WASTEWATER CAPITAL IMPROVEMENT PROGRAM

Size: px
Start display at page:

Download "WASTEWATER CAPITAL IMPROVEMENT PROGRAM"

Transcription

1 WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS ) CATEGORIES: COLLECTION SYSTEM DONALD C. TILLMAN WATER RECLAMATION PLANT HYPERION TREATMENT PLANT LA-GLENDALE WATER RECLAMATION PLANT PUMPING PLANTS SYSTEMWIDE TERMINAL ISLAND WATER RECLAMATION PLANT

2

3 MAYOR ERIC GARCETTI COUNCIL MEMBERS 1ST DISTRICT 4TH DISTRICT 7TH DISTRICT 10TH DISTRICT 13TH DISTRICT GILBERT CEDILLO TOM LABONGE FELIPE FUENTES HERB J. WESSON, JR MITCH O FARRELL 2ND DISTRICT 5TH DISTRICT 8TH DISTRICT 11TH DISTRICT 14TH DISTRICT PAUL KREKORIAN PAUL KORETZ BERNARD PARKS MIKE BONIN JOSE HUIZAR 3RD DISTRICT 6TH DISTRICT 9TH DISTRICT 12TH DISTRICT 15TH DISTRICT BOB BLUMENFIELD NURY MARTINEZ CURREN D. PRICE, JR MITCHELL ENGLANDER JOE BUSCAINO BOARD OF PUBLIC WORKS KEVIN JAMES, PRESIDENT MONICA RODRIGUEZ, VICE PRESIDENT MATT SZABO, PRESIDENT PRO TEMPORE BARBARA ROMERO MICHAEL DAVIS ENRIQUE C. ZALDIVAR DIRECTOR D.C.TILLMAN WATER RECLAMATION PLANT ENVIRONMENTAL MONITORING DIVISION FINANCIAL MANAGEMENT DIVISION HYPERION TREATMENT PLANT INFORMATION & CONTROL SYSTEMS DIVISION LOS ANGELES-GLENDALE WATER RECLAMATION PLANT TERMINAL ISLAND WATER RECLAMATION PLANT WASTEWATER COLLECTION SYSTEMS DIVISION WASTEWATER ENGINEERING SERVICES DIVISION BUREAU OF ENGINEERING GARY LEE MOORE, P.E. CITY ENGINEER ARCHITECTURAL DIVISION ENVIRONMENTAL ENGINEERING DIVISION WASTEWATER CONVEYANCE ENGINEERING DIVISION WASTEWATER CONVEYANCE CONSTRUCTION DIVISION BUREAU OF CONTRACT ADMINISTRATION JOHN L. REAMER, JR. INSPECTOR OF PUBLIC WORKS WASTEWATER CONSTRUCTION DIVISION

4

5 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION The Wastewater Capital Improvement Program (WCIP) includes capital projects that the Bureau of Sanitation (BOS) and the Bureau of Engineering (BOE) have developed for the City s wastewater facilities. The projects included in this document have been approved by the City s Program Review Committee, comprised of Assistant Directors of the BOS and a Deputy City Engineer. The administration, coordination and implementation of the projects in the 10-Year WCIP are assigned to various divisions of the BOS and BOE in the Department of Public Works. The Program includes replacement, rehabilitation and expansion of the City s wastewater treatment and collection facilities. The 10-year estimated total cost of this Program is $2,561,350,000. The City s wastewater system is divided into two separate subsystems Hyperion and Terminal Island - based upon the topographical features of the service area. The Hyperion System serves the area north of Imperial Highway and includes the Hyperion Treatment Plant in Playa Del Rey, the Los Angeles-Glendale Water Reclamation Plant near the City of Glendale and the Donald C. Tillman Water Reclamation Plant in the San Fernando Valley. The Los Angeles-Glendale and Donald C. Tillman Plants are located upstream of the Hyperion Plant and along the Los Angeles River, and treat only the liquid portion of the wastewater. All biosolids from these two upstream plants are conveyed to, and treated at the Hyperion Treatment Plant. The Terminal Island System serves the portion of the City south of Lomita Boulevard (the area between Lomita Boulevard and Imperial Highway is served by County Sanitation District #5). This subsystem has one treatment plant, the Terminal Island Water Reclamation Plant, located in the Los Angeles Harbor area. This plant also treats biosolids and produces recycled water. In addition to these four (4) treatment plants, the City's wastewater facilities include forty-seven (47) pumping plants and more than 6,700 miles of mainline sewers. Through separate service agreements, the City provides wastewater collection, treatment and disposal services to twenty-nine (29) contract agencies located in areas adjoining the City. PROJECT DESCRIPTION/EXPENDITURE PLAN INFORMATION The projects in the Program are divided into seven (7) categories: Collection System (CS), Donald C. Tillman Water Reclamation Plant (DCT), Hyperion Treatment Plant (HTP), Los Angeles-Glendale Water Reclamation Plant (LAG), Pumping Plants (PP), Systemwide (SW), and the Terminal Island Water Reclamation Plant (TIWRP). Each category contains a planned expenditure summary of projects within that category, followed by a detailed project description for each of the projects along with the 10-year project expenditure plan. Page i August 2, 2013

6 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION PROJECT NAME The Project Name is the name assigned to each project that appears above the project description table. Abbreviated project names are used in the expenditure summary tables, so they may not match the project name in the description page exactly. The designation of a phase or unit indicates that a project is related to other projects. A phase is normally assigned when projects are proposed to be constructed sequentially. A unit is normally assigned when a large project is divided into smaller, manageable projects. COUNCIL DISTRICT(S) The Council District is the location where the project construction or study will be taking place. There are a total of fifteen (15) Council Districts within the City of Los Angeles. PLANNING AREA(S) The new City Charter adopted in June of 1999, operative in July 2000, created seven Area Planning Commissions covering different areas of the City. These areas were designated as follows: - North Valley - South Valley - West Los Angeles - Central - East - South Los Angeles - Harbor Page ii August 2, 2013

7 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION CIP # The CIP # is a unique number that is assigned to each project in this book for identification purposes by the Financial Management Division (FMD), which publishes this book. This number will remain the same during the life of the project. PROJECT DESCRIPTION The Project Description describes the scope and purpose of the project, project location, and other pertinent information. WORK ORDER The Work Order is used to accumulate costs within the Department of Public Works. Each Work Order has a defined cost objective. One or more Work Orders may be assigned to a project. In cases where more than one Work Order is assigned to a project, only the primary Work Order is listed. TABLE The Ten-Year Expenditure Plan table provides information regarding the expected funding for each project in 6 different cost categories. The amounts spent in the years prior to FY 13/14, as well as the planned expenditures for the 10-year span from 13/14 to 22/23 is shown for each cost category. The cost categories are described as follows: FAP (Force Account Planning)... City Staff Design Costs CTP (Consultant Planning)... Consultant Design Costs RW (Right-Of-Way)... Right of Way Costs CONS (Construction)... Construction Costs FACM (Force Account Construction Management)... City Staff Construction Management Costs CTCM (Consultant Construction Management)... Consultant Construction Management Costs Page iii August 2, 2013

8 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION Significant projects from the various project categories are highlighted as follows: I. COLLECTION SYSTEM (CS) Activities planned for the Collection System category include major sewer projects, relief sewers, sewer replacement projects, the Secondary Sewer Renewal Program, and miscellaneous emergency repair/replacement projects. The major projects in this category are as follows: The Secondary Sewer Renewal Program (SSRP) evaluates all secondary sewers on a sewershed by sewershed basis, and rehabilitates/repairs damaged sewer reaches. Secondary sewers are those sewers less than 16-inches in diameter. Currently the SSRP includes 61 projects that are scheduled for construction between 13/14 and 18/19, and a placeholder program for future years with a combined estimated cost of $341,122,000. The Northeast Interceptor Sewer (NEIS) Phase 2A will construct approximately 3.67 miles of sewer and associated structures, including a junction structure, maintenance holes, and a connection to the North Outfall Sewer (NOS) south of the LA-Glendale Water Reclamation Plant. This project will relieve the portion of the NOS adjacent to this project. The estimated cost of this project is $177,659,000. Five North Outfall Sewer (NOS) Rehabilitation projects will rehabilitate the existing NOS between the Hyperion Treatment Plant and the LA-Glendale Water Reclamation Plant, and a northern segment above the LA-Glendale Water Reclamation Plant: NOS Rehab Unit 2 Western to Vermont, NOS Rehab Vermont to Trinity Unit 3, NOS Rehabilitation Unit 5 San Pedro to Hooper, NOS Rehabilitation Unit 6 Hooper to Wilson, and NOS Rehabilitation Unit 7 Wilson to LA River. The estimated cost of these projects and the program placeholder total $88,518,000. Two projects will rehabilitate the La Cienega Interceptor Sewer: The La Cienega Interceptor Sewer Rehabilitation Blackwelder to Olympic, and the La Cienega Interceptor Sewer Rehabilitation Jefferson to La Cienega projects. The estimated cost of these projects is $41,848,000. Three projects will rehabilitate the Central Outfall Sewer: Central Outfall Sewer at 59th Street and Fourth Avenue, Central Outfall Sewer Rehabilitation Market Street to Slauson Avenue, and Central Outfall Sewer Rehabilitation Slauson Avenue to Vernon Page iv August 2, 2013

9 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION Avenue. The estimated cost of these projects is $28,828,000. One Slauson Avenue Sewer Rehabilitation - Compton Avenue to Van Ness Avenue project will rehabilitate sewers constructed in Slauson Avenue between Compton Avenue and Van Ness Avenue. The estimated cost of this project is $25,205,000. One installation project will provide for an additional Air Treatment Facility: Air Treatment Facility East Central Interceptor Sewer (ECIS) - Mission & Jesse. The estimated total cost of this project is $20,570,000. Two projects will rehabilitate Wilshire area Sewers: Wilshire Area Olympic Sewer Rehabilitation and Wilshire Area System Sewer Rehabilitation. The estimated cost of these projects is $19,826,000. The Adams Boulevard Relief Sewer project will relieve sewers in Adams Boulevard from West Boulevard to Fairfax Avenue. The estimated cost of this project is $17,595,000. One project will rehabilitate the Normandie Sewer: Normandie Sewer Replacement and Rehabilitation. The estimated cost of this project is $14,759,000. Page v August 2, 2013

10 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION II. DONALD C. TILLMAN WATER RECLAMATION PLANT (DCT) The projects in this category address the needs of the Donald C. Tillman Water Reclamation Plant. The major projects in this category include the following: The Advanced Water Purification Facility project will construct a Micro Filtration/Reverse Osmosis Advanced Oxidation Process facility at Donald C. Tillman Water Reclamation Plant. The estimated cost of the project is $472,211,000. The Maintenance Facilities Relocation project will relocate the current Maintenance Facilities at Donald C. Tillman Water Reclamation Plant in order to accommodate the new Advanced Water Purification Facility. The estimated cost of this project is $30,562,000. The Personnel and Multi-Use Facility project will provide design and construction of a Multi-purpose and Office Building, in accordance with the Leadership in Energy and Environmental Design criteria to incorporate sustainable design features including exhibits. The estimated cost of this project is $ $16,625,000. A Distributed Control System Replacement project will provide updated hardware and software for the distributed control system required to operate the treatment plant. The estimated cost of this project is $16,622,000. An Emergency Backup Power project will evaluate the existing emergency backup power generator and install additional generating capacity. This is to ensure that DCT will not violate its discharge permit in case the existing power feeders are lost. The estimated cost of this project is $9,039,000. Page vi August 2, 2013

11 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION IV. HYPERION TREATMENT PLANT (HTP) These projects are necessary to comply with Regional Water Quality Control Board permit requirements, refurbish various plant facilities, and meet future operating requirements. The major projects in this category include the following: The Solids Handling and Truck Loading Facility project will construct a new solids handling facility that includes screening and dewatering of digested sludge, wet cake storage and loading, plus associated odor control facilities. The estimated cost of the project is $76,067,000. Three Secondary Clarifiers Rehabilitation and Expansion projects will add more clarifiers to the secondary system. The estimated cost of the project is $48,240,000. The Distributed Control System Replacement project will replace the existing control systems with one single system. The estimated cost of the project is $27,682,000. Four Headworks projects will improve grit handling, install fine screens to remove debris with a 5/8 opening or smaller, and upgrade odor control. The estimated cost of these projects is $17,532,000. Two Digester Gas projects will improve the treatment, transportation, use and disposal of the digester gas. The estimated cost of these projects is $11,939,000. The Effluent Pumping Plant Header Replacement project will replace the Effluent Pumping Plant Header. The estimated cost of the project is $9,822,000. V. LOS ANGELES-GLENDALE WATER RECLAMATION PLANT (LAG) The projects in this category address the needs of the Los Angeles-Glendale Water Reclamation Plant. The major projects in this category include the following: Two Nitrification Denitrification Blower Management System projects will provide mechanical, electrical and instrumentation replacement and additions for the Blower Management System, including 3 Local Control Panels, a Master Control Panel, software, graphics, commissioning, start-up, and training. The estimated cost of the projects is $8,307,000. Page vii August 2, 2013

12 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION The Distributed Control System Replacement project will update hardware and software of the distributed control system required to operate the plant. The estimated cost of the project is $7,013,000. The Personnel Building project will provide an estimated 7,000 square feet permanent office, laboratory and shower facilities for the Plant's Staff. The estimated cost of the project is $6,756,000. The Tertiary Filter Replacement project will replace existing dual media filters. The estimated cost of the project is $5,696,000. VI. PUMPING PLANTS (PP) The projects in this category concern the pumping plants serving the Wastewater collection system. Many of the projects represent the final phase of the rehabilitation and replacement of pumping plants to improve the reliability and efficiency of the Wastewater collection system. The largest projects are the following: The Venice Pumping Plant Dual Force Main project will provide added capacity for future wet weather flows and allow operational flexibility. The estimated cost is $61,232,000. The Pumping Plant Generators Replacement Phase 3 project will provide for procurement and installation of generators and ancillary controllers, transfer switches, plus exhaust and cooling systems at nine (9) pumping plants. The estimated cost is $5,871,000. VII. SYSTEMWIDE (SW) This category includes projects that cannot be appropriately assigned to any of the other categories or may apply to the entire Wastewater System. Such projects include Construction Services Contract, construction of the Environmental Learning Center, consultant and other miscellaneous support projects for the Wastewater Program. Page viii August 2, 2013

13 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION VIII. TERMINAL ISLAND WATER RECLAMATION PLANT (TIWRP) The projects in this category address the needs of the Terminal Island Water Reclamation Plant. The major projects in this category include: The Advanced Water Purification Facility (AWPF) Ultimate Expansion project will increase product water by 6.5 million gallons per day (mgd) for a total of 11.5 mgd of AWPF product water, including disinfection and conversion to advanced oxidation process. The estimated cost of this project is $61,641,000. The Modification of Primary Clarifier Weirs project will replace the discharge pumps at the Dissolved Air Floatation Thickener with new progressive cavity pumps, including construction of a dedicated feed line to the digesters. The estimated cost of this project is $14,834,000. The Blower Replacement project will replace the existing three secondary aeration blowers with new models, including accessories and controls. The estimated cost of this project is $12,177,000. One Control System Replacement project will replace the existing Programmable Logic Control system with a Distributed Control System for plant-wide process control. The estimated cost of this project is $11,992,000 The New Service Maintenance Facility project will demolish the existing metal sheds along the north-east corner of the plant and construct a new service maintenance facility. The estimated cost of this project is $11,695,000. One Headworks Improvement project will enhance the preliminary treatment process at the plant. The estimated cost of this project is $5,635,000. Page ix August 2, 2013

14 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM INTRODUCTION THIS PAGE INTENTIONALLY LEFT BLANK Page x August 2, 2013

15 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS PLANNED EXPENDITURE SUMMARY... 1 CS PLANNED EXPENDITURE SUMMARY RD & SAN PEDRO DROP STRUCTURE AIR DAMPER ADAMS BOULEVARD RELIEF SEWER ARLINGTON AND JEFFERSON DIVERSION SEWER ASSESSMENT ACT SEWERS AIR TREATMENT FACILITY EAST CENTRAL INTERCEPTOR SEWER (ECIS) - MISSION & JESSE BALDWIN HILLS AREA SEWER REHABILITATION BALLONA CARBON SCRUBBER FACILITY UPGRADE COASTAL INTERCEPTOR SEWER RELIEF SEWER CLEAN WATER FLEET REPLACEMENT TIER COLLECTION SYSTEM ADVANCED PLANNING (SANITATION) CONCORD STREET RELIEF SEWER CENTRAL OUTFALL SEWER (COS) AT 59TH STREET AND FOURTH AVENUE CENTRAL OUTFALL SEWER (COS) REHABILITATION MARKET STREET TO SLAUSON AVENUE CENTRAL OUTFALL SEWER (COS) REHABILITATION SLAUSON AVENUE TO VERNON AVENUE DACOTAH CARBON SCRUBBER FACILITY UPGRADE EMERGENCY SEWER REPLACEMENT ENTERPRISE STREET SIPHON MODIFICATION FIGUEROA STREET SEWER REPLACEMENT GENESEE CARBON SCRUBBER FACILITY UPGRADE HIGHLAND PARK EAGLE ROCK SEWER REHABILITATION HOLLYWOOD SEWER SANITATION MAINTENANCE YARD HUMBOLDT DROP STRUCTURE AIR DAMPER HUMBOLDT SCRUBBER FACILITY UPGRADE LA CIENEGA INTERCEPTOR SEWER (LCIS) REHABILITATION BLACKWELDER TO OLYMPIC LA CIENEGA INTERCEPTOR SEWER (LCIS) REHABILITATION JEFFERSON TO LA CIENEGA MAINTENANCE HOLE RESETTING Page xi August 2, 2013

16 WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS MANHATTAN PL SEWER REHABILITATION, S/O 4TH ST TO S/O 6TH ST MLK & RODEO CARBON SCRUBBER FACILITY UPGRADE NORTH HOLLYWOOD SEWER SANITATION MAINTENANCE YARD NORTHEAST INTERCEPTOR SEWER (NEIS) PHASE 2A NORMANDIE SEWER REPLACEMENT AND REHABILITATION NORS/ECIS CARBON SCRUBBER FACILITY UPGRADE NORTH OUTFALL SEWER REHAB PROGRAM NORTH OUTFALL SEWER REHAB UNIT 2 WESTERN TO VERMONT NORTH OUTFALL SEWER REHAB VERMONT TO TRINITY UNIT NORTH OUTFALL SEWER REHAB SAN PEDRO TO HOOPER (UNIT 5) NORTH OUTFALL SEWER REHAB HOOPER TO WILSON (UNIT 6) NORTH OUTFALL SEWER REHAB WILSON TO LA RIVER (UNIT 7) NOTF CARBON SCRUBBER FACILITY UPGRADE ODOR CONTROL SIERRA BONITA SCRUBBER FACILITY UPGRADE ODOR CONTROL ATWATER VILLAGE SCRUBBER PIERCE STREET & WOODMAN AVENUE DIVERSION SEWER PLANNED UPGRADE/REPLACEMENT PROGRAM RADFORD CARBON SCRUBBER FACILITY RESEDA SEWER SANITATION MAINTENANCE YARD RICHMOND SCRUBBER FACILITY UPGRADE SAN FERNANDO AND 110 FREEWAY SEWER REPLACEMENT SAN PEDRO SIPHON-UPSTREAM 30" CAST-IRON-PIPE REPLACEMENT SECONDARY SEWER RENEWAL PROGRAM SLAUSON AVE SEWER REHABILITATION - COMPTON AVENUE TO VAN NESS AVENUE SOUTH DISTRICT MAINTENANCE YARD IMPROVEMENTS SECONDARY SEWER RENEWAL PROGRAM - A04 AIRPORT & 78TH STREET SECONDARY SEWER RENEWAL PROGRAM - C01A CALIF & ABBOTT KINN Page xii August 2, 2013

17 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS SECONDARY SEWER RENEWAL PROGRAM - C08A PALISADES DR & SURFVIEW DR SECONDARY SEWER RENEWAL PROGRAM - C08B TEMESCAL CANYON ROAD & PALISADES DRIVE SECONDARY SEWER RENEWAL PROGRAM - C08C OCEAN AVE & TEMESCAL CANYON ROAD SECONDARY SEWER RENEWAL PROGRAM - E13 VICTORY AND BECK SECONDARY SEWER RENEWAL PROGRAM - E35 GLENOAKS AND MACLAY SECONDARY SEWER RENEWAL PROGRAM - E39 BALBOA BL AND VENTURA BL SECONDARY SEWER RENEWAL PROGRAM - 6TH ST. AND SAN VICENTE SECONDARY SEWER RENEWAL PROGRAM - H03 SUNSET AND RODEO SECONDARY SEWER RENEWAL PROGRAM - H05 BEVERLY AND FAIRFAX SECONDARY SEWER RENEWAL PROGRAM - H06 ADAMS & CRENSHAW SECONDARY SEWER RENEWAL PROGRAM - H11 BURNSIDE AND WILSHIRE SECONDARY SEWER RENEWAL PROGRAM - H14 WILSHIRE AND ORANGE SECONDARY SEWER RENEWAL PROGRAM - H15 JUNE ST AND WILSHIRE SECONDARY SEWER RENEWAL PROGRAM - H16 CRENSHAW AND VENICE SECONDARY SEWER RENEWAL PROGRAM - H19 ARDEN BLVD AND 3RD ST SECONDARY SEWER RENEWAL PROGRAM - H20 2ND ST. AND EDGEMONT SECONDARY SEWER RENEWAL PROGRAM - H21 OLYMPIC BLVD AND OXFORD SECONDARY SEWER RENEWAL PROGRAM - H23 VERMONT & OLYMPIC SECONDARY SEWER RENEWAL PROGRAM - H24 SUNSET BLVD AND RENO ST SECONDARY SEWER RENEWAL PROGRAM - H SECONDARY SEWER RENEWAL PROGRAM - H33 KENMORE AND FOUNTAIN SECONDARY SEWER RENEWAL PROGRAM - N01 BUDLONG AND LEIGHTON SECONDARY SEWER RENEWAL PROGRAM - N02 SAN PEDRO AND 31ST ST SECONDARY SEWER RENEWAL PROGRAM- N03 ADAMS BLVD & COMPTON AVE SECONDARY SEWER RENEWAL PROGRAM - N05 8TH ST AND SOTO ST SECONDARY SEWER RENEWAL PROGRAM - N06A 36TH PL & VERMONT SECONDARY SEWER RENEWAL PROGRAM - N06B ADAMS BLVD & HILL ST SECONDARY SEWER RENEWAL PROGRAM - N07 BROADWAY & PICO Page xiii August 2, 2013

18 WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS SECONDARY SEWER RENEWAL PROGRAM - N12 PARK VIEW & BEVERLY BLVD SECONDARY SEWER RENEWAL PROGRAM - P09 GRIFFIN AVE AND AVENUE SECONDARY SEWER RENEWAL PROGRAM - P15 LEWIS ST & SAYLIN SECONDARY SEWER RENEWAL PROGRAM - P17 CYPRESS AVE & DIVISION ST SECONDARY SEWER RENEWAL PROGRAM- P20 COLORADO BL & TOWNSEND AV SECONDARY SEWER RENEWAL PROGRAM - P21A LOS FELIZ BLVD & REVERE AVE SECONDARY SEWER RENEWAL PROGRAM - P21B GLENDALE BLVD. AND ROWENA AVE SECONDARY SEWER RENEWAL PROGRAM - P21C LOS FELIZ BLVD. AND 5 FWY SECONDARY SEWER RENEWAL PROGRAM - S01 VERNON AND WESTERN SECONDARY SEWER RENEWAL PROGRAM - S04 SLAUSON AVE AND VAN NESS AVE SECONDARY SEWER RENEWAL PROGRAM - S05 10TH AVE AND 71ST ST SECONDARY SEWER RENEWAL PROGRAM - S06 VERMONT & 76TH ST SECONDARY SEWER RENEWAL PROGRAM- S07-76TH ST. & GRAND AVE SECONDARY SEWER RENEWAL PROGRAM- S08- MAIN & MANCHESTER SECONDARY SEWER RENEWAL PROGRAM - S10 FLORENCE AV & WESTERN AV SECONDARY SEWER RENEWAL PROGRAM - S11 WESTERN AVE AND 92ND ST SECONDARY SEWER RENEWAL PROGRAM - S SECONDARY SEWER RENEWAL PROGRAM - S14 HOOVER AND VERNON SECONDARY SEWER RENEWAL PROGRAM - S16 AVALON & VERNON SECONDARY SEWER RENEWAL PROGRAM - S17 COMPTON AND VERNON SECONDARY SEWER RENEWAL PROGRAM - T01 3RD ST & MESA ST SECONDARY SEWER RENEWAL PROGRAM - T04 S ALMA ST & W 10TH ST SECONDARY SEWER RENEWAL PROGRAM - T05 CHANNEL ST & GAFFEY ST SECONDARY SEWER RENEWAL PROGRAM - T06A ANAHEIM ST AND BROAD AVE SECONDARY SEWER RENEWAL PROGRAM - T06B FRIES AV & PIER A ST SECONDARY SEWER RENEWAL PROGRAM - T08 ALAMEDA AND ANAHEIM SECONDARY SEWER RENEWAL PROGRAM - U11 BUNDY & SAN VINCENTE Page xiv August 2, 2013

19 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS SECONDARY SEWER RENEWAL PROGRAM - U14 OVERLAND AND 10 FREEWAY SECONDARY SEWER RENEWAL PROGRAM - U16 SELBY AND LA GRANGE SECONDARY SEWER RENEWAL PROGRAM - U20 BEVERLY GLEN & QUITO LANE SECONDARY SEWER RENEWAL PROGRAM - U21 GAYLEY AND LE CONTE SECONDARY SEWER RENEWAL PROGRAM - U23 DAVID & CANFIELD AV SECONDARY SEWER RENEWAL PROGRAM - Z13 MORAY & W 25TH ST SECONDARY SEWER RENEWAL PROGRAM- Z18A CENTURY BL & MAIN ST SECONDARY SEWER RENEWAL PROGRAM- Z18B IMPERIAL BL & AVALON BL UPPER BEACHWOOD EASEMENT MAINTENANCE HOLE ADDITION VENICE AND HIGHLAND MH SEWER VENICE BLVD INTERCEPTOR SEWER U WASHINGTON GRIFFITH LONG BEACH SEWER REPLACEMENT WILSHIRE AREA OLYMPIC SEWER REHABILITATION WILSHIRE AREA SYSTEM SEWER REHABILITATION WEST LA SEWER SANITATION MAINTENANCE YD WLAIS REHABILITATION OVERLAND TO KELTON DCT PLANNED EXPENDITURE SUMMARY DCT AERATION TANKS CONCRETE REHABILITATION DCT ADVANCED WATER PURIFICATION FACILITY DCT BALBOA LAKE PUMP REPLACEMENT DCT CAPITAL EQUIPMENT REPLACEMENT PROGRAM (CERP) DCT CHANNEL 1 AIR SPARGERS IMPROVEMENTS DCT ELECTRICAL POWER SYSTEM MODIFICATIONS DCT ELECTRICAL VAULT REHABILITATION DCT EMERGENCY BACKUP POWER DCT GRIT CHAMBER BACKUP FLUSH SYSTEM DCT MAINTENANCE FACILITIES RELOCATION DCT MULTI-PURPOSE AND OFFICE FACILITY Page xv August 2, 2013

20 WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS DCT MULTI-PURPOSE AND OFFICE FACILITY EXHIBITS DCT ODOR CONTROL SYSTEM UPGRADE DCT-PHASE 2 SCREW PUMPS REPLACEMENT DCT SCREW PUMP 3 & 4 STARTER UPGRADES DCT SOLAR PANEL GUARD RAILS DCT WASTEWATER CONTROL SYSTEM REPLACEMENT HTP PLANNED EXPENDITURE SUMMARY HTP 1-MILE OUTFALL CHEMICAL LINE UPGRADE HTP 1-MILE OUTFALL STRUCTURE REHABILITATION HTP 5-MILE OUTFALL REBALLASTING HTP ABRASIVE BLAST & STEAM CLEANING FACILITY HTP AMMONIA REMOVAL PILOT STUDY HTP AUXILIARY BOILER NO 2 REPLACEMENT HTP CAPITAL EQUIPMENT REPLACEMENT PROGRAM HTP CAPITAL UTILITY REPLACEMENT PROGRAM (CURP) HTP CENTRATE INFLUENT FLOW EQUALIZATION HTP CHEMICAL LINES UPGRADES HTP COMPUTER ROOM COOLING SYSTEM UPGRADE HTP DIGESTER GAS UTILIZATION COOLING WATER SYSTEM HTP DIGESTER EXPANSION LITIGATION PHASE HTP DIGESTER GAS DESULFURIZATION FACILITY IMPROVEMENTS HTP DIGESTER SCREENING FACILITY IMPROVEMENTS (DSF) HTP DILUTE POLYMER PUMP IMPROVEMENT HTP EFFLUENT PUMPING PLANT HEADER REPLACEMENT HTP FLARES SYSTEM UPGRADE HTP FOG RECEIVING STATION EXPANSION HTP FOG RECEIVING STATION NORTH Page xvi August 2, 2013

21 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS HTP G STREET PIPE RACK STRUCTURAL REHAB HTP GRIT HANDLING IMPROVEMENTS HTP HEADWORKS FINE SCREENS INSTALLATION HTP HEADWORKS GRIT CLASSFIER RELOCATION HTP HEADWORKS ODOR CONTROL UPGRADE HTP IPS ODOR CONTROL IMPROVEMENTS HTP PREGERSON BUILDING DATA HIGHWAY DISTRIBUTION ROOM HTP PREGERSON BUILDING FIRST FLOOR MODIFICATION HTP PRIMARY EFFLUENT CHANNEL COVER PLATE REPLACEMENT HTP PRIMARY INFLUENT CHANNEL AIR SPARGERS HTP PRIMARY INFLUENT GATES REPLACENT HTP REACTOR 1 & 2 UPGRADE HTP REACTOR MICRO-OXYGENATION AND BYPASS INSTALLATION HTP SCREENINGS HANDLING IMPROVEMENT HTP SECONDERY CLARIFIERS STRUCTURAL REHABILITATION PHASE I HTP SECONDERY CLARIFIERS STRUCTURAL REHABILITATION PHASE II HTP SECONDARY CLARIFIERS EXPANSION HTP SERVICE WATER FACILITY UPGRADE HTP SOLIDS HANDLING AND TRUCK LOADING FACILITY HTP SUBSTATION SEPARATION HTP SERVICE WATER FACILITY SOUTH SIDE CLOTH FILTER INSTALLATION HTP TRUCK LOADING FACILITY ODOR CONTROL MODERNIZATION HTP WASTEWATER CONTROL SYSTEM REPLACEMENT LAG PLANNED EXPENDITURE SUMMARY LAG CAPITAL EQUIPMENT REPLACEMENT PROGRAM (CERP) LAG DISINFECTION PROCESS GATE REPLACEMENT LAG ELECTRICAL POWER SYSTEM MODS LAG HIGH PRESSURE EFFLUENT AND AIR PIPING IMPROVEMENTS Page xvii August 2, 2013

22 WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS LAG NITRIFICATION/DENITRIFICATION BLOWER INSTALLATION LAG NITRIFICATION DENITRIFICATION BLOWER PROCUREMENT LAG PERSONNEL BUILDING LAG PERSONNEL TRAILERS REPLACEMENT LAG POND MEMBRANE LINER LAG SOLAR PANELS INSTALLATION LAG TERTIARY FILTER REPLACEMENT LAG WASTEWATER CONTROL SYSTEM REPLACEMENT PP PLANNED EXPENDITURE SUMMARY FRIES PUMPING PLANT 666 REHABILITATION HAWAIIAN & B PUMPING PLANT 677 REHABILITAITON HIGHBURY PUMPING PLANT 604 REHABILITATION PUMPING PLANT GENERATORS REPLACEMENT PHASE PP 601 MANCHESTER GENERATOR REPLACEMENT PP 606 DAKOTAH GENERATORS REPLACEMENT PP 669 HARRIS PLACE GENERATOR REPLACEMENT PP 672 MURDOCK & I GENERATOR REPLACEMENT PP TH & VERMONT GENERATOR REPLACEMENT SAN PEDRO PUMPING PLANT 691 REHABILITATION SUNSET PP632 ELECTRICAL SYSTEM REHAB TERMINAL WAY PP 671 REHABILITATION VENICE PUMPING PLANT 646 GENERATORS REPLACEMENT VENICE PP 646 PUMP REPLACEMENT VENICE PP DISCHARGE MANIFOLD REPLACEMENT VENICE PP DUAL FORCE MAIN VENICE PP VIBRATION REHABILITATION WILMINGTON PUMPING PLANT 676 REHABILITATION Page xviii August 2, 2013

23 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS SW PLANNED EXPENDITURE SUMMARY BOND ASSISTANCE PROGRAM BUREAU-WIDE SECURITY SYSTEM COMMUNITY AND PUBLIC INVOLVEMENT AND PROJECT MITIGATION CONSTRUCTION SERVICES CONTRACT (CISCO) CS WASTEWATER CONTROL SYSTEM REPLACEMENT ENVIRONMENTAL LEARNING CENTER EXHIBITS & MEDIA EMPAC SYSTEM REPLACEMENT EQUIPMENT UPGRADE/REPLACEMENT FOR TREATMENT PLANTS GREEN ACRES CAPITAL EQUIPMENT REPLACEMENT PROGRAM (CERP) HUMBOLDT NEIGHBORHOOD STORMWATER GREENWAY SEP LABORATORY EQUIPMENT PROCUREMENT SANTA MONICA URBAN RUNOFF RECYCLING FACILITY WASTEWATER NETWORK SERVERS CAPITAL EQUIPMENT REPLACEMENT PROGRAM WASTEWATER SYSTEM FINANCIAL CONSULTANT (BONDS) WASTEWATER SYSTEM AUDITOR TIWRP PLANNED EXPENDITURE SUMMARY TIWRP AWPF PRODUCT WATER HARDNESS STABILIZATION SYSTEM TIWRP AWPF ULTIMATE EXPANSION TIWRP AWPF VARIBLE FREQUENCY DRIVES FOR PRODUCT WATER PUMPS TIWRP BIOGAS UPGRADE SYSTEM TIWRP BLOWER REPLACEMENT TIWRP CAPITAL EQUIPMENT REPLACEMENT PROGRAM (CERP) TIWRP DISSOLVED AIR FLOATATION TANK MODIFICATION TIWRP FERROUS CHLORIDE SYSTEM EQUIPMENT REPLACEMENT TIWRP FINAL CLARIFIERS REHABILITATION TIWRP FIRE PROTECTION SYSTEM REPLACEMENTS TIWRP HEADWORKS IMPROVEMENTS Page xix August 2, 2013

24 WASTEWATER CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS TIWRP HIGH PRESSURE EFFLUENT DISINFECTION TIWRP NEW SERVICE MAINTENANCE FACILITY TIWRP PLANT INFLUENT SAMPLING SYSTEM TIWRP POWER/ENERGY MANAGEMENT TIWRP PRIMARY CLARIFIER WEIRS MODIFICATIONS TIWRP RENEWABLE ENERGY SLURRY FRACTURE INJECTION # TIWRP TERTIARY FILTER INFLUENT PUMP VARIABLE FREQUENCY DRIVE REPLACEMENT TIWRP TERTIARY FILTER REHABILITATION TIWRP TIRE SITE IMPROVEMENTS TIWRP WASTEWATER CONTROL SYSTEM REPLACEMENT Page xx August 2, 2013

25 CITY OF LOS ANGELES WASTEWATER CAPITAL IMPROVEMENT PROGRAM PLANNED EXPENDITURE SUMMARY CATEGORY 2 nd Year 20017/ /19 COLLECTION SYSTEMS 88,008,131 74,017, ,365, ,538, ,206, ,769, ,454, ,509, ,295,820 37,807,960 DONALD C. TILLMAN WATER RECLAMATION PLANT 16,021,947 18,216,650 21,119,879 31,303,085 24,923,455 53,533, ,755, ,769, ,201,248 0 HYPERION TREATMENT PLANT 37,074,699 53,554,438 50,277,667 24,323,566 36,137,678 54,439,234 30,688,380 5,981, LA/GLENDALE WATER RECLAMATION PLANT 12,725,396 8,812,650 3,528,698 6,289,484 5,298,504 4,804, PUMPING PLANTS 3,970,120 8,720,739 19,963,306 29,125,194 27,906,862 6,764, SYSTEM WIDE 11,640,509 8,122,685 6,037,263 23,491,663 8,384,363 11,011,774 9,572,217 12,186,000 10,337,000 2,350,000 TERMINAL ISLAND WATER RECLAMATION PLANT 9,823,015 19,837,400 41,627,084 35,965,658 13,428,223 11,899,743 9,271, , WCIP 179,263, ,282, ,919, ,036, ,285, ,222, ,742, ,606, ,834,068 40,157,960 Page 1 August 2, 2013

26 WASTEWATER CAPITAL IMPROVEMENT PROGRAM THIS PAGE INTENTIONALLY LEFT BLANK Page 2 August 2, 2013

27 COLLECTION SYSTEM (CS) CS PLANNED EXPENDITURE SUMMARY PROJECT TITLE 2 nd Year 20017/ /19 4TH AVE SLAUSON SEWER RREHAB 4,615,562 1,477, & SAN PEDRO D S AIR DAMPER 635, ADAMS BL RELIEF SEWER , , ,940 5,398,842 8,105,898 2,833, ARLINGTON/JEFFERSON DVRSN SWR 41, , , ASSESSMENT ACT SWRS 464, , , , , , , , , ,000 ATF ECIS - LA CNGA & JEFF UPG 28, ATF ECIS - MISSION & JESSE 9,603,760 4,524, ATF NCOS SIPHON UPGRADE 81, BALDWIN HILLS AREA SWR REHAB , , ,988 3,646,449 22, BALLONA CARBON SCRUB FAC UPG ,000 88, , , CIS RELIEF SWR 5,500, CLEAN WATER FLEET REPL T2 850,000 1,000, ,000 1,050,000 1,500, , COLL SYS ADV PLANNING (BOS) 2,250,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 0 CONCORD STREET RELIEF SWR , , ,860 4,009,920 COS 59TH ST AND FOURTH AVE 217,804 64,940 7, COS REHAB MARKET ST TO SLAUSON 8,751,115 7,355,844 77, COS REHAB SLAUSON TO VERNON 567, , ,385 4,074,245 3,813,165 2,843, DACOTAH CARBON SCRUB FAC UPG ,000 64, ,000 43, EMERGENCY SEWER REPLACEMENT 13,060,000 11,060,000 9,060,000 9,300,000 9,547,000 9,000,000 9,274,000 9,552,000 9,840,000 0 ENTERPRISE ST SIPHON MOD 0 50, , ,924 1,145,516 7, FIGUEROA ST SWR REPLCEMENT 0 34, , ,440 2,264,866 4,794,496 1,449, Page 3 CS August 2, 2013

28 COLLECTION SYSTEM (CS) PROJECT TITLE 2 nd Year 20017/ /19 GENESEE CARBON SCRUB FAC UPG 135, , , , HIGHLAND PK EAGLE ROCK SWR RHB , ,080 5,047,868 7,466, , HOLLYWOOD SEWER MAINT YARD , , ,160 7,885,816 6,482,984 5, HUMBOLDT DRP STRUCT AIR DAMPER 795, HUMBOLDT SCRUBBER FACILITY UPG ,000 85, , , LCIS REHAB BLACKWELDER OLYMPIC 907,800 2,307,030 1,885,910 2,643,980 12,198,920 12,198,920 3,792, LCIS REHAB JEFFERSON LA CIEN 318,160 3,794,345 1,794,634 5, MAINTENANCE HOLE RESETTING 698, , , , , , , , , ,000 MANHATTAN 4TH SWR REHAB , , ,900 1,180,390 4, MLK & RODEO CARB SCRUB FAC UPG 78, , , N HOLLYWOOD SEWER MAINT YARD 528, ,820 71, , ,000 6,000,440 5,255, NEIS 2A 3,307,280 1,312,120 35,665,184 51,978,540 51,745,860 33,649, NORMANDIE SWR REPL/REHAB 203,180 2,793,524 7,180,312 4,552,458 29, NORS/ECIS CARBON SCRUB FAC UPG 78, , , NOS REHAB PROGRAM ,291,956 9,225,475 5,352,852 3,181,140 2,769,812 0 NOS REHAB U-2 WESTERN TO VERMONT 368,240 4,273,360 4,285,152 3,075,598 30, NOS REHAB U-3 VERMONT TO TRINITY 398, ,000 1,779,131 7,749,345 6,192,864 47, NOS REHAB U-5 SAN PEDRO HOOPER 272,460 3,207,145 3,214,794 2,308,670 22, NOS REHAB U-6 HOOPER WILSON , , , ,720 4,029,556 8,504,748 0 NOS REHAB U-7 WILSON LA RIVER , , ,660 1,422,985 5,475,188 4,364, NOTF CARBON SCRUBBER FAC UPG 0 84,000 84, , , ODOR CONTROL SIERRA BONITA FAC UPG , , , , ODOR CTRL ATWATER VILLAGE SCR 764,979 24, Page 4 CS August 2, 2013

29 COLLECTION SYSTEM (CS) PROJECT TITLE 2 nd Year 20017/ /19 PIERCE & WOODMAN DIVER SWR 0 33, , , , PLANNED UPGR REPLC PROG ,000 5,000,000 65,100,000 65,100,000 68,225,000 68,225,000 0 RADFORD CARBON SCRUB FAC UPG 81,000 81, , , RESEDA SEWER MAINT YARD , , ,700 8,024,892 6,605,308 5, RICHMOND SCRUBBER FACILITY UPG 0 84,000 84, , , SAN FERNANDO & 110 FWY SWR RPL 660, SAN PEDRO SIPHON UPSTREAM 30" ,840 1,364, , SECONDARY SWR RENEWAL PROG 0 0 5,734,090 29,694,416 30,177,637 45,904,000 42,925,000 40,946,000 32,967,000 32,967,000 SLAUSON COMPTON SWR REHAB 488,120 4,280,880 9,919,458 9,659, , SOUTH DISTRICT YARD IMPRV 0 1,005, ,272,593 8,616, , ,400 81,040 SSRP A04 AIRPORT & 78TH ST 19, SSRP C01A CALIF & ABBOTT KINN 527, SSRP C08A PALISADES & SURFVIEW 87, SSRP C08B TEMESCAL & PALISADES 201, SSRP C08C OCEAN & TEMESCAL 262, SSRP E13 VICTORY & BECK 2,640 88,060 66, SSRP E35 GLENOAKS & MACLAY 198, SSRP E39 BALBOA BL & VENTURA BL 1,020,432 4, SSRP H02 6TH & SAN VICENTE 438, , SSRP H03 SUNSET & RODEO 2,209, , SSRP H05 BEVERLY & FAIRFAX 274, , SSRP H06 ADAMS & CRENSHAW 54, , , SSRP H11 BURNSIDE & WILSHIRE 15, , , Page 5 CS August 2, 2013

30 COLLECTION SYSTEM (CS) PROJECT TITLE 2 nd Year 20017/ /19 SSRP H14 WILSHIRE & ORANGE 242, SSRP H15 JUNE & WILSHIRE 304,313 1, SSRP H16 CRENSHAW & VENICE 219,320 57, SSRP H19 ARDEN BLVD & 3RD ST 268, SSRP H20 2ND & EDGEMONT 1,389,175 7, SSRP H21 OLYMPIC & OXFORD 148, SSRP H23 VERMONT & OLYMPIC 1,160,167 7, SSRP H24 SUNSET BL & RENO ST 171, SSRP H , , ,958 2,539,202 26, SSRP H33 KENMORE & FOUNTAIN 570,844 4, SSRP N01 BUDLONG & LEIGHTON 300,093 2, SSRP N02 SAN PEDRO & 31ST 244, SSRP N03 ADAMS BL & COMPTON AV 142,640 2,184, ,460 1, SSRP N05 8TH & SOTO 1,082, , SSRP N06A 36TH PL & VERMONT 118,560 1,626, , SSRP N06B ADAMS & HILL 114,720 1,954,055 1,474,465 7, SSRP N07 BROADWAY & PICO 155,747 1,820,189 3,719,177 28, SSRP N12 PARK VIEW & BEVERLY 1,786,139 14, SSRP P09 GRIFFIN AVE & AVE ,816 4, SSRP P15 LEWIS & SAYLIN 1,049,575 8, SSRP P17 CYPRESS & DIVISION 134, ,240 2,865, , SSRP P20 COLORADO & TOWNSEND 96, ,320 1,698, , SSRP P21A LOS FELIZ & REVERE 1,082,257 7, Page 6 CS August 2, 2013

31 COLLECTION SYSTEM (CS) PROJECT TITLE 2 nd Year 20017/ /19 SSRP P21B GLENDALE & ROWENA 205,938 1, SSRP P21C LOS FELIZ & 5 FWY 392,027 2, SSRP S01 VERNON & WESTERN 41, ,835 74, SSRP S04 SLAUSON & VAN NESS 49, , , SSRP S05 10TH AV & 71 ST 672, SSRP S06 VERMONT & 76TH ST 200, SSRP S07 76TH ST & GRAND AVE 58, ,486 2, SSRP S08 MAIN & MANCHESTER 80, , , SSRP S10 FLORENCE & WESTERN 182,970 1,132, , SSRP S11 WESTERN & 92 29, , , SSRP S ,514 30, , , SSRP S14 HOOVER & VERNON 118,560 1,558,268 1,577,012 10, SSRP S16 AVALON & VERNON 661, , SSRP S17 COMPTON & VERNON 455, , SSRP T01 3RD & MESA 198, SSRP T04 S ALMA & W 10TH ST 1,413,193 9, SSRP T05 CHANNEL & GAFFEY ST 348,804 10, SSRP T06A ANAHEIM ST & BROAD 1,726,860 14, SSRP T06B FRIES & PIER A 549,520 5, SSRP T08 ALAMEDA & ANAHEIM 215, ,803 7, SSRP U11 BUNDY & SAN VINCENTE 638,281 3, SSRP U14 OVERLAND & 10 FWY 805, , SSRP U16 SELBY & LA GRANGE 315,438 5, Page 7 CS August 2, 2013

32 COLLECTION SYSTEM (CS) PROJECT TITLE 2 nd Year 20017/ /19 SSRP U20 BEV GLEN & QUITO LN 303, SSRP U21 GAYLEY & LE CONTE 283, SSRP U23 DAVID & CANFIELD 1,478,461 8, SSRP Z13 MORAY & W 25TH 305,320 1, SSRP Z18A CENTURY & MAIN 223, ,840 4,538, , SSRP Z18B IMPERIAL & AVALON 331, ,360 7,062,010 1,114, UPPER BEACHWOOD EASEMNT MH ADD 206, ,600 36, , , VENICE & HIGHLAND MH SWR 28, VENICE BLVD INTERCEPTOR U2 18, , ,120 2,752,680 1,709, WASH GRIFFITH LB SWR REPLC 1,956,149 12, WILSHIRE AREA OLYM SWR REHAB , , ,320 4,047,725 4,733,679 34, WILSHIRE AREA SYS SWR REHAB , , ,700 2,478,897 6,076, , WLA SEWER MAINT YARD 0 17, , , , ,600 3,927,066 9,677, WLAIS REHAB OVERLAND TO KELTON 120,400 1,675,804 2,380,096 14, CS 88,008,131 74,017, ,365, ,538, ,206, ,769, ,454, ,509, ,295,820 37,807,960 Page 8 CS August 2, 2013

33 COLLECTION SYSTEM (CS) 4TH AVENUE SLAUSON SEWER REHABILITATION 5 8 South Los Angeles SZC TH AVE SLAUSON SWR REHAB PROJECT DESCRIPTION: This project will rehabilitate 1.2 miles of structurally deteriorated 75-inch diameter reinforced concrete pipe sewer (built in 1924) by sliplining method. The project location is on Slauson Avenue from Van Ness Avenue to 4th Avenue, and on 4th Avenue from Slauson Avenue to Vernon Avenue. PROJECT MANAGER: Sean Zahedi Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 1,366, ,366,160 PLANS CONSULTANT (CTP) 342, ,300 CONSTRUCTION (CONS) 2,649,225 3,455,802 1,306, ,411,487 CONST MGT CITY (FACM) 1,059,200 1,104, , ,332,960 CM CONSULTANT (CTCM) 53,000 55,200 2, ,500 5,469,885 4,615,562 1,477, ,563,407 Page 9 CS August 2, 2013

34 COLLECTION SYSTEM (CS) 23RD & SAN PEDRO DROP STRUCTURE AIR DAMPER East, South Los Angeles SZC & SAN PEDRO D S AIR DAMPER PROJECT DESCRIPTION: This project will design and install a manually adjustable air damper in the air return lines of the existing 23rd and San Pedro Drop Structure. To provide access, the damper will be housed in a concrete vault. PROJECT MANAGER: Al Bazzi Phone: (310) Office: Environmental Engineering Division (BOE) PLANS CITY (FAP) 132, ,400 PLANS CONSULTANT (CTP) 43, ,000 CONSTRUCTION (CONS) 0 540, ,000 CONST MGT CITY (FACM) 8,320 80, ,480 CM CONSULTANT (CTCM) 1,400 15, , , , ,580 Page 10 CS August 2, 2013

35 COLLECTION SYSTEM (CS) ADAMS BOULEVARD RELIEF SEWER South Los Angeles SZC11474 ADAMS BLVD RELIEF SWR PROJECT DESCRIPTION: This project will construct approximately 8,865 linear feet of 36-inch relief sewer in Adams Boulevard from West Boulevard to Fairfax Avenue, parallel to the existing sewers in Adams Boulevard, and will replace 250 linear feet of 18-inch and 100 linear feet of 15-inch sewer. The project boundaries are Adams Boulevard between Dunsmuir Avenue and the LCSFVRS (La Cienega - San Fernando Valley Relief Sewer) at Fairfax Avenue. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) , , ,440 18, ,183,840 PLANS CONSULTANT (CTP) ,700 41,600 22, ,800 CONSTRUCTION (CONS) ,416,062 7,100,718 2,684, ,201,314 CONST MGT CITY (FACM) , , , ,021,840 CM CONSULTANT (CTCM) ,900 47,900 2, , , , ,940 5,398,842 8,105,898 2,833, ,594,594 Page 11 CS August 2, 2013

36 COLLECTION SYSTEM (CS) ARLINGTON AND JEFFERSON DIVERSION SEWER , 10 South Los Angeles SZC12484 ARLINGTON/JEFFERSON DVRSN SWR PROJECT DESCRIPTION: This project will construct a 6-inch diameter maintenance hole on the existing 20-inch sewer in Jefferson Boulevard, construct an 8-inch by 15-inch box diversion structure with stop logs on the 30-inch Vitrified Clay Pipe (VCP) sewer along Arlington Avenue, construct a junction structure with maintenance hole on the 42-inch sewer along Arlington, Install approximately 23 linear feet of 42-inch VCP between the junction structure and the diversion structure, and install approximately 29 linear feet of 21-inch VCP between the diversion structure and the maintenance hole on Jefferson Blvd, and modify maintenance hole channel. PROJECT MANAGER: Richard Pedrozo Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 86,190 40,200 5, ,290 PLANS CONSULTANT (CTP) 8,300 1, ,450 CONSTRUCTION (CONS) , , ,000 CONST MGT CITY (FACM) ,010 4, ,530 CM CONSULTANT (CTCM) 0 0 5, ,390 94,490 41, , , ,121,660 Page 12 CS August 2, 2013

