1 RD&D, Technology February 1999 A Proposed Strategy for Quality in Life-cycle Asset Management

2 A Proposed Strategy for Quality in Life-cycle Asset Management i Executive Summary The principal objective of asset management is to achieve value-for-money throughout an asset's service life. In order to provide cost-effective solutions to the various demands placed upon a facility adequate decision making tools must be available. The need for such tools is more significant when resources are limited. Maintenance levels directly affect the asset performance as well as their economic lives by altering the rate and nature of the deterioration process. Current understanding and explanation of the degradation mechanisms tend to be subjective. Government Services Canada recognizes that further development of performance indicators is required. A basic responsibility of GSC is to supply client departments with facilities which provide stated functions for an optimum life-cycle at an ideal level of maintenance. GSC has in-place the necessary framework for quality management. The Project Delivery System (PDS) provides guidance for the delivery of initial facility quality while systems such as the Preventative Maintenance Support System (PMSS) attempt to sustain the required asset function. Despite use of these tools, more complete and updateable knowledge of the future service lives of facilities is required. The key goals stated in this strategy are: i) the development of tools to assess service life and performance at any point within the service life; ii) iii) the retention, via databases, of the knowledge/experience obtained; the optimization of maintenance practices, on a life-cycle basis, in order to maximize facility service life and more effectively allocate resources; and iv) the on-going identification, investigation and quantification of deterioration mechanisms. The tools to be developed will be used to examine performance indicators at any point within the life span of the asset. It is crucial to methodology that the information gathered, and the tools themselves, be useful for on-going supervision of O&M on an annual basis.

3 A Proposed Strategy for Quality in Life-cycle Asset Management ii Due to the dynamic nature of the factors which describe performance, the use of probabilistic (reliability-based) techniques is the only approach that will provide realistic analysis of the likelihood of fulfilling performance requirements. The reliability-based methodology hinges upon the identification of functions which describe the conditions governing performance of the components for any given system. The wealth of information found within GSC will form the basis for developing our future reliability-based maintenance and management procedures and practices. Application of the life-cycle asset and quality management concept will help asset managers, engineers and architects to make rational and cost-effective decisions. This document proposes a concept utilizing a reliability-based analysis system, based on our GSC knowledge, will provide asset managers with a dependable and easy-to-use tool for their decision making processes in the management of buildings. The creation of such a tool will permit the monitoring and management of quality during the building's life-cycle; eventually resulting in improved asset performance and significant savings in repair and maintenance expenditures on our facilities. The continued enhancement of these knowledge bases should result in better selection of materials, equipment and maintenance procedures. A direct effect of application of this knowledge would be heightened life-cycle performance of our assets. To strengthen the assessment capability, all expertise in the Department must be marshalled to work toward the same objectives. More effective communication ties must be established between the respective domains in order to effectively link the economic and technical aspects of the same asset. By establishing this link the Department will have created the necessary mechanisms to fulfil Real Property's roles in Asset and Investment Management.

4 A Proposed Strategy for Quality in Life-cycle Asset Management iii Table of Contents Page 1.0 Purpose Scope of Application Background Need to enhance Quality of Life-cycle Asset Management Existing Quality Assurance Framework Role of Real Property Branch Role of the Service Branches Provision of Quality via the Project Delivery System Sustaining In-service Quality 3.3 Difficulties with Existing Framework Strategy Implementation of Enhanced Quality Management Framework Performance Indicators Assessing Service Life Determining Economic Factors 5.2 Maintenance, Expected Performance and Inspection Data/Knowledge Base Potential Applications Conclusion 27

5 A Proposed Strategy for Quality in Life-cycle Asset Management iv List of Figures Page 1 Concept of Life-cycle Asset and Quality Management 2 2 Conceptual Relationship of Performance, Service Life and Premature Deterioration 3 3 Typical Service Life Ranges for Principal Building Subsystems 4 4 Comparison of Repair vs. Replacement of Parking Slab 25 List of Appendices Appendix A Potential Impact of Maintenance upon Life-cycle

6 A Proposed Strategy for Quality in Life-cycle Asset Management Purpose The purpose of the strategy is: a) to strengthen Government Services Canada's capability to assess and provide value-for-money throughout asset service life; b) to identify the techniques necessary for the successful enhancement of the existing Asset Management procedures; and c) to provide background information on the methodology being proposed as well as that currently in place. 2.0 Scope of Application The strategy and implementation presented in this document are in keeping with Public Works Canada's vision of the future. Basic assumptions are: i) that PWC (GSC) will continue to be the major provider of real property services and of office and general purpose facilities to the Federal Government; ii) that inter-branch cooperation for the provision of products and services to fulfil client requirements will be nurtured; and iii) that the department is committed to an ethic of continuous improvement. The methodology proposed in this document should be developed as an integral tool of the Project Delivery System. As such these techniques would be applied to all GSC real property projects. This includes new construction, fit-up and repair. Full implementation of the enhanced procedures will provide insight into the anticipated long-term performance of our assets. This type of information is not currently available or rationally determined. Continuing investigation of it's applicability to various building components is recommended. 3.0 Background The principal objective of asset management is to attain, and sustain, value-for-money throughout the entire service life of an asset. The optimum potential value which may be realized, for any particular facility, is dependent upon the optimum level of investment (money). Both the value to be obtained and the monies available for investment vary with time. The relationship

7 A Proposed Strategy for Quality in Life-cycle Asset Management 2 between these three elements is graphically depicted below in Figure 1. Figure 1 Concept of Life-cycle Asset and Quality Management The relationship between money and time is the primary concern of economists and financial analysts. There are many mathematical models and formulae which represent the relationships between money and time for numerous economic situations. Very little future development work is required for the horizontal plane of Figure 1. However, neither the true value of an asset nor the variation of that value with time are readily defined. Facilities may be considered to have value if they can generate revenue. Revenue generating potential is usually a reflection of a facility's capability to meet the ongoing functional requirements of clients. The extent to which a facility is capable of providing for those needs is related directly to quality. Relatively soft expressions or notional relationships between quality and time are available for a number of building components, systems or equipment. Considerably more work needs to be done in establishing reproducible criteria of measurement.

8 A Proposed Strategy for Quality in Life-cycle Asset Management 3 For any given building component, there is a distinct anticipated service life which will be directly dependent upon its environment, material properties as well as operations and maintenance (O&M) (Figure 2). Similarly, building subsystems have typical service life ranges, which rarely coincide with one another (Figure 3), yet these subsystems are expected to perform satisfactorily throughout the anticipated service life of the facility. Figure 2

9 A Proposed Strategy for Quality in Life-cycle Asset Management 4 SERVICE LIFE - YEARS Figure 3 The ability to accurately evaluate performance throughout an asset's life-cycle and then to manage that asset to alter future performance would be particularly useful. Those preparing and managing investment plans would benefit from an ongoing refinement in the prediction of facility service lives and from that the relative impacts of various maintenance options and schedules would guide annual O&M allocations. The pressure to make sound decisions regarding alternative construction/ repair/rehabilitation methods and priorities is never greater than it is during difficult economic times. Thorough examination of the relative efficiency of repair and replacement as well as the long and short term returns on investment is crucial to the decision making process. Current maintenance levels impact upon the economic life of the facility, the downstream operating and maintenance costs, future value of the asset as well as the ability to maintain a safe and healthy working environment. In addition, the capability to provide fundamental tenant functional needs, with an acceptable degree of reliability, and other aspects of a "productive work environment"

10 A Proposed Strategy for Quality in Life-cycle Asset Management 5 is directly influenced by the maintenance levels. Certain asset functions, including basic occupant requirements such as lighting, heating plumbing and electrical supply as well as those functions dealing with health and safety concerns, must be provided and appropriate maintenance procedures implemented to assure the required reliability of service. Other functional aspects should be provided in order to demonstrate that the facilities are being operated with prudence and probity. The GSC funding levels for maintenance should be compared to industry norms (Building Owners & Managers Association). It is believed that our existing maintenance practices may not be cost effective, yet comparative tools do not exist. It also may be suspected that mandatory requirements are being met. The effect of timeliness of maintenance must not be overlooked. It is generally believed that considerable more reinvestment capital would be required to restore a deteriorated facility, which was poorly or under maintained, than it would cost to have adequately preserved the facility in the first place. The development of a framework for the systematic collection of the information necessary to verify or to deny these suspicions is being performed as an initial task of the implementation phase. The majority of the existing knowledge related to the deterioration of performance and the required procedures to arrest that deterioration is subjective. The strategy and proposed implementation described in this paper attempt to quantitatively examine asset deterioration as well as the impact of various maintenance procedures. We must enhance our knowledge of the factors influencing asset performance, particularly those pertaining to life safety issues and to the provision of tenant functional requirements. 3.1 Need to enhance Quality of Life-cycle Asset Management Not all building materials, or systems, provide equivalent initial effectiveness or long term performance. It is desirable to control the condition of assets throughout their service lives.

