Course Outline. Project Design and Project Management. Course Outline. What is a Project? Part 1. Basics of Project Design and Project Management

Size: px
Start display at page:

Download "Course Outline. Project Design and Project Management. Course Outline. What is a Project? Part 1. Basics of Project Design and Project Management"

Transcription

1 Project Design and Project Management May 24-28, 2006 Kabul, Afghanistan Presented by: Dr. Jobaid Kabir Workshop-I 1 Course Outline Part 1. Basics of Project Design and Project Management Part 2. Risk Management and Project Scheduling Part 3. Project Budgeting, Tracking and Control Part 4. Project Reporting and Closing Part 5. Project Management Tools Part 6. Team Exercise Workshop-I 2 Course Outline Part 1. Basics of Project Design and Project Management Part 2. Risk Management and Project Scheduling Part 3. Project Budgeting, Tracking and Control Part 4. Project Reporting and Closing Part 5. Project Management Tools Part 6. Team Exercise Workshop-I 3 Part 1. Basics of Project Design and Project Management Workshop-I 4 Agenda Part-1. Basics of Project Design and Project Management What is a Project? Introduction Project and Project Management Q&A Session Definition of commonly used terms Discussion Session Team Exercise: Project Definition and Assignment Workshop-I 5 A group of actions with clearly defined beginning and ending Must produces pre-defined outcome Workshop-I 6 1

2 What is a Project Management? A process of planning, organizing, staffing, scheduling, leading, and controlling of project activities to reach desired goal within specified time and budget. Managing on going activities is different from managing projects. Workshop-I 7 Workshop-I 8 Ongoing Activities. Repeat activities No defined beginning and ending Similar output is desired each time Everyone in the team do similar work Workshop-I 9 Project activities. Unique Temporary Pre-defined beginning and ending Only one outcome accomplish project goal Need people with multiple skills in the team Workshop-I 10 Skill test. Example of on-going activities. Mr. Ahmed manages a team of technicians for repairing roads in Kabul. Every day his crews identify road damages and repair them as they finds them Is Mr. Ahmed s group assigned to a project or ongoing work? Why? Workshop-I 11 Mr. Ahmed's group work is doing ongoing work They are repeating set of tasks In their work there is no a clear beginning or ending They are producing about the same outcome everyday Workshop-I 12 2

3 Skill test. Ms. Rahman's team is developing a training manual on how to repair road. Her team has engineers, estimators, writers, and graphic designers. Ms. Rahman's work began on May 1, 2006, and must be completed by July 1, Is Rahman's team assigned to a project or on-going activities? Why? Workshop-I 13 Example of project activities. Ms. Rahman's team is working in a project Unique: One of a kind Temporary: 2-month duration Pre-defined beginning and ending: May 1 to July 1, 2006 Only one outcome: Training Manual Need people with multiple skills in the team: engineers, estimators, writers, and graphic designers Workshop-I 14 Program Management A program is bigger and last longer May include multiple projects. For example: Afghanistan Reconstruction may be a multi-year program Building certain road or a bridge are shorter term projects Difference between project and regular management? In regular management we use experience for developing schedule, budget and tools needed for the job. Workshop-I 15 Workshop-I 16 Difference between project and regular management? In project management: Don t depend fully on previous experience as each project is unique Project management is more risky Need special risk management tools Project Management Life Cycle Initiation Planning Implementation Close-Out Workshop-I 17 Workshop-I 18 3

4 Initiation phase activities Project team skill matrix Project definition and scoping Stakeholders identification Setting project rules Project team formation People with required collective skills for the project Committed to work together Membership may change with time Skills Engineering design Cost estimation Drafting Report preparation Public meeting Skills Level Supervision Experience Education Team Member X Y Z A B Workshop-I 19 Workshop-I 20 Initiation phase deliverable Project Charter Stakeholder Responsibility Matrix Statement of Work Team Charter Project Charter An official documents signed by the project's sponsor demonstrating full support and funding Workshop-I 21 Workshop-I 22 Project Charter must include Project name Project purpose Project objectives Project manager Authorization to use resources Project Charter Example Form Example Workshop-I 23 Workshop-I 24 4

