1 Gestionnaire du Réseau de Transport d'electricité On line security assessment based on probabilistic approach and data mining P. Panciatici, S. Henry EPCC, June 2007
2 EPCC, June An example : Operating rules against voltage collapse in the southeast region of France (PACA) Context Statistical method. consistency check of samplings Results and conclusions Improvement : base cases selection
3 Context: PACA area EPCC, June PACA: Area with potential problems of voltage collapse vers MONTRICHER vers VALENCE SERRE-BARBIN vers CHAMPAGNIER BRIANCON vers PRATCLAUX L ARGENTIERE MONTPEZAT LOGI CRUAS-MEYSSE COULANGE S- GRISOLLES BOUDEYRE PIED-DE-BORNE NEUF SERRE-PONCON CHÂTEAU-NEUF-DU-RHONE CURBANS LAFIGERE TRICASTIN PIERRELATTE TRICASTIN BOLLENE BARJAC PHENIX SISTERON VIRADEL L ARDOISE VALABRES S ST AUBAN BANCAIRON vers CAMPOROSSO T vers ST-VICTOR LA MOTTE CASTILLON ROQUEBILLIERE TERRADOU BROC-CARROSD ITALIE T AVIGNON ORAISON LA CHAUDANNE MENTON MOUISSONNES A GANGES AG ARAMON A ROUMOULES LINGOSTIERE TRINITER L JONQUIERES ASSV CHATEAURENARD STE TULLE P. DE GRASSE RISSO CAGNES/MER ST-CESAIRE BEAUCAIRE P. D ORGON STE CROIX MOUGINSM E T.S. QUINSON A L BOUTRE Nice ROQUEROUSSE ST ESTEVE S TRANS vers TAMAREAU RASSUENST CHAMAS vers ST-CHRISTOL PALUN FEUILLANE ROGNAC VINS CABAN SEPTEME LAVERA Réaltor ARENC RENAIRES ENCO-DEBOTTE DARSE BELLE DE NEOULES MARTIGUES-PONTEAU MAI MAZARGUES RABATAU COUDON VALLAT Marseille L ESCAILLON Toulon Assess the collapse risk in real time Groupe Ligne 400 kv Ligne 225 kv Nice area is nearly an antenna (few interconnections) Unbalanced : generation (west) and load (east) Operating rules usable in real time allowing the prevention of voltage collapse in PACA
4 EPCC, June A rule to assess if a situation is acceptable (first rule in 1997) 400 kv Voltage (Réaltor) > 390 kv Acceptable situation AND Reactive Generation (hydro plants in Durance+Verdon) < 400 Mvar Simple and clear criteria Used in real time AND Regional Reactive Import < 260 Mvar REFUSE Decrease of the imposed generation Economy: ~ 1 M per year OK
5 Base case Random samplings Build of the situations EPCC, June General method Optimal Power Flow Selection of realistic situations Set of situations Situation probabilities Contingency simulations Margin computations Statistical analysis Decision trees Operating rules Measure of consequences Characterisation of situations
6 Build of the situations EPCC, June Base case: created from a snapshot (winter peak) The samplings carried out for each situation are: line and transformer unavailabilities load level of the area production (in the area and surrounding areas)
7 Random samplings EPCC, June Topology: Max. of 1 unavailable device (transformer or line in the area) Load level: [4500 MW ; 8000 MW] in the area Generation : availability of regional units surrounding areas units remote units Busbar configuration in 2 important substations in Roquerousse: two nodes in 50 % of the cases in Sisteron : two nodes when generation of Durance valley is high and load level low. Noise on some parameters : (α,β), Qmax, Vc of voltage control pilot points
8 EPCC, June Initial point determination The initial point is determined with an Optimal Power Flow: generation start-up (with respect of unit samplings) voltage profile in the area ( Vmin,Vmax) We suppress from the set, the situations for which the OPF doesn't converge or converge with: load shedding an amont of Mvar added larger than 150 Mvar Corresponding cases are mainly due to unrealistic samplings (no correlation taken into account)
9 EPCC, June Description of the set of situations initial situations Total Number of situations kept situations after OPF Total Number of situations this emphasizes the need for the generation of a large number of initial situations
10 Base case Random samplings Build of the situations EPCC, June Consistency check of samplings Optimal Power Flow Selection of realistic situations Set of simulated situations Data base of snapshots Comparison of statistics on some important variables Consistent? NO
