University of Wisconsin Platteville IT Governance Model Final Report Executive Summary

Size: px
Start display at page:

Download "University of Wisconsin Platteville IT Governance Model Final Report Executive Summary"

Transcription

1 University of Wisconsin Platteville IT Governance Model Final Report Executive Summary February 2013

2 Project Objectives & Approach Objectives: Build on the efforts of the Technology Oversight Planning Committee (TOPC) to design improvements to the existing IT governance structure and processes aligned with leading practices, customer expectations, and institutional priorities Engage key stakeholders and customers in the design and development of the future state model Provide a solid foundation to support the development of an IT strategic plan and facilitate the implementation of improvements in the IT organization, processes / policies, and service delivery Establish a governance structure and process that meets institutional needs and is able to drive priorities and resources Approach: During the assessment, the team: Shared information regarding IT governance leading practices and insights from our recent engagements Conducted interviews to assess the existing governance model and processes, including perspectives regarding strengths, challenges, and opportunities for improvement. Personnel input consisted of 16 interviews, including participants from University administration, OIT, and academic representatives Analyzed existing TOPC processes, forms, and other components of the existing governance model Developed and presented the validation of findings confirming observations from interviews and analysis Developed and presented preliminary recommendations through workshops with University administration, OIT, and academic representatives Developed and presented the final report, including the implementation roadmap 2

3 Project Timeline The assessment, analysis, and development phases of the future IT Governance model were completed over a 12 week timeframe. Leadership checkpoints were incorporated including a validation of findings and a preliminary recommendations review. Week Project Timeline /03 12/10 12/17 12/24 12/31 01/07 01/14 01/21 01/28 02/04 02/11 02/18 02/25 Plan Engagement Kick-Off Confirm vision, project scope, and objectives Define project roles & responsibilities Phase 1: Current State Conduct Interviews & Collect Data Guiding Principles Leadership Checkpoint #1 1 Phase 2: Framework Structural Alternatives Draft Recommendations Leadership Checkpoint #2 2 End Product IT Governance Structure IT Governance Process IT Governance Roadmap 3 Leadership Checkpoints: 1 Validation of Findings: Review findings and receive feedback 2 Preliminary Recommendations Review: Conduct executive retreat and receive feedback 3 Submission of Final Deliverable: Review of final recommendations 3

4 Recommendation Summary IT Governance Summary recommendations for a new IT governance model and additional opportunities to enhance enterprise IT are outlined below. Detailed recommendations are presented throughout the report. Category Recommendation Observation IT Strategy Develop a multi-year IT strategic plan to prioritize current and future initiatives, establish alignment with institutional strategy, and provide a communication platform with campus constituencies There is insufficient routine review of strategic IT priorities and their tie-in with broader campus strategies UW-Platteville lacks defined guiding principles for IT investment IT Governance Structure Disband TOPC and establish a domain-focused (Administrative Technology, Educational Technology, Architecture / Infrastructure) governance structure to provide for analysis and prioritization within functional areas, and support an Executive Committee for decision-making Draft charters for Committees, and establish formal roles and responsibilities for Committee chairs and members The formation of TOPC has provided a solid IT governance foundation, and has spurred thoughtful dialogue among a diverse group of stakeholders However, TOPC lacks support and is too large to spearhead an effective governance organization TOPC s mission, leadership, and member responsibilities are unclear, both internal and external to the group itself IT Governance Process Adopt structured, and defined demand, portfolio, and transition management processes Leverage and build upon existing TOPC material to support process Promote transparency by openly communicating strategic decisions and progress The TOPC process includes best-practice governance components to build upon, particularly in the intake area However, the relative informality and inconsistency of the overall governance process combined with limited supplemental documentation perpetuates a lack of awareness of how IT decisions are made on campus Project Management Office (PMO) Establish a centralized PMO to define project management standards and methodologies, support the IT governance process, promote effective portfolio management, and provide a central pool of resources that can be deployed on an as needed basis Create a business analyst role to form a key link between colleges / divisions and IT, and support the PMO / IT governance processes UW-Platteville has started to build a scalable project management methodology However, IT lacks a formal and supported PMO to guide project planning, project completion and drive management standards A portfolio management function is not in place to manage the demand and project/program activity Office of Information Technology Formalize and refine the systems development lifecycle and system testing methodology Develop and implement an OIT staffing strategy to address critical resource needs and establish clear roles and responsibilities Activities associated with stages of the systems development lifecycle including system testing could be more adequately defined A suboptimal division of labor exists between break / fix, development, and other initiatives Communications Adopt a new customer advocacy program to improve communications and service OIT lacks a clear process for engagement with constituencies Measurement Create and routinely update a customer dashboard for IT departments and an IT balanced scorecard for overall IT performance OIT lacks effective tools for measuring and communicating performance and promoting accountability 4

5 Impact Assessment Recommendations UW-Platteville recommendations are tied to a variety of qualitative and quantitative return on investment opportunities. Opportunity Benefit Potential Savings 1. Comprehensive IT Strategic Planning Initiative Unites the IT community behind common goals Establishes a vision and provides a framework for making IT choices that align with University strategy Reduced spend on projects/activities misaligned with institutional strategy 2. New IT Governance Structure and Process Aligns prioritization of issues and decision making with institutional goals Optimizes resources and manages risk Reduced spend on duplicative or underutilized services, projects, and hardware / software 3. New Project Management Office Provides resources to enable projects to be completed on-time and on-budget Improves communication among project stakeholders Reduced spend due to standardization, accurate forecasting and predictability 4. OIT Quick Wins Optimized Systems Development Lifecycle and System Testing Methodology Updated OIT Staffing Strategy Refined Project Resource Estimating Helps set user expectations and increases development productivity Provides for higher standards of customer service through a clear delineation between break / fix and new development activities More valuable and accurate status reporting Potential to reduce the need for additional resources due to optimized staffing model and standardized methodologies 5. New Customer Advocacy Program Provides mechanism for customers to effectively prioritize and communicate needs Uncovers opportunities to leverage technology to improve business performance Labor efficiency due to optimized business processes Fewer investments unrelated to UW- Platteville strategy 6. New Customer Dashboard and IT Balanced Scorecard Provides transparency into IT operations Establishes accountability related to IT services Promotes labor efficiency and effectiveness; reduces spend on external services 5

