Intelligent Cable Management Systems
|
|
|
- Geraldine Mitchell
- 10 years ago
- Views:
Transcription
1 Intelligent Cable Management Systems Bringing Practical Application Karen Pearson - Leviton
2 Why Cable Management Matters Performance Cooling and air-handling Maintenance
3 ANSI/TIA 569* Telecommunication Spaces Entrance Facilities (EF) Equipment Rooms (ER) Telecommunications Rooms (TR) Telecommunication Enclosures (TE) Telecommunications Pathways Ceiling spaces Under Floor Furniture pathways
4 Pathways and Cable Supports Attached to support weight and pulling Installed with clear vertical space above the ceiling tiles and t-bars. Should not rest on panels, wires, power or light fixtures Use properly sizes for cable Design in room for growth
5 J Hook Cable Support Spacing Intervals for effective support and distribution. Cable Sag between 4 and 12 in. Use independent support rods or wire to mount For large bundles split the bundle or use a cable tray.
6 Cable Trays and Ladder Racks Design for 25% fill ratio Maximum of 50% fill and up to 6 in inside depth. Utilize Retaining post to contain cables Protect the cable from treaded rod supports
7 Conduit Guidelines Do Not exceed 100ft between pull points Flexible Metal Conduit is not recommended Maximum Fill Ratio: Maximum Fill Ratio Number of Cables Maximum Fill (%) 1 53% 2 31% 3* 40%
8 Optical Fiber Raceway Use innerduct or raceway to ensure protection Must be free of sharp bends and turns The Raceway must have the proper fire rating
9 Two Categories Mechanical Non-Mechanical Putties Caulks Fire Stopping Pre-Manufactured Pillow
10 Cable Handling Physical damage to the cable will cause degradation in performance Condition the cable to prevent cracking No kink, twist, snag or not while pulling.
11 Cable Pulling Watch edges of conduit, tray and sleeves Steady as it goes don t be a jerk Maximum Pulling Tension: Cable Type Maximum Pull Strength 4 Pair 100Ω U/UTP 25 lbf (111 N) Multipair 100Ω U/UTP * 4 Pair 100Ω shielded * Premise Distribution Fiber 50 lbf (222 N) OSP Optical Fiber 600 lbf (2.65 kn)* * Check manufacturer s specifications for maximum pulling tension
12 Cable Runs
13 Bend Radius Allowable varies with cable type and OD Cable Type Bend Radius No-Load Load 4 Pair 100Ω U/UTP Multipair i 100Ω U/UTP Pair 100Ω shielded Premise Distribution Fiber (1-4 strands) Premise Distribution ib ti Fiber (5+ strands) OSP Optical Fiber Note: In all cases follow manufactures recommended instructions. Cat 5e Cat 6 Cat 6A
14 Micro- and Macro-Bending Violating the bend radius causes Macro- Excessive pull Tension or tight tie wraps cause Micro- Both cause unwanted light loss
15 Cable Bundles Cable stress should be minimized Do not over cinch bundles Recommend Velcro style wraps Stacking bundles can cause crush Separate Cu and Fiber
16 Horizontal Cable Managers Minimize damage Facilitate moves, adds and changes Improve performance Angled Patch Panels address some need Rear Managers are also needed
17 Vertical Cable Managers Must be appropriately p sized Symmetrical Distribution Waterfalls
18 Cable Slack Slack loops or service loops help to accommodate future Recommended amount of cable slack: TR or TE is 10ft (3m) Ceiling about the TO is 3.28 ft (1 m) The recommended slack after termination 1ft(3 (.3m)for balanced dtwisted t pair 3.28 ft (1 m) for optical fiber
19 Important Considerations Avoid over-bundling the cables or placing multiple bundles on top of each other Avoid blocking access to other equipment such as power strip.
20 Important Considerations Keep all cable runs under 90 percent of the maximum distance supported.. For backbone and horizontal runs, install additional cables as spares.
21 Important Considerations Don t stress the cable by: apply additional twist Pulling or stretching beyond load rating Bending beyond the bend radius Creating tension in suspended runs Stapling or applying ppy pressure with cable ties Avoid pipes and holes limiting future runs
22 Best Practices Label cables with their destination at every termination point Test every cable as it is installed and terminated. Do not route cables in the way of fans or air flow
23 Best Practices cont. Allocate a port in the patch panel for each horizontal run Include sufficient vertical and horizontal managers in the design. Use angled patch panels in high-density areas.
