Restoring Floods to Floodplains: Riparian and Floodplain Restoration at the Cosumnes River Preserve

Size: px
Start display at page:

Download "Restoring Floods to Floodplains: Riparian and Floodplain Restoration at the Cosumnes River Preserve"

Transcription

1 Restoring Floods to Floodplains: Riparian and Floodplain Restoration at the Cosumnes River Preserve RAMONA O. SWENSON, KEITH WHITENER, AND MIKE EATON The Nature Conservancy, Cosumnes River Preserve, Galt, CA ABSTRACT. Riparian and floodplain ecosystems are shaped and sustained by the river s hydrologic processes, such as flooding. The Cosumnes River Preserve is a multi-partner effort to protect and restore natural habitats within the floodplain of the Cosumnes River. This landscape-scale project protects over 40,000 acres of riparian forest, wetlands, and vernal pool grasslands. Early restoration efforts relied on active measures, such as hand planting of oaks and willows. This method, however, was expensive and labor intensive, and sometimes plantings failed. In the last several years we have focused on restoring natural processes that sustain and create habitat, such as flooding. Natural process restoration is now an integral part of the restoration program and central to our planning for property acquisition. Intentional levee breaches have restored the hydrologic connection between the lower Cosumnes River and its floodplain. Floods passing through levee breaches created in 1995 and 1997 have deposited sediment, seeds and plant cuttings on former farm fields, and stimulated natural recruitment of cottonwood and willow riparian forests. This method also provided valuable habitat for chinook salmon and Sacramento splittail. Creating seasonally flooded habitat rather than permanent ponds benefits native fishes more than non-native fishes. Monitoring by the Cosumnes Research Group and others is providing feedback for adaptive management. INTRODUCTION California s riparian and floodplain ecosystems have been greatly modified and impaired. Historically, rivers would overtop their banks in the winter and spring to create extensive flooded plains. Many of the fishes native to the Central Valley, including chinook salmon and Sacramento splittail, evolved to take advantage of these productive seasonally-flooded shallow water habitats. Riparian forests were once the predominant floodplain vegetation in the Sacramento Valley prior to extensive settlement (Hunter et al., 1999). Currently on most rivers, however, the natural hydrologic regime has been drastically altered by dams and levees that impound runoff, straitjacket stream channels, and alter the timing and magnitude of flows (Mount 1995). Floodwaters cannot spread across the floodplain to deposit sediment, distribute plant seeds and cuttings, or seep into the ground to recharge groundwater aquifers. Valley oaks grew best in the deep alluvial soils preferred by early farmers, who cleared the forests for agriculture (Reiner 1986). By the late 1980s less than four percent of the floodplain remained covered by forest (Hunter et al., 1999). Floodplain restoration will require restoring the flooding process. The Cosumnes River is the only unregulated Sierran river in the Central Valley and, as such, it retains much of its natural hydrology. This represents a major opportunity to restore a functional ecosystem by providing the river access to its floodplain. Successful experiments with breaching and removing levees on the preserve have made the Cosumnes a natural laboratory for restoring riparian forests and native fishes, as well as developing nonstructural flood management. In this paper we review the planning, implementation and outcomes of levee breaches at the Preserve, and discuss future directions for natural process restoration. An overview of the extensive research being carried out here by the Cosumnes Research Group (U.C. Davis) is provided in Mount et al. (this volume). Cosumnes River Watershed. The Cosumnes River is the last free-flowing river in the Central Valley, draining the western slope of the Sierra Nevada (ESA, 1991). No large dams have been constructed on the river. A small reservoir, Sly Park Reservoir, is located on a tributary with a capacity of 40,000 acre-ft, or 10% of the average annual yield. The watershed (1,265 square miles) reaches over 7,600 feet elevation in the Sierra Nevada. Little snow accumulates because of the watershed s low elevation. Thus, the river s

