Property Management Plan for the EMD Project
|
|
|
- Jeffry Gallagher
- 10 years ago
- Views:
Transcription
1 105-EMD-001 ECS Maintenance and Development Project Property Management Plan for the EMD Project Revision 01 January 2008 Raytheon Information Solutions Riverdale, Maryland
2
3 This page intentionally left blank. 105-EMD-001, Rev. 01
4 Preface This document is a formal contract deliverable. It requires Government review and approval within 20 business days. Changes to this document will be made by document change notice (DCN) or by complete revision. Any questions should be addressed to: Data Management Office The EMD Project Office Raytheon Information Solutions 5700 Rivertech Ct Riverdale, Maryland Revision History Document Number Status/Issue Publication Date CCR Number 105-EMD-001 Original December EMD-001 Revision 01 January iii 105-EMD-001, Rev. 01
5 This page intentionally left blank. iv 105-EMD-001, Rev. 01
6 Abstract This Property Management Plan for the EMD Project addresses management of EMD Contractor-acquired commercial off-the-shelf (COTS) hardware and software and governmentfurnished property (GFP) until NASA accepts it. This also includes management of Contractoracquired property and GFP in which the EMD Contractor has direct maintenance and operations (M&O) responsibility. Keywords: COTS, MWO, GFP, DCMAO, EDS, ILS, ILM database, Property Administration, Purchase Order, Bill of Material, Inventory, Material, EIN, Maintenance Work Order, GSFC Form 20-4, DD Form 250, Property, Equipment v 105-EMD-001, Rev. 01
7 This page intentionally left blank. vi 105-EMD-001, Rev. 01
8 Contents Preface Abstract 1. Introduction 1.1 Identification Scope Purpose Organization Related Documents 2.1 Parent Documents Applicable Documents Property Organization and Responsibilities 3.1 Organization Responsibilities Property Administration Procurement Office Property Management Process 4.1 Property Management Acquisition vii 105-EMD-001, Rev. 01
9 4.3 Receiving Receiving Inspection Receipt Processing Receipt Reporting Identification Records Property Management System Movement Intra-site Relocations Inter-site Relocations External Transfers Off-Site Vendor Repairs Storage Physical Inventories Reports Quarterly Reporting NASA 1018 Reporting Consumption Reporting of Lost, Theft, Damaged, and or Destroyed (LTDD) EMD Property Utilization Control of Pilferable Material Maintenance Warranty Management Recording Maintenance Actions Subcontract and Vendor Control Disposition Government Furnished Property (GFP) Reporting Excess Government Property Disposing of Excess Government Property Property Close-out viii 105-EMD-001, Rev. 01
10 List of Figures 3-1 Property Management Roles Property Management Process Flow EMD Property Tags Abbreviations and Acronyms ix 105-EMD-001, Rev. 01
11 This page intentionally left blank. x 105-EMD-001, Rev. 01
12 1. Introduction 1.1 Identification This plan is prepared in compliance with Contract Data Requirements List (CDRL) item 005 as required by the ECS Maintenance and Development (EMD) contract NAS Scope This plan addresses management of EMD Contractor-acquired commercial off-the-shelf (COTS) hardware and software and Government-furnished property (GFP) until the Contracting Officer (CO) or the Contracting Officer s Technical Representative (COTR) accepts it. 1.3 Purpose The purpose of this document is to identify responsibilities and procedures for the management and execution of EMD property management functions. When approved by the Defense Contract Management Agency (DCMA), this document will establish the processes, policies, and procedures to be followed by the EMD contractor in managing, accounting for, and reporting contractor-acquired COTS hardware, software, and GFP. The objectives of property management are to accomplish the following: Maintain control of EMD property from time of receipt until relief from accountability through approved means. Maintain accountability of EMD property through the establishment and maintenance of accountable records that provide accurate description, location, and condition status of the property. 1.4 Organization The remainder of this document is organized as follows: Section 2: Identifies related documents for requirements or documents referenced in this plan. Section 3: Identifies the organization and its responsibilities for the management and execution of EMD property management functions. Section 4: Describes the processes and procedures for the execution of property management functions A list of abbreviations and acronyms appears at the end of this document EMD-001, Rev. 01
13 This page intentionally left blank EMD-001, Rev. 01
14 2. Related Documents 2.1 Parent Documents Not Applicable 2.2 Applicable Documents The following documents are either referenced in this document, are directly applicable, or contain policies or other directives that are binding upon the content of this volume: NAS EMD Contract, Clauses: E5, 6, and 10, F2 and 6, G5, 6, 15, 16, 17, 18, 19, and PL EMD-001 NPG E 108-EMD-001 EMD Statement of Work Procurement Management Plan for EMD Equipment Management Manual EMD Program Management Plan EMD-001, Rev. 01
15 This page intentionally left blank EMD-001, Rev. 01
16 3. Property Organization and Responsibilities 3.1 Organization Raytheon is solely responsible to the Government for the accountability, control, and reporting of contractor-acquired property and Government furnished property (GFP) during the execution of the EMD contract. As such, Raytheon will manage EMD property management functions performed by subcontractors. Property Custodians (PC) and the EMD Property Administrator (PA) will control EMD property located at the following sites. GES DAAC, Goddard Space Flight Center (GSFC), Greenbelt, MD ECHO, Goddard Space Flight Center (GSFC), Greenbelt, MD SMC, Goddard Space Flight Center (GSFC), Greenbelt, MD Land Processing DAAC (LP DAAC), Earth Resources Observation Systems (EROS) Data Center (EDC), Sioux Falls, SD Atmospheric Sciences Data Center (ASDC DAAC), Langley Research Center (LaRC), Hampton, VA National Snow and Ice Data Center (NSIDC), University of Colorado, Boulder, CO EMD Development Facility (EDF), Riverdale, MD EMD Excess Equipment Warehouse, Hanover, MD Additional locations may be incorporated into the EMD as operational needs warrant. The EMD organizations will share facilities belonging to the institutional hosts. Host facilities will support property management operations by providing space for maintenance, parts, tools, material and consumable storage, and personnel and will provide external communications. Figure 3-1, Property Management Roles, identifies the EMD personnel involved in managing and executing EMD property functions. The following section addresses the property management roles and responsibilities of EMD Project personnel. 3.2 Responsibilities The Raytheon EMD Contracts Manager is responsible for subcontracts management and reporting the following to the Government PA (GPA): lost, theft, damaged, and or destroyed contractor-acquired property and GFP, revisions of the EMD property management procedures, and submission of monthly and annual NASA Form (NF 1018) EMD-001, Rev. 01
17 ESDIS Project Manager DCMA Gov't Property Administrator Raytheon EMD Project Manager Quality Office EMD Contracts Office Contract Administrator Integrated Logistics Support (ILS) Office ILS Manager EMD Property Administrator Figure 3-1. Property Management Roles The Integrated Logistics Support (ILS) Manager, under the general direction of the COTS HW and SW Maintenance Manager and the Raytheon EMD Contracts Manager, is responsible for the execution of the EMD property management program. This includes development of policies and procedures for EMD-wide property administration, management of property administration resources, and property accountability and reporting. The Defense Contract Management Agency (DCMA) is the Government PA (GPA), responsible for oversight of EMD property administration. As such, DCMA will review and approve this plan and the processes, procedures, and systems used in the administration of EMD property Property Administration The EMD PA within the ILS Office at the EDF is responsible for the establishment and maintenance of EMD property records using the Inventory and Logistics Maintenance (ILM) database. The EMD PA is the focal point regarding the execution of property administration functions EMD-wide and for maintaining control and accountability of contractor-acquired and GFP property at the EDF. The EMD PA coordinates and monitors property actions of the Site PC The Property Custodian (PC) designated at each EMD Distributed Active Archive Center (DAAC) performs property administration for the site s material. Site PC s are responsible for the receipt, inspection, storage, issue, inventory, recording, accounting, and reporting of EMD property at EMD sites. PC will follow the policies and procedures approved in this Plan, EMD Project Instructions, and EMD-approved local procedures developed between site PC and local site property control offices. Locally developed procedures will be reviewed by the ILS Manager to ensure that they are in conformance with provisions of this Plan, EMD Project Instructions, EMD-001, Rev. 01
