PFI Property Project. Shadwell Fire Station. New station design July 2012
|
|
|
- Reynold Warren Holt
- 10 years ago
- Views:
Transcription
1 PFI Property Project Shadwell Fire Station New station design July 0
2 Introduction to Project The London Fire Brigade (LFB) is working in the PFI Property Project using the Private Finance Initiative model to bring additional Central Government Capital Investment into the London Fire Brigade to upgrade nine of its stations which are in poor condition and no longer meet the needs of a modern fire service. The private sector will design, build, finance and operate the above station for at least 5 years. Through the incorporation of private sector expertise and investment LFB will be utilising their management skills to maximise value for money and good design. E A S T L O N D O N L U L D L R S T A T I O N SITE D L R C o m iew iew The detailed planning applications are prepared and submitted in partnership with the appointed private sector partner. LFB will control the process and design through the use of an output specification and ongoing dialogue and assessment of designs submitted by the private sector partner to ensure that new station supports: T h e H i g h w a y exemplary design and is operationally fit for purpose energy efficiency, meeting as a minimum a B xcel lent standard at design stage and completion community focus and engagement by providing designated space with access to the public and making London a Safer city by minimising risks, social and economic costs of fire and other hazards. Site Location iew Business Continuity The displaced appliance and crew from Shadwell will be hosted at Poplar station for the duration of the works. Site nalysis The site sits within a predominantly residential area consisting of medium density, typically 5 storey flat accommodation. To the east (Sage Street) are smaller units of three storey height, with a school located to the south of the site. N 3 storey residential & shops CABLE STREET NORTH LIGHT Shadwell Gardens (4 storey residential) NOISE FROM CABLE STREET N 3 storey residential & shops VIEWS FROM SHADWELL GARDENS TO NEW FIRE STATION FRONTAGE Shadwell Gardens (4 storey residential) CABLE STREET VIEWS OUT FROM UPPER FLOOR OF NEW STATION VIEWS OUT FROM UPPER FLOOR OF NEW STATION Sage St. There are several key views into and out of the site. The key approach view is from the north west. Key views into the site from adjoining premises are from Sage Street houses, Bewley House to the west and Shadwell Gardens to the north. The site is served well by pedestrian, cycle and bus routes and is in close proximity to the L and ast London Underground line at Shadwell Station. The width of the site has a wide exposed south face, and a south facing drill yard. Controlled use of east and west apertures has been restricted to overcome residential amenity/overlooking issues and to limit solar exposure/ glare concerns. Bewley House (5 storey residential) W NOISE FROM BEWLEY STREET BEWLEY STREET Lowood House (5 storey residential) Existing Shadwell Fire Station SOUTH FACING DRILL YARD training centre Existing drill tower 5 storey residential NOISE FROM PLAYGROUND 3 storey residential playground E VIEWS FROM BEWLEY HOUSE TO NEW FIRE STATION FACADE Bewley House (5 storey residential) 3 BEWLEY STREET Lowood House (5 storey residential) Existing Shadwell Fire Station VIEWS OUT TO YARD VIEWS FROM FLATS TO DRILL YARD & TOWER training centre Existing drill tower VIEWS FROM FLATS TO DRILL YARD & TOWER 5 storey residential 3 storey residential VIEWS FROM FLATS TO TRAINING CENTRE FACADE playground Sage St. Site nalysis nvironment Site nalysis Key iews
3 Site Plan The proposal provides a compact three storey form set to the north west of the site, with single storey set back to the southeast and east of the form, an integrated covered wash down (which is 5.0 m in depth) and the four storey drill tower to the south east corner of the site in a location similar to that of the existing tower. Our concept is a carefully detailed modern building with the upper floor expressed as a metal and glass clad box floating above a set back lower form, which includes the two appliance bays. xacerbated by the current large footprint the physical size of the site is limited and careful building design and tracking have been a priority. We have examined the optimum arrangement for appliance return and exit, and discussed this at our station visit. The limited width of Bewley Street and need to return to Cable Street for exit out of the vicinity favours direct discharge onto Cable Street. Soft Landscape It is proposed that a mixture of species are provided to the front of the station, designed with spiky planting to aid natural standoff and low maintenance. To the east of the site a meaningful landscape proposal has been developed, softening the edge of the scheme