1 New DirectionsforSurface Water ModelingfPmceeàings of the Baltimore Symposium, May 1989) IAHSPubl.no. 181,1989. Assessment of the US Conservation Service method for estimating design floods A.A. Hoesein Fakultas Teknik, Universitas Brawijaya, Malang 65113, Indonesia D.H. Pilgrim School of Civil Engineering, The University of New South Wales, Kensington 2033, Australia G.W. Titmarsh Department of Primary Industries, Queensland, Toowoomba 4350, Australia I. Cordery School of Civil Engineering, The University of New South Wales, Kensington 2033, Australia ABSTRACT The US SCS method has been tested as a design flood procedure in two regions in eastern Australia. Runoff curve numbers have been derived from observed data on a probabilistic rather than an event basis, fitting the design case. Derived values depended on the method for determining time of concentration and the average recurrence interval of the design flood, and to a minor extent on basin characteristics. Values derived by the normal SCS handbook procedure were shown to give very poor estimates of flood frequency values. Mapping of derived values provides a satisfactory basis for flood design. INTRODUCTION The U.S. Soil Conservation Service (SCS) Method is widely used for estimating floods on small to medium sized ungauged drainage basins in the USA and in many other countries. While there is an extensive literature on the method, little quantitative information is available on the data base from which the method was developed, and the manner in which this base was used in the development. Rallison (1980) gives a general description of the origin and evolution of the method from infiltrometer tests. The procedure as currently employed is described by US SCS (1985), and the relationships involved will not be repeated here. The basic relationship in the method is between depths of runoff and rainfall in a flood event, utilizing a runoff curve number CN as a primary variable. An equation involving the calculated runoff depth and lag, time of concentration, and rainfall duration provides an estimate of the peak discharge. Many variations of the procedure have been proposed and employed in practice. A series of papers presented at an international symposium on rainfall-runoff modelling (Singh, 1982) gives a recent review of the method. 283

2 A. A. Hoesein et al. 284 INTERPRETATION AND TESTING OF THE METHOD As discussed in more detail by Pilgrim (1989), the estimation of design floods on small to medium sized rural drainage basins is of considerable economic importance. Although each individual structure on these basins might be of relatively low cost, the total expenditure on all of these structures is greater than that on any other type of structure for which a design flood provides the basic criterion for sizing and satisfactory performance. It is therefore important that the adequacy of methods such as the SCS procedure should be tested as thoroughly as possible. In addition, designers should understand the method used, its strengths and particularly its weaknesses. As with many other types of flood estimation methods, the SCS method is applied to two quite different types of problems. Although the computational procedure may be virtually the same in both cases, the interpretation of the method, its validity, and the requirements for testing the method are different. The first type of application is where an estimate is required of the depth, and possibly peak rate, of runoff from a particular storm event. This is a deterministic problem and for this case the method is regarded as a deterministic model. The second type is the design case, where a flood of a selected probability of exceedance is derived from a design rainfall of the same probability of exceedance. A probabilistic interpretation of the method is involved, and this is the approach adopted here. Much confusion has arisen through lack of appreciation of the differences in the two approaches, which are discussed in more detail by Pilgrim (1989) in the context of the Rational Method. The SCS method has been tested extensively in the deterministic sense with generally poor results. For example, Wood and Blackburn (1984) using 1600 runoff plots in Nevada, Texas and New Mexico found differences of greater than ±50% in 67% of the results. They found that the assumed antecedent moisture condition had a major effect, and that results were better for bare soil or sparse vegetation than for dense vegetation. Similar findings on the effects of vegetation were reported by Steichen (1983) and Glanville et al. (1984). Hawkins (1980) and Chen (1982) give examples of the sensitivity of runoff estimates to variations in CN. Poor performance as a deterministic model does not necessarily imply that the SCS method is inadequate as a design tool. The requirement here is that the method converts the design rainfall of selected average recurrence interval (ARI) and duration into the runoff depth, or more usually peak rate of flow, of the same ARI. The transformation here is between values of the same ARI from frequency curves of rainfall and floods. This interpretation is the only one that fits the normal design case, and it provides the basis for valid testing of methods for estimating design floods. Some limited testing of the SCS method using this general approach has been carried out by Hiemstra (1968) and Hjelmfelt (1980,1983). This paper reports the results of a more extensive assessment of the method as a design model. DRAINAGE BASINS STUDIED The study covered two regions in eastern Australia. The first involved 43 drainage basins in a km 2 region in south eastern

