Integrated Planning and Performance Management

Size: px
Start display at page:

Download "Integrated Planning and Performance Management"

Transcription

1 Integrated Planning and Performance Management A Framework for Fermilab Carl Strawbridge August 22,

2 Overview Challenges to Integrated Planning Integrated Planning and CAS Integrated Planning Issues What are we trying to integrate? Families of plans Lab Integrated Planning/Work Cycle FRA/FNAL Agenda and Business Plans Annual Lab Business Plan Preparation Steps to an Integrated Planning Process 2

3 Challenges to Integrated Planning Simultaneous complex events impacting Fermilab (among others): Constrained overall funding climate & single-program Lab Affects total size & needed broadened flexibility of staff, emphasizes cost of operations Annual forces on HEP Program do not always mesh with sustained efficient, long-term management of a large facility like a national lab ( eg.- budget/staff cuts, gates-open costs) Lab mission transition (growing Intensity Frontier focus, reducing Energy Frontier efforts for now, maintaining Cosmic Frontier engagement) Affects needed staff skill mix and drives facilities planning Changing work mix: capital project investments in future years are supported by research program reductions Affects skill mix, skill base (how to sustain) and facilities planning FRA management processes (CAS) are still maturing CAS planning support process not defined Historical, expert-based management approach struggling with lack of suitably defined management system processes and leadership responsibilities Good opportunity to make CAS useful but not burdensome 3

4 Integrated Planning & CAS CAS M-3 (Performance Management) supported by 3 key processes: Strategic Planning and Goal Setting Project Management Oversight Performance Evaluation and Measurement Process (PEMP) Only PEMP has any defined process Current planning is de-centralized, short-term and budget-driven instead of strategy-driven Project oversight relies on meetings and committee reviews Meetings on individual projects are difficult to trend and lack consistent, visual data presentations Reviews can be untimely Effective oversight for all projects is reduced to a single senior manager Of the 11 CAS Management Systems, 8 include risk-based evaluations ERM is needed (and is coming!) 4

5 Integrated Planning Issues-Overview Mechanisms (plans) to ensure continuity of strategy/goals/initiatives from top-bottom have some holes FRA FNAL Plan, Mission/Mission Support Organization Business Plans Ad hoc Sector plans starting to fill in gaps Lab integrated planning process is not defined Roles of contributing organizations (OPPS, CFO, Sectors, etc.) have been unclear Current process is budget vs. strategy-driven Interfaces/links with other management systems need clarification Consolidated planning annual timetable needed for efficiency Organizational roles/responsibilities need alignment to defined planning process OPPS functions to be focused around Integrated Planning & Performance Management, OPMO organization to be modified: Project oversight model to be changed to involve broader management team and regular, trendable metrics (Project Support Services to be re-focused as separate support office) 5

6 Integrated Planning What are we trying to integrate? Science (research) and Operations (management) Strategic vision and business planning/results Institutional planning: workforce, facilities/site master planning Performance (and risk) management Wide planning horizons: from 10+ years to monthly Stakeholder interests: Sponsor (DOE SC, HEP & FSO), HEP community, FRA (M&O), FNAL leadership & staff Expanding capital projects and constrained science/technology research programs (for now) Other interfaces? 6

7 Family of Plans DOE/SC Scientific Facilities Strategic Plan (20 years, major capital projects) DOE Strategic Plan (7-10 years) DOE (HEP)/Fermilab Strategic Plan (10 years) FRA/FNAL Plan for Managing & Operating Fermilab during the duration of contract (5-7 years)* Nominally the proposal as reflected in the contract Need to bridge these goals into a living framework to manage major initiatives at the D/S/C level DOE/Fermilab Annual Lab (Budget)Plan (1-3 years) Includes Fermilab Facilities Plan (5+ year horizon) Supported by Fermilab Workforce Development Strategic Plan (3 year horizon) Updates 10-year plan DOE/M&O Performance Evaluation and Management Plan (PEMP, annual) Fermilab Mission Area/Mission Support Business Plans (annual)* 7

8 Lab Integrated Planning/Work Cycle (Generic) Plan--strategic planning aligns the business to deliver on the Strategy Business plans Performance plan development Annual Lab Plan Other plans (Site/Facilities, WFD, etc) Execute--perform technical & business functions Management systems (CAS) Check--measure/analyze & evaluate performance PEMP Assessment Plan Feedback--Identify Improvement opportunities and inform business decisions Upcoming Annual Lab Plan CI/Best practices 8

9 Strategic planning framework Lab M&O Plan/Agenda National R&D Priorities Customer Requirements Lab Agenda Strategy and Planning Align the business to deliver on strategy Business Plan Performance Plan Other Plans Lab Plan PEMP Communication, Feedback, and Improvement Identify improvement opportunities and inform business decisions Communicating Results Feedback Improvement Opportunities Performance Monitoring and Analysis Monitor, measure, and evaluate performance Performance Indicators Assessment Performance Analysis Work Execution Perform the work and business functions Execute Work Management Systems 9

10 FRA/FNAL Plan (Agenda) Communications framework that would: align Lab strategic objectives, critical outcomes and major initiatives in major mission areas of science & operations, other?) Provide top-level basis for Business Plans that flesh out annual actions and performance plans to make progress toward the strategic vision keep the FRA proposal a living document (sustain good ideas, kill those not panning out) 10

