Central Piedmont Community College Technology Plan Process vs. Project Request Process

Size: px
Start display at page:

Download "Central Piedmont Community College Technology Plan Process vs. Project Request Process"

Transcription

1 Central Piedmont Community College Technology Plan Process vs. Project Request Process

2 What type of request do I submit? Project or Tech Plan? Project Request Tech Plan You have an idea for a process improvement that involves technology, but you only have requirements not a specific product in mind Technology Equipment needs (ie. computers, projectors, printers, smart classroom, conference room upgrades) You need a technical system developed Software needs An improvement/enhancement to an already existing system Classroom Technology needs

3 Project Request Process

4 The Project Request Process Seven Steps Step Process Submission Departments submit requests via an online request system. Approval Department Manager Approves Project Sponsor Assess Scheduled Cabinet Sponsor of project evaluates need and provides approval. Project is placed in ITS project queue if approved ITS offers consultation services to review and understand client requirements for project. FTE generation, Maximum benefits to students, Efficiencies, Legal mandates, Outsourcing, Costs, and Complexity are considered at this time. Project is scheduled and an ETA for completion is provided to client Completion ITS provides completed project solution based on client requirements Confirmed Completion Client is asked to confirm that the project is completed and requirements for project have been met

5 Project Request Flow Chart Not Approved Client Submits Request Request is sent to Approving Manager Approved by Manager? If approved by Manager, request is sent to the Cabinet Sponor Approved by Cabinet Sponsor? Cabinet Sponsor Denies Request Project is developed and completed Project is scheduled Client requirements are defined Assessment of project request is performed Request is placed in ITS Project Queue Client confirms project is completed

6 Technology Plan Process

7 Collect Assess The Technology Planning Process Seven Steps Step Process Timeline Timeline Departments submit requests via an online request system. IT Services offers consultation services, if needed, for further review and understand their requests. Estimate costs. Through 6/2/14 Through 6/3/13 March 2014 Sept /3/13 9/3/13 Prioritize Decision Communicate Procure Areas Managers, Deans, and VP s prioritize requests for their areas to meet their goals. Prioritized list of requests presented to the College Cabinet for review and approval. Seek funding support. Publish funded list of requests and expected deployment timeline. Initiate procurement. Procure approved requests, receive and settle invoices. June 2014 Sept /3/13 9/6/13 August /9/13 Sept /13/13 Sept 2014 Dec /13/13 12/2/13 Deploy Deploy approved requests Complete by June 2015 Complete by 6/23/14

8 Request Prioritization Prioritization includes an interactive approach, allowing area leaders (Managers, Deans, and Vice Presidents) to review, approve, and prioritize requests. Upon completion, IT Services presents those recommendations to the College Cabinet for approval. The following criteria were recommended for use throughout the process for individuals, area managers, and vice presidents to prioritize their requests. Critical High Medium Low Enhances institutional effectiveness; is critical to student success; is required to meet external agency guidelines and/or a college goal. Enhances departmental effectiveness; is beneficial to student success, and meets a college goal. Good to have; improves efficiency of College services to students and staff. Nice to have.

9 Technology Planning Flow Chart Not Approved Client Submits Request Request is sent to Approving Manager Approved? If approved, request is sent to Technology Planning Team Cost & Feasibility Analysis is performed on request

10 Technology Planning Flow Chart (cont t) Funding is provided based on fiscal year equipment budget Funding Needs are summarized by priority and sent to Cabinet for funding allottment Cabinet Priority is set to Critical, High, Medium, or low Requests are presented to cabinet for prioritization Status of request is changed based on funding allottment Cabinet Denies Request

11 Request is placed in queue for approval and funding for the next fiscal year equipment budget cycle Technology Planning Flow Chart (cont t) Not Approved for Equipment Funding Approved for Equipment Funding Items needed to fulfill request are procured Items are recieved Department can find other funding source to complete request Alternative funding found? Deployment of items are scheduled and completed Request is marked complete

12 If you have any questions about the Project Request or Technology Planning process please contact our ITS Help Desk or

CENTRAL VIRGINIA COMMUNITY COLLEGE. Annual Strategic Budget Planning Process

CENTRAL VIRGINIA COMMUNITY COLLEGE. Annual Strategic Budget Planning Process CENTRAL VIRGINIA COMMUNITY COLLEGE Annual Strategic Budget Planning Process Table of Contents Important Dates and Deadlines... 2 Compliance Assist Access and Input... 4 Content for Budget Request... 9

More information

H107 Video Conference Room

H107 Video Conference Room Capacity: 20 persons White Board (1) Document Camera (1) Door (1) Network connections possible Layout: Seminar style with chairs and tables (moveable) Podium (1) Media Cart (1) Windows (4) Meets all ADA

More information

Programmatic Facilities projects that benefit a specific program or function.

