SOCALGAS DIRECT TESTIMONY OF JILL TRACY (ENVIRONMENTAL SERVICES) November 2014
|
|
|
- Clare Logan
- 10 years ago
- Views:
Transcription
1 Company: Southern California Gas Company (U0G) Proceeding: 01 General Rate Case Application: A.1-- Exhibit: SCG-1 SOCALGAS DIRECT TESTIMONY OF JILL TRACY (ENVIRONMENTAL SERVICES) November 01 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
2
3 Doc # 1 TABLE OF CONTENTS I. INTRODUCTION... 1 A. Summary of Costs... 1 B. Summary of Activities... 1 C. Importance of Environmental Protection and Compliance... D. Support To/From Other Witnesses... II. NON-SHARED COSTS... A. Introduction... B. Environmental Compliance Description of Costs and Activities.... Forecast Method.... Cost Drivers... C. NERBA Description of Costs and Activities... a. Background... b. Proposal.... Forecast Method.... Cost Drivers... III. SHARED COSTS... A. Introduction... B. Environmental Programs Description of Costs and Activities.... Forecast Method Cost Drivers... 1 C. Policy, Oversight & Compliance Management Description of Costs and Activities Forecast Method Cost Drivers... 1 IV. SUPPORT FOR OTHER COST WITNESSES... 1 A. Leak Reduction Efforts (support for F. Ayala - Gas Distribution)... 1 B. SWRCB (support for J. Dagg - Gas Transmission)... 1 C. Subpart W (support for P. Baker - Underground Storage)... 1 D. MDAQMD and RWQCB (support for R. Stanford - Gas Engineering & Emergency Services)... 1 JT-i
4 . MDAQMD (Air Quality) RWQCB (Water Quality)... 1 E. SWRCB and MS (support for C. Herrera - Fleet Services & Facilities) SWRCB MS... 1 F. GHG and Environmental Management Tool (support for C. Olmstead - IT)... 1 V. CONCLUSION... 1 VI. WITNESS QUALIFICATIONS... 0 LIST OF APPENDICES APPENDIX A - Witness Matrix for SoCalGas Environmental Policy and Costs... A-1 APPENDIX B - Glossary of Acronyms...B-1 Doc # 1 JT-ii
5 SUMMARY ENVIRONMENTAL Shown in Thousands of 01 Dollars 01 Adjusted- TY01 Change Recorded Estimated Total Non-Shared,0, 1, Total Shared Services (Incurred),, 0 Total O&M,1 1, 1, Summary of Requests SoCalGas Environmental Services Department is requesting adoption of its 01 Test Year forecast of $1.1 million for operations and maintenance (O&M) expenses. Requesting authorization to continue the New Environmental Regulatory Balancing Account (NERBA) with three proposed updates: the removal of Cap and Trade related costs and the addition of two new environmental costs associated with forecasted activities. Requesting costs for water quality compliance and programmatic permits, which can streamline the permitting process, provide uniform compliance requirements and reduce project costs. Requesting the addition of five full time equivalents (FTEs) to support new and/or expanding regulatory and operational requirements and SoCalGas environmental sustainability program. Provides environmental policy support for other operational witnesses who sponsor costs that are impacted by environmental regulations and pressures. Doc # 1 JT-iii
6 SOCALGAS DIRECT TESTIMONY OF JILL TRACY (ENVIRONMENTAL SERVICES) I. INTRODUCTION A. Summary of Costs I sponsor the Test Year (TY) 01 forecasts for O&M costs for both non-shared and shared services associated with the Environmental Services area for SoCalGas. I do not sponsor any capital projects. Table 1 summarizes my sponsored costs. TABLE 1 Test Year 01 Summary of Total Costs ENVIRONMENTAL Shown in Thousands of 01 Dollars 01 Adjusted- TY01 Change Recorded Estimated Total Non-Shared,0, 1, Total Shared Services (Incurred),, 0 Total O&M,1 1, 1, In addition to this testimony, please also refer to my workpapers, Ex. SCG-1-WP, for additional information on the activities described herein. B. Summary of Activities Environmental Services oversees compliance for federal, state, regional and local environmental statutes, rules and regulations, including laws protecting air quality, water quality, hazardous materials, waste, cultural resources, land planning and natural resources. Environmental Services responsibilities include: tracking and analyzing pending and final environmental regulations; developing compliance policies, procedures and tools; developing and supporting sustainability efforts; developing and delivering training material; developing and implementing internal quality assurance and quality control procedures; screening planned projects for environmental compliance and efforts to avoid and/or minimize project environmental impacts, contamination considerations, permitting needs and potential impacts; providing compliance oversight; and developing and obtaining environmental permits and plans. Environmental Services is also responsible for managing two SoCalGas Treatment, Storage and Disposal Facilities (TSDFs), the remediation of contaminated media at current and former utility third party sites, and for responding to emergency release events. JT-1
7 C. Importance of Environmental Protection and Compliance SoCalGas believes in protecting the environment while providing safe, reliable and affordable energy services. We strive to avoid environmental impacts in our project design and operations and to minimize impacts when avoidance is not possible. SoCalGas minimizes its environmental impacts and its environmental risks with its comprehensive, multifaceted approach of clear guidance, training, early project environmental review, assessment, auditing, field monitoring and compliance certification. Environmental Services has a published library of environmental field policies and procedures and company-specific employee training, much of which is web-based or e-learning to provide real time access. Environmental Services leverages a Geographic Information System (GIS) mapping technology to review and screen all planned projects that have the potential to disturb soil and result in an environmental impact. This review process involves multiple environmental disciplines that track, manage, document, and report permitting requirements and compliance issues. Early involvement in the planning and designing phase helps to identify related environmental issues to avoid and minimize environmental impacts. Biological and cultural monitoring is conducted as needed. Annually, Environmental Services, along with the Safety department, conducts an internal certification of program compliance and identifies opportunities for process improvement. Key components of our environmental compliance management program include internal assessments to help support and monitor compliance, hazardous waste vendors audit program, and environmental contract terms and conditions for our vendors to abide by. Additionally, Environmental Services conducts regulatory review by subject matter experts to analyze the potential impacts of proposed regulations as well as provide early planning for compliance with new legislation. Field-based environmental representatives are located at SoCalGas operations sites to support day-to-day operations. A comprehensive governance program is in place that partners with operations management and crews to focus on compliance requirements and leading practices. Environmental Services also supports -hour on call environmental subject matter experts to assist field operations. There are numerous acronyms for the various programs, agencies and requirements encountered by Environmental Services and described in this testimony. In addition to describing the acronym in this text, I have included a Glossary of Acronyms in an appendix for helpful reference. JT-
8 D. Support To/From Other Witnesses In addition to sponsoring my own organization s costs, I also provide business or policy justification for the following other witnesses who sponsor operational costs driven by environmental regulation or pressures: Mr. Frank Ayala, witness for Gas Distribution (Ex. SCG-0), is sponsoring O&M costs for leak reduction efforts, which are supported by environmental requirements to reduce greenhouse gas (GHG) emissions as part of Senate Bill 11 (SB11); Mr. John Dagg, witness for Gas Transmission (Ex. SCG-0), is sponsoring O&M for the California State Water Resources Control Board s (SWRCB s) annual permit fees, which are related to water quality mandates; Mr. Phillip Baker, witness for Underground Storage (Ex. SCG-0), is sponsoring O&M costs related to Subpart W of the Code of Federal Regulations (CFR), Title 0, Part ; Mr. Raymond Stanford, witness for Gas Engineering & Emergency Services (Ex. SCG-0), is sponsoring Capital and O&M cost for Mojave Desert Air Quality Management District (MDAQMD), and O&M costs for Hydrostatic Test Water and Dewatered Groundwater Treatment for Permits; Ms. Carmen Herrera, witness for Fleet Services & Facilities (Ex. SCG-1) is sponsoring facilities O&M costs for California SWRCBs Industrial General Permit Renewal and annual permit fees, which are driven by water quality mandates. Additionally, Ms. Herrera is sponsoring O&M costs for forecasted work related to Municipal Separate Storm Sewer Systems (MS) requirements. Mr. Christopher Olmsted, witness for Information Technology (Ex. SCG-1), is sponsoring capital costs for a GHG and Environmental Management Tool. 0 The business/policy environmental support for each of the witnesses listed above is addressed after the discussion of my sponsored costs, in Section IV of my testimony. As for reference, I have also included a Witness Matrix for SoCalGas Environmental Policy and Costs in Appendix A. // // JT-