2 flow is derived principally from winter rain instead of spring snowmelt. The Cosumnes River historically wandered back and forth across the valley floor and occupied several channels. Tidal fluctuation is observed in the lower river up to Twin Cities Road (river mile 5). During the summer, streamflow is intermittent upstream of Twin Cities Road. The lower Cosumnes River is extensively leveed (Philip Williams and Associates, 1997). This has contributed to incision of the channel upstream of Highway 99. Surface water diversion rights exceed the river s average monthly flow in some months. Groundwater pumping for agriculture and urban development has created a dramatic decline of ground water levels, up to 60 feet near Highway 99 (Montgomery Watson 1995). Increased water use has delayed streamflow in the fall, which adversely affects chinook salmon attempting to migrate upstream to spawn. The Cosumnes River supports a variety of natural communities (ESA, 1991): coniferous forests in the upper watershed, oak woodlands in the foothills, and vernal pool grasslands and riparian forests on the valley floor. Bottomland riparian forests consist of cottonwood, willow, valley oak and Oregon ash, which support many species of migratory birds (PRBO, 2000; Estep, 1989). In the lower watershed and east Delta, seasonal marshes and agricultural fields provide habitat for waterfowl and sandhill cranes (Littlefield and Ivey, 2000). Badger Creek provides wetland habitat for giant garter snakes. The upper Cosumnes River hosts native rainbow trout, as well as non-native brown and brook trout. The middle reaches of the river were historically dominated by native minnows such as hardhead and roach, but are now invaded by redeye bass and smallmouth bass (Moyle et al. manuscript). The lower reaches contain native fishes, such as chinook salmon, Sacramento splittail, and Sacramento suckers, as well as many non-native species, such as largemouth bass, carp, and silversides (Harris, 1986; Moyle, Crain and Whitener, unpublished data). Chinook salmon migrate through the lower reaches to spawn along the middle reaches of the river below a natural passage barrier at Latrobe Falls, 41.5 miles upstream from the confluence with the Mokelumne River. Cosumnes River Preserve. In 1984, the Nature Conservancy acquired a large valley oak grove on the Cosumnes River. The Cosumnes River Preserve was established in 1987 and currently protects over 40,000 acres of riparian forest, wetlands, vernal pool grasslands and agriculture. The Preserve is a showcase for the Conservancy s strategies of public and private conservation partnerships, habitat restoration, development and demonstration of wildlifefriendly land management methods, community involvement, and compatible economic activities. The Cosumnes River is also a flagship project of the California Riparian Habitat Joint Venture. The Preserve is managed under an cooperative agreement among The Nature Conservancy, U.S. Bureau of Land Management, California Department of Fish and Game, California Department of Water Resources, Ducks Unlimited, and Sacramento County. About 2,400 acres are private lands that are protected with conservation easements that restrict development and intensive agricultural practices that are incompatible with wildlife, such as vineyards and orchards. Almost 90 percent of the Preserve is maintained in active agricultural production, including annual crops, grazing, and a 1,000-acre organic rice farm managed by Living Farms. RESTORATION PROJECTS AT THE COSUMNES RIVER PRESERVE Active Restoration Early efforts to enhance and restore habitats along the lower Cosumnes focused on active measures, such as wetlands construction and hand planting of trees (Eaton, 1998). Approximately 725 acres of ponds are managed for waterfowl and sandhill cranes. In 1988, the Preserve initiated the first large-scale replanting of a valley oak forest (Griggs, 1991; Reiner, 1996). Since then, a total of 500 acres have been planted with oaks, willows and other trees by volunteers and school children. Planting remains an integral part of the Preserve's education program. However, a 1994 study found that hand planting was expensive and some plantings failed or grew slowly (Reiner 1996). Furthermore, natural regeneration of oaks was occurring in many areas, particularly where natural flooding and sediment deposition still occurred. The Nature Conservancy reoriented the forest restoration program in 1995 to identify areas where natural regeneration could be encouraged by reestablishing natural flooding (Reiner 1996).

3 Restoration of Natural Flooding Processes Alteration or removal of levees, such as breaching or creation of setback levees, provides the opportunity to reconnect the river to its floodplain. A Lesson From Nature: The Accidental Forest. In early 1985, a levee protecting a farm field adjacent to the Preserve failed, and much of the river's flow was diverted through a gap in the levee for a brief period. The floodwaters dropped a substantial amount of sand on about 15 acres. The farmer repaired the levee, but left the deposited sediment and farmed the remainder of the field. Cottonwood and willows rapidly colonized the depositional area, and by late 1985 the "accidental forest" was well established (Figure 2). Within a few years the area contained a thick mosaic of 15- to 20-foot high cottonwood trees, Oregon ash, and willow thickets. Sixteen years later, many of the cottonwoods are over 40 feet tall and the "accidental forest" provides habitat for songbirds, raptors, deer, beaver, and otter. Researchers from the Point Reyes Bird Observatory have found a variety of migratory songbirds nesting in the forest (PRBO 2000). PRBO has ranked the site well above other areas they have studied in the Central Valley. In the understory of the forest and on its edges, naturally regenerated valley oak trees have taken hold (Tu 2000). As the shorter-lived softwood trees die or fall victim to beavers, the oaks will fill in the forest canopy and ultimately succeed the cottonwoods and willows (Tu 2000). This farm property was acquired by the Nature Conservancy in The rapidly growing "accidental forest" inspired us to explore how natural flooding processes could be enlisted to expand the riparian corridor Intentional Levee Breach. In 1994, a hydrologic assessment was conducted of the lower preserve, with funding from the US EPA. The goal was to determine whether levees could be intentionally breached without creating flooding problems for the Preserve s neighbors. The HEC-2 modeling demonstrated that water surface elevations in the river would be reduced upstream of a levee breach because waters would spread out on the expanded floodplain (Swanson and Hart, 1994). Thus, a levee breach would reduce flood levels elsewhere on the river. In October 1995, a 50-foot gap in the levee was created and a shallow channel was cut through the field (Figure 2). This reopened about 200 acres of bottomland to natural flooding. The project cost approximately $10,000-$15,000. In December, the rising river flooded the field for the first time. By March, high flows had scoured the channel and deposited sand in bars parallel to the channel, along with natural "cuttings" of willow and cottonwood. In May, receding floodwaters exposed mudflats, where cottonwood seeds settled. By early fall 1996, the cottonwood trees were about three feet tall (Tu 2000). A three-year study found that cottonwood trees that grew from cuttings were much taller and survived better than those that grew from seed (Tu 2000). Beavers have browsed many trees, but the trees have often resprouted. By late 2000, some trees were over feet tall. The success of the 1995 breach has attracted much attention from resource and regulatory agencies Levee Breach and Floodproofing. The massive floods of January 1997 caused many levee breaks along the Cosumnes River. Given the success of the 1995 project, the Preserve and local farmers reached an agreement on an unleveeing project and convinced the Army Corps of Engineers to fund a non-structural flood management project in lieu of traditional levee repairs. The project cost approximately $1.55 million, with $900,000 from the Corps (nonstructural flood control program) and $650,000 from a developer (mitigation grant to create wetlands). The project site was upstream of the accidental forest and the 1995 levee breach (Figure 2). A major component of the project involved breaching and abandoning 5.5 miles of levees. The main levee along the Cosumnes was breached to let the river flow onto the floodplain. An internal levee to the south was also breached to allow the floodwaters to drain south into the accidental forest and adjacent floodplain. A waterfowl pond was excavated as part of the wetlands mitigation. To protect adjacent farm fields, a low setback levee was constructed. Irrigation pumps were either elevated or replaced with submersible pumps. Construction started in the fall of 1997 with the levee breaches and setback levee. This added about 100 acres to the floodway. Floodproofing of infrastructure was completed by winter Floodwaters again created a large sand splay on this restored floodplain, and willows and cottonwoods quickly established (Mount et al.,