6 IT Governance Maturity Model UWP 2014 Level 5 Optimized Stage Level 4 Managed Stage IT Governance processes and management are considered best practices Automated tools have been implemented to automate workflow and improve analysis Portfolio Management has become an integral part of Governance including regular reviews and informed decisions Portfolio is optimized to maximize business value while managing acceptable levels of risk Project management office functions at high level and provides training and consultative support to the organization IT Governance processes are monitored and measured by campus leadership to ensure compliance Steering Committee (IT Executive Committee) is functioning effectively on a university-wide level and is actively engaged in selecting and prioritizing projects with formal review of the active portfolio Poorly performing investments are terminated early in their life cycles Portfolio performance is measured and reported using a balanced scorecard Continuous improvement efforts are initiated Level 3 Defined Stage IT Governance processes have been defined, documented, and formal training exists Processes are not sophisticated, but the result of formalizing existing processes Portfolio management is mandated throughout the organization; however, no mechanism to enforce compliance UWP Current State Level 2 Repeatable Stage Level 1 Initial Stage Project management office plays an active role in the IT Governance process Organization can begin comparing projects on apples-to-apples basis, improving project selection and prioritization Standard business case is used, but not by everyone Portfolio management processes have been developed and implemented ad hoc across the organization Expertise is limited to a few people, so inconsistencies exist Organization recognizes changes are required for IT Governance No standardized processes exist; any approaches available are ad hoc and fragmented May exist at a college / divisional level, or for large projects Business cases are used for some projects but lack consistent format or methodology Business benefits for portfolio management start to be seen Level 0 Non-Existent No formal IT Governance processes exist Leadership does not recognize there is an issue Projects managed independent of one another without regard to fit or risk Project and resource prioritization is FIFO (first in, first out) No Steering Committee in place to review, approve and prioritize investments Achieved stage by implementing recommendations Natural progression, timeframe undefined 6

7 Detailed Recommendations IT Governance The table below provides a comprehensive set of recommendations related to IT governance. Category General Structure Recommendation In conjunction with the IT strategic planning process, develop and promote guiding principles for IT investment and service delivery Disband TOPC and establish a domain-focused (Administrative Technology, Educational Technology, Architecture / Infrastructure) governance structure to provide for analysis and prioritization within functional areas Draft formal roles and responsibilities for proposed Executive and Advisory Committees Appoint committee chairs and members based on interest, experience, availability, and equal representation Process Submit Evaluate Prioritize Decide Allocate Monitor Transition Establish a timeline (expected process flow) to support a standardized demand management process and set appropriate expectations Designate individual(s) within project management office to receive, categorize, and forward all project requests and communicate project status Refine existing TOPC project overview form to create a straightforward yet thorough mechanism for project intake Review existing TOPC project criteria list and project levels form and agree upon initial thresholds for project classification / routing Convert existing TOPC detail project form into a business case template to provide for founded, objective decision-making on larger projects Review existing TOPC prioritization criteria and agree upon balanced project prioritization approach based on cost, drivers, risk, and impact Work with project management office to decide on a prioritization and submission calendar that dovetails with operating and capital budget cycles Determine appropriate mix of projects (i.e. transform, grow, run) that will be used to guide the project approval process Ensure timely, accurate, and regular flow of information from project management office to Executive IT Committee to reduce risks related to schedule, budget, and quality when allocating resources Based on various project classifications, standardize monitoring activities for each type, including a communication and feedback loop Develop an institutional change and communication process that is used throughout projects, with a particular emphasis on move to production Encourage routine use of existing TOPC lessons learned template to conduct project post mortems 7

8 Detailed Recommendations Additional Areas The table below provides a comprehensive set of recommendations related to the project management office (PMO), OIT quick wins, strategy & planning, communications, and measurement. Category Recommendation Continue to build a scalable, clearly defined project management methodology and ensure integration with software development framework(s) PMO Methodology Designate an institutional owner for project management to develop the content, create training programs, and serve as a resource for others Expand the role of the OIT communications lead to include alignment of OIT outreach with project management philosophy PMO Organization Establish a centralized project management office to define project management standards and methodologies, support the IT governance process, and provide a central pool of resources that can be deployed on an as needed basis Create a business analyst role to form a key link between colleges / divisions and IT, and support the PMO / IT governance processes Document standards and templates for each stage of the systems development lifecycle Implement a rigorous system testing methodology (e.g. V-Model) Move all code migrations to a monthly schedule; manage urgent requests by exception OIT Quick Wins Reevaluate the time tracking and dedication of team members (e.g. 26 of 40 hours of development time a week) Establish clear delineation on the application support team between break / fix and new development activities; define roles / responsibilities for both Determine entry / exit criteria and assign percent complete for each stage of the systems development lifecycle Assign development object estimates based on complexity (e.g. high, medium, low); refine values over time Strategy & Planning Communications Develop and utilize strategy map as a framework to generate the IT strategic plan and tie specific initiatives to institutional priorities Develop a clear process for customer engagement with constituencies, including colleges / divisions, faculty, students, and administrators Implement a customer advocacy program in which OIT staff are assigned to specific constituent groups and serve as the eyes and ears of OIT Establish a customer dashboard for each department (e.g. help desk) that is focused on key concerns of OIT customers and consistently updated Measurement Roll up departmental scorecards to create an IT balanced scorecard to provide transparency in overall operations and highlight areas of concern Provide real-time status updates for core systems via the intranet as a self service forum for customers to view system availability or issues 8

9 For more information, please contact: Sally Swindall Administrative Services UW-Platteville (608)

Information Technology Services Project Management Office Operations Guide

Information Technology Services Project Management Office Operations Guide Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...

