DOE LHC Quarterly Review. Magnet Production Cable Testing Cost to Complete issues. Mike Harrison, BNL July 26, 2004
|
|
|
- Brett Shelton
- 10 years ago
- Views:
Transcription
1 DOE LHC Quarterly Review Magnet Production Cable Testing Cost to Complete issues Mike Harrison, BNL July 26,
2 BNL Production Status Magnet production complete The last series of dipoles (D3 s) is ready for cold test Four magnets not yet cold tested (1 D4, 3 D3 s) 2
3 Magnet Performance BNL-built IR Dipoles for LHC Number of Magnets More No. of quenches to reach operating field 3
4 BNL LHC Magnet Production Status Issues during the past 12 months Magnet Geometry We have needed to adjust the cold masses with welding to conform to the required sagitta. The cold masses tended to relax after final survey. This has resulted in more survey/weld/edia time than estimated. We have also needed to survey and re-position cryogenic and beam pipes to bring these some of these elements into tolerance (± 2mm). The fundamental problem is that with small quantities we do not have sophisticated fixturing of the type needed to ensure the desired accuracy. This has resulted in more survey/welding/edia hours than estimated 4
5 BNL LHC Magnet Production Status Issue - Cryo-header Interface - QQS In a similar fashion to the magnet interfacing some of the QQS pipe/flange positions were out of tolerance (± 5mm). Again no special fixturing to ensure accurate placement 5
6 BNL LHC Magnet Production Status Magnet Testing Recent Experience Baseline called for 11 cooldowns to complete testing by May 04. Even with the heat exchanger failure we accomplished this. Regrettably 4 of them did not yield a good test. At this point estimate October 04 for 4 more tests 6
7 Cable Testing Cable testing continues as a level of effort task we are currently testing about ~70 samples per month. Testing baseline has testing through April 05 Testing costs at $82K/ month (direct) No significant cost increases above baseline 7
8 Spending Rate Monthly burn rate decreasing but not fast enough 8
9 Expenses for last 12 months Significant increase in EDIA arising from magnet acceptance. This has required a Q/C person 60%, ~ 50% of an engineering FTE, and ~20% of a scientific FTE. BNL O/H rates are currently running ~2.5% above baseline. 9
10 EDIA Categories EDIA Since 6/1/ Test Support Mechanical Electrical Total Jun03 Jul03 Aug03 Sep03 Oct03 Nov03 Dec03 Jan04 Feb04 Mar04 Apr04 May04 Jun04 Month LHC Project has been incremental since the start of FY04 (as promised) 10
11 Cost to complete 11
12 Magnet Production Cost Mitigation Potential cost savings: Request CERN produce D1 interface parts from BNL drawings ($81K) Request CERN ship empty boxes back to BNL ($50K) Do not cold test the last (spare) D3 ($46K) Attempt to adiabatically ramp down EDIA rather than continue throughout the balance of the program at 2.7 FTE s ($100K) 12
13 Magnet Production Cost Mitigation 13
14 Endgame Even with cost mitigation measures and CERN help we are still looking at a shortfall in magnet production of ~$270K (direct). In FY05 the only BNL Project funding is for cable testing which runs thru April 05 at the rate of $82K/month (direct). Truncating cable testing at the end of calendar 04 would produce an equivalent financial savings resulting a zero sum scenario. 14
15 Summary Technically we are/have progressed well. Magnet production complete. 10 magnets shipped to CERN, 10 to go. Cable testing is routine Cost to complete projection shows cash shortfall of ~$750K Cost mitigation will require some form of truncated cable testing. 15
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
Analysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
Ashley Institute of Training Schedule of VET Tuition Fees 2015
Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-
CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY 2015. Small Commercial Service (SCS-1) GSR
JULY 2015 Area (RS-1) GSR GSR (LCS-1) Texarkana Incorporated July-15 $0.50690/Ccf $0.45450/Ccf $0.00000/Ccf $2.85090/MMBtu $17.52070/MMBtu Texarkana Unincorporated July-15 $0.56370/Ccf $0.26110/Ccf $1.66900/Ccf
Detailed guidance for employers
April 2015 3 Detailed guidance for employers Appendix A: Pay reference periods This document accompanies: Detailed guidance no. 3 Assessing the workforce Pay reference period calendars where the definition
P/T 2B: 2 nd Half of Term (8 weeks) Start: 25-AUG-2014 End: 19-OCT-2014 Start: 20-OCT-2014 End: 14-DEC-2014
2014-2015 SPECIAL TERM ACADEMIC CALENDAR FOR SCRANTON EDUCATION ONLINE (SEOL), MBA ONLINE, HUMAN RESOURCES ONLINE, NURSE ANESTHESIA and ERP PROGRAMS SPECIAL FALL 2014 TERM Key: P/T = Part of Term P/T Description
P/T 2B: 2 nd Half of Term (8 weeks) Start: 26-AUG-2013 End: 20-OCT-2013 Start: 21-OCT-2013 End: 15-DEC-2013
2013-2014 SPECIAL TERM ACADEMIC CALENDAR FOR SCRANTON EDUCATION ONLINE (SEOL), MBA ONLINE, HUMAN RESOURCES ONLINE, NURSE ANESTHESIA and ERP PROGRAMS SPECIAL FALL 2013 TERM Key: P/T = Part of Term P/T Description
P/T 2B: 2 nd Half of Term (8 weeks) Start: 24-AUG-2015 End: 18-OCT-2015 Start: 19-OCT-2015 End: 13-DEC-2015
2015-2016 SPECIAL TERM ACADEMIC CALENDAR For Scranton Education Online (SEOL), Masters of Business Administration Online, Masters of Accountancy Online, Health Administration Online, Health Informatics
Easter Seals Central Texas Programs Outcome Profiles Monthly and Year to Date FY 2011 85% 87% 80% 80% 84% 84% 83%
I. Outcomes Indicators for individuals receiving services: (Service Delivery Effectiveness) 85% 87% 80% 80% 84% 84% 83% A. Access Sep 10 Oct 10 Nov 10 YTD Dec 10 Jan 11 Feb 11 YTD Mar 11 Apr 11 May 11
Computing & Telecommunications Services Monthly Report March 2015
March 215 Monthly Report Computing & Telecommunications Services Monthly Report March 215 CaTS Help Desk (937) 775-4827 1-888-775-4827 25 Library Annex [email protected] www.wright.edu/cats/ Last Modified
2015-16 BCOE Payroll Calendar. Monday Tuesday Wednesday Thursday Friday Jun 29 30 Jul 1 2 3. Full Force Calc
July 2015 CM Period 1501075 July 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 August 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Climatography of the United States No. 20 1971-2000
Climate Division: CA 4 NWS Call Sign: Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 1 Number of s (3) Jan 59.3 41.7 5.5 79 1962
Climatography of the United States No. 20 1971-2000
Climate Division: CA 6 NWS Call Sign: SAN Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) Jan 65.8 49.7 57.8
CAFIS REPORT 2015.10
CAFIS REPORT 2015.10 INDEX Message CAFIS Inbound 03-06 07-08 CAFIS Arch 09-10 CAFIS Brain 11-12 CAFIS Global 13-14 What We Do 15-16 About CAFIS 17-18 Services for Member Stores 19-34 Services for Card
Sage ERP MAS 90, 200, 200 SQL, and Sage ERP MAS 500. Supported Versions
Sage ERP MAS 90, 200, 200 SQL, and Sage ERP MAS 500 Supported Versions Current Document: 2012... Page 1 Earlier Documents: 2011... Page 2 2010... Page 3 2009... Page 4 2008... Page 5 Sage ERP MAS 90, 200,
Maryland Board of Public Accountancy CPA Examination Application Process (August 1, 2012)
Maryland Board of Public Accountancy CPA Examination Application Process (August 1, 2012) This report has been prepared to review the CPA examination process administered by the Board of Public Accountancy
Department of Public Welfare (DPW)
Department of Public Welfare (DPW) Office of Income Maintenance Electronic Benefits Transfer Card Risk Management Report Out-of-State Residency Review FISCAL YEAR 2012-2013 June 2013 (March, April and
