1 Hazardous Waste Management, nd ed. Instructors Manual CHAPTER 16 REMEDIAL TECHNOLOGIES Supplemental Questions: The opening quote describes the fifth labor of Hercules. How many labors were there and what are they? King Eurystheus, set Hercules 1 mighty labors: 1. Killing the Nemean lion 7. Capturing the Cretan bull. Killing the mufti-headed Hydra 8. Capturing the mares of Diomedes. Capturing the Arcadian deer 9. Procuring the girdle of Hippolyte 4. Capturing the Erymanthian boar 10. Capturing the cattle of Geryon 5. Cleansing the Augean stables 11. Procuring the golden apples of the Hesperides 6. Driving off the Stymphalian birds 1. Capturing the Cerberus What was so laborous about cleansing the Augean stables? The story of the cleansing of the Augean stables is the earliest recorded instance of site remediation. Augeas, King of Elis, kept 000 oxen in the stables and they had not been cleaned for thirty years. Hercules had to clean the stables out in a single day. He did this by re-routing two rivers through the stables. There is no record of an environmental impact statement ever being filed for this project. When Augeas failed to pay him, Hercules killed the king. Many consultants today use somewhat less extreme measures when dealing with recalcitrant clients The remedial investigation site characterization at an old industrial facility on Long Island revealed a sandy site with shallow ground water contaminated with low levels of volatile organics. The contaminant plume was found to migrate a short distance beyond the property line but had not yet reached residences relying upon ground water for their drinking water supply. What might be the objective for cleanup of this site? The objective might be to immediately contain the contamination from further movement to then allow for treatment or removal to ultimately protect ground water in the area for drinking. Continued migration of contaminants from this site would obviously threaten the nearby water supplies. Thus the immediate objective of this site remediation is the protection of these water supplies by stopping or reversing the migration of the contaminants. Over the longer term, the threat to public health due to contaminated ground water can best be minimized by the removal of the contaminants from the ground water. For this particular site, in order to accomplish the above stated objectives, a remedial system was selected which included a series of groundwater pumping wells and a water treatment system. What goals would be established for the components of this system? Pumping wells: The ground water withdrawal system must alter the groundwater gradients to capture the zone of contaminated ground water. Treatment system: The extracted ground water must be cleaned to some acceptable level; in this case, the drinking water j standards. Duration: The cleanup system must be operated until the remaining contaminants in the ground water are below some acceptable concentration; in this case, the drinking water standards. 001 Environmental Resources Managment Page 1 of 1
2 Hazardous Waste Management, nd ed. Instructors Manual 16-. Cite three advantages and three disadvantages of containment as a means of hazardous waste site remediation. Advantages Disadvantages 1. Cost effectiveness 1. Design uncertainties. Little attention is necessary after implementation. Questionable long-term liability (passive containment). Can be used in conjunction with other treatment. Does not actually clean up the site, contaminants methods remain 16-. Suppose that a section of the circumferential barrier wall described in Example 16-1 Is constructed without adequately keying into an underlying layer of low hydraulic conductivity. A section of the original material 100ft long and ft deep remains with the original aquifer hydraulic conductivity of 1 x 10 - cm/s (a shallow buried valley). What would the leakage through the wall be from this zone? Would this jeopardize the success of the associated pump and treat system? Use: q kia where: k 1 x 10 - cm/s, i 1.67 (from 16.1), A (10)(0) 00 ft. Calculate q: in ft 7.48gal 60s q ( 1 10 cm /sec)(1.67)( 00 ft ) 7. 8gpm.54cm 1in ft 1min This would overwhelm the treatment system design for 5 gpm, rendering it ineffective A 1 m thick up-gradient barrier is planned to control the influx of clean ground water to extraction wells. The down-gradient ground water extraction wells and treatment plant are designed to operate at cm /s. The upgradient barrier is planned to be 500 m long, and the aquifer is 10 m thick. It is estimated that the average drawdown across the wall will be 4 m. By calculating the flow through the wall at various values of hydraulic conductivity, recommend a design value for the barrier. 500m 10m h 4m Q KiA I h 4m 4 L 1m A 10 m x 500 m 5000 m Q KiA K x 4 x x 0,000 m K x 10 8 cm 1 m K (cm/s) Q (cm /s) 1 x x x x 10-9 Select K 1 x 10-8 cm/s Note: Typo in 1st, nd & rd printings: m /s should be cm /s. 001 Environmental Resources Managment Page of 1
3 Hazardous Waste Management, nd ed. Instructors Manual Calculate the volume of water to be mixed with a 100 pound bag of bentonite for a 5% bentonite-water slurry. What will be the unit weight of this slurry? 100 lb bentonite bentonite content 5% Calculate the volume of water: V Calculate the volume of solids: W 100lb (6.4lb / ft ) V W.1ft.1ft (7.48gal/ft ) 40gal V WS G γ 100lb ft.77(6.4lb / ft ) S S S Calculate the weight of water: WW VW γ W (.1 ft )(6.4lb / ft ) 00lb Determine the fluid unit weight: W γ V ( ) ( ) T f T 64.4lb / ft 001 Environmental Resources Managment Page of 1
4 Hazardous Waste Management, nd ed. Instructors Manual What is the factor of safety for a trench 10 m deep excavated in sand having an angle of internal friction of 0. The unit weight of the fluid is as calculated in Problem The sand has a total bulk density of.1 g/cm. How does the factor of safety change for a trench 0 m deep?.1 * KN / m Factor of safety (sand): F γ γ (tanφ) ( γ γ ) f f ( ) where: ; γf 64.4 lb/ft 6.4lb / ft γ.1g / cm 11.04lb / ft 1g / cm Calculate F: F (( 11.04) ( 64.4) ) (tan 0) The factor of safety will not change for a trench of 0 m deep, since the equation for sands is independent of H, the depth of the cut-off wall What is the factor of safety for a trench 10 m deep excavated in clay having a shear strength of 1 kg/cm. The unit weight of the fluid as calculated above. The clay has a total unit weight of. g/cm. How does the factor of safety change for a trench 0 m deep? 4SU Factor of safety (clay): F H ( γ γ ) where: S U 1 kg/cm 1000 g/cm ; H 10 m 1000 cm f 1g / cm ( 64.4lb / ft ) 1.0g / γ g γ f 6.4lb / ft. / cm ; cm Determine F: F 4(1000g / cm ) cm(. 1.0) For a trench 0 m deep, the factor of safety is half as much: 4(1000g / cm ) F cm(. 1.0) Describe the steps to be taken prior to determining a containment alternative at a hazardous waste site. First, a thorough site characterization needs to be done. This will be followed closely by an assessment of risk. Then an analysis of remedial alternatives will be done. Economic environmental factors will play key roles in this decision. 001 Environmental Resources Managment Page 4 of 1