11 A priori Important variables EPCC, June vers MONTRICHER vers PRATCLAUX vers ST-VICTOR PIED-DE-BORNE LAFIGERE GANGES vers TAMAREAU MONTPEZAT CRUAS-MEYSSE VIRADEL BOUDEYRE BARJAC LOGIS-NEUF CHÂTEAU-NEUF-DU-RHONE PIERRELATTE TRICASTIN BOLLENE PHENIX L ARDOISE LA MOTTE TERRADOU TAVE AVIGNON MOUISSONNES AGASSE L ARAMON S CHATEAURENARD JONQUIERES ST-CESAIRE BEAUCAIRE P. D ORGON vers ST-CHRISTOL TRICASTIN vers VALENCE COULANGE vers CHAMPAGNIER CURBANS L ARGENTIERE GRISOLLES BOUTRE ROQUEROUSSE ST ESTEVE TRANS RASSUEN ST CHAMAS PALUN FEUILLANE ROGNAC VINS CABAN REALTOR RENAIRES LAVERA SEPTEME ARENC ENCO-DEBOTTE DARSE BELLE DE MAI NEOULES MARTIGUES-PONTEAU MAZARGUES RABATAU COUDON VALLAT L ESCAILLON SERRE-BARBIN BRIANCON SERRE-PONCON SISTERON VALABRES ST ST AUBAN DALMAS vers CAMPOROSSO BANCAIRON CASTILLON ROQUEBILLIERE ITALIE BROC-CARROS ORAISON LA CHAUDANNE MENTON ROUMOULES LINGOSTIERE TRINITE-VICTOR STE TULLE P. DE GRASSE RISSO CAGNES/MER T.S. STE CROIX MOUGINS QUINSON Voltage in «REALTOR», Flows on «TAVEL- REALTOR» lines
12 Distribution of a variable EPCC, June ,9 0,9 0,8 0,8 0,7 0,7 0,6 0,6 0,5 0,5 0,4 0,4 0,3 0,3 0,2 0,2 0,1 0, actual actual simulated Consistent if = similar distributions with more extreme values for simulated cases
13 Base case Random samplings Build of the situations EPCC, June General method Optimal Power Flow Selection of realistic situations Set of situations Contingency simulations Margin computations
14 Margin computation find the maximum stress (load increase) that the system can whistand after a contingency EPCC, June Initial load level + max stress Initial load level + (max stress/2) Not OK OK Initial load level OK t
15 EPCC, June Margin computation stop criteria : OLTC blocking threshold voltage unstability a margin computation is carried out on each kept scenario
16 Situation classification EPCC, June each situation can be characterised as acceptable or unacceptable toward the voltage collapse risk using the computed margin (load increase) acceptable margin > 200 MW unacceptable margin 200 MW in the set Number margin 200 MW 2093 margin > 200 MW % base 9 % 91 %
17 What rule? EPCC, June predict as best as possible if a situation is acceptable or unacceptable toward voltage collapse risk REFUSE it must be based on variables available in real time in the control room based on pre-contingency values simple and clear OK
18 Rule efficiency EPCC, June ND = number non detection rate of unacceptable situations classified as number of unacceptable situations acceptable false alarm rate FA = number of acceptables situations classified as number of acceptable situations unacceptable PACA cost(fa) cost(nd) ND 0 AND min(fa)
19 Possible attributes EPCC, June Build of the rules using the following simple attributes, easily available in the control room : active and reactive loads in the area active and reactive generations in the area and in surrounding areas (individually or aggregated by zone) active and reactive flows of area lines (400 kv and 225 kv) North/South and West/East active and reactive flows Regional Reactive importations 400 kv and 225 kv voltages in the area availability of some generators network topology
20 Most efficient attributes EPCC, June Regional Reactive import (threshold Mvar) Reactive reserve in the area (450 Mvar) Reactive generation of valleys Durance-Verdon (300 Mvar) Active flows on Tavel-Realtor (1800 MW)
21 Main rules EPCC, June Rule Criteria ND FA R1 Reactive import PACA < 300 Mvar 0,3 % 46 % R2 R3 R4 R5 Reactive import PACA < 350 Mvar Reactive import PACA < 400 Mvar Reactive import PACA < 350 Mvar Q_Durance_Verdon < 160 Mvar Reactive reserve PACA > 450 Mvar P_Tavel_Réaltor < 1840 MW V400_Réaltor > 398 kv 0,04 % 0,04 % 0,14 % 0,04 % 40 % 51 % 65 % 58 % R6 Current rule Reactive import PACA < 350 Mvar Reactive import PACA < 260 Mvar Q_Durance_Verdon < 170 Mvar Q_Durance_Verdon < 400 Mvar V400_Réaltor > 390 kv 0,04 % 0,04 % 59 % 53 % Reduced rule Reactive import PACA < 260 Mvar 0,04 % 53 % ND 0,3 % R1 0,2 % R4 0,1 % R2 R3 R6 0 % RA R5 0 % 20 % 40 % 60 % 80 % 100 % FA
22 EPCC, June First rule (1997) Acceptable situation Voltage 400 kv (Réaltor) > 390 kv AND Reactive_Production (Durance+Verdon) < 400 Mvar AND Reactive import PACA < 260 Mvar ND = 0,04 % FA = 53 % efficient rule: low ND but highly conservative: high FA
23 EPCC, June Decision tree example : first rule (1997)
24 EPCC, June Some conclusions Voltage attributes are not efficient Composite attributes are very interesting Current rule is satisfying but conservative. A large number of cases are eliminated after OPF Large modifications are needed to build situations from the base case and could lead to unrealistic states. Active nodal loads are obtained from the global load by a poor proportional law, Reactive nodal loads are obtained keeping the power factor constant.