24 Unique Solutions Using fiber cable assemblies that have a single connector at one end and multiple duplex break out at the other end. Corner bend radius Wire tray waterfall
25 Summary Cabling represents <10% of the overall data center investment Outlives most of the network components Most difficult to replace Requires versatility for current and future needs Since each environment is different, there is no single solution that will meet all your cable management needs.
26 Thank You
TIA 569 Standards Update Pathways & Spaces. Ignacio Diaz, RCDD April 25, 2012
TIA 569 Standards Update Pathways & Spaces Ignacio Diaz, RCDD April 25, 2012 The purpose of this Standard is to standardize specific pathway and space design and construction practices in support of telecommunications
SYSTIMAX SCS PowerSum and GigaSPEED XL Cabling Installation Guidelines
SYSTIMAX SCS PowerSum and GigaSPEED XL Cabling Installation Guidelines This document contains critical information regarding the installation of a certified SYSTIMAX SCS that meets or exceeds performance
Building Telecommunications Infrastructure Requirements
Building Telecommunications Infrastructure Requirements This page identifies specific requirements for the design of telecommunications infrastructure for buildings at Clemson University. (Revised October,
Terminating 25-Pair Cable and 4-Pair Cross Connects
Terminating 25-Pair Cable and 4-Pair Cross Connects Estimated Time: 90 minutes Number of Teams: 2 Number of Team Members: one to four This Lab has four major parts that will be addressed separately. 1.
Data Center Standards Making Progress on Many Fronts. Jonathan Jew J&M Consultants, Inc [email protected]
Data Center Standards Making Progress on Many Fronts Jonathan Jew J&M Consultants, Inc [email protected] J&M Consultants - 2008 Speaker Jonathan Jew Co-chair TIA TR-42.1.1 Data Center working group ANSI/TIA-942
Structured and Point to Point Network Cabling for Industrial Automation
Structured and Point to Point Network Cabling for Industrial Automation Introduction Industrial automation systems are undergoing dramatic transformations that require businesses to adopt new strategies
SECTION 27 13 24 COMMUNICATIONS OPTICAL FIBER OSP CABLING
SECTION 27 13 24 COMMUNICATIONS OPTICAL FIBER OSP CABLING PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete
Minimum Standards for Data/Voice Infrastructure in New Building Construction
UNIVERSITY OF WATERLOO Minimum Standards for Data/Voice Infrastructure in New Building Construction 12/17/2012 Offices 1. Two Work Area Outlets (WAO) on opposite walls, each with 2 jacks 2. Each WAO shall
800 Communications Circuits
ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that
SECTION O FIBER OPTICS
SECTION O FIBER OPTICS CONTENTS PAGE 1. GENERAL...O-2 1.1 Introduction...O-2 1.2 Definitions...O-2 1.3 Requirements...O-2 2. RUNNING, SECURING AND FIRESTOPPING FIBER OPTIC CABLE...O-3 2.1 Running Fiber
Sewing Methods Chicago Style Stitch
Chicago Style Stitch 1 2 3 4 TWO STRANDS OF CORD PULL ALL STITCHES TIGHT STARTING STITCH FIRST STITCH SECOND STITCH VERTICAL FLAT CABLES COMPLETED KNOT A B C D NOTE 6 NOTE 7 GROUPED OR SMALL CABLES 1.
UT Southwestern Medical Center Information Resources Cable Installation Standard
UT Southwestern Medical Center Information Resources Cable Installation Standard PART 1- GENERAL 1.01 SUMMARY A. Furnish and install wire, cable, devices, equipment, and accessories for a complete system
UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-27 05 14.00 10 (April 2006) -------------------------------- Preparing Activity: USACE Superseding UFGS-27 05 14.00 10 (April 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS
TCTC Cabling Specifications
TCTC Cabling Specifications Purpose: To provide a standard specification that will be used for all Tri County Technical College (TCTC) facilities requiring structured cabling installation. Product specifications,
Presenters Brett Weiss, Gabe Martinez, Brian Kroeger.