Programmatic Facilities projects that benefit a specific program or function. The Colorado School of Mines capital budget is impacted by several factors including the implementation of a new strategic plan, the growth in enrollment and research, and the availability of state funds

More information

Title goes here. Critical Access Hospital Workshop Affordable Information Technology For Smaller Health Care Organizations

Title goes here. Critical Access Hospital Workshop Affordable Information Technology For Smaller Health Care Organizations Critical Access Hospital Workshop Affordable Information Technology For Smaller Health Care Organizations WIPFLI HEALTH CARE PRACTICE Title goes here February 4, 2010 8:30 a.m. 10:15 a.m. Date or subtitle

More information

Administrative Data Management Procedures - Security

Administrative Data Management Procedures - Security Administrative Data Management Procedures - Security University Roles, Cognos Security and Security Class Definitions Administrative Data Management Business, Finance and Human Resources New Mexico State

More information

Contents. Service Request Departmental Procedures

Contents. Service Request Departmental Procedures Departmental Procedures Contents Process... 2 Scope... 2 Key Definitions... 2 Metrics and Reporting... 2 Roles and Responsibilities... 3 Level Agreements... 3 RACI Chart... 4 Process Flow and Procedure...

More information

GUIDELINES FOR ACCOUNTING RELATED TO COSTS OF COMPUTER SOFTWARE DEVELOPMENT

GUIDELINES FOR ACCOUNTING RELATED TO COSTS OF COMPUTER SOFTWARE DEVELOPMENT GUIDELINES FOR ACCOUNTING RELATED TO COSTS OF COMPUTER SOFTWARE DEVELOPMENT Accounting for Costs of Computer Software Developed Or Obtained for Internal Use A. Background: Required by Accounting Rules

More information

The ITS Project Management Framework

The ITS Project Management Framework The ITS Project Management Framework Information Technology Services Project Management Framework v1.0 1 Table of Contents Introduction 3 Why Create a Project Management Framework? 4 Projects versus Operational

More information

IT PROJECT PRIORITIZATION PROPOSAL. Summary. Proposed Process

IT PROJECT PRIORITIZATION PROPOSAL. Summary. Proposed Process IT PROJECT PRIORITIZATION PROPOSAL Summary University of West Florida Information Technology Services has indicated a need for crossdivisional guidance in determining the level of priority that should

More information

Policy Statement. Policy

Policy Statement. Policy OFFICIAL POLICY 10.7 Procedures for Developing, Purchasing, and Maintaining Smart/Laptop-ready/Computer Classrooms 1/19/16 Policy Statement Type here. Text will automatically wrap. Policy 2.0 Definitions

More information

Technology Replacement & Deployment Plan 2008-09

Technology Replacement & Deployment Plan 2008-09 Technology Replacement & Deployment Plan 2008-09 Description The Technology Replacement & Deployment Plan (TRDP) describes the processes, procedures and authorities for the procurement and deployment of

More information

Technology Master Plan 2010-2015 Irvine Valley College

Technology Master Plan 2010-2015 Irvine Valley College Technology Master Plan 2010-2015 Irvine Valley College Adopted Fall Term 2010 V4.0 Created By: Irvine Valley College Page 1 6/21/2010 Table of Contents Introduction and Overview... 3 Background and Planning

More information

Duke Maestro Care and Clinical Research: 1 st Town Hall Meeting

Duke Maestro Care and Clinical Research: 1 st Town Hall Meeting 6// Duke Maestro Care and Clinical Research: st Town Hall Meeting Dean Nancy Andrews, MD, PhD Dr. Iain Sanderson, Chief Research and Academic Information Officer. Dr. Mark Stacy, Vice Dean for Clinical

More information

University of Oregon Information Technology Risk Assessment. December 2, 2015

University of Oregon Information Technology Risk Assessment. December 2, 2015 December 2, 2015 Table of Contents EXECUTIVE SUMMARY... 3 BACKGROUND... 3 APPROACH... 4 IT UNITS... 5 NOTED STRENGTHS... 5 THEMES... 6 IT RISKS... 11 IT RISKS DESCRIPTIONS... 12 APPENDIX A: BAKER TILLY

More information

Florida A & M University

Florida A & M University Florida A & M University AP PROCEDURES 3-8-2013 TABLE OF CONTENTS 1.0 OVERVIEW... 1 2.0 DEFINITIONS... 1 3.0 RESPONSIBILITIES... 2 4.0 GENERAL PROCEDURES... 3 4.1 DEPARTMENTAL FISCAL REPRESENTATIVES...

