Submission Term/Year: Fall, Number of Pages: 38. Style Manual Used: American Psychological Association, 6 th edition

Size: px
Start display at page:

Download "Submission Term/Year: Fall, Number of Pages: 38. Style Manual Used: American Psychological Association, 6 th edition"

Transcription

1 Author: Baral, Pranaya Title: Implementation of 5S methodology on slot line assembly for a Manufacturing Company located in Minnesota The accompanying research report is submitted to the University of Wisconsin-Stout, Graduate School in partial completion of the requirements for the Graduate Degree/ Major: MS Technology Management Research Adviser: Ned Weckmueller Submission Term/Year: Fall, 2012 Number of Pages: 38 Style Manual Used: American Psychological Association, 6 th edition STUDENT: I understand that this research report must be officially approved by the Graduate School and that an electronic copy of the approved version will be made available through the University Library website I attest that the research report is my original work (that any copyrightable materials have been used with the permission of the original authors), and as such, it is automatically protected by the laws, rules, and regulations of the U.S. Copyright Office. My research adviser has approved the content and quality of this paper. NAME Pranaya Baral DATE: 12/18/2012 ADVISER: (Committee Chair if MS Plan A or EdS Thesis or Field Project/Problem): NAME Ned Weckmuller DATE: 12/18/ This section for MS Plan A Thesis or EdS Thesis/Field Project papers only Committee members (other than your adviser who is listed in the section above) 1. CMTE MEMBER S NAME: DATE: 2. CMTE MEMBER S NAME: DATE: 3. CMTE MEMBER S NAME: DATE: This section to be completed by the Graduate School This final research report has been approved by the Graduate School. Director, Office of Graduate Studies: DATE:

2 1 Baral, Pranaya. Implementation of 5S methodology on slot line assembly for a Manufacturing Company located in Minnesota Abstract One of the most common practices carried in modern manufacturing facilities is the implementation of 5S philosophy. 5S, Japanese improvement ideology, is a lean manufacturing tool directed at improving the overall efficiency and consistency. This particular project study was carried by the author during his internship with XYZ company. The study was based on a moving assembly line. Due to increase in volume of cabs in recent year, the work stations were not fully organized as desired, resulting in loss of productivity, time, and quality to some extent. This research study was aimed at improving the assembly line flow by using effective and efficient lean manufacturing tools (5S in particular), thereby resulting in increased productivity, run time, quality, and adapting to the 5S culture as a means for continuous process improvement. The paper covers the results and documents them in form of pictures, accesses the results, and also suggest necessary recommendations based on the findings for a continuous improvement cycle.

3 2 Acknowledgments I would like to thank my mentor and research advisor, Mr. Ned Weckmueller for his valuable support, unchallenging suggestions, and constant motivation throughout this project study. Also, I would like to thank company XYZ for providing me a platform to utilize my knowledge, skills, education for a pragmatic industrial exposure. I would also like to mention my program director, Dr. James Keyes, who has always been positive, helpful, and humble. I would also like to thank University of Wisconsin-Stout for allowing me to purse my graduate studies. Last but not the least; I would like to dedicate this degree to my parents who have always been pillar of strength throughout my life, and supporting me in my endeavors.

4 3 Table of Contents... Page Abstract...1 List of Figures...6 Chapter I: Introduction...7 Statement of the Problem...7 Purpose of the Study...8 Assumptions of the Study...8 Definition of Terms...8 Limitations of the Study...10 Methodology...10 Chapter II: Literature Review...11 Lean Manufacturing : An Overview...11 Key Concepts in Lean...13 Waste Elimination...13 Continuous Improvement...14 Just in time (JIT)...14 Product Smoothing...14 Standardization of Work...15 Total Preventive Maintenance (TPM)...15 Other Waste Reduction Methods S...17 Seri...17

5 4 Seiton...18 Seiso...18 Seiketsu...18 Shitsuke...19 Benefits of 5S S as Culture...19 Chapter III: Methodology...21 Perform 1-S (Sort)...21 Perform 2-S (Set in Order)...22 Perform 3-S (Shine)...23 Perform 4-S (Standardize)...23 Perform 5-S (Sustain)...24 Limitations...24 Chapter IV: Results...26 Introduction...26 Visual Management System...26 Red Tagging Strategy...29 Organization of work station...30 Cleanliness of work station...33 Auditing 5S process for continuous improvement...34 Summary...34 Chapter V: Discussion...35 Limitations...35

6 5 Recommendations...36 Conclusions...36 References...37 Appendix A: 5S Observation Sheet...38

7 6 List of Figures Figure 1: +QDIP Board...27 Figure 2: Cell Daily Management Board...28 Figure 3: Unneeded Item Log List...29 Figure 4: Red Tag Area Board...30 Figure 5: Rework Station...31 Figure 6: Fixture Station...32 Figure 7: Cleaning Supply Shadow Board...33 Figure 8: Trash Bin...33

8 7 Chapter I: Introduction In today s world the importance of Lean Manufacturing principles in industrial sector can t be ignored. The global market is becoming competitive and customers are demanding more than ever. Companies mainly focus on reducing the cost and improving the productivity & quality through continuous improvement. One of the most common practices carried in modern manufacturing facilities is the implementation of 5S philosophy. 5S is a lean manufacturing tool directed at improving the overall efficiency & consistency of the process/place/service by eradicating unwanted waste. Originally pioneered by the Japanese, 5S is an abbreviation for Seiri (Sort), Sheton (Set in order), Seiso (Shine), Seiketsu (Standardize), and Shitsuke (Sustain). Company XYZ is one of the leading providers of steel cabs in North America and roll over protective structures (ROPS) for original equipment manufacturers (OEM) such as John Deere and Caterpillar. It offers world class metal fabrication, cutting-edge robotic welding, high-level paint finishes, and value-added assembly. It has two facilities totaling 43 acres enclosing more than 600,000 square feet. Both sites utilize the latest in modern manufacturing environment backed by expert service, quality driven culture, and on time delivery. Statement of the Problem The problem situation is based on the slot line assembly. Slot line is basically a moving conveyor assembly line for cabs. The line covers around 70% of the total manufactured cabs in the plant. There are 14 stations in total with over 25 employees working during a regular shift. The increase in volume of the cabs (currently 50 per day) in recent years resulted in moving cabs on the slot line. Due to this, each station is not as fully organized as it was supposed to be, resulting in loss of time, productivity, and also quality to some extent.

9 8 Purpose of the Study The purpose of this research project is to focus on improving the assembly line flow by using effective and efficient lean manufacturing tools (5S in particular), thereby resulting in increased productivity, run time, quality, and adapting to the 5S culture as a means for continuous process improvement. Assumptions of the Study 1. The project was planned, supported, and well executed under the guidance provided by upper level management. 2. All the associates and personnel involved in this project were educated about the objectives, basic guidelines, principles, barriers, and other related information pertaining to its successful implementation. 3. The output on implementation of the project was followed up on regular basis and loopholes were communicated as a basis for continuous process improvement. Definition of Terms 5S. A method commonly used by a manufacturing company to achieve an effective, efficient, and organized work environment, so as to boost productivity, reduce cost, and improve quality standards. Heijunka. A concept introduced by Toyota Production System (TPS) meaning product or service smoothing. Just in Time (JIT). A concept that helps to reduce the inventory level and carrying cost. Kaizen. A term coined in Japanese language emphasizing continuous process improvement.

10 9 Kanban. Also a Japanese term, it basically refers to signals between different points in various processes. Lean. A Japanese philosophy that focuses on achieving high productivity, low cost, and improved quality. Muda. Japanese term for waste. Mura. Japanese term for unevenness. Poka - Yoke. A Japanese term for a defect control system focusing on inspection of every part to insure zero defects. Seiri. Segregate what is needed and what is not needed in the work place. Confirm and involve everyone that the items sorted are not needed for performing a particular job in that work station before getting rid of them. Seiton. Clearly mark and organize all the needed items as per use in an effort to eliminate the waste. Seiso. Cleaning and inspecting work areas to ensure a clean and safe environment. Seiketsu. Create proper methods and procedures that guarantees all the above 3 steps (Seiri, Sheton, and Seiso) happen on a daily basis. Shitsuke. Continuous process improvement for achieving a discipline to properly manage the 5S principle. Total Productive Maintenance (TPM). A key concept used in lean for improving machine availability through proper maintenance and production resources. Total Quality Maintenance (TQM). A management concept developed by W. Edwards Deming for successful implementation of business processes.