1 Presenters Brett Weiss, Gabe Martinez, Brian Kroeger. Topics to be covered: Cable identification Purpose of the various cable types Installation techniques Building Infrastructure Overview of networking
TELECOMMUNICATIONS STRUCTURED CABLING GUIDELINES AND SPECIFICATIONS. University of Chicago IT Services Infrastructure Services October 2011
TELECOMMUNICATIONS STRUCTURED CABLING GUIDELINES AND SPECIFICATIONS IT Services Infrastructure Services October 2011 Table of Contents 1 Introduction... 4 1.1 Planning and Design... 4 1.2.1 Roles and Responsibilities...
1.1 SYSTEM DESCRIPTION.1 Data system includes data outlets and wiring for office and school applications.
Issued 2005/06/01 Section 16743 Data System Page 1 of 7 PART 1 GENERAL 1.1 SYSTEM DESCRIPTION.1 Data system includes data outlets and wiring for office and school applications..2 Data system equipment
ATTACHMENT F 050R6800016 - CABLE AND WIRING SERVICES FUNCTIONAL AREA I PRICE PROPOSAL FORM Amendment 6
050R6800016 CABLE AND WIRING SERVICES (Column A) (Column B) (Column C) (Column D) (Column E) (Column F) (Column G) (B+C+D+E)*F= G Item Description PER 100' RUN PER 150' RUN PER 200' RUN PER 300' RUN QUANTITY
Standards and Guidelines for Telecommunications Wiring Design and Installation Montana State University-Bozeman
Standards and Guidelines for Telecommunications Wiring Design and Installation Montana State University-Bozeman This document defines the standards used for voice and data wiring in buildings used by MSU
Data Center Cabling Design Trends
Data Center Cabling Design Trends BICSI Regional Meeting Maurice Zetena Fiber Connect Infrastructure Trends Infrastructure Trends Any to All Trunk Cabling Trends: Data Center Infrastructure Media Choice:
Cable management for rack-mounted systems
Cable management for rack-mounted systems technology brief, 2 nd edition Abstract... 2 Introduction... 2 Cable routing guidelines... 3 Separation of power and data cables... 3 Retention of excess cable...
Specifications for Communication Cabling Distribution Systems
Washington University in St. Louis Specifications for Communication Cabling Distribution Systems General Overview Listed below are the separate sub-systems of Washington University s structured cabling
Cable Installation Project
Cable Installation Project 1. Intent. It is the intent of the U.S. Court of Appeals to install Category 6 (CAT6) data cabling in the Robert F. Peckham Federal Building and United States Courthouse, 280
SBC Companies Fiber Distribution Frame Interbay Management Panel Cross-Connect Procedures
Page 1 ADCP -007 PN 7 Rev A 1 3 3 3 0 1 2 7 8 2 1 3 3 3 0 1 2 7 8 2 1 3 3 3 0 1 2 7 8 2 1 3 3 3 0 1 2 7 8 2 1 3 3 3 0 1 2 7 8 2 1 3 3 3 0 1 2 7 8 2 1 3 3 3 0 1 2 7 8 2 1 3 3 3 0 1 2 7 8 2 1 3 3 3 0 1 2
1. Furnish and install faceplate and modular jacks at each single gang outlet as described below:
Washington University in St. Louis Building: Communication Specification: Research Voice/Network/Typical 1. Furnish and install faceplate and modular jacks at each single gang outlet as described below:
BIX Cross-Connect System Distribution Connectors, Multiplying Connectors and Modular Jack Connectors
C O M M E R C I A L N E T W O R K I N G C O P P E R 15.13 Distribution Connectors, Multiplying Connectors and Modular Jack Connectors A0393146 QCBIX1A4 Connector BIX Distribution Connector The BIX Distribution
Network Cabling Guide
Network Cabling Guide Poor or incorrectly installed network cabling can cause numerous problems with your computer network. Whilst we recommend that you employ a network / cabling specialist to wire and
Installation Manual For Support Call 01704 807114 or email [email protected]
Installation Manual Hip Smart Hub (Standard BT and BT FTTP Sites) The Home Network Hub houses the Home Owner s Broadband Router and connects the hardwired network ports on that Router to three network
ANSI/TIA-942 Telecommunications Infrastructure Standard for Data Centers
ANSI/TIA-942 Telecommunications Infrastructure Standard for Data Centers Jonathan Jew [email protected] J&M Consultants, Inc Co-chair TIA TR-42.1.1 data center working group Co-chair BICSI data centers standards
Unified Physical Infrastructure (UPI) Strategies for Thermal Management
Unified Physical Infrastructure (UPI) Strategies for Thermal Management The Importance of Air Sealing Grommets to Improving Smart www.panduit.com WP-04 August 2008 Introduction One of the core issues affecting