11 Strategic Objectives Critical Outcomes Major Initiatives Draft FRA/FNAL Lab Agenda Excellence in Particle Physics, Accelerator Science and Large Scale User Facilities Intensity Frontier Energy Frontier Cosmic Frontier Intense particle beams reveal new physics through experiments with neutrinos, muons and other new particles Accelerator Improvement Plan o NOvA o Proton Improvement Plan Neutrino Facilities and Experiments o NOvA o Mini/MicroBooNE o Minos/MINERvA o LBNE Muon Campus o g-2 Experiment o Mu2e Experiment Project X High energy particle colliders discover new particles and probe the architecture of fundamental forces of nature LHC Physics and Upgrades SRF Accelerator Technology Initiative Liquid Ar Detector Underground experiments and ground based telescope uncover the nature of dark energy matter and dark energy Dark Matter Experiments Dark Energy Systems and Experiments Excellence in Operations and ES&H World-class technical support staff complement a modern suite of facilities /infrastructure and well-integrated, efficient business and management systems SLI Initiative IARC Facility Mission Readiness Site Sustainability Plan OHAP/Workforce Development Reduce cost of doing business CAS Development and Implementation 11

12 Business Plans For Mission and Mission Support Organizations, annual Business Plans align Sector/Div/Sec/Center actions and resources withlablevel strategy and initiatives Business plans contents (typical): Strategy: Top level/overview Core capabilities Goals and outcomes Risk perspective Resource requirements (staff, facilities, infrastructure) Work Action Plan: Near term outcomes and milestones Risk mitigating actions Performance Monitoring plan: Performance indicators Performance Monitoring & Assessment Plan 12

13 Mission outcomes, risks, and measurement are expressed in business plans 13

14 Support organization business plans focus on enabling mission accomplishment 14

15 Annual Lab Business Plan Preparation Culminates in ~May submission of updated FNAL Lab Plan to DOE-SC/HEP Outlines the 10-year strategy that aligns/prioritizes FNAL Mission outcomes with DOE and national-level objectives FNAL Mission and Mission Support organizations engage in a strategic planning process to define long-term goals, desired outcomes and nearterm actions to execute the FNAL vision Strategic planning process provides the framework for discussion and communication within/across all Sectors and the Lab Directorate Addresses future risks/opportunities, challenges, resource needs and methods to monitor performance Planning process is vital in translating strategies into actions Mission/Mission Support organization Business Plans are key framework to address specific mission readiness capability and development, integration with FRA/FNAL top level initiatives, Sector initiatives and management system deployment 15

16 FY 20 Key Institutional Planning and Performance Management Activities 16

17 Strategy and Budget Meeting Schedule The critical element of this process occurs during August Each Sector has the opportunity to discuss their strategy, risks and budget needs with the Lab Director s Office before plans are finalized Date May June July July August August August Aug Sept Action scheduled (FY Planning) Laboratory Plan for FNAL submitted to DOE Internal Business Planning guidance issued Laboratory Plan for FNAL presented by FNAL Director to Dr. SC-1 (et. al,) Budget input for service centers/service organization burdens Budget input for overhead, research organization burden, program offices, user facilities, scheduled rates, BA/FTE estimates Lab Agenda initiative Plans due Mission/Mission Support Organization Business Plans due Sector meetings with Director s Office Leadership Team review of FY Planning overhead investment outcomes 17

18 Steps to an Integrated Planning Process (1) Re-align Integrated Planning, Performance Management and Project oversight/support functions and responsible organization units OPPS functions & organization simplified and re-aligned: Office of Integrated Planning and Performance Management (OIPPM) Office of Project Support Services (OPSS) Both report to the Directorate through the COO 18

19 Office of Integrated Planning and Performance Management Develops and coordinates an integrated planning process to integrate and implement the Lab scientific and operations vision through results-oriented business plans Provides guidance for the Laboratory-level investment portfolio Develops lab-wide policy, procedures and instructions related to integrated planning and performance management Coordinates monitoring, assessment and analysis of laboratory performance (PEMP, projects, major programs) through FNAL Performance Oversight Group (POG) and CAS M-3 POG = senior manager oversight group that meets regularly to review and trend performance metrics and issues with project and program managers Initiate Director s project reviews when needed, lab-level liaison with DOE-SC/OPA external reviews Provides communication of results, feedback to future plans and risks/opportunities and coordinates continuous improvement/best practice initiatives (QA, CAS M-8) Assessment program targeted to risk-based priorities, PEMP coordination, process improvements/best practices) 19

20 Office of Project Support Services Lead efficient start-up services and resources to new projects (~CD-0) and training of top managementassigned leadership teams, hand-off to IPT not later than 3 months before CD-1 Provide project controls services/staff as needed and funded by projects Maintain FNAL EVMS certification, expertise in risk management & cost estimate development Produce consolidated performance metrics for major projects in planning and execution for POG reviews Support Sector Heads and Directorate in planning and identification of future candidates for project teams 20

21 Steps to an Integrated Planning Process (II) Develop/document the process for Strategic (Integrated) Planning and Goal Setting and establish the IPPM organization Revise CAS M-3 (SP & GS) Develop FRA/FNAL Lab Agenda Develop Sector Business Plans Organize/schedule management planning retreats Define R2A2 and staff plans for IPPM and PSS Offices Define ERM process and planning interfaces Initiate FY14 ALP 21

22 Steps to an Integrated Planning Process (III) Establish modified Performance Management Process Revise CAS M-3 (PMO and PEMP ) Charter Performance Oversight Group (POG) Schedule POG meeting cycle and get agreement on performance review areas (projects, major programs, infrastructure, PEMP ) Develop performance metrics Brief/train POG participants Initiate monthly POG internal (project) performance reviews (Q1FY13) Automate/integrate performance metrics (Fermidash?) Align Assessment program to performance priorities Identify CI/BP candidates with savings/efficiency goals Initiate PEMP for