18 procedures accepted by Government PA, and are conducive to the maintenance of control and accountability of EMD property at all sites. The EMD Raytheon DAAC Lead, in coordination with the government DAAC manager and site support contractor will designate site PC in writing. At locations where Raytheon is not the site support contractor a Raytheon engineer will be assigned to monitor the actions of the site support property custodian to ensure that procedures outlined in this document are followed. Prior to the transfer of responsibility from one PC to another, the ILS Manager will verify that the incoming PC has been adequately prepared to assume his/her responsibilities, that a site inventory is performed and the results recorded, and that accountable records are current Procurement Office The purchase of EMD COTS material, software, repair parts, and consumables is the responsibility of the EMD COTS Procurement Office. The Procurement Office is under the direction of the EMD Business Operations Office and the Contracts Manager. The purchase of EMD COTS material, software, repair parts and consumables is the responsibility of the EMD COTS Procurement Office. The control and accountability of the property including transfers between EMD sites or to other contracts is the responsibility of the ILS Manager, the EMD PA and the DAAC PC EMD-001, Rev. 01
19 This page intentionally left blank EMD-001, Rev. 01
20 4. Property Management Process This section describes the processes to be performed in the execution of the EMD property management functions. The property management process is depicted in Figure 4-1. The process depicted here is described in detail in the following pages. Documentation to/from NASA Draft POs Consent to Issue POs Install Ltr Inventory Changes Report (Qtrly) Monthly and Annual NF 1018 rpts Vendors HW/SW Rqmts Purch Orders HW & SW Data Procu Office Prepare Draft POs Procu Office Release Purch Orders Property Administrator Receive HW/SW Record Prop Info Prepare Rcv Rpt ILS Office Install HW/SW Report Install. Prop Admin Control &Report Inventory Changes ILS Office Identify training, repair parts, test equip, and maint. requirements Plan installation Receipts Data Installation Data Inventory Changes Property Management Database Figure 4-1. Property Management Process Flow EMD-001, Rev. 01
21 4.1 Property Management Raytheon will maintain an adequate property control system for government property that will meet the guidelines of FAR The Raytheon EMD Project Manager, having overall responsibility and authority for the EMD contract, is considered "managerial personnel" with regards to the FAR. 4.2 Acquisition EMD COTS Procurement Office will obtain the Contracting Officer s written consent before placing any subcontract for which advanced notification is required. EMD contractor requests for Government-owned equipment must obtain the Contracting Officer s consent. The ESDIS Contracting Officer and GSFC Code have determined that all hardware, software, and consumables purchased for EMD by the EMD COTS Procurement Office is material. Therefore screening through the NASA Equipment Management System (NEMS) system is not required. Prior to purchasing EMD material or facilities (including plant equipment) the EMD COTS Procurement Office will submit a consent package for review, through the Raytheon EMD Contracts Manager, to the NASA EMD Contracting Officer (CO) or Hardware Planner for review. A consent package consists of a signed configuration change request (CCR), bill of material (BOM), and EDS purchase order (PO). The NASA EMD CO and Hardware Planner will return the consent package with a signed approval letter to the EMD COTS Procurement Office to purchase the item(s). Upon the receipt of the NASA CO s consent to purchase, EMD COTS Procurement Office will purchase the material using the PO and provide the EMD PA a copy of the returned PO and a detailed BOM. The EMD PA will use these documents to monitor material due in, reconcile receipts against what is ordered, and configure the material when received. When a BOM identifies material to be used as a trade in the following procedures will be used. The COTS Procurement Office will prepare NASA form 20-56A and submit it as a part of the consent procurement package to the EMD CO and or Hardware Manager. When approval is received to purchase from the EMD CO or Hardware Manager the EMD COTS Procurement Office will initiate PO based on the approval package. The NASA CO or Hardware Manager will forward the NASA Form 20-56A to the appropriate GSFC property office. Disposition/approval will be provided to the NASA CO or Hardware Manager. If the disposition instructions require that the trade in HW be sent another NASA organization, this information will be passed to the EMD PA, EMD COTS Procurement Manager, and EMD ILS Manager. The ILS manager will inform EMD hardware engineering if trade in items are to be shipped to other NASA organizations After EMD hardware engineering releases the HW the EMD Property Custodian will accomplish the transfer. 4.3 Receiving All Contractor-acquired property, vendor-loaned property, and GFP entering an EMD facility (i.e., the EDF or an EMD site) will be received and processed by the EMD PA or site Property Custodian prior to its use. The following is a description of the process to be followed in the EMD-001, Rev. 01
22 receipt and processing of EMD property Material purchased by Raytheon Supply Chain, will require that a copy of the packing lists be provided to the designated Raytheon Supply Chain point of contract for entry into the Raytheon JAMIS system. Procedures for receiving vendorloaned property will be described in a separate EMD project instruction Receiving Inspection Upon arrival of EMD material or software, the EMD PA will perform a receiving inspection against the PO to verify correctness of delivery, quantity received, and to determine if there is evidence of damage during shipment. The PA will complete a Loading Dock Checklist verifying the number of pieces received against the shipper's bill of lading and the condition of the material. The following will be noted on the checklist: carrier name and bill of lading number, date and number of pieces received, description of discrepancies noted, and signature of person receiving the items. On the carrier s copy of the shipping document, the receiving individual will note any damage to the shipment and sign the Loading Dock Checklist, thereby acknowledging receipt of the shipment. The signature of the carrier s representative will be obtained when container shortages, damages, and other transit-related discrepancies are identified. Property received will be promptly moved under the direction of the PA from the loading dock to a controlled inventory area for unpacking inspection, detailed component level inventory, and preparation of an Inventory Worksheet. Items received will be reconciled against purchase orders, transfer documents (e.g. GSFC Form 20-4), packing lists, or related documents to ensure accountability for all items, attachments, and accessories. Item identification, configuration, and quantity will be matched against the vendor s packing list, the purchase order, and the detailed configuration list (supplied by the COTS Procurement Office). For GFP having a NASA equipment control number (ECN), the ECN, serial and model numbers, and any other appropriate marking will be noted on the Inventory Worksheet for entry into the property record. Normally EMD property will be received at the EDF. However in extraordinary circumstances HW may be shipped directly to a DAAC. In most cases the EMD PA or an EMD engineer will travel to the DAAC to perform the receiving operation. However in cases where travel is not possible the site Property Custodian will follow the instructions above. In addition the site Property Custodian will and send a copy of the inventory worksheet and shipping document will be forwarded electronically (i.e. fax) to the EMD PA within a day of receipt of the shipment (fax number is (301) The original inventory worksheet will be attached to the shipping documents and retained in the site s property files as a permanent record of the property received. Such documents will be retained until accountability is transferred to the Government. The inventory worksheet is used by the EMD PA to build the inventory records in the Inventory, Logistics, and Maintenance (ILM) database, which contains the master records of EMD property. The site Property Custodian will notify the EMD PA of EIN tag changes via the EMD Move Change form. Changes to property records caused by maintenance actions will be reported via the MWO process outlined in the EMD 611 series documents. When change documents are received the EMD PA will update ILM. Received property will be secured and protected from electrostatic discharge (ESD) during movement, storage, inspection, inventory, during assembly, test and issue. ESD prevention and EMD-001, Rev. 01