5 Hazardous Waste Management, nd ed. Instructors Manual Describe the hydrologic pathways for contaminant migration at a typical waste disposal site. - migration of leachate - runoff that encounters waste - contaminates transported in groundwater - contaminants in groundwater discharged to surface water List and briefly describe the types of vertical barriers available as passive containment alternatives. Slurry trench cutoff walls - These are commonly made of soil-bentonite, cement-bentonite, or plastic concrete. The process involves excavating a trench around the contaminated area, and replacing it with the low permeability backfill. Grout curtains - These are most commonly used when materials such as rock are involved (and cannot be excavated). The grout curtain is pressure injected into the rock and then sets in place, filling the fractures and voids What are active containment systems? List three alternative techniques. Active systems are systems which require ongoing energy input while controlling and containing contaminant migration. Some additional alternatives might be: - excavation and disposal of the contaminated soil - electrokinetic soil decontamination - biological or chemical permeable treatment beds - soil washing - low-temperature soil treatment 001 Environmental Resources Managment Page 5 of 1
6 Hazardous Waste Management, nd ed. Instructors Manual Construct the flow net for the conditions defined in Example Environmental Resources Managment Page 6 of 1
7 Hazardous Waste Management, nd ed. Instructors Manual Soil on a five-acre site has become contaminated with a mixture of volatile organic compounds. Prepare a brief outline indicating what type of data you would need to collect to begin analyzing remedial measures. The different soil, contaminant and environmental properties are to be found to analyze remedial measures for the compounds. The different soil properties that affect the treatment method are Permeability, Porosity, Grain Size Distribution, Moisture Content, ph, Organic Content, Bulk Density. As the site has been contaminated with different VOC's, only representative compounds should be taken into consideration. For example, TCDD should be taken as a representation for all PCDD's. The contaminant properties which affect the treatment methods are Henry's Law Constant, Solubility, Adsorption Coefficient, VOC Concentration in Soil, Polarity, Vapor Pressure, Diffusion Coefficient. The environmental properties also affect the treatment methods. The different environmental properties that affect the remedial measures are Temperature, Humidity, Wind Speed, Solar Radiation, Precipitation, Terrain, Vegetation Use Hartley's method to estimate the rate of volatilization of trichloroethane. Use an estimated diffusion coefficient of 0.80 cm /s. The following data is provided: TCE saturation in air 76 g/m (Verschueren) Diffusion coefficient 0.80 cm /sec (Lyman et al) Humidity 0.; Temperature 0 C Latent heat of vaporization 7.96 Kcal/mol (Dean) Thickness of stagnant boundary layer 0. cm Specific gravity of TCE 1.5 (Verschueren) 1. Flux: A sat 76 g/m M 1 g/mol λ 7960 cal/mol 1 g/mol x 10-6 m /cc 7. 6 x 10-4 g/cc k 61 x 9-6 Cal/sec cm K cal/g J 1 0.8cm ( g / cc)(0.7) 0. 4 (59.85cal / g) ( g / cc)(1g / mol) + 6 /sec (61 10 cal /sec cm K)(1.987cal / mol K)(9K) 4.74 x 10-5 g/cm sec. Area and mass of chemical Area, 000 Ft x x 10 6 cm Volume x 10 4 gal x m Mass 11.55(1.5)(1000Kg/m ) 15,9 Kg g. Time required: Time Mass/Area Flux 1. 5 x 10 8 g/(1.858 x 10 6 cm ) (4.74 x 10-5 g/cm sec) x 10 6 sec 47.5 hrs ~ 0 days 001 Environmental Resources Managment Page 7 of 1
8 Hazardous Waste Management, nd ed. Instructors Manual 4. Limitations of method: Hartley's method accounts for only a few of the parameters listed in Table 9-. Specifically this problem does not consider soil properties, depth of contamination and many of the environment properties Repeat problem for benzene. Use an estimated diffusion coefficient of cm /s. The following data is provided: Benzene saturation in air 19 g/m (Verschueren) Diffusion coefficient cm /sec (Lyman et al) Humidity 0.; Temperature 0 C Latent heat of vaporization 9.5 Kcal/mol (Dean) Thickness of stagnant boundary layer 0. cm Specific gravity of TCE (Verschueren) 1. Flux: A sat 19 g /m x 10-6 m /cc.19 x 10-4 g/cc M 78 g/mol λ 950 cal/mol 78 g/mol k 61 x 9-6 Cal/sec cm K cal/g J cm ( g / cc)(0.7) 0. 4 (1.179cal / g) ( g / cc)(78g / mol) + 6 /sec (61 10 cal /sec cm K)(1.987cal / mol K)(9K) g / cm sec. Area and mass of chemical Area, 000 ft x x 10 6 cm Volume x 10 4 gal x m Mass (0.8786) (1000Kg/m ) 99,765Kg 1.0 x 10 8 g. Time required: Time Mass/Area Flux 1.0 x 10 8 g / (1.858 x 10 6 cm ) ( x 10-5 g/cm sec ) 8101 sec 9. 6days l week days 4. Limitations of method: Hartley's method accounts for only a few of the parameters listed in Table 9-. Specifically this problem does not consider soil properties, depth of contamination and many of the environment properties. 001 Environmental Resources Managment Page 8 of 1
9 Hazardous Waste Management, nd ed. Instructors Manual Repeat problem for toluene. Use an estimated diffusion coefficient of cm /s. The following data is provided: TCE saturation in air 110 g/m (Verschueren) Diffusion coefficient cm /sec (Lyman et al) Humidity 0. Temperature 0 C Latent heat of vaporization 86.8 cal/g (App. C, Table C-4) Thickness of stagnant boundary layer 0. cm Specific gravity of TCE (Verschueren) 1. Flux: A sat 110 g/m x 10-6 M 9g/mol λ 86.8 cal/g m /cc 1.10 x 10-4 g/cc k 61 x 10-6 Cal/sec cm K J cm ( g / cc)(0.7) 0. 4 (86.8cal / g) ( g / cc)(9g / mol) + 6 /sec (61 10 cal /sec cm K)(1.987cal / mol K)(9K) g / cm sec. Area and Mass of Chemical Area,000 ft x x 10 6 cm Volume x 10 4 gal x m Mass x / (1000 Kg/m ) Kg 1. 0 x 10 8 g r... Time required: Time Mass/(Area Flux) 1.0 x 10 8 g / (1.858 x 10 6 cm ) (.00 x 10-5 g / cm sec).688 x 10 6 sec 1.l days 4 weeks.l days 001 Environmental Resources Managment Page 9 of 1
