1 Example Operation, Management and Emergency Response Plan (O, M and ER Plan) for Northfield Village WWTF The attached Example O,M and ER Plan was developed by Chief Operator Patrick DeMasi and Assistant Chief Operator Phil Gleason for the Northfield Wastewater Treatment Facility, with assistance from Dennis Bryer and Paul Olander of the Vermont Department of Environmental Conservation (VTDEC). It was prepared according to the VTDEC document Written Guidance for Preparation of Plans to Prevent Sewage Spills (8/13/07). The Example Plan is intended as a supplement to the guidance document, to provide further assistance to the wastewater operations community in preparing the O, M and ER Plans required by Act 154, Section 5a). As the first plan to be prepared and submitted to VTDEC for approval, Northfield WWTF was selected for the Example. Act 154, Section 5a) requires that municipalities assess their wastewater treatment facility components to determine which components are prone to failures that would cause a significant release of untreated or partially treated sewage to waters of the State. The law further requires that the municipality set a schedule for the regular inspection of those components and prepare a plan to mitigate sewage spills resulting from a failure. The Department presented the August 2007 guidance document detailing treatment components and types of failures that must be considered in the assessment. Further guidance was presented in November 2007 in the form of presentation slides, on the definitions of key terms in the law, such as element prone to failure, significant release, and untreated or partially treated sewage. The slides also discuss the limits of planning requirements. Both documents were mailed to WWTF Chief Operators and are available on the Wastewater Management Division s website: in the Operation, Management and Emergency Response Plan section. The Northfield WWTF is a Sequencing Batch Reactor (SBR) type of facility, upgraded in 2004 from a 1966-built trickling filter process. The facility design flow is 1.0 MGD and currently receives an annual average of about 0.67 MGD. Preliminary treatment is by fine screening and an aerated grit chamber. There are two SBR basins, followed by a surge tank, and hypochlorination with bisulfite dechlorination. The facility has two aerated sludge holding tanks and dewaters sludge via centrifugation. The collection system served by the plant is a mix of piping types and ages. The Main Interceptor was constructed in 1966 and is reinforced concrete pipe in relatively good condition. Roughly half the sewerlines are on the East Side and are mostly clay tile, installed in 1905 and are in fair-to-good condition. The other half are on the West Side and are mostly clay tile installed in There are several newer small subsections in the system as well. There is one small submersible-type pump station which serves 5 houses, and nine concrete-encased, single-barrel gravity sewerline stream crossings in the system. Development of the Plan began by going through the treatment plant, pump station, stream crossings and collection system to develop a list of all equipment or systems prone to failure (List (1)), shown in Attachment A. The information included for each
2 Example Plan Introduction Page 2 component includes the age, history and condition of the equipment and the basis for the assessment of risk. The list style is not important partial sentences, an outline, bulletpoints, etc. are all appropriate. The purpose of the list is to provide documentation of whether to include (or not) a treatment component in the O, M and ER Plan. Note that this list is included in the Example Plan to illustrate the chosen method of assessing the equipment, but is not required to be submitted to the VT DEC. As described in the Plan Introduction section, a probability-risk assessment was used to determine whether equipment in List (1) posed a risk of significant release of untreated or partially treated sewage to surface waters of the State. Based on age, condition, history, etc., the probability of a failure was assigned to each component on a scale of 1 5. Based on proximity to water courses, potential to interfere with disinfection, presence of alarms, etc., the risk of a release was assigned on scale of 1 5. The probability and risk values for each component were multiplied and the product compared to a threshold value of 10. Those treatment system elements with probability-risk products of 10 and above were determined to be elements requiring inspection and response planning. The results of the evaluations for each component are summarized as List (1) (Attachment A). Note that the risk assessment methodology used in the Example Plan is but one approach for evaluating the risk of sewage spills from wastewater treatment system components. While the use of this particular method is not mandated, the Department will be evaluating all O, M and ER Plans to insure that they are comprehensive and contain a logical and reasonable justification for including (or not) a system component in the Plan. The Example Plan includes photo reproductions of the treatment facility piping plan (Attachment B) and the collection system plan (Attachment C). The collection system plan shows piping direction, sizes and a key to the piping materials and ages. Note that full-sized copies of those plans, not photos, should be attached to O, M & ER Plans submitted to VTDEC. The Plan also includes telephone contact lists for emergencies related to sewage spills (Attachment D). Note that the Example Plan includes the collection system. The current requirement from the Secretary of the Agency of Natural Resources is that O, M and ER Plans for wastewater treatment facility components, pump stations and stream crossings must be submitted by April 1, O, M and ER Plans for the collection system must be submitted by July 1, 2010, or as part of the permit renewal application for discharge permits which expire on or after July 1, For further information and assistance please call Dennis Bryer at , Paul Olander at , Liz Dickson at , or Suzanne Pickett at