23 control procedures specified in EMD Project Instructions will be followed. Access to the property storage areas will be controlled at all times to prevent unauthorized entry Receipt Processing The Receiving Process Checklist is attached to the bill of lading and filed by the PA as "Purchase Orders Received/Complete" or, in the case of an incomplete shipment, filed as "Purchase Orders Pending/Incomplete." Items received are reconciled against transfer documents, purchase orders, packing lists and related documentation to ensure accountability for all items purchased or requested. Discrepancies will be annotated on the Purchase Order and a COTS Non-Conforming Product Report will be completed and forwarded to the COTS Procurement Office for resolution. Property records for EMD ILM will be recorded in the property database as quickly as possible but not later than 5 business days after initial receipt of the property. For incomplete shipments, receiving personnel will make a copy of the PO, annotate the missing items, and return a copy of the PO to the COTS Procurement Office. The COTS Procurement Office will contact the vendor to obtain shipment information on the missing items. Misdirected or other discrepant property will be segregated and controlled pending disposition instructions from the COTS Procurement Office. Shipping discrepancies (other than incomplete shipments) are documented and given to the COTS Procurement Office for vendor notification and resolution. Applicable manufacturer model numbers, part numbers, and serial numbers are recorded on the COTS Non-Conforming Product Report for use in establishing a non-conforming property record. Discrepant material will not normally be given to engineering for test or installation. The EMD COTS HW/SW Maintenance Manager will notify the EMD Property Custodian in writing if discrepant material is to be released to the engineering function Receipt Reporting The receipt reporting requirements clauses stated in Sections G.5 and G.6 of the EMD contract will be followed upon receipt of further direction from the Government, as they apply to contractor acquired property. When received from NASA, the ILS Office will provide direction to EMD sites. The DD 250, Material Inspection and Receiving Report, will be prepared at contract closeout at the direction of the EMD Contracting Officer. 4.4 Identification EMD GFP received as a part of contract start up was provided to Raytheon based on the documentation Raytheon supplied to ESDIS as a part of the ECS contract closeout. The ESDIS Contracting Officer determined the baseline for EMD property would consist of the HW identified in the DD-250 closeout package. Because Raytheon is the incumbent contractor the Contracting Officer determined that ECS property tags did not need to be removed and replaced by EMD property tags. Therefore EMD property received, as GFP at contract initiation will EMD-001, Rev. 01
24 continue to have ECS property tags affixed. To distinguish the initial set of EMD GFP, from later procurement items, it will be identified in the ILM database as EMD_ In addition any residual ECS material received after 1 August 2003 (contract start date) will be tagged with ECS property tags. EMD property tags will be used effective with the first receipts for material that is purchased with EMD dollars. Therefore EMD property will have either an ECS property tag or an EMD property tag. To ensure that the GFP list in the contract is kept as current as possible, at the least cost to the government, the ESDIS Contracting Officer determined that the EMD contractor will provide a quarterly update of all EMD property in the possession of the EMD contractor, to the Contracting officer. The quarterly list will become the new EMD baseline GFP List and will be valid until the receipt of the next quarter list. EMD property (i.e., contractor-acquired and GFP) will be tagged with EMD property tags. The PA will apply an EMD tag immediately after property is received and unpacked. EMD property tags are shown at Figure 4-2. Bar coded EMD property tags (on left below) are 5/8 by 1 13/16 inches and imprinted in black on a silver background displaying "Property of NASA/GSFC NAS " These tags contain a bar code with human-readable interpretation of the contractor-assigned equipment identification number (EIN). Property tags will be placed on the property in an area so that they are visible and easily accessible. Vendor-loaned Raytheon property will not be tagged with EMD property tags. Vendor loaned material will be marked loaner.. Figure 4-2. EMD Property Tags Components that are a part of an end item of EMD hardware will not be assigned an EIN tag. These items will be controlled with C numbers automatically generated by the ILM system as a part of the receiving process. The following data will be entered into ILM, for C numbered hardware items; manufacturer, description, model/version, serial number (if assigned), location, status code, and quantity. Because software media and documentation are not considered property it will not be assigned EIN tag. It will be controlled as an inventory item. The following data will be entered into ILM for inventory items; manufacturer, description, model/version, serial number (if assigned), location, status code, and quantity The round property disk shown on EMD-001, Rev. 01
25 the right above is applied to media, documents, and non-property items of GFP and contractoracquired EMD property. Property tags of GFP containing a NASA equipment control number (ECN) will not be removed. At the time of receipt of such property, the PA will affix an EMD property tag with EIN next to the government tag. The NASA ECN will be recorded in the property record and crossreferenced to the EIN. Prior to disposing of EMD property (or prior to returning it to the Government), EMD property tags will be removed. 4.5 Records The EMD PA at the EMD Riverdale, MD facility will maintain the official accountable records for Contractor-acquired property and GFP accountable to the EMD Project under contract NAS These records are available for examination by Government PA s upon request. This section describes how EMD property records are established and maintained to account for and control Government property. EMD property records and procedures will conform to the FAR Property Management System The EMD Project will use a Remedy based database management system to support the property management, control, and reporting functions for Contractor-acquired and GFP,material.. Property records will be created and maintained in this system and contain, the following information: Purchase Order Number Dates received and installed Item description, part number, and serial number Manufacturer Cost Location of property Equipment Identification Number (EIN) Government Equipment Control Number (ECN) for GFP received after 1 August GSFC Form 20-4 Control Number (for property transferred to/from the contract). Audit date Site PC will report property actions as quickly as possible but no later than 2 business days after property changes. Examples of changes include the following; receipt and/or installation of new property, relocations, completion of model/version changes, changes in operational status of the property, and component configuration changes made because of maintenance actions EMD-001, Rev. 01
26 The EMD PA will maintain support documentation used to post entries to the ILM database. This documentation provides complete, current, and auditable records to support entries into ILM. This documentation will generally be kept in the Receiving file maintained by the PA. Examples of documents used for posting changes to property records include the following: CCR Package Approved copy of CCR, BOM, and PO which are forwarded to the NASA Contracting Officer or Hardware Planner for his/her approval to purchase. Purchase Order - Used for the purchase of COTS property, software, and material. Purchase orders are used to track material due in and to verify that items received are the same as those ordered. Discrepant receipts are noted and forwarded to the COTS Procurement Office to resolve. Bill of Materials - Created by the systems engineers and the COTS Procurement Office to verify that all components that should accompany purchased items have been received. Loading Dock Checklist- Used to record the physical condition of the property received, quantities received, shipping data, date received, and the name of the person who received and inspected the property. Installation Receipt Report - Used by the EMD PA to obtain acknowledgment of receipt by the user of receipt and installation of property at the EDF or DAACs. COTS Non-Conforming Product Report Used to record products that arrive at a site that are not in compliance with the PO or other accompanying information or that are not properly functioning at the time of assembly, burn-in, or installation. Receiving Process Checklist Used by PA's and system engineers to ensure that the receiving, inventory, burn-in and reporting processes were conducted properly. Inventory Worksheet Used by PA s to record data about property that has been received and assigned parent and part EIN numbers. GFSC Form Transfer/Shipping Request Used to document the acceptance or transfer of NASA Government property (if any). The EMD PA will also manage consumable material. For consumable property, property records will include stock quantities, location and, if applicable, shelf life information. These property records may be either computer or manual records. 4.6 Movement Prior to shipping property to another site, the EMD PA will notify the receiving site Property Custodian that material is being shipped.. The shipping report will alert the site of the expected shipment date, carrier, shipping document number, estimated weight and cube, number of pieces, shipper, ship-to address, task and CCR number if appropriate. Prior to shipment, a pre-shipment inspection will be performed to verify the following: CCR number if appropriate EMD-001, Rev. 01