4 this volume). After 2-1/2 years, these trees were about 6-7 feet tall (W. Trowbridge, UC Davis, unpublished data). Reconnecting the river with its floodplain did more than just start forest recruitment: it created valuable habitat for native fishes. Significant numbers of juvenile chinook salmon and Sacramento splittail use the seasonal wetlands (Whitener and Kennedy, 1999; Kennedy and Whitener, 2000). The warm, shallow waters produce enormous blooms of algae and invertebrates (Mount et al., this volume), which provide food for fishes (Sommer et al. 2001). Habitat quality for native fish is influenced by timing and depth of inundation, and habitat complexity (P.B. Moyle, P. Crain, and K. Whitener, unpublished data). Native fishes have adapted to spawn early in the spring, when floods inundate the floodplain and water temperatures are colder. In contrast, the majority of non-native fishes that dominate the Cosumnes spawn later in the season, when water temperatures are warmer. Thus, inundation of the floodplain by the rising river provides shallow water habitat that corresponds with the life histories of native fishes. Late in the spring, river flows decline, waters start draining from the floodplain, water temperatures rise, and the connection between the river and floodplain is severed, thereby eliminating habitat for nonnative fishes. Depth of water within the floodplain is also a critical element. Preliminary data suggests that native minnows such as Sacramento splittail adults spawn on the submerged vegetation at about 4-6 feet deep, while juvenile chinook salmon and splittail feed in shallow waters about 1-3 feet deep. Areas deeper than six feet do not appear to be as productive, possibly because it is too deep for photosynthesis to occur. These deep waters may also harbor more predators. Finally, habitat complexity is important. A mosaic of microhabitat types, with various flows, depths and vegetation will ensure habitat for different life stages of fishes and invertebrates. DISCUSSION The Cosumnes River Preserve is a proving ground for innovative approaches to restoring riparian forest and floodplain habitats. Its history mirrors changes in restoration practices and reflects the growing sophistication of conservation biology (Reiner, 1996; Poiani et al., 2000). The preserve has evolved from opportunistic acquisition of the best remaining groves of riparian valley oak forest in the Central Valley, to active restoration via hand-planting of trees, and finally to restoration of natural processes that encourage natural forest regeneration. Current scientific theory emphasizes conserving biodiversity at multiple scales within an ecosystem or landscape context, along with the ecological processes that sustain it (Poiani et al., 2000). The levee breach projects are a living laboratory for investigating floodplain dynamics and restoration ecology. The Cosumnes Research Group, a coalition of more than 30 university and agency researchers, has been monitoring patterns and processes of the physical and biological environments, including surface and groundwater hydrology, geomorphology, primary productivity, aquatic invertebrates, fish, and vegetation (Mount et al., this volume). This interdisciplinary effort is providing information for further restoration and adaptive management in the lower Cosumnes River and other stream systems. Altering or removing levees has several consequences for ecosystem restoration as well as flood management and groundwater recharge. These two projects have added about 300 acres to the active floodway, and about 1,200 acres overall to the Cosumnes floodplain. Floodwaters have deposited fresh sediment, seeds and other plant materials on the floodplain, resulting in natural recruitment of cottonwood and willows, which will lead to the establishment of riparian valley oak forest (Tu 2000). Sediment deposition has created diverse topography on the floodplain, thereby increasing habitat diversity. The inundated floodplain provides valuable habitat for wintering waterfowl and sandhill cranes, as well as for native fishes, such as Sacramento splittail and juvenile chinook salmon, that are adapted to take advantage of these seasonally flooded areas. From a farm management perspective, future levee maintenance and emergency repair costs have been reduced. From a flood management perspective, the floodplain s holding capacity has been increased. This attenuates the flood peak and reduces flow velocity in the river, thereby decreasing the risk of flooding to surrounding areas (Philip Williams and Associates, 1997). Finally, groundwater recharge is enhanced when floodwaters have a longer residence time on the floodplain. The regional groundwater table has declined dramatically since 1940, resulting in reduced or