3 NORTHFIELD WASTEWATER TREATMENT FACILITY I. Introduction: Operation Management and Emergency Response Plan This document contains the O, M and ER Plan for the Village of Northfield wastewater treatment facility and its pump station, sewerline stream crossings and collection system. It was developed in response to Section 5a) of Act 154, which requires municipalities to prepare and implement Operation, Management and Emergency Response Plans for their wastewater treatment facilities. All components of the treatment system were evaluated to determine whether they were elements prone to failure which, if one or more failed, would result in a significant release of untreated or partially treated sewage to the surface waters of the state. This evaluation was performed in accordance with the VTDEC s Written Guidance for Preparation of Plans to Prevent Sewage Spills (8/13/07). An assessment as to which components were prone to failure with a risk of significant release was made using a probability-risk method. Based on age, condition, history, etc., the probability of a failure was assigned to each component on a scale of 1 5. Based on proximity to water courses, potential to interfere with disinfection, presence of alarms, etc., the risk of a release was assigned on scale of 1 5. The probability and risk values for each component were multiplied and the product compared to a threshold value of 10. Those treatment system elements with probability-risk products of 10 and above were determined to be elements requiring inspection and response planning. The results of the evaluations for each component are summarized as List (1) in Attachment A. The Plan identifies the disinfection chemical feed pump and effluent flowmeter, the Jarvis Lane pump station, the nine sewerline stream crossings, and five known troublespots in the collection system as elements prone to failure with a significant risk of a release. Schedules for inspection and response plans to mitigate the effect of sewage spills on public health and the environment for these components are presented in the following sections. (1)
4 II. Wastewater Treatment Facility: All components of the plant were replaced or rehabilitated during the complete upgrade/refurbishment in Almost all components are new, protected by alarms, and with redundant critical systems. An overview of the WWTF layout is shown in Attachment B. The only components of the wastewater treatment facility deemed to need an inspection schedule and a response plan were the chemical feed pumps for chlorination and the effluent flow meter, which controls/paces the feed rate of the hypochlorite pumps. a. Chemical Feed Pumps: The chemical feed pumps were determined to have a moderate (2) probability for being prone to failure with a high (5) level of risk for a significant release of untreated or partially treated sewage to waters of the State. It is not uncommon for this type of pumping equipment to malfunction due to a ruptured diaphragm, debris blockage, or having become air-bound. As a result of such a malfunction, disinfection will be compromised or terminated. Inspection Schedule The chemical feed pumps were installed in 2004 as part of the facility upgrade. They are currently checked for proper operation twice per day, at the beginning and end of the work day, and this will continue to be the inspection schedule in the future. Response Plan The response plan for dealing with a malfunction of a chemical feed pump is to activate the backup pump that is provided in the chemical feed room at the treatment facility. (2)
5 b. Effluent Flow Meter The effluent flow meter was also determined to have a moderate (2) probability for being prone to failure with a high (5) level of risk for a significant release of untreated or partially treated sewage to waters of the State. Effluent flow meters are known to be vulnerable to electrical power surges and lightening strikes, either of which can render them inoperable. In situations where the flow meter controls the hypochlorite feed pumps, once the flow meter is compromised, disinfection will in turn be terminated. Inspection Schedule A new effluent flow metering system was installed as part of the facility upgrade in The flow meter is checked for proper operation at least once per day when the total daily sewage flow for the past 24 hours is recorded. This will continue to be the inspection schedule in the future. Response Plan The response plan for a failure of the effluent flow meter is to immediately restore disinfection by operating the hypochlorite feed pumps manually during decant periods. Then arrangements will be made to trouble shoot the problem with the flow meter itself, which may entail contacting an instrumentation specialist. (3)
6 III. Sewage Pump Station: There is one small sewage pump station (Jarvis Lane) in the collection system that serves five residences. The pump station was installed in 1988 and is equipped with dual alternating pumps, which increases the overall reliability of the station. Also, one of the pumps was replaced in 1998 and the other pump was replaced in A new pump control panel and floats, along with audio and visual alarms and a battery back-up power supply for the alarm system were installed in The pump station is located in a residential area, wherein an alarm condition will be promptly acknowledged. The wetwell has sufficient emergency storage volume above the alarm level to accommodate the incoming flow for at least five hours. The pump station was determined to have a moderately low (2) probability for being prone to failure with a high (5) level of risk for a significant release of untreated or partially treated sewage to waters of the State due to its very close proximity to a small waterway. Therefore an inspection schedule and a response plan for the pump station are necessary. Inspection Schedule The sewage pump station is currently checked for proper operation at least once per week. This will continue to be the inspection schedule in the future. Response Plan In the event of a spill at the sewage pump station, the overflow will be temporarily relieved by pumping down the station with the Village s vacuum sweeper and disposing of the contents at the wastewater treatment facility. The sweeper is equipped with a solids handling vacuum pump and an 800 gallon holding tank. Alternatively, a local septage hauler could be hired to pump and truck sewage from the pump station to the wastewater treatment facility. The Village also has a 500 gpm portable engine-driven pump and hoses that can be set up to transfer sewage from the pump station to a nearby sewer manhole on an adjacent reach of sewerline, until the repairs have been completed on the pump station. (4)
