of processing up to 1400 ADt/d of accept stock and is guaranteed to remove at least 95% of the incoming shives (see Fig. 6). In the Canfor configuration, the screen capacity is rated at 1150 ADt/d of accepts. The existing Hooper pressure screen now serves as the secondary screen. A rebuilt Ingersoll-Rand pressure screen from Canfor s Northwood mill has been placed as the tertiary screen. All the pressure screens have slotted baskets, with a different rotor design in each screen. Two Cowan screens were retained for use in the quaternary position (one on-line, one spare), for fibre recovery purposes. The fibre recovery system was retained as-is. Refer to Fig. 7 for a layout of the new screen room. PROJECT JUSTIFICATION The justification for this project was quite complex, involving elements of cost reduction, revenue enhancement, and strategic benefits that were difficult to quantify in terms of production or cost increases. The cost reduction elements were: Bleaching cost - bleached paper 19% reduction Bleaching cost - coloured paper 55% reduction Bleaching cost - semi-bleach pulp 4% reduction Screen room defoamer use 50% reduction Fibre loss from screens 1 t/d reduction Electrical energy $1.50/t increase The revenue enhancement elements were: Increased UBK pulp sales 5% increase Production increase due to reduced BOD loading 2 t/d increase The strategic elements were: Improved pulp quality, due to reduced shives Improved environmental performance Increased operational consistency PROJECT MANAGEMENT AND IMPLEMENTATION First, a project team was created and specific roles and responsibilities were assigned to each team member. A project implementation schedule was prepared and project milestones were identified. Team member deliverables were identified based on the project schedule. Two major target dates were identified early in the project; one was a major mill outage in the fall of 2004 and the other was a smaller outage in the spring of The success of the project was dependant on being able to meet those dates and completing all of the work required in those outages to allow mill operations to continue after the outages. The detailed project scope was developed from the process and control diagram drawing through team meetings including personnel from operations, maintenance, and engineering. A final project scope of work meeting and operability review meeting was arranged in the two weeks following the project approval by Canfor s board of directors in March Any changes requested to the project after those two meetings were treated as scope change, requiring a process and cost justification. Project steering committee meetings were held on a regular basis to monitor key project milestones, to approve scope changes and to make critical project decisions. Project team meetings were also held regularly to discuss design, process PULP & PAPER CANADA 107:9 (2006) 29
4 T181 bleaching and operations problems, construction progress and to update the project schedule. Interaction between the various engineering disciplines was also coordinated during the team meetings. During the team meetings, each team member was asked to provide a verbal progress report of the respective portion of the project and delegation of tasks were issued based on progress. A scope change evaluation document was created. Each scope change was evaluated based on specific criteria such as total cost of scope change, impact on project budget, necessity of the scope change for project success, and cost justification. The scope change requestor had to provide a process operability justification for the scope change before it was heard by the steering committee. There were five scope changes approved for the Bleach Split portion, and another four scope changes approved for the Screen Room portion. Some of those scope changes were necessary to the success of the project and others with a smaller impact on the overall project budget were approved to improve the mill operator s work conditions, such as large knife gate valves. The project went extremely well considering the fast track schedule. Good communication channels were established from the project kick-off meeting and all deadlines were met. The project team understood that good communication and prioritizing of tasks was key to ensuring good construction progression and collaboration between the various trades involved. Good planning and overcommunication proved to be the key to the success of this project. DETAILED PROJECT SCHEDULE The project was divided into two distinct projects: The Bleach Split Project The Screen Room Upgrade Project Early on in the detail engineering development, it was identified that it would be advantageous to start-up the Bleach Plant Split portion of the project before the September shutdown to avoid having to commission two large projects following the September 2004 shutdown. There was an opportunity in May 2004, during a scheduled recovery boiler water wash, to install most of the tie-ins for the Bleach Plant Split Project. By thinking outside the box, the area Process Engineer and Operators identified all of the tie-ins that could be installed without interrupting operations, before and after the May outage. Each process connection on the project was evaluated and scheduled based on mill production operations. The project implementation schedule was updated and incorporated in the mill production schedule. This allowed a minimum of tie-ins and final connections to be scheduled during outages. Installation of some final tie-ins on the effluent system required a full mill outage and had to be delayed until the September shutdown, but again, an ingenious operation strategy