1 Comparison of Underground and Overhead Transmission Options in Iceland (132 and 220kV) Prepared by November, 2013 THIS IS AN INDEPENDENT REPORT BY METSCO ENERGY SOLUTIONS INC. (MES) AN ENGINEERING CONSULTING CORPORATION IN CANADA. MES FOCUSES ON ENGINEERING ANALYSIS AND ASSET MANAGEMENT SERVICES FOR THE ELECTRICAL POWER INDUSTRY. THIS REPORT WAS COMMISSIONED BY LANDVERND IN ICELAND. ALL RECOMMENDATIONS REMAIN THE INDEPENDENT VIEW OF MES. 1

2 Executive Summary This report provides a general comparison of the overhead and underground options currently under discussion in Iceland regarding rebuild and strengthening of the current 132 kv/220 kv transmission system. Although Overhead Lines are still the dominant transmission construction around the world in terms of footprint the innovation of Underground Cable and accessories technology has made underground transmission projects more and more feasible in the last few decades. In Iceland this is also the case, since 1990 Underground Cables have increasingly been constructed on distribution voltages as well as on transmission voltages up to and including 132 kv and although specific numbers are not available the experience has been good in terms of reliability and operability. The main benefits of Underground Cables include being more aesthetical in surroundings, less losses, less operating costs and being non-susceptible to storms, salt contamination and icing. The main benefits of Overhead Lines on the other hand are that they are cheaper and easier to construct, easier to fix when failed and more flexible in terms of maximum load capacity. True comparison of costs can only be performed by taking into consideration both construction and operating costs or so called life-cycle costs. With the estimated lifetime of both Underground Cables and Overhead Lines at 60 years full life cycle costs which include construction and operation costs is generally expected to be as shown in the table below for a typical 120 km line: Total Costs Overhead Underground Overall Ratio (UG/OH) 132 kv kv Lifetime of modern Underground Cables is expected to be at least 60 years where care is taken in not overloading them similarly as has to be done with many other transmission assets such as power transformers. Overhead Lines do not have this limitation but they are directly susceptible to storms and icing loads which in worst cases may require major premature rebuild. Another aspect which may be considered is that if Overhead Lines are nonetheless built in controversial scenic areas it is quite likely that they will be forced underground much before their 60 year lifetime is reached resulting in non-optimal investment. When deciding whether to build overhead or underground not only the actual costs of the options need to be considered but also the benefits to customers and overall economy. It is important to strike a balance in stakeholders interests and recognizing the impact on businesses and economy as a whole. As costs can largely vary with specific aspects of projects a true comparison of costs should be done on individual cases but this general comparison does show that both the options are feasible and need to be seriously considered. 2

3 Samantekt skýrslu Í þessari skýrslu er gerður almennur samanburður á loftlínum og jarðstrengjum í tengslum við umræðu á Íslandi um þessar mundir vegna áætlana um uppbyggingu á flutningskerfi raforku. Enda þótt loftlínur séu enn ríkjandi í byggingu flutningskerfa í heiminum þegar á heildina er litið, hafa tækninýjungar og lækkandi verðlag í framleiðslu jarðstrengja og búnaði þeim tengdum gert notkun jarðstrengja í flutningskerfum sífellt vænlegri kost á síðustu áratugum. Þetta gildir einnig um Ísland, þar sem lagning jarðstrengja hefur aukist síðan um 1990 bæði í dreifi- og flutningskerfi allt að 132 kv spennu. Þó nákvæmar tölur liggi ekki fyrir hefur reynsla af jarðstrengjum almennt verið góð með tilliti til reksturs og áreiðanleika. Það sem helst mælir með notkun jarðstrengja er fagurfræði- og umhverfislegt gildi, minni orkutöp, lægri rekstrarkostnaður og engin áhrif veðurs, seltu og ísingar. Hinsvegar eru loftlínur ódýrari í byggingu, auðveldari að gera við og veita meira svigrúm til aukningar á flutningsgetu. Einungis er hægt að gera raunverulegan samanburð á kostnaði þessara valkosta með því að taka tillit til bæði stofn- og rekstrarkostnaðar eða svokallaðs líftímakostnaðar (e. life-cycle costs). Miðað við 60 ára líftíma bæði loftlína og jarðstrengja má almennt búast við að heildarkostnaður fyrir dæmigerða 120 km línulengd í dreifbýli sé eins og eftirfarandi tafla sýnir: Heildarkostnaður Loftlínur (LL) Jarðstrengir (JS) Hlutfall (JS/LL) 132 kv kv Gert er ráð fyrir að nútíma jarðstrengir endist í að minnsta kosti 60 ár sé þess gætt að þeir séu reknir innan hitaþolmarka sem þeir eru hannaðir fyrir, líkt og ávallt þarf að hafa í huga með aflspenna og annan rafbúnað í flutningskerfum. Þessi hætta á yfirlestun á ekki við um loftlínur. Á hinn bóginn leiðir óveður og ísing í verstu tilfellum til ótímabærrar endurbyggingar stórra loftlínukafla. Annað sem hafa ber í huga er að séu loftlínur byggðar á umdeildum svæðum, svo sem þar sem náttúruverndarsjónarmið eiga við, er ekki ólíklegt að þær línur verði rifnar og settar í jörð áður en 60 ára líftíma þeirra yrði náð, sem aftur myndi leiða til þess að fjárfestingin væri óhagkvæm. Við ákvörðun um hvort leggja skuli jarðstreng eða loftlínu nægir ekki að bera saman líftímakostnað, heldur þarf að skoða heildarmyndina. Vega þarf og meta hagsmuni allra hagsmunaaðila og áhrifin á náttúru og umhverfi, fyrirtækin í landinu og þjóðarbúið í heild. Rík áhersla er lögð á að ávallt þarf að skoða hvert verkefni fyrir sig, þar sem kostnaður bæði loftlína og jarðstrengja er breytilegur og fer eftir aðstæðum hverju sinni. Niðurstaða þess almenna samanburðar sem hér hefur verið gerður er hinsvegar sú að báðir valkostir eru raunhæfir og ekki verður hjá því komist að taka þá til raunverulegrar skoðunar þegar ákvörðun er tekin um einstök verkefni í flutningskerfinu. 3

4 Contents Executive Summary... 2 Samantekt skýrslu... 3 Introduction... 5 Electrical System and Infrastructure Iceland... 6 Overview - European Electricity Lines... 9 Overhead versus Underground Lines Life Cycle Cost Comparison Reliability and Availability of Power Other Considerations Safety Right of Way EMF Environment Tourism and local economy Regulatory Conclusion and Recommendations References

5 Introduction As economic growth in the world drives intensive electric energy demand, the need for advanced electric networks is fundamental for sustained and optimal usage of assets and resources available. For more than century electricity networks have primarily remained with the traditional model of being generated from generation plants, usually situated far from densely populated areas, transmitted through overhead transmission lines over long distances until they reach the locality where they are stepped down for commercial and residential use. Although the operational model of the system hasn t completely changed, the advent of new technologies and smart grid concepts are bringing about some changes to the electricity generation, transmission and distribution systems around the world. One of these changes is increased installation of underground transmission networks as underground cables have become more advanced, reliable and cost effective i. The objective of this report is to provide an impartial analysis of the technical and business merits of building an Overhead Transmission line (OHTL) versus an Underground Transmission line (UGTL). Independent primary and secondary research of information available in the public domain in the form of data, reports, and links from around the world have been referenced and personal experience and interpretive analysis provided to construct the overall assessment. Consequently, this report will provide some constructive opinions to the various stakeholders in Iceland about their ongoing discussion regarding the feasibility of rebuilding an existing 132 kv OHTL with an OHTL at 220 kv level or with an UGTL at 132 kv level or 220 kv level. The first underground transmission line was a 132 kv line constructed in 1927 ii. The cable was fluid-filled and paper insulated. The fluid was necessary to dissipate the heat. For decades, reliability problems continued to be associated with constructing longer cables at higher voltages. The most significant issue was maintenance difficulties. Not until the mid-1960s did the technology advance sufficiently so that a high-voltage 345 kv line could be constructed underground. The lines though were still fluid filled. This caused significant maintenance, contamination, and infrastructure issues. Extruded cable systems (XLPE) have a major part to play in this new, competitive environment, especially when it comes to replacing overhead lines with underground cables. XLPE cable systems costs have decreased during the last decade and are likely to fall even further. At the same time, XLPE cable performance has increased enormously as cables today are water resistant and are expected to have longer lifetime than most other electrical system assets. This means that XLPE cable systems are able to compete with overhead lines, technically, environmentally and commercially. In the 1990s the first solid cable transmission line was constructed more than one mile in length and greater than 230 kv iii and now transmission cables are constructed on regular basis throughout the world and at greater lengths than ever before. OHTL is still the dominant transmission construction around the world in terms of footprint. Innovation of underground cable and accessories technology have resulted in increased underground transmission networks projects in the last few decades. Other factors such as extreme weather have caused major power disruptions by damaging overhead structures to an irreparable state. As people and communities recover from lengthy outages, utility companies, politicians and social groups start questioning the 5

