1 TECHNICAL BRIEFING SHEET NRG Texas Power LLC Permit No.: HAP-14 PROJECT DESCRIPTION: NRG Texas Power LLC (NRG Texas) has requested a Hazardous Air Pollutant (HAP) Major Source [FCAA 112(g)] Permit HAP-14, which would establish Case-By-Case Maximum Achievable Control Technology (MACT) requirements for the Limestone Electric Generating Station (LMS) - Unit 3 Boiler (LMS3) and auxiliary boiler (AUX) located approximately 9 miles north of Jewett, Texas on FM 39, Jewett, Limestone County, Texas. These new boilers are also subject to State Air Quality and federal Prevention of Significant Deterioration (PSD) preconstruction permitting requirements. The TCEQ has prepared draft State Air Quality Permit and PSD Air Quality Permit PSD-TX-1072, which establishes additional conditions under which the proposed facility must operate. A pending contested case hearing for permits and PSD-TX-1072 has been abated for this HAP review. LMS3 is an 800 MW boiler firing sub-bituminous coal, petroleum coke, or bituminous coal with a maximum heat input rate of 8,000 MMBtu/hr at their Limestone Electric Generating Station which has two existing solid fuel fired boilers. LMS3 will fire either 100 percent sub-bituminous coal, or a nominal blend (by weight) of 20% petroleum coke with 80% sub-bituminous, or a 40% bituminous coal with 60% sub-bituminous coal blend MACT Case-by-Case Review: NRG recognizes that the vacatur of the Clean Air Mercury Rule, along with the absence of a source category MACT standard for the proposed PC boiler, and the vacatur of the Industrial Boiler MACT (40 CFR 63 Subpart DDDDD) that applied to the auxiliary boiler necessitates the need for NRG to accomplish a case-by-case MACT analysis. NRG has provided a Clean Air Act Section 112(g) case by-case MACT analysis for LMS3 and a Section 112(j) case-by-case MACT analysis for AUX. Permit HAP-14 establishes federally enforceable MACT emission limitations for carbon monoxide [(CO) as a surrogate for organic hazardous air pollutants (HAPs)], filterable particulate matter [(PM) as a surrogate for non-mercury HAP metals], hydrogen fluoride (HF), hydrogen chloride (HCl), and mercury (Hg) for LMS3. The analysis by NRG Texas confirms that the control technologies and emissions limits proposed by NRG Texas in its June 2006 state PSD permit application for the PC Boiler meet case-by-case MACT requirements, with the exception that slightly reduced emissions limits for mercury, HF, and filterable PM are indicated due to recent emissions compliance demonstrations at similar sources. Had a case-by-case MACT analysis been an applicable requirement when the 2006 state/psd application was submitted, the emission limits proposed as BACT to the TCEQ for mercury and other hazardous air pollutants would have satisfied that requirement. The Hg emission limit of lb/gwh was reduced to the MACT floor determined to be lb/gwh when firing subbituminous coal and lb/gwh when firing only bituminous coal. Filterable PM emission limit was lowered to lb/mmbtu. The HCI emission limit remains lb/mmbtu. The HF emission limit was lowered to lb/mmbtu. CO as a surrogate for organic HAPS remains 0.15 lb/mmbtu. This permit also establishes federally enforceable MACT emission limitations for CO as a surrogate for organic HAPs and filterable PM as a surrogate for non-mercury HAP metals for AUX. MACT for HAPs is the use of good combustion practices and the use of natural gas as the fuel. CO is a surrogate for organic HAPs and was lowered to 0.04 lb/mmbtu. ADDITIONAL IMPACTS: The impact on air quality resulting from any commercial or industrial growth associated with Permit HAP-14 were accounted for the review of Draft Permit Nos and PSD-TX CONCLUSION: The Executive Director has made a preliminary decision to issue this permit.

2 SPECIAL CONDITIONS MAXIMUM ACHIEVABLE CONTROL TECHNOLOGY (MACT) APPROVAL 1. This case-by-case MACT permit (HAP-14) establishes federally enforceable MACT emission limitations for carbon monoxide (CO) (CO is a surrogate for organic hazardous air pollutants [HAPs]), filterable particulate matter (PM) (filterable PM is a surrogate for non-mercury HAP metals), hydrogen fluoride (HF), hydrogen chloride (HCl), and mercury (Hg) for the Limestone 3 Pulverized Coal Boiler (LMS3). This permit also establishes federally enforceable MACT emission limitations for CO (CO is a surrogate for organic HAPs) and filterable PM (filterable PM is a surrogate for non-mercury HAP metals) for the natural gas-fired auxiliary boiler (AUX). 2. Emission limits are based upon representations in the case-by-case MACT permit application dated May 12, 2008 and subsequent updates. 3. These facilities shall comply with all applicable requirements of Title 30 Texas Administrative Code (30 TAC) Chapter 113, 30 TAC Chapter 116, and the U.S. Environmental Protection Agency (EPA) regulations on National Emission Standards for Hazardous Air Pollutants for Source Categories in Title 40 Code of Federal Regulations Part 63 (40 CFR Part 63), promulgated for: A. Applicable General Provisions, Subpart A. B. Clean Air Act Section 112(g) case-by-case MACT determination for the PC Boiler (EPN LMS3) and a Section 112(j) case-by-case MACT determination for the Auxiliary Boiler (EPN AUX). 4. If any condition of this case-by-case MACT permit, HAP-14, conflicts with a condition of Permit and PSD-TX-1072 or any other authorization for the facilities covered by permit HAP-14, the most stringent permit condition shall govern. FUEL SPECIFICATIONS, OPERATING LIMITATIONS, PERFORMANCE STANDARDS, AND CONSTRUCTION SPECIFICATIONS 5. Fuel fired in the Unit 3 Boiler, EPN LMS3, shall be limited to a maximum heat input of 8,000 million British thermal units per hour (MMBtu/hr), averaged over a 30-day period, based on the higher heating value (HHV) of the fuel and the fuel fired shall be limited to:

3 SPECIAL CONDITIONS Page 2 A. Sub bituminous coal, bituminous coal and petroleum coke. The maximum bituminous coal/subbituminous coal blend could be up to 40 percent/60 percent by weight respectively and the petroleum coke/subbituminous coal blend could be up to 20 percent/80 percent by weight, respectively. B. Pipeline-quality natural gas. C. Use of any other fuel will require prior approval from the permitting authority. D. Upon request by the Executive Director of the Texas Commission on Environmental Quality (TCEQ) or any air pollution control program having jurisdiction, the holder of this permit shall provide a sample and/or an analysis of the fuel fired in the PC Boiler or shall allow air pollution control agency representatives to obtain a sample for analysis. 6. Emissions from the Limestone Unit 3 Utility Boiler exhausting through EPN LMS3 shall not exceed the performance standards identified in the table below. The performance standards of this permit condition shall apply at all times, except during periods of planned start-up and shutdown. During periods of planned start-up and shutdown, the holder of this permit shall not exceed the hourly mass emission limits in the maximum allowable emission rates table (MAERT), and the holder of the permit shall operate the Limestone Unit 3 Utility Boiler and associated air pollution control equipment in accordance with good air pollution control practices to minimize emissions. The permit holder shall retain records of planned start-up and shutdown periods in which the emission specifications identified below are exceeded and shall identify all measures taken to mitigate emissions. Initial compliance with the performance standards of this special condition shall be demonstrated in the initial determination of compliance stack sampling utilizing EPA Reference Method testing and shall be determined based upon the average of three stack sampling test runs. Continuous compliance thereafter shall be either via Continuous Monitoring Systems (CMS) for the pollutants monitored by CMS or via stack sampling described by Special Condition No. 11. Compliance with the HAP emission limits for non-mercury HAP metals and organic HAPs shall be demonstrated by using the surrogate s filterable particulate matter (PM) for non-mercury HAP metals and CO for organic HAPs. The averaging periods identified in Table A below shall be the basis for continuous compliance.

4 SPECIAL CONDITIONS Page 3 A. Standards demonstrated by Continuous Monitoring Systems (CMS) Pollutant 1 Performance Standard Compliance Averaging Period CO 0.15 lb/mmbtu 2 30-day rolling Hg to lb/gwh* 12-month rolling * When firing subbituminous coal, or a blend of subbituminous coal and petroleum coke, an output-based emission limit of lb/gwh, based on a monthly rolling 12-month average. When firing a blend that includes both subbituminous coal and bituminous coal, a weighted, output-based emission limit, based on a monthly rolling 12-month average, computed as follows: Where: EL b = Total allowable Hg in lb/gwh that can be emitted to the atmosphere during any12-month period when a blend of fuels was burned. EL i = Hg emissions limit for the subcategory i (coal rank), lb/gwh for subbituminous coal and petroleum coke and lb/gwh for bituminous coal; HH i = GWh contributed by the corresponding subcategory i (coal rank) burned during the compliance period; and n = Number of subcategories (coal ranks) being averaged. During 12-month periods when a blend of fuels including bituminous coal is burned, the applicable Hg emission limit will vary with the amount of bituminous coal. For example, if a 60/40 blend of subbituminous and bituminous coals is burned, the Hg emission limit will be lb/gwh; for an 80/20 blend, the limit will be lb/gwh.