3 285 Assessment of the SCS method for estimating design floods New South Wales, mostly with areas of km 2 and either forest or pasture cover. The second region was larger, with 96 drainage basins over an area of km 2 in and adjacent to south eastern Queensland with areas mostly in the range km 2. As well as forest and pasture cover, some basins had large areas of cultivation. In both regions, all of the gauged rural basins were used that were of small to medium size and that had at least 10 years of recorded streamflows. DERIVATION OF CN VALUES FROM RECORDED DATA As the SCS method was being tested as a design procedure, conventional design rainfalls from intensity-frequency-duration data derived by the Bureau of Meteorology (Inst. Engrs Aust., 1987) were calculated for each drainage basin for a range of ARIs. A frequency analysis of observed floods was carried out for each basin, using the partial series of floods. Flood peaks were only estimated for ARIs up to or a little beyond the length of record In each case. As very little extrapolation of data was involved, log Pearson ill distributions were fitted by moments to the partial series of floods purely as a curve fitting or smoothing procedure, using the same number of floods in the series as the number of years of record to give the best fit to the data (McDermott Pilgrim, 1982). Values of CN were then derived to make the peak discharges estimated from the design rainfalls equal to the peak discharges determined from the frequency analyses of observed floods. The estimated peak discharges were calculated by the formula based on a triangular hydrograph shape. As the values of design rainfall and the peak discharge from the flood frequency curve for a given basin were different for the various ARIs, the values of CN derived in this way were different for each ARI. EFFECT OF METHOD OF DETERMINING TIME OF CONCENTRATION In the SCS method, the rainfall duration depends on an estimated value of the time of concentration(t ). The design rainfall depth on a given basin for a particular ARI is calculated from the intensityfrequency-duration relation for the region, and CN will therefore depend on the method used to calculate t. In general, a longer t_ leads to a lower design rainfall and hence a larger value of CN. For south eastern New South Wales, the effects of five methods of estimating t were investigated. Four of these involved formulae for calculating t c directly from catchment characteristics. These were the Bransby Williams formula using the length and slope definitions of the Institution of Engineers Australia (1987), a simple power function of area derived by McDermott Pilgrim (1982), the Ramser-Kirpich formula (Kirpich, 1940), and a variation of this (Midgley 5 Schultz, 1956) using a different measure of slope. The fifth method was that given by the US SCS (1985) where t c is related to stream length, slope and potential Infiltration. This last value Is a function of CN, so that in deriving the CN value from observed flood data, a trial and error procedure was required. For south eastern Queensland, a similar range of methods was tested, but with parameters for many of the formulae derived from local data. Table 1 shows values of CN for an ARI of 10 years [CN(10)] derived from the observed flood data on two drainage basins In south eastern

4 A. A. Hoesein et al. 286 New South Wales using design rainfalls with durations derived from t c values given by each of the five procedures. The variations are typical of those for the remainder of the basins in both regions. They demonstrate that the appropriate value of CN for a given basin depends on the manner in which the rainfall duration is determined, which must also be used in application of the derived CN values in design if the observed flood data are to be reproduced. TABLE 1 Variation of derived CN(iO) with method of estimating t c Basin Method of estimating t c gauging TïrluTsTyy McDermott Ramser- Midgley SCS triallj stn Natl No. Williams Pilgrim Kirpich Schultz error VARIATION OF DERIVED CN WITH ARI As noted previously, different values of CN were derived on each basin for each different value of ARI. CN remains almost constant in very few cases. However, the direction and magnitude of change with increasing ARI vary considerably for different basins, and also vary on most basins with the different methods of estimating t c. For this latter effect, the differences in CN values for the different t methods increase with increasing ARI. Tables 2 and 3 show the differences between the 1 and 10 year, and 10 and 50 year ARI values of CN for 30 of the basins in south eastern New South Wales. There are feiver values in Table 3 because CN(50) was not derived for basins with relatively short records. The tables illustrate the differences in the variation of CN with ARI for the different methods of estimating t c. For the first four methods in which t~ is estimated directly from basin characteristics, there is a greater variation of CN for low ARIs between 1 and 10 years than for higher ARIs above 10 years. For all but the Bransby Williams method, CN values seem to reach a minimum on average at an ARI of about 10 years. CN values derived using the SCS method for estimating t c tend to vary randomly with little trend. TABLE 2 [CN (1) - CN (10)] - south eastern New South Wales Number of stations with CN difference Method for ^ m ^ÏQ -5 g- ^7j t c to -5 to 0 to 5 to 10 Bransby Williams McDermott Pilgrim Ramser Kirpich Midgley Schultz SCS trial error TABLE 3 [CN (10) - CN (50)] - south eastern New South Wales Method for t Bransby Williams McDermott %, Pilgrim Ramser % Kirpich Midgley Schultz SCS trial error < Number of stations with CN difference >10 to - 5 to 0 to 5 to

5 287 Assessment of the SCS method for estimating design floods For the CN values derived with the McDermott Pilgrim method of estimating t, linear regressions were derived for CN(Y) against C(10) for each of the ARIs of Y = 1, 2, S, 20, 50 and 100 years. The number of CN values decreased as ARI increased. The coefficient of determination (r 2 ) was in the range 0.70 to 0.98 for all regressions, and the correlations were significant at probability levels considerably less than 1% in all cases. Table 4 shows the CN values given by the regressions for each of the ARIs noted above corresponding to CN(10) values of 60, 80 and 90, covering the approximate range of derived values. This shows that the magnitude of CN has a considerable effect on the manner in which the CN values vary with ARI. For basins with CN(10) of 60, the derived CN values tend to decrease rapidly with increasing ARI. There is a very slight decrease, and a small increase for values of CN(10) of 80 and 90 respectively. The results represented only apply to this region and to CN values derived using t c calculated from the McDermott Pilgrim formula. They would not necessarily apply to other t c procedures or other regions. TABLE 4 CN(10) CN values given by regressions of CN(Y) on CN(10) - south eastern NSW using McDermott Pilgrim t c CN(Y) given by regressions CN(1) CNC2) CN(5) CNC2ÏÏ) CN(50) CNTTÔÔY"' (r 2 =0.702) (r 2 =0.873) (r 2 =0.981) (r 2 =0.985) ( r 2 =0.890) (r 2 =0.858) _ Similar variations of derived CN values with ARI were found for south eastern Queensland as are discussed above for south eastern New South Wales, In summary, derived values of CN vary with ARI on a given drainage basin. However from the results in this study, the manner and magnitude of variation depend on the particular region, the method of determining t c for the rainfall duration, and the magnitude of CN. To be useful for design, the effects of ARI need to be investigated in the region of interest. VARIATION OF DERIVED CN VALUES WITH BASIN CHARACTERISTICS Relationships between the derived CN values and a large number of drainage basin characteristics were investigated for both regions. Unless otherwise stated, the details of the following discussion apply to the south eastern Queensland region, with CN values derived from design rainfalls with durations estimated by the SCS procedure for t, but with locally derived parameters. Only a few basin characteristics had significant effects. The percentage of area cultivated had the greatest effect. Although there was a large scatter of data, increasing percentages produced significant increases in derived CN values, with r 2 = 0.35 for the 69 basins with the most reliable records. CN(10) values from the regression fitted to the data increased from 78 to 92 as area cultivated increased from 0 to 100%. The effect was most pronounced for ARIs up to 10 years, with lesser effects for the larger floods. The results here agree with those obtained deterministically for individual events, for example by Freebairn Boughton (1981), Rawls Richardson (1983) and Steichen (1983).