allowed the mill to fully commission and start-up the Bleach Split portion of the project in July 2004, without a major mill outage. The Bleach Plant Split portion project was started-up in July 2004 during a scheduled one-day outage. The construction logistics for the Screen Room Upgrade project were quite different from the Bleach Plant Split project, hence the necessity of splitting the project in two distinct projects. Most of the piping and equipment had to be installed in the screen room without interrupting operations, leaving the final tie-ins and commissioning to be done during the fiveday mill wide September 2004 outage. To reduce project costs and to simplify piping arrangements, a large number of pipes from the old screen room were reused in the new screen room. The engineering team was again asked to think outside the box to design this project. Because of a limited amount of space in the old screen room, the design team was asked to minimize new piping runs and reuse as much as possible existing piping runs. This also limited the amount of redundant pipelines to be left after the project completion. This made the shutdown schedule and pipeline tie-in identification process more complicated, but a significant amount of the budget was saved in new pipeline costs and installation. A detailed shutdown construction schedule was prepared in conjunction with the mill shutdown coordinators to avoid conflicts between the screen room project construction and regular maintenance work during the major shutdown. The final schedule, incorporating maintenance activities, screen room construction, final commissioning and start-up, was updated daily before and during the shutdown. The project shutdown construction schedule was the critical path during the mill outage and the schedule was evaluated and optimized to perform the work in the shortest time span possible with a limited budget and resources. A schedule review meeting was held with each trade foreman, so they were fully aware of the impact of their schedule on the other trades, which made the coordination between trades a much easier task. There were 71 piping ties-ins, five chest inserts, and three centrifugal pumps installed in a very small area during the five-day September outage. A large construction crew was required and a detailed completion schedule was prepared, signed off and updated daily to monitor progression. Coordination between the day and night shifts was critical to assure good progression of the project. Construction trades were scheduled to avoid overhead work as much as possible and safety was most important. A large portion of the instrumentation was pre-commissioned before the shutdown. As well, the control system was modeled on a simulator to identify and fix logic and operation bugs before start-up, resulting in very short final commissioning and start-up. BUDGET AND COST CONTROL The project was completed within 1% of the budget. A significant amount of pipe and existing control valves were re-used to reduce the equipment purchase costs. Swapping the existing titanium ClO 2 mixer from the D2 stage with an SMO grade ClO 2 mixer from the Intercon Pulp Mill saved the cost of purchase of a new chlorine dioxide mixer. Equipment was also refurbished and reused for the screen room portion of the project, such as the HiQ 210 pressure screen obtained from Northwood for use as a tertiary screen. The quaternary feed pump and the secondary screen feed pump were reused. This resulted in a cost savings of about 3% for the complete project. SCOPE CHANGES There were five approved scope changes on the Bleach Plant Split portion of the project. Relocate an existing Kajaani brightness probe to the discharge of washer #3 Install a new Kajaani probe in the brownstock line to tower #4 Replace 100 of 12 SS pipe for bleach bypass with brownstock (line was totally rotten) Replace 45t Hi D stock pump Install On/Off actuators on five knife gate valves on the bleach hot water tank There were four approved scope changes on the Screen Room Upgrade portion of the project, plus one for shutdown help. Install a flowmeter and control valve in the primary screen accepts recirculation line Provide independent flow control on both of the primary screen rejects lines (requirement by Metso) Install an On/Off actuator on the primary screen feed pump suction valve A contractor had to be brought in last minute to complete 90% of the tie-ins during the September shutdown. The extra costs are due to contract requirements attached to the short notice of the call. Two full working days during the shutdown were lost due to under-manning. Install an 8 line from the turpentine condenser to tank farm hot water tank (to take this water out of the brown white water chest). The scope changes for the bleach plant screen portions of the project amounted to about 6% of the total project cost. There were significant cost savings in the mechanical equipment supply for the :9 (2006) PULP & PAPER CANADA
