1 Eindhoven, February 2010 Designing and validating an instrument to measure the degree of customization and cost of use and maintenance for a packaged ERP system By A.S. EHSARY, (Ali) BSc Industrial Engineering and Management Science TU/e 2007 Student identity number in partial fulfilment of the requirements for the degree of Master of Science in Operations Management and Logistics Supervisors: dr.ir. R.M. Dijkman, TU/e, IS prof.dr. R.J. Kusters, TU/e, IS drs. D. Zijlstra, Accenture, SI&T Consulting

2 TUE. Department Technology Management. Series Master Theses Operations Management and Logistics Subject headings: Information systems, Maintenance Costs, Measurement instrument ii

3 Abstract Standard Enterprise Resource Planning (ERP) packages are often customized by the adopting organizations in order to close the gap between the functionalities offered by the package and the specific needs of the organization. When customizing these packages, most organizations only take into account the extra costs during the implementation phase and neglect the ongoing use and maintenance costs. A reason for this is the lack of a good estimation tool which can be used to estimate the expected use and maintenance cost as a function of the degree of customization (DOC). To develop such a tool, data should be gathered from practice on degree of customization and cost of use and maintenance but in order to be able to do that first a validated measurement instrument is needed. This research focuses on developing and validating such an instrument which can be used to quantify the DOC and estimate the cost of use and maintenance. Two case studies are conducted: one to design the instrument and one to validate it. iii

4 Summary Standard Enterprise Resource Planning (ERP) packages developed by vendors such as SAP and Oracle are designed to support standard business processes. However, since every organization has some uniqueness in their processes at a certain level, there is always a gap between business and IT. This gap could either be closed by customizing the ERP package (IT) or changing the existing business processes. To avoid costly change management practices, most organizations choose to customize the ERP package and while doing that they only account for the extra costs during the implementation and neglect the costs of using and maintaining the package. This research is carried out at Accenture Consulting and focuses on the relation between the cost of use and maintenance for a specific ERP package, PeopleSoft HRMS, and the degree to which the package is customized. The following problem statement is formulated: There is a lack of insight into the relation between the degree of customization to the HRMS package and its use and maintenance costs after the implementation. Moreover, there are no tools which can be used to: (1) quantify the degree of customization (DOC) and (2) estimate the associated cost of using and maintaining the customized HRMS package based on the DOC. Taking the above stated problem into account the following research goal is formulated: Designing a measurement instrument which can be used to: 1. Quantify the extent to which the ERP package is customized and 2. To estimate the cost of using and maintaining such a package, with the objective of gathering data from practice to do research on the exact relation between the degree of customization and the associated costs of use and maintenance so that the research results can be used to develop a tool, similar to existing tools at Accenture, which can be used by Accenture consultants to estimate the cost of use and maintenance for a certain level of customization. To design the instrument, knowledge from the literature is combined with findings from a case study which is conducted at a Dutch Regional Education Centre (ROC) and validated by conducting an additional case study at an Academic Hospital in Leiden, Netherlands (LUMC). The measurement instrument consists of two frameworks: one for estimating the cost of use and maintenance and one for quantifying the degree of customization. Figure 1 represents the first framework. From the figure we can conclude that there are seven main use and maintenance activities which bring costs along three different dimensions (people, process and products&services) and that these costs can be estimated by using several sources of information within an organization. iv

5 Figure 1: Measuring cost of use and maintenance To quantify the degree of customization for a specific system, the amount of development time is taken as a measure. The total degree of customization is thus the total amount of development time spent on customizing the ERP package. The DOC can be estimated in two ways: either by simply summing up all the effort and calculating the total development time in hours or using the matrix of figure 2. Customization types Reports Interfaces Extensions Conversions Workflows v Complexity Simple Medium Complex Very complex 0 < dt 56 i = 31 0 < dt 44 i = 33 0 < dt 44 i = 21 0 < dt 90 i = 56 0 < dt 57 i = 49 Figure 2: Measuring the degree of customization 56 < dt 84 i = < dt 116 i = < dt 103 i = < dt 212 i = < dt 71 i = < dt 157 i = < dt i = < dt 227 i = < dt i = < dt i = < dt i = < dt i = 281

6 The matrix can be used to estimate the development time based on experts judgment on how complex a piece of customization is. First it should be evaluated to which of the five types the customization belongs (vertical axis of the matrix) and then how complex it is using the four categories: simple, medium, complex and very complex (horizontal axis of the matrix). To assess the complexity the assessor can also make use of the ranges in development time (dt) for each complexity level. Then, depending on which cell is pointed out in the matrix the complexity index (i) can be used to calculate the total degree of customization which is the sum of all the complexity indices: Where CI i is the complexity index of the i-th customization. Figure 3 presents the findings from the two case studies conducted at ROC and LUMC. As we can see the differences are large for people and products&services dimensions but there is almost no difference in costs along the process dimension ROC (DOC = 2120) LUMC (DOC = 3911) ROC (DOC = 2120) LUMC (DOC = 3911) Process People Products & Services Figure 3: Findings from the two case studies vi

7 Table of Contents Abstract... iii Summary... iv Table of Contents... vii 1 Introduction Background Standard ERP systems Misfit between ERP and business Customizing ERP to resolve misfits ERP lifecycle Definition of ERP maintenance Research context Problem statement Research goal Report overview Research approach Literature review Analysis of Accenture methodology Case study research Designing the measurement instrument Validation process Analysis of results Framework for measuring cost of use and maintenance Findings from literature Maintenance categories Organizing maintenance Cost dimensions Findings from ROC case study ERP maintenance at ROC Eindhoven vii

8 3.2.2 Collecting data on cost of maintenance activities Measurement instrument for cost of use and maintenance Cost of people Cost of products and services Cost of processes Conclusion Framework for measuring the degree of customization (DOC) Findings from literature Customizing ERP packages Customization implications Quantification of the degree of customization (DOC) Developing the DOC measurement framework Development time as a metric to quantify the DOC Findings from ROC case study Design process Measuring the DOC in practice Conclusion Validation of the measurement instrument Construct validity Content validity External validity Academic Hospital Leiden (LUMC) Measuring cost of maintenance at LUMC Measuring the DOC at LUMC Conclusion Findings General findings ROC Eindhoven Cost of maintenance viii

9 6.2.2 Degree of customization LUMC Cost of maintenance Degree of customization Conclusion Conclusions and future work Conclusions Cost of maintenance Degree of customization Findings Future work References Appendix A Customization objects in PeopleSoft Reports... Error! Bookmark not defined. Interfaces... Error! Bookmark not defined. Extensions... Error! Bookmark not defined. Conversions... Error! Bookmark not defined. Workflow... Error! Bookmark not defined. ix

10 1 Introduction Standard ERP systems are off-the-shelve software packages designed to support typical business processes within a whole field or industry. Unlike tailor-made information systems, ERP systems are based on best practice processes from the specific industry. Since these ERP systems are standard and organizations have some uniqueness in their processes on a certain level of detail, there is often a misfit between the ERP system and the adopting organization s business processes. Academic literature provides two main kinds of solutions to resolve these misfits. Either the organization should adopt the business processes on which the ERP package is based or the ERP package should be tailored to meet the organizations demand. Tailoring the ERP package can vary between simply configuring the system in order to choose between different executions of processes and functions to changing the software code. While configuring the system is seen as normal by the ERP vendors, all the other changes or customizations are discouraged due to limitations and increasing costs concerning maintenance, future updates and migrations. Despite this, the occurrence of customizations in ERP implementation projects is very common. However, a large number of companies which customize their ERP, fall back to a new version without any customization at all (also called the vanilla system) because of cost overrun during the usage period of the previous version. One of the hypothetical reasons for this is that the costs of using and maintaining a customized system turns out to be much higher than most organizations anticipated during the implementation phase. Taking the above in mind the conclusion can be drawn that there is a lack of insight into the use and maintenance cost of a customized ERP package and especially into the relation between the degree (or extent) of customization and the associated use and maintenance costs after the implementation. To explore this relation it is necessary to measure the cost of use and maintenance at one side and the degree of customization at the other side in practice and compare the cases with each other. But to be able to do that first it has to be defined what is exactly meant by customizations and the cost of use and maintenance and how these two can be measured. This research concentrates on developing a measurement instrument which can be used to measure the cost of use and maintenance and the degree of customization for an ERP package. The instrument is designed for a specific ERP package, namely PeopleSoft Human Resources Management System (HRMS) module of Oracle developed through a case study at a regional education centre and validated through another case study conducted at an Academic Hospital in Leiden. This introduction chapter is organized as follows. First some background information is given on the topic in section 1.1. Within the research context, which is described in sections 1.2, the problem statement is formulated in section 1.3 and taken the problem statement in mind the research goal is stated in section Background In this section some background information is given on ERP customization. First, it is explained what exactly a standard ERP system is and secondly what kinds of misfits could exist between 1