37 COLLECTION SYSTEM (CS) ASSESSMENT ACT SEWERS 21 ALL ALL VARIOUS PROJECT DESCRIPTION: This project will provide funding of a portion of local sewer projects, which are primarily financed by benefiting property owners through the Assessment Act proceeding. This funding pays for incurred costs which cannot be assessed, including engineering and other incidental project costs which exceed the limitation established by the City Council. Other funding includes the portion of the project costs to provide for future, additional capacity beyond the immediate local sewer requirements of the Assessment District and the proportionate cost for offsite sewers which cannot be assessed to the owners within the assessment district. PROJECT MANAGER: Mary Marcus Phone: (818) Office: Valley District (BOE) PLANS CITY (FAP) 1,026, , , , , , , , , , ,000 2,208,000 PLANS CONSULTANT (CTP) CONSTRUCTION (CONS) 3,300, , , , , , , , , , ,000 5,850,000 CONST MGT CITY (FACM) 1,350, , , , , , , , , , ,000 3,000,000 CM CONSULTANT (CTCM) ,676, , , , , , , , , , ,000 11,058,000 Page 13 CS August 2, 2013

38 COLLECTION SYSTEM (CS) AIR TREATMENT FACILITY EAST CENTRAL INTERCEPTOR SEWER (ECIS) - MISSION & JESSE East SZC11545 ATF ECIS - MISSION & JESSE PROJECT DESCRIPTION: This project will design and construct an Air Treatment Facility (ATF) for the East Central Interceptor Sewer (ECIS). This ATF will be designed to treat foul air from this location of turbulent flow at the ECIS pipeline. This location includes a drop structure at Mission Street & Jesse Road. The ATF will consist of a building with a control room and treatment trains composed of cylindrical biotrickling filters and cylindrical carbon vessels. Landscaping around the ATF will also be included. PROJECT MANAGER: Gus Malkoun Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 1,086, ,086,080 PLANS CONSULTANT (CTP) 89, ,900 CONSTRUCTION (CONS) 3,508,000 8,440,000 4,300, ,248,000 CONST MGT CITY (FACM) 998, , , ,967,120 CM CONSULTANT (CTCM) 180, , , ,000 5,862,540 9,603,760 4,524, ,991,100 Page 14 CS August 2, 2013

39 COLLECTION SYSTEM (CS) BALDWIN HILLS AREA SEWER REHABILITATION 23 8, 10 South Los Angeles SZC11654 BALDWIN HILLS AREA PRIM SWR RE PROJECT DESCRIPTION: This project will rehabilitate approximately 7,500 linear feet of sewers constructed around 1920 ranging from 18 to 42 inches in diameter. The reaches are located in Exposition Boulevard, Rodeo Road, Arlington Avenue, La Cienega Boulevard, National Boulevard, and Crescent Heights Boulevard. PROJECT MANAGER: Andrias Badalian Phone: (213) Office: Wastewater Conveyance Engineering Division (BOE) PLANS CITY (FAP) 49, , , , ,840 PLANS CONSULTANT (CTP) 7, ,900 29,600 1, ,100 CONSTRUCTION (CONS) ,128 3,204, ,676,477 CONST MGT CITY (FACM) , ,000 22, ,720 CM CONSULTANT (CTCM) ,900 20, ,000 56, , , ,988 3,646,449 22, ,136,137 Page 15 CS August 2, 2013

City of Los Angeles Bureau of Sanitation Additional Clean Water Projects Constructed with 10-Year Rate Adjustment

City of Los Angeles Bureau of Sanitation Additional Clean Water Projects Constructed with 10-Year Rate Adjustment Additional Clean Water s Constructed with 10-Year Rate Adjustment 1 COLLECTION SYSTEM COLL SYSTEM CONTROL SYSTEM REPL Citywide 2013 $4 M 2 COLLECTION SYSTEM ODOR CTRL ATWATER VILLAGE SCR 4,13 2013 $1 M

More information

WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS 2009/10 2018/19) CATEGORIES:

WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS 2009/10 2018/19) CATEGORIES: WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS ) CATEGORIES: COLLECTION SYSTEM DONALD C. TILLMAN WATER RECLAMATION PLANT HYPERION TREATMENT PLANT

More information

WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS 2006/07 2015/16) CATEGORIES:

WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS 2006/07 2015/16) CATEGORIES: WASTEWATER CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS AND 10-YEAR EXPENDITURE PLAN (FISCAL YEARS ) CATEGORIES: COLLECTION SYSTEM DONALD C. TILLMAN WATER RECLAMATION PLANT EARTHQUAKE RECOVERY HYPERION

More information

ODOR TASKS in SETTLEMENT AGREEMENT

ODOR TASKS in SETTLEMENT AGREEMENT ODOR TASKS in SETTLEMENT AGREEMENT IV. DEFINITIONS Deliverable shall mean any written reports required to be prepared and/or submitted pursuant to Sections VI (Reporting Requirements) and VIII (Supplemental

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE FORM GEN. 160 CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: November 2 4, 2 01 4 CAO File No. 0640-01386-0022 To: The Honorable Members of the City Council From: Sharon M. Tso, Chief Legislative

More information

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The

More information

SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco

SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco Emilio Cruz AGM, Infrastructure Agenda + San Francisco s Sewer System + San Francisco

More information

Distribution: Jonathan Bishop, Executive Officer Los Angeles Regional Water Quality Control Board 320 W. 4 th Street, Suite 200 Los Angeles, CA 90013

Distribution: Jonathan Bishop, Executive Officer Los Angeles Regional Water Quality Control Board 320 W. 4 th Street, Suite 200 Los Angeles, CA 90013 Distribution: Kathi Moore, Chief Clean Water Act Compliance Office (WTR-7) Water Division U.S. Environmental Protection Agency, Region 9 75 Hawthorne Street San Francisco, CA 94105 Jonathan Bishop, Executive

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

Click to edit Master title style

Click to edit Master title style Click to edit Master title style Sewer System Improvement Program (SSIP) Karen Kubick, PE Wastewater Enterprise Capital Program Director San Francisco Public Utilities Commission Construction Managers

More information

Cambridge Wastewater Treatment Facility

Cambridge Wastewater Treatment Facility Cambridge Wastewater Treatment Facility Emergency Situations If you have a water or sewer emergency that relates to the City s utility system call the Public Works office at 763-689-1800 on normal working

More information

William E. Dunn Water Reclamation Facility. Facility Overview & Information

William E. Dunn Water Reclamation Facility. Facility Overview & Information William E. Dunn Water Reclamation Facility Facility Overview & Information General Area Served: Plant History Facility Highlights Northern Pinellas County St. Joseph Sound to East Lake Road (E/W) Tampa

More information

The City of Boulder 75 th Street Wastewater Treatment Facility

The City of Boulder 75 th Street Wastewater Treatment Facility The City of Boulder 75 th Street Wastewater Treatment Facility Wastewater Collection and Treatment The Foundation of Public Health Wastewater Collection Boulder s wastewater collection system, also known

More information

COUNTY OF LOS ANGELES DEPARTMENT OF MENTAL COUNTYWIDE CHILDREN S SERVICES TBS PROVIDER DIRECTORY SA PROVIDER NAME CONTACT

COUNTY OF LOS ANGELES DEPARTMENT OF MENTAL COUNTYWIDE CHILDREN S SERVICES TBS PROVIDER DIRECTORY SA PROVIDER NAME CONTACT 1 Children's Bureau of Southern California 921 West Ave. J, Suite C Lancaster, Ca 93534 Ph: (661) 949-0131 Fax: (661) 729-8912 1 Children's Bureau of So Ca- Antelope Valley 1529 E. Palmdale Blvd. Suite

More information

ORANGE COUNTY SANITIATION DISTRICT CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS

ORANGE COUNTY SANITIATION DISTRICT CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS ORANGE COUNTY SANITIATION DISTRICT CAPITAL IMPROVEMENT PROGRAM PERFORMANCE REPORTS CONTENTS: Construction Change Order Summary Report Design Consultant PSA Amendment Summary Report Contractors Active Projects

More information

LOS ANGELES COUNTY IMMUNIZATION PROGRAM PROVIDER REFERRAL LIST

LOS ANGELES COUNTY IMMUNIZATION PROGRAM PROVIDER REFERRAL LIST Alhambra Avalon Bell Bell Bell Gardens Bell Gardens Bellflower Boyle Heights Culver City Downey Gardena Glendale Harbor City Hawaiian Garde Hawthorne Huntington Park Inglewood Inglewood La Puente Lancaster

More information

Orange. County. Reclamation Plant No. 1 Treatment Plant No. 2. La Habra Brea. Fullerton Placentia Anaheim Villa Park Alamitos.

Orange. County. Reclamation Plant No. 1 Treatment Plant No. 2. La Habra Brea. Fullerton Placentia Anaheim Villa Park Alamitos. Energy Management OCSD Service Area 572 miles of sewers 471 square miles 200 million gallons per day 2.5 million population 20 cities, 4 special districts 15 pumping stations 2 treatment plants Pacific

More information

CITY OF LOS ANGELES CALIFORNIA ERIC GARCETTI MAYOR. CREATING INFORMATION NETWORK FOR NEiGHBORHOOD COUNCIL AND PUBLIC USE

CITY OF LOS ANGELES CALIFORNIA ERIC GARCETTI MAYOR. CREATING INFORMATION NETWORK FOR NEiGHBORHOOD COUNCIL AND PUBLIC USE BOARD OF NEIGHBORHOOD COMMISSIONERS KAREN MACK PRESIDENT LEONARD SHAFFER VlCE PRESIDENT JOY ATKINSON LYDIA GRANT LINDA LUCKS VICTOR MEDINA OLIVIA RUBIO JANET UNDO EXECUTIVE ADMINISTRATIVE ASSISTANT TELEPHONE'

More information

REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT

REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT REQUEST FOR PROPOSAL for CONSTRUCTION MANAGEMENT SERVICES for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT Ref: Admin.15 12265c September 23, 2015 Proposals Due November 2,

More information

Sewer System Improvement Program Update

Sewer System Improvement Program Update August 20, 2014 Sewer System Improvement Program Update Tommy T. Moala SFPUC Assistant General Manager, Wastewater Enterprise Agenda 1. SF Sewer System 2. Our Challenges 3. Sewer System Improvement Program

More information

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper C-4-04 CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES Brad Jenson

More information

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer

More information

INFRASTRUCTURE ARCHITECTURE OPEN SPACE

INFRASTRUCTURE ARCHITECTURE OPEN SPACE The Bureau of Engineering Transforms Los Angeles INFRASTRUCTURE ARCHITECTURE OPEN SPACE City of Los Angeles Department of Public Works Bureau of Engineering Introduction Who are we? Capital Program Overview/Upcoming

More information

Description of the Water Conserv II Facility

Description of the Water Conserv II Facility Description of the Water Conserv II Facility Introduction The Water Conserv II (WCII) Water Reclamation Facility provides service to a majority of the southwest section of Orlando. The WCII facility has

More information

KANSAS CITY WATER SERVICES FISCAL YEAR 2016 CAPITAL IMPROVEMENT PROGRAM

KANSAS CITY WATER SERVICES FISCAL YEAR 2016 CAPITAL IMPROVEMENT PROGRAM KANSAS CITY WATER SERVICES FISCAL YEAR 2016 CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS Water...Page 2 Design Professional Services... Page 3 Construction... Page 8 Wastewater...Page 12 Design Professional

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee City of Inglewood Well No. 2 Rehabilitation City of Inglewood Thomas Lee Project Location (Photos and location maps of the project) Project Description The City of Inglewood (City)receives its annual potable

More information

California : Los Angeles County (Central)

California : Los Angeles County (Central) California : Los Angeles County (Central) Arroyo Vista Family Health Center 6000 N, Figueroa, Los Angeles, CA 90042, (323)254-5221 Adults and Children Cost: Medi-cal, sliding scale fee Catholic Worker

More information

School Management Services / Master Planning & Demographics

School Management Services / Master Planning & Demographics Facilities Services Division Los Angeles Unified School District School Management Services / Master Planning & Demographics ARE YOU LOOKING FOR BOUNDARY CHANGE INFORMATION FOR YOUR SCHOOL? This file provides

More information

California Wastewater

California Wastewater Abridged Edition L A Y P E R S O N S G U I D E T O California Wastewater Prepared by the Water Education Foundation Contents The Layperson s Guide to California Wastewater is prepared and distributed by

More information

Asset Management Answering the 5 Core Questions

Asset Management Answering the 5 Core Questions Asset Management Answering the 5 Core Questions by Timothy Taber, PE Barton & Loguidice Page 1 Drivers Asset Management Case Study 1. What is the current state of my assets? 2. What is my required sustainable

More information

NOTICE OF THE CLASS DISTRIBUTION PLAN. A court has authorized this notice. This is not a solicitation from a lawyer.

NOTICE OF THE CLASS DISTRIBUTION PLAN. A court has authorized this notice. This is not a solicitation from a lawyer. NOTICE OF THE CLASS DISTRIBUTION PLAN A court has authorized this notice. This is not a solicitation from a lawyer. THIS NOTICE MAY AFFECT YOUR RIGHTS. PLEASE READ THIS ENTIRE NOTICE CAREFULLY. TO THE

More information

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside

More information

OPERATIONS & MAINTENANCE FY 2012-2013 Adopted Budget

OPERATIONS & MAINTENANCE FY 2012-2013 Adopted Budget SERVICE DESCRIPTION To maintain all of the transferred and accepted infrastructure within the district including water, wastewater, and stormwater systems, streetlights, traffic signals, and landscaping

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

CHAPTER 10-2. Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities

CHAPTER 10-2. Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities CHAPTER 10-2 SEWAGE COLLECTION AND TREATMENT FACILITIES Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities 1.1 SANITARY SEWER COLLECTION SYSTEM The City of Washougal operates

More information

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001 Maricopa Association of Governments Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS August 2001 3033 NORTH 44TH STREET, SUITE 101 PHOENIX, ARIZONA 85018 (602) 263-9500 FAX (602) 265-1422 Technical

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

City of Riverside WASTEWATER COLLECTION AND TREATMENT FACILITIES INTEGRATED MASTER PLAN

City of Riverside WASTEWATER COLLECTION AND TREATMENT FACILITIES INTEGRATED MASTER PLAN WASTEWATER COLLECTION AND TREATMENT FACILITIES INTEGRATED MASTER PLAN VOLUME 10: CAPITAL IMPROVEMENT PLAN AND OVERALL IMPLEMENTATION SCHEDULE CHAPTER 1: CAPITAL COSTS AND IMPLEMENTATION SCHEDULE FINAL

More information

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana

More information

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

MARKET OPPORTUNITIES. Incentives for Food Retailers

MARKET OPPORTUNITIES. Incentives for Food Retailers MARKET OPPORTUNITIES Incentives for Food Retailers South : Opportunity for Growth... Increasing healthy eating options by locating new grocery stores, sit-down restaurants and fresh food markets in the

More information

How To Improve Water Quality In East Pacificon

How To Improve Water Quality In East Pacificon WATER STORIES EAST PROVIDENCE, RI We are proud to partner with East Providence on this very important project. Together we developed an innovative, sustainable solution that promotes public, economic

More information

Capital Improvement Program Monthly Status Report for June 2014

Capital Improvement Program Monthly Status Report for June 2014 Capital Improvement Program Monthly Status Report for June 2014 August 7, 2014 This report provides a summary of the progress and accomplishments of the Capital Improvement Program (CIP) for the San José-Santa

More information

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance

More information

NEVADA CITY WASTEWATER TREATMENT INQUIRY

NEVADA CITY WASTEWATER TREATMENT INQUIRY NEVADA CITY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated

More information

Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach

Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach Fundamentals of Asset Management Step 10. Build Asset Management Plan A Hands-On Approach Tom s bad day Fundamentals of Asset Management 2 AM plan 10-step process Develop Asset Registry Assess Performance,

More information

CHAPTER 1 - EXECUTIVE SUMMARY

CHAPTER 1 - EXECUTIVE SUMMARY Chapter Page CHAPTER 1 - EXECUTIVE SUMMARY 1.1 Background 1-1 1.2 Purpose/ Objectives 1-1 1.3 Flow, Condition and Operation Assessment 1-3 1.4 Class A Biosolids 1-4 1.5 Summary of Recommendations 1-4 CHAPTER

More information

EXISTING WASTEWATER TREATMENT FACILITIES

EXISTING WASTEWATER TREATMENT FACILITIES Chapter 5 EXISTING WASTEWATER TREATMENT FACILITIES 5.1 THERESA STREET WWTF 5.1.1 Overview The Theresa Street WWTF is the larger of the two wastewater treatment facilities owned and operated by the City

More information

EXISTING WASTEWATER TREATMENT FACILITIES

EXISTING WASTEWATER TREATMENT FACILITIES Chapter 5 EXISTING WASTEWATER TREATMENT FACILITIES 5.1 THERESA STREET WWTF 5.1.1 Overview The Theresa Street WWTF is the larger of the two wastewater treatment facilities owned and operated by the City.

More information

PROJECT NAME BACKGROUND STATUS

PROJECT NAME BACKGROUND STATUS Utilities Department Projects This report reflects the status of Utility Capital Improvement Projects, Rehabilitation and Maintenance Programs of the City s water, wastewater, and reclaimed infrastructure

More information

Linabond Partial Project History

Linabond Partial Project History P r o t e c t i o n - C o n t a i n m e n t - S t r u c t u r a l R e h a b i l i t a t i o n Please understand that this is only a very small sampling of projects over a 30 year period of time. It would

More information

Altoona Water Authority. Infrastructure Overview

Altoona Water Authority. Infrastructure Overview Altoona Water Authority Infrastructure Overview Mission Statement As stewards of the community s water system, our mission is to provide a clean, safe, reliable water supply and to collect and treat wastewater

More information

Executive Summary Consent Decree

Executive Summary Consent Decree OVERFLOW ABATEMENT PROGRAM Executive Summary Consent Decree The sewer system in Nashville dates back to the late 1800s and originally consisted of a combined sewer system, later transitioning to separate

More information

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values

More information

Would These Keywords Help Your Business? divorce lawyer 90254 90254 divorce lawyer divorce lawyer hermosa beach divorce lawyer hermosa beach ca

Would These Keywords Help Your Business? divorce lawyer 90254 90254 divorce lawyer divorce lawyer hermosa beach divorce lawyer hermosa beach ca divorce lawyer 90254 90254 divorce lawyer divorce lawyer hermosa beach divorce lawyer hermosa beach ca divorce lawyer hermosa beach california divorce lawyer in hermosa beach divorce lawyer in hermosa

More information

How To Get A Stormwater Discharge Permit In A City Of Scottsdale

How To Get A Stormwater Discharge Permit In A City Of Scottsdale Environmental Regulations Guide Section 4 Pollution Prevention 4. 0 Pollution Prevention The Pollution Prevention Act (PPA) focuses on source reduction, i.e. on reducing the amount of pollution through

More information

San Diego Citizen s Forum. USIBWC San Diego Field Office

San Diego Citizen s Forum. USIBWC San Diego Field Office San Diego Office Update San Diego Citizen s Forum Steve Smullen, Area Operations Manager USIBWC San Diego Field Office August 25, 2011 SAN DIEGO OFFICE ACTIVITIES Flood Control Tijuana River Flood Control

More information

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East Jian Li, Ph.D., P.Eng., PE Senior Environmental Engineer Stantec Consulting Ltd. Water & Wastewater Treatment BMP Forum

More information

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION...