6 design philosophy and returns of investments of electric system infrastructure. Frank Alonso and Carolyn Greenwell, engineers at Science Applications International Corporation (SAIC) write in the aftermath of hurricane Sandy in the United States, Although overhead power lines are typically more economical, they are susceptible to damage from wind-borne tree branches, debris and high wind and ice-loading conditions from extreme weather. The damages can cause extended power outages that in extreme cases cannot be restored for days or even weeks, as we have seen after Hurricane Sandy. The cost for repairing the physical damages can be in the billions of dollars. During long outages after a catastrophe, there are also associated intangible impacts to a utility's customers such as despair, discomfort, anxiety and helplessness. iv In Iceland similar extreme events happen also regularly such as in 1991, 1995 and The event in 1991 resulted in over 550 distribution poles being destroyed with severe outages for customers whereas the event in 2012 had over 100 distribution poles destroyed and according to RARIK (Iceland State Electricity) that event would have been much more catastrophic if not for approximately half of their distribution lines having been replaced with underground cable in the last 20 years. The event of 2012 also caused damage to Landsnet s transmission lines specifically the 66kV transmission line from Laxá to Kópasker v as well as the 132kV ring between Akureyri and Krafla. Other considerations also loom as construction needs, ongoing operating and maintenance activities, aesthetics and impact of natural habitat differ significantly between the overhead and underground systems. Electrical System and Infrastructure Iceland Some key facts about the Electrical System and Infrastructure relevant to this report are provided below. The information is based on the National Energy Authority 2011 Report: vi The Icelandic electricity system is an isolated system without any connection to other countries. There were 314,000 residents in December of 2010, living mostly along the coastline of 103 thousand square kilometers of land. Per capita electricity consumption is however among the highest levels in Europe, as energy-intensive industry consumes 80% of generated electricity % of electricity produced in 2010 was from hydro-electric or geothermal sources. There are five major producers of electricity in Iceland; the national power company Landsvirkjun, Reykjavik Energy, HS Orka, Fallorka and Orkusalan. All of these companies are publicly owned except for HS Orka, which was owned by Canadian firm Magma Energy Corp. in 2010, which became Alterra Power in 2011 after merging with another firm. The three largest companies generate 97% of total electricity produced and are active in the wholesale market. The dominant producer, Landsvirkjun, produces 74% of total electricity. Smaller producers either sell directly to their own retail division or enter 7-10 year contracts with retail sales companies. Approximately 80% of electricity consumption is by energy intensive industry. 6

7 Virtually all inhabitants of Iceland, except those living on small islands off the coast and on remote farms, are connected to a single transmission system through six distribution networks. In 2010 the transmission system consisted of approx. 3,169 km of high voltages lines (operated at 33, 66, 132 and 220 kv) and around 70 substations and transformer stations (Figure 1 and Figure 2). The Icelandic electricity system has expanded considerably during the last 15 years, mainly due to the increased production of power intensive industrial facilities and the commissioning of new ones. The total length of the Transmission (TSO) network in Iceland is approximately km while the length of the Distribution (DSO) network (sum of all DSO) is approx. 22,565 km. Two major transmission projects were completed in A 24.6 km, 132 kv, line was completed to provide a second connection between Nesjavellir Power Plant and the capital city area. The 140 MVA line is completely below ground. The TSO company, Landsnet also completed a 12 km, 66 kv, 28.5 MVA underground cable in the rural West Fjords area, with the aim of shortening the distance of the existing connection and decreasing supply disruptions. During the period from 1995 to 2010, installed capacity increased from 1,049 MW to 2,579 MW and generation increased from 4,976 GWh to 17,059 GWh. The increase in electricity demand from power intensive industries has called for considerable investments in the transmission system. The long term investment needs of the Icelandic electricity sector are heavily dependent on the developments of power intensive industry. A medium or long term forecast for power intensive industries does not exist. There is uncertainty regarding investment needs due to increased demand from power intensive industries after 2012 but such investments may amount to ISK 5 to 7 billion per year. vii Annual growth in the general public market is estimated at approximately 1.7% per year. The distribution system operators (DSOs) and the transmission system operator (Landsnet) create and publish investment plans for the general public market. According to Landsnet, medium and long-term investment and reinvestment needs for the transmission system are estimated at ISK 3 to 4 billion over the next three years (i.e ). viii Iceland is an island with no interconnections to mainland Europe and therefore no international trade in electricity. Nearly all of Iceland s electricity is produced from domestic and renewable sources. Production potential in Iceland is such that power intensive industries have been sought out to utilise Iceland s electric supply. Generation from the geothermal and hydropower sources used in Iceland is base load and not subject to intermittency issues. The Electricity Act stipulates that the TSO and the DSOs are responsible for maintaining and developing the transmission and distribution systems in an economic manner, taking into account security, efficiency, reliability of supply and the quality of electricity. ix 7

8 Figure 1: Iceland Transmission Network (Geographical) x Figure 2: Iceland Transmission Network (Connectivity) xi 8

9 The Reliability of the electrical system in Iceland has improved over the last decade as can be seen in Figure 3 with the System Average Interruption Duration Index (SAIDI) indicators being as follows: SAIDI (planned and unplanned interruptions) = 0.56 hours per customer SAIDI (planned interruptions) = 0.25 hours per customer SAIDI (unplanned interruptions) = 0.31 hours per customer Number of Unplanned Interruptions Figure 3: System Performance of Electrical System in Iceland xii With the current structure of the electrical Transmission Network in Iceland and the relatively undefined future need, it is imperative that developments and investment are made with thorough case by case assessment of the site specific needs. The sustainment and evolution of the system can t only be made on technical merit or continuing current design philosophies but needs should be based on a clear outlook of the future. As electrical systems get higher attention as major economic driver and investments are scrutinized with a thicker acceptance lens, it is critical that investments are also based on life cycle costs and performance analysis, future climate data, industrial customer loads and recognizing other national economical drivers such as tourism, environmental sustenance and others. Overview - European Electricity Lines Majority of all Transmission line networks in the world have through history been constructed as overhead but although this may indicate that overhead is the preferred choice, the imbalance in volume 9

10 can easily be attributed to factors such as initial cost of investment, technical expertise to build and manage the overhead system, availability and complexity of application of underground transmission infrastructure. As the underground transmission systems and devices evolve and additional long-term investment considerations are taken into account, an upward shift in the proportion of underground versus overhead has taken place and that trend is expected to continue. Countries such as Holland, Germany and France now build a large portion of their transmission network with underground infrastructure. New transmission projects continue to being proposed, planned and built all over the world. The need for a water crossing, the desire to preserve open space and other aesthetic issues, and dealing with constrained right of way drives utilities to consider installing underground transmission in more and more cases. In some cases going underground is necessary in order to bring a project to completion, based on public pressure or constrained space. In addition, in more and more instances, underground or submarine transmission is becoming the first choice for longer distances. Going underground with transmission has traditionally been a transmission owner's last resort because the cost of underground transmission was many times the cost of overhead transmission and maintenance and repair has proved costly and difficult. However, advanced cable technologies are being developed, installation techniques have expanded in terms of options and efficiency while cost factors have improved. xiii Figure 4 below shows the proportions (2006 data) of overhead and underground in various countries of the world. Figure 4: Total Length of UG circuit (km) worldwide in 2006 xiv 10

