1 DRAFT FEASIBILITY REPORT EXECUTIVE SUMMARY MAY 2003
2 EXECUTIVE SUMMARY Draft Feasibility Report Santa Rosa Incremental Recycled Water Program The City of Santa Rosa (City) is the managing partner for the Subregional Water Reclamation System, which comprises the cities of Santa Rosa,, Cotati, and Sebastopol. The City has undertaken the Incremental Recycled Water Program (IRWP or Program) to provide reliable treatment, recycling, and/or disposal of the existing wastewater volume affected by new regulations (California Toxics Rule) and additional flow resulting from growth anticipated in the general plans of the communities included in the system. Program Objectives The Feasibility Report develops alternatives that support the Program s objectives, as directed by the City of Santa Rosa Utilities Department staff, Board of Public Utilities (BPU), and City Council. The BPU and the City Council have adopted a Purpose and Need Statement that includes primary and secondary program objectives. The Program must accomplish the entire primary and most of the secondary Program objectives. Because alternatives may be combined to meet the Program objectives, an alternative must make a meaningful contribution toward fulfilling the objectives, but need not fulfill all objectives. The Program objectives are as follows. Primary Program Objectives Provide wastewater treatment, recycling, and disposal for the Santa Rosa Subregional Reclamation System to accommodate projected growth as indicated in the adopted general plans of each Subregional System member effective as of July Develop and operate the wastewater treatment and disposal system in ways that protect public health and safety, protect natural resources including the Russian River and its tributaries, promote use of recycled water, meet current regulatory requirements, and provide flexibility to comply with future regulatory requirements. Maintain a system and components that are economically feasible and continue to be successfully financed. Secondary Program Objectives Maximize use of recycled water. Maximize reuse opportunities where recycled water will increase the availability of potable water supplies. Dispose of reclaimed water in a manner that protects beneficial uses of receiving waters. Optimize water conservation. RDD\ (CAH2379.DOC) 1
3 DRAFT FEASIBILITY REPORT Maintain the level of weather-independence (as defined by Regional Water Quality Control Board [RWQCB] policy) that is provided by the addition of the Geysers Recharge Project to the Subregional Reclamation System. Maximize use of existing infrastructure. Maintain a disposal system that is manageable and reliable. Provide flexibility to accommodate use of recycled water made available by neighboring agencies as deemed appropriate by the City of Santa Rosa. Development of Program Alternatives Alternatives have been developed through a public process involving public meetings, a project website, and comments received on both the Initial Study and Scoping Report for the 2003 IRWP Program EIR being prepared in compliance with the California Environmental Quality Act (CEQA). The nine alternatives developed during this process are shown in Table ES-1. All areas where alternatives would be implemented are within Sonoma County except for a small portion of the Geysers steamfield, which is located in Lake County. TABLE ES-1 List of Alternatives Santa Rosa Incremental Recycled Water Program Alternative Number Alternative Name 1 Indoor Water Conservation 2 Infiltration and Inflow Reduction 3 Urban Reuse 4 Agricultural Reuse 5 Industrial Reuse 6 Geysers Expansion 7 Treatment and Reuse 8 Discharge 9 No Project In 1997, the City of Santa Rosa certified the Santa Rosa Long-term Subregional Wastewater Project Environmental Impact Report (Long-term EIR), which provided project-level environmental documentation for 13 alternatives. These alternatives included discharge to the Russian River and agricultural reuse projects throughout western, southern, and central Sonoma County, and the Geysers Recharge Project. The Long-term EIR remains a valid document today, and the Subregional Water Reclamation System could implement any of the projects evaluated in that EIR. For that reason, it has not been necessary for the IWRP to duplicate evaluations of alternatives that already have been reviewed in the Long-term EIR. Feasibility of Alternatives Feasibility, or practicability, means capable of being accomplished successfully within a reasonable period, and includes technological, logistical, and economic considerations. RDD\ (CAH2379.DOC) 2
4 DRAFT FEASIBILITY REPORT Technology Technology criteria include constructibility (i.e., can the project be built) and reliability. Reliability represents long-term ability of an alternative to consistently perform as designed. Alternatives must be considered constructible and provide a high level of reliability to be evaluated in the Program EIR. Logistics Logistical considerations include legal considerations and the ability to obtain the approvals or rights necessary for construction and ongoing operation of the alternative within the allotted schedule. The Subregional System needs to have an approved approach to accommodating capacity needs and California Toxics Rule (CTR) compliance for the RWQCB to act favorably on the next National Pollutant Discharge Elimination System (NPDES) permit application in early 2005, less than 3 years from now. Cost The cost impact of an alternative can be represented by the following types of information: Total cost. The total cost to all project participants of constructing and operating a project. Net Cost. The cost of an alternative after the cost of benefits have been credited. User Fees. The Subregional System is funded by a combination of connection fees and monthly user rates. These fees are based on the net cost of a project to the Subregional System. Total capital and net present value (NPV) costs of alternatives have been estimated. Net costs were estimated for only the infiltration and inflow (I/I) reduction alternative to represent the tradeoff with treatment plant capacity. User fee impacts have not yet been determined for any of the alternatives. Therefore, judgment about the relationship between the current estimate of total cost and affordability of alternatives was used to screen alternatives for inclusion in the Program EIR. However, screening decisions considered that some alternatives have beneficial effects that reduce other costs borne by the member cities in the Subregional System, such as reducing the need to develop additional potable water supplies. Background and Assumptions Background The existing Subregional System consists of the following components: Sewer Collection. Water Reclamation Facility (Laguna Plant). Agricultural Reuse System. Urban Reuse System. RDD\ (CAH2379.DOC) 3