10 Hazardous Waste Management, nd ed. Instructors Manual Briefly describe the alternative processes that could be considered for removing volatile organics from soils. 1. Soil Vapor Extraction: a non-steady state process by which VOC's are removed from the soil. It may be accomplished in situ in the vadose zone or above ground. It operates by passing an air stream through the soil and transferring the contaminants from the soil to the air. (See Sec. 9-). Soil Washing: The passing of solvent through the soil in a fashion similar to Figs: 10-1 and 10- (pages 596, 597). Organic contaminants are removed from the recovered solvent using solvent extraction and the solvent may be reused.. Chemical Stabilization (see Chap. 11): Stabilization is a process where additives are mixed with waste to reduce the toxicity of the waste and to minimize the rate of contaminant migration. In this process, the contaminants are fully or partially bound by the addition of supporting media, binders, or other modifiers. 4. In-situ bioremediation: The process where the contaminated ground water and subsurface contaminant are treated at the same place where they are found without excavating the overlying soil is called Em-situ Bioremediation. All the treatment actually takes place in the subsurface. (See Section 10-6) 5. In-site vitrification: In-situ Vitrification is a process where the remediation of the contaminated soil is done by melting the soil into a molten mass by applying electric current. As the current flows through the soil, heat builds up, eventually causing the soil to melt. (See Section 11-) 6. Low Temperature Thermal Stripping: Soil is excavated and placed in a device where the soil is mechanically dis-assugated (typically thru the use of a screw conveyor). By passing a heated oil through the center of the screw conveyor, heat is added to the soil and organic vapors are driven off. Additional details may be found in "Hazardous Waste Soil Remediation" (Wilson, D. J. and Clarke, A. N. ed.), Marcel Dekker, Inc., Environmental Resources Managment Page 10 of 1
11 Hazardous Waste Management, nd ed. Instructors Manual An underground storage tank (UST) containing trichloroethane at a chemical plant has ruptured. The plume currently extends west to a distance of 45 feet and is 10 feet wide at this distance. The depth of the plume is 1 feet and the seasonal high ground water table is at a depth of 7 feet. Provide a preliminary design and layout of a soil vapor extraction system. Specifically determine: pressure (a) (b) (c) The required number of extraction wells and their layout. The volumetric capacity in cubic feet per minute (CFM) and operating system of the blower. Equipment layout and any required ancillary facilities. State any assumptions made. Contaminant - Trichloroethane Plume Extension - 45 ft - west; 10 ft - wide Depth of the plume - 1 ft Water table - 7 ft Assumptions: the curves in Fig and 9-11 are applicable to this site. The minimum measurable vacuum pressure at the radius of influence of the extraction wells will be 0.5 inches water gauge (15 pa). Solution: 1) Using Fig. 16-, a vacuum of 0.5 inches water gage can be obtained from either CFM blower, with 5 foot radius of influence per extraction well, or a 40 CFM blower with 40 foot radius of influence. Selecting a 40 CFM blower yields an extraction well spacing of 80 feet. Eight extraction wells should be adequate to cover the plume. ) Using Fig. 16-, a 40 CFM blower per extraction well must be capable of generating a vacuum of 4 inches of water gage. This does not include any losses in the piping system, which would have to be considered after the piping system is designed. Because the blowers will be manifold to all extraction wells, the system must be capable of producing 8 x CFM at 4 inches of water gage (8450 pa). ) Ancillary equipment required includes manifold piping, a Knocrout drum to remove any water removed by the vacuum system, and a Carbon adsorption system or other means of removing organics from the air before release to the atmosphere. As the water table is above the plume depth, ground water extraction pumps has to be installed into the vapor extraction wells to either lower the- ground water table (and therefore enlarge the vadose zone) and/or concurrently remove contaminated ground water. Many of the system options, enhancements discussed above may be considered in this Preliminary design. A schematic representation is shown below in Fig Identify additional parameters other than those presented in Table 16- that might affect SVE system performance. Further, describe how these parameters influence system performance. (Refer to Lyman, et al., Reference 85, for additional information.) The additional parameters that might affect the SVE system performance other than those listed in table 9- are: 1. Vapor density : It is the chemical concentration in air in which the saturated vapor is the maximum concentration. The volatilization rate can be determined by vapor density. Vapor density and vapor pressure are affected by interaction with soils. 001 Environmental Resources Managment Page 11 of 1
12 Hazardous Waste Management, nd ed. Instructors Manual To have a saturated vapor in moist soil, some chemicals may require only a low total soil concentration. The total volatilization rate decreases if the chemicals are incorporated into the soil.. Mass transport by Wick effect : The process of transport of a chemical from the soil body to the surface by capillary action is called Wick effect or Wick evaporation. The rate of evaporation increases with evaporation of water causing capillary action Given the following octanol water partition coefficients, K ow, indicate for which compounds vacuum extraction is a candidate process for removing the compound from the vadose zone of contaminated soil. Compound Log K ow Trichloroethene.8 Pyrene 4.88 Polychlorinated biphenyl congeners 6.01 Vinyl chloride 1.8 Ethyl benzene.15 Phenol Lindane.9 0 DDT Butanone (methyl ethyl ketone) 0.6 The Octanol Water Partition coefficients, K OW Co C where Co concentration in Octanol (mg/ L or µg/ L) C concentration in Water (m g/ L or µg/ L) The Octanol-Water Partition coefficient is useful in estimating fate and transport of chemicals and is related to soil adsorption coefficients. Chemicals with low values of K OW (< 10) tend not to be hydrophilic and have low soil adsorption. As vacuum extraction is used for removing the compound from vadose zone of contaminated soil, that is from soil/water, higher the K OW, more efficient is the vacuum extraction process. Compound Log K OW K OW Vacuum Extraction 1) Trichloroethene Possible ) Pyrene Possible ) Polychlorinated Possible Biphenyl Congeners 4) Vinyl Chloride Possible 5) Ethyl Benzene Possible 6) Phenol Possible 7) Lindane Possible 8) DDT Possible 9) -Butanone Not Possible (methyl ethyl ketone) As for most of the cases K OW > 10, vapor extraction is possible. The efficiency is greater for DDT, followed by Polychlorinated Biphenyl Congeners, Pyrene and Lindane. 001 Environmental Resources Managment Page 1 of 1