More information

IT Help Desk Management Survey Questionnaire January 2007

IT Help Desk Management Survey Questionnaire January 2007 IT Help Desk Management Survey Questionnaire January 2007 Thank you for participating in the IT Help Desk Management study being conducted by the EDUCAUSE Center for Applied Research, or ECAR. This survey

More information

AMERICAN SAMOA COMMUNITY COLLEGE TOTAL COST OF OWNERSHIP. Report and Recommendations. Fall Semester 2010

AMERICAN SAMOA COMMUNITY COLLEGE TOTAL COST OF OWNERSHIP. Report and Recommendations. Fall Semester 2010 AMERICAN SAMOA COMMUNITY COLLEGE TOTAL COST OF OWNERSHIP Report and Recommendations Fall Semester 2010 Introduction: In August of 2009, the ASCC Institutional Strategic Plan 2009 2013 was approved by the

More information

CSCC Grants Administration Handbook; Last Revised 12/21/2012

CSCC Grants Administration Handbook; Last Revised 12/21/2012 1 GRANTS ADMINISTRATION HANDBOOK Adopted September 2010 Introduction The Grants Office and Fiscal and Compliance Services manage external funding to advance the teaching, workforce development, research,

More information

UNIVERSITY of NORTH DAKOTA RESEARCH & ECONOMIC DEVELOPMENT POLICY LIBRARY NO-COST EXTENSION

UNIVERSITY of NORTH DAKOTA RESEARCH & ECONOMIC DEVELOPMENT POLICY LIBRARY NO-COST EXTENSION UNIVERSITY of NORTH DAKOTA RESEARCH & ECONOMIC DEVELOPMENT POLICY LIBRARY NO-COST EXTENSION Policy 7, No-Cost Extension Responsible Executive: VP for Research & Economic Development Responsible Office:

More information

Technology Evergreening

Technology Evergreening IT 02 Technology Evergreening Classification: Responsible Authority: Executive Sponsor: Approval Authority: Date First Approved : 2006.02.01 Date Last Reviewed: 2011.11.23 Mandatory Review Date: 2016.11.23

More information

PROCEDURES FOR ACADEMIC FACULTY AND ADMINISTRATIVE PROFESSIONAL STAFF SALARIES

PROCEDURES FOR ACADEMIC FACULTY AND ADMINISTRATIVE PROFESSIONAL STAFF SALARIES PROCEDURES FOR ACADEMIC FACULTY AND ADMINISTRATIVE PROFESSIONAL STAFF SALARIES Revised and Adopted by the Provost Executive Vice President and the Vice President for University Operations Effective: April

More information

Policy: Information Technology Refresh Policy

Policy: Information Technology Refresh Policy IT Refresh Policy Policy: Information Technology Refresh Policy Policy Statement CITATION REFERENCE Official Title: Information Technology Refresh Policy Abbreviated Title: IT Refresh Policy Volume: CCGA

More information

Welcome to the University of Northern Colorado Information Management & Technology Project and Academic Software request submission site.

Welcome to the University of Northern Colorado Information Management & Technology Project and Academic Software request submission site. Default Question Block Welcome to the University of rthern Colorado Information Management & Technology Project and Academic Software request submission site. Please provide the following information about

More information

City of Seattle Next Generation Data Center

City of Seattle Next Generation Data Center City of Seattle Next Generation Data Center Work through June 2013 Current Situation Four Strategy Dimensions Strategy Recommendations Scope Phase 2 Planning High Level Implementation Plan Next Steps Project

More information

Beginning in February, the CFO will host the following 11 budget conferences for support units and auxiliaries, organized by officers:

Beginning in February, the CFO will host the following 11 budget conferences for support units and auxiliaries, organized by officers: To: From: Support Unit Vice Presidents Ken Kaiser, CFO and Treasurer Date: January 4, 2016 Re: Support Unit Budget Conferences and FY17 Budget Preparation It is time to begin building the FY2016-17 operating

More information

Program Review User Guide

Program Review User Guide Program Review User Guide This document contains information regarding Program Reviews for 2015-16. To access the Program Review website, go to http://programreview.sbcc.edu and log in with your Pipeline

More information

Arizona State University Fiscal Year 2009 IT Risk Assessment Methodology Prepared for the January 22, 2009 Audit Committee Meeting

Arizona State University Fiscal Year 2009 IT Risk Assessment Methodology Prepared for the January 22, 2009 Audit Committee Meeting Arizona State University Fiscal Year 2009 IT Risk Assessment Methodology Prepared for the January 22, 2009 Audit Committee Meeting This document provides an overview of the methodology used by ASU University

More information

Appendix B California Health Benefits Exchange Level I Establishment Grant Application Budget and Budget Narrative

Appendix B California Health Benefits Exchange Level I Establishment Grant Application Budget and Budget Narrative Appendix B California Health Benefits Exchange Level I Establishment Grant Application Budget and Budget Narrative Budget Narrative Salary and Wages (Does not include IT Exchange Program positions) Total:

More information

Angelo State University

Angelo State University Angelo State University Campus-wide Project Management Software Business Justification Project Name: Project Management Software Implementation Proposed By: Jackie Droll & John Russell Department Head/Director/Dean:

More information

Instructional Technology Cost Analysis

Instructional Technology Cost Analysis Instructional Technology Cost Analysis Objective: The objective of this cost-gathering project is two-fold. (i) ITC would like to have an overall assessment of the campus current investment in instructional

More information

1.1 Please indicate below if any aspect of the service is legally mandated by any of the following and provide the relevant reference.