5 DRAFT FEASIBILITY REPORT Geysers Recharge Project (pump s, pipelines, and a tank). The Geysers injection facilities are owned by Calpine and are not part of the Subregional System. Discharge System. The City s current NPDES permit allows the City to treat, recycle, and discharge the annual flow resulting from receiving a daily average dry weather flow (ADWF) of million gallons per day (mgd) at the Laguna Plant, after the Geysers Steamfield Recharge System becomes operational. Higher winter flows that cannot be stored for agricultural or urban reuse during summer or recycled at the Geysers Steamfield are currently discharged to the Laguna de Santa Rosa and, ultimately, the Russian River. The current permit allows discharge to occur only from October 1 through May 14 of each year. Since the Geysers Recharge Project was planned, several important changes to the basis of system planning have occurred. The Subregional System partners have adopted new general plans that indicate higher population growth and resulting wastewater generation than anticipated during planning for the Geysers project. The U.S. Environmental Protection Agency (EPA) enacted the National Toxics Rule, and the State of California subsequently enacted the California Toxics Rule (CTR). These rules and the subsequent State Implementation Plan outline a process for developing wastewater treatment plant discharge limits for 126 EPA Priority Pollutants (mostly pesticides and metals). Preliminary testing indicates that new limits will likely be imposed for the Laguna Plant discharge that could be very difficult to meet without additional treatment. Effluent limits are expected to be imposed in response to the CTR in The U.S. Fish and Wildlife Service (USFWS) published an emergency rule on July 22, 2002, listing the California tiger salamander as endangered. The emergency listing was made permanent on March 18, USFWS is expected to establish rules for protecting the salamander and its habitat. These rules could affect the City s ability to continue operating the existing irrigation system and the feasibility of siting additional storage facilities within the salamander s range. The salamander s range is not well defined, but is generally considered to include the Santa Rosa Plain west of Highway 101 and south of Guerneville Road. The City s current discharge permit requires that certain ph, temperature, and turbidity limits be met in the Laguna de Santa Rosa. These limits have not been met at all times at the existing discharge locations. Assumptions This Feasibility Report is based on the following assumptions regarding how these changed conditions will affect the Subregional System: CTR limits will be imposed when the Laguna Plant NPDES permit is re-issued (scheduled for 2005). Interim limits will be imposed for constituents with limits that cannot be attained at the time of permit adoption. A compliance schedule will be imposed in the permit, requiring final limits to be attained within 5 years. RDD\ (CAH2379.DOC) 4
6 DRAFT FEASIBILITY REPORT The City will continue to fulfill Geysers contract recycled water delivery volume and water quality obligations for the volume currently under contract. Some Program alternatives propose additional water deliveries and different water quality conditions than currently contracted. The City will continue to operate the existing agricultural and urban irrigation system as it is planned to be operated at the time of Geysers Recharge Project startup (i.e., approximately 2.1 billion gallons per year [BG/yr]). The implementation schedule for the IRWP, given these assumptions, is shown on Figure ES-1. Figure ES-1 Program Schedule Future Subregional System Flows To achieve the objectives of the IRWP, the future system must accomplish the following: Provide adequate reliable capacity to accommodate future flows generated by population and employment growth of the member entities. Achieve the quality of recycled water that will be required by regulatory agencies. Discharge of recycled water is subject to the CTR, which may require additional treatment for compliance. Discharge compliance also may require an additional point of discharge. Different methods were used to determine dry weather and wet weather flows, as described in the following sections. Dry Weather Flow Future flow projections for the Subregional System are based on the population, housing, and employment growth projected by the general plans (effective as of July 2002) of the Subregional System partners. Flow projections for these projected populations were predicated on actual 2000 population and Laguna Plant ADWF flows for each Subregional partner. In summary, the total projected ADWF at the Laguna Plant for the horizon planning year of each Subregional partner is 25.9 mgd. Table ES-2 summarizes ADWF projections. RDD\ (CAH2379.DOC) 5