5 SPECIAL CONDITIONS Page 4 B. Standards demonstrated by Reference Method 3 (RM) testing Pollutant 1 PM (front-half catch) Performance Standard (lb/mmbtu) annual HCl annual HF annual Compliance Demonstration Period Notes: PM - particulate matter CO - carbon monoxide Hg - mercury HF - hydrogen fluoride HCl - hydrogen chloride lb/mmbtu - pounds of emissions per million Btu of heat input. Heat input is based on fuel HHV. RM - EPA Reference Methods, based on the average of three stack sampling runs to be conducted as prescribed by Special Condition No The holder of this permit shall operate the boilers and associated air pollution control equipment in accordance with good air pollution control practices to minimize emissions during start-up and shutdown, by operating in accordance with a written start-up and shutdown plan. The plan shall include detailed procedures for review of relevant operating parameters of the boilers and associated air pollution control equipment during start-up and shutdown to make adjustments and corrections to reduce or eliminate any excess emissions. The plan shall also address readily foreseeable start-up scenarios, including hot start-ups, when the operation of the boiler is only temporarily interrupted, and provide for appropriate review of the operational condition of the boilers before initiating start-up. 8. The 155 MMBtu/hr Auxiliary Boiler (EPN AUX) shall meet the following specifications: A. Emissions of CO shall not exceed 0.04 lb/mmbtu, averaged over 3 hours of operation except during start-up and shutdown. B. Emissions of filterable PM shall not exceed lb/mmbtu, averaged over 3 hours of operation except during start-up and shutdown. C. Fuel shall be limited to pipeline quality natural gas. D. Operation of the auxiliary boiler shall be limited to a maximum annual heat input of 135,780 MMBtu/yr, which is the equivalent of a 10 percent annual capacity factor.

6 SPECIAL CONDITIONS Page 5 9. Stack sampling ports and platform(s) as specified in the attachment entitled AChapter 2, Stack Sampling Facilities,@ or an alternate design may be required at a later date if determined necessary by the TCEQ Regional Director or the TCEQ Austin Compliance Support Division. INITIAL DEMONSTRATION OF COMPLIANCE 10. The holder of this permit shall perform initial stack sampling and other testing to establish the actual quantities of air contaminants being emitted into the atmosphere. Unless otherwise specified in this special condition, the sampling and testing shall be conducted in accordance with the methods and procedures specified in Special Condition No. 11. The holder of this permit is responsible for providing sampling and testing facilities and conducting the sampling and testing operations at his expense. The TCEQ Executive Director or his designated representative shall be afforded the opportunity to observe all such sampling. A. For the PC Boiler, EPN LMS3: (1) Demonstrate compliance with the performance standards of Special Condition No. 6 and the hourly emission rates of the MAERT, using the average of three one-hour stack sampling test runs for each contaminant. (2) Air contaminants to be sampled and analyzed include: CO, HCl, HF, filterable PM, and Hg. Diluents to be measured include O 2 or carbon dioxide (CO 2 ). (3) Boiler load during testing shall be maintained as follows. a. Operate at maximum firing rates for the atmospheric conditions occurring during the test as measured by millions of pounds of steam generated per hour or MW of electric generator output. If the steam generating unit is unable to operate at maximum rates during testing, then additional stack testing may be required when higher production rates are achieved. b. During 30-day average emission testing, the boiler load does not have to be at maximum, but the load must be representative of future operating conditions and must include at least one 24-hour period at full load. If the steam generating unit is unable to operate at maximum rates during testing, then additional stack testing may be required when higher production rates are achieved.

7 SPECIAL CONDITIONS Page 6 B. For the Auxiliary Boiler (EPN AUX) demonstrate compliance with the CO and filterable PM performance standards of Special Condition No. 8 using the average of three one-hour stack sampling test runs for each contaminant. C. Requests to waive testing for any pollutant specified in this condition shall be submitted to the TCEQ Office of Permitting, Remediation, and Registration, Air Permits Division. Test waivers and alternate or equivalent procedure proposals for New Source Performance Standards testing which must have EPA approval shall be submitted to the TCEQ Field Operations Support Division, MC-174. D. Sampling as required by this condition shall occur within 60 days after achieving the maximum fuel firing rate at which the PC Boiler will be operated but no later than 180 days after initial start-up. The first boiler operating day of 30-day average initial performance testing required by 40 CFR 60.48Da(f) must commence within this time. TEST METHODS AND PROCEDURES 11. Sampling Methods Required and Pre-test meeting requirements: A. Sampling shall be conducted in accordance with the appropriate procedures of the TCEQ Sampling Procedures Manual, EPA Methods in 40 CFR Part 60, Appendix A and 40 CFR Part 51, Appendix M, EPA Conditional Test Methods, and American Society for Testing and Materials (ASTM) as follows: (1) Appendix A, Methods 1 through 4, as appropriate, for exhaust flow, diluent, and moisture concentration; (2) Appendix A, Method 5 or 17, for the filterable concentration of PM (front-half catch); (3) Appendix A, Method 10 for the concentration of CO; (4) Appendix A, Method 19, for applicable calculation methods; (5) Appendix A, Method 26 or 26A for HCl and HF; (6) Appendix M, Methods 201A or Appendix A, Reference Method 5, for the filterable concentration of particulate matter less than 10 microns in diameter, PM 10 (front-half catch);

8 SPECIAL CONDITIONS Page 7 (7) ASTM D , Standard Test Method for Elemental, Oxidized, Particle-Bound, and Total Mercury in Flue Gas Generated from Coal-Fired Stationary Sources (also known as the Ontario Hydro Method), or other approved EPA methods. (8) Any deviations from those procedures must be approved by the Executive Director of the TCEQ prior to sampling. B. The TCEQ Waco Regional Office shall be given notice as soon as testing is scheduled but not less than 30 days prior to sampling to schedule a pretest meeting. (1) The notice shall include: (a) (b) (c) (d) (e) Date for pretest meeting. Date sampling will occur. Name of firm conducting sampling. Type of sampling equipment to be used. Method or procedure to be used in sampling. (2) The purpose of the pretest meeting is to review the necessary sampling and testing procedures, to provide the proper data forms for recording pertinent data, and to review the format procedures for submitting the test reports. The permit holder shall present at the pretest meeting the manner in which stack sampling will be executed in order to demonstrate compliance with emission standards found in this permit. (3) Prior to the pretest meeting, a written proposed description of any deviation from sampling procedures specified in permit conditions or TCEQ, EPA or ASTM sampling procedures shall be made available to the TCEQ. The TCEQ Regional Director or the TCEQ Field Operations Support Division, MC-174 shall approve or disapprove of any deviation from specified sampling procedures. C. Information in the initial test report for the PC boiler, EPN LMS3, shall include the following data for each test run: (1) hourly coal and petroleum coke firing rate (in tons); (2) average coal and petroleum coke Btu/lb as-received and dry weight; (3) average steam generation rate in millions of pounds per hour;

9 SPECIAL CONDITIONS Page 8 (4) average generator output in MW; (5) control device operating rates, including SCR reagent injection and solids injection rates (fresh lime, recycle lime/ash); (6) emissions in the units of the limits of this permit, lb/hr and lb/mmbtu, three-hour or 30-day average, as appropriate; and (7) any additional records deemed necessary during the stack sampling pre-test meeting. D. Three copies of the final sampling report shall be forwarded to the TCEQ within 60 days after sampling is completed. Sampling reports shall comply with the attached conditions of Chapter 14 of the TCEQ Sampling Procedures Manual. The reports shall be distributed as follows: One copy to the TCEQ Waco Regional Office. One copy to EPA Region 6 Office, Dallas. One copy to the TCEQ Austin Office of Permitting, Remediation, and Registration, Air Permits Division. CONTINUOUS DEMONSTRATION OF COMPLIANCE 12. The holder of this permit shall install, calibrate, maintain, and operate a continuous emission monitoring system (CEMS) to measure and record the concentrations of CO from EPN LMS3. Diluents to be measured include O 2 or CO 2. The CEMS data shall be used to determine continuous compliance with the CO, emission limitations in Special Condition No. 6 and the attached MAERT. 13. The holder of this permit shall install, calibrate, operate, and maintain a CEMS to measure and record the concentration of mercury from EPN LMS3, unless another means of compliance is prescribed by federal rules. The CEMS data (or data from other means prescribed by federal rules) shall be used to demonstrate continuous compliance with the emission limitations of Special Condition No. 6 and the MAERT 14. If any emission monitor fails to meet specified performance, it shall be repaired or replaced as soon as reasonably possible.

10 SPECIAL CONDITIONS Page After the initial demonstration of compliance, on-going stack sampling of EPN LMS3 for HCl, HF, and filterable PM shall be used to demonstrate ongoing compliance and shall meet the following specifications: A. Stack sampling shall be performed once annually during periods of normal operation, except as follows: (1) If the annual test does not establish compliance with a performance standard of Special Condition No. 6, the holder of this permit may conduct additional tests during the year to be averaged with the previous test(s) to demonstrate compliance; or (2) If, after two years of stack sampling, the average of the two annual stack sampling results for a pollutant is less than 70 percent of the applicable performance standard identified in Special Condition No. 6, then compliance stack sampling for such pollutant may be conducted once every three years. B. Sampling required in this special condition shall demonstrate compliance with the performance standards of Special Condition No. 6. C. Sampling required in this special condition shall be conducted in accordance with the methods, procedures, and notification protocol specified in Special Condition No. 11. D. Ongoing compliance with the HF, HCl, and filterable PM tons-per-year emission rates in the MAERT shall be demonstrated by calculating rolling 12-month annual emissions from emission factors (lb/mmbtu, HHV) obtained from the sampling required in this condition and the monthly total heat input (MMBtu, HHV) from coal and petroleum coke. E. To demonstrate proper operation of the baghouse, pressure drop shall be monitored and recorded. 16. Compliance with the applicable filterable PM and CO emission limits for the PC Boiler (EPN LMS3) will be demonstrated as follows for periods of start-up and shutdown: A. Compliance with the filterable PM emission rates in Special Condition No. 6 will be demonstrated, when firing solid fuels, if the recorded pressure drop across the baghouse meets manufacturer guidelines for proper operation during start-up and shutdown.

