3. Given the geographic extent of the area, amendments have been made to the following regional planning documents

Size: px
Start display at page:

Download "3. Given the geographic extent of the area, amendments have been made to the following regional planning documents"

Transcription

1 AMENDMENTS TO THE REGIONAL PLANS RELATING TO LAND REPAIR ON EARTHQUAKE DAMAGED RESIDENTIAL LAND UNDER s27 OF THE CANTERBURY EARTHQUAKE RECOVERY ACT This memorandum outlines the specific changes to the Canterbury Regional Council regional plans that have made under s27(1)(a) of the Canterbury Earthquake Recovery Act (2011) (CER Act). The amendments to the regional plans have been made in order to streamline and simplify the planning process for owners of earthquake damaged residential land. 2. The geographic extent of the regional plan amendments is shown as the hashed area in Figure 1. The hashed area encompasses land located within the Christchurch-West Melton, Waimakariri and Selwyn-Waihora sub-regional sections defined in the proposed Land and Water Regional Plan 1. Figure 1 Map showing the geographic extent of the proposed plan amendments 3. Given the geographic extent of the area, amendments have been made to the following regional planning documents The operative Natural Resources Regional Plan (NRRP) (Report R11/2) The operative Waimakariri River Regional Plan (WRRP) (Report R11/21) The proposed Land and Water Regional Plan (plwrp) (as notified on 11 August 2012) 1 The extent of the sub-regional boundaries is as defined in the proposed Land and Water Regional Plan as notified on 11 August 2012.

2 4. The amendments made to each of the regional plans are detailed below under the applicable subheadings. Additions are shown in underlined font, and deletions shown in strikethrough. NATURAL RESOURCES REGIONAL PLAN (NRRP) AMENDMENTS 5. The amendments to the NRRP are limited to amendments only to Chapter 4 (Water Quality) of the NRRP. The amendments involve the insertion of: a new objective (Objective WQL5), a new policy (Policy WQL21); a new rule (Rule WQL36A); a rule explanation note to support Rule WQL36A; two new schedules (Schedule WQL14 and Schedule WQL15) minor amendments to the figures, tables, etc to ensure consistency throughout the plan. 6. A detailed description of amendments made to Chapter 4 of the NRRP is provided below. 7. In the Table of Contents section after Policy WQL20: Effects of Activities in Christchurch Groundwater Protection Zone 3. insert a new Objective entitled Objective WQL5 as follows: Objective WQL5 Repair of earthquake damaged land on individual sites used for residential activities. 8. In the Table of Contents section after the insertion of Objective WQL5, insert a new policy entitled Policy WQL21 as follows: Policy WQL21 Enable the repair of earthquake damaged land on individual sites used for residential activities. 9. In the Table of Contents Section under the Heading Water Quality Schedules and after Schedule WQL13, insert a new line of text as follows: Schedule WQL14 Map showing area to which Rule WQL36A applies 10. In the Table of Contents Section under the Heading Water Quality Schedules and after Schedule WQL14, insert a new line of text as follows: Schedule WQL15 Map showing High Risk Soil Erosion Areas 11. On Page 4-12 in Table WQL4 Relationship between existing regional plans and water conservation orders and the NRRP Chapter 4 amend as follows: Waimakariri River Regional Plan The regional rules of Chapter 4 of the NRRP authorising some permitted activities, prohibiting or requiring resource consent for a discharge to groundwater, or to land more than 20 metres from a surface water body, and certain land uses apply in the area of the Waimakariri River Regional Plan. Except for Rule WQL36A,, Rregional rules in Chapter 4 of the NRRP authorising discharges of sewage tank effluent, animal effluent, land drainage water, aquifer or bore test water, water tracers, cooling water, stormwater and swimming pool water, or rules requiring a resource consent for a discharge of a contaminant to surface water, or onto land within 20 metres of a surface water body or where a contaminant may enter surface water, do not apply in the area of the Waimakariri River Regional Plan. Rule WQL36A applies within the area of the Waimakariri River Regional Plan, where the activity is carried out within the boundaries of Greater Christchurch.

3 12. On Page 4-24, under the Heading Issue Resolution, amend the diagram by adding in Objective WQL5 and Policy WQL2 to the flowchart as follows: Policy WQL14 Effects of Activities in Christchurch Groundwater Protection Zone 1. Policy WQL15 Effects of Activities in Christchurch Groundwater Protection Zone 1A (Urban). Policy WQL16 Effects of Activities in Christchurch Groundwater Protection Zone 1B (Mineral Extraction). ISSUE WQL4 CHRISTCHURCH GROUNDWATER Objective WQL4 The quality of Christchurch groundwater Policy WQL17 Effects of Activities in Christchurch Groundwater Protection Zone 1C (Christchurch International Airport). Policy WQL18 Effects of Activities in Christchurch Groundwater Protection Zone 1D (Designations). Policy WQL19 Effects of Activities in Christchurch Groundwater Protection Zone 2. Policy WQL20 Effects of Activities in Christchurch Groundwater Protection Zone 3. Objective WQL5 Repair of earthquake damaged land on individual sites used for residential activities Policy WQL21 Enable the repair of earthquake damaged land on individual sites used for residential activities

4 13. On Page 4-113, after the storage and/or use of hazardous substances as defined as a territorial authority responsibility in the Canterbury Regional Policy Statement. and before Heading 4.6 Regional Rules on page 4-114, insert Objective WQL5 as follows: Objective WQL5: Repair of earthquake damaged land used for residential activities Enable a timely and expeditious recovery process for communities by permitting within the area shown in Schedule WQL14, the repair of earthquake damaged land on sites used for residential activities, within specific thresholds. 14. On Page after Objective WQL5, Policy WQL21 has been inserted as follows: Policy WQL21: Enable the repair of earthquake damaged land on sites used for residential activities (1) Until 31 December 2018, and where the site was used for residential activities as at 4 September 2010, enable within the area shown in Schedule WQL14, the repair of earthquake damaged land within specified thresholds as permitted activities. Beyond these thresholds, provide for land repair activities by way of a resource consent, where the adverse effects on the environment are mitigated. (2) Ensure a focused and expedited decision making process for landowners by requiring resource consent applications to be processed and considered without public or limited notification. In addition, ensure the social, economic, cultural and environmental well-being of communities is met by requiring adverse effects from the repair of earthquake damaged land to be mitigated through conditions of consent. 15. On pages , Table WQL8 specifies the areas to which the rules in Chapter 4 of the NRRP apply. Where an activity described in Rule WQL36A is carried out, Rule WQL36A will apply instead of the existing rules in the NRRP that relate to that activity. To clarify where the rules apply, the following amendments to Table WQL8 have been made. Where the rule applies Rule No. Activity type Description Activity Status Page No. Everywhere in the Canterbury region excluding where the discharge is to a river, lake or artificial watercourse, or onto or into land, and is controlled by the Opihi River Regional Plan or the Waimakariri River Regional Plan or is an activity that is classified by Rule WQL36A. WQL1 WQL2 Discharge Discharge Discharge of water or a contaminant into a river, lake or artificial watercourse, or onto land which may result in water or a contaminant entering a river, lake or artificial watercourse Discharge of land drainage, site dewatering, aquifer test or bore development water into a river, lake or artificial watercourse, or onto land which may result in water or a contaminant entering a river, lake or artificial watercourse Permitted Permitted Everywhere in the Canterbury region excluding where the land use is controlled by the Land and Vegetation Regional Plan Part 1: Earthworks and Vegetation Clearance Kaikoura and East Coast, or is an activity that is classified by Rule WQL36A. WQL29 WQL30 Land Use Land Use Vegetation clearance within a riparian zone or adjacent to a wetland boundary Earthworks or cultivation within a riparian zone or adjacent to a wetland boundary Permitted Restricted Discretionary Permitted Restricted Discretionary