23 Conclusions? 23

Response to Director s Review of Fermilab Project Management Improvement Initiatives

Response to Director s Review of Fermilab Project Management Improvement Initiatives Response to Director s Review of Fermilab Project Management Improvement Initiatives May 14, Executive Summary Fermilab is entering a new, transitional era defined by the transformation from operating

More information

US NSF s Scientific Software Innovation Institutes

US NSF s Scientific Software Innovation Institutes US NSF s Scientific Software Innovation Institutes S 2 I 2 awards invest in long-term projects which will realize sustained software infrastructure that is integral to doing transformative science. (Can

More information

Value to the Mission. FEA Practice Guidance. Federal Enterprise Architecture Program Management Office, OMB

Value to the Mission. FEA Practice Guidance. Federal Enterprise Architecture Program Management Office, OMB Value to the Mission FEA Practice Guidance Federal Enterprise Program Management Office, OMB November 2007 FEA Practice Guidance Table of Contents Section 1: Overview...1-1 About the FEA Practice Guidance...

More information

Growing Your Business Through The Project Management Office

Growing Your Business Through The Project Management Office Growing Your Business Through The Project Management Office Increasing Throughput Rate Achieving higher customer satisfaction Strengthening the weakest link Identifying the bottlenecks Reducing the program

More information

Fermi Site Office FY-2015 Annual Assessment Report (AAR) and FY 2016 Annual Performance Plan (APP) Revision 0

Fermi Site Office FY-2015 Annual Assessment Report (AAR) and FY 2016 Annual Performance Plan (APP) Revision 0 Fermi Site Office FY-2015 Annual Assessment Report (AAR) and FY 2016 Annual Performance Plan (APP) Revision 0 Michael J. Weis, Fermi Site Office Manager And the Fermi Site Office 1 Table of Contents I.

More information

Draft Strategic Plan for FY 2013-2016

Draft Strategic Plan for FY 2013-2016 The Public Health Surveillance and Informatics Program Office (Proposed) Draft Strategic Plan for FY 2013-2016 James W. Buehler, MD Director, PHSIPO Office of Surveillance, Epidemiology, and Laboratory

More information

Integrated Performance Management at SLAC: Plans for Implementation in PPA

Integrated Performance Management at SLAC: Plans for Implementation in PPA Integrated Performance Management at SLAC: Plans for Implementation in PPA Steven M. Kahn Director of Particle Physics and Astrophysics Page 1 McCallum-Turner Recommendation on IPM * Element 5 - (SLAC)

More information

HEP Software Collaboration Governance, Fermilab Perspective!

HEP Software Collaboration Governance, Fermilab Perspective! HEP Software Collaboration Governance, Fermilab Perspective Panagiotis Spentzouris, with Daniel Elvira and Rob Roser HEP Software Collaboration Meeting CERN, April 3 rd 2014 HEP Computing Facing Many Challenges

More information

MGMT 4135 Project Management. Chapter-16. Project Oversight

MGMT 4135 Project Management. Chapter-16. Project Oversight MGMT 4135 Project Management Chapter-16 Project Oversight Project Oversight: defined as a set of principles and processes to guide and improve the management of projects. Ensures projects meet the needs

More information

IT UNIFICATION Vision, Impact & Strategy. May 2015

IT UNIFICATION Vision, Impact & Strategy. May 2015 IT UNIFICATION Vision, Impact & Strategy May 2015 Presentation Agenda Why Unification Embracing Business Drivers UC San Diego Strategic Plan IT Unification Vision Campus Impact What s in it for campus?

More information

The DoD Information Enterprise Strategic Plan and Roadmap (SP&R)

The DoD Information Enterprise Strategic Plan and Roadmap (SP&R) The DoD Information Enterprise Strategic Plan and Roadmap (SP&R) A collaborative planning approach for the Information Enterprise Jun 1-4, 2009 Lloyd Thrower lloyd.thrower@osd.mil DoD CIO Strategic Planning

More information

VA Office of Inspector General

VA Office of Inspector General VA Office of Inspector General OFFICE OF AUDITS AND EVALUATIONS Department of Veterans Affairs Audit of Office of Information Technology s Strategic Human Capital Management October 29, 2012 11-00324-20

More information

Release of the Draft Cybersecurity Procurement Language for Energy Delivery Systems

Release of the Draft Cybersecurity Procurement Language for Energy Delivery Systems Release of the Draft Cybersecurity Procurement Language for Energy Delivery Systems Energy Sector Control Systems Working Group Supporting the Electricity Sector Coordinating Council, Oil & Natural Gas

More information

High Energy Physics (HEP) Program Status Update to the AAAC Meeting. June 1, 2015

High Energy Physics (HEP) Program Status Update to the AAAC Meeting. June 1, 2015 OFFICE OF SCIENCE High Energy Physics (HEP) Program Status Update to the AAAC Meeting June 1, 2015 Kathy Turner Program Manager, Cosmic Frontier Office of High Energy Physics Office of Science, U.S. Department

More information

Head, Office of Project Management Oversight

Head, Office of Project Management Oversight SUBJECT: FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Management Oversight REVISION: 43 APPROVED BY: TITLE Head, Office of Project Management

More information

DOE National Laboratories Improvement Council s White Paper on Management of Major Research Facility Construction Projects

DOE National Laboratories Improvement Council s White Paper on Management of Major Research Facility Construction Projects DOE National Laboratories Improvement Council s White Paper on Management of Major Research Facility Construction Projects What is this white paper about? Research investments by the Department of Energy