More information

How Technology Supports Project, Program and Portfolio Management

How Technology Supports Project, Program and Portfolio Management WHITE PAPER: HOW TECHNOLOGY SUPPORTS PROJECT, PROGRAM AND PORTFOLIO MANAGEMENT SERIES 4 OF 4 How Technology Supports Project, Program and Portfolio Management SEPTEMBER 2007 Enrico Boverino CA CLARITY

More information

Project, Program & Portfolio Management Help Leading Firms Deliver Value

Project, Program & Portfolio Management Help Leading Firms Deliver Value in collaboration with Project, Program & Portfolio Help Leading Firms Deliver Value Managing Effectively & Efficiently Through an Enterprise PMO Program & Portfolio : Aligning IT Capabilities with Business

More information

Enterprise Architecture (Re)Charter Template

Enterprise Architecture (Re)Charter Template Enterprise Architecture (Re)Charter Template To learn more about this full research or to inquire about membership, contact us: +1-866-913-8101 IT.Support@ executiveboard.com www.cebglobal.com/it CEB Enterprise

More information

CITY OF BOULDER IT GOVERNANCE AND DECISION-MAKING STRUCTURE. (Approved May 2011)

CITY OF BOULDER IT GOVERNANCE AND DECISION-MAKING STRUCTURE. (Approved May 2011) CITY OF BOULDER IT GOVERNANCE AND DECISION-MAKING STRUCTURE (Approved May 2011) I. Citywide IT Mission, Goals and Guiding Principles The following mission, goal and principle statements are applied throughout

More information

Visual Enterprise Architecture

Visual Enterprise Architecture Business Process Management & Enterprise Architecture Services and Solutions October 2012 VEA: Click About to edit Us Master title style Global Presence Service and Solution Delivery in 22 Countries and

More information

IT PROJECT GOVERNANCE GUIDE

IT PROJECT GOVERNANCE GUIDE IT PROJECT GOVERNANCE GUIDE P1133-ITGG-NNA V1.2 04/24/06 UCLA Office of Information Technology UCLA IT GOVERNANCE TABLE OF CONTENTS 1 IT GOVERNANCE OVERVIEW...1 1.1 STEP 1- PROJECT IDENTIFICATION...1

More information

Project Management Office Charter

Project Management Office Charter Old Dominion University Office of Computing and Communication Services Project Management Office Charter Version: 1.0 Last Update: February 18, 2010 Created By: Anthony Fox, PMP OCCS Project Management

More information

Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology... Ron Huston Director

Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology... Ron Huston Director Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology.......... June 2010 Ron Huston Director Message from the State Enterprise Portfolio Project

More information

PM Services. Portfolio Strategy, Design and Build

PM Services. Portfolio Strategy, Design and Build PM Services Portfolio Strategy, Design and Build Portfolio Strategy, Design and Build PM Services consultants will design an effective portfolio management system and works closely with client management

More information

Project Management Office Best Practices

Project Management Office Best Practices Project Management Office Best Practices Agenda Maturity Models (Industry & PMO) PMO Areas of Expertise (Scale & Scope) Project Management Office Process Model Project Management Framework PMO Implementation

More information

Office of Information Technology. County of Dallas FY2014 FY2018 Information Technology Strategic Plan

Office of Information Technology. County of Dallas FY2014 FY2018 Information Technology Strategic Plan Office of Information Technology County of Dallas Letter from the Office of Information Technology This Information Technology Strategic Plan is the culmination of hard work and collaboration by County

More information

A Final Report for City of Chandler Strategic IT Plan Executive Summary

A Final Report for City of Chandler Strategic IT Plan Executive Summary A Final Report for City of Chandler 6 January 2004 Table of Contents 1. Executive Summary... 1 1.1 Background... 2 1.2 Chandler Business and IT Context... 3 1.3 Chandler s IT Strategic Direction... 5 1.4

More information

Final. North Carolina Procurement Transformation. Governance Model March 11, 2011

Final. North Carolina Procurement Transformation. Governance Model March 11, 2011 North Carolina Procurement Transformation Governance Model March 11, 2011 Executive Summary Design Approach Process Governance Model Overview Recommended Governance Structure Recommended Governance Processes

More information

The Project/Program Management Office (PMO)

The Project/Program Management Office (PMO) PM WORLD TODAY - FEATURED PAPER JANUARY 2008 The Project/Program Management Office (PMO) By TD Jainendrukumar The Project/Program Management Office (PMO) is the fastest growing concept in project management

More information

The Integration of Strategic Planning and Portfolio Management

The Integration of Strategic Planning and Portfolio Management The Integration of Strategic Planning and Portfolio Management Bank of Canada Management Offices (PMO s) International Summit Brasilia, Brazil, April 9-10, 2014 Presented by: Sheila Vokey, Chief Financial