1.1 Please indicate below if any aspect of the service is legally mandated by any of the following and provide the relevant reference. Response ID:60; 100888517 Data 1. Support Services Report Template Report Info Name of the person completing this report : Borre Ulrichsen Title of the person completing this report : CIO & AVP, IT Services

More information

San Jacinto College District Annual Priorities for 2014-2015 Human Resources

San Jacinto College District Annual Priorities for 2014-2015 Human Resources I Our People Accountable Department 1 Positioning for the Future Implement Work-Life Balance Program Steve Trncak Susan Temple (design) Sandra Ramirez (implementation) San Jacinto College District Annual

More information

Risk Assessment of Outsourcing Pharmaceutical Packaging

Risk Assessment of Outsourcing Pharmaceutical Packaging Risk Assessment of Outsourcing Pharmaceutical Packaging Dr Afshin Hosseiny November 2004 Slide Number 1 11/04 Why Outsource? Technical requirements Capacity requirements Speed of Setting up Location -

More information

PROCUREMENT MANAGEMENT PLAN <PROJECT NAME>

PROCUREMENT MANAGEMENT PLAN <PROJECT NAME> PROCUREMENT MANAGEMENT PLAN TEMPLATE This Project Procurement Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template

More information

Research Funding & Monitoring Compliance: An Essential Risk Mitigation Strategy THE CURRENT SITUATION

Research Funding & Monitoring Compliance: An Essential Risk Mitigation Strategy THE CURRENT SITUATION Research Funding & Monitoring Compliance: An Essential Risk Mitigation Strategy Gracy Pardillo Director, Controls and Compliance Financial Services McGill University John Cornwell Associate University

More information

Mike Hill, Cabinet Member, Community Services Amanda Honey, Corporate Director Customer & Communities

Mike Hill, Cabinet Member, Community Services Amanda Honey, Corporate Director Customer & Communities From: To: Mike Hill, Cabinet Member, Community Services Amanda Honey, Corporate Director Customer & Communities Communities Cabinet Committee Date: 17 December 2013 Decision No: 13/00086 Subject: Procurement

More information

Services Providers. Ivan Soto

Services Providers. Ivan Soto SOP s for Managing Application Services Providers Ivan Soto Learning Objectives At the end of this session we will have covered: Types of Managed Services Outsourcing process Quality expectations for Managed

More information

Project SAGE Update As of February 12 th, 2009

Project SAGE Update As of February 12 th, 2009 Project SAGE Update As of February 12 th, 2009 Summary Overall ERP status remains Yellow primarily due to potential budget issues and our focus on the HR and Finance Go-Lives. Primary issues for HR/Payroll

More information

Integrated Technology Plan (FY10 FY12)

Integrated Technology Plan (FY10 FY12) (FY10 FY12) Anne Arundel Community College embraces and promotes a seamless integration of appropriate technologies in support of the learning community within the framework of the college s mission and

More information

Audio Visual Equipment Loans

Audio Visual Equipment Loans IT 03 Audio Visual Equipment Loans Classification: Information Technology Responsible Authority: Director, Information, Institutional Research and Technology Services (IIRTS) Executive Sponsor: Vice President,

More information

U.S. Department of Housing and Urban Development Data Center Consolidation Plan

U.S. Department of Housing and Urban Development Data Center Consolidation Plan U.S. Department of Housing and Urban Development Data Center Consolidation Plan FY12 Final Plan September 30, 2011 1 P a g e TABLE OF CONTENTS DOCUMENT INFORMATION TABLE OF CONTENTS... 2 TABLE of TABLES...

More information

Coffeyville Community College Strategic Plan 2013-2015

Coffeyville Community College Strategic Plan 2013-2015 Coffeyville Community College Strategic Plan 2013-2015 Coffeyville Community College Strategic Plan 2013-2015 Vision Statement: Coffeyville Community College shall be recognized as an institution which

More information

ASSOCIATE DEAN, INSTRUCTION

ASSOCIATE DEAN, INSTRUCTION ASSOCIATE DEAN, INSTRUCTION Board Approved May 27, 2015 FLSA: EXEMPT DEFINITION Under the direction of the Vice President of Instruction and the Executive Dean of Instruction, the Associate Dean of Instruction,

More information

Process for Nursing Research Proposal Review Nursing Student/Faculty Research Projects

Process for Nursing Research Proposal Review Nursing Student/Faculty Research Projects Process for Nursing Research Proposal Review Nursing Student/Faculty Research Projects General guideline for all research: Nurses and other staff may not participate in studies conducted by external researchers

More information

FY 2015 16 Budget Call Form Instructions

FY 2015 16 Budget Call Form Instructions FY 205 6 Budget Call Form Instructions: Page FY 205 6 Budget Call Form Instructions Overview The form included in this packet is tailored to your unit based on the budget call submission from FY 204 5.