7 DRAFT FEASIBILITY REPORT Wet Weather Flow Wet weather system flow projections are needed to determine how to manage total system inflows and outflows throughout each year. Wet weather inflow to the plant is much more sensitive than dry weather flow to hydrologic conditions, including rainfall events, Russian River flows, and groundwater levels. Among these factors, Laguna Plant dry weather inflow and wet weather inflow correlate most consistently with Russian River flow. TABLE ES-2 ADWF Projections Santa Rosa Incremental Recycled Water Program 2000 Flows a Projected Flows with Geysers Recharge Project 2020 Projected Flows Member Entity Mgd Percent mgd Percent mgd Percent & SSU SR/SPCSD Sebastopol Cotati Total a Includes 0.39 mgd for Oakmont and 0.05 mgd correction for Cotati metering in addition to actual Laguna Plant metered flow. Note: SR/SPCSD = Santa Rosa and South Park County Sanitation District. A water balance model was developed to simulate Laguna Plant daily inflow and daily outflows to storage, reuse, and discharge. The model yielded a peak wet weather day inflow to the Laguna Plant of 101 mgd, corresponding to a dry weather condition of 25.9 mgd. This represents the highest daily plant inflow during 67 years of record. The model was further used to simulate the amount of water in storage, being discharged, or reused at any time of year for future alternatives and example combinations of alternatives. Table ES-3 shows the portion of the total volume of the ADWF of 25.9 mgd that needs to be managed under the IRWP. TABLE ES-3 Future Capacity of the Subregional System by System Components at ADWF Under IRWP of 25.9 mgd (all values in BG) Santa Rosa Incremental Recycled Water Program Year Type (in 67-Year Analysis) Existing Irrigation System Geysers Recharge Project Discharge Growth a Total Subject to CTR b,c Total System Capacity at 25.9 mgd c, d Driest th percentile Median (50 th percentile) th percentile Wettest a Growth represents the total amount of Subregional System flow associated with an ADWF increase from 21.3 to 25.9 mgd. b Sum of Discharge and Growth. c Values do not always total exactly because of rounding of values to the nearest 0.1 BG. d Total system capacity at 25.9 mgd is the sum of existing irrigation system, Geysers Recharge Project, discharge and growth. RDD\ (CAH2379.DOC) 6
8 DRAFT FEASIBILITY REPORT Description of Alternatives The descriptions of IRWP alternatives have been developed at a conceptual or program-level in keeping with the programmatic nature of the 2003 Draft EIR that the City has prepared. Because the alternatives of the IRWP have only been defined at a program level and not at a projectspecific level of detail, the locations and design characteristics of the project components shown on Figure ES-2 are general or conceptual. Each alternative is discussed as a stand-alone entity in terms of its maximum practicable size consistent with the criteria for feasibility. Individual project alternatives are not necessarily mutually incompatible. The City anticipates that, as the IRWP is implemented, various alternatives will be combined to provide reliable, cost-effective system capacity. Because various alternatives will be combined in this manner, each alternative may not be constructed to the full design capacity described in this section. The array of potential combinations of various alternatives of varying sizes is quite extensive. Therefore, analyzing all of these combinations, and all the possible sizes of individual alternatives in combination with other alternatives, is unworkable. To provide meaningful and manageable information regarding the potential feasibility of particular alternatives, this section describes each alternative at its maximum practicable, feasible size. Major Program Components Several major program components are common to many alternatives as follows: Laguna Plant Expansion. The Laguna plant needs to be expanded to provide treatment for the incremental flow. Treatment plant expansion is necessary regardless of which disposal or reuse options are selected. However, the extent of expansion could be smaller if the I/I reduction alternative were implemented. Storage. recycled water storage is a necessary part of some alternatives, as described in Table ES-4. Surface and subsurface (aquifer storage and recovery) storage options were considered. Wetlands. Wetlands are not needed to make any of the alternatives function, but could be implemented in association with pipeline and storage components of several alternatives to provide habitat. Other components that are combined to create each of the alternatives include indoor water conservation, I/I reduction, urban irrigation (including dual piping systems and gray water system), agricultural irrigation, industrial reuse, pipelines, pump s and tanks, Geysers Steamfield expansion, direct discharge, indirect discharge (percolation ponds, infiltration basins, and injection wells), advanced membrane treatment, and no project. Table ES-4 and Figures ES-3 through ES-10 describe each Program Alternative. RDD\ (CAH2379.DOC) 7
9 MILES SCALE IS APPROXIMATE W RDD_915 (5/29/03) FIGURE ES-2 CONCEPT-LEVEL MAP OF PROGRAM ALTERNATIVES FEASIBILITY REPORT EXECUTIVE SUMMARY
10 DRAFT FEASIBILITY REPORT TABLE ES-4 Summary of Alternatives Santa Rosa Incremental Recycled Water Program Maximum Flow Storage Estimated Cost Annual Alternative Managed (BG) Needed (BG) Capital ($ millions) O&M ($ millions) Components Included in Alternative Treatment Plant Upgrade 65 3 Laguna Plant Upgrade Indoor Water Conservation Laguna Plant Upgrade, Indoor Water Conservation I/I Reduction (1) Laguna Plant Upgrade, I/I Reduction Urban Reuse to Laguna Plant Upgrade, Urban Irrigation, Pipelines, Storage, Created Wetlands, Pump Stations and Tanks Agricultural Reuse to Laguna Plant Upgrade, Agricultural Irrigation, Pipelines, Storage, Created Wetlands, Pump Stations and Tanks Industrial Reuse 0 0 a a Industrial Reuse, Pipelines, Storage, Pump Stations and Tanks Treatment and Reuse a a Created Wetlands, Direct Discharge, Indirect Discharge, Advance Membrane Treatment Geysers Expansion Laguna Plant Upgrade, Pipelines, Storage, Created Wetlands, Pump Stations and Tanks, Geysers Steamfield Expansion Discharge to to to 29 Laguna Plant Upgrade, Pipelines, Storage, Created Wetlands, Pump Stations and Tanks, Geysers Steamfield Expansion, Direct Discharge, Indirect Discharge a Cost estimate not developed. RDD\ (CAH2379.DOC) 9