5 Team charter is a living document A set of rules team agrees on interpersonal behavior Meetings Record Keeping Decision Making Resources Communications Workshop-I 25 Training manual team charter. Project Training Manual Date May 25, 2006 Revision no. 1 Meeting Meet every Saturday at 8 AM Ms. Rahman will send the agenda on Thursday Everyone must attend Must inform in advance if unable to attend Workshop-I 26 Training manual team charter. (Continued) Record Keeping All expenses must be pre-approved Take turn for taking meeting notes Ms. Rahman will distribute meeting notes by Saturday noon Behavior There is no dumb question Let all voice expressed Solve problems instead of blaming someone Allow critique but not criticism Workshop-I 27 Training manual team charter. (Continued) Decision Making Consensus for decision making If team is unable to decide Ms. Rahman will decide Resources Which computers to use? Telephone and fax? Copier? Workshop-I 28 Planning phase activities Budget Schedule Activity Plan Planning phase deliverable Deliverable Breakdown Structure Work Breakdown Structure Detail Responsibility Matrix Schedule Budget Activity Plan Workshop-I 29 Workshop-I 30 5

6 Implementation phase activities Working the Plan Monitoring Progress Take Corrective Action Reporting Progress Implementation phase deliverable Status Progress Report Earned Value Analysis Change Requests Workshop-I 31 Workshop-I 32 Close-out phase activities Handing Off to End Users Closing Down Operations Reporting Outcomes Close-out phase deliverable Final Report Personnel Evaluations Workshop-I 33 Workshop-I 34 Team Exercise: Project Definition and Assignment Workshop-I 35 Work in a team to: Define a project Simple so that all can participate Identify a project manager Identify project team Assign responsibilities Prepare project charter Use the form provided Workshop-I 36 6

7 De-briefing Session Team Exercise: De-briefing Present project charter to the group Seek feedback Workshop-I 37 Workshop-I 38 7

Course Outline. Project Design and Project Management. Risk Management. Sources of project risks. What is risk?

Course Outline. Project Design and Project Management. Risk Management. Sources of project risks. What is risk? Project Design and Project Management May 24-28, 2006 Kabul, Afghanistan Presented by: Dr. Jobaid Kabir University of Texas at Austin Course Outline Part 1. Basics of Project Design and Project Management

More information

Project Roles and Responsibilities Template

Project Roles and Responsibilities Template Purpose The purpose of this document is to provide a summary of the primary roles in the X project and the responsibilities associated with each role. A roles and responsibilities spreadsheet also maps

More information

Project Management Fundamentals. Office of the Senior Associate Vice President for Finance

Project Management Fundamentals. Office of the Senior Associate Vice President for Finance Project Management Fundamentals Project Management Institute PMI is an aggregation of best practices from thousands of professional project managers Principles in this training are based on PMI methodologies,

More information

IT Project Management Methodology. Project Scope Management Support Guide

IT Project Management Methodology. Project Scope Management Support Guide NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Scope Management Support Guide Version 0.3 Version Date Author Change Description 0.1 23 rd Mar, 2013 Gerald

More information

Department of Administration Portfolio Management System 1.3 June 30, 2010

Department of Administration Portfolio Management System 1.3 June 30, 2010 E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2

More information

THE FUNDAMENTALS OF PROJECT MANAGEMENT

THE FUNDAMENTALS OF PROJECT MANAGEMENT THE FUNDAMENTALS OF PROJECT MANAGEMENT Learning the Essential Elements for Effective Management at UW-Stout WHAT IS A PROJECT? 1. Improve the efficiency of a specific production line. 2. Organize the annual

More information

Positive Train Control (PTC) Program Management Plan

Positive Train Control (PTC) Program Management Plan Positive Train Control (PTC) Program Management Plan Proposed Framework This document is considered an uncontrolled copy unless it is viewed online in the organization s Program Management Information