5 absent flows in the Cosumnes River during the fall when chinook salmon attempt to migrate upstream to spawn (Phil Williams and Associates, 1997). Monitoring is providing valuable information for adaptive management. A few of the lessons learned and possible applications are discussed below. Multiple breaches could foster increased forest recruitment Regeneration of cottonwoods and willows was most successful on the freshly deposited sand splay that formed immediately inside the levee breach (Mount et al., this volume). In order to foster more extensive riparian restoration in a field, it may be worth considering filling old breaches once recruitment has occurred, and creating new breaches to get more sand and plant materials spread across the field at a new location (J. Mount and J. Florsheim, unpublished data). Seasonal spring flooding creates habitat for native fishes The timing of flooding can have a large effect on fish use of the floodplain, depending on the species life history (P.B. Moyle, P. Crain and K Whitener unpublished data). Inundation that corresponds to the historic natural hydrograph will allow native species to utilize the habitat while excluding many of the non-native species. Ponds and ditches that hold water year-round tend to favor non-native fishes. Therefore, creation of seasonally flooded habitat will enhance conditions for native fishes. Floodplain topography can affect fish stranding Stranding of fishes can be a potential problem. Preliminary data suggests that the decreasing flows and rising temperatures cue the native species to leave the floodplain and avoid stranding. The project design should consider drainage patterns from the floodplain, with an eye toward creating exit points for fish. Stranding seems to be associated with man-made structures such as roads, fences, ponds, ditches and levees. Removal or adjustment of such structures will alleviate potential stranding. For example, a waterfowl pond excavated as part of the 1997 project may be a stranding site for fish. It is worth noting, however, that overall production of fishes on the inundated floodplain is greater than in the river channel alone, even with some stranding. Placement of breaches and setback levees- Consider carefully the placement of the levee breach and the resulting flow of water. If you re going to breach a river levee and put in a setback levee, leave enough room for flows to work the new floodplain. In some cases, the river could abandon its channel in favor of a new channel through the restoration site. At the Preserve, one end of the low setback levee was constructed too close the levee breach, in order to maximize farmed acres. High flood flows overtop this low levee, resulting in some erosion of the levee and sand deposition in the adjacent farm field, which has required ongoing maintenance. Floodproof farm infrastructure in the floodplain Incorporate floodproofing of farm infrastructure in the restoration project if you want to continue farming on adjacent lands. Remove or replace equipment that cannot withstand inundation, raise and improve necessary roads so they can withstand some wave action from temporary floodwaters. So what does the future hold for natural process restoration of riparian habitat along the Cosumnes River? We are looking for other opportunities to allow the river to inundate its floodplain. Areas that receive regular flooding (i.e. 2-5 year recurrence interval) would be the highest priority for land acquisition and restoration. A hydrologic study indicated that the best opportunities for restoring a functional floodplain exist downstream of Highway 99 (11 miles above the confluence of the Cosumnes and Mokelumne Rivers) (Philip Williams and Associates 1997). Upstream of Highway 99, the channel is incised and consequently the river is isolated from its floodplain. As the channel deepens and increases its capacity, larger flows are required to overtop the banks, resulting in less frequent floodplain inundation. Restoring functional floodplains will not only benefit riparian ecosystems, it can also minimize flood damages and improve groundwater conditions. The Nature Conservancy is discussing initiating a feasibility study with the Army Corps of Engineers along the lower Cosumnes and Mokelumne Rivers. The objective is to identify and evaluate ecosystem restoration projects that will also reduce flood damages via non-structural measures. The study would include hydrologic and hydraulic modeling of the rivers and measures such as controlled levee breaches, setback levees, and flood bypasses. The Corps process also presents the opportunity for leveraging federal funds for implementation, and provides a vehicle for engineering and environmental review of such projects. We hope