9 II. NON-SHARED COSTS A. Introduction Environmental Services non-shared O&M costs are contained in two cost categories: Environmental Compliance and NERBA. Table summarizes the total non-shared O&M forecasts for the listed cost categories. TABLE Non-Shared O&M Summary of Costs ENVIRONMENTAL Shown in Thousands of 01 Dollars Categories of Management 01 Adjusted- TY01 Change Recorded Estimated A. Environmental Compliance,, B. New Environmental Reg Balancing,01,0 Acct (NERBA) Total,0, 1, B. Environmental Compliance 1. Description of Costs and Activities The compliance activities in this non-shared O&M cost category include management of hazardous waste and TSDF operations, oversight of daily environmental compliance activities and permits, and support for sustainability and compliance with all operations and maintenance activities and associated facilities. There are currently.1 Full-Time Equivalents (FTEs) supporting this cost category. The incremental increase of $K includes a request for labor adjustment for full year funding (0. FTEs), two incremental subject matter experts to support environmental sustainability programs ( FTEs), and non-labor costs associated with renewal of hazardous waste permit fees for two TSDFs. The fulfillment of this request will result in FTEs in this non-shared service category.. Forecast Method A base year forecasting methodology was used to forecast labor and non-labor for this cost category. This method is most appropriate because it identifies specific new environmental regulatory and program-related requirements impacting the company during the GRC period, which are incremental to base year incurred costs. The costs in this cost category have risen in each consecutive year since 00; therefore, traditional averaging based on historically recorded JT-
10 costs would yield an unreliable and low forecast, and would fail to capture the incremental costs forecasted for TY 01. Our compliance requirements will change additively with new requirements that would not be captured using historic year averages. For example, new water quality requirements are resulting in cost upward pressures. SoCalGas faces specific fee increases, new permit conditions, and is partnering with other utilities to share costs for programmatic permits, which will help to control long-term costs. The other upward pressures are environmental compliance related or for system enhancements to support GHG reporting. These costs are also additive to our base year operations. Starting with the base year represents a reasonable base upon which to apply forecasted incremental cost pressures described below. See workpapers for EV (Ex. SCG-1-WP).. Cost Drivers The following is a breakdown of the components of our incremental cost request of $K for this cost category: Breakdown of Costs in Environmental Compliance ($000) EV : Environmental Compliance Labor full year funding (. FTEs) $ Consulting Fee for renewal of hazardous $ waste permit for two TSDFs 1 Environmental Sustainability Operational Support. My organization needs two Environmental Specialists by 01 to support and run the company s Green Operations Initiative. Beginning in 01, Environmental Services assumed responsibility for coordinating and supporting SoCalGas Green Operations Initiative. The objective of the Green Operations Initiative is to establish a company-wide baseline environmental footprint and develop/implement a -year plan to mitigate and/or reduce that footprint. This initiative will support regulatory requirements (e.g., Assembly Bill (AB)), give SoCalGas the ability to anticipate and respond to issues vital to California (e.g., drought and climate change) and bring innovation and sustainability to company operations. Through the Green Operations Initiative, SoCalGas will be developing GHG emissions reduction goals. 1 The cost forecast for the TSDF Department of Toxic Substances Control Permit Renewal ($K in 01) will need to be adjusted and will be corrected in a forthcoming errata submission. SCG-1-WP, Non-Shared O&M workpapers for EV JT-
11 The Green Operations Initiative will include developing a centralized environmental data collection system, identifying key performance indicators, setting goals for reducing the company s environmental footprint, analyzing operational processes for efficiencies and cost reduction opportunities, and establishing an annual cycle of monitoring with operations. Currently, one FTE is responsible for managing and implementing the Green Operations Initiative for the company. Thus, my department lacks the expertise and resources needed to develop the data collection system and to carry out the functions of the Green Operations Initiative. As one of the largest natural gas utilities in the country, SoCalGas is an integral player in the efforts to reduce emissions and promote a cleaner environment in California. SoCalGas needs the resources to execute its goals. The incremental investment in two dedicated FTEs is both reasonable and necessary to get the Green Operations Initiative operational and to keep the company on track to meet the longer-term goals of minimizing the company s environmental footprint. See workpapers for EV (Ex. SCG-1-WP). TSDF Department of Toxic Substances Control Permit Renewal. SoCalGas maintains and operates two hazardous waste TSDFs to efficiently consolidate and manage its hazardous wastes for the company. Located within in the City of Pico Rivera and the City of Los Angeles, both of these TSDFs have a Standardized Series B permit that will expire on July 0, 01 and May, 01, respectively. The permit application process requires a consultant to support development of the TSDF permit renewal, associated technical documents, agency meetings and inquiries and public outreach. The permit development process will take place in 01, and the associated non-labor costs incurred in 01. The development process for a Standardized Series B permit is a technical process that takes about a minimum of 0 days, which includes preparing and submitting an application, providing and updating emergency response plans and associated paperwork as well as technical review time by agency. See workpapers for EV (Ex. SCG-1-WP). C. NERBA 1. Description of Costs and Activities a. Background See Footnote 1. JT-
12 In the 0 GRC, the Commission approved the NERBA as a two-way balancing account, and adopted cost forecasts for the costs SoCalGas proposed to record in the NERBA. The currently authorized NERBA costs include (1) AB Administration Fees; () Gas Cap and Trade related costs; and () Subpart W costs. The intent of the NERBA is to record costs meeting the following key criteria: (1) uncertainty as to the scope, magnitude, and mechanics of the compliance requirements associated with new, proposed, or evolving environmental rules or regulations; and () potential for incurring significant incremental costs. b. Proposal Environmental Services is requesting that the existing NERBA two-way balancing account be authorized to continue during this GRC cycle (for AB Administrative Fees and Subpart W costs) with the following three updates: 1. Removal of the Cap and Trade related costs from the NERBA, upon the condition that the Commission authorize recording of these costs pursuant to Rulemaking (R.) Because the rulemaking is an active proceeding that deals squarely with gas Cap and Trade, Cap and Trade related costs, it is appropriate and logical to transition these costs and related ratemaking proposals to R To facilitate this proposal, SoCalGas has removed any historical/forecasted costs from the GRC. However, until a final decision is reached in the rulemaking, and a mechanism is adopted and implemented to record Cap and Trade related costs, SoCalGas will continue to use NERBA to record these costs, and will use the advice letter process to facilitate any transfer or disposition of NERBA balances.. Inclusion of O&M costs for compliance with the anticipated MS compliance requirements as a new cost to be recorded in the NERBA for inclusion into rates. The MS O&M costs relate to facilities expenses and thus sponsored by Ms. Herrera (Ex. SCG-1). A discussion of the MS compliance related costs is contained in the cost drivers section.. Inclusion of costs for Leak Detection and Repair (LDAR) program activities as a new cost to be recorded in the NERBA for inclusion into rates. A discussion of the LDAR related costs are contained in the cost drivers section. See Decision (D.) (0 GRC decision) and implementing Advice Letter 0-G. R , Order Instituting Rulemaking to Address Natural Gas Distribution Utility Cost and Revenue Issues Associated with Greenhouse Gas Emissions, March 1, 01. JT-