25 EPCC, June Proposed improvement : base cases selection For each sample Select some important variables Snapshots Choose the «nearest» snapshot based on the selected variables Base Case (could be different for each sample) The approach is promising, definition of the nearest snapshot?
A progressive method to solve large-scale AC Optimal Power Flow with discrete variables and control of the feasibility
A progressive method to solve large-scale AC Optimal Power Flow with discrete variables and control of the feasibility Manuel Ruiz, Jean Maeght, Alexandre Marié, Patrick Panciatici and Arnaud Renaud manuel.ruiz@artelys.com
More informationA Flexible Machine Learning Environment for Steady State Security Assessment of Power Systems
A Flexible Machine Learning Environment for Steady State Security Assessment of Power Systems D. D. Semitekos, N. M. Avouris, G. B. Giannakopoulos University of Patras, ECE Department, GR-265 00 Rio Patras,
More informationDynamic Security Assessment in the Future Grid. Vijay Vittal Ira A. Fulton Chair Professor Arizona State University
1 Dynamic Security Assessment in the Future Grid Vijay Vittal Ira A. Fulton Chair Professor Arizona State University 2 Key requirements for DSA Need to perform DSA as close to real time as possible Need
More informationitesla Project Innovative Tools for Electrical System Security within Large Areas
itesla Project Innovative Tools for Electrical System Security within Large Areas Samir ISSAD RTE France samir.issad@rte-france.com PSCC 2014 Panel Session 22/08/2014 Advanced data-driven modeling techniques
More informationSummary of CIP Version 5 Standards
Summary of CIP Version 5 Standards In Version 5 of the Critical Infrastructure Protection ( CIP ) Reliability Standards ( CIP Version 5 Standards ), the existing versions of CIP-002 through CIP-009 have
More informationEMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID
Tension (kv) Impedance (Ohms) EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID frequency (Hz) Simon DESCHANVRES Yannick VERNAY RTE, CNER, Substations Department t (ms) EMTP-RV Users Group
More informationHow To Operate The Williston Uvls
WND Winter Operating Guide 2012/2013 1 WND Operating Study Using EQ-890-2012WIN- FINAL.sav developed through the 890 process Got load updates from MDU, Central Power, UM G&T Made several topology updates
More informationOptimization based method to consolidate European Transmission Data
Optimization based method to consolidate European Transmission Data Manuel Ruiz Michael Gabay Artelys Paris, France Jean Maeght Mireille Lefevre Patrick Panciatici RTE Versailles, France Abstract In this
More informationLV4MV: A CONCEPT FOR OPTIMAL POWER FLOW MANAGEMENT IN DISTRIBUTION GRIDS, USING DER FLEXIBILITY
LV4MV: A CONCEPT FOR OPTIMAL POWER FLOW MANAGEMENT IN DISTRIBUTION GRIDS, USING DER FLEXIBILITY Emmanuelle VANET Gaspard LEBEL Raphaël CAIRE G2Elab France G2Elab France G2Elab - France emmanuelle.vanet@g2elab.greble-inp.fr
More informationFRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003
F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify
More informationGeneration Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055
Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights
More informationVenteea A Smart Grid demonstrator for the DRES integration on the MV distribution networks. www.venteea.fr/en/
Venteea A Smart Grid demonstrator for the DRES integration on the MV distribution networks www.venteea.fr/en/ Lille, le 26 novembre 2015 Agenda Project overarching objectives The consortium The added value
More informationGuidelines for Monthly Statistics Data Collection
Guidelines for Monthly Statistics Data Collection Final version Data Expert Group 31 May 2015 1. Table of contents 1. Table of contents... 2 2. Remarks... 3 3. Introduction... 3 4. Geographical perimeter
More informationTransmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report
Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives (Required per CPUC Decision No. C10-1328) Final Report (Submitted with Public Service s 2011 ERP) Executive Summary The objective
More informationENEL plans for storage introduction in Italian distribution network
ENEL plans for storage introduction in Italian distribution network Network technologies system manager Enel SpA Infrastructure and Network division Accumulo e rinnovabili: i sistemi e le tecnologie verso
More informationMidwest Reliability Organization Procedure For NERC PRC-012
Midwest Reliability Organization Procedure For NERC PRC-012 A. Introduction The following procedure developed by the MRO Protective Relay Subcommittee (PRS) and Transmission Assessment Subcommittee (TAS)
More informationThis document should be reviewed at least every two years.