More information

WHY COMPANIES STRUGGLE WITH IT STRATEGIC PLANNING

WHY COMPANIES STRUGGLE WITH IT STRATEGIC PLANNING WHY COMPANIES STRUGGLE WITH IT STRATEGIC PLANNING AND HOW TO FIX IT B L A K E A B D E L L A 2 0 1 3 M I N N E S O T A I T S Y M P O S I U M O C T O B E R 2 3, 2 0 1 3 Sponsored by: KEY OBJECTIVES IT Strategic

More information

Positive Train Control (PTC) Program Management Plan

Positive Train Control (PTC) Program Management Plan Positive Train Control (PTC) Program Management Plan Proposed Framework This document is considered an uncontrolled copy unless it is viewed online in the organization s Program Management Information

More information

Tools for Managing and Measuring the Value of Big Data Projects

Tools for Managing and Measuring the Value of Big Data Projects Tools for Managing and Measuring the Value of Big Data Projects Abstract Big Data and analytics focused projects have undetermined scope and changing requirements at their core. There is high risk of loss

More information

Strategic Training and Employee Development Plan FY2013-2015

Strategic Training and Employee Development Plan FY2013-2015 EXECUTIVE OVERVIEW Training on policies, processes, and systems is an essential part of the success of the OCFO organization for both departmental and lab-wide employees. Development of leadership skills

More information

The Future of Census Bureau Operations

The Future of Census Bureau Operations The Future of Census Bureau Operations Version 1.0 April 25, 2013 The Future of Census Bureau Operations Page ii [This page intentionally left blank] The Future of Census Bureau Operations Page iii Document

More information

University of Wisconsin Platteville IT Governance Model Final Report Executive Summary

University of Wisconsin Platteville IT Governance Model Final Report Executive Summary University of Wisconsin Platteville IT Governance Model Final Report Executive Summary February 2013 Project Objectives & Approach Objectives: Build on the efforts of the Technology Oversight Planning

More information

Using Earned Value Management Concepts to Improve Commercial Project Performance

Using Earned Value Management Concepts to Improve Commercial Project Performance Using Earned Value Management Concepts to Improve Commercial Project Performance R. Scott Brunton, PMP, PMI-RMP/SP, EVP Principal Solutions Consultant Lewis Fowler, LLC www.lewisfowler.com Welcome to the

More information

TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.

TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended. Previews of TDWI course books offer an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews cannot be printed. TDWI strives to provide

More information

Performance-Based Management System Project Management Plan ORNL/TM-2000/377

Performance-Based Management System Project Management Plan ORNL/TM-2000/377 Performance-Based Management System Project Management Plan ORNL/TM-2000/377 Revision 0 December 2000 Prepared by: Jeff Long, Quality Systems Manager Quality Services Division Prepared by Oak Ridge National

More information

U.S. DEPARTMENT OF ENERGY CONTRACT AND PROJECT MANAGEMENT IMPROVEMENT. Closure Report

U.S. DEPARTMENT OF ENERGY CONTRACT AND PROJECT MANAGEMENT IMPROVEMENT. Closure Report U.S. DEPARTMENT OF ENERGY CONTRACT AND PROJECT MANAGEMENT IMPROVEMENT Closure Report April 2012 Executive Summary The Department of Energy (DOE) is committed to making continuous improvements in contract

More information

Concept of Operations for Line of Business Initiatives

Concept of Operations for Line of Business Initiatives Concept of Operations for Line of Business Initiatives Version 1.0 Office of E-Gov and IT, OMB March 2006 Table of Contents FOREWORD...2 1 OBJECTIVES OF THE LINES OF BUSINESS CONCEPT OF OPERATIONS...3

More information

Organizational Restructuring

Organizational Restructuring Organizational Restructuring The Challenge Facilitating better alignment between technology and business units Focusing organizational strengths on delivering business value despite frequent distractions

More information

Visual Enterprise Architecture

Visual Enterprise Architecture Business Process Management & Enterprise Architecture Services and Solutions October 2012 VEA: Click About to edit Us Master title style Global Presence Service and Solution Delivery in 22 Countries and

More information

Real Property Portfolio Optimization

Real Property Portfolio Optimization Real Property Portfolio Optimization Improving and Modernizing Management of the Federal Real Property Portfolio to Optimize Space, Financial Resources and Energy Impact www.pwc.com/publicsector Contents

More information

Project Management Office Best Practices

Project Management Office Best Practices Project Management Office Best Practices Agenda Maturity Models (Industry & PMO) PMO Areas of Expertise (Scale & Scope) Project Management Office Process Model Project Management Framework PMO Implementation

More information

Creating HR Service Delivery Success

Creating HR Service Delivery Success Creating HR Service Delivery Success HRO Today Forum Europe 2012 By Brad McCaw, Senior Consultant, London 2012 Towers Watson. All rights reserved. Setting the context Businesses are going through significant

More information

Developing Excellence in Leadership, Training and Science

Developing Excellence in Leadership, Training and Science DELTAS Africa Initiative Outline Developing Excellence in Leadership, Training and Science August 2014 Improving School Governance 1 The Wellcome Trust and its partners have launched an initiative with

More information

ISO JTC 1 SGBD Mtg and ACM Workshop

ISO JTC 1 SGBD Mtg and ACM Workshop ISO JTC 1 SGBD Mtg and ACM Workshop Technology Roadmap Subgroup Presentation March 18 th, 2014 Carl Buffington (Vistronix) David Boyd (L-3 Data Tactics) Dan McClary (Oracle) Overview Goals and Objectives