11 such a software system and the business processes of the organization adopting it. Finally, it is explained how a standard ERP software can be modified to resolve the misfits Standard ERP systems ERP systems are process aware information systems which support the operational processes of the whole enterprise by integrating and optimizing the processes and managing transactions throughout the whole organization (Moon 2007). According to Moon (2007), ERP finds its origin in the manufacturing which needed an information system that was capable of calculating more efficiently materials required through the whole manufacturing process as well as enabling efficient use of manufacturing capacity and optimizing scheduling (hence the terms Resource and Planning). Soon after these kinds of information systems proved their value for manufacturing, companies began to realize that their functionality could be extended beyond manufacturing and encompassing finance, sales and distribution and human resources (Klaus et al. 2000). To avoid major development costs, during the last decades, more and more companies choose to purchase packaged ERP software resulting into the rise of major ERP vendors such as SAP and Oracle. In order to be able to earn back the large development costs these vendors needed to sell as many software packages as possible and therefore standardize the software as much as possible. Although standard ERP packages are developed for specific processes (such as Human Resource and Supply Chain Management) and for specific industries (such as financial or manufacturing industry) and based on so called best practices within these fields, there still remains a certain misfit between these ERP packages and the business processes of the adopting organizations. This misfit is addresses in the next subsection Misfit between ERP and business Misfit between ERP packages and organizations is primarily caused by the fact that standard ERP systems are designed to support standard processes in a certain field whereas each organization has its own unique way of working, which is influenced by a combination of company specific, sector specific and country/culture specific factors (Soh et al. 2000). There are four types of misfits identified in the literature: Data, Functional, Output and Interface (Hong and Kim 2002; Soh et al. 2000): 1 Data misfit refers to incompatibilities between organizational requirements and ERP package in terms of data format and the relationships between entities as represented in the underlining data model. 2 Functional misfit can be divided into Access, Control and Operational misfit. Access misfits occur when the required access to perform certain tasks is not present, control misfits refer to missing validation procedures or checking routines and operational misfits refer to missing operational steps or the presence of certain steps which are inappropriate. 3 Output misfit refers to incompatibilities between requirements and ERP package in terms of the information content and presentation format of the output and. 2

12 4 Interface misfit occurs when there is a gap between the way the graphical user interface (look and feel) of the ERP package is designed and what the users within the adopting organization are accustomed to work with Customizing ERP to resolve misfits Although standard ERP packages allow the adopting organization to configure the software to meet most of their specific needs, there always remain some misfits which cannot be resolved by simply configuring the package. In order to resolve these misfits, there are basically two things that an organization can do: either changing their processes to better match the software package or modifying the software to meet their specific needs. The latter is referred to as customizing the ERP package ERP lifecycle There are four basic stages within an ERP systems lifecycle which can be distinguished from each other (Brehm and Markus 2000; Esteves and Pastor 1999; Markus and Tanis 1999): Acquisition: in this phase the decision whether or not to buy a packaged ERP system is analyzed as well as which package would be the most suitable one for the organization. Implementation: in this phase the package is actually configured and implemented. All the decisions regarding whether, what and how much to customize are made in this phase. Use and maintenance: during this stage the system is actually used and maintained. This phase is or at least ought to be the biggest stage in the ERP systems lifecycle since in this phase the organization actually benefits (or should benefit) from the ERP system and there is return on investment. Evolution: after using the ERP package for a while, internal and external factors might cause the system to evolve either to a complete new package or an upgrade of the existing one. Internal factors could be anything from changing the processes within the organization or changes in the IT environment of the ERP package whereas external factors could be the opportunity to upgrade to a better system with more functionalities or the expiration of support from the vendor for the current version Definition of ERP maintenance Maintenance of traditional software systems is defined by the IEEE as the modification of a software product after delivery to correct faults, to improve performance or other attributes, or to adapt the product to a modified environment (IEEE 1990). This definition points out that maintenance is a post-delivery activity and comprises all the tasks necessary to correct faults, improve performances and to adapt to changed environment. Correcting, improving and adapting could either be done to the software code, functionality or the hardware on which the software system is running. Since there are significant differences between standard ERP packages and traditional tailormade software systems (Klaus et al. 2000), this definition should be adjusted for ERP. Ng et al. (2002) state that ERP maintenance involves all post-implementation activities related to the 3

13 packaged application software undertaken by the client organization from the time the system goes live (i.e. successfully implemented) until it is retired from an organization s production system: - To keep the system running, - To adapt to a changed environment in order to operate well, - To provide help to the system users in using the system, - To realize benefits from the system, and - To keep the system a supported-version and meet the vendor s requirements for standard code. (Ng et al. 2002) 1.2 Research context This research is carried out at a company called Accenture. Accenture is a global management consulting, technology services and outsourcing company which among other things offers consulting services during ERP implementation projects. One of the various ERP modules for which Accenture offers consulting services is the PeopleSoft Human Resource Management System (HRMS). The research is carried out within the Service Integration and Technology (SI&T) department of Accenture Netherlands. The sub department Oracle within SI&T is responsible for implementation projects of Oracle modules and the focus group Oracle HR focuses specifically on the PeopleSoft HRMS package and has implemented this package with and without customizations in various companies in the Netherlands. The HR focus group is mainly interested in a tool which enables their consultants to predict the expected cost of using and maintaining the HRMS module for client companies who are considering customizing the package to a certain extent. PeopleSoft HRMS was originally developed by the company PeopleSoft Inc, which was specialized in human resource management, customer relationship management and student administration systems. In 2005 PeopleSoft was taken over by Oracle Corporation; the PeopleSoft name and product line are now marketed by Oracle, who also is responsible for developing maintenance patches and upgrades for the software. Table 1 provides an overview of HRMS versions released during the last decade along with the availability of upgrades and patches for each version. Since Oracle does not release any upgrades and patches for older versions than HRMS 8.9, it is likely that most companies currently use version 8.9 or higher. 4

14 Table 1: Overview of PeopleSoft HRMS versions Version Release Updates, Fixes, Security Alerts, and Upgrade Scripts Tax, Legal and Regulatory Extended Support Ends Sustaining Support Ends HRMS 8.0 SP1 Dec 2000 Mar 2007 Mar 2007 Not Available Indefinite HRMS 8.3 Nov 2001 Mar 2007 Mar 2008 Not Available Indefinite HRMS 8.8 Dec 2002 Dec 2007 Dec 2008 Dec 2011 Indefinite HRMS 8.9 Dec 2004 Dec 2009 Dec 2010 Dec 2012 Indefinite HRMS 8.9 ANZ Sep 2005 Sep 2010 Sep 2011 Sep 2013 Indefinite HRMS 9.0 Dec 2006 Dec 2011 Dec 2012 Dec 2014 Indefinite 1.3 Problem statement Since standard ERP systems, like the HRMS package, do not fully meet the requirements of all the companies using it, there is always a gap between the ERP functionality and the business processes of the companies. To fill this gap, the adopting organizations have the option to adjust their processes and/or to tailor the ERP system (Ehsary 2009). According to Accenture consultants, most organizations choose to customize the ERP system and this choice is often based on cost and benefit analysis concentrating on only the implementation phase. As long as the cost of customizations fit within the implementation budget, companies mostly choose to customize the ERP system in order to avoid difficult change management practices. But what often is neglected are the update and maintenance costs incurred after the implementation phase, during the rest of the ERP system s lifecycle, as a result of these customizations. Figure 4 shows hypothetically the difference in total lifecycle costs between a vanilla- and customized system as it is expected to be according to Accenture consultants. The figure demonstrates that although these costs may not seem much at the implementation phase, during the systems usage period the costs could dramatically increase for a customized system because of implications during update and maintenance activities. Moreover, the more complex the customizations are, the more dramatically the costs are expected to increase at a certain point, which results into exceeding the allocated budget for the ERP package before the accounted depreciation period is reached. 5

15 Figure 4: expected total cost of vanilla system versus customized system To be able to offer better services to the customers and to help them avoid major cost overrun during the lifecycle of the (customized) HRMS package, Accenture consultants need to gain more insights into the exact relation between the complexity of customization and the use and maintenance costs of the HRMS package. So to conclude, Accenture consultants face the following problem: There is a lack of insight into the relation between the degree of customization to the HRMS package and its use and maintenance costs after the implementation. Moreover, there are no tools which can be used to: (1) quantify the degree of customization (DOC) and (2) estimate the associated cost of using and maintaining the customized HRMS package based on the DOC. 1.4 Research goal Taking the problem statement in mind, the main goal of the project can be defined as: Designing a measurement instrument which can be used to: 1. Quantify the extent to which the ERP package is customized and 2. To estimate the cost of using and maintaining such a package, with the objective of gathering data from practice to do research on the exact relation between the degree of customization and the associated costs of use and maintenance so that the research results can be used to develop a tool, similar to existing tools at Accenture, which can be used by Accenture consultants to estimate the cost of use and maintenance for a certain level of customization. 6