7 IV. Stream Crossings: There are a total of nine single barrel gravity sewerline stream crossings in the collection system. All of the crossings were constructed utilizing concrete-encased cast iron pipe buried in the stream bed. Seven of the stream crossings are associated with the main interceptor, which was constructed in These crossings were inspected with closedcircuit television equipment in 2006, and were found to be in good condition with no structural concerns. The stream crossing associated with the Water Street sewerline was constructed in This stream crossing was internally inspected in 1998, and was also found to be in good condition. The Doyon Road sewerline stream crossing was constructed in In 2006 the pipeline was stabilized with stone rip rap to address some undermining that had begun to develop. All of the stream crossings were determined to have a moderate (2-3) probability for being prone to failure with a high (5) risk for a significant release of untreated or partially treated sewage to waters of the State. Therefore an inspection schedule and a response plan for sewage spills associated with the stream crossings are necessary. A sewage spill at a stream crossing could occur as the result of either an in-line blockage or a structural failure. Inspection Schedule The Village recently purchased closed-circuit television (CCTV) equipment for internal inspection of sewerlines and the equipment has been installed in an enclosed work trailer. In the future, all of the stream crossings will be internally inspected with the CCTV equipment once per year, and a visual inspection of the streambed at each crossing will be performed at least twice per year; once following the springtime high flow period and again in the fall. (5)
8 Response Plan In the event of a sewage spill at a stream crossing due to an in-line blockage, refer to Section V, which pertains to the sewage collection system and wherein a response plan is established for dealing with sewerline blockages. In the event of a sewage spill at a stream crossing due to a structural failure, arrangements will be made to control the discharge of sewage from the structure. This will be accomplished through the use of inflatable plugs or sand bags in the manholes just upstream and downstream of the crossing. The Village has several different size inflatable plugs on hand, up to twelve inch diameter. Larger pipe sizes will require the use of sandbags. A portable engine-driven pump and hoses will be set up to maintain sewage flow around the stream crossing. The Village has a 500 gpm portable pump that would be used for situations involving lower sewage flows or as an initial action for larger sewage flows. If larger capacity portable pumping equipment is required it will be obtained from another municipality, or rented from Godwin Pumps, a local construction company, or a septage hauling/pumping company. A fully equipped construction company may need to be hired to repair the sewerline at a stream crossing. Several local companies are available. (6)
9 V. Sewage Collection System: The majority of the sewage collection system is between 70 and 100 years old (circa 1934 and 1905, respectively), and constructed of vitrified clay pipe. The Main Interceptor was installed in 1966, in conjunction with the construction of the original sewage treatment facility. The Main Interceptor was constructed with reinforced concrete pipe. Smaller extensions to the collection system were installed in 1940, 1955, 1988, 1992 and The 1940 and 1955 extensions were constructed using vitrified clay pipe and the 1988, 1992, and 1997 extensions are constructed of PVC. The pipe sizes and material for the various sections of sewerline, along with their age, are indicated on the collection system plan in Attachment C. The Main Interceptor was internally inspected with closed-circuit television equipment in 2005 to assess its condition. This inspection found the pipe to be structurally sound and in very good condition, despite being in service approximately 40 years. The Village has a high pressure jetter for flushing sewerlines, and by having this capability the entire collection system is cleaned on a five year cycle, or more often if deemed necessary. The portions of the collection system receiving storm water in addition to sanitary waste are flushed on a two year cycle. The Village will use the recently purchased closed-circuit television equipment for internal inspection of the sewerlines to routinely and conveniently inspect problem areas to identify the reason for recurring problems and to assess the effectiveness of flushing/cleaning activities. The equipment will be used to internally inspect the entire collection system to assess the current condition of the sewerlines and to identify locations in need of further attention or repair. There are five known problem areas within the collection system; four of which are associated with root intrusion and one associated with grease accumulation from a food preparation establishment. The known problem areas are also indicated on the drawing depicting the layout and configuration of the overall collection system. The root intrusion troublespots are as follows: On the East Side - Central St., MH1S to MH4S On the West Side - Water St MH8 to MH9, Vine Street MH4 to MH5 and the Pearl Street to Water Street connector. The grease accumulation troublespot is in the stub off the Main Interceptor that serves the restaurant. All of the collection system, and particularly the problem areas, were determined to have a moderate (3 or 4) probability for being prone to failure with a moderate (4) to high (5) risk for a significant release of untreated or partially treated sewage to waters of the State. Therefore an inspection schedule with a spill response plan is necessary for potential sewage spills associated with the collection system in general, and the problem areas in particular. (7)