11 A Proposed Strategy for Quality in Life-cycle Asset Management 6 By properly maintaining facilities the owner/operator will prolong asset life. All of the above statements are generally accepted as truths yet many of the key words they contain have not or can not be specified with certainty. Understanding of the rates at which material degradation affects overall performance is very limited. Knowledge of the deterioration mechanisms is often weaker. Without these pieces of information little may objectively be said concerning performance, service lives or the appropriateness of either material selection or maintenance scheduling. Clearly, there is a need to investigate degradation of performance of building systems in order to predict at what point the system will no longer be capable of meeting its intended function. That is, to define service life. Appropriate measures may then be taken to synchronize the service lives of the various systems to the overall estimated life span for the asset. The causes of performance degradation should be identified so that similar circumstances are not repeated and that the information may be used to develop remedial strategies. Once the degradation processes are understood and described it is possible to: predict the performance of a facility at any point in time; make relative comparisons of the performance of construction options; to examine the impact of maintenance scenarios upon asset life-cycle and value. Financial information is essential to these analyzes since the ability of any given option to provide its required function is not necessarily directly proportional to either their implementation price or their O&M costs. "To assess the cost-effectiveness of the (Real Property) Program's operations, the Accommodation Branch (Real Property) will continue to develop and monitor against certain performance indicators, including: unit cost comparisons with the private sector and across regions; and return on investment targets." MYOP Real Property Program -Asset Management -Business Methodology

12 A Proposed Strategy for Quality in Life-cycle Asset Management 7 This objective acknowledges that further development of performance indicators is required. If realistic appraisals of the relative worth of various assets and/or their performance histories is to be conducted, analysis should be based on actual life-cycle performance of each individual asset. 3.2 Existing Quality Assurance Framework Government Services Canada (GSC) supplies office and general purpose accommodation and the related technical services support to client departments and agencies. GSC's ability to provide the level of service requested by its clients depends upon many factors; one of the most significant being inter-branch cooperation and communication. We must recognize that for GSC to provide facilities which initially meet client needs does not necessarily assure the client satisfaction or that the function being performed will remain relevant. It is extremely important that the facilities turned over to the clients be of the best possible quality in keeping with stated requirements and budget. The clients must be fully aware of the ongoing maintenance requirements if the service is to remain satisfactory. The goal is to provide the desired functionality for an optimum life-cycle at an ideal level of maintenance expenditure Role of Real Property Branch The mission of the Real Property Branch is to manage a diverse portfolio of federal real property to appropriately accommodate federal tenants and to optimize the investment in the asset. Two of the business activities undertaken by the Real Property Branch are of particular interest to this discussion and are briefly described below. -Asset Management - the management of assets to ensure that they meet all codes, standards and norms required to support the operational needs of the tenants and the public; to ensure that maintenance decisions taken reflect a reasonable return on investment; and that a productive work environment is provided to federal tenants -Investment Management

13 A Proposed Strategy for Quality in Life-cycle Asset Management 8 - the management of the capital and leasing investments to ensure that investment and disinvestment decisions optimize the long-term economic advantages to the Crown and take into account land use plans and policies of levels of government Real Property "Branch must ensure that the quality and condition of the real property asset base does not deteriorate. The Branch must not only preserve the economic value of the assets but also ensure the assets continue to meet operational needs of the tenants and the public." 2 Asset Management Plans which include detailed building condition studies are currently being conducted for each of GSC's assets. The review of GSC office buildings is scheduled for completion by March Some of the issues considered in these plans are: provision of tenants' needs; usability/functionality; repair versus disposal; and the effectiveness of management from a tenant, building performance and return on investment perspective. The Real Property Branch is currently reviewing its revenue management policies, practices and procedures, including such functions as revenue generation, recognition, forecasting and collection. By improving this management process the Branch is attempting to collect all revenues possible Role of the Service Branches A primary responsibility of the Service Branches to Real Property is the provision of expertise to assess technical quality and merit. Architectural and Engineering Services (A&ES) provides planning, design and construction services as well as related engineering and architectural advise and support. Asset Managers of Real Property purchase operations, maintenance and property management services from the Realty Services Branch. Dependant upon the size and type of Project, Real Property Branch will engage the services of Project Managers from either A&ES or Realty Services Branch MYOP Real Property Program - Overview

14 A Proposed Strategy for Quality in Life-cycle Asset Management 9 The Service Branches provide verification that the assets and facilities are designed, constructed and maintained in accordance with the existing codes and state-of-the-art knowledge. Technical assessment of GSC's assets is usually performed by Service Branch staff. The Service Branches also estimate expected facility service life and associated operation and maintenance costs Provision of Quality via the Project Delivery System PWC (GSC) policy calls for the use of the Project Delivery System on all real property projects in which the Department is involved. It is applicable to new construction, fit-up and repair of existing and leased facilities and is intended to provide an initial quality of the asset. The PDS acknowledges that the Planning stage of any project will require input from numerous sources of expertise. The Planning stage produces the Investment Analysis Report. Identified by this report are: the need; the objectives; the recommended solution; the budget; and schedule. All feasible alternatives are examined and the most viable means of meeting the stated requirement(s) is recommended. Comparison of the relative economic worthiness of options usually takes the form of lifecycle cost analysis. The net expenditures associated with owning and operating a facility over its useful life are compared to the potential revenue sources throughout and at the conclusion of that life. The Investment Analysis Report serves as a guide for subsequent phases of the project delivery and therefore will greatly influence the initial quality of product which may be delivered. The Definition phase provides a quantification of the required quality described in the Investment Analysis Report. The Project Brief defines the project requirements in verifiable technical criteria and specifies the implementation strategy. Implementation of the project is to be conducted in accordance with the strategy laid out in the Project Brief. Success of project execution is measured relative to the criteria for content, cost, time and quality as defined in the Investment Analysis Report and the Project Brief. Verification that the end product meets the initial performance expectations is conducted in the Commissioning phase. The

15 A Proposed Strategy for Quality in Life-cycle Asset Management 10 facility is taken to an operating state. The outcome of this phase is a facility operating as intended and staffed with personnel conversant in the operational and maintenance requirements. The Commissioning Report documents the performance compared to the stated requirements. Relative to the future service life of the facility this is the most important phase of the PDS since a poorly commissioned or non-commissioned facility is considerably less likely to provide the initial level of performance required ( Refer to Section ). The Operation phase of the project brings the facility to in-service operations in response to needs identified in the preliminary phases of the project. These needs are transferred, where applicable, into Occupancy/User Agreements. A systematic comparison of the final project against the stated goals is undertaken in the Evaluation phase. In addition, performance data is gathered as input for planning of future projects (feedback loop for PDS - Planning Stage). This information is documented in an Evaluation Report Sustaining In-service Quality Once the Operation phase of the PDS has been concluded the custodian is responsible for the continued performance of the facility. Often the regular operations are conducted by the same personnel who had brought the facility into operation (Operation phase), usually a Property Manager from GSC Realty Services Branch. (Subsequent discussions shall assume that the facilities management is being conducted by GSC staff.) Property Managers allocate, on an annual basis, O&M funds for designated works within an asset. Following resolution of health and safety issues, priority should ideally be given to activities which, if not performed, bare grave impact upon the functionality and/or the level of performance. The life-cycle performance of any given facility is directly dependant upon the O&M practices. The understanding of the interrelationship and the relative importance of the various systems of a facility is dependent upon the thoroughness of the Commissioning Report and the capabilities of the Property Manager.