More information

Federal Segment Architecture Methodology (FSAM): An Overview

Federal Segment Architecture Methodology (FSAM): An Overview Information Resources Management College Federal Segment Architecture Methodology (FSAM): An Overview Dr. Stan Boddie & Prof. Matt Newman 1 a global learning community for government s most promising information

More information

STRATEGIC PLAN 2012-2016 Office of Research, Innovation and Economic Development OUR FOUNDATION

STRATEGIC PLAN 2012-2016 Office of Research, Innovation and Economic Development OUR FOUNDATION STRATEGIC PLAN 2012-2016 Office of Research, Innovation and Economic Development OUR FOUNDATION NC STATE MISSION: As a research-extensive land-grant university, North Carolina State University is dedicated

More information

HEP Software Consortium

HEP Software Consortium HEP Software Consortium Lothar Bauerdick, Paolo Calafiura, Peter Elmer, Liz Sexton-Kennedy, Panagiotis Spentzouris, Torre Wenaus, Avi Yagil May 28, 2014 1 Objective HEP computing is facing many challenges

More information

State of Minnesota IT Governance Framework

State of Minnesota IT Governance Framework State of Minnesota IT Governance Framework June 2012 Table of Contents Table of Contents... 2 Introduction... 4 IT Governance Overview... 4 Process for Developing the New Framework... 4 Management of the

More information

U.S. Defense Priorities OSD PA&E

U.S. Defense Priorities OSD PA&E 1 U.S. Defense Priorities Deter potential adversaries and defend America and American interests Counter asymmetric threats including terrorism, cyber attacks and ballistic and cruise missiles Fight and

More information

Driving Project Success with Organizational Change Management

Driving Project Success with Organizational Change Management Driving Project Success with Organizational Change Management Agenda Introductions & Objectives OCM Defined Driving Project Success with OCM Building an OCM Capability Case Study: OPRS ERM Program Speakers

More information

Measures and Metrics for PMO Success

Measures and Metrics for PMO Success Project Management Office Summit Measures and Metrics for PMO Success Jim Kendrick, PMP, CMC President and Practice Leader 2009 P2C2 Group, Inc. kendrick@p2c2group.com 301-942-7985 Also See Related Blog

More information

Business Analyst Position Description

Business Analyst Position Description Analyst Position Description September 4, 2015 Analysis Position Description September 4, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...

More information

Brookhaven Site Office Environment, Safety & Health Management Plan. January 2013

Brookhaven Site Office Environment, Safety & Health Management Plan. January 2013 Brookhaven Site Office Environment, Safety & Health Management Plan January 2013 Brookhaven Site Office (BHSO) Environment, Safety & Health Management Plan January 2013 Prepared by: Signature and Date

More information

PMI Standard for Portfolio Management

PMI Standard for Portfolio Management Project : how organizations can measure and improve their performance PMI Standard for Milan, April 20th 2011 Walter Ginevri, PMP, PgMP Agenda 2 Evolution of PMI standard of PfM PfM definition and high-level

More information

U.S. Department of Education Federal Student Aid

U.S. Department of Education Federal Student Aid U.S. Department of Education Federal Student Aid Lifecycle Management Methodology Stage Gate Review Process Description Version 1.3 06/30/2015 Final DOCUMENT NUMBER: FSA_TOQA_PROC_STGRW.NA_001 Lifecycle

More information

NASCIO Recognition Award Nomination - 2009. IT Project and Portfolio Management

NASCIO Recognition Award Nomination - 2009. IT Project and Portfolio Management NASCIO Recognition Award Nomination - 2009 IT State of North Carolina Enterprise Project Management Office June 3, 2009 Executive Summary The Enterprise Project Management Office () was established in

More information

Enhancing University Research through Corporate Engagement and Collaboration

Enhancing University Research through Corporate Engagement and Collaboration Enhancing University Research through Corporate Engagement and Collaboration Jeffrey Scott Vitter, Provost and Executive Vice Chancellor, The University of Kansas Julie S. Nagel, Executive Director of

More information

ENTERPRISE COMPUTING ENVIRONMENT. Creating connections THROUGH SERVICE & WORKFORCE EXCELLENCE

ENTERPRISE COMPUTING ENVIRONMENT. Creating connections THROUGH SERVICE & WORKFORCE EXCELLENCE ITA Strategic Plan FY 2011 - FY 2016 U.S. Army Information Technology Agency REALIZING The DoD ENTERPRISE COMPUTING ENVIRONMENT Creating connections THROUGH SERVICE & WORKFORCE EXCELLENCE Provide Quality

More information

Best Practice: Strengthening Human Resources in Public School Systems

Best Practice: Strengthening Human Resources in Public School Systems REPORT UPDATED: MARCH 29, 2010 CITY: NEW YORK CITY POLICY AREA: EDUCATION BEST PRACTICE Project Home Run was a two-year initiative undertaken by the New York City Department of Education (DOE) to transform

More information

ACMP Certification Committee. Methods for Demonstrating Competency

ACMP Certification Committee. Methods for Demonstrating Competency ACMP Certification Committee Methods for Demonstrating Competency 6 February 2014 CCMP Assessment of Competency ACMP s Certification Committee recommended a two-part assessment through which CCMP applicants

More information

CYBERINFRASTRUCTURE FRAMEWORK FOR 21 ST CENTURY SCIENCE, ENGINEERING, AND EDUCATION (CIF21)

CYBERINFRASTRUCTURE FRAMEWORK FOR 21 ST CENTURY SCIENCE, ENGINEERING, AND EDUCATION (CIF21) CYBERINFRASTRUCTURE FRAMEWORK FOR 21 ST CENTURY SCIENCE, ENGINEERING, AND EDUCATION (CIF21) Overview The Cyberinfrastructure Framework for 21 st Century Science, Engineering, and Education (CIF21) investment