More information

Appeals Case Management System Project. Scope Management Plan. November 20, 2014

Appeals Case Management System Project. Scope Management Plan. November 20, 2014 Appeals Case Management System Project Version 1.0 Health and Human Services Agency, Office of Systems Integration Template Revision History REVISION HISTORY REVISION # DATE OF RELEASE OWNER SUMMARY OF

More information

Companion Notes for LTC Process Flowcharts. Notes for Initiation Stage

Companion Notes for LTC Process Flowcharts. Notes for Initiation Stage Companion Notes for LTC Process Flowcharts Contents Notes for Initiation, Planning, Execution/Production and Close Stages Glossary and Acronyms Page 1 4 5 6 Notes for Initiation Stage Purpose The purpose

More information

Project Management for Everyone

Project Management for Everyone Project Management for Everyone Contact Information Adam Donaldson, PMP Business Management & Analysis Group System, Analytics & Insights Group Phone: (202) 994-6867 Email: [email protected] Objectives Basic

More information

SCOPE MANAGEMENT PLAN <PROJECT NAME>

SCOPE MANAGEMENT PLAN <PROJECT NAME> SCOPE MANAGEMENT PLAN TEMPLATE This Project Scope Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome

More information

Project Knowledge Areas

Project Knowledge Areas From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.

More information

PROJECT MANAGEMENT FOR NON-PROJECT MANAGERS

PROJECT MANAGEMENT FOR NON-PROJECT MANAGERS PROJECT MANAGEMENT FOR NON-PROJECT MANAGERS NADC PTAC 2929 3 rd Ave., N., Suite 300 Billings, MT 59101 P. (406) 259-3804 F. (406) 259-4569 ww.nadc-nabn.org HIGHLINER CONSULTING GROUP, LLC. 255 E. Fireweed

More information

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name

More information

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

THE PROJECT MANAGEMENT KNOWLEDGE AREAS THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human

More information

Project Management Change Management Procedure

Project Management Change Management Procedure Change Management Procedure Procedure # Description: Overview Outlines the steps for a Project Manager to manage change in an organization Objective To ensure that organizational change is managed in a

More information

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History

More information

Project Management Professional (PMP)

Project Management Professional (PMP) Project Management Professional (PMP) Duration: 5 days Course Objectives: PMI s Project Management Professional (PMP) credential is the most important industry-recognized certification for project managers.

More information

COMMUNICATION MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

COMMUNICATION MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: COMMUNICATION MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Document Information Document Title Amendment History Document Version Date Author/Reviewer Modifications 5/28/2014 Page i 2014 CSG

More information

Basel Committee on Banking Supervision. Charter

Basel Committee on Banking Supervision. Charter Basel Committee on Banking Supervision Charter January 2013 This publication is available on the BIS website (www.bis.org). Bank for International Settlements 2013. All rights reserved. Brief excerpts

More information

Module 11 Stakeholder Management PMP Exam Questions

Module 11 Stakeholder Management PMP Exam Questions Module 11 Stakeholder Management PMP Exam Questions PMP, PMBOK and the Registered Education Provider logo are registered marks of the Project Management Institute, Inc Question 1 You are the project manager

More information

INTRODUCTION TO PROJECT MANAGEMENT

INTRODUCTION TO PROJECT MANAGEMENT INTRODUCTION TO PROJECT MANAGEMENT OVERVIEW The purpose of presentation is to provide leaders and team members of projects, committees or task forces with advanced techniques and practical skills for initiating,

More information

PROJECT MANAGEMENT PLAN <PROJECT NAME>

PROJECT MANAGEMENT PLAN <PROJECT NAME> PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome

More information

Project Management for Everyone

Project Management for Everyone Project Management for Everyone Contact Information Adam Donaldson, PMP Business Management & Analysis Group Phone: (202) 994-6867 Cell: (240) 472-2171 Email: [email protected] Objectives Basic understanding

More information

LMI Aerospace PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012

LMI Aerospace PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012 PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012 TABLE OF CONTENTS INTRODUCTION... 2 PROJECT MANAGEMENT APPROACH... 2 PROJECT SCOPE... 2 MILESTONE LIST... 2 SCHEDULE BASELINE