11 Overhead versus Underground Lines Some of the critical technical requirements for the planning and design of building or upgrading an existing transmission line to either OHTL or UGTL is determined by several factors [Peter Nefzger, Ulf Kaintzyk, Joao Felix Nolasco, 2003] xv : - Terminal Substations and line length - Power to be transmitted in normal and emergency conditions - Type of transmission; AC vs. DC; - Conductors, voltage, necessity of shield wires - Number of circuits - Tower type, phase configuration - Use of earth wires such as optimal ground wires - Maximum allowable losses - Maximum acceptable levels of electrical and magnetic field Beyond just electrical and system characteristics, there are also other factors such as terrain, environmental and governmental policy constraints. From a construction perspective, the land has to be secured as right-of-way (ROW) in both cases of OHTL and UGTL. Overhead lines are traditionally attached to insulators mounted on transmission structures which vary in height and design based on the voltage level and phase separation required between the conductors. The OHTL ROW typically spans 45m-85m for 132 kv to 220 kv whereas the UGTL ROW is typically 12-14m. Figure 6: Underground Transmission Cable and Overhead Conductor xvi The overhead line structure is preassembled and shipped to the construction location and placed on prefabricated buried steel tubes or concrete foundations. No additional digging is required on each site as the transmission line is build. Clearances need to be met when crossing roads, structures and other water bodies such as lakes or rivers. Maintenance of overhead lines is typically simple as they are easily 11

12 accessible from the surroundings. As overhead lines are exposed to dirt, moisture and lightning strikes, short circuits due to flash-overs or overvoltage surges do happen. These are typically transient faults and line condition can be restored with delayed reclosing after allowing the fault to clear. Line ratings are altered based on ambient temperature, loading, wind, sunlight etc. In essence, the overhead transmission system is more vulnerable to environmental externalities but is also restored to normal state in an expedient manner. Due to the distance between conductors of an OHL of several meters, their specific capacity is rather low compared to the specific inductivity. In a report by ECOFYS it is stated: Given the extensive track record of OHL projects reliable information about specific costs is available. The cost for the conductors amounts to roughly one third of the total cost of a typical 2- system HV OHL. xvii Due to governmental and environmental pressures, newer tower designs have been in development to enable better aesthetic integration into the locality or terrain the OHTL is built in. Taken from a transmission technology assessment report from Ireland, Figure 7 below provides some examples of innovative design. 12

13 Figure 7: Conventional design (Donau-Mast) and new tower designs for improved visual impact [Energienet.dk] xviii In the case of the UGTL, trenches need to be dug where cables are laid either directly buried in ground or in ducts. The ducts can be either concrete encased or plastic pipes (PVC). The cables need joints in regular intervals because of weight and handling constraints for the typically heavy cable. For a recent 220 kv UGTL project in Denmark this was at 1200m intervals xix. Compared to underground cable, the specific capacitance is times lower and the inductivity 3-4 times higher for an OHL. Reactive power does not contribute to the desired power transmission, but contribute to line loading and losses. Additionally, with long lines these charging currents become an engineering issue (energizing, testing, voltage profile, etc.). For that reason, the reactive power of an underground cable may need to be compensated at distances of as short as 40 km for 132/220kV lengths xx by shunt reactors. However through accurate and unprejudiced network analysis and system design, including installation, the compensation length can be significantly increased for cable systems circuit lengths without reactive compensation xxi. Also the compensation design, if required, can be such that the compensation occurs at each end point of the cable or at its switching station. Thus it may not be unreasonable to expect that a single circuit cable at 132kV could be 120 km long without any compensation reactors required along the cable length (only at its endpoints). The most important technical differences between OHTL and UGTL are insulation, thermal heating and installation techniques. In overhead lines, air acts as the insulating medium around the bare conductors attached to overhead structures. Based on the clearance requirements at different voltage levels and structure design, each conductor is spread wide apart from each other and the ground. In the case of underground lines heavy insulating medium has to be in place. Earlier generations of cable had oil impregnated paper as the insulation. The oil was borne in the cable via a pressured oil-duct through the center. Another type of insulation had high pressure fluid, e.g. nitrogen or oil, and was covered in a steel shielding. More recently cross-linked poly ethylene (XLPE) insulated cable has emerged as the most preferred cable for low to extra high voltage applications see Figure 8 for an illustration of both types of cable. They are of a dry type and essentially maintenance free till they fail. These cables have totally different characteristics than the previous generation of cables and one need to be very careful when 13

14 utilizing life time and reliability statistics from historical cable installations as these would be mostly derived from the older types. Unfortunately, much of the statistics that is often presented when comparing overhead lines and underground cables have included these older types of cables. Figure 8: Fluid-filled or Gas-filled Cable versus XLPE xxii All conductor losses are directly due to the resistivity of the cable. In the case of underground cable, the losses are also due to induced current in the cable sheath and the insulation layer around the conductive medium. For overhead conductors air acts as the thermal conducting medium in overhead conductors to dissipate the heat whereas in the case of underground conductor, the soil can hinder the proper dissipation of heat generated in the cable. Typically XLPE underground cable conductors have a maximum operation temperature of at about 80 to 90 C with an emergency operating temperature of about 130 C. xxiii The selection of cable with lower resistivity, larger cross-section and transmitting energy at higher voltages are ways of mitigating the loss impact. Costs for UGTL construction is significantly higher in urban areas as the existing infrastructure has to be supported and carefully handled whereas in rural areas mechanical diggers can be used without obstruction. In all cases when building a new UGTL, additional costs and care will be required to preserve the natural environment and existing infrastructure, e.g. rivers, roads, wetlands, lava fields, etc. When laying the cable inside trenches, it can be laid in a triangular bundle, or laid side by side. Each 14

15 technique has its own merit but can affect the cost, electrical conductivity (distance between cable and heat generated), future ability to maintain as well as fixing and restoration of faults. Some of the techniques used in the excavation of soil include horizontal drilling and running conduits, U or V shaped trenched (in rural land), pipe jacking and micro-tunneling. Trenches for UGTL are typically m deep to keep them below the frost line. xxiv The other factor affecting the construction is joints and terminations. Vaults need to be dug when joints are required and they are traditionally over 3 m each way (length, breadth and height) or bigger. When underground sections of the cable has to be transitioned to an overhead section, termination structures have to be built for the continuity of the current flow and transition of construction. These differences are all major considerations when building OHTL and UGTL and overall costs can be significantly different based on the choices made of each projects. Life Cycle Cost Comparison As discussed, historically transmission lines have predominantly been built overhead. The primary reasons for this have been availability of equipment, ease of construction and continued access and expertise. These construction costs for overhead lines are lower than for underground cables where civil costs are a big part of the initial investment. Digging trenches, building vaults and installing splice joints form a big portion of the complexity and cost of the underground installation. However, overhead lines require significant civil construction as well in terms of access roads and foundations platforms for the overhead structures. When costs are considered while building a transmission line, the initial investment costs based on equipment selection, procurement and installation are not the only criteria that should be considered. Overall life cycle costs of electrical infrastructure also need to be considered such as maintenance, failures, losses, environmental impact etc. xxv The attribution of these costs are relevant too as they can be classified as Capital Expenditure (CapEx) and Operational Expenses (OpEx). The costs provided below are approximate costs based on a culmination of project data collected across the industry and recent numbers provided by Landsnet xxvi. As such these are general values for rural surroundings and do not in any way represent a specific project. The actual costs of a specific project can vary based on local conditions and specific design and construction criteria selected. In the examples below, a general comparison of single circuit options with approximately 400MVA capacity at 220kV and 200MVA capacity at 132kV is made. If larger capacity is required the costs for installation of UGTL will go up more rapidly than for OHTL but at same time costs of losses would be much more favourable towards the Underground Cable. In the first example, overhead lines have an expected life of about 60 years based on historical performance, while underground cables are often defined to have a lifetime of 40 years by design. The data presented is normalized to a 40 year period and a discount rate of 5.0% is used. 15

