Station operator licence asset stewardship obligations Statement by the Office of Rail Regulation (ORR)
|
|
|
- Ilene Lyons
- 10 years ago
- Views:
Transcription
1 Station operator licence asset stewardship obligations Statement by the Office of Rail Regulation (ORR) Introduction 1. This statement sets out the Office of Rail Regulation s approach to monitoring and enforcement of the new condition 27 in Abellio Greater Anglia Ltd s (AGA s) station operator licence. AGA has taken over from Network Rail the responsibility for station asset stewardship of stations in the Greater Anglia franchise. The detail of what we require the licence holder to deliver is set out in paragraphs 13 to 18 below. This statement sets out how we will work with the Department for Transport (DfT) given the interface between licence obligations and the DfT s franchise specifications. 2. This statement deals specifically with the Greater Anglia franchise that started operations on 5 February 2012 for a period of up to 29 months. We will issue a separate statement regarding future, longer franchises. 3. This statement sets out our approach to the monitoring and enforcement of the station stewardship licence (condition 27) and to the working arrangements with the DfT. Should we intend to change our approach from what is set out here, we will consult as appropriate those affected, consider any representations and provide reasons for any changes. Background 4. This statement reflects close working between ORR, the DfT, Network Rail and the Association of Train Operating Companies (ATOC) to develop detailed proposals that will facilitate the transfer of responsibility for the maintenance, repair and renewal of station assets from Network Rail to the franchised train operator. 5. For the Greater Anglia franchise, station asset stewardship responsibilities have been passed from Network Rail to AGA through a lease that transfers the maintenance, repair and renewal responsibilities. The lease has been developed jointly by Network Rail and ATOC, without input from ORR. ORR is responsible for monitoring and enforcing the station asset stewardship obligations through the station operator s licence. 6. The Greater Anglia franchise is a shorter-than-usual franchise that could last up to 29 months. Given its short duration, the station operator will have limited opportunity to introduce asset management policies to replace those of Network Rail or to develop and implement plans that reflect those policies. For this reason the approach set out in this statement is specific to this franchise.
2 General approach 7. Our approach is to replicate as far as possible what we already do in respect of Network Rail s stewardship of stations. 8. AGA s station operator s licence includes new condition that imposes a general duty to achieve a purpose defined in the licence. 9. In summary, the purpose is to secure the maintenance, renewal and improvement of the stations so as to meet the reasonable requirements of customers and funders (including potential customers and funders). This work is to be done in accordance with best practice and in an efficient and economical manner. 10. The general duty achieves the purpose to the greatest extent reasonably practicable having regard to all relevant circumstances, which includes the funding available. 11. The licence contains specific obligations in relation to publishing an asset management policy and a plan, providing information to ORR and a suitable audit (which may be by way of samples where appropriate) of the information so provided. All of this will be at the station operator s expense. 12. Given the short duration of the Greater Anglia franchise, the purpose to act in the long term interest of the assets will be relevant only insofar as the station operator introduces new and substitute policies, renewals or enhancements. Maintenance and renewals schemes inherited from Network Rail will be assumed to fulfil this requirement. Customer and funder reasonable requirements 13. For the Greater Anglia franchise, we consider the following obligations to be customer and funder reasonable requirements: The provision of the documents and information specifically set out in paragraphs 4 to 10 of the licence condition; In particular, the station asset management policy must include: (i) (ii) policies inherited from Network Rail or appropriate replacement policies; and other appropriate and consistent policies to support the licence purpose where activities are not covered by Network Rail s policies; The station asset management plan must include: (i) a timetable (and an estimate of costs) to deliver the renewal schemes identified in Annex A to this statement;
3 (ii) (iii) details of any additional commitments the licence holder makes on maintenance, renewals and/or enhancements 1, inserted as Annex B to this statement; and details of any reactive maintenance, including cyclical and planned preventative maintenance consistent with the station asset management policy; Application of the station asset management policies; Delivery of the station asset management plan; Maintain appropriate, accurate, readily accessible and transferable information about the station assets, including their condition, capability and capacity (and in particular, asset information for the Station Stewardship Measure); and Development of a plan for maintenance and renewals that extends two years beyond the end of the station operator s franchise, and arrangements for completing schemes at franchise end and for efficiently and effectively handing over incomplete schemes to a subsequent operator or third party. Monitoring and enforcement 14. We will enforce the station operator s delivery of those customer and funder requirements listed above in line with our existing enforcement policy ( 15. To the extent that the station operator inherits Network Rail s asset policy, we will not assess it for robustness and sustainability. 16. ORR will require the station operator to report each year (on 31 March) and at the end of the franchise about what maintenance, renewal and/or enhancement works were undertaken in the year and the reasons for any variation from its published plan. 17. ORR will also require the station operator to report each year and at the end of the franchise about: the current condition score of each station taking account of the most recent station surveys conducted 2 ; the average condition score for each category of station; and the methodology used to produce the data. 1 This does not include any enhancement schemes undertaken by the bidder for Network Rail. 2 We recognise that some of these scores will be those inherited from Network Rail, given that the station operator will look to build on Network Rail s existing survey work rather than conduct fresh surveys of all stations within the franchise.