11 10 Toyota Production System (TPS). A lean management philosophy developed by Japanese company Toyota. Limitations of the Study This project study was carried by the author while working as an intern for the Company XYZ from Jan 2011 to Dec This project was limited to only one moving assembly line on the plant floor. The implementation of the same process in other areas of the plant was not covered under the scope of study. The same process might not be recommended for any other moving assembly line as there were many variables that might alter the output of the project. However, recommendations for continuous improvements were provided within the scope of study. Methodology The plan was to focus on the major objectives of increasing productivity, lowering cost, and improving overall quality standards. The key was to work closely with the associates and personnel, so that they would develop an overall understanding of the process, would be able to gather necessary details and information, and become acquainted with the 5S culture. The orderly implementation of the 5S ideology and its proper follow up were critical for the continuous process improvement. This project study was successful in applying the lean methodologies and principles to pragmatic effect with great efficiency, thereby organizing the workplace for higher productivity, customer satisfaction, and sustainability.

12 11 Chapter II: Literature Review This chapter basically covers the general literature review for the lean manufacturing and 5S philosophy. The purpose of this portion of study is to familiarize the readers with lean manufacturing, the key concepts used in lean, the philosophy of 5S & its importance, and 5S as culture. Lean Manufacturing: An Overview Manufacturing companies have always strived to improve their productivity and the quality of their products in order to be sustainable in today s competitive market. Globalization of the market and the rise of merger companies have made it even tougher to prevail in the market. In such cases, correct strategies to make the manufacturing line more efficient and produce higher quality product become crucial. Amongst various methodologies to improve the production line, the Japanese improvement ideology of lean manufacturing is the most proven and widely accepted. Today, a lot of manufacturing companies are implementing this philosophy for better productivity and quality. The concept of lean principles was derived from the Japanese manufacturing industry (Jones, 2003). The term lean manufacturing was first coined by John Krafcik in his article entitled Triumph of the Lean Production System in 1988 which was based on his master s thesis at MIT (Krafcik, 1988) and the concept has not been limited to Japanese industries but has been accepted and implemented all over the world. Toyota, the Japanese automobile company, has been considered as the initial promoter of the lean manufacturing philosophy which evolved from the experiences during the end of 1930 s. After the Second World War Toyota and other Japanese companies had to go through a very hard time since they had very limited resources to rebuild their industry. Most Japanese companies resorted to western industries for ideas and

13 12 inspiration to rejuvenate their industries (Jones, 1990). Since US companies had to address a very large market after the end of World War II, they put their efforts into mass production to meet the consumers demand. On the other hand, Japan had a very small market and investment capital was also very scarce. With very limited resources and production demand, there was a need to develop an efficient manufacturing system which was flexible and used fewer resources. In this situation, the genius executive of Toyota, Taiichi Ohno, developed the concept which fundamentally focused on preserving value with less work and resource which was later coined as lean production in the 1990 s. Since it was derived mostly from the Toyota Production System (TPS), it is also often referred to as Toyotism (Jones, 1990). This concept is basically focused on reducing/eliminating wastes (muda) and improving the flow or smoothness or work, thereby steadily eliminating unevenness (mura) through the system. In the 1980 s, western automotive companies began to realize that the Japanese manufacturing concept was far better than theirs in terms of productivity, quality, and resource utilization. Hence, an intensive research study called The International Motor Vehicle Program (IMVP) was carried out by Womack, Jones and Roos at Massachusetts Institute of Technology to investigate the Japanese automotive industry and compare it with western automotive industries. IMVP deduced significant difference in productivity and quality between these two cultures. The concept applied by the Japanese companies to remain superior in the market was then termed as lean production in IMVP research (Egglestone, 1994). The IMVP report is well recognized all over the world in the famous book entitled The Machine that Changed the World (Jones, 1990).

14 13 Key Concepts in Lean Lean Manufacturing is of great interest to manufacturing companies from all around the world. Today many companies are applying the lean manufacturing concept to achieve a substantial competitive advantage by improving quality, productivity, customer service, and profitability. Lean manufacturing is a production philosophy. It is a method of mapping the overall manufacturing process from raw material to finished goods delivered to the customers. It is termed lean because these principles help manufacturers to produce more with less - less time, less inventory, less capital, and fewer resources. Lean accomplishes this by focusing the changes required to streamline the overall production process by identifying and eliminating any waste (muda) in the process. The concept of lean manufacturing can be summarized in the following categories. Waste Elimination Wastes are the activities that do not add any value to the product. There are basically seven types of wastes in the lean manufacturing concept. They are: 1. Transportation: movement of materials which add no value to the product. 2. Inventory: any material or work on hand other than what s needed right now to satisfy customer demand. 3. Motion: any movement of people that does not add value to the product. This includes walking and reaching. 4. Waiting: time spent waiting during the processes. 5. Over Production: when more products are produced than customer demand. 6. Over processing: when something uses more resources such as space, energy, time or people than required.

15 14 7. Defects: work that is less than the desired quality level (Jones, 2003). All of these activities add cost, but no value to the products. Controlling and eliminating these wastes leads to more efficient work. Continuous Improvement Continuous improvement is another important principle of lean manufacturing. It is often referred to by the Japanese word Kaizen which means change for good. Thus, Kaizen is a continuous effort for perfection. Kaizen has become popular all over the world as a successful concept behind good management. The concept of Kaizen is summarized by the 5S principles. The 5S principles will be later discussed in this section. Just-In-Time (JIT) Just-in-time (JIT) is a concept that helps to reduce inventory and related carrying cost. JIT relies on signals which are termed as Kanban in Japanese. Kanban is basically the signals between different points in various processes. These signals help to notify when to produce the next part. Kanban are usually in form of tickets, however simple visual signals are also often used. JIT, if implemented properly, can significantly improve a manufacturing organization s efficiency, quality of work, and eventually, profit. In short, Just-in-Time focuses on having the right material, at the right time, at the right place, in the right amount (Monden, 1998). Product Smoothing Product Smoothing is another lean manufacturing tool. The Japanese term used for product smoothing is Heijunka. Product smoothing means trying to keep the production level as consistent as possible each day (Jones, 1990). Heijunka is a concept introduced in Toyota Production system (TPS) which suggests that the production should not exceed the demand to save cost. To accomplish this concept, the scheduling should be made smooth and effective to

16 15 produce the right quantities of product and utilize resources wisely. If the production level is not consistent, it results in waste and ultimately, loss of the company. Standardization of Work Standardization of the work is a very important part in any organization as it helps to smoothen the work and reduce waste. Standardization of works helps to confirm that every job is well organized and is accomplished in the most efficient manner. It helps to maintain the quality of the job regardless of the person or group performing the job. If every worker follows the same processing steps to do a particular kind of job, the same result can be achieved every time, which results in consistent quality and better reduction of waste. Standardized procedures may include order of the working steps, job accomplishment time, and parts on hand. Following the standardized work, an organization can assure that line balancing is achieved, inventory is minimized, and wastes are reduced. Total Productive Maintenance (TPM) Total Productive Maintenance (TPM) is a very important aspect of lean manufacturing. It is a method of improving machine availability via better utilization of maintenance and production resources. It is basically an extension of Total Quality Maintenance (TQM). The main objective of TPM is to maintain the machines in good condition and thus reduce downtime. Downtimes are usually caused by machine breakdown, incorrect use, and maintenance. The uncertainty in uptime results in the necessity of keeping extra stocks and thus increases cost. TPM has the unique concept of tackling this issue. Unlike other production setups, TPM considers even operators as members of the maintenance team. The operators are trained to perform general maintenance tasks and simple troubleshooting. Further, technical teams with

17 16 experts are also designated for advance maintenance. Introducing general troubleshooting of the machines to operators decreases downtime, thus improving production and profit. The three main components of TPM are preventive maintenance, corrective maintenance, and maintenance prevention. Preventive maintenance accounts for regular planned maintenance of all the equipment as well as random check ups. Preventive maintenance helps to avoid sudden break down of the machines (Fled, 2000). Corrective maintenance accounts for the decision of whether to fix a down machine or to buy a new one. If a machine is very unreliable on uptimes, then it is always better to buy new one. Sometimes replacing only the important parts/components can also solve the problem. Maintenance prevention accounts for buying the right machine. If the machine is hard to comprehend for the operator and maintenance person, then it can adversely affect the production line. Other Waste Reduction Methods Other lean manufacturing waste reduction tools include zero defects, setup reduction, and line balancing. The zeros defect concept ensures that the products are defect free and quality is improved continuously (Karlsson, 1996). One of such zero defects concepts is poka-yoke. Poka-yoke is a defect control system that inspects every part to make sure that there are zero defects. The main objective of poka-yoke is to point out the defective parts at the source, detect the cause of the defect, and prevent the defective part from moving to the next work station (Fled, 2000). Setup reduction is another tool to reduce waste. It basically accounts for reducing the time required to change the setup in a machine. There are two types of setups: internal and external setup. Internal setups are those setups that can be done only when machine is stopped

18 17 and external setups are those setups which can be done even when the machine is running. The basic idea of setup reduction is to reduce the internal activities and replace them with external activities if possible which helps in speedy operations. The other waste reduction tool, line balancing is also one of the most efficient tools in tackling wastes. The idea of line balancing is to balance the work between each workstation and move the correctly worked part to the downstream workstation as soon as possible. This helps in creating a smooth synchronized production line without any stoppage. 5S 5S is one of the most widely used lean tools. 5S was introduced by Hiroyuki Hirano within an overall approach to production systems. It is a methodology that uses five Japanese words to organize a workplace. These five Japanese words are seiri, seiton, seiso, seiketsu, and shitsuke which mean tidiness, orderliness, cleanliness, standardization, and discipline respectively. However to preserve the 5S concept some term them as sort, set, shine, standardize and sustain. These words basically describe how a workplace can be made smooth, disciplined, clean, and impressive. The 5S concept can be applied to any workplace in the service sector, manufacturing units, and normal offices. 5S was brought forward to enable Just in Time Manufacturing. Later IMVP research suggested that the term Just in Time was inappropriate since the success of Japanese companies was built upon far more than time factor alone (Jones, 1990). Seiri Seiri is first S of the 5S processes. It refers to getting rid of all the unwanted, unnecessary, and unrelated material from the workplace and thus prioritizing the requirements, and keeping only the most essential items at easily accessible places. The unnecessary items are

19 18 either stored or discarded as per their degree of importance. Furthermore, it tries to reduce even the necessary items to a minimum level. Seiri helps in simplification of tasks, effective use of space, and wise purchase of items. Seiton The second S, Seiton, accounts for orderliness. By orderliness, it means right things at right place. The concept behind seiton is that every item should have a proper designated place from where it can be accessed and returned quickly whenever necessary. The place should be designated in such a way that everyone will have easy access to the item. This will eventually help in a smooth and efficient work flow and more productive outcome. The proper place, position or holder for every item is in close relation to how the work is performed, who is performing the work, and how often it is necessary. Seiso The third S is Seiso, which refers to cleanliness. The concept behind seiso is that everyone is responsible to maintain cleanliness in the workplace. No matter whether one is an operator or a manager, seiso bounds everyone. Though, it is better to assign areas to a person or group for cleaning, everyone should be accountable for every workspace and no area should be left unclean. At the end of each shift the workplace should be cleaned and everything should be restored to the original location. Thus, additionally it ensures that seiri has been followed. Seiketsu The fourth S is Seiketsu, which can be translated as standardization. Sieketsu bounds all the other previous steps of 5S and it accounts for both personal as well as environmental tidiness. It is a visual management approach and uses standardized color-coding for easier visual

20 19 identification. The abnormalities and anomalies are easily detectable when seiketsu is employed and it becomes very easy to troubleshoot problems and make the working process smooth. Shitsuke The final S represents Shitsuke, which means discipline. Discipline is one of the most important qualities required in every workplace. Discipline encompasses commitment to maintain orderliness and to follow the previous 4S as a way of life. Shitsuke basically focuses on removing bad habits and practicing good ones. When shitsuke is incorporated by personnel, they voluntarily follow the rules of cleanliness and orderliness all the times without the necessity of management enforcing them. Therefore, shitsuke is the backbone of 5S concept. Benefits of 5S The major benefits of 5S can be summarized as: Increase in productivity Better time saving (promptness) Enhanced self confidence Less accidents Less breakdowns and downtimes Improved performance Elegant work space Reduction in documentation 5S as Culture 5S should be implemented and developed as a culture in every working environment. It does not require any rocket science technology to implement 5S. Its implementation helps to change the mindset of the employees and facilitate continuous improvement. Establishing 5S as

21 20 culture first requires establishing behaviors in order to change mindsets. Therefore, 5S should be first treated as a behavior modification rather than a lean implementation tool. If 5S is enforced as a management tool without culture, it is definitely going to fail. In order to succeed with 5S and achieve operational excellence, one must start it as a culture. If the implementation level makes 5S a part of behavior, there is no need to enforce the system. Instead the system will stand on its own in the organizational process. Once the 5S system is rooted as a culture in a company, the newcomers will automatically adopt them and the process will continue.

22 21 Chapter III: Methodology Manufacturing companies have always strived hard to improve their productivity and the quality of their products in order to compete in today s market. Globalization of the market and the rise of merger companies have made it even tougher to prevail in the market. In such cases, correct strategies to make the manufacturing line more efficient and produce higher quality product become crucial. Companies mainly focus on reducing cost and improving productivity & quality through continuous improvement. One of the most common practices used in modern manufacturing facilities is the implementation of the 5S philosophy. This part of the research mainly focuses on the implementation of 5S principles to achieve set objectives. Perform 1-S (Sort) Needed and unneeded items were identified in this process, hence eliminating the unneeded items. Examination of the entire work area was sorted (involvement of area workers, supervisors, and area managers was crucial in this step). Identification of Needed items was carried out. Basic questions were asked: a. What is it for? b. Why is it here? c. How often is it used? Disposal of obvious trash was done with immediate effect. A potential unneeded item that could not be thrown away was placed in a control area to be reviewed by supervisors, managers, and the lean department.

23 22 Red Tagging Strategy, a simple method for identifying potentially unneeded items in the work area, evaluating their usefulness, and dealing with them appropriately was carried out in each station as needed. The following procedures were followed for red tagging a particular station in general: a. Red tagging criteria was determined as per job requirements in each station. b. Holding areas were marked off and responsibility was identified. c. Red tagging was performed with the active involvement of area workers. d. The items were tagged and a red tag board was created. e. The tagged items were moved to temporary holding areas. f. All tagged items were disposed within a pre-determined time period. Perform 2-S (Set in Order) Arrangement of needed items was done first, so that they were easy to use and then a visual control method was used, so that anyone could find and return the items. A proper storage method that minimized inventory and promoted visual management was implemented. Sign boards, labels, shadow boards, and charts were used, so that the organization of inventory, equipment, tools, and other items could be done without any hassle. Safety, efficiency, and motion economy were critical for this step. Since slot line was a moving assembly line, we focused on eliminating waste by minimizing unnecessary motion. Some of the procedures involved in motion minimization were: a. Start and end each motion with both hands moving at once. b. Both arms should move symmetrically and in opposite directions.

24 23 c. Avoid zigzagging motions and sudden changes in direction - move with a steady rhythm. d. Maintain a comfortable posture with comfortable motions. e. Keep materials and tools close and in front. f. Arrange materials and tools in the order of their use. g. Keep operators at the proper height for the work to be done. h. Make materials easy to pick up and move. i. Make handles and grips in efficient, easy-to-use shapes and positions. Perform 3-S (Shine) Elimination of dirt, dust, and other foreign matter was important to make the workplace clean. The associates were directed to clean up personal belongings (if any) and working environment, so there would be no areas untidy with trash, dirt, oil, batch material, and other clutter. Supervisors were involved to designate a time for everyone in each station to engage in inspection and shine activities, either daily/weekly/monthly/quarterly as per the requirement of the work station and the specific job. Awareness for establishing and maintaining a clean workplace was paramount for successful implementation of this step. The focus was to clean everything in conjunction with functions and needs, thereby eliminating small imperfections through cleaning/inspecting activities. Perform 4-S (Standardize) Standard procedures were made for inspection, cleaning, and housekeeping activities. It

25 24 was made sure that they were easy to follow and use. All visual controls were deployed effectively. Labels and signs were made that were easy to see from a distance. The safety of all associates was given utmost importance. Continuous improvement boards were established to measure the progress in each station as per needs and specifications of a particular job. Communication of standards and procedures was carried by the supervisor to all associates. A process was established so as to ensure adherence to standards and procedures. Perform 5-S (Sustain) Proper training and correct procedures were established for each station as per the job type, needs, and specific criteria. Feedback and follow up on the implementation of the process was critical for longevity and the continuous improvement process. Awareness: need to understand what the 5S are and how important it is to sustain them. Time: in the work schedule to perform 5S implementation. Structure: for how and when 5S activities will be implemented. Support: for efforts from management, in terms of acknowledgement, leadership, and resources. Rewards & Recognition: need to be rewarded for encouragement and motivation. Limitations Auditing process too time consuming. Culture change of people. Back to old habits and resistance to change.

26 25 Discipline to keep up the activity and to enforce it. Commitment; one person/group more committed than others. Pointing fingers. Training for new hires.

27 26 Chapter IV: Results Introduction Amongst various methodologies to improve the production line, the Japanese improvement ideology of lean manufacturing is the most proven and widely accepted. Today, a lot of manufacturing companies are implementing this philosophy for better productivity and quality. 5S, a powerful lean tool, is used to achieve efficiency, higher productivity, lower cost, and for a continuous improvement process. The research project was undertaken to focus on improving the assembly line flow by using effective and efficient lean manufacturing tools (5S in particular), thereby resulting in increased productivity, run time, quality, and adapting to the 5S culture as a means for continuous process improvement. This study was conducted to implement the 5S process for a moving slot line assembly system. All the necessary steps (Sort, Set in order, Shine, Standardize, and Sustain) were followed and procedures were created as per requirement. Basically, the after and before results were analyzed and conclusions and recommendations were made based on the study, which will be dealt later in Chapter V under Discussion. Visual Management System +QDIP board (Figure 1), a visual management tool was used to evaluate all the key performance indicators (KPI); namely safety, quality, delivery, inventory (cost), and productivity in the slot line assembly. It was a visual method to track all the daily floor activities and also provide for the posting of root causes and countermeasures when the KPIs do not meet the goal. Another, visual tool used was Cell Daily Management Board (Figure 2). It was used to track the production on a frequent (usually hourly) basis against customer need and expected outcomes. This board was used to identify issues and establish countermeasures in real time.

28 Fig 1. +QDIP Board 27

29 Fig 2. Cell Daily Management Board 28

30 29 Red Tagging Strategy In order to serve the purpose of sorting the unneeded items in a specific work station, a red tagging strategy was followed. Basically, it was a simple approach that ensured the unneeded items were distinguished from the needed. If the item was needed, was it needed in the right quantity? If it was needed, does it need to be it that specific location or be moved as per the job requirement? An unneeded item log list (Figure 3) was used to sort the unneeded items. Then, a red tag area board (Figure 4) was used to standardize the red tagging activities. All the rules, instructions, and red tagging procedures were highlighted on that board. The items were reviewed either by the supervisor/utility associate and disposed of as required. Unneeded Item # Date Reason For Tagging Notes / Description Figure 3. Unneeded Item Log List

31 30 Figure 4. Red Tag Area Board Organization of work station The next step after identifying the unneeded item was to organize the needed item as per the specific job requirement in each station. In this process, we fabricated kit carts for tools and fixtures for each work station. Then, we identified a designated space as a home for those carts. The floor was outlined for each kit cart and the tools were labeled accordingly. In this process, we tried to use as much of a visual approach as possible to ease the organization process and make life easier for the associates. Pictures (Figure 5 and 6) were taken to differentiate the after and before condition of a typical work station, thereby highlighting the importance of this process. The major benefits of organizing the work station were to ensure clear visibility of

32 31 needed items, increasing efficiency of job performed, reducing the run time, and increasing the productivity of assembled cabs. Figure 5. Rework Station. The picture on the top side illustrates a typical work station before the organization of the place, while the picture on the bottom side is after the implementation of 5S in that station.

33 32 Figure 6. Fixture Station. The picture on the top is an example of fixture location in a work station before the 5S implementation, on the other hand the picture on the bottom is one after the implementation of the process.

34 33 Cleanliness of work station In order to maintain a clean and organized work atmosphere, cleaning supply shadow boards (Figure 7) were used. Several areas in the work station have problems keeping things clean. This sometimes comes from not being able to find cleaning supplies. By creating the cleaning supply shadow boards and locations for those supplies, everyone knew where to get them when needed and where they belong after the completion of work. The importance of keeping each station was paramount and awareness was created among the associates holding them accountable for their specific work station. Also, trash bins (Figure 8) were labeled and located at convenient locations to ease the implementation process. Figure 7. Cleaning Supply Shadow Board Figure 8. Trash Bin

35 34 Auditing 5S process for continuous improvement After the successful implementation of the 5S process, the discipline to sustain is of utmost importance. Proper awareness, correct structures and procedures, support from associates, and adaptability to 5S is vital for continuous improvement. In order to achieve that, a 5S observation sheet (Appendix A) was prepared to aid in the implementation of the 5S process. The observation was done on a monthly basis and the results were analyzed following the completion of the sheet (quarterly basis). Refer to Appendix A for the complete procedure of the 5S observation sheet. Summary The 5S process was successful implemented across each station on the slot line assembly. All the steps were followed carefully and each stage was completed following proper procedures, rules, and support from the associates. As a result of that the work stations were properly organized with increased efficiency and effectiveness. The productivity of the slot line also increased from 40 Cabs per Day (8 hours per day = 5 Cabs per hour) to 48 Cabs per Day (8 hours per day= 6 Cabs per hour). An audit process was created for visibility and continuous improvement. Feedback from the associates was gathered and changes were made accordingly as per requirements and feasibility.

36 35 Chapter V: Discussion 5S, lean tool derived from the Japanese culture meaning Seiri (Sort), Sheton (Set in order), Seiso (Shine), Seiketsu (Standardize), and Shitsuke (Sustain). The problem situation for this project study was taken from a XYZ manufacturing company. The research study is based on a moving conveyor line for assembly of the cabs. The company is a well known fabricator of sheet metal in North America and supplies operator cab roll over protective structures to leading original equipment manufacturers such as John Deere, Caterpillar, and Miller. The implementation of the 5S process is based on a moving slot line assembly for that company. As discussed earlier in the beginning of paper, the purpose of the study is to focus on improving the assembly line flow by using effective and efficient lean manufacturing tools (5S in particular), thereby resulting in increased productivity, run time, quality, and adapting to the 5S culture as a means for continuous process improvement. Limitations This project was limited to only one moving assembly line on the plant floor. The implementation of the same process in other areas of the plant was not covered under the scope of study. The same process might not be recommended for any other moving assembly line as there were many variables that might alter the output of the project. Auditing the process of 5S implementation was time consuming. Training of the new hired associates for the 5S implementation is not covered within the scope of the study. However, recommendations for continuous improvements were provided within the scope of study. This project study was carried by the author while working as an intern for the Company XYZ from Jan 2011 to Dec 2011.

37 36 Recommendations Since the slot line was a moving assembly line, the implementation of the 5S process was limited to one work station. One recommendation is to allow sufficient time to track the audit process on a monthly basis. Based on the reports and result analysis, efforts should be made to improve the implementation in every step: sort, set in order, shine, standardize, and sustain continuous improvement. In order to communicate the issues and information, weekly meetings between the supervisor and associates would be beneficial. Also, the follow up on the progress of 5S in each step is a must for its successful implementation. The culture of 5S as a discipline and behavioral change is important not only in specific work stations but can also be extended beyond other areas within the company. Conclusions 5S implementation is a foundation for a continuous improvement process. 5S is fundamental in implementing a visual management system, thereby improving safety, quality, productivity, and minimizing cost. All the steps; sort, set in order, shine, standardize, and sustain must be properly followed and completed for the successful implementation of the process. The result of implementation was that the work stations were properly organized with increased efficiency and effectiveness. The productivity of the slot line also increased from 40 Cabs per Day (8 hours per day = 5 Cabs per hour) to 48 Cabs per Day (8 hours per day= 6 Cabs per hour). Awareness of the 5S process and discipline are paramount to sustainability of the process. Developing a 5S work culture is important not only in specific areas but efforts should be made for adaptability throughout the company.

38 37 References Egglestone, A. & Sohal, A. S. (1994). Lean production: Experience among Australian organizations. International Journal of Operations & Production Management, Vol. 14, No. 11, pp , ISSN Fled, M. W. (2000). Lean Manufacturing: Tools, Techniques and how to use them. Boca Raton, London: The St. Lucie Press. Jones, D. T., Roos, D., & Womack J. P. (1990). The Machine that Changed the World: The Triumph of Lean Production. Rawson Associates, New York, NY, USA. Jones D. T., and Womack J. P. (2003). Lean Thinking - Banish waste and create wealth in your corporation. Free Press, New York, NY, USA Jones D. T., & Womack J. P. (2003). Lean Thinking. Free Press, p Karlsson, C., and Par, A.,. (1996). Assessing changes towards lean production. International Journal of Operation & Production Management, Vol. 16, No. 2, pp Krafcik, John F. (1988). Triumph of the lean production system. Sloan Management Review 30 (1): Monden, Y. (1998). Toyota Production System- An Integrated Approach to Just-in-Time. Norcross, Georgia: Engineering & Management Press, 3 rd Edition. Ohno, Taiichi. Toyota Production System (TPS), ISBN

39 38 APPENDIX A: 5S Observation Sheet 5S Observation Sheet Jan. Feb. Mar. Y N Y N Y N 1S SORT Clearly distinguishing between what is need and what is unneeded 1 Are only utilized machines, tools, fixtures, materials, gages, equipment present? 2 Initial red-tagging is complete and unneeded items have been removed according to procedure? 3 A separate red-tag holding area exists and an unneeded item log is posted? 4 Red-tagging is performed at set time intervals and the holding area is reviewed regularly? 2S SET IN ORDER Standardizing the storage methods for the needed items 1 Are equipments, storage, walkways, non-conforming material areas marked for location? 2 Are materials, equipment, tools, gages visually controlled and at point of use? 3 Is defective material identified, segregated and documented by log? 3S SHINE Sweeping, scrubbing, cleaning and maintaining a clean work area 1 Are floors free of trash, fluids, debris, etc.? 2 Are machines & equipment free of material waste, dirt, fluids, etc.? 3 Are cleaning supplies and equipment readily available & visually controlled? 4 Are cleaning responsibilities documented, posted & followed daily? 4S STABILIZE Implementing standard procedures for the first 3S s 1 Actions being develop to improve Set-in Order and reduce cleaning time 2 Everyone has accepted 5S as part of their roles and responsibilities every day. 3 Are defective materials reviewed/logged daily and appropriate action taken in a timely manner? 5S SUSTAIN Establishing the necessary discipline to consistently sustain 5S standards The 5th S is awarded when a minimum of 3 consecutive months of 1S, 2S, 3S, 4S have been sustained.

AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS

AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Integrity, Reliability and Failure of Mechanical Systems Paper Ref: 3927 AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Eric Costa 1(*), Rui Sousa 1, Sara Bragança 1,

More information

Welcome to the 5S and Kanban Training

Welcome to the 5S and Kanban Training Welcome to the 5S and Kanban Training Five Hills Health Region Presenter: Ed Seman Pursuing Excellence 5S Techniques Pursuing Excellence PURPOSE A clean well-organized, visual workplace is fundamental

More information

Appendix Lean Glossary Page 1

Appendix Lean Glossary Page 1 Appendix Lean Glossary Page 1 Andon Board A visual control device in a work area giving the current status on performance to expectations and alerting team members to emerging issues. Batch-and- Queue

More information

times, lower costs, improved quality, and increased customer satisfaction. ABSTRACT

times, lower costs, improved quality, and increased customer satisfaction. ABSTRACT Simulation of Lean Assembly Line for High Volume Manufacturing Hank Czarnecki and Nicholas Loyd Center for Automation and Robotics University of Alabama in Huntsville Huntsville, Alabama 35899 (256) 520-5326;

More information

The Consultants Guide to. Successfully Implementing 5S

The Consultants Guide to. Successfully Implementing 5S The Consultants Guide to Successfully Implementing 5S Norm Bain NBI Email: nb@leanjourney.ca January 2010 Preface When I was first introduced to the 5S system, I thought this is pretty lame. What a convoluted

More information

STANDARDIZED WORK 2ND SESSION. Art of Lean, Inc. 1 www.artoflean.com

STANDARDIZED WORK 2ND SESSION. Art of Lean, Inc. 1 www.artoflean.com STANDARDIZED WORK 2ND SESSION 1 STANDARDIZED WORK AND WORK STANDARDS - SESSION 2 AIM (1) Understand the Importance of Standardization in TPS (2) Introduce Various Standards Sheets and Basics of Creation

More information

Clean House With Lean 5S

Clean House With Lean 5S Clean House With Lean 5S by Christopher D. Chapman Television shows exploring the virtues of better living through organization are ubiquitous. On such popular shows as Mission Organization (Home & Garden

More information

5S Training - Lean Manufacturing Housekeeping

5S Training - Lean Manufacturing Housekeeping 5S Training - The 5s Housekeeping Approach within Lean Manufacturing What Is 5S? 5S is a set of techniques providing a standard approach to housekeeping within Lean Manufacturing. It is often promoted

More information

The 5S-Method. The 5S-Method. Clean up and nothing else? or a step further on the ladder of continuous improvement?

The 5S-Method. The 5S-Method. Clean up and nothing else? or a step further on the ladder of continuous improvement? The 5S-Method The 5S-Method Clean up and nothing else? or a step further on the ladder of continuous improvement? Page 1 What is 5S? The 5S-Method 5S is: A discipline for creating and maintaining a clutter-free,

More information

Hessel Visser NCOI Les 6 A P 373. Operations Management, 7E: Chapter 14 en15

Hessel Visser NCOI Les 6 A P 373. Operations Management, 7E: Chapter 14 en15 1 Lecture Planning and Control 14 Enterprise Resource Planning (ERP) 15 Lean synchronization 16 Project Management (zie andere sheets) 17 Quality Management (zie andere sheets) Hessel Visser NCOI Les 6

More information

The Principles of the Lean Business System: #5 Prevention. Lean in the 21 st Century Series Professor Peter Hines

The Principles of the Lean Business System: #5 Prevention. Lean in the 21 st Century Series Professor Peter Hines The Principles of the Lean Business System: #5 Prevention Lean in the 21 st Century Series Professor Peter Hines Our Webinar Welcome Webinar will last about 1 hour We will invite you to complete a few

More information

JUST IN TIME (JIT) CONTEXT A PHILOSOPHY, A PROCESS P6/341-I ORIGINS:

JUST IN TIME (JIT) CONTEXT A PHILOSOPHY, A PROCESS P6/341-I ORIGINS: JUST IN TIME (JIT) Original written by professor José Luis Fernández at IE Business School. Original version, 22 January 2004. Last revised, 18 July 2008. Published by IE Publishing Department. María de

More information

1 Introduction to ISO 9001:2000

1 Introduction to ISO 9001:2000 Introduction to ISO 9001:2000 CHAPTER 1 1 Introduction to ISO 9001:2000 By the end of this chapter you should be able to: Describe the origins of quality management systems. Describe the potential benefits

More information

Toyota Production System. Lecturer: Stanley B. Gershwin

Toyota Production System. Lecturer: Stanley B. Gershwin Toyota Production System Lecturer: Stanley B. Gershwin Primary source: Toyota Production System by Yasuhiro Monden See also: Decoding the DNA of the Toyota Production System by Steven Spear and H. Kent

More information

VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the

VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS by Ganesh S Thummala A Research Paper Submitted in Partial Fulfillment of the Requirements for the Master of Science Degree In Management Technology

More information

The Thinking Approach LEAN CONCEPTS. 2012-2013, IL Holdings, LLC All rights reserved 1

The Thinking Approach LEAN CONCEPTS. 2012-2013, IL Holdings, LLC All rights reserved 1 The Thinking Approach LEAN CONCEPTS All rights reserved 1 Basic Thinking to Manage the Journey MANAGEMENT TACTICS OF A LEAN TRANSFORMATION All rights reserved 2 LEAN MANAGEMENT Two key questions What is

More information

TPM at the heart of Lean - March 2005 Art Smalley

TPM at the heart of Lean - March 2005 Art Smalley TPM at the heart of Lean - March 2005 Art Smalley Total Productive Maintenance (TPM) has been a very important tool for equipment intensive manufacturing sectors. It is a key means for increasing machine

More information

Lean Manufacturing: Part 2. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1I

Lean Manufacturing: Part 2. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1I Lean Manufacturing Part 1I 2013 ProcessPro, the ProcessPro logos, and the ProcessPro product and service names mentioned herein are registered trademarks or trademarks of Blaschko Computers, Inc. d.b.a.

More information

THE 5S STRATEGY FOR CONTINUOUS IMPROVEMENT OF THE MANUFACTURING PROCESSES IN AUTOCAR EXHAUST

THE 5S STRATEGY FOR CONTINUOUS IMPROVEMENT OF THE MANUFACTURING PROCESSES IN AUTOCAR EXHAUST Management & Marketing (2008) Vol. 3, No. 4, pp. 115-120. THE 5S STRATEGY FOR CONTINUOUS IMPROVEMENT OF THE MANUFACTURING PROCESSES IN AUTOCAR EXHAUST Gheorghe DULHAI Gheorghe Asachi Technical University,

More information

Lean process improvement is CDOT s approach for engaging everyone, every day, to improve every process and product, to benefit every customer.

Lean process improvement is CDOT s approach for engaging everyone, every day, to improve every process and product, to benefit every customer. February 2013 Lean process improvement is CDOT s approach for engaging everyone, every day, to improve every process and product, to benefit every customer. A crucial part of the Lean approach is 6S, a

More information

A Sheet Plant s Lean Journey

A Sheet Plant s Lean Journey Article Heading Jamestown Container provides a closer look at how its Cleveland, Ohio, plant is tackling lean manufacturing. By Jackie Schultz, Editor A Sheet Plant s Lean Journey ONCE A QUARTER THROUGHOUT

More information

The Need for Lean Training

The Need for Lean Training The Need for Lean Training Jim Keyes University of Wisconsin Stout The recent economic downturn and the sustaining of lower economic conditions into the near future have caused manufacturers to reevaluate

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

Basic concepts of Lean Manufacturing

Basic concepts of Lean Manufacturing T H E P R O D U C T I O N S Y S T E M D O C T O R S O F F I C E - W W W.TWINETWORK.COM 1 / 1 1 Basic concepts of Lean Manufacturing LEAN MANUFACTURING...2 THE GOALS OF LEAN MANUFACTURING...2 Cost Reduction

More information

Lean Management. KAIZEN Training of Trainers. KAIZEN Facilitators Guide Page to.