to the neighbouring properties to Sage Street, improving the amenity currently enclosed by palisade fencing. It will provide amenity for firefighter and trainees, while allowing permanent access to the TW sewer in the unlikely event of maintenance or replacement. Community Context The square format of the site would suggest that all mass is focussed to the north this is informed by the London Borough of Tower Hamlets (LBTH) desire to focus mass to the north west corner, the presence of a sewer to the eastern edge of the site, and the residential amenity issue and lower mass of residential accommodation to the east. We have maximised the use of northlight. Controlled use of east and west apertures has been restricted to overcome residential amenity/overlooking issues and to limit solar exposure/glare concerns. Key
4 Transport General Transport statement will be submitted with the Planning application ccess ehicle egress is proposed to the North of the site onto Cable Street, with return access (and access and egress for non appliance vehicles) via Bewley Street into the yard space at the rear of the site. Pedestrian access for visitors and firefighters is from Cable Steet. Parking Within the yard 5no car parking spaces are provided together with no. ccessible Parking Bays. total of 5no motorcycle spaces together with 5 covered cycle spaces are proposed within the yard and a further 5no proposed to the front of the station adjacent to the reception for visitor use benefiting from easy access by visitors and being overlooked by office spaces and the reception. Proposed Highway Changes The tracking analysis undertaken has demonstrated that all uthority vehicles stated in the IS S briefing document with the exception of the FTU are able to achieve safe access and egress from the site. To allow for the turning circle of the larger uthority vehicles such as the erial Ladder Platform and H P, minor kerb adjustments are required to the eastern side of the junction of Cable Street and Bewley Street as well as the following amendments: New kerbs at the front of the station to define footway and forecourt areas xtension of raised carriageway surface to include Cable Street/Bewley Street junction elocation of on street parking bays on Bewley Street to a new position further south adjacent to the site s side access gate elocation of street lighting where required Bollard removal on Cable Street footway epositioning of the bus stop cage marking on Cable Street further eastwards elocation of the bus shelter to the east of the site with a new shelter with a half width end panel New or extended double yellow line waiting and loading restrictions Site Plan Proposed Highway Changes
5 Ground Floor 4a The building is arranged on three levels with two staircores serving each floor. The main core incorporating stair and a compliant lift, is accessible to public, trainees and firefighters The rear core is designated as a utilitarian staircore for firefighter use only, linking the drill yard and the crew amenities on the second floor. The plan is arranged in a rectangular form with the forecourt fronting Cable Street and a yard, which has been maximised to the south. The main entrance of the station, shared between firefighters, the community engagement users, the public and the outh ctivities trainees is located to the north east corner of the building facing Cable Street. There are three rear entrances into the building on the ground floor one providing access from the ard through to the reception and the other two directly into the ppliance Bay.
6 First Floor 4b The first floor sees the Community ngagement facility (also the Lecture room for the outh ctivity trainees), the Lecture room for the firefighters and the qualities / First id room arranged around the main staircore to the west side of the plan. The First id and qualities room has been located as close as possible to the most accessed public area the Community ngagement facility. This space has direct access to the two WCs and an ccessible WC self contained within a secured boundary. embers of the public and trainees are restricted from accessing the remaining part of this floor. Firefighters are able to access the amenities located on the second floor directly via a secondary utilitarian staircase.
7 Second Floor 4c This floor consists of the Community Fire Safety Office, the ess / Kitchen, the Watch anager and Station anager s office, quiet study, Comms room, Gym and the firefighters amenities. The second floor accommodation is accessible to firefighters only, and has been replanned to accommodate the rest accommodation, lockers, and shower/wc arrangement. The only space accessed by non firefighters is the J Locker rooms which are co located to allow showers to be shared between outh ctivity Trainers and the operational area. There is no public access or access for trainees.