4 18. The information provided as part of the report made in paragraphs 16 and 17 above must be suitably audited, by independent means. Although the starting point of the audit (including the appropriate nature and size of any sampling exercise undertaken) will depend on the station operator s quality management system, ORR may require the station operator to commission further audit work (including changes to any sampling exercise) as part of its seeking assurance as to the quality, accuracy and reliability of the data reported. All auditing will be carried out at the station operator s expense. 19. A copy of this audit must be provided to ORR as part of the reports made in paragraphs 16 and 17 above. 20. A failure to achieve the station asset stewardship obligations is potentially a licence breach and could result in ORR taking enforcement action, in line with our current published policy. In this context, the purpose of enforcement is to ensure delivery of and compliance with licence obligations. If an area of concern is identified, say through our monitoring of the operator s annual return, we would adopt a staged approach of investigation and escalation focused on serious and systemic failures, as we do when enforcing licence obligations now. Where necessary, this could lead ultimately to consideration of formal enforcement action in line with our published policy. 21. Where ORR undertakes enhanced monitoring and enforcement activity this may be re-charged to the station operator. Working arrangements between ORR and the DfT 22. ORR has sole responsibility for monitoring and enforcing the station operator s licence obligations relating to the stewardship of station assets. This includes any enhancements that are committed to in the franchise agreement. 23. ORR was involved in the examination of the station asset stewardship proposals during the franchise bid evaluation: (a) (b) to consider whether the bidder s asset stewardship policy and plan show sufficient maturity to be developed so as to meet the licence obligation; and to assess in particular the credibility of the proposed spend profile against planned outputs ORR will revise and re-issue, as appropriate, this statement. 25. Throughout the franchise any proposed variation to the work to be done must be agreed by ORR. In the case of specific enhancements committed under the franchise, the approval of the Secretary of State is also required. 3 ORR s consideration of credible funding for this GA franchise will establish that the bidder has acknowledged any significant gaps (where they exist) whether positive or negative - in its proposed scheme budget against Network Rail s scheme budget. And that the bidder has provided satisfactory assurance as to how the scheme could be delivered within the proposed budget or why the proposed budget is significantly at variance with that envisaged by Network Rail.
5 26. Variation involving a review of the asset management policy, or re-timing of maintenance and renewal works (including renewals or for reduction in spend from efficiency savings) would require the agreement of ORR. 27. ORR will report performance information to the DfT together with an assessment of the asset stewardship of the licence holder. This will normally be annually and at the end of the franchise but may be more frequently where there are specific performance concerns and/or the DfT has made ORR aware of wider issues affecting the viability of the franchise. 28. ORR s report should cover performance against the policy and plan and actual spend against forecast spend, and will take into account any audit report required under the licence. The report will also summarise any changes agreed with the licence holder to its policy and plan. 29. At franchise end, ORR will determine whether asset stewardship obligations have been fulfilled to the date of asset handover. If obligations have not been fulfilled, ORR will determine the size of the shortfall. A report on the fulfilment of obligations including any shortfall would be provided to the Secretary of State. 30. These arrangements will be reviewed from time to time. 31. Existing statutory requirements already provide for the following: (a) (b) (c) Should ORR find that the station operator has breached its licence and make an order that it should comply with the same, it will report the fact to the DfT; ORR will investigate complaints from other operators who have access rights to any station at which the licence holder is the leaseholder regarding any alleged or apprehended contravention by the licence holder of its licence obligations; and ORR will investigate complaints from the DfT regarding any alleged or apprehended contravention by the station operator of its licence obligations.