Resource Management Spreadsheet Capabilities. Stuart Dixon Resource Manager
Resource Management Spreadsheet Capabilities Stuart Dixon Resource Manager Purpose Single view of resource data Shows rolling demand vs supply for 14 months, 2 months back, current month, and 11 forward
2015 Settlement Calendar for ASX Cash Market Products ¹ Published by ASX Settlement Pty Limited A.B.N 49 008 504 532
2015 Calendar for ASX Cash Market Products ¹ Published by ASX Pty Limited A.B.N 49 008 504 532 Calendar for ASX Cash Market Products¹ ASX Pty Limited (ASX ) operates a trade date plus three Business (T+3)
14-Dec-15. Number Amount Number Amount Number Amount Number Amount Number Amount
14-Dec-15 and Number of Qualifying Children, 2013 Returns with no Returns with one Returns with two Returns with three or Size of AGI qualifying children qualifying child qualifying children more qualifying
Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre
Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre Proposal To change the opening hours of the Revenues & Benefits Call Centre to 9am until 5pm Monday to Friday with effect
Choosing a Cell Phone Plan-Verizon
Choosing a Cell Phone Plan-Verizon Investigating Linear Equations I n 2008, Verizon offered the following cell phone plans to consumers. (Source: www.verizon.com) Verizon: Nationwide Basic Monthly Anytime
South Dakota Public Funds Investment Trust (FIT) Fixed Rate Investment Options & Services
South Dakota Public Funds Investment Trust (FIT) Fixed Rate Investment Options & Services FIT Fixed Rate Account Service Features Free multiple accounts Free electronic transfers Online access to account
Climatography of the United States No. 20 1971-2000
Climate Division: CA 2 NWS Call Sign: SAC Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) Jan 53.8 38.8 46.3
Interest Rates. Countrywide Building Society. Savings Growth Data Sheet. Gross (% per annum)
Interest Rates (% per annum) Countrywide Building Society This is the rate of simple interest earned in a year (before deducting tax). Dividing by 12 gives the monthly rate of interest. Annual Equivalent
Consumer ID Theft Total Costs
Billions Consumer and Business Identity Theft Statistics Business identity (ID) theft is a growing crime and is a growing concern for state filing offices. Similar to consumer ID theft, after initially
Accident & Emergency Department Clinical Quality Indicators
Overview This dashboard presents our performance in the new A&E clinical quality indicators. These 8 indicators will allow you to see the quality of care being delivered by our A&E department, and reflect
OPERATING FUND. PRELIMINARY & UNAUDITED FINANCIAL HIGHLIGHTS September 30, 2015 RENDELL L. JONES CHIEF FINANCIAL OFFICER
PRELIMINARY & UNAUDITED FINANCIAL HIGHLIGHTS September 30, 2015 RENDELL L. JONES CHIEF FINANCIAL OFFICER MANAGEMENT OVERVIEW September 30, 2015 Balance Sheet Cash and cash equivalents had a month-end balance
2016 Examina on dates
Please note the following informa on: The following exams are available throughout the year: Please click on the exam for which you wish to see the dates. When you have finished, you can select to return
May 2014 Texas School Bond Elections
May 2014 Texas School Bond Elections What are the individual districts needs? New facilities Renovations Technology Central facilities How much tax revenue can the district generate? Depends on district
DHS BUDGET REQU~ST FOR FY 2015-2016
DHS BUDGET REQU~ST FOR FY 2015-2016 ($ Amounts in Thousands) Page # of Governor's Executive Budget: APPROPRIATION: Pp. C1.8, E30.5, E30.16, E30.17 Payment to Federal Govt. - Medicare Drug Progr~m l. SUMMARY
2015 Examination dates