10 Inspection Schedule The areas in the collection system known to have root intrusion are cleared using the Village s rodding/root cutting equipment twice per year, in the spring and fall, and the section prone to grease accumulation is flushed/cleaned twice per year. This will continue to be the inspection/maintenance schedule for these portions of the collection system known to be problem areas. The older sections of the collection system, the East and West sides and the Main Interceptor will be inspected via CCTV on a basis of every five years. The newer sections of the system will be CCTV-inspected on a basis of every ten years. The East Street Overflow structure will be studied further, and inspected after each significant rainfall event. Response Plan Inline Blockage - In the event of a spill within the sewage collection system due to an inline blockage, the overflow will be temporarily relieved by pumping down the surcharged manhole with the Village s vacuum sweeper and the Village s rodding/root cutting equipment will be utilized to clear the blockage. If the blockage cannot be cleared in a timely manner with the Village s rodding/cutting equipment, the Village s 500 gpm portable engine-driven pump and hoses will be set up to transfer sewage flow around the location to a downstream manhole. Larger capacity portable pumping equipment can be obtained from another municipality, or rented from Godwin Pumps, a local construction company, or a septage hauling/pumping company. If necessary, larger capacity flushing/cleaning equipment will be obtained through a private contractor, such as the Hartigan Company. Pipe Structural Failure - In the event of a sewage spill within the sewage collection system due to a structural failure, arrangements will be made to control the discharge of sewage from the system. This will be accomplished through the use of inflatable plugs or sand bags in the manholes just upstream and down stream of the location. The Village has several different size inflatable plugs on hand, up to twelve inch diameter. Larger pipe sizes will require the use of sandbags. A portable engine-driven pump and hoses would be set up to transfer sewage flow around the location to a downstream manhole. The Village has a 500 gpm portable pump that could be utilized for situations involving lower sewage flows or as an initial action for larger sewage flows. If larger capacity portable pumping equipment is required it will be obtained from another municipality, or rented from Godwin Pumps, a local construction company, or a septage hauling/pumping company. The Village has a backhoe that can be utilized in conjunction with municipal personnel to repair small structural failures. However, a fully equipped construction company may need to be hired to repair a large structural failure. Several local companies are available. (8)
11 Attachments Attachment A Components Prone to Failure (List 1) Attachment B Photo Reproduction of Treatment Facility Plan Treatment Facility Layout Attachment C Photo Reproduction of Collection System Map Attachment D Northfield Contact Lists
12 Attachment A Northfield Village WWTF List of Elements Prone to Failure (List 1) Following is a listing of all the treatment components of the Northfield WWTF, including those determined to be Elements Prone to Failure (List (1)). An assessment of the probability of failure and a risk of a significant release to surface waters of the State was made for each component. The assessment was made using a probability-risk method. Based on age, condition, history, etc., the probability of a failure was assigned to each component on a scale of 1 5. Based on proximity to water courses, potential to interfere with disinfection, presence of alarms, etc., the risk of a release was assigned on scale of 1 5. The probability and risk values for each component were multiplied and the product compare to a threshold value of 10. Those treatment system elements with probability-risk products of 10 and above were determined to be elements requiring inspection and response planning. The results of the evaluations for each component are summarized as follows. Wastewater Treatment Facility Headworks: Mechanical Screening Device new rotary fine screen in 2004 plant upgrade. Alternate channel with manual bar rack available. Probability of failure is low (1). Risk of compromised treatment/disinfection is nil (0). Grit Removal System new aerated grit chamber, grit pump and classifier in 2004 upgrade. Inoperability of system will not adversely affect treatment/disinfection. Probability of failure is low (1), and risk is nil (0). Influent Pumps three influent pumps, new in the 2004 upgrade. Probability of failure is moderately low (2). Risk of release is also moderately low (2) due to alarm dialer system, pump size (one pump can handle most flows, excluding those in excess of the two year CSO storm ), and emergency storage in the main interceptor. Influent Flow Meter new in 2004 upgrade. Does not pace disinfection or influent pumping. Probability of failure low (1) and risk is nil (0). Yard Piping two 14 inch ductile iron pipes from influent pumps to SBRs, installed new in Probability of failure is very low (1), but risk of a release, should failure occur, is high (5) given the volume of pumping and the proximity to the Dog River.
13 Northfield Village WWTF O, M and ER Plan List 1 (cont d) SBR Treatment Unit SBR Process Control PLCs new installation in 2004; probability of failure is low (1). Replacement cards are on-hand and programming can be restored via on-line connection with software provider. Process can be controlled manually if necessary. Risk is low (1). SBR Blowers and Aeration System - new in Probability is low (1). Five blowers provided, ample redundancy; risk is low (1). SBR Decanters new in 2004, probability of failure is low (1). High SBR basin level alarm, failure to open/close alarms, overflow line to surge tank, risk is low (1). SBR Motorized Valves (Infl and Effl) new in 2004, have had actuator problems; probability of failure moderately low (2). Failure to open / close alarms provided. Can manually operate valves, can operate on one SBR tank; risk is low (1). SBR Tanks new in 2004, probability of rupture low (1). Risk is high (5) due to volume contained and proximity to Dog River. SBR Biological Treatment Process moderately low (2) probability of failure of biological process causing partial nitrification and chlorination interference. Risk is moderate (3) due to SBR process stability and denitrification step. Slow development of process problem and adequate hypochlorite delivery capacity allow process control correction. Effluent Units Surge Tank new in 1966 (trickling filter tank), refurbished as surge tank in 2004; low probability of failure (1). Due to volume and proximity to Dog River risk is high (5). Outlet Control Valve new in 2004, probability is low (1). Can be controlled manually, risk of spill due to failure is low (1). Chlorine Contact Chamber refurbished 1966 clarifiers. Chlorination interference can be caused by sludge accumulations. Probability of failure moderately low (2). Regular chamber cleaning reduces risk (2). Chemical Feed Pumps (Cl2 and de-cl2) new in 2004, moderately low (2) probability of failure due to diaphragm failure, air-binding, etc. Risk of undisinfected effluent high (5). This treatment component is an element prone to a failure that would cause a significant release. See further discussion in Plan.