11 Quantity: Captital cost: O&M cost: 0.3 BG $3 million a $1 million/year a urban reuse pump Santa Rosa agricultural irrigation Storage Russian River Llano pump Mountain pump s indoor water conservation Pretreatment I/I Reduction Laguna Plant Expansion Terminal tank Geysers steam field Notes a Does not include $65 million in captal cost or $3 million in annual operation and maintenance costs for expansion of the Laguna Plant. b Gray-tone indicates existing facilities; colors represent proposed incremental flow facilities. W RDD_028 (5/29/03) FIGURE ES-3 ALTERNATIVE 1 INDOOR WATER CONSERVATION b FEASIBILITY REPORT EXECUTIVE SUMMARY
12 Quantity: 2 BG Captital cost: $600 million O&M cost: $-1 million/year a urban reuse pump Santa Rosa agricultural irrigation Storage Russian River Llano pump Mountain pump s Indoor water conservation Pretreatment I/I Reduction Laguna Plant Expansion Terminal tank Geysers steam field Notes a The largest size of this alternative would reduce expansion of the Laguna Plant from $65 million to $15 million in capital cost and reduce annual O&M costs from $3 million to $2 million. b Gray-tone indicates existing facilities; colors represent proposed incremental flow facilities. W RDD_029 (5/29/03) FIGURE ES-4 ALTERNATIVE 2 I/I REDUCTION b FEASIBILITY REPORT EXECUTIVE SUMMARY
13 and Cotati urban reuse Quantity: 2.1 BG Captital cost: $261 million a O&M cost: $6 million/year a pump Santa Rosa agricultural irrigation surface storage Russian River Llano pump Mountain pump s Indoor water conservation Pretreatment I/I Reduction Laguna Plant Expansion Terminal tank Geysers steam field Santa Rosa urban reuse pump surface storage Subsurface storage Notes a Does not include $65 million in captal cost or $3 million in annual operation and maintenance costs for expansion of the Laguna Plant. b Gray-tone indicates existing facilities; colors represent proposed incremental flow facilities. W RDD_031 (5/29/03) Santa Rosa urban reuse FIGURE ES-5 ALTERNATIVE 3 URBAN REUSE b FEASIBILITY REPORT EXECUTIVE SUMMARY
14 urban reuse Quantity: Captital cost: O&M cost: 0.3 BG $3 million a $1 million/year a pump Surface storage Pump East of agricultural irrigation Santa Rosa agricultural irrigation Storage Russian River Llano pump Mountain pump s Indoor water conservation Pretreatment I/I Reduction Laguna Plant Expansion Pump Pump Terminal tank Geysers steam field Surface or subsurface storage Pump North County agricultural irrigation NOTES a Does not include $65 million in captal cost or $3 million in annual operation and maintenance costs for expansion of the Laguna Plant. b gray-tone indicates existing facilities; colors represent proposed incremental flow facilities. W RDD_032 (5/29/03) FIGURE ES-6 ALTERNATIVE 4 AGRICULTURAL IRRIGATION b FEASIBILITY REPORT EXECUTIVE SUMMARY
15 Quantity: Captital cost: O&M cost: 0 BG $ million a $ million/year a urban reuse pump Santa Rosa agricultural irrigation Storage Russian River Llano pump Industrial reuse Mountain pump s Indoor water conservation Pretreatment I/I Reduction Laguna Plant Expansion Terminal tank Geysers steam field NOTES a Cost estimates were not developed for this alternative. It is infeasible because it does not provide disposal in addition to reuse. b Gray-tone indicates existing facilities; colors represent proposed incremental flow facilities. W RDD_033 (5/29/03) FIGURE ES-7 ALTERNATIVE 5 INDUSTRIAL REUSE b FEASIBILITY REPORT EXECUTIVE SUMMARY
16 Quantity: 6.7 BG Captital cost: $253 million a O&M cost: $12 million/year a urban reuse pump Santa Rosa agricultural irrigation storage Russian River Llano pump Mountain pump s Indoor water conservation Pretreatment I/I Reduction Laguna Plant Expansion Terminal tank Geysers steam field Notes a Does not include $65 million in captal cost or $3 million in annual operation and maintenance costs for expansion of the Laguna Plant. b Gray-tone indicates existing facilities; colors represent proposed incremental flow facilities. W RDD_035 (5/28/03) FIGURE ES-8 ALTERNATIVE 6 GEYSERS EXPANSION b FEASIBILITY REPORT EXECUTIVE SUMMARY
17 urban reuse Quantity: 6.7 BG Captital cost: $ million a O&M cost: $ million/year a pump Santa Rosa agricultural irrigation storage Russian River Llano pump Mountain pump s Indoor water conservation pretreatment I/I Reduction Laguna Plant Expansion Pump Pump Terminal tank Geysers steam field treatment Pump s Lake Sonoma NOTES a Cost estimates were not developed for this alternative. It was determined to be infeasible because of permitting and schedule constraints. b Gray-tone indicates existing facilities; colors represent proposed incremental flow facilities. W RDD_036 (5/29/03) Groundwater augmentation FIGURE ES-9 ALTERNATIVE 7 ADDITIONAL TREATMENT AND REUSE b FEASIBILITY REPORT EXECUTIVE SUMMARY
18 urban reuse Quantity: 6.7 BG Captital cost: $ million a,b O&M cost: $ million/year a,b pump Santa Rosa agricultural irrigation Storage Russian River Llano pump Mountain pump s Indoor water conservation Pretreatment I/I Reduction Laguna Plant Expansion Terminal tank Geysers steam field Percolation/ infiltration basin Surface storage NOTES a Capital costs could range from $318 to $506 million and annual O&M costs could range from $19 to $34 million because of the range of treatment, discharge, and storage associated with the alternative. b Does not include $65 million in captal cost or $3 million in annual operation and maintenance costs for expansion of the Laguna Plant. c Gray-tone indicates existing facilities; colors represent proposed incremental flow facilities. W RDD_038 (5/29/03) Russian River treatment FIGURE ES-10 ALTERNATIVE 8 DISCHARGE c FEASIBILITY REPORT EXECUTIVE SUMMARY
