1 FY Integrated Technology Plan Page 1

2 Table of Contents Introduction & Overview... 2 Current Environment & Enterprise Applications... 4 ITS Strategic Priority and Goals... 6 Technology Outlook... 7 IT Plan Planning Process Environmental Scan Technology Surveys Major IT Projects by Fiscal Year Resources Appendix Integrated Technology Plan Page 2

3 Introduction & Overview The Information Technology Service group (ITS) at the College of Lake County is an internal organization dedicated to assuring above average delivery of products and services in the following areas: Network Support Services Application Services User Services The team is committed to providing technical leadership, staff and student support, training and the development of policies and procedures that relate to technology in the college environment. It is the goal of ITS to align the mission of the College with the mission of IT using technology and available resources. Information Technology Services, under the leadership of the Chief Information Officer, provides the following services and support to faculty and staff. Helpdesk Enterprise application Network infrastructure Desktop/laptop deployment Audio visual Telecommunication A complete list of the ITS Service Catalog is included in Appendix A. The Integrated Technology Plan is a directional tool that ensures that the Information Technology Services (ITS) operations are synchronized with the College s vision, strategic plan, identified resources, and timeframes. The plan is not a concrete roadmap, it allows for changes and flexibility as technology shifts. This document is updated annually to ensure that technology is keeping pace with the needs of students, faculty, and staff while leveraging current and future technological trends. ITS uses the input of the Information Technology Commission (ITC) to provide input that is critical in setting directions and priorities for IT. This process includes developing and implementing strategic and tactical IT plans and the ability to allocate resources properly. ITC membership consists of Faculty members, Specialist and Classified Staff, (s), Administrators and representatives of the Southlake and Lakeshore campuses. ITC meets monthly during fall and spring semesters. In addition to ITC, the Information Technology Services Staff participates regularly with other college committees to discuss operational issues and prioritize project requests. This includes the ERP Steering committee which drives our core PeopleSoft applications. Integrated Technology Plan Page 3

4 Current Environment & Enterprise Applications Of the 269 total classrooms at CLC, 65% are considered Smart Rooms with a minimum of one desktop computer, overhead projector or document camera and a DVD player. There are 95 laboratories with a total of 2155 computers at all three campuses. As an extension to the wired network, CLC offers wireless services on all three campuses. Additional access points are being added as existing buildings and wings are remodeled or as new facilities are constructed. ITS provides technology assistance in support in several areas of the college. The following items are key enterprise applications currently in place at CLC PeopleSoft ERP Campus Solutions 9.0 administration including the ability to register/drop classes, make payments and view schedules/grades online. Financials 9.1 Finance administration including purchasing, e-procurement, accounts payable, general ledger and financial reporting. Human Capital Management 9.1 Human Resources administration which includes employee self-service. These applications run on proprietary software, PeopleTools. The PeopleTools version varies by release but will be upgraded in the next months and all modules will all be on a tools release of 8.54 or higher. The PeopleTools 8.54 release is a game changer; it includes several new features like HTML5, which will be a key technology for Mobile devices. Additionally, with Mobile Computing in mind, the PeopleSoft modules will be modified to make use of Home Pages and Dashboards, Related Actions, Hover, and Related Content features, which will ease Mobile navigation. Blackboard Blackboard Enterprise is used as the Course Learning Management System. Our LMS is the second most used piece of software by both our faculty and students. Interaction with our LMS is daily involving such activities as taking assessments, posting and consuming of content and use of other resources linked via the LMS to support the classroom learning environment. We are working to grow our LMS system to include more capabilities around content management and virtual classroom technologies. This system is currently maintained by Educational Affairs. CLC Website Under the leadership of the Public Relations and Marketing, the college launched a redesigned website in June 2014, featuring responsive web design using the Telerik Sitefinity content management system. Currently, all updates to the website are performed by the Public Relations and Marketing web team staff. Integrated Technology Plan Page 4

5 Blackboard Mobile Springboard The Mobile Springboard is a platform that allows CLC to utilize some pre-packaged features such as Maps, News, and Directory. In addition, we have the ability to add our custom links to publish additional information via the mobile app. We currently have several links into our Enterprise system for resources relevant to faculty, students, and staff of the college. MyCLC, Faculty and Staff Portal CLC has a faculty, staff and student portal called My CLC. The current portal tool provides core functionality such as menu driven navigation, single sign on, unique user communities, user group centric content, and discussion forums. The portal also include the ability to access multiple applications such as PeopleSoft, Blackboard, campus announcements, calendars, college newspaper and internal directory information. Microsoft Exchange Staff and Faculty ITS supports and maintains a comprehensive unified messaging service for the staff of CLC which includes voic and . The system is currently run on Microsoft Exchange Server A pilot is currently in process to migrate to Exchange 365 with target for completion of Fall Google Gmail s All students are provided an account with the domain of stuclc.illinois.edu currently hosted by Google. Google Maps The college has worked with Google to create an online map of all three college campuses. Google Maps details not only roads to the college but internal areas within the college such as the James Lumber Center and the Library Resource Center (LRC) as well as actual classroom locations. Additional Software There are over 100 other software applications used for student education and development throughout the college. Integrated Technology Plan Page 5

6 ITS Strategic Priority and Goals Alignment of ITS Strategic goals with College s strategic goals. 1. Design and deploy an effective and responsive organization structure to support all clients consequently improving user satisfaction. 2. Improve the efficiencies and effectiveness of IT resources by providing training and support for current and future technology. 3. Foster a culture that encourages exploration and adoption for innovation technology while continuing to use the full potential of existing applications. 4. Encourage and support departments in their efforts to streamline and simplify college administrative operations and systems through technology while also improving skills and knowledge of supported technology. 5. Enhance and improve the capabilities of the information systems methodologies to better serve and match the needs of students, faculty and staff in a diverse learning environment with a diverse student population. 6. Ensure maximum stewardship of IT resources and support the college s sustainability goals. 7. Improve IT infrastructure to provide high reliability and high performance access to network and other online services whether on or off campus. 8. Provide a secure infrastructure, free from malware and virus and other intrusions to internal domains, using appropriate technologies and processes. 9. Improve technology tracking and replacement strategy for servers, computer, printers and other valuable hardware. 10. Research and present new technology and technology resources that could improve teaching, learning or improve efficiencies in administrative and operational functions. ITS Strategic Goals Advance student learning and success X X X X X X X X CLC Strategic Goals Maximize educational opportunities within the district X X X Ensure fiscal stability and appropriate stewardship of resources X X X X X X X Promote diversity, global engagement and sustainability as strengths within the college and Lake County X X X X community Enable a culture of innovation, excellence and continuous X X X X X X X improvement Build the college's reputation as a premier education institution X X X X X X X X Integrated Technology Plan Page 6

7 Technology Outlook As often stated, the one constant is change. Technology will continue to change how the college educates students and how we work and interact with people. This is easily seen by comparing the top 10 IT issues for IT from 2014 to 2015 as identified by Educause, In this top 10 list only 30% of the list is exactly the same from These include developing the IT funding models, improving student outcomes and developing an enterprise IT architecture that can respond to, you guess it, change. The focus for interaction has moved from simply making wireless available and reducing cost by using the cloud to a full support system in the new normal which includes mobile (phones, tablets), online education (not tethered to a classroom environment), cloud (data everywhere and when you want it) and finally BYOD (my device, not yours). Other important shifts in IT thoughts include IT Staffing and the value of IT to the business. Number 1 on the list is the importance of hiring, retaining and keeping the knowledge and skills current for IT employees. Additionally, IT going beyond just being a partner to the college, but rather showing the business value of information technology and showing how IT can help the institution achieve its goals. Below are the top IT issues identified by Educause, Hiring and retaining qualified staff, and updating the knowledge and skills of existing technology staff 2. Optimizing the use of technology in teaching and learning in collaboration with academic leadership, including understanding the appropriate level of technology to use 3. Developing IT funding models that sustain core service, support innovation, and facilitate growth 4. Improving student outcomes through an institutional approach that strategically leverages technology 5. Demonstrating the business value of information technology and how technology and the IT organization can help the institution achieve its goals 6. Increasing the IT organization's capacity for managing change, despite differing community needs, priorities, and abilities 7. Providing user support in the new normal mobile, online education, cloud, and BYOD environments 8. Developing mobile, cloud, and digital security policies that work for most of the institutional community 9. Developing an enterprise IT architecture that can respond to changing conditions and new opportunities 10. Balancing agility, openness, and security (Source: Educause, 2015) Integrated Technology Plan Page 7