5 bleaching T182 FIG. 7. NEW Screen Room. TABLE I. Bleaching cost reduction. % Reduction Bleach Paper 14.4% SB-77 Pulp 14.5% SB-67 Pulp 3.1% FIG. 8. Shive Count (Before & After). Screen Room Project, including: Savings on the Primary Screen and Tertiary Screen Feed Pumps, due to aggressive pricing from the supplier Savings in Metso spares for the Primary Screen, after it was decided that a spare rotor would not be required, as it was a low risk item Re-using the Secondary Screen Feed Pump rather than replacing it as had been anticipated Savings on the Tertiary Screen, by obtaining a surplus screen from Northwood, rebuilding the housing, re-using a demonstration rotor and salvaging spare parts from the Northwood mill s extra stock. The total cost savings in mechanical equipment was about 3% of the overall capital cost. The tight control of the original scope of work allowed the extras to be purchased and installed without over-running the approved budget for the complete project. SAFETY PERFORMANCE Safety was a top priority on this project. The contractors were briefed every morning in toolbox meetings about various safety issues. Housekeeping was also a top priority as many different trades were working in a relatively small space. The safety performance from all workers on this project was exceptional. Approximately a total of 3,000 contractor manhours and 4,500 mill crew manhours were worked on the Bleach Plant Split project. Only one first aid (a chlorine dioxide gas exposure) was reported. The worker returned to work the same day. A total of 8,000 contractor manhours and 3,000 mill crew manhours were worked on the Screen Room Upgrade project. No first aids were reported. PRELIMINARY PERFORMANCE RESULTS The main Key Performance Indicator (KPI) for the Bleach Split project was reduced bleaching costs on bleached paper due to the change to a sequence using the more efficient first three (DEopD) rather than the last three (DEpD) bleaching stages. Since August, the bleach paper and SB-77 costs have been reduced by an average of 14%. The SB-67 pulp, which uses less overall chemical, has also seen reduced bleaching costs, but not as dramatically, as shown in Table I (as % of cost of bleached paper). The Screen Room Upgrade KPI was reduced shives, particularly when making UBK pulp. The first UBK production with the new screen showed total shive count cut in half compared to the previous runs, with the large shive count about 10% of the previous level. The performance guarantee tests completed in 2005 confirmed the 96% shive removal claimed by the manufacturer. (Figs.8, 9, 10). There have been two very significant operational improvements as a result of this project, one in the bleach plant and one in the screen room. The bleach plant operational stability has improved dramatically as a result of the new sequence. In the old bleaching sequence, a complete shutdown of the bleach plant was required every two weeks as the sequence was changed from DEopDEpD (full bleach or semi-bleach pulp) to WW & DEpD (unbleached pulp and bleached paper). At each switch, tower #3 changed from low consistency to medium consistency or back, causing stock channelling after most grade changes. In the new sequence, adjusting the chemical application rate on the Eop and D1 stages changes the brightness and the grade. The switching between pulp machine and paper machine is done by automatic switching valves on the stock lines from the two bleach plant high-density storage towers. The screen room operation has also become much more consistent. The old screen room had two primary screening lines and a common rejects screening line, with a total of nine atmospheric screens and one pressure screen, along with a two-stage radiclone cleaning system. It was operated in manual control mode most of the time, except for a few flow controllers around the pressure screen. The new screen room has three pressure screens and a single atmospheric screen, plus the radiclones. All the screens as well as the stock chest level controls run in auto mode, based on chest level or production rate. The screen room has become a relatively simple area to operate rather than an area that required constant operation attention. LEARNINGS There was a great deal of time spent on the AFE preparation phase of this project. As a result, there were relatively few scope changes during the project. Careful cost control of the major purchases and during construction allowed the extras to be accommodated within the project budget. The involvement of operations personnel helped with the design, commissioning and start-up phases. There were very few fixes required once the rebuilt processes were on-line, indicating that the majority of the operators concerns were addressed in the original design. The use of mill crews as opposed to PULP & PAPER CANADA 107:9 (2006) 31
6 T183 bleaching FIG. 9. Total Shive Count. FIG. 10. Large Shive Count. dedicated contractors for the fabrication and installation of capital projects can present a vulnerability to the cost control of a project. Mill crews are often subject to the shifting priority of the mill needs and are not always able to be dedicated to completing their capital project work on a timely basis. Unless the mill crew s priorities are firmly with the project, the project budget can be at risk. ACKNOWLEDGEMENTS The technical assistance of Mona Henderson, Process Engineer, of Metso was greatly appreciated during the training, commissioning and start-up phases of the project. The prime contractor IIC is also thanked for working safely and for the high quality work of their tradesmen during the entire project. The cooperation between Allnorth Consultants Ltd (formerly Duncan Industrial Engineering) - Mechanical, Universal Dynamics - Electrical and Instrumentation, and the mill personnel was critical to the project s success. The assistance of the mill tradesmen and operators during the design, construction, and commissioning was an essential part of the success of this project. Finally, the assistance and support of Peter Lovell, Team Leader and Jim Dunn, Area Supervisor and the other mill personnel was invaluable. Résumé: Prince George Pulp produit 400 t/j de pâte commerciale kraft et de papier kraft de résineux ainsi que du papier écru et mi-blanchi. Les exigences des clients et les restrictions en matière de traitement des effluents ont entraîné l