5 Where the rule applies Rule No. Activity type Description Activity Status Page No. Everywhere in the Canterbury region excluding where the land use is an activity that is classified by Rule WQL36A. WQL35 Land Use Construction and use of a bore excluding a groundwater bore, or a hydrocarbon bore Permitted Discretionary 181 Everywhere in the Canterbury region excluding where the land use is an activity that is classified by Rule WQL36A. WQL36 Land Use Excavation of land in the Coastal Confined Gravel Aquifer System, or over an unconfined or semi-confined aquifer Restricted Discretionary Discretionary 182 Non-complying Everywhere within the hashed area shown on Schedule WQL14. WQL36A Land Use Discharge Taking of The repair of earthquake damaged land used for residential activities, and the associated taking and discharge of groundwater for dewatering and land drainage purposes. Permitted Restricted Discretionary Page groundwater Everywhere in the Canterbury region excluding where the land use is an activity that is classified by Rule WQL36A. WQL37 Land Use Deposition of more than fifty cubic metres of material into excavated land over an unconfined or semi-confined aquifer Controlled Discretionary Each of the individual rule documents in Chapter 4 of the NRRP includes a section which specifies the geographic area to which the rule applies. As Rule WQL36A over-rides the existing rules in certain situations, an amendment to each of the rule documents listed in the table above as detailed below has been made. 17. On Page 4-122, within Rule WQL2, in the left hand column of the rule under the heading Where Rule Applies the rule has been amended as follows: This rule applies everywhere in the Canterbury region, excluding: (a) The Coastal marine area; and (b) Where the discharge is to surface water or onto land and is controlled by the (i) (ii) (iii) Opihi River Regional Plan; or Waimakariri River Regional Plan; or Rule WQL36A of the NRRP 18. On Page 4-173, within Rule WQL29, in the left hand column of the rule under the heading Where Rule Applies the rule has been amended as follows: This rule applies everywhere in the Canterbury region, excluding: (a) The Coastal marine area; and (b) Where the land use is controlled by the Land and Vegetation Regional Plan Part 1: Earthworks and Vegetation Clearance Kaikoura and East Coast; or (c) Where the activity is classified by Rule WQL36A. 19. On Page 4-175, within Rule WQL30, in the left hand column of the rule under the heading Where Rule Applies, the rule has been amended as follows:

6 This rule applies everywhere in the Canterbury region, excluding: (a) The Coastal marine area; and (b) Where the land use is controlled by the Land and Vegetation Regional Plan Part 1: Earthworks and Vegetation Clearance Kaikoura and East Coast; or (c) Where the activity is classified by Rule WQL36A. 20. On Page 4-181, within Rule WQL35, in the left hand column of the rule under the heading Where Rule Applies, the rule has been amended as follows: This rule applies everywhere in the Canterbury region, excluding: the Coastal marine area (a) the Coastal marine area; or (b) Where the activity is classified by Rule WQL36A. 21. On Page 4-182, within Rule WQL36, in the left hand column of the rule under the heading Where Rule Applies, the rule has been amended as follows: This rule applies everywhere in the Canterbury region, excluding: the Coastal marine area (a) the Coastal marine area; or (b) Where the activity is classified by Rule WQL36A. 22. After Rule WQL36 the following rule has been inserted:

7 Rule WQL36A The repair of earthquake damaged land on individual sites used for residential activities, the discharge of sediment-laden water, and the associated taking and discharge of groundwater for dewatering and land drainage purposes Activity Prior to 31 December 2018, the repair of earthquake damaged land located outside the High Soil Erosion Risk Areas shown on Schedule WQL15, and which is carried out on an individual site used for residential activities, (but excluding any residential property zoned red by the Canterbury Earthquake Recovery Authority), which involves any one or more of: (a) the use of land for: (i) the excavation of material over the unconfined, semi-confined or coastal confined aquifer system; (ii) the deposition of material into land; or into groundwater; and any associated discharge into groundwater; (iii) vegetation clearance or earthworks within the riparian margin (defined for the purposes of this rule as any land with 10 metres of the bed of a river, lake or wetland boundary); (iv) the installation, maintenance, and use of a bore for geotechnical investigations or monitoring purposes; (v) the installation and construction of building foundations; (b) the discharge of sediment-laden water generated from earthworks into a surface waterbody, or onto or into land where it may enter a surface waterbody; (c) the taking of groundwater for the purposes of dewatering or land drainage, and the associated discharge of that water into a surface water body, or onto or into land where it may enter a surface water body. is - 1. a permitted activity if all parts of the activity comply with all of the applicable conditions of this Rule; 2. a restricted discretionary activity if any part of the activity does not comply with any of the applicable conditions of this Rule. General Conditions Conditions 1. The extent and duration of any works, is limited to only that necessary to repair the land. 2. The works (excluding any discharges associated with the works authorised by this rule do not occur in the bed of any lake, river or natural wetland. Earthworks, Excavation and Deposition of Material 3. Erosion and sediment control measures are implemented and maintained in accordance with Environment Canterbury's Erosion and Sediment Control Guidelines for Small Sites, to minimise erosion and the discharge of sediment laden water to surface water. 4. Any material deposited into land consists only of uncontaminated fill (soil, rocks, gravels, sand, silt, clay), concrete, cement, grout, concrete steel or timber foundation piles, or inert building materials. 5. From the date this rule becomes operative, the use of land for the placement of treated timber foundation piles into confined groundwater within the Coastal Confined Aquifer System, and any discharge from those foundation piles, does not occur within a community drinking water supply protection zone, as set out in Schedule WQL2 of this plan. 6. Any excavation over the coastal confined aquifer system maintains at least one metre of undisturbed material between the deepest part of the excavation and Aquifer No materials (other than those listed in condition 4) vehicles or machinery (excluding clean uncontaminated equipment used for dewatering, and infrastructure installed for the purposes of land repair) are deposited into or used within groundwater. 8. Compaction, or earthworks involve below ground soil disturbance (excluding filling), do not occur on any part of a site which is identified as a landfill. 9. There is no discharge of any cement, concrete, grout, or water containing cement, grout or concrete, into any surface waterbody, or beyond the property boundary. 10. Where grout is deposited into land, or into groundwater, the following conditions also apply: a) The volume of grout shall not exceed 50 cubic metres per site. b) The point of deposition into land is not within: (i) (ii) 20 metres of any surface water body, or 20 metres of the Coastal Marine Area, where the material is deposited into groundwater; or 10 metres of any surface water body, or 10 metres of the Coastal Marine Area, where a separation of one metre is maintained between groundwater and any deposited material. c) Where grout is deposited into land via in-situ mixing:

8 For the purposes of this rule: Grout means a material which consists of water and at least 20% cement, and which may also contain aggregate, inert additives, or bentonite. Earthquake Damaged Land means land damaged as a result of the Canterbury Earthquake Sequence that commenced on 4 September Landfill means any part of a site where solid or hazardous waste has been deposited (either lawfully or not), and which is identified as a landfill on Environment Canterbury s Listed Land Use Register, or in the records of the relevant territorial authority. Residential Activities means land zoned residential in a district plan, or land used predominantly for residential occupation, as at 4 September Notification An application for consent under this rule shall be processed and considered without public or limited notification. Where Rule Applies: This rule applies only within the area shown in Schedule WQL14 Information to be provided An application for a resource consent under this rule must meet the information requirements set out in Section and Section 4.7. (i) the grout shall be mixed evenly throughout the augured soil column; and (ii) the percentage of grout within the area of the augured soil column shall not exceed 20%. d) Where the grout is deposited into land using methods other than in-situ mixing, the percentage of cement in the dry grout mixture shall not exceed 30%. 11. To prevent erosion, bare ground is stabilised within 10 days of any vegetation clearance or earthworks. 12. For earthworks carried out within the riparian margin, in addition to conditions (3) and (11), the following conditions apply: a) Vegetation used and maintained by Environment Canterbury for flood or erosion control purposes is not removed. b) Replanting is not of a species listed in the Biosecurity NZ Register of Unwanted Organisms or Canterbury Pest Management Strategy. c) The activities do not reduce the available floodway d) The activities do not result in the destabilisation of the bank of any river, lake or natural wetland, or destabilise any existing lawfully established structures, or interfere with access to waterways for maintenance or inspection purposes. Geotechnical Investigations 13. The bore is used only for the purposes of geotechnical investigations and is decommissioned by filling with clean material and compacted or sealed at the surface to prevent contaminants entering the bore. 14. Information on location (including bore logs and intended uses), and other relevant information is submitted to the CRC within 20 working days of drilling the bore. Dewatering, Sediment-laden Water, and Land Drainage 15. Dewatering and land drainage discharges are not from, or discharged onto or into any site listed on Environment Canterbury's Listed Land Use Register. 16. The taking of groundwater for dewatering purposes does not lower the groundwater level more than 8 metres below the ground level of the site. 17. The taking and discharge of land drainage water and site dewatering water onto or into land or into surface water does not result in subsidence of the land surface, or bed or bank erosion. 18. The discharge of dewatering water onto or into land or into surface water does not result in any flooding of any neighbouring property, or result in ponding on the land surface for more than 48 hours. 19. The concentration of suspended solids in any dewatering water, or sediment-laden water discharged to a surface water body does not exceed 100 grams per cubic metre. Restriction of Discretion Cross reference: This rule contributes to the implementation of Policy WQL21 Where the activity is classified as a restricted discretionary activity, Environment Canterbury has reserved its discretion to the following matters: cultural effects 1. The effect of not meeting the condition or conditions of Rule WQL36A 2. Mitigation Measures proposed to be implemented or mitigation measures available to minimise any actual or potential environmental effect.

9 23. On Page 4-183, within Rule WQL37, in the left hand column of the rule under the heading Where Rule Applies, the rule has beenamended as follows: This rule applies everywhere in the Canterbury region, excluding: the Coastal marine area the Coastal marine area; or Where the activity is classified by Rule WQL36A. 24. On Page within the section entitled Explanation and principle reasons for methods which commences at Page a new paragraph after the explanation note for Rule WQL36 as been inserted as follows: Rule WQL36A The repair of earthquake damaged land on individual sites used for residential activities, and the associated taking and discharge of groundwater for dewatering and land drainage purposes Rule WQL36A recognises the exceptional circumstances following the Canterbury Earthquake event sequence that commenced on 4 September The rule provides for the repair of earthquake damaged land zoned on individual sites zoned for residential activities, or where the land was used for residential activities, as a permitted activity subject to compliance with the conditions of the rule. In recognition of the need for a simplified planning process for landowners, the rule adopts the concept of rule bundling where several different RMA permissions (s9, s14, s15) have been combined into a single rule. The rule applies only to the repair of land on individual sites used for residential activities and which is located within the area shown in Schedule WQL14. The boundary of Schedule 14 takes into account the boundary of the Greater Christchurch Area, and loosely aligns with the boundaries of the Christchurch-West Melton, Waimakariri and Selwyn-Te Waihora sub-regional areas (as defined in the notified version of the proposed Land and Water Regional Plan), It is considered appropriate to limit the rule s application to land located within the sub-regional areas given the geographic extent of the land damage The rule does not apply to the repair of earthquake damaged land within the residential red zone (as classified by the Canterbury Earthquake Recovery Authority), or to the repair of earthquake damaged land located within the High Soil Erosion Risk Areas identified in Schedule WQL15. Land repairs within the High Soil Erosion Risk area have been excluded from the rule as works within this area pose a greater environmental risk due to the erosive nature of the loess soils, and the need for specific erosion and sediment control measures. Land repair carried out within these excludes areas are subject to the existing rules in the regional plans, and will require a resource consent if the conditions of the rule are not complied with. The rule requires erosion and sediment control measures to be implemented and maintained during the duration of the works, and land is to be stabilised within 10 days of completion of the works in order to minimise the discharge of sediment laden water, dust generation and effects on aquatic ecosystems (conditions 3 and 11). To avoid adverse effects on groundwater quality, the rule limits the deposition of material to only uncontaminated fill, concrete, cement, grout or concrete, steel or timber building foundations; and uncontaminated equipment necessary to carry out the works (conditions 4 and 7). In addition any geotechnical bores must be sealed and compacted to ensure these bores do not act as a conduit for contaminants to enter groundwater (condition 13). Where foundation piles are placed into land, the activity is generally permitted, except in circumstances where the treated timber piles intercept confined groundwater in the Coastal