6 this partnership will be a model for innovative riparian restoration and flood management, both in the Cosumnes River basin and beyond. ACKNOWLEDGEMENTS The Cosumnes River Preserve is a collaborative project that receives funding and support from several partners, including the U.S. Bureau of Land Management, California Department of Fish and Game, California Department of Water Resources, Sacramento County, Ducks Unlimited, and Living Farms. Additional funding for acquisition and restoration has been generously provided by CALFED, the David and Lucille Packard Foundation, Natural Resources Conservation Service, U.S. Bureau of Reclamation, U.S. Army Corps of Engineers, U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service, and the Wildlife Conservation Board. LITERATURE CITED Eaton, M.R Restoration of natural flooding process on the Cosumnes River Preserve. Overview and status report. The Nature Conservancy. San Francisco, CA. Environmental Science Associates (ESA) Cosumnes River Watershed Study. Report prepared for The Nature Conservancy. San Francisco, CA. 124 pp. Estep, J.A Biology, movements, and habitat relationships of the Swainson s hawk in the central valley of California, State of California, The Resources Agency, Department of Fish and Game. 52 pp. Griggs, T History of the riparian forest restoration project The California Nature Conservancy, Cosumnes River Preserve. 19 pp. and appendix. Hart, J.A Middle Cosumnes River corridor and vernal pool/grassland study: Master Plan Unit Study for Focused Planning Area 2 (Middle Cosumnes River Corridor) and Focused Planning Area 4 (Vernal Pool/Grassland Area). Report prepared for The Nature Conservancy. San Francisco, CA. 92 pp. and appendices. Hunter, J.C., K.B. Willett, M.C. McCoy, J.F. Quinn, and K.E. Keller Prospects for preservation and restoration of riparian forests in the Sacramento Valley, California, USA. Environmental Management 24(1): Kennedy, T. and K. Whitener Draft report on chinook salmon use of the Cosumnes River Preserve floodplain. Littlefield, C.D. and G.L. Ivey Conservation assessment for greater sandhill cranes wintering on the Cosumnes River floodplain and Delta regions of California. February Report prepared for The Nature Conservancy, Cosumnes River Preserve. 27 pp. Montgomery-Watson Phase II groundwater yield analysis: technical memorandum no. 2 impacts analysis. Prepared for the Sacramento County Water Agency, Sacramento, CA. Mount, J.F California rivers and streams: the conflict between fluvial process and land use. University of California Press, Berkeley, CA. 359 pp. The Nature Conservancy (TNC) Cosumnes River Project Strategic Plan. The Nature Conservancy, San Francisco, CA. 100 pp. The Nature Conservancy (TNC) Cosumnes River Preserve Site Plan Update. May 23, San Francisco, CA. 15 pp. P&D Technologies Lower Cosumnes Master Plan. September Prepared for the Nature Conservancy. Philip Williams & Associates, LTD Analysis of opportunities for restoring a natural flood regime on the Cosumnes River floodplain. May, Consultant report prepared for The Nature Conservancy. 88 pp. Poiani, K.A., B.D. Richter, M.G. Anderson, and H.E. Richter Biodiversity conservation and multiple scales: functional sites, landscapes, and networks. BioScience 50: Reiner, R.J The Cosumnes River Preserve: fertile ground for new conservation ideas. Fremontia 24(1): Sommer, T.R., M. Nobriga, B. Harrell, W. Batham, and W. Kimmerer Floodplain rearing of juvenile chinook salmon: evidence of enhanced growth and survival. Canadian Journal of Fisheries and Aquatic Sciences. In Press. Swanson, M., and J. Hart The Cosumnes River Preserve, hydrologic analysis of planned restoration from Interstate-5 to Twin Cities Road Crossing. The Nature Conservancy of California, San Francisco. 25 pp. Tu, M Vegetation patterns and processes of natural regeneration in periodically flooded riparian forests in the Central Valley of California. Doctoral Dissertation, University of California, Davis. Whitener, K. and T. Kennedy Evaluation of fisheries relating to floodplain restoration on the Cosumnes River Preserve. Interagency Ecological Program Newsletter 12(3):50-57.

7 FIGURE 1. Cosumnes River Preserve.

8 FIGURE 2. Location of levee breaches on the Cosumnes River Preserve.

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

FLOOD PROTECTION BENEFITS

FLOOD PROTECTION BENEFITS IV. (340 points) Flood Protection Benefits A. Existing and potential urban development in the floodplain (50) 1. Describe the existing and potential urban development at the site and the nature of the

More information

Floodplain Connectivity in Restoration Design

Floodplain Connectivity in Restoration Design Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,

More information

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline San Francisco Bay Area Wetlands Restoration Program Design Review Group Project Summary Outline The project proponent desiring to have a project considered by the Design Review Group (DRG) shall provide

More information

4.2 Buena Vista Creek Watershed

4.2 Buena Vista Creek Watershed Buena Vista Creek Watershed 4.2 Buena Vista Creek Watershed Watershed Overview The Buena Vista Creek Watershed is the fourth-largest system within the Carlsbad Hydrologic Unit. The watershed extends approximately

More information

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit

More information

Gold Ray Dam Interagency Technical Team Meeting

Gold Ray Dam Interagency Technical Team Meeting Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California

Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California IWA Publishing 2011 Water Practice & Technology Vol 6 No 4 doi:10.2166/wpt.2011.074 Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California William

More information

Subsidence Mitigation Through Rice Cultivation Research Project Goals:

Subsidence Mitigation Through Rice Cultivation Research Project Goals: Twitchell Island rice growing area Subsidence Mitigation Through Rice Cultivation Research 1. Determine the viability of different rice growing methods within the Delta. 2. Determine the rates/amounts

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Post-Flood Assessment

Post-Flood Assessment Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of

More information

UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION

UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION Joshua A. Israel, Fish Biologist, U.S Bureau of Reclamation, Sacramento, CA. jaisrael@usbr.gov; Paul

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

DRAFT SOUTH FORK SKYKOMISH RIVER

DRAFT SOUTH FORK SKYKOMISH RIVER DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly

More information

Prioritizing Riparian Restoration at the Watershed, Reach and Site Scales. Richard R. Harris University of California, Berkeley Cooperative Extension

Prioritizing Riparian Restoration at the Watershed, Reach and Site Scales. Richard R. Harris University of California, Berkeley Cooperative Extension Prioritizing Riparian Restoration at the Watershed, Reach and Site Scales Richard R. Harris University of California, Berkeley Cooperative Extension Issues Riparian communities provide multiple benefits

More information

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14. Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

Prepared By: Tom Parker Geum Environmental Consulting, Inc.

Prepared By: Tom Parker Geum Environmental Consulting, Inc. Prepared By: Tom Parker Geum Environmental Consulting, Inc. Topics covered: Definition of riparian and floodplain restoration Floodplain attributes as a basis for developing criteria for restoration designs

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

Increasing water availability through juniper control.