16 The above stated research goal is further divided into the following sub goals: 1. Development of a framework which can be used to estimate the total cost of maintenance and use. 2. Validation of the framework for cost of maintenance and use through case study analysis 3. Development of a framework which can be used to quantify the degree of customization (DOC) for the PeopleSoft HRMS package. 4. Validation of the DOC framework through case study analysis 5. Analyzing the results of the case studies and drawing preliminary conclusions regarding the relation between DOC and cost of use and maintenance 1.5 Report overview This report is structured as follows. After this introduction chapter, in chapter 2 the research approach is explained in detail. Chapters 3 and 4 focus on the frameworks for estimating the cost of maintenance and quantifying the degree of customization respectively. The validation process for both frameworks is explained in chapter 5. In chapter 6 the findings from the case studies are discussed and chapter 6 concludes the report. 7

17 2 Research approach In this chapter the research approach is explained in more detail. Figure 5 represents the research process on a high level. As it can be noted from the figure, the starting point is the research goal as defined in section 1.4. Taking the research goal in mind, a literature review (2.1) is conducted to find out how literature can contribute when designing the instrument. Next to literature, also findings from a case study analysis and an analysis of currently used methodology at Accenture are used to design the measurement instrument. The analysis of Accenture methodology and the case study analysis are more thoroughly explained in sections 2.2 and 2.3 respectively. In section 2.4 it is explained how exactly the design process is carried out. The instrument is validated through an additional case study. This validation process is explained in more detail in Section 2.5. Finally, section 2.6 explains how the findings of the case studies are analyzed to draw preliminary conclusions on how the relation between the DOC and cost of maintenance looks like. Literature review (2.1) Research goal Analysis of Accenture methodology (2.2) Designing the measurement instrument (2.4) Validation through case study (2.5) Analysis of results (2.6) Case study analysis (2.3) Figure 5: Research approach 2.1 Literature review In order to avoid reinventing the wheel it is important to first study relevant literature on ERP packages to see what already has been researched and how it can contribute to the design of the measurement instrument. Therefore, the research goal is used to define the following set of research questions for the literature review: Research questions on ERP maintenance 1. What is ERP maintenance and which types of ERP maintenance exist? 2. How can maintenance activities be organized? 3. What kinds of costs are involved with ERP maintenance? Research questions on ERP customization 4. How can an ERP package be customized? 5. What are the implications of customizations on (cost of) maintenance? 6. How can the degree of customization be quantified? 8

18 To answer the above stated questions, academic journals and books as well as research papers published by large commercial research organizations were consulted. Table 2 presents an overview of the used resources and search terms. Table 2: Overview of literature sources and search terms Sources Academic research libraries ACM Digital Library Elsevier ScienceDirect Emerald IEEE IEE Electronic Library (IEL) IngentaConnect JSTOR SpringerLink Wiley Interscience Commercial research organizations Gartner Research Burton Group Forrester Research International Data Group (IDC) Search term(s) ERP maintenance ERP application management Information systems maintenance Information systems management ERP lifecycle cost ERP maintenance cost Cost of IS maintenance ERP (mis)fit ERP modification ERP customization Tailoring ERP systems It should be noted here that these search terms were only used to get started and to find the most important research and surveys on these topics. A substantial part of the references used in this report are found by looking into the references used in the surveys. 2.2 Analysis of Accenture methodology Accenture consultants already use a methodology, called Accenture Delivery Methods (ADM), to estimate the amount of effort needed for ERP implementation projects. To determine the estimated effort, ADM also take into account the amount of customization a client needs or asks for. ADM tools provide a good starting point for designing the instrument which can be used to quantify the DOC and therefore it is wise to study them to see how they can be used in the design process. Another reason for first analyzing ADM tools is because of the terminology used in it. Since the goal of the measurement instrument is to collect data which can be used to develop a tool for Accenture consultants, it would be convenient to use the same terminology as in the already existing Accenture tools. The following research questions are used when assessing the Accenture methodology: 9

19 7. How is ADM developed and how does it work? 8. How are ADM tools used by Accenture consultants? 9. Which parts of ADM is relevant for this research? 10. How can ADM be used when designing the measurement instrument? 2.3 Case study research Next to literature and Accenture methodology, a third important source of information is conducting field research in order to be able to find out what kind of information is available in practice and how and where exactly within an organization one could gather data on cost of maintenance and degree of customization. Therefore, the following research questions are addressed by the field research: 11. How do organizations organize and execute ERP maintenance activities? 12. How can one gather data on cost of maintenance activities in an organization? 13. How do organizations keep track of the number and type of customizations in their ERP package? 14. How can one gather data on the degree of customization of an ERP package used in an organization? There are several ways to conduct field research such as experiments, surveys, workshops, focus groups, case study analysis etcetera; see (Cooper and Schindler 2001) for an extensive list. However in this research, we have chosen to conduct a case study because of two specific characteristics of case study research: (1) high complexity of the unit of analysis and (2) possibility to do in-depth contextual analysis (Cooper and Schindler 2001; Yin 2008). Since ERP packages are enterprise wide systems and people from different departments and with different expertise are maintaining and using the package, the unit of analysis, which is the organization using the ERP package, is very complex. Also, to answer the above defined how-questions, an in-depth contextual analysis is necessary and therefore a case study approach is used here (Yin 2008). The case study analysis is carried out at a Dutch education institution ( ROC Eindhoven ) which has implemented the PeopleSoft HRMS package and has been using it for a few years. To conduct the case study, methodology of Yin (2008) is used. Within the organization first an intake interview with the head of Application Management was carried out. The intake interview was not structured and its goal was to present the problem statement and research goal in order to determine together with the respondent which people and roles within ROC Eindhoven are responsible for maintaining the PeopleSoft HRMS package. After the intake interview, three semi-structured interviews were conducted later on with (1) the change manager, (2) PeopleSoft developer and (3) PeopleSoft HRMS functional application manager to answer the research questions stated above. Next to the interviews, also some documentation and archival records were provided by the respondents in order to support their answers and increase construct validity (Yin 2008). 10

20 2.4 Designing the measurement instrument The measurement instrument has been developed by answering the research questions defined in sections 2.1, 2.2 and 7; thus combining theory form academic literature and commercial papers with Accenture methodology and findings from a field research. The instrument basically consists of two frameworks which are elaborated in more detail in chapters 3 and 4: 1. Framework for measuring cost of use and maintenance of ERP packages (Chapter 3) 2. Framework for measuring the degree of customization (Chapter 4) Figure 6 depicts how the three sources of information are combined to design the instrument. As it can be noted from the figure, the answers to research questions 1-3, 11 and 12 are used to design framework 1 and the answers to research questions 4-6, 13 and 14 to design framework 2. Research questions 7 through 10 focus on how Accenture methodology can contribute in the design of the whole instrument and thus the answers to those questions are used for both frameworks (this is illustrated by the dashed line in the centre column between framework 1 and 2. Literature review Accenture methodology Field research 1. What is ERP maintenance and how are maintenance activities organized 2. What kinds of costs are involved with ERP maintenance 3. Which types of ERP maintenance exist? 4. How can an ERP package be customized? 5. What are the implications of customizations on (cost of) maintenance? 6. How can the degree of customization be quantified? 7. How is ADM developed and how does it work? 8. How are ADM tools used by Accenture consultants? 9. Which parts of ADM is relevant for this research? 10. How can ADM be used when designing the measurement instrument? 11. How do organizations organize and execute ERP maintenance activities? 12. How can one gather data on cost of maintenance activities in an organization? 13. How do organizations keep track of the number and type of customizations in their ERP package? 14. How can one gather data on the degree of customization of an ERP package used in an organization? Figure 6: Combining literature, Accenture methodology and field research findings to design the measurement instrument 2.5 Validation process In order to ensure the quality of the measurement instrument, its validity should be tested first. Two types of instrument validity are taken into account here: external and internal validity (Carmines and Zeller 1994; Yin 2008). External validity refers to the extent to which the 11

21 instrument is applicable in other situations, or in other words the extent to which the instrument is generalizable and transferable whereas internal validity refers to how well the instrument does what it is designed to do. The latter can again be divided into construct and content validity (Figure 7). Figure 7: Validity Construct validity refers to the extent to which the instrument measures what it is supposed to measure. In this study the construct validity can be determined by evaluating after the case study whether that what has been measured matches with what was intended to measure. So the following questions are taken into consideration: 15. Did the measurement framework measure the costs of maintenance for the specific ERP package? 16. Did the measurement framework quantify the degree of customization of the specific ERP package? Content validity ensures that the instrument measures everything that is relevant and leaves nothing out. To evaluate the instruments content validity, the findings are compared to that of similar researches in academic literature. The following questions are addressed here: 17. Are all relevant costs of maintenance for the specific ERP package taken into account? 18. Are all kinds of customization options taken into account? External validity of the instrument is addressed by conducting an additional case study and evaluating for each of them whether the instrument consistently measures what it supposed to measure. Thus the research questions are again evaluated, but now at a different organization using the same measurement instrument. To ensure the external validity we need to ask the following: 19. Are there any significant differences between the answers to the research questions when we compare the ROC case study with the LUMC case study? The validity of the instrument is addressed in chapter 5. 12