14 Northfield Village WWTF O, M and ER Plan List 1 (cont d) Effluent Flow Meter new in 2004, but moderately low probability (2) of failure due to power surges or lightening strikes. Paces chlorination and dechlorination pumps; failure would cause lack of disinfection, risk is high (5). This treatment component is an element prone to a failure that would cause a significant release. See further discussion in Plan. Polymer/Alum/Caustic Storage Tanks new in 2004, probability of failure low (1). Tanks are contained and risk is nil (0). Sludge Handling Units Sludge Holding Tanks one new in 1966, refurbished in 2004 upgrade, one new in 2004, probability of failure is low (1). Structural failure would pose high risk (5) due to volume and proximity to Dog River. Centrifuge new in 2004, probability of failure low (1). Risk of release is nil (0) as sludge can be stored. Waste Activated Sludge Pumps new in 2004, low probability of failure (1). Redundant pumps, other pumps available, risk is nil (0). Emergency Systems Emergency Generator new in 2004, probability of failure due to engine malfunction, etc. is moderately low (2). Risk is moderately low (2), without influent pumping influent flow surcharges into main interceptor but power failure is alarmed. Alarm System new in 2004, battery backup, probability of failure is low (1). Risk of significant release due to failure of alarms is moderate (3), as a failure of another critical system would be necessary to cause a release.
15 Northfield Village WWTF O, M and ER Plan List 1 (cont d) Jarvis Lane Pump Station Sewage Pumps new in 1988, one replaced in 1998, the other in 2006, failure history is good, probability of pump failure is moderately low (2). Two pumps on automatic, each with capacity to pump design flow, emergency storage is 5+ hours at peak design flow conditions, wetwell high level local alarm. Relatively short distance to surface waters; risk is high (5). Pump Control System new in 2005, probability of failure is low (1). Protected by wetwell high level alarm, emergency storage is 5+ hours under spring high flow conditions; risk of release is moderately low (2) Isolation/Check Valves new in 1988, probability of failure is moderately low (2). Emergency storage is 5+ hours under spring high flow conditions, wetwell high level local alarm, long distance to surface waters; risk is moderately low (2). Pump Discharge Piping new in 1988, probability of failure is moderately low (2). Emergency storage is 5+ hours under spring high flow conditions, wetwell high level local alarm, long distance to surface waters; risk is moderately low (2). Force Main new in 1988, PVC pipe, probability of failure is low (1). Emergency storage is 5+ hours under spring high flow conditions, wetwell high level local alarm, long distance to surface waters; risk is moderately low (2). Pump Wetwell new precast concrete in 1988, probability of failure is low (1). Risk of release to surface water due to failure is low (1). Alarm System new in 2005, probability of failure is low (1). Risk of significant release due to failure of alarms is moderately low (2) as a failure of another critical system would be necessary to cause a release. Power Supply power failure history is good no failures have occurred in the past 5 years. Probability of failure is moderately low (2). Emergency storage is 5+ hours under peak design flow conditions, high wetwell level alarm is backed up by battery; risk of release is high (5) due to proximity to brook.
16 Northfield Village WWTF O, M and ER Plan List 1 (cont d) Stream Crossings The nine stream crossings in the collection system are shown on the collection system plan in Attachment C. Main Interceptor Crossings seven, concrete-encased single-barrel cast iron pipe, gravity flow, new in 1966, CCTV inspections in 2006 good condition; probability of failure moderately low (2). Risk of significant discharge to surface waters is high (5). Doyon Rd. Crossing concrete-encased single-barrel ductile iron pipe, gravity flow, new in Some undermining detected in 2006 inspection and repaired; probability of failure is moderate (3). Risk of significant discharge to surface waters is high (5). Water Street Crossing - concrete-encased single-barrel cast iron pipe, gravity flow, new in 1934, CCTV inspection in 2007 good condition; probability of failure is moderately low (2). Risk of significant discharge to surface waters is high (5). All nine stream crossings are elements prone to a failure that would cause a significant release. See further discussion in Plan.