CHAPTER 13 LAND DISPOSAL
CHAPTER 13 LAND DISPOSAL Supplemental Questions: Which of Shakespeare's plays is the source of the opening quote? The Tempest [1611-1612],Act: I, Scene: i, Line: 70. 13-1. Cite four reasons landfills remain
More informationREMEDIATION TECHNIQUES FOR SOIL AND GROUNDWATER
REMEDIATION TECHNIQUES FOR SOIL AND GROUNDWATER X.H. Zhang Department of Environmental Science & Engineering, Tsinghua University, Beijing, China Keywords: Remediation, soil, groundwater, aquifer, contamination,
More informationU. S. Army Corps of Engineers Ground Water Extraction System Subsurface Performance Checklist
U. S. Army Corps of Engineers Ground Water Extraction System Subsurface Performance Checklist Installation Name Site Name / I.D. Evaluation Team Site Visit Date This checklist is meant to aid in evaluating
More informationPresented by: Craig Puerta, PE, MBA December 12, 2012
Presented by: Craig Puerta, PE, MBA December 12, 2012 Established in 2010 under charter from New York State to transfer lower priority sites from State s program. First municipally-run brownfield cleanup
More information1.34 WASTE CONTAINMENT AND SITE REMEDIATION TECHNOLOGY TAKE-HOME FINAL EXAM DUE FRIDAY MAY 7, 2004 AT 9:30 AM
1.34 WASTE CONTAINMENT AND SITE REMEDIATION TECHNOLOGY TAKE-HOME FINAL EXAM DUE FRIDAY MAY 7, 2004 AT 9:30 AM This is an open-book exam, but the work should be yours alone. Please do not work with others
More informationInventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination
Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination H. Keith Moo-Young, Professor, Villanova University Ronald Wilhelm, Senior Scientist, U.S. EPA, Office
More informationUtilizing an Innovative, Effective Site Assessment and Monitoring Tool
Utilizing an Innovative, Effective Site Assessment and Monitoring Tool Jay W. Hodny, Ph.D. W. L. Gore & Associates, Inc., Elkton, MD, USA Laurie LaPlante, P.E. Kleinfelder, Inc., Salt Lake City, UT, USA
More informationFrequently Asked Questions FAQ (click to follow link) How Does The Thermal Well System Work? How Much Does It Cost?
Frequently Asked Questions FAQ (click to follow link) How Does The Thermal Well System Work? How Much Does It Cost? Isn't the Power Itself Excessively Expensive? What Are The Risks Of Using ISTD? Which
More informationM Area Inactive Process Sewer Lines (MIPSL) Operable Unit CAB Recommendation #236 Update
A Presentation to the Facilities Disposition and Site Remediation Committees SRS Citizens Advisory Board M Area Inactive Process Sewer Lines (MIPSL) Operable Unit CAB Recommendation #236 Update A Presentation
More informationCHAPTER 7: REMEDIATION TECHNOLOGIES FOR CONTAMINATED GROUNDWATER
CHAPTER 7: REMEDIATION TECHNOLOGIES FOR CONTAMINATED GROUNDWATER There are a number of technologies that are being use to remediate contaminated groundwater. The choice of a certain remediation technology
More informationIn-situ Chemical Oxidation via Ozone at a Multiple-Remedy UST Site - 9124
ABSTRACT In-situ Chemical Oxidation via Ozone at a Multiple-Remedy UST Site - 9124 Frederic R. Coll and R.A. Moore URS Corporation Foster Plaza 4, Suite 300 501 Holiday Drive Pittsburgh, PA 15220 URS Corporation
More informationEnvironmental Remediation Examples and Remediation Strategic Planning
Environmental Remediation Examples and Remediation Strategic Planning Yasuo Onishi (yasuo.onishi@pnnl.gov) October 16, 2011 Pacific Northwest National Laboratory, and Washington State University, Civil
More informationWell gauging results LNAPL in Benzol Processing Area
Well gauging results LNAPL in Benzol Processing Area 3.59 ft 0.62 ft 4.64 ft Context Scope & Methods Onshore Results Offshore Results Summary & Conclusions 13 Page 1 of 4 Underground Storage Tanks Last
More informationIn Situ Bioremediation of Chlorinated Solvent R&D 100 Award Winner
In Situ Bioremediation of Chlorinated Solvent R&D 100 Award Winner Description This patented bioremediation technology combines natural gas injection and air stripping to stimulate microbes to completely
More informationEnvironmental and Economical Oil and Groundwater Recovery and Treatment Options for hydrocarbon contaminated Sites
2014 5th International Conference on Environmental Science and Technology IPCBEE vol.69 (2014) (2014) IACSIT Press, Singapore DOI: 10.7763/IPCBEE. 2014. V69. 15 Environmental and Economical Oil and Groundwater
More informationCase Study 3 Conservation Chemical Company, Kansas City, Missouri, EPA Region 7
29 technologies. The large amount of waste at the site poses a difficult problem for which some innovative cleanup technologies, including in situ techniques to avoid excavation, could have been considered
More informationBioremediation. Introduction
Bioremediation Introduction In the twentieth century, the ever increase in the global human population and industrialization led to the exploitation of natural resources. The increased usage of heavy metals
More informationBioremediation of contaminated soil. Dr. Piyapawn Somsamak Department of Environmental Science Kasetsart University
Bioremediation of contaminated soil Dr. Piyapawn Somsamak Department of Environmental Science Kasetsart University Outline Process description In situ vs ex situ bioremediation Intrinsic biodegradation
More informationGAS WELL/WATER WELL SUBSURFACE CONTAMINATION
GAS WELL/WATER WELL SUBSURFACE CONTAMINATION Rick Railsback Professional Geoscientist CURA Environmental & Emergency Services rick@curaes.com And ye shall know the truth and the truth shall make you free.