installation d une nouvelle salle de classage et d une nouvelle séquence de blanchiment. La salle de classage utilise un classeur primaire sous pression et un procédé en quatre étapes. L atelier de blanchiment comprend deux procédés de blanchiment indépendants, qui peuvent fournir de la pâte à la machine à pâte ou à la machine à papier. Le projet a été achevé dans les délais prévus et selon le budget établi. Les opérateurs ont très bien accepté les nouvelles installations. La performance a dépassé les attentes. Reference: J. BENNETT, L. GARANT. Bleach Plant and Screen Room Modernization. Pulp & Paper Canada 107(9) T: (September, 2006) Paper presented at the 2005 PACWEST Conference in Harrison Hot Springs, BC, May 11-14, Not to be reproduced without permission of PAPTAC. Manuscript received February 27, Revised manuscript approved for publication by the Review Panel on February 6, Keywords: MODERNIZATION, BLEACH PLANTS, SCREEN ROOMS, KRAFT MILLS, BRITISH COLUMBIA, PERFORMANCE EVALUATION :9 (2006) PULP & PAPER CANADA
Monitoring carryover at the brownstock washers
Monitoring carryover at the brownstock washers By B. Richardson Abstract: Brownstock-washing efficiency affects bleach plant chemical consumption as well as the load to the chemical recovery area. We investigated
Basics of Kraft Pulping & Recovery Process. Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology
Basics of Kraft Pulping & Recovery Process Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology Outline History Goals Process Overview Kraft Pulping Process Kraft
How To Manage A Project
Project Management - Maintenance Management p. 105 to 112 Project Management - Maintenance Management PGP / OCP-E PGP / OCP Project Management Major Grassroots Projects 5 Days Level: Foundation To provide
Appendix F Use of spill basin to further reduce final effluent variability - report
Appendix F Use of spill basin to further reduce final effluent variability - report yry (November 2008) Use of the emergency basin to further reduce the variability of final effluent quality. Report prepared
OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa
OPTIMIZING CONDENSER WATER FLOW RATES W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa T.A. Brown, P.E. Thermal Energy Corporation Houston, Texas ABSTRACT Most chillers are designed for a
OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW
ISRAEL ELECTRIC OROT RABIN POWER STATION UNITS 1-4 4 x 350 MW COAL BOILER CONVERSION TO LOW NO X NATURAL GAS AND COAL FIRING BY PRIMARY AND SECONDARY MEASURES INSTALLATION Replacing the Burner Management
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi
Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi Matti Rautanen Manager, External Networks, Power-wide R&D Tutkimuksella tulevaisuuteen- seminaari Kaukolämpöpäivät, Kuopio 29.8.2013
Fact Sheet on Steam Sterilizers at Stanford University
Fact Sheet on Steam Sterilizers at Stanford University By: Environmental Quality and Water Efficiency Group, Stanford University; December 2013 Jennifer Fitch, Marty Laporte, Julia Nussbaum, Adam Kern,
WATER/WASTEWATER: ACHIEVING THE THREE LEVELS OF REDUNDANCY
Schneider Electric Three Levels of Redundancy January 2008 WATER/WASTEWATER: ACHIEVING THE THREE LEVELS OF REDUNDANCY by Grant Van Hemert, P.E., application engineer, Water and Wastewater Competency Center,
Reliability Modeling Software Defined
Reliability Modeling Software Defined Using Titan Reliability Modeling Software May 30, 2014 Prepared by: The Fidelis Group 122 West Way, Suite 300 Lake Jackson, TX 77566 Fidelis Group, LLC All Rights
Reactor Clarifier Solids Contact Clarifiers
Reactor Clarifier Solids Contact Clarifiers Solids Contact and Flocculating Clarifiers for Water & Wastewater Treatment Key features & benefits Large diameter turbine producing high internal recycling
University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery
University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery Yellow Alert for Mayflower Residence hall Peak at 31.5 feet Power Plant floods from steam tunnel and shuts down 1993 Flood
Recovery Boiler Combustion control system(ccs) & Emergency shutdown(esd).
Insert Photo Here Recovery Boiler Combustion control system(ccs) & Emergency shutdown(esd). Mario López Jorge Quesada Rockwell Automation Process Solutions User Group (PSUG) November 14-15, 2011 Chicago,
Asset management in urban drainage
Asset management in urban drainage Gestion patrimoniale de systèmes d assainissement Elkjaer J., Johansen N. B., Jacobsen P. Copenhagen Energy, Sewerage Division Orestads Boulevard 35, 2300 Copenhagen
Stock Preparation Division: The C-bar screen basket a high-tech product
14 Stock Preparation Division: The C-bar screen basket a high-tech product According to an old saying: paper is made in the Holländer. Despite the common opinion that paper mills only contain paper machines,
CONTROL OF LEGIONELLA AUDIT PROFORMA
CONTROL OF LEGIONELLA AUDIT PROFORMA This document is an audit sheet designed to assist persons in control of cooling systems which incorporate cooling towers or evaporative condensers, to assess their
C. starting positive displacement pumps with the discharge valve closed.
KNOWLEDGE: K1.04 [3.4/3.6] P78 The possibility of water hammer in a liquid system is minimized by... A. maintaining temperature above the saturation temperature. B. starting centrifugal pumps with the
This is a Master s degree level apprenticeship which includes academic learning combined workplace learning and training.
Power Engineer Degree Apprenticeship The UK s energy sector is integral to the prosperity and stability of the UK economy as a whole, delivering an absolutely fundamental service for all its citizens.