6 A. A. Hoesein et al. 288 Increasing basin size produced small variations in opposite directions in the derived CN values in the two regions. In south eastern New South Walesj basin size had no effect up to an ARI of 20 years, but beyond this CN increased with size. This could have resulted by chance from the small sample. In south eastern Queensland, CN decreased slightly with increasing basin size, possibly because the smaller gauged basins are generally on clays as these are the most important agriculturally. Overall, the results indicate that basin size probably had little effect on CN, and that the variations that did occur may have resulted from other causes. The only other basin characteristics showing any significant relation with CN were soil type and crop management. Average values of CN(10) decreasing by only 9 for soils with the lowest to the highest expected final infiltration rates respectively. Values of CN were influenced by crop management practices for small floods with ARIs up to 5 years. Overall, the derived values of CN varied over a much smaller range than the recommended values published by the US SCS (1985), and they were related to a much smaller number of basin characteristics. COMPARISON WITH CN VALUES ESTIMATED FROM BASIN CHARACTERISTICS A basic aspect of the SCS procedure as normally applied in practice is the estimation of a value of CN from basin characteristics. Tabulated values are given for three antecedent moisture conditions, for land use or cover, treatment or practice, hydrologie condition of soil cover, and four soil types. Values of CN were estimated by this handbook procedure for each of the drainage basins in the two regions. These values were then compared with those derived probabilistically from observed data. The results for both regions are typified by Fig. 1, showing derived CN(10) values plotted against estimated values for all 96 basins in the south eastern Queensland region. The line of equality is also shown. The very large scatter shows that the handbook procedure for estimating CN from basin characteristics is highly inaccurate. Poor estimates of the observed flood characteristics would result. Fig. 1 Estimated CN value Fig. 1 Comparison of derived and estimated CN values, south eastern Queensland.

7 289 Assessment of the SCS method for estimating design floods shows that the estimated values are too low on average, but this could result from the procedure used to estimate t c in calculating the derived values. In fact, as the derived values depend on the method used for estimating t c, exact correspondence of the two sets of CN values is of little importance. However, a consistent relation between the two sets would be necessary to make it possible for the estimated CN values to give accurate discharge values that reflect basin records. It is the scatter on Fig. 1 that indicates the poor accuracy of the handbook type procedure for estimating CN, and its inadequacy as a design procedure. MAPPING OF CN VALUES FOR DESIGN Mapping of the values of CN(10) derived from observed data was suggested by the similar procedure that was used by McDermott Pilgrim (1982) for probabilistic runoff coefficients for the Rational Method. It was also supported by the relation of CN values to soil type and percentage of area cultivated which are related to location. Values of CN(10) were plotted on maps and contours were sketched in. These were drawn subjectively, but account was taken of patterns of average annual rainfall and short duration design intensities, and of topography, geology and soil types. Reliability of gauging station records was also assessed and considered in the drawing of the contours. Fig. 2 shows a map of CN(10) for the south eastern New South Wales region. Some scatter of the values from the contours is to be expected due to the random errors and relatively small sample sizes of the recorded flood data, and to a lesser extent the design rainfalls. In general, the contours agree well with the plotted values, and are smooth, consistent and of reasonable shape. For both regions studied, the maps provide a sound basis for practical design and should give results that match the frequency curves of observed floods as well as possible. This is the objective of design. For application it would be essential to use the same design rainfall data and t c estimation procedure as was used in deriving the values. To determine CN values of other ARIs for design purposes, relations between these values and CN(10) are required. As discussed previously, N I- 100 Fig. 2 Map of design CN(10) values, south eastern New South Wales.