6 Annex A The remit of each of the works set out in this Annex A is as set out on the CDs named "Annex A" and initialled by the parties to this Agreement. As set out in this Regulatory Statement, the obligation of the station operator to act in the long term interests of the assets so as to satisfy the reasonable requirements of persons providing services relating to railways, funders and station customers, including potential providers and potential funders and potential customers shall be fulfilled by the station operator delivering the Maintenance and Renewal (M&R) works set out below: Reactive M&R works Station Works Year All Urgent minor work All Urgent minor work 13/14 All Planned Preventative Maintenance and reactive All Planned Preventative Maintenance and reactive 13/14 All Minor emerging work All Minor emerging work 13/14 Small M&R schemes Station Works Year Bishops Stortford Platform and car park refurbishment Darsham Platform repairs Romford Renew UPS batteries and refurbish (escape lighting) Sawbridgeworth Platform, car park, building repairs Stratford Renew UPS batteries and refurbish (escape lighting) Ilford Stair lift removal 13/14 Ipswich Lift renewal Large M&R schemes Station Works Year Audley End Rewire/Relight Public Area - Renewal, 2 platforms and public areas Brentwood Rewire/Relight Station & Car Park - Renewal, 4 platforms (all), overbridge areas/offices and car park Bruce Grove Re-wire/re-light 13/14
7 Station Works Year Cressing Elsenham Elsenham Platform 1 - Renewal of platform surface, tactiles and 30% of copers Rewire/Relight Public Area - Renewal, 2 platforms and public areas Platform repairs & resurfacing including installing tactile paving Refurbishment 13/14 Ely Repairs to platforms, building fabric, car park etc 13/14 Harlow Mill Rewire / Relight 13/14 Harlow Town Rewire/Relight Public Area - Renewal, 4 platforms and public areas 13/14 Harlow Town Platform repairs 13/14 Harlow Town Footbridge repairs 13/14 Harlow Town Canopy and drainage Repairs 13/14 Hythe (Essex) Re-wire/re-light 13/14 Maryland Ramp repairs to platform 1 Maryland Platform and canopy repairs Northumberland Park Rewire/Relight Public Area - Renewal, 2 platforms and public areas 13/14 North Walsham Platform and riser wall repairs 13/14 Ponders End Platform Repairs Roydon Platform Repairs Rye House Platform Repairs Silver Street Platform Repairs 13/14 Stansted Airport Replace Defective Lighting - Renewal to (all) 3 platforms and public areas. Stowmarket Rewire/Relight Tottenham Hale Turkey Street Walthamstow Central Walthamstow Central Rewire/Relight Public Area - Renewal, 2 platforms and public areas Platform repairs & resurfacing including installing tactile paving Rewire/relight Public Areas- renewals, 2 platforms (all) 13/14 Platform repairs Weeley Platform Repairs 13/14 Weeley Exmouth Footbridge Replacement 13/14
8 Annex B Below Abellio has outlined the main approach elements from its stations approach set out in its bid. Some specific commitments have been detailed in the Franchise Specific Agreement and are therefore not covered here Overall rationale for Station Operator's initiatives The short GA franchise provides a pilot for combining the maintenance and renewals of stations under a single train operator infrastructure manager. The station operator will use this period as a preparatory step for GA Long and lay the foundations that are intended to lead to higher efficiency, lower costs and a better passenger experience. The station operator will: act as a safe pair of hands and endeavour to provide a reliable transition by complying with DfT/ORR requirements endeavour to demonstrate that a train operator can act efficiently as infrastructure manager for stations consider the enhancement of assets and capability for benefits in GA Long. The station operator s approach will be to: manage all station assets under a single senior business leader and using a single process (maximising the potential for efficiencies e.g. packaging) be responsive to stakeholder and other external inputs and work requests improve the quality and quantity of data on asset condition so that works can be better planned improve transparency in relation to station lease costs and management data plan work to endeavour to maintain or improve long-term asset condition Commitments Commitment: Implement the asset management process The station operator will: (a) (b) (c) design, implement and populate an asset management system ("AMS") compliant with the BSI PAS55 Asset Management standard, using Atrium software and with asset management data from OPAS for all franchise stations. This will be used to report Station Stewardship Measure ; use its best endeavours to populate the AMS with asset management data from other parties, as relevant, including FM Direct; and use its best endeavours to cleanse all data entered into the AMS. The new process will provide the direction, systems and tools which will enable the station operator to deliver its combined responsibilities more efficiently than the previous split structure. Asset management policies and strategies: To further continuity and deliverability, the station operator will adopt the Operational Property asset management policies currently published by Network Rail on which the integrated station plan ("ISP") has been built. The station operator will deliver the work in the ISP, applying policies B and C as a minimum as specified in the existing Network Rail policy. For the purposes of this Annex B, the ISP incorporates all the aspirational or funded work activity, including the Specified Works on the portfolio of franchise stations.