27 Correct identification of property on packing lists and shipping documents including configurations, serial numbers, number of containers, and ship-to address. Adherence to packaging and marking standards. Inclusion of appropriately prepared documents with shipping containers. Generally, EMD property being shipped from vendors and the EDF will be shipped directly to and received by the site Property Custodian. Local policy at some sites may require delivery to a site central receiving point. In such cases, written procedures will be developed between the site Property Custodian and site s central receiving office regarding notification of receipt, documentation required, and provisions for local delivery to the EMD facility. If required the EMD ILS manager and Raytheon site lead will work with site management to resolve any issues caused by EMD shipments Intra-site Relocations Requirements for property relocation at the same site will be processed through the site s Property Custodian to ensure that control and accountability of property is maintained. If required by other procedures, the site Property Custodian will document the relocation request on a CCR and forward the CCR to the appropriate configuration control board (CCB) for approval. Configuration Control Board authorization may be required prior to reconfiguring/moving property or software within a DAAC or the EDF. When the relocation request is approved, and the action is completed, the site Property Custodian will document the changes in an ECO. The EMD PA will update the property records and technical documents, as needed per the ECO requests Inter-site Relocations Generally the hardware engineering staff at the EDF will direct inter-site relocations. In these cases the EMD PA will provide the DAAC Property Custodian and engineering staffs complete information to facilitate the transfer. In the rare event that a DAAC determines that material relocation is needed the following will be followed. Requests to relocate property to another EMD site will be forwarded via a configuration change request (CCR) prepared by the requesting organization or EMD COTS hardware engineering. The EMD COTS hardware engineering function is responsible for processing DAAC CCR's through the EMD CCB approval process. When relocation is approved, the EMD PA will notify both the gaining and losing custodian of the pending property movement. The gaining Site Property Custodian will report completion of the relocation to the EMD PA, who will update the property record with the new location and date of the action External Transfers The ESDIS Contracting Officer (CO) must approve in writing any transfers of EMD property outside the EMD contract. Transfers of EMD property to the Government or to other contracts will be documented by the completion of GSFC Form 20-4 or other documentation as directed by the CO EMD-001, Rev. 01
28 Further, the CO must authorize in writing relocations of EMD property to sites other than those designated in Section 3.1. Examples of such relocations include relocations of property to a university or to an instrument support team (IST). These authorizations may take the form of a temporary loan or may involve permanent transfer of the property via GSFC Form 20-4 or other document designated by the CO. In either case, the signature of the gaining organization s authorized agent will be obtained and retained as a part of EMD property records Off-Site Vendor Repairs For property returned to a vendor for repair, the applicable Maintenance Work Order (MWO) will be retained in a pending actions file until the item is returned. It will identify date of shipment, expected return date, and vendor point of contact. Status code F (failure--out for repair) will be entered into the property record. The Site Property Custodian or Local Maintenance Coordinator will remove the ECS/EMD property tag (if the item is tagged) before the item is returned to the repair facility. Once returned, the date of return will be recorded in the MWO, MWO closed, and serial number and a new EIN tag applied. The property status code in the property record will be changed to reflect status R (received/in-stock) or I (installed) as appropriate for the property. In the event the vendor replaces the original property because it was not repairable the site Property Custodian or EMD PA as appropriate, will record the new item in the MWO as a replacement for the failed item and close the MWO. The PA will then archive the failed item property record and add the replacement item into the active inventory. The receiving actions described in paragraph 4.3 will be followed for inventory and receipt of the replacement item. 4.7 Storage EMD property will be stored in clean, orderly, and secure areas conforming to the environmental controls for temperature, humidity, and electrostatic discharge. Access will be limited to authorized personnel only and controlled by the PA. EMD EIN's will appear on all contractor acquired and GFP under EMD control to distinguish it from contractor and vendor-loaned property. Material will be inspected to determine serviceability before being stored. Material that is unserviceable will be segregated and disposed of following procedures described in Section Contractor-owned and vendor-loaned property will be segregated from Government-owned property during storage. Site PC and the EMD PA will ensure that storage areas are kept in a clean, orderly manner. Material will be stored on shelves or in bins or drawers, as appropriate, and its storage location entered into the property record. Special storage areas or controls will be provided for items subject to corrosion, humidity, temperature, and shelf life limitation. Such items will be inspected semi-annually. Excess equipment will be stored offsite in a secure facility located in Hanover, MD EMD-001, Rev. 01
29 4.8 Physical Inventories All EMD property will be inventoried annually. Personnel from the EDF may travel to DAACs to oversee the annual property inventory. EMD personnel responsible for maintaining property records will not assist in the conduct of these inventories. Inventories will be designed to achieve the following objectives: Verify that recorded property is still on hand. Confirm or determine current location. Identify unrecorded property, which qualifies for control. Locate or identify missing property. Identify unused or underutilized property as well as material in need of repair or rehabilitation. Results of site inventories, including the identification of any discrepancies noted, will be reported promptly to the Government PA (GPA). The EMD PA will assist sites in resolving discrepancies. If relief from accountability is granted by the GPA, the EMD PA will make appropriate inventory adjustments to the property database. 4.9 Reports Quarterly Reporting A listing of contractor-acquired property received during the reporting period will be reported within 30 days following each calendar quarter, (i.e., January, April, July and October). Listings will include item description, manufacturer, model, serial number, cost, location, and ECN (if assigned). Reports will be submitted to the CO and the Supply and Equipment Management Office, Code Property previously reported on GSFC Form 20-4 or equivalent and GFP will be included in these quarterly reports. This report along with the total list of current property will become the baseline for the EMD GFP for the following quarter NASA 1018 Reporting The ILS Office will prepare NASA Form 1018, Report of Government-Owned/Contractor-Held Property, monthly and annually. The annual report will be transmitted to NASA using the NF 1018 Electronic Submission system (NESS). Monthly reports will be prepared and submitted per NASA instructions and submitted using CHATS. The Raytheon EMD Contracting Officer will be the final releasing authority for all 1018 reports. This report will be prepared using data contained in the property management database. Per NASA direction the report will value property at the acquisition price and not EDS purchase cost. Methodology for computing the acquisition price is available in the ILS office, the EMD Contracting Office, and the Raytheon Program Control Office. NASA has further directed that the value of EMD custom code be included in the annual Methodology for computing the value of the custom code is maintained in the Raytheon Program Control Office EMD-001, Rev. 01
30 4.10 Consumption Consumables, expendables, and repair parts will be controlled as inventory items. Consumption of these items will be accounted for by recording all purchases receipts, issues, and maintaining identity of balance on hand and balance on order. Issues will be accounted for by date, quantity, and to whom issued. The ILS Office will establish reorder quantities based on EMD requirements and review these levels semi-annually. Any item having storage limitations (i.e., limited storage life) or requiring a controlled environment will be identified in its property record. Limited storage life items will be issued on a first-in first-out (FIFO) basis. Receipts and issues of Government property will be performed as documented in Section 4.3 of this Plan Reporting of Lost, Theft, Damaged, and or Destroyed (LTDD) EMD Property If Government property in the possession of the Contractor is lost, stolen (theft) damaged, or destroyed, the EMD PA will notify the Raytheon Contracts Manager, who will notify the Government PA immediately by telephone upon discovery and follow up with a written report as soon as the facts become known. The report and statement of loss will contain the following factual data as to the circumstances surrounding the loss: Contractor's name and contract number. Description of items lost, stolen, damaged, or destroyed. Cost of property lost, stolen, damaged, or destroyed and cost of repairs in instances of damage (if actual costs are not known, reasonable estimates will be given). Date, time, and cause of the loss, theft, damage, or destruction. Actions taken by the Contractor to prevent further loss, theft, damage, or destruction and to prevent repetition of similar incidents. Other facts or circumstances relevant to the determination of liability and responsibility for repair or replacement. Statement that no insurance costs or other means of covering loss, theft, damage, or destruction of Government property were charged to the contract, if applicable. Statement that Raytheon does or does not have insurance to cover to loss and whether or not Raytheon was or will be reimbursed or compensated for loss, theft, damage, or destruction of Government property Utilization All property, either contractor-acquired or furnished by the Government will be used exclusively on authorized contracts. In the event other use can be made of specific property on other Government contracts, a request will be made in writing to the ESDIS Contracting Officer for written approval, either by letter or contract modification prior to use on other contracts EMD-001, Rev. 01