16 A Proposed Strategy for Quality in Life-cycle Asset Management 11 The Preventative Maintenance Support System is an information base in ongoing development by Realty Services Branch. It is intended to readily provide information on maintenance requirements and records, material properties and specifications as well as inspection logs of all components used in systems of facilities maintained by Realty Services Branch. Asset management evaluates an overall investment plan, relative to asset performance, for a portfolio of facilities throughout their expected service lives. Information on the various projects vying for funds is submitted by the Property Managers for consideration. The Asset Managers must weigh the factors which affect the ability of any particular facility to fulfil predefined functions. As the reliability of providing a function increases so does the expected service life and the revenue generating capability of that as

17 A Proposed Strategy for Quality in Life-cycle Asset Management Difficulties with Existing Framework Real Property Branch's goal of ensuring that maintenance decisions provide reasonable return on investment cannot be achieved in an objective manner without thorough knowledge of asset service life (past and future) as well as the impact of various maintenance scenarios. The decisions to invest or divest in facilities should, in part, be guided by the potential future service which may be realized from the property. The intent of the Real Property's Asset Management Plans is very good. The applicability of the information gleaned from the condition surveys to make decisions as to appropriate investment scenarios is, however, questionable since the surveyed conditions are static in time and do not necessarily provide an indication of the future performance. In order to manage the revenue generation from an asset, there should be reliable forecasts of that facility's future life span as well as an indication of any potential breaks in its revenue generating capability. The building construction and maintenance is generally conducted by people with years of experience in the field. Often, little other than "gut-feelings" and "standard-operating-procedures" dictate the selection of materials, maintenance schedules and scenarios. Rules of thumb and manufacturers' performance and materials specifications provide some expectations and estimates of service life of components. These practises, while generally satisfactory, are relatively inflexible, do not make comparative evaluations of alternatives and the knowledge-base is not readily transferable. Little is passed-on concerning either the service life of the systems comprising any given asset or the effect which particular maintenance scenarios may have upon the service life. With current technology, rigorous determination of service life (initial or remaining) of any given asset is not readily conducted. The usefulness of life-cycle cost analysis for the assessment of options hinges upon the accurate determination of service life of the asset and the costs and revenue expected over that life. Traditionally, the procedure has been used to examine the asset's financial

18 A Proposed Strategy for Quality in Life-cycle Asset Management 13 performance either before the life-cycle is initiated or when it has concluded. In the first of these instances the analysis is speculative and in the latter it is of historical significance only. The budgets associated with the capital investment and the annual maintenance of assets are separate. For this reason, the impact which initial design considerations may have upon long term building performance and the subsequent maintenance requirements is often overlooked. The material, component and system options available may imply vastly differing maintenance budgets and asset service life.

19 A Proposed Strategy for Quality in Life-cycle Asset Management Strategy The most evident shortcoming of the existing quality assurance framework is the technical inability to analytically assess the service life of an asset. The key goals of the proposed strategy are: the development of tools to assess service life and performance (financial and technical) at any point within the service life; the retention, via databases, of the knowledge/experience obtained; the optimization of maintenance practices, on a life-cycle basis, in order to maximize facility service life and more effectively allocate resources; and the on-going identification, investigation and quantification of deterioration mechanisms. Information to be used in the preliminary planning of the latter of the key elements shall describe the functional requirements of the various types of GSC building stock, categorizing the asset functions as either basic or occupant driven. For each of the functional requirements, the system(s) that control and/or influence the provision of function will be identified and the inter-relationship(s) between the systems described. For each of these systems, the key equipment and components will be identified and the economic factors which influence capital reinvestment and disinvestment decisions shall be described. The typical levels of funding (normal practise) to maintain each of the systems may then be compared to actual GSC funding levels. The life-cycle asset and quality management concept being proposed attempts to unite economic indicators of performance to the asset's ability to continue to provide the function(s) for which it was designed. It recognizes that both the functionality and required maintenance of a facility are time dependant. The concept and techniques presented in the following section should be used to assess the relative merits of various construction, rehabilitation and major maintenance alternatives. By employing this concept at the planning stage of the PDS more realistic indications of expected life-cycles will be available for the options analyses. When the facilities are on-line, use of the modified framework will provide insight to the best procedures of assuring continued reliability of service.

20 A Proposed Strategy for Quality in Life-cycle Asset Management 15

21 A Proposed Strategy for Quality in Life-cycle Asset Management Implementation of Enhanced Quality Management Framework By scrutinizing the condition of any given asset the merits of various construction and maintenance options may be determined on an economic as well as scientific basis. Since the intent of this analysis will be to examine the performance indicators at any point within the life span of the asset, it is crucial to methodology that the information gathered be useful for on-going supervision of O&M on an annual basis. Reassessment of the service lives and economic factors affecting any given facility must be conducted frequently enough to provide an accurate reflection of the asset performance and to allow for modification of the O&M practices if (and as) deemed necessary. 5.1 Performance Indicators The performance indicators to be used in this methodology are of two basic types, economic and technical. The technical indicators, those describing the physical performance of the asset, vary from case to case dependant upon the functional requirements of the occupant. Generally, the economic indicators used are considerably less variable; dealing primarily with the net expenditures and net benefits associated with a particular option Assessing Service Life Based upon experience, the conditions which govern performance of the various components and systems may be determined. This would permit: i) the calculation of the likelihood that these governing conditions will exceed designated acceptable limits; ii) iii) the calculation of the expected (or remaining) service life of a facility; and the updating of service life predictions of an asset from within the life-cycle. A system can be defined as a number of components combined in parallel or in series. In series systems, if one component fails so does the system. All components of a parallel system must fail for system failure to occur. More complex systems may be modelled by combining parallel and series subsystems.

22 A Proposed Strategy for Quality in Life-cycle Asset Management 17 The performance of any particular component, subsystem or system of an asset depends upon numerous variables. Only in rare instances would the values of any of these variables or their interactions be known categorically. In most instances the values and nature of these variables are in accordance with definable distribution functions. For example, the relative humidity (RH) in office buildings may reasonably be expected to range between 20 % and 60 %. Within that range, the likelihood of having a particular value of RH may vary with the geographic location and building usage as well as with other considerations. Therefore, the analysis must consider the potential variation in physical conditions and their inter-relationships to accurately portray the asset performance. A deterministic approach, using fixed or arbitrary values for pertinent variables, should not be used to assess facility performance since it can not take the natural variation of the physical parameters into account. Analysis by probabilistic means will permit consideration of inherent randomness and shall determine the probability that certain events may occur. The use of probabilistic, or reliabilitybased, techniques is the only approach which will provide realistic analysis of the likelihood of fulfilling performance requirements. The reliability-based methodology hinges upon the identification of functions which describe the conditions governing performance of the components for any given system. These governing conditions describe the mathematical relationships between various parameters and component performance. More significantly, the methodology should be capable of reflecting changes in these physical and/or chemical conditions. Some fundamental terminology related to reliability-based techniques is presented below. Reliability is the probability that a function will be fulfilled. Governing Parameters are the physical and chemical properties which are used to mathematically define the function. Probability Density Function is the frequency function, f(x), describing the likelihood that a particular variable will take a specific value, x. Probability of Exceedance is the likelihood that the value of the defined function will exceed designated acceptable limits.