9 The asset management policy will be underpinned by a number of enablers including an appropriate organisation, streamlined contracts, leadership training and an integrated helpdesk. Asset management enablers: an Atrium-based AMS that uses the sophisticated capabilities currently unused by Network Rail The station operator s AMS will contain details of assets, their condition and remaining asset life. It will also contain the ISP workplan detailing all asset-related activities including inspections, renewals, enhancements, and planned maintenance. The station operator s AMS will use the same Atrium software as used by Network Rail s OPAS system and it will use exactly the same asset hierarchy and database structure. The outcome of this activity will be an AMS that will be a single consolidated repository for all station asset data. The station operator s AMS will be configured to support enhanced asset management processes and will include station lease cost and management data. The station operator's intention is for the AMS to support strategic asset management in GA Long and shall make available the transfer of data to the successor operator. Asset management enablers: a single consolidated helpdesk: The station operator will put a single property helpdesk in place Commitment: Creation of a management and delivery framework The new franchise will combine the maintenance and renewals activities that were in practice immediately before the franchise start date split between Network Rail and the previous train operator. The proposed station operator management structure will have the relevant competencies and sufficient capacity to manage the integrated plan and be equipped with appropriate systems and processes. More reliance will be placed on competent supply partners to deliver the ISP. The current myriad of contract delivery frameworks will be rationalised into 5 main suppliers, summarised as follows: Large renewals Geoffrey Osborne; Reactive/routine maintenance and small renewals Network Rail novated contractor; Telecoms maintenance Telent; FM Contract management (6 months) Lambert Smith Hampton; Commercial management - Lambert Smith Hampton; Enhancement project management Vextrix; Station cleaning - Carlisle Cleaning Services. The Estate Management software used will be migrated to the AMS to retain asset knowledge within the franchise in a single entity and reduce dependence on external agents. The Direct Labour Organisation ("DLO") delivered work will be outsourced to suppliers and DLO staff will transfer to the new contractor. This is the appropriate solution as a mixed insource and out-source solution causes interface risks, occupies additional management time and reduces economies of scale. The station operator will contract with Atrium for the use of the AMS; it will use Railscape for vegetation control; and use Stannah and Kone for lifts and escalators under the Network Rail contract Commitment: Creation of consolidated ISP, including station refreshes To create an ISP, the station operator will collate Network Rail maintenance and renewals data, NSIP data, AfA data, maintenance plans from the previous franchise operator and all industry enhancements, and bring them together into a single, consolidated work bank. The station operator will use its ISP to identify efficiencies and reduce duplication and conflict. The station operator is aware: of the imbalance in the workload existing immediately
10 before the franchise start date; that a transition organisation will operate until all posts have been recruited; and that it is prudent to avoid major works being carried out during the Olympics. The station operator has thus decided to defer the start of construction of large renewals until September Consultation with stakeholders: The station operator will identify key stakeholders in the ISP and develop a process for communication and sharing work plans with them. The station operator will manage the ISP on behalf of all stakeholders: it will contain all planned and aspirational activities, providing a common platform for sharing information. Delivery of ISP: There is a large renewals delivery volume in 20 ( 20m) compared to 2013/14 ( 9m) See Annex A. Whilst some development will be initiated in mobilisation just before the franchisee start date, large renewals delivery will be deferred for six reporting periods and delivery will be completed by the end of GA Short. The station operator will begin developing the renewals for the two years following franchiseend after a careful review of the data received from the Network Rail OPAS system and when any missing data on asset condition has been gathered. The station operator anticipates that this will be six months into the franchise.
Customer requirements. Asset management planning Inspection and assessment Route asset planning Annual work plans Contracting strategy
Section 8 Output monitoring Inputs Customer requirements Safety standards Outputs and funding SRA and Government Policy Network stewardship strategy Asset and operational policies Maintenance & renewal
Asset Management Policy March 2014
Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and
Safety. Standards. Asset Management Planning Inspection and Assessment Route asset planning Contracting strategy Annual work plans