8 Of these issues identified by Educause the College of Lake County is focusing attention in the following areas. Staff and Improvement As the number one IT Issue as noted by Educause, CLC will work to shift the focus on achieving the ultimate service satisfaction levels of students, faculty and staff in the next three years. This can only be accomplished by increasing the knowledge, skills and satisfaction levels of existing staff through training, cross training, and personal development while retaining the lessons learned through application. CLC is interested in expanding the job content of ITS staff members to include a wider variety of tasks that include greater responsibility and accountability. We would like to capitalize on the expertise that exists and that is currently underutilized. Developing special project teams from all areas of ITS to fulfill a college goal with direction, specific task and milestones will foster camaraderie, the ability to work together as a team and a greater level of satisfaction. Improving Outcomes Technology will play critical roles from capturing students academic goals, retaining students to assist them in reaching their goals, to intervening early to prevent students from falling behind and in improving student outcomes. Technology will also help financially as funding models for higher education are increasingly focused on student program completion. There is a tremendous amount of data available on students from many different applications that can provide colleges information on how to better assist students. Technology offers tools to faculty and administrators to assist students towards success in college. They can connect with each other virtually by using social media, thus expanding the support systems necessary to be successful. Also, the use of open educational resources can reduce the financial burden faced by the students. CLC, in the next 12 to 24 months, will bring our help desk services in-house for student support. This initiative will provide better support for students resulting in greater student academic success. CLC students are best served by college employees and student apprentices who are familiar with their technology needs. Mobile computing: According to the Horizon Report 2013, an annual report that examines emerging technologies for higher education, mobile devices will transform education systems. Today s devices are smaller, faster, and multi-functional with an extended battery life. s increasingly carry multiple devices for different purposes and do not want to be confined to computer laboratories or the classroom. They expect to be able to collaborate and access information anywhere. Integrated Technology Plan Page 8

9 With connections that are increasing in speed, less costly, and easily accessible, wireless data networks have provided students the optimal user experience much like wired networks have in the past. Mobile technology is not just for surfing the net or social networks but a valuable tool of efficiency and convenience. For example, many of the Course Management Systems (e.g., Blackboard) have created applications where course information and assignments can be accessed by mobile devices. Many of the Enterprise Systems have web applications that allow students to register/drop classes and make payments, while providing faculty with the versatility of mobile computing to send messages and post grades. Mobile technology has also allowed students and teachers to connect with each other via communication enhancement tools, such as group chat, Twitter, Google Hangouts, etc. Faculty can make their classes more interactive by using mobile devices to poll their class to ensure students understand the concepts being taught and encourage the asking of questions and participation in discussions. Based on what today s CLC students are demanding, mobile technology adoption is a must and the necessary steps must be put in place for full adoption. Access to the high speed wireless data network has become what some consider the fourth utility after electricity, water and gas. Cloud Computing: The National Institute of Standard and Technology defines Cloud Computing as: a model for enabling convenient, on demand network access to a shared pool resource that is rapidly provisioned and released with minimal management effort. There are multiple ways to deploy the Cloud services including: public, private, community and hybrid. A public cloud is where applications are hosted for general public use such as Google suites, Microsoft suites etc. A public cloud is more cost effective and easier to implement. In a private cloud only the individuals from your institution are able to access it. This option is more expensive, but it provides increased security and compliance. In a community cloud, resources are available only to a certain group. The hybrid cloud is a combination of the public and private cloud where some resources are available to all and some only to authorized users. Cloud computing can make it easier for an institution to deploy applications or services compared to the traditional method where hardware is purchased and consultants are utilized in the absence of in-house expertise. Often, the costs associated are less because external providers resources are leveraged and do not purchase resources for future growth. However, there may be future issues regarding security, ownership and the performance of the actual application in a cloud environment. Based on analysis of these risks, CLC will continue to seek to offer more services via the cloud. CLC is currently using the cloud for student , Blackboard, portal and file storage. A pilot is in place for migrating staff to the cloud. Over the next several years, additional applications will be evaluated for migration to the cloud. Enterprise applications such as student registration system, finance system, and human resource system will all be considered. Integrated Technology Plan Page 9

10 Business Intelligence: Business Intelligence (BI) is a process of collecting various internal and external data into a central location. The information is then provided to end users within the organization to easily query the data in multiple ways to discover value within the data. Analytical tools are becoming a necessity for analyzing and sharing data that are stored in an Enterprise Resource Planning (ERP) system. While an ERP allows institutions to integrate and manage their information in one database, the BI tools allow the institution to quickly retrieve, analyze, and report the data. This is possible by developing a data warehouse. The warehouse allows for extracts of relevant data from the ERP system of record and other systems containing student data. Business intelligence tools are userfriendly web-based applications that include online analytical processing (OLAP) technology, dashboards, data mining, and other analytical tools that assist organizations with making informed decisions while planning for action. Furthermore, reports generated by analytical tools can easily be shared and disseminated across the institution. CLC currently uses a data warehouse for mining of student data in the Office of Institutional Effectiveness, Planning & Research department and reports are distributed accordingly. There may be opportunities for more analytical research by deploying this tool or a similar tool for use in other areas of the college. Competency Based Education: In addition to the top 10 issues identified by Educause, an emerging trend is competency-based education or personalized learning. CBE is described as allowing students to advance through learning a skill or competency at their own pace. s learn by mastering competencies not just by time spent in formal instruction. This model of learning would allow the college to meet the needs of different learning abilities and styles and, as a result, contribute to more successful student outcomes. s would be able to accelerate quickly through certain areas of which they can demonstrate that they have mastered the subject matter. Integrated Technology Plan Page 10

11 Conclusion: The College of Lake County must continuously analyze and adapt to rapidly changing technological advances to meet the needs of our students, faculty, staff, and administrators. As our number one goal, increasing the knowledge, skills and satisfaction of the ITS team and supporting our students directly by bringing the Help Desk in house, we believe will increase overall satisfaction and increase academic success. Mobile Computing, The Cloud, and Business Intelligence are not fads they are essential to the college to meet the needs of our stakeholders. They have been proven and tested by Fortune 500 companies and top universities/community colleges and are now commonplace. Research and confirmation are the best courses of action at this time for CLC. Technology is not a one size fits all solution. CLC must feel confident that the introduction of new technology best meets the requirements of the college and the students. Once proven, implementation, training and full utilization with periodic review of the process will occur. Integrated Technology Plan Page 11

12 IT Plan Planning Process The IT Plan is created from inputs from multiple sources including: CLC Strategic Plan: Specific goals and objectives listed in the CLC Strategic Plan. Environmental Scan: Data is used to make decisions on what initiatives should be included in the IT Plan. PeopleSoft Maintenance and Functionality: Includes all required PeopleSoft upgrades and timeframe for each upgrade. Technology Infrastructure Improvement: Details technology resources available for the optimization of technology in the learning environment. Sustainability: Includes action items from the Sustainability Plan related to ITS. Professional : Includes action items to keep the skills of ITS staff current on existing and new technology. Includes action items from the Teaching Learning Educational Technology Center,TLETC to be proactive in updating faculty and staff on the use of technology. CLC Strategic Plan CLC Operational Plans Professional Enviromental Scan Sustainbility IT Plan Technology Infrastructure Improvement PeopleSoft Maintenance and Functionality Integrated Technology Plan Page 12

13 IT Plan Timeline Collect Data July - Oct Communicate June Analyze Data/ CIO Trends Nov Finalize May Department Requests Jan - Feb Align with Budget March Create Action Plan Feb - March July October: Conduct faculty, staff and student surveys; update CSSE and ACT Data November Analyze the data and create a discussion paper on results and industry trends January February : College departments will have the opportunity to submit their requests for new initiatives, projects, software and hardware February March : Review requests and prioritize new action items for next year March Costs associated with new Action items will be put in the budgeting process May Update the IT Plan Matrix after the budget is finalized June Communicate the updated plan for the following year to the College community Integrated Technology Plan Page 13