16 For loss costs an approximate price of per MWh is used for the calculation (3.5 IKR/kWh) with an escalation of 3% per year typically in Europe a cost of 40 per MWh are used for this purposes but costs in Iceland are lower. For this general example the amount of losses is roughly estimated as 2% with an average load of 200MVA for 220kV and 100MVA for 132kV. Cost Category (132 kv) OH Cost/km /km UG Cost/Km /km Line Length Approx km Overhead Underground Ratio (UG/OH) Installation: Losses Total Table 1: CapEx and Loss Costs for OHTL/UGTL for 132 kv With Cable at 40 Year Life Cost Category (220 kv) OH Cost/km /km UG Cost/Km /km Line Length Approx km Overhead Underground Ratio (UG/OH) Installation: Losses Total Table 2: CapEx and Loss Costs for OHTL/UGTL for 220 kv With Cable at 40 Year Life However although Underground Cables are designed to last 40 years the modern XLPE type cables are generally expected to last much longer especially through well-developed precautionary measures designed to minimize overloading during their lifetime. For instance with the estimated life of UG cables at 60 years xxvii (true lifetime is expected to be even longer than that), the tables above would be revised to: Cost Category (132 kv) OH Cost/km /km UG Cost/Km /km Line Length km Overhead Underground Ratio (UG/OH) Installation: Losses Total Table 3: CapEx and Loss Costs for OHTL/UGTL for 132 kv With Cable at 60 Year Life 16

17 Cost Category (220 kv) OH Cost/km /km UG Cost/Km /km Line Length Approx km Overhead Underground Ratio (UG/OH) Installation: Losses Total Table 4: CapEx and Loss Costs for OHTL/UGTL for 220 kv With Cable at 60 Year Life Dismantling costs are excluded in the above examples. These future costs are hard to estimate and may not be needed especially in the case of XLPE cable buried in the ground which may be better off left there rather than dug back up. Also when these costs are brought forward to present value they are very low. Maintenance and failure remedial costs can be considered as OpEx and have to be considered over the life cycle. Typically OHTL requires significantly higher maintenance costs (as a ratio to initial capital cost) than underground, this cost needs to be considered of the life of the asset. Routine maintenance of overhead lines can be conducted through visual inspection of observers on the ground or helicopter patrols. On the other hand underground equipment need monitoring devices installed to continually monitor the health of the cable and joints. This does pose different cost structures of each type of construction. Approximate industry data is used to measure operating and maintenance costs of overhead and underground line. Operating and maintenance for OHTL is 1.5%-2% per year (of initial CapEx investment) and for underground it is 0.2%-0.4% xxviii. The lower limit is used in both cases (Tree trimming is not required in Iceland therefore lowering maintenance cost for OHTL and XLPE cables require much less maintenance than other types of cables) and this would result in approximate total costs as shown in table below. Operating and Maintenance Costs (132 kv) Overhead Underground Ratio (UG/OH) Total Cost Table 5: O&M Costs Comparison for 132 kv Operating and Maintenance Costs (220 kv) Overhead Underground Ratio (UG/OH) Total Cost Table 6: O&M Costs Comparison for 220 kv 17

18 As OpEx is direct expense and CapEx is depreciated over life cycle of assets, CapEx and OpEx expenses can be normalized further. For the simplicity of this analysis, we are considering them as equivalent expenditure over the life cycle of the assets and thus total costs can be considered as the aggregate of the two costs. Total Costs Overhead Underground Overall Ratio (UG/OH) 132 kv kv Table 7: Total Life Cycle Cost Comparison for Cable with 40 Year Lifetime In the more realistic case where the estimated life of UG cables is 60 years, the tables above would be revised to: Total Costs Overhead Underground Overall Ratio (UG/OH) 132 kv kv Table 8: Total Life Cycle Cost Comparison for Cable with 60 Year Lifetime As observed in the above ratios, although the initial investment in UGTL investment is higher, energy losses and life-cycle operating and maintenance costs will reduce the overall life-cycle ratios. Cost prudence with a longer term outlook can definitely ensure that investments on this magnitude can serve Iceland for the entire life cycle and future needs of the electricity grid. In Iceland there is currently a 15% duty on electrical cable but not overhead wire. This cost is included in the above examples. It should be recognized that the actual project costs incurred on specific project are heavily dependent on many specific factors and a full estimate should be performed for true comparison. The cost estimates provided above are for general comparison purposes only and is not recommended to be used as accurate estimates for specific projects. Reliability and Availability of Power Both overhead and underground transmission lines are reliable by design. The transmission systems, overhead or underground, are impacted differently; overhead systems are exposed to weather and volcanic ash while underground lines can be dug into. Soil reinforcement might be required for strength and stability of overhead structure and re-enforced concrete ducts can be used to counter unintentional damage to cables. Major earthquakes do occur in Iceland and in the case of one occurring; the underground transmission lines are often believed to be more vulnerable than overhead lines although evidence from previous earthquakes has not supported that theory. Failure patterns would vary by 18

19 location, design, weather, environment, awareness, standards and other factors. In the case of faults, locating faults in overhead lines is easier. Once located visually, the restoration process can start. Due to ease of accessibility, overhead failures on average can be fixed within few days (typically 1 day for minor failure and 5 days for major failure average outage time for Landsnet s 220 kv system is 6.9 hours per failure xxix but that may also include momentary outages). Historically underground failures take longer to locate and restoration of XLPE type can last 5-9 days based on factors such as condition of equipment, availability of replacements, ease of access, and expertise of workers. xxx This results in an unavailability of cables being higher than that of overhead lines, in this case by a factor of approximately two as is seen in table below. However, failure data for XLPE cables is being conservatively estimated as they have not been utilised for many years and failure rate is very low. The rate shown below for cable is estimated and should be considered a maximum failure rate. For a typical 120 km cable this would represent a single failure approximately every 30 years or twice in its 60 year lifetime. Reliability Estimates Failure Probability Per year/100km Average Duration Hours Unavailability Hours per year XLPE Underground Cable (Estimate) xxxi kv Overhead Line (Landsnet report) xxxii It should be noted that unavailability as shown in above table does not necessarily mean outages to customers as transmission systems are normally built in contingencies which allows for at least one failure to occur without causing customer being without power this is the case with Landsnet s system. Therefore the chances of two transmission system sections being unavailable at the same time are very low especially in the case of underground cables which have both a very random and low occurrences of failure. On the other hand, as overhead lines are more susceptible to storms the chances of simultaneous unavailability of two or more overhead lines is much higher which could result in large customer outages. Therefore the statistics shown in the table above seem overly favourable to overhead lines as their outages tend to happen during same episodes and they have many momentary outages that may cause voltage sags or short outages to customers. Other Considerations Safety Safety around electrical equipment is the major concern of any company in the electrical sector around the world. Working on or around existing electrical equipment is a part of modern life for hydro workers and also for the general public. The risks are escalated in the case of high voltage transmission lines. Best safety standards have to be followed in the design of the lines and during the construction stages of the projects. Building residences under or over the ROW is not suggested. The biggest risk is the direct contact to energized lines and with ground at the same time. Fallen lines due to failure, lightning, wind, icing and/or storms can pose this threat if they continue to be energized. In the case of underground transmission, people or equipment can dig into the ground and contact risk can occur. Completely cordoning of ROWs, installing cable inside concrete encased ducts and adequate protection schemes are ways of mitigating or lowering these risks. 19

20 In general, many of the public safety concerns can almost be eliminated in the underground option. The weather and accessibility risks will continue to remain in any overhead design. Right of Way In general, building an UGTL is far more complex than building and OHTL. While some of the considerations are general in both types of construction, some are very unique to the underground option. In the case of transmission corridor or Right of Way (ROW) selection, securement and construction execution, several key steps need to be considered that can have an impact on the overhead or underground lines during its life. In the selection stage of the path of the lines, many considerations do emerge. It can be in the form of pre-existing contamination, local habitat disruption unregistered private landfill that can form obstruction to the boring or drilling process. In the case of urban development, the ROW goes through local neighborhoods causing specific concerns amongst the neighboring constituencies. Water bodies in the path of the ROW can cause water erosion into the excavation site causing seepage into the ducts supporting cable. The other key issue is ensuring the underground ROW remains unharmed during its entire lifecycle. In underground construction, grading adjustments and heavy equipment digging can damage the duct structure and in turn damage the cable. This can cause significant outages to many people and have monetary impact on businesses and society in general. This requires acquiring proper land surveys, and having indemnity agreements and easements in place to control landscaping, tree-planting and storm water re-direction around the underground ROW. EMF Electo-magnetic fields (EMF) are created around cable or conductors when they carry current. With higher voltage the higher the strength of the electric field becomes and with higher current the higher the magnetic field becomes. These fields are prominent around the bare conductors in OHTL but are obstructed by the surrounding in the UGTL. At ground level, there is no electric field due to the shielding in the underground cable and the magnetic field falls off much more rapidly with distance than those from overhead power lines. However, the ground level magnetic fields can actually be higher close to the underground cable. According to the Public Service Commission of Wisconsin report on underground lines, The strength of the magnetic field produced by a particular transmission line is determined by current, distance from the line, arrangement of the three conductors, and the presence or absence of magnetic shielding. Underground transmission lines produce lower magnetic fields than aboveground lines if the underground conductors are placed closer together which causes the magnetic fields created by each of the three conductors to cancel out some of the other s fields. Magnetic fields are also strongest close to their source and drop off rapidly with distance. This phenomenon impacts the way the cables are installed in the ground, the closer the cables the lesser the EMF around but in reality bringing them too close will pose higher electrical limits to the amount of electricity that can be transported through the cable. Environment As transmission lines are built in a certain area, the implications on the land and the natural habitat is permanent. In the case of underground, the land is excavated and deep rooted planting cannot be 20