31 Only authorized personnel performing functions in support of the EMD Project will use EMD property. PA s will ensure that users of EMD property are aware of the provisions of this Plan, Project Instructions, and local procedures regarding the use, control, reporting, and disposition of EMD property, and that it is used in accordance with EMD contractual requirements Control of Pilferable Material The EMD PA and Site PC will establish special controls for the security and identification of pilferable items. Pilferable items include any of the following: computer components, calculators, cameras, VCRs, tape recorders, television receivers, and any items that have a high loss history. Pilferable items will be stored in a locked secure area when not in use. When issued, the primary user will sign for the item acknowledging receipt and responsibility. The primary user assumes responsibility for the surveillance and safekeeping of pilferable items and will report any changes of status, location, or use to the EMD PA or Site Property Custodian. Pilferable items will not be loaned out of the possession or control of the person to whom they are assigned unless the PA is notified Maintenance Preventive maintenance of EMD property will be performed in accordance with the frequencies and procedures recommended by the original equipment manufacturer. The Contractor s maintenance engineers or authorized vendor maintenance personnel will perform hardware preventive maintenance. The site maintenance personnel will maintain records of both scheduled and completed preventive maintenance. Corrective maintenance action records are initiated by the site local maintenance coordinators (LMC s) using the MWO form, who will confirm maintenance actions taken and enter property and/or component change information as described below in the MWO upon completion of the action Warranty Management The EMD PA will support the maintenance and warranty management functions by entering the receipt date of all property under warranty. Generally, EMD property will be procured with a one-year warranty starting at the date of receipt. Replacement repair parts and component warranties will vary dependent upon whether the manufacturer s standard warranty applies or whether an extended warranty has been purchased. The ILS Office will manage warranty and maintenance contracts with COTS maintenance vendors. This information is used by the ILS Office to determine whether property is under warranty or contract maintenance support. As warranty/maintenance expiration dates approach, the ILS Office will determine the level of follow-on maintenance support required, select the maintenance source, and initiate actions with the COTS Procurement Office necessary to renew maintenance support coverage. Copies of maintenance support purchase orders will be provided to the EMD PA for posting to the property record EMD-001, Rev. 01
32 Recording Maintenance Actions DAAC Local Maintenance Coordinators document maintenance actions via a hardcopy form of a MWO. The DAAC LMC will fax the form to the ILS Maintenance Lead. The ILS Maintenance Lead will input the faxed information into the property database. The inventory changes for spares/repair parts resulting from these maintenance actions will be reflected in the property database Subcontract and Vendor Control In the event any subcontracts are entered into where Government property will be involved, assurance will be made that Raytheon relates proper property control requirements to all of its subcontractors. The Government PA will be advised of all subcontracts under which Government property will be provided in performance of the subcontract Disposition The ILS Office will request disposition instructions for excess property located at all EMD sites from the Plant Clearance Office, DCMA using the Plant Clearance Automated Reutilization Screening System (PCARSS) reporting system. Normally all excess property will be returned to the EDF and thus all excess processing actions will take place at the EDF under the direction of the ILS Manager and the EMD PA. Since decisions regarding disposition of the property will be based on the information provided in PCARSS all fields must be completed and property must be adequately described to permit reviewing organizations to determine whether the property can be reused. Once the Plant Clearance Office provides disposition instructions, the ILS Office will forward them to the site PA for execution of disposition actions. The EMD PA removes Contractor-applied property tags prior to release of the property for disposition. The EMD PA will record disposal actions in the property database and retain all disposition documentation in its accountable record files for audit purposes until the end of the contract Government Furnished Property (GFP) When the Government makes GFP available to the EMD contract, it will normally do so by transferring the property via GSFC 20-4, however a GSFC 20-4 may not be used in all instances. The government will determine what transfer documentation is appropriate for each situation. A GFP list is Attachment M to the EMD Contract. Upon transfer of the GFP, the EMD PA will inventory the property to verify serial, model, and ECN numbers and configurations and affix an EMD EIN tag to each item of property. If discrepancies are noted he will notify the Government transferring organization immediately and attempt to resolve the discrepancies. Once items received agree with the transfer document, the EMD PA will sign the GSFC 20-4 (if provided), enter the information into the property database, and return the original signed document to the transferring organization for forwarding to GSFC Code 235. In conjunction with the transfer of GFP the ILS Office will determine from the transferring organization maintenance/warranty EMD-001, Rev. 01
33 terms (if any) of the property being transferred and initiate action to obtain maintenance funding for the property (if required) Reporting Excess Government Property Excess Contractor-acquired property and GFP at EMD sites will be reported by site PC to the EMD PA for disposition instructions. Excess property is defined as (1) usable property that no longer serves a useful purpose in meeting the requirements of the EMD contract, or (2) property that is unusable to the extent that repair or rehabilitation would exceed its replacement cost or 65 percent of the original acquisition cost. All DAAC excess property will be returned to the EDF for excess processing. Upon receipt of excess property, the EMD PA will screen the EMD project for reuse. If no EMD requirement exists, the EMD PA will submit a written report describing the property as potential excess to the NASA EMD Hardware Manager for screening by the ESDIS Project, NASA/GSFC, and Code 423. If an ESDIS Project requirement exists, the property will be transferred to the Project via GSFC Form If no ESDIS Project requirement exists, the NASA EMD Hardware Manager will notify the EMD PA in writing that the property is excess to ESDIS. The EMD PA will then report the property as excess via PCARSS to the DCMA Plant Clearance Office. DCMA will conduct screening per current DOD regulations. Upon completion of the screening period the Plant Clearance Officer will provide disposition instructions for the entire excess inventory schedule. Disposition instructions will be executed in a timely manner as requested by the Plant Clearance Officer. Instructions from DCMA may include shipping to another agency, or selling to the highest bidder. All Contractor and Government property tags will be removed and markings obliterated prior to actual disposal of Government property that is sold, scrapped, or abandoned. Shipments of excess Government property will be made as directed by either the NASA EMD Hardware Manager or the Plant Clearance Officer. If the excess property is deemed to be scrap, the EMD PA will list it as such in PCARSS. The Plant Clearance Office will then after a period of time issue a SCRAP Warranty form DD 1639 which will be signed by the receiver of the property. The EMD PA will return the signed DD 1639 along with Certification of Hard Drive Disposition forms to the Plant Clearance Officer per their instructions. While in storage at the EDF, Excess Government property will be labeled as Excess, The property will have any data cleaned/wiped from the system and given appropriate labels indicating this action has taken place, the property will then be moved to the offsite excess warehouse in Hanover, MD Disposing of Excess Government Property Upon receiving the disposition instructions from the Plant Clearance Officer, the EMD PA will ensure the following items are met for hardware: Certificate of Hard Drive Disposition completed EMD-001, Rev. 01