Please note the following information: The following exams are available throughout the year: BULATS Paper-based: Please click on the exam for which you wish to see the dates. When you have finished, you
FY 2015 Schedule at a Glance
Coaching and Mentoring for Excellence Oct 21 23, 2014 $2,950 Residential Coaching and Mentoring for Excellence Apr 7 9, 2015 $2,400 Non-residential Coaching and Mentoring for Excellence May 27 29, 2015
PROJECTS SCHEDULING AND COST CONTROLS
Professional Development Day September 27th, 2014 PROJECTS SCHEDULING AND COST CONTROLS Why do we need to Control Time and Cost? Plans are nothing; Planning is everything. Dwight D. Eisenhower Back to
ACCESS Nursing Programs Session 1 Center Valley Campus Only 8 Weeks Academic Calendar 8 Weeks
Session 1 Academic Calendar August 24, 2015 to October 17, 2015 Tuesday / Thursday, 5:30 pm to 8:30 pm M/W T/TH T/W TH S Saturday lab as scheduled Classes Begin 24-Aug 25-Aug 25-Aug 27-Aug 29-Aug NU205
ACCESS Nursing Programs Session 1 Center Valley Campus Only 8 Weeks Academic Calendar 8 Weeks
Session 1 Academic Calendar August 24, 2015 to October 17, 2015 Tuesday / Thursday, 5:30 pm to 8:30 pm M/W T/TH T/W TH S Saturday lab as scheduled Classes Begin 24-Aug 25-Aug 25-Aug 27-Aug 29-Aug NU205
An Introduction to the. Society Program Portfolio Management Process
An Introduction to the Society Program Portfolio Management Process Presentation Topics What is Society Program Portfolio Management or SPPM? What is the Goal of SPPM? Who Oversees SPPM? Who Participates
WEATHERHEAD EXECUTIVE EDUCATION COURSE CATALOG
2016 WEATHERHEAD EXECUTIVE EDUCATION COURSE CATALOG APPRECIATIVE INQUIRY COMMUNICATION AND PROFESSIONAL SKILLS EMOTIONAL INTELLIGENCE FINANCIAL DECISION MAKING DESIGNING INNOVATION AND STRATEGY MANAGING
Start Your. Business Business Plan
Start Your Waste Recycling Business A TECHNICAL STEP-BY-STEP-GUIDE OF HOW TO START A COMMUNITY-BASED WASTE RECYCLING BUSINESS Start Your Waste Recycling Business Business Plan INTERNATIONAL LABOUR OFFICE
Independent Accountants Report on Applying Agreed-Upon Procedures
Independent Accountants Report on Applying Agreed-Upon Procedures Board of Trustees We have performed the procedures, as discussed below, with respect to the employer contributions remitted by to the in
Human Resources Management System Pay Entry Calendar
Human Resources Management System Pay Entry Calendar http://www1.umn.edu/ohr/payroll/calendars/index.html Important Information The system is unavailable for entry, due to maintenance, during the following
Brookhaven Magnet Division - Nuclear Physics Program Support Activities
Brookhaven - Nuclear Physics Program Support Activities Spin Program support E-Cooling R&D RIA RHIC Operations Support Funding AGS Warm Siberian Snake AGS Warm Snake Magnetic element designed and built
Unifying Compensation:
Unifying Compensation: The Lehigh Valley Physicians Group Experience American Medical Group Association Orlando, FL March 15, 2013 Edward Norris, M.D. Chair, Compensation Committee Michael A. Rossi, M.D.,
Robeco High Yield Bonds
Important Information 1. Robeco High Yield Bonds (the Fund aims to provide long term capital growth. The Fund invests at least two thirds of its total assets in bonds, asset backed securities and similar
MONTHLY REMINDERS FOR 2013
MONTHLY REMINDERS FOR 2013 Legend: Red IRS Due Dates Green Department of Revenue Due Dates Blue Parish Finance Due Dates Black Second Collections JANUARY 4 Deposit payroll tax for payments on Jan 1 if
OPERATIONS SERVICE UPDATE
OPERATIONS SERVICE UPDATE EXECUTIVE SUMMARY Policy Processing At the June 24 Citizens Board of Governors meeting, Staff committed to achieving year end policy processing service goals by September 1, 24.