21 placed on top of the right of way (ROW). Several steps during the design, construction and post construction phases can be taken to minimize the impacts. Some of the important factors are selection of equipment considering environmental sustainability, aesthetic design, timing of construction, restoration and species management. During the replacement or upgrading of transmission lines, a few factors would definitely impact the surrounding environment and might add to the cost of building the line. A detailed transmission design analysis and construction estimate needs to consider this additional impact and also its monetary effect. For overhead lines, agriculture underneath is possible but there could be impacts such as soil erosion, increased weed and pest infestation, soil mixing, rutting and compaction. For underground lines, these direct impacts are minimized but still, the ROW land predominantly is secured but can still be used for general agricultural purposes. Waterways in the form of rivers, lakes, streams can also be impacted more for underground cable installation than overhead lines, however successful maneuvers around rivers in the construction of Kopasker Bruarland 33kV underground cable in the 1990s show how that can be managed successfully. Important aspect in Iceland is the abundance of untouched nature and scenery. It is considered valuable to have as much as possible of this extraordinary landscape remaining unchanged. Building very visible transmission lines can be quite contrary to that value statement as overhead lines can have strong visual impacts on the environment. That becomes particularly important in the Icelandic context, where landscape is frequently open, often with a wide horizon, and large wilderness areas are among the last remaining in Europe. Tourism and local economy Tourism is a big contributor to the Icelandic economy and the number of tourists coming into Iceland continued to grow over the last decade. The beautiful Icelandic landscape and natural habitat along with its unique climate are major drivers why people from all over the world come visit Iceland. According to a report published on Icelandic tourism in 2010, the share of tourism in Iceland s GDP was 6%, having been between % since Tourism s share in export revenue between was between 18.8% and 23.5% according to measurements of the export of goods and services. Foreign visitors paid approximately ISK 238bn ( 1.45B) to Icelandic companies in 2012 according to measurements of service transactions. The growth in spending was around 21% between 2011 and When, however, account is taken of price changes, the real growth was approx. 14%. At fixedprice levels, the spending of international visitors has increased by almost 30% from 2009 to xxxiii This trend is expected to increase in future years with increasing benefits to the Icelandic economy. It can be recognized that preserving the natural views and habitat is important to the country and building transmission lines underground is the natural choice in that regard. Studies have shown that this does affect people s perception of unspoiled nature xxxiv. When evaluating options it is very important to consider the effect on this major economical driver. For example if a 220 kv transmission option similar to the example provided earlier in this report were built underground rather than overhead the total additional lifecycle cost could be approximately 20M. Per year that is an equivalent 21

22 cost of about 1M per year or less than 0.1% of the 2012 total economic value of tourism in Iceland at the 2012 level. In other words if the specific option chosen would cause a 0.1% reduction in tourism economic value or growth it may negate the other cost benefits of choosing that option. Regulatory The regulatory approval is crucial in this type of investment of this nature. It is widely accepted that electrical sector and assets are key economic drivers and prudent decisions needs to be made to enable long term sustainability of the system. The initial impact on rates needs to be assessed carefully with a outlook to the longer term investment returns considering all the different impacts discussed in the report. The other key aspect is striking a balance in stakeholders interests and recognizing the impact on businesses and economy as a whole. In Iceland the regulatory approval process is the responsibility of the National Energy Authority (NEA). Their role is to issue licenses for individual transmission projects based on merit, economic effectiveness and the approval of other relevant authorities. The NEA is therefore instrumental in ensuring that true economical comparison is performed on the options of constructing Underground Cables vs. Overhead Lines and that not only construction costs are being used as a decision driver as often is the tendency from a TSO perspective. 22

23 Conclusion and Recommendations As the Commission of European Community eloquently mentions in their report: The issue of undergrounding of overhead lines is not new, as underground cables have been used for many decades for low and medium voltage lines in urban areas. As more environmental considerations started to be taken into account in the construction of electricity networks since the 1970 s, underground cables started to be used in high voltage and extra high voltage lines, but in limited cases owing to their high cost. xxxv Based on the life-cycle cost estimate provided in this report, it is evident that undergrounding transmission lines is a financially viable choice for long term return on investment. This option has other benefits such as enhanced safety, lower environmental impact, aids in the maintenance of Iceland s natural habitat and may support the growth of the tourism industry. When evaluating options, such as these that are discussed in the report, it is important to consider all life-cycle costs and not only initial construction costs. Only then can a true comparison be made. Although the comparison shown in this report is of general nature and it is necessary that case by case analysis is performed for individual projects the following conclusions can be made: The life-cycle costs for underground cable at 132/220 kv can be expected to be about 4-20% more costly than 132/220 kv overhead lines respectively and can therefore be a very viable option when other economic drivers are considered. The above statement assumes similar lifetime (60 years) for both the underground cable and the overhead line. This assumption may be contested as there have not been many years of experience with the modern types of cables but it is generally believed they will last much longer than their 40 years of design life. Similarly overhead lines have been shown to last longer than their generally accepted lifetime of 50 years although in many cases they are replaced prematurely for other reasons than deterioration. For instance some of the 132 kv lines in Iceland currently being utilized for the national ring transmission are only about 40 years old. This could also be the case for prospective overhead lines that may be built in controversial scenic areas. It is possible that they will be forced underground much before their 60 year lifetime is reached resulting in non-optimal investment. 23

environment briefing02

environment briefing02 PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The

More information

Undergrounding high voltage electricity transmission. The technical issues

Undergrounding high voltage electricity transmission. The technical issues Undergrounding high voltage electricity transmission The technical issues This is an interactive PDF document with clickable links from the contents to all sections and back and also to URL and email links.

More information

RGI Cable Workshop Understanding Underground Cables 13 and 14 February in Spreitenbach, Switzerland A workshop kindly hosted by Swissgrid

RGI Cable Workshop Understanding Underground Cables 13 and 14 February in Spreitenbach, Switzerland A workshop kindly hosted by Swissgrid RGI Cable Workshop Understanding Underground Cables 13 and 14 February in Spreitenbach, Switzerland A workshop kindly hosted by Swissgrid During the 1.5 day workshop, more than 70 participants from industry,

More information

FIXED CHARGE: This is a cost that goes towards making the service available, including

FIXED CHARGE: This is a cost that goes towards making the service available, including ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer

More information

Stephen G. Whitley, Senior Vice President & Chief Operating Officer

Stephen G. Whitley, Senior Vice President & Chief Operating Officer Peter T. Brandien Vice President, System Operations To: Stephen G. Whitley, Senior Vice President & Chief Operating Officer From: Peter T. Brandien Re: Discussion of Cable Technologies Under Evaluation

More information

AMSC s Superconductor Cable Technologies for Electric Utilities

AMSC s Superconductor Cable Technologies for Electric Utilities International Workshop 2014 AMSC s Superconductor Cable Technologies for Electric Utilities Michael Ross, P.E. Managing Director of Superconductor Power Systems AMSC Corporate Facts Headquartered in MA,

More information

The electrical energy produced at the gen

The electrical energy produced at the gen 300 300 Principles of Power System CHAPTER CHAPTER 12 Distribution Systems General 12.1 Distribution System 12.2 Classification of Distribution Systems 12.3 A.C. Distribution 12.4 D.C. Distribution 12.5