More informationPresumptive Remedy: Supplemental Bulletin Multi-Phase Extraction (MPE) Technology for VOCs in Soil and Groundwater Quick Reference Fact Sheet
Office of Emergency and Remedial Response United States Air Force Air Combat Command United States Environmental Protection Agency Office of Solid Waste and Emergency Response Directive No. 9355.0-68FS
More informationCOST AND PERFORMANCE REPORT
COST AND PERFORMANCE REPORT Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon September 1998 Prepared by: SITE INFORMATION Identifying Information: United
More informationSUCCESSFUL FIELD-SCALE IN SITU THERMAL NAPL REMEDIATION AT THE YOUNG-RAINEY STAR CENTER
Paper 2B-01, in: A.R. Gavaskar and A.S.C. Chen (Eds.), Remediation of Chlorinated and Recalcitrant Compounds 2004. Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant
More informationSEAR Wastewater Treatment: Contaminant Removal and Material Recovery
ESTCP SEAR Wastewater Treatment: Contaminant Removal and Material Recovery U.S. Environmental Protection Agency National Risk Management Research Laboratory Cincinnati, Ohio SEAR Workshop Outline Motivation
More informationIn-situ Bioremediation of oily sediments and soil
1 Peter Werner, Jens Fahl, Catalin Stefan DRESDEN UNIVERSITY OF TECHNOLOGY In-situ Bioremediation of oily sediments and soil 2 WHAT IS OIL? MIXTURE of aliphatic and aromatic hydrocarbons Different composition
More informationBioremediation of Petroleum Hydrocarbons and Chlorinated Volatile Organic Compounds with Oxygen and Propane Gas infusion
Bioremediation of Petroleum Hydrocarbons and Chlorinated Volatile Organic Compounds with Oxygen and Propane Gas infusion Walter S. Mulica Global Technologies Fort Collins, CO Co-Authors Mike Lesakowski
More informationSTATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM
STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM Solid Waste Management Program Waste Management Division 103
More informationNew Cumberland Army Depot Formerly Used Defense Site (FUDS) Marsh Run Park Site Restoration Community Meeting
New Cumberland Army Depot Formerly Used Defense Site (FUDS) Marsh Run Park Site Restoration Community Meeting Fairview Township, York County, Pennsylvania April 23, 2013 N US Army Corps of Engineers Depot
More informationWater Pollution. A Presentation for Café Scientifique Cherie L. Geiger, Ph.D. Department of Chemistry, UCF
Water Pollution A Presentation for Café Scientifique Cherie L. Geiger, Ph.D. Department of Chemistry, UCF Overview What is Causing it? Problems with Groundwater Contamination Traditional Remediation Techniques
More informationField Test to Demonstrate Real-Time In-Situ Detection of Volatile Organic Compounds Hazmat Spill Center, Nevada Test Site September 19-25, 2001
Field Test to Demonstrate Real-Time In-Situ Detection of Volatile Organic Compounds Hazmat Spill Center, Nevada Test Site September 19-2, 21 Clifford K. Ho Sandia National Laboratories Albuquerque, NM
More informationSite Assessment for the Proposed Coke Point Dredged Material Containment Facility at Sparrows Point
Site Assessment for the Proposed Coke Point Dredged Material Containment Facility at Sparrows Point Prepared for Maryland Port Administration 2310 Broening Highway Baltimore, MD 21224 (410) 631-1022 Maryland
More informationCOTTON WATER RELATIONS
COTTON WATER RELATIONS Dan R. Krieg 1 INTRODUCTION Water is the most abundant substance on the Earth s surface and yet is the most limiting to maximum productivity of nearly all crop plants. Land plants,
More informationSite Description and History
3130 Southwest 17 th Street Pembroke Park, Florida County: Broward District: Southeast Site Lead: EPA Placed on National Priorities List: July 22, 1987 HWC # 023 Site Description and History The Petroleum
More informationSTRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
More informationBioremediation. Biodegradation
Bioremediation A technology that encourages growth and reproduction of indigenous microorganisms (bacteria and fungi) to enhance biodegradation of organic constituents in the saturated zone Can effectively
More informationBIOREMEDIATION: A General Outline www.idem.in.gov Mitchell E. Daniels, Jr.