11 SPECIAL CONDITIONS Page 10 B. Compliance with the CO emission rate in the MAERT applicable during start-up and shutdown will be demonstrated if the CO emissions during start-up and shutdown are in compliance with the CO emission rate in the MAERT for planned start-up and shutdown. 17. Following the initial demonstration of compliance, ongoing compliance with the emission limits shall be through source operation in accordance with manufacturer s specifications, or in accordance with written procedures that are shown to maintain operating conditions necessary for emission compliance. The Executive Director of the TCEQ or his designated representative may also require direct measurement of emissions using the sampling methods and procedures specified in Special Condition No. 11 to establish compliance with the limitations, in which case the sampled emission rate will be used to determine compliance. RECORDKEEPING REQUIREMENTS 18. The following records shall be kept at the plant for the life of the permit. All records required in this permit shall be made available at the request of personnel from the TCEQ, the EPA, or any air pollution control agency with jurisdiction. A. A copy of this permit. B. Permit application dated May, 12, 2008 and subsequent updates submitted to the TCEQ. C. A complete copy of the testing reports and records of the initial performance testing completed pursuant to Special Condition No. 10 to demonstrate initial compliance. 19. Records shall be kept for a minimum of five years after collection and shall be made immediately available upon request to representatives of the TCEQ, the EPA, or any local air pollution control program having jurisdiction. The most recent two years shall be maintained on-site and shall be available for inspection. The remaining three years of records may be maintained off site. Records shall be legible and maintained in an orderly manner. The following records shall be maintained:

12 SPECIAL CONDITIONS Page 11 A. Continuous monitoring data for CO, Hg and diluent gases, O 2 or CO 2, from CEMS to demonstrate compliance with the emission rates listed in the MAERT and performance standards listed in Special Condition No. 6 for pollutants that are monitored by CMS. Records should identify the times when emissions data have been excluded from the calculation of average emission rates because of planned start-up and shutdown periods along with the justification for excluding data. The CEMS data retention at intervals less than one hour is not required. The permit holder shall retain additional records of planned start-up and shutdown periods in which the emission specifications identified in Special Condition No. 6 are exceeded and shall identify all measures taken to mitigate emissions. All records should also identify factors used in calculations that are used to demonstrate compliance with emissions limits and performance standards. B. Files of all CMS quality assurance measures, calibration checks, adjustments and maintenance performed on these systems. C. Steam turbine generator hourly gross electrical output in MW, including identification of shutdown intervals, for compliance with output based performance specifications of this permit. D. Average coal and petroleum coke feed rate to the PC Boiler in tons per hour and the corresponding average heat input (HHV) in MMBtu/hr, based upon an average over each calendar month. E. Hourly average pressure drop records for the baghouse. F. Tons of coal and petroleum coke fired in the PC Boiler, EPN LMS3, monthly to show compliance with the fuel throughput requirements of this permit. G. Required stack sampling results or other air emissions testing (other than CMS data) that may be conducted on units authorized under this permit after the date of issuance of this permit. REPORTING 20. The holder of this permit shall submit to the TCEQ Waco Regional Office and the Air Enforcement Branch of EPA in Dallas semi-annual reports for each emission unit which is required to be continuously monitored pursuant to this permit.

13 SPECIAL CONDITIONS Page 12 AS-BUILT INFORMATION 21. The holder of this permit shall submit to the TCEQ Waco Regional Office and the TCEQ Air Permits Division change pages to the permit application reflective of the final plans and engineering specifications on the PC Boiler and auxiliary boiler, including their respective control equipment, no later than 30 days before initial start-up of the PC Boiler. This information shall include: A. All TCEQ Tables in the permit application, updated with manufacturer and other specified data. B. Revised plot plans and equipment drawings as required to reflect the constructed facility. C. Identification of any maximum inputs of raw materials for the as-built facility that is lower than the values represented in the permit application and used for calculating or establishing emissions. Accompanying this information shall be a request for permit alteration. The TCEQ shall alter the permit special conditions and MAERT to reflect any such reduction in emissions. Increases in allowable emission rates require a permit amendment before construction begins.

14 EMISSION SOURCES - MAXIMUM ALLOWABLE EMISSION RATES This table lists the maximum allowable emission rates and all sources of air contaminants on the applicant s property covered by this permit. The emission rates shown are those derived from information submitted as part of the application for permit and are the maximum rates allowed for these facilities. Any proposed increase in emission rates may require an application for a modification of the facilities covered by this permit. AIR CONTAMINANTS DATA Emission Point No. (1) Source Name (2) Air Contaminant Emission Rates * Name (3) lb/hr TPY** NORMAL OPERATIONS LMS3 Unit 3 Pulverized Coal Boiler 8,000-MMBtu/hr Nominal 800-MW Gross CO PM (filterable) HF HCl Hg 1,200 (6) 5, (5) 17.5 (5) (5) AUX Auxiliary Boiler 155-MMBtu/hr CO PM (filterable) 2.7 (5) 0.15 (5) PLANNED START-UP AND SHUTDOWN LMS3 Unit 3 Pulverized Coal Boiler 8,000-MMBtu/hr Nominal 800-MW Gross CO 4,480

15 Permit Number HAP14 Page 2 EMISSION SOURCES - MAXIMUM ALLOWABLE EMISSION RATES (1) Emission point identification - either specific equipment designation or emission point number from a plot plan. (2) Specific point source names. For fugitive sources, use an area name or fugitive source name. (3) CO - carbon monoxide PM - particulate matter, suspended in the atmosphere, including PM 10 and PM 2.5 PM 10 - particulate matter equal to or less than 10 microns in diameter HCl - hydrogen chloride HF - hydrogen fluoride Hg - mercury (4) Fugitive emissions are an estimate only and should not be considered as a maximum allowable emission rate. (5) Emission rates reflect the case-by-case MACT determination for the issuance of Permit HAP-14. (6) Compliance with hourly emission limit for CO is based on a rolling 30-day average. * Emission rates are based on and the facilities are limited by the following maximum operating schedule: 24 Hrs/day 7 Days/week 52 Weeks/year or 8,760 Hrs/year ** Compliance with annual emission limits is based on a rolling 12-month period.

16 PRELIMINARY DETERMINATION SUMMARY NRG Texas Power, LLC Permit No. HAP-14 I. APPLICANT NRG Texas Power LLC 1301 McKinney, Suite 2300 Houston, Texas II. III. IV. PROJECT LOCATION The proposed project, new Unit 3 Boiler, at the Limestone Electric Generating Station will be located approximately nine miles north of Jewett on Farm-to Market Road 39 in Limestone County, Texas. PROJECT DESCRIPTION NRG Texas Power LLC (NRG Texas) has requested a Hazardous Air Pollutant (HAP) Major Source [FCAA 112(g)] Permit HAP-14, which would establish Case-By-Case Maximum Achievable Control Technology (MACT) requirements for the Limestone Electric Generating Station - Unit 3 Boiler (LMS3) and auxiliary boiler (AUX) near Jewett in Limestone County, Texas. These new boilers are also subject to State Air Quality and Federal Prevention of Significant Deterioration (PSD) preconstruction permitting requirements. The TCEQ has prepared draft State Air Quality Permit and PSD Air Quality Permit PSD-TX-1072, which establishes additional conditions under which the proposed facility must operate. A pending contested case hearing for permits and PSD-TX-1072 has been abated for this HAP review. The PC Boiler is an 800 MW boiler firing sub-bituminous coal, petroleum coke, or bituminous coal with a maximum heat input rate of 8,000 MMBtu/hr at their Limestone Electric Generating Station (LMS) which has two existing solid fuel fired boilers. LMS3 will fire either 100 percent sub-bituminous coal, or a nominal blend (by weight) of 20% petroleum coke with 80% sub-bituminous, or a 40% bituminous coal with 60% sub-bituminous coal blend EMISSIONS Permit HAP-14 establishes federally enforceable MACT emission limitations for carbon monoxide [(CO) as a surrogate for organic hazardous air pollutants (HAPs)], filterable particulate matter [(PM) as a surrogate for non-mercury HAP metals], hydrogen fluoride (HF), hydrogen chloride (HCl), and mercury (Hg) for LMS3. This permit also establishes federally enforceable MACT emission limitations for CO as a surrogate for organic HAPs and filterable PM as a surrogate for non-mercury HAP metals for AUX. Annual potential emissions of surrogate HAP pollutants, in tons per year (tpy), for CO, and filterable PM for LMS3 are summarized in the following table:

17 Preliminary Determination Summary Page 2 CO Surrogate Pollutants tpy Filterable PM 5, * Annual potential emissions of other HAP pollutants in tpy, for LMS3 are identified in the following table: Fluorides (as HF) Other HAP Pollutants in tpy Mercury (Hg) Hydrogen Chloride (HCl) 17.5* 0.053* 81.7 * - indicates emission rates reduced by case-by-case MACT analysis Annual potential emissions of surrogate HAP pollutants for AUX, for CO is 2.7 tpy, and for filterable PM is 0.15 tpy. V. FEDERAL APPLICABILITY Recent federal court vacatur of both EPA's delisting of electric utility steam generating units (EUSGUs) as sources subject to MACT standards and the Clean Air Mercury Rule (CAMR) require that MACT emission limitations separately be established for coal-fired electric generating units such as the proposed PC Boiler LMS3. LMS3 is now subject to the requirements for case-by-case MACT pursuant to Clean Air Act Section 112(g). Additionally, the U.S. Court of Appeals for the D.C. Circuit vacated the National Emissions Standard for Hazardous Air Pollutants [40 CFR 63 Subpart DDDDD (Boiler MACT)] that applied to the proposed auxiliary boiler. Vacatur of the Boiler MACT may subject the proposed auxiliary boiler to case-by-case MACT requirements under Clean Air Act Section 112(j). NRG Texas elected to submit a case-by-case analysis for both the PC and auxiliary boiler in this application. VI. CONTROL TECHNOLOGY REVIEW The analysis by NRG Texas confirms that the control technologies and emissions limits proposed by NRG Texas in its June 2006 state PSD permit application for the PC Boiler meet case-by-case MACT requirements, with the exception that slightly reduced emissions limits for mercury, HF, and PM (the surrogate for non-mercury HAP metals) are indicated due to recent emissions compliance demonstrations at similar sources. Had a case-by-case