22 2.6 Analysis of results Once the instrument is designed and validated, the data collected during the case studies can be analyzed to see whether we can draw any conclusions regarding the relation between the cost of maintenance and the degree of customization. Based on the data gathered we try in this step to answer the following questions: 20. Are there any differences in the magnitude and composition of the total cost of maintenance for the ERP package between the two cases? 21. Are there any differences in magnitude and composition of the degree of customization of the ERP package between the two cases? 22. Can we conclude on the basis of the findings that there is a positive relation between the degree of customization and the total cost of use and maintenance? The answers to the above stated questions can be found in chapter 6 where the findings from the case studies are discussed. 13

23 3 Framework for measuring cost of use and maintenance In this chapter the framework for measuring the cost of use and maintenance of a standard ERP package is presented. First the findings from the literature are discussed in section 3.1. Section 3.2 covers the findings from the case study analysis and in section 3.3 the framework for cost of maintenance is presented. Section 3.4 finally concludes this chapter. 3.1 Findings from literature In sections through findings from the literature review are presented which cover the following research questions: 1. What is ERP maintenance and which types of ERP maintenance exist? How can maintenance activities be organized according to literature? What kinds of costs are involved with ERP maintenance? Maintenance categories With ERP systems being relatively new compared to traditional information systems, there is little scientific literature available about its use and maintenance stage. Therefore, in this subsection research on software maintenance in general together with that on maintenance of ERP systems in particular is reviewed to understand what kinds of activities typically are carried out in this phase. From the literature there are seven maintenance categories identified: - Corrective: refers to fixing errors in the program, fixing performance issues and repair implementation failures (Abran and Nguyenkim 1991; Burch and Grupe 1993; Ng et al. 2002; Swanson 1976) - Adaptive: refers to adapting the system to meet changing environment such as changes in software and hardware or business processes and regulations (Abran and Nguyenkim 1991; Burch and Grupe 1993; Ng et al. 2002; Swanson 1976) - Perfective: eliminating the programs inefficiencies or other imperfections such as source code readability and poor use of computer operator time (Abran and Nguyenkim 1991; Burch and Grupe 1993; Ng et al. 2002; Swanson 1976) - Preventive: proactive maintenance which consists of a periodic inspection and review of the system to uncover and anticipate problems (Burch and Grupe 1993) - User-support and training: supporting and training the end users in using the system (Abran and Nguyenkim 1991; Ng et al. 2002) - Upgrade: upgrading the software to a newer version which has been developed by the vendor with major functional and technical improvements (Ng et al. 2002) - Patch maintenance: implementing small patches distributed by the vendor in order to fix, problems, adjust to changes in regulations or to realize small functional and/or technical improvements (Ng et al. 2002) Organizing maintenance In order to be able to measure the costs of ERP maintenance activities it is important to find out how these activities are typically managed within an organization. Since ERP is an information 14

24 system (IS) and maintaining such a system is something which is part of the IS management field, we approach ERP maintenance from this viewpoint. IS management involves all the activities and tasks needed to design, implement and manage the various information systems within an organization. IS management can be approached from several different perspectives such as the nature of the tasks and the object(s) on which the task is performed, the states in which an IS can find itself, the specific processes carried out and the way IS management tasks are organized (Looijen 2004). The latter is relevant for our framework. Looijen (2004) links the state in which an IS can find itself (use, change and exploit) to task areas and assigns them to one of the three types of management: functional management, application management and infrastructure management as depicted in Figure 8 (Looijen 2004). Figure 8: Linking IS states to management areas (Looijen 2004) Since information systems, like ERP systems, are software systems (application) which run on hardware (infrastructure) and used to support business processes (functional) and since the software, hardware as well as the functionality of it has to be maintained, it can be concluded that ERP maintenance activities are performed in all these IT management areas (Figure 9). 15

25 Business Internal IT organization Users and business processes Functional management Application management ERP Maintenance activities Infrastructure management Organization Figure 9: Organizing maintenance, adopted from (Meijer and Smalley 2006) Combining the three IS management areas with the maintenance categories of section 3.1.1, Table 3 presents all the maintenance activities which are performed within an organization. Table 3: Maintenance and use categories combined with IS management areas Functional management Application management Infrastructure management Corrective - All activities needed to keep the ERP application running when problems occur All activities needed to keep the infrastructure running when problems occur Adaptive All activities needed to adjust the application to the business when changes occur in the business processes (new users, new procedures etcetera) or regulations All activities needed to keep the application running when something has been changed All activities needed to keep the infrastructure running when something has been changed 16

26 Perfective Changing the way ERP is used to perform business operations in order to gain more benefits from it Changing the application parameters to improve performance Changing the infrastructure to improve performance Preventive General periodic maintenance to anticipate on changes in the business environment General periodic maintenance to keep the application in good condition and anticipate on problems General periodic maintenance to keep the infrastructure in good condition and anticipate on problems User support and training Providing user support on functional level Providing technical user support - Training the users to work with the ERP module Upgrade Activities needed to arrive at the functional design for the upgrade Technical design and implementation of the upgrade Adjusting the infrastructure to support the upgrade Patch maintenance All activities regarding the decision of implementing a vendor patch or parts of it Implementing a vendor patch or parts of it Adjusting the infrastructure to support the patches (if necessary) Cost dimensions The costs of the use and maintenance activities, identified in the previous section, manifest themselves in different forms. When designing an instrument to measure the total costs of use and maintenance it is important to first identify how these costs manifest themselves. Literature on cost of ERP and packaged application maintenance, as well as literature on total cost of ownership (TCO) for such systems, is consulted to see how costs were measured in earlier studies. It was found out that there are basically three different cost dimensions, namely: 1. Products & services: all costs for which an organization receives an invoice and has to pay in monetary units (Gable et al. 1998; Somers and Nelson 2004) 2. People: cost of effort spent by the internal IT personnel on maintenance activities (Abts et al. 2000; Boehm 1981; David et al. 2002; Somers and Nelson 2004) 17

27 3. Processes: indirect costs at the business side as a result of downtime due to planned or unplanned ERP maintenance activities; this also includes time spent on training by endusers. (David et al. 2002) 3.2 Findings from ROC case study The goal of the case study research was to find out: 11. How do organizations organize and execute ERP maintenance activities in practice? 12. How can one gather data on cost of maintenance activities in an organization? The case study was conducted at the Regional Education Centrum (ROC) Eindhoven. First an intake interview took place with the head of application management to understand how maintenance is organized within ROC and to identify which people and roles were involved in conducting maintenance activities specifically for PeopleSoft HRMS. Then, depending on the specific function and responsibility within the organization, for each identified respondent a different list of questions was prepared to conduct the semi structured interviews. The maintenance activities as listed in Table 3 were taken as a basis to formulate the questions. Next to the above stated two research questions also two research questions regarding the degree of customization were built into the interviews but those findings are discussed in the next chapter ERP maintenance at ROC Eindhoven HRMS maintenance activities are organized within ROC as depicted in Figure 10. All maintenance activities are divided over the three areas: functional management, technical application management and infrastructure management. The functional managers are dedicated to the HRMS package, within PeopleSoft technical management there is only one PeopleSoft developer which is responsible for changes in PeopleSoft HRMS as well as PeopleSoft Campus Solutions (CS) and the people within infrastructure management are not dedicated to any application at all. Since the latter makes it very difficult to measure the amount of effort spent on HRMS maintenance by Infrastructure management, it was decided to leave infrastructure (right column in Table 3) out of the framework. The following roles within ROC were identified as people responsible for maintaining the HRMS package and thus interviewed during the case study: - Change manager: responsible for managing all modifications to applications. - PeopleSoft developer: responsible for technical design of the modifications to PeopleSoft HRMS and CS. - PeopleSoft HRMS functional application mangers: responsible for providing functional support to HRMS users as well as performing functional maintenance activities such as training and functional design of the modifications to the HRMS package. Maintenance activities to HRMS package are, with the exception of user support and training, performed through change requests. A change request can either by initiated by end users 18

28 because of changes at the business side or by the application management department because of changes at the IT side (corrective, adaptive, preventive and perfective maintenance from Table 3). For each change request first the functional managers make a functional design which is then built by the PeopleSoft developer and again tested by the functional managers before it is implemented by the database administrator (DBA). Figure 10: HRMS maintenance at ROC Eindhoven Table 4 presents an overview of the maintenance activities which are performed for the HRMS package. The table includes almost all the maintenance activities except patches since ROC does not actively implement official Oracle patches. Whenever necessary, parts from the official patches are implemented into the system through a change request. 19