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION... Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY VISION... 5 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION... 33 CAPITAL IMPROVEMENT PROJECTS

More information

Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and

Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and Advanced Wastewater Treatment and Disposal Systems Water and Wastewater Utility Operation and Management for Tribes Preliminary Treatment Primary Treatment Secondary Treatment Tertiary Treatment Disinfection

More information

1.0 INTRODUCTION 2.0 REGULATORY FRAMEWORK. 2.1 Federal Regulations. 2.1.1 Part 40, Section 122.41(m)

1.0 INTRODUCTION 2.0 REGULATORY FRAMEWORK. 2.1 Federal Regulations. 2.1.1 Part 40, Section 122.41(m) IV.L.2 Wastewater 1.0 INTRODUCTION This section discusses sanitary sewer service for the Proposed Loyola Marymount University (LMU) Project and surrounding area. This section analyzes Proposed Project

More information

PEIRCE ISLAND WASTEWATER TREATMENT FACILITY PROJECT CITY COUNCIL WORK SESSION C I T Y O F P O R T S M O U T H W A S T E W A T E R D I V I S I O N

PEIRCE ISLAND WASTEWATER TREATMENT FACILITY PROJECT CITY COUNCIL WORK SESSION C I T Y O F P O R T S M O U T H W A S T E W A T E R D I V I S I O N Explore Innovative Solutions Protect our Environment Manage our Resources Preserve our Community C I T Y O F P O R T S M O U T H W A S T E W A T E R D I V I S I O N PEIRCE ISLAND WASTEWATER TREATMENT FACILITY

More information

Wastewater Collection System Capacity Report and Plan

Wastewater Collection System Capacity Report and Plan City of Los Angeles Department of Public Works Bureau of Sanitation Wastewater Engineering Services Division Wastewater Collection System Capacity Report and Plan A deliverable of the Settlement Agreement

More information

OWOW Proposition 84, Round 2 Master Project List

OWOW Proposition 84, Round 2 Master Project List OWOW Proposition 84, Round 2 Master List Name s Recommended for Prop 84 Round 2 Funding 1 2071 Inland Empire Utilities Agency 2 2068 USDA Forest Service San Bernardino National Forest Wineville Regional

More information

California State Department of Fair Employment and Housing 611 West Sixth Street, 15th Floor Los Angeles, CA 90017 800-233-3212

California State Department of Fair Employment and Housing 611 West Sixth Street, 15th Floor Los Angeles, CA 90017 800-233-3212 California Housing Resources Provided by Consumer Action (www.consumer-action.org) Note: If any of the contact information here has changed, please email info@consumeraction.org B Bay Area Legal Aid 2

More information

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste 3.6 3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste Police Protection The Clarkstown Police Department provides police protection services to properties within the 40 square

More information

Sanitary Sewers LINK TO THE COMPREHENSIVE PLAN

Sanitary Sewers LINK TO THE COMPREHENSIVE PLAN Sanitary Sewers PROGRAM DESCRIPTION Fairfax County provides sewer service to its residents through a system of nearly 3,412 miles of sewer lines, 59 sewage pumping stations, 5 storm water pumping stations,

More information

Report Relating to Incidents of Flooding within the Dollar Catchment

Report Relating to Incidents of Flooding within the Dollar Catchment Joint Position Statement Report Relating to Incidents of Flooding within the Dollar Catchment October 2012 Eric McQuarrie, Scottish Water Stuart Cullen, Clackmannanshire Council TABLE OF CONTENTS 1. INTRODUCTION...

More information

NON-CIRCULAR SEWER LINER INSTALLATION AND FUTURE PROJECTS IN LOS ANGELES

NON-CIRCULAR SEWER LINER INSTALLATION AND FUTURE PROJECTS IN LOS ANGELES North American Society for Trenchless Technology 2008 No-Dig Conference & Exhibition Dallas, Texas April 27 May 2, 2008 NON-CIRCULAR SEWER LINER INSTALLATION AND FUTURE PROJECTS IN LOS ANGELES Brad Jenson

More information

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,

More information

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM Stadium Reconstruction EIR Appendices \ AECOM Technical Services, Inc 401 West A Street Suite 1200 San Diego, CA 92101 www.aecom.com 619-610-7600 tel 619-610-7601

More information

Summary of Potential Storm Drain Projects and Programs

Summary of Potential Storm Drain Projects and Programs Summary of Potential Storm Drain Projects and Programs CAPITAL IMPROVMENTS PUMP STATION UPGRADES The storm runoff from a large portion of Palo Alto cannot flow by gravity into one of the local creeks.

More information

INTRODUCTION AND BACKGROUND

INTRODUCTION AND BACKGROUND Chapter 1 INTRODUCTION AND BACKGROUND 1.1 INTRODUCTION The City of Lincoln s Sewer System Management Program (SSMP) generally describes the City s sanitary sewer system operation and maintenance procedures,

More information

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall

More information

Section 7 Existing Treatment Facilities

Section 7 Existing Treatment Facilities Section 7 7.1 Introduction An essential tool for the IRP is the wastewater treatment and effluent discharge facility capacities. There are six wastewater treatment facilities within the City s service

More information

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery County of Nassau Department of Public Works Bay Park Sewage Treatment Plant Super Storm Sandy Recovery Edward P. Mangano County Executive Shila Shah-Gavnoudias, P.E. Commissioner of Public Works Bay Park

More information

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)

More information

The Donut Hole Sunset The San Francisco-Pacifica Exclusion Zone

The Donut Hole Sunset The San Francisco-Pacifica Exclusion Zone The Donut Hole Sunset The San Francisco-Pacifica Exclusion Zone Changes to the exclusionary factors since designation Presentation to the Gulf of the Farallones National Marine Sanctuary Advisory Council

More information

PREPARING INDUSTRIAL ENGINEERING REPORTS

PREPARING INDUSTRIAL ENGINEERING REPORTS PREPARING INDUSTRIAL ENGINEERING REPORTS EARLE HARTLING, LOS ANGELES COUNTY SANITATION DISTRICT JOHN ROBINSON, JOHN ROBINSON CONSULTING, INC WateReuse LA Chapter December 2, 2014 Presentation Overview

More information

Wastewater Treatment System Rehabilitation Project

Wastewater Treatment System Rehabilitation Project Wastewater Treatment System Rehabilitation Project An overview The City of Shelton, WA / January 2010 Before After SHELTON WASTEWATER TREATMENT IMPROVMENTS PROJECT Enabled by extensive grant-funding, loans

More information

KOCE-TV CABLE / SATELLITE LIST

KOCE-TV CABLE / SATELLITE LIST KOCE-TV CABLE / SATELLITE LIST KOCE-TV transmits from Mount Wilson on Channel 50. Here is a list of the many cable systems throughout Southern California that carry KOCE. If your cable system does not

More information

(310) 543-9900 (310) 379-3620, (310) 370-5902, (213) 745-6434, (213) 222-1237, (562) 388-7652 info@1736fcc.org

(310) 543-9900 (310) 379-3620, (310) 370-5902, (213) 745-6434, (213) 222-1237, (562) 388-7652 info@1736fcc.org Los Angeles Violence Prevention Resource Directory Domestic Violence Victim/Prevention Services 1736 Family Crisis Center South Bay Office 21707 Hawthorne Blvd., Suite 300 Torrance, CA 90503 (310) 543-9900

More information

SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND

SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND Wastewater Utility Overview In the late 1950 s, the Village of Old Forge began to realize the impacts of dumping sewage in the Moose River.

More information

RAdaptive. Reuse Program. City of Los Angeles. Creates new housing opportunities. Revitalizes neighborhoods. Preserves historic architecture

RAdaptive. Reuse Program. City of Los Angeles. Creates new housing opportunities. Revitalizes neighborhoods. Preserves historic architecture Creates new housing opportunities Revitalizes neighborhoods Preserves historic architecture Encourages community development Stimulates economic investment Facilitates mixed-use City of Los Angeles RAdaptive

More information

CLEARWATER PROGRAM. Executive Summary FINAL

CLEARWATER PROGRAM. Executive Summary FINAL CLEARWATER PROGRAM Executive Summary FINAL SCH# 2008101074 November 2012 CLEARWATER PROGRAM Executive Summary FINAL Prepared by: Sanitation Districts of Los Angeles County Facilities Planning Department

More information

Capital Improvement Project Status Report October 2015 (Actuals through August 2015) Percent Design Complete. Design Finish. Construction Finish

Capital Improvement Project Status Report October 2015 (Actuals through August 2015) Percent Design Complete. Design Finish. Construction Finish Title I. Terminals Berth 90-93 - World Cruise Center 1. B. 93 - Cruise Terminal - Customs and Border Protection Improvements (2525300) 06/30/16 80% 02/28/18 0% $2,740,000 $181,831 7% 2. B. 91-93 - Alternative

More information

Wastewater Nutrient Removal

Wastewater Nutrient Removal Wastewater Nutrient Removal An overview of phosphorus and nitrogen removal strategies Presented by: William E. Brown, P.E. Peter C. Atherton, P.E. Why are nutrients an issue in the environment? Stimulates

More information

Orange County Sanitation District

Orange County Sanitation District Orange County Sanitation District The Orange County Sanitation District operates large wastewater treatment plants in Fountain Valley and Huntington Beach, CA. These plants treat about 230 million gallons

More information

St. John s Harbour Clean-Up Phase 2. Project Description

St. John s Harbour Clean-Up Phase 2. Project Description St. John s Harbour Clean-Up Phase 2 Project Description February 2003 NEWFOUNDLAND DESIGN ASSOCIATES LIMITED 1 Introduction The City of St. John s, the adjoining City of Mount Pearl and the Town of Paradise

More information

Executive Summary. Purpose and Need for Project. Background Work

Executive Summary. Purpose and Need for Project. Background Work Executive Summary Purpose and Need for Project The City of St. John s, and the adjoining City of Mount Pearl and the Town of Paradise now encompass a development of approximately 12,000 hectares, with

More information

Los Angeles Match Initiation Form

Los Angeles Match Initiation Form Los Angeles Match Initiation Form This form is used as an addendum to the VI-SPDAT Screener. This Match Initiation Form includes questions that will assist with making a match to a unit of Permanent Supportive

More information

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s

More information

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO-0098001, Construction Permit No. CP0001707, Callaway County

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO-0098001, Construction Permit No. CP0001707, Callaway County Ms. Gail Geary Ameren Missouri 1901 Chouteau Ave. PO Box 66149, MC 602 St. Louis, MO 63166-6149 RE: Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO-0098001, Construction,

More information

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty

More information

Chapter 8: Common Treatment Facilities, Programs, Operational Improvements and Policies for the Recommended Plan

Chapter 8: Common Treatment Facilities, Programs, Operational Improvements and Policies for the Recommended Plan Chapter 8: Common Treatment Facilities, Programs, Operational Improvements and Policies for the Recommended Plan 8.1 Introduction The purpose of this chapter is to document the variety of treatment-related

More information

Using An Environmental Management System to Optimize Performance And Achieve Sustainability

Using An Environmental Management System to Optimize Performance And Achieve Sustainability Using An Environmental Management System to Optimize Performance And Achieve Sustainability Andrew Kricun, P.E. Deputy Executive Director / Chief Engineer Camden County Municipal Utilities Authority Camden,

More information

Sanitary Sewer Master Plan

Sanitary Sewer Master Plan , Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY

More information

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION Vallecitos Water District Rock Springs Sewer Replacement Project Vallecitos Water District has prepared a Draft Mitigated Negative Declaration

More information