TECHNICAL GUIDANCE DOCUMENT INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT BIOREMEDIATION: A General Outline www.idem.in.gov Mitchell E. Daniels, Jr. Thomas W. Easterly Governor Commissioner 100 N. Senate
More informationManaging Floor Drains and Flammable Traps
Managing Floor Drains and Flammable Traps Contents: Problem... 1 Solution... 2 Maintenance... 2 Waste Management Options... 2 For More Information... 4 BMP Chart... 5 This fact sheet discusses recommended
More information4 th & Carey Groundwater. Remediation Project and Reverse Osmosis Water Treatment System
4 th & Carey Groundwater Remediation Project and Reverse Osmosis Water Treatment System Contaminated City Well Well #8 4 th and Carey Groundwater contamination from industry was discovered in the Southeast
More informationKey Factors for Successful DPVE Remediation at Hydrocarbon-Impacted Sites. by Wanda Sakura, John Agar & Tai Wong
Key Factors for Successful DPVE Remediation at Hydrocarbon-Impacted Sites by Wanda Sakura, John Agar & Tai Wong OUTLINE What is DPVE? Why DPVE? How to design it? How should it be operated? How well would
More information1.72, Groundwater Hydrology Prof. Charles Harvey Lecture Packet #2: Aquifers, Porosity, and Darcy s Law. Lake (Exposed Water Table)
1.72, Groundwater Hydrology Prof. Charles Harvey Lecture Packet #2: Aquifers, Porosity, and Darcy s Law Precipitation Infiltration Lake (Exposed Water Table) River Water table Saturated zone - Aquifer
More informationOZONE SPARGE TECHNOLOGY FOR GROUNDWATER REMEDIATION. Charles R. Plummer, P.E., M.S., Michael D. Luckett, P.E., Shaun Porter, and Robert Moncrief
OZONE SPARGE TECHNOLOGY FOR GROUNDWATER REMEDIATION Charles R. Plummer, P.E., M.S., Michael D. Luckett, P.E., Shaun Porter, and Robert Moncrief ABSTRACT Ozone sparging is an oxidization remedial technology
More informationFor Water to Move a driving force is needed
RECALL FIRST CLASS: Q K Head Difference Area Distance between Heads Q 0.01 cm 0.19 m 6cm 0.75cm 1 liter 86400sec 1.17 liter ~ 1 liter sec 0.63 m 1000cm 3 day day day constant head 0.4 m 0.1 m FINE SAND
More informationTECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the
More informationLaboratory scale electrical resistivity measurements to monitor the heat propagation within porous media for low enthalpy geothermal applications
32 CONVEGNO NAZIONALE 19-21 Novembre 2013 TRIESTE Laboratory scale electrical resistivity measurements to monitor the heat propagation within porous media for low enthalpy geothermal applications N. Giordano
More informationPREDICTIVE MODELLING AND MONITORING NATURAL ATTENUATION TO SAVE REMEDIAL COSTS
PREDICTIVE MODELLING AND MONITORING NATURAL ATTENUATION TO SAVE REMEDIAL COSTS A.Aziz Shaikh, Brian Tsang, Greg Sutor and Thomas Dance Abstract This paper describes the multidisciplinary components of
More informationState of Rhode Island Department of Environmental Management Division of Site Remediation. Policy Memo 95-01
State of Rhode Island Department of Environmental Management Division of Site Remediation Policy Memo 95-01 Guidelines for the Management of Investigation Derived Wastes 1.0 Purpose The purpose of this
More informationSAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment
More informationExtraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan
Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the
More informationRemediation of VOC Contaminated Groundwater
Remediation of VOC Contaminated Groundwater Background Contaminated groundwater has become an ever-increasing problem in the United States and around the world. Treatment and disposal of waste is a serious
More informationStreet Address (number and street): City: County: ZIP Code: B. CURRENT SITE PRIORITY INFORMATION Was free product present this quarter?
QUARTERLY MONITORING REPORT (QMR) COVER SHEET AND REPORT FORMAT State Form 56087 (6-16) 329 IAC 9-5 Indiana Department of Environmental Management Office of Land Quality Leaking Underground Storage Tank
More informationGUIDELINES FOR LEACHATE CONTROL
GUIDELINES FOR LEACHATE CONTROL The term leachate refers to liquids that migrate from the waste carrying dissolved or suspended contaminants. Leachate results from precipitation entering the landfill and
More informationPCB SPIU CLEANUP CAUSE AND EFFECT DIAGRAM. Bruce A. Bohnen Technical Director Integrated Chemistries, Incorporated 1970 Oakcrest Avenue, Suite 215
CHEMICAL SPILL CLEANUP TECHNOLOGY Bruce A. Bohnen Technical Director Integrated Chemistries, Incorporated 1970 Oakcrest Avenue, Suite 215 St. Paul, MN 55113 Building structures occasionally are contaminated
More information2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT
2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the
More informationIn Situ Bioremediation at FracRock Sites Mary F. deflaun, PhD
In Situ Bioremediation at FracRock Sites Mary F. deflaun, PhD Slide 1 Overview Two case studies of bioaugmentation in fractured rock: 1. Naval Air Warfare Center in NJ fractured mudstones 2. Industrial
More informationIn-well Vapor Stripping
Technology Overview Report TO-97-01 GWRTAC O SERIES Prepared By: Ralinda R. Miller, P.G. and Diane S. Roote, P.G. Ground-Water Remediation Technologies Analysis Center February 1997 Prepared For: Ground-Water
More informationSoil remediation you can trust In Situ Thermal Desorption. The real ISTD TERRATHERM R TECHNOLOGY. Technology
Soil remediation you can trust In Situ Thermal Desorption TERRATHERM R TECHNOLOGY Technology The real ISTD ISTD Testing the efficiency Our pilot ISTD system is easy and ready to use if a client wants to
More informationBioremediation of Petroleum Contamination. Augustine Ifelebuegu GE413
Bioremediation of Petroleum Contamination Augustine Ifelebuegu GE413 Bioremediation Bioremediation is the use of living microorganisms to degrade environmental contaminants in the soil and groundwater
More informationSOIL GAS MODELLING SENSITIVITY ANALYSIS USING DIMENSIONLESS PARAMETERS FOR J&E EQUATION
1 SOIL GAS MODELLING SENSITIVITY ANALYSIS USING DIMENSIONLESS PARAMETERS FOR J&E EQUATION Introduction Chris Bailey, Tonkin & Taylor Ltd, PO Box 5271, Wellesley Street, Auckland 1036 Phone (64-9)355-6005