SECTION 25110 TELECOMMUNICATION ROOMS
PART 1 - GENERAL 1.1 SUMMARY A. SCOPE SECTION 25110 TELECOMMUNICATION ROOMS 1. This section includes the minimum installation requirements for equipment and cabling infrastructure in Telecommunication
Standards. www.nordx.com 5 ANSI/TIA/EIA-569-A (CSA T530)
The primary focus of this standard is to provide design specifications and guidance for all building facilities relating to telecommunications cabling systems and components. This standard identifies and
ANSI/TIA-942 Telecommunications Infrastructure Standards for Data Centers
ANSI/TIA-942 Telecommunications Infrastructure Standards for Data Centers Jonathan Jew jew@j-and and-m.com J&M Consultants, Inc Co-chair TIA TR-42.1.1 data center committee Co-chair BICSI data centers
Telecommunications Systems Narrative Page 1 The Engineering Enterprise
I. TELECOMMUNICATIONS GENERAL REQUIREMENTS A. The project consists of a renovation to the historic Clinical Sciences building, originally built in 1933. The existing building has a total area of 105,000
Purpose of the ANSI/TIA/EIA-569-A Standard
For more information, see anixter.com/standards Purpose of the ANSI/TIA/EIA-569-A Standard As the complexity of voice and data telecommunications has increased, standards have been established to ensure
1 Campus Cabling Systems Introduction
1 Campus Cabling Systems Introduction This document represents the campus cable and infrastructure standards adopted and supported by the XXXX. All new construction and renovation should conform to these
DESIGN GUIDELINES. Local Area Network
DESIGN GUIDELINES Local Area Network The total oversight and management responsibilities for information assurance (IA) and protection of DoDEA s critical infrastructure fall under the purview of the DoDEA
Designing A Communications Cabling System for the Colocation Data Center Larry Smith President, ABR Consulting Group, Inc.
Designing A Communications Cabling System for the Colocation Data Center Larry Smith President, ABR Consulting Group, Inc. It is often said that the communications cabling system is the conduit over which
InstaPATCH Cu Cabling Solutions for Data Centers
SYSTIMAX Solutions InstaPATCH Cu Cabling Solutions for Data Centers Design Guidelines August 2008 www.commscope.com Contents Overview 1 Instapatch Cu Solution Specification 2 Harness Assembly Design 3
Managing High-Density Fiber in the Data Center: Three Real-World Case Studies
Managing High-Density Fiber in the Data Center: Three Real-World Case Studies CHALLENGE In today s data center, fiber optic links have become more vital than ever for transmitting data to and from a large
Code Compliance for Spring Steel Fasteners Based on the 2005 NEC
Code Compliance for Spring Steel Fasteners Based on the 2005 NEC B-Line has recognized the need for a reference source, detailing the National Electrical Code requirements for Spring Steel Fasteners. The
SECTION 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY
SECTION 28 05 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections, apply
OCTOBER 2010. Layer Zero, the Infrastructure Layer, and High-Performance Data Centers
Layer Zero, the Infrastructure Layer, and The demands on data centers and networks today are growing dramatically, with no end in sight. Virtualization is increasing the load on servers. Connection speeds
Cabling Services (price per pull) Zone 1 Zone 2 Zone 3 Zone 4 Zone 5
BryComm, LLC -SDD-1901 Cabling Services (per pull) - Labor Only STANDARD TIME The price per cable pull represents all labor to include fishing walls, running cable through modular furniture, terminating,
Data Centers. Mapping Cisco Nexus, Catalyst, and MDS Logical Architectures into PANDUIT Physical Layer Infrastructure Solutions
Data Centers Mapping Cisco Nexus, Catalyst, and MDS Logical Architectures into PANDUIT Physical Layer Infrastructure Solutions 1 Introduction The growing speed and footprint of data centers is challenging
Data Center. Pre-terminated. Patch Panel System. Cabling Systems Simplified. Patch Panels. 10G + Gigabit. Patch Cords. Plug & Play Installation
Data Center Pre-terminated Patch Panel System Patch Panels Plug & Play Installation 10G + Gigabit Patch Cords Bundled + Labeled Cabling Systems Simplified Our Mission At Cablesys, our mission is to simplify