More information

How To Decommission A Nuclear Plant

How To Decommission A Nuclear Plant International Atomic Energy Agency Decommissioning of Nuclear Facilities Management of Decommissioning Projects Lawrence E. Boing Manila, Philippines, October 2006 1 Lesson Objectives Understand the management

More information

Agenda. 0 Agenda review 2 minutes. 0 Chapter of the week 50 minutes. 0 Q&A of chapter 10 minutes. 0 Break 10 minutes. 0 Exercises 25 minutes

Agenda. 0 Agenda review 2 minutes. 0 Chapter of the week 50 minutes. 0 Q&A of chapter 10 minutes. 0 Break 10 minutes. 0 Exercises 25 minutes Agenda 0 Instructor Introduction 3 minutes 0 Agenda review 2 minutes 0 Chapter of the week 50 minutes 0 Q&A of chapter 10 minutes 0 Break 10 minutes 0 Exercises 25 minutes 0 Round table 15 minutes 0 Closure

More information

Guidelines. Project Management Methodology. & Step-by-Step Guide to Managing Successful Projects

Guidelines. Project Management Methodology. & Step-by-Step Guide to Managing Successful Projects Project Management Methodology Guidelines Project Management Methodology & Step-by-Step Guide to Managing Successful Projects Table of Contents Table of Contents 1. Project Management Overview...1 1.1.

More information

PROJECT HUMAN RESOURCE MANAGEMENT

PROJECT HUMAN RESOURCE MANAGEMENT 9 PROJECT HUMAN RESOURCE MANAGEMENT Project Human Resource Management includes the processes required to make the most effective use of the people involved with the project. It includes all the project

More information

PROJECT PLAN FOR. Project Name Here

PROJECT PLAN FOR. Project Name Here PROJECT PLAN FOR Project Name Here Version # DatE Reviewed and Approved for submittal to Executive Sponsor , Project Manager Project Plan Approved for submittal to Executive Sponsor: , Project

More information

Playing The Project Management Game

Playing The Project Management Game Playing The Project Management Game Tools and Techniques to Win the Game Dean Athanassiades, PMP Nancy Stetson, PMP Version 2003-12-02 (c) Dean Athanassiades 2003 1 Presenters Dean Athanassiades, PMP Philips

More information

Requirements Workshop Work Breakdown Structure

Requirements Workshop Work Breakdown Structure Requirements Workshop Work Breakdown Structure Reference Introduction to Part II in Requirements by Collaboration by Ellen Gottesdiener, Addison-Wesley, 2002. Phase 1: Plan Stage 1: Define Workshop Purpose

More information

The Job of the Project Manager. Robert Youker World Bank (retired) 5825 Rockmere Drive Bethesda, Md. USA 20816 [email protected].

The Job of the Project Manager. Robert Youker World Bank (retired) 5825 Rockmere Drive Bethesda, Md. USA 20816 bobyouker@worldnet.att. The Job of the Project Manager Robert Youker World Bank (retired) 5825 Rockmere Drive Bethesda, Md. USA 20816 [email protected] For any organization and for any project manager it is vitally important

More information

Project Management Guidelines

Project Management Guidelines Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of

More information

Role and Skill Descriptions. For An ITIL Implementation Project

Role and Skill Descriptions. For An ITIL Implementation Project Role and Skill Descriptions For An ITIL Implementation Project The following skill traits were identified as fairly typical of those needed to execute many of the key activities identified: Customer Relationship

More information

From Body of Knowledge to Embodied Knowledge: Leveraging the Project Management Professional (PMP) Certification

From Body of Knowledge to Embodied Knowledge: Leveraging the Project Management Professional (PMP) Certification From Body of Knowledge to Embodied Knowledge: Leveraging the Project Management Professional (PMP) Certification By Jennifer Tucker, PMP OKA (Otto Kroeger Associates), [email protected] Abstract. The

More information

<project name> COMMUNICATIONS PLAN

<project name> COMMUNICATIONS PLAN COMMUNICATIONS PLAN Version [n.n Month Day, Year] Project Sponsor: [Name of Business Sponsor] Project Manager: [Name of Project Manager] Project Number: [Number Assigned to the Project] Document History

More information

10.1 Communications Planning 10.2 Information Distribution Figure 10 1 10.3 Performance Reporting 10.1 Communications Planning 10.