More information

ITS Project Management

ITS Project Management ITS Project Management Policy Contents I. POLICY STATEMENT II. REASON FOR POLICY III. SCOPE IV. AUDIENCE V. POLICY TEXT VI. PROCEDURES VII. RELATED INFORMATION VIII. DEFINITIONS IX. FREQUENTLY ASKED QUESTIONS

More information

Project Management through

Project Management through Project Management through Unified Project and Portfolio Fluent User Interface Management Built on SharePoint Server 2010 Time Reporting Enhancements Project Initiation & Business Case Exchange Server

More information

Information Technology Governance Overview and Charter

Information Technology Governance Overview and Charter Information Technology Governance Overview and Charter Prepared by: Project #: Date submitted Document version: IT Governance Charter v03.05.2012 1.0 48.0 - Page 1 of 34 Document History Version Date Author

More information

University of Wisconsin - Platteville UNIVERSITY WIDE INFORMATION TECHNOLOGY STRATEGIC PLAN 2014

University of Wisconsin - Platteville UNIVERSITY WIDE INFORMATION TECHNOLOGY STRATEGIC PLAN 2014 University of Wisconsin - Platteville UNIVERSITY WIDE INFORMATION TECHNOLOGY STRATEGIC PLAN 2014 Strategic PRIORITIES 1 UNIVERSITY WIDE IT STRATEGIC PLAN ITS is a trusted partner with the University of

More information

Office of the Auditor General AUDIT OF IT GOVERNANCE. Tabled at Audit Committee March 12, 2015

Office of the Auditor General AUDIT OF IT GOVERNANCE. Tabled at Audit Committee March 12, 2015 Office of the Auditor General AUDIT OF IT GOVERNANCE Tabled at Audit Committee March 12, 2015 This page has intentionally been left blank Table of Contents Executive Summary... 1 Introduction... 1 Background...

More information

TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.

TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended. Previews of TDWI course books offer an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews cannot be printed. TDWI strives to provide

More information

2014 Guide to IT Governance

2014 Guide to IT Governance 2014 Guide to IT Governance What is IT Governance? IT governance provides the conceptual framework, structures, processes, resources and information aligned to university strategies and objectives, enabling

More information

WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)?

WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)? WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)? Due to the often complex and risky nature of projects, many organizations experience pressure for consistency in strategy, communication,

More information

Data Integration Initiative Semi Annual Report April 2009. State of North Carolina Office of the State Controller

Data Integration Initiative Semi Annual Report April 2009. State of North Carolina Office of the State Controller Data Integration Initiative Semi Annual Report April 2009 State of North Carolina Office of the State Controller David McCoy, State Controller April 1, 2009 Table of Contents I. Background... 1 II. BEACON

More information

A Privacy Officer s Guide to Providing Enterprise De-Identification Services. Phase I

A Privacy Officer s Guide to Providing Enterprise De-Identification Services. Phase I IT Management Advisory A Privacy Officer s Guide to Providing Enterprise De-Identification Services Ki Consulting has helped several large healthcare organizations to establish de-identification services

More information

The overall aim for this project is To improve the way that the University currently manages its research publications data

The overall aim for this project is To improve the way that the University currently manages its research publications data Project Plan Overview of Project 1. Background The I-WIRE project will develop a workflow and toolset, integrated into a portal environment, for the submission, indexing, and re-purposing of research outputs

More information

IT Governance (Worthwhile Exercise?) January 10, 2013 Presented by Chad Murphy, CISA

IT Governance (Worthwhile Exercise?) January 10, 2013 Presented by Chad Murphy, CISA IT Governance (Worthwhile Exercise?) January 10, 2013 Presented by Chad Murphy, CISA Things we hear! You are making it much too complex. It is an IT problem! We do not know where to start! We do this already!

More information

Role and Skill Descriptions. For An ITIL Implementation Project

Role and Skill Descriptions. For An ITIL Implementation Project Role and Skill Descriptions For An ITIL Implementation Project The following skill traits were identified as fairly typical of those needed to execute many of the key activities identified: Customer Relationship

More information

Delaware Performance Appraisal System

Delaware Performance Appraisal System Delaware Performance Appraisal System Building greater skills and knowledge for educators DPAS-II Guide for Administrators (Principals) Principal Practice Rubric Updated July 2015 1 INEFFECTIVE A. DEVELOPS

More information

Creating a project management office (PMO)

Creating a project management office (PMO) Executive summary The project management was initially developed to define and maintain standards for project management in the organisation. In many organisations, the PMO has developed a strategic role

More information

Fortune 500 Medical Devices Company Addresses Unique Device Identification

Fortune 500 Medical Devices Company Addresses Unique Device Identification Fortune 500 Medical Devices Company Addresses Unique Device Identification New FDA regulation was driver for new data governance and technology strategies that could be leveraged for enterprise-wide benefit

More information

Analytics Strategy Information Architecture Data Management Analytics Value and Governance Realization

Analytics Strategy Information Architecture Data Management Analytics Value and Governance Realization 1/22 As a part of Qlik Consulting, works with Customers to assist in shaping strategic elements related to analytics to ensure adoption and success throughout their analytics journey. Qlik Advisory 2/22

More information

DISCIPLINE DATA GOVERNANCE GOVERN PLAN IMPLEMENT

DISCIPLINE DATA GOVERNANCE GOVERN PLAN IMPLEMENT DATA GOVERNANCE DISCIPLINE Whenever the people are well-informed, they can be trusted with their own government. Thomas Jefferson PLAN GOVERN IMPLEMENT 1 DATA GOVERNANCE Plan Strategy & Approach Data Ownership

More information

CSR / Sustainability Governance and Management Assessment By Coro Strandberg Principal, Strandberg Consulting www.corostrandberg.