More information

OneOxy Experience - Suppliers strategic integration into supply chain: Capitalizing on these outsourced members of your team Occidental Petroleum

OneOxy Experience - Suppliers strategic integration into supply chain: Capitalizing on these outsourced members of your team Occidental Petroleum OneOxy Experience - Suppliers strategic integration into supply chain: Capitalizing on these outsourced members of your team Occidental Petroleum Corporation 12th Annual OFS Portal Fall Retreat Houston

More information

UW-L Information Technology Services Standard Operating Procedure (SOP)

UW-L Information Technology Services Standard Operating Procedure (SOP) UW-L Information Technology Services Standard Operating Procedure (SOP) Title: Computer Lifecycle Management Date Prepared: 9/12/2014 Author(s): ITS Cross Reference/Related Procedure(s): Campus Surplus

More information

Director, Disabled Students Programs and Services (DSP&S) and Counseling Bakersfield College Kern Community College District JOB DESCRIPTION

Director, Disabled Students Programs and Services (DSP&S) and Counseling Bakersfield College Kern Community College District JOB DESCRIPTION Director, Disabled Students Programs and Services (DSP&S) and Counseling Bakersfield College Kern Community College District JOB DESCRIPTION Definition The Director of Disabled Students Programs and Services

More information

Leveraging the erate Program to Get a Next-Generation Communication System. November, 2012

Leveraging the erate Program to Get a Next-Generation Communication System. November, 2012 Leveraging the erate Program to Get a Next-Generation Communication System November, 2012 Agenda 1. erate Basics 2. 10 Important Considerations 3. Brush School District (Case Study) 4. Mitel AnyWare for

More information

How To Implement An Enterprise Resource Planning Program

How To Implement An Enterprise Resource Planning Program ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing

More information

Massachusetts College of Art and Design Mobile Phone Stipend Policy, 2010

Massachusetts College of Art and Design Mobile Phone Stipend Policy, 2010 Massachusetts College of Art and Design Mobile Phone Stipend Policy, 2010 Purpose Cellular telephones and cellular-based wireless communications devices can be an effective resource for campus employees

More information

Administration Procedure

Administration Procedure Administration Procedure Complete Procedure Title: Procedures related to Tracking, Loss, Damage and Disposition of University Assets Approved by: Assistant Vice President Administration and CFO Date of

More information

Royal Holloway University of London

Royal Holloway University of London Royal Holloway University of London Consultancy Policy December 2008 1.0 Introduction 1.1 Consultancy is defined as: The deployment of existing knowledge to meet the specific requirements of a client either

More information

Information Technology Master Plan

Information Technology Master Plan Information Technology Master Plan May 6, 2011 Prepared by: Table of Contents INFORMATION TECHNOLOGY MASTER PLAN Executive Summary of the IT Master Plan... 4 Overview of the IT Master Plan... 7 University

More information

Berkeley City College Technology Plan

Berkeley City College Technology Plan Berkeley City College Technology Plan Five Year Plan 2009-2014 Peralta Community College District Berkeley City College Technology Planning Committee Berkeley City College Technology Action Plan Table

More information

IT GOVERNANCE AT CARLETON UNIVERSITY

IT GOVERNANCE AT CARLETON UNIVERSITY IT GOVERNANCE AT CARLETON UNIVERSITY Version 4.5 March 2015 Office of the Chief Information Officer, Computing and Communication Services This Document provides the terms of reference and structure for

More information

2015 BUSINESS PLAN PRELIMINARY INITIATIVES/GOALS

2015 BUSINESS PLAN PRELIMINARY INITIATIVES/GOALS 2015 BUSINESS PLAN PRELIMINARY INITIATIVES/GOALS 1 2015 Business Plan & Budget Process Sept 18, 2014 Preliminary 2015 Initiatives/Goals Presented to Board at Strategic Planning Meeting October 20, 2014

More information

SharePoint Deployment at the FSU College of Education

SharePoint Deployment at the FSU College of Education SharePoint Deployment at the FSU College of Education This document presents benefits of Microsoft Share Point (SP) for the College of Education faculty and staff, highlights critical success factors,

More information

Campbell s Journey to Invoice Automation. Joyce Couts, Manager, Business Payment Services Jeff Nowlin, Sr. Manager, Information Technology