18 Preliminary Determination Summary Page 3 MACT analysis been an applicable requirement when the 2006 state/psd application was submitted, the emission limits proposed as BACT to the TCEQ for mercury and other hazardous air pollutants (emission limits that are now stipulated in the draft State/PSD permit for the PC Boiler) would have satisfied that requirement. Additionally, the analysis confirms that the control technologies and emissions limits proposed by NRG Texas in its June 2006 state/psd permit application for the auxiliary boiler meet case-by-case MACT requirements, with the exception of a more stringent emission limit for CO, the proposed surrogate for organic HAPs. The EPA definition of MACT for a new source in 40 CFR is: Maximum achievable control technology (MACT) emission limitation for new sources means the emission limitation which is not less stringent that the emission limitation achieved in practice by the best controlled similar source, and which reflects the maximum degree of deduction in emissions that the permitting authority, taking into consideration the cost of achieving such emission reduction, and any non-air quality health and environmental impacts and energy requirements, determines is achievable by the constructed or reconstructed major source. The EPA definition of MACT for an existing source in 40 CFR is: Maximum achievable control technology (MACT) emission limitation for existing sources means the emission limitation reflecting the maximum degree of reduction in emissions of hazardous air pollutants (including a prohibition on such emissions, where achievable) that the Administrator, taking into consideration the cost of achieving such emission reductions, and any non-air quality health and environmental impacts and energy requirements, determines is achievable by sources in the category or subcategory to which such emission standard applies. This limitation shall not be less stringent than the MACT floor. The HAPs potentially emitted by LMS3 can be classified in broad categories, based on the effective methods of controlling their emissions: mercury, non-mercury HAP metals, acid gases (hydrogen chloride and hydrogen fluoride), and organic HAPs. The HAPs potentially emitted by AUX can be classified into two broad categories: metal HAPs and organic HAPs NRG Texas performed the case-by-case MACT analyses in two steps. First, they established the "MACT floor" or most stringent emission limitation achieved in practice by the best controlled similar source. Next, NRG Texas performed a "beyond the floor" analysis of the other methods for potentially reducing emissions to a greater degree, considering factors such as the cost of achieving such emissions reductions and any non-air quality health and environmental impacts and energy requirements to establish whether these reductions are achievable.

19 Preliminary Determination Summary Page 4 Of particular relevance to the case-by-case MACT analyses is the requirement of 40 CFR 63.43(d)(4) that case-by-case MACT determinations must take into consideration emissions standards that may have been proposed by EPA pursuant to 112(d) of the Clean Air Act for the pertinent source category. In the case of the PC Boiler, the relevant proposed (and later rescinded) rule is Subpart UUUUU of 40 CFR Part 63. For the auxiliary boiler, the relevant proposed and promulgated (later rescinded) rule is Subpart DDDDD of 40 CFR Part 63. NRG Texas considered the emissions standards under these rules in establishing the case-by-case MACT emissions limitations presented in their application. In addition, NRG Texas considered the following materials in identifying and evaluating available control options, emission limits, and averaging periods: 1) The Clean Air Mercury Rule, 2) BACT determinations made by TCEQ, 3) Entries in the RACT/BACT/LAER Clearinghouse maintained by EPA, and 4) Control technology determinations and emission limits imposed by air quality permitting authorities outside Texas. To be consistent with the draft state/psd permit, proposed Subpart UUUUU, and CAMR, all case-by-case MACT limitations established for the PC Boiler are also expressed as 12-month rolling averages, except for the organic HAP surrogate, CO, which is expressed as a 30-day average. For the auxiliary boiler, the MACT limitations in today's application were established in the averaging period units expressed in the previous Subpart DDDDD Boiler MACT standard. The proposed suite of controls to limit HAP emission from the PC Boiler are a selective catalytic reduction system, a wet flue gas desulfurization system, state-of-the art mercury controls, and a fabric filter. These control technologies will meet the MACT emission limitations established pursuant to 30 TAC and meet the definition of MACT set forth in 30 TAC (7). LMS3 BOILER CASE-BY-CASE MACT Mercury (Hg) - is the HAP of primary concern from coal-fired PC Boilers as demonstrated by EPA in their proposed Subpart UUUUU. NRG Texas first established the MACT floor, or the most stringent mercury emission limit that has been achieved in practice by the best controlled similar source. The LMS3 main boiler will be a PC Boiler with a nominal 800-MW generating capacity, burning subbituminous coal and blends of subbituminous coal with up to 20 percent by weight petroleum coke or up to 40 percent by weight bituminous coal. The universe of similar sources includes all PC Boilers burning subbituminous coal or blends of primarily subbituminous coal and lesser amounts of petroleum coke or bituminous coal.

20 Preliminary Determination Summary Page 5 NRG Texas provided a detailed evaluation of mercury emission controls and recent permit limits for mercury emissions from PC Boilers in a June 2007 technical supplement to the initial state/psd permit application. Based on information then available, NRG Texas determined that a mercury emission limit of pounds per gigawatts-hour (lb/gwh) represented BACT for LMS3 for all fuel types. That emission limit is included in the draft of Permit Nos and PSD-TX-1072 and remains more stringent than nearly all mercury emission limits for PC Boilers that have made initial compliance demonstrations. To date, the most stringent mercury emission limit identified for any facility that burns, primarily, subbituminous coal and has made an initial compliance demonstration is a heat input based limit of 1.7 x 10-6 lb/mmbtu for Unit 4 at the Walter Scott, Jr. Energy Center in Iowa. Based on a maximum heat input rate of 7,675 MMBtu/hr and a gross rating of 870 MW, this unit has a gross heat rate of approximately 8,820 Btu/kWh and its equivalent output-based limit is lb/gwh. Although this unit has been operating for less than one year, NRG Texas conservatively concluded that the mercury emission limit of lb/gwh has been demonstrated in practice and represents the MACT floor for boilers burning only subbituminous coal. NRG Texas's evaluation did not reveal any PC Boiler burning a blend of subbituminous coal and a lesser amount of bituminous coal that achieves a mercury emission limit more stringent than that achieved by Walter Scott Unit 4. However, PC Boilers burning bituminous coal are known to be able to achieve lower mercury emissions rates than boilers burning subbituminous coal, and NRG Texas has taken this into account in establishing the MACT floor for mercury emissions from the PC Boiler. Specifically, NRG Texas has reviewed regulatory agency information to identify the most stringent mercury emission limit for any facility that burns primarily bituminous coal and has made an initial compliance demonstration as of May The results of this review indicate that the most stringent mercury emission limit identified is an output-based limit of lb/gwh pursuant to 7.29(5)(a)3.e of the Massachusetts Air Pollution Control Regulations. This limit took effect in January 2008 and is currently being achieved by the three bituminous PC Boilers at the Brayton Point Station. Although this limit has been in effect for only two months, NRG Texas conservatively concludes that the mercury emission limit of lb/gwh has been demonstrated in practice and would represent the MACT floor for boilers burning only bituminous coal. To reflect the most stringent mercury emission limits demonstrated in practice for both subbituminous coal firing and firing of subbituminous coal blends, this analysis indicates that the MACT floor for mercury emissions from the PC Boiler should be defined as follows:

21 Preliminary Determination Summary Page 6 When firing a blend that includes both subbituminous coal and bituminous coal, a weighted, output-based emission limit, based on a monthly rolling 12-month average, computed as follows: Where: EL b = Total allowable Hg in lb/gwh that can be emitted to the atmosphere during any12-month period when a blend of fuels was burned. EL i = Hg emissions limit for the subcategory i (coal rank), lb/gwh for subbituminous coal and petroleum coke and lb/gwh for bituminous coal; HH i = GWh contributed by the corresponding subcategory i (coal rank) burned during the compliance period; and n = Number of subcategories (coal ranks) being averaged. During 12-month periods when a blend of fuels including bituminous coal is burned, the applicable Hg emission limit will vary with the amount of bituminous coal. For example, if a 60/40 blend of subbituminous and bituminous coals is burned, the Hg emission limit will be lb/gwh; for an 80/20 blend, the limit will be lb/gwh. NRG Texas and the TCEQ also reviewed the available literature to identify whether a "beyond-the-floor" MACT emission limit would be appropriate for mercury emissions from the PC boiler. This review identified no other methods for potentially reducing emissions to a greater degree. Thus, the MACT floor represents the most stringent limit achievable. It should be noted that the mercury emission limits presented above, Unit 4 at the Walter Scott, Jr., Energy Center in Iowa for subbituminous coal firing and the three bituminous coal fired boilers at the Brayton Point Station are based on the use of activated carbon injection in conjunction with state-of-the-art control equipment for reducing emissions of NO X, SO 2, and particulate matter. This is the most effective of all identified mercury emission control strategies, irrespective of cost, and is consistent with the planned air pollution control technologies for the LMS3 PC boiler.