19 DRAFT FEASIBILITY REPORT Alternative 9 No Project Consideration of the No Project alternative is required by CEQA. For purposes of the Program EIR, the No Project alternative includes only facilities existing or under construction as of July Screening of Alternatives Potential IRWP alternatives were screened by both the BPU and Santa Rosa City Council in September 2002 to determine which alternatives should be further developed and evaluated in the Program EIR. The IRWP may be subject to National Environmental Policy Act (NEPA), as well as CEQA, requirements at some point in the future. Therefore, screening criteria listed below are derived from both state and federal guidelines: Alternatives must accomplish most of the program objectives. Alternatives must be feasible (practicable). An alternative is considered feasible after taking technology, logistics, and cost into consideration. Using these criteria, the following components and alternatives were screened out: Subsurface storage Treatment and Reuse, including groundwater augmentation and surface water augmentation in Lake Sonoma Industrial reuse Example Combinations of Feasible Alternatives The alternatives described in this report have been analyzed individually at their maximum practicable size. The maximum practicable size of discharge alternatives could address the maximum expected annual volume of 6.7 BG. Because the maximum practicable size of certain alternatives will not accommodate the maximum expected annual volume, these alternatives will have to be combined to provide sufficient water recycling or disposal capacity. The IRWP will likely consist of combinations of alternatives of various sizes to achieve the project objectives in a reliable, cost-effective, and environmentally sensitive manner. Example combinations of alternatives that could recycle or dispose of 6.7 BG annually are shown in Table ES-5. RDD\ (CAH2379.DOC) 18
20 DRAFT FEASIBILITY REPORT TABLE ES-5 Example Combinations of Alternatives (annual capacities in BG) and Total Capital and O&M Costs ($ millions) Santa Rosa Incremental Recycled Water Program Alternative Number Indoor Water Conservation I/I Reduction Urban Reuse Agricultural Reuse Geysers Expansion Direct or Indirect River Discharge Indirect River Discharge Direct River Discharge 6.4 Total Capital Cost a Annual O&M Cost a NVP Cost a a All values in millions of dollars adjusted to 2002 dollar value. Program Implementation Following certification of the Program EIR, the selection process will occur by adopting a Water Recycling Master Plan that will identify specific program alternatives or combinations of alternatives to be implemented and the size, sequencing, timing, and cost of each. As additional reuse or discharge capacity is needed, the City will prepare additional project-specific environmental documentation to implement specific projects. RDD\ (CAH2379.DOC) 19
Indoor Water Conservation and I&I Reduction (EIR Alternatives 1 and 2)
SECTION 2 Description of Master Plan Alternatives The six alternatives that constitute the building blocks of the IRWP Master Plan are as follows: Indoor Water Conservation (EIR Alternative 1) I&I Reduction
More information5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
More informationNEVADA CITY WASTEWATER TREATMENT INQUIRY
NEVADA CITY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated
More informationATTACHMENT 7. CWSRF Project Descriptions and Examples for Green Project Reserve
Attachments 7 and 8 are from the American Recovery and Reinvestment Act Guidance, produced March 2, 2009 by the U.S. EPA Office of Water. Attachments 7 and 8 specifically address the 20% Green Project
More informationEarly SNMP Case Studies Salt and Nutrient Management Plans and Related Issues at Camp Pendleton MCB. Rob Beggs, Brown and Caldwell
Early SNMP Case Studies Salt and Nutrient Management Plans and Related Issues at Camp Pendleton MCB Rob Beggs, Brown and Caldwell November 7, 2013 Water Sustainability for Camp Pendleton Camp Pendleton
More information3.1.8 Utilities and Service Systems
3.1.8 Utilities and Service Systems This section discusses potential impacts to utilities and service systems, including water, wastewater, and solid waste hauling and disposal, resulting from the implementation
More informationPlan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.
6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.
More informationKansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
More informationSewer servicing and integrated resource management
Sewer servicing and integrated resource management Gabriola Village Center Ian Ralston Eng.L. 1 Outline Sewage systems, servicing Regulatory context Decentralized concept Management Treatment techniques
More informationFY 2015-16 Springs Funding Projects
FY 2015-16 Springs Funding Projects Spring Homosassa Springs Project Name and Description Garcia Point Septic Project: Through the connection of 88 residential septic systems to Citrus County s central
More informationPajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form
Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: Corralitos Creek Water Supply and Fisheries Enhancement Project Project
More informationCWSRF Project Descriptions and Examples for Green Project Reserve
CWSRF Project Descriptions and Examples for Green Project Reserve I. Water Efficiency a. Water efficiency is the use of improved technologies and practices to deliver equal or better services with less
More informationINFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
More information4 Water supply description
4 Water supply description A description of the drinking-water system is equally applicable to large utilities with piped distribution systems, piped and non-piped community supplies, including handpumps
More informationProposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
More informationRESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT
CHAPTER 14 RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT Grace Johns and Lisa A. McDonald Economic analysis methods have been used in Florida to identify positive
More informationWater Recycling in action in South Australia: a review of agricultural and municipal reuse schemes and innovation.