13 A complete snapshot of SoCalGas proposed NERBA is shown below. Overview Scope of NERBA ($000) NERBA Item 01 Cost Status Witness Reference AB Administrative Fees $, Continue in 01 GRC period Cap and Trade N/A Remove from NERBA LDAR Impact Program $ Add to NERBA MS Local Ordinance Compliance $10 Add to NERBA Herrera, Carmen $ 0 Subpart W $ Continue in 01 GRC $0 period Baker, Phillip The regulatory accounting for the NERBA is addressed by Mr. Reginald Austria, witness for Regulatory Accounts (Ex. SCG-).. Forecast Method A base year forecast methodology plus incremental upward pressures was used to determine cost requirements for NERBA as a cost category. The proposed new additions to NERBA (MS O&M and LDAR) are treated as incremental costs to the base year amount. Historical averaging is a less reliable methodology for this cost category. For example, AB Administrative Fees, which comprise the largest portion of NERBA, began in 0. A -year average would yield an unreasonably low forecast because it would factor in zero costs for 00. Base year 01 is a conservative starting point for applying incremental pressures to calculate our test year requirements. See workpapers for EV (Ex. SCG-1-WP).. Cost Drivers This cost category currently has 0. FTEs. The incremental increase of $K includes a request for one subject matter expert to support greenhouse LDAR Impact Program (1 FTE), and non-labor costs associated with Subpart W, MS, and LDAR. AB Administrative Fees. Since 0, SoCalGas has paid AB Administrative Fees, which are for the CARB to recover its costs to implement AB. AB requires public utility gas corporations, such as SoCalGas, to pay annual administrative fees for each therm of natural gas they deliver to any end user in California, excluding natural gas delivered to electric JT-
14 1 1 generating facilities and to wholesale providers. SoCalGas cannot determine either the fuel delivered to customers or the exact common carbon cost to provide very detailed projections. However, we have not observed total gas deliveries and the changes in the common carbon cost resulting in any predictable upward pressures. As such, SoCalGas is not seeking additional dollars for the AB Administrative Fees beyond base year levels, although it is prudent to continue to balance this cost item due to these restrictions on developing a detailed projection. Subpart W. Both the federal and state mandatory GHG Reporting Rules require Petroleum and Natural Gas Systems to report GHG emissions annually. The federal requirement is embodied in Title 0, CFR, Part, Subpart W. The state requirement is contained in Title 1, California Code of Regulations (CCR), Sub-Article, beginning with section 10. Typical activities that must be conducted per Subpart W requirements include: Gas Distribution Subpart W compliance monitoring, recordkeeping and reporting (MRR) conducted by contractors and/or internal labor such as leak surveys on meter and regulation stations each year; Compliance MRR tools and software such as optical imaging, high flow sampling or other required leak surveying equipment and associated software to support compliance MRR; Compliance MRR conducted by contractors and/or internal labor such as development and maintenance of the Best Available Monitoring Methods (BAMM) and monitoring plans as well as leak surveying and internal labor oversight and management of contractors performing any compliance MRR functions; Transmission and Storage Operations Subpart W compliance MRR conducted by contractors and/or internal labor such as development and maintenance of the BAMM and monitoring plans as well as leak surveying and internal labor oversight and management of contractors performing any compliance MRR functions; Environmental Services Subpart W compliance MRR by contractors and/or internal labor such as reporting to EPA s electronic GHG reporting tool, rule language review and analysis; Environmental Services Subpart W compliance MRR software and tools; Gas Engineering Subpart W compliance MRR support such as activities to measure compressor venting/fugitive emissions, purchasing and training on survey equipment (e.g., at elevated locations with optical gas imaging cameras) and support of BAMM; Internal labor for administrative support and oversight of Subpart W compliance JT-
15 Substantial changes in both the federal and state Subpart W regulatory language and requirements have been approved within the past year. The regulation changes dictate how and when SoCalGas compliance MRR activities are both carried out in the field as well as reported to the respective agencies. Even though the state regulatory language seeks to incorporate various portions of 0 CFR by reference, there are also key differences between the two. As a result of the extensive regulatory changes, significant time and effort has been spent by Environmental Services, Gas Transmission and Storage Personnel and third party consultants to provide comments on rule changes and subsequently make substantial modifications to MRR Monitoring Plans for each affected SoCalGas facility. In addition, the cost of verification services for affected facilities has increased significantly now that MRR verification activities are critical to Cap and Trade compliance for all major sources. Finally, training of field personnel and reporting/management tools and documentation are needed due to the rule updates. These factors account for the considerable upward pressures that drive projections for to exceed the 01 actual spend. See Mr. Baker s testimony (Ex. SCG-0) and my workpapers for cost category EV (Ex. SCG-1-WP). MS Local Ordinance Compliance. The RWQCBs issue National Pollutant Discharge Elimination System (NPDES) permits to MS owners/operators that include counties, cities, and flood control districts. Municipalities and MS owners/operators, in turn, must regulate dischargers located within their jurisdiction, including commercial facilities. This includes requiring commercial facilities to minimize discharge of pollutants to the MS through the implementation of Best Management Practices (BMPs). Since NPDES permits are renewed on a five-year cycle and are generally becoming more stringent, municipalities may become more stringent in enforcing BMP implementation on commercial facilities. MS owners/operators are required to inspect and regulators can enforce BMP implementation at these facilities and can impose further compliance requirements if the facility is located in a watershed of an impaired waterbody that has a Total Maximum Daily Loading (TMDL). One of the most cost effective BMPs is good housekeeping and sweeping. Currently, most SoCalGas facilities are swept on a monthly basis. To lower potential pollutant discharge from commercial activities and vehicular traffic at SoCalGas facilities, it may be necessary to increase sweeping to a frequency of twice a month for approximately facilities. See Ms. Herrera s testimony (Ex. SCG-1) for O&M forecasted cost related to MS compliance activities. JT-
16 LDAR Impact Program. SB11 was enacted on September 1, 01. It requires California Public Utilities Commission to adopt rules and procedures governing the natural gas leakage abatement for those commission-regulated gas pipeline facilities that are intrastate transmission and distribution lines to reduce emissions of natural gas pursuant to the California Global Warming Solutions Act of 00. When considering the California Global Solution Act of 00, it is important to note that the recent CARB AB Climate Change Scoping Plan updates indicated the intent to minimize methane emissions from natural gas transmission and distribution systems. The Scoping Plan proposes that CARB work with local air agencies to develop regulations to reduce GHG fugitive emissions from these systems. The requirements of SB11 differ from current requirements under Environmental Protection Agency (EPA) Subpart W for fugitive emission monitoring and leak detection in that the intent is to minimize gas distribution system leaks and any associated fugitive methane emissions through rigorous leak testing and repairs establishing a reduction requirement that is not currently present in EPA Subpart W. SB11 rulemaking is expected to be completed during the rate case period with initial costs to SoCalGas in 01. Impacts and anticipated costs of the new requirements cannot be precisely calculated at this time, although cost estimates developed herein permits flexibility to adjust target methane emissions reductions and actual costs necessary to meet the anticipated regulatory requirements for emission reductions in either the test year or post-test years. Because the final conditions of the requirements in SB11 cannot be exactly known or precisely accounted for at this time, this would be appropriate candidate for inclusion to the existing NERBA two-way balancing account. SoCalGas would therefor propose that it be added to the existing NERBA two-way balancing account as a new component with authorized expense tracking. See workpapers for EV (Ex. SCG-1-WP). The new emergent environmental requirements noted above have the same characteristics as the legislation that prompted SoCalGas to propose the NERBA in the last GRC. The rulemaking for LDAR and MS is expected to be completed during the rate case period with initial costs to SoCalGas in 01. The anticipated costs of the new requirement California Legislative Information, Senate Bill 11 - Natural gas: leakage abatement (September 1, 01), JT-