More informationRemediation Services & Technology
Remediation Services & Technology Miranda Cruttenden- Well Remediation Engineer Todd Studer- Business Development Manager September 2011 Agenda Near wellbore remediation Causes of formations damage Field
More informationSoils, Foundations & Moisture Control
Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations
More informationTheoretical and Experimental Modeling of Multi-Species Transport in Soils Under Electric Fields
United States National Risk Management Environmental Protection Research Laboratory Agency Cincinnati, OH 45268 Research and Development EPA/6/SR-97/54 August 997 Project Summary Theoretical and Experimental
More information9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems
9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of
More informationWyckoff/Eagle Harbor Site Bainbridge Island, Washington
Alaska Region 10 Idaho 1200 Sixth Avenue Oregon Seattle WA 98101 Washington Superfund Fact Sheet Wyckoff/Eagle Harbor Site Bainbridge Island, Washington April 1998 Many significant developments have taken
More informationLong-Term Monitoring Network Optimization Evaluation. for. Wash King Laundry Superfund Site Lake County, Michigan
Long-Term Monitoring Network Optimization Evaluation for Wash King Laundry Superfund Site Lake County, Michigan June 2006 Solid Waste and Emergency Response (5102P) EPA 542-R-06-004 December 2006 www.epa.gov
More informationBUREAU OF ENVIRONMENTAL REMEDIATION/REMEDIAL SECTION GUIDANCE INVESTIGATION AND REMEDIATION OF SALT (CHLORIDE)- IMPACTED SOIL AND GROUND WATER
BUREAU OF ENVIRONMENTAL REMEDIATION/REMEDIAL SECTION GUIDANCE INVESTIGATION AND REMEDIATION OF SALT (CHLORIDE)- IMPACTED SOIL AND GROUND WATER 1.0 Introduction 1 BER POLICY # BER-RS-13A DATE: March 2004
More informationA perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.
BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming
More informationConstruction Dewatering and Ground Freezing
UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Construction Dewatering and Ground Freezing
More informationPierre VOC Ground Water Investigation and MTBE Remediation Pilot Study
Pierre VOC Ground Water Investigation and MTBE Remediation Pilot Study Joint Meeting of 2007 Eastern South Dakota Water Conference and the 52 nd Annual Midwest Ground Water Conference October 30, 2007
More informationInnovative LNAPL Recovery Techniques
Innovative LNAPL Recovery Techniques RTDF NON-AQUEOUS PHASE LIQUID (NAPL) CLEANUP ALLIANCE San Antonio, Texas February 7-8, 2006 Presented by: Patrick E. Haas P. E. Haas & Associates, LLC http://www.phaas.net
More informationAlberta Onsite Wastewater Management Association Installer Training Program
Alberta Onsite Wastewater Management Association Installer Training Program OWTS 100 Overview and Principles of Wastewater Treatment Systems Brief Review of All Types of Systems 1. Know the general principles
More informationEMERGENCY PETROLEUM SPILL WASTE MANAGEMENT GUIDANCE. Hazardous Materials and Waste Management Division (303) 692-3300
EMERGENCY PETROLEUM SPILL WASTE MANAGEMENT GUIDANCE Hazardous Materials and Waste Management Division (303) 692-3300 First Edition January 2014 This guidance is meant to provide general information to
More informationTravel Centers of America 1003300
Travel Centers of America 1003300 Source Water Assessment Report A State Assessment of Your Drinking Water Source s Vulnerability As a requirement of the 1996 Amendments to the Federal Safe Drinking Water
More informationTCE. The Use & Remediation of TCE at NASA. Keep reading. is developing innovative. NASA s pollution prevention efforts significantly reduced TCE use
National Aeronautics and Space Administration Space flight and exploration begin with developing innovative technologies here on Earth. Our commitment to environmental stewardship is central to that effort.
More informationInterim Summary Report for the Treatment Facility D Helipad In-Situ Bioremediation Treatability Test
Interim Summary Report for the Treatment Facility D Helipad In-Situ Bioremediation Treatability Test June 15, 2012 Environmental Restoration Department This work was performed under the auspices of the
More informationSan Mateo County Environmental Health Characterization and Reuse of Petroleum Hydrocarbon Impacted Soil
INTRODUCTION San Mateo County Environmental Health Characterization and Reuse of Petroleum Hydrocarbon Impacted Soil This guidance relates to the on-site reuse of non-hazardous petroleum hydrocarbon impacted
More informationHow To Test For Water Flow In A Site Near Niagara Falls
TRACER TEST CHARACTERIZATION DURING IN SITU BIOREMEDIATION OF CHLORINATED VOLATILE ORGANIC COMPOUNDS IN OVERBURDEN AND HIGH VELOCITY FRACTURED BEDROCK James W. Schuetz, Parsons Mark Raybuck, Parsons William
More informationMark A. Lehar, P.Geo. Regional Environmental Lead and Senior Environmental Geologist
Mark A. Lehar, P.Geo. Regional Environmental Lead and Senior Environmental Geologist Exova Seminar: 15 January 2016 HYDRASleeve TM Focused Sampling - Monitoring Well Sampling Using No Purge HYDRASleeves
More informationWATER SUPPLY WELL RECEPTOR SURVEY GUIDANCE DOCUMENT
STATE OF CONNECTICUT DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION WATER SUPPLY WELL RECEPTOR SURVEY GUIDANCE DOCUMENT Bureau of Water Protection and Land Reuse Remediation Division September 2009
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationK. P. Catlett D. G. Adler U.S. Department of Energy, Oak Ridge, TN. P. D. Moss Science Applications International Corporation, Oak Ridge, TN
PREVENTING WASTE - SUPPORTING CLEANUP: POLLUTION PREVENTION USED IN CONJUNCTION WITH CERCLA ACTIVITIES AT BEAR CREEK VALLEY, OAK RIDGE RESERVATION, OAK RIDGE, TN K. P. Catlett D. G. Adler U.S. Department
More informationDrainage A Crucial Component for Athletic Field Performance. Part Three: Sub-Surface Installed Drainage Systems
www.stma.org Drainage A Crucial Component for Athletic Field Performance Part Three: Sub-Surface Installed Drainage Systems Water is applied to maintained turfgrass areas by irrigation or precipitation.