17 Northfield Village WWTF O, M and ER Plan List 1 (cont d) Collection System Section 1 East Side new in 1905, clay tile, 8 24 diameter. Cleaned and inspected by CCTV as follows, Central Street 1997 and 2006, Main Street in 2000 and the South End in The remainder will be inspected in Inspections found the condition of the sewerlines in these areas to be fair-to-good. Probability of failure moderate (3), risk is high (5), due to the proximity of water courses and the separated stormwater catchbasins in this area drain to a wetland that feeds brook near Jarvis Lane pump station. One troublespot identified Central St. MH1S to MH4S root intrusion checked and roots cut in spring and fall. Probability of failure is moderately high (4), risk is high (5). East Street Overflow last overflow structure remaining in system. Recent CSO Effectiveness study indicated that of the three overflow events since 2005, perhaps only one occurred during a storm that exceeded the CSO policy level of 2.5 in 24 hours or 1.07 per hour. Further study will be performed. Section 2 West Side new in 1934, clay tile, two subsections, pipe sizes Inspected Vine Street and lines to the south in 2007, condition was found to be good-toexcellent. Other section will be done in Probability of failure is moderately low (2), risk is high (5) due to proximity of water courses. Three troublespots of root intrusion identified Water Street MH8 MH9, Vine Street MH4 to MH5 and Pearl Street to Water Street connector. Check and roots cut in spring and fall. Probability of failure is moderately high (4) and risk is high (5). Section 3 Main Interceptor new in 1966, reinforced concrete, pipe sizes: Inspected in 2005 very good condition. Probability of failure is low (2). Risk of failure causing significant release is high (5) due to volume of flow and proximity to Dog River. One troublespot for grease accumulation identified in stub serving restaurant. Stub is flushed spring and fall. Probability of failure is moderately high (4) and risk is high (5). The Main Interceptor had an overflow event in summer 2007 from a manhole in Dog River Drive, the approach to the WWTF. The storm causing this overflow was an intense thunderstorm that dumped 3 of rain in about 15 minutes, well over the CSO Policy storm.
18 Northfield Village WWTF O, M and ER Plan List 1 (cont d) Section 4 Braley / Byam / Hill Streets new in 1940, clay tile, pipe sizes: Probability of failure is moderate (3), risk is moderate (3) due to distance to water courses. Section 5 Winter Street / Alpine Drive new in 1955, clay tile, pipe size: 6. Probability of failure is moderate (3), risk is moderate (3). Section 6 Jarvis Lane / Wall Street new 8 PVC pipe in Probability of failure is moderately low (2), risk is moderately high (4). Section 7 Norwich University Extension new 8 PVC pipe in Probability of failure is moderately low (2), risk is moderately high (4).
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,
Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
DRAFT Public Outreach Document for What s an SSMP?
DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities
Fats, Oil and Grease Best Management Practices Manual Information, Pollution Prevention, and Compliance Information For Food Service Facilities Pinellas County Utilities Water Quality Management Division
SANITARY SEWER BACKUP. Causes & Prevention
SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides
Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and
Advanced Wastewater Treatment and Disposal Systems Water and Wastewater Utility Operation and Management for Tribes Preliminary Treatment Primary Treatment Secondary Treatment Tertiary Treatment Disinfection
Routine Maintenance and Inspection
THE CORPORATION OF THE VILLAGE OF WARFIELD POLICY TITLE: Sanitary Sewer Operations POLICY: #5435 PURPOSE: This policy is to provide the Village of Warfield s procedures for maintaining its sanitary sewer
SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
The City of Boulder 75 th Street Wastewater Treatment Facility
The City of Boulder 75 th Street Wastewater Treatment Facility Wastewater Collection and Treatment The Foundation of Public Health Wastewater Collection Boulder s wastewater collection system, also known
1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment
WATER AND SEWER UTILITY OPERATION AND MAINTENANCE Although sewage systems the operation and maintenance of public utilities are not considered themselves are not a chronic sources of stormwater pollution,
812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
City of Largo Environmental Services Department Environmental Control Program 5100 150 th Avenue North Clearwater, FL 33760 Phone: (727) 518-3076
POCTS # (To be assigned by City of Largo Environmental Control.) City of Largo Environmental Services Department Environmental Control Program 5100 150 th Avenue rth Clearwater, FL 33760 Phone: (727) 518-3076
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or
March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS
March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High
SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.
SEPTIC SYSTEMS Who Has A Septic System? Approximately 30 percent of Connecticut s population is served by on-site subsurface sewage disposal systems (a.k.a. septic systems). This means a large percentage
SECTION 810 SEWER LINE CLEANING
SECTION 810 SEWER LINE CLEANING I. GENERAL 1.1 DESCRIPTION OF WORK The work covered by this section consists of providing all labor, equipment, material and supplies and performing all operations required
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
Sanitary Sewer Overflow (SSO) Incident Report Form
Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category
Monterey Regional Water Pollution Control Agency. Sewer System Management Plan
Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final
SANITARY SEWER SYSTEM ASSESSMENT
SANITARY SEWER SYSTEM ASSESSMENT What is this tool? The Sanitary Sewer System Assessment is a form that helps your utility identify and document all of the components in your utility s sanitary sewer system.