8 Roof Plan The roof plan shows the ecologically rich green roof which is being provided as part of the Sustainable Urban Drainage mounted photovoltaic modules which help to ensure a
9 Sustainability pproach 5 Our proposal for the new Shadwell Community Fire Station is designed to be an exemplar in terms of sustainability. The design of Shadwell station using the ayor s energy hierarchy of being Lean, Green and Clean, is designed to achieve a draft PC rating under the PB initiative and the excellent Carbon Index (CI) rating of 5. This meets the mandatory requirement for B xcellent, will ensure compliance with the future building regulations Part L 00 and the ayor s London Plan. To achieve this exceptional performance, the mayor s energy hierarchy signifies that after providing best practice building fabric performance to reduce energy, low carbon and renewable technologies have been implemented in the form of Combined Heat & Power (CHP) and roof mounted photovoltaic modules. This generation of heat and power for on-site low carbon technology is anticipating a CO reduction exceeding the 0% target. The station is designed to be a naturally ventilated intelligent building, providing a healthy environment for occupants which is comfortable in terms of temperature, odour control, draughts and noise. This avoids rooftop plant, high energy consumption and long term maintenance costs. Our objective is also key to achieving the energy and carbon emissions key to targeting a B Outstanding rating. Where possible B Green Guide rated materials have been selected this is an indication of recyclability, the intensity of usage of primary resources and embodied energy. Terracotta, Cedar timber, and brick are some of these materials. ainwater will be harvested and utilised wherever possible for non-potable purposes for example, rainwater will feed WC cisterns. Natural Ventilation Photovoltaic Panels Green Roof A - Rated Materials: Timber, Brick, Glass, and Terracotta Daylighting has been maximised throughout the project for occupied spaces. n ecologically rich green roof is provided and is part of the SUDS and ecology strategy for the site. BREEAM Pre-Assessment
10 levations and aterials pproach Our concept for the elevations is a series of carefully detailed elements, forming a simple three storey modern building to the main form with the upper floor expressed as a metal and glass clad box floating above a set back lower form, which includes the three ppliance Bays. The base would be clad in a combination of terracotta panels, brick and glass panels. The form and primary elevations are intentionally designed to be sympathetic to their context which is residential accommodation to all four sides. The colours and material palette proposed reflect the largely brick context North levation This is the most important facade of the scheme facing onto Cable Street, and is designed to be highly inviting from the approach from Shadwell DL station, beyond the junction of Cable/Bewley Street. The height of the elevation ties up with the ridge of the properties to Sage Street. The elevation consists of two key forms with a floating predominantly glazed/metal box to second floor set above a carefully recessed base. The base would be clad in a combination of terracotta panels and glass panels. highly glazed reception and community engagement facility sign the entrance position. North levation 5 8 ast levation It is proposed that this elevation is clad in metal cladding and brickwork, with high level glass strip windows designed to respect the amenity of adjoining residential accommodation. low maintenance green wall is also proposed at first floor level screening the wall to the plant area. t ground floor the brick wall proposed would be particularly screened from the adjoining residential premises by soft landscaping to the strip that separates the uthority s property from the Sage Street properties. South levation This elevation faces over the Yard, with a similar treatment to the north elevation. This elevation comprises part screened balcony, glazed areas, metal panel cladding, and a terracotta treatment to low level. To the lower two levels terracotta rainscreen cladding is proposed, at second floor a floating box incorporating copper coloured metal panels reflects the uthority s secondary material palette, with windows that are designed to meet the Gym, ess and est