CSR / Sustainability Governance and Management Assessment By Coro Strandberg Principal, Strandberg Consulting www.corostrandberg. Introduction CSR / Sustainability Governance and Management Assessment By Coro Strandberg Principal, Strandberg Consulting www.corostrandberg.com June 2015 Companies which adopt CSR or sustainability 1

More information

Board of Trustees IT Subcommittee Meeting. November 3, 2014 2:00-2:50 PM Harper Center 3023

Board of Trustees IT Subcommittee Meeting. November 3, 2014 2:00-2:50 PM Harper Center 3023 Board of Trustees IT Subcommittee Meeting November 3, 2014 2:00-2:50 PM Harper Center 3023 Agenda Introductions June 2, 2014 Meeting Minutes Creighton University Digital Strategy Information Technology

More information

DHS IT Successes. Rationalizing Our IT Infrastructure

DHS IT Successes. Rationalizing Our IT Infrastructure TESTIMONY OF Richard A. Spires Chief Information Officer U.S. Department of Homeland Security Before the House Committee on Oversight and Government Reform February 27, 2013 Chairman Issa, Ranking Member

More information

State of Minnesota IT Governance Framework

State of Minnesota IT Governance Framework State of Minnesota IT Governance Framework June 2012 Table of Contents Table of Contents... 2 Introduction... 4 IT Governance Overview... 4 Process for Developing the New Framework... 4 Management of the

More information

HHS OCIO Policy for Information Technology (IT) Enterprise Performance Life Cycle (EPLC)

HHS OCIO Policy for Information Technology (IT) Enterprise Performance Life Cycle (EPLC) Office of the Chief Information Officer Office of the Assistant Secretary for Resources and Technology Department of Health and Human Services HHS OCIO Policy for Information Technology (IT) Enterprise

More information

Audit of the Test of Design of Entity-Level Controls

Audit of the Test of Design of Entity-Level Controls Audit of the Test of Design of Entity-Level Controls Canadian Grain Commission Audit & Evaluation Services Final Report March 2012 Canadian Grain Commission 0 Entity Level Controls 2011 Table of Contents

More information

Best practices in project and portfolio management

Best practices in project and portfolio management Business white paper Best practices in project and portfolio management Practical advice for achieving greater value and business benefits Table of contents 3 Introduction 3 The importance of best practices

More information

Final Report. Audit of the Project Management Framework. December 2014

Final Report. Audit of the Project Management Framework. December 2014 Final Report Audit of the Project Management Framework December 2014 Audit of the Project Management Framework Table of Contents Executive summary... i A - Introduction... 1 1. Background... 1 2. Audit

More information

Building for the future

Building for the future Building for the future Why predictive analytics matter now William Gaker Goals for today Growth and establishment of the people analytics field Best practices for building a people analytics function

More information

Section 4 MANAGEMENT CONTROLS AND PROCESSES. Section 4

Section 4 MANAGEMENT CONTROLS AND PROCESSES. Section 4 Section 4 MANAGEMENT CONTROLS AND PROCESSES Section 4 MANAGEMENT CONTROLS AND PROCESSES MANAGEMENT CONTROLS AND PROCESSES FEATURED IN THIS SECTION 4.1 Information Management Framework... 1 4.2 Strategic

More information

R U N D O. The ECU Technology Governance Framework A brief guide

R U N D O. The ECU Technology Governance Framework A brief guide PLAN R U N D O DO The ECU Technology Governance Framework A brief guide The ECU Technology Governance Framework A brief guide The ECU Technology Governance Framework is made up of a set of processes, effected

More information

COMPUTER SCIENCE PROGRAM ASSESSMENT PLAN

COMPUTER SCIENCE PROGRAM ASSESSMENT PLAN COMPUTER SCIENCE PROGRAM ASSESSMENT PLAN December 5, 2003 1. Overview The computer science program assessment plan provides a basis for obtaining feedback on the program and making improvements. This document

More information

Information Technology Strategic Plan 2014-2017

Information Technology Strategic Plan 2014-2017 Information Technology Strategic Plan 2014-2017 Leveraging information technology to create a competitive advantage for UW-Green Bay Approved December 2013 (Effective January 2014 December 2017) Contents

More information

Computing Services Network Project Methodology

Computing Services Network Project Methodology Computing Services Network Project Prepared By: Todd Brindley, CSN Project Version # 1.0 Updated on 09/15/2008 Version 1.0 Page 1 MANAGEMENT PLANNING Project : Version Control Version Date Author Change

More information

Strategic Plan FY 2014-2016

Strategic Plan FY 2014-2016 Strategic Plan FY 2014-2016 CONTENTS SUMMARY 3 ACADEMIC SERVICES 4 DATA MANAGEMENT & REPORTING 6 COMMUNICATIONS & COLLABORATION 7 IT SERVICES 8 INFRASTRUCTURE 9 SECURITY 10 BRAND BUILDING 11 INITIATION

More information

Human Resources Service Delivery Initiative Findings and Recommendations. Campus Update. November 2014

Human Resources Service Delivery Initiative Findings and Recommendations. Campus Update. November 2014 Human Resources Service Delivery Initiative Findings and Recommendations Campus Update November 2014 Context for the Initiative HR activities touch virtually everyone on the campus and present an area

More information

C A S E S T UDY The Path Toward Pervasive Business Intelligence at an Asian Telecommunication Services Provider