23 A Proposed Strategy for Quality in Life-cycle Asset Management 18 Component Reliability is the probability that the component will provide its defined function. System Reliability is the probability that the system of components will fulfil its function. The basic methodology to be used for analysis of individual components and systems is: a) identification, prioritization and quantification of the conditions governing performance; b) determination of the nature (probability density functions) of relevant physical parameters; c) calculation of the probability that the asset will fail to provide its predefined function(s), p f ; d) expression of performance in terms of reliability, R = 1 - p f ; and e) determination of service life; the asset age when reliability falls below an acceptable level Determining Economic Factors The economic elements required for this analysis (initial cost, operating costs, revenues and profit) can be relatively easily acquired. The principles associated with the manipulation of these factors (such as Net Present Value and Capital Recovery Factor) are widely understood and shall not be described further in this discussion. The concept of ongoing management of operations and maintenance is complementary to that of asset management from within the life-cycle. Economic or investment performance indicators will be based upon the expressions of annual owning and operating costs as defined below: - annual owning cost is derived from the amortization of the initial cost, at a given rate of interest, over the expected service life of the asset; and - annual operating cost is composed of the cost of labour, material, taxes (and grants in-lieu-of) and other cost incurred on a regular basis. From these costs, the annual revenue and annual profit (where applicable) indices can then easily be determined and controlled. Specific revenue, revenue per unit of production, is an example of one such indicator that can serve as a very useful asset performance

24 A Proposed Strategy for Quality in Life-cycle Asset Management 19 management tool. By influencing the service lives of facilities, maintenance procedures have direct impact upon both the annual owning and operating costs. Maintenance cost is a principal component of the annual operating cost. If the service life of an asset deviates from initial predictions, the annual cost of owning will change accordingly. Ideally, if better and more appropriate operation and maintenance practices are conducted the service life will be extended; lowering the annual owning cost. Analysis could identify the scope of operation and maintenance that would yield the lowest sum of annual owning cost and annual operating cost. Once established this sum may be set in accordance with (or determine) the expected revenue and funding requirements for the asset. 5.2 Maintenance, Expected Performance and Inspection For any identified deterioration mechanism there will be a variety of physical and chemical characteristics which play a significant role. Each of these parameters is considered to vary according to a definable distribution function. The exact distributions are evasive. Inspection data and the records of performance of various facilities, to be obtained from the PMSS and other sources, will be used to indicate tendencies in observed conditions which reflect physical conditions. This link provides essential input to the reliabilitybased analysis. It is believed that, through extensive collection of field performance data, and its implementation within the methodology, the confidence in the distributions being chosen and hence in the methodology itself shall steadily increase. Output from the analysis will, similarly, be available to modify the output of, or input to, the PMSS.

25 A Proposed Strategy for Quality in Life-cycle Asset Management Data/Knowledge Base The maintenance options chosen over the life of a facility undoubtedly influence both the annual cost of operating the asset and its service life. Thorough examination of the relative efficiencies of various design options, repair and replacement scenarios, as well as the long and short term returns on investment is crucial to the decision making process. Such assessment can only be accomplished if adequate suitable data exists. The ability to manage annual O&M activities should be greatly increased once the desired service life of an asset has been determined and translated into annual operations budgets. The relative impacts of various O&M scenarios on asset performance will become more evident as the experience/knowledge base grows. By regularly collecting data which reflect performance the knowledge of the costs associated with owning the asset as well as of the effect of the maintenance procedures upon the asset's service life will be continually improved. As our knowledge of the controlling conditions grows so will the understanding of the maintenance levels required to provide functional continuity from our assets at an acceptable level of reliability. The costs associated with various levels of maintenance may then be used to manage the assets in a fiscally prudent manner so as to optimize financial performance. 5.4 Potential Applications The strengths of various construction and maintenance options may be determined on an economic as well as scientific basis by scrutinizing the condition of any given asset and comparing the performance to previous predictions. The methodology may be applied at any time, prior-to, within or after the asset service life.

26 A Proposed Strategy for Quality in Life-cycle Asset Management 21 As a planning tool this procedure will be applied to various GSC activities. In the early stages of new capital projects, it may be used for needs identification purposes by demonstrating the advantages of different material selections or by providing substantive evidence of the relative effectiveness of various building system options. Similar potential applications will also arise for retrofit and rehabilitation projects. In cases where the required service life is definitively stated and system selection has been made the procedure will provide an indication of the required maintenance funding levels. Figure 4 Comparison of Repair vs. Replacement of Parking Slab An example of the potential applications of the methodology to assess the relative merits of repair and/or replacement scenarios is presented in Figure 4. The horizontal dashed line in this plot indicates the risk acceptance level for this particular system as determined by economic and physical performance characteristics. If the reliability of the system falls below this level, remedial action should be taken to restore function. By anticipating when the system is likely to provide less than the acceptable reliability, inspection schedules may be optimized to confirm or denounce the predicted asset condition.

27 A Proposed Strategy for Quality in Life-cycle Asset Management 22 The initial curve of Figure 4 estimates that the reliability will fall to the risk acceptance level at approximately three and a half years. An inspection conducted at 3 yrs. 4 months confirmed the condition of the slab to be comparable to that predicted. The curve indicated with F's represents the expected performance projection resulting from the slab repair at an age of 4 years. Alternatively, the slab could be completely replaced at that time. The projected reliability curve for the latter option is plotted with G's. The two projected scenarios indicate reliability falling to the risk acceptance level at approximately 6 yrs. and 9 yrs. respectively. Having predicted the potential life extensions to be achieved, a comprehensive economic analysis/comparison of the each of the alternatives is possible. The cycle of prediction-inspection-action should be continued throughout the desired asset life-cycle; inspections would be scheduled in accordance with the predicted performance of the chosen scenario. The modified performance curve for the replaced slab, plotted with +'s, results from an unfavourable inspection at an age of 10 years. By having an informed idea of the rate of deterioration of any given asset the operational personnel may optimize their inspection and maintenance schedules. Maintenance budgets will reflect not only the appropriate level of funding but also will indicate the most effective placement of those funds. Continued use of the procedure and recording of the findings will provide further knowledge of the effectiveness of various scenarios. Different maintenance options will undoubtedly result in variations of the expected service life and of the annual maintenance costs. As the life-cycle of the facility varies with the maintenance practises so does its revenue generating capability. An example of the potential effect of the level of maintenance upon the life-cycle viability of an asset is presented as Appendix A. The sum of the costs associated with owning and operating the asset should not outweigh the benefits; an optimum annual operating cost may be determined for each asset and/or component. The most significant of the benefits is the revenue generated from rental/lease agreements. The revenue and profit (potential as well as real) to be acquired from a facility influence the investment plan and should therefore determine the maintenance scheme(s) to be implemented.

28 A Proposed Strategy for Quality in Life-cycle Asset Management 23

29 A Proposed Strategy for Quality in Life-cycle Asset Management Conclusion Government Services Canada provides client departments and agencies with accommodation while attempting to preserve the quality, condition and economic value of the asset base. A comprehensive and rational decision making framework, linking all aspects of facility life-cycle (from the planning stage through to operations and maintenance, reinvestment and disinvestment), is essential if GSC is to fulfil its responsibility to prudently manage the assets. Implementation of the methodology presented in the preceding paper will develop a continually strengthening knowledge base as well as providing non-subjective evidence on the effectiveness of various construction, maintenance and refurbishing alternatives. Due to the dynamic nature of the factors which describe performance, the reliability-based technique is the only approach which permits rational prediction and assessment of asset life-cycle and thereby provides the necessary tools to manage federal real property in an efficient and cost-effective manner.

30 Appendix A A-1 Potential Impact of Maintenance upon Life-cycle (Hypothetical Example - intended for discussion purposes only) Assumptions Unit capital Cost P = 1000 Interest rate i = 10 % per annum Annual Owning Cost A = P i(1 + i) n / ( (1 + i) n - 1) where n = service life (yrs.) Annual Operating & Maintenance Cost Annual Cost OM a = O a + M a where AC = A + OM a O a = annual operations cost M a = annual maintenance cost Annual Revenue AR = AC + Overhead + Profit where Overhead = 300% OM a Profit = 0% (break-even) Typical Example Expected Service Life n = 20 yrs. Annual Operating & Maintenance Cost OM a = P / 8 = (P /8 as per BOMA norm) Operations O a =.9 OM a = Maintenance M a =.1 OM a = Annual Owning Cost A = Annual Cost AC = A + OM a = = 242 Annual Break-even Revenue AR = AC + 3 OM a = = 617 Therefore Annual Maintenance Cost is : % of the Annual Cost; and % of the Annual Revenue. 617 Maintenance has a very direct impact upon the service life of any given asset. The economic advantages that particular maintenance schemes and funding levels would provide are not accurately known. The following table illustrates three possible scenarios of maintenance funding and the estimated service lives as well as presenting likely tendencies of the relative economic indictors. Capital Cost P = 1000

31 Appendix A A-2 Potential Impact of Maintenance upon Life-cycle (Hypothetical Example - intended for discussion purposes only) Interest rate Annual Operations Cost Expected Service Life -amortization period- n exp = 20 yrs. i = 10 % per annum O a = (constant) Annual Maintenance Cost M a Estimated Service Life n est * (yrs.) Annual O&M Cost OM a Annual Owning Cost A Annual Cost AC Annual Revenue AR (break-even) Annual Cost / Revenue AC / AR Total Cost C t =(n est x OM a )+(n exp x A) Total Revenue R t = n est x AR Total Cost / Revenue C t / R t Normalized * These service lives and annual maintenance costs are presented to demonstrate the tendencies of the cost-to-revenue ratios. More accurate, rational estimates of asset service lives should be determined.