14 Environmental Scan Below are the data elements to be used to assist in deciding what action items to include in the IT Plan: Benchmark compare CLC data with peer institutions and national data. CCSE/ACT Use results to analyze where CLC students rank technology and ITS services. Technology Survey Continue to conduct an annual survey of students to ascertain their technology needs. Faculty and Staff Technology Survey - Conduct annual survey of faculty and staff to determine their technology needs. Future Technology Trends- Review the literature of current and future technology trends and discuss the impact on CLC. Benchmark Future Technology Trends Enviromental Scan CCSE / ACT Faculty and staff Survey Technology Survey Integrated Technology Plan Page 14

15 Environmental Scan The ITS department conducts an environmental scan annually to identify factors or trends that might impact its operations in the next three to five years. Data from both internal and external sources were examined to provide the department with a better understanding of factors that may be influential in the short term and long term. As the College of Lake County prepares to plan for improvements in its information technology services to students, faculty, and staff, information collected will be used to guide the planning process. Key Findings Most fluctuations from 2013 to 2014 are less than two percent. The largest changes from 2013 to 2014 include a 9% increase in the use of notebook computers or tablets, a 5% increase in the use of the wireless network via a smart phone and an 11% decrease in the use of CLC s social network. s: Change in Technology and Access: 90% of students are satisfied or very satisfied with technology at CLC 90% reported having high speed/broadband internet access at home 92% of students have access to a desktop or full-size laptop outside the CLC campus 61% have a notebook computer or tablet Wireless: 83% of students access the CLC wireless network with their own device 72% are satisfied/very satisfied with the wireless internet connection speed 58% of students access the wireless network with a smartphone and Social: 86% of students use their CLC account on a weekly basis 94% of students are satisfied/very satisfied with the CLC 30% of our students visits CLC social network 61% of students use CLC mobile app Faculty Change in Technology and Access: 84 % of are satisfied with the technology at CLC 97% reported having access to high speed internet from home 90% have a personal mobile device 63% indicated that they are somewhat or very likely to use a personal mobile technology device on campus Integrated Technology Plan Page 15

16 Campus Technology: 71% have an on-campus work area with computer access 82% are satisfied with CLC computers 32% of faculty members use Remote Desktop 81% are satisfied with Remote Desktop Staff: Change in Technology and Access 90% are satisfied with the technology at CLC 96% reported having access to high speed internet from home 95% have a personal mobile device 74% indicated that they are somewhat or very likely to use a personal mobile technology device on campus Campus Technology 90% have an on-campus work area with computer access 87% of employees are satisfied with CLC computers Integrated Technology Plan Page 16

17 National Surveys CCSSE The most recent administration of the Community College Survey of Engagement (CCSSE) compiled for 2014 revealed that 64% of CLC students report using computer labs; 32% report using computer labs often. Of those who use the computer labs, 95% report being satisfied. Usage of and Satisfaction with computer labs at CLC are comparable to national norms reported by CCSSE. CCSSE Usage: Computer Labs Group CLC Nat l CCSSE Cohort CCSSE Satisfaction: Computer Labs Group CLC Nat l CCSSE Cohort Integrated Technology Plan Page 17

18 Technology Surveys CLC Technology Surveys s, Faculty and Staff As part of the Technology Planning process, separate surveys were conducted of students enrolled in college-level courses and active faculty during the Fall 2014 semester with the following objectives: Determine the level of use of various technologies Measure satisfaction with current CLC technologies, Identify training needs of faculty Determine opportunities for adding new technologies to the college Both surveys were conducted online. The student survey was ed to a random sample of 5,000 students, including 70% part-time and 30% full-time for the fall of the 2014 term, matching the group s population proportion. A total of 510 valid responses were obtained, a 10% response rate. 1,705 employees were invited to take the survey, including 54% part-time faculty, 13% full-time faculty, 5% administrative and professional staff and 28% classified and specialist staff. 471 employees responded to the survey, a 27% response rate. The full methodology and a summary of the complete results of the surveys are available on the Institutional Effectiveness, Planning and Research website. Highlights are presented in the tables and figures below. and employee satisfaction with the technologies available at CLC were relatively high. A slightly higher percentage of students than employees indicated that they were satisfied in fall Among both groups, satisfaction declined somewhat as compared to the results from fall 2012 when 92% of students and 90% of employees indicated that they were satisfied. Overall Satisfaction with the Technologies Available at CLC Integrated Technology Plan Page 18

19 Overall Employee Satisfaction with the Technologies Available at CLC satisfaction with specific technologies available at CLC had very favorable results with the highest level of satisfaction with , emergency notification, classroom technology and blackboard at 90% and above. Areas for improvement include the CLC Mobile App and wireless communication. Satisfaction with Specific Technologies Integrated Technology Plan Page 19

20 Social, Mobile and CLC vs Other Integrated Technology Plan Page 20

21 Frequency of Usage of Computer Labs and Personal Devices Integrated Technology Plan Page 21

22 Blackboard: o o 47% of students indicate having used Blackboard daily as compared to 43.7 in 2013 and 40.7% in 2012 Overall satisfaction with Blackboard has increased to 90%, slightly higher than previous years at 89% Satisfaction with Blackboard Platform Satisfied Dissatisfied Integrated Technology Plan Page 22

23 Use of Technology s per Computer Fiscal Year Number of Computers FTE # of FTE per computer (for student use) FY FY FY FY FY FY FY2015 Estimated Source: IPEDS; Data Warehouse was used to estimate FY15 FTE (attempted credits/30) # of FTE per computer FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 Estimated Integrated Technology Plan Page 23

24 Total IT Expenditures per FTE Fiscal Year Total IT Expenditures FTE IT Expenditures per FTE FY2010 $5,244, , FY2011 $5,153, , FY2012 $5,540, , FY2013 $5,886, , FY2014 $5,889, , FY2015 (budgeted) $6,371, , FY2016 (budgeted) $6,369, , Sources: A1(student) data files FY2015 student counts will not be available until July 2015; FY2016 student counts will not be available until July 2015 IT Expenditures per FTE $ $ $ $ $ $ $ $ $0.00 $ $ $ $ $ FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 (budgeted) $ $ FY2016 (budgeted) Integrated Technology Plan Page 24

25 Technology Fee expense per student FTE Fiscal Year Total Technology Fee Expenditure FTE Technology fee expenditure per student FY2010 $998, , FY2011 $1,194, , FY2012 $1,235, , FY2013 $926, , FY2014 $1,070, , FY2015 (budgeted) $1,156, , FY2016 (budgeted) $996, , Technology fee expenditure per student FTE FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 (budgeted) FY2016 (budgeted) Integrated Technology Plan Page 25

26 Technology Resources Benchmark Analysis (2013) The College of Lake County Chief Information Officer (CIO) requested information about technology resources from eight peer Illinois community colleges. Peer colleges included College of DuPage, Triton College, Joliet Junior College, Elgin Community College, Harper College, Waubonsee Community College, Oakton Community College and Moraine Valley Community College. The objective was to determine how CLC ranked in comparison with these colleges on various measures. 5 out of 8 peer colleges charge technology fees with most of them calculating fees per credit hour. The average peer technology fee is $7.00 compared to $4.00 at the College of Lake County. The average life cycle for computers at peer colleges is 4-5 years, which is the same as the College of Lake County. All the colleges have made efforts to provide wireless connection on campus with the average coverage being 98% in the classrooms, 100% in public areas and 95% in the offices. With security being one of the main concerns in higher education, 6 out of 8 colleges have a security officer for IT. Colleges have started to increase their presence in virtual servers. Integrated Technology Plan Page 26