More information

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS FEBRUARY 2008 PB POWER PB Power Page i EXECUTIVE SUMMARY General

More information

Underground vs. Overhead Transmission and Distribution

Underground vs. Overhead Transmission and Distribution electric power engineering Underground vs. Overhead Transmission and Distribution Your Power System Specialists June 9, 2009 1 NATIONAL TRENDS Municipalities have passed laws requiring new distribution

More information

Q: PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. A: Gerry Sheerin. Sheerin Technical, 25 Eastville Avenue, Toronto, Ontario Canada

Q: PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. A: Gerry Sheerin. Sheerin Technical, 25 Eastville Avenue, Toronto, Ontario Canada DIRECT TESTIMONY OF GERRY SHEERIN, P. ENG ON BEHALF OF PIEDMONT ENVIRONMENTAL COUNCIL BEFORE THE STATE CORPORATION COMMISSION OF VIRGINIA CASE NOS. PUE-00-0001 AND PUE-00-000 1 1 1 1 1 1 1 1 1 Q: PLEASE

More information

Respecting the environment

Respecting the environment MAIN FEATURE CHAPTER I RESEARCH WITH AN EYE ON THE FUTURE Respecting the environment Low power losses and a lesser visual impact on the landscape make Gas-Insulated Lines (GIL) a very environmentally friendly

More information

HV Submarine Cable Systems Design, Testing and Installation

HV Submarine Cable Systems Design, Testing and Installation HV Submarine Cable Systems Design, Testing and Installation CIGRE Ireland Technical Seminar 6 th October 2010 Robert Donaghy Senior Consultant Engineer, ESB International Presentation Overview Applications

More information

E-Highway2050 WP3 workshop April 15 th, 2014 Brussels

E-Highway2050 WP3 workshop April 15 th, 2014 Brussels E-Highway2050 WP3 workshop April 15 th, 2014 Brussels High voltage underground and subsea cable technology options for future transmission in Europe Ernesto Zaccone, Chairman Europacable High Voltage Systems

More information

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3

More information

Overhead lines in Ireland

Overhead lines in Ireland Overhead lines in Ireland The value in Cigré Jarlath Doyle Abstract The main theme of my presentation is to give a brief overview of the valuable information and influence Cigré has and is having on the

More information

State, trends and evolutions of HV/EHV power cables systems and contributions of SC B1 to their ongoing progress

State, trends and evolutions of HV/EHV power cables systems and contributions of SC B1 to their ongoing progress 0611-048-Mep229 12/12/06 6:44 Page 22 State, trends and evolutions of HV/EHV power cables systems and contributions of SC B1 to their ongoing progress Reinhard SCHROTH, Chairman of SC B1 2002-2006 High

More information

Summary of Electric Transmission Assessment Report

Summary of Electric Transmission Assessment Report Summary of Electric Transmission Assessment Report January 2010 Assessment and Analysis of the State-Of-the-Art High-Voltage Electric Transmission Systems with Specific Focus on High-Voltage Direct Current

More information

Cable Consulting International

Cable Consulting International Cable Consulting International Brian Gregory BSc, CEng, MIEEE, FIEE Technical Director www.cableconsulting.net Alan Williams BSc, CEng, MIEE Senior Consultant 1 FEASIBILITY STUDY for 500 kv AC UNDERGROUND

More information

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables

More information

By Manitoba Hydro, March 4 th 2013

By Manitoba Hydro, March 4 th 2013 Rebuttal to Bipole III Coalition underground cable report Potential Use of Underground Cables for Sections of the Planned 500 kvdc Bipole III Overhead Line in Manitoba By Manitoba Hydro, March 4 th 2013

More information

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI 1 Vision 2050 An Asset Management Strategy Jaclyn Cantler Manager, Transmission Planning, PHI 2 Agenda Case for Change About Vision 2050 Status Closing System Design Cybersecurity Interface with distributed/dispersed

More information

Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations

Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations Dana Louth, CL&P VP - Infrastructure Hardening December 14, 2011 0 Topics for today s presentation Review of

More information

DISCUSSION OF CROSS-LINKED POLYETHYLENE INSULATED CABLES FOR UNDERGROUND PORTIONS OF THE MIDDLETOWN-NORWALK 345 kv PROJECTS.

DISCUSSION OF CROSS-LINKED POLYETHYLENE INSULATED CABLES FOR UNDERGROUND PORTIONS OF THE MIDDLETOWN-NORWALK 345 kv PROJECTS. DISCUSSION OF CROSS-LINKED POLYETHYLENE INSULATED CABLES FOR UNDERGROUND PORTIONS OF THE MIDDLETOWN-NORWALK 345 kv PROJECTS December 20, 2004 David W. Forrest Rachel I. Mosier 1. EXECUTIVE SUMMARY CL&P

More information

Hendrix Spacer Cable

Hendrix Spacer Cable Hendrix Spacer Cable What is Spacer Cable? Covered Conductor Withstands temporary branch contact Eliminates temporary faults Protects wildlife Less clearance issues Compact Configuration Multiple Circuits

More information

BC Hydro. Electric Distribution System Cost of Service Study

BC Hydro. Electric Distribution System Cost of Service Study BC Hydro Electric Distribution System Reimer Consulting Group Inc. Arnie Reimer May 7, 2010 Table of Contents 1. Executive Summary... 3 2. BC Hydro Electric Distribution System... 4 2.1. General Description...

More information

Business Administration of Windchill PDMLink 10.0

Business Administration of Windchill PDMLink 10.0 Business Administration of Windchill PDMLink 10.0 Overview Course Code Course Length TRN-3160-T 3 Days After completing this course, you will be well prepared to set up and manage a basic Windchill PDMLink

More information

HIGH-CAPACITY HIGH TEMPERATURE SUPERCONDUCTING POWER CABLES

HIGH-CAPACITY HIGH TEMPERATURE SUPERCONDUCTING POWER CABLES HIGH-CAPACITY HIGH TEMPERATURE SUPERCONDUCTING POWER CABLES Jean-Maxime SAUGRAIN NEXANS Corporate VP Technical IASS Workshop Postdam May 13, 2011 Rationale High-capacity High Temperature Superconducting

More information

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Submarine Power Cables State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Reliable submarine power cables ABB is one of the world s most

More information

Comparison of GIS and AIS systems for urban supply networks

Comparison of GIS and AIS systems for urban supply networks Comparison of GIS and AIS systems for urban supply networks Studies carried out by ABB show that for urban supply networks the combination of HV gas-insulated switchgear (GIS) and HV cable has important

More information

Market Growth and New Regulations Demand Network Modernization

Market Growth and New Regulations Demand Network Modernization CASE ESB NETWORKS: POLE TOP COMMUNICATION INCREASES EFFICIENCY IN IRELAND Viola s solution for remotely operating pole-top reclosers and switches increases reliability, cuts operating costs and helps to

More information

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION 1 EFFICIENT ELECTRICAL ENERGY TRANSMISSION

More information

Treasure Valley Electric Plan - Community Advisory Committee

Treasure Valley Electric Plan - Community Advisory Committee Treasure Valley Electric Plan - Community Advisory Committee What is a transmission line and why are they necessary? A transmission line is used to conduct electricity between two points. Without high

More information

AORC Technical meeting 2014

AORC Technical meeting 2014 http : //www.cigre.org B1-1055 AORC Technical meeting 2014 220 kv Long Distance Underground HVAC Cable Circuit NAVEED RAHMAN Nexans Olex Melbourne, Australia SUMMARY In 2009, the Victorian state government

More information

Considering UNDERGROUND. tampaelectric.com

Considering UNDERGROUND. tampaelectric.com Considering UNDERGROUND Electric Service? tampaelectric.com INTRODUCTION The majority of Tampa Electric s customers receive their electric service through overhead construction, which is the standard type

More information

Report on regulation and the electricity market. Iceland

Report on regulation and the electricity market. Iceland Report on regulation and the electricity market 2010 Iceland The National Energy Authority in Iceland (NEA) 1/21 Table of contents 1. Foreword 3 2. Main developments in the gas and electricity markets

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 SHE Transmission 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 Summary This paper presents SHE Transmission s views and approach on the impact of transmission losses on the transmission

More information

factsheet High Voltage Direct Current electricity technical information

factsheet High Voltage Direct Current electricity technical information factsheet High Voltage Direct Current electricity technical information Introduction High voltage direct current (HVDC) technology is one of the technical options National Grid can consider for the future