17 cannot yet be precisely calculated, although a range can be estimated, the anticipated range of costs exceeds an amount that might be reasonably absorbed in routine operations in either the test year or post-test years. Because of these characteristics, this new requirement would appear to be a suitable candidate to add to the existing NERBA two-way balancing account. III. SHARED COSTS A. Introduction Environmental Services shared O&M costs are contained in two cost categories: Environmental Programs and Policy, Oversight & Compliance. Table summarizes the total shared O&M forecasts for the listed cost categories. TABLE Shared O&M Summary of Costs ENVIRONMENTAL Shown in Thousands of 01 Dollars Incurred Costs (0% Level) Categories of Management 01 Adjusted- TY01 Change Recorded Estimated A. Environmental Programs,0,10 0 B. Policy, Oversight & Compliance Management Total Shared Services (Incurred),, 0 I am sponsoring the forecasts on a total incurred basis, as well as the shared services allocation percentages related to those costs. Those percentages are presented in my shared services workpapers, along with a description explaining the activities being allocated. See Ex. SCG-1-WP. The dollar amounts allocated to affiliates are presented in our Shared Services Policy and Procedures testimony. See Ex. SCG-. B. Environmental Programs 1. Description of Costs and Activities The compliance activities in this shared service O&M cost category includes labor cost associated with day-to-day environmental compliance activities in water quality environmental permitting, conducting project screening for potential environmental impacts, and providing compliance guidance and oversight and currently has 1. FTEs. The incremental increase of $0K includes a request for labor full year funding for an Air Quality Specialist (0. FTEs), two JT-
18 incremental water quality subject matter experts ( FTEs), and non-labor costs associated with increasing water quality stringent permit requirements and development of programmatic permits and supporting GHG reporting,. The fulfillment of this request will result in 1. FTEs in this shared service category.. Forecast Method A base year forecast methodology plus incremental upward pressures was used to determine cost requirements. This method is most appropriate because it identifies specific environmental regulatory changes and their related costs impacting the company during the GRC period. The specific cost drivers are more appropriately applied to base year spend to derive a Test Year forecast. Historical averaging would ignore those cost drivers in developing a forecast. See workpapers for cost center 00-1 (Ex. SCG-1-WP).. Cost Drivers The following breaks down the components of the $0K increase for this cost category. Breakdown of Costs in Environmental Programs ($000) : Environmental Programs Labor full year funding (. FTEs) $ California SWRCB Annual Permit Fees $ Water Quality Programmatic Permits $1 GHG and Environmental Sustainability $ Management Tool Project California SWRCB General Permit for Storm Water Discharges Associated with Industrial Activities. On April 1, 01, the SWRCB adopted the Industrial Storm Water General Permit Order DWQ (Industrial General Permit) superseding the previous Order - 0-DWQ. The Industrial General Permit is a NPDES permit authorized by the Federal Clean Water Act (CWA) that regulates discharges associated with nine broad categories of industrial activities. The Industrial General Permit requires the implementation of management measures that will achieve the performance standard of Best Available Technology Economically Achievable and Best Conventional Pollutant Control Technology. SoCalGas has seven facilities (Aliso Canyon, Goleta, Honor Rancho, Montebello, Playa Del Rey, Olympic and Pico Rivera) subject to the requirements of the Industrial General Permit. To meet the new changes to this permit, SoCalGas will be required to increase internal and consultant support, amend the facilities Storm Water Pollution Prevention Plans, increase the sampling and testing frequencies JT-1
19 at each of the facilities, manage additional reporting requirements to the SWRCB, and implement minimum required BMPs as well as advanced structural BMPs to comply with Numerical Action Levels. See workpapers for cost center 00-1 and supplemental workpapers (Ex. SCG-1-WP). California SWRCB Annual Permit Fees. SWRCB has a fee schedule for the initial application and annual fees for the permits and water quality certifications that are issued by the SWRCB and the RWQCBs. These fees are reviewed on an annual basis. A revised fee schedule is normally adopted each September, effective from the previous July 1 to the following June 0. Fee incremental increases are based on historic fee increases using base year forecasting. Water Quality Programmatic Permits. Federal and state water quality laws and regulations require SoCalGas to obtain prior authorization through permits and/or certifications from the applicable water quality agencies (e.g., SWRCB, Army Corps of Engineers ACOE) for some of SoCalGas utility O&M and construction activities. Obtaining permits and certifications for each individual project may cause project delays and inconsistent permit requirements, and may result in increased costs for the projects. In contrast, programmatic permits can be used for multiple projects and establish standard application and approval processes and uniform compliance requirements which provide for more certain approval times and consistency in permit requirements between projects and can result in an overall reduction in project costs. Because of the advantages of programmatic permits, SoCalGas is working with other utility companies in California to obtain two different types of programmatic permits from SWRCB. SoCalGas is requesting funding for its share of the consultant costs associated with the development of the following water quality programmatic permits: 1) Programmatic CWA Section 01 Water Quality Certification and associated Waste Discharge Requirements (WDRs) for natural gas, electric and telecommunications linear projects, and ) Programmatic NPDES discharge permit for natural gas projects. Some of SoCalGas natural gas utility O&M and construction activities, even after implementing avoidance measures, must disturb areas regulated as jurisdictional waters (e.g., streams, rivers) under federal and/or state water quality laws. Work in Waters of the United States requires water quality permits to be obtained under CWA Section 0 through the ACOE. Each Section 0 permit must have an accompanying Section 01 Water Quality Certification (WQC) issued by the SWRCB or RWQCB. California WDRs are also required for similar JT-1
20 dredge or fill-type impacts to state-only jurisdictional waters. Similar activities and similar permitting is required of other natural gas, electric and telecom companies that conduct linear underground/overhead projects (LUPs) in California. To facilitate permitting for these activities, reduce permitting delays and to obtain uniform permit requirements throughout the state, a number of natural gas, electric and telecom companies will request a programmatic Section 01 WQC and associated WDRs from the SWRCB. The costs to develop these permits will be shared by the participating companies. Natural gas pipeline O&M and construction activities require trenching and excavation to uncover existing buried pipelines and/or installation of new pipelines. In some cases, when trenching and excavation occurs, groundwater is encountered and will likely be removed to complete these activities. Additionally, required hydrostatic pressure tests of new or existing pipelines generates wastewater, for which we would generally need a permit to discharge it to surface waters. Similar activities and similar permitting is required of all of the major natural gas pipeline operators in the state of California. To facilitate permitting for these activities and other pipeline activities, and to obtain uniform permit requirements throughout the state, SoCalGas, in partnership with San Diego Gas & Electric Company (SDG&E) and Pacific Gas and Electric Company, is requesting one or more NPDES programmatic permits from the SWRCB. These permits focus only on wastewater discharges from natural gas facility activities. Costs are to fund third party consultants to develop a statewide, programmatic NPDES permit(s) for construction and maintenance work on natural gas facilities. See workpapers for cost center 00-1 and supplemental workpapers (Ex. SCG-1-WP). Water Quality Programs Staffing. Additional staff is needed at the total labor upward pressure of $1K for two additional in-house FTEs to support the new water quality compliance requirements described above. See workpapers for cost center 00-1 and supplemental workpapers (Ex. SCG-1-WP). GHG and Environmental Sustainability Management Tool Project. SoCalGas conducts both voluntary and mandatory reporting of its GHG inventory. SoCalGas voluntary GHG inventory reporting was initially to The California Climate Action Registry, now The Climate Registry. Pressure is increasing on businesses to have solid environmental data management tools in place for ensuring consistency, accuracy, traceability, and compliance. Currently SoCalGas is using various manual methods (i.e. spreadsheets) for collecting such data from JT-1