27 Integrated Technology Plan Page 27

28 Major IT Projects by Fiscal Year Full Project List included in Appendix Fiscal Year 2016 Projects Project Department Description Help Desk Migration from College Wide Migration of Help Desk support to Campus EAI Internal ITS resources Tech Bar concept for additional student support College Wide Develop additional support for students using the Genius Bar approach Implementation of Exchange 365 College Wide Movement of to Microsoft based cloud Server Implementation of Office 365 College Wide Movement of Microsoft based products to the cloud Server Reduction and continued migration to Virtualization Virtual Desktop deployment Implement Absence Management Information Technology Information Technology Human Resources Develop plan and implement for maximum virtualization in the data center. Replace standard desktop with thin client with virtual desktop application Carry over of FY2015 project; training and implementation Implement Time and Labor Finance Carry over of FY2015 project; training and implementation Electronic Confirmation of Program/Plan Implement Recruitment module for Enrollment Services (CRM) Simplified Experience (SSE) Task Management Framework Texting Product College Scheduler software install After Tools Upgrade; require program plan confirmation each term This project is to implement recruitment module to track and reach out to our prospective students. After Tools Upgrade; updated student self-service interface After Tools Upgrade; alternative to checklists for "to-do" management Allow non-emergency texts and additional flexibility with texting Pending funding Integrated Technology Plan Page 28

29 Assign Advisors (New, replaces Waitlist) Auto assignment of advisorscheck priority and status of project Bookstore Process Financial Aid Update the bookstore data extract process. It is outdated and does not reflect the best data from the student record. Improving the extract will reduce lines in FA and student frustrations because information will be up-to-date. It will also reduce overcharging because limits will be reduced as students drop classes or awards reduce. Financial Aid Status Page in my Center Financial Aid Provide a page in mycenter where financial aid students can check their financial aid status, including SAP and other eligibility categories. Loan Calculator Financial Aid Leverage PeopleSoft to capture student loan request information and calculate loan eligibility. Presently process is paper-based and manual. Waitlists Ed. Affairs Implementation of PS Waitlist functionality to allow students quick enrollment to high demand courses Adjunct Faculty Contract pay Ed. Affairs/ Human Resources/ Finance Automation of the Adjunct Faculty process for Ed. Affairs/HR/and Payroll, which will be a combination of new development of manual processes and streamlining of existing automated processes. Finance Upgrade 9.2 Finance PeopleSoft Upgrade Nelnet Mobile Finance Will allow students using CLC Mobile App to pay for classes with mobile device Paperless Bills Finance Move from paper bills to electronic Turbo Tax W2 Download Finance Interface to Turbo Tax to upload tax data Integrated Technology Plan Page 29

30 Project Costing Finance New module in PS Financials, will allow ability to track accounting of large projects Program Management Finance New module in PS Financials, will allow ability to report on large projects Upgrade of CLC and HR mobile product College Wide Need to upgrade current system to latest release Fiscal Year 2017 Projects Projects Department Description Athletic Eligibility Reports Services Center ( 360 ) Delegated Access (Parent Access Center) Program Enrollment and Academic Progress Tracker Redesign Center Pop-up and Actions Address Update in Center Electronic Grade Change Request Public Online Transcript Requests Tutoring Center sign-in and tracking Transfer Credit Sync with TES College Source Implement HCM 9.2 Upgrade Human Resources Improve process for certifying athletes Security only, need user feedback After Tools Upgrade; allows students to give limited access to 3rd parties (like parents) for payment, etc. After Tools Upgrade; new tool similar to degree audit/my planner, research possible uses After Tools upgrade, additional features available in SSE Allow students to update address while ensuring residency regs followed Allow faculty to submit grade changes online, uses workflow Allow students without log in account to order transcripts After Transfer Credit; make equivalencies public through College Source TES site Implement HCM 9.2 Integrated Technology Plan Page 30

31 Research potential Projects Project Department Description Research SSP system Ed Affairs Review of Success software options Research loading CRM data to Data Warehouse Position Budget Management Position Encumbrance Phase 2 Research Applicant Tracking System (ATS) options Performance Management Tuition Waiver/Reimb/Career Dev/PLARP automation Research HR upgrade to 9.2 Research enhancement for CLC Budget System IEPR Human Resources Human Resources Human Resources Human Resources Human Resources Human Resources Finance Will allow analysis of data to develop trends of student prospects Research and possibly implement if it requires just utilizing delivered pages or creating queries in PS. Research Only to track PT faculty Allocation. implement interface from PeopleAdmin or research adding e-recruit in PS for FY 2017 Project under research, might be able to build PS evaluation templates out once CLC determines how evaluation should look. Project under research for PeopleSoft, might need to create custom pages to house the information or continue with MS Access w/upload. Upgrade to Current rev level Review of software to manage CLC's budget system Nelnet Quikpay Upgrade (Enterprise) Finance Need to upgrade credit card system to latest release E-commerce expansion Finance Continue expansion of Nelnet tool to process credit card payments in PCI compliance at the College Research options of CLC Portal College Wide Research Portal options for CLC Review of CLC Mobile App College Wide Research options to enhance CLC's Mobile App Integrated Technology Plan Page 31

32 Resources A. Staffing FY 15 FY 16 FY 17 (Proj) FY 18 (Proj) Management Office Support Application Network User Services Total B. Life Cycle equipment to be replaced FY 15 FY 16 FY 17 FY 18 Proj) Labs / classroom (computers) Faculty/staff (computers) Smart rooms Servers Switches Phones C. Life Cycle cost estimate for equipment to be replaced FY2016 Average or Estimated Cost** FY 16 Extended Estimated Cost FY 16 Labs / classroom (computers) Faculty/staff (computers) $ $369, $ $130, Smart rooms $ $32, Servers $10, $200, Switches $7, $370, Phones $ $33, ** The costs are averages as hardware is available in many different configurations based on need. Integrated Technology Plan Page 32

33 Appendix Information Technology Fact Sheet ITS Service Catalog The following are all the services provided by ITS at the College of Lake County. Enterprise Application Support o Records and Admission system o Human Resource System o Finance System o Application Security Application Support o Resource 25 Room Scheduling o Microsoft Office o Image Now Document Scanning o SPSS Network Support o Core Infrastructure Support o o File system o Document Imaging o Infrastructure support of Educational and Administrative Departments o Manage Print Resources o Databases Telecommunication Services o IP Phone o Fax o Voice Mail Desktop Service Support o Computer Labs Hardware / Software Support o Computer Classroom Hardware / Software Support o Laptop Cart Support Audio Visual Service Support o Video Casting o Audio/Visual Equipment Delivery and Setup for events and meetings o Smart Room Training Service desk Support Web Services Support o Portal o Web Application Integrated Technology Plan Page 33

34 IT Project List Fiscal Year 2016 Projects Project Department Description Masterplan Support College Wide Support of CLC Masterplan Project for expansion and facility upgrades. Help Desk Migration from Campus EAI Tech Bar concept for additional student support Cloud Migration of Server Based Applications Expansion of Flash Storage Array College Wide College Wide Information Technology Information Technology Migration of Help Desk support to Internal ITS resources Develop additional support for students using the Genius Bar approach Cloud Migration of Server based applications. Continued research and implementation where cost benefit and performance gains are present Support growth of data center Collaboration Tools Support within Office Products Information Technology Add additional support for collaboration tools within online office products to support using video, data, and voice communications on a variety of devices. Implementation of Exchange 365 College Wide Movement of to Microsoft based cloud Server Implementation of Office 365 College Wide Movement of Microsoft based products to the cloud Server Reduction and continued migration to Virtualization Virtual Desktop deployment Implement Absence Management Information Technology Information Technology Human Resources Develop plan and implement for maximum virtualization in the data center. Replace standard desktop with thin client with virtual desktop application Carry over of FY2015 project; training and implementation Implement Time and Labor Finance Carry over of FY2015 project; training and implementation Document Camera Deployment College Wide Replacement Overhead Projectors with Document Cameras in all classrooms Integrated Technology Plan Page 34

35 and Staff portal upgrade College Wide s and Staff Portal Upgrade to a more responsive and needs based environment Electronic Confirmation of Program/Plan After Tools Upgrade; require program plan confirmation each term Research, customize, and implement delivered consolidated statistics and NSC report Electronic PS Forms Implement Recruitment module for Enrollment Services (CRM) Test Scores Processing and Updates DAISI Import DAISI Automated Drop Process Simplified Experience (SSE) Task Management Framework Texting Product College Scheduler software install Assign Advisors (New, replaces Waitlist) This will replace the old consolidated statistics and NSC report with the new delivered versions. After Tools Upgrade; online forms which feed directly into PS, such as program plan change requests This project is to implement recruitment module to track and reach out to our prospective students. ACT removing SSN; new PARCC state testing Create data file of applicants from PS to upload to DAISI. Automate DAISI 3rd day drop to ensure data integrity between PS and DAISI After Tools Upgrade; updated student self-service interface After Tools Upgrade; alternative to checklists for "to-do" management Allow non-emergency texts and additional flexibility with texting Pending funding Auto assignment of advisorscheck priority and status of project Bookstore Process Financial Aid Update the bookstore data extract process. It is outdated and does not reflect the best data from the student record. Improving the extract will reduce lines in FA and student frustrations because information will be up-to-date. It will also reduce over- Integrated Technology Plan Page 35