Replace the Pump Tube Classic
Entire document: 7 pages THIS DOCUMENT CONTAINS GENERAL INSTRUCTION FOR SERVICING STENNER PRODUCTS. PLEASE BE SURE TO READ ALL SAFETY INFORMATION. NOTICE: Indicates special instructions or general mandatory
PAYGO for Data Center -- Modular Infrastructure
PAYGO for Data Center -- Modular Infrastructure Introduction The infrastructure costs for Data Centers are increasing at a significant pace. Construction costs and their environmental impact are also soaring.
BHS CANDLE FILTER APPLICATIONS FOR CLARIFICATION / RECOVERY OF SOLIDS FROM CHEMICAL SLURRIES
FOR CLARIFICATION / RECOVERY OF SOLIDS FROM CHEMICAL SLURRIES TABLE OF CONTENTS 1. FINE CATALYST RECOVERY AT A REFINERY Pages 2 4 2. FINE SOLIDS REMOVAL & CLARIFICATION OF A SPECIALIZED ACIDIC SOLVENT
Recovery Boiler Research Needs An Industry Perspective
Recovery Boiler Research Needs An Industry Perspective Andrew Jones International Paper 7th International Colloquium on Black Liquor Combustion and Gasification International Paper Recovery Operation Goals
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater
ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER. Occupation Specific Technical Requirements
ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER Responsible for performing entry level engineering analysis, design, plan, review and inspection for small to medium projects and/or designated segments of
Amiad s AMF² pre-treatment technology ensures efficient and reliable nanofiltration of Scottish Highland loch water
technical article Document Ref: 0411001-NFPT-text-RevG Status: Re-issued to Elsevier Science Company: Amiad Filtration Systems Limited Issue Date: 10 February 2006 Copy Deadline: 10 February 2006 Publication:
DIESEL FUEL CONDITIONING
COD FILTRATION DIESEL FUEL CONDITIONING REMOVE WATER & PARTICLES TO EXTEND FUEL INJECTOR LIFE & INCREASE COMBUSTION ENGINE FUEL EFFICIENCY Remove free water to saturation point with high single pass efficiency
Axial and Mixed Flow Pumps for Large Volume Pumping
Vertical Industrial and Process Axial and Mixed Flow for Large Volume Pumping Encased (Can ) Water and Process Liquid Vertical Turbine for Water Supply from Drilled Wells Vertical close coupled single
ANAEROBIC/ANOXIC TANKS
PROCESS DESCRIPTION In the anaerobic/anoxic tanks, wastewater is prepared for further treatment in the biological reactors. Denitrification and luxury uptake of phosphorus take place by mixing a food source
Agile Project Execution
ebook Agile Project Execution The future of Industrial Process Automation projects v1.4 EMK(VDS)-TR-EB-01 APEX ebook Table of Contents Intro Agile Project Execution Page 2. Chapter 1 Conventional Project
Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents
Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 HELPER AND INTERMEDIATE JOBS...
REGULATING VALVE APPLICATIONS
REGULATING APPLICATIONS GENERAL REGULAR APPLICATION & INSTALLATION NOTES Regulator Application & Installation Notes The following are considerations for all steam regulator installations, as system operation
Extracting Valuable Lignin for Biorefinary Production and Replacement of Fossil Fuels
Extracting Valuable Lignin for Biorefinary Production and Replacement of Fossil Fuels Extrayendo valiosa lignina para Producción en Biorefinería y sustitución de Combustibles Fósiles Anders Larsson Martin
Chapter 10. Control Design: Intuition or Analysis?
Chapter 10 Control Design: Intuition or Analysis? Dan P. Dumdie 10.1 Introduction In previous chapters, we discussed some of the many different types of control methods available and typically used in
Industrial Steam System Process Control Schemes
Industrial Steam System Process Control Schemes This paper was developed to provide a basic understanding of the different process control schemes used in a typical steam system. This is however a fundamental
3.5-1 THE BASICS OF FOUL CONDENSATE STRIPPING. Ben Lin, P.Eng. A. H. Lundberg Systems Ltd. 5480 Parkwood Way Richmond, B. C.