34 Any proceeds received from sale of excess property will be returned to NASA, unless otherwise directed by the Plant Clearance Officer. Removal of abandoned excess equipment will be arranged by the responsibility of the EMD PA. If the Plant Clearance Office and the EMD PA determine that the excess property should be sold, the Plant Clearance Officer will provide a list of approved bidders to the EMD PA. A packet including a listing of the excess property will be sent to each bidder along with a notice of the date of sale and when all bids must be submitted. Once all bids have been received, a DCMA appointed person will come to the EMD EDF facility and open the bids and award the property to the highest bidder. The winning bidder must then remove the entire lot within 30 days. The EMD PA may dispose of any property not removed by the winning bidder. Scrap that has been abandoned in place will be processed in the following manner: The EMD PA will ask the DCMA Plant Clearance Officer for an approved list of people or companies, if the EMD PA selects a person or company not on DCMA s list they must get approval from DCMA before any equipment can be released to them. Whomever removes the equipment will be required to complete and sign the End Use Certificate and the EMD PA will forward a copy to the Plant Clearance Officer. Upon receiving the disposition instructions from the NASA Contracting Officer, the EMD PA will ensure the following items are met for software: Software media and licensing no longer baselined/or in use will be disposed of after a compiled list has been reviewed by the NASA Contracting Officer. The CO will send the Property Administrator a letter approving the items that can be destroyed 4.15 Property Close-out Upon completion or termination of the EMD Contract, EMD PA s will perform a final physical inventory of Government EMD property. After completion of all DD 250s transferring EMD property to the Government, the EMD Contracts Manager will submit a final NASA 1018 to the GPA indicating that all property has been transferred from the EMD contract. Inventory adjustments, liability determinations, and other property issues will be resolved before contract closeout. The EMD Contract Manager will obtain the Contracting Officer's statement of approval of contract closeout by submitting a letter to the CO and the GPA declaring that no EMD property remains on the contract that no credits are due to the Government, and that no outstanding balances are due to EMD suppliers EMD-001, Rev. 01
35 This page intentionally left blank EMD-001, Rev. 01
36 Abbreviations and Acronyms CDRL CI CM CM/DM CO COTR COTS CSMS DAAC DCMA DID ECN EMD EMD PA EDC EDF EDS EIN EOS EOSDIS GFE GFP GPA GSFC HW I&T ILS Contract Data Requirements List Configuration Item Configuration Management Configuration Management and Data Management Contracting Officer Contracting Officer s Technical Representative Commercial off-the-shelf Communications and Systems Management Segment Distributed Active Archive Center Defense Contract Management Agency Data Item Description Equipment Control Number ECS Maintenance and Development EMD Property Administrator EROS Data Center EMD Development Facility Electronic Data Systems Equipment Identification Number Earth Observing System Earth Observing System Data and Information System Government Furnished Equipment Government Furnished Property Government PA Goddard Space Flight Center hardware Integration and Test Integrated Logistics Support AB EMD-001, Rev. 01
37 IPO IV&V LaRC LMC LRU MWO NASA NCR NEMS NSIDC PAIP PC PCARSS PCO PDO PI PM PO QA QO RAYTHEON SDPS Site PC SMO SOW SW Industrial Property Office Independent Verification and Validation Langley Research Center Local Maintenance Coordinator Line Replaceable Unit Maintenance Work Order National Aeronautics and Space Administration Non-Conformance Report NASA Equipment Management System National Snow and Ice Data Center Performance Assurance Implementation Plan Property Custodian Plant Clearance Automated Reutilization Screening System Plant Clearance Office Property Disposal Office Project Instruction Preventive Maintenance Purchase Order Quality Assurance Quality Office Raytheon Systems Company Science Data Processing Segment Site Property Custodian Subcontract Management Office Statement of Work Software AB EMD-001, Rev. 01
3-0127 ADMINISTRATION & FINANCE August 2010 FEDERAL PROPERTY MANAGEMENT STANDARDS
[ FEDERAL PROPERTY MANAGEMENT STANDARDS 3-0127 ADMINISTRATION & FINANCE August 2010 1.01 The Director of Budget Operations through the Associate Vice President for Administration and Finance is designated
FEDERAL PROPERTY MANAGEMENT PROCEDURE GUIDE
FEDERAL PROPERTY MANAGEMENT PROCEDURE GUIDE Purpose The Federal Property Management Procedure Guide provides basic procedures for the management of federal property under North Dakota State University
Overview. Responsibility
Overview Property management is an important function at the University. Prudent inventory practices help protect the University s multi-million dollar investment in equipment, provide documentation needed
Washington Headquarters Services ADMINISTRATIVE INSTRUCTION
Washington Headquarters Services ADMINISTRATIVE INSTRUCTION NUMBER 94 October 19, 2007 Incorporating Change 1, February 19, 2008 DFD SUBJECT: Personal Property Management and Accountability References:
Chapter 10 Receiving, Inspection, Acceptance Testing and Acceptance or Rejection
Chapter 10 Receiving, Inspection, Acceptance Testing and Acceptance or Rejection Table of Contents Receiving, Inspection, Acceptance Testing and Acceptance or Rejection...1 Chapter 10...3 Receiving, Inspection,
Mississippi Institutions of Higher Learning IHL Executive Office. Administrative Policies. Property Guidelines
Page No. 1 of 7 Purpose The purpose of maintaining a furniture and equipment inventory is to comply with the Stateowned property inventory rules of the Mississippi Administrative Procedures Act and the
Property Management System (GPMS)
Property Management System (GPMS) Business System Overview Sep 20, 2013 Marcia D. Whitson, CPPM, CF NPMA National President DFARS 252.242-7005 Contractor Business Systems DoD Business Systems Rule - Clarifies
Supplier Quality Requirements and Clauses
Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion
ARKANSAS TECH UNIVERSITY
ARKANSAS TECH UNIVERSITY INVENTORY CONTROL MANUAL SEPTEMBER 2005 PROPERTY MANAGEMENT OFFICE 204 BRYAN EXT. 6087 FAX 968-0227 INTRODUCTION The purpose of this Inventory Manual is to present a uniform method
Hickman Mills C-1 School District. Inventory Control Procedures
1. Purpose To ensure the maintenance and implementation of adequate controls to account for the procurement, location, custody, and security of equipment purchased with District and Grant funds. To present
NGA Instruction for Determining Property Accountability. a. Primary. NGA PD 4000R2, Policy Directive for Logistics, 24 November 2003.
NI 4160.1R3 Approved: 1 October 2004 Subgroup: Personal and Military Property 1. References. NGA Instruction for a. Primary. NGA PD 4000R2, Policy Directive for Logistics, 24 November 2003. b. Secondary.
Responsible Office: Logistics Management Division
NID: NPR 4200.2B Date: March 18, 2009 Subject: Equipment Management Manual for Property Custodians Responsible Office: Logistics Management Division NID 4200-73 NPR 4200.2B Table of Contents Cover Change
14 FAH-1 H-620 INVENTORY REQUIREMENTS FOR DEPARTMENT AND FIELD OFFICES
14 FAH-1 H-620 INVENTORY REQUIREMENTS FOR DEPARTMENT AND FIELD OFFICES (CT:PPM-18; 08-05-2013) (Office of Origin: A/LM) 14 FAH-1 H-621 GENERAL (CT:PPM-2; 07-27-2005) a. Inventories are taken and reconciled
GFP and CAP Basics Webinar Script Amber Barber 30 April 2010
GFP and CAP Basics Webinar Script Amber Barber 30 April 2010 WELCOME Thank you all for joining us. My name is Amber Barber. I am from the OSD Property and Equipment Policy Office, and I will be hosting
Supply Chain Security Audit Tool - Warehousing/Distribution
Supply Chain Security Audit Tool - Warehousing/Distribution This audit tool was developed to assist manufacturer clients with the application of the concepts in the Rx-360 Supply Chain Security White Paper:
FIXED ASSETS PROCEDURES
SECTION XI - INVENTORY / FIXED ASSETS FIXED ASSETS PROCEDURES WHO IS RESPONSIBLE? A. Building principals and department managers are accountable for assets/equipment within their immediate area of responsibility.
Self-Audit Checklist
Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page
14 FAH-1 H-110 DELEGATED RESPONSIBILITIES
14 FAH-1 H-100 DELEGATED RESPONSIBILITIES 14 FAH-1 H-110 DEPARTMENT-WIDE MANAGEMENT CONTROLS (Office of Origin: A/LM) 14 FAH-1 H-111 AGENCY PROPERTY MANAGEMENT OFFICER (Uniform State/USAID) a. The Director,
4.0 Receiving Process
4.0 Receiving Process Delivery of requested products or services marks a transition in the Purchase-to-Pay process from a purchasing activity to a payables activity. All purchases must be received to release
GAO. Inventory System Checklist Systems Reviewed Under the Federal Financial Management Improvement Act of 1996. Financial Management Series
GAO United States General Accounting Office Financial Management Series May 1998 Inventory System Checklist Systems Reviewed Under the Federal Financial Management Improvement Act of 1996 GAO/AIMD-98-21.2.4
Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division
Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...
FIXED ASSET POLICIES & PROCEDURES
FIXED ASSET POLICIES & PROCEDURES Table of Contents WHAT ARE CAPITAL ASSETS?... 3 LAND... 3 BUILDINGS... 3 CONSTRUCTION IN PROGRESS... 3 LIBRARY HOLDINGS... 3 VEHICLES... 3 ARCHIVES AND COLLECTIONS...
UNIVERSITY OF NORTH GEORGIA EQUPMENT/INVENTORY MANAGEMENT PROCEDURES MANUAL
Purpose: The purpose of this document is to assist UNG personnel in day to day equipment inventory control functions. Proper maintenance of this equipment inventory is necessary to achieve correct financial
Facilities Planning & Management Maintenance Repair Parts Policies & Procedures
Facilities Planning & Management Policies & Procedures Revised 10/2013 Facilities Planning & Management Policies & Procedures PURCHASE REQUESTS cspolicy1.wpd 1-4 ISSUES FROM STOCK cspolicy2.wpd 5-7 MONTHLY
Anti-Counterfeit Policy Mouser has adopted this Anti-Counterfeit Policy to eliminate the impact of counterfeit products on Mouser and its customers.