More informationHazardous Waste Accumulation, Storage, & Labeling
Nadine Deak, Kalamazoo District Office 269-567-3592 or deakn@michigan.gov Jenny Bennett, Gaylord District Office 989-705-2421 or bennettj6@michigan.gov Hazardous Waste Accumulation, Storage, & Labeling
More informationUse of Alternate Concentration Limits (ACLs) to Determine Cleanup or Regulatory Levels Under RCRA and CERCLA
U.S. Department of Energy Office of Environmental Policy and Assistance ACL Information Brief DOE/EH-413-9912 (December 1999) DEPARTMENT OF ENERGY UN ITED STATES OF AMERICA Use of Alternate Concentration
More informationDIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012
DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY August 2012 SECTION 2 The storage requirements in Directive 055 apply to upstream petroleum facilities, well sites, and pipelines
More information3. Asbestos Abatement Course 1. Introduction and Background to Asbestos Abatement. 4. Health Effects and Medical Surveillance
St. Louis Brownfields Worker Training Program St. Louis Community College Harrison Education Center and St. Louis University Environmental Education & Training 1. Introduction to Environmental Technologies
More informationPrepared for ENRY2000, Belgrade, Yugoslavia, September 27, 2001
Prepared for ENRY2000, Belgrade, Yugoslavia, September 27, 2001 PERSPECTIVES ON INNOVATIVE CHARACTERIZATION AND REMEDIATION TECHNOLOGIES FOR CONTAMINATED SITES W.W. Kovalick, Jr. Technology Innovation
More informationTim Johnson, Mike Truex, Jason Greenwood, Chris Strickland, Dawn Wellman: Pacific Northwest National Laboratory
3D Site Characterization and Autonomous Remedial Process Monitoring Using High Performance Electrical Resistivity and Induced Polarization Tomographic Imaging Tim Johnson, Mike Truex, Jason Greenwood,
More informationCURRENT AND FUTURE IN SITU TREATMENT TECHNIQUES FOR THE REMEDIATION OF HAZARDOUS SUBSTANCES IN SOIL, SEDIMENTS, AND GROUNDWATER
CURRENT AND FUTURE IN SITU TREATMENT TECHNIQUES FOR THE REMEDIATION OF HAZARDOUS SUBSTANCES IN SOIL, SEDIMENTS, AND GROUNDWATER Robert A. Olexsey and Randy A. Parker National Risk Management Research Laboratory,
More informationAlternate Concentration Limits/Groundwater Cleanup Levels. Title slide
Alternate Concentration Limits/Groundwater Cleanup Levels Title slide 1 Alternate Concentration Limits (ACL) Terms and Definitions 40 CFR 264 Subpart F Definitions Regulated Unit Ground Water Protection
More informationSoil and Groundwater. Removing Contaminants. Groundwater. Implementing. Remediation. Technologies 1 / 6
carol townsend, C: 469-263-4343, carol.townsend@sageenvironmental.com robert sherrill, C: 512-470-8710, robert.sherrill@sageenvironmental.com October 2012. ALL RIGHTS RESERVED. Revised Nov. 12, 2012 Background:
More informationCivil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
More informationHow To Model Soil On Gri
TECHNICAL NOTE ON USING HELP MODEL (VER. 3.07) I: INPUT STEPS GUIDE The purpose of this document is to help the users of HELP Model through the input procedures, and interpretation of the output results.
More informationEnvironmental Engineering Professors Cal (Chair of Department), Richardson Associate Professor Huang Adjunct Faculty Brady, Hendrickx
Environmental Engineering Professors Cal (Chair of Department), Richardson Associate Professor Huang Adjunct Faculty Brady, Hendrickx Degrees Offered: B.S. in Environmental Engineering; M.S. in Environmental
More informationSoil Cleanup Goals. Minnesota Department of Agriculture Pesticide and Fertilizer Management Division. Guidance Document 19
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Minnesota Department
More informationThe EPA's Superfund Remediation of Oil Spill Sites
The EPA's Superfund Remediation of Oil Spill Sites Brett Bryngelson Background The United States, being the most consumptive industrial nation in the world, demands large volumes of raw materials. This
More information6 Chemicals from human settlements
6 Chemicals from human settlements 6.1 Introduction The world is becoming increasingly urban, particularly in developing countries. The transition of people from rural areas to cities represents a major,
More information1. Page 1, Incoming Soil Materials, Testing Frequency :
March 31, 2014 Ms. Wendy Henderson Director of Public Health Town of Dartmouth Board of Health Town Hall, Room 119 400 Slocum Road Dartmouth, MA 02747 Dear Ms. Henderson: I understand that the Dartmouth
More informationElectrical Classification
Electrical Classification Using NFPA 70 and NFPA 499 to Classify Hazardous Locations Electrical classifications are established in accordance with the National Electrical Code, NFPA 70, also referred to
More informationSTATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS TECHNICAL GUIDANCE DOCUMENT - 008
STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS TECHNICAL GUIDANCE DOCUMENT - 008 Effective Date - January 13, 1992 Revised Date - November 19, 1993
More informationCONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,
More informationSUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
More information