22 Preliminary Determination Summary Page 7 It should be noted that this case-by-case MACT emission limit for mercury emissions from LMS 3 is based on new compliance demonstration data generated after NRG Texas submitted the LMS3 permit application in June The mercury emission limit of 0.02 lb/gwh established as BACT in the draft of Permit Nos and PSD-TX-1072 would have represented case-by-case MACT for Limestone Unit 3 at the time of permit application submittal if a case-by-case MACT determination had been an applicable requirement at that time. Non-Mercury HAP Metals - HAP metals other than mercury are emitted in the form of particulate matter, and particulate matter air pollution control devices are the only identified control technology for non-mercury HAP metals emissions. The design and operation of these devices is not based on the control of emissions of individual metals to meet target levels; rather these devices are designed and operated to meet emission limits for the particulate matter category as a whole. Therefore, NRG Texas proposes the use of filterable particulate matter emissions as a surrogate for non mercury HAP metals emissions. As such, a filterable particulate matter emission limit can be established which represents the case-by-case MACT for all non-mercury HAP metals, as has been EPA's practice when establishing MACT emission standards for source categories emitting HAP metals. NRG Texas provided a detailed evaluation of particulate matter emission controls and recent permit limits for particulate matter emissions from coal-fired PC Boilers in the state/psd permit application technical supplement submitted in June 2007 that established a filterable particulate matter emission limit of lb/mmbtu as BACT for the PC boiler for all fuel types. That emission limit is included in the draft of Permit Nos and PSD-TX-1072 to represent BACT and neither NRG Texas nor the TCEQ found any more stringent emission limit for a pulverized coal-fired PC Boilers that has made its initial compliance demonstration. Accordingly, the MACT floor for emissions of non-mercury HAP metals from the PC boiler is a filterable particulate matter emission limit of lb/mmbtu. As part of this analysis, a review of the available literature was performed to determine whether a "beyond-the-floor" MACT emission limit would be appropriate for emissions of non-mercury HAP metals from the PC boiler. This review shows through advances in fabric filter technology and in the continued commercialization of wet electrostatic precipitator technology, a more stringent filterable particulate matter emission limit of lb/mmbtu is achievable. NRG Texas has determined that the cost of achieving this additional emission reduction through the use of advanced fabric filter baghouse technology at LMS3 is acceptable. Fabric filter baghouses do not cause any appreciable non-air quality health or environmental impacts, nor are they characterized by unacceptable energy requirements. Accordingly, a filterable particulate matter emission limit of lb/mmbtu has been

23 Preliminary Determination Summary Page 8 determined to represent beyond-the-floor MACT for the PC boiler. This emission limit will be achieved using the planned air pollution control technologies represented in the application for Permit Nos and PSD-TX As noted above, wet electrostatic precipitator technology was identified as another add-on control technology that could be used to achieve a beyond-the-floor filterable particulate matter emission limit of lb/mmbtu. The wet electrostatic precipitator is less preferred than the fabric filter baghouse upgrade because of its unacceptable economic costs. The annualized cost of installing, maintaining and operating a wet electrostatic precipitator is estimated to be $22.4 million (a detailed cost estimate is provided in Appendix C of the application). Adding a wet electrostatic precipitator to the planned air pollution control technologies for the PC boiler would not achieve a more stringent limit than the proposed lb/mmbtu. However, the emission reduction achievable with this technology is not material, as the economic costs are unacceptable in any event. Even assuming that the wet electrostatic precipitator in this configuration could achieve a further 50 percent reduction, the cost effectiveness would be more than $100,000 per ton of reduction in filterable particulate matter emissions and approximately $10 million per ton of non-mercury HAP metals emissions. No direct comparison can be made between the case-by-case MACT emission limit for the PC boiler and the new source MACT proposed by EPA under Subpart UUUUU because EPA elected not to propose an emission standard for non-mercury HAP metals from coal-fired EUSGUs. An emission limit of lb/mmbtu for filterable particulate matter should be established as the beyond-the-floor MACT limit for emissions of non-mercury HAP metals from the PC boiler. Acid Gases - Hydrogen chloride (HCl) and hydrogen fluoride (HF) are inorganic, vapor phase HAPs formed from combustion of trace quantities of the halogens chlorine and fluorine in the fuel. NRG Texas provided a detailed evaluation of acid gas emission controls and recent permit limits for HCl and HF emissions from coal-fired PC Boilers in the state/psd application technical supplement submitted in June Based on that evaluation, NRG Texas determined that HCl and HF emission limits of lb/mmbtu and lb/mmbtu, respectively, represent BACT for the PC boiler for all fuel types. Those emission rates were agreed to by the TCEQ and included in the draft of Permit Nos and PSD-TX-1072.

24 Preliminary Determination Summary Page 9 HCl - To date, available information shows that the most stringent HCl emission limit identified for any facility that burns primarily subbituminous coal and has made an initial compliance demonstration is lb/mmbtu for Unit 4 at the Walter Scott, Jr., Energy Center in Iowa. Although this unit has been operating for less than one year, NRG Texas has conservatively concluded that the HCl emission limit of lb/mmbtu has been demonstrated in practice and represents the MACT floor for boilers burning only subbituminous coal. To date, available information shows that the most stringent HCl emission limit identified for any facility that burns primarily bituminous coal and has made an initial compliance demonstration is lb/mmbtu for Unit 3 at the Cross Generating Station in South Carolina." Based on this emission limit, NRG Texas concludes that an HCl emission limit of lb/mmbtu has been demonstrated in practice and represents the MACT floor for boilers burning primarily bituminous coal. Because continuous monitoring for HCl emissions is not feasible, the MACT floor for HCl emissions from the PC boiler should be established based on the use of a worst-case blend containing 60 percent by weight subbituminous coal and 40 percent by weight bituminous coal. The corresponding proposed MACT floor emission limit is lb/mmbtu. HF - To date, available information shows that emissions, based on the use of subbituminous coals primarily from New Mexico with very low fluoride content of 86 parts per million by weight or less. Applying this control efficiency of percent to the HF emission calculations for the PC boiler, and considering the average coal fluoride concentrations of the coals proposed to be burned at this unit, results in an annual average HF emission rate of lb/mmbtu. This value represents the MACT floor for the PC boiler. NRG Texas reviewed available literature to determine whether a beyond-the-floor MACT emission limit would be appropriate for emissions of acid gases from the PC boiler. This review shows that, due to the continued commercialization of wet electrostatic precipitator technology, lower hydrogen chloride and hydrogen fluoride emissions are likely achievable through the addition of a wet electrostatic precipitator to the planned air pollution control technologies for Limestone Unit 3. The hydrogen chloride and hydrogen fluoride emission reductions achievable with this technology addition are unknown, because there are no performance data for any similarly configured existing facility. However, the precise level of emission reduction achievable with this technology is not material to the case-by-case MACT determination, as the economic costs are unacceptable in any event. The required total capital investment for a wet electrostatic precipitator at LMS3 is $128 million and the total annualized cost of installing, maintaining and operating this technology is estimated to be $22.4 million (details are in Appendix C of the application). Even assuming that the wet electrostatic precipitator in this configuration could remove all the remaining HCl and HF,

Site Identification No.: 197809AAO Application No.: 15030051

Site Identification No.: 197809AAO Application No.: 15030051 Project Summary for a Construction Permit Application from Midwest Generation for a Natural Gas Conversion Project for the Joliet Electric Generating Station Joliet, Illinois Site Identification No.: 197809AAO

More information

Wolverine Clean Energy Venture

Wolverine Clean Energy Venture Prepared for: Wolverine Power Supply Cooperative Cadillac, Michigan Supplement to CAA Section 112(g) MACT Auxiliary Boiler Amended Application No. 317-07 Wolverine Clean Energy Venture Rogers City, MI

More information

INDUSTRIAL BOILER MACT FACTSHEET

INDUSTRIAL BOILER MACT FACTSHEET INDUSTRIAL BOILER MACT FACTSHEET The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Industrial/Commercial/Institutional Boilers and Process Heaters (40 CFR Part 63, Subpart DDDDD),

More information

State of the Art (SOTA) Manual for Boilers and Process Heaters

State of the Art (SOTA) Manual for Boilers and Process Heaters State of the Art (SOTA) Manual for Boilers and Process Heaters Original Date: July 1997 Revision Date: February 22, 2004 State of New Jersey Department of Environmental Protection Air Quality Permitting

More information

Assessing the Changes Required by the Industrial Boiler MACT Regulations

Assessing the Changes Required by the Industrial Boiler MACT Regulations Technical Paper MS-17 Assessing the Changes Required by the Industrial Boiler MACT Regulations Authors: A.L. LeClair L.M. McDermitt Babcock & Wilcox Power Generation Group, Inc. Barberton, Ohio, U.S.A

More information

SMALL ENTITY COMPLIANCE GUIDE FOR MAJOR SOURCE BOILERS AND PROCESS HEATERS

SMALL ENTITY COMPLIANCE GUIDE FOR MAJOR SOURCE BOILERS AND PROCESS HEATERS SMALL ENTITY COMPLIANCE GUIDE F MAJ SOURCE BOILERS AND PROCESS HEATERS National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and

More information

MATS and Boiler Rules

MATS and Boiler Rules em feature MATS and Boiler Rules Practical, Data-Driven Standards by Gina McCarthy Gina McCarthy is Assistant Administrator for Air and Radiation at the U.S. Environmental Protection Agency. The U.S. Environmental

More information

SLMA Meeting. Boiler MACT and Related Rules. Atlanta, GA March 2, 2011. Martin Rollins, P. E. H. M. Rollins Company, Inc. Gulfport, Mississippi

SLMA Meeting. Boiler MACT and Related Rules. Atlanta, GA March 2, 2011. Martin Rollins, P. E. H. M. Rollins Company, Inc. Gulfport, Mississippi SLMA Meeting Atlanta, GA March 2, 2011 Boiler MACT and Related Rules Martin Rollins, P. E. H. M. Rollins Company, Inc. Gulfport, Mississippi Boiler MACT and Related Rules EPA Had Requested 15 Month Delay

More information

FACT SHEET PROPOSED MERCURY AND AIR TOXICS STANDARDS

FACT SHEET PROPOSED MERCURY AND AIR TOXICS STANDARDS FACT SHEET PROPOSED MERCURY AND AIR TOXICS STANDARDS ACTION On March 16, 2011, the Environmental Protection Agency (EPA) issued a proposed rule that would reduce emissions of toxic air pollutants from

More information

Texas Commission on Environmental Quality Page 1 Chapter 117 - Control of Air Pollution from Nitrogen Compounds

Texas Commission on Environmental Quality Page 1 Chapter 117 - Control of Air Pollution from Nitrogen Compounds Texas Commission on Environmental Quality Page 1 SUBCHAPTER G: GENERAL MONITORING AND TESTING REQUIREMENTS DIVISION 1: COMPLIANCE STACK TESTING AND REPORT REQUIREMENTS 117.8000, 117.8010 Effective June

More information

STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR MANAGEMENT

STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR MANAGEMENT Page 1 of 7 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statutes

More information

NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE

NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Page 1 of 9 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statutes

More information

NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE

NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Page 1 of 7 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statues