More information

WORKFORCE AND SUCCESSION PLANNING

WORKFORCE AND SUCCESSION PLANNING 2012 WORKFORCE AND SUCCESSION PLANNING Toolkit to Identify and Address Strategic Talent Gaps Workforce Management Office NOAA 1/1/2012 Table of contents Introduction... 3 Workforce Planning... 3 Step 1:

More information

Linking Risk Management to Business Strategy, Processes, Operations and Reporting

Linking Risk Management to Business Strategy, Processes, Operations and Reporting Linking Risk Management to Business Strategy, Processes, Operations and Reporting Financial Management Institute of Canada February 17 th, 2010 KPMG LLP Agenda 1. Leading Practice Risk Management Principles

More information

G R E E N G L O B A L R E S O U R C E S : C O N F I D E N T I A L A N D P R O P R I E T A R Y 1

G R E E N G L O B A L R E S O U R C E S : C O N F I D E N T I A L A N D P R O P R I E T A R Y 1 P R O P R I E T A R Y 1 INTRODUCTION TO CHANGE MANAGEMENT Definition The Change Process Change Management Approach Awareness to New Normal Change Management Approach Operating Principles List of Change

More information

EXAMPLE <PROJECT NAME> DATE

EXAMPLE <PROJECT NAME> DATE EXAMPLE DATE TABLE OF CONTENTS 1. EXECUTIVE SUMMARY... 2 1.1. Issue... 2 1.2. Anticipated Outcomes... 2 1.3. Recommendation... 2 1.4. Justification... 3 2. BUSINESS CASE ANALYSIS TEAM...

More information

Leap Frog Digital Sensors and Definition, Integration & Testing

Leap Frog Digital Sensors and Definition, Integration & Testing PNNL-14493 Leap Frog Digital Sensors and Definition, Integration & Testing FY 2003 Annual Report W.D. Meitzler S.V. Shoemaker R.L. Griswold S.J. Ouderkirk S. Tzemos December 2003 Prepared for the U.S.

More information

NIST Cloud Computing Program Activities

NIST Cloud Computing Program Activities NIST Cloud Computing Program Overview The NIST Cloud Computing Program includes Strategic and Tactical efforts which were initiated in parallel, and are integrated as shown below: NIST Cloud Computing

More information

ORACLE S PRIMAVERA FEATURES PORTFOLIO MANAGEMENT. Delivers value through a strategy-first approach to selecting the optimum set of investments

ORACLE S PRIMAVERA FEATURES PORTFOLIO MANAGEMENT. Delivers value through a strategy-first approach to selecting the optimum set of investments ORACLE S PRIMAVERA FEATURES Delivers value through a strategy-first approach to selecting the optimum set of investments Leverages consistent evaluation metrics, user-friendly forms, one click access to

More information

Small Business. Leveraging SBA IT resources to support America s small businesses

Small Business. Leveraging SBA IT resources to support America s small businesses Small Business Administration Information Technology Strategic Plan ( ITSP) 2012-2016 Leveraging SBA IT resources to support America s small businesses Message from the Chief Information Officer The Small

More information

Establishing an Enterprise-Wide PMO-Striking Out Once Doesn't Mean Game Over! Bennetta B. Raby MS, PMP, LSSBB

Establishing an Enterprise-Wide PMO-Striking Out Once Doesn't Mean Game Over! Bennetta B. Raby MS, PMP, LSSBB Establishing an Enterprise-Wide PMO-Striking Out Once Doesn't Mean Game Over! Bennetta B. Raby MS, PMP, LSSBB DISCLAIMER: The views and opinions expressed in this presentation are those of the author and

More information

Follow-up of the Audit of Quarantine, Migration and Travel Health and International Health Regulations

Follow-up of the Audit of Quarantine, Migration and Travel Health and International Health Regulations Final Audit Report Follow-up of the Audit of Quarantine, Migration and Travel Health and International Health Regulations October 2012 Table of Contents Executive summary... i A - Introduction... 1 1.

More information

Enterprise Architecture and Cloud Computing Briefing. March 28, 2014

Enterprise Architecture and Cloud Computing Briefing. March 28, 2014 Enterprise Architecture and Cloud Computing Briefing March 28, 2014 Agenda Why Enterprise architecture EA @ CDC EA Hot Topics Enterprise Architecture Solution Stories Examples Shared Services briefing

More information

Project Management Office Charter

Project Management Office Charter Old Dominion University Office of Computing and Communication Services Project Management Office Charter Version: 1.0 Last Update: February 18, 2010 Created By: Anthony Fox, PMP OCCS Project Management

More information

WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)?

WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)? WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)? Due to the often complex and risky nature of projects, many organizations experience pressure for consistency in strategy, communication,

More information

Purchased Care at the Health Administration Center. Managing Feedback

Purchased Care at the Health Administration Center. Managing Feedback Purchased Care at the Health Administration Center Rocky Mountain Performance Excellence Managing Feedback Setting Priorities for Continued Improvement Agenda Who We Are The process Establish the baseline

More information

SLCM Framework (Version 2003.1) Roles and Responsibilities As of January 21, 2005

SLCM Framework (Version 2003.1) Roles and Responsibilities As of January 21, 2005 SLCM Framework (Version 2003.1) Roles and Responsibilities As of January 21, 2005 ROLE RESPONSIBILITY REVIEW SIGN- OFF CTO Manage IT assets to meet corporate goals Establish and chair the Information Technology