A basic paycheque will show gross pay, deductions and net pay:
Accounting (HOSP 1860) Learning Centre Payroll Accounting Understanding payroll will help you as an or an. It explains all the deductions that are removed from your paycheque, where the numbers on your
Example of a diesel fuel hedge using recent historical prices
Example of a diesel fuel hedge using recent historical prices Firm A expects to consume 5,, litres of diesel fuel over the next 12 months. Fuel represents a large expense for the firm, and volatile prices
EMPLOYER S LIABILITY CLAIMS
EMPLOYER S LIABILITY CLAIMS Opened date Subtype Incident date Location (type) Description Status Damages Jan-09 EMPLO Dec-08 Injured by defective equipment. Settled 2,750.00 Jan-09 EMPLO Nov-08 Department
NHS BLOOD AND TRANSPLANT MARCH 2009 RESPONDING EFFECTIVELY TO BLOOD DONOR FEEDBACK
09/26 NHS BLOOD AND TRANSPLANT MARCH 2009 RESPONDING EFFECTIVELY TO BLOOD DONOR FEEDBACK EXECUTIVE SUMMARY From April 2009 an NHS wide common approach to complaint handling comes in to effect. This provides
Employers Compliance with the Health Insurance Act Annual Report 2015
Employers Compliance with the Health Insurance Act Annual Report 2015 ea Health Council Health Council: Employers Compliance with the Health Insurance Act 1970 Annual Report 2015 Contact us: If you would
Annexure B: Planning, Budgeting and Performance Management Programme
Annexure B:, Budgeting Programme The following are key activities that need take place in more detail than Time frame Nature Period referred Start Finish 2012/09/01 /08/31 /or September /09/01 /09/26 August
Equipping your Forecasting Toolkit to Account for Ongoing Changes
Equipping your Forecasting Toolkit to Account for Ongoing Changes Presented by: Roger Parlett Supply Chain Manager January 23, 2014 Overview Forecast Set-up Objectives of Creating a Forecast Identify Critical
NASDAQ DUBAI TRADING AND SETTLEMENT CALENDAR 2015. 1. On US Federal Reserve Holidays, no settlements will take place for USD.
NASDAQ Dubai Circular No. : 65/14 Date of Issue : December 22 nd 2014 Date of Expiry : Upon issue of replacement Circular NASDAQ DUBAI TRADING AND SETTLEMENT CALENDAR 2015 Issued pursuant to the NASDAQ
South Dakota Board of Regents. Web Time Entry. Student. Training Manual & User s Guide
South Dakota Board of Regents Web Time Entry Student Training Manual & User s Guide Web Time Entry Self Service Web Time Entry is a web-based time entry system designed to improve accuracy and eliminate
2013-2014. oct 03 / 2013 nov 12 / 2013. oct 05 / 2013. oct 07 / 2013. oct 21 / 2013. oct 24 / 2013. nov 07 / 2013 nov 14 / 2013.