29 Table 4: Overview of maintenance activities at ROC Eindhoven PeopleSoft HRMS Functional application manager PeopleSoft developer Database administrator (DBA) Modifications through change requests (adaptive, corrective, perfective and preventive maintenance) Minor changes to the application Assessment of change requests Functional design of the modifications Testing the modifications built by the PeopleSoft developer Building the functional designs of the functional manager Testing the modifications Solving problems (bug fixes) Implementing the modifications Solving problems (bug fixes) User support Providing user support whenever necessary Training Training the users whenever new functionalities are added Upgrades and extension of used functionality Functional design Technical design and testing Collecting data on cost of maintenance activities The first goal of the case study was to identify (or verify) which maintenance activities are performed from the ones mentioned in the literature and how these activities are organized. The second goal of the case study was to see how we can gather data on cost of maintenance. 20

30 During the case study analysis, it became clear that maintenance activities involving infrastructure were impossible to ascribe to a single application, such as HRMS package, since the hardware is mostly shared with other applications. Also the people responsible for infrastructure maintenance are not committed to a single application. Besides, the respondents agreed that infrastructure maintenance activities are unlikely to be affected by the amount of customization in the application software. Therefore, taking this in mind, infrastructure maintenance is left out of the framework for cost of use and maintenance. For the remaining maintenance activities from Table 3 (the columns functional and application management), for each of the three cost dimensions products&services, people and processes it is identified which sources of information should be used. To gather data within an organization two kinds of sources can be distinguished: the knowledge available in the information systems (either or not automated) and the knowledge of people within the organization. Taking the maintenance activities and cost dimensions as a basis the following sources of information is identified in the case study analysis for measuring the cost of use and maintenance: Information systems: Incident and Problem management system, change management, Time reporting system, procurement system, financial system. People and roles within organization: Functional application manager, Technical application manager, application developer, Purchase/contract manger. 3.3 Measurement instrument for cost of use and maintenance Combining the findings from literature and ROC case study and the three cost dimensions, Table 5 was constructed. The total cost for maintaining the PeopleSoft HRMS package can be obtained by evaluating for each maintenance category the cost along the dimensions Products & services, People and Process. The overview is basically a matrix with the use and maintenance activities which are taken into account along the vertical axis and the cost dimensions along its horizontal axis. To obtain a complete view of the total cost of use and maintenance of the ERP system, all of the boxes in the matrix should be evaluated. 21

A benchmarking model for Maintenance and Support assignments in an ERP environment Andreas Holm Sebastian Mattsson

A benchmarking model for Maintenance and Support assignments in an ERP environment Andreas Holm Sebastian Mattsson Master thesis in Applied Information Technology REPORT NO. 2008:080 ISSN: 1651-4769 Department of Applied Information Technology A benchmarking model for Maintenance and Support assignments in an ERP environment

More information

HiTouch Business Services has been invited to serve as one of 14 organizations on HP s Managed Print Services Advisory Council.

HiTouch Business Services has been invited to serve as one of 14 organizations on HP s Managed Print Services Advisory Council. HP Managed Print Services (MPS) combines innovative hardware, software, and services to help organizations harness the power of information within their printing environment. HP s printer security services

More information

agility made possible

agility made possible SOLUTION BRIEF CA IT Asset Manager how can I manage my asset lifecycle, maximize the value of my IT investments, and get a portfolio view of all my assets? agility made possible helps reduce costs, automate

More information

Development, Acquisition, Implementation, and Maintenance of Application Systems

Development, Acquisition, Implementation, and Maintenance of Application Systems Development, Acquisition, Implementation, and Maintenance of Application Systems Part of a series of notes to help Centers review their own Center internal management processes from the point of view of

More information

14 TRUTHS: How To Prepare For, Select, Implement And Optimize Your ERP Solution

14 TRUTHS: How To Prepare For, Select, Implement And Optimize Your ERP Solution 2015 ERP GUIDE 14 TRUTHS: How To Prepare For, Select, Implement And Optimize Your ERP Solution Some ERP implementations can be described as transformational, company-changing events. Others are big disappointments

More information

Application Services Portfolio

Application Services Portfolio Application Services Portfolio Overview Injazat Application Services offer end-to-end solutions that align Enterprises business objectives with their IT goals. Our solutions focus on implementing, building

More information

Cisco Unified Communications and Collaboration technology is changing the way we go about the business of the University.

Cisco Unified Communications and Collaboration technology is changing the way we go about the business of the University. Data Sheet Cisco Optimization s Optimize Your Solution using Cisco Expertise and Leading Practices Optimizing Your Business Architecture Today, enabling business innovation and agility is about being able

More information

Global Shared Support Service:

Global Shared Support Service: Global Shared Support Service: Leveraging expertise, sharing costs andderiving value Chandra Shekar Kakal Shared service in any field comes with an implicit assumption of reduced cost and improved efficiency.

More information

Technology Lifecycle Management. A Model for Enabling Systematic Budgeting and Administration of Government Technology Programs

Technology Lifecycle Management. A Model for Enabling Systematic Budgeting and Administration of Government Technology Programs Technology Lifecycle Management A Model for Enabling Systematic Budgeting and Administration of Government Technology Programs Even as technology improves, government s fundamental IT challenge remains

More information

BRIDGE. the gaps between IT, cloud service providers, and the business. IT service management for the cloud. Business white paper

BRIDGE. the gaps between IT, cloud service providers, and the business. IT service management for the cloud. Business white paper BRIDGE the gaps between IT, cloud service providers, and the business. IT service management for the cloud Business white paper Executive summary Today, with more and more cloud services materializing,

More information

SOLUTION BRIEF: CA IT ASSET MANAGER. How can I reduce IT asset costs to address my organization s budget pressures?

SOLUTION BRIEF: CA IT ASSET MANAGER. How can I reduce IT asset costs to address my organization s budget pressures? SOLUTION BRIEF: CA IT ASSET MANAGER How can I reduce IT asset costs to address my organization s budget pressures? CA IT Asset Manager helps you optimize your IT investments and avoid overspending by enabling

More information

PLM and ERP Integration: Business Efficiency and Value A CIMdata Report

PLM and ERP Integration: Business Efficiency and Value A CIMdata Report PLM and ERP Integration: Business Efficiency and Value A CIMdata Report Mechatronics A CI PLM and ERP Integration: Business Efficiency and Value 1. Introduction The integration of Product Lifecycle Management

More information

The Extent of ERP Customization towards User Satisfaction in Daily Operation for Manufacturing Companies

The Extent of ERP Customization towards User Satisfaction in Daily Operation for Manufacturing Companies 1788 JOURNAL OF COMPUTERS, VOL. 8, NO. 7, JULY 2013 The Extent of ERP Customization towards User Satisfaction in Daily Operation for Manufacturing Companies Kasturi Kanchymalay Faculty of Information and

More information

View Point. Oracle Applications and the economics of Cloud Computing. Abstract

View Point. Oracle Applications and the economics of Cloud Computing. Abstract View Point Oracle Applications and the economics of Cloud Computing Mandar Bhale Abstract Cloud computing is making waves in the Enterprise package space as the latest trend in Information Technology.

More information

Designing a Process Architecture - A Concrete Approach

Designing a Process Architecture - A Concrete Approach Designing a Process Architecture - A Concrete Approach Remco Dijkman, Eindhoven University of Technology Introduction Nowadays, business process management techniques develop quickly in both academia and

More information

An InControl Technology White Paper

An InControl Technology White Paper An InControl Technology White Paper Defining Asset Intelligence and the evolution from IT inventory InControl Technology, Inc. 4025 Camino Del Rio South, Suite 300 San Diego, CA 92108 Phone: (1) 619.542.7732

More information

ASL 2, An introduction

ASL 2, An introduction ASL 2, An introduction Machteld Meijer and Louk Peters - Introduction - Why ASL? - What is ASL? - ASL framework - What can you do with ASL? - ASL in relation to other frameworks - More Info Introduction

More information

Cisco Network Optimization Service

Cisco Network Optimization Service Service Data Sheet Cisco Network Optimization Service Optimize your network for borderless business evolution and innovation using Cisco expertise and leading practices. New Expanded Smart Analytics Offerings

More information

2. MOTIVATING SCENARIOS 1. INTRODUCTION

2. MOTIVATING SCENARIOS 1. INTRODUCTION Multiple Dimensions of Concern in Software Testing Stanley M. Sutton, Jr. EC Cubed, Inc. 15 River Road, Suite 310 Wilton, Connecticut 06897 ssutton@eccubed.com 1. INTRODUCTION Software testing is an area

More information

How To Develop Software

How To Develop Software Software Engineering Prof. N.L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture-4 Overview of Phases (Part - II) We studied the problem definition phase, with which

More information

SAP Managed Services SAP MANAGED SERVICES. Maximizing Performance and Value, Minimizing Risk and Cost