Water Recycling in action in South Australia: a review of agricultural and municipal reuse schemes and innovation. S. Rinck-Pfeiffer * Veolia Water/United Water, Parkside, GPO Box 1875, Adelaide, South
More informationRoosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT
ROOSEVELT WATER CONSERVATION DISTRICT RESPONSE TO ARIZONA POWER AUTHORITY REQUEST FOR INFORMATION DATED SEPTEMBER 12, 2012 PRESENTED OCTOBER 24, 2012 RWCD is an irrigation district that was established
More informationPREPARING INDUSTRIAL ENGINEERING REPORTS
PREPARING INDUSTRIAL ENGINEERING REPORTS EARLE HARTLING, LOS ANGELES COUNTY SANITATION DISTRICT JOHN ROBINSON, JOHN ROBINSON CONSULTING, INC WateReuse LA Chapter December 2, 2014 Presentation Overview
More informationLEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
More informationUsing Technology to Administer a Reclaimed Water Program. Abstract
Using Technology to Administer a Reclaimed Water Program Karen Dotson, Tucson Water, Tucson, AZ Abstract Administering annual backflow prevention assembly testing and reclaimed water site inspections can
More informationDOCKET NO. D-2004-008-2 DELAWARE RIVER BASIN COMMISSION. Southeastern Pennsylvania Ground Water Protected Area
This DRAFT docket has been prepared for the purposes of the scheduled public hearing and may be substantially modified as a result of the public hearing process prior to Commission action. 8/26/2013 4:17
More informationGetting More Out of the Water We Have
Water Recycling and Reuse California has the potential to recycle enough water to meet 30-50% of the household water needs of our projected population growth. California Recycled Water Task Force Getting
More informationGreater Los Angeles County Region
Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this
More informationThe 91 st Avenue Unified WWTP Targets 100 Percent Reuse
SROG GLEND LE The 91 st Avenue Unified WWTP Targets 100 Percent Reuse 26 th Annual WateReuse Symposium September 14, 2011 Presentation Outline Facility Location and Ownership Basic Facility Information
More information1 INTRODUCTION. Kayenta Complex Page 9 December 2011 Cumulative Hydrologic Impact Assessment
1 INTRODUCTION The Office of Surface Mining Reclamation and Enforcement (OSMRE) is the regulatory authority for coal mining operations under the Surface Mining Reclamation and Control Act of 1977 that
More information9.1. Adequacy of Available Data and Monitoring Efforts
9. DATA MANAGEMENT Data management is a crucial aspect of successful implementation of the ARB IRWMP and its component projects. This section discusses the adequacy of available data and monitoring efforts,
More informationSan Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission
San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 January
More informationDIRECT POTABLE REUSE: A PATH FORWARD:
DIRECT POTABLE REUSE: A PATH FORWARD: 2012 WATER REUSE CONFERENCE Boise, ID April 17, 2012 George Tchobanoglous Professor Emeritus of Civil and Environmental Engineering Department of Civil and Environmental
More informationA Long-Range Plan: Melbourne s Drinking Water Supply
April 2002 A Long-Range Plan: Melbourne s Drinking Water Supply The long-term water supply of South Brevard County must be dependable, flexible, and affordable. With those goals in mind, we continue to
More informationRetention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects
Description Retention/irrigation refers to the capture of stormwater runoff in a holding pond and subsequent use of the captured volume for irrigation of landscape of natural pervious areas. This technology
More informationCENTRAL ARIZONA SALINITY STUDY ---- Phase I. Technical Appendix O. Municipal TDS Research
CENTRAL ARIZONA SALINITY STUDY ---- Phase I Technical Appendix O Municipal TDS Research Introduction Water availability and quality are among the world s most important environmental issues. Demand for
More informationCALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD LOS ANGELES REGION. February 12, 2015
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD LOS ANGELES REGION Resolution No. R15-001 Amendment to the Water Quality Control Plan for the Los Angeles Region to Incorporate Stakeholder-Proposed Groundwater
More informationRouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity
Community Case Study Rouge River Watershed, MI Region 5 Number of CSO Outfalls 168 Combined Sewer Service Area 93 square miles Wastewater Treatment Capacity 1,700 mgd (primary) 930 mgd (secondary) Receiving
More informationMAY 28, 2014 GRAND JURY REPORT "SUSTAINABLE AND RELIABLE ORANGE COUNTY WATER SUPPLY: ANOTHER ENDANGERED SPECIES?"
DIRECTORS PHILIP L. ANTHONY KATHRYN L. BARR DENIS R. BILODEAU, P.E. SHAWN DEWANE JAN M. FLORY CATHY GREEN VINCENT F. SARMIENTO, ESQ. STEPHEN R. SHELDON HARRY S. SIDHU, P.E. ROGER C. YOH, P.E. OFFICERS
More informationCOMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary
CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,
More informationTHE GEYSERS Renewable, Geothermal Energy. Mike Rogers, Senior Vice President Calpine Geothermal Operations
THE GEYSERS Renewable, Geothermal Energy Mike Rogers, Senior Vice President Calpine Geothermal Operations Impact Sonoma Energy: Plugging Into Sonoma County s Future 18 October 2012 Geothermal Fields: Resources
More informationChapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN
Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
More informationCity of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee
City of Inglewood Well No. 2 Rehabilitation City of Inglewood Thomas Lee Project Location (Photos and location maps of the project) Project Description The City of Inglewood (City)receives its annual potable
More informationGOALS, OBJECTIVES AND POLICIES
GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates
More informationDRAFT Public Outreach Document for What s an SSMP?
DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials
More informationWater Resource Management Planning
Water Resource Management Planning About this Document This guidance was designed to explain the types of water management planning reports towns and communities can use when approaching their particular
More informationRecommended Practices Associated with Hydraulic Fracturing Operations
Recommended Practices Associated with Hydraulic Fracturing Operations API standards program includes best-practices for hydraulic fracturing which include: Proper well construction and integrity Zonal
More informationSummary: Introduction
Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with
More informationM E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to
M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)
More informationA GUIDE TO THE PREPARATION OF THE WATER SUPPLY FACILITIES WORK PLAN
A GUIDE TO THE PREPARATION OF THE WATER SUPPLY FACILITIES WORK PLAN Florida Department of Economic Opportunity Division of Community Development Bureau of Community Planning September 2007. Revised July
More informationSource Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
More informationPackage Treatment Plant Policy and Procedure
Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are
More informationSection 4 General Strategies and Tools
Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General
More informationHow To Manage Water Resources In The Yakima Basin
Yakima Basin Integrated Water Resource Management Plan October 23, 2014 Presented by Derek Sandison, Director Office of Columbia River Photo Courtesy of Tom Ring Basin size: 6,155 sq. miles Population:
More informationWater Quantity Trading & Banking: Concepts and Illustrations. Kurt Stephenson Dept. of Agricultural & Applied Economics October 15, 2015
Water Quantity Trading & Banking: Concepts and Illustrations Kurt Stephenson Dept. of Agricultural & Applied Economics October 15, 2015 Groundwater Management Roles: Commonwealth and Users What GW goal
More informationCOMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B
More informationUtilities Privatization Success Story. Mid-west drought management Enhance water conservation Enhance environmental sustainability
Utilities Privatization Success Story Reclaimed Water Reuse Fort Sill, OK Objective Mid-west drought management Enhance water conservation Enhance environmental sustainability December 2015 Background
More informationELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS
(408) 761 5882 http://www.sewerlock.net ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS 1. `The United States and various State Environmental Protection Agency regulations require elimination
More informationCHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.