10 Confined Aquifer System and their location occurs within a Community Drinking Water Supply Area. In these circumstances a resource consent is required in order to allow the council to consider the effects of the discharge from treated timber piles on groundwater quality and users. The use of alternative foundation options which do not pose a risk to groundwater quality (e.g. concrete or steel piles) is a permitted activity. Where earthworks are to be carried out on a landfill site, additional conditions must be complied with in order to mitigate potential adverse effects on groundwater quality (condition 8). Earthworks which are unlikely to result in disturbance of landfill material are permitted (e.g. filling land or cracks). However, methods which may disturb landfill material and result in the migration of landfill leachate into groundwater will require a resource consent, in order to allow the council to fully assess the effects of the activity. Where cement based materials are used, there is the potential for adverse effects on surface water quality (resulting from changes in ph) if the material is not managed appropriately. The rule prohibits the surface run-off of concrete, cement or grout into surface water, or water containing this material is prohibited by the rule (condition 9). Grout presents a higher risk to surface water quality given the greater mobility of the material and the higher proportion of cement in the material. Consequently, in order to avoid adverse effects on surface water quality and ecosystems, additional restrictions apply where grout is deposited into land or groundwater. These restrictions include a limit on the amount of grout deposited into land, and a requirement to maintain separation to surface waterbodies (condition 10). Grouts used for insitu mixing typically contains a very high proportion of cement content (up to 70%), and consequently there is the potential for significant changes in alkalinity of receiving groundwater and nearby surface water, unless the grout is uniformly mixed with the insitu soil, and the cement in the final column limited to 20% (condition 10c) Alternative land repair methodologies (e.g. low mobility grouting) often do not rely on mixing of in-situ soil with the grout. Consequently there is a need to limit the percentage of cement in the dry grout mix, in order to avoid significant changes in alkalinity in the receiving groundwater within riparian areas works are to be managed in a manner which avoids adverse effects on existing structures, and ensures the flood capacity of the waterway is maintained (condition 8). Where dewatering occurs, adherence to additional conditions is required, to ensure adverse effects on ecosystems, surface water quality and neighbouring property owners are avoided. Dewatering from sites, or onto sites listed on Environment Canterbury s Listed Land Use Register is not permitted under the rule, as former activities carried out at these sites may have resulted in land contamination (condition 15) A limit of 100 grams per cubic metre of total suspended solids in any dewatering water or sediment laden water discharged to surface water has been imposed to minimise adverse effects caused to aquatic organisms through sedimentation (condition 19). 25. Amendments have been made to insert Schedule WQL14 and Schedule WQL15 into the Water Quality Schedules section of Chapter 4 of the NRRP The amendments are as follows: 26. On Page after Schedule WQL13 a new schedule has been inserted as follows:

11 Schedule WQL14 Map showing area to which Rule WQL36A applies

12 27. On Page after new Schedule WQL14 a new schedule has been inserted as follows: Schedule WQL15 Map showing High Risk Soil Erosion Areas

13 PROPOSED LAND AND WATER REGIONAL PLAN (PLWRP) AMENDMENTS 28. The following amendments have been made to the Waimakariri, Selwyn-Waihora, and Christchurch- West Melton sub-regional sections of the proposed Land and Water Regional Plan: the insertion of a new policy the insertion of a new permitted activity rule the insertion of a restricted discretionary activity rule the insertion of a new map which delineate the area to which the policy and rule applies the insertion of a new map which shows the high soil erosion risk areas which are excluded. 29. On Page 2-3 under the heading Relationship with other regional plans controlling land and water, and within the Waimakariri River Regional Plan the text has been amended as follows: The Waimakariri River Regional Plan has objectives, policies and rules relating to the taking or diverting of surface water and discharge to surface water (excluding the Styx River catchment) or onto land where the discharge may enter surface water (excluding the Styx River catchment) in the area covered by the Waimakariri River Regional Plan. The Waimakariri River Regional Plan also has rules relating to sewage tank effluent, animal effluent, land drainage water, aquifer or bore test water, water tracers, cooling water, stormwater and swimming pool water. Except for policies and rules in the sub-regional sections of the proposed Land and Water Regional Plan that specifically address the repair of earthquake damaged land on individual sites used for residential activities, Aany objective, policy or rule on the same subject matter in the Waimakariri River Regional Plan prevails over the objectives, policies and rules contained in this Plan. The regional rules in the LWRP apply to all of the Styx River catchment. The regional rules for water quality in the Waimakariri River Regional Plan do not apply in the Styx River catchment. Section 8 - Waimakariri Sub-Regional Section 30. On Page 8-2, Section has been amended as follows: Waimakariri River Regional Plan 2004 The Waimakariri River Regional Plan 2004 controls use of water in the Waimakariri River, its tributaries and hydrologically hydraulically connected groundwater; point and non-point source discharges of contaminants to waterbodies in the Waimakariri River catchment; and land use activities in the beds of rivers and lakes in the Waimakariri River catchment. Except for Policy and Rules and which address the repair of earthquake damaged land on individual sites used for residential activities T the LWRP s objectives, policies and rules do not apply to the matters controlled by the Waimakariri River Regional Plan 2004,. 31. On Page 8-2, under the heading Policies and, after Policy 8.4.3, Policy Number has been inserted along with the policy wording shown in Appendix On Page 8-2, under the heading Rules, and after Rule 8.5.1, Rule Number and the note and rule as shown in Appendix 2 has been inserted 33. On Page 8-2, following Rule 8.5.2, Rule Number and the rule and note shown in Appendix 3 has been inserted 34. On Page 8-6 after the Ashley / Rakahuri River Environmental Flow and Allocation Limits Map, the maps shown in Appendix 4 and 5 of this report have been inserted.