SAP Managed Services SAP MANAGED SERVICES. Maximizing Performance and Value, Minimizing Risk and Cost SAP Managed Services SAP MANAGED SERVICES Maximizing Performance and Value, Minimizing Risk and Cost WE RE FOCUSED ON YOUR GOALS Increase productivity with fewer resources. Optimize IT systems while cutting

More information

White Paper. Business Analysis meets Business Information Management

White Paper. Business Analysis meets Business Information Management White Paper BABOK v2 & BiSL Business Analysis meets Business Information Management Business Analysis (BA) and Business Information Management (BIM) are two highly-interconnected fields that contribute

More information

Supply chain management in the ERP industry

Supply chain management in the ERP industry Chapter 5 Supply chain management in the ERP industry 5.1 Introduction Supply chain management is a management philosophy that takes a systems approach to viewing the supply chain as a single entity (Mentzer

More information

CONTENTS. List of Tables List of Figures

CONTENTS. List of Tables List of Figures Prelims 13/3/06 9:11 pm Page iii CONTENTS List of Tables List of Figures ix xi 1 Introduction 1 1.1 The Need for Guidance on ERP System Validation 1 1.2 The Need to Validate ERP Systems 3 1.3 The ERP Implementation

More information

10 Best Practices in Printer Fleet Management

10 Best Practices in Printer Fleet Management 10 Best Practices in Printer Fleet Management Corporations recognize that they need to address out of control costs associated with network printing. How do they get there? Many are looking to solve it

More information

PUBLIC RELEASE PATENT AND TRADEMARK OFFICE. Inadequate Contractor Transition Risks Increased System Cost and Delays

PUBLIC RELEASE PATENT AND TRADEMARK OFFICE. Inadequate Contractor Transition Risks Increased System Cost and Delays PUBLIC RELEASE PATENT AND TRADEMARK OFFICE Inadequate Contractor Transition Risks Increased System Cost and Delays Inspection Report No. OSE-10084-8-0001 / December 1997 Office of Systems Evaluation PTO

More information

Automated IT Asset Management Maximize organizational value using BMC Track-It! WHITE PAPER

Automated IT Asset Management Maximize organizational value using BMC Track-It! WHITE PAPER Automated IT Asset Management Maximize organizational value using BMC Track-It! WHITE PAPER CONTENTS ADAPTING TO THE CONSTANTLY CHANGING ENVIRONMENT....................... 1 THE FOUR KEY BENEFITS OF AUTOMATION..................................

More information

WHITE PAPER Using SAP Solution Manager to Improve IT Staff Efficiency While Reducing IT Costs and Improving Availability

WHITE PAPER Using SAP Solution Manager to Improve IT Staff Efficiency While Reducing IT Costs and Improving Availability WHITE PAPER Using SAP Solution Manager to Improve IT Staff Efficiency While Reducing IT Costs and Improving Availability Sponsored by: SAP Elaina Stergiades November 2009 Eric Hatcher EXECUTIVE SUMMARY

More information

The Continuously Current Enterprise: Trends in lifecycle management of automation assets

The Continuously Current Enterprise: Trends in lifecycle management of automation assets : Trends in lifecycle management of automation assets 1. Introduction 2. Managing the Automation Lifecycle 3. Return on Upgrade Investment 4. Ramping Up to the Enterprise 5. Customer FIRST Regardless of

More information

THE BENEFITS OF CHANGE MANAGEMENT SAASAM WHITE PAPER. 439/35 Hobson Street, 1010, Auckland, New Zealand www.saasam.co.nz

THE BENEFITS OF CHANGE MANAGEMENT SAASAM WHITE PAPER. 439/35 Hobson Street, 1010, Auckland, New Zealand www.saasam.co.nz THE BENEFITS OF CHANGE MANAGEMENT SAASAM WHITE PAPER 439/35 Hobson Street, 1010, Auckland, New Zealand www.saasam.co.nz Why Do We Need Change Management? Change is an inevitable part of every IT department

More information

ENTERPRISE Resource Planning (ERP) software is one

ENTERPRISE Resource Planning (ERP) software is one 322 IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, VOL. 51, NO. 3, AUGUST 2004 A Framework for Evaluating ERP Implementation Choices Wenhong Luo and Diane M. Strong Abstract A key issue in enterprise resource

More information

Altiris Asset Management Suite 7.1 from Symantec

Altiris Asset Management Suite 7.1 from Symantec Ensuring compliance and maximizing your IT investment Overviewview In IT change is inevitable, but asset management provides a starting point for disciplined, standards-based management that elevates the

More information

W H I T E P A P E R T h e B u s i n e s s V a l u e o f P r o a c t i v e S u p p o r t S e r v i c e s

W H I T E P A P E R T h e B u s i n e s s V a l u e o f P r o a c t i v e S u p p o r t S e r v i c e s Global Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.872.8200 F.508.935.4015 www.idc.com W H I T E P A P E R T h e B u s i n e s s V a l u e o f P r o a c t i v e S u p p o r t S e r v i

More information

ENTERPRISE MANAGEMENT AND SUPPORT IN THE TELECOMMUNICATIONS INDUSTRY

ENTERPRISE MANAGEMENT AND SUPPORT IN THE TELECOMMUNICATIONS INDUSTRY ENTERPRISE MANAGEMENT AND SUPPORT IN THE TELECOMMUNICATIONS INDUSTRY The Telecommunications Industry Companies in the telecommunications industry face a number of challenges as market saturation, slow

More information

Enterprise System Assimilation: phases, activities, and outcomes

Enterprise System Assimilation: phases, activities, and outcomes Przemysław Lech * Enterprise System Assimilation: phases, activities, and outcomes Introduction Enterprise systems (ES) are the backbone of most global manufacturing and service enterprises [Muscatello,

More information

White Paper. Comparison of ISO/IEC 20000 with ASL and BiSL

White Paper. Comparison of ISO/IEC 20000 with ASL and BiSL White Paper Comparison of ISO/IEC 20000 with ASL and BiSL Both ISO/IEC 20000 and ASL offer guidance for IT Service Providers, ISO/IEC 20000 giving broad guidance for IT Service Management and ASL focusing

More information

ITIL V3 and ASL Sound Guidance for Application Management and Application Development

ITIL V3 and ASL Sound Guidance for Application Management and Application Development For IT V3 and Sound Guidance for Application and Application Development Machteld Meijer, Mark Smalley & Sharon Taylor Alignment White Paper January 2008 V3 & : A Comparison Abstract In May 2007, the Office

More information

ITIL V3 Application Support Volume 1

ITIL V3 Application Support Volume 1 ITIL V3 Application Support Volume 1 Service Management For Application Support ITIL is a Registered Trade Mark and Community Trademark of the Office of Government and Commerce. This document may contain

More information

A discussion of information integration solutions November 2005. Deploying a Center of Excellence for data integration.

A discussion of information integration solutions November 2005. Deploying a Center of Excellence for data integration. A discussion of information integration solutions November 2005 Deploying a Center of Excellence for data integration. Page 1 Contents Summary This paper describes: 1 Summary 1 Introduction 2 Mastering

More information

POINT OF VIEW. The Critical Role of Networking in Enterprise Resource Planning. Introduction

POINT OF VIEW. The Critical Role of Networking in Enterprise Resource Planning. Introduction The Critical Role of Networking in Enterprise Resource Planning Introduction Achieving and maintaining competitive advantage is the raison d etre for every business around the world. Doing so requires

More information

Network Configuration Management

Network Configuration Management Network Configuration Management Contents Abstract Best Practices for Configuration Management What is Configuration Management? FCAPS Configuration Management Operational Issues IT Infrastructure Library

More information

How To Save Money On Print

How To Save Money On Print Expect More savings Smart Managed Document Solutions from OKI Smart Managed Document Solutions from OKI A long-term strategy for reducing costs and increasing efficiencies. The costs of printer hardware,

More information

HR Technology Strategies that Work in Healthcare. Background

HR Technology Strategies that Work in Healthcare. Background HR Technology Strategies that Work in Healthcare Shawn Davis Intermountain Healthcare Background Shawn Davis Director, HR Workforce Solutions & Analytics IHRIM Board of Directors (2009-2011) HRIP Certification

More information

How To Manage It Asset Management On Peoplesoft.Com

How To Manage It Asset Management On Peoplesoft.Com PEOPLESOFT IT ASSET MANAGEMENT KEY BENEFITS Streamline the IT Asset Lifecycle Ensure IT and Corporate Compliance Enterprise-Wide Integration Oracle s PeopleSoft IT Asset Management streamlines and automates

More information

Change Management Procedures Re: The Peoplesoft Application at Mona

Change Management Procedures Re: The Peoplesoft Application at Mona Change Management Procedures Re: The Peoplesoft Application at Mona (The original Peoplesoft document was modified to relate more closely to UWI Mona) See also.. MITS Project Management Methodology & MITS

More information

Defining, Modeling & Costing IT Services Integrating Service Level, Configuration & Financial Management Processes

Defining, Modeling & Costing IT Services Integrating Service Level, Configuration & Financial Management Processes Defining, Modeling & Costing IT Services Integrating Service Level, Configuration & Financial Management Processes In our cost driven economy IT is facing increasing pressure to account for and reduce

More information

Simplify and Automate IT

Simplify and Automate IT Simplify and Automate IT Expectations have never been higher Reduce IT Costs 30% increase in staff efficiency Reduce support costs by 25% Improve Quality of Service Reduce downtime by 75% 70% faster MTTR

More information

A Proven Approach for Successful Systems Integration

A Proven Approach for Successful Systems Integration FIS POSITION PAPER A Proven Approach for Successful Systems Integration David Luttig FIS Consulting Services 1 800 822 6758 Introduction System integration involves integrating existing (often disparate)

More information

How much do you pay for your PKI solution?