oom uses. The form follows the profile of the first floor to this elevation, expressed over the ppliance Bays. This element is framed with an edge profile cladding system West levation This is the other outward facing elevation fronting onto Bewley Street. It is designed as a metal clad and terracotta clad elevation with high level windows and elements of active frontage intentionally expressed. brick wall is proposed to the immediate east of the building form ast levation Key: Western Red Cedar timber cladding Linear PVF aluminium louvres/brise soleils Terracotta rainscreen cladding Poppy Red Terracotta rainscreen cladding Natural Precast coloured aggregate concrete panels PVF coated RAL 9007 aluminium doors/windows Stainless steel ironmongery Clear glass Clear glass within clerestory windows Obscure/translucent glass in vision levels windows Graded fritted glass in curtain walling Metal gate Brick Copper coloured metal panels Greenwall planting on brick wall PVF aluminium ventilation louvres Glassblock Flag Pole West levation
11 Next Steps 7 F DB CK Share your feedback We would like to hear your thoughts on the design proposals and have produced questionnaires for your feedback on the scheme. Once complete, please leave these with a member of the design team or send to the address at the bottom of the form. lectronic copies of the consultation boards and questionnaire can be downloaded from: The next stage in the process is to review all of your feedback and respond to any queries or concerns you may have in relation to the design proposals. Please provide all comments by rd July 0. fter taking on board your views, it is our intention to submit a planning application towards the end of ugust 0. Once the planning application has been submitted to London Borough of Tower Hamlets you will have a further opportunity to review and comment on the final design proposals at the Council Offices or through their planning website Please post, or call with your comments or queries Property PFI Team London Fire Brigade Union Street - rd Floor London S 0LL mail: PropertyPFI london-fire.gov.uk Tel: Property PFI Team ext: iew from Cable Street West P OG The dates below are intended to give an idea of the timing of key programme milestones: Public consultation event: July 0 eview of community feedback: July 0 Submission of detailed planning application: ugust 0 Construction start on site: September 0 New station available: September 05 iew from Cable Street ast
Oliver House. 51-53 City Road, EC1. Design & Access Statement Addendum Oliver House
51-53 City Road, EC1 01 Introduction 02 Revised Plans 03 Revisions to height & appearance 04 Summary Statement 01 Introduction 01 Introduction This document forms an addendum to the previous Design &
LONDON ROAD SEVENOAKS
WELCOME TO THE BERKELEY HOMES EXHIBITION Train Station Gr anv i ll e Dar tford Road Lo ad Ro nd on ad Ro Eard SITE Th ed riv e ley R oad on R oad A 224 Gord Pem b rok e Roa d Site Location Since the submission
Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY
Committee Date: 23/01/2014 Application Number: 2013/09236/PA Accepted: 16/12/2013 Application Type: Full Planning Target Date: 17/03/2014 Ward: Nechells Palmer Street/Great Barr Street, (former MacDermid
HurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park.
HurlinghamRetailPark Aerial view of site Welcome Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park. Londonewcastle, a specialist residential developer, has been
Design and Access Statement. 141-145 Earls Court Road London SW5 9RH
J U L I A N A R E N D T A S S O C I A T E S 1 7 a P i n d o c k M e w s L i t t l e V e n i c e L o n d o n W 9 2 P Y F + 4 4 2 0 7 2 8 6 9 9 0 1 Design and Access Statement T + 4 4 2 0 7 2 8 6 9 9 9 1
Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants
Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder
KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156
APPENDIX C KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005 YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 REPORT BY HEAD OF PLANNING AND DEVELOPMENT SUMMARY
K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends
Melbourne Survey T 9869 0813 F 9869 0901
Melbourne Survey T 9869 081 F 9869 0901 COPERNICUS CIRCUIT SEE SHEET CENTRAL PARKWAY 5019 508 SEE SHEET 50 SEE SHEET 4 HARVARD STREET STANFORD STREET Melbourne Survey T 9869 081 F 9869 0901 No.1 5 57 No.