Measurement Information Model

Measurement Information Model mcgarry02.qxd 9/7/01 1:27 PM Page 13 2 Information Model This chapter describes one of the fundamental measurement concepts of Practical Software, the Information Model. The Information Model provides

More information

Integrated Risk Management:

Integrated Risk Management: Integrated Risk Management: A Framework for Fraser Health For further information contact: Integrated Risk Management Fraser Health Corporate Office 300, 10334 152A Street Surrey, BC V3R 8T4 Phone: (604)

More information

LIFECYCLE COSTING FOR DATA CENTERS: DETERMINING THE TRUE COSTS OF DATA CENTER COOLING

LIFECYCLE COSTING FOR DATA CENTERS: DETERMINING THE TRUE COSTS OF DATA CENTER COOLING LIFECYCLE COSTING FOR DATA CENTERS: DETERMINING THE TRUE COSTS OF DATA CENTER COOLING Summary Experts estimate that the average design life of a data center is 10-15 years. During that time, equipment

More information

Haulsey Engineering, Inc. Quality Management System (QMS) Table of Contents

Haulsey Engineering, Inc. Quality Management System (QMS) Table of Contents Haulsey Engineering, Inc. Quality Management System (QMS) Table of Contents 1.0 Introduction 1.1 Quality Management Policy and Practices 2.0 Quality System Components 2.1 Quality Management Plans 2.2 Quality

More information

PART A: OVERVIEW...1 1. Introduction...1. 2. Applicability...2. 3. Legal Provisions...2. 4. Effective Date...2

PART A: OVERVIEW...1 1. Introduction...1. 2. Applicability...2. 3. Legal Provisions...2. 4. Effective Date...2 PART A: OVERVIEW...1 1. Introduction...1 2. Applicability...2 3. Legal Provisions...2 4. Effective Date...2 PART B: INTERNAL CAPITAL ADEQUACY ASSESSMENT PROCESS...3 5. Overview of ICAAP...3 6. Board and

More information

White Paper Operations Research Applications to Support Performance Improvement in Healthcare

White Paper Operations Research Applications to Support Performance Improvement in Healthcare White Paper Operations Research Applications to Support Performance Improvement in Healthcare Date: April, 2011 Provided by: Concurrent Technologies Corporation (CTC) 100 CTC Drive Johnstown, PA 15904-1935

More information

Accurately and Efficiently Measuring Individual Account Credit Risk On Existing Portfolios

Accurately and Efficiently Measuring Individual Account Credit Risk On Existing Portfolios Accurately and Efficiently Measuring Individual Account Credit Risk On Existing Portfolios By: Michael Banasiak & By: Daniel Tantum, Ph.D. What Are Statistical Based Behavior Scoring Models And How Are

More information

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement

More information

Town of Mattawa Asset Management Plan. December 2013

Town of Mattawa Asset Management Plan. December 2013 Town of Mattawa Asset Management Plan December 2013 2 P a g e Town of Mattawa Asset Management Plan Executive Summary This Asset Management Plan is intended to describe the infrastructure owned, operated,

More information

Introduction. Who should read this part?

Introduction. Who should read this part? Introduction This part of the Asset Management Series describes the purpose and fundamental principles of effective asset management and provides a strategic framework through which agencies can achieve

More information

Benefits realisation. Gate

Benefits realisation. Gate Benefits realisation Gate 5 The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and Planning, January 2010. The Queensland

More information

Guidance for Industry. Q10 Pharmaceutical Quality System

Guidance for Industry. Q10 Pharmaceutical Quality System Guidance for Industry Q10 Pharmaceutical Quality System U.S. Department of Health and Human Services Food and Drug Administration Center for Drug Evaluation and Research (CDER) Center for Biologics Evaluation

More information

PHARMACEUTICAL QUALITY SYSTEM Q10

PHARMACEUTICAL QUALITY SYSTEM Q10 INTERNATIONAL CONFERENCE ON HARMONISATION OF TECHNICAL REQUIREMENTS FOR REGISTRATION OF PHARMACEUTICALS FOR HUMAN USE ICH HARMONISED TRIPARTITE GUIDELINE PHARMACEUTICAL QUALITY SYSTEM Q10 Current Step

More information

IS YOUR DATA WAREHOUSE SUCCESSFUL? Developing a Data Warehouse Process that responds to the needs of the Enterprise.

IS YOUR DATA WAREHOUSE SUCCESSFUL? Developing a Data Warehouse Process that responds to the needs of the Enterprise. IS YOUR DATA WAREHOUSE SUCCESSFUL? Developing a Data Warehouse Process that responds to the needs of the Enterprise. Peter R. Welbrock Smith-Hanley Consulting Group Philadelphia, PA ABSTRACT Developing

More information

A PLANNING MODEL FOR ABET ENGINEERING CRITERIA 2000

A PLANNING MODEL FOR ABET ENGINEERING CRITERIA 2000 A PLANNING MODEL FOR ABET ENGINEERING CRITERIA 2000 M. Dayne Aldridge and Larry Benefield College of Engineering Auburn University, AL 36849 Introduction ABET Engineering Criteria 2000 provides a new basis

More information

Module 10: Assessing the Business Case

Module 10: Assessing the Business Case Module 10: Assessing the Business Case Learning Objectives After completing this section, you will be able to: Do preliminary assessment of proposed energy management investments. The measures recommended

More information

PART B INTERNAL CAPITAL ADEQUACY ASSESSMENT PROCESS (ICAAP)

PART B INTERNAL CAPITAL ADEQUACY ASSESSMENT PROCESS (ICAAP) Framework (Basel II) Internal Capital Adequacy Assessment PART A OVERVIEW...2 1. Introduction...2 2. Applicability...3 3. Legal Provision...3 4. Effective Date of Implementation...3 5. Level of Application...3

More information

NASCIO EA Development Tool-Kit Solution Architecture. Version 3.0

NASCIO EA Development Tool-Kit Solution Architecture. Version 3.0 NASCIO EA Development Tool-Kit Solution Architecture Version 3.0 October 2004 TABLE OF CONTENTS SOLUTION ARCHITECTURE...1 Introduction...1 Benefits...3 Link to Implementation Planning...4 Definitions...5

More information

COMPREHENSIVE ASSET MANAGEMENT STRATEGY

COMPREHENSIVE ASSET MANAGEMENT STRATEGY COMPREHENSIVE ASSET MANAGEMENT STRATEGY APPROVED BY SENIOR MANAGEMENT COMMITTEE ON AUGUST 23, 2012 (TO BE FINALIZED AFTER APPROVAL OF CAM POLICY BY COUNCIL) August 2012 Contents CONTENTS EXECUTIVE SUMMARY

More information

Date: 10/10/2014 Initiated by: AAS-100

Date: 10/10/2014 Initiated by: AAS-100 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Airport Pavement Management Program (PMP) Date: 10/10/2014 Initiated by: AAS-100 AC No: 150/5380-7B Change:

More information

ASSET MANAGEMENT PROGRAM EVALUATION BEST PRACTICES

ASSET MANAGEMENT PROGRAM EVALUATION BEST PRACTICES 1.0 Corporate Asset Management Program 1.1 Vision and Support 1.2 Resource Management 1.3 Strategic Asset Management Plan 1.4 Communications 2.0 Customer Service and Risk Management 2.1 Levels of Service

More information

Copyright 2014 Carnegie Mellon University The Cyber Resilience Review is based on the Cyber Resilience Evaluation Method and the CERT Resilience

Copyright 2014 Carnegie Mellon University The Cyber Resilience Review is based on the Cyber Resilience Evaluation Method and the CERT Resilience Copyright 2014 Carnegie Mellon University The Cyber Resilience Review is based on the Cyber Resilience Evaluation Method and the CERT Resilience Management Model (CERT-RMM), both developed at Carnegie

More information

FACILITIES MAINTENANCE

FACILITIES MAINTENANCE Program Direction and Accountability 1. The district s maintenance and operations department has a mission statement and goals and objectives that are established in writing. a. The maintenance department

More information

AN INTRODUCTION TO REAL ESTATE INVESTMENT ANALYSIS: A TOOL KIT REFERENCE FOR PRIVATE INVESTORS

AN INTRODUCTION TO REAL ESTATE INVESTMENT ANALYSIS: A TOOL KIT REFERENCE FOR PRIVATE INVESTORS AN INTRODUCTION TO REAL ESTATE INVESTMENT ANALYSIS: A TOOL KIT REFERENCE FOR PRIVATE INVESTORS Phil Thompson Business Lawyer, Corporate Counsel www.thompsonlaw.ca Rules of thumb and financial analysis

More information

RISK MANAGEMENT OVERVIEW - APM Project Pathway (Draft) RISK MANAGEMENT JUST A PART OF PROJECT MANAGEMENT

RISK MANAGEMENT OVERVIEW - APM Project Pathway (Draft) RISK MANAGEMENT JUST A PART OF PROJECT MANAGEMENT RISK MANAGEMENT OVERVIEW - APM Project Pathway (Draft) Risk should be defined as An uncertain event that, should it occur, would have an effect (positive or negative) on the project or business objectives.