QS-PR-024 Anti-Counterfeit Control Plan Approved by: Chuck Amsden Approved 1/19/15 This procedure is current and approved when viewed on-line. The procedure becomes uncontrolled when printed. Uncontrolled
Office of Business and Finance Asset Management 4.21
OBJECTIVE To ensure the recording and maintenance of capital assets in accordance with state and federal regulations. POLICY Applies to: Any person responsible for purchasing, recording and maintaining
IEC Electronics Terms and Conditions
IEC Electronics Terms and Conditions 1. General: This Purchase Order is placed subject to these terms and conditions including those within the Purchase Order. The terms of any proposal referred to in
Position Classification Standard for Industrial Property Management Series, GS-1103. Table of Contents
Position Classification Standard for Industrial Property Management Series, GS-1103 Table of Contents SERIES DEFINITION... 2 EXCLUSIONS... 2 OCCUPATIONAL INFORMATION... 3 TITLES... 4 PART I - INDUSTRIAL
Section 700 Fixed Assets
Section 700 Fixed Assets Section 701 Definition Fixed Assets Section 702 Responsibility for Fixed Assets Section 703 Inventory of Fixed Assets Section 705 Inventory Shortage Procedures Section 706 Inventory
Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature
Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev
Project Management Procedures
1201 Main Street, Suite 1600 Columbia, South Carolina 29201 Project Management Procedures Start Up The grant becomes effective upon return of one copy of the grant award executed by the Chief Executive
Office of Inspector General
AR 11-004 Office of Inspector General AUDIT OF THE FEDERAL TRADE COMMISSION WAREHOUSE OPERATIONS September 26, 2011 TABLE OF CONTENTS EXECUTIVE SUMMARY -------------------------------------------------------------------------------------------------------
Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011
Aerospace Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011 The SPOC Manual is controlled in Electronic format as presented on the Supplier Portal and Honeywell Intranet.
CONTACT: 1. Proposed rule BDO GOVERNMENT CONTRACTING PRACTICE GUIDANCE ON THE PROPOSED DOE BUSINESS SYSTEM RULE
BDO GOVERNMENT CONTRACTING PRACTICE GUIDANCE ON THE PROPOSED DOE BUSINESS SYSTEM RULE By Eric Sobota, Kelley Doran and Barron Avery Contractors that work for the Department of Energy (DOE) under agreements
NASH ROCKY MOUNT PUBLIC SCHOOLS PURCHASING PROCEDURES
1 NASH ROCKY MOUNT PUBLIC SCHOOLS PURCHASING PROCEDURES INTRODUCTION The authority to purchase goods and services and to enter into contracts is given to Boards of Education by action of the North Carolina
Procedures & program of auditing assets. Section one Procedures & program of Auditing Fixed Assets
CHAPTER FOUR Procedures & program of auditing assets Section one Procedures & program of Auditing Fixed Assets 1. Record and inspection 1-1 Examining due procedures of the properties of fixed assets. 1-2
Bogue Machine Company, Inc. Business Instruction
Bogue Machine Company, Inc. Business Instruction Document Title: Supplier Quality Control Requirements Document Number: Revision: Document Owner: Mark Bogue Backup Owner: Craig Bogue Parent Document: PURP-004,
Century Fasteners & Machine Co., INC. /CFMC PURCHASE ORDER
Century Fasteners & Machine Co., INC. /CFMC PURCHASE ORDER CONDITIONS AND INSTRUCTIONS A HARDCOPY OF THIS DOCUMENT MAY NOT BE THE DOCUMENT IN EFFECT. SEE CFMC DOCUMENT LIBRARY FOR CURRENT REVISION. 1.
543.7 What are the minimum internal control standards for bingo?
Bingo Purpose This section provides guidance on the development of internal controls, policies, and procedures for the operation of bingo. It has been compiled by tribal regulators, Class II gaming operators,
FIXED ASSET CAPITALIZATION POLICY
FIXED ASSET CAPITALIZATION POLICY I. Who is responsible II. IV. Fixed Assets A. Definition B. Acquiring Fixed Assets C. Receiving Fixed Assets D. Adjustmens of Fixed Assets E. Temp Loans F. Repairs Inventory
ALABAMA TAS PROVIDER EQUIPMENT AGREEMENT
ALABAMA TAS PROVIDER EQUIPMENT AGREEMENT FOR INTERNAL USE ONLY Agreement Number: ALDAYC-00- Provider ID: Effective Date: This Agreement is made by and between XEROX State & Local Solutions, Inc. a New
THE FOLLOWING ARE INSTRUCTIONS FROM THE FRONT SIDE OF SEAGATE PURCHASE ORDERS:
THE FOLLOWING ARE INSTRUCTIONS FROM THE FRONT SIDE OF SEAGATE PURCHASE ORDERS: INSTRUCTIONS: Read this entire order form, including the incorporated terms and conditions located at http://www.seagate.com/about/legal-privacy/purchasing-and-pricing/purchase-orders-legal-overview/
PROPERTY MANAGEMENT GUIDELINES
The following guidelines related to property management are promulgated by the Property Management Department in accordance with MAPP 03.03.01 Property Management Overview. DEFINITIONS 2 FORMS 3 RESPONSIBILITIES
Helical Products Co., Inc.
Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance
RANDALL COUNTY FIXED ASSET POLICY April 2002 Revised 5/20/2014
RANDALL COUNTY FIXED ASSET POLICY April 2002 Revised 5/20/2014 Fixed Asset Policy 1 I. INTRODUCTION The Taxpayers of Randall County have an enormous investment in our county buildings, land, furnishings,
INTRODUCTION: PURPOSE:
UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found
UID and Property Management. Offsite #1 June 22, 2005
UID and Property Management Offsite #1 June 22, 2005 C Current Environmental Landscape: E-2C Gyroscope Repair Example Instruments Shop Work Center Instruments Shop Production Control FISC Building 36 Container
California State University, East Bay Property Management. Policies And Procedures
California State University, East Bay Property Management Policies And Procedures PROPERTY MANAGEMENT POLICIES AND PROCEDURES Table of Contents 1.0 INTRODUCTION 3 2.0 DEFINITIONS 3 2.1 Definition of Equipment
CHAPTER 23. Contract Management and Administration
Date Issued: June 12, 2009 Date Last Revised: September 28, 2015 CHAPTER 23. Contract Management and Administration Table of Contents CHAPTER 23. Contract Management and Administration... 23-1 23.1 Policy...