B. PART 1 - GENERAL of SECTION 271300 BACKBONE COMMUNICATIONS CABLING shall also apply to this section.
SECTION 271500 - HORIZONTAL UTP CABLING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
Developing the Green Data Center
Products and Solutions to Support Energy Efficiency Ordering Guide Table of Contents Developing the Green Data Center Introduction...5 Airflow Management in the Data Center...6 Angled Panels Glide Cable
Building a Tier 4 Data Center on a Tier 1 Budget
Building a Tier 4 Data Center on a Tier 1 Budget A Walk Through of TIA-942 Peter P. Charland III, RCDD/NTS/WD, CET RTKL Associates Inc. March 27, 2008 BICSI South Central Region Meeting Denver, CO TIA-942
Solar Panel Installations
Solar Panel Installations Page 1 of 6 SINGLE-FAMILY RESIDENTIAL CHECKLIST City of Hayward Development Services Department Revised: 7-09-15 PERMIT REQUIREMENTS Permits are required for all solar panel installations.
B. Cross-Connect: A facility enabling the termination of cable elements and their interconnection or cross-connection.
DIVISION 16 ELECTRICAL Section 16740 Telephone System PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
Request for Proposal (RFP) IP Cameras/Door Access Control
WAHPETON PUBLIC SCHOOLS Information Technology Department Request for Proposal (RFP) IP Cameras/Door Access Control Inquiries and requests regarding this RFP should be directed to: Jason Pfahl, Director
Specifying an IT Cabling System
Specifying an IT Cabling System This guide will help you produce a specification for an IT cabling system that meets your organisation s needs and gives you value for money. You will be able to give your
4 Installation Requirements
4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming
THE IMPACT OF CURRENT TRENDS ON THE DATA CENTER COMMUNICATIONS CABLING INFRASTRUCTURE
THE IMPACT OF CURRENT TRENDS ON THE DATA CENTER COMMUNICATIONS CABLING INFRASTRUCTURE Prepared by Michael Wood Senior Product Manager Data Center Infrastructure Systems Hubbell Premise Wiring www.hubbell-premise.com
ADC Structured Cabling Solutions
ADC Structured Cabling Solutions The highest performing cross-connect system in the world HighBand Wall Mount Patching Solution Reliable, secure and cost effective ADC s HighBand cross connect solution
Telecommunications Infrastructure Standard for Data Centers. 802.3 Tutorial
Telecommunications Infrastructure Standard for Data Centers 802.3 Tutorial Prepared by: Jonathan Jew - J&M Consultants and Chris DiMinico - MC Communications - Co-chairs TR42.1.1 TR42: Data Center Standard
SECTION 17400 ACCESS CONTROL SYSTEM. CONDITIONS OF THE CONTRACT AND DIVISION 1, as applicable, apply to this Section.
SECTION 17400 ACCESS CONTROL SYSTEM CONDITIONS OF THE CONTRACT AND DIVISION 1, as applicable, apply to this Section. PART 1 - GENERAL 1.1 RELATED WORK A. 16060 Grounding and Bonding B. 16070 Electrical
DIVISION 27 COMMUNICATIONS. A. System design shall be completed by a Registered Communications Distribution Designer (RCDD).
DIVISION 27 COMMUNICATIONS 27 00 00 COMMUNICATIONS A. System design shall be completed by a Registered Communications Distribution Designer (RCDD). B. Comply with American National Standards Institute
Division 27 Master Specification for
Division 27 Master Specification for Information Transport Systems and Spaces May 1, 2014 1 Table of Contents 1 Section 27 10 01 Structured Cabling General Requirements 1.1 Scope 1.2 Approved Contractor
What is a Datacenter?