More information

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value

More information

Asset Management Plan 2015 Facilities and Transit

Asset Management Plan 2015 Facilities and Transit Asset Management Plan 2015 Facilities and Transit Prepared for Submitted by October 2015 Asset Management Plan Contents Section 1 Executive Summary Table of Content Section 2 Introduction Section 3 State

More information

DRAFT RESEARCH SUPPORT BUILDING AND INFRASTRUCTURE MODERNIZATION RISK MANAGEMENT PLAN. April 2009 SLAC I 050 07010 002

DRAFT RESEARCH SUPPORT BUILDING AND INFRASTRUCTURE MODERNIZATION RISK MANAGEMENT PLAN. April 2009 SLAC I 050 07010 002 DRAFT RESEARCH SUPPORT BUILDING AND INFRASTRUCTURE MODERNIZATION RISK MANAGEMENT PLAN April 2009 SLAC I 050 07010 002 Risk Management Plan Contents 1.0 INTRODUCTION... 1 1.1 Scope... 1 2.0 MANAGEMENT

More information

American Society of Heating Refrigeration and Air Conditioning Engineers (ASHRAE) Procedures for Commercial Building Energy Audits (2004)

American Society of Heating Refrigeration and Air Conditioning Engineers (ASHRAE) Procedures for Commercial Building Energy Audits (2004) Excerpt from: American Society of Heating Refrigeration and Air Conditioning Engineers (ASHRAE) Procedures for Commercial Building Energy Audits (2004) 2004 American Society of Heating, Refrigerating and

More information

- centred on human factors (ie. ergonomics, desire to have a new computer system) - Are there unused computer terminals in the company now?

- centred on human factors (ie. ergonomics, desire to have a new computer system) - Are there unused computer terminals in the company now? Feasibility and Cost-Benefit Analysis Feasibility Operational Feasibility - centred on human factors (ie. ergonomics, desire to have a new computer system) - Is the problem worth solving? - How do the

More information

C. Wohlin, "Managing Software Quality through Incremental Development and Certification", In Building Quality into Software, pp. 187-202, edited by

C. Wohlin, Managing Software Quality through Incremental Development and Certification, In Building Quality into Software, pp. 187-202, edited by C. Wohlin, "Managing Software Quality through Incremental Development and Certification", In Building Quality into Software, pp. 187-202, edited by M. Ross, C. A. Brebbia, G. Staples and J. Stapleton,

More information

Asset Management Plan Final Report

Asset Management Plan Final Report AssetManagementPlan FinalReport DillonConsultingLimited 10FifthStreetSouth Chatham,ONN7M4V4 T:519-352-7802 F:519-354-2050 May,2014 www.dillon.ca EXECUTIVE SUMMARY Public infrastructure is central to our

More information

Project Management Plan for

Project Management Plan for Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...

More information

The Town of Fort Frances POLICY SECTION ACCOUNTING FOR TANGIBLE CAPITAL ASSETS. ADMINISTRATION AND FINANCE NEW: May 2009 1. PURPOSE: 2.

The Town of Fort Frances POLICY SECTION ACCOUNTING FOR TANGIBLE CAPITAL ASSETS. ADMINISTRATION AND FINANCE NEW: May 2009 1. PURPOSE: 2. The Town of Fort Frances ACCOUNTING FOR TANGIBLE CAPITAL ASSETS SECTION ADMINISTRATION AND FINANCE NEW: May 2009 REVISED: POLICY Resolution Number: 05/09 Consent 156 Policy Number: 1.18 PAGE 1 of 11 Supercedes

More information

15 Guiding Principles

15 Guiding Principles Health, Safety, Environment and Corporate Social Responsibility 15 Guiding Principles 2013 Message from President and CEO 0 New Gold has a complementary portfolio of assets in different countries and cultures

More information

Contract and Vendor Management Guide

Contract and Vendor Management Guide Contents 1. Guidelines for managing contracts and vendors... 2 1.1. Purpose and scope... 2 1.2. Introduction... 2 2. Contract and Vendor Management 2.1. Levels of management/segmentation... 3 2.2. Supplier

More information

Final Audit Report. Audit of the Human Resources Management Information System. December 2013. Canada

Final Audit Report. Audit of the Human Resources Management Information System. December 2013. Canada Final Audit Report Audit of the Human Resources Management Information System December 2013 Canada Table of Contents Executive summary... i A - Introduction... 1 1. Background... 1 2. Audit objective...

More information

How To Develop Software

How To Develop Software Software Engineering Prof. N.L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture-4 Overview of Phases (Part - II) We studied the problem definition phase, with which

More information

Business Process Services. White Paper. Optimizing Extended Warranty Processes by Embracing Analytics

Business Process Services. White Paper. Optimizing Extended Warranty Processes by Embracing Analytics Business Process Services White Paper Optimizing Extended Warranty Processes by Embracing Analytics About the Author Dr. Anuj Prakash Anuj Prakash is a part of the TCS Analytics and Insights Practice,

More information

Project Management Competency Standards

Project Management Competency Standards BSB01 Business Services Training Package Project Management Competency Standards CONTENTS BSBPM401A Apply scope management techniques...3 BSBPM402A Apply time management techniques...8 BSBPM403A Apply

More information

Organizing Your Approach to a Data Analysis

Organizing Your Approach to a Data Analysis Biost/Stat 578 B: Data Analysis Emerson, September 29, 2003 Handout #1 Organizing Your Approach to a Data Analysis The general theme should be to maximize thinking about the data analysis and to minimize

More information

Level 1 Articulated Plan: The plan has established the mission, vision, goals, actions, and key

Level 1 Articulated Plan: The plan has established the mission, vision, goals, actions, and key S e s s i o n 2 S t r a t e g i c M a n a g e m e n t 1 Session 2 1.4 Levels of Strategic Planning After you ve decided that strategic management is the right tool for your organization, clarifying what

More information

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division A Guide For Preparing The Financial Information Component Of An Asset Management Plan Licensing, Monitoring and Customer Protection Division July 2006 Contents 1 Important Notice 2 2 Scope and purpose

More information

Establishing a Cost Effective Fleet Replacement Program

Establishing a Cost Effective Fleet Replacement Program Establishing a Cost Effective Fleet Replacement Program Regardless of what purpose your company s fleet serves, there are certain fundamentals to keep in mind when designing and implementing a cost-effective

More information

6500m HOV Project Stage 1: A-4500 HOV

6500m HOV Project Stage 1: A-4500 HOV 6500m HOV Project Stage 1: A-4500 HOV Systems Engineering, Integration & Testing Plan Document Control No.: 0000000 01-November-2009 WOODS HOLE OCEANOGRAPHIC INSTITUTION WOODS HOLE, MA 02543 Document Control

More information

(Refer Slide Time: 01:52)

(Refer Slide Time: 01:52) Software Engineering Prof. N. L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture - 2 Introduction to Software Engineering Challenges, Process Models etc (Part 2) This

More information

Business Process Services. White Paper. Improving Efficiency in Business Process Services through User Interface Re-engineering

Business Process Services. White Paper. Improving Efficiency in Business Process Services through User Interface Re-engineering Business Process Services White Paper Improving Efficiency in Business Process Services through User Interface Re-engineering About the Authors Mahesh Kshirsagar Mahesh has a vast experience of about 24