8 A. A. Hoesein et al. 290 linear regressions were derived between CN(Y) and CN(10) for each of the regions for ARIs of Y = 1, 2, 5, 20, 50 and 100 years. Some values from the regressions for south eastern New South Wales are shown in Table 4. These relations would complete the design procedures for the two regions. CONCLUSION Values of curve number (CN) for use in the SCS method as a design procedure should be derived probabilistically from observed data so that they reproduce values given by flood frequency curves, when they are applied to design rainfalls. This exactly matches the design procedure, in contrast to the usual approach of deriving CN values deterministically on an event basis. Probabilistic values of CN have been derived for large numbers of drainage basins in two regions in eastern Australia. The values of CN are not fixed or constant for a given basin as is implied in the normal handbook approach. They depend on the method used for estimating t in determining the rainfall duration and on the ARI of the flood considered, but their variation with these factors differed in the two regions. The CN values were fairly weakly related to some basin characteristics, but with a much smaller range of values than indicated by the SCS recommendations. There was a very poor relationship between CN values estimated from basin characteristics by the SCS handbook recommendations and the values derived from observed data. The former values would give inaccurate estimates of design runoff and flood peaks in both regions. Mapping of the derived values provided a sound basis for design in both regions. REFERENCES Chen, C.L. (1982) An evaluation of the mathematics and physical significance of the Soil Conservation Service curve number procedure for estimating runoff volume. In: Runoff-Rainfall Relationship (Proc. Internat. Symp. on Rainfall-Runoff Modeling, ed. by V.P. "Singh), Water Resources Publ., Littleton, Colo. Freebairn, D.M. & Boughton, W.C. (1981) Surface runoff experiments on the eastern Darling Downs. Aust J. Soil Res. 19, Glanville, S.F., Freebairn, D.M. Silburn, D.M. (1984) Using curve numbers from simulated rainfall to describe runoff characteristics of contour bay catchments. Agric. Engg Conf., Bundaberg 1984, Inst. Engrs Aust., Natl. Conf. Publ. 84/6, Hawkins, R.H. (1980) Infiltration and curve numbers: some pragmatic and theoretic relationships. Proc. Symp. on Watershed Management 1980, Boise Idaho, Vol. II. Am. Soc. Civil Engrs Hiemstra, L.A.V. (1968) Modifications on the "Soil Conservation Service Method" for the estimation of design floods on very small catchments in the arid western part of the United States of America. Colo. State Univ., Civil Engg Dept, Tech. Report. Contract No Hjelmfelt, A.T. (1980) Empirical investigation of curve number technique. Proc. Am. Soc.

9 291 Assessment of the SCS method for estimating design floods Civil Engrs, J. Hydraul. Div., 106(HY9), Hjëlmfelt, A.T71JWI) Curve numbers: a personal interpretation. In: Proc. Speciality Conf. on Advances in Irrigation and Drainage: Surviving External Pressures (ed. by J. Borrelli, V.R. Hasfurther R.D. Burman). Am. Soc. Civil Engrs Institution of Engineers Australia (1987) Australian Rainfall and Runoff, a Guide to Flood Estimation (ed. by D.H. Pilgrim), Canberra. Kirpich, Z.P. (1940) Time of concentration of small agricultural watersheds. Civil Engg, 10(6), 362. McDermott, G.E. Pilgrim, D.H. (1982) Design flood estimation for small catchments in New South Wales. Dept Natl. Devel. Energy, Aust. Water Resour. Council Tech. Paper No. 73, Aust. Govt Publ. Service, Canberra. Midgley, D.C. S Schultz, G.A. (1956) Progress in flood hydrograph synthesization. Die Siviele Inginieur in Suid-Afrika, 7(2), Pilgrim, D.H. (1989) Regional methods for estimation of design floods for small to medium sized drainage basins in Australia. Proc. IAHS Third Scientific Assembly, Baltimore, Thj- volume. Rallison, R.E. (1980) Origin and evolution of the SCS runoff equation. Proc._Symp. on Watershed Management 1980, Boise Idaho, Vol. II. Am. Soc. Civil Engrs Rawls, W.J. Richardson, H.H. (1983) Runoff curve numbers for conservation tillage. J. Soil Wat. Conserv., 38(6), ' Singh, V.P. (ed.) (1982) Rainfall-runoff relationship. Wat. Resources Publ., Littleton, Colo. Steichen, J.M. (1983) Field verification of runoff curve numbers for fallow rotations. J. Soil Wat. Conserv., 38(6), United States Soil Conservation Service (1985) National Engineering Handbook, Section 4, Hydrology. Washington, D.C. Wood, M.K. Blackburn, W.H. (1984) An evaluation of the hydrologie soil groups as used in the SCS runoff method on rangelands. Wat. Resour. Bull., 20,

10

Rainfall Intensities for Southeastern Arizona

Rainfall Intensities for Southeastern Arizona Rainfall Intensities for Southeastern Arizona By Herbert B. Osborn, Member, ASCE1 and Kenneth G. Renard, Fellow, ASCE1 Introduction Small watershed storm runoff in the southwestern United States is dominated

More information

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006 The David B. Thompson Civil Engineering Deptartment Texas Tech University Draft: 20 September 2006 1. Introduction For hydraulic designs on very small watersheds, a complete hydrograph of runoff is not

More information

Computing Stormwater Runoff Rates and Volumes

Computing Stormwater Runoff Rates and Volumes New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 5 Computing Stormwater Runoff Rates and Volumes This chapter discusses the fundamentals of computing stormwater runoff

More information

Application of Monte Carlo Simulation Technique with URBS Model for Design Flood Estimation of Large Catchments

Application of Monte Carlo Simulation Technique with URBS Model for Design Flood Estimation of Large Catchments Application of Monte Carlo Simulation Technique with URBS Model for Design Flood Estimation of Large Catchments J. Charalambous ab, A. Rahman c and D. Carroll a a City Design, Brisbane City Council, [email protected]

More information

Basic Hydrology. Time of Concentration Methodology

Basic Hydrology. Time of Concentration Methodology Basic Hydrology Time of Concentration Methodology By: Paul Schiariti, P.E., CPESC Mercer County Soil Conservation District What is the Time of Concentration? The time it takes for runoff to travel from

More information

Estimating Potential Reduction Flood Benefits of Restored Wetlands

Estimating Potential Reduction Flood Benefits of Restored Wetlands Estimating Potential Reduction Flood Benefits of Restored Wetlands Kenneth W. Potter University of Wisconsin Introduction Throughout the summer of 1993 a recurring question was the impact of wetland drainage