What is a Datacenter? Telecom Room Primarily Cross Connect Equipment and switches. Computer room A room whose primary function is to house computer equipment. (Servers, Storage) 5 or less cabinets Small
LOS ANGELES CITY COLLEGE Technology Design Standards
LOS ANGELES CITY COLLEGE Technology Infrastructure Final January, 2007 Prepared for: Los Angeles City College Los Angeles City College TABLE OF CONTENTS Section Page INTRODUCTION 1 DESIGN STANDARDS FOR
ANSI/TIA/EIA - 568-A, Commercial Building Telecommunications Cabling Standard.
WIRING STANDARD INTRODUCTION This standard defines a telecommunications wiring system for North Dakota State Agencies, offices or buildings that will support a multi-product environment. The purpose of
CABLE SUPPORT SYSTEMS
CABLE SUPPORT SYSTEMS eaturing the CADDY CAT HP J-Hook System Why CADDY CAT HP? Why Choose CADDY CAT HP over tray? ast and Easy to Install Much faster installation compared to conventional cable or ladder
Coordinate size and location of telecommunications rooms with the architect to be in compliance with this document and NEC Article 800.
Section 16700- TELECOMMUNICATIONS Part 1 - General The scope of this project includes providing all material and labor to install a complete telecommunication system. The systems shall include riser cables,
SECTION J -- CABLING
INSTALLATION REQUIREMENTS Section J, ATT-TP-76300 AT&T January, 2012 SECTION J -- CABLING CONTENTS PAGE 1. GENERAL... J-2 1.1. Introduction... J-2 1.2. General Requirements... J-2 1.3. General Cable Routing...
in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.
DATA CENTER The current Campus Data Center is located within historic Founders Hall which is in a less-than ideal location for a variety of reasons, but is typical of an existing campus IT infrastructure
TELUS Residential Service Conduit Requirements for Stand Alone Homes and Duplexes in Fibre Only Communities
1 TELUS Residential Service Conduit Requirements for Stand Alone Homes and Duplexes in Fibre Only Communities Beginning in January 2010 TELUS began designing new subdivisions within the Top 48 population
Security & Surveillance Cabling Systems
Security & Surveillance Cabling Systems Security and Surveillance Cabling Systems The video security industry is growing and ever-changing, offering a wealth of opportunity for today s security professionals.
March 2007. 27 08 00 Commissioning of Communications. See Appendix E3. 27 08 00-1
March 2007 27 08 00 Commissioning of Communications See Appendix E3. 27 08 00-1 27 11 00 Communications Equipment Room Fittings 1.0 General TELEPHONE RISERS: A. All copper telephone riser cables must be
AMP NETCONNECT Data Center Cabling Solutions
AMP NETCONNECT Data Center Cabling Solutions Modern business and administrative environments require today more and more sophisticated IT services, what leads to an increasing demand for data provision
Secure your IT equipment with confidence... secure with NetClosure
Secure your IT equipment with confidence... secure with NetClosure SERVER CABINETS NetClosure s REM Series Server Cabinet is the ultimate solution designed and engineered for demanding data center environments.