ACCESS AUDIT OF WESTPORT HOUSE
ACCESS AUDIT OF WESTPORT HOUSE Large sign on the highway to indicate the entrance to Purbeck District Council Large and wide entrance Entrance showing sign for opening times Entrance sign Main entrance
Kings Road, Beith. Development Brief. Part 1: Site Specific Information
Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular
DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf
DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf Discovery Hall reflects its dynamic program and dramatic site, as well as the collaborative and student-centered spirit of
K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
Glossop Design & Place Making Strategy
Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance
Designing Out Crime Assessment
Designing Out Crime Assessment New Flats (Affordable Housing) Yew Tree Road Moreton Wirral CH46 8UA Construction of flats complex. For Bernard Taylor Partnership Ltd [email protected] Tel 0161 443
Department for Communities and Local Government
Department for Communities and Local Government Permitted development for householders Technical Guidance April 2014 Department for Communities and Local Government Please note: This technical guidance
Design Essentials. Stockland Residential Communities 1 st January 2014
Design Essentials Stockland Residential Communities 1 st January 2014 WELCOME TO THE DESIGN ESSENTIALS The Design Essentials form part of your Contract of Sale and assist when designing your home and landscape.
4 Alternatives and Design Evolution
4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that
Householder Applications: Supplementary Planning Guidance GENERAL POINTS
Householder Applications: Supplementary Planning Guidance Environment Committee: 28 January 2004 Chief Planning Officer Town Hall The Parade Epsom Surrey KT18 5BY tel 01372 732000 web www.epsom-ewell.gov.uk
Introduction. Welcome. 358-364 London Road, Mitcham
Introduction View from the southern junction of London Road and Cricket Green Welcome Thank you for attending our public exhibition and viewing the latest proposals for 358-364 London Road. As you may
21 Plumbers Row, London, E1 1EQ
Committee: Development Date: 19 th October 2011 Classification: Unrestricted Agenda Item No: Report of: Corporate Director of Development and Renewal Case Officer: Shahara Ali-Hempstead Title: Planning
28.0 Development Permit Area #2 (Neighbourhood District)
28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character
Sergison Bates architects. 90 Masterplan for landscape and urban housing, Newham, London
90 Masterplan for landscape and urban housing, Newham, London 1 Client Barratt East London / London Development Agency Project duration: 005-1 Contract value: 10 million Gross internal area: 71,000m Housing
part 9 waste management
part 9 waste management 30m Hammerhead T-form 22m 21m Hammerhead Y-form 30m 18m Forward Side-Turn 25m 15m Reverse Side-Turn 30m Above: Recommended turning circles for waste collection vehicles 9 WASTE
Development Layout Design
Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose
Site Layout & Traffic Plan
Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley
Green House, Hungary
Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support [email protected] Green House, Hungary Case Study 109 Aspects of Sustainability This project
WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.
WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas
R&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction
Building Engineer UK Registration Board n.075077h Design and Access Statement for Application for Planning Permission for demolition of a garage and construction of an extension to an existing Victorian
WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS
WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS CONTENTS Page 1 Introduction 2 2 Planning Applications 3 3 Internal Segregation of Waste 3 4 Housing Developments 4 5 Apartment Developments 5-6
DESIGN AND ACCESS STATEMENT PLANNING APPLICATION. 25 Gilston Road, SW10 9SJ June 2015
DESIGN AND ACCESS STATEMENT PLANNING APPLICATION 25 Gilston Road, SW10 9SJ June 2015 CONTENTS 1.0 INTRODUCTION 2.0 SITE & CONTEXT 2.1 SITE CONTEXT 2.2 CONSERVATION AREA 3.0 BACKGROUND 3.1 RELEVANT PLANNING
1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.