Small Wastewater Treatment Systems
Small Wastewater Treatment Systems By Michael Albanese, P.Eng. H2FLOW EQUIPMENT INC. www.h2flow.com Why do you need one? Typical Reasons Enviromental Regulations New Development Failing Septic Systems
City of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
Septic Tank Use & Maintenance Tips
Yellowhead County Hamlet of Cadomin Septic Tank Use & Maintenance Tips This guide gives an overview of the responsibilities for property owners in Cadomin. For Seasonal, Permanent & Vacationing Cadomin
FY15 Gravity Sewer and Manhole Rehabilitation
Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE
SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER
Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating
SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND
SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND Wastewater Utility Overview In the late 1950 s, the Village of Old Forge began to realize the impacts of dumping sewage in the Moose River.
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS
GEORGIA DEPARTMENT OF HUMAN RESOURCES ENVIRONMENTAL HEALTH SECTION A HOMEOWNERS GUIDE TO ON-SITE SEWAGE MANAGEMENT SYSTEMS March 12, 2002 WHAT IS AN ON-SITE SEWAGE MANAGEMENT SYSTEM An on-site sewage management
Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards
Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL
Altoona Water Authority. Infrastructure Overview
Altoona Water Authority Infrastructure Overview Mission Statement As stewards of the community s water system, our mission is to provide a clean, safe, reliable water supply and to collect and treat wastewater
PREVENTING WET OR FLO ODED BASEMENTS
PREVENTING WET OR FLO ODED BASEMENTS TABLE OF CONTENTS Prevention Tips...Page 1 Why is there Water in my Basement?...Page 2 City of Saskatoon Sewer Systems...Page 3 Why Does Saskatoon Have Two Separate
MODEL WEB CONTENT FOR CITY SANITARY SEWER DEPARTMENTS
MODEL WEB CONTENT FOR CITY SANITARY SEWER DEPARTMENTS The following information is designed to be used in conjunction with the Sewer Toolkit, located in the Wastewater section of the Florida Rural Water
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington
National Precast Concrete Association
National Precast Concrete Association NOTES 1. This manual does not claim or imply that it addresses any safety-related issues associated with its use. Operation and maintenance of precast concrete grease
Addressing SSOs in Austin, Texas: Initial Call to Final Fix
Addressing SSOs in Austin, Texas: Initial Call to Final Fix Gopal K. Guthikonda, P.E., Barbara L. Wilde, Steven W. Schrader, P.E., and Rajendra P. Bhattarai, P.E. Austin Water Utility City of Austin 2600
Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses
Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to
CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG
CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG WHY IS THERE WATER IN MY BASEMENT? There are two major sources of water in a basement as the
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana
CITY OF GOLDEN DEPARTMENT OF PUBLIC WORKS, ENVIRONMENTAL SERVICES DIVISION
CITY OF GOLDEN DEPARTMENT OF PUBLIC WORKS, ENVIRONMENTAL SERVICES DIVISION Grease, So What's the Problem? Does your facility produce grease? All commercial cooking facilities generate Fats, Oil, and Grease
ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:
ORDINANCE NO. 15 Amending Chapter 60 of the Code of Ordinances of Kansas City, Missouri, entitled Sewers and Sewage Disposal by adding Sections 60-349 through 60-360; and establishing an effective date.
Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM
Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM This section of the SSMP discusses the City s FOG control measures, including identification of problem areas, focused cleaning, and source control.
Septic System Owner s Manual
Septic System Owner s Manual Sponsored by: copyright 2013 No part of this publication may be reproduced without our consent. www.callbrownies.com Brownie s Septic and Plumbing has provided quality service
Number 2014-20 September 2014 SEWER LIABILITY
Number 2014-20 September 2014. SEWER LIABILITY Sewer Backups: Most of us take the use of our wastewater and sewer systems for granted, while municipalities must be vigilant to ensure that citizens of the
Florida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT
Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public
San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN
FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN ENGINEERING REPORT 408 College Street, West Fayetteville, TN 37334 (931)433-1522 CONSOLIDATED TECHNOLOGIES,
Type of Sewer Systems. Solomon Seyoum
Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of
Description of the Water Conserv II Facility
Description of the Water Conserv II Facility Introduction The Water Conserv II (WCII) Water Reclamation Facility provides service to a majority of the southwest section of Orlando. The WCII facility has
Environmental Science 101 Waste. Fall 2012. Lecture Outline: Terms You Should Know: Learning Objectives: Reading Assignment: Chlorinated.
Environmental Science 101 Waste Fall 2012 1 Lecture Outline: 17. SEWAGE DISPOSAL A. Sewage Handling B. Raw Sewage C. Wastewater Treatment Steps D. Individual Septic Systems E. Taking Stock Learning Objectives:
Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010
Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010 A. Purpose The purpose of this policy is to explain how and why sewer or stormwater backups occur, what to do in the event a homeowner
Downspout Disconnection Program FAQs
Why is the Village making downspout disconnection mandatory? A mandatory downspout disconnection has been the law for several years in La Grange Park. All gutter downspouts must be disconnected from the
Emerging Technologies in Wastewater Collection Systems
Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation
WASTEWATER MANAGEMENT SYSTEM
WASTEWATER MANAGEMENT SYSTEM PROTECT WHAT S MOST IMPORTANT TO YOU... Choosing to live in a suburban or rural area without a municipal sewer no longer means having to live with the problems associated with
SEWER CLEANING, INSPECTION AND ASSESSMENT
3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity
STORM DRAIN PIPE MAINTENANCE. a. Develop standard operating procedures for maintaining storm drain pipes.