10.1 Communications Planning 10.2 Information Distribution Figure 10 1 10.3 Performance Reporting 10.1 Communications Planning 10. PROJECT 10 COMMUNICATIONS MANAGEMENT Project Communications Management includes the processes required to ensure timely and appropriate generation, collection, dissemination, storage, and ultimate disposition

More information

Application Information Pack CRM Project Manager

Application Information Pack CRM Project Manager Application Information Pack CRM Project Manager Introduction to Girlguiding Thank you for your interest in the role of CRM Project Manager. This document provides information relating to the above vacancy

More information

User experience prototype requirements PROJECT MANAGEMENT PLAN

User experience prototype requirements PROJECT MANAGEMENT PLAN Tallinn University Institute of Informatics User experience prototype requirements PROJECT MANAGEMENT PLAN Authors Roger Puks Erkki Saarnit Ekaterina Shafeeva Maria Angelica Medina Angarita Lecturer Peeter

More information

CALIFORNIA GIS COUNCIL CHARTER

CALIFORNIA GIS COUNCIL CHARTER CALIFORNIA GIS COUNCIL CHARTER ADOPTED JANUARY 7, 2015 SECTION 1: FINDING AND DECLARATIONS WHEREAS: A. Geographic Information Systems (GIS) are a critical tool for improving the quality, accuracy and responsiveness

More information

Project Scope Management in PMBOK made easy

Project Scope Management in PMBOK made easy By Dr. TD Jainendrakumar The main objective of any project is to fulfill the scope of the project on time and within the budget. What is Project Scope? Scope refers to all the work involved in creating

More information

Minnesota Health Insurance Exchange (MNHIX)

Minnesota Health Insurance Exchange (MNHIX) Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration

More information

JAD Guidelines. Description

JAD Guidelines. Description Joint Application Development (JAD) sessions are highly structured, facilitated workshops that bring together customer decision makers and IS staff to produce high-quality deliverables in a short time

More information

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement

More information

Program Lifecycle Methodology Version 1.7

Program Lifecycle Methodology Version 1.7 Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated

More information

POLICY STATEMENT Commonwealth of Pennsylvania Department of Corrections

POLICY STATEMENT Commonwealth of Pennsylvania Department of Corrections POLICY STATEMENT Commonwealth of Pennsylvania Department of Corrections Policy Subject: Policy Number: Project Management 1.1.5 Date of Issue: Authority: Effective Date: May 29, 2009 Signature on File

More information

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing

More information

PMP: Project Management Professional Exam Study Guide. 7th Edition

PMP: Project Management Professional Exam Study Guide. 7th Edition Brochure More information from http://www.researchandmarkets.com/reports/2505193/ PMP: Project Management Professional Exam Study Guide. 7th Edition Description: The ultimate package for preparing you

More information

Appendix 3: Project Management Substation Guidelines (General Process Flow Template)

Appendix 3: Project Management Substation Guidelines (General Process Flow Template) 365 Appendix 3: Project Management Substation Guidelines (General Process Flow Template) Checkpoint Methodology The schedule is issued prior to the go decision. It covers the duration of the project. It

More information

Federal Office of Small and Disadvantaged Business Utilization (OSDBU) Directors Interagency Council. CHARTER

Federal Office of Small and Disadvantaged Business Utilization (OSDBU) Directors Interagency Council. CHARTER Federal Office of Small and Disadvantaged Business Utilization (OSDBU) Directors Interagency Council. CHARTER MISSION: The mission of the Federal Office of Small and Disadvantaged Business Utilization

More information

Agile Scrum and PMBOK Compatible or Contrary?