C A S E S T UDY The Path Toward Pervasive Business Intelligence at an Asian Telecommunication Services Provider C A S E S T UDY The Path Toward Pervasive Business Intelligence at an Asian Telecommunication Services Provider Sponsored by: Tata Consultancy Services November 2008 SUMMARY Global Headquarters: 5 Speen

More information

Project Management Office (PMO) Charter

Project Management Office (PMO) Charter Project Management Office (PMO) Charter Information & Communication Technologies 10 January 2008 Information & Communication Technologies Enterprise Application DISCLAIMER Services Project Management Office

More information

ELECTRONIC FILE STORAGE. Laurie Hafner Dahms Mark Wilson. David Bronder

ELECTRONIC FILE STORAGE. Laurie Hafner Dahms Mark Wilson. David Bronder ELECTRONIC FILE STORAGE Project Information Project Team Leads: Project Manager: Laurie Hafner Dahms Mark Wilson David Bronder TeamDynamix Project Number: 241112 Project Overview Centralize standard electronic

More information

Strategic Plan 2015-2017

Strategic Plan 2015-2017 Strategic Plan 2015-2017 Page 1 Table of Contents Information Technology Mission... 5 Information Technology Vision Statement... 5 Information Technology Values... 5 The Information Technology s Alignment

More information

Business Plan 2014-2015

Business Plan 2014-2015 Business Plan 2014-2015 Table of Contents RHRA Corporate Overview Profile 1 Vision, Mission, Mandate and Values 1 Strategic Priorities and Business Planning Overview 2 Fiscal Year 2014-15 Activities and

More information

Release Management: Effective practices for IT delivery

Release Management: Effective practices for IT delivery Release Management: Effective practices for IT delivery Introduction Today s health plans face a unique combination of technology challenges due to their complex IT environments. These environments serve

More information

PMO Starter Kit. White Paper

PMO Starter Kit. White Paper PMO Starter Kit White Paper January 2011 TABLE OF CONTENTS 1. ABOUT THE PMO STARTER KIT...3 2. INTRODUCTION TO THE PMO STARTER KIT WHITE PAPER...3 3. PMO DEVELOPMENT ROADMAP...4 4. PLAN PHASE...5 4.1 CREATE

More information

U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT. Issued: September 6, 2002

U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT. Issued: September 6, 2002 U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ADMINISTRATION Special Attention of: Transmittal for Handbook No: 3260.1 Issued: September 6, 2002 1. This Transmits: HUD Handbook 3260.1, Enterprise Data

More information

Avanade Point of View. Getting it right with a project and portfolio management solution

Avanade Point of View. Getting it right with a project and portfolio management solution Avanade Point of View Getting it right with a project and portfolio management solution Better control, higher value Orchestrating a portfolio of projects, and the resources for execution, challenges leaders

More information

Collaboration Tools: Innovation Management and Solution Infusion Benefits

Collaboration Tools: Innovation Management and Solution Infusion Benefits 2007 NASCIO Recognition Awards Information Communications Technology Innovations Collaboration Tools: Innovation Management and Solution Infusion Benefits Michigan Department of Information Technology

More information

OPTIMUS SBR. Optimizing Results with Business Intelligence Governance CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE.

OPTIMUS SBR. Optimizing Results with Business Intelligence Governance CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE. OPTIMUS SBR CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE. Optimizing Results with Business Intelligence Governance This paper investigates the importance of establishing a robust Business Intelligence (BI)

More information

E-commerce Project Governance Overview

E-commerce Project Governance Overview Implementing Effective ERP Governance and Portfolio Management Walter Sevon Deputy CIO and Executive Director Technology Systems Division Jennifer Flagel Director of Technology Projects Enrollment Services

More information

Office of Information Technology - Strategic Plan FY 2015 2020

Office of Information Technology - Strategic Plan FY 2015 2020 Office of Information Technology (OIT) Strategic Plan FY 2015 2020 Office of Information Technology - Vision, Mission, Pillars, and Values Vision Statement We believe in the promise and capacity of information

More information

The following is intended to outline our general product direction. It is intended for informational purposes only, and may not be incorporated into

The following is intended to outline our general product direction. It is intended for informational purposes only, and may not be incorporated into The following is intended to outline our general product direction. It is intended for informational purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any

More information

IT Portfolio Management

IT Portfolio Management IT Portfolio Management The Critical Step to Continually Optimizing Your Data Center Consolidation and Migration Initiatives Christopher Steel Digital Government Institute s Cloud Computing & Data Center

More information

Current Challenges in Managing Contract Lifecycle Management

Current Challenges in Managing Contract Lifecycle Management Current Challenges in Managing Lifecycle Management s are the bloodline of your business. Due to increased pressure in volume, complexity and regulatory compliance, contracts have evolved from a simple

More information

A PROJECT MANAGEMENT OFFICE (PMO) FRAMEWORK FOR SUCCESSFUL IMPLEMENTATION OF INFORMATION TECHNOLOGY PROJECTS

A PROJECT MANAGEMENT OFFICE (PMO) FRAMEWORK FOR SUCCESSFUL IMPLEMENTATION OF INFORMATION TECHNOLOGY PROJECTS Allied Academies International Conference page 1 A PROJECT MANAGEMENT OFFICE (PMO) FRAMEWORK FOR SUCCESSFUL IMPLEMENTATION OF INFORMATION TECHNOLOGY PROJECTS Chris Kaufman, Agovia Consulting chriskaufman@agovia.com

More information

Section 6. Governance & Investment Roadmap. Executive Governance

Section 6. Governance & Investment Roadmap. Executive Governance Section 6 Governance & Investment Roadmap Executive Governance Strong governance is critical to the success of a long-term, complex transformative initiative. The following section provides a high-level