1.0 Change Control Version Date Modification Author(s) Reviews and Approvals by Issue 1 06 August 2007 Initial Document Philip J. Tatro David Wright Issue 2 29 February Removed Confidential from Philip
More informationALL ISLAND GRID STUDY WORK STREAM 4 ANALYSIS OF IMPACTS AND BENEFITS
ALL ISLAND GRID STUDY WORK STREAM 4 ANALYSIS OF IMPACTS AND BENEFITS January 2008 Executive Summary The All Island Grid Study is the first comprehensive assessment of the ability of the electrical power
More informationElectric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas
Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables
More informationPower System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Basics of Power systems Network topology Transmission and Distribution Load and Resource Balance Economic Dispatch Steady State System
More informationFIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS -
International Conference Nuclear Energy in Central Europe 2000 Golf Hotel, Bled, Slovenia, September 11-14, 2000 FIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS - H.P. Berg Bundesamt für Strahlenschutz
More information16 West Coast Regional Plan
16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast
More informationIncreasing situational awareness of system operators by highly aggregated dynamic security results. Dr. Uros Kerin
1 Increasing situational awareness of system operators by highly aggregated dynamic security results Dr. Uros Kerin Introduction Renewables feeding all voltage levels Bulk wind farms onshore and offshore
More informationChapter 5. System security and ancillary services
Chapter 5. System security and ancillary services 1 Introduction Markets for electrical energy can function only if they are supported by the infrastructure of a power system. System should continue to
More informationUE Project N.261788. Assessment and applicability of the global risk assessment tool. Hanne Vefsnmo, hanne.vefsnmo@sintef.no SINTEF Energy Research
UE Project N.261788 Assessment and applicability of the global risk assessment tool Hanne Vefsnmo, hanne.vefsnmo@sintef.no SINTEF Energy Research Final workshop, Rome, 2014-11-27 Outline Short introduction
More informationPI/PSLF Based Model Validation Application. Eric Bakie and Milorad Papic WECC JSIS Meeting Tempe, AZ January 21-23, 2014
PI/PSLF Based Model Validation Application Eric Bakie and Milorad Papic WECC JSIS Meeting Tempe, AZ January 21-23, 2014 1 OUTLINE 1. Background Information 2. What is PI/PSLF Based PPMV Application? 3.
More informationAlberta Reliability Standard Cyber Security Security Management Controls CIP-003-AB-5
A. Introduction 1. Title: 2. Number: 3. Purpose: To specify consistent and sustainable security management controls that establish responsibility and accountability to protect BES cyber systems against
More informationGenerator Interconnection and Deliverability Study Methodology Technical Paper
Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:
More informationStudy to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid
Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy
More information"PLANNING FOR THE OPTIMAL HSR CITY PAIRS" THE MEDITERRANEAN HSL IN FRANCE. Fabrice MOREL
"PLANNING FOR THE OPTIMAL HSR CITY PAIRS" THE MEDITERRANEAN HSL IN FRANCE Fabrice MOREL Sncf Voyages, International Development Director Paris, France "PLANNING FOR THE OPTIMAL HSR CITY PAIRS" THE MEDITERRANEAN
More informationGENe Software Suite. GENe-at-a-glance. GE Energy Digital Energy
GE Energy Digital Energy GENe Software Suite Today s utilities have complex requirements that need sophisticated solutions. GE Energy s GENe provides these solutions. Using the latest advances in technology,
More informationModelling framework for power systems. Juha Kiviluoma Erkka Rinne Niina Helistö Miguel Azevedo
S VISIONS SCIENCE TECHNOLOGY RESEARCH HIGHLIGHT 196 Modelling framework for power systems Juha Kiviluoma Erkka Rinne Niina Helistö Miguel Azevedo VTT TECHNOLOGY 196 Modelling framework for power systems
More informationPSS E. High-Performance Transmission Planning Application for the Power Industry. Answers for energy.