1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises
50 St Mary Axe London EC3
50 St Mary Axe London EC3 Letting specification 1.Structure and Envelope The main superstructure comprises of a braced steel fame (app 7m span / 90min fire rated) and the elevations are formed from a series
GD 04. Waste Storage and Collection Guidance for New Developments. Version: 2.00
GD 04 Waste Storage and Collection Guidance for New Developments Version: 2.00 Citywide Support Environmental Protection September 2014 SCOPE AND PURPOSE: Scope of this Guidance: This guidance contains
Mount Pleasant Sorting Office
Mount Pleasant Sorting Office LBI References: P2013/1423/FUL P2013/1425/CAC LBC Reference: 2013/3807/P GLA Reference: D&P/3032a&b/02 Update - Topics Scheme proposal Summary of key resident objections Mayoral
West London Volkswagen, Capital Interchange Way, Brentford, TW8 0EX
ISLEWORTH AND BRENTFORD AREA COMMITTEE (PLANNING) 24 May 2012 Tim Goodall e-mail: [email protected] References: P/2012/0601 01508/B/P11 Address: Ward: Proposal: Drawing numbers: West London Volkswagen,
Access onto roof from Center Block
2 2 Tap 4 Tank 3 3 4 5 5 6 4 1 Services PV panels Forth floor structure (later additions) Rooflights Access / Walkways Access onto roof from Center Block muf architecture/art LLP 4.3 Roof alterations and
81-91 COMMERCIAL ROAD, LONDON E1 1RD OFFICES TO LET 81-91 COMMERCIAL ROAD, LONDON E1 1RD. 3,499 ft² (325 m²) 37,222 ft² (3,458 m²)
8-9 COMMERCIAL ROAD, LONDON E RD S TO LET 3,499 ft² (325 m²) 37,222 ft² (3,458 m²) 8-9 COMMERCIAL ROAD, LONDON E RD LOCATION The premises are located on the north side of Commercial Road at the junction
GENERAL + MEANS OF ESCAPE (Part One) By Mdm Eng Yew Hoon (SIA)
GENERAL + MEANS OF ESCAPE (Part One) By Mdm Eng Yew Hoon (SIA) Chapter 1 : Definitions clause 1.2.10 : circulation space OLD CLAUSE A space mainly used as means of access between a room or protected shaft
New Fox Farm Watchfield, Highbridge, Somerset
New Fox Farm Watchfield, Highbridge, Somerset New Fox Farm, Watchfield, Highbridge, Somerset, This 6 bedroom extended former farmhouse (requiring some finishing and 2nd fix works) offers spacious and flexible
The Zig Zag Building Victoria Street, London, SW1
The Zig Zag Building Victoria Street, London, SW1 The Zig Zag Building Victoria Street, London, SW1 Client: Land Securities Scope: Lead Design Architectural Services (CMT & Novated) Type: Offices, Retail,
Welcome & background. www.theperfumefactory.info
Welcome & background Essential Living welcomes you to this community involvement event introducing the proposed redevelopment of The Perfume Factory, North Acton. EXISTING SITE PLAN AERIAL VIEW OF SITE
STATEMENT OF ENVIRONMENTAL EFFECTS AND NOTES IN SUPPORT OF DEVELOPMENT APPLICATION
CITY COUNCIL PROPOSED NEW RESIDENCE AT LOT XX, DP:55555 XXX Anon Drive, Somewhere FOR X. & Y Anonymous STATEMENT OF ENVIRONMENTAL EFFECTS AND NOTES IN SUPPORT OF DEVELOPMENT APPLICATION Angela Elliss Design
redland house, bristol - public consultation exhibition
Preliminary proposals for a new office building on Simplyhealth Stoford Redland Hill Simplyhealth propose to build a new office building on Redland Hill to expand the company and its existing links with
Archant London Environmental Awards
Archant London Environmental Awards Environmental Business of the Year Big Yellow Self Storage PLC Barking Central, Hertford Road, Barking, IG11 8BL Introduction Big Yellow is a local business that has
BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust
BREEAM Refurbishment and Fit-out 2014 Briefings Part of the BRE Trust BREEAM for Refurbishment and Fit-out Follows 2 years of development Draft scheme published and consultation from 19 th July 2014 Launched
HHHHH Outstanding 85%
Provinciehuis_Assessment_2040204_74,32%Final Score and Rating BREEAM Scheme: Europe 2009: Offices H Pass 30% Building Name: Provinciehuis Antwerpen HH Good 45% BREEAM Registration No.: BREEAM-0048-4626
Version Decision Number Adoption Date History 1 20\2501 23/02/10 Adopted 2 3 4
Title: Waste Management Policy No: 054 Adopted By: Council Next Review Date: 23/02/2014 Responsibility: General Manager Infrastructure Document Number: 2118629 Version Decision Number Adoption Date History
Household waste & recycling storage requirements
South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well
Shaping Whanganui. Have your say, korero mai
Shaping Whanganui Have your say, korero mai Outer Commercial Design Guidelines Discussion Document Background The Outer Commercial zone of the District Plan sits on the outside of the central shopping
DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines
DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the
Refuse & Recycling Storage Design Guide
Refuse & Recycling Storage Design Guide July 2013 Good design and effective management are key to delivering successful refuse storage. Contents Section Page Introduction 2 1. Wheelie Bins 3 2. External
Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road.