14 Section 9 Christchurch-West Melton Sub-Regional Section 35. On page 9-1, Section has been amended as follows: Waimakariri River Regional Plan 2004 The Waimakariri River Regional Plan 2004 controls use of water in the Waimakariri River, its tributaries and hydrologically hydraulically connected groundwater; point and non-point source discharges of contaminants to waterbodies (except for the Styx River catchment) in the Waimakariri River catchment; and land use activities in the beds of rivers and lakes in the Waimakariri River catchment. Except for the water quality rules in the LWRP which apply in the Styx River Catchment, policy and rules and of the LWRP which address the repair of earthquake damaged land on individual sites used for residential activities Tthe LWRP s objectives, policies and rules do not apply to the matters controlled by the Waimakariri River Regional Plan The water quality rules in the Waimakariri River Regional Plan do not apply to the Styx River catchment. 36. On Page 9-2, under the heading Policies, and after Policy 9.4.3, Policy Number has been inserted along with the policy wording as shown in Appendix On Page 9-3, under the heading Rules, and after Rule 9.5.5, Rule Number has been inserted, along with the note and rule shown in Appendix On Page 9-3 under the heading Rules and after Rule 9.5.6, Rule Number 9.5.7has been inserted, along with the note and rule as shown in Appendix On Page 9-5 after the Avon/Otakaro and Heathcote River Environmental Flow and Allocation Limits Map, the maps shown in Appendix 4 and 5 of this report have been inserted. Section 11 Selwyn-Waihora Sub-Regional Section 40. On Page 11-2, after the heading 11.4 Policies the following amendments have been made: 11.4 Policies Under development, refer to Canterbury Regional Council Long Term Plan 2012 The following policies apply in the Selwyn-Waihora Sub-regional area, in addition to those set out in Section 4 of this Plan. 41. On Page 11-2, immediately following the above text, Policy Number has been inserted along with the policy wording shown in Appendix 1.On Page 11-2, after the heading 11.5 Rules the following amendments have been made: Under development, refer to Canterbury Regional Council Long Term Plan 2012 The following rules apply in the Selwyn-Waihora Sub-regional area, in addition to those set out in Section 5 of this plan. 42. On Page 11-2, immediately following the above text, Rule Number has been inserted, along with the note and rule as shown in Appendix On Page 11-2 immediately following the above text Rule Number has been inserted and the note and rule shown in Appendix After Page 11-2 the maps shown in Appendix 4 and 5 have been inserted.

15 WAIMAKARIRI RIVER REGIONAL PLAN AMENDMENTS 45. The Waimakariri River Regional Plan (WRRP) promotes the sustainable management of rivers, lakes and hydraulically connected groundwater, and river and lake beds in the Waimakariri Catchment. 46. Under the existing planning framework, the policies and regional rules of Chapter 4 of the NRRP do not apply to: Discharges into surface water within the area covered by the WRRP; or Discharges onto or into land within 20 metres of a surface water body where the contaminant may enter surface water. 47. To facilitate the repair of earthquake damaged land on individual sites within the Waimakariri Catchment, changes have been made to the WRRP to apply the amended provisions of the NRRP and plwrp, within this catchment. These amendments are described below 48. On Page 2, under Section 1.3 Area to which this plan applies, a new paragraph has been inserted as follows: Within the area controlled by the WRRP, the repair of earthquake damaged land on land zoned residential in a district plan, or where, as at 4 September 2010 the land was used for residential activities and which is located within the boundaries of Greater Christchurch, is subject to Objective WQL5, Policy WQL21 and Rule WQL36A of the Natural Resources Regional Plan; Policy and Rules and of the Waimakariri sub-regional section of proposed Land and Water Regional Plan; Policy and Rules and of the Christchurch-West Melton sub-regional section of the proposed Land and Water regional plan; and Policy and Rules and of the Selwyn-Waihora sub-regional sections of the proposed Land and Water Regional Plan. 49. On Page 5, under Section 1.4 of the WRRP, under the heading Regulation of Activities the clauses have been amended as follows: a) The taking (abstraction) of water from the Waimakariri River or its tributaries or from hydraulically connected groundwater, (Chapter 5, Rule 5.1 discretionary activity, Rule 5.3 non-complying activity, Rule 5.4 prohibited activity), except where the activity occurs within the boundaries of Greater Christchurch, and is classified by Rule WQL36A of the Natural Resources Regional Plan; or Rules or of the Waimakariri sub-regional section of the proposed Land and Water Regional Plan; or Rules or of the Christchurch-West Melton sub-regional section of the proposed Land and Water Regional Plan; or Rules or of the Selwyn-Waihora sub-regional section of the proposed Land and Water Regional Plan (a) The discharge of contaminants into the Waimakariri River or its tributaries or onto or into land where the discharge can enter surface waters (Chapter 6, Rule 6.1 discretionary activity, Rule 6.2 non-complying activity) except where the activity occurs within the boundaries of Greater Christchurch, and is classified by Rule WQL36A of the Natural Resources Regional Plan; or Rules or of the Waimakariri sub-regional section of the proposed Land and Water Regional Plan; or

16 Rules or of the Christchurch-West Melton sub-regional section of the proposed Land and Water Regional Plan; or Rules or of the Selwyn-Waihora sub-regional section of the proposed Land and Water Regional Plan 50. On Page 9 under the heading Proposed Canterbury Natural Resources Regional Plan the text has been amended as follows: The Proposed Canterbury Natural Resources Regional Plan (NRRP) is a plan that Environment Canterbury notified in The NRRP includes sections on air, water and land. The NRRP applies to the whole Canterbury region addressing issues on a regional or sub-regional basis. It does not apply to those issues specifically addressed by the Waimakariri River Regional Plan, except that the objectives, policies and regional rules relating to the repair of earthquake damaged land on individual sites used for residential activities apply within the area addressed by the WRRP, where the activity is carried out within the boundaries of Greater Christchurch. The NRRP will be prepared in stages and eventually it will replace the Transitional Regional Plan and may also replace this and some other regional plans.

17 Appendix 1 Policy wording inserted into the Christchurch-West Melton, Waimakariri, Selwyn-Waihora sub-regional sections of proposed Land and Water Regional Plan (1) Until 31 December 2018, and where the site was used for residential activities as at 4 September 2010, enable within the area shown in Map 1, the repair of earthquake damaged land within specified thresholds as permitted activities. Beyond these thresholds, provide for land repair activities by way of a resource consent, where the adverse effects on the environment are mitigated. (2) Ensure a focused and expedited decision making process for landowners by requiring resource consent applications to be processed and considered without public or limited notification. In addition, ensure the social, economic, cultural and environmental well-being of communities is met by requiring adverse effects from the repair of earthquake damaged land to be mitigated through conditions of consent.