21 operations and customers for environmental requirements and it is difficult to quality assure for accurate inventorying and reporting needed to satisfy compliance obligations, analyze trends, forecast, and traceability. With the onset of increasingly complex environmental regulations such as the mandatory federal and state GHG requirements and the need to meet strategic objectives related to Corporate Responsibility/Sustainability and Green Operations Initiatives, a new tool is needed for the purpose of centralizing, analyzing, forecasting, reporting, monitoring, and quality assuring the GHG information. SoCalGas requires the O&M costs associated with the development of a new GHG and Environmental Sustainability Management Tool to manage the complex data collection, increased timeliness and accuracy of data analysis and reporting requirements needed for GHG compliance and to support the tracking of metrics that help to reduce SoCalGas environmental footprint. This software development is a shared service project with SDG&E for operational synergies and cost sharing. For capital costs associated with the development of the GHG and Environmental Management Tool, see Mr. Olmsted testimony (Ex. SCG-1). For O&M costs associated with the ongoing maintenance of the tool, see my workpapers for cost center C. Policy, Oversight & Compliance Management 1. Description of Costs and Activities The compliance activities in this shared service O&M cost category include Environmental Director oversight function and administrative assistants that support the organization and currently has.1 FTEs. The incremental increase of $K is an adjustment to annualize existing labor costs as well as capture incremental labor costs required to support my organization.. Forecast Method A base year forecast methodology plus incremental upward pressures was used to determine cost requirements. These are costs related to staffing of the management activities for Environmental Services. The incremental upward pressures, which are attributed to reflecting full year funding for these FTE positions, are best applied to a conservative base year level of costs. Traditional averaging or trending of historical costs would not appropriately capture the current and future staffing profile related to this cost center, while a base year starting point better reflects the activities and responsibilities of SoCalGas management function for Environmental Services. See workpapers for cost center 00-0 (Ex. SCG-1-WP). JT-1
22 Cost Drivers As described above, the primary reason for the incremental cost increase is annualizing existing labor costs and reflecting the incremental labor costs to perform this function. IV. SUPPORT FOR OTHER COST WITNESSES A. Leak Reduction Efforts (support for F. Ayala - Gas Distribution) Mr. Ayala is sponsoring O&M costs for the leak reduction efforts, which are in part supported by environmental requirements to reduce GHG emissions. In anticipation of legislative and regulatory methane reduction requirements Gas Distribution in addition to continuing with its trend of historical leak repairs included in the base forecast is taking action towards significantly reducing its pending leaks and proactively replace a larger number of services in a system wide effort to aggressively mitigate leaks starting in 01. This effort will reduce the number of pending main leaks, pending service leaks and leak maintenance and repair from 01 through 01. The project will complement a larger effort of SoCalGas quest to work down the leakage backlog. As mentioned earlier in this testimony, SB11 will require the Commission to adopt rules and procedures governing the operation, maintenance, repair and replacement of Commission-regulated gas pipeline facilities. SB11 proposes to minimize leaks as a hazard to be mitigated pursuant to the Natural Gas Pipeline Safety Act of 0 and to reduce emissions of natural gas from those facilities to the maximum extent feasible. Mr. Ayala addresses the costs forecasted for Gas Distribution pursuant to SB11. B. SWRCB (support for J. Dagg - Gas Transmission) Mr. Dagg is sponsoring O&M for the California State Water Resources Control Board s (SWRCB) annual permit fees, which are related to water quality mandates. Earlier in my Shared Costs section (Environmental Programs), I discussed the underlying environmental policies for this item in justification of my sponsored costs. That discussion also supports Mr. Dagg s forecasted costs. C. Subpart W (support for P. Baker - Underground Storage) Mr. Baker is sponsoring O&M costs related to Subpart W. Earlier in my Non-Shared Costs section (NERBA), I discuss the underlying environmental policies for this item in California Legislative Information, Senate Bill 11 - Natural gas: leakage abatement (September 1, 01), JT-1
23 justification of my sponsored Subpart W costs. That discussion also supports Mr. Baker s forecasted costs. D. MDAQMD and RWQCB (support for R. Stanford - Gas Engineering & Emergency Services) 1. MDAQMD (Air Quality) Mr. Stanford is sponsoring Capital and O&M costs for 1) Mojave Desert Air Quality Management District (MDAQMD), pursuant to its Rule 0 on Internal Combustion Engines. SoCalGas anticipates that MDAQMD will revise Rule 0 in a manner that will require SoCalGas to meet new emission limits and monitoring requirements at North and South Needles, Blythe, Adelanto, Kelso and Newberry Compressor Stations. Rule 0 is included in the MDAQMD s 01 Master Rule Development Calendar and it indicates that MDAQMD will amend Rule 0 to: Analyze [particulate matter] measures for cost effectiveness. Update for [Reasonably Available Control Technology]. Conform to [Air Toxics Control Measure], [National Emission Standards for Hazardous Air Pollutants] and [New Source Performance Standards]. MDAQMD Rule 0 was initially adopted in 1 and has not been amended in over fifteen years. There is significant interest at MDAQMD to revise the rule. SoCalGas participated in several recent discussions with the MDAQMD concerning the amendments. The agency indicated that they expect to publish the draft staff report and/or draft rule language by August 01. We anticipate that MDAQMD s Rule 0 amendments will establish emission limits and other requirements in a manner similar to South Coast Air Quality Management District (SCAQMD) Rule., Emissions From Gaseous- and Liquid-Fueled Engines (amended September, 01). Mr. Stanford addresses the costs forecasted pursuant to Rule 0 amendments.. RWQCB (Water Quality) Mr. Stanford is sponsoring O&M costs for Hydrostatic Test Water and Dewatered Groundwater Treatment for permit compliance, which relates to water quality mandates. Hydrostatic test and dewatering permits are NPDES permits renewed by the Regional Water Mojave Desert Air Quality Management District 01 Master Rule Development Calendar (February 01), JT-1
24 Quality Control Board (RWQCB) on a five-year cycle. Each year, conditions and effluent limits may become more stringent. Additionally, Total Maximum Daily Loading water quality standards may apply in certain impaired waterbodies; therefore, discharges in specific areas may have requirements that are more stringent. In order to meet permit conditions, treatment of wastewater prior to discharge may be necessary to comply with effluent limitations. Cost estimate is based on work conducted with a wastewater treatment vendor in 01. E. SWRCB and MS (support for C. Herrera - Fleet Services & Facilities) 1. SWRCB Ms. Herrera is sponsoring facilities O&M costs for California SWRCBs Industrial General Permit Renewal and annual permit fees, which I discuss in my Shared Costs section (Environmental Programs) to support my own O&M costs related to this item. That discussion also supports Ms. Herrera s forecasted costs.. MS Ms. Herrera is sponsoring forecasted facilities O&M costs related to MS ordinance compliance, which I discuss earlier in my Non-Shared Costs section (NERBA). That discussion also supports Ms. Herrera s forecasted costs. F. GHG and Environmental Management Tool (support for C. Olmsted - IT) Mr. Olmsted is sponsoring the capital costs associated with the development of the GHG and Environmental Management Tool, pursuant to the Green Operations Initiative. Earlier in my Shared Costs section (Environmental Programs), I discussed the underlying environmental policies for this item in justification of my sponsored O&M costs. That discussion also supports Mr. Olmsted s forecasted capital costs. V. CONCLUSION My testimony and workpapers provide support for the costs I sponsor for Environmental Services, and the reasonableness of the methodologies used to derive those costs. Environmental Compliance is a critical element of our business and ecological stewardship. Our 01 Test Year forecasts represent a modest and justified increase over base year costs, and we respectfully ask the Commission to fully fund our important work so SoCalGas can continue to meet its obligations to applicable regulations and environmental stewardship. This concludes my prepared direct testimony. JT-1