More informationCalifornia Wastewater
Abridged Edition L A Y P E R S O N S G U I D E T O California Wastewater Prepared by the Water Education Foundation Contents The Layperson s Guide to California Wastewater is prepared and distributed by
More informationTown of Yorktown Comprehensive Plan 8. INFRASTRUCTURE
Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE 8. Infrastructure 8.1 VISION STATEMENT Infrastructure is a basic building block of the community essential for the health, safety, and welfare of residents.
More informationCity of Fort Collins Water Supply and Demand Management Policy
City of Fort Collins Water Supply and Demand Management Policy The City of Fort Collins Water Supply and Demand Management Policy provides a foundational framework for water supply and demand management
More information* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey
IV. PROPOSED PLAN FOR AMD ABATEMENT GOALS AND OBJECTIVES Although the major natural resource in the Wyoming Valley is anthracite coal*, its importance to the present and future economy of the area is limited
More informationEPA Trends for wastewater Treatment in California - 2011
EPA S TECHNOLOGY NEEDS FOR THE WATER AND WASTEWATER INDUSTRY Nancy Stoner Acting Assistant Administrator U.S. EPA Office of Water International Emerging Technology Symposium Arlington, VA April 23rd, 2014
More informationNASA Stennis Space Center Environmental Resources Document
16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic
More informationAsset Management Answering the 5 Core Questions
Asset Management Answering the 5 Core Questions by Timothy Taber, PE Barton & Loguidice Page 1 Drivers Asset Management Case Study 1. What is the current state of my assets? 2. What is my required sustainable
More informationAddressing Declining Elevations in Lake Mead
Integrated Resource Planning Advisory Committee July 23, 2014 Addressing Declining Elevations in Lake Mead 1 Meeting Topics Drought update Attribute finalization Interbasin Cooperation Intake Pumping Station
More informationFiberglass Tanks for Green Building Applications. a subsidiary of ZCL Composites Inc.
Fiberglass Tanks for Green Building Applications a subsidiary of ZCL Composites Inc. Xerxes Fiberglass Tanks for Green Building When people think of green building, they often think of the more obvious
More informationRecycled Water Program, Phase II CLWA- 1
Recycled Water Program, Phase II CLWA- 1 Description: This project includes the planning, designing, and construction of a new recycled water storage tank, pump station modifications, and new recycled
More informationTreatment, Beneficial Use and Management of CBM Produced Water Industry Perspective
IP/BEC - Challenges and Opportunities of IP/BEC Challenges and Opportunities of Treatment, Beneficial Use and Management of CBM Produced Water Industry Perspective Forward-Looking Statements Except for
More informationMaine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans
Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans OVERVIEW The objective of a Combined Sewer Overflow (CSO) Facility Plan is to abate CSO discharges
More informationIntegrated Water Management in Maryland. Anwer Hasan, Senior Vice President
Integrated Water Management in Maryland Anwer Hasan, Senior Vice President Discussion Topics State initiatives for water management o Stormwater management o Agriculture runoff o Enhanced Nutrient Removal
More informationFoothill Municipal Water District Recycled Water Project
Foothill Municipal Water District Recycled Water Project Update to Incorporate a Watershed Approach Introduction This paper will describe the Foothill Municipal Water District (FMWD) Recycled Water Project,
More informationRecycled Water for Cooling Towers
Recycled Water for Cooling Towers City of Santa Clara Alan Kurotori, P.E. Director of Water & Sewer Utilities Critical Facilities Round Table April 15, 2010 Presentation Overview Water Supply Where do
More informationGAO COMPREHENSIVE EVERGLADES RESTORATION PLAN. Additional Water Quality Projects May Be Needed and Could Increase Costs
GAO United States General Accounting Office Report to the Chairman, Subcommittee on Transportation and Infrastructure, Committee on Environment and Public Works, U.S. Senate September 2000 COMPREHENSIVE
More informationCHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN
CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN PLEASE COMPLETE CHECKLIST AND ENCLOSE WITH THE APPLICATION. If you need assistance,
More informationDirector of Utilities. Manager. Regulatory Compliance Supervisor. Distribution Supervisor. Utilities Analyst. Account Clerk. Water
DEPARTMENT ORGANIZATIONAL CHART WATER RESOURCES Director of Utilities Secretary Resources Manager Business Services Manager Utilities Engineer Resources Supervisor Distribution Supervisor Utilities Project
More informationEast Niles Community Services District 2010 Urban Water Management Plan
East Niles Community Services District 60182838.401 June 2011 East Niles Community Services District Timothy P. Ruiz, PE - General Manager AECOM Joshua T. Nord, PE - District Engineer 5001 E. Commercenter
More informationWASTEWATER TREATMENT
Freshwater WASTEWATER TREATMENT Water Quality 1. INDICATOR (a) Name: Wastewater treatment. (b) Brief Definition: Proportion of wastewater that is treated, in order to reduce pollutants before being discharged
More informationTEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer
TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer Background San Antonio, the seventh largest city in the United States, covers approximately 515 square miles of Bexar County in south central Texas.