More information

Damage Estimation in Wrongful Termination Cases: Impact of the Great Recession

Damage Estimation in Wrongful Termination Cases: Impact of the Great Recession 29 March 2012 Damage Estimation in Wrongful Termination Cases: Impact of the Great Recession By Dr. Laila Haider and Dr. Stephanie Plancich 1 Introduction The recent financial crisis was marked by the

More information

Long-Term Asset Management Plan 2011-2021

Long-Term Asset Management Plan 2011-2021 Long-Term Asset Management Plan 2011-2021 Contents Introduction...3 A shared vision...4 Strategic planning to achieve our goals...4 Towards 2031...5 A long-term vision, communicated by our community...5

More information

TOTAL ASSET MANAGEMENT. Life Cycle Costing Guideline

TOTAL ASSET MANAGEMENT. Life Cycle Costing Guideline TOTAL ASSET MANAGEMENT Life Cycle Costing Guideline September 2004 TAM04-10 Life Cycle Costing Guideline September 2004 TAM04-10 ISBN 0 7313 3325 X (set) ISBN 0 7313 3272 5 1. Asset management New South

More information

TIER II STANDARD FOR FINANCIAL MANAGEMENT SPECIALISTS

TIER II STANDARD FOR FINANCIAL MANAGEMENT SPECIALISTS Job Classification Manual Page 1 of 60 TIER II STANDARD FOR FINANCIAL MANAGEMENT SPECIALISTS INTRODUCTION 1. This grade level standard illustrates the application of the ICSC Master Standard (Tier I) to

More information

A Programme Implementation of Several Inventory Control Algorithms

A Programme Implementation of Several Inventory Control Algorithms BULGARIAN ACADEMY OF SCIENCES CYBERNETICS AND INFORMATION TECHNOLOGIES Volume, No Sofia 20 A Programme Implementation of Several Inventory Control Algorithms Vladimir Monov, Tasho Tashev Institute of Information

More information

Hazard Analysis and Critical Control Points (HACCP) 1 Overview

Hazard Analysis and Critical Control Points (HACCP) 1 Overview Manufacturing Technology Committee Risk Management Working Group Risk Management Training Guides Hazard Analysis and Critical Control Points (HACCP) 1 Overview Hazard Analysis and Critical Control Point

More information

INCORPORATING CONDITION ASSESSMENT INTO A COMPREHENSIVE ASSET MANAGEMENT PROGRAM

INCORPORATING CONDITION ASSESSMENT INTO A COMPREHENSIVE ASSET MANAGEMENT PROGRAM INCORPORATING CONDITION ASSESSMENT INTO A COMPREHENSIVE ASSET MANAGEMENT PROGRAM Tony Urquhart Vice President MWH Business Solutions Suite 700, 380 Interlocken Crescent Broomfield, CO 80304 ABSTRACT In

More information

Quality Standard Customer Service Complaints Handling

Quality Standard Customer Service Complaints Handling Quality Standard Customer Service Complaints Handling Version 1 Date:- 2 nd December 2010 Page 1 Contents INTRODUCTION 4 OVERVIEW OF THE COMPLAINTS STANDARD 5 FRAMEWORK 6 MANDATORY SECTIONS 7 SECTION 1

More information

ICH guideline Q10 on pharmaceutical quality system

ICH guideline Q10 on pharmaceutical quality system September 2015 EMA/CHMP/ICH/214732/2007 Committee for Human Medicinal Products Step 5 Transmission to CHMP May 2007 Transmission to interested parties May 2007 Deadline for comments November 2007 Final

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Professional Engineers Using Software-Based Engineering Tools

Professional Engineers Using Software-Based Engineering Tools GUIDELINE Professional Engineers Using Software-Based Engineering Tools CONTRIBUTORS Eric Brown, P. Eng. Colin Cantlie, P. Eng. Norm Fisher, P. Eng. Jeremy Jackson, P. Eng. Tibor Palinko, P. Eng. Daniel

More information

Bachelor's Degree in Business Administration and Master's Degree course description

Bachelor's Degree in Business Administration and Master's Degree course description Bachelor's Degree in Business Administration and Master's Degree course description Bachelor's Degree in Business Administration Department s Compulsory Requirements Course Description (402102) Principles

More information

Measuring Energy Efficiency in a Data Center

Measuring Energy Efficiency in a Data Center The goals of the greening of the Data Center are to minimize energy consumption and reduce the emission of green house gases (carbon footprint) while maximizing IT performance. Energy efficiency metrics

More information

The Total Economic Impact Of SAS Customer Intelligence Solutions Intelligent Advertising For Publishers

The Total Economic Impact Of SAS Customer Intelligence Solutions Intelligent Advertising For Publishers A Forrester Total Economic Impact Study Commissioned By SAS Project Director: Dean Davison February 2014 The Total Economic Impact Of SAS Customer Intelligence Solutions Intelligent Advertising For Publishers

More information

Statement #4/Managerial Cost Accounting Concepts and Standards for the Federal Government

Statement #4/Managerial Cost Accounting Concepts and Standards for the Federal Government Statement #4/Managerial Cost Accounting Concepts and Standards for the Federal Government Executive Office of the President Office of Management and Budget "Managerial Cost Accounting Concepts and Standards

More information

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure

More information

Project Evaluation Guidelines

Project Evaluation Guidelines Project Evaluation Guidelines Queensland Treasury February 1997 For further information, please contact: Budget Division Queensland Treasury Executive Building 100 George Street Brisbane Qld 4000 or telephone

More information

Preparation of a Rail Safety Management System Guideline

Preparation of a Rail Safety Management System Guideline Preparation of a Rail Safety Management System Guideline Page 1 of 99 Version History Version No. Approved by Date approved Review date 1 By 20 January 2014 Guideline for Preparation of a Safety Management

More information

A better way to calculate equipment ROI

A better way to calculate equipment ROI page 1 A better way to calculate equipment ROI a West Monroe Partners white paper by Aaron Lininger Copyright 2012 by CSCMP s Supply Chain Quarterly (www.supplychainquarterly.com), a division of Supply

More information

CAPITAL ASSET MANAGEMENT AND FINANCING POLICY

CAPITAL ASSET MANAGEMENT AND FINANCING POLICY Effective Date: October 7, 2014 Supersedes /Amends: December 14, 1998 Originating Office: Office of the Chief Financial Officer Policy Number: CFO-4 SCOPE The University owns, operates, and maintains a

More information

How To Manage Asset Management

How To Manage Asset Management 4. Managing asset lifecycles a) Asset condition The condition of an asset is a measure of its physical state and provides indication as to whether or not service levels are being attained. Tracking the

More information

Chapter 14 Special Report for the Public Accounts Committee Evergreen and Wackenhut Leases

Chapter 14 Special Report for the Public Accounts Committee Evergreen and Wackenhut Leases Special Report for the Public Accounts Committee Evergreen and Wackenhut Leases Contents Background.............................................................. 183 Scope...................................................................

More information

Better decision making under uncertain conditions using Monte Carlo Simulation

Better decision making under uncertain conditions using Monte Carlo Simulation IBM Software Business Analytics IBM SPSS Statistics Better decision making under uncertain conditions using Monte Carlo Simulation Monte Carlo simulation and risk analysis techniques in IBM SPSS Statistics

More information

Outline feasibility study for ORET application in the health care sector

Outline feasibility study for ORET application in the health care sector Outline feasibility study for ORET application in the health care sector In this section we outline the information needed for a proper assessment of your application for financing under the ORET program.