More information

GUIDELINES FOR SOURCE TESTING

GUIDELINES FOR SOURCE TESTING GUIDELINES FOR SOURCE TESTING Created August 12, 2011 Revised October 03, 2013 Source Testing Guidelines Rev. 2 TABLE OF CONTENTS 1.0 INTRODUCTION...6 1.1 Purpose...6 1.2 Application...6 1.3 Revisions...6

More information

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY. REGION IX 7!; Hawthorne Street. San Francisco, CA 94105-3901. July 31, 2008

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY. REGION IX 7!; Hawthorne Street. San Francisco, CA 94105-3901. July 31, 2008 ---------------------------------.------- UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION IX 7!; Hawthorne Street San Francisco, CA 94105-3901 July 31, 2008 Dirk Straussfeld Desert Rock Energy Company,

More information

Bill Maxwell, U.S. Environmental Protection Agency, OAQPS (C439-01)

Bill Maxwell, U.S. Environmental Protection Agency, OAQPS (C439-01) TO: Bill Maxwell, U.S. Environmental Protection Agency, OAQPS (C439-01) FROM: Jeffrey Cole, RTI International DATE: December 2003 SUBJECT: Methodology for Estimating Cost and Emissions Impact for Coal-

More information

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance The Boiler MACT, 40 CFR 63, Subpart DDDDD, was vacated in 2007 by the U.S Court of Appeals and the 2004 rule

More information

SULFURIC ACID MIST PERFORMANCE TEST PROTOCOL. Duke Energy Florida, Inc. Crystal River Power Plant Units 4&5 Crystal River, Citrus County, Florida

SULFURIC ACID MIST PERFORMANCE TEST PROTOCOL. Duke Energy Florida, Inc. Crystal River Power Plant Units 4&5 Crystal River, Citrus County, Florida SULFURIC ACID MIST PERFORMANCE TEST PROTOCOL Duke Energy Florida, Inc. Crystal River Power Plant Units 4&5 Crystal River, Citrus County, Florida August 2013 CONTENTS SECTION 1.0 INTRODUCTION...3 SECTION

More information

Continuous Emissions Monitoring - Program 77

Continuous Emissions Monitoring - Program 77 Program Description Program Overview Coal-fired power plants are in increased need of robust, accurate, and certifiable continuous emissions monitors (CEMs) for mercury, particulate matter (PM), acid gases,

More information

INDEX 9-7-100 GENERAL

INDEX 9-7-100 GENERAL REGULATION 9 INORGANIC GASEOUS POLLUTANTS RULE 7 NITROGEN OXIDES AND CARBON MONOXIDE FROM INDUSTRIAL, INSTITUTIONAL AND COMMERCIAL BOILERS, STEAM GENERATORS AND PROCESS HEATERS INDEX 9-7-100 GENERAL 9-7-101

More information

The Regulatory Impact Analysis (RIA) for the Mercury Air Toxics Standard (MATS)

The Regulatory Impact Analysis (RIA) for the Mercury Air Toxics Standard (MATS) The Regulatory Impact Analysis (RIA) for the Mercury Air Toxics Standard (MATS) Kevin Culligan U.S. Environmental Protection Agency (EPA) Associate Division Director, Sector Policies and Programs Division

More information

Appendix 5A: Natural Gas Use in Industrial Boilers

Appendix 5A: Natural Gas Use in Industrial Boilers Appendix 5A: Natural Gas Use in Industrial Boilers Industrial boilers consumed 2.1 Tcf of natural gas in 2006, accounting for 36% of total natural gas in manufacturing. 1 In this appendix, we provide further

More information

Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting

Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting The monitoring provisions for the WEB trading program balance the need for accurate monitoring to provide certainty for

More information

PART 225 CONTROL OF EMISSIONS FROM LARGE COMBUSTION SOURCES SUBPART A: GENERAL PROVISIONS

PART 225 CONTROL OF EMISSIONS FROM LARGE COMBUSTION SOURCES SUBPART A: GENERAL PROVISIONS TITLE 35: ENVIRONMENTAL PROTECTION SUBTITLE B: AIR POLLUTION CHAPTER I: POLLUTION CONTROL BOARD SUBCHAPTER c: EMISSION STANDARDS AND LIMITATIONS FOR STATIONARY SOURCES PART 225 CONTROL OF EMISSIONS FROM

More information

CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT. Lone Star Industries, Inc. 3301 South County Road 150 West Greencastle, Indiana 46135

CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT. Lone Star Industries, Inc. 3301 South County Road 150 West Greencastle, Indiana 46135 CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT Lone Star Industries, Inc. 3301 South County Road 150 West 46135 (herein known as the Permittee) is hereby authorized to construct the facilities listed in

More information

Statement of Basis SCA Tissue North America, LLC. 701-0055

Statement of Basis SCA Tissue North America, LLC. 701-0055 Statement of Basis SCA Tissue North America, LLC. 701-0055 On December 26, 2012, the Department received SCA Tissue North America, LLC renewal Title V application. SCA is considered a major source for

More information

POTENTIAL TO EMIT SUMMARY FIBERIGHT, LLC HAMPDEN, MAINE

POTENTIAL TO EMIT SUMMARY FIBERIGHT, LLC HAMPDEN, MAINE POTENTIAL TO EMIT SUMMARY FIBERIGHT, LLC HAMPDEN, MAINE s (Ton/Year) Thermal Flare Oxidizer Boiler#1 Boiler #2 Scrubber #1 Scrubber #2 Total Carbon Monoxide (CO) 6.91 2.90 43.59 24.90 78.3 Oxides of Nitrogen

More information

PRE-PERMIT CONSTRUCTION APPROVAL GUIDANCE DOCUMENT

PRE-PERMIT CONSTRUCTION APPROVAL GUIDANCE DOCUMENT PRE-PERMIT CONSTRUCTION APPROVAL GUIDANCE DOCUMENT State of Idaho Department of Environmental Quality Updated May 2012 OVERVIEW Questions regarding the 15-Day Pre-Permit Construction Approval process may

More information

Well Positioned for the Future

Well Positioned for the Future Dominion Generation Virginia City Hybrid Energy Center Well Positioned for the Future The Coal Institute July 13, 2015 Rick Boyd Manager of Fuel Origination & Operations 1 Dominion Profile Operating Segments

More information

AIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC

AIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC AIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC Multek Flexible Circuits Inc.-Sheldahl Road East and West Buildings 1150 Sheldahl Road and 805 North Highway 3 Northfield,

More information

BEST AVAILABLE RETROFIT TECHNOLOGY AT EGU FACILITIES. July 1, 2011

BEST AVAILABLE RETROFIT TECHNOLOGY AT EGU FACILITIES. July 1, 2011 BEST AVAILABLE RETROFIT TECHNOLOGY AT EGU FACILITIES July 1, 2011 WISCONSIN DEPARTMENT OF NATURAL RESOURCES 101 South Webster Street Box 7921 Madison, Wisconsin 53707-7921 1 Statement of Purpose This document

More information

Implementation Question and Answer Document. for

Implementation Question and Answer Document. for Implementation Question and Answer Document for National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines and New Source Performance Standards for

More information

STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT --.--~.-------------------------------- STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean

More information

ADEQ OPERATING AIR PERMIT

ADEQ OPERATING AIR PERMIT ADEQ OPERATING AIR PERMIT Pursuant to the Regulations of the Arkansas Operating Air Permit Program, Regulation #26: Permit #: 263-AOP-R4 IS ISSUED TO: Renewal #1 Entergy Arkansas, Inc. - White Bluff 1100

More information

COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS

COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS 310 CMR 7.00 APPENDIX B U EMISSION BANKING, TRADING AND AVERAGING 310 CMR 7.00: Appendix

More information

State of Colorado Comments Docket ID No. EPA-HQ-OAR-2009-0234 and Docket ID No. EPA-HQ-OAR-2011-0044

State of Colorado Comments Docket ID No. EPA-HQ-OAR-2009-0234 and Docket ID No. EPA-HQ-OAR-2011-0044 U.S. Environmental Protection Agency EPA Docket Center (EPA/DC) Mail Code: 2822T 1200 Pennsylvania Ave., N.W. Washington, DC 20460 RE: State of Colorado Comments Docket ID No. EPA-HQ-OAR-2009-0234 and

More information

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit. Ms. Heather N. Frosch Midwestern Gas Transmission P.O. Box 2511 Houston, Texas 77252-2511 Re: 153-11686 First Significant Permit Modification to Part 70 No.: T153-5975-00006 Dear Ms. Frosch: Midwestern

More information

HB10-1365, Clean Air/Clean Jobs Act

HB10-1365, Clean Air/Clean Jobs Act National Governors Association Governors Energy Advisors Policy Institute HB10-1365, Clean Air/Clean Jobs Act Martha E. Rudolph Director of Environmental Programs Colorado Department of Public Health and

More information

Guidance and Reporting Instructions on Temporary E-reporting for the MATS Rule

Guidance and Reporting Instructions on Temporary E-reporting for the MATS Rule Guidance and Reporting Instructions on Temporary E-reporting for the MATS Rule As explained in the interim MATS e-reporting rule, which was signed by the Administrator on March 9, 2015, the EPA plans to

More information

Part 4: How to Avoid Being a Title V Major Source

Part 4: How to Avoid Being a Title V Major Source Part 4: How to Avoid Being a Title V Major Source Many smaller sources of air pollution have a high PTE but have actual emissions well below the Title V major source thresholds. If your PTE makes you a

More information

Air Permitting in Colorado. Martha Hyder Wind River Environmental Group LLC September 2013

Air Permitting in Colorado. Martha Hyder Wind River Environmental Group LLC September 2013 Air Permitting in Colorado Martha Hyder Wind River Environmental Group LLC September 2013 Overview O Background (pollutants) O Federal permitting regulations O Colorado permitting regulations O Colorado

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO DOCKET NO. 1A E IN THE MATTER OF THE APPLICATION OF BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, LP, FOR A CERTIFICATE OF PUBLIC CONVENIENCE

More information

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF REGULATION O.Reg. 127/01 Ontario Ministry of the Environment