WELCOME Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road. The site covers approximately 0.37 hectares and
www.thefurlongphase2.co.uk
Welcome Thank you for coming along today to view our plans for Phase 2 of The Furlong Shopping Centre. We are undertaking a consultation programme that will run up to and beyond submission of the planning
WELCOME TO OUR EXHIBITION
WELCOME TO OUR EXHIBITION The purpose of the exhibition is to provide you with the opportunity to view our proposals and give feedback prior to the submission of a planning application to the London Borough
THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST
THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST THE LEONARDO BUILDING - Designed to meet BREEAM Excellent 2011 & EPC B Rating GATWICK AIRPORT proposed
Richmond upon Thames College. Draft Planning Brief. May 2008
Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of
Developer Guidance Note: Provision of Waste and Recycling Collection and Storage Facilities
NEWCASTLE CITY COUNCIL Developer Guidance Note: Provision of Waste and Recycling Collection and Storage Facilities This document addresses: 1. Refuse and recycling storage for residential developments
GREENACRE OFF GORING ROAD F CRAYS POND F OXFORDSHIRE
GREENACRE OFF GORING ROAD F CRAYS POND F OXFORDSHIRE GREENACRE OFF GORING ROAD F CRAYS POND F OXFORDSHIRE Woodcote - 1 mile F Reading - 6 miles F Pangbourne on Thames - 3 miles F Oxford - 21 miles F Henley
Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)
Waste Management GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012) 1. Introduction The aim of this guide is to inform developers of
VEHICLE CROSSOVER INFORMATION PACK
VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)
How To Build A Luxury Apartment Complex In London
Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking
Blackhorse Lane Croydon Surrey CR0 375,000
Blackhorse Lane Croydon Surrey CR0 375,000 Character Features Extended Kitchen/Diner Three Double Bedrooms Secluded Private Rear Garden Fully Integrated Kitchen Double Glazed Further Scope To Extend S.T.P.C.
Development Management Officer Report Committee Application. Summary
Development Management Officer Report Committee Application Summary Committee Meeting Date: 15 Dec 2015 Item Number: Application ID: Z/2014/0978/F Target Date: 31 st October 2014 Proposal: Single storey
HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015. May 2015
HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015 May 2015 MAYOR OF LONDON Housing Standards: Transition Policy Statement. On 25 March 2015 through a written ministerial statement,
Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:
Electricity Thank you for considering for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information for your application
Home Office, Home Occupation and Home Business
, Home Occupation and Home Business Introduction This fact sheet provides summary information on requirements for, Home Occupation and Home Business proposals. It is not a definitive document but provides
IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF
IALN11006400 /05 01 19.06.13 FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF Dear Sir / Madam Re: 12/02994 BCA Sports Hall Condition
Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.
P/2010/1404/MPA St Marychurch Ward Former G A Insurance Buildng, Greenway Road/St Marychurch Road, St Marychurch Torquay Demolition of former G A building; formation of up to 7 retail units for purposes
13 Oakleigh Gardens London N20 9AB
Location 13 Oakleigh Gardens London N20 9AB Reference: 15/00608/HSE Received: 2nd February 2015 Accepted: 2nd February 2015 Ward: Oakleigh Expiry 30th March 2015 Applicant: Mr A Peqini Proposal: Single
BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010
Building Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010 Page 1 of 6 PURPOSE: This Guidance
Engineering Standard
Public Transport Services Engineering Standard Stations - Bicycle Facilities PART 129013 AR-PW-PM-SPE-00129013 (D073) Document Control Document Status Document Amendment Record Revision Change Description
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention
Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
Green and Sustainable Buildings
Green and Sustainable Buildings Design Criteria and Application in Hong Kong Green building is the practice of increasing the efficiency with which buildings use resources energy, water and materials.