36 Financial Aid Status Page in my Center Financial Aid charging because limits will be reduced as students drop classes or awards reduce. Provide a page in mycenter where financial aid students can check their financial aid status, including SAP and other eligibility categories. Loan Calculator Financial Aid Leverage PeopleSoft to capture student loan request information and calculate loan eligibility. Presently process is paper-based and manual. Regulatory Changes Financial Aid Some area of Financial Aid and Institutional Compliance requirements seem to change every year, which require system updates. This line allows for planning for that occurrence. Update processes to incorporate custom enrollment status table IEPR Update to processes to make use of new Enrollment Status field, formally was a calculated value in DW, now in PS Modifications to processes for ICCB IEPR This project to implement changes required by ICCB. Waitlists Ed. Affairs Implementation of PS Waitlist functionality to allow students quick enrollment to high demand courses Adjunct Faculty Contract pay Ed. Affairs/ Human Resources/ Finance Automation of the Adjunct Faculty process for Ed. Affairs/HR/and Payroll, which will be a combination of new development of manual processes and streamlining of existing automated processes. Finance Upgrade 9.2 Finance PeopleSoft Upgrade Nelnet Mobile Finance Will allow students using CLC Mobile App to pay for classes with mobile device Integrated Technology Plan Page 36

37 Paperless Bills Finance Move from paper bills to electronic Turbo Tax W2 Download Finance Interface to Turbo Tax to upload tax data Project Costing Finance New module in PS Financials, will allow ability to track accounting of large projects Program Management Finance New module in PS Financials, will allow ability to report on large projects Voucher Upload Finance Automation of CLC process Analysis of Enrollment and Fees? Upgrade of CLC and HR mobile product Finance College Wide New report that will include detailed information related to individual students that will list the course they are enrolled and fees related to that specific course (Similar to the information provided in the Add/Drop Mailer) Need to upgrade current system to latest release Fiscal Year 2017 Projects Projects Department Description Athletic Eligibility Reports Services Center ( 360 ) Delegated Access (Parent Access Center) Program Enrollment and Academic Progress Tracker Redesign Center Pop-up and Actions Address Update in Center Improve process for certifying athletes Security only, need user feedback After Tools Upgrade; allows students to give limited access to 3rd parties (like parents) for payment, etc. After Tools Upgrade; new tool similar to degree audit/my planner, research possible uses After Tools upgrade, additional features available in SSE Allow students to update address while ensuring residency regs followed Integrated Technology Plan Page 37

38 Electronic Grade Change Request Public Online Transcript Requests Tutoring Center sign-in and tracking Transfer Credit Sync with TES College Source Implement HCM 9.2 Upgrade Human Resources Allow faculty to submit grade changes online, uses workflow Allow students without log in account to order transcripts After Transfer Credit; make equivalencies public through College Source TES site Implement HCM 9.2 Research potential Projects Project Department Description Research SSP system Ed Affairs Review of Success software options Research loading CRM data to Data Warehouse Position Budget Management Position Encumbrance Phase 2 Research Applicant Tracking System (ATS) options Performance Management Tuition Waiver/Reimb/Career Dev/PLARP automation Research HR upgrade to 9.2 IEPR Human Resources Human Resources Human Resources Human Resources Human Resources Human Resources Will allow analysis of data to develop trends of student prospects Research and possibly implement if it requires just utilizing delivered pages or creating queries in PS. Research Only to track PT faculty Allocation. implement interface from PeopleAdmin or research adding e-recruit in PS for FY 2017 Project under research, might be able to build PS evaluation templates out once CLC determines how evaluation should look. Project under research for PeopleSoft, might need to create custom pages to house the information or continue with MS Access w/upload. Upgrade to Current rev level Integrated Technology Plan Page 38

39 Research enhancement for CLC Budget System Finance Review of software to manage CLC's budget system Nelnet Quikpay Upgrade (Enterprise) Finance Need to upgrade credit card system to latest release E-commerce expansion Finance Continue expansion of Nelnet tool to process credit card payments in PCI compliance at the College Research options of CLC Portal College Wide Research Portal options for CLC Review of CLC Mobile App College Wide Research options to enhance CLC's Mobile App Integrated Technology Plan Page 39

40 Integrated Technology Plan Page 40

Information Technology Plan 2010 2011

Information Technology Plan 2010 2011 Information Technology Plan 2010 2011 September 2010 The FY10-11 IT plan was developed through collaboration with IT staff and engagement with IT governance groups. In the budget-constrained environment,

More information

Information Technology IT Support

Information Technology IT Support Information Technology IT Support Mature data governance practices 11 Mature data governance practices as determined by the Data Governance Information Technology, Vice Begin in 2014-15 5.4c, 5.6c Committee.

More information

CampusNexus Finance, HR & Payroll State of the Union. Robert Capello Product Manager

CampusNexus Finance, HR & Payroll State of the Union. Robert Capello Product Manager CampusNexus Finance, HR & Payroll State of the Union Robert Capello Product Manager Confidential Information The information presented in this session is proprietary and confidential to Campus Management

More information

Information Technology Services. Roadmap 2014-2016

Information Technology Services. Roadmap 2014-2016 Information Technology Services Roadmap 2014-2016 Introduction This document charts the direction for Humboldt State University s Information Technology Services department over the next three years. It

More information

Mt. San Antonio College. Information Technology Report Card. EDUCAUSE: 2013 Top 10 IT Issues

Mt. San Antonio College. Information Technology Report Card. EDUCAUSE: 2013 Top 10 IT Issues Mt. San Antonio College Information Technology Report Card EDUCAUSE: 2013 Top 10 EDUCAUSE releases an annual list of the top 10 issues affecting higher education institutions. The 2013 list emphasizes

More information

Houston Community College Transforms IT Systems to Improve Service and Efficiency

Houston Community College Transforms IT Systems to Improve Service and Efficiency Houston Community College Transforms IT Systems to Improve Service and Efficiency Houston Community College Houston, TX www.hccs.edu Industry: Education & Research Annual Revenue: US$255 million Employees:

More information

PeopleSoft HCM 9.2. Interaction Hub. by Information. Copyright 2013, Oracle and/or its affiliates. All rights reserved.

PeopleSoft HCM 9.2. Interaction Hub. by Information. Copyright 2013, Oracle and/or its affiliates. All rights reserved. PeopleSoft HCM 9.2 Key Concepts Intuitive Usability Redefining How Work Gets Done Efficient Workcenters and Dashboards Continuing Web 2.0 User Experience Strengthened Self Service Experience Next Generation

More information

Section B Standard Five T

Section B Standard Five T Standard Five-T Information Technology Since 2004, the technology support landscape at Lane has undergone dramatic changes. Staff reductions and organizational changes have tested the ability of technology

More information

Moraine Valley Community College. Strategic Technology Priorities and Goals

Moraine Valley Community College. Strategic Technology Priorities and Goals Moraine Valley Community College Strategic Technology Priorities and Goals FY 2016-2019 Letter from the President Moraine Valley Community College s mission of providing a learning-centered environment

More information

Eastern Illinois University information technology services. strategic plan. January,

Eastern Illinois University information technology services. strategic plan. January, Eastern Illinois University information technology services strategic plan January, 2014 Introduction With the selection of emerging technologies as one of the six themes of the university s recent strategic

More information

Copyright 2013, Oracle and/or its affiliates. All rights reserved.

Copyright 2013, Oracle and/or its affiliates. All rights reserved. 1 The Value of PeopleSoft Human Capital Management 9.2 Marc Weintraub Director, PeopleSoft Product Management 2 Safe Harbor Statement The following is intended to outline our general product direction.