2013- ACADEMIC CALENDARS SOUTH UNIVERSITY 2013- ACADEMIC CALENDAR Fall 2013 Winter Spring Summer New Student Orientation Session II (Mid ) oct 03 / 2013 nov 12 / 2013 jan 09 / feb 18 / apr 03 / may 13
The New Prior Approval Rate Application Process Frequently Asked Questions
The New Prior Approval Rate Application Process Frequently Asked Questions 1. We understand that a complete underwriting manual must be filed electronically in SERFF with each private passenger automobile
NATIONAL CREDIT UNION SHARE INSURANCE FUND
NATIONAL CREDIT UNION SHARE INSURANCE FUND PRELIMINARY & UNAUDITED FINANCIAL HIGHLIGHTS RENDELL L. JONES CHIEF FINANCIAL OFFICER MANAGEMENT OVERVIEW Balance Sheet Other - Insurance and Guarantee Program
Natural Gas Wholesale Prices at PG&E Citygate as of November 7, 2006
QUARTERLY GAS ISSUES UPDATE December 26 I. Supply Issues Wholesale Natural Gas Prices Above normal temperatures and a lack of hurricane activity caused market prices to decrease in October. By November,
2014 2015 University-Wide Academic Calendar
2014 2015 University-Wide Academic Calendar Guide to Abbreviations UGD = Undergraduate Day GS = Graduate Schools LAW = School of Law CPS = College of Professional Studies Sunday Monday Tuesday Wednesday
Impacts of Government Jobs in Lake County Oregon
Impacts of Government Jobs in Lake County Oregon April 2011 Prepared by Betty Riley, Executive Director South Central Oregon Economic Development District Annual Average Pay Based on Oregon Labor Market
Coffee Year 2014-15 Futures Trading Analysis
Lower coffee exports lend support to Robusta prices The coffee market rallied slightly in June, led in most part by a recovery in Robusta prices. For the sixth month in a row exports were lower than last
Important Dates Calendar 2014-2015 FALL
Important Dates Calendar 204-205 FALL Rev. 6-8-4 st 8 H st 0 2nd 0 st 5 2nd 5 3rd 5 LSC Advanced Registration Begins May 27 May 27 May 27 May 27 May 27 May 27 May 27 May 27 May 27 Returning Students Advanced
CALL VOLUME FORECASTING FOR SERVICE DESKS
CALL VOLUME FORECASTING FOR SERVICE DESKS Krishna Murthy Dasari Satyam Computer Services Ltd. This paper discusses the practical role of forecasting for Service Desk call volumes. Although there are many
PRELIMINARY STEEL IMPORTS INCREASE 17% IN JANUARY Import Market Share 32% in January
News Release FOR IMMEDIATE RELEASE February 25, 2015 CONTACT: Lisa Harrison 202.452.7115/ [email protected] PRELIMINARY STEEL IMPORTS INCREASE 17% IN JANUARY Import Market Share 32% in January Washington,
Managing Cattle Price Risk with Futures and Options Contracts
Managing Cattle Price Risk with Futures and Options Contracts Dr. John Lawrence, Extension Livestock Economist and Professor, Laura A. Bortz, Undergraduate Research Assistant, Iowa State University Department
1. Introduction. 2. User Instructions. 2.1 Set-up
1. Introduction The Lead Generation Plan & Budget Template allows the user to quickly generate a Lead Generation Plan and Budget. Up to 10 Lead Generation Categories, typically email, telemarketing, advertising,
Homeland Security Grants Management Louisiana Emergency Preparedness Association (LEPA)
Homeland Security Grants Management Louisiana Emergency Preparedness Association (LEPA) An LEM Basic Credentialing Course 1 Objectives Using local government management systems perform: Homeland security
BETTER INFORMATION LEADS TO BETTER PRIVATE HEALTH INSURANCE DECISIONS
MEDIA RELEASE 24 November 2010 BETTER INFORMATION LEADS TO BETTER PRIVATE HEALTH INSURANCE DECISIONS Australia s leading independent source of information about private health insurance Privatehealth.gov.au,
Freedom of Information Request Reference No: I note you seek access to the following information:
Freedom of Information Request Reference No: I note you seek access to the following information: 1. How many incidents in the UK have the police been called to because of people being drug and disorderly
SETSCO. Year 2016 Course Programme. 03 Mar 02 Jun 01 Sep 01 Dec. 21 Dec 15 21 Mar 20 Jun 26 Sep. 01 Feb 02 May 01 Aug 31 Oct.