MILTON HALL BCO AWARDS 2014 THE WORKSPACE CONSULTANTS LLP
MILTON HALL BCO AWARDS 2014 EXTERNAL ELEVATIONS MILTON HALL THE EAST WING THE LINK BUILDING NORTH - WEST ELEVATION (1:200@A3) MILTON HALL THE LINK BUILDING THE NORTH WING SOUTH - EAST ELEVATION (1:200@A3)
ENVIRONMENTAL HEALTH PROFESSIONAL PRACTICE VOL II CHAPTER III. HOUSES IN MULTIPLE OCCUPATION Space Standards
ENVIRONMENTAL HEALTH PROFESSIONAL PRACTICE VOL II CHAPTER III HOUSES IN MULTIPLE OCCUPATION Space Standards ADOPTED HOUSING STANDARDS:CATEGORY F HOUSES Houses within this category would be of a low priority
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
REAL ESTATE DESCRIPTION
REAL ESTATE DESCRIPTION #51 SZIGETVÁR JÓZSEF ATTILA U. 27-31. Id. No.: 592 The Property Appraised Neighborhood Description The subject property is located in the center of the settlement of Szigetvár,
LONDON BOROUGH OF BRENT. Waste and Recycling Storage and Collection Guidance for Residential Properties
LONDON BOROUGH OF BRENT Waste and Recycling Storage and Collection Guidance for Residential Properties Version no 2-2013 1. Introduction... 3 1.1. Code for Sustainable Homes... 3 1.2. Developer requirements...
TO LET. 1 st FLOOR OFFICE SUITE. 204m_ (2,200 Sq Ft) KINGS COURT LEYLAND LOCATION
TO LET 1 st FLOOR OFFICE SUITE 204m_ (2,200 Sq Ft) KINGS COURT LEYLAND LOCATION Leyland benefits from excellent transport links, with junction 28 of the M6 Motorway within 1 mile of the premises and the
Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations
16.20.110 - Industrial Suburban District ( IS ) Figure REFERENCE Typical Buildings in the IS District Figure REFERENCE Site Plan of a typical development in the IS District Sections: 16.20.110.1 Composition
Development Management Report
Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: [email protected] Tel: 01743 252665 Fax:
Advice Series. the maintenance and repair of historic buildings
Advice Series the maintenance and repair of historic buildings Jacqui Donnelly - Architectural Conservation Advisor, Department of the Environment, Heritage & Local Government Current publications in the
Appendix 6 Storage and Collection of Waste and Recycling
Appendix 6 Storage and Collection of Waste and Recycling Appendix 6 Storage and Collection of Waste and Recycling September 2008 (Version 2) 1 Appendix 6 Appendix 6 Design and Sustainability SPD Storage
DESIGN GUIDANCE NOTE: 11 PORCHES
DESIGN GUIDANCE NOTE: 11 PORCHES 1. INTRODUCTION This guidance note is one of a series giving advice on various types of development within Barnet. It advises on designing porch extensions including canopies.
House Code. House Code
1 Application This Code will apply in assessing material change of use and/or building work for a house. 2 Using this Code In using this Code reference should also be made to Section 1.1 How to use the
Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra
Supplementary Guidance Stiùireadh Leasachail Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra March 2013 Managing Waste in New Developments Supplementary Guidance Contents
89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto
89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit
Replacement Windows and Doors
Replacement Windows and Doors Short Policy Guide: Need for Planning Permission and Listed Building Consent For Replacement Windows and Doors Produced by City Development Department, Dundee City Council,
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area
FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request
FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box