More information1. UPDATE ON 20X2020 WATER USE EFFICIENCY LEGISLATION
MEETING OF THE BOARD OF DIRECTORS OF THE MUNICIPAL WATER DISTRICT OF ORANGE COUNTY Jointly with the PUBLIC AFFAIRS AND LEGISLATION COMMITTEE June 15, 2009, 8:30 a.m. Conference Room 101 Teleconference
More informationSILICON VALLEY CLEAN WATER. May 2015
SILICON VALLEY CLEAN WATER May 2015 Slug Discharge Control and Spill Containment Guidelines This document was revised and used with the permission of the Los Angeles County Sanitation District, Industrial
More informationCALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION
DISCUSSION OF INFORMATION PRESENTED IN THIS CHAPTER This chapter contains information regarding the operation of the Los Angeles District of California American Water as well as tables that summarize the
More informationAppendix F6 Option Characterization Reuse
Appendix F6 Option Characterization Reuse Appendix F6 Option Characterization Reuse 1.0 Introduction Many municipal and industrial entities that receive Colorado River water have implemented wastewater
More informationCost of Service Studies For the San Antonio, California Water District
REQUEST FOR PROPOSALS TO PROVIDE: CONSULTING SERVICES TO THE SAN LORENZO VALLEY WATER DISTRICT PROJECT TITLE: ENTERPRISE WIDE COST OF SERVICE FINANCIAL STUDY RESPONSE DUE BEFORE 3:00 P.M. ON JANUARY 15,
More informationFLORIDA ATLANTIC UNIVERSITY
9 Supporting Data The purpose of the Element is to ensure the provision of public facilities and services required to meet the future needs of the University, including: Stormwater management, to protect
More informationOlivenhain Municipal Water District 2014 Strategiic Pllan
Olliivenhaiin Muniiciipall Diistriict Olivenhain Municipal District 2014 Strategiic Pllan 1 Olivenhain Municipal District table of contents Introduction 3 Our Values 4 Our Vision 5 Our Mission 6 Our Goals
More informationDEPARTMENT OF ENVIRONMENTAL QUALITY
PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized
More informationInnovative Water Technologies Programs. 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha
Innovative Water Technologies Programs 5 th Annual Summer Seminar 2015 San Antonio Water Systems July 24, 2015 By Erika Mancha The following presentation is based upon professional research and analysis
More informationINTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT
INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT The Adapting to Rising Tides (ART) project evaluated the current condition of shoreline and community assets, and the
More informationHCP Team Meeting. November 18, 2015. icfi.com
HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next
More informationDescription of the Water Conserv II Facility
Description of the Water Conserv II Facility Introduction The Water Conserv II (WCII) Water Reclamation Facility provides service to a majority of the southwest section of Orlando. The WCII facility has
More informationMaricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001
Maricopa Association of Governments Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS August 2001 3033 NORTH 44TH STREET, SUITE 101 PHOENIX, ARIZONA 85018 (602) 263-9500 FAX (602) 265-1422 Technical
More informationAlberta Environment Standards for Advanced Waste Systems
Alberta Environment Standards for Advanced Waste Systems + Alberta Rural Organic Waste to Resources Network + George Neurohr Regional Municipal Engineer Grande Prairie, Alberta May 1, 2012 Contents: Introduction
More information4.2 Option 1 Expand Existing Lagoon System
4. WASTEWATER TREATMENT SYSTEM 4.1 of Existing Lagoons The of existing lagoon system is evaluated for future demand based on the following requirements. Existing Lagoons Anaerobic cells - Four Cells, of
More informationWater Extraction Permitting Policy
Water Extraction Policy 1 Water Extraction Permitting Policy Department of Environment, Labour & Justice January 2013 Water Extraction Policy 2 EXECUTIVE SUMMARY This document establishes a new policy
More informationIC24. DISPOSAL OF WASTEWATER GENERATED BY MOBILE BUSINESSES AND OUTDOOR ACTIVITIES
IC24. DISPOSAL OF WASTEWATER GENERATED BY MOBILE BUSINESSES AND OUTDOOR ACTIVITIES BEST MANAGEMENT PRACTICES (BMP) A BMP is a technique, measure, or structural control that is used for a given set of conditions
More informationAnish Jantrania (photo) and Allen Knapp
WATER QUALITY VERSUS PROCESS MONITORING CHARLES CITY COUNTY, VA PROJECT Anish Jantrania (photo) and Allen Knapp Anish Jantrania Technical Services Engineer Virginia Department of Health Richmond, VA 23219,
More informationPUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT. Provide an Environmentally Sound Sanitary Sewer System
PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT GOAL 1: Ensure that the City's sanitary sewer system will provide an effective, efficient and environmentally sound method of wastewater collection,
More informationWATER AND WASTEWATER UTILITY RATE STUDY CITY OF
WATER AND WASTEWATER UTILITY RATE STUDY CITY OF MAY 2013 WATER AND WASTEWATER UTILITY RATE STUDY FOR CITY OF YREKA 701 4 TH STREET YREKA, CA 96097 JOB NO. 69.39 MAY 2013 PREPARED BY: TABLE OF CONTENTS
More informationDEVELOPMENT DUE DILIGENCE CHECKLIST
DEVELOPMENT DUE DILIGENCE CHECKLIST A. Title Condition. 1. Preliminary Title Reports. A current preliminary title report ( PTR ) for the Real Property. 2. Copies of Exceptions to Title. Copies of all documents
More informationExcellence in Engineering Since 1946
Excellence in Engineering Since 1946 1 Strand Associates, Inc. Cost and Financing of Phosphorus Removal Systems in Wisconsin Wisconsin Government Affairs Seminar February 27, 2014 Presented by: Jane M.
More informationDeSoto County is not a water service provider and does not operate any
Water and Sewer DeSoto County is not a water service provider and does not operate any water delivery systems. There are 14 certificated, non-municipal water associations operating in the county that are
More information