STORM DRAIN PIPE MAINTENANCE a. Develop standard operating procedures for maintaining storm drain pipes. 2. PROCESS Storm drain pipes are to be maintained per the Storm Water System Maintenance Plan schedule.
DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer
Only RAIN down the Storm Drain... DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer This publication applies to you if: You generate wastewater outdoors, and The wastewater
Cambridge Wastewater Treatment Facility
Cambridge Wastewater Treatment Facility Emergency Situations If you have a water or sewer emergency that relates to the City s utility system call the Public Works office at 763-689-1800 on normal working
Guidelines for Precast Concrete Grease Interceptors
Guidelines for Precast Concrete Grease Interceptors Purpose Provide an overview of the basic design principals that govern why gravity grease interceptors work Provide a forum for discussion of common
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
St. Joseph, Missouri Water Protection Homeowners Guide to Your Sewer
St. Joseph, Missouri Water Protection Homeowners Guide to Your Sewer Out of Sight, Out of Mind: Don t wait until you have a problem to maintain your private lateral sewer line. Keeping Excess Water Out
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]
minimum deductible may be increased significantly.
ABOUT YOUR HOUSE CE 50 Basement flooding is unfortunately a common occurrence in many parts of Canada. But the good news is that many types of basement flooding may be avoided. This publication explains
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack
City of Mebane Wastewater Collection and Treatment Facility
City of Mebane Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2014 - June 30, 2015 City of Mebane Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2014
MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
Fats, Oils and Grease
ENVIRONMENTAL ASSISTANCE OFFICE NEWSLETTER In this Issue Health and Human Impact Fats, Oils and Grease November, 2011 Environmental Impact What to do at Work Introduction What to do at Home Grease Removal
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater
COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary
CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,
Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development
7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building
The Town of Lakeshore Basement Flooding Information to Residents
The Town of Lakeshore Basement Flooding Information to Residents The following information is intended for residents that have homes connected to Municipal storm and sanitary sewers. However, rural residents
26th Ward Wastewater Treatment Plant Wet Weather Operating Plan
26th Ward Wastewater Treatment Plant Prepared by: New York City Department of Environmental Protection Bureau of Wastewater Treatment July 2010 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1-1 1.1 BACKGROUND...
Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding
Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding May 26, 2011 Kyle Chambers, P.Eng. Environmental and Engineering Services Department City of London [email protected] 519-661-2500
BASEMENT FLOODING. Prevention Guide for. Homeowners
BASEMENT FLOODING Prevention Guide for Homeowners 1 Did You Know? Floods are the most common hazards in Canada. Water damage is a common cause of loss for homeowner insurance. A heavy rainfall can result
Emergency Response Plan
Emergency Response Plan Third revised version placed in the Public Document Repository on July 1, 2011 I certify under penalty of law that this document and all attachments were prepared under my direction
WASTEWATER TREATMENT OBJECTIVES
WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater
Collection Systems Technology Fact Sheet Sewers, Conventional Gravity
United States Environmental Protection Agency Collection Systems Technology Fact Sheet Sewers, Conventional Gravity DESCRIPTION Sewers are hydraulic conveyance structures that carry wastewater to a treatment
Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems
Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values
Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective
Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April
CHAPTER 10-2. Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities
CHAPTER 10-2 SEWAGE COLLECTION AND TREATMENT FACILITIES Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities 1.1 SANITARY SEWER COLLECTION SYSTEM The City of Washougal operates
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
FOOD SERVICE FACILITIES Best Management Practices Stormwater Management Program City of Bluff City P.O. Box 70, Bluff City, TN 37618 423-538-7144
FOOD SERVICE FACILITIES Best Management Practices Stormwater Management Program City of Bluff City P.O. Box 70, Bluff City, TN 37618 423-538-7144 This document may be printed and used for reference by
UVDB empowered by Achilles
UVDB empowered by Achilles DISAB Centurion: High Performance Wet/Dry Materials Handling Unit DISAB Centurion: High performance vacuum tanker that will vacuum dry or wet material The DISAB can vacuum material
Village of St. Louis Sewer Back-up Policy
Village of St. Louis Sewer Back-up Policy The Village of St. Louis is responsible for maintaining sewer mains and manholes, which are located in public rights-of-way (Village and Provincial maintained
SECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS
SECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS This section will describe the Town s existing wastewater management systems. This includes on-site disposal systems and private collection systems. The
Bridges & Culverts Condition by Quantity
3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental
Basement Flood Risk Reduction City of Winnipeg. Charles Boulet
Basement Flood Risk Reduction City of Winnipeg Charles Boulet Outline Background Winnipeg Floodway Rain Events Winnipeg Sewer System Basement Flooding Flood Reduction Measures ICLR - BFRR Strategy 2 Where
Sanitary Sewer Master Plan
, Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY