1 WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS ) CATEGORIES: COLLECTION SYSTEM DONALD C. TILLMAN WATER RECLAMATION PLANT HYPERION TREATMENT PLANT LA-GLENDALE WATER RECLAMATION PLANT PUMPING PLANTS SYSTEMWIDE TERMINAL ISLAND WATER RECLAMATION PLANT

2

3 MAYOR ERIC GARCETTI COUNCIL MEMBERS 1ST DISTRICT 4TH DISTRICT 7TH DISTRICT 10TH DISTRICT 13TH DISTRICT GILBERT CEDILLO TOM LABONGE FELIPE FUENTES HERB J. WESSON, JR MITCH O FARRELL 2ND DISTRICT 5TH DISTRICT 8TH DISTRICT 11TH DISTRICT 14TH DISTRICT PAUL KREKORIAN PAUL KORETZ BERNARD PARKS MIKE BONIN JOSE HUIZAR 3RD DISTRICT 6TH DISTRICT 9TH DISTRICT 12TH DISTRICT 15TH DISTRICT BOB BLUMENFIELD NURY MARTINEZ CURREN D. PRICE, JR MITCHELL ENGLANDER JOE BUSCAINO BOARD OF PUBLIC WORKS KEVIN JAMES, PRESIDENT MONICA RODRIGUEZ, VICE PRESIDENT MATT SZABO, PRESIDENT PRO TEMPORE BARBARA ROMERO MICHAEL DAVIS ENRIQUE C. ZALDIVAR DIRECTOR D.C.TILLMAN WATER RECLAMATION PLANT ENVIRONMENTAL MONITORING DIVISION FINANCIAL MANAGEMENT DIVISION HYPERION TREATMENT PLANT INFORMATION & CONTROL SYSTEMS DIVISION LOS ANGELES-GLENDALE WATER RECLAMATION PLANT TERMINAL ISLAND WATER RECLAMATION PLANT WASTEWATER COLLECTION SYSTEMS DIVISION WASTEWATER ENGINEERING SERVICES DIVISION BUREAU OF ENGINEERING GARY LEE MOORE, P.E. CITY ENGINEER ARCHITECTURAL DIVISION ENVIRONMENTAL ENGINEERING DIVISION WASTEWATER CONVEYANCE ENGINEERING DIVISION WASTEWATER CONVEYANCE CONSTRUCTION DIVISION BUREAU OF CONTRACT ADMINISTRATION JOHN L. REAMER, JR. INSPECTOR OF PUBLIC WORKS WASTEWATER CONSTRUCTION DIVISION

4

5 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION The Wastewater Capital Improvement Program (WCIP) includes capital projects that the Bureau of Sanitation (BOS) and the Bureau of Engineering (BOE) have developed for the City s wastewater facilities. The projects included in this document have been approved by the City s Program Review Committee, comprised of Assistant Directors of the BOS and a Deputy City Engineer. The administration, coordination and implementation of the projects in the 10-Year WCIP are assigned to various divisions of the BOS and BOE in the Department of Public Works. The Program includes replacement, rehabilitation and expansion of the City s wastewater treatment and collection facilities. The 10-year estimated total cost of this Program is $2,561,350,000. The City s wastewater system is divided into two separate subsystems Hyperion and Terminal Island - based upon the topographical features of the service area. The Hyperion System serves the area north of Imperial Highway and includes the Hyperion Treatment Plant in Playa Del Rey, the Los Angeles-Glendale Water Reclamation Plant near the City of Glendale and the Donald C. Tillman Water Reclamation Plant in the San Fernando Valley. The Los Angeles-Glendale and Donald C. Tillman Plants are located upstream of the Hyperion Plant and along the Los Angeles River, and treat only the liquid portion of the wastewater. All biosolids from these two upstream plants are conveyed to, and treated at the Hyperion Treatment Plant. The Terminal Island System serves the portion of the City south of Lomita Boulevard (the area between Lomita Boulevard and Imperial Highway is served by County Sanitation District #5). This subsystem has one treatment plant, the Terminal Island Water Reclamation Plant, located in the Los Angeles Harbor area. This plant also treats biosolids and produces recycled water. In addition to these four (4) treatment plants, the City's wastewater facilities include forty-seven (47) pumping plants and more than 6,700 miles of mainline sewers. Through separate service agreements, the City provides wastewater collection, treatment and disposal services to twenty-nine (29) contract agencies located in areas adjoining the City. PROJECT DESCRIPTION/EXPENDITURE PLAN INFORMATION The projects in the Program are divided into seven (7) categories: Collection System (CS), Donald C. Tillman Water Reclamation Plant (DCT), Hyperion Treatment Plant (HTP), Los Angeles-Glendale Water Reclamation Plant (LAG), Pumping Plants (PP), Systemwide (SW), and the Terminal Island Water Reclamation Plant (TIWRP). Each category contains a planned expenditure summary of projects within that category, followed by a detailed project description for each of the projects along with the 10-year project expenditure plan. Page i August 2, 2013

6 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION PROJECT NAME The Project Name is the name assigned to each project that appears above the project description table. Abbreviated project names are used in the expenditure summary tables, so they may not match the project name in the description page exactly. The designation of a phase or unit indicates that a project is related to other projects. A phase is normally assigned when projects are proposed to be constructed sequentially. A unit is normally assigned when a large project is divided into smaller, manageable projects. COUNCIL DISTRICT(S) The Council District is the location where the project construction or study will be taking place. There are a total of fifteen (15) Council Districts within the City of Los Angeles. PLANNING AREA(S) The new City Charter adopted in June of 1999, operative in July 2000, created seven Area Planning Commissions covering different areas of the City. These areas were designated as follows: - North Valley - South Valley - West Los Angeles - Central - East - South Los Angeles - Harbor Page ii August 2, 2013

7 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION CIP # The CIP # is a unique number that is assigned to each project in this book for identification purposes by the Financial Management Division (FMD), which publishes this book. This number will remain the same during the life of the project. PROJECT DESCRIPTION The Project Description describes the scope and purpose of the project, project location, and other pertinent information. WORK ORDER The Work Order is used to accumulate costs within the Department of Public Works. Each Work Order has a defined cost objective. One or more Work Orders may be assigned to a project. In cases where more than one Work Order is assigned to a project, only the primary Work Order is listed. TABLE The Ten-Year Expenditure Plan table provides information regarding the expected funding for each project in 6 different cost categories. The amounts spent in the years prior to FY 13/14, as well as the planned expenditures for the 10-year span from 13/14 to 22/23 is shown for each cost category. The cost categories are described as follows: FAP (Force Account Planning)... City Staff Design Costs CTP (Consultant Planning)... Consultant Design Costs RW (Right-Of-Way)... Right of Way Costs CONS (Construction)... Construction Costs FACM (Force Account Construction Management)... City Staff Construction Management Costs CTCM (Consultant Construction Management)... Consultant Construction Management Costs Page iii August 2, 2013

8 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION Significant projects from the various project categories are highlighted as follows: I. COLLECTION SYSTEM (CS) Activities planned for the Collection System category include major sewer projects, relief sewers, sewer replacement projects, the Secondary Sewer Renewal Program, and miscellaneous emergency repair/replacement projects. The major projects in this category are as follows: The Secondary Sewer Renewal Program (SSRP) evaluates all secondary sewers on a sewershed by sewershed basis, and rehabilitates/repairs damaged sewer reaches. Secondary sewers are those sewers less than 16-inches in diameter. Currently the SSRP includes 61 projects that are scheduled for construction between 13/14 and 18/19, and a placeholder program for future years with a combined estimated cost of $341,122,000. The Northeast Interceptor Sewer (NEIS) Phase 2A will construct approximately 3.67 miles of sewer and associated structures, including a junction structure, maintenance holes, and a connection to the North Outfall Sewer (NOS) south of the LA-Glendale Water Reclamation Plant. This project will relieve the portion of the NOS adjacent to this project. The estimated cost of this project is $177,659,000. Five North Outfall Sewer (NOS) Rehabilitation projects will rehabilitate the existing NOS between the Hyperion Treatment Plant and the LA-Glendale Water Reclamation Plant, and a northern segment above the LA-Glendale Water Reclamation Plant: NOS Rehab Unit 2 Western to Vermont, NOS Rehab Vermont to Trinity Unit 3, NOS Rehabilitation Unit 5 San Pedro to Hooper, NOS Rehabilitation Unit 6 Hooper to Wilson, and NOS Rehabilitation Unit 7 Wilson to LA River. The estimated cost of these projects and the program placeholder total $88,518,000. Two projects will rehabilitate the La Cienega Interceptor Sewer: The La Cienega Interceptor Sewer Rehabilitation Blackwelder to Olympic, and the La Cienega Interceptor Sewer Rehabilitation Jefferson to La Cienega projects. The estimated cost of these projects is $41,848,000. Three projects will rehabilitate the Central Outfall Sewer: Central Outfall Sewer at 59th Street and Fourth Avenue, Central Outfall Sewer Rehabilitation Market Street to Slauson Avenue, and Central Outfall Sewer Rehabilitation Slauson Avenue to Vernon Page iv August 2, 2013

9 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION Avenue. The estimated cost of these projects is $28,828,000. One Slauson Avenue Sewer Rehabilitation - Compton Avenue to Van Ness Avenue project will rehabilitate sewers constructed in Slauson Avenue between Compton Avenue and Van Ness Avenue. The estimated cost of this project is $25,205,000. One installation project will provide for an additional Air Treatment Facility: Air Treatment Facility East Central Interceptor Sewer (ECIS) - Mission & Jesse. The estimated total cost of this project is $20,570,000. Two projects will rehabilitate Wilshire area Sewers: Wilshire Area Olympic Sewer Rehabilitation and Wilshire Area System Sewer Rehabilitation. The estimated cost of these projects is $19,826,000. The Adams Boulevard Relief Sewer project will relieve sewers in Adams Boulevard from West Boulevard to Fairfax Avenue. The estimated cost of this project is $17,595,000. One project will rehabilitate the Normandie Sewer: Normandie Sewer Replacement and Rehabilitation. The estimated cost of this project is $14,759,000. Page v August 2, 2013

10 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION II. DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) The projects in this category address the needs of the Donald C. Tillman Water Reclamation Plant. The major projects in this category include the following: The Advanced Water Purification Facility project will construct a Micro Filtration/Reverse Osmosis Advanced Oxidation Process facility at Donald C. Tillman Water Reclamation Plant. The estimated cost of the project is $472,211,000. The Maintenance Facilities Relocation project will relocate the current Maintenance Facilities at Donald C. Tillman Water Reclamation Plant in order to accommodate the new Advanced Water Purification Facility. The estimated cost of this project is $30,562,000. The Personnel and Multi-Use Facility project will provide design and construction of a Multi-purpose and Office Building, in accordance with the Leadership in Energy and Environmental Design criteria to incorporate sustainable design features including exhibits. The estimated cost of this project is $ $16,625,000. A Distributed Control System Replacement project will provide updated hardware and software for the distributed control system required to operate the treatment plant. The estimated cost of this project is $16,622,000. An Emergency Backup Power project will evaluate the existing emergency backup power generator and install additional generating capacity. This is to ensure that DCT will not violate its discharge permit in case the existing power feeders are lost. The estimated cost of this project is $9,039,000. Page vi August 2, 2013

11 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION IV. HYPERION TREATMENT PLANT (HTP) These projects are necessary to comply with Regional Water Quality Control Board permit requirements, refurbish various plant facilities, and meet future operating requirements. The major projects in this category include the following: The Solids Handling and Truck Loading Facility project will construct a new solids handling facility that includes screening and dewatering of digested sludge, wet cake storage and loading, plus associated odor control facilities. The estimated cost of the project is $76,067,000. Three Secondary Clarifiers Rehabilitation and Expansion projects will add more clarifiers to the secondary system. The estimated cost of the project is $48,240,000. The Distributed Control System Replacement project will replace the existing control systems with one single system. The estimated cost of the project is $27,682,000. Four Headworks projects will improve grit handling, install fine screens to remove debris with a 5/8 opening or smaller, and upgrade odor control. The estimated cost of these projects is $17,532,000. Two Digester Gas projects will improve the treatment, transportation, use and disposal of the digester gas. The estimated cost of these projects is $11,939,000. The Effluent Pumping Plant Header Replacement project will replace the Effluent Pumping Plant Header. The estimated cost of the project is $9,822,000. V. LOS ANGELES-GLENDALE WATER RECLAMATION PLANT (LAG) The projects in this category address the needs of the Los Angeles-Glendale Water Reclamation Plant. The major projects in this category include the following: Two Nitrification Denitrification Blower Management System projects will provide mechanical, electrical and instrumentation replacement and additions for the Blower Management System, including 3 Local Control Panels, a Master Control Panel, software, graphics, commissioning, start-up, and training. The estimated cost of the projects is $8,307,000. Page vii August 2, 2013

12 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION The Distributed Control System Replacement project will update hardware and software of the distributed control system required to operate the plant. The estimated cost of the project is $7,013,000. The Personnel Building project will provide an estimated 7,000 square feet permanent office, laboratory and shower facilities for the Plant's Staff. The estimated cost of the project is $6,756,000. The Tertiary Filter Replacement project will replace existing dual media filters. The estimated cost of the project is $5,696,000. VI. PUMPING PLANTS (PP) The projects in this category concern the pumping plants serving the Wastewater collection system. Many of the projects represent the final phase of the rehabilitation and replacement of pumping plants to improve the reliability and efficiency of the Wastewater collection system. The largest projects are the following: The Venice Pumping Plant Dual Force Main project will provide added capacity for future wet weather flows and allow operational flexibility. The estimated cost is $61,232,000. The Pumping Plant Generators Replacement Phase 3 project will provide for procurement and installation of generators and ancillary controllers, transfer switches, plus exhaust and cooling systems at nine (9) pumping plants. The estimated cost is $5,871,000. VII. SYSTEMWIDE (SW) This category includes projects that cannot be appropriately assigned to any of the other categories or may apply to the entire Wastewater System. Such projects include Construction Services Contract, construction of the Environmental Learning Center, consultant and other miscellaneous support projects for the Wastewater Program. Page viii August 2, 2013

13 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION VIII. TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) The projects in this category address the needs of the Terminal Island Water Reclamation Plant. The major projects in this category include: The Advanced Water Purification Facility (AWPF) Ultimate Expansion project will increase product water by 6.5 million gallons per day (mgd) for a total of 11.5 mgd of AWPF product water, including disinfection and conversion to advanced oxidation process. The estimated cost of this project is $61,641,000. The Modification of Primary Clarifier Weirs project will replace the discharge pumps at the Dissolved Air Floatation Thickener with new progressive cavity pumps, including construction of a dedicated feed line to the digesters. The estimated cost of this project is $14,834,000. The Blower Replacement project will replace the existing three secondary aeration blowers with new models, including accessories and controls. The estimated cost of this project is $12,177,000. One Control System Replacement project will replace the existing Programmable Logic Control system with a Distributed Control System for plant-wide process control. The estimated cost of this project is $11,992,000 The New Service Maintenance Facility project will demolish the existing metal sheds along the north-east corner of the plant and construct a new service maintenance facility. The estimated cost of this project is $11,695,000. One Headworks Improvement project will enhance the preliminary treatment process at the plant. The estimated cost of this project is $5,635,000. Page ix August 2, 2013

14 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION THIS PAGE INTENTIONALLY LEFT BLANK Page x August 2, 2013

15 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS PLANNED EXPENDITURE SUMMARY... 1 CS PLANNED EXPENDITURE SUMMARY RD & SAN PEDRO DROP STRUCTURE AIR DAMPER ADAMS BOULEVARD RELIEF SEWER ARLINGTON AND JEFFERSON DIVERSION SEWER ASSESSMENT ACT SEWERS AIR TREATMENT FACILITY EAST CENTRAL INTERCEPTOR SEWER (ECIS) - MISSION & JESSE BALDWIN HILLS AREA SEWER REHABILITATION BALLONA CARBON SCRUBBER FACILITY UPGRADE COASTAL INTERCEPTOR SEWER RELIEF SEWER CLEAN WATER FLEET REPLACEMENT TIER COLLECTION SYSTEM ADVANCED PLANNING (SANITATION) CONCORD STREET RELIEF SEWER CENTRAL OUTFALL SEWER (COS) AT 59TH STREET AND FOURTH AVENUE CENTRAL OUTFALL SEWER (COS) REHABILITATION MARKET STREET TO SLAUSON AVENUE CENTRAL OUTFALL SEWER (COS) REHABILITATION SLAUSON AVENUE TO VERNON AVENUE DACOTAH CARBON SCRUBBER FACILITY UPGRADE EMERGENCY SEWER REPLACEMENT ENTERPRISE STREET SIPHON MODIFICATION FIGUEROA STREET SEWER REPLACEMENT GENESEE CARBON SCRUBBER FACILITY UPGRADE HIGHLAND PARK EAGLE ROCK SEWER REHABILITATION HOLLYWOOD SEWER SANITATION MAINTENANCE YARD HUMBOLDT DROP STRUCTURE AIR DAMPER HUMBOLDT SCRUBBER FACILITY UPGRADE LA CIENEGA INTERCEPTOR SEWER (LCIS) REHABILITATION BLACKWELDER TO OLYMPIC LA CIENEGA INTERCEPTOR SEWER (LCIS) REHABILITATION JEFFERSON TO LA CIENEGA MAINTENANCE HOLE RESETTING Page xi August 2, 2013

16 WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS MANHATTAN PL SEWER REHABILITATION, S/O 4TH ST TO S/O 6TH ST MLK & RODEO CARBON SCRUBBER FACILITY UPGRADE NORTH HOLLYWOOD SEWER SANITATION MAINTENANCE YARD NORTHEAST INTERCEPTOR SEWER (NEIS) PHASE 2A NORMANDIE SEWER REPLACEMENT AND REHABILITATION NORS/ECIS CARBON SCRUBBER FACILITY UPGRADE NORTH OUTFALL SEWER REHAB PROGRAM NORTH OUTFALL SEWER REHAB UNIT 2 WESTERN TO VERMONT NORTH OUTFALL SEWER REHAB VERMONT TO TRINITY UNIT NORTH OUTFALL SEWER REHAB SAN PEDRO TO HOOPER (UNIT 5) NORTH OUTFALL SEWER REHAB HOOPER TO WILSON (UNIT 6) NORTH OUTFALL SEWER REHAB WILSON TO LA RIVER (UNIT 7) NOTF CARBON SCRUBBER FACILITY UPGRADE ODOR CONTROL SIERRA BONITA SCRUBBER FACILITY UPGRADE ODOR CONTROL ATWATER VILLAGE SCRUBBER PIERCE STREET & WOODMAN AVENUE DIVERSION SEWER PLANNED UPGRADE/REPLACEMENT PROGRAM RADFORD CARBON SCRUBBER FACILITY RESEDA SEWER SANITATION MAINTENANCE YARD RICHMOND SCRUBBER FACILITY UPGRADE SAN FERNANDO AND 110 FREEWAY SEWER REPLACEMENT SAN PEDRO SIPHON-UPSTREAM 30" CAST-IRON-PIPE REPLACEMENT SECONDARY SEWER RENEWAL PROGRAM SLAUSON AVE SEWER REHABILITATION - COMPTON AVENUE TO VAN NESS AVENUE SOUTH DISTRICT MAINTENANCE YARD IMPROVEMENTS SECONDARY SEWER RENEWAL PROGRAM - A04 AIRPORT & 78TH STREET SECONDARY SEWER RENEWAL PROGRAM - C01A CALIF & ABBOTT KINN Page xii August 2, 2013

17 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS SECONDARY SEWER RENEWAL PROGRAM - C08A PALISADES DR & SURFVIEW DR SECONDARY SEWER RENEWAL PROGRAM - C08B TEMESCAL CANYON ROAD & PALISADES DRIVE SECONDARY SEWER RENEWAL PROGRAM - C08C OCEAN AVE & TEMESCAL CANYON ROAD SECONDARY SEWER RENEWAL PROGRAM - E13 VICTORY AND BECK SECONDARY SEWER RENEWAL PROGRAM - E35 GLENOAKS AND MACLAY SECONDARY SEWER RENEWAL PROGRAM - E39 BALBOA BL AND VENTURA BL SECONDARY SEWER RENEWAL PROGRAM - 6TH ST. AND SAN VICENTE SECONDARY SEWER RENEWAL PROGRAM - H03 SUNSET AND RODEO SECONDARY SEWER RENEWAL PROGRAM - H05 BEVERLY AND FAIRFAX SECONDARY SEWER RENEWAL PROGRAM - H06 ADAMS & CRENSHAW SECONDARY SEWER RENEWAL PROGRAM - H11 BURNSIDE AND WILSHIRE SECONDARY SEWER RENEWAL PROGRAM - H14 WILSHIRE AND ORANGE SECONDARY SEWER RENEWAL PROGRAM - H15 JUNE ST AND WILSHIRE SECONDARY SEWER RENEWAL PROGRAM - H16 CRENSHAW AND VENICE SECONDARY SEWER RENEWAL PROGRAM - H19 ARDEN BLVD AND 3RD ST SECONDARY SEWER RENEWAL PROGRAM - H20 2ND ST. AND EDGEMONT SECONDARY SEWER RENEWAL PROGRAM - H21 OLYMPIC BLVD AND OXFORD SECONDARY SEWER RENEWAL PROGRAM - H23 VERMONT & OLYMPIC SECONDARY SEWER RENEWAL PROGRAM - H24 SUNSET BLVD AND RENO ST SECONDARY SEWER RENEWAL PROGRAM - H SECONDARY SEWER RENEWAL PROGRAM - H33 KENMORE AND FOUNTAIN SECONDARY SEWER RENEWAL PROGRAM - N01 BUDLONG AND LEIGHTON SECONDARY SEWER RENEWAL PROGRAM - N02 SAN PEDRO AND 31ST ST SECONDARY SEWER RENEWAL PROGRAM- N03 ADAMS BLVD & COMPTON AVE SECONDARY SEWER RENEWAL PROGRAM - N05 8TH ST AND SOTO ST SECONDARY SEWER RENEWAL PROGRAM - N06A 36TH PL & VERMONT SECONDARY SEWER RENEWAL PROGRAM - N06B ADAMS BLVD & HILL ST SECONDARY SEWER RENEWAL PROGRAM - N07 BROADWAY & PICO Page xiii August 2, 2013

18 WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS SECONDARY SEWER RENEWAL PROGRAM - N12 PARK VIEW & BEVERLY BLVD SECONDARY SEWER RENEWAL PROGRAM - P09 GRIFFIN AVE AND AVENUE SECONDARY SEWER RENEWAL PROGRAM - P15 LEWIS ST & SAYLIN SECONDARY SEWER RENEWAL PROGRAM - P17 CYPRESS AVE & DIVISION ST SECONDARY SEWER RENEWAL PROGRAM- P20 COLORADO BL & TOWNSEND AV SECONDARY SEWER RENEWAL PROGRAM - P21A LOS FELIZ BLVD & REVERE AVE SECONDARY SEWER RENEWAL PROGRAM - P21B GLENDALE BLVD. AND ROWENA AVE SECONDARY SEWER RENEWAL PROGRAM - P21C LOS FELIZ BLVD. AND 5 FWY SECONDARY SEWER RENEWAL PROGRAM - S01 VERNON AND WESTERN SECONDARY SEWER RENEWAL PROGRAM - S04 SLAUSON AVE AND VAN NESS AVE SECONDARY SEWER RENEWAL PROGRAM - S05 10TH AVE AND 71ST ST SECONDARY SEWER RENEWAL PROGRAM - S06 VERMONT & 76TH ST SECONDARY SEWER RENEWAL PROGRAM- S07-76TH ST. & GRAND AVE SECONDARY SEWER RENEWAL PROGRAM- S08- MAIN & MANCHESTER SECONDARY SEWER RENEWAL PROGRAM - S10 FLORENCE AV & WESTERN AV SECONDARY SEWER RENEWAL PROGRAM - S11 WESTERN AVE AND 92ND ST SECONDARY SEWER RENEWAL PROGRAM - S SECONDARY SEWER RENEWAL PROGRAM - S14 HOOVER AND VERNON SECONDARY SEWER RENEWAL PROGRAM - S16 AVALON & VERNON SECONDARY SEWER RENEWAL PROGRAM - S17 COMPTON AND VERNON SECONDARY SEWER RENEWAL PROGRAM - T01 3RD ST & MESA ST SECONDARY SEWER RENEWAL PROGRAM - T04 S ALMA ST & W 10TH ST SECONDARY SEWER RENEWAL PROGRAM - T05 CHANNEL ST & GAFFEY ST SECONDARY SEWER RENEWAL PROGRAM - T06A ANAHEIM ST AND BROAD AVE SECONDARY SEWER RENEWAL PROGRAM - T06B FRIES AV & PIER A ST SECONDARY SEWER RENEWAL PROGRAM - T08 ALAMEDA AND ANAHEIM SECONDARY SEWER RENEWAL PROGRAM - U11 BUNDY & SAN VINCENTE Page xiv August 2, 2013

19 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS SECONDARY SEWER RENEWAL PROGRAM - U14 OVERLAND AND 10 FREEWAY SECONDARY SEWER RENEWAL PROGRAM - U16 SELBY AND LA GRANGE SECONDARY SEWER RENEWAL PROGRAM - U20 BEVERLY GLEN & QUITO LANE SECONDARY SEWER RENEWAL PROGRAM - U21 GAYLEY AND LE CONTE SECONDARY SEWER RENEWAL PROGRAM - U23 DAVID & CANFIELD AV SECONDARY SEWER RENEWAL PROGRAM - Z13 MORAY & W 25TH ST SECONDARY SEWER RENEWAL PROGRAM- Z18A CENTURY BL & MAIN ST SECONDARY SEWER RENEWAL PROGRAM- Z18B IMPERIAL BL & AVALON BL UPPER BEACHWOOD EASEMENT MAINTENANCE HOLE ADDITION VENICE AND HIGHLAND MH SEWER VENICE BLVD INTERCEPTOR SEWER U WASHINGTON GRIFFITH LONG BEACH SEWER REPLACEMENT WILSHIRE AREA OLYMPIC SEWER REHABILITATION WILSHIRE AREA SYSTEM SEWER REHABILITATION WEST LA SEWER SANITATION MAINTENANCE YD WLAIS REHABILITATION OVERLAND TO KELTON DCT PLANNED EXPENDITURE SUMMARY DCT AERATION TANKS CONCRETE REHABILITATION DCT ADVANCED WATER PURIFICATION FACILITY DCT BALBOA LAKE PUMP REPLACEMENT DCT CAPITAL EQUIPMENT REPLACEMENT PROGRAM (CERP) DCT CHANNEL 1 AIR SPARGERS IMPROVEMENTS DCT ELECTRICAL POWER SYSTEM MODIFICATIONS DCT ELECTRICAL VAULT REHABILITATION DCT EMERGENCY BACKUP POWER DCT GRIT CHAMBER BACKUP FLUSH SYSTEM DCT MAINTENANCE FACILITIES RELOCATION DCT MULTI-PURPOSE AND OFFICE FACILITY Page xv August 2, 2013

20 WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS DCT MULTI-PURPOSE AND OFFICE FACILITY EXHIBITS DCT ODOR CONTROL SYSTEM UPGRADE DCT-PHASE 2 SCREW PUMPS REPLACEMENT DCT SCREW PUMP 3 & 4 STARTER UPGRADES DCT SOLAR PANEL GUARD RAILS DCT WASTEWATER CONTROL SYSTEM REPLACEMENT HTP PLANNED EXPENDITURE SUMMARY HTP 1-MILE OUTFALL CHEMICAL LINE UPGRADE HTP 1-MILE OUTFALL STRUCTURE REHABILITATION HTP 5-MILE OUTFALL REBALLASTING HTP ABRASIVE BLAST & STEAM CLEANING FACILITY HTP AMMONIA REMOVAL PILOT STUDY HTP AUXILIARY BOILER NO 2 REPLACEMENT HTP CAPITAL EQUIPMENT REPLACEMENT PROGRAM HTP CAPITAL UTILITY REPLACEMENT PROGRAM (CURP) HTP CENTRATE INFLUENT FLOW EQUALIZATION HTP CHEMICAL LINES UPGRADES HTP COMPUTER ROOM COOLING SYSTEM UPGRADE HTP DIGESTER GAS UTILIZATION COOLING WATER SYSTEM HTP DIGESTER EXPANSION LITIGATION PHASE HTP DIGESTER GAS DESULFURIZATION FACILITY IMPROVEMENTS HTP DIGESTER SCREENING FACILITY IMPROVEMENTS (DSF) HTP DILUTE POLYMER PUMP IMPROVEMENT HTP EFFLUENT PUMPING PLANT HEADER REPLACEMENT HTP FLARES SYSTEM UPGRADE HTP FOG RECEIVING STATION EXPANSION HTP FOG RECEIVING STATION NORTH Page xvi August 2, 2013

21 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS HTP G STREET PIPE RACK STRUCTURAL REHAB HTP GRIT HANDLING IMPROVEMENTS HTP HEADWORKS FINE SCREENS INSTALLATION HTP HEADWORKS GRIT CLASSFIER RELOCATION HTP HEADWORKS ODOR CONTROL UPGRADE HTP IPS ODOR CONTROL IMPROVEMENTS HTP PREGERSON BUILDING DATA HIGHWAY DISTRIBUTION ROOM HTP PREGERSON BUILDING FIRST FLOOR MODIFICATION HTP PRIMARY EFFLUENT CHANNEL COVER PLATE REPLACEMENT HTP PRIMARY INFLUENT CHANNEL AIR SPARGERS HTP PRIMARY INFLUENT GATES REPLACENT HTP REACTOR 1 & 2 UPGRADE HTP REACTOR MICRO-OXYGENATION AND BYPASS INSTALLATION HTP SCREENINGS HANDLING IMPROVEMENT HTP SECONDERY CLARIFIERS STRUCTURAL REHABILITATION PHASE I HTP SECONDERY CLARIFIERS STRUCTURAL REHABILITATION PHASE II HTP SECONDARY CLARIFIERS EXPANSION HTP SERVICE WATER FACILITY UPGRADE HTP SOLIDS HANDLING AND TRUCK LOADING FACILITY HTP SUBSTATION SEPARATION HTP SERVICE WATER FACILITY SOUTH SIDE CLOTH FILTER INSTALLATION HTP TRUCK LOADING FACILITY ODOR CONTROL MODERNIZATION HTP WASTEWATER CONTROL SYSTEM REPLACEMENT LAG PLANNED EXPENDITURE SUMMARY LAG CAPITAL EQUIPMENT REPLACEMENT PROGRAM (CERP) LAG DISINFECTION PROCESS GATE REPLACEMENT LAG ELECTRICAL POWER SYSTEM MODS LAG HIGH PRESSURE EFFLUENT AND AIR PIPING IMPROVEMENTS Page xvii August 2, 2013

22 WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS LAG NITRIFICATION/DENITRIFICATION BLOWER INSTALLATION LAG NITRIFICATION DENITRIFICATION BLOWER PROCUREMENT LAG PERSONNEL BUILDING LAG PERSONNEL TRAILERS REPLACEMENT LAG POND MEMBRANE LINER LAG SOLAR PANELS INSTALLATION LAG TERTIARY FILTER REPLACEMENT LAG WASTEWATER CONTROL SYSTEM REPLACEMENT PP PLANNED EXPENDITURE SUMMARY FRIES PUMPING PLANT 666 REHABILITATION HAWAIIAN & B PUMPING PLANT 677 REHABILITAITON HIGHBURY PUMPING PLANT 604 REHABILITATION PUMPING PLANT GENERATORS REPLACEMENT PHASE PP 601 MANCHESTER GENERATOR REPLACEMENT PP 606 DAKOTAH GENERATORS REPLACEMENT PP 669 HARRIS PLACE GENERATOR REPLACEMENT PP 672 MURDOCK & I GENERATOR REPLACEMENT PP TH & VERMONT GENERATOR REPLACEMENT SAN PEDRO PUMPING PLANT 691 REHABILITATION SUNSET PP632 ELECTRICAL SYSTEM REHAB TERMINAL WAY PP 671 REHABILITATION VENICE PUMPING PLANT 646 GENERATORS REPLACEMENT VENICE PP 646 PUMP REPLACEMENT VENICE PP DISCHARGE MANIFOLD REPLACEMENT VENICE PP DUAL FORCE MAIN VENICE PP VIBRATION REHABILITATION WILMINGTON PUMPING PLANT 676 REHABILITATION Page xviii August 2, 2013

23 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS SW PLANNED EXPENDITURE SUMMARY BOND ASSISTANCE PROGRAM BUREAU-WIDE SECURITY SYSTEM COMMUNITY AND PUBLIC INVOLVEMENT AND PROJECT MITIGATION CONSTRUCTION SERVICES CONTRACT (CISCO) CS WASTEWATER CONTROL SYSTEM REPLACEMENT ENVIRONMENTAL LEARNING CENTER EXHIBITS & MEDIA EMPAC SYSTEM REPLACEMENT EQUIPMENT UPGRADE/REPLACEMENT FOR TREATMENT PLANTS GREEN ACRES CAPITAL EQUIPMENT REPLACEMENT PROGRAM (CERP) HUMBOLDT NEIGHBORHOOD STORMWATER GREENWAY SEP LABORATORY EQUIPMENT PROCUREMENT SANTA MONICA URBAN RUNOFF RECYCLING FACILITY WASTEWATER NETWORK SERVERS CAPITAL EQUIPMENT REPLACEMENT PROGRAM WASTEWATER SYSTEM FINANCIAL CONSULTANT (BONDS) WASTEWATER SYSTEM AUDITOR TIWRP PLANNED EXPENDITURE SUMMARY TIWRP AWPF PRODUCT WATER HARDNESS STABILIZATION SYSTEM TIWRP AWPF ULTIMATE EXPANSION TIWRP AWPF VARIBLE FREQUENCY DRIVES FOR PRODUCT WATER PUMPS TIWRP BIOGAS UPGRADE SYSTEM TIWRP BLOWER REPLACEMENT TIWRP CAPITAL EQUIPMENT REPLACEMENT PROGRAM (CERP) TIWRP DISSOLVED AIR FLOATATION TANK MODIFICATION TIWRP FERROUS CHLORIDE SYSTEM EQUIPMENT REPLACEMENT TIWRP FINAL CLARIFIERS REHABILITATION TIWRP FIRE PROTECTION SYSTEM REPLACEMENTS TIWRP HEADWORKS IMPROVEMENTS Page xix August 2, 2013

24 WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS TIWRP HIGH PRESSURE EFFLUENT DISINFECTION TIWRP NEW SERVICE MAINTENANCE FACILITY TIWRP PLANT INFLUENT SAMPLING SYSTEM TIWRP POWER/ENERGY MANAGEMENT TIWRP PRIMARY CLARIFIER WEIRS MODIFICATIONS TIWRP RENEWABLE ENERGY SLURRY FRACTURE INJECTION # TIWRP TERTIARY FILTER INFLUENT PUMP VARIABLE FREQUENCY DRIVE REPLACEMENT TIWRP TERTIARY FILTER REHABILITATION TIWRP TIRE SITE IMPROVEMENTS TIWRP WASTEWATER CONTROL SYSTEM REPLACEMENT Page xx August 2, 2013

25 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM PLANNED EXPENDITURE SUMMARY CATEGORY 2 nd Year 20017/ /19 COLLECTION SYSTEMS 88,008,131 74,017, ,365, ,538, ,206, ,769, ,454, ,509, ,295,820 37,807,960 DONALD C. TILLMAN WATER RECLAMATION PLANT 16,021,947 18,216,650 21,119,879 31,303,085 24,923,455 53,533, ,755, ,769, ,201,248 0 HYPERION TREATMENT PLANT 37,074,699 53,554,438 50,277,667 24,323,566 36,137,678 54,439,234 30,688,380 5,981, LA/GLENDALE WATER RECLAMATION PLANT 12,725,396 8,812,650 3,528,698 6,289,484 5,298,504 4,804, PUMPING PLANTS 3,970,120 8,720,739 19,963,306 29,125,194 27,906,862 6,764, SYSTEM WIDE 11,640,509 8,122,685 6,037,263 23,491,663 8,384,363 11,011,774 9,572,217 12,186,000 10,337,000 2,350,000 TERMINAL ISLAND WATER RECLAMATION PLANT 9,823,015 19,837,400 41,627,084 35,965,658 13,428,223 11,899,743 9,271, , WCIP 179,263, ,282, ,919, ,036, ,285, ,222, ,742, ,606, ,834,068 40,157,960 Page 1 August 2, 2013

26 WASTEWATER CAPITAL IMPROVEMENT PROGRAM THIS PAGE INTENTIONALLY LEFT BLANK Page 2 August 2, 2013

27 COLLECTION SYSTEM (CS) CS PLANNED EXPENDITURE SUMMARY PROJECT TITLE 2 nd Year 20017/ /19 4TH AVE SLAUSON SEWER RREHAB 4,615,562 1,477, & SAN PEDRO D S AIR DAMPER 635, ADAMS BL RELIEF SEWER , , ,940 5,398,842 8,105,898 2,833, ARLINGTON/JEFFERSON DVRSN SWR 41, , , ASSESSMENT ACT SWRS 464, , , , , , , , , ,000 ATF ECIS - LA CNGA & JEFF UPG 28, ATF ECIS - MISSION & JESSE 9,603,760 4,524, ATF NCOS SIPHON UPGRADE 81, BALDWIN HILLS AREA SWR REHAB , , ,988 3,646,449 22, BALLONA CARBON SCRUB FAC UPG ,000 88, , , CIS RELIEF SWR 5,500, CLEAN WATER FLEET REPL T2 850,000 1,000, ,000 1,050,000 1,500, , COLL SYS ADV PLANNING (BOS) 2,250,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 0 CONCORD STREET RELIEF SWR , , ,860 4,009,920 COS 59TH ST AND FOURTH AVE 217,804 64,940 7, COS REHAB MARKET ST TO SLAUSON 8,751,115 7,355,844 77, COS REHAB SLAUSON TO VERNON 567, , ,385 4,074,245 3,813,165 2,843, DACOTAH CARBON SCRUB FAC UPG ,000 64, ,000 43, EMERGENCY SEWER REPLACEMENT 13,060,000 11,060,000 9,060,000 9,300,000 9,547,000 9,000,000 9,274,000 9,552,000 9,840,000 0 ENTERPRISE ST SIPHON MOD 0 50, , ,924 1,145,516 7, FIGUEROA ST SWR REPLCEMENT 0 34, , ,440 2,264,866 4,794,496 1,449, Page 3 CS August 2, 2013

28 COLLECTION SYSTEM (CS) PROJECT TITLE 2 nd Year 20017/ /19 GENESEE CARBON SCRUB FAC UPG 135, , , , HIGHLAND PK EAGLE ROCK SWR RHB , ,080 5,047,868 7,466, , HOLLYWOOD SEWER MAINT YARD , , ,160 7,885,816 6,482,984 5, HUMBOLDT DRP STRUCT AIR DAMPER 795, HUMBOLDT SCRUBBER FACILITY UPG ,000 85, , , LCIS REHAB BLACKWELDER OLYMPIC 907,800 2,307,030 1,885,910 2,643,980 12,198,920 12,198,920 3,792, LCIS REHAB JEFFERSON LA CIEN 318,160 3,794,345 1,794,634 5, MAINTENANCE HOLE RESETTING 698, , , , , , , , , ,000 MANHATTAN 4TH SWR REHAB , , ,900 1,180,390 4, MLK & RODEO CARB SCRUB FAC UPG 78, , , N HOLLYWOOD SEWER MAINT YARD 528, ,820 71, , ,000 6,000,440 5,255, NEIS 2A 3,307,280 1,312,120 35,665,184 51,978,540 51,745,860 33,649, NORMANDIE SWR REPL/REHAB 203,180 2,793,524 7,180,312 4,552,458 29, NORS/ECIS CARBON SCRUB FAC UPG 78, , , NOS REHAB PROGRAM ,291,956 9,225,475 5,352,852 3,181,140 2,769,812 0 NOS REHAB U-2 WESTERN TO VERMONT 368,240 4,273,360 4,285,152 3,075,598 30, NOS REHAB U-3 VERMONT TO TRINITY 398, ,000 1,779,131 7,749,345 6,192,864 47, NOS REHAB U-5 SAN PEDRO HOOPER 272,460 3,207,145 3,214,794 2,308,670 22, NOS REHAB U-6 HOOPER WILSON , , , ,720 4,029,556 8,504,748 0 NOS REHAB U-7 WILSON LA RIVER , , ,660 1,422,985 5,475,188 4,364, NOTF CARBON SCRUBBER FAC UPG 0 84,000 84, , , ODOR CONTROL SIERRA BONITA FAC UPG , , , , ODOR CTRL ATWATER VILLAGE SCR 764,979 24, Page 4 CS August 2, 2013

29 COLLECTION SYSTEM (CS) PROJECT TITLE 2 nd Year 20017/ /19 PIERCE & WOODMAN DIVER SWR 0 33, , , , PLANNED UPGR REPLC PROG ,000 5,000,000 65,100,000 65,100,000 68,225,000 68,225,000 0 RADFORD CARBON SCRUB FAC UPG 81,000 81, , , RESEDA SEWER MAINT YARD , , ,700 8,024,892 6,605,308 5, RICHMOND SCRUBBER FACILITY UPG 0 84,000 84, , , SAN FERNANDO & 110 FWY SWR RPL 660, SAN PEDRO SIPHON UPSTREAM 30" ,840 1,364, , SECONDARY SWR RENEWAL PROG 0 0 5,734,090 29,694,416 30,177,637 45,904,000 42,925,000 40,946,000 32,967,000 32,967,000 SLAUSON COMPTON SWR REHAB 488,120 4,280,880 9,919,458 9,659, , SOUTH DISTRICT YARD IMPRV 0 1,005, ,272,593 8,616, , ,400 81,040 SSRP A04 AIRPORT & 78TH ST 19, SSRP C01A CALIF & ABBOTT KINN 527, SSRP C08A PALISADES & SURFVIEW 87, SSRP C08B TEMESCAL & PALISADES 201, SSRP C08C OCEAN & TEMESCAL 262, SSRP E13 VICTORY & BECK 2,640 88,060 66, SSRP E35 GLENOAKS & MACLAY 198, SSRP E39 BALBOA BL & VENTURA BL 1,020,432 4, SSRP H02 6TH & SAN VICENTE 438, , SSRP H03 SUNSET & RODEO 2,209, , SSRP H05 BEVERLY & FAIRFAX 274, , SSRP H06 ADAMS & CRENSHAW 54, , , SSRP H11 BURNSIDE & WILSHIRE 15, , , Page 5 CS August 2, 2013

30 COLLECTION SYSTEM (CS) PROJECT TITLE 2 nd Year 20017/ /19 SSRP H14 WILSHIRE & ORANGE 242, SSRP H15 JUNE & WILSHIRE 304,313 1, SSRP H16 CRENSHAW & VENICE 219,320 57, SSRP H19 ARDEN BLVD & 3RD ST 268, SSRP H20 2ND & EDGEMONT 1,389,175 7, SSRP H21 OLYMPIC & OXFORD 148, SSRP H23 VERMONT & OLYMPIC 1,160,167 7, SSRP H24 SUNSET BL & RENO ST 171, SSRP H , , ,958 2,539,202 26, SSRP H33 KENMORE & FOUNTAIN 570,844 4, SSRP N01 BUDLONG & LEIGHTON 300,093 2, SSRP N02 SAN PEDRO & 31ST 244, SSRP N03 ADAMS BL & COMPTON AV 142,640 2,184, ,460 1, SSRP N05 8TH & SOTO 1,082, , SSRP N06A 36TH PL & VERMONT 118,560 1,626, , SSRP N06B ADAMS & HILL 114,720 1,954,055 1,474,465 7, SSRP N07 BROADWAY & PICO 155,747 1,820,189 3,719,177 28, SSRP N12 PARK VIEW & BEVERLY 1,786,139 14, SSRP P09 GRIFFIN AVE & AVE ,816 4, SSRP P15 LEWIS & SAYLIN 1,049,575 8, SSRP P17 CYPRESS & DIVISION 134, ,240 2,865, , SSRP P20 COLORADO & TOWNSEND 96, ,320 1,698, , SSRP P21A LOS FELIZ & REVERE 1,082,257 7, Page 6 CS August 2, 2013

31 COLLECTION SYSTEM (CS) PROJECT TITLE 2 nd Year 20017/ /19 SSRP P21B GLENDALE & ROWENA 205,938 1, SSRP P21C LOS FELIZ & 5 FWY 392,027 2, SSRP S01 VERNON & WESTERN 41, ,835 74, SSRP S04 SLAUSON & VAN NESS 49, , , SSRP S05 10TH AV & 71 ST 672, SSRP S06 VERMONT & 76TH ST 200, SSRP S07 76TH ST & GRAND AVE 58, ,486 2, SSRP S08 MAIN & MANCHESTER 80, , , SSRP S10 FLORENCE & WESTERN 182,970 1,132, , SSRP S11 WESTERN & 92 29, , , SSRP S ,514 30, , , SSRP S14 HOOVER & VERNON 118,560 1,558,268 1,577,012 10, SSRP S16 AVALON & VERNON 661, , SSRP S17 COMPTON & VERNON 455, , SSRP T01 3RD & MESA 198, SSRP T04 S ALMA & W 10TH ST 1,413,193 9, SSRP T05 CHANNEL & GAFFEY ST 348,804 10, SSRP T06A ANAHEIM ST & BROAD 1,726,860 14, SSRP T06B FRIES & PIER A 549,520 5, SSRP T08 ALAMEDA & ANAHEIM 215, ,803 7, SSRP U11 BUNDY & SAN VINCENTE 638,281 3, SSRP U14 OVERLAND & 10 FWY 805, , SSRP U16 SELBY & LA GRANGE 315,438 5, Page 7 CS August 2, 2013

32 COLLECTION SYSTEM (CS) PROJECT TITLE 2 nd Year 20017/ /19 SSRP U20 BEV GLEN & QUITO LN 303, SSRP U21 GAYLEY & LE CONTE 283, SSRP U23 DAVID & CANFIELD 1,478,461 8, SSRP Z13 MORAY & W 25TH 305,320 1, SSRP Z18A CENTURY & MAIN 223, ,840 4,538, , SSRP Z18B IMPERIAL & AVALON 331, ,360 7,062,010 1,114, UPPER BEACHWOOD EASEMNT MH ADD 206, ,600 36, , , VENICE & HIGHLAND MH SWR 28, VENICE BLVD INTERCEPTOR U2 18, , ,120 2,752,680 1,709, WASH GRIFFITH LB SWR REPLC 1,956,149 12, WILSHIRE AREA OLYM SWR REHAB , , ,320 4,047,725 4,733,679 34, WILSHIRE AREA SYS SWR REHAB , , ,700 2,478,897 6,076, , WLA SEWER MAINT YARD 0 17, , , , ,600 3,927,066 9,677, WLAIS REHAB OVERLAND TO KELTON 120,400 1,675,804 2,380,096 14, CS 88,008,131 74,017, ,365, ,538, ,206, ,769, ,454, ,509, ,295,820 37,807,960 Page 8 CS August 2, 2013

33 COLLECTION SYSTEM (CS) 4TH AVENUE SLAUSON SEWER REHABILITATION 5 8 South Los Angeles SZC TH AVE SLAUSON SWR REHAB PROJECT DESCRIPTION: This project will rehabilitate 1.2 miles of structurally deteriorated 75-inch diameter reinforced concrete pipe sewer (built in 1924) by sliplining method. The project location is on Slauson Avenue from Van Ness Avenue to 4th Avenue, and on 4th Avenue from Slauson Avenue to Vernon Avenue. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 1,366, ,366,160 PLANS CONSULTANT (CTP) 342, ,300 CONSTRUCTION (CONS) 2,649,225 3,455,802 1,306, ,411,487 CONST MGT CITY (FACM) 1,059,200 1,104, , ,332,960 CM CONSULTANT (CTCM) 53,000 55,200 2, ,500 5,469,885 4,615,562 1,477, ,563,407 Page 9 CS August 2, 2013

34 COLLECTION SYSTEM (CS) 23RD & SAN PEDRO DROP STRUCTURE AIR DAMPER East, South Los Angeles SZC & SAN PEDRO D S AIR DAMPER PROJECT DESCRIPTION: This project will design and install a manually adjustable air damper in the air return lines of the existing 23rd and San Pedro Drop Structure. To provide access, the damper will be housed in a concrete vault. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 132, ,400 PLANS CONSULTANT (CTP) 43, ,000 CONSTRUCTION (CONS) 0 540, ,000 CONST MGT CITY (FACM) 8,320 80, ,480 CM CONSULTANT (CTCM) 1,400 15, , , , ,580 Page 10 CS August 2, 2013

35 COLLECTION SYSTEM (CS) ADAMS BOULEVARD RELIEF SEWER South Los Angeles SZC11474 ADAMS BLVD RELIEF SWR PROJECT DESCRIPTION: This project will construct approximately 8,865 linear feet of 36-inch relief sewer in Adams Boulevard from West Boulevard to Fairfax Avenue, parallel to the existing sewers in Adams Boulevard, and will replace 250 linear feet of 18-inch and 100 linear feet of 15-inch sewer. The project boundaries are Adams Boulevard between Dunsmuir Avenue and the LCSFVRS (La Cienega - San Fernando Valley Relief Sewer) at Fairfax Avenue. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) , , ,440 18, ,183,840 PLANS CONSULTANT (CTP) ,700 41,600 22, ,800 CONSTRUCTION (CONS) ,416,062 7,100,718 2,684, ,201,314 CONST MGT CITY (FACM) , , , ,021,840 CM CONSULTANT (CTCM) ,900 47,900 2, , , , ,940 5,398,842 8,105,898 2,833, ,594,594 Page 11 CS August 2, 2013

36 COLLECTION SYSTEM (CS) ARLINGTON AND JEFFERSON DIVERSION SEWER , 10 South Los Angeles SZC12484 ARLINGTON/JEFFERSON DVRSN SWR PROJECT DESCRIPTION: This project will construct a 6-inch diameter maintenance hole on the existing 20-inch sewer in Jefferson Boulevard, construct an 8-inch by 15-inch box diversion structure with stop logs on the 30-inch Vitrified Clay Pipe (VCP) sewer along Arlington Avenue, construct a junction structure with maintenance hole on the 42-inch sewer along Arlington, Install approximately 23 linear feet of 42-inch VCP between the junction structure and the diversion structure, and install approximately 29 linear feet of 21-inch VCP between the diversion structure and the maintenance hole on Jefferson Blvd, and modify maintenance hole channel. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 86,190 40,200 5, ,290 PLANS CONSULTANT (CTP) 8,300 1, ,450 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,010 4, ,530 CM CONSULTANT (CTCM) 0 0 5, ,390 94,490 41, , , ,121,660 Page 12 CS August 2, 2013

37 COLLECTION SYSTEM (CS) ASSESSMENT ACT SEWERS 21 ALL ALL VARIOUS PROJECT DESCRIPTION: This project will provide funding of a portion of local sewer projects, which are primarily financed by benefiting property owners through the Assessment Act proceeding. This funding pays for incurred costs which cannot be assessed, including engineering and other incidental project costs which exceed the limitation established by the City Council. Other funding includes the portion of the project costs to provide for future, additional capacity beyond the immediate local sewer requirements of the Assessment District and the proportionate cost for offsite sewers which cannot be assessed to the owners within the assessment district. PROJECT MANAGER: Mary Marcus Phone: (818) Office: Valley District (BOE) PLANS CITY (FAP) 1,026, , , , , , , , , , ,000 2,208,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 3,300, , , , , , , , , , ,000 5,850,000 CONST MGT CITY (FACM) 1,350, , , , , , , , , , ,000 3,000,000 CM CONSULTANT (CTCM) ,676, , , , , , , , , , ,000 11,058,000 Page 13 CS August 2, 2013

38 COLLECTION SYSTEM (CS) AIR TREATMENT FACILITY EAST CENTRAL INTERCEPTOR SEWER (ECIS) - MISSION & JESSE East SZC11545 ATF ECIS - MISSION & JESSE PROJECT DESCRIPTION: This project will design and construct an Air Treatment Facility (ATF) for the East Central Interceptor Sewer (ECIS). This ATF will be designed to treat foul air from this location of turbulent flow at the ECIS pipeline. This location includes a drop structure at Mission Street & Jesse Road. The ATF will consist of a building with a control room and treatment trains composed of cylindrical biotrickling filters and cylindrical carbon vessels. Landscaping around the ATF will also be included. PROJECT MANAGER: Gus Malkoun Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 1,086, ,086,080 PLANS CONSULTANT (CTP) 89, ,900 CONSTRUCTION (CONS) 3,508,000 8,440,000 4,300, ,248,000 CONST MGT CITY (FACM) 998, , , ,967,120 CM CONSULTANT (CTCM) 180, , , ,000 5,862,540 9,603,760 4,524, ,991,100 Page 14 CS August 2, 2013

39 COLLECTION SYSTEM (CS) BALDWIN HILLS AREA SEWER REHABILITATION 23 8, 10 South Los Angeles SZC11654 BALDWIN HILLS AREA PRIM SWR RE PROJECT DESCRIPTION: This project will rehabilitate approximately 7,500 linear feet of sewers constructed around 1920 ranging from 18 to 42 inches in diameter. The reaches are located in Exposition Boulevard, Rodeo Road, Arlington Avenue, La Cienega Boulevard, National Boulevard, and Crescent Heights Boulevard. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 49, , , , ,840 PLANS CONSULTANT (CTP) 7, ,900 29,600 1, ,100 CONSTRUCTION (CONS) ,128 3,204, ,676,477 CONST MGT CITY (FACM) , ,000 22, ,720 CM CONSULTANT (CTCM) ,900 20, ,000 56, , , ,988 3,646,449 22, ,136,137 Page 15 CS August 2, 2013

40 COLLECTION SYSTEM (CS) BALLONA CARBON SCRUBBER FACILITY UPGRADE West Los Angeles NEW PROJECT DESCRIPTION: This project will provide the replacement of corroded carbon vessels including the associated air duct, isolation dampers, blowers and differential pressure gauges for Ballona carbon scrubber facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,000 70,000 6, ,000 PLANS CONSULTANT (CTP) ,000 18,000 1, ,000 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,000 13, ,000 CM CONSULTANT (CTCM) ,000 4, , ,000 88, , , ,000 Page 16 CS August 2, 2013

41 COLLECTION SYSTEM (CS) COASTAL INTERCEPTOR SEWER RELIEF SEWER West Los Angeles SZC11748 COASTAL INT SWR-LFD-RLF SWR PROJECT DESCRIPTION: This project proposes the construction of the Coastal Interceptor Relief Sewer (CIRS) in order to provide additional capacity beyond that of the existing Costal Interceptor Sewer. The additional capacity is needed in order to handle the increased flows associated with the Santa Monica Canyon and the Palisades Park Low Flow Diversion (LFD) Upgrades. The new 4,500 foot long parallel gravity relief sewer is to be aligned within Pacific Coast Highway (3,100 feet) and also within Will Rodgers Beach parking lot (1,400 feet). PROJECT MANAGER: Andy Flores Phone: (213) Office: Stormwater Group (BOE) PLANS CITY (FAP) PLANS CONSULTANT (CTP) 17, ,000 CONSTRUCTION (CONS) 1,373,000 5,500, ,873,000 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) 110, ,000 1,500,000 5,500, ,000,000 Page 17 CS August 2, 2013

42 COLLECTION SYSTEM (CS) CLEAN WATER FLEET REPLACEMENT TIER ALL ALL PROJECT DESCRIPTION: This project will purchase and procure maintenance vehicles to replace the entire BOS/WCSD wastewater fleet. Vehicles to be replaced include: sewer cleaning combos, rodders, electrical/mechanical trucks, vacuum tankers, as well as other vehicles that are used to clean and maintain the sewer/pumping plant collection system. The aforementioned equipment is to be purchased over a six year period from FY 13/14 to FY 18/19. PROJECT MANAGER: Augustine Nnuro Phone: (213) Office: Financial Management Division (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 850,000 1,000, ,000 1,050,000 1,500, , ,730,000 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,000 1,000, ,000 1,050,000 1,500, , ,730,000 Page 18 CS August 2, 2013

43 COLLECTION SYSTEM (CS) COLLECTION SYSTEM ADVANCED PLANNING (SANITATION) 865 ALL ALL VARIOUS PROJECT DESCRIPTION: This project will provide general staff support in helping to assess 600 miles of sewers per year and prepare the primary master plans and secondary sewershed plans for the wastewater collection system and will also provide expertise in hydraulic modelling, GIS support, and odor control planning. It will help to support Settlement Agreement. PROJECT MANAGER: Ali Poosti Phone: (323) Office: Wastewater Engineering Services Division (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) 15,450,000 2,250,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 28,500,000 CONSTRUCTION (CONS) CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,450,000 2,250,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200, ,500,000 Page 19 CS August 2, 2013

44 COLLECTION SYSTEM (CS) CONCORD STREET RELIEF SEWER East NEW PROJECT DESCRIPTION: This project will remove 1300 linear feet of existing 12- and 14-inch sewer and construct 2100 linear feet of new sewer in the Boyle Heights area. PROJECT MANAGER: Fernando Gonzalez Phone: (323) Office: Wastewater Engineering Services Division (BOS) PLANS CITY (FAP) , , ,360 5, ,040 PLANS CONSULTANT (CTP) ,400 15,700 8, ,600 CONSTRUCTION (CONS) ,518,000 3,518,000 CONST MGT CITY (FACM) , ,400 CM CONSULTANT (CTCM) ,000 22, , , ,860 4,009,920 4,384,040 Page 20 CS August 2, 2013

45 COLLECTION SYSTEM (CS) CENTRAL OUTFALL SEWER (COS) AT 59TH STREET AND FOURTH AVENUE South Los Angeles SZC11942 COS 59TH ST AND FOURTH AVE PROJECT DESCRIPTION: This project will remove the existing Central Outfall Sewer (COS) pipe at 59th Street and Fourth Avenue and replace with a new section of pipe to eliminate an obstruction and restore the invert in COS. PROJECT MANAGER: James Corralejo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 217, ,600 PLANS CONSULTANT (CTP) 17, ,700 CONSTRUCTION (CONS) 2,076, , ,180,726 CONST MGT CITY (FACM) 109, ,560 62,240 7, ,840 CM CONSULTANT (CTCM) 89,400 5,400 2, ,500 2,510, ,804 64,940 7, ,801,366 Page 21 CS August 2, 2013

46 COLLECTION SYSTEM (CS) CENTRAL OUTFALL SEWER (COS) REHABILITATION MARKET STREET TO SLAUSON AVENUE South Los Angeles SZC11784 COS REHAB MARKET ST TO SLAUSON PROJECT DESCRIPTION: This project will rehabilitate by sliplining or by man-entry approximately 13,182 feet of the Central Outfall Sewer from the intersection of Market Street and Hyde Park Boulevard to the intersection of Slauson Avenue and Van Ness Avenue. This project will also construct access pits, clean pipes, rehabilitate or remove existing Maintenance Hole's (MH s), and construct new MH s at required intervals along the alignment. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 1,622, ,622,960 PLANS CONSULTANT (CTP) 2,200, ,200,000 RIGHT-OF-WAY (RW) 150, ,000 CONSTRUCTION (CONS) 200,000 7,649,335 6,685, ,534,979 CONST MGT CITY (FACM) 1,003,360 1,049, ,600 77, ,771,520 CM CONSULTANT (CTCM) 50,200 52,500 28, ,300 5,226,520 8,751,115 7,355,844 77, ,410,759 Page 22 CS August 2, 2013

47 COLLECTION SYSTEM (CS) CENTRAL OUTFALL SEWER (COS) REHABILITATION SLAUSON AVENUE TO VERNON AVENUE , 10 South Los Angeles SZC12534 COS REHAB SLAUSON TO VERNON PROJECT DESCRIPTION: This project will rehabilitate by sliplining or by man-entry approximately 5,270 feet of the Central Outfall Sewer (COS) from the intersection of Slauson Avenue and Van Ness Avenue to the intersection of Vernon Avenue and alley east of Arlington Avenue. This project will also construct access pits, clean pip, rehabilitate or remove existing Maintenance Hole's, (MH's) and construct new MH's at required intervals along the alignment. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 224, , ,240 77, ,600 PLANS CONSULTANT (CTP) 19,400 29, ,600 RIGHT-OF-WAY (RW) 0 200, ,000 CONSTRUCTION (CONS) ,825 3,403,625 3,403,625 2,843, ,219,682 CONST MGT CITY (FACM) , , , ,348,800 CM CONSULTANT (CTCM) ,800 31,900 16, , , , , ,385 4,074,245 3,813,165 2,843, ,596,482 Page 23 CS August 2, 2013

48 COLLECTION SYSTEM (CS) DACOTAH CARBON SCRUBBER FACILITY UPGRADE East NEW PROJECT DESCRIPTION: This project will replace corroded carbon vessels including the associated air duct, isolation dampers, blowers and differential pressure gauges and install soundproof enclosures for fans and air ducts at the Dacotah carbon scrubber facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,000 51, ,000 PLANS CONSULTANT (CTP) ,000 13, ,000 CONSTRUCTION (CONS) ,000 35, ,000 CONST MGT CITY (FACM) ,000 6, ,000 CM CONSULTANT (CTCM) ,000 2, , ,000 64, ,000 43, ,000 Page 24 CS August 2, 2013

49 COLLECTION SYSTEM (CS) EMERGENCY SEWER REPLACEMENT 48 ALL N/A VARIOUS PROJECT DESCRIPTION: This budget item represents contingency funding for expenditures through standby construction contracts for capital improvement construction activities necessary to protect public health and safety during structural failures of the existing Collection System. PROJECT MANAGER: Jon Haskett Phone: (213) Office: Wastewater Conveyance Construction Division (BOE) PLANS CITY (FAP) 4,275, , , , , , , , , , ,000 9,070,000 PLANS CONSULTANT (CTP) 500, ,000 CONSTRUCTION (CONS) 110,788,000 12,000,000 10,000,000 8,000,000 8,240,000 8,487,000 9,000,000 9,274,000 9,552,000 9,840,000 9,840, ,021,000 CONST MGT CITY (FACM) 5,265, , , , , , ,170,000 CM CONSULTANT (CTCM) 500, , ,328,000 13,060,000 11,060,000 9,060,000 9,300,000 9,547,000 9,000,000 9,274,000 9,552,000 9,840, ,261,000 Page 25 CS August 2, 2013

50 COLLECTION SYSTEM (CS) ENTERPRISE STREET SIPHON MODIFICATION Central, East SZC11467 ENTERPRISE ST SIPHON MODIF PROJECT DESCRIPTION: This project will clean and modify the existing North Outfall Sewer (NOS) siphon at the Enterprise Street level to accommodate reduced wastewater flows in the NOS. The siphon inlet and outlet structures will also be modified for better access. The Enterprise Street Siphon is located south of the 60 Freeway and carries flow from the NOS across and under the Los Angeles River. PROJECT MANAGER: Hortensia Alonso Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 218, ,240 11, ,440 PLANS CONSULTANT (CTP) 22, ,200 RIGHT-OF-WAY (RW) ,000 50, ,000 CONSTRUCTION (CONS) ,104 1,052, ,718,700 CONST MGT CITY (FACM) ,640 88,720 7, ,800 CM CONSULTANT (CTCM) ,500 4, , , , , ,924 1,145,516 7, ,367,840 Page 26 CS August 2, 2013

51 COLLECTION SYSTEM (CS) FIGUEROA STREET SEWER REPLACEMENT 53 8 South Los Angeles NEW PROJECT DESCRIPTION: This project will replace approximately 8,000 feet of 18-inch cement sewer constructed around 1930 in Figueroa Street from 108th Street to the Pumping Plant 601 connection (just south of Manchester Avenue). PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) , , ,640 80, ,520 PLANS CONSULTANT (CTP) 0 0 4,500 33,400 30, ,700 CONSTRUCTION (CONS) ,709,546 4,159,896 1,390, ,260,000 CONST MGT CITY (FACM) , ,400 59, ,115,520 CM CONSULTANT (CTCM) ,600 30, , , , ,440 2,264,866 4,794,496 1,449, ,340,540 Page 27 CS August 2, 2013

52 COLLECTION SYSTEM (CS) GENESEE CARBON SCRUBBER FACILITY UPGRADE West Los Angeles NEW PROJECT DESCRIPTION: This project will provide the replacement of corroded carbon vessels including the associated air duct, isolation dampers, blowers and differential pressure gauges for Genesee carbon scrubber facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 108, ,000 10, ,000 PLANS CONSULTANT (CTP) 0 27,000 27,000 2, ,000 CONSTRUCTION (CONS) , , ,010,000 CONST MGT CITY (FACM) ,000 21, ,000 CM CONSULTANT (CTCM) ,000 6, , , , , , ,394,000 Page 28 CS August 2, 2013

53 COLLECTION SYSTEM (CS) HIGHLAND PARK EAGLE ROCK SEWER REHABILITATION , 9, 13, 14 East NEW PROJECT DESCRIPTION: This project will provide the rehabilitation of approximately 27,374 linear feet of structurally deteriorated sewers. The sewers range from 16 to 21 inches in diameter and were constructed around The sewer reaches are located over a wide area roughly bounded by the CA-2, I-5 and I-10 Freeways. PROJECT MANAGER: Carlos Amaya Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) , ,880 13, ,920 PLANS CONSULTANT (CTP) ,700 21, ,900 CONSTRUCTION (CONS) ,209,048 6,767, , ,829,550 CONST MGT CITY (FACM) , ,080 63, ,516,160 CM CONSULTANT (CTCM) ,300 32, , , ,080 5,047,868 7,466, , ,374,330 Page 29 CS August 2, 2013

54 COLLECTION SYSTEM (CS) HOLLYWOOD SEWER SANITATION MAINTENANCE YARD Central NEW PROJECT DESCRIPTION: This project will demolish the existing 13,700 square foot building and construct a new 7,500 square foot office building including new site lighting, new security system, and 840 linear feet of perimeter fence. It will also remove and replace the existing site parking with 26,800 square feet of parking, install a clarifier, construct a 540 square foot wash pad, and provide landscaping for 2,200 square foot area. PROJECT MANAGER: Paul Young Phone: (213) Office: Architectural Division (BOE) PLANS CITY (FAP) , , ,960 7, ,000 PLANS CONSULTANT (CTP) ,800 32, ,000 CONSTRUCTION (CONS) ,077,896 6,204, ,282,880 CONST MGT CITY (FACM) , ,000 5, ,083,440 CM CONSULTANT (CTCM) , , ,160 7,885,816 6,482,984 5, ,216,320 Page 30 CS August 2, 2013

55 COLLECTION SYSTEM (CS) HUMBOLDT DROP STRUCTURE AIR DAMPER East SZC12477 HUMBOLDT DRP STRUCT AIR DAMPER PROJECT DESCRIPTION: This project will design and install a manually adjustable air damper in the air return lines of the existing Humboldt Drop Structure. To provide access, the damper will be housed in a concrete vault. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 132, ,400 PLANS CONSULTANT (CTP) 43, ,000 CONSTRUCTION (CONS) 0 700, ,000 CONST MGT CITY (FACM) 8,320 80, ,480 CM CONSULTANT (CTCM) 1,400 15, , , , ,580 Page 31 CS August 2, 2013

56 COLLECTION SYSTEM (CS) HUMBOLDT SCRUBBER FACILITY UPGRADE East NEW PROJECT DESCRIPTION: This project will replace corroded carbon vessels including the associated air ducts, isolation dampers, demister, blowers, and differential pressure gauges and install soundproof enclosure for fans and air ducts at the Humboldt carbon scrubber facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,000 68,000 5, ,000 PLANS CONSULTANT (CTP) ,000 17,000 1, ,000 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,000 13, ,000 CM CONSULTANT (CTCM) ,000 4, , ,000 85, , , ,000 Page 32 CS August 2, 2013

57 COLLECTION SYSTEM (CS) LA CIENEGA INTERCEPTOR SEWER (LCIS) REHABILITATION BLACKWELDER TO OLYMPIC , 5, 10 South Los Angeles SZC12539 LCIS REHAB BLACKWELDER OLYMPIC PROJECT DESCRIPTION: This project will rehabilitate 11,662 linear feet (2.21 miles) of the La Cienega Interceptor Sewer (LCIS) constructed in the 1920s, from La Cienega Boulevard and Fairfax Avenue (north of the Blackwelder Diversion Structure) to Schumacher Drive (north of Olympic Boulevard). The project will also construct 24 Maintenance Holes (MH's) and reconnect existing house connections (HC's). PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 126, , , , , ,084,510 PLANS CONSULTANT (CTP) 0 97,610 64, ,800 RIGHT-OF-WAY (RW) 0 0 1,500,000 1,752, ,252,000 CONSTRUCTION (CONS) ,670,050 10,780,720 10,780,720 3,603, ,835,000 CONST MGT CITY (FACM) ,770 1,350,680 1,350, , ,559,920 CM CONSULTANT (CTCM) ,520 67,520 67, , , ,800 2,307,030 1,885,910 2,643,980 12,198,920 12,198,920 3,792, ,061,790 Page 33 CS August 2, 2013

58 COLLECTION SYSTEM (CS) LA CIENEGA INTERCEPTOR SEWER (LCIS) REHABILITATION JEFFERSON TO LA CIENEGA South Los Angeles SZC11845 LCIS REHB JEFFERSON TO LA CIEN PROJECT DESCRIPTION: This project will rehabilitate approximately 2,200 feet of the existing 63-inch semi-elliptical La Cienega Interceptor Sewer (LCIS) from the intersection of Jefferson Boulevard and National Boulevard to the intersection of La Cienega and Fairfax by slip-lining and man-entry repair. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 365,680 96, ,680 PLANS CONSULTANT (CTP) 34, ,600 RIGHT-OF-WAY (RW) 75,000 75, ,000 CONSTRUCTION (CONS) 0 0 3,353,985 1,690, ,044,539 CONST MGT CITY (FACM) 0 140, , ,480 5, ,920 CM CONSULTANT (CTCM) 0 7,000 21,000 3, , , ,160 3,794,345 1,794,634 5, ,388,339 Page 34 CS August 2, 2013

59 COLLECTION SYSTEM (CS) MAINTENANCE HOLE RESETTING 85 ALL ALL SZC11264 MAINTENANCE HOLE RESETTING PROJECT DESCRIPTION: This project will provide adjustment of sewer maintenance hole frames and covers to grade, slotting of adjusted maintenance holes, and removal and disposal of all foreign materials resulting from this work. PROJECT MANAGER: Carmelo Martinez Phone: (323) Office: Wastewater Collection Systems Division (BOS) PLANS CITY (FAP) 30, ,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 4,690, , , , , , , , , , ,000 9,738,000 CONST MGT CITY (FACM) 140,000 78,000 78,000 92,000 92,000 92,000 92, , , , ,000 1,104,000 CM CONSULTANT (CTCM) ,860, , , , , , , , , , ,000 10,872,000 Page 35 CS August 2, 2013

60 COLLECTION SYSTEM (CS) MANHATTAN PL SEWER REHABILITATION, S/O 4TH ST TO S/O 6TH ST 87 4, 10 Central NEW PROJECT DESCRIPTION: This project will rehabilitate approximately 1,500 linear feet of 27-inch diameter sewers constructed in the 1930 s. The sewer reaches are located in Manhattan Place, from south of Fourth Street to south of Sixth Street. PROJECT MANAGER: Carlos Amaya Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) , ,320 61, ,360 PLANS CONSULTANT (CTP) ,600 10,100 1, ,500 CONSTRUCTION (CONS) ,090, ,090,770 CONST MGT CITY (FACM) ,400 85,520 4, ,920 CM CONSULTANT (CTCM) ,500 4, , , , ,900 1,180,390 4, ,428,150 Page 36 CS August 2, 2013

61 COLLECTION SYSTEM (CS) MLK & RODEO CARBON SCRUBBER FACILITY UPGRADE South Los Angeles SZC12525 MLK & RODEO CARB SCRUB FAC UPG PROJECT DESCRIPTION: This project will replace corroded carbon vessels including the associated air duct, isolation dampers, blowers and differential pressure gauges at the Martin Luther King (MLK) & Rodeo carbon scrubber facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 62,000 62,000 6, ,000 PLANS CONSULTANT (CTP) 16,000 16,000 1, ,000 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,000 13, ,000 CM CONSULTANT (CTCM) ,000 3, ,000 78,000 78, , , ,000 Page 37 CS August 2, 2013

62 COLLECTION SYSTEM (CS) NORTH HOLLYWOOD SEWER SANITATION MAINTENANCE YARD Central NEW PROJECT DESCRIPTION: This project will renovate and upgrade the remaining Wastewater Collection Yards. The renovations and upgrades could consist of upgrading office areas to comply with City standards, renovation of the locker rooms, restrooms, and common areas to comply with Americans with Disabilities Act requirements. PROJECT MANAGER: Paul Young Phone: (213) Office: Architectural Division (BOE) PLANS CITY (FAP) 0 498, ,720 71,280 7, ,023,760 PLANS CONSULTANT (CTP) 0 29,900 30, ,000 CONSTRUCTION (CONS) ,995,080 5,255, ,250,844 CONST MGT CITY (FACM) , ,000 5, ,083,440 CM CONSULTANT (CTCM) , ,820 71, , ,000 6,000,440 5,255, ,418,044 Page 38 CS August 2, 2013

63 COLLECTION SYSTEM (CS) NORTHEAST INTERCEPTOR SEWER (NEIS) PHASE 2A 101 1, 4, 13 Central, South Valley SZC11777 NORTHEAST INTERCEPTOR SEWR PH2 PROJECT DESCRIPTION: The Northeast Interceptor Sewer (NEIS) 2A will construct approximately 3.8 miles of 98-inch sewer and associated structures, including junction structure; drop structures; maintenance holes; and 84-inch connection to the North Outfall Sewer (NOS) south of Los Angeles Glendale Water Reclamation Plant (LAGWRP). PROJECT MANAGER: Carlos Amaya Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 7,263,280 1,912, , ,436,000 PLANS CONSULTANT (CTP) 5,612, , ,507,500 RIGHT-OF-WAY (RW) 500, , ,000,000 CONSTRUCTION (CONS) ,510,484 48,832,620 48,832,620 32,510, ,686,700 CONST MGT CITY (FACM) ,880 1,904,800 1,899,520 1,759,040 1,138, ,337,040 CM CONSULTANT (CTCM) ,600 1,249,900 1,246,400 1,154, ,067,100 13,375,580 3,307,280 1,312,120 35,665,184 51,978,540 51,745,860 33,649, ,034,340 Page 39 CS August 2, 2013

64 COLLECTION SYSTEM (CS) NORMANDIE SEWER REPLACEMENT AND REHABILITATION , 9 South Los Angeles SZC11943 NORMANDIE SWR REPL/RHB PROJECT DESCRIPTION: This project will rehabilitate approximately 8700 linear feet of the existing 30-inch, 34-inch and 39-inch of cementbrick sewer by CIPP (cured-in-place) method and replace 500 linear feet of sewer where rehabilitation is not practical. All affected maintenance holes will be either rehabilitated or replaced. The sewers will be located on Slauson Avenue, Alley east of Van Ness Avenue, 6oth Street, Western Avenue, 60th Place and Normandie Avenue, and span from the intersection of Slauson Avenue/Van Ness Avenue to 68th Street. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 660, , , ,680 PLANS CONSULTANT (CTP) 64,900 11, ,000 CONSTRUCTION (CONS) 0 0 2,115,724 6,347,172 4,213, ,676,694 CONST MGT CITY (FACM) , , ,360 29, ,673,280 CM CONSULTANT (CTCM) ,200 39,700 13, , , ,180 2,793,524 7,180,312 4,552,458 29, ,484,854 Page 40 CS August 2, 2013

65 COLLECTION SYSTEM (CS) NORS/ECIS CARBON SCRUBBER FACILITY UPGRADE West Los Angeles SZC12524 NORS/ECIS CARBON SCRUB FAC UPG PROJECT DESCRIPTION: This project will provide the replacement of corroded carbon vessels including the associated air duct, isolation dampers, blowers and differential pressure gauges for NORS/ECIS (North outfall Replacement Sewer/East Central Interceptor Sewer) carbon scrubber facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 62,000 62,000 6, ,000 PLANS CONSULTANT (CTP) 16,000 16,000 1, ,000 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,000 13, ,000 CM CONSULTANT (CTCM) ,000 3, ,000 78,000 78, , , ,000 Page 41 CS August 2, 2013

66 COLLECTION SYSTEM (CS) NORTH OUTFALL SEWER REHAB PROGRAM , 8, 9, 10, 11, 14, Central, East, South Los Angeles, South Valley, West Los Angeles PROJECT DESCRIPTION: This is a placeholder for the new 1 mile, $10M/year plan to rehab the NOS. It reflects the remaining amount of funding available for addiotional NOS projects. PROJECT MANAGER: Brad Jenson NEW Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) ,291,956 9,225,475 5,352,852 3,181,140 2,769, ,821,235 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,291,956 9,225,475 5,352,852 3,181,140 2,769, ,821,235 Page 42 CS August 2, 2013

67 COLLECTION SYSTEM (CS) NORTH OUTFALL SEWER REHAB UNIT 2 WESTERN TO VERMONT , 9 South Los Angeles SZC12318 NOS REHAB U-2 WESTERN TO VERMONT PROJECT DESCRIPTION: This project will rehabilitate 6,150 feet of the semi-elliptical 72-inch tile lined concrete NOS starting at 41st Place between St. Andrews Place and Western Avenue and extending to 42nd Street and Vermont Avenue. Existing maintenance holes will be removed and replaced to restore the integrity of the structure and new maintenance holes will be added to allow future operation and maintenance of this sewer. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 604, , ,360 PLANS CONSULTANT (CTP) 58,700 3, ,400 CONSTRUCTION (CONS) 0 0 3,778,480 3,788,832 2,825, ,393,090 CONST MGT CITY (FACM) 0 157, , , ,920 30, ,372,080 CM CONSULTANT (CTCM) 0 7,900 23,600 23,600 9, , , ,240 4,273,360 4,285,152 3,075,598 30, ,695,930 Page 43 CS August 2, 2013

68 COLLECTION SYSTEM (CS) NORTH OUTFALL SEWER REHAB VERMONT TO TRINITY UNIT South Los Angeles SZC12400 NOS REHAB U-3 VERMONT TO TRINITY PROJECT DESCRIPTION: This project will rehabilitate 6739 feet of the North Outfall Sewer (NOS) starting at 42nd Street and Vermont Avenue and extending to 41st Place and Trinity Street. Existing maintenance holes will be removed and replaced to restore the integrity of the structure and new maintenance holes will be added to allow future operation and maintenance of this sewer. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 97, , , , ,030,000 PLANS CONSULTANT (CTP) 16,700 31,600 31, ,900 CONSTRUCTION (CONS) ,145,391 6,872,345 5,708, ,725,780 CONST MGT CITY (FACM) , , ,920 47, ,759,280 CM CONSULTANT (CTCM) ,700 41,800 20, , , , ,000 1,779,131 7,749,345 6,192,864 47, ,678,360 Page 44 CS August 2, 2013

69 COLLECTION SYSTEM (CS) NORTH OUTFALL SEWER REHAB SAN PEDRO TO HOOPER (UNIT 5) South Los Angeles SZC12180 NOS REHAB U5 SN PEDRO/HOOPER PROJECT DESCRIPTION: This project will rehabilitate 4,420 feet of the North Outfall Sewer (NOS) starting at 23rd and San Pedro and extending to 20th and Hooper. Existing maintenance holes will be removed and replaced to restore the integrity of the structure and new maintenance holes will be added to allow future operation and maintenance of this sewer. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 630, , ,480 PLANS CONSULTANT (CTP) 63, ,400 CONSTRUCTION (CONS) 0 0 2,835,685 2,843,454 2,121, ,800,409 CONST MGT CITY (FACM) 0 118, , , ,000 22, ,028,600 CM CONSULTANT (CTCM) 0 5,900 17,700 17,700 7, , , ,460 3,207,145 3,214,794 2,308,670 22, ,719,589 Page 45 CS August 2, 2013

70 COLLECTION SYSTEM (CS) NORTH OUTFALL SEWER REHAB HOOPER TO WILSON (UNIT 6) , 14 Central, South Los Angeles SZC12182 NOS REHAB U6 HOOPER/WILSON PROJECT DESCRIPTION: This project will rehabilitate approximately 5,303 feet of the North Outfall Sewer (NOS) starting at 20th and Hooper and extending to 14th and Wilson. Existing maintenance holes will be removed and replaced to restore the integrity of the structure and new maintenance holes will be added to allow future operation and maintenance of this sewer. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) , , , ,920 41, ,260,240 PLANS CONSULTANT (CTP) ,500 35,900 38,700 9, ,900 RIGHT-OF-WAY (RW) ,000 50, ,000 CONSTRUCTION (CONS) ,959,116 7,230, ,189,304 CONST MGT CITY (FACM) ,160 1,219, ,151,520 CM CONSULTANT (CTCM) ,600 55, , , , , ,720 4,029,556 8,504, ,900,764 Page 46 CS August 2, 2013

71 COLLECTION SYSTEM (CS) NORTH OUTFALL SEWER REHAB WILSON TO LA RIVER (UNIT 7) Central SZC12181 NOS REHAB U7 WILSON/LA RIVER PROJECT DESCRIPTION: This project will rehabilitate 3,947 feet of the North Outfall Sewer (NOS) starting at 14th and Wilson and extending to Enterprise Street west of the LA River. Existing maintenance holes will be removed and replaced to restore the integrity of the structure and new maintenance holes will be added to allow future operation and maintenance of this sewer. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) , , , , ,000 PLANS CONSULTANT (CTP) ,300 29,900 22, ,700 RIGHT-OF-WAY (RW) ,000 50, ,000 CONSTRUCTION (CONS) ,525 4,647,148 3,859, ,281,417 CONST MGT CITY (FACM) , , , ,663,280 CM CONSULTANT (CTCM) ,500 39,400 19, , , , ,660 1,422,985 5,475,188 4,364, ,173,097 Page 47 CS August 2, 2013

72 COLLECTION SYSTEM (CS) NOTF CARBON SCRUBBER FACILITY UPGRADE West Los Angeles NEW PROJECT DESCRIPTION: This project will provide the replacement of corroded carbon vessels including the associated air duct, isolation dampers, blowers and differential pressure gauges for NOTF (North Outfall Treatment Facility) carbon scrubber facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,000 67,000 5, ,000 PLANS CONSULTANT (CTP) ,000 17,000 1, ,000 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,000 13, ,000 CM CONSULTANT (CTCM) ,000 3, , ,000 84, , , ,000 Page 48 CS August 2, 2013

73 COLLECTION SYSTEM (CS) ODOR CONTROL SIERRA BONITA SCRUBBER FACILITY UPGRADE Central NEW PROJECT DESCRIPTION: This project will replace corroded carbon vessels including the associated air ducts, isolation dampers, demister, blowers, and differential pressure gauges an install soundproof enclosure for fans and air ducts at the Sierra Bonita carbon scrubber facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,200 77,040 5, ,520 PLANS CONSULTANT (CTP) ,900 24,200 1, ,200 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,640 10, ,640 CM CONSULTANT (CTCM) ,300 2, , , , , , ,960 Page 49 CS August 2, 2013

74 COLLECTION SYSTEM (CS) ODOR CONTROL ATWATER VILLAGE SCRUBBER Central SZC12337 ODOR CTRL ATWATER VILLAGE SCR PROJECT DESCRIPTION: This project installs a 10,000 CFM air carbon scrubber in a parkway located at the intersection of Silver Lake Boulevard and Hollydale Drive to address the need for odor control along the North Outfall Sewer. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 163, ,520 PLANS CONSULTANT (CTP) 138, ,300 CONSTRUCTION (CONS) 0 616, ,919 CONST MGT CITY (FACM) 0 40,960 10, ,040 CM CONSULTANT (CTCM) 0 107,100 14, , , ,979 24, ,090,879 Page 50 CS August 2, 2013

75 COLLECTION SYSTEM (CS) PIERCE STREET & WOODMAN AVENUE DIVERSION SEWER North Valley SZC12450 PIERCE & WOODMAN DIVER SWR PROJECT DESCRIPTION: The project will construct approximately 185 linear feet of 24-inch Vitrified Clay Pipe sewer between existing 21-inch sewer in Pierce Street at intersection of Woodman Avenue and Pierce Street, and a diversion structure with a 24-inch stub on the 21-inch sewer in Pierce Street east of Woodman Avenue. PROJECT MANAGER: James Corralejo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) ,160 97,120 2, ,080 PLANS CONSULTANT (CTP) 0 0 2,900 6, ,200 CONSTRUCTION (CONS) , , ,461 CONST MGT CITY (FACM) ,960 4, ,680 CM CONSULTANT (CTCM) , , , , , , ,152,721 Page 51 CS August 2, 2013

76 COLLECTION SYSTEM (CS) PLANNED UPGRADE/REPLACEMENT PROGRAM 109 ALL ALL NEW PROJECT DESCRIPTION: This project represents a projection of the future needs for the replacement and/or rehabilitation of deteriorated sewers throughout the City. Different ongoing inspection methods, such as CCTV inspection, smoke testing, and maintenance logs will be used to identify these deteriorated sewers. As future projects are identified, a separate project description will be provided. PROJECT MANAGER: Lisa Mowery Phone: (213) Office: Financial Management Division (BOS) PLANS CITY (FAP) ,000 2,500,000 3,600,000 3,600,000 3,730,000 3,730,000 3,730,000 17,410,000 PLANS CONSULTANT (CTP) ,000 2,500,000 3,500,000 3,500,000 3,675,000 3,675,000 3,675,000 17,100,000 CONSTRUCTION (CONS) ,500,000 52,500,000 55,000,000 55,000,000 55,000, ,000,000 CONST MGT CITY (FACM) ,000,000 3,000,000 3,150,000 3,150,000 3,150,000 12,300,000 CM CONSULTANT (CTCM) ,500,000 2,500,000 2,670,000 2,670,000 2,670,000 10,340, ,000 5,000,000 65,100,000 65,100,000 68,225,000 68,225,000 68,225, ,150,000 Page 52 CS August 2, 2013

77 COLLECTION SYSTEM (CS) RADFORD CARBON SCRUBBER FACILITY South Valley NEW PROJECT DESCRIPTION: This project will replace corroded carbon vessels including the associated air duct, isolation dampers, blowers and differential pressure gauges and install soundproof enclosure for fans and air ducts at the Radford carbon scrubber facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 65,000 65,000 5, ,000 PLANS CONSULTANT (CTP) 0 16,000 16,000 2, ,000 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,000 12, ,000 CM CONSULTANT (CTCM) ,000 4, , ,000 81, , , ,000 Page 53 CS August 2, 2013

78 COLLECTION SYSTEM (CS) RESEDA SEWER SANITATION MAINTENANCE YARD South Valley NEW PROJECT DESCRIPTION: This project will demolish the existing 9,000 square foot building and construct a new 7,500 square foot Office Building including new site lighting, new security system, 740 linear feet of perimeter fence, remove and replace existing parking with 27,000 square feet of parking, install a clarifier and construct a 540 square foot wash pad, and provide landscaping for a 2,200 square foot area. PROJECT MANAGER: Paul Young Phone: (213) Office: Architectural Division (BOE) PLANS CITY (FAP) , , ,600 7, ,760 PLANS CONSULTANT (CTP) ,900 30, ,000 CONSTRUCTION (CONS) ,217,692 6,327, ,545,000 CONST MGT CITY (FACM) , ,000 5, ,083,440 CM CONSULTANT (CTCM) , , ,700 8,024,892 6,605,308 5, ,552,200 Page 54 CS August 2, 2013

79 COLLECTION SYSTEM (CS) RICHMOND SCRUBBER FACILITY UPGRADE East NEW PROJECT DESCRIPTION: This project will replace corroded carbon vessels including the associated air ducts, isolation dampers, demister, blowers, and differential pressure gauges and install soundproof enclosure for fans and air ducts at the Richmond carbon scrubber facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,000 67,000 5, ,000 PLANS CONSULTANT (CTP) ,000 17,000 1, ,000 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,000 13, ,000 CM CONSULTANT (CTCM) ,000 3, , ,000 84, , , ,000 Page 55 CS August 2, 2013

80 COLLECTION SYSTEM (CS) SAN FERNANDO AND 110 FREEWAY SEWER REPLACEMENT East SZC12522 SAN FERNANDO & 110 FWY SWR RPL PROJECT DESCRIPTION: This project will remedy the excessive flow into the North Outfall Sewer (NOS) from an existing 18-inch sewer south of San Fernando Road and east of 110 Freeway. Replace 30 linear feet of the potentially corroded existing 18-inch steep cast iron sewer lateral connection to NOS and provide maintenance holes per Departmental standards. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 97, ,920 PLANS CONSULTANT (CTP) 7, ,500 CONSTRUCTION (CONS) 0 585, ,542 CONST MGT CITY (FACM) 6,000 71, ,280 CM CONSULTANT (CTCM) 300 3, , , , ,942 Page 56 CS August 2, 2013

81 COLLECTION SYSTEM (CS) SAN PEDRO SIPHON-UPSTREAM 30" CAST-IRON-PIPE REPLACEMENT Harbor SZC11791 SAN PEDRO SIPHON-UPSTREAM 30" PROJECT DESCRIPTION: This project will replace and upsize 20 linear feet of 30-inch diameter cast-iron pipe with 33-inch diameter vitrified-clay pipe encased in concrete. It will also demolish and replace a storm-drain structure and restore the landscaped area under which it is located. This project is located underneath the landscaped area in front of the Los Angeles Maritime Museum, Berth 84 (6th Street at Sampson Way). PROJECT MANAGER: Lawrence Cuaresma Phone: (310) Office: Harbor District (BOE) PLANS CITY (FAP) 219, , ,320 PLANS CONSULTANT (CTP) 22, ,200 CONSTRUCTION (CONS) ,172, , ,408,602 CONST MGT CITY (FACM) , ,800 9, ,840 CM CONSULTANT (CTCM) ,800 9, , , ,840 1,364, , ,957,762 Page 57 CS August 2, 2013

82 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM 31 ALL ALL NEW PROJECT DESCRIPTION: This project is an umbrella placeholder project for future secondary sewer renewal projects which have not yet been scoped individually. Projects will be identified each year as a part of the Secondary Sewer Renewal Program (SSRP) planning process. PROJECT MANAGER: Ali Poosti Phone: (213) Office: Wastewater Engineering Services Division (BOS) PLANS CITY (FAP) ,550,000 1,560,000 1,570,000 1,580,000 1,590,000 1,600,000 1,610,000 1,610,000 12,670,000 PLANS CONSULTANT (CTP) RIGHT-OF-WAY (RW) , , , , , , , , ,275 CONSTRUCTION (CONS) ,892,815 26,832,416 27,294,637 43,000,000 40,000,000 38,000,000 30,000,000 30,000, ,019,868 CONST MGT CITY (FACM) ,170,000 1,180,000 1,190,000 1,200,000 1,210,000 1,220,000 1,230,000 1,230,000 9,630,000 CM CONSULTANT (CTCM) ,734,090 29,694,416 30,177,637 45,904,000 42,925,000 40,946,000 32,967,000 32,967, ,315,143 Page 58 CS August 2, 2013

83 COLLECTION SYSTEM (CS) SLAUSON AVE SEWER REHABILITATION - COMPTON AVENUE TO VAN NESS AVENUE 133 8, 9 South Los Angeles SZC11944 SLAUSON COMPTON SWR REHAB PROJECT DESCRIPTION: This project will rehabilitate by sliplining approximately 21,171 linear feet of the structurally deteriorated Slauson Compton Sewer ranging in size from 36-inches to 42-inches in diameter. The project also replaces the Slauson Van Ness junction structure. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 972, , , ,589,120 PLANS CONSULTANT (CTP) 96,800 26, ,400 CONSTRUCTION (CONS) 0 0 3,318,960 8,837,718 8,813, , ,719,073 CONST MGT CITY (FACM) ,480 1,030, , , ,713,920 CM CONSULTANT (CTCM) ,400 51,500 38, ,500 1,069, ,120 4,280,880 9,919,458 9,659, , ,274,013 Page 59 CS August 2, 2013

84 COLLECTION SYSTEM (CS) SOUTH DISTRICT MAINTENANCE YARD IMPROVEMENTS South Los Angeles SZC11668 SOUTH DISTRICT SWR MAINT YARD PROJECT DESCRIPTION: The project will renovate and upgrade the South District Yard. The renovations and upgrades will consist of upgrading office areas, renovating the locker rooms, restrooms, and common areas to comply with the requirements of the Americans with Disabilities Act (ADA). Female locker rooms and showers will be added, and underground tanks will be removed. Hazardous materials will be removed such as hydrocarbons, asbestos, and lead containing paint. The surface condition of the yards will be improved and parking areas will be re-striped to comply with the ADA. PROJECT MANAGER: Paul Young Phone: (213) Office: Architectural Division (BOE) PLANS CITY (FAP) ,360 48,000 30, ,023,760 PLANS CONSULTANT (CTP) , ,000 CONSTRUCTION (CONS) ,272,593 8,568, ,841,171 CONST MGT CITY (FACM) , ,400 81, ,083,440 CM CONSULTANT (CTCM) ,005, ,272,593 8,616, , ,400 81,040 15,008,371 Page 60 CS August 2, 2013

85 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - A04 AIRPORT & 78TH STREET West Los Angeles SZC12178 SSRP A04 AIRPORT & 78TH ST PROJECT DESCRIPTION: This project will rehabilitate approximately 0.9 miles of sewer pipes as part of the 60-miles-per-year Settlement Agreement. The project is located in Westchester Playa Del Rey in an area bounded by Centinela Avenue to the north, Manchester Boulevard to the south, La Cienega Boulevard to the east, and Sepulveda Boulevard to the west. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 36, ,880 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 207,899 17, ,782 CONST MGT CITY (FACM) 46,000 2, ,000 CM CONSULTANT (CTCM) , , ,662 Page 61 CS August 2, 2013

86 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - C01A CALIF & ABBOTT KINN West Los Angeles SZC12085 SSRP C01A CALIF & ABBOT KINN PROJECT DESCRIPTION: This project will rehabilitate approximately 4.8 miles of sewer pipes as part of the 60-miles-per-year Settlement Agreement. This project is bounded by Ocean Park to the north, Ocean Front Walk to the west, Lincoln Boulevard to the east and Via Marina to the south. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 227, ,200 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 1,827, , ,330,439 CONST MGT CITY (FACM) 343,600 24, ,160 CM CONSULTANT (CTCM) ,398, , ,925,799 Page 62 CS August 2, 2013

87 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - C08A PALISADES DR & SURFVIEW DR West Los Angeles SZC12189 SSRP C08A PALISADES/SURFVIEW PROJECT DESCRIPTION: This project will rehabilitate approximately 0.7 miles of sewer pipes as part of the 60-miles-per-year Settlement Agreement. The project is located in Brentwood- Pacific Palisades in an area bounded by Mulholland Drive to the north, Pacific Coast Highway to the south, Temescal Canyon Road to the east, and Topanga Canyon Boulevard to the west. PROJECT MANAGER: Doug Irvine Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 57, ,840 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 276,271 82, ,959 CONST MGT CITY (FACM) 70,080 5, ,200 CM CONSULTANT (CTCM) , , ,999 Page 63 CS August 2, 2013

88 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - C08B TEMESCAL CANYON ROAD & PALISADES DRIVE West Los Angeles SZC12190 SSRP C08B TEMESCAL CYN & PALIS PROJECT DESCRIPTION: This project will rehabilitate approximately 3.7 miles of sewer pipes as part of the 60-miles-per-year Settlement Agreement. The project is located in Brentwood-Pacific Palisades in an area generally bounded by Glynn Drive to the north, Pacific Coast Highway to the south, Palisades Drive to the west and Temescal Canyon Road to the east. PROJECT MANAGER: Doug Irvine Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 208, ,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 1,413, , ,599,155 CONST MGT CITY (FACM) 320,800 16, ,800 CM CONSULTANT (CTCM) ,942, , ,143,955 Page 64 CS August 2, 2013

89 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - C08C OCEAN AVE & TEMESCAL CANYON ROAD West Los Angeles SZC12188 SSRP C08C OCEAN/TEMESCAL CYN PROJECT DESCRIPTION: This project will rehabilitate approximately 4.9 miles of sewer pipes as part of the 60-miles-per-year Settlement Agreement. The project is located in Pacific Palisades in an area generally bounded by Sunset Blvd. to the north, Pacific Coast Highway to the south, Chautauqua Blvd. to the east, and Temescal Canyon Rd. to the west. PROJECT MANAGER: Hortensia Alonso Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 229, ,040 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 1,170, , ,417,971 CONST MGT CITY (FACM) 312,740 14, ,460 CM CONSULTANT (CTCM) ,712, , ,974,471 Page 65 CS August 2, 2013

90 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - E13 VICTORY AND BECK South Valley SZC12482 SSRP E13 VICTORY & BECK PROJECT DESCRIPTION: This project will rehabilitate approximately 0.36 miles of sewer pipes. This project is located in the San Fernando Valley area bounded by Sherman Way to the north, Burbank Boulevard to the south, Tujunga Avenue to the east and Lankershim Boulevard to the west. PROJECT MANAGER: Doug Irvine Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 15,280 2, ,080 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) ,060 61, ,125 CONST MGT CITY (FACM) ,840 5, ,280 CM CONSULTANT (CTCM) ,280 2,640 88,060 66, ,485 Page 66 CS August 2, 2013

91 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - E35 GLENOAKS AND MACLAY West Los Angeles SZC12356 SSRP E35 GLENOAKS & MACLAY PROJECT DESCRIPTION: This project will rehabilitate approximately 0.67 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is located in the Sylmar and Pacoima areas bounded by Hubbard Street to the north, Foothill Freeway to the east, Arroyo Avenue to the south, and Omelveny Avenue to the west. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 37, ,200 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 78, , ,506 CONST MGT CITY (FACM) 25,600 21, ,240 CM CONSULTANT (CTCM) , , ,946 Page 67 CS August 2, 2013

92 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - E39 BALBOA BL AND VENTURA BL , 11 South Valley SZC12316 SSRP E39 BALBOA BL & VENTURA BL PROJECT DESCRIPTION: This project will rehabilitate approximately 3.57 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is bounded by Burbank Boulevard to the north, Lower East Mandeville Fire Road to the south, Sepulveda Boulevard to the east, and Oak Avenue to the west. PROJECT MANAGER: Doug Irvine Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 153, ,280 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 374, , ,294,752 CONST MGT CITY (FACM) 115,760 99,680 4, ,440 CM CONSULTANT (CTCM) ,040 1,020,432 4, ,667,472 Page 68 CS August 2, 2013

93 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - 6TH ST. AND SAN VICENTE , 10 Central SZC12402 SSRP H02 6TH & SAN VICENTE PROJECT DESCRIPTION: This project will rehabilitate approximately 1.1 miles of sewer pipes as part of the Secondary Sewer Renewal Program 60-miles-per-year Settlement Agreement. The project is located in Hollywood in an area bounded by Blackburn Ave. to the north, Olympic Blvd. and Horner St. to the south, Sweetzer Ave. and La Cienega Blvd. to the west and Fairfax Ave. and Orlando Ave. to the east. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 81, ,680 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 354, , ,056 CONST MGT CITY (FACM) 14,080 84,400 7, ,600 CM CONSULTANT (CTCM) , , , ,336 Page 69 CS August 2, 2013

94 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H03 SUNSET AND RODEO 725 4, 5 West Los Angeles SZC12355 SSRP H03 SUNSET & RODEO PROJECT DESCRIPTION: This project will rehabilitate approximately 5.5 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement.The project is located in Hollywood in an area bounded by Mulholland Drive to the north, Doheny Drive to the east, Pico Boulevard to the south, and Beverly Glen Boulevard to the west. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 223, ,280 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 1,964, , ,292,260 CONST MGT CITY (FACM) 95, ,520 20, ,920 CM CONSULTANT (CTCM) ,040 2,209, , ,877,460 Page 70 CS August 2, 2013

95 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H05 BEVERLY AND FAIRFAX , 5 Central SZC12403 SSRP H05 BEVERLY & FAIRFAX PROJECT DESCRIPTION: This project will rehabilitate approximately 1.4 miles of sewer pipes as part of the Secondary Sewer Renewal Program 60-miles-per-year Settlement Agreement. The project is located in Hollywood in an area bounded by Fountain Ave. to the north, La Brea Ave. to the east, 3rd St. to the south, and Kings Rd. to the west. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 44, ,160 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 229, , ,875 CONST MGT CITY (FACM) 7,600 45,760 3, ,200 CM CONSULTANT (CTCM) , , , ,235 Page 71 CS August 2, 2013

96 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H06 ADAMS & CRENSHAW Central SZC12481 SSRP H06 ADAMS & CRENSHAW PROJECT DESCRIPTION: This project will rehabilitate approximately 2.4 miles of sewer pipes. The project is located in Central Los Angeles in an area bounded by Washington Boulevard to the north, Fairfax Avenue to the west, 6th Avenue to the east and 30th Street to the south. PROJECT MANAGER: Hortensia Alonso Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 69,360 38, ,360 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) , , ,126 CONST MGT CITY (FACM) 0 16, ,160 14, ,520 CM CONSULTANT (CTCM) ,360 54, , , ,175,006 Page 72 CS August 2, 2013

97 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H11 BURNSIDE AND WILSHIRE Central SZC12518 SSRP H11 BURNSIDE & WILSHIRE PROJECT DESCRIPTION: This project will rehabilitate approximately 0.5 miles of sewer pipes as part of the Secondary Sewer Renewal Program. The project is located in Hollywood in an area bounded by Beverly Blvd. to the North, La Brea Ave. to the east, Olympic Blvd. to the south and Vista St. to the West. PROJECT MANAGER: Hortensia Alonso Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 43,040 8, ,280 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) , , ,944 CONST MGT CITY (FACM) 0 7,040 53,120 6, ,480 CM CONSULTANT (CTCM) ,040 15, , , ,704 Page 73 CS August 2, 2013

98 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H14 WILSHIRE AND ORANGE 979 4, 10 Central SZC12280 SSRP H14 WILSHIRE & ORANGE PROJECT DESCRIPTION: This project will rehabilitate approximately 0.5 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is located in the Greater Wilshire area bounded by Melrose Avenue to the north, Washington Boulevard to the south, Victoria Avenue to the east, and Cochran Avenue to the west. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 60, ,640 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 110, , ,581 CONST MGT CITY (FACM) 46,880 31, ,560 CM CONSULTANT (CTCM) 1, , , , ,381 Page 74 CS August 2, 2013

99 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H15 JUNE ST AND WILSHIRE 995 4, 10 Central SZC12326 SSRP H15 JUNE & WILSHIRE PROJECT DESCRIPTION: This project will rehabilitate approximately 0.8 miles of sewer pipes as part of the Collection System Renewal Program for the 60-mile-per-year Settlement Agreement. The project is located in Central Los Angeles in an area bounded by 2nd St. to the north, Muirfield Rd. to the east, San Vincente Blvd. to the south, and Highland Ave. to the west. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 45, ,530 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 108, , ,417 CONST MGT CITY (FACM) 29,670 32,896 1, ,501 CM CONSULTANT (CTCM) , ,313 1, ,448 Page 75 CS August 2, 2013

100 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H16 CRENSHAW AND VENICE Central SZC12404 SSRP H16 CRENSHAW & VENICE PROJECT DESCRIPTION: This project will rehabilitate approximately.6 mile of sewer pipes as part of the Collection System Renewal Program for the 60-mile-per-year Settlement Agreement. The project is located in Central Los Angeles in an area bounded by Pico Blvd. to the north, Jefferson Blvd. to the south, 5th Ave. to the west, and Claudina Ave. to the east. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 37, ,040 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 181,000 54, ,409 CONST MGT CITY (FACM) 6,400 38,320 3, ,000 CM CONSULTANT (CTCM) , ,320 57, ,449 Page 76 CS August 2, 2013

101 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H19 ARDEN BLVD AND 3RD ST 986 4, 10, 13 Central SZC12313 SSRP H19 ARDEN BLVD & 3RD ST PROJECT DESCRIPTION: This project will rehabilitate approximately 1.1 miles of sewer pipes as part of the Collection System Renewal Progam for the 60 miles-per-year Settlement Agreement. The project is located in Central Los Angeles in an area bounded by Melrose Ave. to the north, Norton Ave. to the east, Olympic Blvd. to the south, and Rossmore Ave. to the west. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 51, ,600 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 113, , ,049 CONST MGT CITY (FACM) 40,080 26, ,960 CM CONSULTANT (CTCM) , , ,609 Page 77 CS August 2, 2013

102 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H20 2ND ST. AND EDGEMONT 990 4, 10, 13 Central SZC12281 SSRP H20 2ND & EDGEMONT PROJECT DESCRIPTION: This project will rehabilitate approximately 3.4 miles of sewer pipes as part of the 60-miles-per-year Settlement Agreement. The project is located in Northeast Wilshire area and bounded by Santa Monica Boulevard to the north, Sunset Boulevard to the east, Pico Boulevard to the south, and Rossmore Avenue to the west. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 173, ,830 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 185,000 1,263, ,448,582 CONST MGT CITY (FACM) 113, ,593 7, ,260 CM CONSULTANT (CTCM) ,110 1,389,175 7, ,868,672 Page 78 CS August 2, 2013

103 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H21 OLYMPIC BLVD AND OXFORD 987 1, 4, 10 Central SZC12282 SSRP H21 OLYMPIC & OXFORD PROJECT DESCRIPTION: This project will rehabilitate approximately 0.9 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is located in the Central area bounded by 9th Street to the north, Vermont Avenue to the east, Pico Boulevard to the south, and Westchester Place to the west. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 91, ,040 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 429, , ,197 CONST MGT CITY (FACM) 112,800 4, ,760 CM CONSULTANT (CTCM) , , ,997 Page 79 CS August 2, 2013

104 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H23 VERMONT & OLYMPIC 993 1, 10, 13 Central SZC12328 SSRP H23 VERMONT & OLYMPIC PROJECT DESCRIPTION: This project will rehabilitate approximately 2.2 miles of sewer pipes as part of the 60-miles-per-year Settlement Agreement. The project is located in the Central area bounded by Hollywood Freeway to the north, Alvarado Street to the east, Venice Boulevard to the south, and Normandie Avenue to the west. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 149, ,360 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 227,000 1,038, ,265,727 CONST MGT CITY (FACM) 84, ,440 7, ,440 CM CONSULTANT (CTCM) ,680 1,160,167 7, ,628,527 Page 80 CS August 2, 2013

105 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H24 SUNSET BLVD AND RENO ST 708 4, 13 Central SZC12191 SSRP H24 SUNSET BL & RENO ST PROJECT DESCRIPTION: This project will rehabilitate approximately 1.7 miles of sewer pipes as part of the 60-miles-per-year Settlement Agreement. The project is located in the Northeast Wilshire area bounded by Sunset Boulevard to the north, Vermont Avenue to the west, Glendale Boulevard to the east, and Hollywood Freeway to the south. PROJECT MANAGER: Hortensia Alonso Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 174, ,480 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 999, , ,160,000 CONST MGT CITY (FACM) 238,640 11, ,840 CM CONSULTANT (CTCM) ,412, , ,584,320 Page 81 CS August 2, 2013

106 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H Central NEW SSRP H31 PROJECT DESCRIPTION: This is an umbrella project representing all rehabilitation projects that will result from the current study of the H31sewershed in the Hollywood area. Once the study is complete and specific projects are identified, the specific projects will replace this project. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) , ,880 54, ,920 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) ,078 2,249, ,628,000 CONST MGT CITY (FACM) , ,280 26, ,680 CM CONSULTANT (CTCM) , , ,958 2,539,202 26, ,261,600 Page 82 CS August 2, 2013

107 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - H33 KENMORE AND FOUNTAIN , 13 Central SZC12327 SSRP H33 KENMORE & FOUNTAIN PROJECT DESCRIPTION: This project will rehabilitate approximately 1.56 reach miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is located in Central Los Angeles in an area bounded by Franklin Avenue to the north, North Vermont Avenue to the east, Melrose Avenue to the south, and Normandie Avenue to the west. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 90, ,080 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 182, , ,244 CONST MGT CITY (FACM) 38,320 73,600 4, ,800 CM CONSULTANT (CTCM) , ,844 4, ,124 Page 83 CS August 2, 2013

108 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - N01 BUDLONG AND LEIGHTON , 9 South Los Angeles SZC12329 SSRP N01 BUDLONG & LEIGHTON PROJECT DESCRIPTION: This project will rehabilitate approximately 0.4 miles of sewer pipes as part of the Collection System Renewal Program for the 60 miles-per-year Settlement Agreement. The project is located in South Los Angeles in an area bounded by W. 38th St. to the north, S. Vermont Ave. to the east, W. Martin Luther King Jr. Blvd. to the south, and S. Normandie Ave. to the west. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 45, ,680 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 85, , ,973 CONST MGT CITY (FACM) 19,360 37,120 2, ,960 CM CONSULTANT (CTCM) , ,093 2, ,613 Page 84 CS August 2, 2013

109 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - N02 SAN PEDRO AND 31ST ST South Los Angeles SZC12291 SSRP N02 SAN PEDRO & 31ST PROJECT DESCRIPTION: This project will rehabilitate approximately 0.80 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is located in Central Los Angeles in an area bounded by Washington Boulevard to the north, 43rd Street to the south, Central Avenue and Griffith Avenue to the east, and Main Street to the west. PROJECT MANAGER: Gus Malkoun Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 53, ,200 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 142, , ,221 CONST MGT CITY (FACM) 45,680 23, ,880 CM CONSULTANT (CTCM) , , ,301 Page 85 CS August 2, 2013

110 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM- N03 ADAMS BLVD & COMPTON AVE , 14 East SZC12480 SSRP N03 ADAMS BL & COMPTON AV PROJECT DESCRIPTION: This project will rehabilitate approximately 2.7 miles of sewer pipes. The project is bounded by East 8th Street to the north, Sout Santa Fe Avenue to the east, East 41st Street to the south, and South Central Avenue to the west. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 166,240 98, ,240 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 0 1,844, , ,710,000 CONST MGT CITY (FACM) 0 44, ,040 43,440 1, ,240 CM CONSULTANT (CTCM) , ,640 2,184, ,460 1, ,402,480 Page 86 CS August 2, 2013

111 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - N05 8TH ST AND SOTO ST East SZC12352 SSRP N05 8TH & SOTO PROJECT DESCRIPTION: This project will rehabilitate approximately 2.2 miles of sewer pipes as part of the Secondary Sewer Renewal Program for the 60 miles-per-year Settlement Agreement. The project is located in East Los Angeles in an area bounded by Pomeroy Ave. to the north, Lorena St. to the east, Eleventh St. to the south, and Soto St. to the west. PROJECT MANAGER: James Corralejo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 211, ,840 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 830, , ,108,643 CONST MGT CITY (FACM) 67, ,800 22, ,520 CM CONSULTANT (CTCM) ,680 1,082, , ,664,003 Page 87 CS August 2, 2013

112 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - N06A 36TH PL & VERMONT , 9 South Los Angeles SZC12478 SSRP N06A 36TH PL & VERMONT PROJECT DESCRIPTION: This project will rehabilitate approximately 1.6 reach miles of sewer pipes as part of the Secondary Sewer Renewal Program. The project is located in South Los Angeles in an area bounded by Santa Monica Freeway to the North, Western Ave. to the East, Martin Luther King Jr. Blvd. to the South, and San Pedro St. to the West. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 151,360 83, ,800 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 0 1,359, , ,997,000 CONST MGT CITY (FACM) 0 35, ,880 32, ,520 CM CONSULTANT (CTCM) , ,560 1,626, , ,567,320 Page 88 CS August 2, 2013

113 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - N06B ADAMS BLVD & HILL ST , 9 South Los Angeles SZC12479 SSRP N06B ADAMS & HILL PROJECT DESCRIPTION: This project will rehabilitate approximately 2.5 miles of sewer pipes as part of the Secondary Sewer Renewal Program. The project is located in South Los Angeles in an area bounded by Santa Monica Freeway to the North, Western Ave. to the East, Martin Luther King Jr. Blvd. to the South, and San Pedro St. to the West. PROJECT MANAGER: James Corralejo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 169, ,720 4, ,040 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 0 1,592,695 1,370, ,963,000 CONST MGT CITY (FACM) , ,160 7, ,080 CM CONSULTANT (CTCM) , ,720 1,954,055 1,474,465 7, ,720,120 Page 89 CS August 2, 2013

114 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - N07 BROADWAY & PICO , 9, 14 Central SZC12512 SSRP N07 BROADWAY & PICO PROJECT DESCRIPTION: This project will rehabilitate approximately 7.3 miles of sewer pipes. The project is boudned by Stadium Way to the north, Alameda Street to the east, Washington Boulevard to the south, and Lebnon Street to the west. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 237, ,747 69, ,994 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 0 1,356,512 3,391, ,747,969 CONST MGT CITY (FACM) , ,720 28, ,223 CM CONSULTANT (CTCM) , ,747 1,820,189 3,719,177 28, ,961,186 Page 90 CS August 2, 2013

115 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - N12 PARK VIEW & BEVERLY BLVD 718 1, 13 East SZC12176 SSRP N12 PARK VIEW & BEVERLY PROJECT DESCRIPTION: This project will rehabilitate approximately 2.6 miles of sewer pipes as part of the 60-miles-per-year Settlement Agreement. The project is located in Westlake and Silver Lake - Echo Park in an area bounded by Riverside Drive to the north, Pico Boulevard to the south, Glendale Boulevard to the east, and Hoover Street to the west. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 242, ,080 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 339,000 1,563, ,902,019 CONST MGT CITY (FACM) 154, ,120 14, ,240 CM CONSULTANT (CTCM) ,240 1,786,139 14, ,536,339 Page 91 CS August 2, 2013

116 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - P09 GRIFFIN AVE AND AVENUE East SZC12315 SSRP P09 GRIFFIN AVE & AVE 43 PROJECT DESCRIPTION: This project will rehabilitate approximately 1.09 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is located in Northeast Los Angeles bounded by North Figueroa Street to the north, Monterey Road to the east, North Mission Road to the south, and North San Fernando Road to the west. PROJECT MANAGER: Gus Malkoun Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 91, ,520 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 43, , ,896 CONST MGT CITY (FACM) 41,840 71,920 4, ,560 CM CONSULTANT (CTCM) , ,816 4, ,976 Page 92 CS August 2, 2013

117 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - P15 LEWIS ST & SAYLIN 998 1, 14 Central SZC12292 SSRP P15 LEWIS & SAYLIN PROJECT DESCRIPTION: This project will rehabilitate approximately 2.4 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is located in Central Los Angeles in an area bounded by La Loma Road to the north, York Boulevard to the south, Avenue 56 to the west, and San Pascual Avenue to the east. PROJECT MANAGER: Hortensia Alonso Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 137, ,600 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 82, , ,008,615 CONST MGT CITY (FACM) 64, ,960 8, ,640 CM CONSULTANT (CTCM) ,480 1,049,575 8, ,342,855 Page 93 CS August 2, 2013

118 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - P17 CYPRESS AVE & DIVISION ST East SZC12536 SSRP P17 CYPRESS & DIVISION PROJECT DESCRIPTION: This project will rehabilitate approximately 3.4 miles of sewer pipes. The project is located in Northeast Los Angeles/Burbank/Glendale in an area bounded by Richardson Drive to the north, San Rafael Avenue to the east, Huron Street to the south, and Blake Avenue to the west. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 78, ,080 97, ,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) ,495, , ,181,000 CONST MGT CITY (FACM) , ,680 34, ,640 CM CONSULTANT (CTCM) , , ,240 2,865, , ,993,640 Page 94 CS August 2, 2013

119 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM- P20 COLORADO BL & TOWNSEND AV East SZC12535 SSRP P20 COLORADO & TOWNSEND PROJECT DESCRIPTION: This project will rehabilitate approximately 2.09 miles of sewer pipes. The project located in Northeast Los Angeles in an area bounded by Ventura Freeway to the north, Hillmont Avenue to the east, Yosemite Drive to the south, and Glendale Freeway to the west. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 56,720 96,160 52, ,280 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) ,499, , ,749,000 CONST MGT CITY (FACM) , ,520 16, ,760 CM CONSULTANT (CTCM) ,720 96, ,320 1,698, , ,248,040 Page 95 CS August 2, 2013

120 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - P21A LOS FELIZ BLVD & REVERE AVE , 13 East SZC12310 SSRP P21A LOS FELIZ & REVERE PROJECT DESCRIPTION: This project will rehabilitiate approximately 2.2 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. This project is located in the Highland Park/Eagle Rock & Griffith Park areas bounded by the Ventura Freeway to the north, San Fernando Road to the east, Edward Avenue to the south, and Golden State Freeway to the west. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 142, ,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 240, , ,206,897 CONST MGT CITY (FACM) 80, ,360 7, ,640 CM CONSULTANT (CTCM) ,000 1,082,257 7, ,551,537 Page 96 CS August 2, 2013

121 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - P21B GLENDALE BLVD. AND ROWENA AVE , 13 East SZC12311 SSRP P21B GLENDALE & ROWENA PROJECT DESCRIPTION: This project will rehabilitate approximately 0.3 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. This project is located in the East Los Angeles area bounded by the Los Angeles River to the north, Hyperion Avenue to the west, Glendale Freeway to the east, and Sunset Boulevard to the south. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 35, ,440 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 37, , ,938 CONST MGT CITY (FACM) 18,240 26,000 1, ,760 CM CONSULTANT (CTCM) , ,938 1, ,138 Page 97 CS August 2, 2013

122 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - P21C LOS FELIZ BLVD. AND 5 FWY West Los Angeles SZC12312 SSRP P21C LOS FELIZ & 5 FWY PROJECT DESCRIPTION: This project will rehabilitate approximately 1.1 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. This project is located in Highland Park/ Eagle Rock & Griffith Park in an area bounded by Griffith Park Dr. to the north, Commonwealth Avenue & Vista Del Valle Drive to the west, Golden State Freeway to the east, and Los Feliz Boulevard to the south. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 54, ,560 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 45, , ,867 CONST MGT CITY (FACM) 28,000 40,160 2, ,560 CM CONSULTANT (CTCM) , ,027 2, ,987 Page 98 CS August 2, 2013

123 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - S01 VERNON AND WESTERN South Los Angeles SZC12517 SSRP S01 VERNON & WESTERN PROJECT DESCRIPTION: This project will rehabilitate approximately 1.2 miles of sewer pipes as part of the Secondary Sewer Renewal Program. The project is located in South Los Angeles in an area bounded by Martin Luther King Jr.to the north, Normandie Ave. to the east, Slauson Ave. to the south, and Crenshaw Blvd. to the west. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 48,720 18, ,880 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) ,195 69, ,709 CONST MGT CITY (FACM) 0 23,120 58,640 4, ,640 CM CONSULTANT (CTCM) ,720 41, ,835 74, ,229 Page 99 CS August 2, 2013

124 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - S04 SLAUSON AVE AND VAN NESS AVE South Los Angeles SZC12516 SSRP S04 SLAUSON & VAN NESS PROJECT DESCRIPTION: This project will rehabilitate approximately 1.2 miles of sewer pipes as part of the Secondary Sewer Renewal Program. The project is located in South Los Angeles in an area bounded by 50th St. to the North, Budlong Ave. to the East, 73rd St. to the South and Alviso Ave. to the West. PROJECT MANAGER: Hortensia Alonso Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 81,760 15, ,360 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) , , ,050 CONST MGT CITY (FACM) 0 33,600 85,280 7, ,000 CM CONSULTANT (CTCM) ,760 49, , , ,410 Page 100 CS August 2, 2013

125 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - S05 10TH AVE AND 71ST ST South Los Angeles SZC12309 SSRP S05 10TH AV & 71 ST PROJECT DESCRIPTION: This project will rehabilitate approximately 2.8 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is located in the South Los Angeles area bounded by 60th Street to the north, Van Ness Avenue to the east, Manchester Boulevard to the south, and La Brea Avenue to the west. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 104, ,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 297, , ,728 CONST MGT CITY (FACM) 92,000 47, ,000 CM CONSULTANT (CTCM) , , ,165,728 Page 101 CS August 2, 2013

126 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - S06 VERMONT & 76TH ST 722 8, 9 South Los Angeles SZC12091 SSRP S06 VERMONT & 76TH ST PROJECT DESCRIPTION: This project will rehabilitate approximately 5.8 miles of sewer pipes as part of the Secondary Sewer Renewal Program for the 60-miles-per-year Settlement Agreement. The project is located in South Los Angeles in an area bounded by Slauson Ave. to the north, Century Blvd. to the south, San Pedro to the east, and Van Ness Ave. to the west. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 380, ,080 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 2,580, , ,746,471 CONST MGT CITY (FACM) 580,560 35, ,680 CM CONSULTANT (CTCM) ,541, , ,742,231 Page 102 CS August 2, 2013

127 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM- S07-76TH ST. & GRAND AVE , 9 South Los Angeles SZC12515 SSRP S07 76TH ST & GRAND AVE PROJECT DESCRIPTION: This project will rehabilitate approximately 0.4 miles of sewer pipes. The project is located in South Los Angeles in an area bounded East 59th Street to the north, Central Avenue to the east, East 79th Street to the south and South Figueroa Street to the west. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 28,560 5, ,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 35, , ,367 CONST MGT CITY (FACM) 0 17,520 24,560 2, ,080 CM CONSULTANT (CTCM) ,560 58, ,486 2, ,447 Page 103 CS August 2, 2013

128 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM- S08- MAIN & MANCHESTER , 9 South Los Angeles SZC12514 SSRP S08 MAIN & MANCHESTER PROJECT DESCRIPTION: This project will rehabilitate approximately 1.7 miles of sewer pipes. The project is located in South Los Angeles in an area bounded by Florence Avenue to the north, Manchester Avenue to the south, I-110 Harbor Freeway to the west, and Central Avenue to the east. The project will also rehabilitate 80 feet of 27-inch sewer along Vermont Avenue. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 85,920 34, ,720 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) , , ,027,723 CONST MGT CITY (FACM) 0 46, ,400 10, ,640 CM CONSULTANT (CTCM) ,920 80, , , ,321,083 Page 104 CS August 2, 2013

129 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - S10 FLORENCE AV & WESTERN AV South Los Angeles SZC12523 SSRP S10 FLORENCE & WESTERN PROJECT DESCRIPTION: This project will rehabilitate approximately 0.6 miles of sewer pipes as part of the Secondary Sewer Renewal Program. The project is located in South Los Angeles in an area bounded by Gage Ave. to the north, Normandie Ave. to the east, 85th St. to the south and Van Ness Ave. to the west. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 110,160 36, ,640 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 82, , , ,249,000 CONST MGT CITY (FACM) 0 64, ,880 12, ,680 CM CONSULTANT (CTCM) , ,970 1,132, , ,605,320 Page 105 CS August 2, 2013

130 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - S11 WESTERN AVE AND 92ND ST South Los Angeles SZC12542 SSRP S11 WESTERN & 92 PROJECT DESCRIPTION: This project will rehabilitate approximately.8 miles of sewer pipes as part of the Secondary Sewer Renewal Program. The project is located in the South Los Angeles area bounded by E. Manchester Ave. to the north, S. Normandie Ave to the east, W. 104th St. to the south, and S. Van Ness Ave. to the west. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 10,160 29,040 1, ,320 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,160 13, ,080 CM CONSULTANT (CTCM) ,160 29, , , ,400 Page 106 CS August 2, 2013

131 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - S , 9 South Los Angeles NEW SSRP S13 PROJECT DESCRIPTION: Based on Secondary Sewer Plan report S13 produced by Bureau of Sanitation in June 2011, this project will rehabilitate approximately 1.3 miles of sewer pipes as part of the Secondary Sewer Renewal Program. PROJECT MANAGER: Doug Irvine Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) ,554 27, ,108 PLANS CONSULTANT (CTP) 0 0 2,960 2, ,920 CONSTRUCTION (CONS) , , ,882 CONST MGT CITY (FACM) ,118 60, ,236 CM CONSULTANT (CTCM) ,277 2, , ,514 30, , , ,096,700 Page 107 CS August 2, 2013

132 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - S14 HOOVER AND VERNON , 9 South Los Angeles SZC12531 SSRP S14 HOOVER & VERNON PROJECT DESCRIPTION: This project will rehabilitate approximately 4.0 miles of sewer pipes as part of the Secondary Sewer Renewal Program. This project is located in South Los Angeles in an area bounded by E. Jefferson Blvd. to the north, S. Main St. to the east, W. Slauson Ave. to the south, and S. Vermont Ave. to the west. PROJECT MANAGER: Doug Irvine Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 135, ,560 10, ,240 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 0 1,259,068 1,448, ,708,000 CONST MGT CITY (FACM) , ,080 10, ,000 CM CONSULTANT (CTCM) , ,560 1,558,268 1,577,012 10, ,400,240 Page 108 CS August 2, 2013

133 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - S16 AVALON & VERNON South Los Angeles SZC12406 SSRP S16 AVALON & VERNON PROJECT DESCRIPTION: This project will rehabilitate approximately 0.97 miles of sewer pipes. The project is located in South Los Angeles in an area bounded by 23rd Street to the north, 59th Street to the south, San Pedro Street to the west, and Hooper Avenue to the east. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 109, ,200 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 557, , ,517 CONST MGT CITY (FACM) 28, ,800 8, ,200 CM CONSULTANT (CTCM) , , , ,010,917 Page 109 CS August 2, 2013

134 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - S17 COMPTON AND VERNON South Los Angeles SZC12401 SSRP S17 COMPTON & VERNON PROJECT DESCRIPTION: This project will rehabilitate approximately 1.5 miles of sewer pipes as part of the Secondary Sewer Renewal Program 60-miles-per-year Collection System Settlement Agreement. The project is located in South Los Angeles in an area bounded by 41st St. to the north, Alameda St. to the east, Slauson Ave. to the south, and Central Ave. to the west. PROJECT MANAGER: Hortensia Alonso Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 73, ,280 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 385, , ,965 CONST MGT CITY (FACM) 18,800 70,240 5, ,640 CM CONSULTANT (CTCM) , , , ,885 Page 110 CS August 2, 2013

135 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - T01 3RD ST & MESA ST Harbor SZC12317 SSRP T01 3RD & MESA PROJECT DESCRIPTION: This project will rehabilitate approximately 1.3 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is located in the San Pedro-Harbor area of Los Angeles bounded by West Summerland Avenue to the north, Harbor Boulevard to the east, 9th Street to the south, and Miraleste Drive to the west. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 74, ,500 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 530, , ,021 CONST MGT CITY (FACM) 93,950 18, ,200 CM CONSULTANT (CTCM) , , ,721 Page 111 CS August 2, 2013

136 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - T04 S ALMA ST & W 10TH ST Harbor SZC12177 SSRP T04 S ALMA & W 10TH ST PROJECT DESCRIPTION: This project will rehabilitate approximately 4.4 miles of sewer pipes as part of the 60-miles-per-year Settlement Agreement. The project is located in San Pedro in an area bounded by Summerland Avenue to the north, 25th Street to the south, Harbor Boulevard to the east, and Western Avenue to the west. PROJECT MANAGER: Doug Irvine Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 194, ,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 467,000 1,252, ,719,473 CONST MGT CITY (FACM) 144, ,720 9, ,480 CM CONSULTANT (CTCM) ,640 1,413,193 9, ,227,953 Page 112 CS August 2, 2013

137 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - T05 CHANNEL ST & GAFFEY ST Harbor SZC12123 SSRP T05 CHANNEL & GAFFEY ST PROJECT DESCRIPTION: This project will rehabilitate approximately 1.3 miles of sewer pipes as part of the 60-miles-per-year Settlement Agreement. The project is located in the San Pedro area bounded by Anaheim Street to the north, 7th Street to the south, Harbor Boulevard to the east, and Western Avenue to the west. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 112, ,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 438, , ,804 CONST MGT CITY (FACM) 19, ,000 10, ,000 CM CONSULTANT (CTCM) , ,804 10, ,804 Page 113 CS August 2, 2013

138 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - T06A ANAHEIM ST AND BROAD AVE Harbor SZC12353 SSRP T06A ANAHEIM ST & BROAD PROJECT DESCRIPTION: This project will rehabilitate 2.4 miles of sewer pipes as part of the Secondary Sewer Renewal Program for the 60- mile-per-year Settlement Agreement. The project is located in Wilmington area bounded by W. Pacific Coast Hwy. to the north, Broad Ave. to the east, Port of Los Angeles to the south, and I-110 Fwy to the west. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 227, ,360 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 137,000 1,523, ,660,100 CONST MGT CITY (FACM) 106, ,760 14, ,120 CM CONSULTANT (CTCM) ,160 1,726,860 14, ,212,580 Page 114 CS August 2, 2013

139 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - T06B FRIES AV & PIER A ST Harbor SZC12354 SSRP T06B FRIES & PIER A PROJECT DESCRIPTION: This project will rehabilitate.7 miles of sewer pipes as part of the Secondary Sewer Renewal Program for the 60-mileper-year Settlement Agreement. The project is located in Harbor area bounded by W. Pacific Coast Hwy. to the north, Banning Blvd. to the east, Pier A St. to the south, and I-110 Fwy. To the west. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 99, ,280 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 198, , ,800 CONST MGT CITY (FACM) 42,320 80,720 5, ,480 CM CONSULTANT (CTCM) , ,520 5, ,560 Page 115 CS August 2, 2013

140 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - T08 ALAMEDA AND ANAHEIM Harbor SZC12513 SSRP T08 ALAMEDA & ANAHEIM PROJECT DESCRIPTION: This project will rehabilitate 1.4 miles of sewers. The project is located in the Harbor area bounded by Lomita Boulevard to the north, Marine Avenue to the west, Terminal Island Freeway to the east, and Nissan Way to the south. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 105,120 20, ,200 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 130, , ,370 CONST MGT CITY (FACM) 0 64,480 90,400 7, ,160 CM CONSULTANT (CTCM) , , ,803 7, ,197,730 Page 116 CS August 2, 2013

141 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - U11 BUNDY & SAN VINCENTE West Los Angeles SZC12331 SSRP U11 BUNDY & SAN VINCENTE PROJECT DESCRIPTION: This project will rehabilitate approximately 1.8 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is located in West Los Angeles in an area bounded by Homewood Road to the north, Bundy Drive to the south, Mandeville Canyon Road to the west, and Bringham Avenue to the east. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 124, ,640 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 232, , ,401 CONST MGT CITY (FACM) 94,480 80,880 3, ,640 CM CONSULTANT (CTCM) 1, , , ,281 3, ,094,281 Page 117 CS August 2, 2013

142 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - U14 OVERLAND AND 10 FREEWAY West Los Angeles SZC12357 SSRP U14 OVERLAND & 10 FWY PROJECT DESCRIPTION: This project will rehabilitate approximately 2.1 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is located in West Los Angeles in an area bounded by Santa Monica Boulevard to the north, Beverwil Drive to the east, National Boulevard to the south, and the San Diego Freeway to the west. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 120, ,560 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 668, , ,375 CONST MGT CITY (FACM) 22, ,360 12, ,640 CM CONSULTANT (CTCM) , , , ,201,575 Page 118 CS August 2, 2013

143 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - U16 SELBY AND LA GRANGE West Los Angeles SZC12314 SSRP U16 SELBY & LA GRANGE PROJECT DESCRIPTION: This project will rehabilitate 0.96 miles of secondary sewers as part of the 60 miles-per-year Settlement Agreement. The project is located in West Los Angeles in an area bounded by Wilshire Boulevard to the north, Camden Avenue to the west, Patricia Avenue to the east, Asby Avenue to the south. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 92, ,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 145, , ,438 CONST MGT CITY (FACM) 39,000 76,000 5, ,000 CM CONSULTANT (CTCM) , ,438 5, ,438 Page 119 CS August 2, 2013

144 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - U20 BEVERLY GLEN & QUITO LANE West Los Angeles SZC12179 SSRP U20 BEV GLEN & QUITO LN PROJECT DESCRIPTION: This project will rehabilitate approximately 1.5 miles of sewer pipes as part of the 60-miles-per-year Settlement Agreement. The project is located in West Los Angeles in an area bounded by Mulholland Drive to the north, Wilshire Boulevard to the south, Benedict Canyon Drive to the east, and Roscomare Road to the west. PROJECT MANAGER: Doug Irvine Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 133, ,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 500, , ,081 CONST MGT CITY (FACM) 138,000 51, ,000 CM CONSULTANT (CTCM) , , ,074,081 Page 120 CS August 2, 2013

145 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - U21 GAYLEY AND LE CONTE West Los Angeles SZC12283 SSRP U21 GAYLEY & LE CONTE PROJECT DESCRIPTION: This project will rehabilitate approximately 2 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement. The project is located in West Los Angeles in an area bounded by Ortiz Lane to the north, Wilshire Boulevard to the south, Stradella Road and Veteran Avenue to the west, and Bel-Air Road to the east. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 154, ,080 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 627, , ,401 CONST MGT CITY (FACM) 160,400 60, ,480 CM CONSULTANT (CTCM) , , ,224,961 Page 121 CS August 2, 2013

146 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - U23 DAVID & CANFIELD AV 980 5, 10 West Los Angeles SZC12279 SSRP U23 DAVID & CANFIELD PROJECT DESCRIPTION: This project will rehabilitate approximately 3.7 miles as part of the 60 miles-per-year Settlement Agreement. The project is located in West Los Angeles in an area bounded by Airdrome Street and Gregory Way to the north, Forrester Drive and Castle Heights to the west, Crescent Heights Boulevard to the east, and Washington Boulevard and Exposition Boulevard to the south. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 212, ,560 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 433,000 1,323, ,756,261 CONST MGT CITY (FACM) 140, ,200 8, ,920 CM CONSULTANT (CTCM) ,040 1,478,461 8, ,272,741 Page 122 CS August 2, 2013

147 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM - Z13 MORAY & W 25TH ST Harbor SZC12293 SSRP Z13 MORAY & W 25TH PROJECT DESCRIPTION: This project will rehabilitate approximately 1.1 miles of sewer pipes as part of the 60 miles-per-year Settlement Agreement.The project is located in Harbor Los Angeles in an area bounded by 9th Street to the north, Patton Avenue to the east, Paseo Del Mar Avenue to the south, and Catalina Vista to the west. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 45, ,840 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 58, , ,000 CONST MGT CITY (FACM) 27,520 30,320 1, ,360 CM CONSULTANT (CTCM) , ,320 1, ,200 Page 123 CS August 2, 2013

148 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM- Z18A CENTURY BL & MAIN ST , 9, 15 South Los Angeles SZC12537 SSRP Z18A CENTURY & MAIN PROJECT DESCRIPTION: This project will rehabilitate approximately 4.8 miles of sewer pipes. The project is located in South Los Angeles in an area bounded by Firestone Boulevard to the north, Alameda Street to the east, El Segundo Boulevard to the south, and Figueroa Street to the west. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 117, , , ,280 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) ,720 4,071, , ,750,000 CONST MGT CITY (FACM) , ,440 38, ,320 CM CONSULTANT (CTCM) , , ,840 4,538, , ,963,600 Page 124 CS August 2, 2013

149 COLLECTION SYSTEM (CS) SECONDARY SEWER RENEWAL PROGRAM- Z18B IMPERIAL BL & AVALON BL , 9, 15 South Los Angeles SZC12538 SSRP Z18B IMPERIAL & AVALON PROJECT DESCRIPTION: This project will rehabilitate approximately 7.5 miles of sewer pipes. The project is located in South Los Angeles in an area bounded by Firestone Boulevard to the north, Alameda Street to the east, El Segundo Boulevard to the south, and Figueroa Street to the west. PROJECT MANAGER: Doug Irvine Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 166, , , ,040 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) ,278,730 1,046, ,325,000 CONST MGT CITY (FACM) , ,280 68, ,157,280 CM CONSULTANT (CTCM) , , ,360 7,062,010 1,114, ,196,320 Page 125 CS August 2, 2013

150 COLLECTION SYSTEM (CS) UPPER BEACHWOOD EASEMENT MAINTENANCE HOLE ADDITION Central SZC11793 UPPER BEACHWOOD EASE MH ADDIT PROJECT DESCRIPTION: This project will construct 31 maintenance holes in existing sewer easements in the Hollywood Hills area. This project is located in the area roughly bounded by Mulholland Highway to the west, Westshire Drive to the south, Hollyridge Drive to the east, Rogerton Drive to the north. Maintenance holes will be installed at angle points left in the sewer when it was originally built. PROJECT MANAGER: Hortensia Alonso Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 957,200 64,000 9,600 36,800 3, ,070,720 PLANS CONSULTANT (CTP) 11, ,200 RIGHT-OF-WAY (RW) 142, , , ,000 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,400 58, ,280 CM CONSULTANT (CTCM) ,110, , ,600 36, , , ,697,200 Page 126 CS August 2, 2013

151 COLLECTION SYSTEM (CS) VENICE AND HIGHLAND MH SEWER South Los Angeles SZC12511 VENICE & HIGHLAND MH SWR PROJECT DESCRIPTION: The project will install a maintenance hole (MH) with slide gate on existing 18- inch pipe that diverts flow from MH at Wilshire Hollywood Interceptor Sewer (WHIS) at intersection of Venice Boulevard and Highland Avenue to a 42- inch sewer at MH in Highland Avenue. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 6, ,720 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 25, ,000 CONST MGT CITY (FACM) 0 3, ,480 CM CONSULTANT (CTCM) ,480 28, ,200 Page 127 CS August 2, 2013

152 COLLECTION SYSTEM (CS) VENICE BLVD INTERCEPTOR SEWER U West Los Angeles NEW PROJECT DESCRIPTION: This project will construct 3,800 linear feet of new 21-inch relief sewer in Venice Boulevard to intercept existing flow at the upstream end from the intersection of Venice Boulevard and Beethoven Avenue and at the downstream end. The new 21-inch sewer will be connected to the existing 21-inch Vitrified Clay Pipe stub located at Venice Boulevard and Superior Avenue. PROJECT MANAGER: James Corralejo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 0 16, , ,520 12, ,160 PLANS CONSULTANT (CTP) 0 2,400 14,800 14, ,800 CONSTRUCTION (CONS) ,270,520 1,638, ,909,000 CONST MGT CITY (FACM) ,120 68, ,920 CM CONSULTANT (CTCM) ,400 2, , , , ,120 2,752,680 1,709, ,871,380 Page 128 CS August 2, 2013

153 COLLECTION SYSTEM (CS) WASHINGTON GRIFFITH LONG BEACH SEWER REPLACEMENT 147 9, 14 Central SZC11655 WASHINGTON SWR GRIFFITH/LB AVE PROJECT DESCRIPTION: This project will provide for the replacement of approximately 1,400 feet of 8-inch diameter sewers located beneath the Metropolitan Transportation Authority Blue Line on Washington Boulevard between Griffith Avenue and Control Avenue, Hooper Avenue and Tarleton Street, Long Beach Avenue and Compton Avenue. PROJECT MANAGER: James Corralejo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 338, ,000 PLANS CONSULTANT (CTP) 27, ,400 CONSTRUCTION (CONS) 1,582,242 1,801, ,383,991 CONST MGT CITY (FACM) 287, ,600 12, ,960 CM CONSULTANT (CTCM) 98,400 6, ,200 2,333,402 1,956,149 12, ,301,551 Page 129 CS August 2, 2013

154 COLLECTION SYSTEM (CS) WILSHIRE AREA OLYMPIC SEWER REHABILITATION 159 4, 10 Central SZC11741 WILSHIRE AREA OLYMPIC SW REHAB PROJECT DESCRIPTION: This project will rehabilitate approximately 3,050 linear feet of 21-inch, 27-inch, and 30-inch diameter sewers constructed in the 1920 s. The sewers are located in Victoria Avenue, Bronson Avene, Country Club Drive right of way, 11th Street, and Olympic Boulevard. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) , , ,120 14, ,200 PLANS CONSULTANT (CTP) ,600 30,300 15, ,100 CONSTRUCTION (CONS) ,195,585 4,260, ,456,204 CONST MGT CITY (FACM) , ,160 34, ,284,640 CM CONSULTANT (CTCM) ,900 20, , , , ,320 4,047,725 4,733,679 34, ,851,944 Page 130 CS August 2, 2013

155 COLLECTION SYSTEM (CS) WILSHIRE AREA SYSTEM SEWER REHABILITATION 160 4, 10 Central, South Los Angeles NEW PROJECT DESCRIPTION: This project will rehabilitate approximately 7,760 linear feet of sewers in the Wilshire area. The sewers range from 18- inch to 54-inch in diameter and were built in PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) , , , , ,880 PLANS CONSULTANT (CTP) ,100 29,300 42, ,500 CONSTRUCTION (CONS) ,792,577 5,319, , ,563,782 CONST MGT CITY (FACM) , ,560 34, ,292,240 CM CONSULTANT (CTCM) ,800 34, , , , ,700 2,478,897 6,076, , ,973,602 Page 131 CS August 2, 2013

156 COLLECTION SYSTEM (CS) WEST LA SEWER SANITATION MAINTENANCE YD West Los Angeles NEW PROJECT DESCRIPTION: This project will demolish the existing 10,800 square foot building and construct a 7,500 square foot office building including new site lighting, new security system, 880 linear feet of perimeter fence, remove and replace the existing site parking with 29,000 square feet of parking, install a clarifier, construct a 540 square foot wash pad, and provide landscaping for 2,200 square feet area. PROJECT MANAGER: Paul Young Phone: (213) Office: Architectural Division (BOE) PLANS CITY (FAP) , , ,800 63, ,023,760 PLANS CONSULTANT (CTP) ,800 47, ,000 CONSTRUCTION (CONS) ,883,626 9,677, ,561,000 CONST MGT CITY (FACM) , ,600 43, ,083,440 CM CONSULTANT (CTCM) , , , , ,600 3,927,066 9,677, ,728,200 Page 132 CS August 2, 2013

157 COLLECTION SYSTEM (CS) WLAIS REHABILITATION OVERLAND TO KELTON West Los Angeles SZC12367 WLAIS REHAB OVERLAND TO KELTON PROJECT DESCRIPTION: This project will rehabilitate approximately 1,795 feet of the 60-inch semi-elliptical existing West Los Angeles Interceptor Sewer (WLAIS); construct new maintenance holes (MH); and upgrade existing MH's. This project is bounded from Venice Boulevard and Overland Avenue to Venice Boulevard and Kelton Avenue. PROJECT MANAGER: Brad Jenson Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 229, ,800 11, ,680 PLANS CONSULTANT (CTP) 23,500 5, ,100 CONSTRUCTION (CONS) 0 0 1,379,484 2,186, ,566,000 CONST MGT CITY (FACM) , ,880 14, ,640 CM CONSULTANT (CTCM) ,600 8, , , ,400 1,675,804 2,380,096 14, ,443,720 Page 133 CS August 2, 2013

158 COLLECTION SYSTEM (CS) THIS PAGE INTENTIONALLY LEFT BLANK Page 134 CS August 2, 2013

159 CITY OF LOS ANGELES PROJECT PLANNED EXPENDITURE SUMMARY DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT PLANNED EXPENDITURE SUMMARY PROJECT TITLE 2 nd Year 20017/ /19 DCT AERATION TANKS CONC REHAB 343, ,035 3,098,717 3,241, , DCT AWPF 2,572,440 2,572,440 6,765,660 8,849,780 8,849,780 38,470, ,160, ,769, ,201,248 0 DCT BALBOA LAKE PUMP REPLC 76, , DCT CAPITAL EQP REPLC PROG 265, , , , , DCT CHANNEL 1 AIR SPARGERS IMP 0 85, , , , DCT ELECTRICAL POWER SYS MODS 371,900 5,195, , DCT ELECTRICAL VAULT REHAB 429,870 1,009, DCT EMERGENCY BACKUP POWER 0 64,920 2,763,240 5,712, , DCT GRIT CHAMBER BACKUP FLUSH SYS 80, , DCT MAINTENANCE FACIL RELOC 0 132, , ,040 8,871,830 14,548,765 5,594, DCT MULTI-PURP & OFFICE FAC 10,136,540 6,488, DCT MULT-PURP & OFFICE FAC EXH 65, ,600 2,369, DCT ODOR CNTRL SYS UPGRADE 0 106,360 35,240 1,210, , DCT PH2 SCREW PUMPS RPLC 956, ,830 2,145,630 1,743, DCT SCREW PUMP 3 & 4 STARTERS 369, DCT SOLAR PANEL GUARD RAILS 355, DCT WW CONTROL SYSTEM REPL 0 96,600 2,300,237 8,882,204 4,828, , DCT 16,021,947 18,216,650 21,119,879 31,303,085 24,923,455 53,533, ,755, ,769, ,201,248 0 Page 135 DCT August 1, 2013

160 PROJECT PLANNED EXPENDITURE SUMMARY DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) THIS PAGE INTENTIONALLY LEFT BLANK Page 136 DCT August 1, 2013

161 CITY OF LOS ANGELES DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT AERATION TANKS CONCRETE REHABILITATION South Valley NEW PROJECT DESCRIPTION: This project will line the surfaces of 18 aeration basins with a chemical resistant polymer coating. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 253, , ,672 PLANS CONSULTANT (CTP) 0 89,308 41, ,057 CONSTRUCTION (CONS) ,641,370 2,851, , ,720,000 CONST MGT CITY (FACM) , , ,219 36, ,771 CM CONSULTANT (CTCM) ,264 67,313 62,748 12, , , ,035 3,098,717 3,241, , ,278,109 Page 137 DCT August 1, 2013

162 DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT ADVANCED WATER PURIFICATION FACILITY South Valley NEW PROJECT DESCRIPTION: This project provides for design and construction of a Micro Filtration (MF) / Reverse Osmosis (RO) Advanced Oxidation Process (AOP) facility at Donald C. Tillman Water Reclamation Plant (DCT). PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 463,200 1,857,840 1,857,840 5,218,960 6,891,280 6,891,280 6,308, ,489,200 PLANS CONSULTANT (CTP) 178, , ,600 1,546,700 1,958,500 1,958,500 1,392, ,463,900 CONSTRUCTION (CONS) ,911, ,445, ,108, ,533, ,000,000 CONST MGT CITY (FACM) ,406,720 16,813,360 16,767,440 12,615, ,603,280 CM CONSULTANT (CTCM) ,450,500 2,901,000 2,893,000 3,051, ,296, ,300 2,572,440 2,572,440 6,765,660 8,849,780 8,849,780 38,470, ,160, ,769, ,201, ,852,580 Page 138 DCT August 1, 2013

163 CITY OF LOS ANGELES DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT BALBOA LAKE PUMP REPLACEMENT South Valley SZD11258 DCT BALBOA LAKE PUMP REPLC PROJECT DESCRIPTION: This project will replace a pump at Balboa Lake. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 30,300 60,600 10, ,000 PLANS CONSULTANT (CTP) 7,800 15,600 2, ,000 CONSTRUCTION (CONS) , ,000 CONST MGT CITY (FACM) , ,000 CM CONSULTANT (CTCM) , ,000 38,100 76, , ,000 Page 139 DCT August 1, 2013

164 DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT CAPITAL EQUIPMENT REPLACEMENT PROGRAM (CERP) South Valley VARIOUS PROJECT DESCRIPTION: This project will provide for replacement of equipment at the end of its design life. Capital Equipment Replacement tasks are specified as having a replacement cost in excess of $25,000. The DCT capital equipment replacement program projects for fiscal year are: Replacing lower bearings for screw pump-phase-1, Waterchamp Chemical Induction Mixer, Battery Bank (UPS), Submersible flyght pump to supply Lake Balboa, and influent meter and Gear box for screw pump. PROJECT MANAGER: Lance Vincent Phone: (818) Office: Bureau of Sanitation (BOS) PLANS CITY (FAP) 96, ,180 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 1,787, , , , , , ,333,150 CONST MGT CITY (FACM) 161, ,770 CM CONSULTANT (CTCM) ,045, , , , , , ,591,100 Page 140 DCT August 1, 2013

165 CITY OF LOS ANGELES DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT CHANNEL 1 AIR SPARGERS IMPROVEMENTS South Valley NEW PROJECT DESCRIPTION: This project will install new spargers in DCT s Channel 1, and construction of a new Channel 1 bulkhead. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , , ,000 PLANS CONSULTANT (CTP) ,333 34, ,000 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,000 22, ,000 CM CONSULTANT (CTCM) ,667 6, , , , , , ,182,000 Page 141 DCT August 1, 2013

166 DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT ELECTRICAL POWER SYSTEM MODIFICATIONS South Valley SZD11204 DCT ELECT POWER SYS MODIFI PROJECT DESCRIPTION: This project will replace all existing switchgear that is 20 years old and reconfigure the current loop system to a more reliable configuration at the Donald C. Tillman Water Reclamation Plant (DCT). PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 235, , ,240 PLANS CONSULTANT (CTP) 91,400 33, ,800 CONSTRUCTION (CONS) 0 0 4,485, , ,915,160 CONST MGT CITY (FACM) 0 185, ,200 34, ,480 CM CONSULTANT (CTCM) 0 34, ,000 13, , , ,900 5,195, , ,371,180 Page 142 DCT August 1, 2013

167 CITY OF LOS ANGELES DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT ELECTRICAL VAULT REHABILITATION South Valley SZD11222 DCT ELECTRICAL VAULT REHAB PROJECT DESCRIPTION: This project will replace 17 electrical vaults that have the least amount of useful life remaining at the Donald C. Tillman Water Reclamation Plant (DCT). PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 229,840 47, ,280 PLANS CONSULTANT (CTP) 79,000 10, ,500 CONSTRUCTION (CONS) 0 307, , ,250,000 CONST MGT CITY (FACM) 0 47,680 49, ,120 CM CONSULTANT (CTCM) 0 16,900 17, , , ,870 1,009, ,748,700 Page 143 DCT August 1, 2013

168 DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT EMERGENCY BACKUP POWER South Valley SZD11134 DCT EMERGENCY BACKUP POWER PROJECT DESCRIPTION: This project will provide emergency backup power, test the existing emergency backup power generator, and install one or two generators depending upon the reliability of the existing generator at the Donald C. Tillman Water Reclamation Plant (DCT). PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 454, ,320 4, ,600 PLANS CONSULTANT (CTP) 130, ,600 1, ,000 CONSTRUCTION (CONS) ,169,000 5,277, , ,938,374 CONST MGT CITY (FACM) , ,400 5, ,600 CM CONSULTANT (CTCM) ,600 74,000 1, , , ,920 2,763,240 5,712, , ,623,974 Page 144 DCT August 1, 2013

169 CITY OF LOS ANGELES DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT GRIT CHAMBER BACKUP FLUSH SYSTEM South Valley SZD11257 DCT GRIT CHAMBER BACKUP FLUSH SYS PROJECT DESCRIPTION: This project will install a backup flush system at DCT s Grit Chamber. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 14,545 25, ,000 PLANS CONSULTANT (CTP) 3,636 6, ,000 CONSTRUCTION (CONS) 0 40, , ,000 CONST MGT CITY (FACM) 0 6,500 6, ,000 CM CONSULTANT (CTCM) 0 2,000 2, ,000 18,181 80, , ,000 Page 145 DCT August 1, 2013

170 DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT MAINTENANCE FACILITIES RELOCATION South Valley SZD11242 DCT MAINTENANCE FACIL RELOC PROJECT DESCRIPTION: This project will relocate the current Maintenance Facilities at Donald C. Tillman (DCT) Water Reclamation Plant in order to accommodate the new Advanced Water Purification Facility (AWPF) which is to be built. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , , ,440 32, ,018,400 PLANS CONSULTANT (CTP) , , ,600 9, ,000 CONSTRUCTION (CONS) ,579,530 13,173,945 5,233, ,987,000 CONST MGT CITY (FACM) ,039,200 1,142, , ,448,800 CM CONSULTANT (CTCM) , ,500 94, , , , ,040 8,871,830 14,548,765 5,594, ,562,200 Page 146 DCT August 1, 2013

171 CITY OF LOS ANGELES DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT MULTI-PURPOSE AND OFFICE FACILITY South Valley SZD11246 DCT MULTI-PURP & OFFICE FAC PROJECT DESCRIPTION: This project will provide design and construction of DCT Multi Purpose and Office Building including a plaza. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 96,560 86,400 45, ,720 PLANS CONSULTANT (CTP) 142,000 16,000 16, ,000 CONSTRUCTION (CONS) 1,563,600 9,511,900 6,202, ,277,750 CONST MGT CITY (FACM) 261, , , ,920 CM CONSULTANT (CTCM) 12,000 12,000 16, ,000 2,075,680 10,136,540 6,488, ,700,390 Page 147 DCT August 1, 2013

172 DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT MULTI-PURPOSE AND OFFICE FACILITY EXHIBITS South Valley SZD11250 DCT MULT-PURP & OFFICE FAC EXH PROJECT DESCRIPTION: This project provides for design and fabrication of the exhibits as part of the new Donald C. Tillman Water Reclamation Plant Multipurpose and Office Building. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 46, ,200 91, ,480 PLANS CONSULTANT (CTP) 0 18,800 44,100 36, ,700 CONSTRUCTION (CONS) ,940 2,089, ,500,000 CONST MGT CITY (FACM) , , ,320 CM CONSULTANT (CTCM) ,200 40, , , ,600 2,369, ,148,200 Page 148 DCT August 1, 2013

173 CITY OF LOS ANGELES DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT ODOR CONTROL SYSTEM UPGRADE South Valley NEW PROJECT DESCRIPTION: This project will construct an air scrubbing system to remove harmful contaminants before the blowers. Install new scrubber system, and provide ductwork. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,760 30, ,400 PLANS CONSULTANT (CTP) ,600 4, ,200 CONSTRUCTION (CONS) ,172, , ,950,000 CONST MGT CITY (FACM) ,560 5, ,600 CM CONSULTANT (CTCM) ,200 1, , ,360 35,240 1,210, , ,137,300 Page 149 DCT August 1, 2013

174 DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT-PHASE 2 SCREW PUMPS REPLACEMENT South Valley SZD11256 DCT PH2 SCREW PUMPS RPLC PROJECT DESCRIPTION: This project will replace all four (4) of the Phase 2 screw pumps at the Donald C Tillman Water Reclamation Plan,. And replace the upper flange and the bearing of the pump. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 711, , ,880 PLANS CONSULTANT (CTP) 0 245,300 39, ,400 CONSTRUCTION (CONS) ,410 1,850,130 1,536, ,700,000 CONST MGT CITY (FACM) , , , ,400 CM CONSULTANT (CTCM) ,600 43,500 38, , , ,830 2,145,630 1,743, ,534,880 Page 150 DCT August 1, 2013

175 CITY OF LOS ANGELES DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT SCREW PUMP 3 & 4 STARTER UPGRADES South Valley SZD11248 DCT SCREW PUMP 3 & 4 STARTERS PROJECT DESCRIPTION: This project will replace Medium Voltage starters for Screw pump 3 & 4 at the Donald C. Tillman Water Reclamation Plant. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 123, ,400 PLANS CONSULTANT (CTP) 38, ,500 CONSTRUCTION (CONS) 0 250, ,000 CONST MGT CITY (FACM) 10, , ,600 CM CONSULTANT (CTCM) 1,750 19, , , , ,375 Page 151 DCT August 1, 2013

176 DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT SOLAR PANEL GUARD RAILS South Valley SZD11244 DCT SOLAR PANEL GUARD RAILS PROJECT DESCRIPTION: This project will install guard raillings & access ladders on the perimeters of the phase 1 & 2 filter building's solar panel roofs. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 111, ,400 PLANS CONSULTANT (CTP) 33, ,200 CONSTRUCTION (CONS) 26, , ,000 CONST MGT CITY (FACM) 0 66, ,240 CM CONSULTANT (CTCM) 0 12, , , , ,940 Page 152 DCT August 1, 2013

177 CITY OF LOS ANGELES DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) DCT WASTEWATER CONTROL SYSTEM REPLACEMENT South Valley NEW PROJECT DESCRIPTION: This project will provide updated hardware and software for the distributed control system (DCS) required to operate the Donald C. Tillman Water Reclamation Plant (DCT) treatment facility. The DCT DCS was upgraded in 2000 and will require replacement in the future. This project is part of the overall Wastewater Control System Replacement program. PROJECT MANAGER: Ali Poosti Phone: (323) Office: Wastewater Engineering Services Division (BOS) PLANS CITY (FAP) , ,216 PLANS CONSULTANT (CTP) , ,384 CONSTRUCTION (CONS) ,230,863 7,561,588 3,878, ,670,818 CONST MGT CITY (FACM) , , , , ,541,760 CM CONSULTANT (CTCM) , , , , ,312, ,600 2,300,237 8,882,204 4,828, , ,621,818 Page 153 DCT August 1, 2013

178 DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) PAGE INTERNATIONALLY LEFT BLANK Page 154 DCT August 1, 2013

179 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP PLANNED EXPENDITURE SUMMARY PROJECT TITLE 2 nd Year 20017/ /19 HTP 1 MILE OUTFA CHEM LINE UPG 362,000 9, HTP 1-MILE OUTFAL STRU REHAB 106,360 53,141 2,250, HTP 5-MILE OUTFALL REBAL 482, HTP ABRA BLA & STEAM CLEAN FAC , ,220 1,113,509 25, HTP AMMONIA REMO PILOT STUDY 105, HTP AUX BOILER NO.2 REPL 210, HTP CAPITAL EQP REPLC PROG 4,126,500 3,951,700 3,845,625 4,082,000 4,110, HTP CAPITAL UTILITY REPLC PROG 400, , , , HTP CENTRATE INFLUENT FLW EQUAL , ,180 1,551,627 1,391, HTP CHEMICAL LINES UPGRADES 245,484 1,230,696 3, HTP COMPUTER COOLING SYS UPG , ,380 1,676,073 1,433, HTP DGUP COOLING WATER SYS 802,500 1,013, HTP DIG EXP LITIGATION PH ,524, HTP DIG GAS DESULF FAC IMPR 3,184,025 2,403, HTP DIG SCREENING FAC IMPR 222, ,240 2,781,530 3,129, HTP DILUTE POLYMER PUMP IMPR , ,040 2,593,618 1,347, HTP EPP HEADER REPL 101,000 2,501,520 4,774,000 2,445, HTP FLARES SYSTEM UPGRADE 3,673,292 2,240, HTP FOG RECEIVING STATION EXPANSION 27,080 98, HTP FOG RECEIVING STATION NORTH 304, ,202 1,655, , HTP G ST PIPE RACK STR REHAB 349,740 2,485,976 2,387, , Page 155 HTP August 1, 2013

180 HYPERION TREATMENT PLANT (HTP) PROJECT TITLE 2 nd Year 20017/ /19 HTP GRIT HANDL IMPROV 280,020 4,426,120 1,531, HTP HDWKS FINE SCREENS INSTALL 0 134, ,000 6,083, ,439 61,900 1, HTP HDWKS GRIT CLASS RELOC 725, , HTP HDWRKS ODOR CTRL UPG 13, ,430 2,125, , HTP IPS ODOR CNTRL IMPROVEMENT , ,880 2,691,115 1,244, HTP PREG BLD DATA HWY DIST RM 68, HTP PREG BUILD FIRST FL MODS 1,725, HTP PRIM EFFL CHANN COVER REPL 0 385,320 30,220 1,588,720 81, HTP PRIM INFL CH AIR SPARGERS , , ,045 1,059,222 2, HTP PRIMARY INFLUENT GATES REPL 349,000 1,327, HTP REACTOR 1 & 2 UPGRADE , ,840 1,182, HTP REACTOR MICRO OXYGENATION 0 211, , ,341 3,135, , HTP SCREENING HANDLING IMPR 2,584,444 1,128, HTP SEC CLARIF STRU REHAB PH I 706,700 3,736,205 3,382,115 19, HTP SEC CLARIF STRU REHAB PH II 765,100 4,586,618 5,236,150 1,679, HTP SEC CLARIFIERS EXPANSION , , ,840 7,282,279 14,047,923 5,979, HTP SERVICE WATER FAC UPG 1,776,784 1,640, HTP SOLIDS HNDL TRUCK LOAD FAC 0 928,000 1,907,280 1,307,760 24,825,217 35,528,258 11,570, HTP SUBSTATION SEPARATION 1,067, , HTP SWF S SIDE CLOTH FILT INST 267,249 1,534,214 6,300, HTP TRUCK LOAD FAC ODOR CNTL MOD 203,820 2,182,206 2,507, , HTP WW CONTROL SYSTEM REPL 11,840,294 12,335,107 3,506, HTP 37,074,699 53,554,438 24,323,566 24,323,566 36,137,678 54,439,234 30,688,380 5,981, Page 156 HTP August 1, 2013

181 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP 1-MILE OUTFALL CHEMICAL LINE UPGRADE West Los Angeles SZH11718 HTP 1 MILE OUTFA CHEM LINE UPG PROJECT DESCRIPTION: This project will replace the in-ground sodium hypochloride pipe from Service Water Facility to the 1-mile gates with above ground and in-trench piping installation. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 108, ,400 PLANS CONSULTANT (CTP) 33, ,200 CONSTRUCTION (CONS) 0 293, ,000 CONST MGT CITY (FACM) 0 58,800 7, ,240 CM CONSULTANT (CTCM) 0 10,200 1, , , ,000 9, ,940 Page 157 HTP August 1, 2013

182 HYPERION TREATMENT PLANT (HTP) HTP 1-MILE OUTFALL STRUCTURE REHABILITATION West Los Angeles NEW PROJECT DESCRIPTION: This project will rehabilitate and reinforce the end structure. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 77,760 30, ,400 PLANS CONSULTANT (CTP) 0 28,600 4, ,200 CONSTRUCTION (CONS) ,901 2,172, ,190,000 CONST MGT CITY (FACM) , ,240 CM CONSULTANT (CTCM) , , ,360 53,141 2,250, ,409,940 Page 158 HTP August 1, 2013

183 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP 5-MILE OUTFALL REBALLASTING West Los Angeles SZH11567 HTP 5 MILE OUTFALL REBALLAST PROJECT DESCRIPTION: This project will rehabilitate the 5 Mile outfall as recommended by an engineering evaluation report. Work consists of designing and placing approximately 60,000 tons of graded rock of varying sizes to re-ballast the 5-mile outfall for added protection of the inshore portions of the outfall for storms up to a return period of 100 years. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 469, ,280 PLANS CONSULTANT (CTP) 201, ,800 CONSTRUCTION (CONS) 9,340, , ,787,470 CONST MGT CITY (FACM) 939,520 26, ,400 CM CONSULTANT (CTCM) 144,200 7, ,100 11,094, , ,577,050 Page 159 HTP August 1, 2013

184 HYPERION TREATMENT PLANT (HTP) HTP ABRASIVE BLAST & STEAM CLEANING FACILITY West Los Angeles SZH11400 HTP ABRASV BLAST & STEAM CLEAN PROJECT DESCRIPTION: This project will procure and install new equipment in the existing Abrasive Blast Facility at HTP. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , ,920 1, ,120 PLANS CONSULTANT (CTP) ,900 41, ,500 CONSTRUCTION (CONS) ,189 19, ,066 CONST MGT CITY (FACM) ,280 4, ,360 CM CONSULTANT (CTCM) ,300 1, , , ,220 1,113,509 25, ,429,946 Page 160 HTP August 1, 2013

185 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP AMMONIA REMOVAL PILOT STUDY West Los Angeles SZH11750 HTP AMMONIA REMO PILOT STUDY PROJECT DESCRIPTION: This project will procure consultant services for process review and selection; conceptual design; budgetary estimate and testing protocol. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 6,000 9, ,000 PLANS CONSULTANT (CTP) 64,000 96, ,000 CONSTRUCTION (CONS) CONST MGT CITY (FACM) CM CONSULTANT (CTCM) , , ,000 Page 161 HTP August 1, 2013

186 HYPERION TREATMENT PLANT (HTP) HTP AUXILIARY BOILER NO 2 REPLACEMENT West Los Angeles SZH11644 HTP AUX BOILER #2 REP (2410) PROJECT DESCRIPTION: This project will install and replace existing Auxiliary Boiler No. 2 and water treatment system. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 387, ,600 PLANS CONSULTANT (CTP) 111, ,200 CONSTRUCTION (CONS) 4,650, , ,860,667 CONST MGT CITY (FACM) 379, ,560 CM CONSULTANT (CTCM) 168, ,100 5,697, , ,907,127 Page 162 HTP August 1, 2013

187 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP CAPITAL EQUIPMENT REPLACEMENT PROGRAM West Los Angeles VARIOUS PROJECT DESCRIPTION: This project will provide for replacement of equipment at the end of its design life. Capital Equipment Replacement tasks are specified as having a replacement cost in excess of $25,000. The HTP Capital Equipment Replacement Program projects for fiscal year are: 1 - Primary Scum Pump Rplc, 2 - Return Activated Sludge (RAS) Line Reconditioning, 3 - Clarifier Return Activated Sludge (RAS) Pump Rplc, 4 - Mixer Gear Box 5 - Reactor Deck Gas Detector Upgrade, 6 - Mechanical & Vacuum Jacketed Piping Insulationt, 7- RAS Line Reconditioning, 8 - Rebuild Process Air Compressor (PAC) # 2, 9 - Molsieve Media Replacement, 10 - G-3 Centrifuge Rp, 11 - Primary Raw Scum (PRS) Grinders, 12 - Digester Sludge Mixers, 13 - Air Pollution Control (APC) Equip Rplc Plantwide, 14 - Uninterrupted Power Source (UPS) Rplc, 15 - Veriable Frequency Drives (VFD) Rplcl, 16 - Intake/Exhaust Fan R, 17 - Elevator Upgrade, 18 - Instrumentation Upgrades Plantwide. PROJECT MANAGER: Mark Starr Phone: (310) Office: Hyperion Treatment Plant (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 8,343,422 4,126,500 3,951,700 3,845,625 4,082,000 4,110, ,459,832 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,343,422 4,126,500 3,951,700 3,845,625 4,082,000 4,110, ,459,832 Page 163 HTP August 1, 2013

188 HYPERION TREATMENT PLANT (HTP) HTP CAPITAL UTILITY REPLACEMENT PROGRAM (CURP) West Los Angeles VARIOUS PROJECT DESCRIPTION: This project will provide for replacement of utilities at the end of their useful life. Specific replacement projects will be identified and evaluated annually. PROJECT MANAGER: Mark Starr Phone: (310) Office: Hyperion Treatment Plant (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 800, , , , , ,800,000 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) , , , , , ,800,000 Page 164 HTP August 1, 2013

189 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP CENTRATE INFLUENT FLOW EQUALIZATION West Los Angeles NEW PROJECT DESCRIPTION: This project will construct a distribution system of in-plant recycle flows which allows the centrate coming from the centrifuges to be evenly distributed in the influent channel of the Headworks. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , ,080 22, ,960 PLANS CONSULTANT (CTP) ,100 59,100 5, ,200 CONSTRUCTION (CONS) ,336,967 1,315, ,652,250 CONST MGT CITY (FACM) ,400 55, ,160 CM CONSULTANT (CTCM) ,100 20, , , ,180 1,551,627 1,391, ,314,170 Page 165 HTP August 1, 2013

190 HYPERION TREATMENT PLANT (HTP) HTP CHEMICAL LINES UPGRADES West Los Angeles SZH11719 HTP CHEMICAL LINES UPGRADES PROJECT DESCRIPTION: This project will replace the in-ground Sodium Hypochloride (NaOCl) and Sodium Hydroxide (NaOH) pipes from Chemical Storage Facility to Digester Screening Facility, from Service Water Facility (SWF) bleach tanks to SWF and from SWF to Clarifiers Return Activated Sludge line. The new piping shall be above ground, in trench or double contained overhead installation. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 64,400 53, ,680 PLANS CONSULTANT (CTP) 177,500 27, ,800 CONSTRUCTION (CONS) 0 92,064 1,107, ,200,000 CONST MGT CITY (FACM) 0 61, ,960 3, ,520 CM CONSULTANT (CTCM) 0 11,400 19, , , ,484 1,230,696 3, ,722,000 Page 166 HTP August 1, 2013

191 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP COMPUTER ROOM COOLING SYSTEM UPGRADE West Los Angeles SZH11428 HTP CPU COOLING SYSTEM UPGRD PROJECT DESCRIPTION: This project will add capacity to the ventilation system inside the computer server room at the Hyperion Technical Service Facility (TSF). PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , ,880 46, ,600 PLANS CONSULTANT (CTP) ,100 91,500 11, ,900 CONSTRUCTION (CONS) ,420,533 1,273, ,694,480 CONST MGT CITY (FACM) , , ,000 CM CONSULTANT (CTCM) ,000 24, , , ,380 1,676,073 1,433, ,628,980 Page 167 HTP August 1, 2013

192 HYPERION TREATMENT PLANT (HTP) HTP DIGESTER GAS UTILIZATION COOLING WATER SYSTEM West Los Angeles SZH11706 HTP DGUP COOLING WATER SYS PROJECT DESCRIPTION: This project will rehabilitate the cooling water supply to the Energy Recovery Building in preparation for the startup of the Digester Gas Utilization Project (DGUP). PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 265,200 44, ,400 PLANS CONSULTANT (CTP) 64,800 10, ,600 CONSTRUCTION (CONS) 0 667, , ,600,000 CONST MGT CITY (FACM) 0 62,500 62, ,000 CM CONSULTANT (CTCM) 0 18,000 18, , , ,500 1,013, ,146,000 Page 168 HTP August 1, 2013

193 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP DIGESTER EXPANSION LITIGATION PHASE West Los Angeles NEW PROJECT DESCRIPTION: This amount is for the final two payments to settle the litigation over the HTP Digester Expansion project that was completed in These payments were approved in Council File PROJECT MANAGER: Lisa Mowery Phone: (213) Office: Financial Management Division (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 27,000, ,524, ,524,300 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,000, ,524, ,524,320 Page 169 HTP August 1, 2013

194 HYPERION TREATMENT PLANT (HTP) HTP DIGESTER GAS DESULFURIZATION FACILITY IMPROVEMENTS West Los Angeles SZH11591 HTP DG DESULF FAC IMPR PROJECT DESCRIPTION: This project will improve emission control system, paint and lead abatement at the Facility and Operational Reliability and Maintainability. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 288, ,800 PLANS CONSULTANT (CTP) 395, ,200 CONSTRUCTION (CONS) 0 2,746,525 2,188, ,935,000 CONST MGT CITY (FACM) 61, , , ,400 CM CONSULTANT (CTCM) 12,400 73,100 30, , ,240 3,184,025 2,403, ,345,400 Page 170 HTP August 1, 2013

195 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP DIGESTER SCREENING FACILITY IMPROVEMENTS (DSF) West Los Angeles SZH11679 HTP HTP DSF IMPROVEMENTS PROJECT DESCRIPTION: This project will: 1) Replace all DSF systems with chopper pump and grinder running in series; 2) Upgrade Odor Control System; 3) Upgrade electrical systems ; 4) Upgrade control systems; and 5) Integrate with (DCS), PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 54,800 70,240 19, ,160 PLANS CONSULTANT (CTP) 0 168, ,000 22, ,000 CONSTRUCTION (CONS) ,307,690 2,692, ,000,000 CONST MGT CITY (FACM) , , ,920 CM CONSULTANT (CTCM) , , , , ,240 2,781,530 3,129, ,351,980 Page 171 HTP August 1, 2013

196 HYPERION TREATMENT PLANT (HTP) HTP DILUTE POLYMER PUMP IMPROVEMENT West Los Angeles SZH11410 HTP-DILUTE POLYMER PUMP IMPR PROJECT DESCRIPTION: This project will evaluate the polymer system at C-7 building and develop alternatives to meet future demands. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,560 89,040 25, ,960 PLANS CONSULTANT (CTP) , ,000 2, ,000 CONSTRUCTION (CONS) ,230,778 1,185, ,416,099 CONST MGT CITY (FACM) , , ,720 CM CONSULTANT (CTCM) ,600 28, , , ,040 2,593,618 1,347, ,479,179 Page 172 HTP August 1, 2013

197 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP EFFLUENT PUMPING PLANT HEADER REPLACEMENT West Los Angeles SZH11613 HTP-EPP HEADER REPLACEMENT PROJECT DESCRIPTION: This project willl rehabilitate all the Effluent Pumping Plant header system components. The rehabilitation includes patch weld and carbon fiber lining portions of deteriorated steel pipe and replacement of the header. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 1,114,140 72, ,186,140 PLANS CONSULTANT (CTP) 440,000 29, ,020 CONSTRUCTION (CONS) 0 0 2,214,500 4,429,000 2,214, ,858,000 CONST MGT CITY (FACM) , , , ,000 CM CONSULTANT (CTCM) ,000 77,000 52, ,000 1,554, ,000 2,501,520 4,774,000 2,445, ,376,160 Page 173 HTP August 1, 2013

198 HYPERION TREATMENT PLANT (HTP) HTP FLARES SYSTEM UPGRADE West Los Angeles SZH11712 HTP FLARES SYSTEM UPGRADE PROJECT DESCRIPTION: This project will upgrade the existing digester gas flare system at Hyperion Treatment Plant to improve its reliability. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 161, ,720 31, ,080 PLANS CONSULTANT (CTP) 54, ,600 12, ,900 CONSTRUCTION (CONS) 0 2,896,132 2,103, ,000,000 CONST MGT CITY (FACM) 0 205,840 67, ,600 CM CONSULTANT (CTCM) 0 92,000 24, , ,520 3,673,292 2,240, ,130,380 Page 174 HTP August 1, 2013

199 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP FOG RECEIVING STATION EXPANSION West Los Angeles SZH11751 HTP FOG RECEIVING STATION EXPANSION PROJECT DESCRIPTION: This project will expand the existing fats, oils, and grease (FOG) Receiving Station at the Hyperion Treatment Plant (HTP). PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 4,400 14, ,200 PLANS CONSULTANT (CTP) 1,700 5, ,900 CONSTRUCTION (CONS) , ,000 CONST MGT CITY (FACM) 0 6,080 7, ,360 CM CONSULTANT (CTCM) 0 1,000 1, ,500 6,100 27,080 98, ,960 Page 175 HTP August 1, 2013

200 HYPERION TREATMENT PLANT (HTP) HTP FOG RECEIVING STATION NORTH West Los Angeles NEW PROJECT DESCRIPTION: This project will construct a new facility to inject fats, oils, and grease (FOG) into the existing digesters at the Hyperion Treatment Plant (HTP). PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 16,000 75,840 36, ,240 PLANS CONSULTANT (CTP) 54, ,200 24, ,600 CONSTRUCTION (CONS) ,242 1,424, , ,140,000 CONST MGT CITY (FACM) , ,200 30, ,760 CM CONSULTANT (CTCM) ,000 34,100 6, ,100 70, , ,202 1,655, , ,955,700 Page 176 HTP August 1, 2013

201 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP G STREET PIPE RACK STRUCTURAL REHAB West Los Angeles SZH11747 HTP G ST PIPE RACK STR REHAB PROJECT DESCRIPTION: This project will rehabilitate severely deteriorated components of the Overhead pipe support structural two 6-inch nitrogen and instrumentation air pipelines. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 129, , ,920 PLANS CONSULTANT (CTP) 46,600 54, ,600 CONSTRUCTION (CONS) 0 0 2,019,696 2,200, , ,400,000 CONST MGT CITY (FACM) 0 101, , , ,920 CM CONSULTANT (CTCM) 0 17,500 68,600 36, , , ,740 2,485,976 2,387, , ,579,040 Page 177 HTP August 1, 2013

202 HYPERION TREATMENT PLANT (HTP) HTP GRIT HANDLING IMPROVEMENTS West Los Angeles SZH11672 HTP GRIT HANDLING IMPROVEMENT PROJECT DESCRIPTION: This project will replace the existing grit handling system at Hyperion. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 342,320 83, ,240 PLANS CONSULTANT (CTP) 125,000 15, ,000 CONSTRUCTION (CONS) 0 0 4,082,980 1,487, ,570,000 CONST MGT CITY (FACM) 0 134, ,840 32, ,400 CM CONSULTANT (CTCM) 0 47,100 89,300 11, , , ,020 4,426,120 1,531, ,704,640 Page 178 HTP August 1, 2013

203 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP HEADWORKS FINE SCREENS INSTALLATION West Los Angeles SZH11746 HTP HDWKS FINE SCREENS INSTALL PROJECT DESCRIPTION: This project will replace all existing 3/4 inches bar screens with ½ inches bar screens (with trapezoidal or tear drop profile bars), upgrade auxiliary systems, upgrade solids collections and handling system. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 9, ,960 98, ,120 PLANS CONSULTANT (CTP) 22, , , ,100 CONSTRUCTION (CONS) ,674, , ,180,000 CONST MGT CITY (FACM) , ,760 22, ,440 CM CONSULTANT (CTCM) , ,100 66,100 61,900 1, ,100 31, , ,000 6,083, ,439 61,900 1, ,295,760 Page 179 HTP August 1, 2013

204 HYPERION TREATMENT PLANT (HTP) HTP HEADWORKS GRIT CLASSFIER RELOCATION West Los Angeles SZH11705 HTP HDWKS GRIT CLASS RELOC PROJECT DESCRIPTION: This project will relocate the three existing grit classifiers in the Headowrks building to a new location on the second floor. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 132, ,960 PLANS CONSULTANT (CTP) 41, ,700 CONSTRUCTION (CONS) 47, , , ,022,537 CONST MGT CITY (FACM) 17,360 42,960 15, ,600 CM CONSULTANT (CTCM) 6,100 15,300 5, , , , , ,299,997 Page 180 HTP August 1, 2013

205 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP HEADWORKS ODOR CONTROL UPGRADE West Los Angeles SZH11748 HTP HDWRKS ODOR CTRL UPG PROJECT DESCRIPTION: This project will replace ducting, chemical addition system; modify headers; instrumentation; containment repair; integration with Distributed Control System (DCS). PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 32,480 10, , ,560 PLANS CONSULTANT (CTP) 12,500 2,900 41, ,200 CONSTRUCTION (CONS) ,970 1,989, , ,500,000 CONST MGT CITY (FACM) ,320 99, ,160 CM CONSULTANT (CTCM) ,500 36, ,700 44,980 13, ,430 2,125, , ,021,620 Page 181 HTP August 1, 2013

206 HYPERION TREATMENT PLANT (HTP) HTP IPS ODOR CONTROL IMPROVEMENTS West Los Angeles SZH11163 HTP IPS ODR CNTRL IMPRVMT2253 PROJECT DESCRIPTION: This project will upgrade and expand the odor control system, and provide a new building ventilation system to overcome the corrosive action caused by hydrogen sulfide emitted from the primary effluent. This project will also upgrade and construct a permanent odor control facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , ,880 2, ,440 PLANS CONSULTANT (CTP) ,700 64, ,300 CONSTRUCTION (CONS) ,210,315 1,188, ,399,000 CONST MGT CITY (FACM) ,120 41, ,880 CM CONSULTANT (CTCM) ,200 14, , , ,880 2,691,115 1,244, ,478,320 Page 182 HTP August 1, 2013

207 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP PREGERSON BUILDING DATA HIGHWAY DISTRIBUTION ROOM West Los Angeles SZH11749 HTP PREG BLD DATA HWY DIST RM PROJECT DESCRIPTION: This project will construct a new 110 square foot room in the basement of the Pregerson building to facilitate the Wastewater Control System Enterprise Network fiber optic termination. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 11, ,500 PLANS CONSULTANT (CTP) 3, ,000 CONSTRUCTION (CONS) 31,333 62, ,000 CONST MGT CITY (FACM) 4,000 4, ,000 CM CONSULTANT (CTCM) 1,500 1, , , , ,500 Page 183 HTP August 1, 2013

208 HYPERION TREATMENT PLANT (HTP) HTP PREGERSON BUILDING FIRST FLOOR MODIFICATION West Los Angeles SZH11601 HTP PREGERSON 1ST FL MODS PROJECT DESCRIPTION: This project will modify the 1st floor of the Hyperion Pregerson Building for Central Monitoring Center (CMC) and BOS Bureau Wide Security Center, PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 418, ,000 PLANS CONSULTANT (CTP) 156, ,600 CONSTRUCTION (CONS) 533,021 1,652, ,186,000 CONST MGT CITY (FACM) 248,720 58, ,440 CM CONSULTANT (CTCM) 80,000 13, ,600 1,436,341 1,725, ,161,640 Page 184 HTP August 1, 2013

209 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP PRIMARY EFFLUENT CHANNEL COVER PLATE REPLACEMENT West Los Angeles SZH11716 HTP PRIM EFFL CHANN COVER REPL PROJECT DESCRIPTION: This project will replace the aluminum cover plates, as well as repair the concrete around the bulkhead slots (21 locations) located over the South side of Primary Battery B, C and D effluent channels, at the Hyperion Treatment Plant. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 19, ,320 24, ,960 PLANS CONSULTANT (CTP) 7, ,000 5, ,200 CONSTRUCTION (CONS) ,438,240 72, ,511,000 CONST MGT CITY (FACM) ,880 6, ,360 CM CONSULTANT (CTCM) ,600 2, ,100 27, ,320 30,220 1,588,720 81, ,113,620 Page 185 HTP August 1, 2013

210 HYPERION TREATMENT PLANT (HTP) HTP PRIMARY INFLUENT CHANNEL AIR SPARGERS West Los Angeles NEW PROJECT DESCRIPTION: This project will install air spargers within the primary influent channels at the Hyperion Treatment Plant (HTP). PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , ,200 61, ,960 PLANS CONSULTANT (CTP) ,700 48,600 14, ,600 CONSTRUCTION (CONS) , , ,092,727 CONST MGT CITY (FACM) ,920 48,000 1, ,760 CM CONSULTANT (CTCM) ,900 17, , , , ,045 1,059,222 2, ,494,947 Page 186 HTP August 1, 2013

211 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP PRIMARY INFLUENT GATES REPLACENT West Los Angeles SZH11723 HTP PRIMARY INFLUENT GATES REPL PROJECT DESCRIPTION: This project will replace the existing four primary influent sluice gates with new 316 SS. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 197, , ,000 PLANS CONSULTANT (CTP) 50,000 29, ,000 CONSTRUCTION (CONS) 0 154,000 1,236, ,390,000 CONST MGT CITY (FACM) 0 39,000 71, ,000 CM CONSULTANT (CTCM) 0 12,000 20, , , ,000 1,327, ,923,000 Page 187 HTP August 1, 2013

212 HYPERION TREATMENT PLANT (HTP) HTP REACTOR 1 & 2 UPGRADE West Los Angeles NEW PROJECT DESCRIPTION: This project will upgrade reactors 1 and 2 at the Hyperion Treatment Plant (HTP). PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,800 85, ,080 PLANS CONSULTANT (CTP) ,300 22, ,600 CONSTRUCTION (CONS) ,060, ,060,900 CONST MGT CITY (FACM) , , ,560 CM CONSULTANT (CTCM) ,700 19, , , ,840 1,182, ,531,040 Page 188 HTP August 1, 2013

213 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP REACTOR MICRO-OXYGENATION AND BYPASS INSTALLATION West Los Angeles NEW PROJECT DESCRIPTION: This project will convert Modules #1, #2, #4, #6, #8 and #9 to include anaerobic selectors in the first 20% of the reactors; reinstall the original 125 HP surface aerator modified by Philadelphia to zone one, but supplement it with a variable frequency drive so that the speed of the aeration disc can be varied, resulting in precision control of the Disolved Oxygen content of the mixed liquor in the selector stage; install bypass for a portion (up to 50%) of the Mixed Liquor and Return Activated Sludge mix entering the reactor around the selector zone, directly into the first aeration stage (Zone 2), thus mitigating the no-growth phenomenon associated with the selector. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , ,240 71, ,000 PLANS CONSULTANT (CTP) ,100 64,300 16, ,500 CONSTRUCTION (CONS) ,001 2,920, , ,120,001 CONST MGT CITY (FACM) , ,320 38, ,800 CM CONSULTANT (CTCM) ,400 35,500 14, , , , ,341 3,135, , ,123,801 Page 189 HTP August 1, 2013

214 HYPERION TREATMENT PLANT (HTP) HTP SCREENINGS HANDLING IMPROVEMENT West Los Angeles SZH11319 HTP GRIT SCREEN HANDL IMPR PROJECT DESCRIPTION: This project will replace the existing screenings handling system at the HTP Headworks. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 471, ,520 PLANS CONSULTANT (CTP) 147, ,900 CONSTRUCTION (CONS) 189,641 2,378,024 1,054, ,621,818 CONST MGT CITY (FACM) 61, ,320 54, ,920 CM CONSULTANT (CTCM) 21,800 54,100 20, , ,221 2,584,444 1,128, ,605,358 Page 190 HTP August 1, 2013

215 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP SECONDERY CLARIFIERS STRUCTURAL REHABILITATION PHASE I West Los Angeles SZH11722 HTP SEC CLARIF UPGD PH I PROJECT DESCRIPTION: This project will rehabilitate the structural components that are experiencing severe corrosion, at sixteen (four modules) out of the thirty-six Secondary Clarifers at HTP. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 678, , ,280 PLANS CONSULTANT (CTP) 231,000 46, ,100 CONSTRUCTION (CONS) 0 247,100 3,221,125 2,991, ,460,000 CONST MGT CITY (FACM) 0 178, , ,240 14, ,080 CM CONSULTANT (CTCM) 0 30,700 75,800 68,100 5, , , ,700 3,736,205 3,382,115 19, ,754,560 Page 191 HTP August 1, 2013

216 HYPERION TREATMENT PLANT (HTP) HTP SECONDERY CLARIFIERS STRUCTURAL REHABILITATION PHASE II West Los Angeles NEW PROJECT DESCRIPTION: This project will rehabilitate the structural components at twenty (five modules) out of the thirty-six Secondary Clarifers at HTP. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 566, ,200 1, ,237,440 PLANS CONSULTANT (CTP) 0 198, , ,200 CONSTRUCTION (CONS) 0 0 3,004,938 4,513,590 1,533, ,052,000 CONST MGT CITY (FACM) , , , ,336,960 CM CONSULTANT (CTCM) , ,100 39, , ,100 4,586,618 5,236,150 1,679, ,267,000 Page 192 HTP August 1, 2013

217 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP SECONDARY CLARIFIERS EXPANSION West Los Angeles NEW PROJECT DESCRIPTION: This project will add more clarifiers to the secondary system to meet the current loading level. The current loading level is 450MGD. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , , ,640 29, ,920 PLANS CONSULTANT (CTP) ,900 81,800 87,200 8, ,300 CONSTRUCTION (CONS) ,647,519 13,331,563 5,770, ,750,000 CONST MGT CITY (FACM) , , , ,279,840 CM CONSULTANT (CTCM) , ,400 48, , , , ,840 7,282,279 14,047,923 5,979, ,127,560 Page 193 HTP August 1, 2013

218 HYPERION TREATMENT PLANT (HTP) HTP SERVICE WATER FACILITY UPGRADE West Los Angeles SZH11313 HTP SERV WATER FAC UPGRADE PROJECT DESCRIPTION: The purpose of this project is to replace the aging and corroding micro-screens currently installed in the SWF with 6 AquaDisk cloth media filters, currently installed at DCT. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 458, ,280 PLANS CONSULTANT (CTP) 173, ,300 CONSTRUCTION (CONS) 0 1,481,584 1,528, ,010,000 CONST MGT CITY (FACM) 0 248,320 91, ,680 CM CONSULTANT (CTCM) 0 46,300 21, , ,000 1,776,784 1,640, ,049,760 Page 194 HTP August 1, 2013

219 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP SOLIDS HANDLING AND TRUCK LOADING FACILITY West Los Angeles SZH11380 HTP SOLID HAND TRUC LOAD FAC PROJECT DESCRIPTION: This project will construct a new solids handling facility that includes screening and dewatering of digested sludge, wet cake storage and loading, plus additional odor control facilities. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , , ,760 19, ,462,240 PLANS CONSULTANT (CTP) ,000 1,260, ,000 40, ,740,000 CONSTRUCTION (CONS) ,864,897 30,593,618 10,812, ,271,204 CONST MGT CITY (FACM) ,101,120 3,134, , ,643,200 CM CONSULTANT (CTCM) ,800,000 1,800, , ,950, ,000 1,907,280 1,307,760 24,825,217 35,528,258 11,570, ,066,644 Page 195 HTP August 1, 2013

220 HYPERION TREATMENT PLANT (HTP) HTP SUBSTATION SEPARATION West Los Angeles SZH11320 HTP SUBSTATION SEPARATION PROJECT DESCRIPTION: This project will install a separate radial 34.5 KV primary feeder to the Main Substation Transformer and modify electrical systems at Unit Substation Transformer. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 825, ,000 PLANS CONSULTANT (CTP) 205, ,000 CONSTRUCTION (CONS) 0 865, , ,731,400 CONST MGT CITY (FACM) 117, ,546 13, ,000 CM CONSULTANT (CTCM) 33,955 45,272 3, ,000 1,181,364 1,067, , ,131,400 Page 196 HTP August 1, 2013

221 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP SERVICE WATER FACILITY SOUTH SIDE CLOTH FILTER INSTALLATION West Los Angeles SZH11745 HTP SWF S SIDE CLOTH FILT INST PROJECT DESCRIPTION: This project will replace the existing microscreens on the south side of the Service Water Facility with new cloth media filters. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 175, , , ,000 PLANS CONSULTANT (CTP) 45,357 54,249 27, ,320 CONSTRUCTION (CONS) 0 0 1,166,667 5,833, ,000,000 CONST MGT CITY (FACM) , , ,000 CM CONSULTANT (CTCM) , , , , ,249 1,534,214 6,300, ,322,320 Page 197 HTP August 1, 2013

222 HYPERION TREATMENT PLANT (HTP) HTP TRUCK LOADING FACILITY ODOR CONTROL MODERNIZATION West Los Angeles SZH11611 HTP TRUCK LOAD FAC ODOR CNTL MOD PROJECT DESCRIPTION: This project will construct a containment area over the existing old digester (6C) and install two (2) two-stage chemical scrubber units and all associated piping and utility for thetruck Loading Facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 366, , ,000 PLANS CONSULTANT (CTP) 120,900 29, ,000 CONSTRUCTION (CONS) 0 0 1,913,406 2,202, , ,320,000 CONST MGT CITY (FACM) 0 60, , ,920 27, ,800 CM CONSULTANT (CTCM) 0 10,000 40,000 49,000 9, , , ,820 2,182,206 2,507, , ,620,800 Page 198 HTP August 1, 2013

223 CITY OF LOS ANGELES HYPERION TREATMENT PLANT (HTP) HTP WASTEWATER CONTROL SYSTEM REPLACEMENT West Los Angeles SZH11324 HTP DCS REPLACEMENT PROJECT DESCRIPTION: This project will replace the existing Distributed Control Systems (DCS) at Hyperion with one plant-wide DCS. Currently there are at least two different systems at HTP. This project will replace all systems with one system. This project is part of the overall Wastewater Control System Replacement program. PROJECT MANAGER: Ali Poosti Phone: (323) Office: Wastewater Engineering Services Division (BOS) PLANS CITY (FAP) 378, ,200 PLANS CONSULTANT (CTP) 2,102, ,102,400 CONSTRUCTION (CONS) 10,537,738 8,835,559 10,609,287 2,346, ,329,509 CONST MGT CITY (FACM) 1,274,516 1,012, , , ,709,018 CM CONSULTANT (CTCM) 1,148,709 1,992, , , ,604,041 15,441,563 11,840,294 12,335,107 3,506, ,123,168 Page 199 HTP August 1, 2013

224 HYPERION TREATMENT PLANT (HTP) THIS PAGE INTENTIONALLY LEFT BLANK Page 200 HTP August 1, 2013

225 CITY OF LOS ANGELES LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG PLANNED EXPENDITURE SUMMARY PROJECT TITLE 2 nd Year 20017/ /19 LAG BAR SCREENS UPGRADE 0 109, , , , LAG CAPITAL EQUIP REPL PROG 295, , , LAG DISINFEC PROCESS GATE REPL 15,120 93,220 97, ,587 45, LAG ELECTRICAL POWER SYS MODS 3,203, , LAG HPE & AIR PIPING IMPRO 501,880 1,601,017 1,121,463 29, LAG NDN BLOWER INSTALLATION 2,778,694 1,574, LAG NDN BLOWER PROCUREMENT 3,108, , LAG PERSONNEL BUILDING , ,880 2,704,923 3,187, LAG PERSONNEL TRAILERS 0 980, LAG POND MEMBRANE LINER 189, , , , LAG SOLAR PANELS INSTALLATION ,477, LAG TERTIARY FILTER REPL 2,633,527 3,049,634 12, LAG WW CONTROL SYSTEM REPL ,577 3,958,818 2,104, , LAG 12,725,396 8,812,650 3,528,698 6,289,484 5,298,504 4,804, Page 201 LAG August 1, 2013

226 LA-GLENDALE WATER RECLAMATION PLANT (LAG) THIS PAGE INTENTIONALLY LEFT BLANK Page 202 LAG August 1, 2013

227 CITY OF LOS ANGELES LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG BAR SCREENS UPGRADE East NEW PROJECT DESCRIPTION: This project will replace and install new bar screens. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , ,080 8, ,840 PLANS CONSULTANT (CTP) ,400 38,400 1, ,600 CONSTRUCTION (CONS) , , ,000,000 CONST MGT CITY (FACM) ,280 16, ,680 CM CONSULTANT (CTCM) ,400 6, , , , , , ,367,020 Page 203 LAG August 1, 2013

228 LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG CAPITAL EQUIPMENT REPLACEMENT PROGRAM (CERP) East VARIOUS PROJECT DESCRIPTION: This project will provide for the replacement of equipment at the end of its useful life. Capital Equipment Replacement tasks are specified as having a replacement cost in excess of $5,000. Specific replacement projects are identified and evaluated annually. The LAG Capital Equipment Replacement Program projects for fiscal year are: Replacing influent pump Variable Frequency Drives, Oxygen, Hydrogen Sulphide, and Lower Explosive Limits sensor system in the headworks. PROJECT MANAGER: Lance Vincent Phone: (818) Office: Bureau of Sanitation (BOS) PLANS CITY (FAP) 66, ,600 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 1,172, , , , ,777,000 CONST MGT CITY (FACM) 99, ,900 CM CONSULTANT (CTCM) ,338, , , , ,943,500 Page 204 LAG August 1, 2013

229 CITY OF LOS ANGELES LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG DISINFECTION PROCESS GATE REPLACEMENT East NEW PROJECT DESCRIPTION: This project will replace 10 of the 22 gates which need replacement at Los Angeles-Glendale Water Reclamation Plant. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 10,720 69,920 43, ,240 PLANS CONSULTANT (CTP) 0 4,400 23,300 11, ,000 CONSTRUCTION (CONS) ,427 39, ,090 CONST MGT CITY (FACM) ,080 93,760 4, ,240 CM CONSULTANT (CTCM) ,200 17,400 1, , ,120 93,220 97, ,587 45, ,231,870 Page 205 LAG August 1, 2013

230 LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG ELECTRICAL POWER SYSTEM MODS East SZL11169 LAG ELECT POWER SYS MODIF PROJECT DESCRIPTION: This project will replace the existing Main Switchgear A, upgrade the existing Main Switchgear B, install DCS power monitoring capabilities, remove the Department of Water and Powerproduct water pump loads from the Los Angeles-Glendale Water Reclamation Plant's system, and reconfigure the single feeder configuration to a more reliable dual feeder power distribution system. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 145, ,600 PLANS CONSULTANT (CTP) 404, ,000 CONSTRUCTION (CONS) 1,301,875 3,019, ,321,000 CONST MGT CITY (FACM) 36,400 96,240 56, ,360 CM CONSULTANT (CTCM) 24,000 88,000 74, ,000 1,911,875 3,203, , ,245,960 Page 206 LAG August 1, 2013

231 CITY OF LOS ANGELES LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG HIGH PRESSURE EFFLUENT AND AIR PIPING IMPROVEMENTS East SZL11175 LAG HPE & INST AIR PIPNG RPLC PROJECT DESCRIPTION: This project will replace existing substandard process piping at various locations within the Los Angeles-Glendale Water Reclamation Plant, including: process air, high pressure effluent, low pressure effluent, and plant instrument air. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 227, ,480 1, ,200 PLANS CONSULTANT (CTP) 81, , ,200 CONSTRUCTION (CONS) 0 0 1,266, , ,229,000 CONST MGT CITY (FACM) , ,040 21, ,800 CM CONSULTANT (CTCM) ,000 25,600 8, , , ,880 1,601,017 1,121,463 29, ,563,100 Page 207 LAG August 1, 2013

232 LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG NITRIFICATION/DENITRIFICATION BLOWER INSTALLATION East SZL11182 LAG NDEN BLOW INST (CIP 4151) PROJECT DESCRIPTION: This project will install two systems procured by the City: Capital Improvement Program (CIP) #4163, Los Angeles- Glendale Water Reclamation Plant (LAG) Blower Procurement and CIP #4164, LAG Blower Integration with ABB Distributed Control System Procurement. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 251, ,440 PLANS CONSULTANT (CTP) 90, ,600 CONSTRUCTION (CONS) 0 2,371,734 1,533, ,905,628 CONST MGT CITY (FACM) 63, ,560 30, ,200 CM CONSULTANT (CTCM) 37, ,400 10, , ,460 2,778,694 1,574, ,796,868 Page 208 LAG August 1, 2013

233 CITY OF LOS ANGELES LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG NITRIFICATION DENITRIFICATION BLOWER PROCUREMENT East SZL11183 LAG NDEN BLOW PRO (CIP 4163) PROJECT DESCRIPTION: This project will sole source to supply mechanical, electrical and instrumentation replacement/additions at the Los Angeles-Glendale Water Reclamation Plant (LAG) for the LAG Blower Management System, including 3 Local Control Panels, a Master Control Panel, software, graphics, commissioning, start-up, and training. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 160, ,000 PLANS CONSULTANT (CTP) 58, ,100 CONSTRUCTION (CONS) 752,580 3,052, , ,607,648 CONST MGT CITY (FACM) 0 32,000 24, ,000 CM CONSULTANT (CTCM) 0 24,000 18, , ,580 3,108, , ,923,748 Page 209 LAG August 1, 2013

234 LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG PERSONNEL BUILDING East SZL11188 LAG PERSONNEL BUILDING PROJECT DESCRIPTION: This project will design and construct an estimated 7,000 square feet building to provide permanent office, lab and shower facilities for Los Angeles-Glendale Water Reclamation Plant's Staff. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , ,880 6, ,680 PLANS CONSULTANT (CTP) , ,000 1, ,400 CONSTRUCTION (CONS) ,169,463 2,830, ,000,000 CONST MGT CITY (FACM) , , ,880 CM CONSULTANT (CTCM) ,600 61, , , ,880 2,704,923 3,187, ,756,360 Page 210 LAG August 1, 2013

235 CITY OF LOS ANGELES LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG PERSONNEL TRAILERS REPLACEMENT East NEW PROJECT DESCRIPTION: This project replaces three of the Los Angeles-Glendale Water Reclamation Plant personnel trailers with new trailers of equal or greater size. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) , ,000 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) , ,000 Page 211 LAG August 1, 2013

236 LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG POND MEMBRANE LINER East SZL11192 LAG POND MEMBRANE LINER PROJECT DESCRIPTION: This project will replace the pond liner and repair adjacent supporting utility line at Los Angeles-Glendale Water Reclamation Plant. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 21, ,880 58, ,640 PLANS CONSULTANT (CTP) 8,400 48,700 14, ,600 CONSTRUCTION (CONS) , , , ,000,000 CONST MGT CITY (FACM) ,040 99,040 11, ,600 CM CONSULTANT (CTCM) 0 0 6,400 17,100 4, ,900 30, , , , , ,467,740 Page 212 LAG August 1, 2013

237 CITY OF LOS ANGELES LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG SOLAR PANELS INSTALLATION East NEW PROJECT DESCRIPTION: This project is for a design-build installation of approximately 500 kw of solar panels and associated equipment at the L.A. Glendale Wastewater Plant. It will be installed on the truck parking area between the plant lake and the process tanks. PROJECT MANAGER: Bahram Roshanian Phone: (310) Office: Hyperion Treatment Plant (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) ,477, ,477,834 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,477, ,477,834 Page 213 LAG August 1, 2013

238 LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG TERTIARY FILTER REPLACEMENT East SZL11184 LAG TERTIARY FILTER RPLCMNT PROJECT DESCRIPTION: This project will replace (4) existing EIMCO dual-media filters at the Los Angeles-Glendale Water Reclamation Plant with existing, upgraded Aqua Aerobics sand filters from the Donald C. Tillman Water Reclamation Plant. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 660,480 1, ,000 PLANS CONSULTANT (CTP) 207, ,500 CONSTRUCTION (CONS) 0 2,122,487 2,721, ,843,601 CONST MGT CITY (FACM) 0 434, ,920 9, ,440 CM CONSULTANT (CTCM) 0 74,900 56,600 3, , ,680 2,633,527 3,049,634 12, ,563,541 Page 214 LAG August 1, 2013

239 CITY OF LOS ANGELES LA-GLENDALE WATER RECLAMATION PLANT (LAG) LAG WASTEWATER CONTROL SYSTEM REPLACEMENT East NEW PROJECT DESCRIPTION: This project will provide updated hardware and software for the Distributed Control Systems (DCS) required to operate the Los Angeles-Glendale Water Reclamation Plant. This project is part of the overall Wastewater Control System Replacement program. PROJECT MANAGER: Ali Poosti Phone: (323) Office: Wastewater Engineering Services Division (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) ,822 3,476,654 1,910, ,910,566 CONST MGT CITY (FACM) , ,866 77,605 55, ,988 CM CONSULTANT (CTCM) , , ,407 83, , ,577 3,958,818 2,104, , ,013,035 Page 215 LAG August 1, 2013

240 LA-GLENDALE WATER RECLAMATION PLANT (LAG) THIS PAGE INTENTIONALLY LEFT BLANK Page 216 LAG August 1, 2013

241 CITY OF LOS ANGELES PROJECT PLANNED EXPENDITURE SUMMARY PUMPING PLANTS (PP) PP PLANNED EXPENDITURE SUMMARY PROJECT TITLE 2 nd Year 20017/ /19 FRIES PP 666 REHAB 180,000 1,847, , HAWAIIAN & B PP 677 REHAB 180,000 1,847, , HIGHBURY PP 604 REHAB 0 61, , ,687 2,187, PP GENERATORS REPL PHASE , ,760 1,151,829 4,074, PP601 MANCHESTER GNRTR REPL 23, , , , PP606 DAKOTHA GNRTRS REPL 33, , , , PP669 HARRIS PL GNRTR REPL 16,280 60, , , PP672 MURDOCK & I GNRTR REPL 18,900 70, , , PP & VERMONT GNRTR REPL 39, , , , SAN PEDRO PP 691 REHAB 261, ,189 2,305, SUNSET PP632 ELECT SYS REHAB 240,500 1, TERMINAL WAY PP 671 REHAB 7 3, , ,437 2,648, VENICE PP 646 GENERATORS REPL 335, ,100 3,041, VENICE PP 646 PUMP REPLACEMENT 215, VENICE PP DISCHARGE MANIFOLD REPL 1,920, VENICE PP DUAL FORCE MAIN 0 496,560 10,681,168 21,645,320 21,645,320 6,764, VENICE PP VIBRATION REHAB 246,460 1, WILMINGTON PP 676 REHAB 187,000 1,918, , PP 3,970,120 8,720,739 19,963,306 29,125,194 27,906,862 6,764, Page 217 PP August 1, 2013

242 PROJECT PLANNED EXPENDITURE SUMMARY PUMPING PLANTS (PP) THIS PAGE INTENTIONALLY LEFT BLANK Page 218 PP August 1, 2013

243 CITY OF LOS ANGELES PUMPING PLANTS (PP) FRIES PUMPING PLANT 666 REHABILITATION Harbor SZC12526 FRIES PP 666 REHAB PROJECT DESCRIPTION: This project will provide for replacement of three pumps, six suction/discharge gate valves, three check valves, three VFD's, a back-up generator with a transfer switch and associated piping. Conveyance requirement will also be evaluated and adjust pump capacity as needed. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 36,000 35, ,000 PLANS CONSULTANT (CTP) 146, , ,000 CONSTRUCTION (CONS) 0 0 1,688, , ,110,000 CONST MGT CITY (FACM) ,000 12, ,000 CM CONSULTANT (CTCM) ,000 41, , , ,000 1,847, , ,684,000 Page 219 PP August 1, 2013

244 PUMPING PLANTS (PP) HAWAIIAN & B PUMPING PLANT 677 REHABILITAITON Harbor SZC12527 HAWAIIAN & B PP 677 REHAB PROJECT DESCRIPTION: This project will provide for replacement of three pumps, six suction/discharge gate valves, three check valves, three VFD's, a back-up generator with a transfer switche and associated piping. Conveyance requirement will also be evaluated and adjust pump capacity as needed. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 36,000 35, ,000 PLANS CONSULTANT (CTP) 146, , ,000 CONSTRUCTION (CONS) 0 0 1,688, , ,110,000 CONST MGT CITY (FACM) ,000 12, ,000 CM CONSULTANT (CTCM) ,000 41, , , ,000 1,847, , ,684,000 Page 220 PP August 1, 2013

245 CITY OF LOS ANGELES PUMPING PLANTS (PP) HIGHBURY PUMPING PLANT 604 REHABILITATION East SZC12520 HIGHBURY PP 604 REHAB PROJECT DESCRIPTION: This project will provide for demolition of existing equipment, procurement and installation of four pumps (2 at 20 Horse Power (HP); 2 at 47 HP); inlet, discharge, and check valves for a total of twelve; four Vertical Frequency Drives; integration with existing Supervisory Control and Data Acquisition systems; and a bypass during construction. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,920 97,520 59, ,880 PLANS CONSULTANT (CTP) , ,800 15, ,000 CONSTRUCTION (CONS) ,127 1,852, ,209,498 CONST MGT CITY (FACM) , , ,440 CM CONSULTANT (CTCM) ,000 32, , , , ,687 2,187, ,077,218 Page 221 PP August 1, 2013

246 PUMPING PLANTS (PP) PUMPING PLANT GENERATORS REPLACEMENT PHASE NEW PROJECT DESCRIPTION: Project provides for procurement, demolition and installation of generators and ancillary controller, transfer switches, plus exhaust and cooling systems at: (1)PP 624 ROSCOMARE: One 1 New 123kW (240/480 V) Portable Trailer Mounted; (2) PP 632 SUNSET: One 1 New 350kW (480 V); (3)PP 638 PALISADES: One 1 New 100kW (480 V); (4)PP 648 THOMPSON: One 1 New 250kW (240 V); (5) North Yard: One 1 New 250kW (240/480 V) Portable Trailer Mounted; (6) North Yard: One 1 New 60kW (240/480 V) Portable Trailer Mounted; (7) West LA Yard: One 1 New 60kW (240/480 V) Portable Trailer Mounted; (8) PP 654 BALLONA CREEK: Two 2 New 800kW (480 V); (9) PP 616 CAHUENGA (North Hollywood Yard): One 1 New 100kW (480 V) Portable Trailer Mounted. Fluid storage will be provided for these units. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,000 46,560 38, ,960 PLANS CONSULTANT (CTP) , ,200 71, ,200 CONSTRUCTION (CONS) ,109 3,656, ,362,000 CONST MGT CITY (FACM) , , ,080 CM CONSULTANT (CTCM) ,200 68, , , ,760 1,151,829 4,074, ,870,640 Page 222 PP August 1, 2013

247 CITY OF LOS ANGELES PUMPING PLANTS (PP) PP 601 MANCHESTER GENERATOR REPLACEMENT South Los Angeles NEW PROJECT DESCRIPTION: Project provides for procurement, demolition and installation of a generator and ancillary controller, transfer switches, plus exhaust and cooling systems at PP 601 Manchester. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 16,800 75,920 28, ,960 PLANS CONSULTANT (CTP) 0 6,500 31,400 6, ,300 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,520 49, ,280 CM CONSULTANT (CTCM) ,200 10, , , , , , ,840 Page 223 PP August 1, 2013

248 PUMPING PLANTS (PP) PP 606 DAKOTAH GENERATORS REPLACEMENT NEW PROJECT DESCRIPTION: Project provides for procurement, demolition and installation of a generator and ancillary controller, transfer switches, plus exhaust and cooling systems at PP 606 DACOTAH. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 24, ,480 41, ,160 PLANS CONSULTANT (CTP) 0 9,500 45,700 9, ,500 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,480 72, ,880 CM CONSULTANT (CTCM) ,400 14, , , , , , ,298,540 Page 224 PP August 1, 2013

249 CITY OF LOS ANGELES PUMPING PLANTS (PP) PP 669 HARRIS PLACE GENERATOR REPLACEMENT NEW PROJECT DESCRIPTION: Project provides for procurement, demolition and installation of a generator and ancillary controller, transfer switches, plus exhaust and cooling system at PP 669 Harris Place. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 11,680 42,720 17, ,000 PLANS CONSULTANT (CTP) 0 4,600 17,700 3, ,000 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,640 27, ,680 CM CONSULTANT (CTCM) ,900 5, , ,280 60, , , ,080 Page 225 PP August 1, 2013

250 PUMPING PLANTS (PP) PP 672 MURDOCK & I GENERATOR REPLACEMENT Harbor NEW PROJECT DESCRIPTION: Project provides for procurement, demolition and installation of a generator and ancillary controller, transfer switches, plus exhaust and cooling systems at PP 672 Murdock & I. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 13,600 49,760 20, ,840 PLANS CONSULTANT (CTP) 0 5,300 20,600 4, ,200 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,400 31, ,920 CM CONSULTANT (CTCM) ,600 6, , ,900 70, , , ,960 Page 226 PP August 1, 2013

251 CITY OF LOS ANGELES PUMPING PLANTS (PP) PP TH & VERMONT GENERATOR REPLACEMENT Harbor NEW PROJECT DESCRIPTION: Project provides for procurement, demolition and installation of a generator and ancillary controller, transfer switches, plus exhaust and cooling systems at PP th & Vermont. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 28, ,840 47, ,760 PLANS CONSULTANT (CTP) 0 10,900 52,900 10, ,500 CONSTRUCTION (CONS) , , ,041,000 CONST MGT CITY (FACM) ,120 84, ,840 CM CONSULTANT (CTCM) ,900 17, , , , , , ,502,100 Page 227 PP August 1, 2013

252 PUMPING PLANTS (PP) SAN PEDRO PUMPING PLANT 691 REHABILITATION Harbor SZC12519 SAN PEDRO PP 691 REHAB PROJECT DESCRIPTION: This project will provide for procurement, demolition and installation of one pump for low flow conditions; inlet, discharge, and check valves for a total of twelve; three VFD's; integration with existing SCADA systems; and a bypass during construction. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 18,300 71,200 15, ,200 PLANS CONSULTANT (CTP) 45, ,160 67, ,280 CONSTRUCTION (CONS) ,769 2,060, ,455,684 CONST MGT CITY (FACM) ,200 40, ,400 CM CONSULTANT (CTCM) , , ,520 63, , ,189 2,305, ,300,084 Page 228 PP August 1, 2013

253 CITY OF LOS ANGELES PUMPING PLANTS (PP) SUNSET PP632 ELECTRICAL SYSTEM REHAB N/A SZC12540 SUNSET PP632 ELECT SYS REHAB PROJECT DESCRIPTION: This project will install a new 480 Volt, 600 Amps automatic transfer switch; inspect and repair leaks in two existing 3.5 inch electrical conduits; and repair rusted roof on 480 volt outdoor utility panel. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 32,640 6, ,120 PLANS CONSULTANT (CTP) 13,400 2, ,400 CONSTRUCTION (CONS) 0 200, ,000 CONST MGT CITY (FACM) 0 26, ,520 CM CONSULTANT (CTCM) 0 5, ,600 46, ,500 1, ,640 Page 229 PP August 1, 2013

254 PUMPING PLANTS (PP) TERMINAL WAY PP 671 REHABILITATION Harbor SZC12521 TERMINAL WAY PP 671 REHAB PROJECT DESCRIPTION: This project will provide for procurement, demolition and installation of one pump for low flow conditions; inlet, discharge, and check valves for a total of twelve; three Vertical Frequency Drives; integration with existing Supervisory Control and Data Acquisition systems; and a bypass during construction. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 52, ,400 75, ,920 PLANS CONSULTANT (CTP) 0 21,000 82,000 18, ,100 CONSTRUCTION (CONS) ,837 2,369, ,826,141 CONST MGT CITY (FACM) , , ,240 CM CONSULTANT (CTCM) ,700 46, , , , ,437 2,648, ,792,301 Page 230 PP August 1, 2013

255 CITY OF LOS ANGELES PUMPING PLANTS (PP) VENICE PUMPING PLANT 646 GENERATORS REPLACEMENT West Los Angeles SZC12541 VENICE PP 646 GENERATORS REPL PROJECT DESCRIPTION: Project provides for procurement, demolition and installation of generators at the Venice PP 646. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 16,000 45,120 34, ,360 PLANS CONSULTANT (CTP) 78, ,000 64, ,700 CONSTRUCTION (CONS) ,220 2,743, ,280,000 CONST MGT CITY (FACM) , , ,120 CM CONSULTANT (CTCM) ,400 50, ,000 94, , ,100 3,041, ,347,180 Page 231 PP August 1, 2013

256 PUMPING PLANTS (PP) VENICE PP 646 PUMP REPLACEMENT West Los Angeles SZC11724 VENICE PP646 PUMP REPLACEMENT PROJECT DESCRIPTION: This project will purchase and deliver one 20" dry-pis submersible pump as a replacement for an existing pump at the Venice Pumping Plant. This project will also replace three pumps. PROJECT MANAGER: Carmelo Martinez Phone: (323) Office: Wastewater Collection Systems Division (BOS) PLANS CITY (FAP) 2,000 3, ,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 200, ,000 CONST MGT CITY (FACM) 0 12, ,000 CM CONSULTANT (CTCM) , , ,000 Page 232 PP August 1, 2013

257 CITY OF LOS ANGELES PUMPING PLANTS (PP) VENICE PP DISCHARGE MANIFOLD REPLACEMENT West Los Angeles SZC12320 VENICE PP DISCHARGE MANIFOLD REPL PROJECT DESCRIPTION: This project will install a new 60-inch diameter steel manifold; a 48-inch and 54-inch remotely operated valved in vaults; other appurtenances; reconnection of the five existing pump discharge lines to the new manifold without interrupting plant operations; and upgrades for security and access reasons at the Venice Pumping Plant. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 185, ,000 PLANS CONSULTANT (CTP) 100, ,000 RIGHT-OF-WAY (RW) 250, ,000 CONSTRUCTION (CONS) 3,864,100 1,920, ,784,100 CONST MGT CITY (FACM) 345, ,000 CM CONSULTANT (CTCM) ,744,100 1,920, ,664,100 Page 233 PP August 1, 2013

258 PUMPING PLANTS (PP) VENICE PP DUAL FORCE MAIN West Los Angeles SZC11631 VENICE DUAL FORCE MAIN PROJECT DESCRIPTION: This project will design and construct a new 54-inch force main from the existing Venice Pump Plant (VPP) to the North Outfall Sewer/Coastal Interceptor Sewer junction structure at the intersection of Vista Del Mar and Water View. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 3,284, ,560 86, ,766,960 PLANS CONSULTANT (CTP) 1,350, ,000 45, ,495,000 RIGHT-OF-WAY (RW) , ,000 CONSTRUCTION (CONS) ,916,628 19,136,220 19,136,220 6,395, ,585,000 CONST MGT CITY (FACM) ,793,840 2,389,600 2,389, , ,941,200 CM CONSULTANT (CTCM) , , , ,700 4,634, ,560 10,681,168 21,645,320 21,645,320 6,764, ,866,860 Page 234 PP August 1, 2013

259 CITY OF LOS ANGELES PUMPING PLANTS (PP) VENICE PP VIBRATION REHABILITATION West Los Angeles SZC12083 VENICE PP VIBRATION REHAB PROJECT DESCRIPTION: This project will implement vibration isolation approaches to reduce fellable vibration levels at the Venice Pumping Plant. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 92,880 11, ,320 PLANS CONSULTANT (CTP) 8, ,500 CONSTRUCTION (CONS) 166, ,900 1, ,300 CONST MGT CITY (FACM) 21,840 27, ,440 CM CONSULTANT (CTCM) 2, , , ,460 1, ,860 Page 235 PP August 1, 2013

260 PUMPING PLANTS (PP) WILMINGTON PUMPING PLANT 676 REHABILITATION Harbor SZC12528 WILMINGTON PP 676 REHAB PROJECT DESCRIPTION: This project will provide for replacement of three pumps, six suction/discharge gate valves, three check valves, three VFD's, a back-up generator with a transfer switch and associated piping. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 37,000 36, ,000 PLANS CONSULTANT (CTP) 151, , ,000 CONSTRUCTION (CONS) 0 0 1,752, , ,190,000 CONST MGT CITY (FACM) ,000 12, ,000 CM CONSULTANT (CTCM) ,000 42, , , ,000 1,918, , ,785,000 Page 236 PP August 1, 2013

261 CITY OF LOS ANGELES SYSTEMWIDE (SW) SW PLANNED EXPENDITURE SUMMARY PROJECT TITLE 2 nd Year 20017/ /19 BOND ASSISTANCE PROGRAM 500, , , , , , , , ,000 0 BUREAU-WIDE SECURITY SYSTEM ,700 2,941, , COMM INVLVMNT & PROJ MITIGAT 200, , , , , , , , ,000 0 CONSTRUCTION SERVICES CONTRACT 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 CS WW CONTROL SYSTEM REPL 3,624,122 2,071, ELC EXHIBITS AND MEDIA 417, EMPAC SYSTEM REPLACEMENT 76,403 1,273, EQP UPGR/REPLC TREATMENT PLANT 0 0 2,000,000 19,000,000 4,800,000 4,800,000 5,970,000 9,075,000 7,200,000 0 GREEN ACRES CERP 75,000 75, HUMBOLDT GREENWAY SEP 2,451, LABORATORY EQUIPMENT PROC 564, , , , SMURRF 261, , , , , , , WW NETWORK SERVERS CERP 1,115,000 1,055, , , WW SYS FINANCIAL CNSLT (BONDS) 275, , , , , , , , , ,000 WW SYSTEM AUDITOR 79,000 80,000 81,000 82,000 83,000 84,000 85,000 86,000 87,000 0 SW 11,640,509 8,122,685 6,037,263 23,491,663 8,384,363 11,011,774 9,572,217 12,186,000 10,337,000 2,350,000 Page 237 SW August 1, 2013

262 SYSTEMWIDE (SW) BOND ASSISTANCE PROGRAM 833 ALL ALL VARIOUS PROJECT DESCRIPTION: This will provide funding for wastewater project default guarantees for the Bond Assistance Program administered by the City Administrative Officer. PROJECT MANAGER: Dale Burgoyne Phone: (213) Office: Financial Management Division (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 2,500, , , , , , , , , , ,000 7,500,000 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,500, , , , , , , , , , ,000 7,500,000 Page 238 SW August 1, 2013

263 CITY OF LOS ANGELES SYSTEMWIDE (SW) BUREAU-WIDE SECURITY SYSTEM 878 4, 5, 11, 15 East, Harbor, South Los Angeles, West Los Angeles SZW00060 BUR WIDE SECURITY SYS WW FAC PROJECT DESCRIPTION: This project will provide a Bureau-wide Security System to be implemented at all of the treatment plants and will establish standards for use throughout the Bureau. This will include CCTV, cameras, digital video recorders (DVR), gate security, equipment/camera locations, central monitoring, etc. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , , ,160 PLANS CONSULTANT (CTP) ,500 14, ,700 CONSTRUCTION (CONS) ,404, , ,647,896 CONST MGT CITY (FACM) ,640 68, ,351 CM CONSULTANT (CTCM) ,900 18, , ,700 2,941, , ,611,365 Page 239 SW August 1, 2013

264 SYSTEMWIDE (SW) COMMUNITY AND PUBLIC INVOLVEMENT AND PROJECT MITIGATION 245 ALL ALL VARIOUS PROJECT DESCRIPTION: This project will provide community outreach and impact mitigation for various projects in the Wastewater program. PROJECT MANAGER: Mike Sarullo Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) PLANS CONSULTANT (CTP) 1,100,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 1,600,000 CONSTRUCTION (CONS) CONST MGT CITY (FACM) CM CONSULTANT (CTCM) 1,500, , , , , , , , , , ,0000 3,000,000 2,600, , , , , , , , , , ,000 4,600,000 Page 240 SW August 1, 2013

265 CITY OF LOS ANGELES SYSTEMWIDE (SW) CONSTRUCTION SERVICES CONTRACT (CISCO) 240 ALL ALL VARIOUS PROJECT DESCRIPTION: This project, known as CiSCo, is an alternative contracting option. CiSCo was established to address some of the limitations of the traditional bid and award and "On Call" contracting approach. CiSCo establishes a contract with fixed markups, avoiding the need for more costly defensible plans and specifications for smaller projects. CiSCo also expedites completion of non-emergency small projects. All CiSCo projects in excess of $100,000 must be approved by the Program Review Committee and Board of Public Works. PROJECT MANAGER: Ray Mohamadi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 2,595, ,595,000 PLANS CONSULTANT (CTP) 855, ,000 CONSTRUCTION (CONS) 24,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 44,000,000 CONST MGT CITY (FACM) 1,500, ,500,000 CM CONSULTANT (CTCM) 600, ,000 29,550,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 49,550,000 Page 241 SW August 1, 2013

266 SYSTEMWIDE (SW) CS WASTEWATER CONTROL SYSTEM REPLACEMENT 463 ALL ALL SZW00046 SCADA REPLACEMENT FOR WCSD PROJECT DESCRIPTION: This project will provide updated hardware and software for the Supervisory Control and Data Acquisition (SCADA) system required to monitor and control pump plants, lift stations and other WCSD facilities. This project will include a complete replacement of all existing hardware and software, including control room workstations, communications and networking gear, sensors and instrumentation, Programmable Logic Controllers (PLC), operating systems, monitoring and control software, and Human Machine Interface (HMI) software. This project will investigate the feasibility of using wireless remote communications technology and replace the current practice of using telephone lines for data acquisition and control. This project is part of the overall Wastewater Control System Replacement program. PROJECT MANAGER: Ali Poosti Phone: (323) Office: Wastewater Engineering Services Division (BOS) PLANS CITY (FAP) 15, ,840 PLANS CONSULTANT (CTP) 82, ,240 CONSTRUCTION (CONS) 2,141,006 2,957,578 1,603, ,702,384 CONST MGT CITY (FACM) 251, , ,071 CM CONSULTANT (CTCM) 90, , , ,054 2,580,833 3,624,122 2,071, ,276,589 Page 242 SW August 1, 2013

267 CITY OF LOS ANGELES SYSTEMWIDE (SW) ENVIRONMENTAL LEARNING CENTER EXHIBITS & MEDIA West Los Angeles SZW00072 HTP - ELC EXHIBITS & MEDIA PROJECT DESCRIPTION: This project will contract exhibit fabrication and media production companies for the fabrication of all 3D exhibit elements, graphic production, graphic fabrication, audio/visual coordination packing, crating, shipping and installation of exhibits and media production including the creation of all video, film and interactive media for the exhibits for the Environmental Learning Center-West. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 380, ,600 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 1,608, , ,025,844 CONST MGT CITY (FACM) 297, ,000 CM CONSULTANT (CTCM) ,285, , ,703,444 Page 243 SW August 1, 2013

268 SYSTEMWIDE (SW) EMPAC SYSTEM REPLACEMENT 969 ALL ALL NEW PROJECT DESCRIPTION: This project will select and implement a system to replace the Enterprise Maintenance Planning and Control (EMPAC) software currently used for asset management by five Bureau divisions. The new system will integrate with Department of General Services Supply Management System (SMS) and Sanitation's Field Automation for Sanitation Trucks (FAST) system. PROJECT MANAGER: Anita Fernandez Phone: (323) Office: Information and Control System Division (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 76,403 1,273, ,349,791 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,403 1,273, ,349,791 Page 244 SW August 1, 2013

269 CITY OF LOS ANGELES SYSTEMWIDE (SW) EQUIPMENT UPGRADE/REPLACEMENT FOR TREATMENT PLANTS 242 4, 6, 11, 15 East, Harbor, South Valley, West Los Angeles VARIOUS PROJECT DESCRIPTION: This project provides for future major equipment upgrades and replacement at all of the wastewater treatment plants. The four plants are the Hyperion Treatment Plant, Los Angeles-Glendale Water Reclamation Plant, Tillman Water Reclamation Plant, and Terminal Island Water Reclamation Plant. Equipment will be identified on an as-needed basis and assigned a specific project in the appropriate program category. PROJECT MANAGER: Dale Burgoyne Phone: (213) Office: Financial Management Division (BOS) PLANS CITY (FAP) ,000, , , , , , , ,000 3,025,000 PLANS CONSULTANT (CTP) ,000, , , , , , , ,000 3,025,000 CONSTRUCTION (CONS) ,000,000 4,000,000 4,000,000 5,000,000 5,500,000 6,000,000 6,000,000 53,500,000 CONST MGT CITY (FACM) , , , , , , ,000 2,625,000 CM CONSULTANT (CTCM) , , , ,000 2,750, , ,000 5,070, ,000,000 19,000,000 4,800,000 4,800,000 5,970,000 9,075,000 7,200,000 7,200,000 67,245,000 Page 245 SW August 1, 2013

270 SYSTEMWIDE (SW) GREEN ACRES CAPITAL EQUIPMENT REPLACEMENT PROGRAM (CERP) 625 N/A N/A VARIOUS PROJECT DESCRIPTION: This project will replace various elements approaching the end of their useful lives for Green Acres projects. The Green Acres Capital Equipment Replacemen Program projects for are Pumps PROJECT MANAGER: Mark Starr Phone: (310) Office: Hyperion Treatment Plant (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 205,000 75,000 75, ,000 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,000 75,000 75, ,000 Page 246 SW August 1, 2013

271 CITY OF LOS ANGELES SYSTEMWIDE (SW) HUMBOLDT NEIGHBORHOOD STORMWATER GREENWAY SEP East SZW00076 HUMBOLDT GREENWAY SEP PROJECT DESCRIPTION: This project will intercept and treat street level flows from the Humboldt Street and Avenue 19 intersection area through a bio-swale within the plaza and storm drain day-lighting as both an aesthetic and functional feature that will help to alleviate local street flooding. The project will also include a fenced area for public use that supports enhanced native habitats along the Los Angeles River corridor and will integrate native plant materials within a constructed topography that features signage, trails, passive recreation and an open plaza on site frontage at Avenue 19. This project will provide closure to the 1990 Cease and Desist Order due to wastewater spillage. PROJECT MANAGER: Ding Lee Phone: (213) Office: Stormwater Group (BOE) PLANS CITY (FAP) 587, ,547 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 1,200,000 2,092, ,292,955 CONST MGT CITY (FACM) 100, , ,022 CM CONSULTANT (CTCM) ,887,547 2,451, ,339,524 Page 247 SW August 1, 2013

272 SYSTEMWIDE (SW) LABORATORY EQUIPMENT PROCUREMENT 480 ALL ALL SZW00007 LABORATORY EQUIP PURCHASES PROJECT DESCRIPTION: This project will annually purchase and/or replace laboratory equipment. This is an on-going project. Specific laboratory equipment will be identified and evaluated annually. The following projects are proposed for FY 12/13: Flow Injection Analyzer (HTP); Total Organic Carbon (TOC) Analyzer (HTP); Gas Chromatograph Spectrophotometer-Semi Volatile (HTP); Gas Chromatograph Mass Spectrophotometer-Volatile (HTP); Inductivity Coupled Plasma Optical Emission Spectroscopy (HTP); Deionized Water/RO/Storage Unit (DCT); UV/VIS Spectrophotometer (DCT). PROJECT MANAGER: Jeff Beller Phone: (310) Office: Environmental Monitoring Division (BOS) PLANS CITY (FAP) 10, ,080 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 2,257, , , , , ,250,838 CONST MGT CITY (FACM) 8, ,800 CM CONSULTANT (CTCM) ,276, , , , , ,269,718 Page 248 SW August 1, 2013

273 CITY OF LOS ANGELES SYSTEMWIDE (SW) SANTA MONICA URBAN RUNOFF RECYCLING FACILITY 456 N/A N/A SZW00028 SANTA MONICA URBAN RUNOFF FAC PROJECT DESCRIPTION: This is the City's share of the State Revolving Fund Loan repayment for the Santa Monica Urban Runoff Recycling Facility. PROJECT MANAGER: Dale Burgoyne Phone: (213) Office: Financial Management Division (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 3,619, , , , , , , , ,851,445 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,619, , , , , , , , ,851,445 Page 249 SW August 1, 2013

274 SYSTEMWIDE (SW) WASTEWATER NETWORK SERVERS CAPITAL EQUIPMENT REPLACEMENT PROGRAM 352 ALL ALL SZW00025 WW NETWORK SERVERS CERP PROJECT DESCRIPTION: This project will replace aging computer network hardware and servers that are relied upon by the Wastewater Treatment Plants and Collection System Division for file sharing, , Bureau data communications, data backup, data security, Intranet/Internet access, the Enterprise Maintenance Planning and Control, maintenance management system, and other business critical systems. For FY 12/13, the proposed projects are: File Server upgrade (Public Works Building); Network Upgrade (Media Training Center); CiSCo Data Center Switch Module upgrade; ESX Servers upgrade; Network Access Control; FAST Server upgrade; and Server upgrade. PROJECT MANAGER: Bounsom Sananikone Phone: (213) Office: Information and Control System Division (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 5,317,000 1,115,000 1,055, , , ,507,000 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,317,000 1,115,000 1,055, , , ,507,000 Page 250 SW August 1, 2013

275 CITY OF LOS ANGELES SYSTEMWIDE (SW) WASTEWATER SYSTEM FINANCIAL CONSULTANT (BONDS) 251 ALL ALL EXX01005 WASTEWATER FACILITIES (IND) PROJECT DESCRIPTION: This project is for financial consultants to advise the City s managers of the Sewer Construction and Maintenance (SCM) Fund on financial matters concerning the issuance of debt to finance the Wastewater Capital Improvement Program. Services to be provided include coordination of debt issues, technical review of official statements, and advice concerning the financial planning for the SCM Fund. PROJECT MANAGER: Lisa Mowery Phone: (213) Office: Financial Management Division (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) 2,225, , , , , , , , , , ,000 5,375,000 CONSTRUCTION (CONS) CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,225, , , , , , , , , , ,000 5,375,000 Page 251 SW August 1, 2013

276 SYSTEMWIDE (SW) WASTEWATER SYSTEM AUDITOR 250 ALL ALL E W W SYS AUDITOR PROJECT DESCRIPTION: This project will provide auditing and consulting services by a certified public accounting firm for the Sewer Construction and Maintenance (SCM) Fund. Services to be provided include an annual audit of the financial statements of the SCM Fund, arbitrage rebate calculations for the Wastewater System Revenue Bonds as required by the Tax Reform Act of 1986, and other technical assistance to the SCM Fund in the areas of financial accounting and reporting. PROJECT MANAGER: Lisa Mowery Phone: (213) Office: Financial Management Division (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) 562,000 79,000 80,000 81,000 82,000 83,000 84,000 85,000 86,000 87,000 87,000 1,396,000 CONSTRUCTION (CONS) CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,000 79,000 80,000 81,000 82,000 83,000 84,000 85,000 86,000 87,000 87,000 1,396,000 Page 252 SW August 1, 2013

277 CITY OF LOS ANGELES PROJECT PLANNED EXPENDITURE SUMMARY TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP PLANNED EXPENDITURE SUMMARY PROJECT TITLE 2 nd Year 20017/ /19 TIWRP AWPF PROD WATER STABILIZ 637, TIWRP AWPF ULTIMATE EXPANSION 1,156,400 10,325,800 23,821,064 24,046,460 2,290, TIWRP AWPF VFD PROD H2O PUMPS 486,760 1, TIWRP BIOGAS UPGRADE SYS , ,440 1,559, , TIWRP BLOWER REPLC 276,380 4,180 5,443,884 6,452, TIWRP CAPITAL EQP REPLC 640, , , TIWRP DAFT MODIFICATION 5 0, , ,232 1,268, TIWRP FERR CHL SYS EQU REPL 364,925 1, TIWRP FINAL CLARIFIERS REHAB 432,760 4, TIWRP FIRE PROTECT SYS REPLC , ,220 1,013, , TIWRP HEADWORKS IMPROVEMENTS 3,931,147 1,704, TIWRP HPE DISINFECTION , , , , TIWRP NEW SERVICE MAINT FAC , ,640 3,238,560 6,665, , TIWRP PLANT INFL SAMPLING SYS , , , , TIWRP POWER/ENERGY MGMT , , TIWRP PRIM CLAR WEIRS MODS 0 71, , ,380 9,224,977 4,420, TIWRP RENEWABLE ENERGY SFI 4 1,000, TIWRP TER FIL INF PUMP VFD RPL , , TIWRP TERTIARY FILTER REHAB 407, ,967 2,886,098 1,204, TIWRP TIRE SITE IMPROVEMENTS 250,120 2,473,884 1,052, TIWRP WW CONTROL SYSTEM REPL 190,160 4,253,359 6,333,530 1,214, Page 253 TIWRP August 1, 2013

278 PROJECT PLANNED EXPENDITURE SUMMARY TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) PROJECT TITLE 2 nd Year 20017/ /19 TIWRP 9,823,015 19,837,400 41,627,084 35,965,658 13,428,223 11,899,743 9,271, , Page 254 TIWRP August 1, 2013

279 CITY OF LOS ANGELES TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP AWPF PRODUCT WATER HARDNESS STABILIZATION SYSTEM Harbor SZT11332 TIWRP AWPF PROD WATER STABILIZ PROJECT DESCRIPTION: This project will modify containment area pads to hold two 7000 gallon chemical tanks (calcium chloride) and injection pumps and two 4000 gallon chemical tanks (sodium hydroxide) and injection pumps. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 77,760 12, ,840 PLANS CONSULTANT (CTP) 22,300 3, ,700 CONSTRUCTION (CONS) 559, , ,124,995 CONST MGT CITY (FACM) 120,160 46, ,240 CM CONSULTANT (CTCM) 20,700 10, , , , ,438,075 Page 255 TIWRP August 1, 2013

280 TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP AWPF ULTIMATE EXPANSION Harbor SZT11341 TIWRP AWPF ULTIMATE EXPANSION PROJECT DESCRIPTION: This project provides for expansion of Advanced Wastewater Purification Facility (AWPF) product water by 6.5 million gallons per day (mgd) all at once instead of in 3 steps to a total of 11.5 mgd of AWPF product water, and (2) disinfection conversion to advanced oxidation process. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 134, ,400 43, ,920 PLANS CONSULTANT (CTP) 1,260, , , ,398,000 CONSTRUCTION (CONS) 0 0 9,390,600 22,913,064 22,850,460 2,002, ,157,000 CONST MGT CITY (FACM) , , ,000 64, ,272,000 CM CONSULTANT (CTCM) , , , , ,848,000 1,394,320 1,156,400 10,325,800 23,821,064 24,046,460 2,290, ,034,920 Page 256 TIWRP August 1, 2013

281 CITY OF LOS ANGELES TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP AWPF VARIBLE FREQUENCY DRIVES FOR PRODUCT WATER PUMPS Harbor SZT11335 TIWRP AWPF VFD PROD H2O PUMPS PROJECT DESCRIPTION: This project provides for AWPF variable frequency drives (VFDs) for product water pumps, procurement and installation, integration with existing electrical system, commissioning and start-up, performance testing. ICSD is responsible for PLC programming and graphics modifications. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 105,600 5, ,200 PLANS CONSULTANT (CTP) 36, ,200 CONSTRUCTION (CONS) 0 432, ,000 CONST MGT CITY (FACM) 34,160 34,160 1, ,360 CM CONSULTANT (CTCM) 14,100 14, , , ,760 1, ,360 Page 257 TIWRP August 1, 2013

282 TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP BIOGAS UPGRADE SYSTEM Harbor NEW PROJECT DESCRIPTION: This project will provide for digester gas conditioning through the removal of Hydrogen Sulfide and siloxans. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,880 57,440 2, ,720 PLANS CONSULTANT (CTP) ,800 72, ,300 CONSTRUCTION (CONS) ,379, , ,121,800 CONST MGT CITY (FACM) ,640 24, ,440 CM CONSULTANT (CTCM) ,400 9, , , ,440 1,559, , ,574,960 Page 258 TIWRP August 1, 2013

283 CITY OF LOS ANGELES TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP BLOWER REPLACEMENT Harbor SZT11315 TIWRP BLOWER REPLACEMENT PROJECT DESCRIPTION: This project will replace the existing three secondary aeration blowers at Terminal Island Water Reclamation Plant. The new system will include blowers, accessories and controls. This project will replace the TIWRP Secondary Air Modifications project (BOE #5159). PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 209, ,480 3, ,800 PLANS CONSULTANT (CTP) 74,300 63, ,100 CONSTRUCTION (CONS) ,595,304 5,869, ,465,000 CONST MGT CITY (FACM) , , ,191,600 CM CONSULTANT (CTCM) , , , , ,380 4,180 5,443,884 6,452, ,460,100 Page 259 TIWRP August 1, 2013