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Hydrologic Soil Groups

Hydrologic Soil Groups United States Department of Agriculture Natural Resources Conservation Service Hydrology Chapter 7 Rain clouds Cloud formation Precipitation Transpiration Surface runoff Evaporation from vegetation Transpiration

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

Chapter 4. Flood Risk Assessment

Chapter 4. Flood Risk Assessment Chapter 4 Flood Risk Assessment Chapter Overview Any floodplain management program must be established on a sound technical and scientific basis in order to be effective, whether for flood loss reduction

More information

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

Rural Flooding: The Potential Role of Forestry

Rural Flooding: The Potential Role of Forestry Rural Flooding: The Potential Role of Forestry Nadeem Shah, Tom Nisbet, & Huw Thomas Centre for Forestry and Climate Change Structure Background Woodland and Flood Alleviation The Theory. Studies on Woodland

More information

The Natural Hazards Project - 5 Flood and Surface Water Flooding. Flood estimation in small catchments

The Natural Hazards Project - 5 Flood and Surface Water Flooding. Flood estimation in small catchments The Natural Hazards Project - 5 Flood and Surface Water Flooding Flood estimation in small catchments 60 2013 R A P P O R T NIFS - Flood estimation in small catchments (Literature study) Norwegian Water

More information

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by: Rational Method Hydrologic Calculations with Excel, Course #508 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com Calculation of peak storm water runoff rate from a drainage

More information

Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts

Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts LARS 2007 Catchment and Lake Research Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts Seleshi Bekele Awulachew International Water Management Institute Introduction

More information

Applying MIKE SHE to define the influence of rewetting on floods in Flanders

Applying MIKE SHE to define the influence of rewetting on floods in Flanders Applying MIKE SHE to define the influence of rewetting on floods in Flanders MARK HENRY RUBARENZYA 1, PATRICK WILLEMS 2, JEAN BERLAMONT 3, & JAN FEYEN 4 1,2,3 Hydraulics Laboratory, Department of Civil

More information

THUNDERSTORM RAINFALL IN THE SOUTHWEST -*

THUNDERSTORM RAINFALL IN THE SOUTHWEST -* Purchased by \hz U. S. Department or Agriculture for official use SOME REGIONAL DIFFERENCES IN RUNOFF-PRODUCING THUNDERSTORM RAINFALL IN THE SOUTHWEST -* H. B. 03born - INTRODUCTION Regional differences

More information

Hydrologic Modeling using HEC-HMS

Hydrologic Modeling using HEC-HMS Hydrologic Modeling using HEC-HMS Prepared by Venkatesh Merwade School of Civil Engineering, Purdue University [email protected] April 2012 Introduction The intent of this exercise is to introduce you

More information

Evaluation of Open Channel Flow Equations. Introduction :

Evaluation of Open Channel Flow Equations. Introduction : Evaluation of Open Channel Flow Equations Introduction : Most common hydraulic equations for open channels relate the section averaged mean velocity (V) to hydraulic radius (R) and hydraulic gradient (S).

More information

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management 40 slide sample of Presentation Please contact [email protected] if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated

More information

Flood Frequency Analysis Using the Gumbel Distribution

Flood Frequency Analysis Using the Gumbel Distribution Flood Frequency Analysis Using the Gumbel Distribution Never Mujere University of Zimbabwe, Department of Geography and Environmental Science, Box MP 167, Mount Pleasant, Harare E-mail [email protected]

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam

How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam FLOOD HAZARD AND RISK ASSESSMENT OF HOANG LONG RIVER BASIN, VIETNAM VU Thanh Tu 1, Tawatchai TINGSANCHALI 2 1 Water Resources University, Assistant Professor, 175 Tay Son Street, Dong Da District, Hanoi,

More information

ADDING VALUE TO BOM FLOOD PREDICTIONS (WITHOUT MESSING AROUND WITH MODELS)

ADDING VALUE TO BOM FLOOD PREDICTIONS (WITHOUT MESSING AROUND WITH MODELS) ADDING VALUE TO BOM FLOOD PREDICTIONS (WITHOUT MESSING AROUND WITH MODELS) Mark Babister Steve Opper Peter Cinque Matthew Chadwick Belinda Davies Director, Webb McKeown & Associates Director, Emergency

More information

Hydrologic Engineering Techniques for Regional Water Resources Planning

Hydrologic Engineering Techniques for Regional Water Resources Planning US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Engineering Techniques for Regional Water Resources Planning October 1969 Approved for Public Release. Distribution Unlimited. TP-17

More information

Applying PEST (Parameter ESTimation) to improve parameter estimation and uncertainty analysis in WaterCAST models

Applying PEST (Parameter ESTimation) to improve parameter estimation and uncertainty analysis in WaterCAST models 18 th World IMACS / MODSIM Congress, Cairns, Australia 13-17 July 29 http://mssanz.org.au/modsim9 Applying PEST (Parameter ESTimation) to improve parameter estimation and uncertainty analysis in WaterCAST

More information

CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung 2,3, H. Kainz 3 and K.

CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung 2,3, H. Kainz 3 and K. CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung,, H. Kainz and K. König 1 Linz AG Wastewater, Wiener Straße 151, A-41 Linz, Austria Municipality

More information

Assessment of hydropower resources

Assessment of hydropower resources Assessment of hydropower resources Oliver Froend Assessment of hydropower resources Relevance of surveys, data assessment and analyses to the success of the project. Required data and field survey. Key

More information

WEPP MODEL APPLICATIONS FOR EVALUATIONS OF BEST MANAGEMENT PRACTICES

WEPP MODEL APPLICATIONS FOR EVALUATIONS OF BEST MANAGEMENT PRACTICES WEPP MODEL APPLICATIONS FOR EVALUATIONS OF BEST MANAGEMENT PRACTICES D.C. FLANAGAN 1, W.J. ELLIOT 2, J.R. FRANKENBERGER 3, C. HUANG 4 1 USDA-Agricultural Research Service, National Soil Erosion Research

More information

Ponds- Planning, Design, Construction

Ponds- Planning, Design, Construction United States Department of Agriculture Soil Conservation Service Agriculture Handbook Number 590 Ponds- Planning, Design, Construction This handbook describes the requirements for building a pond. It

More information

From Civil 3D, with Love

From Civil 3D, with Love From Civil 3D, with Love Download the zip file containing the files needed for the exercise. Extract the files to a convenient location on your hard drive before you begin. The files associated with this

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs

Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs US Army Corps of Engineers Hydrologic Engineering Center Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs October 1966 Approved for Public Release. Distribution Unlimited.

More information

Application of global 1-degree data sets to simulate runoff from MOPEX experimental river basins

Application of global 1-degree data sets to simulate runoff from MOPEX experimental river basins 18 Large Sample Basin Experiments for Hydrological Model Parameterization: Results of the Model Parameter Experiment. IAHS Publ. 37, 26. Application of global 1-degree data sets to simulate from experimental

More information

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING 1 MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING This note is intended as a general guideline to setting up a standard MIKE 21 model for applications

More information

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

FLOOD INFORMATION SERVICE EXPLANATORY NOTES FLOOD INFORMATION SERVICE EXPLANATORY NOTES Part 1 About the flood maps Limitations of the mapping What the maps don t show Where to find more information Definitions of words used to describe flooding.

More information

Stormwater Management Functional Servicing Report

Stormwater Management Functional Servicing Report Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015

More information

River Flood Damage Assessment using IKONOS images, Segmentation Algorithms & Flood Simulation Models

River Flood Damage Assessment using IKONOS images, Segmentation Algorithms & Flood Simulation Models River Flood Damage Assessment using IKONOS images, Segmentation Algorithms & Flood Simulation Models Steven M. de Jong & Raymond Sluiter Utrecht University Corné van der Sande Netherlands Earth Observation

More information

The Mississippi River & Tributaries Project

The Mississippi River & Tributaries Project The Mississippi River & Tributaries Project The Mississippi River & Tributaries (MR&T) project was authorized by the 1928 Flood Control Act. Following the devastating 1927 flood, the nation was galvanized

More information

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Presentation Overview

More information

5.3.1 Arithmetic Average Method:

5.3.1 Arithmetic Average Method: Computation of Average Rainfall over a Basin: To compute the average rainfall over a catchment area or basin, rainfall is measured at a number of gauges by suitable type of measuring devices. A rough idea

More information

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water 1 P age Module 6 : Quantity Estimation of Storm Water Lecture 6 : Quantity Estimation of Storm Water 2 P age 6.1 Factors Affecting the Quantity of Stormwater The surface run-off resulting after precipitation

More information

DEPARTMENT OF THE ARMY EM 1110-2-1619 U.S. Army Corps of Engineers CECW-EH-Y Washington, DC 20314-1000

DEPARTMENT OF THE ARMY EM 1110-2-1619 U.S. Army Corps of Engineers CECW-EH-Y Washington, DC 20314-1000 DEPARTMENT OF THE ARMY EM 1110-2-1619 U.S. Army Corps of Engineers CECW-EH-Y Washington, DC 20314-1000 Manual No. 1110-2-1619 1 August 1996 Engineering and Design RISK-BASED ANALYSIS FOR FLOOD DAMAGE REDUCTION

More information

Appendix F Benefit-Cost Analysis of Flood Protection Measures

Appendix F Benefit-Cost Analysis of Flood Protection Measures Appendix F Benefit-Cost Analysis of Flood Protection Measures Acronyms used in Appendix F: AA B AA C AA D BC BFE EAD FEMA NED O&M PV RED USACE Average Annual Benefits Average Annual Cost Average Annual

More information

Burnsville Stormwater Retrofit Study

Burnsville Stormwater Retrofit Study Burnsville Stormwater Retrofit Study Prepared for City of Burnsville June 2006 4700 West 77 th Street Minneapolis, MN 55435-4803 Phone: (952) 832-2600 Fax: (952) 832-2601 Burnsville Stormwater Retrofit

More information

COMPARISON BETWEEN ANNUAL MAXIMUM AND PEAKS OVER THRESHOLD MODELS FOR FLOOD FREQUENCY PREDICTION

COMPARISON BETWEEN ANNUAL MAXIMUM AND PEAKS OVER THRESHOLD MODELS FOR FLOOD FREQUENCY PREDICTION COMPARISON BETWEEN ANNUAL MAXIMUM AND PEAKS OVER THRESHOLD MODELS FOR FLOOD FREQUENCY PREDICTION Mkhandi S. 1, Opere A.O. 2, Willems P. 3 1 University of Dar es Salaam, Dar es Salaam, 25522, Tanzania,