More information

Technology Strategic Plan Middlesex Community College 2013_2018

Technology Strategic Plan Middlesex Community College 2013_2018 Technology Strategic Plan Middlesex Community College 2013_2018 Revised 03/20/2014 Brad Yoder Chief Technology Officer 1 I. Executive Summary... 4 II. Technology Operations... 4 A. Governance... 4 1. Executive

More information

University of Wisconsin - Platteville UNIVERSITY WIDE INFORMATION TECHNOLOGY STRATEGIC PLAN 2014

University of Wisconsin - Platteville UNIVERSITY WIDE INFORMATION TECHNOLOGY STRATEGIC PLAN 2014 University of Wisconsin - Platteville UNIVERSITY WIDE INFORMATION TECHNOLOGY STRATEGIC PLAN 2014 Strategic PRIORITIES 1 UNIVERSITY WIDE IT STRATEGIC PLAN ITS is a trusted partner with the University of

More information

Essex County College INFORMATION TECHNOLOGY MASTER PLAN 2009-2012

Essex County College INFORMATION TECHNOLOGY MASTER PLAN 2009-2012 Essex County College INFORMATION TECHNOLOGY MASTER PLAN 2009-2012 TABLE OF CONTENTS Introduction... 3 Guiding Principles... 4 Alignment... 5 Projected Annual Costs... 6 Goals and Objectives... 7 Page 2

More information

Strategic Plan. for the. Department of Information Technology 2008-2012

Strategic Plan. for the. Department of Information Technology 2008-2012 Strategic Plan for the Department of Information Technology 2008-2012 Submitted by Frank Williams Director, Information Technology October 20, 2008 Strategic Plan Information Technology 2008-2012 Information

More information

Iowa State University Proposal for HR-01 ISU HR Operating Model

Iowa State University Proposal for HR-01 ISU HR Operating Model Iowa State University Proposal for HR-01 ISU HR Operating Model Overview: Iowa State University proposes undertaking the HR-01 ISU HR Operating Model business case to transform the quality, manner and

More information

The Baltimore County Public Schools 2015-2019 Technology Plan

The Baltimore County Public Schools 2015-2019 Technology Plan 2015-2019 Technology Plan Prepared by: The Department of Information Technology Plan Origination Date: March 2014 Plan Updated April 2015 Version 2.0 The guiding document of Baltimore County Public Schools

More information

Technology Services Strategic Direction

Technology Services Strategic Direction Technology Services Strategic Direction 2014-2016 Update If we are not serving the student directly, we are serving someone who is Who we are: Technology Services currently reports to the Vice Chancellor

More information

Strategic Plan FY 2014-2016

Strategic Plan FY 2014-2016 Strategic Plan FY 2014-2016 CONTENTS SUMMARY 3 ACADEMIC SERVICES 4 DATA MANAGEMENT & REPORTING 6 COMMUNICATIONS & COLLABORATION 7 IT SERVICES 8 INFRASTRUCTURE 9 SECURITY 10 BRAND BUILDING 11 INITIATION

More information

Digital Marketplace - G-Cloud

Digital Marketplace - G-Cloud Digital Marketplace - G-Cloud CRM Services Core offer 9 services in this area: 1. Dynamics CRM Upgrade Services Utilising this service, Core will undertake an evaluation of your current CRM platform. We

More information

Strategic Plan for Technology 2015-2020

Strategic Plan for Technology 2015-2020 Florida Gulf Coast University Strategic Plan for Technology 2015-2020 Information Resource Committee I. Overview of the Process Information Resource Committee In the Fall of 2014, the Planning and Budget

More information

Citrus College. Technology Master Plan 2009-2014 Adopted 2011

Citrus College. Technology Master Plan 2009-2014 Adopted 2011 Citrus College Technology Master Plan 2009-2014 Adopted 2011 Citrus College District Information Technology Master Plan 2009-2014 2011 Update Table of Contents Planning Overview... 3 Background... 4 Factors

More information

Information Technology Strategic Plan 2014-2017

Information Technology Strategic Plan 2014-2017 Information Technology Strategic Plan 2014-2017 Leveraging information technology to create a competitive advantage for UW-Green Bay Approved December 2013 (Effective January 2014 December 2017) Contents

More information

Student Academic Services Software Products Committee Final Recommendations (March 2011)

Student Academic Services Software Products Committee Final Recommendations (March 2011) Student Academic Services Software Products Committee Final Recommendations (March 2011) Introduction This committee was charged with identifying technological means to achieve the following goals: Determine

More information

Office of Information Technology Service Catalog FY2015

Office of Information Technology Service Catalog FY2015 Office of Information Technology Service Catalog FY2015 Office of Information Technology Service Catalog FY2015 Table of Contents Accounts & Passwords... 3 Administrative... 4 Business Tools and Services...

More information

Standard Seven: Library and Other Information Resources

Standard Seven: Library and Other Information Resources Standard Seven: Library and Other Information Resources The institution demonstrates sufficient and appropriate information resources and services and instructional and information technology and utilizes

More information

Unleash Your District s Performance and Efficiencies. K-12 Financial and Personnel Management Software and Services

Unleash Your District s Performance and Efficiencies. K-12 Financial and Personnel Management Software and Services Unleash Your District s Performance and Efficiencies K-12 Financial and Personnel Management Software and Services K-12 Business Is Our Business For more than 25 years, Tyler Technologies has empowered

More information

University of Illinois at Chicago Campus Auxiliary Services Information Technology & Systems Programming

University of Illinois at Chicago Campus Auxiliary Services Information Technology & Systems Programming University of Illinois at Chicago Campus Auxiliary Services Information Technology & Systems Programming Strategic Plan 2012-2016 Purpose Mission Statement Former Mission Statement pre- 2012 The mission

More information

Subject: Overview of Information Technology Services and the Strategic Technology Plan. Proposed Committee Action No Action Required Information Only.

Subject: Overview of Information Technology Services and the Strategic Technology Plan. Proposed Committee Action No Action Required Information Only. AGENDA ITEM: IV Florida Polytechnic University Board of Trustees Technology Committee Subject: Overview of Information Technology Services and the Strategic Technology Plan Proposed Committee Action No

More information

Objective: END 3.3 Title: Effectively Managing IT Resources Date of Report: March 12, 2015

Objective: END 3.3 Title: Effectively Managing IT Resources Date of Report: March 12, 2015 Objective: END 3.3 Title: Effectively Managing IT Resources Date of Report: March 12, 2015 END 3.3 Centralia College will plan, implement and utilize a technology system and infrastructure that supports

More information

Office of Information Technology Service Catalog FY2015

Office of Information Technology Service Catalog FY2015 Office of Information Technology Service Catalog FY2015 Office of Information Technology Service Catalog FY2015 Table of Contents Accounts & Passwords... 3 Administrative... 4 Business Tools and Services...

More information

GRAND ERIE DISTRICT SCHOOL BOARD

GRAND ERIE DISTRICT SCHOOL BOARD D-2-c GRAND ERIE DISTRICT SCHOOL BOARD TO: FROM: RE: John Forbeck, Director of Education & Secretary David Abbey, Assistant Superintendent of Education Information Technology Services Annual Report DATE:

More information

AGENDA ITEM BACKGROUND TO: GOVERNING BOARD ITEM NUMBER

AGENDA ITEM BACKGROUND TO: GOVERNING BOARD ITEM NUMBER TO: GOVERNING BOARD AGENDA ITEM BACKGROUND DATE FROM: PRESIDENT SUBJECT: Information Technology Update April 11, 2011 ENCLOSURE(S) REASON FOR BOARD CONSIDERATION INFORMATION Storage Area Network (SAN)

More information

Whitepaper Enable Talent Management Through Fusion

Whitepaper Enable Talent Management Through Fusion Enable Talent Through Fusion Hexaware Technologies. All rights reserved. Enable Talent Through Fusion Table of Contents 1. Why Talent 3 2. Employee engagement through Talent 3 2.1. Fusion as a Technology

More information

Students. Information Technology Support Services Fall 2015

Students. Information Technology Support Services Fall 2015 Information Technology Support Services Fall 2015 Students On behalf of Information Technology, we would like to welcome you to USF. Our job is to make sure you receive the necessary support to complete

More information

Information Technology Services

Information Technology Services Information Technology Services 2015 Annual Report The 2015 Information Technology Services Annual Report Key Performance Indicators (KPIs) and Highlights of the 2014-2015 Academic Year Information Technology

More information

Customer Timeline - New in Summer 2012. Web Lead Capture - New in Summer 2012. Built-In Dashboards - New in Summer 2012

Customer Timeline - New in Summer 2012. Web Lead Capture - New in Summer 2012. Built-In Dashboards - New in Summer 2012 What s New Maximizer CRM 12 Features New Mobile Access User Interface Enhanced Mobile Access Appointment Management Enhanced Web Access User Interface Improved Web Access Speed & Navigation LinkedIn Integration

More information

Enhancing productivity, enabling. Success. Sage CRM

Enhancing productivity, enabling. Success. Sage CRM Enhancing productivity, enabling Success. Sage CRM Customer Relationship Management Customer Relationship Management (CRM) is far more than just a software application. It is a business solution that gives

More information

CedarCrestone 2013 2014 HR Systems Survey Highlights. In Denver!