Healthcare. Carol Everett Oliver, RCDD, ESS. Berk-Tek, a Nexans Company
Cabling for Healthcare Carol Everett Oliver, RCDD, ESS Marketing Analyst, Berk-Tek, a Nexans Company Healthcare Digital Movement 1970 s First computer usage for administration (billing, etc.) Early 90
FTE Cabling Best Practices Author: Todd Bill, RCDD/NTS
FTE Cabling Best Practices Author: Todd Bill, RCDD/NTS Document ID: WP-07-01-ENG Original Issue Date: May 2007 Version: 1.0 FTE Cabling Best Practices 1 Table of Contents Introduction and Applicable Standards...3
Best Practices Guide: High Density Cable Management Solutions
Best Practices Guide: High Density Cable Management Solutions Describes recommended cabling solutions for high density port solutions based on Brocade s FC8-64 FC port blade. CONTENTS Introduction... 3
ATT-TP-76401-001. Internet Services Cabinet Supported Cable Rack Requirements
Internet Services Cabinet Supported Cable Rack Requirements This practice provides the guidelines and requirements for engineering and installing cable rack arrangements in AT&T IS equipment environments
DATA CENTER NETWORK INFRASTRUCTURE. Cable and Connectivity for the Most Demanding Networks. BerkTekLevitonTechnologies.com
DATA CENTER NETWORK INFRASTRUCTURE Cable and Connectivity for the Most Demanding Networks Customer-focused, technology-driven, quality-assured for an unparalleled RETURN ON infrastructure investment DATA
Cable Preparation and Pulling Procedure Best Practices for Fiber Optic Indoor Tight-Buffered Cable
Cable Preparation and Pulling Procedure Best Practices for Fiber Optic Indoor Tight-Buffered Cable Panduit Corp. 2009 BEST PRACTICES PN447B \ Table of Contents 3 2.0 Preparation Notes Tools and Material
Organizing and Managing Equipment Rooms
Organizing and Managing Equipment Rooms How you organize and maintain your equipment room can be just as important as maintaining the operating systems on the boxes themselves. Although many companies
Unarmored Variable Frequency Drive (VFD) Cable Termination Guide
Authorized Distributor Unarmored Variable Frequency Drive (VFD) Cable Termination Guide Be Certain with Belden A Step-by-Step Look at the Connection/Termination of Unarmored VFD Cables Terminating Unarmored
Cat7/Class F New Installation Concept New infrastructure. Handbook
Cat7/Class F New Installation Concept New infrastructure Handbook contents 1 Introduction 3 2 What is the Cat7/Class F installation concept 3 3 Distribution centre 3 3.1 Patch Modules 3 4 How to handle
Cabling Requirements for the District of Columbia on behalf of the Criminal Justice Coordinating Council
Cabling Requirements for the District of Columbia on behalf of the Criminal Justice Coordinating Council Date: 6/19/2013 Version: 1.0 Prepared by: Gregory Cotten Department of General Services District
Cabinets 101: Configuring A Network Or Server Cabinet
Cabinets 101: Configuring A Network Or Server Cabinet North, South and Central America White Paper May 2012 www.commscope.com Contents Background Information 3 What is a network or server cabinet? 3 What
BICSI NxtGEN & Global Data Center Standards Update
BICSI NxtGEN & Global Data Center Standards Update Bob Faber, RCDD/NTS Siemon Global Accounts Manager Chair NEMA High Performance Wire & Cable Chair BICSI Standards Committee Vice Chair BICSI TI&M Committee
BIX Termination Blocks
Characteristics One piece unit that passes the connection through Unit is reversed after cable connection for the cross-connect field Mounting Frames are available 250-pair, in 50-pair, 300-pair and 900-pair
Application Note Optical Fiber Cable
Underground Installation of Optical Fiber Cable by Pulling Authors Prasanna Pardeshi and Sudipta Bhaumik Issued July 2015 Abstract This application note discusses underground fiber optic cable installation
TELECOMMUNICATIONS NETWORK STANDARDS AND GUIDELINES FOR THE NEW ADMINISTRATION BULDING
TELECOMMUNICATIONS NETWORK STANDARDS AND GUIDELINES FOR THE NEW ADMINISTRATION BULDING October 1998 Table of Contents SECTION I: New Construction Programming 1.0 New Construction 1.1 Design Elements..................................
Structured Wiring Specifications ERAU Daytona Beach Campus (Dec 14 2011)
Structured Wiring Specifications ERAU Daytona Beach Campus (Dec 14 2011) A. Objectives The Information Technology (IT) Department of Embry-Riddle Aeronautical University (ERAU) seeks to establish a standards-based
Installing Commercial Building Telecommunications Cabling
ANSI/NECA/BICSI 568-2001 Standard for Installing Commercial Building Telecommunications Cabling Published by BICSI A Telecommunications Association Jointly developed with National Electrical Contractors
Applying Proper Cable Management In IT Racks A Guide For Planning, Deployment And Growth
Applying Proper Cable Management In IT Racks A Guide For Planning, Deployment And Growth Integrated Cabinet Solutions For Business-Critical Continuity Why Proper Cable Management Is So Important Your rack