E. Custodian - the Vice President for Administrative Services and Finance or designee.
Florida Gulf Coast University Policy Manual TITLE: Tangible Personal Property Policy Policy: 3.033 Approved: 1/13/12 Responsible Executive: Vice President for Administrative Services and Finance Responsible
FIXED ASSET ACCOUNTING AND MANAGEMENT PROCEDURES MANUAL. 1 Purpose. 2 Scope. 3 Responsibilities by Major Asset Category
Section 13 1 Purpose The purpose of this section is to govern the removal of a fixed asset or controlled item from the custodial department s records and to account for the resulting gain or loss. To achieve
FOR OFFICIAL USE ONLY AGREEMENT BETWEEN THE DEPARTMENT OF DEFENSE OF THE UNITED STATES OF AMERICA AND THE MINISTRY OF DEFENSE OF THE STATE OF ISRAEL
FOR OFFICIAL USE ONLY AGREEMENT BETWEEN THE DEPARTMENT OF DEFENSE OF THE UNITED STATES OF AMERICA AND THE MINISTRY OF DEFENSE OF THE STATE OF ISRAEL FOR RESEARCH, DEVELOPMENT, TEST AND EVALUATION PROJECTS
Equipment Management Guidelines
Equipment Management Guidelines The following guidelines were developed by the CSU Financial Officers Association to assist campuses in implementing Executive Order 649, Safeguarding State Property. Revised
LAS CRUCES PUBLIC SCHOOLS FIXED ASSETS PROCEDURES
The purpose of this procedure is to define and outline responsibilities for management and control of the District s fixed assets. This procedure applies to all locations and personnel employed by Las
4 FAH-2 H-210 CHECK STOCK, SIGNATURE DIE, INTERNAL CONTROLS AND FILE MANAGEMENTS
4 FAH-2 H-200 CHECK STOCK, SIGNATURE DIE, INTERNAL CONTROLS AND FILE MANAGEMENTS 4 FAH-2 H-210 REQUISITIONING, RECEIVING, AND CONTROLLING CHECK STOCK, AND SIGNATURE DIE (Office of Origin: CGFS/FPRA/FP)
LIVINGSTON COUNTY CREDIT CARD PROCEDURES
LIVINGSTON COUNTY CREDIT CARD PROCEDURES INTRODUCTION Livingston County is introducing an alternative approach to purchasing products and services through the use of credit cards. A credit card purchase
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
CONCORD UNIVERSITY BOARD OF GOVERNORS
CONCORD UNIVERSITY BOARD OF GOVERNORS Policy No. 12 Policy on Fixed Asset Inventory Effective Date: 05/04/2005 Section 1. GENERAL 1.1 Scope: This policy provides direction for establishing and maintaining
GENERAL FIXED ASSETS Fixed Assets Administration
GENERAL FIXED ASSETS Fixed Assets Administration Colorado Revised Statutes (CRS) 22-45-101(2), 22-45-112, 29-1-506(1) and generally accepted accounting principles (GAAP) require that certain records be
Report No. D-2009-089 June 18, 2009. Internal Controls Over Government Property in the Possession of Contractors at Two Army Locations
Report No. D-2009-089 June 18, 2009 Internal Controls Over Government Property in the Possession of Contractors at Two Army Locations Additional Information and Copies To obtain additional copies of this
Subj: Appointment as a Contracting Officer's Technical Representative (COTR)
Attachment (1) Agency/Component letterhead Subj: Appointment as a Contracting Officer's Technical Representative (COTR) From: (Insert name of Contracting Officer) To: (Insert name of prospective COTR)
Volume EASTMAN KODAK COMPANY. Worldwide Purchasing. Supplier Manual
Volume EASTMAN KODAK COMPANY Worldwide Purchasing Supplier Manual EASTMAN KODAK COMPANY Supplier Manual Purpose of Manual To document standard business practices between Eastman Kodak Company and its suppliers
Lesson 6: Physical Inventory
Lesson 6: Physical Inventory Lesson Overview At the completion of this lesson, students will be able to: Define the purpose of a location survey. Identify the types of physical inventories. Identify the
THE FOLLOWING ARE INSTRUCTIONS FROM THE FRONT SIDE OF SEAGATE PURCHASE ORDERS:
THE FOLLOWING ARE INSTRUCTIONS FROM THE FRONT SIDE OF SEAGATE PURCHASE ORDERS: INSTRUCTIONS: Read this entire order form, including the incorporated terms and conditions located at http://www.seagate.com/about/legal-privacy/purchasing-and-pricing/purchase-orders-legal-overview/
Project Management Guidelines
Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.
Supplier Requirements Manual M M 0 3
Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.
Purchase Order Clauses and Conditions
Purchase Order Clauses and Conditions All purchase orders for materials, special processes, machining and fabrication services and end items are subject to the following requirements: General Requirements:
Quality Manual. DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1
Quality Manual Approval Page Document: QA1000 Issue Date: 5/29/1997 Page 1 of 17 Revision Date: 5/20/2013 DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1 This
Board Memorandum. Objective: Establish procedures for the disposal of the District s surplus property within the Fixed Asset and Capital Asset Policy.
Board Memorandum September 24, 2015 To: From: General Manager Tamara Sexton, Business Services Manager Subject: Amend the Fixed Asset and Capital Asset Policy Objective: Establish procedures for the disposal
Table of Contents. Section G: Contract Administration Data Mod: AA20: (Verizon) 10/05/09-GS11T08BJD6001
Section Table of Contents Section G: Contract Administration Data Mod: AA20: (Verizon) 10/05/09- Page G.1 Contract Administration 1 G.1.1 Government Points of Contact 1 G.1.1.1 Procuring Contracting Officer
FIVE MANAGEMENT SYSTEM Policies and Procedures Checklist
FIVE MANAGEMENT SYSTEM Procedures Checklist Provided by: Navajo Nation Office of the Auditor General TABLE OF CONTENTS Introduction.........................................1 General Administrative Procedures...............................1
Audit of IT Asset Management Report
Audit of IT Asset Management Report Recommended by the Departmental Audit Committee for approval by the President on Approved by the President on September 4, 2012 e-doc : 3854899 1 Table of Contents EXECUTIVE
Quality Agreement Template
Quality Agreement Template Prepared by Dan O Leary Ombu Enterprises, LLC 3 Forest Ave. Swanzey, NH 03446 603-209-0600 This document is intended to form the basis for a Supplier Agreement. The document
SYSTEM ADMINISTRATION REAL ASSET MANAGEMENT MANUAL
SYSTEM ADMINISTRATION REAL ASSET MANAGEMENT MANUAL Office of Business Operations and Procurement Updated April 2012 TABLE OF CONTENTS TOPIC PAGE Introduction 3 Objectives of the 3 Equipment Definition
Fixed Asset Policy & Procedures. Content
Content 1. Purpose... 3 2. Definitions... 3 3. Responsibility... 3 4. Tagging and Identifying Inventoriable Assets... 4 5. Additions to Fixed Assets... 4 6. Transfer of Assets... 5 7. Disposition of Assets...
JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management
JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project
Flexible Circuits Inc. Purchase Order Standard Terms and Conditions
Flexible Circuits Inc. Purchase Order Standard Terms and Conditions 1. Acceptance- This writing, together with any attachments incorporated herein, constitutes the final, complete, and exclusive contract
ACQUISITION ALERT 11-04. Delegation of Invoice Approval Authority
February 2, 2011 ACQUISITION ALERT 11-04 Delegation of Invoice Approval Authority This Acquisition Alert is being transmitted to all NOAA Heads of Contracting Offices (HCOs) for dissemination within their
DFARS Procedures, Guidance, and Information
PGI 245.1 - GENERAL PGI 245.102-70 Policy. (Added July 23, 2010) (1) A basic principle of the Federal Acquisition Regulations System is that, upon contract award, contractors bring all the necessary organization,
Property Management Manual
Property Management Manual written/compiled by Brown University Office of Sponsored Projects I. INTRODUCTION II. WHAT IS EQUIPMENT? A. Memory Upgrades B. Component Parts C. Fabricated Items D. Software
COUNTY OF TRINITY CASH HANDLING PROCEDURES
COUNTY OF TRINITY CASH HANDLING PROCEDURES Prepared by the Trinity County Auditor/Controller s Office Revised October 1, 2009 TABLE OF CONTENTS I. Introduction--------------------------------------------------------------------1
CONTRACT POLICES & PROCEDURES MANUAL CONTRACT POLICIES AND PROCEDURES MANUAL
CONTRACT POLICIES AND PROCEDURES MANUAL REVISED JULY 2013 1 Table of Contents Section 1: Definitions... 3 Section 2: General Process... 7 Section 3: Professional Service Agreement (PSA)... 8 Section 4:
How To Manage A 9-1-1 Service In Texas
INTERLOCAL AGREEMENT FOR E9-1-1 PUBLIC SAFETY ANSWERING POINT SERVICES Article 1: Parties & Purpose 1.1 The Houston-Galveston Area Council (RPC) is a regional planning commission and political subdivision
Supplier Quality Management Handbook
Supplier Quality Management Handbook PREPARED BY: ORGANIZATION: DATE: Byron Murray SYS 05/20/2013 APPROVALS (Name): ORGANIZATION: APPROVAL DATE: Javier Marti CCB Chair 06/12/2013 Krista Laursen CCB Chair
CORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS
USACE / NAVFAC / AFCEC / NASA UFGS-01 45 00.10 10 (February 2010) ----------------------------------- Preparing Activity: USACE Superseding UFGS-01 45 01.10 (January 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS
Within the context of this policy, the following definitions apply: A. Fixed Assets A resource that meets all the following criteria:
FIXED ASSETS Effective: July 1, 2011 I. Policy Statement As a part of its obligation to publicly account for the resources dedicated to the education of students of the Howard County Public School System