THE BASICS OF FOUL CONDENSATE STRIPPING Ben Lin, P.Eng. A. H. Lundberg Systems Ltd. 5480 Parkwood Way Richmond, B. C. V6V 2M4 CANADA ABSTRACT Foul condensates from the digesters and evaporators contain
How To Clean Up A Reactor Water Cleanup
General Electric Systems Technology Manual Chapter 2.8 Reactor Water Cleanup System TABLE OF CONTENTS 2.8 REACTOR CLEANUP SYSTEM... 1 2.8.1 Introduction... 2 2.8.2 System Description... 2 2.8.3 Component
Procurement, Inventory Management and Supply Chain solutions for the Petrochemicals sector
Procurement, Inventory Management and Supply Chain solutions for the Petrochemicals sector 1 2 About us Saudi Maintenance and Supply Chain Management Company (SMSCMC) is a top-tier integrated supply chain
Water Efficiency. Water Management Options. Boilers. for Commercial, Industrial and Institutional Facilities. Boiler Water Impurities
Water Efficiency Water Management Options Boilers for Commercial, Industrial and Institutional Facilities Boiler Water Impurities All boiler make-up water contains impurities. As clean steam is released
CHAPTER 2: The Plumbing System
CHAPTER 2: The Plumbing System SECTION I: SIZING REQUIREMENTS Establish building dimensions Building height can be determined either by architectural drawings or # of floors times height/floor. (ex: 1
High Availability White Paper
High Availability White Paper This document provides an overview of high availability best practices for mission critical applications. Author: George Quinlan, Senior Consultant Background - High Availability
Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach
Fundamentals of Asset Management Step 10. Build Asset Management Plan A Hands-On Approach Tom s bad day Fundamentals of Asset Management 2 AM plan 10-step process Develop Asset Registry Assess Performance,
THE DEVELOPMENT OF OFFICE SPACE AND ERGONOMICS STANDARDS AT THE CITY OF TORONTO: AN EXAMPLE OF SUCCESSFUL INCLUSION OF ERGONOMICS AT THE DESIGN STAGE
THE DEVELOPMENT OF OFFICE SPACE AND ERGONOMICS STANDARDS AT THE CITY OF TORONTO: AN EXAMPLE OF SUCCESSFUL INCLUSION OF ERGONOMICS AT THE DESIGN STAGE BYERS JANE, HARDY CHRISTINE, MCILWAIN LINDA, RAYBOULD
THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL
THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL ABSTRACT Timur Deniz, Ph.D., Thomas W. Friedrich, P.E.
SWIMMING POOL HEAT PUMP
SWIMMING POOL HEAT PUMP Installation & User Manual Model HP40B HP50B HP65B Hayward Pool Products Canada, Inc. T: 1-888-238-7665 www.haywardpool.ca CONTENT I. Application 4 II. Features 4 III. Technical
Ground-breaking conversion of critical Data Room WaterChiller from R22 to R422D / MO29
Ground-breaking conversion of critical Data Room WaterChiller from R22 to R422D / MO29 A refrigerant retrofit project, involving the conversion of a large Data Room cooling system from R22 to R422D (DuPont
CLEANING IN PLACE AUTOMATION FOR PROCESS INDUSTRY USING PLC AND SCADA SOFTWARE
CLEANING IN PLACE AUTOMATION FOR PROCESS INDUSTRY USING PLC AND SCADA SOFTWARE Siddhesh Dhonde 1, Bhaskar Nadigatla 2, D.U. Dalavi 3 1,2, 3 ETC, SCSCOE, SPPU, (India), ABSTRACT In Process Industries, proper
Natural gas liquids recovery from gas turbine fuel
Natural gas liquids recovery from gas turbine fuel By Simone Amidei, Francesca Monti, Riccardo Valorosi / GE Oil & Gas GE imagination at work Natural gas liquids recovery from gas turbine fuel By Simone
Eco- and water efficiency development prospects in Pulp-Board integrate.
Eco- and water efficiency development prospects in Jari Räsänen, StoraEnso Oyj March 22, 2013 1 Some remarks as considering water: Water covers 70.9% of the Earth's surface, and is vital for all known
Control of legionella bacteria in water systems
Control of legionella bacteria in water systems Audit checklists This is a free-to-download, web-friendly version of Control of legionella bacteria in water systems: Audit checklists (published 2003).
Sack Kraft Paper IN TOUCH EVERY DAY. www.mondigroup.com. www.mondigroup.com
Sack Kraft Paper IN TOUCH EVERY DAY 1 Keeping you competitive At Mondi we have a strong commitment to high-quality sack kraft paper. With state-of-the-art machinery, continuous R&D, and dedicated customer
White liquor composition and calculations
White liquor composition and calculations H. Sixta, A. Potthast and A. W. Krotschek, Chemical Pulping Processes in H. Sixta (ed.) Handbook of Pulp. Wiley-VCH Verlag GmbH, 2006, p. 113 1 : Conventional
Experience Our Innovation
Experience Our Innovation Rinnai Holdings (Pacific) Pte Ltd 47 Tannery Lane #05-01/02 Elite Industrial Buiding II Singapore 347794 T. +65 6748 9011 F. +65 6745 9240 E. [email protected] www.rinnai.sg
! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)
Series 150S and 157S (Snap Switch, All Models except 157S-RB-P) Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications McDonnell & Miller Installation & Maintenance Instructions
Providing the basis for success. Gas applications for the pulp and paper industry.