Lean Management. KAIZEN Training of Trainers. KAIZEN Facilitators Guide Page to. Lean Management KAIZEN Training of Trainers KAIZEN Facilitators Guide Page to. Objectives of the session At the end of the session, trainees are able to: 1) Understand the philosophy on lean management

More information

Energy Conservation for a Paint Company Using Lean Manufacturing Technique

Energy Conservation for a Paint Company Using Lean Manufacturing Technique Universal Journal of Industrial and Business Management 1(3): 83-89, 2013 DOI: 10.13189/ujibm.2013.010302 http://www.hrpub.org Energy Conservation for a Paint Company Using Lean Manufacturing Technique

More information

Lean Manufacturing: Part 1. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1

Lean Manufacturing: Part 1. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1 Lean Manufacturing Part 1 2013 ProcessPro, the ProcessPro logos, and the ProcessPro product and service names mentioned herein are registered trademarks or trademarks of Blaschko Computers, Inc. d.b.a.

More information

Workplace Color Coding Standards

Workplace Color Coding Standards Workplace Color Coding Standards You won t GET LEAN... until you GET VISUAL! 7381 Ardith Ct., Byron Center, MI 49315 616.583.9400 info@ Why do we use color to communicate? How much information in our daily

More information

Session 4-Lean Tools- 5S, Kanban, VSM, SMED, TPM

Session 4-Lean Tools- 5S, Kanban, VSM, SMED, TPM Session 4-Lean Tools- 5S, Kanban, VSM, SMED, TPM Upholstery Frame Workshop NCSU Wood Products Extension Hickory, North Carolina December 10th, 2009 Harry Watt Business Improvement Specialist harry_watt@ncsu.edu

More information

Operations Management and Lean Six Sigma. Presented by: David Muncaster Manager, CI and CSAT Staples Advantage Canada

Operations Management and Lean Six Sigma. Presented by: David Muncaster Manager, CI and CSAT Staples Advantage Canada Operations Management and Lean Six Sigma Presented by: David Muncaster Manager, CI and CSAT Staples Advantage Canada Who is this guy standing up in front of you? Manager, Continuous Improvement and CSAT

More information

Development of Lean Manufacturing Course Material

Development of Lean Manufacturing Course Material Development of Lean Manufacturing Course Material An Interactive Qualifying Project Submitted to the Faculty of WORCESTER POLYTECHNIC INSTITUTE In partial fulfillment of the requirements for the Degree

More information

www.stephenbarkar.se Lean vs. Agile similarities and differences 2014-08-29 Created by Stephen Barkar - www.stephenbarkar.se

www.stephenbarkar.se Lean vs. Agile similarities and differences 2014-08-29 Created by Stephen Barkar - www.stephenbarkar.se 1 www.stephenbarkar.se Lean vs. Agile similarities and differences 2014-08-29 Purpose with the material 2 This material describes the basics of Agile and Lean and the similarities and differences between

More information

What is Lean Manufacturing?

What is Lean Manufacturing? What is Lean Manufacturing? Levantar March 2012 www.levantar.co.uk info@levantar.co.uk Lean Guides for other sectors are available on our website www.levantar.co.uk e.g. Lean Office, Lean Legal, Lean Engineering

More information

LEAN 101 CRASH COURSE. Presented by Jacob McKenna and Seaver Woolfok

LEAN 101 CRASH COURSE. Presented by Jacob McKenna and Seaver Woolfok LEAN 101 CRASH COURSE Presented by Jacob McKenna and Seaver Woolfok Introductions Name Company Position Expectations Favorite Movie Instructors Background: Jacob McKenna has been involved with Lean manufacturing

More information

A Book Review: Lean Thinking by Womack and Jones

A Book Review: Lean Thinking by Womack and Jones A : Lean Thinking by Womack and Jones Assignment for ESD.83: Research Seminar in Engineering Systems Prepared by Annalisa L. Weigel November 2000 We can lick gravity, but sometimes the paperwork is overwhelming.

More information

How To Understand Jidoka

How To Understand Jidoka Tyler Thomas MBA 634 14 March 2007 Jidoka Japanese manufacturing techniques have had a major affect on the approaches taken in manufacturing and management in manufacturing companies today. Many terms

More information

TOYOTA AND ITS COMPONENT SUPPLIERS CASE STUDY

TOYOTA AND ITS COMPONENT SUPPLIERS CASE STUDY TOYOTA AND ITS COMPONENT SUPPLIERS CASE STUDY Automobiles, which make full use of the technology for the day are necessities of life in the world. Even in the Antarctica or in the deserts of the Middle

More information

Improving supply chain management information systems in public administration using a new theory

Improving supply chain management information systems in public administration using a new theory www.ijcsi.org 102 Improving supply chain management information systems in public administration using a new theory Hind LAHMIDANI Omar EL BEQQALI Department of Science and Technologies of Information

More information

APPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY

APPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY Bulletin of the Transilvania University of Braşov Vol. 3 (52) - 2010 Series I: Engineering Sciences APPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY M. APREUTESEI 1 I.R. ARVINTE 1 E. SUCIU 2 D. MUNTEANU

More information

Lean Management Standards: Manufacturing

Lean Management Standards: Manufacturing Leader Standard Work. Do leaders have standard work? Do they follow it? Do you carry it with you as a routine? Do you have it with you now?. Is leader standard work regularly reviewed for updating? Has

More information

www.toyota-forklifts.eu Toyota Production System and what it means for business

www.toyota-forklifts.eu Toyota Production System and what it means for business www.toyota-forklifts.eu Toyota Production System and what it means for business Table of Contents Toyota Way 4 Toyota Production System Definition 5 TPS History 6 Just-in-Time 8 Jidoka 10 Kaizen 12 The

More information

Increased Productivity of Tyre Manufacturing Process using Lean Methodology

Increased Productivity of Tyre Manufacturing Process using Lean Methodology INSTITUTE OF TECHNOLOGY, NIRMA UNIVERSITY, AHMEDABAD 382 481, 08-10 DECEMBER, 2011 1 Increased Productivity of Tyre Manufacturing Process using Lean Methodology Ajit Chavda, Prof. M.Y.Patil Abstract--The

More information

ANALYSIS OF THE POTENTIALS OF ADAPTING ELEMENTS OF LEAN METHODOLOGY TO THE UNSTABLE CONDITIONS IN THE MINING INDUSTRY

ANALYSIS OF THE POTENTIALS OF ADAPTING ELEMENTS OF LEAN METHODOLOGY TO THE UNSTABLE CONDITIONS IN THE MINING INDUSTRY AGH Journal of Mining and Geoengineering vol. 36 No. 3 2012 Joanna Helman* ANALYSIS OF THE POTENTIALS OF ADAPTING ELEMENTS OF LEAN METHODOLOGY TO THE UNSTABLE CONDITIONS IN THE MINING INDUSTRY 1. Introduction

More information

LEAN MANUFACTURING LEAN MANUFACTURING, 5S AND SIX SIGMA

LEAN MANUFACTURING LEAN MANUFACTURING, 5S AND SIX SIGMA Page 1 of 8 PREPARED BY THE FOLK GROUP. THIS MAY BE REPRINTED WITH ATTRIBUTION. FEBRUARY, 2009. We re big fans of lean manufacturing practices, 5S and Six Sigma based on the results we ve seen in metal

More information

The problem with waiting time

The problem with waiting time The problem with waiting time Why the only way to real optimization of any process requires discrete event simulation Bill Nordgren, MS CIM, FlexSim Software Products Over the years there have been many

More information

LEAN MANUFACTURING TRAINING As Designed and Implemented by Minnesota Technology, Inc With Support from West Central Initiative

LEAN MANUFACTURING TRAINING As Designed and Implemented by Minnesota Technology, Inc With Support from West Central Initiative LEAN MANUFACTURING TRAINING As Designed and Implemented by Minnesota Technology, Inc With Support from West Central Initiative BACKGROUND For more than ten years Minnesota Technology, Inc. (MTI) and West

More information

Lean Kitting: A Case Study

Lean Kitting: A Case Study Lean Kitting: A Case Study Ranko Vujosevic, Ph.D. Optimal Electronics Corporation Jose A. Ramirez, Larry Hausman-Cohen, and Srinivasan Venkataraman The University of Texas at Austin Department of Mechanical

More information

CHALLENGES OF LEAN MANAGEMENT

CHALLENGES OF LEAN MANAGEMENT CHALLENGES OF LEAN MANAGEMENT Investigating the challenges and developing a recommendation for implementing Lean management techniques Bachelor s thesis Supply Chain Management Forssa spring 2013 Fiona