Campbell s Journey to Invoice Automation. Joyce Couts, Manager, Business Payment Services Jeff Nowlin, Sr. Manager, Information Technology [ Campbell s Journey to Invoice Automation Joyce Couts, Manager, Business Payment Services Jeff Nowlin, Sr. Manager, Information Technology [ Learning Points Hear why Campbell chose Open Text as their

More information

HAMILTON/CLERMONT COOPERATIVE ASSOCIATION OF BOARDS OF EDUCATION. FY11 ITC Continuous Improvement Plan

HAMILTON/CLERMONT COOPERATIVE ASSOCIATION OF BOARDS OF EDUCATION. FY11 ITC Continuous Improvement Plan HAMILTON/CLERMONT COOPERATIVE ASSOCIATION OF BOARDS OF EDUCATION FY11 ITC Continuous Improvement Plan 10/25/2010 Fiscal Services Goal Matrix including accounting (cash basis with generally accepted accounting

More information

Capital Override Election - Frequently Asked Questions

Capital Override Election - Frequently Asked Questions Attachment L Capital Override Election - Frequently Asked Questions 1. What is a capital override? A capital override is a special election requesting voter approval for a secondary tax levy to pay for

More information

EXECUTIVE SUMMARY. A. Planning Process

EXECUTIVE SUMMARY. A. Planning Process EXECUTIVE SUMMARY Provide a narrative describing the program and concise summaries for Evaluation Criteria A-J of the proposal. Label section headings. (Limit 1200 words) Institution: Florida State College

More information

Data Analyst and Operations Administrator

Data Analyst and Operations Administrator American Support Data Analyst and Operations Administrator Overview & Responsibilities 01 March 2011 Position Title: Department: Branch: Location: Reports To: Direct Reports: Consults With (Works With

More information

Kirsten Volpi Senior Vice President for Finance and Administration

Kirsten Volpi Senior Vice President for Finance and Administration TO: FROM: Board of Trustees Kirsten Volpi Senior Vice President for Finance and Administration DATE: May 23, 2011 SUBJECT: FY 2012 Budget I. BACKGROUND INFORMATION Fiscal Year 2012 Operating Budget Summary

More information

Organizational Data. Submitted to the Board of Supervisors of the University of Louisiana System and the Louisiana Board of Regents

Organizational Data. Submitted to the Board of Supervisors of the University of Louisiana System and the Louisiana Board of Regents Organizational Data Submitted to the Board of Supervisors of the University of Louisiana System and the Louisiana Board of Regents In partial fulfillment of the requirements of Act 741 Louisiana GRAD Act

More information

Laney Information Technology Services

Laney Information Technology Services Laney Information Technology Services Mission Statement The mission of the Laney Information Technology Services (LITS) is to provide a scalable technological infrastructure, and provide innovation in

More information

EMPLOYEE SCREENING TOOL AND TELECOMMUTING REQUEST UI TELECOMMUTING PROGRAM

EMPLOYEE SCREENING TOOL AND TELECOMMUTING REQUEST UI TELECOMMUTING PROGRAM EMPLOYEE SCREENING TOOL AND TELECOMMUTING REQUEST UI TELECOMMUTING PROGRAM The success of telecommuting is dependent on it being a mutually beneficial arrangement for the unit and the employee. This form

More information

Ralston Public Schools - Technology Project For district Administrators

Ralston Public Schools - Technology Project For district Administrators IT EFFECTIVENESS & STRATEGIC PLANNING PROJECT Technology Strategic & Tactical Plan Executive Summary April, 2013 Contents The purpose of this document is to summarize the Technology Tactical Plan for Ralston

More information

Wireless Communication Device Allowance

Wireless Communication Device Allowance Wireless Communication Device Allowance Policy Type: Administrative Responsible Office: Vice President for Finance and Administration Initial Policy Approved: 04/05/2012 Current Revision Approved: 12/11/2014

More information

2012-2013 IT Master Plan Executive Summary

2012-2013 IT Master Plan Executive Summary Sinclair Community College 2012-2013 IT Master Plan Executive Summary 1 Table of Contents 1 Introduction 1 New Executive Summary 1 Improved Planning Process 1 Alignment to Key Strategies 2 Return on Four

More information

Managing Vendors on Procurement Management Portal

Managing Vendors on Procurement Management Portal Managing Vendors on Procurement Management Portal Contents 1.0 Vendor registration... 4 1.1 Temporary Registration.... 4 1.2 Registration Verification... 5 1.3 Terms and Conditions... 5 1.4 Full Registration

More information

HPS TECHNOLOGY REPORT September 9, 2013. Response to a School Committee/Superintendent Goal for 2012-2013

HPS TECHNOLOGY REPORT September 9, 2013. Response to a School Committee/Superintendent Goal for 2012-2013 HPS TECHNOLOGY REPORT September 9, 2013 Response to a School Committee/Superintendent Goal for 2012-2013 WHY NOW? What prompts a broad plan? District/Staff Strategic Plan Priority 2011-2016 School Committee