Increasing water availability through juniper control. Tim Deboodt, OSU Crook County Extension Agent 498 SE Lynn Blvd. Prineville, OR 97754 541-447-6228 Tim.deboodt@oregonstate.edu Increasing water availability through juniper control. Throughout the region

More information

How To Manage Water Resources In The Yakima Basin

How To Manage Water Resources In The Yakima Basin Yakima Basin Integrated Water Resource Management Plan October 23, 2014 Presented by Derek Sandison, Director Office of Columbia River Photo Courtesy of Tom Ring Basin size: 6,155 sq. miles Population:

More information

Restoration of dynamic flood plain topography and riparian vegetation establishment through engineered levee breaching

Restoration of dynamic flood plain topography and riparian vegetation establishment through engineered levee breaching The Structure, Function and Management Implications of Fluvial Sedimentary Systems (Proceedings of an international symposium held at Alice Springs, Australia, September 2002). IAHS Publ. no. 276, 2002.

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study

More information

The Teton Creek Restoration Project Summary:

The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens

More information

Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G1400656.

Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G1400656. Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report Department of Ecology Grant No. G1400656 Submitted by: Walla Walla Watershed Management Partnership Walla Walla, WA Walla Walla

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

Long Term Flood Solutions

Long Term Flood Solutions Long Term Flood Solutions Things we can do: Structural and Non-Structural Options 28th Annual Red River Basin Land & Water International Summit Conference January 18, 2011, Fargo, ND John Jaschke, Executive

More information

HCP Team Meeting. November 18, 2015. icfi.com

HCP Team Meeting. November 18, 2015. icfi.com HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next

More information

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: Corralitos Creek Water Supply and Fisheries Enhancement Project Project

More information

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association

More information

The project site lies within an AE Zone and portions lie within the regulated floodway. Development of this site is subject to TCLUO, Section 3.060.

The project site lies within an AE Zone and portions lie within the regulated floodway. Development of this site is subject to TCLUO, Section 3.060. Introduction This application is for the Southern Flow Corridor-Landowner Preferred Alternative, a flood mitigation and tidal wetland restoration project. The Port of Tillamook Bay is the applicant in

More information

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org Wetland study slide Water Quality NRE goals in watershed plans Protect habitat that remains.

More information

Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

The Effects of a Riparian Forest on Water Temperatures in the Restoration Area

The Effects of a Riparian Forest on Water Temperatures in the Restoration Area Study 31 The Effects of a Riparian Forest on Water Temperatures in the Restoration Area Final 2015 Monitoring and Analysis Plan January 2015 1.0 The Effects of a Riparian Forest on Water Temperatures

More information

The North State: Implementing the California Water Action Plan February 24, 2014

The North State: Implementing the California Water Action Plan February 24, 2014 The North State: Implementing the California Water Action Plan February 24, 2014 The North State Water Alliance applauds Governor Brown s California Water Action Plan (Action Plan) and his call for comprehensive

More information

Climate Change. Lauma M. Jurkevics - DWR, Southern Region Senior Environmental Scientist

Climate Change. Lauma M. Jurkevics - DWR, Southern Region Senior Environmental Scientist Climate Change A n o t h e r F a c t o r i n M a n a g i n g S o u t h e r n C a l i f o r n i a s W a t e r R e s o u r c e s Lauma M. Jurkevics - DWR, Southern Region Senior Environmental Scientist USEPA-Region

More information

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS by Hany Elwany, Ph.D. Scripps Institution of Oceanography Headwaters to Oceans Conference 25 October 2003 CE Ref #03-22 San Diego County Lagoons

More information

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: obropta@envsci.rutgers.edu

More information

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002 Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208

STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208 STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208 RANGELAND HEALTH STANDARDS - ASSESSMENT SAGEHEN ALLOTMENT #0208 STANDARD 1 - UPLAND WATERSHED This standard is being met on the allotment.

More information

9.0 PUBLIC HEALTH (MOSQUITO ABATEMENT)

9.0 PUBLIC HEALTH (MOSQUITO ABATEMENT) 9.0 PUBLIC HEALTH (MOSQUITO ABATEMENT) This chapter analyzes the public health effects of the project, particularly with regard to mosquito abatement. The chapter discusses historical and existing efforts

More information

Michigan Wetlands. Department of Environmental Quality

Michigan Wetlands. Department of Environmental Quality Department of Environmental Quality Wetlands are a significant component of Michigan s landscape, covering roughly 5.5 million acres, or 15 percent of the land area of the state. This represents about

More information

Thank you to all of our 2015 sponsors: Media Partner

Thank you to all of our 2015 sponsors: Media Partner Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context

More information

CHAD R. GOURLEY SPECIALTY EMPLOYMENT

CHAD R. GOURLEY SPECIALTY EMPLOYMENT CHAD R. GOURLEY P.O. Box 919 Verdi, Nevada 89439 phone 775.345.9960 cell 775.250.8140 chad_gourley at att.net SPECIALTY Restoration of riverine, spring, and wetland ecosystems, specializing in a process

More information

Background Information: The Mamquam River Floodplain Restoration Project

Background Information: The Mamquam River Floodplain Restoration Project Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries

More information

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially

More information

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official

More information

Proposal to the Trinity Adaptive Management Working Group (TAMWG)

Proposal to the Trinity Adaptive Management Working Group (TAMWG) Proposal to the Trinity Adaptive Management Working Group (TAMWG) Request that the TAMWG recommend that the Trinity River Restoration Program fund BLM to purchase the Weigel parcel at Gold Bar (river mile

More information

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria

More information

Napa River Restoration Projects

Napa River Restoration Projects Napa River Restoration Projects Shaun Horne, Napa County, shaun.horne@countyofnapa.org Jeremy Sarrow, Napa County, jermy.sarrow@countyofnapa.org The Napa River flows though one of the most scenic landscapes