18 Appendix 2 Permitted Activity Rule wording inserted into Waimakariri, Christchurch-West Melton and Selwyn-Waihora sub-regional sections of proposed Land and Water Regional Plan. Note: For all activities in or near waterways, refer also to the requirements and restrictions under the Canterbury Flood Protection and Drainage Bylaw 2013 Prior to 31 December 2018, the repair of earthquake damaged land located within the area shown on area shown on Map 1, and located outside the High Soil Erosion Risk Areas, and which is carried out on an individual site used for residential activities, but excluding any residential property zoned red by the Canterbury Earthquake Recovery Authority), which involves any one or more of: (a) the use of land for: i. the excavation of material over the unconfined, semi-confined or coastal confined aquifer system; ii. iii. iv. the deposition of material into land or into groundwater, and any associated discharge into groundwater; vegetation clearance or earthworks within the riparian margin (defined for the purposes of this rule as any land within 10 metres of the bed of a river, lake or wetland boundary); the installation, maintenance, and use of a bore for geotechnical investigation or monitoring purposes; v. the installation and construction of building foundations; (b) the discharge of sediment-laden water generated from earthworks into a surface waterbody, or onto or into land where it may enter a surface water body; (c) the taking of groundwater for the purposes of dewatering or land drainage, and the associated discharge of that water into a surface water body, or onto or into land where it may enter a surface water body. is a permitted activity, provided the following conditions, as applicable, are met: General Conditions (1) The extent and duration of any works is limited to only that necessary to repair the land. (2) The works (excluding any discharges associated with the works listed above) do not occur in, the bed of any lake, river or natural wetland. Earthworks, Excavation and Deposition of Material (3) Erosion and sediment control measures are implemented and maintained in accordance with Environment Canterbury s Erosion and Sediment Control Guidelines for Small Sites to minimise erosion and the discharge of sediment laden water to surface water. (4) Any material deposited into land consists only of uncontaminated fill (soil, rocks, gravels, sand, silt, clay), concrete, cement, grout, concrete, steel or timber foundation piles, or inert building materials. (5) From the date this rule becomes operative, the use of land for the placement of treated timber foundation piles into confined groundwater within the Coastal Confined Aquifer System, and any discharge from those foundation piles, does not occur within a group or community drinking water supply protection area, as set out in Schedule 1 of this plan.

19 (6) Any excavation over the coastal confined aquifer system maintains at least one metre of undisturbed material between the deepest part of the excavation and Aquifer 1. (7) No materials (other than those listed in condition (4)), vehicles or machinery (excluding clean uncontaminated equipment used for dewatering, and infrastructure installed for the purposes of land repair) are deposited into, or used within groundwater. (8) Compaction, or earthworks involving below ground soil disturbance (excluding filling), do not occur on any part of a site which is identified as a landfill. (9) There is no discharge of any cement, concrete, grout, or water containing cement, grout, or concrete, into any surface waterbody, or beyond the property boundary. (10) Where grout is deposited into land, or into groundwater, the following conditions also apply: a. The volume of groutshall not exceed 50 cubic metres per site. b. The point of deposition into land is not within: i. 20 metres of any surface water body, or 20 metres of the Coastal Marine Area, where the material is deposited into groundwater; or ii. 10 metres of any surface water body, or 10 metres of the Coastal Marine Area, where a separation of one metre is maintained between groundwater and any deposited material. c Where grout is deposited into land via in-situ mixing: i. The grout shall be mixed evenly throughout the augured soil column; and ii. The percentage of grout within the area of the augured soil column shall not exceed 20%, d. Where grout is deposited into land using methods other than in-situ mixing, the percentage of cement in the dry grout mixture shall not exceed 30% (11) To prevent erosion, bare ground is stabilised within 10 days of any vegetation clearance or earthworks. (12) For earthworks carried out within the riparian area, in addition to conditions (3) through (11), the following conditions apply: i. Vegetation used and maintained by the Canterbury Regional Council for flood or erosion control purposes is not removed. ii. iii. iv. Replanting is not of a species listed in the Biosecurity NZ Register of Unwanted Organisms or Canterbury Pest Management Strategy. The activities do not reduce the available floodway. The activities do not result in the destabilisation of the bank of any river, lake or natural wetland, or destabilise any existing lawfully established structures, or interfere with access to waterways for maintenance or inspection purposes. Geotechnical Investigations (13) The bore is used only for the purposes of geotechnical investigations and is decommissioned by filling with clean material and compacted or sealed at the surface to prevent contaminants entering the bore.

20 (14) Information on location (including bore logs and intended uses), and other relevant information is submitted to the CRC within 20 working days of drilling the bore. Dewatering, Sediment-laden Water, and Land Drainage (15) Dewatering and land drainage discharges are not from, or discharged onto or into any site listed on Environment Canterbury s Listed Land Use Register. (16) The taking of groundwater for dewatering purposes does not lower the groundwater level more than 8 metres below the ground level of the site. (17) The taking and discharge of land drainage water and site dewatering water onto or into land or into surface water does not result in subsidence of the land surface, or river bed or river bank erosion. (18) The discharge of dewatering water onto or into land, or into surface water, does not result in any flooding of any neighbouring property, or result in ponding on the land surface for more than 48 hours. (19) The concentration of suspended solids in any dewatering water or sediment-laden water discharged to any surface water body does not exceed 100 grams per cubic metre. For the purposes of this rule the following definitions apply: Earthquake Damaged Land means land damaged as a result of the Canterbury Earthquake Sequence that commenced on 4 September 2010.: Residential Activities means land zoned residential in a district plan; or land used predominantly for residential occupation as at 4 September Grout means a material which consists of water and at least 20% cement, and which may also contain aggregate, inert additives or bentonite. Landfill means any part of a site where solid or hazardous waste has been deposited (either lawfully or not), and which is identified as a landfill on Environment Canterbury s Listed Land Use Register, or in the records of the relevant territorial authority.

21 Appendix 3 Restricted Discretionary Rule wording inserted into Waimakariri, Christchurch-West Melton and Selwyn-Waihora sub-regional sections of proposed Land and Water Regional Plan, following the permitted activity rule. The repair of earthquake damaged land which is carried out on individual sites used for residential activities which does not meet one or more of the applicable conditions of Rule XXX 2 is a restricted discretionary activity. The CRC will restrict discretion to the following matters: 1. The effect of not meeting the condition or conditions of Rule XXX 5 2. Mitigation measures proposed to be implemented or mitigation measures available to minimise any actual or potential environmental effect. Notification Pursuant to sections 95A and 95B of the RMA, an application for resource consent under this rule will be processed and considered without public or limited notification. Note that limited notification to affected order holders in terms of section 95F of the RMA will be necessary, where relevant, under section 95B(3) of the RMA. 2, - Applicable rule number to be inserted as appropriate. Where the rule is inserted into the Waimakariri sub-regional section, the rule number referenced in this rule shall be 8.5.2; where the rule is inserted into the Christchurch-West Melton sub-regional section, the rule number referenced shall be 9.5.6; where the rule is inserted into the Selwyn- Waihora sub-regional section, the rule number referenced shall be

22 Appendix 4 Map showing High Soil Erosion Risk Areas

23 Appendix 5 Map showing area to which Rules X 3 and X 6 apply 3 X to be replaced with rule numbers as follows In the Waimakariri Sub-Regional section, replace X with 8.52 and In the Christchurch-West Melton Sub-regional section replace X with 9.56 and In the Selwyn- Waihora sub-regional section replace X with and