More information

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit. Ms. Heather N. Frosch Midwestern Gas Transmission P.O. Box 2511 Houston, Texas 77252-2511 Re: 125-11685 First Significant Permit Modification to Part 70 No.: T 125-5976-00004 Dear Ms. Frosch: Midwestern

More information

Emissions Uncertainty: Focusing on NOx Emissions from Electric Generating Units

Emissions Uncertainty: Focusing on NOx Emissions from Electric Generating Units Emissions Uncertainty: Focusing on NOx Emissions from Electric Generating Units Emily Wisner +, David Mobley *, George Pouliot * & Bill Hunt + + Statistics Department, North Carolina State University,

More information

Best Available Retrofit Technology Analysis Report

Best Available Retrofit Technology Analysis Report Report Best Available Retrofit Technology Analysis Report Weyerhaeuser Corporation Longview, WA Prepared for Weyerhaeuser Corporation P.O. Box 188 Longview, Washington 98632 December 2007 Revised June

More information

Air Quality Performance Test Guidelines. Kansas Department of Health and Environment Bureau of Air and Radiation

Air Quality Performance Test Guidelines. Kansas Department of Health and Environment Bureau of Air and Radiation Air Quality Performance Test Guidelines Kansas Department of Health and Environment Bureau of Air and Radiation December 22, 2004 TABLE OF CONTENTS 1. INTRODUCTION 2. TEST PLANNING 2.1 EPA Test Methods

More information

Source: EIA Natural Gas Issues and Trends 1998

Source: EIA Natural Gas Issues and Trends 1998 7.0 System Redesign Analysis 7.1 Emissions Natural gas is a clean burning fossil fuel. It consists of a mixture of hydrocarbon gases, primarily Methane (CH 4 ). In analyzing the combustion process, it

More information

Part I GENERAL CONDITIONS. 1. Any activities not identified in the application are not authorized by this permit.

Part I GENERAL CONDITIONS. 1. Any activities not identified in the application are not authorized by this permit. Page 2 of 9 Part I GENERAL CONDITIONS 1. Any activities not identified in the application are not authorized by this permit. 2. The permittee shall at all times maintain in good working order and operate

More information

West Virginia Department of Environmental Protection Division of Air Quality. Fact Sheet

West Virginia Department of Environmental Protection Division of Air Quality. Fact Sheet West Virginia Department of Environmental Protection Division of Air Quality Fact Sheet For Final Renewal Permitting Action Under 45CSR30 and Title V of the Clean Air Act Permit Number: R30-10700001-2009

More information

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies Combined heat and power (CHP) is an efficient and clean approach to generating power and thermal energy from a single

More information

Tampa Electric Company. Biomass Test Burn Report Polk Power Station Unit 1

Tampa Electric Company. Biomass Test Burn Report Polk Power Station Unit 1 Tampa Electric Company Biomass Test Burn Report Polk Power Station Unit 1 April 2002 1.0 INTRODUCTION...2 2.0 BACKGROUND...2 2.1 BIOMASS FUEL HANDLING...2 2.2 PROCESS DATA COLLECTION...3 2.3 EMISSIONS

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES NOTICE OF PUBLIC COMMENT PERIOD

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES NOTICE OF PUBLIC COMMENT PERIOD STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES NOTICE OF PUBLIC COMMENT PERIOD IN RE: Proposed revisions to Air Pollution Control Regulation

More information

Research and Development Information

Research and Development Information Portland Cement Association Research and Development Information 5420 Old Orchard Road Skokie, IL U.S.A. 60077-1083 Fax (847) 966-9781 (847) 966-6200 PCA R&D Serial No. 2086 The Reduction of Resource Input

More information

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R06-OAR-2015-0783; FRL-9940-79-Region 6]

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R06-OAR-2015-0783; FRL-9940-79-Region 6] This document is scheduled to be published in the Federal Register on 01/11/2016 and available online at http://federalregister.gov/a/2015-33098, and on FDsys.gov 6560-50-P ENVIRONMENTAL PROTECTION AGENCY

More information

AIR EMISSION PERMIT NO. 13700318-003 Major Amendment IS ISSUED TO. Mesabi Nugget Delaware LLC Steel Dynamics Inc

AIR EMISSION PERMIT NO. 13700318-003 Major Amendment IS ISSUED TO. Mesabi Nugget Delaware LLC Steel Dynamics Inc AIR EMISSION PERMIT NO. 13700318-003 Major Amendment IS ISSUED TO Mesabi Nugget Delaware LLC Steel Dynamics Inc MESABI NUGGET DELAWARE LLC 6500 Hwy 135 Aurora, St. Louis County, MN 55750 The emission units,

More information

EPA Requirements for Diesel Standby Engines In Data Centers. Bob Stelzer / CTO / Safety Power Inc. For 7x24 Fall 2014 Conference. 1.

EPA Requirements for Diesel Standby Engines In Data Centers. Bob Stelzer / CTO / Safety Power Inc. For 7x24 Fall 2014 Conference. 1. EPA Requirements for Diesel Standby Engines In Data Centers Bob Stelzer / CTO / Safety Power Inc For 7x24 Fall 2014 Conference 1.0 Introduction In order to get the Air Emissions Permit for facilities that

More information

Iron and Steel Manufacturing

Iron and Steel Manufacturing Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Iron and Steel Manufacturing Industry Description and Practices Steel is manufactured by the chemical reduction of iron

More information

Emissions from Waste-to-Energy: A Comparison with Coal-fired Power Plants

Emissions from Waste-to-Energy: A Comparison with Coal-fired Power Plants Proceedings of IMECE 03 2003 ASME International Mechanical Engineering Congress & Exposition Washington, D.C., November 16-21, 2003 IMECE2003-55295 Emissions from Waste-to-Energy: A Comparison with Coal-fired

More information

Reproduction of Permit Terms and Conditions

Reproduction of Permit Terms and Conditions Page 1 of 5 Facility ID: 0536010011 Issuance type: Final State Permit To Operate This version of facility specific terms and conditions was converted from a database format to an HTML file during an upgrade

More information

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR]

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR] State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit For This General Permit allows for the construction, installation, reconstruction and operation of single

More information

The State of New Jersey, New Jersey Department of Environmental Protection

The State of New Jersey, New Jersey Department of Environmental Protection STUART RABNER ATTORNEY GENERAL OF NEW JERSEY R.J. Hughes Justice Complex 25 Market Street PO Box 093 Trenton, NJ 08625-0093 Attorney for Plaintiff State of New Jersey, New Jersey Department of Environmental

More information

STATE OF MISSOURI DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

STATE OF MISSOURI DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT STATE OF MISSOURI DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized to construct

More information

Air Quality PERMIT TO CONSTRUCT

Air Quality PERMIT TO CONSTRUCT Air Quality PERMIT TO CONSTRUCT Permittee Chobani Idaho, Inc. Permit Number P-2012.0003 Project ID 60981 Facility ID 083-00138 Facility Location Permit Authority 3450 Kimberly Road East Twin Falls, ID

More information

Connecticut Department of Energy and Environmental Protection

Connecticut Department of Energy and Environmental Protection Connecticut Department of Energy and Environmental Protection Connecticut s 1-Hour Sulfur Dioxide (SO 2 ) NAAQS Analysis and Management Strategy April 24, 2013 R/S/L Modelers Work Shop Dallas, TX Sam Sampieri

More information

The Texas Commission on Environmental Quality (agency or commission) adopts an amendment to

The Texas Commission on Environmental Quality (agency or commission) adopts an amendment to Texas Commission on Environmental Quality Page 1 The Texas Commission on Environmental Quality (agency or commission) adopts an amendment to 116.603 without changes to the proposed text as published in

More information

NSPS Subpart OOOO: Applicability and Compliance Basics

NSPS Subpart OOOO: Applicability and Compliance Basics NSPS Subpart OOOO: Applicability and Compliance Basics Kentucky Oil & Gas Association 2013 Western Kentucky Meeting September 12, 2013 Roy Rakiewicz All4 Inc. Rob Flynn Environmental Standards, Inc. www.all4inc.com

More information

Regulation No. 34. Emission Banking and Trading Program

Regulation No. 34. Emission Banking and Trading Program Regulation No. 34 Emission Banking and Trading Program (10/6/97) Section 1. PROGRAM OVERVIEW The purpose of this regulation is to establish a voluntary emission banking and trading program. Participation

More information

GREENHOUSE GAS PREVENTION OF SIGNIFICANT DETERIORATION PERMIT APPLICATION. Red Gate Power Plant South Texas Electric Cooperative, Inc.

GREENHOUSE GAS PREVENTION OF SIGNIFICANT DETERIORATION PERMIT APPLICATION. Red Gate Power Plant South Texas Electric Cooperative, Inc. GREENHOUSE GAS PREVENTION OF SIGNIFICANT DETERIORATION PERMIT APPLICATION Red Gate Power Plant South Texas Electric Cooperative, Inc. Submitted by: South Texas Electric Cooperative, Inc. 2849 FM 447, P.O.