More information

Risk Analysis, GIS and Arc Schematics: California Delta Levees

Risk Analysis, GIS and Arc Schematics: California Delta Levees Page 1 of 7 Author: David T. Hansen Risk Analysis, GIS and Arc Schematics: California Delta Levees Presented by David T. Hansen at the ESRI User Conference, 2008, San Diego California, August 6, 2008 Abstract

More information

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES 5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people

More information

Compilation of Upper Mississippi River System Science Questions developed by the Long Term Resource Monitoring Program

Compilation of Upper Mississippi River System Science Questions developed by the Long Term Resource Monitoring Program Compilation of Upper Mississippi River System Science Questions developed by the Long Term Resource Monitoring Program Includes: 1. Questions from the Science Planning Effort in 2003 2. FY07 Additional

More information

PANEL REVIEW OF THE DRAFT BAY DELTA CONSERVATION PLAN: PREPARED FOR THE NATURE CONSERVANCY

PANEL REVIEW OF THE DRAFT BAY DELTA CONSERVATION PLAN: PREPARED FOR THE NATURE CONSERVANCY PANEL REVIEW OF THE DRAFT BAY DELTA CONSERVATION PLAN: PREPARED FOR THE NATURE CONSERVANCY AND AMERICAN RIVERS Jeffrey Mount, Ph.D. (Chair) William Fleenor, Ph.D. Brian Gray, J.D. Bruce Herbold, Ph.D.

More information

Plumas Watershed Forum. Review of Ongoing Projects. Updated 10/1/008

Plumas Watershed Forum. Review of Ongoing Projects. Updated 10/1/008 Plumas Watershed Forum Review of Ongoing Projects Updated 10/1/008 Hosselkus II Restoration Project Approved Funding: $80,000 (A funds) Expended By 10/1/08: $79,603 This pond-and-plug creek restoration

More information

INNOVATIONS IN STREAM RESTORATION AND FLOOD CONTROL DESIGN MEETING FLOOD CAPACITY AND ENVIRONMENTAL GOALS ON SAN LUIS OBISPO CREEK 1

INNOVATIONS IN STREAM RESTORATION AND FLOOD CONTROL DESIGN MEETING FLOOD CAPACITY AND ENVIRONMENTAL GOALS ON SAN LUIS OBISPO CREEK 1 INNOVATIONS IN STREAM RESTORATION AND FLOOD CONTROL DESIGN MEETING FLOOD CAPACITY AND ENVIRONMENTAL GOALS ON SAN LUIS OBISPO CREEK 1 Wayne Peterson 2 Abstract: Can a natural flowing creek be increased

More information

Ouachita River Floodplain Restoration Upper Ouachita NWR, Louisiana

Ouachita River Floodplain Restoration Upper Ouachita NWR, Louisiana Ouachita River Floodplain Restoration Upper Ouachita NWR, Louisiana Interior Hydrologic Restoration Plan Mollicy Farms Unit The Nature Conservancy Louisiana Field Office 2011 Cover: Sediment laden water

More information

QUESTIONS AND ANSWERS WATERS OF THE U.S. PROPOSAL

QUESTIONS AND ANSWERS WATERS OF THE U.S. PROPOSAL QUESTIONS AND ANSWERS WATERS OF THE U.S. PROPOSAL Key Background Congress enacted the modern Clean Water Act in 1972 to address pollution entering the nation s waters to complement statutes such as the

More information

A Stream Restoration Case Study in the California Central Coast

A Stream Restoration Case Study in the California Central Coast International Erosion Control Association Annual Conference 2009, Reno, Nevada Case Study Technical Presentation A Stream Restoration Case Study in the California Central Coast Justin S. Rogers, P.E.,

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION)

BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION) BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION) CD NO. 1 OF 19 CDS Initial Statement Exhibit A: Description

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

CHAPTER I: INTRODUCTION. Background

CHAPTER I: INTRODUCTION. Background CHAPTER I: INTRODUCTION Background California State Law requires each county to adopt a General Plan for the physical development of the county and any land outside its boundaries which bears relation

More information

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May 2010. Prepared by. for the. 2010 by Earth Economics

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May 2010. Prepared by. for the. 2010 by Earth Economics FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN May 2010 Prepared by for the Execubve Summary The Chehalis Basin experienced catastrophic flooding in 2007 and 2009. In response, the

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

Emergency Conservation Program

Emergency Conservation Program Materials Prepared for Federation of Southern Cooperatives Epes, Alabama September 11, 2009 Emergency Conservation Program by Karen R. Krub Farmers Legal Action Group, Inc. 360 North Robert Street, Suite

More information

OVERVIEW MIDDLE CREEK FLOOD DAMAGE REDUCTION AND ECOSYSTEM RESTORATION PROJECT October 3, 2012 INTRODUCTION

OVERVIEW MIDDLE CREEK FLOOD DAMAGE REDUCTION AND ECOSYSTEM RESTORATION PROJECT October 3, 2012 INTRODUCTION OVERVIEW MIDDLE CREEK FLOOD DAMAGE REDUCTION AND ECOSYSTEM RESTORATION PROJECT October 3, 2012 INTRODUCTION The Middle Creek Flood Damage Reduction and Ecosystem Restoration Project (Project) will eliminate