PSS E High-Performance Transmission Planning Application for the Power Industry Answers for energy. PSS E architecture power flow, short circuit and dynamic simulation Siemens Power Technologies International
More informationReliability and security of electricity supply: the Italian blackout
Reliability and security of electricity supply: the Italian blackout Alessandro Ortis President AEEG The Regulatory Authority for Electricity and Gas of Italy 5th NARUC/CEER Energy Regulators Roundtable
More informationOptimal Power Flow Analysis of Energy Storage for Congestion Relief, Emissions Reduction, and Cost Savings
1 Optimal Power Flow Analysis of Energy Storage for Congestion Relief, Emissions Reduction, and Cost Savings Zhouxing Hu, Student Member, IEEE, and Ward T. Jewell, Fellow, IEEE Abstract AC optimal power
More informationIntegration Capacity Analysis Workshop 11/10/15 California IOU s Approach
Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach READ AND DELETE For best results with this template, use PowerPoint 2003 10 November 2015 Background and Importance of ICA Definition:
More informationEvolution of Control for the Smart Transmission Grid
Evolution of Control for the Smart Transmission Grid Anjan Bose Washington State University Pullman, WA SCE Smart Grid Research Symposium California Institute Of Technology October, 2011 The Past (before
More informationELECTRICITY SECURITY OF SUPPLY
- Short Term Issues in the Energy Community CASE STUDIES 2005 crisis, Albania Closure of the NPP Kozloduy (Units 3-4), Bulgaria August 2006 energy supply crisis in KEK, UNMIK August 2006 cut off power
More informationLAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University
LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University PURPOSE: The purpose of this lab is to introduce PSS/E. This lab will introduce the following aspects of PSS/E: Introduction to
More informationNorthport - Norwalk Harbor Cable (NNC) Tie line
September 9, 008 Northport - Norwalk Harbor Cable (NNC) Tie line Technical Assessment of Operating up to NNC Inter Tie STE Ratings Executive Summary Three (3) 38kV submarine cable circuits (Lines 60, 60,
More informationMonitoring & Control of Small-scale Renewable Energy Sources
Small Scale Renewable Energy Sources and Energy Saving: 6-17 th July 2009 Monitoring & Control of Small-scale Renewable Energy Sources Dr G A Taylor Brunel Institute of Power Systems Brunel University,
More informationMouvement de l'emploi 2015 pour les maîtres du 1er degré privé Postes vacants et succeptibles d'être vacants 1/8
ALPES DE HAUTE PROVENCE 1 100% 0040159B ST JOSEPH BARCELONNETTE DIRECTION 1 SV 2 50% 0040159B ST JOSEPH BARCELONNETTE ECMA 0.5 SV 3 50% 0040159B ST JOSEPH BARCELONNETTE ECMA 0.5 SV 4 100% 0040159B ST JOSEPH
More informationUpdated SYSTEM IMPACT STUDY OF NEW ENGLAND AREA
CROSS SOUND CABLE PROJECT 330MW HVdc INTERCONNECTION BETWEEN NEW HAVEN, CONNECTICUT AND SHOREHAM, NY Updated SYSTEM IMPACT STUDY OF NEW ENGLAND AREA Subordinate Status Removal and Amendment of Approved
More informationTreasure Valley Electrical Plan
Treasure Valley Electrical Plan Community Advisory Committee January 25, 2006 Agenda 10 a.m. Welcome 10:10 a.m. Follow up DSM discussion 10:30 a.m. TVEP CAC process update 10:40 a.m. Transmission Presentation
More informationREQUIREMENTS FOR A REAL-TIME RISK MONITORING TOOL TO REDUCE TRANSMISSION GRID NUCLEAR PLANT VULNERABILITIES
REQUIREMENTS FOR A REAL-TIME RISK MONITORING TOOL TO REDUCE TRANSMISSION GRID NUCLEAR PLANT VULNERABILITIES M. D. Muhlheim, 1 L. C. Markel, 2 F. J. Rahn, 3 and B. P. Singh 4 1 Oak Ridge National Laboratory,
More informationModelling electric vehicle demand in London using the DCE platform
Modelling electric vehicle demand in London using the DCE platform Dr Koen H. van Dam Systems-NET Webinar series 9 April 2014 1 Digital City Exchange 2 A smart city is a connected city: efficient use of
More informationControl Number : 37897. Item Number : 9. Addendum StartPage: 0
Control Number : 37897 Item Number : 9 Addendum StartPage: 0 PROJECT NO. 37897 PUC PROCEEDING RELATING TO PUBLIC UTILITy/^OI^IMISSIO^ RESOURCE AND RESERVE ^CL_^ ADEQUACY AND SHORTAGE OF TEXAS PRICING COMMENTS
More informationNV Energy ISO Energy Imbalance Market Economic Assessment
March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,
More informationAssessment of power swing blocking functions of line protective relays for a near scenario of the Uruguayan system
Assessment of power swing blocking functions of line protective relays for a near scenario of the Uruguayan system C. Sena, R. Franco, A. Giusto. Instituto de Ingeniería Eléctrica Facultad de Ingeniería
More informationAgenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. sergio.fujii@areva-td.com. ethan.boardman@areva-td.com
Agenda do Mini-Curso Sérgio Yoshio Fujii sergio.fujii@areva-td.com Ethan Boardman ethan.boardman@areva-td.com Agenda do Mini-Curso Sistemas de Distribuição (DMS) Characteristics of Distribution Network
More informationElectricity Rates Forecasting:
Electricity Rates Forecasting: Muskrat Falls Will Options: Stabilize Rates for Consumers Legal S92A, Good Faith and Regulatory Proceedings in Quebec Department of Natural Resources October 2012 Department
More informationData Mining to Characterize Signatures of Impending System Events or Performance from PMU Measurements
Data Mining to Characterize Signatures of Impending System Events or Performance from PMU Measurements Final Project Report Power Systems Engineering Research Center Empowering Minds to Engineer the Future
More informationNTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario
NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario Table of Contents NTTG Study Plan for the 2014-2015 Public Policy Consideration Scenario Table of Contents... 2 1. Executive Summary...
More informationLIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS
LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS Terence Hazel Senior Member IEEE Schneider Electric 38050 Grenoble France Abstract The power requirements for large industrial sites is increasing.
More informationESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe
NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3
More informationAPPLICATION OF ADVANCED SEARCH- METHODS FOR AUTOMOTIVE DATA-BUS SYSTEM SIGNAL INTEGRITY OPTIMIZATION
APPLICATION OF ADVANCED SEARCH- METHODS FOR AUTOMOTIVE DATA-BUS SYSTEM SIGNAL INTEGRITY OPTIMIZATION Harald Günther 1, Stephan Frei 1, Thomas Wenzel, Wolfgang Mickisch 1 Technische Universität Dortmund,
More informationComparison of GIS and AIS systems for urban supply networks
Comparison of GIS and AIS systems for urban supply networks Studies carried out by ABB show that for urban supply networks the combination of HV gas-insulated switchgear (GIS) and HV cable has important
More informationCOMPETITIVE ELECTRIC ENERGY MARKET IN GREECE
NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) GREECE COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE EVANGELOS DIALYNAS Professor NTUA Director of Electric Power Division 1 Competitive Electric European
More informationIESO Supply Deliverability Guidelines
PUBLIC IMO_GDL_0021 IESO Supply Deliverability Guidelines Issue 3.0 This document is to be used to evaluate long-term system adequacy and connection assessments Public Disclaimer The posting of documents
More informationOpenTrack simulation for suburban tunnel in Paris (RER B & D)
OpenTrack simulation for suburban tunnel in Paris (RER B & D) Presentation Opentrack Viriato workshop January 24th, 2008 Zurich, Switzerland EGIS - ERIC BENARD Table of contents Introduction Overall context
More informationGREENSTONE-MARATHON Integrated Regional Resource Plan
GREENSTONE-MARATHON Integrated Regional Resource Plan Local Advisory Committee Meeting #2 November 24-25, 2015 Presentation Outline Recap of LAC meeting #1 Implementation of Near-term Planning Elements
More informationModelling of Smart Low-Carbon Energy Systems. Imperial College London
Modelling of Smart Low-Carbon Energy Systems Imperial College London Goran Strbac, Marko Aunedi, Dimitrios Papadaskalopoulos, Meysam Qadrdan, Rodrigo Moreno, Danny Pudjianto, Predrag Djapic, Ioannis Konstantelos,
More informationMinimizing Impact of Electric Utility Outages with Backup Generation
Minimizing Impact of Electric Utility Outages with Backup Generation Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions Facility
More informationTotally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply. www.siemens.com/siestorage
Totally Integrated Power SIESTORAGE The modular energy storage system for a reliable power supply www.siemens.com/siestorage Totally Integrated Power (TIP) We bring power to the point. Our products, systems,
More informationContouring and Advanced Visualization
Contouring and Advanced Visualization Contouring Underlay your oneline with an image Geographic Data Views Auto-created geographic data visualization Emphasis of Display Objects Make specific objects standout
More informationCENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI No.L-1/44/2010-CERC Dated: 15 th June 2010 NOTIFICATION In exercise of the powers conferred under section 178 read with Part V of the Electricity Act,
More informationCOMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited
PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date
More informationObjectives. This paper also presents some improvements in the restoration processes of the São Paulo Area of the NIS.
CIGRE 2008 C2-110 Requirements in Design and Implementation of Restoration Facilities and Procedure in Order to Improve Power System Restoration: The Brazilian Experience Paulo Gomes and Antonio P. Guarini
More informationConstruction, Management and Engineering Practices that Lead to Low Losses
Indiana Utility Regulatory Commission Construction, Management and Engineering Practices that Lead to Low Losses George Stevens Utility Analyst September 17, 2007 Note This presentation is based on the
More informationCLASS. Customer Load Active System Services
CLASS Customer Load Active System Services 1 Customer Load Active System Services Offer new services and choice for the future Maximise use of existing assets Delivering value to customers Innovative solutions
More information4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
More informationVOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES
VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES C. Schwaegerl*, M.H.J. Bollen, K. Karoui #, A. Yagmur + *Siemens AG, # Tractebel STRI AB
More informationAlberta Reliability Standard Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-AB-1
A. Introduction 1. Title: 2. Number: 3. Purpose: To prevent and detect unauthorized changes to BES cyber systems by specifying configuration change management and vulnerability assessment requirements
More informationWorkstationST* Network Monitor
GEI-100693E WorkstationST* Network Monitor Instruction Guide These instructions do not purport to cover all details or variations in equipment, nor to provide for every possible contingency to be met during
More informationIntroduction to The Trans Bay Cable Project
Introduction to The Trans Bay Cable Project We ve come a long way 1 But thanks to the advances of two men and 2 The Battle of Currents 3 Utilities are able to choose the most effective and efficient means
More informationImpact of Renewable generation
Impact of Renewable generation Workshop Greenpeace - Terna "Power30" ROME, October15 th 2014 Index - Innovative Solutions Implemented - Main changes in the last years From liberalization to nowadays Investments
More informationCost Benefit Methodology for Optimal Design of Offshore Transmission Systems
Centre for Sustainable Electricity and Distributed Generation Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac July 2008 FUNDED BY BERR URN 08/1144
More informationOperating Security Standards
Version 1.1 Prishtina December 2009 TABLE OF CONTENTS 1 Introduction... 1 2 Definitions... 1 2.1 General...1 2.1.2 Kosovo Transmission System...1 2.1.3 Circuit...2 2.1.4 The N-1 Criterion...2 2.1.5 Normal
More informationWHEN AN EFFECTIVE EU ENERGY POLICY?
WHEN AN EFFECTIVE EU ENERGY POLICY? A. Clerici ABB Italy Honorary Chairman of WEC Italy Chairman of WEC WG The future role of nuclear in Europe 1 INDEX 1. General Comments 2. Vulnerability 3. Transmission
More informationNetwork Consulting for Power Grid Optimization
Network Consulting for Power Grid Optimization Project experience in India Network Consulting Competences Page 1 Our worldwide representation Manchester The Hague Denver Schenectady San Diego Houston Mexico
More informationBIG DATA IN THE MANAGEMENT OF ELECTRIC ENERGY SYSTEMS
1 BIG DATA IN THE MANAGEMENT OF ELECTRIC ENERGY SYSTEMS Louis Wehenkel Department of EE&CS University of Liège Institut Montefiore 2 MENU Some generalities about Big Data Some generalities about Electric
More informationSection 4: Scheduling Philosophy & Tools
Welcome to the Scheduling Philosophy & Tools section of the PJM Manual for Scheduling Operations. In this section you will find the following information: A description of the PJM OI s scheduling philosophy
More informationSystem Protection Schemes in Eastern Denmark
System Protection Schemes in Eastern Denmark Joana Rasmussen COWI A/S, Energy Department System Protection Schemes in Eastern Denmark 1.Advanced system protection schemes are investigated and perspectives
More informationCalculation of Voltage Sag Indices for Distribution Networks
Calculation of Voltage Sag Indices for Distribution Networks Juan A. Martinez-Velasco, Member, IEEE, Jacinto Martin-Arnedo, Nonmember Abstract This paper is presenting the main results of a work aimed
More informationMonitoring of Internet traffic and applications