Section 8 Output Monitoring Having identified the key network outputs it is important that we develop a clear and concise methodology to ensure that what is actually delivered is measured against what
4 Adoption of Asset Management Policy and Strategy
4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are
HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY
HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY 16 November 2015 Highway Infrastructure Asset Management Strategy Contents Introduction 1.0 The Need for Asset Management 1.1. Background 1.2. Aims and
Monitoring and Treatment of Network Rail s Underspend and Efficiency: Policy Statement
Monitoring and Treatment of Network Rail s Underspend and Efficiency: Policy Statement January 2006 Published by the Office of Rail Regulation Contents Executive Summary...1 Context...1 Underspend framework...2
Maintenance Strategy 2015 Owner: Kevin Bullimore Head of Infrastructure Next review 2020
Maintenance Strategy 2015 Owner: Kevin Bullimore Head of Infrastructure Next review 2020 Page 1 of 7 Maintenance Strategy Introduction The requirement for maintenance of premises, plant and equipment arises
LHT S ASSET MANAGEMENT STRATEGY 2015-20. It s My Home
LHT S ASSET MANAGEMENT STRATEGY 2015-20 It s My Home 0 ASSET MANAGEMENT STRATEGY 2015-20 It s My Home Contents Page No 1. WHAT DOES OUR ASSET MANAGEMENT STRATEGY AIM TO DO? 2 2. WHY IS ASSET MANAGEMENT
AGENDA ITEM: 8 SUMMARY
AGENDA ITEM: 8 SUMMARY Report for: Housing and Community Overview and Scrutiny Committee Date of meeting: 28th January 2015 PART: 1 If Part II, reason: Title of report: Contact: Purpose of report: Recommendations
Reactive Maintenance Service Levels
Estates Office Reactive Maintenance Service Levels To report maintenance requests and items for repair go to: bristol.ac.uk/estates In an emergency, always call Ext: 89898 or (0117) 928 9898 Contents Executive
SCHEDULE 16. Exit Plan. sets out the strategy to be followed on the termination (including Partial Termination) or expiry of this Agreement; and
SCHEDULE 16 Exit Plan 1. Scope 1.1 This schedule: (A) sets out the strategy to be followed on the termination (including Partial Termination) or expiry of this Agreement; and requires the Service Provider
The Asset Management Landscape
The Asset Management Landscape ISBN 978-0-9871799-1-3 Issued November 2011 www.gfmam.org The Asset Management Landscape www.gfmam.org ISBN 978-0-9871799-1-3 Published November 2011 This version replaces
JOB DESCRIPTION. TITLE: Corporate Property Manager SALARY RANGE: 55,000-70,000
TITLE: Corporate Property Manager SALARY RANGE: 55,000-70,000 JOB DESCRIPTION DEPARTMENT: Property Management Services REGION: North East / North West / Midlands / London / South ACCOUNTABILITIES: The
Community Health Partnerships Job Description and Person Specification
Community Health Partnerships Job Description and Person Specification Job Title: Senior Key Account Manager Contractual Location: North Reports to: Regional Property Director Band/Grade: 55,000-65,000
Senate. SEN15-P17 11 March 2015. Paper Title: Enhancing Information Governance at Loughborough University
SEN15-P17 11 March 2015 Senate Paper Title: Enhancing Information Governance at Loughborough University Author: Information Technology & Governance Committee 1. Specific Decision Required by Committee
HOME GROUP JOB DESCRIPTION. Date:
HOME GROUP JOB DESCRIPTION 1 JOB DETAILS Job Title: Assistant Finance Business Partner (Care & Support) Reports to: Finance Business Partne Date: Ref: HOMEJD235 2 JOB PURPOSE Based centrally this role
Property Management Service Level Agreement
Property Management Service Level Agreement 2014 comms:3292 www.lancashire.gov.uk 2 Contents 3 Welcome Mission Statement 4 Customer Charter 5 Introduction 6 Responsibilities and Choices 7 Service Level
Published by the National Regulatory System for Community Housing Directorate. Document Identification: 003-04-13/NRSD. Publication date: January 2014
Evidence guidelines Published by the National Regulatory System for Community Housing Directorate. Document Identification: 003-04-13/NRSD Publication date: January 2014 Supported by the Commonwealth Government
Insurance Review: Consultation November 2006
November 2006 Published by the Office of Rail Regulation Contents Executive summary...1 1. Introduction...3 Context...3 Purpose...3 Structure...3 Responses and timetable...4 2. Background...5 Regulatory
The Performance Management Overview PERFORMANCE MANAGEMENT 1.1 SUPPORT PORTFOLIO
The Performance Management Overview PERFORMANCE MANAGEMENT 1.1 SUPPORT PORTFOLIO This document is part of the of the Performance Management Support Portfolio a series of guides to the key elements of Performance
Inspection Wales Remit Paper
Inspection Wales Remit Paper A summary of the remits of the Welsh public sector audit and inspection bodies and the Inspection Wales Programme Issued: July 2015 Document reference: 376A2015 Contents Summary
LSB Procurement Framework
LSB Procurement Framework Introduction Procurement covers the typical purchase of services, supplies and works required to enable project delivery and to manage the infrastructure. The Services Board (LSB)
Model disclosure document for franchisee or prospective franchisee
Model disclosure document for franchisee or prospective franchisee The following pages give a recommended format for a disclosure document for a franchisee or prospective franchisee in accordance with