Basements and Deep Building Construction Policy 2014

Basements and Deep Building Construction Policy 2014 Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets

More information

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS April 2013 i Introduction This guide focuses on repair methods for some of the types of land damage that occurred on flat residential land as a result

More information

Guide to agrichemical use in Resource Management Plans Northland Region as at October 2011

Guide to agrichemical use in Resource Management Plans Northland Region as at October 2011 Guide to agrichemical use in Resource Management Plans Northland Region as at October 2011 Northland Regional Air Quality Plan Note: This guide is intended to assist users and applicators understanding

More information

KAWERAU DISTRICT COUNCIL General Bylaw Part 9: On-site Wastewater Disposal Systems (2010)

KAWERAU DISTRICT COUNCIL General Bylaw Part 9: On-site Wastewater Disposal Systems (2010) KAWERAU DISTRICT COUNCIL General Bylaw Part 9: On-site Wastewater Disposal Systems (2010) Kawerau District Council General Bylaw Part 9: On-site Wastewater Disposal Systems (2010) Explanatory Statement

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014 Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,

More information

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives Rivers Group Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers Flooding & Drainage Perspectives Waimakariri River Catchment Waimakariri River Hydrology Catchment area - 3,990

More information

Waterway Technote Drains

Waterway Technote Drains Waterway Technote Drains Contents Benefits of good drain practice 1 Are your drains healthy? 2 The Sustainable Dairying Water Accord 3 Planning drain maintenance 3 Fencing and clearing 3 Bank shaping (battering)

More information

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

Revenue and Financing Policy

Revenue and Financing Policy Current Revenue Policy Revenue and Financing Policy Group Activity Environmental Activity - Air Ambient Air Quality Monitor and report on strategy development and implementation. benefits from clean air.

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is ~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

Daryl Henehan, Consent Planner Natural Resources. JOHN AND RIA WILMS - REPORT REP10-05-05- Report prepared for hearing of 3 May 2010

Daryl Henehan, Consent Planner Natural Resources. JOHN AND RIA WILMS - REPORT REP10-05-05- Report prepared for hearing of 3 May 2010 STAFF REPORT TO: FROM: REFERENCES: SUBJECT: Environment & Planning Subcommittee Daryl Henehan, Consent Planner Natural Resources RM090804 - Land Use Earthworks JOHN AND RIA WILMS - REPORT REP10-05-05-

More information

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK

More information

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for: EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

Notes on Managing Phosphorus losses

Notes on Managing Phosphorus losses Notes on Managing Phosphorus losses and Appendix Note on Cleaning Drains and Natural Watercourses Field days June 2015 North Canterbury Sustainable Farming Systems SFF Project 1 Notes from P days - The

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project

More information

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses. 4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Guidance on applying for approval of installation of a commercial onsite wastewater system

Guidance on applying for approval of installation of a commercial onsite wastewater system Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum. MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer

More information

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Introduction A Stormwater Report must be submitted with the Notice of Intent

More information

LAND ACCESS ARRANGEMENT FOR MINERAL EXPLORATION Template published in accordance with Section 141(1A) of the Mining Act 1992

LAND ACCESS ARRANGEMENT FOR MINERAL EXPLORATION Template published in accordance with Section 141(1A) of the Mining Act 1992 LAND ACCESS ARRANGEMENT FOR MINERAL EXPLORATION Template published in accordance with Section 141(1A) of the Mining Act 1992 This arrangement ( Agreement ), which is an access arrangement for the purposes

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

City of Valdosta Land Development Regulations. Table of Contents

City of Valdosta Land Development Regulations. Table of Contents TITLE 1 ADMINISTRATION Chapter 102 General Provisions 102-1 Title 102-2 Purpose 102-3 Authority 102-4 Jurisdiction 102-5 Application of Ordinance 102-6 Relationship to Existing Ordinances 102-7 Powers

More information

Section 4 General Strategies and Tools

Section 4 General Strategies and Tools Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General

More information

Section 401 Water Quality Certification

Section 401 Water Quality Certification Section 401 Water Quality Certification Department of Health Environmental Management Division Clean Water Branch Voice: (808) 586-4309 Fax: (808) 586-4352 http://www.hawaii.gov/health/environmental/water/cleanwater/index.html

More information

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue

More information

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012 DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY August 2012 SECTION 2 The storage requirements in Directive 055 apply to upstream petroleum facilities, well sites, and pipelines

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Contaminated land information management strategy Report No. R09/23 ISBN 978-1-86937-950-6

Contaminated land information management strategy Report No. R09/23 ISBN 978-1-86937-950-6 Contaminated land information management strategy Report No. R09/23 ISBN 978-1-86937-950-6 Davina McNickel May 2009 Report R09/23 ISBN 978-1-86937-950-6 58 Kilmore Street PO Box 345 Christchurch Phone

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Q&A: Resource Legislation Amendment Bill 2015

Q&A: Resource Legislation Amendment Bill 2015 Q&A: Resource Legislation Amendment Bill 2015 1. What are the four most significant changes in the Bill? The four most significant changes in the Resource Legislation Amendment Bill are: Requiring councils

More information

Appendix A1. Register of legal and other requirements

Appendix A1. Register of legal and other requirements Appendix A1 Register of legal and other requirements 1 Table 1 Legal register Act Activity / General Environmental Planning and Assessment Act 1979 All Comply with the terms Minister for Planning and Infrastructure

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

Town of Ware Board of Health. Regulations for Percolation Tests, Soil Evaluations, Design, and Technical Review of Subsurface Sewage Disposal Systems

Town of Ware Board of Health. Regulations for Percolation Tests, Soil Evaluations, Design, and Technical Review of Subsurface Sewage Disposal Systems Town of Ware Board of Health Regulations for Percolation Tests, Soil Evaluations, Design, and Technical Review of Subsurface Sewage Disposal Systems Section 1: Authority- The Ware Board of Health adopts

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

Monitoring your consent

Monitoring your consent Monitoring your consent Environment Canterbury regional council works with the people of Canterbury to manage the region s air, water and land. We are committed to the sustainable management of our environment

More information

Environmental Role of Poplar and Willow Drusilla Riddell-Black Lupus Science United Kingdom

Environmental Role of Poplar and Willow Drusilla Riddell-Black Lupus Science United Kingdom Environmental Role of Poplar and Willow Drusilla Riddell-Black Lupus Science United Kingdom Environmental roles include Buffer zones Riparian zone protection Slope stabilisation Flooding reduction Carbon

More information

Technical categories and your property

Technical categories and your property Technical categories and your property Information about residential green zone technical categories December 2011 Outline of land assessments Assessment of the land is undertaken by a range of organisations