More information

CHAPTER 11 1 PREDICTION AND MODELING OF FLOOD HYDROLOGY AND HYDRAULICS

CHAPTER 11 1 PREDICTION AND MODELING OF FLOOD HYDROLOGY AND HYDRAULICS CHAPTER 11 1 PREDICTION AND MODELING OF FLOOD HYDROLOGY AND HYDRAULICS JORGE A. RAMÍREZ Water Resources, Hydrologic and Environmental Sciences Civil Engineering Department Colorado State University Fort

More information

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects Description Retention/irrigation refers to the capture of stormwater runoff in a holding pond and subsequent use of the captured volume for irrigation of landscape of natural pervious areas. This technology

More information

CHAPTER 5 HYDROLOGIC ANALYSIS AND DESIGN

CHAPTER 5 HYDROLOGIC ANALYSIS AND DESIGN CHAPTER 5 HYDROLOGIC ANALYSIS AND DESIGN Chapter Organization 5.1 Introduction... 5-1 5.2 Hydrologic Analysis Methods... 5-1 5.3 Curve Number Method... 5-2 5.3.1 NRCS Curve Number Method Theory... 5-2

More information

National Weather Service Flash Flood Modeling and Warning Services

National Weather Service Flash Flood Modeling and Warning Services National Weather Service Flash Flood Modeling and Warning Services Seann Reed, Middle Atlantic River Forecast Center Peter Ahnert, Middle Atlantic River Forecast Center August 23, 2012 USACE Flood Risk

More information

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS PLANTER BOXES 1. Determine the impervious area contributing flow to the planter box (see Chapter 4.2). 2. Assumption: Typical soil infiltration

More information

Flash Flood Guidance Systems

Flash Flood Guidance Systems Flash Flood Guidance Systems Introduction The Flash Flood Guidance System (FFGS) was designed and developed by the Hydrologic Research Center a non-profit public benefit corporation located in of San Diego,

More information

Increasing water availability through juniper control.

Increasing water availability through juniper control. Tim Deboodt, OSU Crook County Extension Agent 498 SE Lynn Blvd. Prineville, OR 97754 541-447-6228 [email protected] Increasing water availability through juniper control. Throughout the region

More information

Lars-Göran Gustafsson, DHI Water and Environment, Box 3287, S-350 53 Växjö, Sweden

Lars-Göran Gustafsson, DHI Water and Environment, Box 3287, S-350 53 Växjö, Sweden Alternative Drainage Schemes for Reduction of Inflow/Infiltration - Prediction and Follow-Up of Effects with the Aid of an Integrated Sewer/Aquifer Model Introduction Lars-Göran Gustafsson, DHI Water and

More information

Ruissellement du Bassin Précipitation Abstractions Hydrogramme Flux de Base. Superposition Routage

Ruissellement du Bassin Précipitation Abstractions Hydrogramme Flux de Base. Superposition Routage HEC-1 Leçon 11 This lesson will focus on how WMS can be used to develop HEC-1 modeling parameters and not on the fundamental hydrologic principles simulated by HEC-1. 1 Vue D Emsemble Utilisés Couramment

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

Please click on the tutorial most fitting of your expertise in order to learn about the features of the visualization tool.

Please click on the tutorial most fitting of your expertise in order to learn about the features of the visualization tool. Introduction Welcome to the Indian Creek Conservation Reserve Program (CRP) visualization tool. This tool was developed by the University of Iowa - Institute for Hydroscience and Research (IIHR) as part

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

ARTICLE II STORM DRAINAGE. (From Ordinance No. 1987-17; August 4, 1987; Sections III through VIII)

ARTICLE II STORM DRAINAGE. (From Ordinance No. 1987-17; August 4, 1987; Sections III through VIII) ARTICLE II STORM DRAINAGE (From Ordinance No. 1987-17; August 4, 1987; Sections III through VIII) SECTION 2.1 Standard Provisions Standard Provisions All construction for storm drainage in the development

More information

Riprap-lined Swale (RS)

Riprap-lined Swale (RS) Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This

More information

dynamic vegetation model to a semi-arid

dynamic vegetation model to a semi-arid Application of a conceptual distributed dynamic vegetation model to a semi-arid basin, SE of Spain By: M. Pasquato, C. Medici and F. Francés Universidad Politécnica de Valencia - Spain Research Institute

More information

2011 HYDRAULICS MANUAL

2011 HYDRAULICS MANUAL STATE OF LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT P.O. Box 94245 Baton Rouge, Louisiana 70804-9245 http://www.dotd.la.gov/ HYDRAULICS MANUAL Hydraulics (225) 379-1306 PREFACE The following

More information

Interactive comment on A simple 2-D inundation model for incorporating flood damage in urban drainage planning by A. Pathirana et al.

Interactive comment on A simple 2-D inundation model for incorporating flood damage in urban drainage planning by A. Pathirana et al. Hydrol. Earth Syst. Sci. Discuss., 5, C2756 C2764, 2010 www.hydrol-earth-syst-sci-discuss.net/5/c2756/2010/ Author(s) 2010. This work is distributed under the Creative Commons Attribute 3.0 License. Hydrology

More information

06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH

06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH 06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH Richard Kellagher 1, Mike Panzeri 1, Julien L Homme 1, Yannick Cesses 1, Ben Gouldby 1 John Martin 2, Oliver Nicholson 2, Mark

More information

Integrated Local Flood Management and Drainage Strategy OVERVIEW

Integrated Local Flood Management and Drainage Strategy OVERVIEW Integrated Local Flood Management and Drainage Strategy OVERVIEW Flooding is a natural phenomenon. In urban areas where drainage relies on pipe networks, open channels and creeks, flooding can cause infrastructure

More information

WATER AND DEVELOPMENT Vol. II - Types Of Environmental Models - R. A. Letcher and A. J. Jakeman