Environment Committee 11 January 2016
Environment Committee 11 January 2016 Title Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation Report of Wards Status Urgent Key Enclosures Commissioning Director, Environment
Capital Works Management Framework
POLICY DOCUMENT Capital Works Management Framework Policy for managing risks in the planning and delivery of Queensland Government building projects Department of Public Works The concept of the asset
Monitoring Highways England The monitoring framework
Monitoring Highways England The monitoring framework October 2015 Contents Executive summary 4 Roads reform 4 ORR s role in monitoring Highways England 5 What we will do next 10 1. Overview of this document
LONDON BOROUGH OF WALTHAM FOREST
LONDON BOROUGH OF WALTHAM FOREST Meeting / Date 22 nd June 2015 Report Title Cabinet Portfolio Report Author/ Contact details Wards affected Public Access Contract for the provision of Total Facilities
Asset Support Contract Model Service Information. Annex 25 Integrated Asset Management
Asset Support Contract Model Annex 25 Integrated Asset Management Page A25-1 SERVICE INFORMATION FOR ASC CONTRACT ANNEX 25 CONTENTS AMENDMENT SHEET Amend. No. Issue Date Amendments Initials Date Page A25-2
ICT Digital Transformation Programme
Officer and Date Item Cabinet 11 th May 2016 Public ICT Digital Transformation Programme Responsible Officer: Clive Wright, Chief Executive Email: [email protected] Tel: 01743 252007 1.0 Summary
IRIS International Railway Industry Standard
English Addendum, 19th June 2008 IRIS International Railway Industry Standard Hier kann ein kleiner Text stehen Hier kann ein kleiner Text stehen Hier kann ein kleiner Text stehen Chapter 1 3 IRIS Certification
Overview of the Transfer of Undertakings (Protection of Employment) Regulations 2006
TUPE Overview of the Transfer of Undertakings (Protection of Employment) Regulations 2006... 1 Service Provision Changes... 1 Employer Liability Information... 2 Liability for Failure to Inform and Consult
Electricity Market Reform:
Electricity Market Reform: Consultation on Low Carbon Contracts Company s and Electricity Settlements Company s operational costs 2015/16 Government Response January 2015 Crown copyright 2015 URN 15D/001
A Strategic Approach to Housing Asset Management
Housing A Strategic Approach to Housing Asset Management www.milton-keynes.gov.uk/housing-mkc 0 A Strategic Approach to Housing Asset Management Contents Page 1. Introduction 1 2. Developing a New Set
Stakeholder relations code of practice Investing in the Network
Stakeholder relations code of practice Investing in the Network Document version: 1.1 Stakeholder relations code of practice investing in the network Page 2 of 42 Contents 1. Introduction... 3 2. Overview...
States of Jersey Comptroller & Auditor General
States of Jersey Comptroller & Auditor General Code of Audit Practice (Prepared under Article 18 of the Comptroller and Auditor General (Jersey) Law 2014) 28 November 2014 Foreword Independent external
Outsourcing. Knowledge Summary
Knowledge Summary Outsourcing P&SM professionals should have the knowledge and skills required to manage the outsourcing process and to advise colleagues of the most appropriate solution to obtain best
Sustainable Development Strategy
Sustainable Development Strategy Our vision and strategy: A railway fit for the future 2013 2024 Document Ref: SBPT204 Version 0.71 Executive summary Network Rail exists to generate outstanding value for
IAM Certificate in Asset Management Ver1.2 January 2013
IAM Certificate in Asset Management Ver1.2 January 2013 Introduction 1.1 The IAM Certificate is aimed primarily at new entrants and those with some experience in asset management roles and seeking to achieve
Civil Aviation Authority. Regulatory Enforcement Policy
Civil Aviation Authority Regulatory Enforcement Policy PAGE 2 REGULATORY ENFORCEMENT POLICY Civil Aviation Authority This policy is subject to a phased implementation process please therefore check applicability
Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014
for Inspecting and Certifying Buildings and Works Building Control Regulations 2014 February, 2014 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1 1.3 Application
COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited
PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date
Managing Asbestos Policy
Managing Asbestos Policy Liverpool Mutual Homes Page 1 of 16 Table of Contents 1. MANAGEMENT INFORMATION 2. POLICY STATEMENT 3. POLICY AIMS AND KEY OBJECTIVES 4. INTRODUCTION 5. DETAIL 6. LINKS TO LMH
KIER SERVICES. The difference is
KIER SERVICES The difference is WE ARE KIER Kier is a leading construction, services and property group with an unrivalled capability to finance, develop, build and maintain property, adding value every
2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology
2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology Version Number 1 26 June 2015 Tasmanian Networks Pty Ltd (ACN 167 357 299) Table of contents 1 Introduction... 1 2 Meeting our
AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007
PAGE: 1 REPORT TO: SUBJECT: BY: AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007 ASSET MANAGEMENT CHIEF FINANCIAL OFFICER 1. REASON FOR REPORT 1.1 To provide the Audit and Performance Review