More information

Since the 1990s, accountability in higher education has

Since the 1990s, accountability in higher education has The Balanced Scorecard Beyond Reports and Rankings More commonly used in the commercial sector, this approach to strategic assessment can be adapted to higher education. by Alice C. Stewart and Julie Carpenter-Hubin

More information

The current electric delivery system evolved

The current electric delivery system evolved Electric Transmission and Distribution Transmission and Distribution Infrastructure Management Must Enter a New Age Stephen Chapel The current electric delivery system evolved and was a direct result of

More information

DoD Business Process Reengineering CONSTRUCTION IN PROGRESS REQUIREMENTS DOCUMENT

DoD Business Process Reengineering CONSTRUCTION IN PROGRESS REQUIREMENTS DOCUMENT DoD Business Process Reengineering CONSTRUCTION IN PROGRESS REQUIREMENTS DOCUMENT Office of the Deputy Undersecretary of Defense (Installations & Environment) Business Enterprise Integration Directorate

More information

FINANCIAL BENCHMARKING TOOL GUIDE

FINANCIAL BENCHMARKING TOOL GUIDE FINANCIAL BENCHMARKING TOOL GUIDE The following guide has been written as a supplement to the training modules from the Business Effectiveness Assessment Module (BEAM) training series, which specifically

More information

JOURNAL OF OBJECT TECHNOLOGY

JOURNAL OF OBJECT TECHNOLOGY JOURNAL OF OBJECT TECHNOLOGY Online at www.jot.fm. Published by ETH Zurich, Chair of Software Engineering JOT, 2006 Vol. 5. No. 8, November-December 2006 Requirements Engineering Tasks Donald Firesmith,

More information

Guidelines for Best Practices in Data Management Roles and Responsibilities

Guidelines for Best Practices in Data Management Roles and Responsibilities Guidelines for Best Practices in Data Management Roles and Responsibilities September 2010 Data Architecture Advisory Committee A subcommittee of Information Architecture & Standards Branch Table of Contents

More information

pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage

More information

FINANCIAL EVALUATION OF ENERGY SAVING PROJECTS: BUILDING THE BUSINESS CASE

FINANCIAL EVALUATION OF ENERGY SAVING PROJECTS: BUILDING THE BUSINESS CASE FINANCIAL EVALUATION OF ENERGY SAVING PROJECTS: BUILDING THE BUSINESS CASE CFAA 2010 Canadian Rental Housing Conference June 14, 2010 Presented by Robert Greenwald, PEng., MBA President, Prism Engineering

More information

THE DEVELOPMENT OF A WEB BASED MULTIMEDIA INFORMATION SYSTEM FOR BUILDING APPRAISAL

THE DEVELOPMENT OF A WEB BASED MULTIMEDIA INFORMATION SYSTEM FOR BUILDING APPRAISAL THE DEVELOPMENT OF A WEB BASED MULTIMEDIA INFORMATION SYSTEM FOR BUILDING APPRAISAL Dominic O' Sullivan Department of Civil & Environmental Engineering National University of Ireland, Cork. Dr. Marcus

More information

PERFORMANCE MONITORING & EVALUATION TIPS CONDUCTING DATA QUALITY ASSESSMENTS ABOUT TIPS

PERFORMANCE MONITORING & EVALUATION TIPS CONDUCTING DATA QUALITY ASSESSMENTS ABOUT TIPS NUMBER 18 1 ST EDITION, 2010 PERFORMANCE MONITORING & EVALUATION TIPS CONDUCTING DATA QUALITY ASSESSMENTS ABOUT TIPS These TIPS provide practical advice and suggestions to USAID managers on issues related

More information

Risk Mapping A Risk Management Tool with Powerful Applications in the New Economy

Risk Mapping A Risk Management Tool with Powerful Applications in the New Economy Risk Mapping A Risk Management Tool with Powerful Applications in the New Economy By Todd Williams and Steve Saporito What if your company s major business risks, obstacles to strategic objectives, and

More information

Get Better Business Results

Get Better Business Results Get Better Business Results From the Four Stages of Your Customer Lifecycle Stage 1 Acquisition A white paper from Identify Unique Needs and Opportunities at Each Lifecycle Stage It s a given that having

More information

School Construction Projects

School Construction Projects The process of educating young people seems to be continually developing. New insights regarding how students most effectively receive retain and gain understanding of information and principles affect

More information

FOOD FOR THOUGHT Topical Insights from our Subject Matter Experts

FOOD FOR THOUGHT Topical Insights from our Subject Matter Experts FOOD FOR THOUGHT Topical Insights from our Subject Matter Experts A PHASED APPROACH TO PROVIDE A COMPLETE AND COMPLIANT CHEMICAL HAZARD ANALYSIS OF YOUR INCOMING INGREDIENTS The NFL White Paper Series

More information

Practical experience component achieved. Principal. Principal. Principal. Total

Practical experience component achieved. Principal. Principal. Principal. Total HONG KONG INSTITUTE OF CERTIFIED PUBLIC ACCOUNTANTS ( HKICPA / the Institute ) Prospective Member s Record Practical Experience for Membership Admission Employment Summary Prospective Member Name Prospective

More information

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL 14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic

More information

Calculating value during uncertainty: Getting real with real options

Calculating value during uncertainty: Getting real with real options IBM Institute for Business Value Calculating value during uncertainty: Getting real with real options Traditional valuation techniques often fail to capture or adequately quantify the value created by

More information

Classification Appeal Decision Under Section 5112 of Title 5, United States Code

Classification Appeal Decision Under Section 5112 of Title 5, United States Code U.S. Office of Personnel Management Office of Merit Systems Oversight and Effectiveness Classification Appeals and FLSA Programs Washington Oversight Division 1900 E Street, NW Washington, DC 20415 Classification

More information

Army Regulation 702 11. Product Assurance. Army Quality Program. Headquarters Department of the Army Washington, DC 25 February 2014 UNCLASSIFIED

Army Regulation 702 11. Product Assurance. Army Quality Program. Headquarters Department of the Army Washington, DC 25 February 2014 UNCLASSIFIED Army Regulation 702 11 Product Assurance Army Quality Program Headquarters Department of the Army Washington, DC 25 February 2014 UNCLASSIFIED SUMMARY of CHANGE AR 702 11 Army Quality Program This major

More information

5.1 Project Control Overview

5.1 Project Control Overview 5.1 Project Control Overview Project Control is a formal process in project management. In most respects, there is not a lot of room for creativity in the Control Phase of project management. The PMBOK

More information

SUPPLEMENTARY GREEN BOOK GUIDANCE

SUPPLEMENTARY GREEN BOOK GUIDANCE SUPPLEMENTARY GREEN BOOK GUIDANCE ADJUSTING FOR TAXATION IN PFI vs PSC COMPARISONS 1 INTRODUCTION 1.1 This guidance looks at the differential tax receipts that arise from the use of the Private Finance

More information

Lecture 1 IEGR 459: Introduction to Logistics Management and Supply Chain. James Ngeru Industrial and System Engineering

Lecture 1 IEGR 459: Introduction to Logistics Management and Supply Chain. James Ngeru Industrial and System Engineering Lecture 1 IEGR 459: Introduction to Logistics Management and Supply Chain James Ngeru Industrial and System Engineering Objectives Address Logistics in General Terms and definitions Describe the need for

More information

Measurement and Metrics Fundamentals. SE 350 Software Process & Product Quality

Measurement and Metrics Fundamentals. SE 350 Software Process & Product Quality Measurement and Metrics Fundamentals Lecture Objectives Provide some basic concepts of metrics Quality attribute metrics and measurements Reliability, validity, error Correlation and causation Discuss

More information

Measuring Lending Profitability at the Loan Level: An Introduction

Measuring Lending Profitability at the Loan Level: An Introduction FINANCIAL P E RF O R MA N C E Measuring Lending Profitability at the Loan Level: An Introduction sales@profitstars.com 877.827.7101 How much am I making on this deal? has been a fundamental question posed

More information

Interim Performance Management System for Positions Transitioning to the GS from NSPS. Department of the Navy Handbook. Version 2.

Interim Performance Management System for Positions Transitioning to the GS from NSPS. Department of the Navy Handbook. Version 2. Interim Performance Management System for Positions Transitioning to the GS from NSPS Department of the Navy Handbook Version 2.0 September 2010 Table of Contents INTRODUCTION 3 BACKGROUND 3 WHO IS COVERED?

More information

Asset Management Strategy (2013-2016)

Asset Management Strategy (2013-2016) 1.0 Aim 1.1 The aim of this strategy is to ensure that the identified objectives are managed towards successful implementation within the timescales identified. It will ensure that subsequent policies

More information

Part B1: Business case developing the business case

Part B1: Business case developing the business case Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project

More information

APPLYING THE STRATEGIC PLANNING PROCESS

APPLYING THE STRATEGIC PLANNING PROCESS MANAGEWARE APPLYING THE STRATEGIC PLANNING PROCESS Requirements Each department and agency of state government must engage in the process of strategic planning and must produce a strategic plan to be used

More information