WATER AND DEVELOPMENT Vol. II - Types Of Environmental Models - R. A. Letcher and A. J. Jakeman TYPES OF ENVIRONMENTAL MODELS R. A. Letcher and A. J. Jakeman Centre for Resource and Environmental Studies, The Australian National University, Australia Keywords: environmental models, environmental

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

Forecasting of Paddy Production in Sri Lanka: A Time Series Analysis using ARIMA Model

Forecasting of Paddy Production in Sri Lanka: A Time Series Analysis using ARIMA Model Tropical Agricultural Research Vol. 24 (): 2-3 (22) Forecasting of Paddy Production in Sri Lanka: A Time Series Analysis using ARIMA Model V. Sivapathasundaram * and C. Bogahawatte Postgraduate Institute

More information

X X X a) perfect linear correlation b) no correlation c) positive correlation (r = 1) (r = 0) (0 < r < 1)

X X X a) perfect linear correlation b) no correlation c) positive correlation (r = 1) (r = 0) (0 < r < 1) CORRELATION AND REGRESSION / 47 CHAPTER EIGHT CORRELATION AND REGRESSION Correlation and regression are statistical methods that are commonly used in the medical literature to compare two or more variables.

More information

Simple linear regression

Simple linear regression Simple linear regression Introduction Simple linear regression is a statistical method for obtaining a formula to predict values of one variable from another where there is a causal relationship between

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

A plan for conversion of stormwater to groundwater recharge on the Utah Valley University main campus, Orem, Utah

A plan for conversion of stormwater to groundwater recharge on the Utah Valley University main campus, Orem, Utah Hydrology Days 2013 A plan for conversion of stormwater to groundwater recharge on the Utah Valley University main campus, Orem, Utah Dylan B. Dastrup, Gabriela R. Ferreira, Daniel Zacharias, Daniel H.

More information

Storm Drainage Systems 11.9-1

Storm Drainage Systems 11.9-1 Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of

More information

Common Core Unit Summary Grades 6 to 8

Common Core Unit Summary Grades 6 to 8 Common Core Unit Summary Grades 6 to 8 Grade 8: Unit 1: Congruence and Similarity- 8G1-8G5 rotations reflections and translations,( RRT=congruence) understand congruence of 2 d figures after RRT Dilations

More information

Technical Standards and Guidelines for Planning and Design DRAFT VOLUME FLOOD CONTROL

Technical Standards and Guidelines for Planning and Design DRAFT VOLUME FLOOD CONTROL DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JAPAN INTERNATIONAL COOPERATION AGENCY Technical Standards and Guidelines for Planning and Design DRAFT VOLUME FLOOD CONTROL MARCH 2002 Project for the Enhancement

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

26. HYDRAULIC MODEL CALIBRATION USING A MODERN FLOOD EVENT: THE MAE CHAEM RIVER, THAILAND

26. HYDRAULIC MODEL CALIBRATION USING A MODERN FLOOD EVENT: THE MAE CHAEM RIVER, THAILAND 26. HYDRAULIC MODEL CALIBRATION USING A MODERN FLOOD EVENT: THE MAE CHAEM RIVER, THAILAND R. Kidson 1, K.S. Richards 1 & P.A. Carling 2 (1) Department of Geography, University of Cambridge, Downing Place

More information

Catchment Scale Processes and River Restoration. Dr Jenny Mant [email protected]. The River Restoration Centre therrc.co.uk

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk Catchment Scale Processes and River Restoration Dr Jenny Mant [email protected] The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects

More information

Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM

Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM 3 Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM Eric White, James Knighton, Gary Martens, Matthew Plourde and Rajesh Rajan A geoprocessing routine was used for the development

More information

Havnepromenade 9, DK-9000 Aalborg, Denmark. Denmark. Sohngaardsholmsvej 57, DK-9000 Aalborg, Denmark

Havnepromenade 9, DK-9000 Aalborg, Denmark. Denmark. Sohngaardsholmsvej 57, DK-9000 Aalborg, Denmark Urban run-off volumes dependency on rainfall measurement method - Scaling properties of precipitation within a 2x2 km radar pixel L. Pedersen 1 *, N. E. Jensen 2, M. R. Rasmussen 3 and M. G. Nicolajsen

More information

Real-time modelling of surface water flooding hazard and impact at countrywide scales

Real-time modelling of surface water flooding hazard and impact at countrywide scales Real-time modelling of surface water flooding hazard and impact at countrywide scales Steven Cole 1, Robert Moore 1, Paul Mattingley 1,Timothy Aldridge 2, Jon Millard 3,4 and Stefan Laeger 5 BHS National

More information

http://www.jstor.org This content downloaded on Tue, 19 Feb 2013 17:28:43 PM All use subject to JSTOR Terms and Conditions

http://www.jstor.org This content downloaded on Tue, 19 Feb 2013 17:28:43 PM All use subject to JSTOR Terms and Conditions A Significance Test for Time Series Analysis Author(s): W. Allen Wallis and Geoffrey H. Moore Reviewed work(s): Source: Journal of the American Statistical Association, Vol. 36, No. 215 (Sep., 1941), pp.

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

Chapter 9. Selected Watershed Initiatives in the Great Basin Region

Chapter 9. Selected Watershed Initiatives in the Great Basin Region Chapter 9 Selected Watershed Initiatives in the Great Basin Region The Great Basin contains vast areas of sparsely populated desert lands. Lacking an ocean drainage, the Great Basin is a hydrologic sink

More information