25 VI. WITNESS QUALIFICATIONS My name is Jill Tracy. My business address is West Fifth Street, Los Angeles, California, 001. My current position is Director of Environmental Services within the Operations Support organization. The Environmental Services organization provides services to both SoCalGas and SDG&E. I joined Sempra Energy, the parent company of SDG&E and SoCalGas, in 00, where I served as a senior environmental counsel. I have been in my current position at SoCalGas since 01. I hold a Bachelor s of Art Degree in Independent Studies from the Vassar College and a Juris Doctorate from the University of New Hampshire School of Law. I have not previously testified before the Commission. // // JT-0
26 APPENDIX A - WITNESS MATRIX FOR SOCALGAS ENVIRONMENTAL POLICY AND COSTS Witness Matrix for SoCalGas Environmental Policy and Costs # Issue AREA Witness Sponsor for Witness Sponsor for Environmental Policy Environmental Cost 01 California SWRCB Annual Permit Fees Environmental Services (SCG-1-WP) Gas Transmission Real Estate, Land & Facilities (SCG-1) Dagg, John (SCG-0-WP) Herrera, Carmen (SCG-1-WP) 0 California SWRCB Industrial General Permit Renewal 0 Environmental Sustainability Operational Support 0 Greenhouse Gas and Environmental Sustainability Management Tool Project 0 Hydrostatic Test Water and Dewatered Groundwater Treatment for Permit Compliance 0 Leak Reduction Effort (SB11) Real Estate, Land & Facilities Gas Storage Environmental Services IT (Capital) Environmental Services (O&M) Gas Engineering Gas Distribution 0 NERBA AB Admin Fees Environmental Services 0 NERBA - Leak Detection and Repair (LDAR) Impact Program Environmental Services 0 NERBA - Municipal Separate Storm Sewer Systems (MS) Environmental Services NERBA Regulatory Accounts Regulatory Accounts NERBA Subpart W Environmental Services Gas Transmission & Storage Rule 0 - (MDAQMD) Gas Engineering 1 SWRCB CWA Section 01 Water Quality Certification For Linear Utilities Projects 1 SWRCB NPDES discharge permit for Natural Gas Pipeline Projects Environmental Services Environmental Services (SCG-1) (SCG-1) (SCG-1) (SCG-1) (SCG-1) (SCG-1) (SCG-1) (SCG-1) Austria, Reginald (SCG-) (SCG-1) (SCG-1) (SCG-1) (SCG-1) Herrera, Carmen (SCG-1-WP) Baker, Phillip (SCG-0-WP) (SCG-1-WP) Olmsted, Christopher (SCG-1-CWP) (SCG-1-WP) Stanford, Raymond (SCG-0-WP) Ayala, Frank (SCG-0-WP) (SCG-1-WP) (SCG-1-WP) Herrera, Carmen (SCG-1-WP) Austria, Reginald (SCG-) (SCG-1-WP) Baker, Phillip (SCG-0-WP) Stanford, Raymond (SCG-0-WP) (SCG-0-CWP) (SCG-1-WP) (SCG-1-WP) JT-A-1
27 APPENDIX B GLOSSARY OF ACRONYMS AB ACOE BAMM BMP CARB CCR CFR CWA EPA GHG LDAR LUPs M&R MDAQMD MRR MS NERBA NPDES RWQCB SB SCAQMD SWRCB TMDL TSDF VOC WDR WQC WQIP Assembly Bill Army Corps of Engineers Best Available Monitoring Methods Best Management Practice California Air Resources Board California Code of Regulations Code of Federal Regulations Clean Water Act Environmental Protection Agency Greenhouse Gas Leak Detection and Repair Linear Underground/Overhead Projects Meter and Regulation Mojave Desert Air Quality Management District Monitoring, Recordkeeping and Reporting Municipal Separate Storm Sewer Systems New Environmental Regulatory Balancing Account National Pollutant Discharge Elimination System Regional Water Quality Control Board Senate Bill South Coast Air Quality Management District California State Water Resources Control Board Total Maximum Daily Loading Treatment Storage and Disposal Facilities Volatile Organic Compound Waste Discharge Requirement Water Quality Certification Water Quality Improvement Plan JT-B-1
SDG&E DIRECT TESTIMONY OF CARMEN L. HERRERA FLEET SERVICES. November 2014
Company: San Diego Gas & Electric Company (U0M) Proceeding: 01 General Rate Case Application: A.1-- Exhibit: SDG&E-1 SDG&E DIRECT TESTIMONY OF CARMEN L. HERRERA FLEET SERVICES November 01 BEFORE THE PUBLIC
PREPARED DIRECT TESTIMONY OF GREGORY D. SHIMANSKY ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY DECEMBER 15, 2010
Application of Southern California Gas Company for authority to update its gas revenue requirement and base rates effective on January 1, 01. (U0G) Application -1- Exhibit No.: (SCG-) PREPARED DIRECT TESTIMONY
This is a draft document for review by the Oregon Greenhouse Gas Reporting Advisory Committee April 1, 2010
This is a draft document for review by the Oregon Greenhouse Gas Reporting Advisory Committee April 1, 2010 DEPARTMENT OF ENVIRONMENTAL QUALITY Chapter 340 Proposed Rulemaking STATEMENT OF NEED AND FISCAL
NAPA COUNTY WATERSHED SYMPOSIUM
Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath
Fixing the Leaks: What Would it Cost to Clean Up Natural Gas Leaks?
FACT SHEET AND ANALYSIS Fixing the Leaks: What Would it Cost to Clean Up Natural Gas Leaks? About the Authors: The study was designed, carried out, and written by Carbon Limits, a Norwegian consulting
V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials
E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of
For additional information on qualifications and experience of representative EDGE senior staff members, please contact us.
About Us Edge Engineering & Science, LLC (EDGE) is a privately owned professional services firm headquartered in Houston, Texas. EDGE was established with the primary goal of providing high quality environmental
5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
Incorporating Greener Cleanups into Remedy Reviews
Association of State and Territorial Solid Waste Management Officials (ASTSWMO) Incorporating Greener Cleanups into Remedy Reviews Prepared by the Greener Cleanups Task Force Under the Sustainability Subcommittee
AGENCY SUMMARY NARRATIVE
AGENCY SUMMARY Mission Statement and Statutory Authority DEQ s mission is to be a leader in restoring, maintaining and enhancing the quality of Oregon s air, water and land. The Department of Environmental
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.
REQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL FOR DEVELOPMENT OF THE CITY OF CLAYTON SEWER SYSTEM MANAGEMENT PLAN (SSMP) PROPOSALS MUST BE RECEIVED BY: FRIDAY, 01/17/2014 AT 4:00 PM SSMP Request for Proposal Released 12/18/2013
III. Relying on another Governmental Entity
I. Permittee Information Permittee Name Cowlitz County Contact Name Patrick Harbison Permittee Coverage Number WAR4-524 Phone Number 36-577-33 Mailing Address 16 13th Ave. S City State Zip + 4 Kelso WA
ENVIRONMENTAL PROTECTION AGENCY
ENVIRONMENTAL PROTECTION AGENCY Fees Requires application fees for state isolated wetlands permits to be credited to the Surface Water Protection Fund, which is used for the administration of surface water
The California Environmental Protection Agency works to restore, protect,
Environmental Protection The California Environmental Protection Agency works to restore, protect, and enhance environmental quality. The Agency coordinates the state s environmental regulatory programs
Natural Gas End-use Report
San Diego County Greenhouse Gas Inventory An Analysis of Regional Emissions and Strategies to Achieve AB 32 Targets Natural Gas End-use Report Scott J. Anders Director, Energy Policy Initiatives Center
NEW JERSEY ENVIRONMENTAL INFRASTRUCTURE TRUST. Financial Assistance Programs for Environmental Infrastructure Facilities
ENVIRONMENTAL PROTECTION AND NEW JERSEY ENVIRONMENTAL INFRASTRUCTURE TRUST Financial Assistance Programs for Environmental Infrastructure Facilities Proposed Readoption: N.J.A.C. 7:22 Authorized By: Bob
Iowa Smart Planning. Legislative Guide March 2011
Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The
Sewer System Management Plan (SSMP) 2009. Eastern Municipal Water District
Sewer System Management Plan (SSMP) 2009 Eastern Municipal Water District Table of Contents 1.0 SSMP Goals... 3 Goal 1A:... 3 Goal 1B:... 3 2.0 Organizational Structure... 3 3.0 Legal Authority... 4 4.0
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM
Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM This section of the SSMP discusses the City s FOG control measures, including identification of problem areas, focused cleaning, and source control.