Agile Scrum and PMBOK Compatible or Contrary? Agile Scrum and PMBOK Compatible or Contrary? Paul Despres PMI Emerald Coast Panama City Branch June 26, 2014 Meeting Overview Agenda Topics: Review Agile/Scrum Methods Review PMBOK Structure Demonstrate

More information

Impact of PMBOK 5 th Edition

Impact of PMBOK 5 th Edition PMP Exam Changes Impact of PMBOK 5 th Edition When the PMI exam will change Major Updates X1.1 Scope of Update Comments and feedbacks for prior version Overall review for accuracy Appropriate alignment

More information

LEARNING ACTIVITY Painting the living room Ent-teach Unit 6 Project management

LEARNING ACTIVITY Painting the living room Ent-teach Unit 6 Project management LEARNING ACTIVITY Painting the living room Ent-teach Unit 6 Project management Description learning activity You and 3 friends decide to paint your living room. In order to complete this project, you decide

More information

Jim Hoelz, MS, MBA, RN, CEN, FAEN Chief Nurse Executive Blue Jay Consulting, LLC

Jim Hoelz, MS, MBA, RN, CEN, FAEN Chief Nurse Executive Blue Jay Consulting, LLC Jim Hoelz, MS, MBA, RN, CEN, FAEN Chief Nurse Executive Blue Jay Consulting, LLC Overall wait time Actual Perceived Information provided during the visit Overall perception of quality Care versus caring

More information

STATE BOARD OF ELECTIONS P.O. BOX 6486, ANNAPOLIS, MD 21401-0486 PHONE (410) 269-2840

STATE BOARD OF ELECTIONS P.O. BOX 6486, ANNAPOLIS, MD 21401-0486 PHONE (410) 269-2840 MARYLAND STATE BOARD OF ELECTIONS P.O. BOX 6486, ANNAPOLIS, MD 21401-0486 PHONE (410) 269-2840 Bobbie S. Mack, Chairman David J. McManus, Jr., Vice Chairman Rachel T. McGuckian Patrick H. Murray Charles

More information

Communication Plan. Administrative Information Technology Services University of Illinois. December, 2015

Communication Plan. Administrative Information Technology Services University of Illinois. December, 2015 Communication Plan Administrative Information Technology Services University of Illinois December, 2015 Table of Contents Executive Summary... 3 Quick Reference Guide... 3 Purpose... 4 Goals and Objectives...

More information

Mindjet MindManager : A Vital Solution for Improved Project Management

Mindjet MindManager : A Vital Solution for Improved Project Management Timothy G. Bolwerk, PMP [email protected] Mindjet MindManager : A Vital Solution for Improved Project Management Project managers wrestle with mountains of information. Throughout the course of

More information

Develop Project Charter. Develop Project Management Plan

Develop Project Charter. Develop Project Management Plan Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs

More information

Involve-Project Manager

Involve-Project Manager Involve-Project Manager This article will describe: What is Project Management Why is Project Management so important to community and voluntary organisations The Key Phases of Project Management: o Initiation

More information

ICT Project Management

ICT Project Management THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE PUBLIC SERVICE MANAGEMENT ICT Project Management A Step-by-step Guidebook for Managing ICT Projects and Risks Version 1.0 Date Release 04 Jan 2010 Contact

More information

THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT

THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT GERARD M. HILL CRC Press Taylor & Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an informa business

More information

Terms of Reference for LEAP II Final Evaluation Consultant

Terms of Reference for LEAP II Final Evaluation Consultant UNESCO Office Kabul, Afghanistan November 2015 Terms of Reference for LEAP II Final Evaluation Consultant Post Title: Final Evaluation Specialist Organization: UNESCO Office Kabul Location: Kabul, Afghanistan

More information

Project Management Guidelines

Project Management Guidelines Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.