More information

Keywords: PEMS, CEMS, turbine

Keywords: PEMS, CEMS, turbine SYMPOSIUM OF THE INDUSTRIAL APPLICATION OF GAS TURBINES COMMITTEE BANFF, ALBERTA, CANADA OCTOBER 2015 CERTIFICATION OF A STATISTICAL HYBRID PREDICTIVE EMISSION MONITORING SYSTEM IN THE U.S.A. AND DEVELOPMENT

More information

Notice of Decision: Approval Effective Immediately

Notice of Decision: Approval Effective Immediately INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment. 100 N. Senate Avenue Indianapolis, IN 46204 (800) 451-6027 (317) 232-8603 www.idem.in.gov Michael R. Pence Thomas

More information

STATE OF MISSOURI ~1;] DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

STATE OF MISSOURI ~1;] DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT STATE OF MISSOURI ~1;] DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized

More information

A Case Study on Coal to Natural Gas Fuel Switch

A Case Study on Coal to Natural Gas Fuel Switch A Case Study on Coal to Natural Gas Fuel Switch by Brian Reinhart, P.E. Presenter Alap Shah Mark Dittus Ken Nowling Bob Slettehaugh Black & Veatch December 12, 2012 INTRODUCTION In the United States, natural

More information

You have applied in accordance with Section 9 of the Environmental Protection Act for approval of:

You have applied in accordance with Section 9 of the Environmental Protection Act for approval of: Ministry of the Environment Ministère de l Environnement ISP Canada Corp. 34 Industrial Street Toronto, Ontario M4G 1Y9 AMENDED CERTIFICATE OF APPROVAL AIR NUMBER 0275-864JR4 Issue Date: April 1, 2011

More information

1.3 Properties of Coal

1.3 Properties of Coal 1.3 Properties of Classification is classified into three major types namely anthracite, bituminous, and lignite. However there is no clear demarcation between them and coal is also further classified

More information

Fuel Burning Equipment. Maximum Firing Rate (gal/hr)

Fuel Burning Equipment. Maximum Firing Rate (gal/hr) A-806-71-B-A ) Amendment #1 After review of the air emissions license amendment application, staff investigation reports and other documents in the applicant s file in the Bureau of Air Quality, pursuant

More information

Potential to Emit A Guide for Small Businesses

Potential to Emit A Guide for Small Businesses 1EPA United States Office of Air Quality EPA-456/B-98-003 Environmental Protection Planning and Standards October 1998 Agency Research Triangle Park, NC Potential to Emit A Guide for Small Businesses EPA-456/B-98-003

More information

EPA Clean Power Plan and Impact on Texas and the Country. Scott D. Deatherage 214-999-4979 sdeatherage@gardere.com

EPA Clean Power Plan and Impact on Texas and the Country. Scott D. Deatherage 214-999-4979 sdeatherage@gardere.com EPA Clean Power Plan and Impact on Texas and the Country Scott D. Deatherage 214-999-4979 sdeatherage@gardere.com United Nations 21 st Conference of the Parties United Nations Meeting on Climate Change

More information

2. Do I have to certify? 1. What is the ERP Installation Compliance Certification? 3. How do I submit a Compliance Certification?

2. Do I have to certify? 1. What is the ERP Installation Compliance Certification? 3. How do I submit a Compliance Certification? Compliance Certification Instructions Emergency Engines and Emergency Turbines 1. What is the ERP Installation Compliance Certification? Operators of new emergency engines with a rated power output equal

More information

The Fate of Ammonia and Mercury in the Carbon Burn-Out (CBO ) Process

The Fate of Ammonia and Mercury in the Carbon Burn-Out (CBO ) Process The Fate of Ammonia and Mercury in the Carbon Burn-Out (CBO ) Process Vincent M Giampa Progress Materials, Inc., One Progress Plaza, St. Petersburg, Florida 33701 KEYWORDS: mercury, ammonia, carbon burn-out,

More information

Appendix E BACT Analysis

Appendix E BACT Analysis Appendix E BACT Analysis APPENDIX E Project ASCENT Best Available Control Technology (BACT) Analysis May 2014 Environmental Resources Management 204 Chase Drive, Hurricane, WV, 25526 E.1 BACT Analysis

More information

Statement of Paul Kempf, Director of Utilities, University Of Notre Dame

Statement of Paul Kempf, Director of Utilities, University Of Notre Dame Statement of Paul Kempf, Director of Utilities, University Of Notre Dame Before the United States House of Representatives Energy and Commerce Committee, Subcommittee on Energy and Power Hearing on The

More information

A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS BPM 7/1 (2014)

A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS BPM 7/1 (2014) A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS (COAL-FIRED PLANT, GAS-FIRED GAS TURBINE, AND OIL-FIRED GAS TURBINE (PEAK LOPPING PLANT)) BPM 7/1 (2014) Environmental Protection Department

More information

(b) One (1) natural gas-fired boiler identified as B1, with a maximum heat input rate of 4.6 million (MM) British thermal units (Btu) per hour;

(b) One (1) natural gas-fired boiler identified as B1, with a maximum heat input rate of 4.6 million (MM) British thermal units (Btu) per hour; Brandon S. Erlacher Elkhart Truth Publishing Company 421 South Second Street Elkhart, IN 46516 Re: Registered Operation Status, 039-11783-00269 Dear Mr. Erlacher: The application from Elkhart Truth Publishing

More information

New Hampshire Code of Administrative Rules Env-A 3100

New Hampshire Code of Administrative Rules Env-A 3100 Disclaimer: The rules on this page are provided for the convenience of interested parties. While DES has taken care with the accuracy of the files accessible here, they are not necessarily the "official"

More information

STATE OF MISSOURI DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

STATE OF MISSOURI DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT STATE OF MISSOURI flle COPl DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized

More information

FAC 7.1: Generators. EPA Impacts on Emergency Gensets for 2015 Installations

FAC 7.1: Generators. EPA Impacts on Emergency Gensets for 2015 Installations FAC 7.1: Generators EPA Impacts on Emergency Gensets for 2015 Installations Speaker: Bob Stelzer, CTO Safety Power Inc bob.stelzer@safetypower.ca Speaker: Randy Sadler, SME, Safety Power Inc. randy.sadler@safetypower.ca

More information

Oil and Gas Air Quality Regulations and Permitting

Oil and Gas Air Quality Regulations and Permitting Oil and Gas Air Quality Regulations and Permitting Adam Berig Olsson Associates Colorado Springs Oil and Gas Committee Presentation February 2012 Who Regulates Air Quality? United States Environmental

More information

Improving the Thermal Efficiency of Coal-Fired Power Plants: A Data Mining Approach

Improving the Thermal Efficiency of Coal-Fired Power Plants: A Data Mining Approach Paper 1805-2014 Improving the Thermal Efficiency of Coal-Fired Power Plants: A Data Mining Approach Thanrawee Phurithititanapong and Jongsawas Chongwatpol NIDA Business School, National Institute of Development

More information

E N G I N E E R I N G

E N G I N E E R I N G Purpose If the customer s proposed project proceeds to Gate 1 of the Integrated Customer Solutions (ICS) process (see the ICS Process and Proposal Submission Guide), the customer must prepare a Load Displacement

More information

Roadmap Performance Target Best technology Capability

Roadmap Performance Target Best technology Capability Sulfur Dioxide Control Technologies In Electric Power Plants CCTR Basic Facts File #5 Brian H. Bowen, Marty W. Irwin The Energy Center at Discovery Park Purdue University CCTR, Potter Center, 500 Central

More information

White Paper: EPRI s Preliminary Evaluation of the Available HAPs ICR Data Paul Chu, Naomi Goodman Amended January 7, 2011

White Paper: EPRI s Preliminary Evaluation of the Available HAPs ICR Data Paul Chu, Naomi Goodman Amended January 7, 2011 White Paper: EPRI s Preliminary Evaluation of the Available HAPs ICR Data Paul Chu, Naomi Goodman Amended January 7, 2011 1. Background In December 2009, the U.S. Environmental Protection Agency (EPA)

More information

New RCSA section 22a-174-22 Subcommittee Definitions, Applicability, Tune ups, Record keeping 4/29/15 Summary of Discussion

New RCSA section 22a-174-22 Subcommittee Definitions, Applicability, Tune ups, Record keeping 4/29/15 Summary of Discussion New RCSA section 22a-174-22 Subcommittee Definitions, Applicability, Tune ups, Record keeping 4/29/15 Summary of Discussion Before the meeting Bob Silvestri (PSEG) shared diluent cap description and definition.

More information

RESPONSE OF THE UTILITY AIR REGULATORY GROUP TO EPA S CONSIDERATIONS IN THE DESIGN OF A PROGRAM TO REDUCE CARBON POLLUTION FROM EXISTING POWER PLANTS

RESPONSE OF THE UTILITY AIR REGULATORY GROUP TO EPA S CONSIDERATIONS IN THE DESIGN OF A PROGRAM TO REDUCE CARBON POLLUTION FROM EXISTING POWER PLANTS Introduction RESPONSE OF THE UTILITY AIR REGULATORY GROUP TO EPA S CONSIDERATIONS IN THE DESIGN OF A PROGRAM TO REDUCE CARBON POLLUTION FROM EXISTING POWER PLANTS October 2013 On September 23, 2013, the

More information

Hybrid Power Generations Systems, LLC

Hybrid Power Generations Systems, LLC Coal Integrated Gasification Fuel Cell System Study Pre-Baseline Topical Report April 2003 to July 2003 Gregory Wotzak, Chellappa Balan, Faress Rahman, Nguyen Minh August 2003 Performed under DOE/NETL

More information

Mercury Speciation in Flue Gas from Coal-fired Power Stations

Mercury Speciation in Flue Gas from Coal-fired Power Stations Mercury Speciation in Flue Gas from Coal-fired Power Stations Matthew A Dexter, Warren T Corns and Peter B Stockwell P S Analytical Arthur House Crayfields Industrial Estate Main Road Orpington BR5 3HP

More information

Application Note 12: TrendView Recorders Continuous Emissions Monitoring

Application Note 12: TrendView Recorders Continuous Emissions Monitoring Application Note 12: TrendView Recorders Continuous Emissions Monitoring Continuous Emissions Monitoring (often abbreviated to CEM) is the term commonly used to describe instantaneous or real-time environmental

More information

Continuous Monitoring Manual

Continuous Monitoring Manual January, 1992 Revisions: April, 2015 Operations Division 811 SW 6 th Avenue Portland, OR 97204 Phone: 503-229-5696 800-452-4011 Fax: 503-229-5850 Contact: Jill Inahara www.oregon.gov/deq DEQ is a leader

More information

How To Make Calcium Carbide

How To Make Calcium Carbide 11.4 Calcium Carbide Manufacturing 11.4.1 General Calcium carbide (CaC 2 ) is manufactured by heating a lime and carbon mixture to 2000 to 2100 C (3632 to 3812 F) in an electric arc furnace. At those temperatures,