Office of. City Attorney. City of San Diego MEMORANDUM MS 59 (619) 533-5800 QUESTION PRESENTED
Office of The City Attorney City of San Diego MEMORANDUM MS 59 (619) 533-5800 DATE: TO: FROM: SUBJECT: Honorable Mayor and City Councilmembers City Attorney Climate Action Plan QUESTION PRESENTED Are the
PREPARED DIRECT TESTIMONY OF MICHAEL R. WOODRUFF ON BEHALF OF SAN DIEGO GAS & ELECTRIC COMPANY AND SOUTHERN CALIFORNIA GAS COMPANY
Application No: A.1-0-01 Exhibit No.: Witness: M. Woodruff In The Matter of the Application of San Diego Gas & Electric Company (U 0 G) and Southern California Gas Company (U 0 G) for a Certificate of
NEVADA CITY WASTEWATER TREATMENT INQUIRY
NEVADA CITY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated
Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,
Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework
Element 3: OVERFLOW EMERGENCY RESPONSE PLAN
Element 3: OVERFLOW EMERGENCY RESPONSE PLAN The section of the SSMP discusses the City s overflow emergency response plan, which is included in full in Appendix B. This section fulfills the Overflow Emergency
Best Management Practices (BMPs) Ideas for School Districts. Presented by: Donald Lussier
Best Management Practices (BMPs) Ideas for School Districts Presented by: Donald Lussier What Will We Learn? What are BMPs? Why we need them? What to consider when selecting them? What should your BMP
7 CFR Parts 3400, 3401, 3402, 3403, 3405, 3406, 3407, 3415, 3430, and 3431
This document is scheduled to be published in the Federal Register on 02/16/2016 and available online at http://federalregister.gov/a/2016-02473, and on FDsys.gov Billing Code: 3410-KS-P DEPARTMENT OF
Pollution Liability Insurance Agency
Pollution Liability Insurance Agency 2002 Annual Report USTCAP grant site Mazama Store, Okanogan County Working to support a public private partnership that fosters economic and environmental quality,
CITY OF CORONADO SEWER SYSTEM MANAGEMENT PLAN
CITY OF CORONADO SEWER SYSTEM MANAGEMENT PLAN June 2009 Prepared For: The City of Coronado Public Services 101 B Avenue Coronado, California 92118 Prepared By: 9275 Sky Park Court, Suite 200 San Diego,
How To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
About this document. UPS Attention: Sustainability Report Editor 55 Glenlake Parkway N.E. Atlanta, Georgia 30328
UPS Corporate Sustainability Report: Supplemental Data Table of Contents Water 2 Effluents and Waste 3 Compliance 5 Key Performance 7 Indicators About this document In, UPS reported its annual Corporate
2013-2015. Milwaukee Metropolitan Sewerage District STRATEGIC PLAN
Milwaukee Metropolitan Sewerage District STRATEGIC PLAN 2013-2015 The Strategic Plan identifies the District s strengths, weaknesses, opportunities, and threats, and provides direction and focus to help
ILLINOIS DEPARTMENT OF CENTRAL MANAGEMENT SERVICES CLASS SPECIFICATION ENERGY AND NATURAL RESOURCES SPECIALIST SERIES
ILLINOIS DEPARTMENT OF CENTRAL MANAGEMENT SERVICES CLASS SPECIFICATION ENERGY AND NATURAL RESOURCES SPECIALIST SERIES CLASS TITLE POSITION CODE ENERGY AND NATURAL RESOURCES SPECIALIST TRAINEE 13715 ENERGY
City of Los Angeles Bureau of Sanitation Business Development Services
City of Los Angeles Bureau of Sanitation Business Development Services OUR MISSION IS TO PROTECT PUBLIC HEALTH AND THE ENVIRONMENT TABLE OF CONTENTS BUSINESS DEVELOPMENT SERVICES...2-5 EFFORTS TO FACILITATE
John Keel, CPA State Auditor. An Audit Report on The Dam Safety Program at the Commission on Environmental Quality. May 2008 Report No.
John Keel, CPA State Auditor An Audit Report on The Dam Safety Program at the Commission on Environmental Quality Report No. 08-032 An Audit Report on The Dam Safety Program at the Commission on Environmental
4.7.2 Regulatory Framework
CHAPTER 4 Environmental Analysis in the environment, can cause various human health effects, including liver injury, irritation of the skin and mucous membranes, and adverse reproductive effects. PCBs
Ocean Dumping Act: A Summary of the Law
Claudia Copeland Specialist in Resources and Environmental Policy December 15, 2010 Congressional Research Service CRS Report for Congress Prepared for Members and Committees of Congress 7-5700 www.crs.gov
Storm Drain System Operation and Maintenance
Santa Clara Valley Urban Runoff Pollution Prevention Program PUBLIC AGENCY ACTIVITIES Performance Standard and Supporting Documents for Storm Drain System Operation and Maintenance December 19, 1996 March
Sanitary District No.5 of Marin County SSMP
2014 Sanitary District No.5 of Marin County SSMP Tony Rubio Sanitary District No.5 of Marin County 6/1/2014 INTRODUCTION...7 SSMP Requirement Background...7 Document Organization...7 District Service Area
ON-SITE WASTEWATER TREATMENT SYSTEMS ACT
ON-SITE WASTEWATER TREATMENT SYSTEMS ACT Revised and reproduced by the Colorado Department of Public Health and Environment June, 2012 (PLEASE NOTE: This is an unofficial copy of this statute. The official
City of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
Site Cleanup in Connecticut
Site Cleanup in Connecticut Taking the Mystery Out of Dealing with Contaminated Property in Connecticut: Information for Property Owners, Buyers, Sellers, Attorneys, Bankers, Insurance Representatives
Iowa Department of Natural Resources Environmental Protection Commission
Iowa Department of Natural Resources Environmental Protection Commission ITEM # DECISION TOPIC Notice of Intended Action: Chapter 100 Scope of Title Definitions Form Rules of Practice Chapter 101 - Solid
In 2012 the commercial sector natural gas demand was 201 billion cubic feet (bcf) or 2.01e + 23 thousand British thermal units (kbtu).
ENVIRONMENTAL SETTING The Southern California Gas Company (SoCalGas) provides natural gas to the City of Malibu. The City lies within the boundaries of the South Coastal distribution division. SoCalGas
Section 401 Water Quality Certification
Section 401 Water Quality Certification Department of Health Environmental Management Division Clean Water Branch Voice: (808) 586-4309 Fax: (808) 586-4352 http://www.hawaii.gov/health/environmental/water/cleanwater/index.html
COMPREHENSIVE ASSET MANAGEMENT STRATEGY
COMPREHENSIVE ASSET MANAGEMENT STRATEGY APPROVED BY SENIOR MANAGEMENT COMMITTEE ON AUGUST 23, 2012 (TO BE FINALIZED AFTER APPROVAL OF CAM POLICY BY COUNCIL) August 2012 Contents CONTENTS EXECUTIVE SUMMARY
MS4 MUNICIPAL SEPARATE STORM SEWER SYSTEMS. Purpose The magnitude of the MS4 program Where do the stormwater dollars go Benefits Authority
MS4 MUNICIPAL SEPARATE STORM SEWER SYSTEMS Purpose The magnitude of the MS4 program Where do the stormwater dollars go Benefits Authority What is the purpose of the MS4 program? To improve urban water
How To Get A Stormwater Discharge Permit In A City Of Scottsdale
Environmental Regulations Guide Section 4 Pollution Prevention 4. 0 Pollution Prevention The Pollution Prevention Act (PPA) focuses on source reduction, i.e. on reducing the amount of pollution through
Business Plan: Fleet Services
Business Plan: Fleet Services How does this service contribute to the results identified in the City of London Strategic Plan? A Strong Economy A Green and Growing City Fleet Services owns and manages
PREPARED DIRECT TESTIMONY OF TODD J. CAHILL SAN DIEGO GAS & ELECTRIC COMPANY
Application No.: A.0-0-. Exhibit No.: Witness: Todd J. Cahill Application of SAN DIEGO GAS & ELECTRIC COMPANY (U 0 E) for Recovery of Costs Related to the California Bark Beetle Infestation under the Catastrophic
COLORADO REGULATION 7
COLORADO REGULATION 7 Author: Jay Christopher, Business Unit Manager, Air & Process Services, Trihydro Corporation Jane Steere, QAQC Coordinator, Air & Process Services, Trihydro Corporation ABSTRACT The
EPA s proposed hazardous waste pharmaceutical regulations
EPA s proposed hazardous waste pharmaceutical regulations November 4, 2015 By J. Timothy Ramsey The United States Environmental Protection Agency ( EPA ) published proposed regulations in the Federal Register
DRAFT Public Outreach Document for What s an SSMP?
DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials
North Branch Chicago River Watershed-Based Plan
North Branch Chicago River Watershed-Based Plan EXECUTIVE SUMMARY In Lake County, the Lake County Stormwater Management Commission (SMC) is responsible for managing Lake County s water resources. The North
78th OREGON LEGISLATIVE ASSEMBLY--2016 Regular Session. Enrolled
78th OREGON LEGISLATIVE ASSEMBLY--2016 Regular Session Enrolled Senate Bill 1547 Sponsored by Senator BEYER; Senators BATES, BURDICK, DEMBROW, DEVLIN, GELSER, HASS, MONNES ANDERSON, MONROE, RILEY, ROSENBAUM,
Greater Los Angeles County Region
Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this
Guide to the Remediation Report & Fee Submission Form
Guide to the Remediation Report & Fee Submission Form May 1, 2012 TABLE OF CONTENTS 1 DEFINITIONS... 1 2 INTRODUCTION... 3 3 BACKGROUND... 3 3.1 EXISTING POLICY/GUIDELINES FRAMEWORK... 3 Domestic Fuel
DRINKING WATER SYSTEMS IMPROVEMENTS REVOLVING LOAN FUND PROGRAM FINAL REGULATIONS DRAFT AMENDMENT - JUNE 2016 PRESENTED TO THE BOARD FOR ADOPTION
DRINKING WATER SYSTEMS IMPROVEMENTS REVOLVING LOAN FUND PROGRAM FINAL REGULATIONS DRAFT AMENDMENT - JUNE 2016 PRESENTED TO THE BOARD FOR ADOPTION April 22, 2016 LOCAL GOVERNMENTS AND RURAL WATER SYSTEMS
Monterey Regional Water Pollution Control Agency. Sewer System Management Plan
Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance
Highlights of Colorado s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014
Highlights of Colorado s New Oil and Gas Hydrocarbon - Adopted February 2014 Presentation to the Colorado Counties, Inc. June 3, 2014 Mike Silverstein Colorado Department of Public Health and Environment
Developing Colorado s s Oil and Gas Emissions Controls Overview of the Process and Requirements
Developing Colorado s s Oil and Gas Emissions Controls Overview of the Process and Requirements Presentation for the Interstate Oil & Gas Compact Commission s Annual Business Meeting May 19, 2015 Mike
4.7 HAZARDS AND HAZARDOUS MATERIALS
LSA ASSOCIATES, INC. MARCH 2008 FINAL ENVIRONMENTAL IMPACT REPORT YUCCA VALLEY RETAIL SPECIFIC PLAN The State defines hazardous material as any material that, because of its quantity, concentration, or
CITY OF MINNEAPOLIS GREEN FLEET POLICY
CITY OF MINNEAPOLIS GREEN FLEET POLICY TABLE OF CONTENTS I. Introduction Purpose & Objectives Oversight: The Green Fleet Team II. Establishing a Baseline for Inventory III. Implementation Strategies Optimize
COMMUNITY CERTIFICATIONS
National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden
Continuous Monitoring Manual
January, 1992 Revisions: April, 2015 Operations Division 811 SW 6 th Avenue Portland, OR 97204 Phone: 503-229-5696 800-452-4011 Fax: 503-229-5850 Contact: Jill Inahara www.oregon.gov/deq DEQ is a leader
REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND
REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND Harford County, Maryland APRIL 2016 Black & Veatch Holding Company 2011. All rights reserved. Harford County Report on
June 22, 2012. The Local Government Sustainable Energy Coalition ( LGSEC ) 1 applauds the work of
[Type text] P.O. Box 3629 Oakland California 94609 510/459-0667 www.lgsec.org Comments of the Local Government Sustainable Energy Coalition to California Air Resources Board Regarding Public Input on Investment
ENVIRONMENTAL, ENERGY AND TRANSPORTATION MANAGEMENT
Court Services and Offender Supervision Agency for the District of Columbia POLICY STATEMENT ENVIRONMENTAL, ENERGY AND TRANSPORTATION MANAGEMENT I. COVERAGE This Policy Statement and its appended procedures
PREPARED DIRECT TESTIMONY OF YVONNE M. LE MIEUX ON BEHALF OF SAN DIEGO GAS & ELECTRIC COMPANY
Application No: A.1-0- Exhibit No.: Date: April 1, 01 Witness: Yvonne M. Le Mieux Application of San Diego Gas & Electric Company (U 0 E) for Approval of its Greenhouse Gas Forecasted Costs and Allowance
December 21, 2012. The services being procured through the proposed amendment are Hosting Services, and Application Development and Support for CITSS.
Justification for a Contract Amendment to Contract 2012-01: Interim Hosting and Jurisdiction Functionality for the Compliance Instrument Tracking System Service (CITSS) December 21, 2012 Introduction WCI,
INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
Garry Kaufman Colorado Air Pollution Control Division May 14, 2014
Garry Kaufman Colorado Air Pollution Control Division May 14, 2014 Colorado emissions data by sector Greenhouse gas emissions (GHG) Nitrogen oxides (NO x ) Volatile organic compounds (VOC) Past efforts
CHAPTER 4 ALTERNATIVES COMPARISON
CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections
ENVIRONMENTAL COST ACCOUNTING
ENVIRONMENTAL COST ACCOUNTING MAGNITUDES OF ENVIRONMENTAL COSTS Table 12.2 Pollution Abatement Expenditures by U.S. Manufacturing Industries (data reported by U.S. Congress, Office of Technology Assessment,
California Solar Initiative (CSI) Program 2007 Reservation Request Form and Program Contract [follows the second page Reservation Request form]
California Solar Initiative (CSI) Program 2007 Reservation Request Form and Program Contract [follows the second page Reservation Request form] CSI CONTRACT TERMS AND CONDITIONS This California Solar Initiative
Sustainable Development Strategy 2011-2014 Responsibility. Innovation. Commitment.
Canada Revenue Agency Sustainable Development Strategy 2011-2014 Responsibility. Innovation. Commitment. RC4087(E) Rev. 11 xxxx Message from the Commissioner The Government of Canada tabled its first Federal
Appendix C3: Response Plan for Investigations of Illegal Discharges, 2016
Appendix C3: Response Plan for Investigations of Illegal Discharges, 2016 Response Plan for Investigations For the City and County of Honolulu Municipal Separate Storm Sewer System National Pollutant Discharge
2015 -- H 6042 S T A T E O F R H O D E I S L A N D
LC00 01 -- H 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO TOWNS AND CITIES -- RHODE ISLAND COMPREHENSIVE PLANNING AND LAND USE ACT Introduced
) ) ) ) ) ) PREPARED DIRECT TESTIMONY OF SAN DIEGO GAS AND ELECTRIC COMPANY (U 902 E)
Application No: A.0-0-xxx Exhibit No.: Witness: Maury De Bont In the Matter of the Application of San Diego Gas & Electric Company (U 0 E) for Authorization to Recover Unforeseen Liability Insurance Premium
Market Tracking System
California Air Resources Board Office of Climate Change California Air Resources Board Revision History REVISION HISTORY REVISION # DATE OF RELEASE OWNER SUMMARY OF CHANGES 1.0 5/24/2010 Matthew B Public
Green Fleet Policy PURPOSE
PURPOSE The purpose of this policy is to document the process for purchasing and managing the City s diverse vehicle fleet, which include both vehicles and heavy equipment, in a manner that minimizes greenhouse