More information

Implementation of Lean Six Sigma Principles: Making Data Cleansing Lean

Implementation of Lean Six Sigma Principles: Making Data Cleansing Lean Implementation of Lean Six Sigma Principles: Making Data Cleansing Lean Nityanand Wachche B.E in Computer Engineering University of Mumbai Mumbai, India ABSTRACT Data cleansing is required before performing

More information

Using the Lean Model for Performance Improvement

Using the Lean Model for Performance Improvement Using the Lean Model for Performance Improvement Presented by Content Expert: Cindy Mand Director, Lean Enterprise BloodCenter of Wisconsin, Milwaukee, WI Learning Objectives 1. History of Lean and it

More information

Lean Principles by Jerry Kilpatrick

Lean Principles by Jerry Kilpatrick Lean Principles by Jerry Kilpatrick Introduction Lean operating principles began in manufacturing environments and are known by a variety of synonyms; Lean Manufacturing, Lean Production, Toyota Production

More information

MANAGEMENT OF HUMAN RESOURCES IN THE AUTOMOTIVE INDUSTRY

MANAGEMENT OF HUMAN RESOURCES IN THE AUTOMOTIVE INDUSTRY MANAGEMENT OF HUMAN RESOURCES IN THE AUTOMOTIVE INDUSTRY Edita HEKELOVÁ 1, Katarína SRDOŠOVÁ 2 1 Slovak University of Technology Bratislava, Slovakia, edita.hekelova@stuba.sk 2 NSF International, Brussel,

More information

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 MODULE 1 LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 1. Cultural Enablers 15% 20% 25% 1.1. Principles of Cultural Enablers 3% 4% 5% 1.1.1. Respect for the individual 1.1.2. Humility 1.2. Processes

More information

Autonomous Maintenance

Autonomous Maintenance Autonomous Maintenance TPM & Autonomous Maintenance I run it, you fix it! I fix it, you run it! What is Maintenance? Why is Possible Utilization Rate Necessary? One way to look at Lean (JIT) production

More information

VISUAL management techniques for optimum INVENTORY form, fit and function

VISUAL management techniques for optimum INVENTORY form, fit and function You won t GET LEAN... until you GET VISUAL! VISUAL management techniques for optimum INVENTORY form, fit and function Raw materials, work-in-process, finished goods, location and product flow Kanban Min/max

More information

The title 5S refers to five activities within the tool as follows (in brief):

The title 5S refers to five activities within the tool as follows (in brief): 5S Overview 5S is a methodology for creating and maintaining an organized, clean, and safe high-performance work environment. It is an unusual tool in the Lean Sigma arsenal because it can be used in the

More information

Table of Contents MODULE 1: QUALITY MANAGEMENT SYSTEM... 3. Introduction:... 3 What is a QMS (Quality Management System)?... 3

Table of Contents MODULE 1: QUALITY MANAGEMENT SYSTEM... 3. Introduction:... 3 What is a QMS (Quality Management System)?... 3 Table of Contents MODULE 1: QUALITY MANAGEMENT SYSTEM... 3 Introduction:... 3 What is a QMS (Quality Management System)?... 3 The eight quality management principles:... 4 Principle 1: Customer Focus...

More information

Journal of Applied Science and Agriculture

Journal of Applied Science and Agriculture AENSI Journals Journal of Applied Science and Agriculture ISSN 1816-9112 Journal home page: www.aensiweb.com/jasa Optimization Assembly Process base on Motion Time Study in Manufacturing Industry: Study

More information

NEXT GENERATION MOBILITY IN MANUFACTURING

NEXT GENERATION MOBILITY IN MANUFACTURING NEXT GENERATION MOBILITY IN MANUFACTURING NEXT GENERATION MOBILITY IN MANUFACTURING KEEPING PACE WITH DEMANDS The manufacturing sector is a demanding business. Globalisation has increased competition exponentially.

More information

This can be done by simply counting pieces in the line or subtracting total number of pieces loaded to total number of pieces unloaded from the line.

This can be done by simply counting pieces in the line or subtracting total number of pieces loaded to total number of pieces unloaded from the line. Garment industry over the years has adopted various key performance measures from different industries and invented some of their own. In the 2nd of the three article series, Mausmi Ambastha, a budding

More information

Supporting Lean Maintenance

Supporting Lean Maintenance Supporting Lean Maintenance Combining Best Practices with Technology for Superior Results TECHNOLOGY MANAGEMENT SOLUTIONS 2010 An Industry White Paper from Technology Management Solutions Supporting Lean

More information

Lean Manufacturing Application on Welding Defects in Cryogenic Vessel

Lean Manufacturing Application on Welding Defects in Cryogenic Vessel Lean Manufacturing Application on Welding Defects in Cryogenic Vessel Ajay K Solanki 1, Mit Pandya 2, Dhananjay Bisht 3, Arpit Bhatiya 4, Asst. Prof. Manoj Pal 5 1,2,3,4 UG Student Department of Mechanical

More information

VIRGINIA MASON PRODUCTION SYSTEM (VMPS)

VIRGINIA MASON PRODUCTION SYSTEM (VMPS) Source: Virginia Mason Medical Center VIRGINIA MASON PRODUCTION SYSTEM (VMPS) The Patient is GOD Toyota Production System How it translates to the Virginia Mason Production System Benefits Results Conclusion

More information

Lean, Six Sigma, and the Systems Approach: Management Initiatives for Process Improvement

Lean, Six Sigma, and the Systems Approach: Management Initiatives for Process Improvement PREPRINT Lean, Six Sigma, and the Systems Approach: Management Initiatives for Process Improvement Robert B. Pojasek Pojasek & Associates, Boston, USA This paper will be published as a featured column

More information

ENGR 1181 Lab 2: Quality and Productivity Lab

ENGR 1181 Lab 2: Quality and Productivity Lab ENGR 1181 Lab 2: Quality and Productivity Lab - Preparation Material - - Report Guidelines Preparation Material 1. Overview of Quality and Productivity Lab The Quality and Productivity lab introduces various

More information

BEGINNING THE LEAN IMPROVEMENT JOURNEY IN THE CLINICAL LABORATORY

BEGINNING THE LEAN IMPROVEMENT JOURNEY IN THE CLINICAL LABORATORY BEGINNING THE LEAN IMPROVEMENT JOURNEY IN THE CLINICAL LABORATORY Author: Jason A. Coons, Program Manager, TechSolve Abstract Lean is an extremely powerful tool in identifying and eliminating waste. The

More information

Audit Worksheet Sort

Audit Worksheet Sort Audit Worksheet Sort Get rid of clutter. Separate out what is needed for the operations. 1. Is the shop environment uncluttered? 1.Tools, material, equipment, is all over the place, nothing has a home.

More information

Lean Manufacturing and Six Sigma

Lean Manufacturing and Six Sigma Lean Manufacturing and Six Sigma Research Questions What have we done in the past? What must we do in the future? How do we know these are the correct actions? 1 Lean Definitions Key concepts of lean:

More information

Lean Silver Certification Blueprint

Lean Silver Certification Blueprint The Lean Certification Blueprint provides additional useful information beyond the Body of Knowledge. The Body of Knowledge specifies the competencies, topics, and subtopics required by different types

More information

Lean enterprise Boeing 737 manufacturing Lean Production System

Lean enterprise Boeing 737 manufacturing Lean Production System Student Self-administered case study Lean enterprise Boeing 737 manufacturing Lean Production System Case duration (Min): 45-60 Operations Management (OPs) Lean enterprise Worldwide Case summary: Assembling

More information

Getting Started with Lean Process Management

Getting Started with Lean Process Management Getting Started with Lean Process Management Hi-Tec Exchange Conference San Francisco July 25, 2011 Missions To team with Organizational Leaders, Managers, & Employees to focus on customers & improve competitiveness,

More information

THE BEGINNER S GUIDE TO LEAN

THE BEGINNER S GUIDE TO LEAN THE BEGINNER S GUIDE TO LEAN Professor Daniel T Jones Lean Enterprise Academy Who am I? Writer Machine and Lean Thinking books Researcher on how to do lean everywhere! Founder of the non-profit Lean Enterprise

More information

ARTICLE IN PRESS. LeanThinking. journalhomepage:www.thinkinglean.com/ijlt. Redesinging an Automotive Assembly Line Through Lean Strategy

ARTICLE IN PRESS. LeanThinking. journalhomepage:www.thinkinglean.com/ijlt. Redesinging an Automotive Assembly Line Through Lean Strategy InternationalJournalofLeanThinkingVolume2,Isue2(December2011) LeanThinking journalhomepage:www.thinkinglean.com/ijlt Redesinging an Automotive Assembly Line Through Lean Strategy K. P. Paranitharan * Department