How much do you pay for your PKI solution? Information Paper Understand the total cost of your PKI How much do you pay for your PKI? A closer look into the real costs associated with building and running your own Public Key Infrastructure and 3SKey.

More information

The Customizable Cloud. How the Cloud Provides the More Flexible Alternative to Legacy ERP Platforms

The Customizable Cloud. How the Cloud Provides the More Flexible Alternative to Legacy ERP Platforms How the Cloud Provides the More Flexible Alternative to Legacy ERP Platforms Executive Summary For years, Enterprise Resource Planning (ERP) applications have been instrumental in integrating business

More information

Making the Business Case for IT Asset Management

Making the Business Case for IT Asset Management 1 The business case for IT Asset Management Making the Business Case for IT Asset Management Executive Summary IT Asset Management (ITAM) is an important business discipline that provides insight into

More information

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

Achieve greater efficiency in asset management by managing all your asset types on a single platform. Asset solutions To support your business objectives Achieve greater efficiency in asset by managing all your asset types on a single platform. When you use Maximo Asset Management to help maximize the

More information

An ERP Life cycle and its Competitive Advantages in SMEs

An ERP Life cycle and its Competitive Advantages in SMEs An ERP Life cycle and its Competitive Advantages in SMEs Aniket A. Deshmukh 1, Dr. Arun Kumar 2 1 Mechanical Department, VIVA Institute of Technology. Virar (E), Maharashtra, India 2 Mechanical Departments,

More information

A LANDCSAPE OF ENTERPRISE RESOURCE PLANNING IMPLEMENTATION

A LANDCSAPE OF ENTERPRISE RESOURCE PLANNING IMPLEMENTATION A LANDCSAPE OF ENTERPRISE RESOURCE PLANNING IMPLEMENTATION Marina Hassan 1, 2 and Marzanah A. Jabar 1 1 Universiti Putra Malaysia (UPM), Malaysia, marina@unisel.edu.my 1 Universiti Putra Malaysia (UPM),

More information

EXIN Accredited 4 days workshop on ITIL Intermediate Qualification- Release Control & Validation Certificate

EXIN Accredited 4 days workshop on ITIL Intermediate Qualification- Release Control & Validation Certificate EXIN Accredited 4 days workshop on ITIL Intermediate Qualification- Release Control & Validation Certificate About the Workshop Workshop on The ITIL Intermediate Qualification: Release, Control and Validation

More information

DATABASE ANALYST I DATABASE ANALYST II

DATABASE ANALYST I DATABASE ANALYST II CITY OF ROSEVILLE DATABASE ANALYST I DATABASE ANALYST II DEFINITION To perform professional level work in designing, installing, managing, updating, and securing a variety of database systems, including

More information

A technical paper for Microsoft Dynamics AX users

A technical paper for Microsoft Dynamics AX users s c i t y l a n a g n i Implement. d e d e e N is h c a o r Why a New app A technical paper for Microsoft Dynamics AX users ABOUT THIS WHITEPAPER 03 06 A TRADITIONAL APPROACH TO BI A NEW APPROACH This

More information

ENTERPRISEWIZARD WHITE PAPER

ENTERPRISEWIZARD WHITE PAPER ENTERPRISEWIZARD WHITE PAPER THE BENEFITS OF CHANGE MANAGEMENT E N T E R P R I S E W I Z A R D 460 Seaport Court Suite #200 Redwood City, CA 94063 888.727.2209 650.587.8615 sales@enterprisewizard.com www.enterprisewizard.com

More information

AN ALTERNATIVE MODEL OF ERP MAINTENANCE STRATEGY

AN ALTERNATIVE MODEL OF ERP MAINTENANCE STRATEGY AN ALTERNATIVE MODEL OF ERP MAINTENANCE STRATEGY Muhammad Rofi IMTIHAN 1, Mohd. Salihin NGADIMAN, Habibollah HARON Department of Modelling and Industrial Computing Faculty of Computer Science and Information

More information

www.pwchk.com Inspiration for what is possible Inspiring new possibilities for your business with PwC and Oracle

www.pwchk.com Inspiration for what is possible Inspiring new possibilities for your business with PwC and Oracle www.pwchk.com Inspiration for what is possible Inspiring new possibilities for your business with PwC and Oracle Oracle Business Applications Practice Overview December 2013 Inspiring new possibilities

More information

AssetCenter 4.4. Total Asset Visibility and Control. Control Costs. Ensure Compliance. Reduce Complexity

AssetCenter 4.4. Total Asset Visibility and Control. Control Costs. Ensure Compliance. Reduce Complexity AssetCenter 4.4 Total Asset Visibility and Control Control Costs Ensure Compliance Reduce Complexity Peregrine AssetCenter Compliance requirements. Complex infrastructure. Exploding demand. Tighter budgets.

More information

The Power Of Managed Services. Features

The Power Of Managed Services. Features b u s i n e s s C a r e m a n a g e d S e r v i c e s Lower costs, increased profitability, new market expansions and happier customers. These are just a few of the most important priorities for business

More information

HP Service Manager. Software Version: 9.34 For the supported Windows and UNIX operating systems. Processes and Best Practices Guide

HP Service Manager. Software Version: 9.34 For the supported Windows and UNIX operating systems. Processes and Best Practices Guide HP Service Manager Software Version: 9.34 For the supported Windows and UNIX operating systems Processes and Best Practices Guide Document Release Date: July 2014 Software Release Date: July 2014 Legal

More information

Non-Stop Manufacturing Excellence. Automotive. Answers for industry.

Non-Stop Manufacturing Excellence. Automotive. Answers for industry. Non-Stop Manufacturing Excellence. Automotive Answers for industry. Answers to your challenges How can the potential of emerging markets be best economically tapped? What possibilities are there of reducing

More information

Managing the Unmanaged Print Fleet

Managing the Unmanaged Print Fleet Managing the Unmanaged Print Fleet A Staples, Inc. White Paper April 2012 Executive Summary While office printers may seem easy enough to manage, many businesses are hard pressed to state exactly how many

More information

Request for Proposal for Application Development and Maintenance Services for XML Store platforms

Request for Proposal for Application Development and Maintenance Services for XML Store platforms Request for Proposal for Application Development and Maintenance s for ML Store platforms Annex 4: Application Development & Maintenance Requirements Description TABLE OF CONTENTS Page 1 1.0 s Overview...

More information

ENTERPRISE RESOURCE PLANNING SYSTEMS

ENTERPRISE RESOURCE PLANNING SYSTEMS CHAPTER ENTERPRISE RESOURCE PLANNING SYSTEMS This chapter introduces an approach to information system development that represents the next step on a continuum that began with stand-alone applications,

More information

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

Achieve greater efficiency in asset management by managing all your asset types on a single platform. Asset solutions To support your business objectives Achieve greater efficiency in asset by managing all your asset types on a single platform. Obtain an entirely new level of asset awareness Every company

More information

OpenERP evaluation with SAP as reference. Learn by discovering where the challenger meets the leader.