More information

The Future of Statewide Accounts Receivables System Solution. Customer Group Meeting June 10, 2008 10:00 AM 12:00 PM

The Future of Statewide Accounts Receivables System Solution. Customer Group Meeting June 10, 2008 10:00 AM 12:00 PM Accounts Receivables System Solution Customer Group Meeting June 10, 2008 10:00 AM 12:00 PM Agenda Agenda (Vicki James) Purpose (Ann Bruner) The state of OFM AR Today (Sue Wang) Sierra Systems Feasibility

More information

INFORMATION TECHNOLOGY SERVICES TECHNICAL SERVICES 2012 2013 Program Review

INFORMATION TECHNOLOGY SERVICES TECHNICAL SERVICES 2012 2013 Program Review INFORMATION TECHNOLOGY SERVICES TECHNICAL SERVICES 2012 2013 Program Description Technical Services is a service unit in Information Technology Services. The unit: 1. Acquires and distributes new computing

More information

ITS Managed IT Support

ITS Managed IT Support ITS Managed IT Support INCIDENT AND SURVEY REPORT From July 1, 2013 to July 31, 2014 T h e U n i v e r s i t y o f T e x a s a t A u s t i n I T S C U S T O M E R S U P P O R T S E R V I C E S ( C S S

More information

Deadline extended to March 1, 2009! Unleash your creativity!

Deadline extended to March 1, 2009! Unleash your creativity! Deadline extended to March 1, 2009! Unleash your creativity! Looking for great ideas! Pacific is announcing a call for proposals for a new Innovation Grant Fund. This fund is available to fulltime members

More information

IT Governance. Brandeis University Library & Technology Services. Committees... 2 One steering committee and three subcommittees are created.

IT Governance. Brandeis University Library & Technology Services. Committees... 2 One steering committee and three subcommittees are created. Brandeis University Library & Technology Services IT Governance Spring 2013 The term IT Governance refers to any campus-wide decision-making system used to set technology policy; such systems are common

More information

Education Systems Roadmap 2011 2014

Education Systems Roadmap 2011 2014 Education Systems Roadmap 2011 2014 Education Systems Partnership: Offices of Dean for Undergraduate Education Offices of Dean for Graduate Education Offices of Dean for Student Life Information Systems

More information

TENNESSEE STATE BOARD OF EDUCATION

TENNESSEE STATE BOARD OF EDUCATION The technology plan establishes six goals, identifies strategies to achieve the goals and notes measures of progress toward the goals. The plan lays out what must be addressed to utilize technology to

More information

IT@CSUEB: Strategic Plan for IT 2007-2011

IT@CSUEB: Strategic Plan for IT 2007-2011 IT@CSUEB: Strategic Plan for IT 2007-2011 DRAFT May 3, 2007 California State University, East Bay Table of Contents Page Introduction 3 Strategic Imperatives Imperative A Solid Foundation of IT Infrastructure

More information

Productivity Gains for SMBs with OnCloud ERP PestBusters takes 1st mover advantage

Productivity Gains for SMBs with OnCloud ERP PestBusters takes 1st mover advantage 2012 Productivity Gains for SMBs with OnCloud ERP PestBusters takes 1st mover advantage GreeneStep OnCloud ERP enables SMBs to take advantage of an agile business automation and processes integration system

More information

SPO 160- Inventory Management Training

SPO 160- Inventory Management Training Slide 1 - Inventory Management Training Title Page This is a recorded webinar of Inventory Management Training. On this opening slide, you will find our contact information. You can also find the inventory

More information

Campus Technology Planning Guidelines

Campus Technology Planning Guidelines Campus Computing and Information Technology All academic and administrative departments are asked to use the attached guidelines when planning for new technology or upgrading existing technology in their

More information

WSU Vancouver Information Technology Service Catalog

WSU Vancouver Information Technology Service Catalog WSU Vancouver Information Technology Service Catalog Overview The VIT Service Catalog documents the technology services and support delivered by VIT to its customers. Included are the general levels of

More information

Mobile and BYOD Strategy

Mobile and BYOD Strategy Mobile and BYOD Strategy Bring Your Own Device Danairat T. Certified Java Programmer, TOGAF Silver danairat@gmail.com, +66-81-559-1446 1 Agenda Introduction to Mobile Technology Mobile Computing Bring

More information

Policy 2-9: Hospitality and Entertainment Policy: Guest Meals, Business Meals, Receptions Issued: 8-89 Revised: 9-13

Policy 2-9: Hospitality and Entertainment Policy: Guest Meals, Business Meals, Receptions Issued: 8-89 Revised: 9-13 Policy 2-9: Hospitality and Entertainment Policy: Guest Meals, Business Meals, Receptions Issued: 8-89 Revised: 9-13 I. Purpose It is understood that the business of Fort Lewis College (the College) requires