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
Code of Audit Practice
Code of Audit Practice APRIL 2015 Code of Audit Practice Published pursuant to Schedule 6 Para 2 of the Local Audit and Accountability This document is available on our website at: www.nao.org.uk/ consultation-code-audit-practice
Performance audit report. Ministry of Education: Management of the school property portfolio
Performance audit report Ministry of Education: Management of the school property portfolio Office of the Auditor-General Private Box 3928, Wellington Telephone: (04) 917 1500 Facsimile: (04) 917 1549
Housing Association Regulatory Assessment
Welsh Government Housing Directorate - Regulation Housing Association Regulatory Assessment Melin Homes Limited Registration number: L110 Date of publication: 20 December 2013 Welsh Government Housing
Regulatory Financial Reporting. Final Statement
Regulatory Financial Reporting Final Statement Statement Publication date: 20 May 2014 About this document This document sets out the changes that we have decided to make to BT s regulatory financial reporting
Head of Internal Audit:
Head of Internal : Opinion on the effectiveness of the system of Internal Control at Northern Devon Healthcare NHS Trust for the year ended 31 March 2010 Roles and responsibilities The whole Board of Directors
Outsourcing. Definitions. Outsourcing Strategy. Potential Advantages of an Outsourced Service. Procurement Process
CIPS takes the view that the outsourcing of services to specialist providers can often lead to better quality of services and increased value for money. Purchasing and supply management professionals should
The Asset Management Landscape
The Asset Management Landscape Second Edition ISBN 978-0-9871799-2-0 Published March 2014 www.gfmam.org The Global Forum on Maintenance and Asset Management The Global Forum on Maintenance and Asset Management
May 2013. Grafton Group. Clinical contracting considerations
May 2013 Grafton Group Clinical contracting considerations Grafton Group The Grafton Group is a group of nine CCGs comprising Cumbria, North East Lincolnshire, Leeds South and East, Principia Rushcliffe,
Consultation: Auditing and ethical standards
Consultation Financial Reporting Council December 2014 Consultation: Auditing and ethical standards Implementation of the EU Audit Directive and Audit Regulation The FRC is responsible for promoting high
Attachment 20.27 SA Power Networks: Network Program Deliverability Strategy
Attachment 20.27 SA Power Networks: Network Program Deliverability Strategy Network Program Deliverability Strategy 2015-20 Regulatory Control Period SA Power Networks www.sapowernetworks.com.au Internal
NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013
APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective
How To Become A School Business Manager
Headteacher: Tom Sherrington MSc 8 Highbury Grove London N5 2EQ 020 7288 8900 [email protected] www.highburygrove.islington.sch.uk October 2015 Dear Applicant School Business Manager
Preparation of a Rail Safety Management System Guideline
Preparation of a Rail Safety Management System Guideline Page 1 of 99 Version History Version No. Approved by Date approved Review date 1 By 20 January 2014 Guideline for Preparation of a Safety Management
CRM Initial Implementation PROJECT DOCUMENTATION PROJECT INITIATION DOCUMENT PID. Document Description. Version Number 0.1 Release Date Author
CRM Initial Implementation PROJECT DOCUMENTATION PROJECT INITIATION DOCUMENT PID Document Description Version Number 0.1 Release Date Author Sandy Spink Owner Spink Telecom Consultants Ltd Client Tunbridge
Technical Journal. Paper 142
Technical Journal 09 Paper 142 142 Kevin Balaam Programme Manager Highways & Transportation Atkins The Area 6 MAC approach to planning and programme management Introduction Steve Dickinson Schemes Manager
CONTRACT MANAGEMENT FRAMEWORK
CONTRACT MANAGEMENT FRAMEWORK August 2010 Page 1 of 20 Table of contents 1 Introduction to the CMF... 3 1.1 Purpose and scope of the CMF... 3 1.2 Importance of contract management... 4 1.3 Managing contracts...
Code of Corporate Governance
www.surreycc.gov.uk Making Surrey a better place Code of Corporate Governance October 2013 1 This page is intentionally blank 2 CONTENTS PAGE Commitment to good governance 4 Good governance principles
AGENCY AGREEMENT. Between 3Keys Limited company registration number 06841492 6 of Town End Doncaster DN5 9AG ... ... ... ... ... Postcode..
AGENCY AGREEMENT Between 3Keys Limited company registration number 06841492 6 of Town End Doncaster DN5 9AG and Landlord s name/s (all joint landlords):... Landlord s address: (current address and new
The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.
Senior Project Manager Job Description Reference: 102014/51 Job Title: Senior Project Manager Purpose of Role: The University is committed to providing an environment conducive to high quality teaching
Measuring Contractors Performance Using KPIs GUIDANCE NOTES FOR FACILITIES MANAGERS
Measuring Contractors Performance Using KPIs GUIDANCE NOTES FOR FACILITIES MANAGERS Published by the British Institute of Facilities Management BIFM November 2014 1 Why measure performance? Jonah Lomu
(2) That the contract runs from 1 April 2015 for an initial period of seven years. The value of the contract will be in the order of 10m per annum.