More information

Central Agency for Information Technology

Central Agency for Information Technology Central Agency for Information Technology Development of a National IT Governance Framework Project Management Agenda 1 What is project management? Why it is important? 2 Leading practices 3 Project management

More information

Project Transition Plan

Project Transition Plan Put your logo here Put your organization name here Project Transition Plan Template Rev. 1.2 November, 2011 Project Transition Plan Project Name: Prepared by: Date (MM/DD/YYYY): Version History (insert

More information

Systems Analysis and Design in a Changing World, Fifth Edition

Systems Analysis and Design in a Changing World, Fifth Edition Systems Analysis and Design in a Changing World, Fifth Edition Learning Objectives Explain the elements of project management and the responsibilities of a project manager Explain project initiation and

More information

Unit 06 Developing the Work Breakdown Structure

Unit 06 Developing the Work Breakdown Structure Unit 06 Developing the Work Breakdown Structure April 2007 Project Management Wilhelm F. Neuhäuser IBM Corporation 2007 Agenda Unit 6: Developing the Work Breakdown Structure Objectives Value of the WBS

More information

Project Processes. Media Snapshot. Project Management Process Groups

Project Processes. Media Snapshot. Project Management Process Groups Project Processes PROJECT LIFECYCLE A project normally requires a number of processes. A process is a series of actions directed toward a particular result Project management can be viewed as a number

More information

Establishing a Quality Assurance and Improvement Program

Establishing a Quality Assurance and Improvement Program Chapter 2 Establishing a Quality Assurance and Improvement Program O v e rv i e w IIA Practice Guide, Quality Assurance and Improvement Program, states that Quality should be built in to, and not on to,

More information

Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition

Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Topics for Discussion PMI Foundational Standards Harmonization of PMI s Foundational Standards Top 10 changes

More information

DRAFT. Town of Erin Position Description DIRECTOR OF INFRASTRUCTURE & OPERATIONS

DRAFT. Town of Erin Position Description DIRECTOR OF INFRASTRUCTURE & OPERATIONS DRAFT Town of Erin Position Description DIRECTOR OF INFRASTRUCTURE & OPERATIONS Department: Position Title Reports To: Public Works Director of Infrastructure & Operations CAO/Town Manager PURPOSE OF POSITION

More information

IT Project Management Methodology. Project Risk Management Guide. Version 0.3

IT Project Management Methodology. Project Risk Management Guide. Version 0.3 NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Risk Management Guide Version 0.3 Project Risk Management Support Guide version 0.3 Page 1 Version Date Author

More information

EXAM PREP COURSE. Course Overview. Course Objectives. Course Materials Include: Our PMP Exam Prep (Fifth Edition) training program:

EXAM PREP COURSE. Course Overview. Course Objectives. Course Materials Include: Our PMP Exam Prep (Fifth Edition) training program: PMP EXAM PREP COURSE Course Overview The purpose of this course is to prepare you to pass the Project Management Professional (PMP) certification exam. The course is based on the 10 knowledge areas in

More information

Commonwealth of Massachusetts CommonWay Schedule Management Guidelines. Common Values - Common Goals Common Way. Schedule Management.

Commonwealth of Massachusetts CommonWay Schedule Management Guidelines. Common Values - Common Goals Common Way. Schedule Management. Schedule Management Values - Goals Schedule Management Schedule Management v1.0 1 of 6 10/27/2010 Schedule Management Values - Goals Table of Contents 1 Schedule Management Guideline... 3 1.1 Determine

More information

Resource Management. Determining and managing the people resources on projects can be complex as:

Resource Management. Determining and managing the people resources on projects can be complex as: Baseline Resource Management RESOURCE MANAGEMENT Purpose To provide a procedure and associated guidelines to facilitate the management of project people resources. Overview This Phase is used to establish

More information

Module 7 Human Resources Management PMP Exam Questions

Module 7 Human Resources Management PMP Exam Questions Module 7 Management PMP Exam Questions PMP, PMBOK and the Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Question 1 You and your manager are discussing

More information

EVOLUTION OF WORKFORCE MANAGEMENT

EVOLUTION OF WORKFORCE MANAGEMENT EVOLUTION OF WORKFORCE MANAGEMENT One Workforce One Company - One Solution: Why an Enterprise approach to field work is beneficial to electric, gas, and water utilities One Workforce One Company - One