SETSCO Year 2016 Programme Safety in Welding and Cutting Processes : (6 Hours, 6:00 pm 9:00 pm, Thursday and Friday) Closing 17 Mar 18 Mar 16 Jun 17 Jun 15 Sep 16 Sep 15 Dec 16 Dec 03 Mar 02 Jun 01 Sep
Qi Liu Rutgers Business School ISACA New York 2013
Qi Liu Rutgers Business School ISACA New York 2013 1 What is Audit Analytics The use of data analysis technology in Auditing. Audit analytics is the process of identifying, gathering, validating, analyzing,
Business Plan Example. 31 July 2020
Business Plan Example 31 July Index 1. Business Overview 1.1Objectives 1.2Vision Mission and Values 1.3 Keys to Success 2. Business Management 3. Services 2.1 Company Summary 2.2 Company Ownership 2.3
Centers of Academic Excellence in Cyber Security (CAE-C) Knowledge Units Review
Centers of Academic Excellence in Cyber Security (CAE-C) Knowledge Units Review Review Process The Knowledge Unit (KU) Review Calendar divides the entire CAE-C KU list into 12 months for the purposes of
INSE 6230 Total Quality Project Management
Lecture 5 Project Cost Management Project cost management introduction Estimating costs and budgeting Earned Value Management (EVM) 2 IT projects have a poor track record for meeting budget goals Cost
Managing Projects with Practical Software & Systems Measurement PSM
Managing Projects with Practical Software & Systems Measurement PSM Mauricio Aguiar PSM Qualified Instructor TI Métricas Ltda. Av. Rio Branco 181/1910 Rio de Janeiro, RJ Brazil 20040-007 www.metricas.com.br
Project Cost & Schedule Monitoring Process Using MS Excel & MS Project
Project Cost & Schedule Monitoring Process Using MS Excel & MS Project Presented by: Rajesh Jujare About Us Solutions is founded with objectives a. To share its expertise and experiences to overcome the
www.pwc.com/bigdecisions Are you prepared to make the decisions that matter most? Decision making in healthcare
www.pwc.com/bigdecisions Are you prepared to make the decisions that matter most? Decision making in healthcare Results from PwC s Global Data & Analytics Survey 2014 healthcare Patient data. Precision
Cash flow lesson suggestions & activities - CIMA
Cash flow lesson suggestions & activities - CIMA Learning outcomes Students should... Understand the structure of a cash flow forecast (AO1) and evaluate cash flow forecasts as decision making tools (AO3/4)
Supervisor Instructions for Approving Web Time Entry
Supervisor Instructions for Approving Web Time Entry Time Approval Deadlines by Category Local 2110 Members members submit time by NOON on Monday of the pay week. Time should be approved no later than
Schedule of VET FEE-HELP Tuition Fees & Census Dates
Delivery Location Diploma of Beauty Therapy SIB50110 Face to face 87 Bay Street Glebe NSW 2037 Qualification articulates to Bachelor of Applied Health Science (Clinical Aesthetics) delivered by MHM Higher
Ardessie Hydro Electric Project
Ardessie Hydro Electric Project Appendix T - Traffic Management Plan 13 th December 2014 V1.0 Jacinta MacDermot DHG Hydro Ltd 7 St James s Gardens London W11 4RB [email protected] 077 888
Health Insurance Exchange Finance Work Group Meeting August 22, 2012 Wakely Consulting Model Table Summaries - Updated
Table 3 Model Take up rate estimates 2014 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Revised 25.0% 25.0% 18.0% 3.6% 3.6% 3.6% 3.6% 3.6% 3.6% 3.6% 3.6% 3.6% Fast 12.0% 18.0% 20.0% 18.0% 6.0% 4.0% 4.0%
STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2015, QUARTER 2 (JULY THROUGH DECEMBER 2014)
STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 215, QUARTER 2 (JULY THROUGH DECEMBER ) CONTENTS BALANCED SCORECARD OF KEY PERFORMANCE INDICATORS SAFETY & SECURITY SLIDE VEHICLE, PASSENGER
PTC Creo 2.0 Hardware Support Dell
PTC Creo 2.0 Hardware Support Dell Last updated: February 2, 2016 The Desktop Virtualization Environment Support Dell table displays at the end of this document, after the standard Creo certification table.
2015 2016 University-Wide Academic Calendar
2015 2016 University-Wide Academic Calendar Guide to Abbreviations UGD = Undergraduate day GS = Graduate schools LAW = School of Law CPS = College of Professional Studies SEM = Semeter programs (undergraduate
Architectural Services Data Summary March 2011
Firms Typically Small in Size According to the latest U.S. Census Survey of Business Owners, majority of the firms under the description Architectural Services are less than 500 in staff size (99.78%).