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

PHOTO: Jon Waterman THE COLORADO RIVER DELTA, CIRCA NOW OPEN BOOKLET TO SEE CHANGE

PHOTO: Jon Waterman THE COLORADO RIVER DELTA, CIRCA NOW OPEN BOOKLET TO SEE CHANGE PHOTO: Jon Waterman THE COLORADO RIVER DELTA, CIRCA NOW OPEN BOOKLET TO SEE CHANGE 1 OUR VISION RAISE THE RIVER IS AN ENGAGEMENT CAMPAIGN LED BY LIKE-MINDED VISIONARIES Raisetheriver.org sees a day when

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested

More information

Capitalizing on Flooding as Passive. Hearts and Minds of the Musselshell

Capitalizing on Flooding as Passive. Hearts and Minds of the Musselshell Capitalizing on Flooding as Passive Restoration: Hearts and Minds of the Musselshell Karin Boyd Applied Geomorphology, Inc. Chris Boyer, Kestrel Aerial Services, Inc. Strategically t Adopting Flood Impacts

More information

Arkansas River Corridor Vision & Master Plan

Arkansas River Corridor Vision & Master Plan A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership

More information

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure (December 2013) IUCN does not engage in projects which involve the design, construction or rehabilitation

More information

Rural Flooding: The Potential Role of Forestry

Rural Flooding: The Potential Role of Forestry Rural Flooding: The Potential Role of Forestry Nadeem Shah, Tom Nisbet, & Huw Thomas Centre for Forestry and Climate Change Structure Background Woodland and Flood Alleviation The Theory. Studies on Woodland

More information

Preparing for Success: Waterfowl Habitat Management Annual Planning by Houston Havens

Preparing for Success: Waterfowl Habitat Management Annual Planning by Houston Havens Preparing for Success: Waterfowl Habitat Management Annual Planning by Houston Havens While working with private landowners and wetland managers over the past several years, I ve noticed a common theme

More information

Lower Dungeness River Estuarine & Floodplain Restoration

Lower Dungeness River Estuarine & Floodplain Restoration PARTNERS: Clallam County; Jamestown S Klallam Tribe; WA Department of Fish & Wildlife; US Army Corps of Engineers; US Fish & Wildlife Service; WA Department of Transportation; WA Department of Ecology;

More information

Chapter 9. Selected Watershed Initiatives in the Great Basin Region

Chapter 9. Selected Watershed Initiatives in the Great Basin Region Chapter 9 Selected Watershed Initiatives in the Great Basin Region The Great Basin contains vast areas of sparsely populated desert lands. Lacking an ocean drainage, the Great Basin is a hydrologic sink

More information

Bruce Orr and Zooey Diggory S T I L L W A T E R S C I E N C E S. Tom Dudley U C S A N T A B A R B A R A

Bruce Orr and Zooey Diggory S T I L L W A T E R S C I E N C E S. Tom Dudley U C S A N T A B A R B A R A A case study from the lower Santa Clara River, CA: Strategic planning for control of Arundo donax and restoration of riparian vegetation in semi-arid landscapes Bruce Orr and Zooey Diggory S T I L L W

More information

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12 CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the

More information

Steelhead Recovery in San Juan and Trabuco Creeks Watershed

Steelhead Recovery in San Juan and Trabuco Creeks Watershed Steelhead Recovery in San Juan and Trabuco Creeks Watershed Are there fish now? Overview Final San Juan and Trabuco Creeks Watershed Management Plan Fish & Game Implementation NOAA Steelhead Recovery and

More information

Estimating Potential Reduction Flood Benefits of Restored Wetlands

Estimating Potential Reduction Flood Benefits of Restored Wetlands Estimating Potential Reduction Flood Benefits of Restored Wetlands Kenneth W. Potter University of Wisconsin Introduction Throughout the summer of 1993 a recurring question was the impact of wetland drainage

More information

Recognizing Wetlands. For additional information contact your local U.S. Army Corps of Engineers office. Pitcher plant.

Recognizing Wetlands. For additional information contact your local U.S. Army Corps of Engineers office. Pitcher plant. US Army Corps of Engineers For additional information contact your local U.S. Army Corps of Engineers office. 1998 Edition Recognizing Wetlands Pitcher plant The information presented here will help you

More information

Restoring Ecosystems. Ecosystem Restoration Services

Restoring Ecosystems. Ecosystem Restoration Services Restoring Ecosystems Ecosystem Restoration Services 2 Ecosystem Restoration Services AECOM s integrated approach sciencebased planning, with innovative design and execution delivers sustainable and cost-effective

More information

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans Improving the physical condition of Scotland s water environment A supplementary plan for the river basin management plans Contents Executive summary... 2 1. Introduction... 3 2. Vision... 4 3. Taking

More information

JOB DESCRIPTION. GS-11 $46,006 - $59,801 Annual/Full Benefits GS-12 $55,138 - $71,679 Annual/Full Benefits

JOB DESCRIPTION. GS-11 $46,006 - $59,801 Annual/Full Benefits GS-12 $55,138 - $71,679 Annual/Full Benefits OPEN: CLOSE: OR UNTIL FILLED EXEMPT NON-EXEMPT_X_ JOB DESCRIPTION POSITION: RESPONSIBLE TO: SALARY: FLUVIAL GEOMORPHOLOGIST Senior Aquatics Biologist GS-11 $46,006 - $59,801 Annual/Full Benefits GS-12

More information