More information

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros: P a g e 1 Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Generating Electrical Energy Using Moving Water: Hydro-Electric Generation

More information

Underground Commercial Electric Service

Underground Commercial Electric Service Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer

More information

RCP2 Portfolio Overview Document

RCP2 Portfolio Overview Document RCP2 Portfolio Overview Document Portfolio: Expenditure Class: Base Capex Expenditure Category: Grid Replacement & Refurbishment As at date: 15 November 2013 Expenditure Forecast Real 2012/13 NZ$ (m) 2015-2016

More information

2012 San Francisco Colloquium

2012 San Francisco Colloquium 2012 San Francisco Colloquium http : //www.cigre.org Advances in voltage source converter (VSC) technologies B4-6 500 kv VSC Transmission System for lines and cables B. JACOBSON, B. WESTMAN, M. P. BAHRMAN*

More information

Underground Electric Transmission Lines Introduction

Underground Electric Transmission Lines Introduction Underground Electric Transmission Lines Introduction This overview contains information about electric transmission lines which are installed underground, rather than overhead on poles or towers. Underground

More information

CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE

CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE 8.1 SYSTEM 8.1.1 Armoured, screened underground cables are used for control communication in electrified areas to limit induction effect. 8.2

More information

SP Energy Networks 2015 2023 Business Plan

SP Energy Networks 2015 2023 Business Plan Environmental Discretionary Reward Scheme 1 SP Energy Networks 2015 2023 Business Plan Executive summary SP Distribution Ltd SP Manweb plc July 2013 RIIO ED1 Business Plan 2015 to 2023 2 A Message from

More information

Networks. ESB Networks Ltd Basis of Charges for Connection to the Distribution System. Commercial and Customer Asset Management ESB Networks Ltd.

Networks. ESB Networks Ltd Basis of Charges for Connection to the Distribution System. Commercial and Customer Asset Management ESB Networks Ltd. Networks ESB Networks Ltd Basis of Charges for Connection to the Distribution System Revision Date: 14/01/20010 Revision No.: 1 Document No: DOC-10129-AXQ Issued by: ESB Networks Ltd Approved by : CER

More information

Brochure Introducing HVDC

Brochure Introducing HVDC Brochure Introducing HVDC ABB and HVDC The world s first commercial high-voltage direct current (HVDC) link, situated between the Swedish mainland and the island Gotland, was delivered by ABB already in

More information

Electric Power Distribution

Electric Power Distribution Electric Power Distribution A S Pabla Consulting Engineer and Former Chief Engineer Punjab State Electricity Board McGraw-Hill New York Chicago San Francisco Lisbon London Madrid Mexico City Milan New

More information

An Introduction to High Voltage Direct Current (HVDC) Underground Cables

An Introduction to High Voltage Direct Current (HVDC) Underground Cables Page 1 An Introduction to High Voltage Direct Current (HVDC) Underground Cables Brussels, 10 October 2011 An Introduction to High Voltage Direct Current (HVDC) Underground Cables Page 2 Table of content

More information

Presentation to CIGRE Next Generation Network. Visit of Seine substation

Presentation to CIGRE Next Generation Network. Visit of Seine substation Presentation to CIGRE Next Generation Network Visit of Seine substation Projet Seine 30 août 2012 Contents 0. Presentation of RTE 1. Power supply of «Ile-de-France» and Paris 2. 225 kv Paris substations

More information

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2

More information

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission Power transformers Generator step-up and system intertie power transformers Securing high-quality AC transmission Generator step-up transformers Built to withstand continuous full load Generator step-up

More information

Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System

Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System Assessment of the Technical Issues relating to Significant Amounts of EHV Underground Cable in the All-island Electricity Transmission System Summary Report November 2009 Technical Report on using EHV

More information

The calm after the storm

The calm after the storm The calm after the storm Human decision support in storm outage recovery Rafael Ochoa, Amitava Sen It s a fact of life that interruptions in an electrical distribution utility happen. Although they can

More information

Ministry of Social Justice and Empowerment (Department of Social Justice & Empowerment) Government of India

Ministry of Social Justice and Empowerment (Department of Social Justice & Empowerment) Government of India Dr. Ambedkar Central Sector Scheme of Interest Subsidy on Educational Loan for Overseas Studies for Other Backward Classes (OBCs) (Effective from 2014-15) Ministry of Social Justice and Empowerment (Department

More information

your electric service: from overhead to underground

your electric service: from overhead to underground your electric service: from overhead to underground taking responsibility As an individual, your efficient use of energy brings benefits such as lower bills, improved comfort levels in your home and a

More information

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse How the National Grid System Operates Chris Gorman Lead Account Executive Syracuse 2 Parts of the Electric System Parts of the Electric System 1. Generating Station: Produces Electricity. 2. Transmission

More information

Comparison between Gas- and Air Insulated Network Concepts with the Life Cycle Cost Method

Comparison between Gas- and Air Insulated Network Concepts with the Life Cycle Cost Method Comparison between Gas- and Air Insulated Network Concepts with the Life Cycle Cost Method Ingo Jeromin, Gerd Balzer, Technische Universität Darmstadt, Jürgen Backes, Richard Huber, EnBW Regional AG Stuttgart

More information

2. OUR NETWORK 4.42 74.74 16 POWERPOLES 2 POWERPOLES. Our distribution network comprises: For every 1 kilometre of powerlines: Essential Energy has

2. OUR NETWORK 4.42 74.74 16 POWERPOLES 2 POWERPOLES. Our distribution network comprises: For every 1 kilometre of powerlines: Essential Energy has 2. OUR NETWORK Essential Energy s network is unique in terms of the geographic area it covers, the terrain it traverses, the vegetation that grows within it and the diversity of weather that passes over

More information

Reg. IV.18.(i). Special Rules: Telecommunications and ancillary service providers. [Adopted July 31, 2008]

Reg. IV.18.(i). Special Rules: Telecommunications and ancillary service providers. [Adopted July 31, 2008] Reg. IV.18.(i). Special Rules: Telecommunications and ancillary service providers. [Adopted July 31, 2008] The following special rules are established with respect to the apportionment of income from the

More information

16 West Coast Regional Plan

16 West Coast Regional Plan 16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast

More information

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,

More information

MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION

MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION REPORT ON NETWORK RELIABILITY ASPECTS OF THE CHOICE LINE VERSUS CABLE FOR

More information

factsheet High Voltage Direct Current Electricity technical information

factsheet High Voltage Direct Current Electricity technical information factsheet High Voltage Direct Current Electricity technical information Introduction High voltage direct current (HVDC) technology is one of the technical options National Grid can consider for the future

More information

Frequently Asked Transmission Pipeline Questions

Frequently Asked Transmission Pipeline Questions Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).

More information

ICM Project Underground Infrastructure and Cable

ICM Project Underground Infrastructure and Cable EB 0 00 Tab Schedule B ( pages) ICM Project Underground Infrastructure and Cable Handwell Replacement Segment (THESL) EB 0 00 Tab Schedule B I EXECUTIVE SUMMARY. Project Description 0 The handwell replacement

More information

Introduction to Windchill PDMLink 10.0 for Heavy Users

Introduction to Windchill PDMLink 10.0 for Heavy Users Introduction to Windchill PDMLink 10.0 for Heavy Users Overview Course Code Course Length TRN-3146-T 2 Days In this course, you will learn how to complete the day-to-day functions that enable you to create

More information

Oncor Storm Restoration Questions/Answers

Oncor Storm Restoration Questions/Answers Oncor Storm Restoration Questions/Answers Oncor understands that electricity is an essential service to today s businesses and homes, and loss of power places a significant burden on everyone. Oncor performs

More information

Principles of Distribution charging:

Principles of Distribution charging: Principles of Distribution charging: Electricity networks Introduction A three-stage approach involves the following steps: 1. The analysis and quantification of costs. The cost concept that is relevant

More information

DELHI METRO RAIL CORPORATION LIMITED. (A Joint Venture of Govt. of India & GNCTD) MASS RAPID TRANSPORT SYSTEM PHASE III. Contract: - CE -16 VOLUME-6