More information

Servant as Leader. at the University of Virginia. Zeke Crater, PMP University of Virginia Library zeke.crater@virginia.edu

Servant as Leader. at the University of Virginia. Zeke Crater, PMP University of Virginia Library zeke.crater@virginia.edu Servant as Leader Collaboration via Project Management at the University of Virginia Zeke Crater, PMP University of Virginia Library zeke.crater@virginia.edu University of Virginia Landscape 20,000 students

More information

Name of Policy: Wireless communication business expenses paid through any University of Toledo funds. Policy Number: 3364-40-07

Name of Policy: Wireless communication business expenses paid through any University of Toledo funds. Policy Number: 3364-40-07 Name of Policy: Wireless communication business expenses paid through any University of Toledo funds. Policy Number: 3364-40-07 Approving Officer: Vice President for Finance Responsible Agent: Controller

More information

MEMORANDUM FOR HEADS OF EXECUTIVE DEPARTMENTS AND AGENCIES

MEMORANDUM FOR HEADS OF EXECUTIVE DEPARTMENTS AND AGENCIES EXECUTIVE OFFICE OF THE PRESIDENT OFFICE OF MANAGEMENT AND BUDGET WASHINGTON, D.C. 20503 THE DIRECTOR June 28, 2010 M-10-26 MEMORANDUM FOR HEADS OF EXECUTIVE DEPARTMENTS AND AGENCIES FROM: SUBJECT: Peter

More information

Cosumnes River College Planning

Cosumnes River College Planning Cosumnes River College Planning TITLE: Information Technology Strategic Plan, March 2014 OFFICE OF PRIMARY RESPONSIBILITY (OPR): COLLABORATIVE GROUPS: REFERENCED DOCUMENTS: Learning Resources and College

More information

2013-2015 Technology Plan Guidance

2013-2015 Technology Plan Guidance 2013-2015 Technology Plan Guidance Most local education agencies (LEAs) currently have an approved 2012 Technology Bridge Plan on file with the Minnesota Department of Education (MDE) that covers the period

More information

Cash Advance for International Operations

Cash Advance for International Operations Cash Advance for International Operations Effective Date: January 1, 2013 Policy Statement This policy outlines the authorized uses for cash advances to support start-up costs for international operations,

More information

1. Instructional / Student Services Program Maintenance Proposals -APPROVED

1. Instructional / Student Services Program Maintenance Proposals -APPROVED I. EQUIPMENT 1. Instructional / Student Services Program Maintenance Proposals -APPROVED Replace Lab Computers in Room 235 ($49,500) Business These computers will be replaced, and the Dept will begin planning

More information

Return on Investment (ROI) Program Funding Application

Return on Investment (ROI) Program Funding Application Project Tracking No.: Return on Investment (ROI) Program Funding Application This template was built using the ITE ROI Submission Intranet application. FINAL AUDIT REQUIRED: The Enterprise Quality Assurance

More information

Chapter 6 Implementation Planning

Chapter 6 Implementation Planning Chapter 6 Planning Planning- Division into Work Packages The following are the recommended Work Packages Overall Change Programme Work Package 1 E-Cabinet Model Work Package 2 Security Policy Design Work

More information

Bond Technology Update

Bond Technology Update Bond Technology Update Tech Plan Mission Statement To think, learn, and positively contribute to a diverse global community, students and teachers must be provided with technologies, support and learning

More information

Implementation is Not Enough: Keys to EHR Optimization

Implementation is Not Enough: Keys to EHR Optimization Implementation is Not Enough: Keys to EHR Optimization Supported via a National Cooperative Agreement with U.S. Department of Health and Human Services, Health Resources and Services Administration, Bureau

More information

SPONSORED PROJECTS POLICIES

SPONSORED PROJECTS POLICIES Financial Policy Manual SPONSORED PROJECTS POLICIES 2101 Administration of Sponsored Projects 2102 Approval of Proposals 2103 Administration of Clinical Trials 2104 Negotiation of Awards 2105 Acceptance

More information

WEST LOS ANGELES COLLEGE SAO Assessment Tool

WEST LOS ANGELES COLLEGE SAO Assessment Tool SAO or Service Area Outcomes for Administrative Services Date and Semester: 12/26/2012 Fall Semester 2012 Department and Unit Information Technology Department Responsible Person: Nick Dang Check Box(s)

More information

A Field Guide to Learning Management Systems (LMS)

A Field Guide to Learning Management Systems (LMS) A Field Guide to Learning Management Systems (LMS) How can organizations make smart purchasing decisions about LMSs? Ryann K. Ellis Editor, Learning Circuits American Society for Training & Development

More information