CedarCrestone 2013 2014 HR Systems Survey Highlights. In Denver! CedarCrestone 2013 2014 HR Systems Survey Highlights HR Technologies, Deployment Choices, and Metrics 16 th Annual Edition In Denver! Lexy Martin Vice President, Research and Analytics CedarCrestone [email protected]

More information

Information Technology Strategic Plan and Review Colorado State University Pueblo 2013-2018

Information Technology Strategic Plan and Review Colorado State University Pueblo 2013-2018 Information Technology Strategic Plan and Review Colorado State University Pueblo 2013-2018 Table of Contents Table of Contents... 2 Introduction... 5 Mission... 5 Vision Statement... 5 Organizational

More information

NANUET UFSD Instructional Technology Plan - Annually - 2015

NANUET UFSD Instructional Technology Plan - Annually - 2015 LEA Information A. LEA Information 1. What is the total student enrollment based on the most recent BEDS Day submission? 2. 2,209 What is the student enrollment by grade band based on the latest BEDS Day

More information

Statement of Direction

Statement of Direction Microsoft Dynamics SL Statement of Direction Product strategy and roadmap for Microsoft Dynamics SL Date: January 2012 www.microsoft.com/dynamics/sl Page 1 CONTENTS Welcome... 3 Overview of Microsoft Dynamics

More information

Schedule 740966.1. Archive 740964.1. FYI: New Portal with same DocID. Generic Advisor Webcast Note 740966.1. before. now

Schedule 740966.1. Archive 740964.1. FYI: New Portal with same DocID. Generic Advisor Webcast Note 740966.1. before. now FYI: New Portal with same DocID Schedule 740966.1 Archive 740964.1 before Generic Advisor Webcast Note 740966.1 now 1 Copyright 2012, Oracle and/or its affiliates. All rights reserved. Insert Information

More information

Managed Services. Business Intelligence Solutions

Managed Services. Business Intelligence Solutions Managed Services Business Intelligence Solutions Business Intelligence Solutions provides an array of strategic technology services for life science companies and healthcare providers. Our Managed Services

More information

Information Technology Services technology immersion for new employees

Information Technology Services technology immersion for new employees Information Technology Services technology immersion for new employees Technology Immersion At CWRU The ITS Mission: To provide for the information technology needs of the campus community We re always

More information

Copyright 2014, Oracle and/or its affiliates. All rights reserved.

Copyright 2014, Oracle and/or its affiliates. All rights reserved. 1 This Isn t Your Parent s PeopleSoft: PeopleSoft Today and Tomorrow Marc Weintraub Senior Director, PeopleSoft Product Strategy 2 Safe Harbor Statement The following is intended to outline our general

More information

Northeastern State University Online Educator Certificate

Northeastern State University Online Educator Certificate Northeastern State University Online Educator Certificate Purpose Beginning in October 1999, the Northeastern State University Distance Learning Advisory Committee (now the Center for Teaching and Learning

More information

Schenectady City School. Request for Proposal for Website Design and Content Management System RFP #0620 16

Schenectady City School. Request for Proposal for Website Design and Content Management System RFP #0620 16 Schenectady City School District Request for Proposal for Website Design and Content Management System RFP #0620 16 Proposals to be received: Time: 9am Date: June 20, 2016 Place: Schenectady City School

More information

Enhancing Business Performance Through Innovative Technology Solutions

Enhancing Business Performance Through Innovative Technology Solutions Enhancing Business Performance Through Innovative Technology Solutions Contact Center = Customer Experience FIELD SERVICE Customer Service BACK OFFICE CONTACT CENTER BRANCH OFFICE Help Desk HR Finance

More information

Technology Planning Benchmarks

Technology Planning Benchmarks Technology Planning Benchmarks Instructional Technologies Faculty/Staff Computing Support Virtually all of the college s faculty and staff are dependent on a fully functioning, reliable, individual computing

More information

Enhancing Productivity. Enabling Success. Sage CRM

Enhancing Productivity. Enabling Success. Sage CRM Enhancing Productivity. Enabling Success. Sage CRM Customer Relationship Management Customer Relationship Management (CRM) is far more than just a software application. It is a business solution that gives

More information

THE NATURE AND CHARACTERISTICS OF ONLINE LEARNING IN ILLINOIS COLLEGES AND UNIVERSITIES

THE NATURE AND CHARACTERISTICS OF ONLINE LEARNING IN ILLINOIS COLLEGES AND UNIVERSITIES THE NATURE AND CHARACTERISTICS OF ONLINE LEARNING IN ILLINOIS COLLEGES AND UNIVERSITIES Prepared by Dr. John S. Washburn Southern Illinois University Carbondale January 2003 Contents Executive Summary

More information

Microsoft Enterprise Project Management (EPM) Solution

Microsoft Enterprise Project Management (EPM) Solution Microsoft Enterprise Project Management (EPM) Solution Enterprise Project Management (EPM) Solution Version Comparison The Microsoft Enterprise Project Management (EPM) Solution ensures organizations select

More information

Kent State University s Cloud Strategy

Kent State University s Cloud Strategy Kent State University s Cloud Strategy Table of Contents Item Page 1. From the CIO 3 2. Strategic Direction for Cloud Computing at Kent State 4 3. Cloud Computing at Kent State University 5 4. Methodology

More information

HP Service Manager software

HP Service Manager software HP Service Manager software The HP next generation IT Service Management solution is the industry leading consolidated IT service desk. Brochure HP Service Manager: Setting the standard for IT Service

More information

Information Technology and Services (IT & S)

Information Technology and Services (IT & S) Information Technology and Services (IT & S) Service Level Agreement (SLA) Table of contents Mission... 3 Scope... 3 Help Desk services... 3 Helpdesk Hours of operations / Service Request... 3 Priority

More information

Designed for Local Government Powered by Microsoft Dynamics

Designed for Local Government Powered by Microsoft Dynamics Designed for Local Government Powered by Microsoft Dynamics CouncilFirst is a Division of Open Systems Technology Pty Ltd (OST ) A Powerful, Flexible Business Solution CouncilFirst delivers a fully integrated

More information

4000 OPERATIONS AND MAINTENANCE OF PLANT

4000 OPERATIONS AND MAINTENANCE OF PLANT 4000 OPERATIONS AND MAINTENANCE OF PLANT Most of the expenditures in this category are specific to the Department of Public Facilities and have been transferred out of the School Department budget. However,

More information

Business Process Automation, Document Management, & Customer Relationship Management (CRM) System RFP #34-0217 APPENDIX 1 USE CASES

Business Process Automation, Document Management, & Customer Relationship Management (CRM) System RFP #34-0217 APPENDIX 1 USE CASES Business Process Automation, Document Management, & Customer Relationship Management (CRM) System RFP #34-0217 APPENDIX 1 USE CASES September 2013 Table of Contents Purpose... 3 A. Enterprise Content Management

More information

Payroll Operations and Information Management and Payroll Services Alliance Management Office Annual Report. November 2007

Payroll Operations and Information Management and Payroll Services Alliance Management Office Annual Report. November 2007 Payroll Operations and Information Management and Payroll Services Alliance Management Office Annual Report November 2007 1. Initiative Overview 2. Status Update 3. Appendix A: Contract Objectives 4. Appendix

More information

Information Technology Strategic Plan 2013-2016

Information Technology Strategic Plan 2013-2016 Information Technology Strategic Plan 2013-2016 Executive Summary Lone Star College System (LSCS) is the fastest growing community college system in the country. Its mission is to provide high quality,