Providing the basis for success. Gas applications for the pulp and paper industry. 02 Pulp and paper industry Pulp and paper industry 03 Enhancing productivity and performance. Gas applications and know-how
Disaster Recovery Policy
Disaster Recovery Policy INTRODUCTION This policy provides a framework for the ongoing process of planning, developing and implementing disaster recovery management for IT Services at UCD. A disaster is
Multiple Products in a Monoclonal Antibody S88.01 Batch Plant
Presented at the World Batch Forum North American Conference Chicago, IL May 16-19, 2004 900 Fox Valley Drive, Suite 204 Longwood, FL 32779-2552 +1.407.774.0207 Fax: +1.407.774.6751 E-mail: [email protected]
NEW JERSEY CENTER OF EXCELLENCE
Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves
Installation and Service Instructions. Neutralization System Part no. 7441823 Grünbeck part no. 410480
Installation and Service Instructions for use by heating contractors Neutralization System Part no. 7441823 Grünbeck part no. 410480 Safety and Installation Requirements Please ensure that these instructions
COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23
COMMERCIAL REPORT / STOCK CONDITION SURVEY For Sydenham Hill Estate Sydenham Hill London SE 23 Submission Prepared by Gas Advisory Services Limited Date: 4 th June 2013 Gas Advisory Services Limited Phoenix
Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues
Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,
By Steven C. Severini, P.E., Member ASHRAE
The following article was published in ASHRAE Journal, July 2004. Copyright 2004 American Society of Heating, Refrigerating and Air- Conditioning Engineers, Inc. It is presented for educational purposes
Water cooled chiller plant (cp/vs)
Data Center Water cooled chiller plant (cp/vs) Design Envelope File No: 9.573 Date: december 16, 2014 Supersedes: 9.573 Date: november 14, 2014 design envelope s performance improvements are among the
Sewerage Management System for Reduction of River Pollution
Sewerage Management System for Reduction of River Pollution Peter Hartwig Germany Content page: 1 Introduction 1 2 Total emissions 3 3 Discharge from the wastewater treatment plants 4 4 Discharge from
Course available 24/7 for up to six months from the date of purchase or until completion
SPED ONLINE COURSE TRAINING Piper BootCamp and Process Plant Layout BOTH Piper BootCamp and Process Plant Layout online courses contain: Approximately 25 hours of online videos Printable notes Links to
During the past decade, the city of
An Advanced Pollution Control Facility s Conversion to Four-Stage Bardenpho to Improve Biological Nitrogen Removal Timur Deniz, Thomas W. Friedrich, and John Milligan During the past decade, the city of
A Guide to Trouble-Free Cooling Towers
A Guide to Trouble-Free Cooling Towers A basic understanding of cooling tower operation and maintenance will help keep a cooling water system running in top condition, year after year By David M. Suptic
The Comprehensive Coatings Service Provider to Industry
Coating Systems Excellent Engineering Solutions The Comprehensive Coatings Service Provider to Industry 2 Coating Systems Weir Coatings specialises in the application of high performance protective linings
PERMIT: PE-01164. Under the Provisions of the Waste Management Act
MINISTRY OF ENVIRONMENT, LANDS AND PARKS Vancouver Island Region 2080-A Labieux Road Nanaimo, British Columbia V9T 6J9 Telephone: (250) 751-3100 Fax: (250) 751-3103 PERMIT PE-01164 Under the Provisions
GAS HEATING IN COMMERCIAL PREMISES
ENERGY EFFICIENCY OFFICES GAS HEATING IN COMMERCIAL PREMISES www.energia.ie www.energia.ie Typically, energy reductions of 10% or more can be made easily through maintenance and low cost improvements.
PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and Documentation - Project Risk Assessment Examples
PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and Documentation - Project Risk Assessment Examples Example 54 10.0 PROJECT RISK This section outlines a methodology which will be used to
Scalable. Affordable. Flexible. Fast.
Modular Data Center Solutions Scalable. Affordable. Flexible. Fast. Build the data center you need today with the flexibility to meet tomorrow s challenges The only constant in business is change. Fluctuations
Background. 179 million gallons saved for make-up water
Essential Expertise for Water, Energy and Air Gallatin Steel Achieves Significant eroi Savings Through the Use of Nalco Innovative Technologies Background Gallatin Steel is a mini-mill that produces steel
Heat Trace Fundamentals. Monte Vander Velde, P.E. President, Interstates Instrumentation
Heat Trace Fundamentals Monte Vander Velde, P.E. President, Interstates Instrumentation Contents Introduction... 3 Purpose of Heat Trace... 3 Types of Heat Trace... 4 Steam Trace vs. Electric Trace...