More information

C A S E S T UDY The Path Toward Pervasive Business Intelligence at Merck

C A S E S T UDY The Path Toward Pervasive Business Intelligence at Merck C A S E S T UDY The Path Toward Pervasive Business Intelligence at Merck Sponsored by: Microsoft September 2008 SUMMARY Global Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.872.8200 F.508.935.4015

More information

RSA ARCHER OPERATIONAL RISK MANAGEMENT

RSA ARCHER OPERATIONAL RISK MANAGEMENT RSA ARCHER OPERATIONAL RISK MANAGEMENT 87% of organizations surveyed have seen the volume and complexity of risks increase over the past five years. Another 20% of these organizations have seen the volume

More information

Organizational Change Management Methodology. Tools and Techniques to aid Project Implementation

Organizational Change Management Methodology. Tools and Techniques to aid Project Implementation Organizational Change Management Methodology Tools and Techniques to aid Project Implementation Today s Objectives Discuss the Organizational Change Management team and explore ways Organizational Change

More information

UCPath Change Management Strategy for UC San Diego. July 2013

UCPath Change Management Strategy for UC San Diego. July 2013 UCPath Change Management Strategy for UC San Diego July 2013 Overview Background Key Components Approach & Methodology Change Network Framework For Action Challenges Resources & Tools Summary Table of

More information

IT Governance. What is it and how to audit it. 21 April 2009

IT Governance. What is it and how to audit it. 21 April 2009 What is it and how to audit it 21 April 2009 Agenda Can you define What are the key objectives of How should be structured Roles and responsibilities Key challenges and barriers Auditing Scope Test procedures

More information

Presented By: Leah R. Smith, PMP. Ju ly, 2 011

Presented By: Leah R. Smith, PMP. Ju ly, 2 011 Presented By: Leah R. Smith, PMP Ju ly, 2 011 Business Intelligence is commonly defined as "the process of analyzing large amounts of corporate data, usually stored in large scale databases (such as a

More information

WHITE PAPER. Leveraging a LEAN model of catalogbased performance testing for quality, efficiency and cost effectiveness

WHITE PAPER. Leveraging a LEAN model of catalogbased performance testing for quality, efficiency and cost effectiveness WHITE PAPER Leveraging a LEAN model of catalogbased performance testing for quality, efficiency and cost effectiveness Traditionally, organizations have leveraged project-based models for performance testing.

More information

Workflow Automation Solutions that Work

Workflow Automation Solutions that Work White Paper Workflow Automation Solutions that Work Case Study - Leveraging the Web to Manage Workflow Copyright 2001 ESX Engineering, Inc. All Rights Reserved. Printed in the United States of America.

More information

UNIVERSITY OF CALIFORNIA Office of Academic Personnel Academic Personnel Manual (APM) Policy Development Process Guide

UNIVERSITY OF CALIFORNIA Office of Academic Personnel Academic Personnel Manual (APM) Policy Development Process Guide Overview The at the University of California Office of the President manages the Academic Personnel Manual (APM) policy development process from inception to issuance on behalf of the Provost and Executive

More information

White Paper Case Study: How Collaboration Platforms Support the ITIL Best Practices Standard

White Paper Case Study: How Collaboration Platforms Support the ITIL Best Practices Standard White Paper Case Study: How Collaboration Platforms Support the ITIL Best Practices Standard Abstract: This white paper outlines the ITIL industry best practices methodology and discusses the methods in

More information

Project Management Office: Seeing the Whole Picture

Project Management Office: Seeing the Whole Picture Cloud Solutions for IT Management WHITE PAPER Project Management Office: Seeing the Whole Picture Project Portfolio Management gives PMOs the tools and techniques to get lean in lean times. Executive Summary

More information

Cisco Unified Communications and Collaboration technology is changing the way we go about the business of the University.

Cisco Unified Communications and Collaboration technology is changing the way we go about the business of the University. Data Sheet Cisco Optimization s Optimize Your Solution using Cisco Expertise and Leading Practices Optimizing Your Business Architecture Today, enabling business innovation and agility is about being able

More information

Better Data is Everyone s Job! Using Data Governance to Accelerate the Data Driven Organization

Better Data is Everyone s Job! Using Data Governance to Accelerate the Data Driven Organization Better Data is Everyone s Job! Using Data Governance to Accelerate the Data Driven Organization Intros - Name - Interest / Challenge - Role Data Governance is a Business Function Data governance should

More information

Value to the Mission. FEA Practice Guidance. Federal Enterprise Architecture Program Management Office, OMB

Value to the Mission. FEA Practice Guidance. Federal Enterprise Architecture Program Management Office, OMB Value to the Mission FEA Practice Guidance Federal Enterprise Program Management Office, OMB November 2007 FEA Practice Guidance Table of Contents Section 1: Overview...1-1 About the FEA Practice Guidance...