More information

Cloud and Mobile Computing A Higher Education Perspective. Brian Stewart AVU ODL-PD Program Nairobi 16 th 2013

Cloud and Mobile Computing A Higher Education Perspective. Brian Stewart AVU ODL-PD Program Nairobi 16 th 2013 Cloud and Mobile Computing A Higher Education Perspective Brian Stewart AVU ODL-PD Program Nairobi 16 th 2013 Cloud What is Cloud Computing? Cloud computing is a model for enabling ubiquitous, convenient,

More information

March 26, 2013 ADDENDUM NO. 1. RFP #MWJ1304 PeopleSoft Campus Solutions Implementation Project Office of Information Technology

March 26, 2013 ADDENDUM NO. 1. RFP #MWJ1304 PeopleSoft Campus Solutions Implementation Project Office of Information Technology March 26, 2013 ADDENDUM NO. 1 RFP #MWJ1304 PeopleSoft Campus Solutions Implementation Project Office of Information Technology All proposals are due Monday, April 1, 2013, by 12:00 p.m. to: City Colleges

More information

New York State Education Department Instructional technology plan survey

New York State Education Department Instructional technology plan survey The instructional technology plan survey is designed to allow districts the opportunity to compile all data related to their technology planning and needs in one location. The data collected in the survey

More information

The City of Scottsdale. Business Intelligence Strategic Plan

The City of Scottsdale. Business Intelligence Strategic Plan The City of Scottsdale Business Intelligence Strategic Plan Created June 2014 This page intentionally left blank EXECUTIVE SUMMARY 1 SERVICES PROVIDED 3 DATABASE SERVICES 3 BUSINESS INTELLIGENCE SERVICES

More information

Douglas County School System

Douglas County School System Douglas County School System Douglasville, Georgia Three-Year Plan July 1, 2009 June 30, 2012 Creation Date December 10, 2008 Superintendent Don Remillard Todd Hindmon 770-651-2387 [email protected]

More information

James Madison University. Best Practices for Online Programs

James Madison University. Best Practices for Online Programs James Madison University Best Practices for Online Programs Updated December 2013 JMU Best Practices for Online Programs I. Introduction... 2 II. Institutional Context and Commitment... 2 III. Curriculum

More information

UNIVERSITY OF WISCONSIN SYSTEM INFORMATION TECHNOLOGY SUMMARY FISCAL YEAR 2015

UNIVERSITY OF WISCONSIN SYSTEM INFORMATION TECHNOLOGY SUMMARY FISCAL YEAR 2015 UNIVERSITY OF WISCONSIN SYSTEM INFORMATION TECHNOLOGY SUMMARY FISCAL YEAR 2015 This page intentionally left blank. UW System IT Summary FY 2015 Page 2 CONTENTS INTRODUCTION... 5 GENERAL IT SERVICES...

More information

MICROSOFT DYNAMICS CRM Vision. Statement of Direction. Update: May, 2011

MICROSOFT DYNAMICS CRM Vision. Statement of Direction. Update: May, 2011 MICROSOFT DYNAMICS CRM Vision Statement of Direction Update: May, 2011 Microsoft Dynamics CRM - Statement of Direction, May 2011 EXECUTIVE SUMMARY Microsoft has delivered significant innovation and value

More information

The all-in-one Unified Communications solution for SMBs.

The all-in-one Unified Communications solution for SMBs. OpenScape Business The all-in-one Unified Communications solution for SMBs. Improve your performance and take your business to the next level with Unified Communications. Amplifying opportunities The success

More information

University of Regina Information Services Report on Operations May 1, 2014 to October 31, 2014

University of Regina Information Services Report on Operations May 1, 2014 to October 31, 2014 University of Regina Information Services Report on Operations May 1, 2014 to October 31, 2014 Item Activity Name and Purpose Major Issues 1 Service Agreements Service agreements ensure that critical services

More information

ERP Survey Questionnaire

ERP Survey Questionnaire 0 ERP Survey Questionnaire Thank you for your participation in the EDUCAUSE study of Enterprise Resource Planning (ERP) systems. The survey is a key part of a major study on ERP in higher education in

More information

Track-It! 8.5. The World s Most Widely Installed Help Desk and Asset Management Solution

Track-It! 8.5. The World s Most Widely Installed Help Desk and Asset Management Solution The World s Most Widely Installed Help Desk and Asset Management Solution Key Benefits Easy to use! Gain full control of your IT assets, hardware and software Simplify software license management Save

More information

Copyright 2012, Oracle and/or its affiliates. All rights reserved. Insert Information Protection Policy Classification from Slide 13

Copyright 2012, Oracle and/or its affiliates. All rights reserved. Insert Information Protection Policy Classification from Slide 13 Copyright 2012, Oracle and/or its affiliates. All rights reserved. Insert Information Protection Policy Classification from Slide 13 PeopleSoft Human Capital Management Roadmap Ronnie Toerien ECEMEA Competency

More information

EQUELLA. One Central Repository for a Diverse Range of Content. www.equella.com

EQUELLA. One Central Repository for a Diverse Range of Content. www.equella.com EQUELLA One Central Repository for a Diverse Range of Content www.equella.com What is EQUELLA? EQUELLA, our web-based platform, provides one central location for the delivery of a diverse range of content

More information

Online Learning Policies & Procedures. La Roche College

Online Learning Policies & Procedures. La Roche College Online Learning Policies & La Roche College 2012 Table of Contents INTRODUCTION... 1 DEFINITIONS... 1 I. COURSE DEVELOPMENT... 2 A. Course Material Development... 2 B. Online Course Approval... 2 C. Online

More information

What s New Guide: Version 5.6

What s New Guide: Version 5.6 What s New Guide: Version 5.6 A QUEST SOFTWARE COMPANY 1. 8 0 0. 4 2 4. 9 4 1 1 w w w. s c r i p t l o g i c. c o m WHAT S NEW IN ACTIVE ADMINISTRATOR 5.6? Contents...3 Active Administrator Product Overview...3

More information

Best Practices In Vendor Selection & Contracting

Best Practices In Vendor Selection & Contracting Choosing The Right EHR For You: Best Practices In Vendor Selection & Contracting Presented By: Joseph Naughton-Travers, Ed.M., Senior Associate, OPEN MINDS Sponsored by ADVIX Presented On: February 26,

More information

Dell Connected Learning for Schools. Transforming Education for the Digital Age

Dell Connected Learning for Schools. Transforming Education for the Digital Age Dell Connected Learning for Schools Transforming Education for the Digital Age This document was created to provide Dell s point of view for primary and secondary schools and contains the following sections:

More information

Best-In-Class HR, Benefits, and Payroll Solutions for the Public Sector. trusted efficient responsive best practices

Best-In-Class HR, Benefits, and Payroll Solutions for the Public Sector. trusted efficient responsive best practices Best-In-Class HR, Benefits, and Payroll Solutions for the Public Sector trusted efficient responsive best practices The ADP Advantage Best practices are critical when you are challenged to do more with

More information

Customer Master Presentation - Contents

Customer Master Presentation - Contents Customer Master Presentation - Contents V4.607 Solution at a Glance Solution in Detail ESS/MSS with lanes HCM Core Services for Employee Lanes Time Management Services for Employee Lanes Travel Management

More information

CEDARCRESTONE HR SYSTEMS SURVEY HIGHLIGHTS FOCUSING ON BI/ANALYTICS

CEDARCRESTONE HR SYSTEMS SURVEY HIGHLIGHTS FOCUSING ON BI/ANALYTICS CEDARCRESTONE HR SYSTEMS SURVEY HIGHLIGHTS FOCUSING ON BI/ANALYTICS Date: November 20, 2013 Time: 1:00pm 2:00pm EST 10:00am 11:00pm PST Length : 1 hour, including Q&A visier Visier l analytic applications

More information

Cisco Unified Communications and Collaboration technology is changing the way we go about the business of the University.

Cisco Unified Communications and Collaboration technology is changing the way we go about the business of the University. Data Sheet Cisco Optimization s Optimize Your Solution using Cisco Expertise and Leading Practices Optimizing Your Business Architecture Today, enabling business innovation and agility is about being able

More information