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

Asbestos Disposal in the Northern Territory

Asbestos Disposal in the Northern Territory Information on the requirements for the disposal of Asbestos in the Northern Territory Scope These guidance notes have been developed to assist industry, local government, consultants and other relevant

More information

Flood Protection & control works

Flood Protection & control works Flood Protection & control works Whakamarumaru i ngā waipuke Environment Canterbury is the joint lead agency with territorial authorities for flood risk reduction. Under changes to the Local Government

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

SUBDIVISION AND DEVELOPMENT REGULATION

SUBDIVISION AND DEVELOPMENT REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT SUBDIVISION AND DEVELOPMENT REGULATION Alberta Regulation 43/2002 With amendments up to and including Alberta Regulation 119/2014 Office Consolidation Published

More information

RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by RECITALS

RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by RECITALS STATE OF NEW YORK COUNTY OF DECLARATION OF RESTRICTIVE COVENANTS THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by, ("Declarant"), A New York corporation with offices at,, New York.

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

INDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8

INDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8 1 INDEX Introduction 3 The Septic System 3 What Does The Septic Tank Do? 4 Where It All Goes 5 Problems 7 Some Dontʼs 8 Management of Your On-Site System 9 Tank Maintenance 9 Disposal Field Area 10 Appendix

More information

3. QUALITY ASSURANCE REQUIREMENTS

3. QUALITY ASSURANCE REQUIREMENTS 3. QUALITY ASSURANCE REQUIREMENTS 3.1 General This section covers the Kaipara District Council requirements for monitoring and testing of physical asset construction to ensure that the final asset delivered

More information

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

APPLICATION PROCESS FOR LAND DISTURBING PERMIT PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing

More information

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice M. R. Zare 1, S. Wilkinson 2, R. Potangaroa 3 1. PhD candidate, University of Auckland, Auckland, New

More information

DRAFT Revenue and Financing Policy 2015-2025

DRAFT Revenue and Financing Policy 2015-2025 DRAFT Revenue and Financing Policy 2015-2025 Table contents 1 Background 3 2 Guiding principles 4 2.1 Affordability 4 2.2 Paying for benefits received 4 2.3 Paying for costs imposed 4 2.4 Transparency

More information

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended

More information

Crown Land Management

Crown Land Management Crown Land Management An introduction to Crown Land Management Fact Sheet 12 Updated December 2010 Approximately 93% of Western Australia s land area is Crown land (that is, not private land). The majority

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

The answers to some of the following questions are separated into two major categories:

The answers to some of the following questions are separated into two major categories: Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the

More information

Texas Natural Resource Conservation Commission Page 1 Chapter 216 - Water Quality Performance Standards For Urban Development

Texas Natural Resource Conservation Commission Page 1 Chapter 216 - Water Quality Performance Standards For Urban Development Texas Natural Resource Conservation Commission Page 1 SUBCHAPTER B : MUNICIPAL WATER POLLUTION CONTROL AND ABATEMENT 216.21-216.30 Effective March 9, 1999 216.21. Purpose and Policy. (a) The purpose of

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

How To Decide On Water Management In Christchurch West Melton Zone

How To Decide On Water Management In Christchurch West Melton Zone CHRISTCHURCH WEST MELTON WATER MANAGEMENT ZONE COMMITTEE AGENDA THURSDAY 24 NOVEMBER 2011 AT 6PM LINWOOD SERVICE CENTRE 180 SMITH STREET (Please use the entrance to the Boardroom off back car park) Committee:

More information

Chapter 3 Land Use and Development Strategy Hearing Report

Chapter 3 Land Use and Development Strategy Hearing Report Report Chapter 3 Land Use and Development Strategy Hearing Report Prepared for Kaipara District Council (Client) By Beca Carter Hollings & Ferner Ltd (Beca) 20 April 2010 Beca 2010 (unless Beca has expressly

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 Building and Housing has published technical guidance for foundation repairs and reconstruction for residential properties in green zone Foundation Technical

More information

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks.

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks. Q & A Q 4/10/13: In anticipation of the DEM action plan implementation in the next few days, Citizens Advocating for a Safe Environment (CASE) would like to bring a few concerns to your attention. Some

More information

2016 No. 000 ENVIRONMENTAL PROTECTION, ENGLAND AND WALES FLOOD RISK MANAGEMENT, ENGLAND AND WALES

2016 No. 000 ENVIRONMENTAL PROTECTION, ENGLAND AND WALES FLOOD RISK MANAGEMENT, ENGLAND AND WALES Draft Regulations laid before Parliament and the National Assembly for Wales under sections 62(7) and (8) and 90(3) of the Water Act 2014, for approval by resolution of each House of Parliament and the

More information

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.

More information

Well Records and Maintenance Guidelines

Well Records and Maintenance Guidelines 1 Well Records and Maintenance Guidelines If you have a home well, you alone are responsible for maintaining the safety of our drinking water supply. When your well system is suitably located, correctly

More information

3.0 Table of Development Note: This table must be read in conjunction with the explanation provided in Part 5, Division 1, Chapter 2 Using Domains.

3.0 Table of Development Note: This table must be read in conjunction with the explanation provided in Part 5, Division 1, Chapter 2 Using Domains. Part 5 Division 2 Chapter 2 Domains Domains Park Living 1.0 Intent The purpose of this domain is to provide a variety of opportunities for low density residential activity within areas of semi-rural landscapes,

More information

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS 62-624.100 Policy and Purpose. 62-624.200 Definitions. 62-624.300 General Provisions. 62-624.310 General Conditions, Individual Permits. 62-624.400

More information

HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041

HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041 HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041 January 2014 Document control Document controller: Manager Environment & Sustainability Document number: EG0041 Rev Date Description

More information

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

CONSENT, PURSUANT TO SECTIONS 34A, 88, 104, 104C, and 108 OF THE RESOURCE MANAGEMENT ACT, IS GRANTED. THE FULL DECISION IS SET OUT BELOW

CONSENT, PURSUANT TO SECTIONS 34A, 88, 104, 104C, and 108 OF THE RESOURCE MANAGEMENT ACT, IS GRANTED. THE FULL DECISION IS SET OUT BELOW A U C K L A N D C O U N C I L Decision following the hearing of an application for resource consent SUBJECT: Application for resource consent under section 88 of the Resource Management Act 1991 by D C

More information

Wastewater & Stormwater By-law

Wastewater & Stormwater By-law Wastewater & Stormwater By-law WM-28 Consolidated December 8, 2015 In Force and Effect January 1, 2016 As Amended by By-law No. Date Passed at Council WM-28-14001 December 3, 2013 WM-28-14002 November

More information

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of

More information