More information

A Performance-Based Organization

A Performance-Based Organization This section summarizes NASA as an organization and its approach to performance management, strategic planning, and performance reporting. It also explains how the Agency is organized, governed, and managed,

More information

America s particle physics and accelerator laboratory

America s particle physics and accelerator laboratory America s particle physics and accelerator laboratory Fermi National Accelerator Laboratory Home of the world s most powerful neutrino beam Leader in accelerator and detector technology International center

More information

NASA s FY 2014 Management and Performance

NASA s FY 2014 Management and Performance National Aeronautics and Space Administration NASA s FY 2014 Management and Performance Including the FY 2012 Agency Performance Report And the FY 2013 Performance Plan Update FY 2014 Performance Plan

More information

Central Project Office: Charter

Central Project Office: Charter Central Project Office: Charter ITCS: Central Project Office EAST CAROLINA UNIVERSITY 209 COTANCHE STREET, GREENVILLE, NC 27858 1 Table of Contents INTRODUCTION... 3 PURPOSE... 3 EXPECTED BENEFITS... 3

More information

Table of Contents PERFORMANCE REVIEWS STRATEGIC REVIEWS

Table of Contents PERFORMANCE REVIEWS STRATEGIC REVIEWS SECTION 270 PERFORMANCE AND STRATEGIC REVIEWS Table of Contents 270.1 To which agencies does this section apply? 270.2 What is the purpose of this section? PERFORMANCE REVIEWS 270.3 What is the purpose

More information

HOPE ACADEMY. 2011-2012 Performance Analysis

HOPE ACADEMY. 2011-2012 Performance Analysis HOPE ACADEMY 2011-2012 Performance Analysis Core Question 2: Is the organization effective and well-run? 2.1. Is the school in sound fiscal health? STANDARD The school presents significant concerns in

More information

IT PROJECT GOVERNANCE GUIDE

IT PROJECT GOVERNANCE GUIDE IT PROJECT GOVERNANCE GUIDE P1133-ITGG-NNA V1.2 04/24/06 UCLA Office of Information Technology UCLA IT GOVERNANCE TABLE OF CONTENTS 1 IT GOVERNANCE OVERVIEW...1 1.1 STEP 1- PROJECT IDENTIFICATION...1

More information

Agile project portfolio manageme nt

Agile project portfolio manageme nt Agile project portfolio manageme nt Agile project & portfolio summit at Harrisburg University May 9, 2016 Agile project portfolio management Agenda Portfolio management challenges Traditional portfolio

More information

PMO Starter Kit. White Paper

PMO Starter Kit. White Paper PMO Starter Kit White Paper January 2011 TABLE OF CONTENTS 1. ABOUT THE PMO STARTER KIT...3 2. INTRODUCTION TO THE PMO STARTER KIT WHITE PAPER...3 3. PMO DEVELOPMENT ROADMAP...4 4. PLAN PHASE...5 4.1 CREATE

More information

Project Office Establishing the Business Impact. Presented by: Mark Heitkamp

Project Office Establishing the Business Impact. Presented by: Mark Heitkamp Project Office Establishing the Business Impact Presented by: Mark Heitkamp 1 Project Office Establishing the Business Impact Outline of Material: Company Overview Evolution of Project Office (starting

More information

How the Information Governance Reference Model (IGRM) Complements ARMA International s Generally Accepted Recordkeeping Principles (GARP )

How the Information Governance Reference Model (IGRM) Complements ARMA International s Generally Accepted Recordkeeping Principles (GARP ) The Electronic Discovery Reference Model (EDRM) How the Information Governance Reference Model (IGRM) Complements ARMA International s Generally Accepted Recordkeeping Principles (GARP ) December 2011

More information

White Paper March 2009. Government performance management Set goals, drive accountability and improve outcomes

White Paper March 2009. Government performance management Set goals, drive accountability and improve outcomes White Paper March 2009 Government performance management Set goals, drive accountability and improve outcomes 2 Contents 3 Business problems Why performance management? 4 Business drivers 6 The solution

More information

Audit of the Test of Design of Entity-Level Controls

Audit of the Test of Design of Entity-Level Controls Audit of the Test of Design of Entity-Level Controls Canadian Grain Commission Audit & Evaluation Services Final Report March 2012 Canadian Grain Commission 0 Entity Level Controls 2011 Table of Contents

More information

research center concept

research center concept research center concept research center concept 1 Overview As a key part of the Russian Skolkovo Initiative, the Skolkovo Foundation, MIT, and others are assisting in the creation of the Skolkovo Institute

More information

Creating a project management office (PMO)

Creating a project management office (PMO) Executive summary The project management was initially developed to define and maintain standards for project management in the organisation. In many organisations, the PMO has developed a strategic role

More information

The Association of Change Management Professionals

The Association of Change Management Professionals The Association of Change Management Professionals Statement of Change Management Scope, Knowledge Areas, and Process Groups March 31, 2012 Introduction The Association of Change Management Professionals

More information

PRIMAVERA PORTFOLIO MANAGEMENT

PRIMAVERA PORTFOLIO MANAGEMENT PRIMAVERA PORTFOLIO MANAGEMENT Every business faces critical enterprise investment decisions. Making these decisions is among your most pressing challenges. Your PORTFOLIO MANAGEMENT FEATURES Delivers

More information

Business Architecture A Balance of Approaches to Implementation. Business Architecture Innovation Summit June 2013 Presenter: Andrew Sommers

Business Architecture A Balance of Approaches to Implementation. Business Architecture Innovation Summit June 2013 Presenter: Andrew Sommers Business Architecture A Balance of Approaches to Implementation Business Architecture Innovation Summit June 2013 Presenter: Andrew Sommers Implementing Business Architecture at Capital Group Positioning