DELHI METRO RAIL CORPORATION LIMITED. (A Joint Venture of Govt. of India & GNCTD) MASS RAPID TRANSPORT SYSTEM PHASE III. Contract: - CE -16 VOLUME-6 DELHI METRO RAIL CORPORATION LIMITED (A Joint Venture of Govt. of India & GNCTD) MASS RAPID TRANSPORT SYSTEM PHASE III TURNKEY PROJECT OF DESIGN, SUPPLY, LAYING, JOINTING, TESTING AND COMMISSIONING OF

More information

CenterPoint Energy responds to frequently asked questions

CenterPoint Energy responds to frequently asked questions Page 1 of 5 CenterPoint Energy responds to frequently asked questions Houston Sept. 19, 2008 CenterPoint Energy responds to the questions customers are asking. When will you restore my power? We are working

More information

SES Training & Certification Programs Welcome to the SES Grounding, EMI and Lightning Academy

SES Training & Certification Programs Welcome to the SES Grounding, EMI and Lightning Academy SES Training & Certification Programs Welcome to the SES Grounding, EMI and Lightning Academy A Center of Excellence, Where Experts are Created and Certified 1 SES: Training You and Your Staff to Carry

More information

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)

More information

HVDC Light Cables. Submarine and land power cables

HVDC Light Cables. Submarine and land power cables HV Light Cables Submarine and land s The HV Light s to offshore platform The light and robust HV Light s can be laid with very cost effecient methods HV Light System HV Light is a transmission system in

More information

How To Monitor Water Penetration In A Cable Screen

How To Monitor Water Penetration In A Cable Screen Detection and location of high voltage cable sheath damage with Water Penetration Monitoring*) Purpose of Monitoring System The expected lifetime of high voltage underground cables is more than 40 years,

More information

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. sergio.fujii@areva-td.com. ethan.boardman@areva-td.com

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. sergio.fujii@areva-td.com. ethan.boardman@areva-td.com Agenda do Mini-Curso Sérgio Yoshio Fujii sergio.fujii@areva-td.com Ethan Boardman ethan.boardman@areva-td.com Agenda do Mini-Curso Sistemas de Distribuição (DMS) Characteristics of Distribution Network

More information

Case Study. The economic benefits of vocational education and training in South Africa

Case Study. The economic benefits of vocational education and training in South Africa Case Study The economic benefits of vocational education and training in South Africa Introduction As a developing economy, South Africa recognises the importance of a skilled workforce to enable economic

More information

Assessing, Maintaining & Replacing Fluid Filled Cable Systems at PEPCO

Assessing, Maintaining & Replacing Fluid Filled Cable Systems at PEPCO April 2, 2014 Assessing, Maintaining & Replacing Fluid Filled Cable Systems at PEPCO Todd Goyette, P.E., POWER Engineers Mousa Hejazi, P.E., Pepco Holdings Inc. 1 Pepco Quick Facts First incorporated in

More information

Workflow Administration of Windchill 10.2

Workflow Administration of Windchill 10.2 Workflow Administration of Windchill 10.2 Overview Course Code Course Length TRN-4339-T 2 Days In this course, you will learn about Windchill workflow features and how to design, configure, and test workflow

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

Electricity network services. Long-term trends in prices and costs

Electricity network services. Long-term trends in prices and costs Electricity network services Long-term trends in prices and costs Contents Executive summary 3 Background 4 Trends in network prices and service 6 Trends in underlying network costs 11 Executive summary

More information

Contents. iii. ix xi xi xi xiii xiii xiii xiv xv xvi xvii xix

Contents. iii. ix xi xi xi xiii xiii xiii xiv xv xvi xvii xix What s New in Microsoft Office Project 2003 Getting Help Getting Help with This Book and Its CD-ROM Getting Help with Microsoft Office Project 2003 Using the Book s CD-ROM What s on the CD-ROM System Requirements

More information

Contemporary Craft Sector Profile and Analysis

Contemporary Craft Sector Profile and Analysis Contemporary Craft Sector Profile and Analysis This briefing note distils information from several sources, to summarise the craft sector s current economic impact and business profile. Key documents are:

More information

ICM Project Station Infrastructure and Equipment

ICM Project Station Infrastructure and Equipment EB 0 00 Schedule B. ( pages) ICM Project Station Infrastructure and Equipment (THESL) EB 0 00 Schedule B. I EXECUTIVE SUMMARY 0. Project Description Many Municipal Substations (MS) located outside of downtown

More information

Gulf Cable & Electrical Ind. Co.

Gulf Cable & Electrical Ind. Co. CONTENTS INTRODUCTION PRODUCT RANGE I PRODUCT DATA TABLES XLPE INSULATED 600/1000V CABLES Two Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 1 Three Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 2 Four Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC

More information

Undergrounding high voltage electricity transmission lines. The technical issues

Undergrounding high voltage electricity transmission lines. The technical issues Undergrounding high voltage electricity transmission lines The technical issues Contents Introduction 03 National Grid electricity transmission 03 an overview Section 1 Insulating underground cables 04

More information

QUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller 23.06.2015 Approved: F. Wester 23.06.2015 1. BACKGROUND MATERIAL...

QUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller 23.06.2015 Approved: F. Wester 23.06.2015 1. BACKGROUND MATERIAL... POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.2 Number of J-Tubes Filename ONL 15-060-T2_ J tubes_ bays_pp_v2 Version 3 - Public

More information

Cable action plan. 132-150 kv grids March 2009

Cable action plan. 132-150 kv grids March 2009 Cable action plan 132-150 kv grids March 2009 Table of contents 1. Summary of the cable action plan 3 2. Introduction 7 3. Planning scenarios 8 4. Existing overhead lines 8 4.1 Economically optimal dismantling

More information

Network Standard Advice No. 1420C 9/6/2011

Network Standard Advice No. 1420C 9/6/2011 Network Standard Advice No. 1420C 9/6/2011 TO: Customers, Service Providers and Ausgrid Staff. Advisory Note on Changes to the Use of 11kV Cable Types. Introduction This Network Standard Advice (NSA) provides

More information

Vegetation Management. for Distribution Lines

Vegetation Management. for Distribution Lines Vegetation Management for Distribution Lines Working Hand in Hand with Nature Trees contacting power lines and other electric facilities are the major cause of electric service interruptions, especially

More information

Electricity from the Power Plant To the Consumer

Electricity from the Power Plant To the Consumer Electric Transmission Lines Electricity from the Power Plant To the Consumer The Nature of Electricity Electricity must be used as it is generated. Unlike other commodities, there is very little ability

More information

ScottishPower Distribution Cables & Equipment. Metal Theft

ScottishPower Distribution Cables & Equipment. Metal Theft ScottishPower Distribution Cables & Equipment Metal Theft April 2012 As an aid to deterring to metal theft this booklet has been put together to help identify the types of utility power cables and associated

More information

Konti Skan Replacement of Cable 1

Konti Skan Replacement of Cable 1 Konti Skan Replacement of Cable 1 Presentation of the project 1 Agenda Background for the project Scope of Work for the cable delivery Eletrical Requirements Type Test Route description Time Schedule 2

More information

Guidelines for Monthly Statistics Data Collection

Guidelines for Monthly Statistics Data Collection Guidelines for Monthly Statistics Data Collection Final version Data Expert Group 31 May 2015 1. Table of contents 1. Table of contents... 2 2. Remarks... 3 3. Introduction... 3 4. Geographical perimeter

More information

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China ELECTRIC POWER DISTRIBUTION SYSTEMS F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China Keywords: Distribution system planning, Load characteristics, Subtransmission Lines, Distribution

More information

Comparative study for cables and busbars

Comparative study for cables and busbars Comparative study for cables and busbars Preliminary considerations To compare the prices of two categories of product as different as traditional cables and busbars, it is necessary to make some preliminary

More information

Indicative costs for replacing SWER lines

Indicative costs for replacing SWER lines WIT.3019.005.0002 Indicative costs for replacing SWER lines 28 th August 2009 Department of Primary Industries Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 SWER_Replacement_Options_Report_v1_0

More information

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date

More information

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Course No: E02-010 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education

More information

Third Quarter 2013 Earnings Conference Call October 21, 2013

Third Quarter 2013 Earnings Conference Call October 21, 2013 Third Quarter 2013 Earnings Conference Call October 21, 2013 Cautionary Information This presentation contains forward-looking statements and information that are based on management s current expectations.

More information