More information

IT GOVERNANCE AT CARLETON UNIVERSITY

IT GOVERNANCE AT CARLETON UNIVERSITY IT GOVERNANCE AT CARLETON UNIVERSITY Version 4.5 March 2015 Office of the Chief Information Officer, Computing and Communication Services This Document provides the terms of reference and structure for

More information

The National Commission of Audit

The National Commission of Audit CA Technologies submission to The National Commission of Audit November, 2013 Kristen Bresch CA Technologies Executive Summary CA Technologies is pleased to present the National Commission of Audit the

More information

Process-Based Business Transformation. Todd Lohr, Practice Director

Process-Based Business Transformation. Todd Lohr, Practice Director Process-Based Business Transformation Todd Lohr, Practice Director Process-Based Business Transformation Business Process Management Process-Based Business Transformation Service Oriented Architecture

More information

The Future of Census Bureau Operations

The Future of Census Bureau Operations The Future of Census Bureau Operations Version 1.0 April 25, 2013 The Future of Census Bureau Operations Page ii [This page intentionally left blank] The Future of Census Bureau Operations Page iii Document

More information

IT Governance Action Team Report & Recommendations

IT Governance Action Team Report & Recommendations IT Governance Action Team Report & Recommendations March 15, 2012 Action Team Members: Vivek Choudhury Associate Dean, College of Business William Fant Interim Dean, College of Pharmacy Mark Faulkner (Co-chair)

More information

The Road to Enterprise Data Governance: Applying the Data Management Maturity Model in a Financial Services Firm

The Road to Enterprise Data Governance: Applying the Data Management Maturity Model in a Financial Services Firm The Road to Enterprise Data Governance: Applying the Data Management Maturity Model in a Financial Services Firm Patrick DeKenipp, SVP of Business Intelligence, Sterling National Bank events.techtarget.com

More information

GEOSPATIAL LINE OF BUSINESS PROGRAM MANAGEMENT OFFICE CONCEPT OF OPERATIONS

GEOSPATIAL LINE OF BUSINESS PROGRAM MANAGEMENT OFFICE CONCEPT OF OPERATIONS GEOSPATIAL LINE OF BUSINESS PROGRAM MANAGEMENT OFFICE CONCEPT OF OPERATIONS March 2007 Adjudicated Draft TABLE OF CONTENTS 1 INTRODUCTION 3 2 VALUE PROPOSITION 3 3 ORGANIZING FRAMEWORK 3 31 PMO Organizational

More information

Wrangling in the Wild West! Creating a New Web Presence at UC Santa Cruz

Wrangling in the Wild West! Creating a New Web Presence at UC Santa Cruz Wrangling in the Wild West! Creating a New Web Presence at UC Santa Cruz Today s Presenters Teresa Silva - UCSC Web Migration Lead WCMS Technical Trainer tasilva@ucsc.edu Leslie Geary - UCSC Web Service

More information

Audience: FAA Administration and partners with Service Level Agreements FAA Strategic Goal(s) Alignment:

Audience: FAA Administration and partners with Service Level Agreements FAA Strategic Goal(s) Alignment: UWM IT STRATEGIC FOCUS October 2013 STRATEGIC FOCUS DETAILS Develop Annual IT Strategic Status Report DESCRIPTION Inform the UWM community about central and distributed IT activities within a budgetary

More information

Wilhelmenia Ravenell IT Manager Eli Lilly and Company

Wilhelmenia Ravenell IT Manager Eli Lilly and Company Wilhelmenia Ravenell IT Manager Eli Lilly and Company Agenda Introductions The Service Management Framework Keys of a successful Service management transformation Why transform? ROI and the customer experience

More information

CHARTER. Interagency Information Systems Working Group. Timber Regulation and Forest Restoration Program June 23, 2015

CHARTER. Interagency Information Systems Working Group. Timber Regulation and Forest Restoration Program June 23, 2015 Mission and Background CHARTER Interagency Information Systems Working Group Timber Regulation and Forest Restoration Program June 23, 2015 The Mission of the Interagency Information Systems (IIS) Working

More information

Building a Center of Excellence for Organization Change Management at Northwest Airlines Norm Schultz Sara Lykken

Building a Center of Excellence for Organization Change Management at Northwest Airlines Norm Schultz Sara Lykken Building a Center of Excellence for Organization Change Management at Northwest Airlines Norm Schultz Sara Lykken 2008 NWA 1 Elements of Change See It Own It Do It Clear, compelling case for change Demonstrated

More information

University of Hawaii Information Technology Services Strategic Plan May 22, 2015. Looking Forward to 2020 and Beyond [V15-1]

University of Hawaii Information Technology Services Strategic Plan May 22, 2015. Looking Forward to 2020 and Beyond [V15-1] University of Hawaii Information Technology Services Strategic Plan May 22, 2015 [V15-1] I. Introduction This Information Technology Services (ITS) Strategic Plan, Looking Forward to 2020 and Beyond, updates

More information

HRS Strategic Plan 2011-2014

HRS Strategic Plan 2011-2014 HRS Strategic Plan 2011-2014 Aligning HRS Vision and Mission with core UNCG values of Inclusiveness, Collaboration, Sustainability, Responsibility, Transparency Table of Contents HRS Strategic Plan Background...

More information

SUMMARY PROFESSIONAL EXPERIENCE. IBM Canada, Senior Business Transformation Consultant

SUMMARY PROFESSIONAL EXPERIENCE. IBM Canada, Senior Business Transformation Consultant Doreen Funk, MA 191 Discovery Ridge Blvd SW, Calgary Cell: 587-434- 0811 E- mail: dorfunk@hotmail.com SUMMARY Senior management consultant with 20 years of experience in applying strategies and implementing

More information

INFORMATION TECHNOLOGY PROJECT MANAGEMENT ANALYST I / II / III

INFORMATION TECHNOLOGY PROJECT MANAGEMENT ANALYST I / II / III Monterey County INFORMATION TECHNOLOGY PROJECT MANAGEMENT ANALYST I / II / III DEFINITION Under direction, plans, organizes, communicates and manages information technology projects to meet customer expectations

More information

IT Governance Overview

IT Governance Overview IT Governance Overview Contents Executive Summary... 3 What is IT Governance?... 4 Strategic Vision and IT Guiding Principles... 4 Campus-Wide IT Strategic Vision... 4 IT Guiding Principles... 4 The Scope

More information