More information

Strategic Plan 2014 2018

Strategic Plan 2014 2018 DEPARTMENT OF HEALTH Strategic Plan 2014 2018 We focus on improving internal systems and processes in the Vermont Department of Health s Strategic Plan. By successfully implementing the Plan s objectives,

More information

Project Management Best Practice Benchmarks

Project Management Best Practice Benchmarks A PM SOLUTIONS RESEARCH COMPENDIUM Project Management COST SCOPE Quality SCHEDULE 2 Project Management Senior executives want to know one thing about project management: What s the value? Today more than

More information

Project, Program & Portfolio Management Help Leading Firms Deliver Value

Project, Program & Portfolio Management Help Leading Firms Deliver Value in collaboration with Project, Program & Portfolio Help Leading Firms Deliver Value Managing Effectively & Efficiently Through an Enterprise PMO Program & Portfolio : Aligning IT Capabilities with Business

More information

IT@Intel. Aligning IT with Business Goals through Strategic Planning

IT@Intel. Aligning IT with Business Goals through Strategic Planning White Paper Intel Information Technology Computer Manufacturing Strategic Planning Aligning IT with Business Goals through Strategic Planning Intel IT has developed and implemented a new approach to strategic

More information

P U T Y O U R L O G O H E R E. Revision Date Description of Changes Author / Editor. Name Title Organization E-mail Tel. 1

P U T Y O U R L O G O H E R E. Revision Date Description of Changes Author / Editor. Name Title Organization E-mail Tel. 1 : FOR EVALUATION ONLY ENTERPRISE PROJECT MANAGEMENT OFFICE (EPMO) CHARTER for PUT YOUR LOGO HERE Accepted by Revision x.x Sample: For Evaluation

More information

Internal Auditing Guidelines

Internal Auditing Guidelines Internal Auditing Guidelines Recommendations on Internal Auditing for Lottery Operators Issued by the WLA Security and Risk Management Committee V1.0, March 2007 The WLA Internal Auditing Guidelines may

More information

Campus Network Planning and Technical Assistance Overview

Campus Network Planning and Technical Assistance Overview Campus Network Planning and Technical Assistance Overview WHAT IS THE PURPOSE OF A NETWORK? Networks are part of the California College Pathways (CCP) Initiative s strategy to expand college and career

More information

Managing Change Using Enterprise Architecture

Managing Change Using Enterprise Architecture Managing Change Using Enterprise Architecture Abdallah El Kadi, PMP, CISSP, TOGAF Chief Executive Officer, Shift Technologies Managing Director, Open Group Arabia Email: Abdallah.Kadi@awrostamani.com Website:

More information

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. February 2013 1 Executive Summary Adnet is pleased to provide this white paper, describing our approach to performing

More information

OPERATIONAL IT COMMITTEE MEETING AGENDA WEDNESDAY, MAY 23, 2012 3:00 4:00 p.m. FAC 228D

OPERATIONAL IT COMMITTEE MEETING AGENDA WEDNESDAY, MAY 23, 2012 3:00 4:00 p.m. FAC 228D OPERATIONAL IT COMMITTEE MEETING AGENDA WEDNESDAY, MAY 3, 01 3:00 4:00 p.m. FAC 8D I. Cloud File Sharing Task Force Recommendations (Ryan Baldwin) II. UDC Printer Repair Transition to Campus Store (Michael

More information

Enterprise Project and Portfolio Management Implementation Project. Update to the ETS Customer Utility Board Julie Pearson May 27, 2015

Enterprise Project and Portfolio Management Implementation Project. Update to the ETS Customer Utility Board Julie Pearson May 27, 2015 Enterprise Project and Portfolio Management Implementation Project Update to the ETS Customer Utility Board Julie Pearson May 27, 2015 Why do we need PPM? Office of the State CIO Key Initiatives (from

More information

Enterprise PMO is a key enabler and foundation for effective enterprise portfolio management.

Enterprise PMO is a key enabler and foundation for effective enterprise portfolio management. Enterprise Program Management Office (EPMO): "Best Practices and PMOs" Stephen C. Hawald - CISM, PMP Our EPMO Ship Has Been Selected For Our Journey! Our PMO is shipworthy and ready to sail across complex

More information

Fortune 500 Medical Devices Company Addresses Unique Device Identification

Fortune 500 Medical Devices Company Addresses Unique Device Identification Fortune 500 Medical Devices Company Addresses Unique Device Identification New FDA regulation was driver for new data governance and technology strategies that could be leveraged for enterprise-wide benefit

More information

Mobile and BYOD Strategy

Mobile and BYOD Strategy Mobile and BYOD Strategy Bring Your Own Device Danairat T. Certified Java Programmer, TOGAF Silver danairat@gmail.com, +66-81-559-1446 1 Agenda Introduction to Mobile Technology Mobile Computing Bring

More information

IT Governance Framework Summary

IT Governance Framework Summary IT Governance Framework Summary Purpose This summary provides an overview of the IT Governance Framework the UoN has adopted that is aligned with the UoN NeW Directions Strategic Plan 2013-2015. Aligned

More information

CSR / Sustainability Governance and Management Assessment By Coro Strandberg Principal, Strandberg Consulting www.corostrandberg.

CSR / Sustainability Governance and Management Assessment By Coro Strandberg Principal, Strandberg Consulting www.corostrandberg. Introduction CSR / Sustainability Governance and Management Assessment By Coro Strandberg Principal, Strandberg Consulting www.corostrandberg.com June 2015 Companies which adopt CSR or sustainability 1

More information