More information

ProjectMinds Quick Guide to Project Management

ProjectMinds Quick Guide to Project Management ProjectMinds Quick Guide to Project Management By Manjeet Singh [email protected] 1 A D I F F E R E N T K I N D O F C O P Y R I G H T No rights reserved. All the parts of this book can be reproduced,

More information

Time Management. Part 2 Work Breakdown Structure (WBS) Review. Richard Boser

Time Management. Part 2 Work Breakdown Structure (WBS) Review. Richard Boser Time Management Part 2 Work Breakdown Structure (WBS) Review Richard Boser WBS Planning Process PMBOK WBS is deliverable-oriented grouping of components that organizes and defines the total scope of the

More information

EXECUTIVE SUMMARY...5

EXECUTIVE SUMMARY...5 Table of Contents EXECUTIVE SUMMARY...5 CONTEXT...5 AUDIT OBJECTIVE...5 AUDIT SCOPE...5 AUDIT CONCLUSION...6 KEY OBSERVATIONS AND RECOMMENDATIONS...6 1. INTRODUCTION...9 1.1 BACKGROUND...9 1.2 OBJECTIVES...9

More information

2015.02.19. BASICS OF PROJECT MANAGEMENT 2015.02.19. István Vidovszky PhD. table of contents

2015.02.19. BASICS OF PROJECT MANAGEMENT 2015.02.19. István Vidovszky PhD. table of contents BASICS OF PROJECT MANAGEMENT BME/BUTE Faculty of Architecture Department of construction technology and management István Vidovszky PhD 2015.02.19. Building Project Management 0 1. definitions 2. history

More information

INTRODUCTION: Plan and Schedule Development Create a Work Breakdown Structure (WBS) The detailed guidelines and examples start on the following page.

INTRODUCTION: Plan and Schedule Development Create a Work Breakdown Structure (WBS) The detailed guidelines and examples start on the following page. What This Is INTRODUCTION: Plan and Schedule Development Create a Work Breakdown Structure (WBS) The detailed guidelines and examples start on the following page. First of a series of guidelines for project

More information

15 Principles of Project Management Success

15 Principles of Project Management Success 15 Principles of Project Management Success Project management knowledge, tools and processes are not enough to make your project succeed. You need to get away from your desk and get your hands dirty.

More information

2-Day Workshop Project JumpStart The Workshop Designed to Launch Projects Faster

2-Day Workshop Project JumpStart The Workshop Designed to Launch Projects Faster 2-Day Workshop Project JumpStart The Workshop Designed to Launch Projects Faster Traditional Classroom / Onsite Course No. 665 Duration: 2 days Credits: 14 PDUs / 1.4 CEUs Prerequisites Twelve hours of

More information

Title: Executive Associate to CEO & General Counsel Manager: President & CEO. Department: Executive FLSA Status: Exempt ABOUT HUMANITY UNITED:

Title: Executive Associate to CEO & General Counsel Manager: President & CEO. Department: Executive FLSA Status: Exempt ABOUT HUMANITY UNITED: Title: Executive Associate to CEO & General Counsel Manager: President & CEO Department: Executive FLSA Status: Exempt ABOUT HUMANITY UNITED: Humanity United is a foundation committed to building peace

More information

Input, Output and Tools of all Processes

Input, Output and Tools of all Processes 1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) [email protected] 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /

More information

Case Study on Critical Success Factors of Running Scrum *

Case Study on Critical Success Factors of Running Scrum * Journal of Software Engineering and Applications, 2013, 6, 59-64 http://dx.doi.org/10.4236/jsea.2013.62010 Published Online February 2013 (http://www.scirp.org/journal/jsea) 59 Case Study on Critical Success

More information

Project Management 1/20/2015

Project Management 1/20/2015 Project Management 1 Acronyms used in this module: APD Advance Planning Document APDU Advance Planning Document Update FNS Food and Nutrition Service IS Information System IT Information Technology PM

More information