Cabinet Member for Corporate Relations Redesign of Facilities Management Services April 2014 Report by Director Service Operations and Principal Manager Facilities Management Ref No: CR02(14/15) Key Decision:
Audit and Performance Committee Report
Audit and Performance Committee Report Date: 3 February 2016 Classification: Title: Wards Affected: Financial Summary: Report of: Author: General Release Maintaining High Ethical Standards at the City
Role Profile. Leasehold Co-ordinator (LSE) - Career Ladder: Customer Services. - Level: Level 4. - Function: Leasehold
Role Profile Role Title: Directorate: Department: Team: Leasehold Co-ordinator (LSE) Resident Services Local Services Regional Role Identifiers: - Career Ladder: Customer Services - Level: Level 4 - Function:
Date: 7 February 2013
Item No. Report title: Classification: Open Ward(s) or groups affected: From: Date: 7 February 2013 Meeting Name: Deputy Leader and Cabinet Member for Housing Management GW2: Leasehold and Ancillary Properties
Standard conditions of the Electricity Distribution Licence
Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of the Electricity Distribution Licence Statutory Consultation: 29 April 2008 SECTION A: STANDARD CONDITIONS FOR ALL ELECTRICITY
The establishment of the NHVR and the development of the NHVL is expected to bring the following benefits:
DEPARTMENT OF TRANSPORT AND MAIN ROADS REVIEWS OF LEGISLATIVE REQUIREMENTS A legislative requirement is an obligation imposed under any legislative instrument which, for the purposes of this initiative,
Approved by Management Committee 24/03/11 Strategy Document
ELHA POLICY Date Issued May 2007 Last Revised March 2011 Department Asset Management Title Asset Management Strategy Objective To outline the Association s strategy for managing its assets Responsible
Contract and Vendor Management Guide
Contents 1. Guidelines for managing contracts and vendors... 2 1.1. Purpose and scope... 2 1.2. Introduction... 2 2. Contract and Vendor Management 2.1. Levels of management/segmentation... 3 2.2. Supplier
Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding
Committee and Date Cabinet 14 th October 2015 Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Responsible Officer
Consultancy spending approval process: Initial guidance to NHS foundation trusts
Annex One Consultancy spending approval process: Initial guidance to NHS foundation trusts Summary 1. Monitor, the NHS Trust Development Authority (TDA) and NHS England are jointly implementing an approval
Information Services Strategy 2011-2013
Information Services Strategy Issue 1 1 Introduction The States of Jersey public sector is facing significant pressure for efficiencies and savings. This has created the context to take a fresh look at
How To Be Accountable To The Health Department
CQC Corporate Governance Framework Introduction This document describes the components of CQC s Corporate Governance Framework: what it is intended to achieve, what the components of the Framework are
BEST PRACTICE GUIDE 2: TENDER SPECIFICATION WRITING. RDTL MINISTRY OF FINANCE Procurement Service
RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 2: TENDER SPECIFICATION WRITING 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes
Appendix 1a: Facilities Management Guide elements of FM Soft FM
Catering Responsibility for the management of on site catering often falls within the remit of the Facilities Manager. In the public sector this can range from the provision of vending or coffee bar type
HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT
HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT GUIDANCE DOCUMENT MAY 2013 Although this report was commissioned by the Department for Transport (DfT), the findings and recommendations are those of the authors
Facilities Maintenance Contract
Re-tendering the Facilities Maintenance Contract Asset Management Services UTAS Property Portfolio Total Asset Management Reviewing options and preferences Contract structure & deliverables Tendering process
Responsive Repairs and Void Maintenance Strategy
Responsive Repairs and Void Maintenance Strategy Renewal: Nov. 2012 Contents: Page: 1. THE VISION 3 2. INTRODUCTION 3 3. DEFINITIONS 4 4. DELIVERY OF THE STRATEGY 5 5. TARGETS AND OBJECTIVES 6 6. MONITORING
Guidelines for the Application of Asset Management in Railway Infrastructure Organisations
Guidelines for the Application of Asset Management in Railway Infrastructure Organisations INTERNATIONAL UNION OF RAILWAYS (UIC) 16 rue Jean Rey - F-75015 PARIS Tel: +33 (0)1 44 49 20 20 Fax: +33 (0)1
Framework Agreement between the Department of Health and the NHS Trust Development Authority. Annex C: Finance and Accounting
Framework Agreement between the Department of Health and the NHS Trust Development Authority Annex C: Finance and Accounting 2014 1. The Framework Agreement sets out the governance and accountability arrangements
HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE
HERTSMERE BOROUGH COUNCIL REPORT TO EXECUTIVE Item no: 7.1 Document Reference No: EX/12/91 Date of Meeting / Decision: 12 December 2012 This is not a key decision call-in on the grounds of urgency Urgency:
Internal controls Guidance for trustees
Regulatory code of practice no. 9 Internal controls Guidance for trustees Contents Paragraph Page 1 Introduction 3 5 The status of codes of practice 3 6 Other regulatory requirements 3 7 Terminology 4