284 TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP CAPITAL EQUIPMENT REPLACEMENT PROGRAM (CERP) Harbor VARIOUS PROJECT DESCRIPTION: This project will provide for replacement of equipment at the end of its design life. Capital Equipment Replacement tasks are specified as having a replacement cost in excess of $5,000. The TIWRP capital equipment replacement program projects for fiscal year : Replacement of TIWRP Administration Facility HVAC Chiller Units; TIWRP Sand Filter Media Study; TIWRP Replacement of Primary Sludge Pumps; TIWRP Replace Primary Sludge Line from pumps to blending tank; & TIWRP Burner Upgrade for Boiler Number 2 for $560,000. PROJECT MANAGER: Harold Gies Phone: (310) Office: Terminal Island Water Reclamation Plant (BOS) PLANS CITY (FAP) 112, ,550 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 3,675, , , , ,103,333 CONST MGT CITY (FACM) 44, ,500 CM CONSULTANT (CTCM) ,832, , , , ,260,383 Page 260 TIWRP August 1, 2013

285 CITY OF LOS ANGELES TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP DISSOLVED AIR FLOATATION TANK MODIFICATION Harbor NEW PROJECT DESCRIPTION: This project will replace the discharge pumps at the Dissolved Air Floatation Thickener (DAFT) with new progressive cavity pumps. This project will also construct a dedicated feed line to the digesters. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 0 36, ,640 42, ,280 PLANS CONSULTANT (CTP) 0 14,000 97,200 10, ,300 CONSTRUCTION (CONS) ,672 1,191, ,000,000 CONST MGT CITY (FACM) ,800 56, ,280 CM CONSULTANT (CTCM) ,100 20, , , , ,232 1,268, ,679,560 Page 261 TIWRP August 1, 2013

286 TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP FERROUS CHLORIDE SYSTEM EQUIPMENT REPLACEMENT Harbor SZT11337 TIWRP FERR CHL SYS EQU REPL PROJECT DESCRIPTION: This project provides for procurement, demolition and installation of: (1) temporary Ferrous Chloride tank and addition system; (2) new permanent Ferrous Chloride tank; (3) integration w/ existing systems mechanical-piping, electrical, instrumentation and controls) and (4) repair/relining of existing containment. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 48,080 28, ,320 PLANS CONSULTANT (CTP) 19,500 4, ,600 CONSTRUCTION (CONS) 0 301, ,505 CONST MGT CITY (FACM) 0 22, ,760 CM CONSULTANT (CTCM) 0 8, ,500 67, ,925 1, ,685 Page 262 TIWRP August 1, 2013

287 CITY OF LOS ANGELES TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP FINAL CLARIFIERS REHABILITATION Harbor SZT11331 TIWRP FINAL CLARIFIERS REHAB PROJECT DESCRIPTION: This project will rehabilitate cracks found around the aeration tanks and in the final clarifier influent channel 6A. Cracks in the aeration tanks are severe at the cantilevered concrete slabs supporting the pedestal lifts along with the cantilevered concrete slab in aeration tank #1. The project will also rehabilitate broken concrete that has chipped off that once held the walkway above the final clarifier influent channel. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 110, ,480 PLANS CONSULTANT (CTP) 32, ,400 CONSTRUCTION (CONS) 34, , ,000 CONST MGT CITY (FACM) 18,800 40,000 3, ,000 CM CONSULTANT (CTCM) 3,300 7,200 1, , , ,760 4, ,580 Page 263 TIWRP August 1, 2013

288 TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP FIRE PROTECTION SYSTEM REPLACEMENTS Harbor SZT11266 TITP FIRE PROTECTN SYS RPLC PROJECT DESCRIPTION: This project will replace the fire protection systems in five buildings: the Dewatering Building, Energy Recovery Building, In-Plant Lift Station, Digester Area, and Gas Holder. Construction will involve: demolition of existing system, installation of new piping and sprinklers, valves, risers, stand pipes, and control systems. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , ,320 6, ,480 PLANS CONSULTANT (CTP) ,300 39,900 2, ,200 CONSTRUCTION (CONS) , , ,056,924 CONST MGT CITY (FACM) ,760 16, ,800 CM CONSULTANT (CTCM) ,000 7, , , ,220 1,013, , ,559,504 Page 264 TIWRP August 1, 2013

289 CITY OF LOS ANGELES TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP HEADWORKS IMPROVEMENTS Harbor SZT11265 TITP HEADWORKS IMPROVEMENTS PROJECT DESCRIPTION: This project will enhance the Preliminary Treatment Process at Terminal Island Water Reclamation Plant (TIWRP), reduce overall operating costs and make the existing Headworks Building an efficient, well-ventilated, well-illuminated, and odor-free operating facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 53, ,922 PLANS CONSULTANT (CTP) 37, ,767 CONSTRUCTION (CONS) 305,556 3,666,667 1,527, ,500,000 CONST MGT CITY (FACM) 85, , , ,000 CM CONSULTANT (CTCM) 24,600 59,040 39, , ,405 3,931,147 1,704, ,142,689 Page 265 TIWRP August 1, 2013

290 TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP HIGH PRESSURE EFFLUENT DISINFECTION Harbor SZT11307 TIWRP HPE DISINFECTION PROJECT DESCRIPTION: This project will conduct the investigation and design of the optimal disinfection system for the high pressure effluent (HPE) to be placed at the Terminal Island Water Reclamation Plant (TIWRP). This project will examine two alternative disinfection methods for the HPE (Chlorination and Ultra Violet), and determine the optimal disinfection system for the TIWRP. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) ,840 76,880 9, ,080 PLANS CONSULTANT (CTP) ,200 23,200 1, ,300 CONSTRUCTION (CONS) , , ,213 CONST MGT CITY (FACM) ,720 18, ,120 CM CONSULTANT (CTCM) ,800 4, , , , , , ,013 Page 266 TIWRP August 1, 2013

291 CITY OF LOS ANGELES TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP NEW SERVICE MAINTENANCE FACILITY Harbor NEW PROJECT DESCRIPTION: The project will demolish the existing metal sheds along the north-east corner of the Terminal Island Water Reclamation Plant (TIWRP) and construct a new service maintenance facility. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , , , ,211,680 PLANS CONSULTANT (CTP) , ,000 40, ,200 CONSTRUCTION (CONS) ,320,000 5,734,000 96, ,150,000 CONST MGT CITY (FACM) , ,960 46, ,290,344 CM CONSULTANT (CTCM) , ,200 17, , , ,640 3,238,560 6,665, , ,694,914 Page 267 TIWRP August 1, 2013

292 TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP PLANT INFLUENT SAMPLING SYSTEM Harbor NEW PROJECT DESCRIPTION: This project will remove and replace the existing sampling pumps, including new sampling lines for the influent system. This project will also replace all existing monitoring meters for the existing system. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , ,080 1, ,760 PLANS CONSULTANT (CTP) ,500 35, ,300 CONSTRUCTION (CONS) , , ,092,727 CONST MGT CITY (FACM) ,240 11, ,600 CM CONSULTANT (CTCM) ,500 4, , , , , , ,471,287 Page 268 TIWRP August 1, 2013

293 CITY OF LOS ANGELES TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP POWER/ENERGY MANAGEMENT Harbor NEW PROJECT DESCRIPTION: This project will integrate power monitoring into the control system, which will enable implementation of control strategies based on energy efficiency as well as providing a means to detect the degradation of equipment and the need for maintenance. PROJECT MANAGER: Lance Thibodeaux Phone: (310) Office: Terminal Island Water Reclamation Plant (BOS) PLANS CITY (FAP) , ,000 PLANS CONSULTANT (CTP) , ,000 CONSTRUCTION (CONS) , ,410 CONST MGT CITY (FACM) , ,000 CM CONSULTANT (CTCM) , , , , ,410 Page 269 TIWRP August 1, 2013

294 TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP PRIMARY CLARIFIER WEIRS MODIFICATIONS Harbor NEW PROJECT DESCRIPTION: This project will replace the discharge pumps at the Dissolved Air Floatation Thickener (DAFT) with new progressive cavity pumps. This project will also construct a dedicated feed line to the digesters. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , , ,280 1, ,720 PLANS CONSULTANT (CTP) , , , ,100 CONSTRUCTION (CONS) ,138,717 4,221, ,360,000 CONST MGT CITY (FACM) , , ,400 CM CONSULTANT (CTCM) ,000 54, , , , ,380 9,224,977 4,420, ,834,020 Page 270 TIWRP August 1, 2013

295 CITY OF LOS ANGELES TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP RENEWABLE ENERGY SLURRY FRACTURE INJECTION # Harbor NEW PROJECT DESCRIPTION: This project will construct one monitoring well (SFI #4). PROJECT MANAGER: Seung Tag Oh Phone: (310) Office: Terminal Island Water Reclamation Plant (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 1,000, ,000,000 CONST MGT CITY (FACM) CM CONSULTANT (CTCM) ,000, ,000,000 Page 271 TIWRP August 1, 2013

296 TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP TERTIARY FILTER INFLUENT PUMP VARIABLE FREQUENCY DRIVE REPLACEMENT Harbor SZT11280 TITP TERT INFL PUMP VFD RPLC PROJECT DESCRIPTION: This project will replace three variable frequency drives (VFDs) to the existing tertiary filter influent pumps with VFDs that match the motor horsepower of the existing tertiary filter influent pumps. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) , ,720 PLANS CONSULTANT (CTP) , ,800 CONSTRUCTION (CONS) , , ,139,126 CONST MGT CITY (FACM) ,680 29, ,280 CM CONSULTANT (CTCM) ,700 6, , , , ,339,226 Page 272 TIWRP August 1, 2013

297 CITY OF LOS ANGELES TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP TERTIARY FILTER REHABILITATION Harbor NEW PROJECT DESCRIPTION: This project will rehabilitate the tertiary filter at TIWRP. The level of rehabilitation and parts that need rehabilitation will be identified by CIP #5221- TIWRP Tertiary Filter Rehabilitation Study project. This project is in progress, and the results will be used to start the pre-design work for this project. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 7,920 94,320 44, ,640 PLANS CONSULTANT (CTP) 42, ,700 79, ,000 CONSTRUCTION (CONS) ,267 2,716,818 1,142, ,075,000 CONST MGT CITY (FACM) ,800 60,880 18, ,560 CM CONSULTANT (CTCM) , ,400 42, ,000 49, , ,967 2,886,098 1,204, ,955,200 Page 273 TIWRP August 1, 2013

298 TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP TIRE SITE IMPROVEMENTS Harbor TIWRP TIRE SITE IMPROVEMENTS PROJECT DESCRIPTION: The scope of this project includes installing guardrails on unprotected side of elevated work locations, providing covered trenches for piping/conduit/hoses that crosses walkways, removing platforms & cut sheet metals that are flush to the asphalt, providing an approved DOT (Dept. of Transportation) storage container for flammable/hazardous waste, installing temporary barriers or barricades to open enclosures that exposes uncontrolled energized electrical equipment, designing & installing vehicle impact barrier at the edge of the pit, and mounting portable fire extinguishers. PROJECT MANAGER: Richard Mayer Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 206, , ,240 PLANS CONSULTANT (CTP) 71,900 56, ,500 CONSTRUCTION (CONS) 0 0 1,994,564 1,005, ,000,000 CONST MGT CITY (FACM) ,720 34, ,040 CM CONSULTANT (CTCM) ,600 13, , , ,120 2,473,884 1,052, ,055,480 Page 274 TIWRP August 1, 2013

299 CITY OF LOS ANGELES TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) TIWRP WASTEWATER CONTROL SYSTEM REPLACEMENT Harbor NEW PROJECT DESCRIPTION: This project will replace the existing Programmable Logic Control (PLC) system with a Distributed Control System (DCS) for plant-wide process control. The DCS will provide system automation, remote control and remote monitoring. The scope includes the installation of fiber optic data highway that will link and integrate the control of all processes into a single plant-wide control system. This project is part of the overall Wastewater Control System Replacement program. PROJECT MANAGER: Ali Poosti Phone: (323) Office: Wastewater Engineering Services Division (BOS) PLANS CITY (FAP) PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 0 33,701 3,237,933 5,988, , ,193,969 CONST MGT CITY (FACM) 0 33, , , , ,165,956 CM CONSULTANT (CTCM) 0 122, ,834 41, , ,160 4,253,359 6,333,530 1,214, ,991,548 Page 275 TIWRP August 1, 2013

City of Los Angeles Bureau of Sanitation Additional Clean Water Projects Constructed with 10-Year Rate Adjustment

City of Los Angeles Bureau of Sanitation Additional Clean Water Projects Constructed with 10-Year Rate Adjustment Additional Clean Water s Constructed with 10-Year Rate Adjustment 1 COLLECTION SYSTEM COLL SYSTEM CONTROL SYSTEM REPL Citywide 2013 $4 M 2 COLLECTION SYSTEM ODOR CTRL ATWATER VILLAGE SCR 4,13 2013 $1 M

More information

WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS 2009/10 2018/19) CATEGORIES:

WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS 2009/10 2018/19) CATEGORIES: WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS ) CATEGORIES: COLLECTION SYSTEM DONALD C. TILLMAN WATER RECLAMATION PLANT HYPERION TREATMENT PLANT

More information

WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS 2006/07 2015/16) CATEGORIES:

WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS 2006/07 2015/16) CATEGORIES: WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS ) CATEGORIES: COLLECTION SYSTEM DONALD C. TILLMAN WATER RECLAMATION PLANT EARTHQUAKE RECOVERY HYPERION

More information

ODOR TASKS in SETTLEMENT AGREEMENT

ODOR TASKS in SETTLEMENT AGREEMENT ODOR TASKS in SETTLEMENT AGREEMENT IV. DEFINITIONS Deliverable shall mean any written reports required to be prepared and/or submitted pursuant to Sections VI (Reporting Requirements) and VIII (Supplemental

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE FORM GEN. 160 CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: November 2 4, 2 01 4 CAO File No. 0640-01386-0022 To: The Honorable Members of the City Council From: Sharon M. Tso, Chief Legislative

More information

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The

More information

SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco

SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco Emilio Cruz AGM, Infrastructure Agenda + San Francisco s Sewer System + San Francisco

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

Click to edit Master title style

Click to edit Master title style Click to edit Master title style Sewer System Improvement Program (SSIP) Karen Kubick, PE Wastewater Enterprise Capital Program Director San Francisco Public Utilities Commission Construction Managers

More information

Cambridge Wastewater Treatment Facility

Cambridge Wastewater Treatment Facility Cambridge Wastewater Treatment Facility Emergency Situations If you have a water or sewer emergency that relates to the City s utility system call the Public Works office at 763-689-1800 on normal working

More information

William E. Dunn Water Reclamation Facility. Facility Overview & Information

William E. Dunn Water Reclamation Facility. Facility Overview & Information William E. Dunn Water Reclamation Facility Facility Overview & Information General Area Served: Plant History Facility Highlights Northern Pinellas County St. Joseph Sound to East Lake Road (E/W) Tampa

More information

The City of Boulder 75 th Street Wastewater Treatment Facility

The City of Boulder 75 th Street Wastewater Treatment Facility The City of Boulder 75 th Street Wastewater Treatment Facility Wastewater Collection and Treatment The Foundation of Public Health Wastewater Collection Boulder s wastewater collection system, also known

More information

COUNTY OF LOS ANGELES DEPARTMENT OF MENTAL COUNTYWIDE CHILDREN S SERVICES TBS PROVIDER DIRECTORY SA PROVIDER NAME CONTACT

COUNTY OF LOS ANGELES DEPARTMENT OF MENTAL COUNTYWIDE CHILDREN S SERVICES TBS PROVIDER DIRECTORY SA PROVIDER NAME CONTACT 1 Children's Bureau of Southern California 921 West Ave. J, Suite C Lancaster, Ca 93534 Ph: (661) 949-0131 Fax: (661) 729-8912 1 Children's Bureau of So Ca- Antelope Valley 1529 E. Palmdale Blvd. Suite

More information

ORANGE COUNTY SANITIATION DISTRICT CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS

ORANGE COUNTY SANITIATION DISTRICT CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS ORANGE COUNTY SANITIATION DISTRICT CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS CONTENTS: Construction Change Order Summary Report Design Consultant PSA Amendment Summary Report Contractors Active Projects

More information

LOS ANGELES COUNTY IMMUNIZATION PROGRAM PROVIDER REFERRAL LIST

LOS ANGELES COUNTY IMMUNIZATION PROGRAM PROVIDER REFERRAL LIST Alhambra Avalon Bell Bell Bell Gardens Bell Gardens Bellflower Boyle Heights Culver City Downey Gardena Glendale Harbor City Hawaiian Garde Hawthorne Huntington Park Inglewood Inglewood La Puente Lancaster

More information

Orange. County. Reclamation Plant No. 1 Treatment Plant No. 2. La Habra Brea. Fullerton Placentia Anaheim Villa Park Alamitos.

Orange. County. Reclamation Plant No. 1 Treatment Plant No. 2. La Habra Brea. Fullerton Placentia Anaheim Villa Park Alamitos. Energy Management OCSD Service Area 572 miles of sewers 471 square miles 200 million gallons per day 2.5 million population 20 cities, 4 special districts 15 pumping stations 2 treatment plants Pacific

More information

REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT

REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT REQUEST FOR PROPOSAL for CONSTRUCTION MANAGEMENT SERVICES for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT Ref: Admin.15 12265c September 23, 2015 Proposals Due November 2,

More information

Sewer System Improvement Program Update

Sewer System Improvement Program Update August 20, 2014 Sewer System Improvement Program Update Tommy T. Moala SFPUC Assistant General Manager, Wastewater Enterprise Agenda 1. SF Sewer System 2. Our Challenges 3. Sewer System Improvement Program

More information

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper C-4-04 CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES Brad Jenson

More information

INFRASTRUCTURE ARCHITECTURE OPEN SPACE

INFRASTRUCTURE ARCHITECTURE OPEN SPACE The Bureau of Engineering Transforms Los Angeles INFRASTRUCTURE ARCHITECTURE OPEN SPACE City of Los Angeles Department of Public Works Bureau of Engineering Introduction Who are we? Capital Program Overview/Upcoming

More information

Description of the Water Conserv II Facility

Description of the Water Conserv II Facility Description of the Water Conserv II Facility Introduction The Water Conserv II (WCII) Water Reclamation Facility provides service to a majority of the southwest section of Orlando. The WCII facility has

More information

KANSAS CITY WATER SERVICES FISCAL YEAR 2016 CAPITAL IMPROVEMENT PROGRAM

KANSAS CITY WATER SERVICES FISCAL YEAR 2016 CAPITAL IMPROVEMENT PROGRAM KANSAS CITY WATER SERVICES FISCAL YEAR 2016 CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS Water...Page 2 Design Professional Services... Page 3 Construction... Page 8 Wastewater...Page 12 Design Professional

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee City of Inglewood Well No. 2 Rehabilitation City of Inglewood Thomas Lee Project Location (Photos and location maps of the project) Project Description The City of Inglewood (City)receives its annual potable

More information

California : Los Angeles County (Central)

California : Los Angeles County (Central) California : Los Angeles County (Central) Arroyo Vista Family Health Center 6000 N, Figueroa, Los Angeles, CA 90042, (323)254-5221 Adults and Children Cost: Medi-cal, sliding scale fee Catholic Worker

More information

School Management Services / Master Planning & Demographics

School Management Services / Master Planning & Demographics Facilities Services Division Los Angeles Unified School District School Management Services / Master Planning & Demographics ARE YOU LOOKING FOR BOUNDARY CHANGE INFORMATION FOR YOUR SCHOOL? This file provides

More information

California Wastewater

California Wastewater Abridged Edition L A Y P E R S O N S G U I D E T O California Wastewater Prepared by the Water Education Foundation Contents The Layperson s Guide to California Wastewater is prepared and distributed by

More information

Asset Management Answering the 5 Core Questions

Asset Management Answering the 5 Core Questions Asset Management Answering the 5 Core Questions by Timothy Taber, PE Barton & Loguidice Page 1 Drivers Asset Management Case Study 1. What is the current state of my assets? 2. What is my required sustainable

More information

NOTICE OF THE CLASS DISTRIBUTION PLAN. A court has authorized this notice. This is not a solicitation from a lawyer.

NOTICE OF THE CLASS DISTRIBUTION PLAN. A court has authorized this notice. This is not a solicitation from a lawyer. NOTICE OF THE CLASS DISTRIBUTION PLAN A court has authorized this notice. This is not a solicitation from a lawyer. THIS NOTICE MAY AFFECT YOUR RIGHTS. PLEASE READ THIS ENTIRE NOTICE CAREFULLY. TO THE

More information

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside

More information

OPERATIONS & MAINTENANCE FY 2012-2013 Adopted Budget

OPERATIONS & MAINTENANCE FY 2012-2013 Adopted Budget SERVICE DESCRIPTION To maintain all of the transferred and accepted infrastructure within the district including water, wastewater, and stormwater systems, streetlights, traffic signals, and landscaping

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

CHAPTER 10-2. Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities

CHAPTER 10-2. Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities CHAPTER 10-2 SEWAGE COLLECTION AND TREATMENT FACILITIES Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities 1.1 SANITARY SEWER COLLECTION SYSTEM The City of Washougal operates

More information

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001 Maricopa Association of Governments Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS August 2001 3033 NORTH 44TH STREET, SUITE 101 PHOENIX, ARIZONA 85018 (602) 263-9500 FAX (602) 265-1422 Technical

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

City of Riverside WASTEWATER COLLECTION AND TREATMENT FACILITIES INTEGRATED MASTER PLAN

City of Riverside WASTEWATER COLLECTION AND TREATMENT FACILITIES INTEGRATED MASTER PLAN WASTEWATER COLLECTION AND TREATMENT FACILITIES INTEGRATED MASTER PLAN VOLUME 10: CAPITAL IMPROVEMENT PLAN AND OVERALL IMPLEMENTATION SCHEDULE CHAPTER 1: CAPITAL COSTS AND IMPLEMENTATION SCHEDULE FINAL

More information

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana

More information

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

MARKET OPPORTUNITIES. Incentives for Food Retailers

MARKET OPPORTUNITIES. Incentives for Food Retailers MARKET OPPORTUNITIES Incentives for Food Retailers South : Opportunity for Growth... Increasing healthy eating options by locating new grocery stores, sit-down restaurants and fresh food markets in the

More information

How To Improve Water Quality In East Pacificon

How To Improve Water Quality In East Pacificon WATER STORIES EAST PROVIDENCE, RI We are proud to partner with East Providence on this very important project. Together we developed an innovative, sustainable solution that promotes public, economic

More information

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance

More information

NEVADA CITY WASTEWATER TREATMENT INQUIRY

NEVADA CITY WASTEWATER TREATMENT INQUIRY NEVADA CITY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated

More information

Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach

Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach Fundamentals of Asset Management Step 10. Build Asset Management Plan A Hands-On Approach Tom s bad day Fundamentals of Asset Management 2 AM plan 10-step process Develop Asset Registry Assess Performance,

More information

CHAPTER 1 - EXECUTIVE SUMMARY

CHAPTER 1 - EXECUTIVE SUMMARY Chapter Page CHAPTER 1 - EXECUTIVE SUMMARY 1.1 Background 1-1 1.2 Purpose/ Objectives 1-1 1.3 Flow, Condition and Operation Assessment 1-3 1.4 Class A Biosolids 1-4 1.5 Summary of Recommendations 1-4 CHAPTER

More information

EXISTING WASTEWATER TREATMENT FACILITIES

EXISTING WASTEWATER TREATMENT FACILITIES Chapter 5 EXISTING WASTEWATER TREATMENT FACILITIES 5.1 THERESA STREET WWTF 5.1.1 Overview The Theresa Street WWTF is the larger of the two wastewater treatment facilities owned and operated by the City

More information

EXISTING WASTEWATER TREATMENT FACILITIES

EXISTING WASTEWATER TREATMENT FACILITIES Chapter 5 EXISTING WASTEWATER TREATMENT FACILITIES 5.1 THERESA STREET WWTF 5.1.1 Overview The Theresa Street WWTF is the larger of the two wastewater treatment facilities owned and operated by the City.

More information

Linabond Partial Project History

Linabond Partial Project History P r o t e c t i o n - C o n t a i n m e n t - S t r u c t u r a l R e h a b i l i t a t i o n Please understand that this is only a very small sampling of projects over a 30 year period of time. It would

More information

Altoona Water Authority. Infrastructure Overview

Altoona Water Authority. Infrastructure Overview Altoona Water Authority Infrastructure Overview Mission Statement As stewards of the community s water system, our mission is to provide a clean, safe, reliable water supply and to collect and treat wastewater

More information

Executive Summary Consent Decree

Executive Summary Consent Decree OVERFLOW ABATEMENT PROGRAM Executive Summary Consent Decree The sewer system in Nashville dates back to the late 1800s and originally consisted of a combined sewer system, later transitioning to separate

More information

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values

More information

Would These Keywords Help Your Business? divorce lawyer 90254 90254 divorce lawyer divorce lawyer hermosa beach divorce lawyer hermosa beach ca

Would These Keywords Help Your Business? divorce lawyer 90254 90254 divorce lawyer divorce lawyer hermosa beach divorce lawyer hermosa beach ca divorce lawyer 90254 90254 divorce lawyer divorce lawyer hermosa beach divorce lawyer hermosa beach ca divorce lawyer hermosa beach california divorce lawyer in hermosa beach divorce lawyer in hermosa

More information

How To Get A Stormwater Discharge Permit In A City Of Scottsdale

How To Get A Stormwater Discharge Permit In A City Of Scottsdale Environmental Regulations Guide Section 4 Pollution Prevention 4. 0 Pollution Prevention The Pollution Prevention Act (PPA) focuses on source reduction, i.e. on reducing the amount of pollution through

More information

San Diego Citizen s Forum. USIBWC San Diego Field Office

San Diego Citizen s Forum. USIBWC San Diego Field Office San Diego Office Update San Diego Citizen s Forum Steve Smullen, Area Operations Manager USIBWC San Diego Field Office August 25, 2011 SAN DIEGO OFFICE ACTIVITIES Flood Control Tijuana River Flood Control

More information

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East Jian Li, Ph.D., P.Eng., PE Senior Environmental Engineer Stantec Consulting Ltd. Water & Wastewater Treatment BMP Forum

More information

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION...

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION... Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY VISION... 5 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION... 33 CAPITAL IMPROVEMENT PROJECTS

More information

Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and

Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and Advanced Wastewater Treatment and Disposal Systems Water and Wastewater Utility Operation and Management for Tribes Preliminary Treatment Primary Treatment Secondary Treatment Tertiary Treatment Disinfection

More information

OWOW Proposition 84, Round 2 Master Project List

OWOW Proposition 84, Round 2 Master Project List OWOW Proposition 84, Round 2 Master List Name s Recommended for Prop 84 Round 2 Funding 1 2071 Inland Empire Utilities Agency 2 2068 USDA Forest Service San Bernardino National Forest Wineville Regional

More information

California State Department of Fair Employment and Housing 611 West Sixth Street, 15th Floor Los Angeles, CA 90017 800-233-3212

California State Department of Fair Employment and Housing 611 West Sixth Street, 15th Floor Los Angeles, CA 90017 800-233-3212 California Housing Resources Provided by Consumer Action (www.consumer-action.org) Note: If any of the contact information here has changed, please email [email protected] B Bay Area Legal Aid 2

More information

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste 3.6 3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste Police Protection The Clarkstown Police Department provides police protection services to properties within the 40 square

More information

Sanitary Sewers LINK TO THE COMPREHENSIVE PLAN

Sanitary Sewers LINK TO THE COMPREHENSIVE PLAN Sanitary Sewers PROGRAM DESCRIPTION Fairfax County provides sewer service to its residents through a system of nearly 3,412 miles of sewer lines, 59 sewage pumping stations, 5 storm water pumping stations,

More information

Report Relating to Incidents of Flooding within the Dollar Catchment

Report Relating to Incidents of Flooding within the Dollar Catchment Joint Position Statement Report Relating to Incidents of Flooding within the Dollar Catchment October 2012 Eric McQuarrie, Scottish Water Stuart Cullen, Clackmannanshire Council TABLE OF CONTENTS 1. INTRODUCTION...

More information

NON-CIRCULAR SEWER LINER INSTALLATION AND FUTURE PROJECTS IN LOS ANGELES

NON-CIRCULAR SEWER LINER INSTALLATION AND FUTURE PROJECTS IN LOS ANGELES North American Society for Trenchless Technology 2008 No-Dig Conference & Exhibition Dallas, Texas April 27 May 2, 2008 NON-CIRCULAR SEWER LINER INSTALLATION AND FUTURE PROJECTS IN LOS ANGELES Brad Jenson

More information

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,

More information

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM Stadium Reconstruction EIR Appendices \ AECOM Technical Services, Inc 401 West A Street Suite 1200 San Diego, CA 92101 www.aecom.com 619-610-7600 tel 619-610-7601

More information

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall

More information

Section 7 Existing Treatment Facilities

Section 7 Existing Treatment Facilities Section 7 7.1 Introduction An essential tool for the IRP is the wastewater treatment and effluent discharge facility capacities. There are six wastewater treatment facilities within the City s service

More information

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery County of Nassau Department of Public Works Bay Park Sewage Treatment Plant Super Storm Sandy Recovery Edward P. Mangano County Executive Shila Shah-Gavnoudias, P.E. Commissioner of Public Works Bay Park

More information

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)

More information

The Donut Hole Sunset The San Francisco-Pacifica Exclusion Zone

The Donut Hole Sunset The San Francisco-Pacifica Exclusion Zone The Donut Hole Sunset The San Francisco-Pacifica Exclusion Zone Changes to the exclusionary factors since designation Presentation to the Gulf of the Farallones National Marine Sanctuary Advisory Council

More information

PREPARING INDUSTRIAL ENGINEERING REPORTS

PREPARING INDUSTRIAL ENGINEERING REPORTS PREPARING INDUSTRIAL ENGINEERING REPORTS EARLE HARTLING, LOS ANGELES COUNTY SANITATION DISTRICT JOHN ROBINSON, JOHN ROBINSON CONSULTING, INC WateReuse LA Chapter December 2, 2014 Presentation Overview

More information

Wastewater Treatment System Rehabilitation Project

Wastewater Treatment System Rehabilitation Project Wastewater Treatment System Rehabilitation Project An overview The City of Shelton, WA / January 2010 Before After SHELTON WASTEWATER TREATMENT IMPROVMENTS PROJECT Enabled by extensive grant-funding, loans

More information

KOCE-TV CABLE / SATELLITE LIST

KOCE-TV CABLE / SATELLITE LIST KOCE-TV CABLE / SATELLITE LIST KOCE-TV transmits from Mount Wilson on Channel 50. Here is a list of the many cable systems throughout Southern California that carry KOCE. If your cable system does not

More information

(310) 543-9900 (310) 379-3620, (310) 370-5902, (213) 745-6434, (213) 222-1237, (562) 388-7652 [email protected]

(310) 543-9900 (310) 379-3620, (310) 370-5902, (213) 745-6434, (213) 222-1237, (562) 388-7652 info@1736fcc.org Los Angeles Violence Prevention Resource Directory Domestic Violence Victim/Prevention Services 1736 Family Crisis Center South Bay Office 21707 Hawthorne Blvd., Suite 300 Torrance, CA 90503 (310) 543-9900

More information

SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND

SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND Wastewater Utility Overview In the late 1950 s, the Village of Old Forge began to realize the impacts of dumping sewage in the Moose River.

More information

RAdaptive. Reuse Program. City of Los Angeles. Creates new housing opportunities. Revitalizes neighborhoods. Preserves historic architecture

RAdaptive. Reuse Program. City of Los Angeles. Creates new housing opportunities. Revitalizes neighborhoods. Preserves historic architecture Creates new housing opportunities Revitalizes neighborhoods Preserves historic architecture Encourages community development Stimulates economic investment Facilitates mixed-use City of Los Angeles RAdaptive

More information

CLEARWATER PROGRAM. Executive Summary FINAL

CLEARWATER PROGRAM. Executive Summary FINAL CLEARWATER PROGRAM Executive Summary FINAL SCH# 2008101074 November 2012 CLEARWATER PROGRAM Executive Summary FINAL Prepared by: Sanitation Districts of Los Angeles County Facilities Planning Department

More information

Capital Improvement Project Status Report October 2015 (Actuals through August 2015) Percent Design Complete. Design Finish. Construction Finish

Capital Improvement Project Status Report October 2015 (Actuals through August 2015) Percent Design Complete. Design Finish. Construction Finish Title I. Terminals Berth 90-93 - World Cruise Center 1. B. 93 - Cruise Terminal - Customs and Border Protection Improvements (2525300) 06/30/16 80% 02/28/18 0% $2,740,000 $181,831 7% 2. B. 91-93 - Alternative

More information

Wastewater Nutrient Removal

Wastewater Nutrient Removal Wastewater Nutrient Removal An overview of phosphorus and nitrogen removal strategies Presented by: William E. Brown, P.E. Peter C. Atherton, P.E. Why are nutrients an issue in the environment? Stimulates

More information

Orange County Sanitation District

Orange County Sanitation District Orange County Sanitation District The Orange County Sanitation District operates large wastewater treatment plants in Fountain Valley and Huntington Beach, CA. These plants treat about 230 million gallons

More information

St. John s Harbour Clean-Up Phase 2. Project Description

St. John s Harbour Clean-Up Phase 2. Project Description St. John s Harbour Clean-Up Phase 2 Project Description February 2003 NEWFOUNDLAND DESIGN ASSOCIATES LIMITED 1 Introduction The City of St. John s, the adjoining City of Mount Pearl and the Town of Paradise

More information

Los Angeles Match Initiation Form

Los Angeles Match Initiation Form Los Angeles Match Initiation Form This form is used as an addendum to the VI-SPDAT Screener. This Match Initiation Form includes questions that will assist with making a match to a unit of Permanent Supportive

More information

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s

More information

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO-0098001, Construction Permit No. CP0001707, Callaway County

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO-0098001, Construction Permit No. CP0001707, Callaway County Ms. Gail Geary Ameren Missouri 1901 Chouteau Ave. PO Box 66149, MC 602 St. Louis, MO 63166-6149 RE: Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO-0098001, Construction,

More information

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty

More information

Sanitary Sewer Master Plan

Sanitary Sewer Master Plan , Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY

More information

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION Vallecitos Water District Rock Springs Sewer Replacement Project Vallecitos Water District has prepared a Draft Mitigated Negative Declaration

More information