Unrealized Gains in Stocks from the Viewpoint of Investment Risk Management
Unrealized Gains in Stocks from the Viewpoint of Investment Risk Management Naoki Matsuyama Investment Administration Department, The Neiji Mutual Life Insurance Company, 1-1 Marunouchi, 2-chome, Chiyoda-ku,
Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems
Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values
The RWO Ballast Water Treatment System
The RWO Ballast Water Treatment System A mature technology to rely on RWO s CleanBallast system is one of the very few ballast water treatment technologies that can withstand the uncertainties of the future.
BOILER FEED AND CONDENSATE RECOVERY SYSTEMS Extend the life and efficiency of your boiler system
BOILER FEED AND CONDENSATE RECOVERY SYSTEMS Extend the life and efficiency of your boiler system INTEGRATE BOILER FEED AND RECOVERY TO GET THE MOST FROM YOUR BOILER SYSTEM. Increase the safety, reliability,
Framework Policy for the Governance of Major Public Infrastructure Projects
Framework Policy for the Governance of Major Public Infrastructure Projects Framework Policy for the Governance of Major Public Infrastructure Projects For further information on the Framework Policy for
A cure for water damage in real estate
A cure for water damage in real estate Presented for BC Non-Profit Housing Association by Jeff Shearman, Zurich Services Corporation 2010 Zurich Canada Focused on our customer Reduce overall risk by reducing:
GUIDELINES FOR THE CONDUCT OF OIL, GAS & PETROCHEMICAL RISK ENGINEERING SURVEYS
GUIDELINES FOR THE CONDUCT OF OIL, GAS & PETROCHEMICAL RISK ENGINEERING SURVEYS Developed by: Ron Jarvis Andy Goddard Swiss Re, London Talbot Syndicate, London Contributions made by the London market engineers
kajaanipolarox Measure and Control Active Bleaching Chemicals kajaani
kajaanipolarox Measure and Control Active Bleaching Chemicals kajaani Measured Chemical Meas.range [g/l] Cl 2 (chlorine) 0...4 (chlorine dioxide) 0...1.5 ClO - 2 (chlorite) 0...1.5 / SO 2 or NaHSO 3 (chlorine
WASTE WATER Solutions
Huber Technology is a leading supplier of stainless steel waste water treatment equipment. Our extensive experience enables us to offer high quality solutions for all your waste water treatment needs for
Utilities and existing services
Construction Services Building standards for mechanical and electrical installations Utilities and existing services October 2012 Directorate: Environment Construction Services - Building standards for
Innovation and Progress in Water Treatment Technology
Innovation and Progress in Water Treatment Technology Degree of separation of ultrafiltration Summary of the various processes The water will be pressed through the between the raw water side and the filtrate
Nine Industrial Scale V SEPs. Feed Tank V SEP. Feed Pumps (Three) Concentrate. Tank. V SEP Treatment System
River Treatment for Ultrapure Production A cost-effective and environmentally-sound solution Abstract New Logic International installed its Vibratory Shear Enhanced Processing (VSEP) Phase I system in
Dynamic Modeling Of An Ozone Disinfection Facility
Dynamic Modeling Of An Ozone Disinfection Facility Michael Etheridge Black & Veatch 8400 Ward Parkway Kansas City, MO 64114 Presented to the Fourteenth Ozone World Congress August 25 th, 1999 ABSTRACT
CAD/CAE systems and cost engineering
CAD/CAE systems and cost engineering The purpose of this article is to explain how total life-cycle solutions can help engineering procurement and construction and plant owner companies meet today s business
Metrics for Data Centre Efficiency
Technology Paper 004 Metrics for Data Centre Efficiency Workspace Technology Limited Technology House, PO BOX 11578, Sutton Coldfield West Midlands B72 1ZB Telephone: 0121 354 4894 Facsimile: 0121 354
WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL
WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL Siniša Stojan, Ph.D. student Damir Dražić, Ph.D. student Brodotrogir, HR - 21220 Trogir, Croatia [email protected],
Section: R100 Bulletin: R100.51 Date: 07/13 Supersedes: New TRUST. Your Water Level. Steam you can depend on, 24/7. Boiler Level Indication System
Section: R100 Bulletin: R100.51 Date: 07/13 Supersedes: New TRUST Your Water Level Steam you can depend on, 24/7 Boiler Level Indication System Boiler Level Indication System Where s your water? For over
A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly
Data Center Commissioning: What you need to know
Data Center Commissioning: What you need to know Course # CXENERGY1511 AIA Provider # 50111116 AABC Commissioning Group CxEnergy Conference Henderson, NV April 30, 2015 Presented by: Judson H. Adams, P.E.,