More information

Lean Manufacturing Essential Principles

Lean Manufacturing Essential Principles Mini-Lessons from Juran Global The Source for Breakthrough Juran.com Series Lean Manufacturing Essential Principles Juran Global Our expertise has been developed over more than six decades of real-world

More information

A Win Win Approach to Supplier Management in Manufacturing. Emergence of Lean Supplier Management

A Win Win Approach to Supplier Management in Manufacturing. Emergence of Lean Supplier Management A Win Win Approach to Supplier Management in Manufacturing Emergence of Lean Supplier Management Eva Cherry 6/1/2006 2006-01-3132 A Win-Win Approach to Supplier Management in Manufacturing Copyright 2006

More information

SC21 Manufacturing Excellence. Process Overview

SC21 Manufacturing Excellence. Process Overview SC21 Manufacturing Excellence Process Overview Prepared by:- The SC21 Performance, Development and Quality (PDQ) Special Interest Group (SIG) Acknowledgement The scoring methodology used in the Management

More information

Lean Implementation in a Low Volume Manufacturing Environment: a Case Study

Lean Implementation in a Low Volume Manufacturing Environment: a Case Study Proceedings of the 2010 Industrial Engineering Research Conference A. Johnson and J. Miller, eds. Lean Implementation in a Low Volume Manufacturing Environment: a Case Study Lucas Simmons, Robbie Holt,

More information

Managing the Lean Transformation

Managing the Lean Transformation Managing the Lean Transformation Description: This four-day course will introduce operations managers to the system of philosophies and methods that are necessary for achieving lean operations through

More information

Waterloo Agile Lean P2P Group

Waterloo Agile Lean P2P Group Waterloo Agile Lean P2P Group Lean Thoughtware Philip Kirby July 21, 2009 Waterloo Ontario Lean Thoughtware-The Thesis Adoption of a Lean Culture will Improve Financial Performance Improved Financial Performance

More information

TPM OVERVIEW. Manufacturing & Administrative Excellence. www.tpmquality.com 1

TPM OVERVIEW. Manufacturing & Administrative Excellence. www.tpmquality.com 1 TPM OVERVIEW Manufacturing & Administrative Excellence. www.tpmquality.com 1 Background of TPM Main manufacturing excellence approach of Toyota and other excellent Japanese companies since the 70 s. TPM

More information

7 Principles of Lean Supplies

7 Principles of Lean Supplies 7 Principles of Lean Supplies Simple changes make a big impact Our thanks to Kimberly-Clark for allowing us to reprint the following article. Lean supplies: a hidden opportunity Lean has transformed manufacturing

More information

Continuous Improvement From Incremental Changes to Monumental Leaps

Continuous Improvement From Incremental Changes to Monumental Leaps Continuous Improvement From Incremental Changes to Monumental Leaps L Y N N M C K E E P r e s e n t a t i o n a t t h e C a l g a r y S o f t w a r e Q u a l i t y D i s c u s s i o n G r o u p S e p t

More information

Building HR Capabilities. Through the Employee Survey Process

Building HR Capabilities. Through the Employee Survey Process Building Capabilities Through the Employee Survey Process Survey results are only data unless you have the capabilities to analyze, interpret, understand and act on them. Your organization may conduct

More information

9/6/2013 WORKING CONDITIONS AND PRACTICES: #1 Goal of any Company? Guiding Questions. Production Goals:

9/6/2013 WORKING CONDITIONS AND PRACTICES: #1 Goal of any Company? Guiding Questions. Production Goals: #1 Goal of any Company? The goal of any organization is to make money. WORKING CONDITIONS AND PRACTICES: Constraints / Barriers to Optimization in any field K. Hall 9 4 13 To increase net profit simultaneously

More information

Tovota Production System: Beyond Large-Scale Production. by Taiichi Ohno

Tovota Production System: Beyond Large-Scale Production. by Taiichi Ohno Tovota Production System: Beyond Large-Scale Production by Taiichi Ohno 1978 Taiichi Ohno is credited with creating the just-in-time production system. He still feels today that the goal of Toyota is to

More information

Internship Overview EX 1. years now. And during this time I have learned a great deal about project management and leadership.

Internship Overview EX 1. years now. And during this time I have learned a great deal about project management and leadership. Internship Overview EX 1 Student Name I have been taking classes towards earning my bachelors in Operations Management for three years now. And during this time I have learned a great deal about project

More information

Website : www.sgsina.ir Mobile: 0918 811 2283

Website : www.sgsina.ir Mobile: 0918 811 2283 Website : wwwsgsinair Mobile: 0918 811 2283 Email: info@sgsinair es_babaee@yahoocom 13920820 System Gostar Sina co(esbabaei) : Improvement 5S Measurement 5S 5S 5S 5S Identify waste 13920820 System Gostar

More information

Focus Conference 2014 Orlando Florida. Angela Lorenzo, MS, RRT, RPFT VA NY Harbor Healthcare System Long Island University

Focus Conference 2014 Orlando Florida. Angela Lorenzo, MS, RRT, RPFT VA NY Harbor Healthcare System Long Island University Focus Conference 2014 Orlando Florida Angela Lorenzo, MS, RRT, RPFT VA NY Harbor Healthcare System Long Island University Desk Set (1957) Desk Set (1957) The computer generated pink slips for every employee

More information

Chapter 11. MRP and JIT

Chapter 11. MRP and JIT Chapter 11 MRP and JIT (Material Resources Planning and Just In Time) 11.1. MRP Even if MRP can be applied among several production environments, it has been chosen here as a preferential tool for the

More information

11/3/2014 9:30 AM - 11:30 AM

11/3/2014 9:30 AM - 11:30 AM Lean & Mean Presented by Cheryl M. Jekiel CM01 11/3/2014 9:30 AM - 11:30 AM The handouts and presentations attached are copyright and trademark protected and provided for individual use only. Ways to become

More information

Brownfield / Greenfield Contrast SPL 3.1

Brownfield / Greenfield Contrast SPL 3.1 Brownfield / Greenfield Contrast SPL 3.1 Joel Cutcher-Gershenfeld Senior Research Scientist, MIT Sloan School of Management and Executive Director, MIT Engineering Systems Learning Center Presentation

More information

The Leadership Pipeline Ram Charan, Stephen Drotter, and James Noel

The Leadership Pipeline Ram Charan, Stephen Drotter, and James Noel The Big Idea The Leadership Pipeline Ram Charan, Stephen Drotter, and James Noel There is a growing need to develop leaders within many corporations. The demand for leaders greatly outpaces the supply.

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

Welcome to the Lean Solutions Webinar

Welcome to the Lean Solutions Webinar November 15, 2005 Welcome to the Lean Solutions Webinar Duplication of this presentation or the parts thereof is prohibited without the official written consent of. Today s presenter Jim Womack, Ph.D.

More information

Strategic Planning for Rural & Small Libraries: Achieving Excellence One Step at a Time

Strategic Planning for Rural & Small Libraries: Achieving Excellence One Step at a Time Gail Santy gsanty@ckls.org Central Kansas Library System Strategic Planning for Rural & Small Libraries: Achieving Excellence One Step at a Time Signs you need a strategic plan: You don t know where you

More information

Lean and agile supply chain

Lean and agile supply chain 13 Lean and agile supply chain Introduction With the real-time access to the Internet and search engines like Google and with the increased global competition, customers have more power than ever before.

More information

How to Initiate and Sustain Lean Process Improvement

How to Initiate and Sustain Lean Process Improvement How to Initiate and Sustain Lean Process Improvement Gary Sheehan, MBA President and Chief Executive Officer Cape Medical Supply, Inc. HOMES Annual Meeting May 19th, 2014 Newport, RI Learning Objectives

More information

IMPLEMENTATION OF LEAN MANUFACTURING PROCESS TO XYZ COMPANY IN MINNEAPOLIS AREA. Kazuhiro Yamashita. A Research Paper

IMPLEMENTATION OF LEAN MANUFACTURING PROCESS TO XYZ COMPANY IN MINNEAPOLIS AREA. Kazuhiro Yamashita. A Research Paper i IMPLEMENTATION OF LEAN MANUFACTURING PROCESS TO XYZ COMPANY IN MINNEAPOLIS AREA by Kazuhiro Yamashita A Research Paper Submitted in Partial Fulfillment of the Requirements for the Master of Science Degree

More information

LEAN MANUFACTURING: THE NEW NORMAL Leaning for Contract Packaging and Contract Manufacturing

LEAN MANUFACTURING: THE NEW NORMAL Leaning for Contract Packaging and Contract Manufacturing LEAN MANUFACTURING: THE NEW NORMAL Leaning for Contract Packaging and Contract Manufacturing K. DONALD THAM, Ph.D., P.Eng. Ryerson University, Toronto, Canada Professor of IE & Internship Coordinator Nulogy

More information