OpenERP evaluation with SAP as reference. Learn by discovering where the challenger meets the leader. OpenERP evaluation with SAP as reference Learn by discovering where the challenger meets the leader. A world in constant evolution The first industrial application of the electricity appeared around 1880

More information

Microsoft SQL Server and Oracle Database:

Microsoft SQL Server and Oracle Database: Microsoft SQL Server and Oracle Database: A Comparative Study on Total Cost of Administration (TCA) A case study on the comparative costs of database administration for two of the premier enterprise relational

More information

A Work Breakdown Structure for Implementing and Costing an ERP Project

A Work Breakdown Structure for Implementing and Costing an ERP Project 94 Aisha Momoh, Decision Engineering Centre, Cranfield University, Bedford, UK,a.momoh@cranfield.ac.uk Rajkumar Roy, Decision Engineering Centre, Cranfield University, Bedford, UK, r.roy@cranfield.ac.uk

More information

University of Central Florida Class Specification Administrative and Professional. Director Systems and Operations

University of Central Florida Class Specification Administrative and Professional. Director Systems and Operations Director Systems and Operations Job Code: 2519 Report to the university Chief Technology Officer. Serve as the top technical administrator for enterprise systems and operations. Direct the functional areas

More information

The Ten How Factors That Can Affect ERP TCO

The Ten How Factors That Can Affect ERP TCO The Ten How Factors That Can Affect ERP TCO Gartner RAS Core Research Note G00172356, Denise Ganly, 1 February 2010, V1RA9 04082011 Organizations tend to focus on the what that is, the vendor or the product

More information

A Revelatory Case Study into the Adequacy of Standard Maintenance Models in an ERP Context

A Revelatory Case Study into the Adequacy of Standard Maintenance Models in an ERP Context A Revelatory Case Study into the Adequacy of Standard Maintenance Models in an ERP Context Celeste See Pui Ng a, Guy Gable b and Taizan Chan c Abstract a Centre of Information Technology Innovation, Queensland

More information

ERP Briefing. Cook County Government. Bureau of Finance Enterprise Resource Planning Center of Excellence. August 19, 2014

ERP Briefing. Cook County Government. Bureau of Finance Enterprise Resource Planning Center of Excellence. August 19, 2014 Cook County Government Bureau of Finance Enterprise Resource Planning Center of Excellence ERP Briefing August 19, 2014 DISCLAIMER: This presentation is thought to be accurate on the date it is posted,

More information

the limits of your infrastructure. How to get the most out of virtualization

the limits of your infrastructure. How to get the most out of virtualization the limits of your infrastructure. How to get the most out of virtualization Business white paper Table of contents Executive summary...4 The benefits of virtualization?...4 How people and processes add

More information

Accelerating the Transition to Hybrid Cloud with Oracle Managed Cloud Integration Service

Accelerating the Transition to Hybrid Cloud with Oracle Managed Cloud Integration Service Accelerating the Transition to Hybrid Cloud with Oracle Managed Cloud Integration Service How to Connect Applications More Quickly and with Less Risk O R A C L E W H I T E P A P E R O C T O B E R 2 0 1

More information

How To Compare The Profit From Aaas To Onpremise On A Computer Or A Server Or Server (Forrester)

How To Compare The Profit From Aaas To Onpremise On A Computer Or A Server Or Server (Forrester) September 20, 2006 Comparing The ROI Of SaaS Versus On-Premise Using Forrester s TEI Approach by R Ray Wang TECH CHOICES Helping Business Thrive On Technology Change TECH CHOICES Includes a TEI model and

More information

SEVEN WAYS TO AVOID ERP IMPLEMENTATION FAILURE SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND

SEVEN WAYS TO AVOID ERP IMPLEMENTATION FAILURE SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND SEVEN WAYS TO AVOID ERP IMPLEMENTATION FAILURE SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND CONTENTS INTRODUCTION................................ 3 UNDERSTAND YOUR CURRENT SITUATION............ 4 DRAW

More information

COMPARATIVE STUDY OF ERP IMPLEMENTATION METHODOLOGY CASE STUDY: ACCELERATED SAP VS DANTES & HASIBUAN METHODOLOGY

COMPARATIVE STUDY OF ERP IMPLEMENTATION METHODOLOGY CASE STUDY: ACCELERATED SAP VS DANTES & HASIBUAN METHODOLOGY COMPARATIVE STUDY OF ERP IMPLEMENTATION METHODOLOGY CASE STUDY: ACCELERATED SAP VS DANTES & HASIBUAN METHODOLOGY M. Hilman, F. Setiadi, I. Sarika, J. Budiasto, and R. Alfian Faculty of Computer Science,

More information

Managed Data Center Operation and continuous transformation of data center environments

Managed Data Center Operation and continuous transformation of data center environments Managed Data Center Operation and continuous transformation of data center environments Managed Data Center In order to improve their IT and thus give their business an added boost, enterprises are constantly

More information

IT support of contract and contracting

IT support of contract and contracting IT support of contract and contracting Carolyn Paris presented at e-stockholm 08 Proactive Law & IT Who am I? Former lawyer, corporate finance partner, Davis Polk & Wardwell NYC 1978-1999 Experience in

More information

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. February 2013 1 Executive Summary Adnet is pleased to provide this white paper, describing our approach to performing

More information

The Power of Risk, Compliance & Security Management in SAP S/4HANA

The Power of Risk, Compliance & Security Management in SAP S/4HANA The Power of Risk, Compliance & Security Management in SAP S/4HANA OUR AGENDA Key Learnings Observations on Risk & Compliance Management Current State Current Challenges The SAP GRC and Security Solution

More information

A decision framework for enterprise resource planning maintenance and upgrade: A client perspective

A decision framework for enterprise resource planning maintenance and upgrade: A client perspective JOURNAL OF SOFTWARE MAINTENANCE AND EVOLUTION: RESEARCH AND PRACTICE J. Softw. Maint. Evol.: Res. Pract. 2001; 13:431 468 (DOI: 10.1002/smr.241) Research A decision framework for enterprise resource planning

More information

Why Professional Services Firms Need an Integrated ERP Solution

Why Professional Services Firms Need an Integrated ERP Solution A Computer Generated Solutions, Inc. White Paper Why Professional Services Firms Need an Integrated ERP Solution Microsoft Dynamics Case Study 2011 Table of Contents ERP Landscape... 3-4 A More Focused

More information

PEOPLESOFT IT ASSET MANAGEMENT

PEOPLESOFT IT ASSET MANAGEMENT PEOPLESOFT IT ASSET MANAGEMENT K E Y B E N E F I T S Streamline the IT Asset Lifecycle Ensure IT and Corporate Compliance Enterprise-Wide Integration P E O P L E S O F T F I N A N C I A L M A N A G E M

More information

A system is a set of integrated components interacting with each other to serve a common purpose.

A system is a set of integrated components interacting with each other to serve a common purpose. SYSTEM DEVELOPMENT AND THE WATERFALL MODEL What is a System? (Ch. 18) A system is a set of integrated components interacting with each other to serve a common purpose. A computer-based system is a system

More information

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

Achieve greater efficiency in asset management by managing all your asset types on a single platform. Asset solutions To support your business objectives Achieve greater efficiency in asset by managing all your asset types on a single platform. Obtain an entirely new level of asset awareness Every company

More information

Information Systems Change Management and Control

Information Systems Change Management and Control Information Systems Change Management and Control (Sample Document - Not for Distribution) Copyright 1996-2012 Management Systems Consulting, Inc. Table of Contents Page 1.0 Procedure Description... 1

More information

Service Desk Best Practices

Service Desk Best Practices Service Desk Best Practices As an IT service provider, you understand that information can provide a powerful strategic advantage. In order to ensure the proper mechanisms are in place for information

More information

Address IT costs and streamline operations with IBM service request and asset management solutions.

Address IT costs and streamline operations with IBM service request and asset management solutions. Service management solutions To support your IT objectives Address IT costs and streamline operations with IBM service request and asset management solutions. Highlights Help service desk technicians become

More information

How To Know The Roi Of Cesp Workload Automation Software

How To Know The Roi Of Cesp Workload Automation Software WHITE PAPER CA ESP Workload Automation Software: Measuring Business Impact and ROI Sponsored by: CA Tim Grieser Eric Hatcher September 2009 Randy Perry Global Headquarters: 5 Speen Street Framingham, MA

More information

Reducing Cost While Simplifying Administration: Monetizing the Benefits of SAP ASE

Reducing Cost While Simplifying Administration: Monetizing the Benefits of SAP ASE WHITE PAPER Reducing Cost While Simplifying Administration: Monetizing the Benefits of SAP ASE Sponsored by: SAP Carl W. Olofson June 2014 Randy Perry EXECUTIVE SUMMARY In 2011, SAP asked IDC to study

More information

Five Fundamental Data Quality Practices

Five Fundamental Data Quality Practices Five Fundamental Data Quality Practices W H I T E PA P E R : DATA QUALITY & DATA INTEGRATION David Loshin WHITE PAPER: DATA QUALITY & DATA INTEGRATION Five Fundamental Data Quality Practices 2 INTRODUCTION

More information

The End of a Cost Centre - Transform Enterprise Printing into Competitive Advantage

The End of a Cost Centre - Transform Enterprise Printing into Competitive Advantage The End of a Cost Centre - Transform Enterprise Printing into Competitive Advantage Xerox Event, Riyadh, 14 May 2012 Tobias Kleu Research Manager Imaging and Hardcopy Peripherals, Print Services & Document

More information

Validating Enterprise Systems: A Practical Guide

Validating Enterprise Systems: A Practical Guide Table of Contents Validating Enterprise Systems: A Practical Guide Foreword 1 Introduction The Need for Guidance on Compliant Enterprise Systems What is an Enterprise System The Need to Validate Enterprise

More information

can you simplify your infrastructure?

can you simplify your infrastructure? SOLUTION BRIEF CA Virtual Desktop Automation for Vblock Platforms can you simplify your infrastructure? agility made possible You Can. With services that increase the speed of virtual provisioning on Vblock

More information