Monitoring of Internet traffic and applications Chadi BARAKAT INRIA Sophia Antipolis, France Planète research group ETH Zurich October 2009 Email: Chadi.Barakat@sophia.inria.fr WEB: http://www.inria.fr/planete/chadi
More informationImpact of Distributed Generation on Voltage Profile in Deregulated Distribution System
Impact of Distributed Generation on Voltage Profile in Deregulated Distribution System W. EL-KHATTAM M. M. A. SALAMA Electrical & Computer Engineering, Waterloo University, Ontario, Canada Abstract: Due
More informationMarket Potential Study for Water Heater Demand Management
Market Potential Study for Water Heater Demand Management Rebecca Farrell Troutfetter, Frontier Associates LLC, Austin, TX INTRODUCTION Water heating represents between 13 and 17 percent of residential
More informationNERC Cyber Security Standards
SANS January, 2008 Stan Johnson Manager of Situation Awareness and Infrastructure Security Stan.johnson@NERC.net 609-452-8060 Agenda History and Status of Applicable Entities Definitions High Level of
More informationThe Artificial Prediction Market
The Artificial Prediction Market Adrian Barbu Department of Statistics Florida State University Joint work with Nathan Lay, Siemens Corporate Research 1 Overview Main Contributions A mathematical theory
More informationData Quality Mining: Employing Classifiers for Assuring consistent Datasets
Data Quality Mining: Employing Classifiers for Assuring consistent Datasets Fabian Grüning Carl von Ossietzky Universität Oldenburg, Germany, fabian.gruening@informatik.uni-oldenburg.de Abstract: Independent
More informationCyber Security of the Smart Grid
Cyber Security of the Smart Grid Design Document May 12-21 11/4/11 Group Members John Majzner Daniel Kosac Kyle Slinger Jeremy Deberg Team Advisor Manimaran Govindarasu Graduate Students Adam Hahnad Siddharth
More informationPowerWorld Simulator
PowerWorld Simulator Quick Start Guide 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com Purpose This quick start guide is intended to
More informationTOXIC AND FLAMMABLE GAS CLOUD DETECTORS LAYOUT OPTIMIZATION USING CFD
Introduction to the case Gas detectors are commonly installed in process facilities to automatically alarm and trigger safety measures in response to hazardous leaks. Without effective leak detection,
More information2013 Ventyx, an ABB company
Co-optimization of Congestion Revenue Rights in ERCOT Day-Ahead Market Chien-Ning Yu, Vladimir Brandwajn, Show Chang ABB/Ventyx Sainath M. Moorty ERCOT FERC Conference on increasing real-time and day-ahead
More informationData Mining Practical Machine Learning Tools and Techniques
Ensemble learning Data Mining Practical Machine Learning Tools and Techniques Slides for Chapter 8 of Data Mining by I. H. Witten, E. Frank and M. A. Hall Combining multiple models Bagging The basic idea
More informationMANAGEMENT OF ELECTRIC VEHICLES CHARGING PROCESSES IN A DSO CONTROL CENTER
MANAGEMENT OF ELECTRIC VEHICLES CHARGING PROCESSES IN A DSO CONTROL CENTER Guido BENETTI Andrea BIANCHIN Maurizio DELFANTI Università di Pavia Italy DEVAL SpA Italy Politecnico di Milano Italy guido.benetti01@ateneopv.it
More informationMINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION
MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION REPORT ON NETWORK RELIABILITY ASPECTS OF THE CHOICE LINE VERSUS CABLE FOR
More informationGunnar Björkman, ABB Mannheim. Smart Grids Security SICS Security Seminar in Kista on April 8, 2014
Gunnar Björkman, ABB Mannheim Smart Grids Security SICS Security Seminar in Kista on April 8, 2014 Smart Grids Security Agenda Traditional Supervision and Control Evolution to Smart Grids Grid4EU A large
More informationEnergy Management Systems (EMS)
Energy Management Systems (EMS) Introduction Abstract This talk deals with the role of an Energy Management System (EMS) in the overall Smart Grid. Why an EMS is needed will be discussed and its importance
More informationSmartGrids SRA 2035. Summary of Priorities for SmartGrids Research Topics
SmartGrids SRA 2035 Summary of Priorities for SmartGrids Research Topics Version 19 June 2013 Setting Priorities related to SRA 2035 research areas and topics The following section reports on the conclusions
More information